HomeMy WebLinkAbout2017-08-29 Meeting Minutes Engineering Services Committee Meeting Commission Chamber - 8/29/2017
ATTENDANCE:
Present: Hons. Fennoy, Chairman; Hasan, Vice Chairman; Smith and
Frantom, members.
Absent: Hons. Hardie Davis, Jr., Mayor.
ENGINEERING SERVICES
1. Approve and authorize execution of an agreement between Augusta and the
University of Georgia Research Foundation, Inc. Savannah River Ecology
Laboratory (SREL) for the continuation of research and data collection related to
bird activity around the constructed wetland treatment system.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. Fennoy out.
Motion Passes 3-0.
Commissioner
Grady Smith
Commisioner
Sean Frantom Passes
2. Approve the Award of Bid Item 17-147A – Deans Bridge Road MSW Landfill
Phase 3, Stage 1, Cell 3 Earthwork Package for the Environmental Services
Department to Gearig Brothers Civilworks.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. Fennoy out.
Motion Passes 3-0.
Commisioner
Sean Frantom
Commissioner
Grady Smith Passes
3. Consider approval of Change Order No. 1 for WR Toole Engineers, Inc. to
provide Engineering Services for Utilities Department on Fort Gordon.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. Frantom votes No.
Mr. Fennoy out.
Motion Fails 2-1.
Commissioner
Grady Smith
Commissioner
Ben Hasan Fails
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve
reconsidering this
item.
Motion Passes 4-0.
Commissioner
Ben Hasan
Commissioner
Grady Smith Passes
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commisioner Sean
Frantom Passes
4. Consider award of Bid #17-215 to Blair Construction, Inc. for services
associated with construction of the Fort Gordon New Water and Sewage
Connections under the Task Order Program for Infrastructure RFQ #16-178 in
the amount of $799,843.00.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. Fennoy out.
Motion Passes 3-0.
Commisioner
Sean Frantom
Commissioner
Ben Hasan Passes
5. Approve the Memorandum of Agreement (MOA) between the Georgia
Department of Transportation (GDOT) and Augusta Richmond County for the
replacement of 118 roadway lights along Gordon Highway between Skyview
Drive and the Georgia county line for AED.
Item
Action:
Approved
Motions
Motion Motion
Type Motion Text Made By Seconded By Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commisioner Sean
Frantom Passes
6. Discuss renaming the John C. Calhoun Expressway to Veterans Expressway.
(Requested by Commissioner Bill Fennoy)
Item
Action:
Rescheduled
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Defer
Motion to refer this
item back to the next
committee meeting.
Mr. Fennoy out.
Motion Passes 3-0.
Commisioner
Sean Frantom
Commissioner
Grady Smith Passes
7. Motion to approve the minutes of the Engineering Services Committee held on
August 8, 2017.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. Fennoy out.
Motion Passes 3-0.
Commisioner
Sean Frantom
Commissioner
Grady Smith Passes
8. Discuss Policy for cutting vacant lots. (Requested by Commission Bill
Fennoy)
Item
Action:
Rescheduled
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Defer
Motion to refer this
item back to the next
committee meeting.
Mr. Fennoy out.
Motion Passes 3-0.
Commisioner
Sean Frantom
Commissioner
Grady Smith Passes
9. Motion to approve the recommendations as presented herein on behalf of the
Environmental Services Department.
Item
Action:
www.augustaga.gov
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. Hasan votes No.
Motion Passes 3-1.
Commisioner
Sean Frantom
Commissioner
Grady Smith Passes
10. Approve funding of encumbrance carryover from the 2016 Stormwater Budget
for the AED.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Grady Smith Passes
11. Motion to request authorization to proceed with drafting edits to the Augusta,
Georgia code 3-5-95.11 to create a Residential Parking Permit Program.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
Unanimous consent is given to add
this item to the agenda.
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commissioner
William Fennoy Passes
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Attendance 8/29/17
Department:
Presenter:
Caption:
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
AGREEMENT BETWEEN
THE UNIVERSITY OF GEORGIA RESEARCH FOUNDATION, INC.
SAVANNAH RIVER ECOLOGY LABORATORY
AND
AUGUSTA - RICHMOND COUNTY, GEORGIA
Effective, October 1, 2017, the University of Georgia Research Foundation, Inc.,
Savannah River Ecology Laboratory, hereinafter called the “University”, accepts from Augusta -
Richmond County, a political subdivision of the state of Georgia through its Board of
Commissioners, hereinafter called the “Sponsor”, a research grant, the conditions of which are as
follows:
I. Objectives: There are six objectives of this research grant. First, the University will
replace the previously-used aerial surveys with ground-based surveys (via UGA vehicle)
describing the abundance and distribution patterns of waterfowl (ducks, geese, and swans),
wading birds (herons, egrets, ibises, wood storks), other waterbirds (American coots, grebes,
gallinules, cormorants, anhingas, gull species), raptors, and avian species of special interest (bald
eagles, ospreys) using man-made wetlands in the vicinity of Augusta Regional Airport at Bush
Field, hereinafter called the “Airport”. Specifically, this includes only the nearby Messerly
Wastewater Treatment Plant’s artificial wetlands comprised of twelve individual wetland cells.
Surveys of the Merry Land and Investment Company’s Brickyard Ponds will no longer be
included. Second, the University will continue to conduct ground-based bird movement surveys
at both the Airport and the adjacent artificial wetlands. These ground-based surveys are designed
to provide time-and location-specific information regarding the daily patterns of movement,
altitude, and behavior of flocking bird species such as blackbirds and larger-bodied bird species
including waterfowl, wading birds, and birds of prey. Third, the University will continue to
serve as a resource to Airport personnel by providing assistance for the purpose of identifying
birds involved in collisions with aircraft at the Airport and otherwise consulting with Airport
personnel on bird issues. Fourth, the University will continue to examine historical and updated
bird strike data from the Airport to identify patterns that may be associated with the construction
and operation of the artificial wetlands. Fifth, the University will conduct a once-per-week
evening qualitative assessment of blackbird use of the wetlands during October – March to guide
bird harassment efforts conducted by the Sponsor’s bird-harassment team. At the time of these
assessments, University personnel will also provide assistance to the bird-harassment team
members to refine their use of bird-harassment tools. Sixth and finally, the University will
summarize the above data in a manner so as to provide Airport and Augusta Utilities Department
officials useful information for identifying potential bird hazards in the vicinity of the Airport,
guiding bird control efforts, and gauging the effectiveness of bird control measures over time.
II. Programs: The principal contractor/investigator, Robert A. Kennamer, Savannah River
Ecology Laboratory, will direct the programs. The contractor/investigator will be assisted by
certain technical consultants. Commitments as to the extent of the obligations of this investigator
2
will be the responsibility of the investigator, within the scope of the work plans approved by the
Sponsor. Work plans for accomplishing each of the objectives listed above are attached.
III. Funds: (a). For the work accomplished by the University during the grant period from
October 1, 2017 – September 30, 2018 (total cost - $87,682), the Sponsor will pay the University
$87,682 upon submission of periodic invoices and upon receipt of evidence approved by the
Sponsor that the work programs are progressing. Budgets for the research programs are attached.
(b). If this research grant is terminated prior to the end of the grant period, payments by
the Sponsor shall be provided based on the actual incurred and/or obligated expenditures as of
the date of termination.
(c). Expenditures shall be made at the discretion of the principal investigator in
conformity with the approved budgets and work plans and in relation to the fiscal policies of the
University.
IV. Liability: To the extent provided by Georgia law, each party agrees to be responsible
for any and all liability including claims, demands, losses, costs, damages, and expenses of every
kind and description, or damages to persons or property, arising out of or in connection with, or
occurring during the course of this contract, where such liability is founded upon or grows out of
the acts or omissions of any of the officers, employees, or agents of the party. The University
assumes no responsibility for its interpretation of the data collected under these studies, with
regard to aircraft accidents occurring as the result of bird strikes at the Airport.
V. Reports: The principal investigator will submit eight (8) copies of a final report to the
Sponsor on November 1, in the year of the investigation’s completion, covering all aspects of
these investigations, in accordance with the conditions defined in the work plan agreed to by the
University and the Sponsor. Interim presentations summarizing the results to date of the study, as
described above, may be provided to the Sponsor if requested.
VI. Records: The University agrees to abide by the Office of Management and Budget 2
CFR 200 in regard to accounting for staff workloads.
VII. Publications: (a). The University shall have freedom of publication of the research
conducted under this contract.
(b). All manuscripts written for publication will be a collaborative effort between the
principal investigator and a designee of the Sponsor. In the event that no Sponsor collaborator is
designated, the Sponsor will be provided two (2) courtesy copies of any manuscripts written by
the principal investigator prior to publication.
(c). In the event that the Sponsor elects to provide data collected by the University under
this research program to a third party for publication purposes, the principal investigator shall
have the following options in regard to such publications: (1) The principal investigator and/or
other University staff involved in the work may choose to be co-author(s) of the publication,
with editorial privileges and/or (2) The principal investigator shall be allowed the option of
having a disclaimer appear in the publication claiming no responsibility for the use and
interpretation of data collected by the University.
VIII. Duration: (a). The period of performance shall be from October 1, 2017 –
September 30, 2018.
3
(b). This research grant may be terminated at any time upon 30 days written notice by
either party.
(c). The contract covering these research programs shall be renewable on an annual basis
upon agreement of both the Sponsor and the University.
IX. Equal Opportunity Employment: During the performance of this contract, the
University/Contractor agrees not to discriminate in its employment practices or subcontracts with
regard to race, color, sex, age, religion, national origin or disability.
X. Inventions: Investigators/Contractors shall comply with the stipulations of P.L.96-517.
——————————————————————————————————
PRINCIPAL CONTRACTOR/INVESTIGATOR
BY: DATE:
Robert A. Kennamer,
Research Professional I (Savannah River Ecology Laboratory)
——————————————————————————————————
UNIVERSITY OF GEORGIA RESEARCH FOUNDATION, INC.
BY: DATE:
Dr. David C. Lee,
Vice President for Research and Associate Provost
——————————————————————————————————
AUGUSTA - RICHMOND COUNTY
BY: DATE:
Hardie Davis, Jr.
Mayor
Attest:______________________________
Clerk of Commission
4
General Scope of Work
for a Bird Study at Augusta Regional Airport at Bush Field
and Messerly Wastewater Treatment Plant Constructed Wetlands Project
While always endeavoring to effectively monitor bird populations that may or may not
pose a hazard to air traffic operations, Savannah River Ecology Laboratory (SREL) at this time
intends to discontinue aerial survey coverage of: (1) the artificial wetlands (i.e., Constructed
Wetlands Project) constructed to process effluents from the Messerly Wastewater Treatment
Plant, and (2) the Merry Land and Investment Company Brickyard Ponds. The decision to
discontinue aerial bird surveys at this time is based upon results from more than 600 previous
aerial surveys (1998–2017) of these areas and other programmatic ground-based surveys,
together indicating that distributions and movements of heavily-bodied birds such as geese, other
waterfowl, and wading birds using these wetlands in the vicinity of Bush Field Airport have not
posed a particular concern from the perspective of a potential aircraft-bird strike hazard. In the
place of these aerial surveys, SREL will broaden the program of ground-based counts (described
below) at the Constructed Wetlands Project by counting these heavy-bodies bird species from a
vehicle visiting each of the twelve Constructed Wetlands Project cells on a twice-monthly basis.
If warranted, due to a perceived increase in the threat of aircraft strikes with such large-bodied
birds, SREL may consider resuming a program of aerial surveys to include the Constructed
Wetlands Project and Merry Land Brickyard Ponds in future contracts.
While discontinuing aerial surveys as described above, SREL also will continue ground-
based bird movement surveys at both the airfield and the adjacent constructed wetlands. These
ground-based surveys are designed to provide time- and location-specific information regarding
the daily patterns of movement, altitude, and behavior of the larger-bodied bird species including
waterfowl, wading birds, and birds of prey, as well as flocking blackbirds. This specific
information will provide the type of detail that will allow airport management and flight
controllers to continue to predict times, locations, and conditions of increased bird-strike hazard
potential that would be of particular consequence to aircraft in the area. Furthermore, with the
habitat alterations now being implemented at the artificial wetlands during fall/winter (i.e.,
airboat crushing of vegetation) and with active bird dispersal activities (e.g., pyrotechnics, or
acoustics) now being used at the airfield and the artificial wetlands, these ground-based bird
movement surveys have the further importance of helping to evaluate the effectiveness of these
techniques and identifying any new problematic bird movement patterns that might be created by
such bird disturbances.
This contract period will also include a series of qualitative assessments of blackbird use
of the entire artificial wetlands and surrounding tree-line that will be used to guide the bird
harassment activities conducted there. Particular areas within the wetlands harboring relatively
large numbers of roosting blackbirds will be identified before, during, and after Augusta Utilities
Department vegetation crushing by airboats. The results from these once-per-week assessments
(conducted from October through March) will be communicated to the bird-harassment team so
that optimizing adjustments can be made quickly to the bird harassment activities. These same
evening visits to the wetlands will also be used to meet with the Sponsor’s bird-harassment team
members to train and refine their use of all the tools they have to work with, including the Avian
Dissuader laser and various pyrotechnic/launcher devices. These qualitative assessments will
5
further be used in the decision-making process to determine if and when vegetation crushing by
airboats will need to be carried out.
In addition to bird surveys described above, the SREL principal investigator and/or
technical consultants supported under this contract will act as an avian information resource by
providing professional consultation to the Sponsor’s bird-harassment team and Bush Field
Airport personnel with regard to bird issues, including help in identifying the remains and/or
photographs of any birds involved in aircraft strikes in the vicinity of Bush Field or in the
effective use/deployment of bird-harassment techniques (e.g., sound, lasers, pyrotechnics, etc.)
that may be used. Additionally, Senior Ecologist Emeritus and former co-investigator on this
project, Dr. I. Lehr Brisbin, Jr., will remain available for Sponsor consultations and meetings
with airport personnel as an unpaid contribution to the effort.
In order to keep the cost of this work as low as possible, SREL will continue to provide
an annual report to Augusta that is similar in detail to the previous year’s (2017) version that
includes a comprehensive, yet simplified approach of summarizing the results primarily in
tabular and graphical form (excluding detailed statistical analyses), with an accompanying
Executive Summary explaining the meaning and importance of the data that have been collected.
The SREL principal investigator and/or technical consultants will be available however to
verbally discuss the findings with Augusta Utilities Department and Bush Field officials,
including the Wildlife Control Specialist, as necessary. This approach will continue to be the
most cost-effective in terms of directing a greater proportion of the overall budget to personnel
who are involved directly with the collection and reporting of critical data.
Specific details for carrying-out the research programs of this study ([I] conducting
ground-based bird-movement surveys, [II] conducting qualitative assessments of roosting
blackbirds in the Constructed Wetlands Project with bird-harassment techniques refinement) are
provided in the two individual scope of work plans that follow. Separate budgets for each of the
two major study components are also provided.
6
RESEARCH PROGRAM I :
Scope of Work for Ground-Based Bird-Movement Surveys
at the Augusta Regional Airport at Bush Field and
the Constructed Wetlands Project
(12 months, beginning October 1, 2017)
Based on previous aerial surveys of bird abundance and distribution in wetlands near the
Augusta Regional Airport at Bush Field, relatively large numbers of large-bodied aquatic birds
are found in the area, particularly during the winter period when migratory waterfowl are most
abundant. In addition to the many waterfowl found in the area, numerous wading birds, divers
including cormorants and anhingas, blackbirds, gulls, and raptors including vultures are known
to frequent the area as well. Wetlands near Bush Field harboring the majority of these birds
include the Merry Land and Investment Company Brickyard Ponds and the Constructed
Wetlands Project of the Messerly Wastewater Treatment Plant. Based on previous ground-based
bird-movement surveys, extremely large numbers (in the millions) of migrant blackbirds may
move through airspace in the vicinity of Bush Field and the Constructed Wetlands Project in the
fall/winter period on a twice-daily basis. These blackbirds, in particular, have created an annual
period of increased hazardous conditions to aircraft operating in the area.
SREL personnel will continue to collect ground-based bird data to determine daily
behavior and movement patterns (i.e., timing, directions, altitudes) of birds moving through the
airspaces of Bush Field and the Constructed Wetlands Project. Emphasis will be placed on
documentation of movements of flocking bird species such as blackbirds and large-bodied bird
species such as waterfowl that are most likely to produce serious consequences when involved in
collisions with aircraft. In the absence of aerial surveys in this contract period, SREL intends to
broaden the program of ground-based counts at the Constructed Wetlands Project by counting
these heavy-bodies bird species from a vehicle by visiting each of the twelve Constructed
Wetlands Project cells on a twice-monthly basis.
Bird movements will be documented from routinely-monitored ground stations at Bush
Field and the Constructed Wetlands Project. Stations selected at Bush Field (3) and at the
Constructed Wetlands Project (1) in December 2001 will continue to be used to ensure adequate
coverage of the areas of interest. The daylight hours will be divided into four approximately
equal time blocks: (1) 15 minutes before sunrise until 9:00AM, (2) 9:01AM until 12:00PM, (3)
12:01PM until 3:00PM, and (4) 3:01PM until 15 minutes after sunset (Eastern Standard Times;
one hour added when Eastern Daylight Saving Time is in use). Emphasis will be placed on the
time blocks coinciding with sunrise and sunset, because most bird movements occur during these
times of the day. Observations will be made at two different stations within two different time
blocks daily, for two days each week, for four weeks each month of the study. This methodology
allows for all possible combinations of the four locations and the four time blocks to be chosen
monthly in a randomized design. Observations will be made over a 2.5 hr period and will consist
of four 30-minute observation bouts with a 10-minute lapse between each observation period.
Observations will be initiated at the beginning of a time block with the exception of the last time
block, which will be timed so that the final 30-minute observation bout ends approximately 15
7
minutes after sunset. During the observation bouts, observers will scan the 360o horizon with
binoculars, attempting to collect data on as many flying birds as possible with no upper limit on
distance from the observer. Short movements by birds (<100m) or movements by small
passerine birds in flocks of less than 20 birds will not be recorded. Emphasis will be placed on
movements of waterfowl (ducks and geese), wading birds (herons, egrets, ibises, wood storks),
other large and/or flocking waterbirds (coots, cormorants, anhingas, gull spp., blackbird spp.),
and raptors (hawks, kites, vultures, bald eagles, ospreys). During times of intense movements,
observers will give priority to larger birds and larger flocks. Observations will be conducted
regardless of weather conditions. In addition to meteorological data, the following data will also
be recorded for each observation: time, species, actual or estimated number of individuals,
approximate distance from the observer, approximate direction from observer, estimated altitude
above land or water, approximate direction of bird movement, and flight behavior (e.g., level
flight, soaring, landing, taking-off).
Data will be stored on a networked PC-workstation operating in a Microsoft-Windows
environment. Upon project completion, all data will be provided to the Sponsor in a mutually
agreeable database format (e.g., Microsoft Excel). For the purposes of electronic data storage and
summarization, bird movement data from Bush Field and the Constructed Wetlands Project will
be retained according to each of four observational stations. Data summaries will be performed
using the Statistical Analysis System and/or JMP Pro 10 (SAS Institute, Inc.). Summaries will be
made for each observation station and will be comprised of avian species movement patterns
including timing and direction of flight, flight altitudes, and temporal (annual and seasonal)
changes in bird movement patterns.
As a part of this Research Program, the SREL principal investigator and/or technical
consultants will act as an avian information resource by providing professional consultation to
Bush Field Airport personnel with regard to bird-strike issues, including help in identifying the
remains and/or photographs of any birds involved in aircraft strikes in the vicinity of Bush Field
or in the effective use/deployment of bird-harassment techniques (e.g., sound, lasers,
pyrotechnics, etc.) that may be used.
8
RESEARCH PROGRAM II :
Scope of Work for Conducting Qualitative Assessments
of Roosting Blackbirds in the Constructed Wetlands Project
with Bird-Harassment Techniques Refinement
(6 months, beginning October 1, 2017)
Based on previous ground-based surveys of bird abundance and movements in
and around the Constructed Wetlands Project of the Messerly Wastewater Treatment Plant
(WTP) near the Augusta Regional Airport at Bush Field, blackbirds numbering into the millions
have been shown to roost at night within and adjacent to the Constructed Wetlands where they
use the standing vegetation of the wetland cells as a roosting substrate. This behavior is
particularly notable in the fall/winter months (November–February) when migratory blackbirds
frequent the area. Fall crushing of standing vegetation in the entire Constructed Wetlands was
first used as a successful habitat alteration for dissuading use of the wetlands by roosting
blackbirds in November and December 2008, and the process was continued again in 2009
through 2016, each time successfully removing the blackbird roost. This vegetation crushing will
be carried out once again as early as mid-October in 2017 by contractors working for the
Augusta Utilities Department. Although not necessary in past years, multiple airboat crushing
events in the same fall/winter may be required to maintain the desired vegetation alteration and
thus keep roosting blackbird numbers in check as the season progresses, so insight as to
whether/when vegetation re-crushing is needed will be valuable. In addition to altering habitat as
a bird deterrent, the WTP operator prior to December 31, 2009, Operations Management
International (OMI), Inc., first assembled a bird-harassment team in late 2008 to begin actively
engaging the roosting blackbirds with the aid of propane cannons and other pyrotechnic/acoustic
devices. Since January 1, 2010, operations of the WTP have been assumed by Environmental
Services Group (ESG), Inc. and they have provided a bird-harassment team to continue the bird
abatement program. As in 2009 through 2016, and with a continued desire to develop the
activities of the bird-harassment team, SREL personnel will again make qualitative assessments
of numbers of roosting blackbirds in the fall/winter of 2017-18 at all wetland cells and the
surrounding tree-line that will be used to guide and coordinate the activities of the bird-
harassment team. These same qualitative assessments will further be used in the decision-making
process to determine whether/when vegetation re-crushing by airboats will need to be carried
out. Additionally, SREL personnel will work with the bird-harassment team as needed to
increase basic bird knowledge and provide further training and refinement in their use of bird-
harassment tools.
During this contract period, once-per-week visits to the Constructed Wetlands will be
made from October through March. Since blackbirds roosting in the wetland cells arrive in the
evening and depart at dawn, the assessments will concentrate on the evening arrival period.
Observations will be conducted from 30 minutes before sunset until 30 minutes after sunset
(Eastern Standard Times). Each evening while at the Constructed Wetlands, SREL personnel
will qualitatively examine blackbird use of all wetland cells and the surrounding tree-line while
traversing the site in a vehicle, noting areas of high-density bird-use and prioritizing areas for the
concentration of bird harassment activities. SREL personnel will communicate the findings of
9
these assessments within 24-hours to designated ESG and/or Augusta Utilities Department
personnel via e-mail (primary) or voice communication (secondary). SREL personnel will also
assemble the communications/assessments made over the course of the 6-month period into a
text record (pdf file) for inclusion with annual final report documents. SREL personnel will also
coordinate to meet with bird-harassment team members while at the Constructed Wetlands as
needed for the purpose of general consultation on matters related to wetlands and birds,
improving basic knowledge of bird identification/behavior, and providing training/refinement in
the use of such devices as the Avian Dissuader laser, propane cannons, and various
pyrotechnic/launcher devices.
Under this agreement, SREL personnel will only be responsible for conducting the
assessments of bird use of the artificial wetlands and offering refinement of bird-harassment
techniques associated with this scope of work. SREL will not assume responsibility for
conducting the vegetation crushing or any other type of vegetation alteration. Costs and logistics
for conducting the vegetation alteration and costs associated with bird-scaring devices and the
actual bird harassment will be the responsibility of the Sponsor.
10
RESEARCH PROGRAM I :
Budget for Ground-Based Bird-Movement
Surveys at the Augusta Regional Airport at Bush Field
and the Constructed Wetlands Project
(12 months, beginning October 1, 2017)
Personnel costs, including benefits
R.A. Kennamer (PI; Research Professional, 32% FTE)
Salary: $17,002 Benefits @ 13%: $2,210 $19,212.00
M. Oberkircher (Research Technician, 70% FTE)
Salary: $19,934 Benefits @ 66%: $13,156 $33,090.00
Vehicle expenses $ 2,500.00
RESEARCH PROGRAM II DIRECT COSTS $54,802.00
UGA/SREL INDIRECT COSTS (@ 34%) $18,633.00
RESEARCH PROGRAM II: TOTAL $73,435.00
11
RESEARCH PROGRAM II :
Budget for Conducting Qualitative Assessments
of Roosting Blackbirds in the Constructed Wetlands Project
with Bird-Harassment Techniques Refinement
(6 months, beginning October 1, 2017)
Personnel costs, including benefits
R.A. Kennamer (PI; Research Professional, 8.0% FTE)
Salary: $4,251 Benefits @ 13%: $553 $ 4,804.00
M. Oberkicher (Research Technician, 10% FTE)
Salary: $ 2,848 Benefits @ 66%: $ 1,880 $ 4,728.00
Vehicle expenses $ 1,000.00
Expendable supplies $ 100.00
RESEARCH PROGRAM III DIRECT COSTS $10,632.00
UGA/SREL INDIRECT COSTS (@ 34%) $ 3,615.00
RESEARCH PROGRAM II: TOTAL $14,247.00
RESEARCH PROGRAM I: TOTAL (from page 12) $73,435.00
GRAND TOTAL: $87,682.00
Prepared by: Robert A. Kennamer
The University of Georgia
Savannah River Ecology Laboratory (803) 725-0387
P.O. Drawer E, Aiken, SC 29802 rkennamer@srel.uga.edu
Engineering Services Committee Meeting
8/29/2017 1:15 PM
2017-2018 Agreement Between Augusta and Savannah River Ecology Laboratory
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Approve and authorize execution of an agreement between
Augusta and the University of Georgia Research Foundation, Inc.
Savannah River Ecology Laboratory (SREL) for the continuation
of research and data collection related to bird activity around the
constructed wetland treatment system.
Background:In the late 1990's Augusta negotiated an agreement with the
Federal Aviation Administration (FAA) to allow the Utilities
Department to continue to develop the constructed wetland
treatment system which follows the James B. Messerly Water
Pollution Control Plant. One of the conditions of that agreement
is that Augusta will monitor the activity of birds in the vicinity of
the constructed wetland and the Augusta Regional Airport in order
to insure there is no adverse impact on airport operations due to
the wetland construction. Augusta has enlisted the services of the
Savannah River Ecology Laboratory to conduct this monitoring as
a research program funded by the Utilities Department. The
proposed program for this includes activities which are designed
to study the effects of methods used to reduce the attractiveness of
the wetland system to certain types of birds during the migratory
season. The total cost of the proposed research program for this
year is $87,682.00.
Analysis:The research program to date has yielded important data to
support the development of the constructed wetland system at the
current location. Continued monitoring of the bird activity and
development of additional data will provide valuable information
about the effectiveness of wildlife management activities as well
as document the continued beneficial use of the wetlands as a
wildlife habitat.
Financial Impact:The total cost of the proposed research program for 2017-2018 is
$87,682.00. Three additional years would not exceed $110,000.00
per year.
Alternatives:1) Approve the program for just one year, 2) discontinue the
research program, or 3) negotiate a scaled-back program at a
lower cost.
Recommendation:We recommend that the proposed research program be approved
and executed by the Mayor on behalf of Augusta. We further
recommend that this program be extended for an additional 3
years at a maximum annual cost of $110,000.00. The cost and
scope of the program would be negotiated annually by the Utilities
Department based on the results of the previous year's research. If
the negotiated cost exceeds $110,000.00 in any year the agreement
would be brought back to the Commission.
Funds are Available
in the Following
Accounts:
506043310-5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Invitation to Re-Bid
Sealed re-bids will be received at this office until Tuesday, July 25, 2017 @ 3:00 p.m. for furnishing:
Re-Bid Item #17-147A Deans Bridge Road MSW Landfill Phase 3, Stage 1, Cell 3 Earthwork Package for Augusta, GA -
Environmental Services Department
Re-Bid documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605,
Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime contractors, subcontractors and
suppliers exclusively from ARC. The fees for the plans and specifications which are non-refundable are $125.00.
It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the
Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC Southern (706 821-0405)
beginning Thursday, June 15, 2017. Bidders are cautioned that submitting a package without Procurement of a complete set
are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is
material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other
source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving
incomplete or inaccurate information upon which to base his qualifications.
A Mandatory Pre Bid Conference will be held on Friday, July 7, 2017 @ 10:00 a.m. in the Procurement Department, 535
Telfair Street, Room 605.
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the
office of the Procurement Department by July 11, 2017 @ 5:00 P.M. No re-bid will be accepted by fax, all must be received
by mail or hand delivered.
No re-bid may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of contract
with the successful bidder. A 10% Bid Bond is required to be submitted along with the bidders’ qualifications; a 100%
performance bond and a 100% payment bond will be required for award.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications
prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies
needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement
Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director.
All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate
committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the
outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department
is not advisable. Acquisition of RE-BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete
or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle June 15, 22, 29, July 6, 2017
Metro Courier June 21, 2017
Revised: 2/2/2016
OFFICIAL
VENDORS Attachment
"B"E-Verify SAVE
Form
Bid
Bond
Addendum
1 Base Bid Total
Gearig Brothers
Civilworks, LLC
322 Grimade Boulevard
Grovetown, GA 30813
YES 226337 YES YES YES $4,308,561.90
Cooper, Barnette, & Page
1928 Executive Park Drive
Stathom, GA 30666
YES 153674 YES YES YES $4,966,177.06
Peed Bros., Inc.
PO Box 2398
Butler, GA 31006
YES 349653 YES YES YES $5,446,040.90
Total Number Specifications Mailed Out: 18
Total Number Specifications Download (Demandstar): 4
Total Electronic Notifications (Demandstar): 36
Mandatory Pre-Bid Attendees: 12
Total packages submitted: 3
Total Noncompliant: 0
The following vendors did not respond:
Shamrock Environmental Corp. / 6106 Corporate Park Drive / Browns Summit, NC 27214
Comanco / 4301 Sterling Commerce Drive / Plant City, FL 33566
Bid Item #17-147A
Deans Bridge Road MSW Landfill Phase 3, Stage 1, Cell 3 Earthwork Package
for Augusta, Georgia-Environmental Service Department
Bid Date: Tuesday, July 25, 2017 @ 3:00 p.m.
Page 1 of 1
ENVIRONMENTAL SERVICES DEPARTMENT
Lori Videtto
Interim Director
MEMORANDUM
TO:
FROM:
DATE:
Geri Sams
Director - Procurement
Lori Vidett" \ ()1,
Interim DirectH
August 4,2017
SUBJECT: Bid Item l7-l4T[Deans Bridge Road MSW Landfill Phase 3, Stage 1, Cell3
Earthwork Package - Award Recommendation
In response to Bid ltem#17-147A Deans Bridge Road MSW Landfill Phase 3, Stage l, Cell 3 Earthwork
Package, (3) compliant bids were received. Each submission was evaluated by Procurement, Compliance,
and the Environmental Services Department per the criteria in the bid and submittal requirements. Based
on the evaluation process, it is our recommendation to award the bid to Gearig Civil Works, the lowest
responsive and responsible bidder.
Thank you in advance for your time and attention. Please feel free to contact me at 706-592-3206, should
you have any questions or require any additional information.
LY/tgh
Attachment
Cc: Nancy Williams
Phyllis Johnson
File
Environmental Services Department
4330 Deans Bridge Road, Blythe, GA 30805
(706) s92-3200 - Fax (706) s92-325s
WWW.AUGUSTAGA.GOV
J
9tLILo
o
oCDoo-
q,oGJoGo.
.v,oci9.EEtt
.E 8Eopci
-soE !tI-(J.Y6$.Eo+ glo r-EgEE+(,, ts.'
E"tgRs3:eErE i =EE'< -'.ET E io=lu GotE I !t6t.= o- E g16,6G!=EJEFxo.g
=-goi 9pA oroe:(,EttoEeEooEGoo
t
inG
o!
EMPtF
EE{
EE E*c oo-=ox;;o o i $c.,cc;o...9.9EEs
EEe€E.!E !E'E < E.!..,
E H-:EHEoo,Y).li,o.LLCYOtrE P g'I P6
EEEBiEzzl.J.Jfr o-z
---!t--c66-G6o o os o ot-FF>FF
GoFp
@
o6G@
o6l
(O
ro-
G'o(v)+g
(Oo
l-t\
d@o,+e
ooloto-
@\f{dG
E,!t-o!t
tt,uJ o
uJ
ttt
EI
EE oIIJ
o
lrJ
t,uJ
uJr>ts<ocl, lL
tt,
UJ
o
uJ
@
IJJ
Eo
IJJ
N(r,a)(oGIN
t
(o4.,(t
(a(,
@C')t(v,
EIErTPIE
at,
UJ
o
uJ
o
UJ
otooz
UJ
Pt;H;T6
BE i
.slE 6
g$3
sl86
"-feoo-(o
E gB
EEg
gHf
(ogt
="t E8Rt6 rI!o-gEoE
cL
oQ ort
f;Ef;E{qrc 6tz.9r-r'rg'EcG=rrJbE-v o- ,xt b;E()tr
ES E(,).iao
o
o
a,t)(,F(o
=(oE6Od)o 0.,gd
9b9EXo
,qEs
Landserver
2831 Carwell Road
Richmond, VA 23234
Attn: Larry Bowman
Lewis Contracting Services
Attn: David White
457 Flat Shoals Ave. SE, Suite 2
Atlanta, GA 30316
Environmental Specialties
7943 Pecue Lane Suite A
Baton Rouge, LA 70809
Attn: Debra Clark
Gearig Brothers Civilworks
322 Grimaude Blvd
Grovetown, GA 30813
Garnto Southern Construction
4811 Clark Drive
Evans, GA 30809
Peed Brothers
42 Industrial Road
Butler, GA 31006
Cooper Barnette Page
Environmental
1928 Executive Park Dr., Suite A
Statham, GA 30666
Phillips & Jordan
2500 Fairfax Rd., Suite 101D
Greensboro, NC 27407
RETURNED MAIL
Camanco
4301 Sterling Commerce Dr
Plant City, FL 33569
T & K Construction
235 County Road 1242
Vinemont, AL 35179
Southeast Environmental
5567 Val Del Road
Hahira, GA 31632
L-J
220 Stoneridge Dr., Suite 405
Columbia, SC 29210
Reeves Construction
Attn: Greg Hamilton
1 APAC Industrial Way
Augusta, GA 30907
Terra Excavating, LLC
Attn: Tonya Yost-Hudges
1760 Gordon Highway
Augusta, Ga 30904
Beam’s Contracting
Attn: Buddy Rowland
15030 Atomic Road
Beech Island, SC 29842
Strack, Inc.
125 Laser Industrial Court
Fairburn, GA 30213
Richardson Construction Co
Attn: Bobby Richardson
6806 Monticello Rd.
Columbia, SC 29203
C. A. Murren & Sons
Attn: Vlad Volfson
2275 Loganville Hwy.
Grayson, GA 30017
Bid Item #17-147A
Deans Bridge Road MSW Landfill
Phase 3, Stage 1, Cell 3 Earthwork
For Environmental Services
Mailed Out 07/15/17
Bid Item #17-147A
Deans Bridge Road MSW Landfill
Phase 3, Stage 1, Cell 3 Earthwork
For Environmental Services
Bid Due: Tue. 07/25/17@ 3:00 P.M.
Lori Videtto
Environmental Services
Kellie Irving
Compliance Department
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Approve the Award of Bid Item 17-174A – Deans Bridge Road MSW Landfill Phase 3, Stage 1, Cell 3
Earthwork Package for the Environmental Services Department to Gearig Brothers Civilworks.
Department:Environmental Servcies
Presenter:
Caption:Approve the Award of Bid Item 17-147A – Deans Bridge Road
MSW Landfill Phase 3, Stage 1, Cell 3 Earthwork Package for the
Environmental Services Department to Gearig Brothers
Civilworks.
Background:The Augusta Landfill is in the preparation stages for the
construction of the next landfill cell. In order to do so, the area
planned and approved for the next stage of construction needs to
be excavated and properly graded. As such, Augusta placed for
bid the landfill “Earthwork” package which involves the hiring of
a contractor to provide all labor, materials, tools, equipment, and
services to complete approximately 750,000 cubic yards of soil
excavation, 486,000 cubic yards of structural fill placement
264,500 cubic yards of stockpile fill placement. In addition, this
work requires the construction of storm water drainage systems,
concrete ditch, sediment ponds, and various erosion and
sedimentation control items.
Analysis:The project was placed for bid, and three vendors were considered
compliant and responsive. Gearig Brothers Civilworks was the
lowest responsible bidder, and met all of the Procurement
Department and Compliance Department requirements; including
the required 5% LSBOP documentation.
Financial Impact:The price as received in the bid submission is $4,308,561.90.
Funds are available in ESD account number 541 00 0000/13-
36110.
Alternatives:Do not award the work described in Bid Item 17-147A to Gearig
Brothers Civilworks.
Recommendation:Award the work described in Bid Item 17-147A to Gearig
Brothers Civilworks.
Funds are Available
in the Following
Accounts:
The price as received in the bid submission is $4,308,561.90.
Funds are available in ESD Fund Balance - account number 541
00 0000/13-36110.
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
CONTRACT CHANGE ORDER
CO NUMBER 01
BID ITEM 13-124
DATE 7/10/16
PROJECT TITLE Engineering Services for Utilities Department on Fort Gordon
ORIGINAL CONTRACT DATE 11/9/16 PROJECT NUMBER FG_2016-49
OWNER AUGUSTA, GEORGIA PO NUMBER P313469
The following change is hereby made to the contract for the above project:
Description of Change (for a more detailed description see attached proposal):
Add funds in the amount of $200,000.00 to the contract, in order to continue WR Toole Engineers on-call
engineering services for AUD on Fort Gordon
PAYEE W.R. Toole Engineers, Inc.
TOTAL AMOUNT OF THIS CHANGE ORDER $ 200,000.00
The contract time will NOT be INCREASED as determined by assigned work tasks.
ORIGINAL CONTRACT AMOUNT $ 300,000.00
PREVIOUS CHANGE ORDER (INCREASE) $ 0.00
THIS CHANGE ORDER (INCREASE) $ 200,000.00
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 500,000.00
FUNDING NUMBER/ACCOUNT NUMBER 507043490 5212115
88888888 5212115
PROPOSED BY:
DATE:
CONSULTANT
REQUESTED BY: DATE:
PROJECT MANAGER
SUBMITTED BY: DATE:
DEPARTMENT HEAD
FINANCE ENDORSEMENT: DATE:
COMPTROLLER
RECOMMENDED BY:
DATE:
ADMINISTRATOR
APPROVED BY: DATE:
MAYOR
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Change Order for Engineering Services for Utilities Department on Fort Gordon
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Consider approval of Change Order No. 1 for WR Toole
Engineers, Inc. to provide Engineering Services for Utilities
Department on Fort Gordon.
Background:Fort Gordon is undergoing massive growth. Construction and
renovation projects are planned throughout the post for the Army
Cyber Command, NSA, AIT Complex, DDEAMC and various
other associated military units. In addition, the Fort Gordon
community facilities, such as Post Exchange, MWR, and housing
units, have projects underway or planned in support of the growth.
Augusta Utilities Department (AUD) is the contracted water,
sanitary sewer, and irrigation utility provider for Fort Gordon.
AUD not only operates and maintains these systems, but must also
plan and construct system expansions to meet Fort Gordon’s
growth. Additional engineering support is needed to meet these
increasing utility requirements, which Fort Gordon sometimes
makes on short notice.
Analysis:W.R. Toole Engineers, Inc. is currently providing on-call
engineering services for AUD on Fort Gordon to meet these
needs. This has enabled AUD to respond better and more quickly
to Fort Gordon. AUD has assigned seven tasks to WR Toole,
which commits $280,145 .00 of the $300,000.00 contract amount.
In order to continue WR Toole’s on-call services, AUD requests
approval of Change Order No. 1 to add $200,000.00 to their
contract.
Financial Impact:$200,00.00 funding is available from the following accounts:
507043490-5212115 / 88888888-5212115.
Alternatives:No alternatives are recommended.
Recommendation:Recommend approval of Change Order No. 1 to add $200,000 to
the contract with WR Toole Engineers to provide engineering
services for AUD on Fort Gordon.
Funds are Available
in the Following
Accounts:
Funds are available in the following accounts: 507043490-
5212115 / 88888888-5212115.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Invitation to Bid
Sealed bids will be received at this office until Friday, July 14, 2017 @ 11:00 a.m. for furnishing:
Bid Item #17-215 2017 Fort Gordon New Water and Sewer Connections Project – Task Order – for Augusta Utilities
Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Bid documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605,
Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers
exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable are $20.00.
It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner
is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706-722-6488)
beginning Tuesday, June 27, 2017. Bidders are cautioned that submitting a package without Procurement of a complete set are
likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to
the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not
advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate
information upon which to base his qualifications.
A Mandatory Pre Proposal Conference will be held on Friday, June 30, 2017 @ 10:00 a.m. in the Procurement Department, 535
Telfair Street, Room 605.
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the
office of the Procurement Department by Thursday, July 6, 2017 @ 5:00 P.M. No bid will be accepted by fax, all must be received
by mail or hand delivered.
No proposal may be withdrawn for a period of sixty (60) days after RFPs have been opened, pending the execution of contract with
the successful vendor. A 10% Bid Bond is required to be submitted along with the bidders qualifications; 100% performance bond
and a 100% payment bond will be required for award.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications
prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies
needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement
Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director.
All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate
committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the
outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department
is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or
inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
GERI A. SAMS, Procurement Director
Cc: Louis Brazzell Deputy Administrator
Tom Wiedmeier Utilities Department
Stanley Aye Utilities Department
Revised: 2/19/2016
Blair Construction Co. Inc.
4308 Evans to Lock Road
Evans, GA 30809
Beam’s Contracting
2335 Atomic Road
Beach Island, SC 29842
Jamco Civil
953 Ralph David
Atlanta, GA 30310
Bid Item# 17-215 2017 Fort Gordon
New Water and Sewer Connections
Project- Task Order for Augusta Utilities
Department
Bid Due: Friday, 7/14/2017
Bid Item# 17-215 2017 Fort Gordon
New Water and Sewer Connections
Project- Task Order for Augusta
Utilities Department
Bid Mailed: Thurs 6/22/2017
Bid Item# 17-215 2017 Fort Gordon
New Water and Sewer Connections
Project- Task Order for Augusta Utilities
Department
Bid Due: Friday, 7/14/2017
Bid Item# 17-215 2017 Fort Gordon
New Water and Sewer Connections
Project- Task Order for Augusta Utilities
Department
Bid Mailed: Thurs 6/22/2017
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Fort Gordon New Water and Sewage Connections
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Consider award of Bid #17-215 to Blair Construction, Inc. for
services associated with construction of the Fort Gordon New
Water and Sewage Connections under the Task Order Program for
Infrastructure RFQ #16-178 in the amount of $799,843.00.
Background:This project will provide water and sewage connections on Fort
Gordon. The project will consist of multiple connections of
various sizes, and installation of up to 6900 LF of sewer main and
4900 LF of water main. Some connections to the existing
infrastructure will be upgraded and some connections will be for
new infrastructure throughout the post.
Analysis:Blair Construction, Inc. submitted an acceptable bid package and
was the lowest responsive bidder. The Utilities Department
reviewed the bid and find it to be fair and reasonable. We
recommend awarding this contract to Blair Construction, Inc.to
construct the Fort Gordon New Water and Sewage Connections
under the Task Order Program for Infrastructure RFQ #16-178.
Financial Impact:Funding is available in the amount of $799,843.00 under account
number 507043490-5425410 / 88886666-5425410.
Alternatives:No alternatives due to the contract being awarded under the Task
Order Program for Infrastructure RFQ #16-178.
Recommendation:We recommend award of the Task Order contract to Blair
Construction, Inc. in the amount of $799,843.00 for the
construction of the Fort Gordon New Water and Sewage
Connections Project under the Task Order Program for
Infrastructure RFQ #16-178.
Funds are Available
in the Following
Accounts:
$799,843.00 from account 507043490-5425410 / 88886666-
5425410
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Gordon Highway Lighting Upgrade – MOA Roadway Lighting (SR 10/Gordon Hwy from Skyview Dr to
Georgia County Line)
Department:Engineering
Presenter:Abie L. Ladson - Director
Caption:Approve the Memorandum of Agreement (MOA) between the
Georgia Department of Transportation (GDOT) and Augusta
Richmond County for the replacement of 118 roadway lights
along Gordon Highway between Skyview Drive and the Georgia
county line for AED.
Background:The existing roadway lighting infrastructure along Gordon
Highway between Skyview Drive and the Georgia County Line is
nearing the end of its serviceable life. New, energy efficient
roadway lights are needed to replace the existing roadway light
system.
Analysis:This MOA will allow Augusta Richmond County to remove and
replace 118 roadway lights with new, modern emergency efficient
lighting systems within the state right-of-way. Many of the
existing roadway lights are located on wood power poles. This
project will place the new roadway lights on their own poles near
existing lighting locations. Augusta Richmond County will also be
responsible for roadway lighting maintenance and the cost of
electricity within the state right-of-way.
Financial Impact:Funding to replace the 118 roadway lights along Gordon Highway
is funded through Streetlighting budget with no financial impact.
The new roadway lights will be more energy efficient and
incorporate new technologies such as LED lighting systems.
These improvements will save on maintenance and electricity
costs in the future.
Alternatives:1) Approve the MOA between Augusta Richmond County and the
Georgia Department of Transportation (GDOT) to improve
roadway lighting along Gordon Highway. 2) Do not approve and
leave existing roadway lighting along Gordon Highway as is.
Recommendation:Approve Alternative Number 1
Funds are Available
in the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/29/2017 1:15 PM
John C. Calhoun Expressway
Department:
Presenter:Commissioner Bill Fennoy
Caption:Discuss renaming the John C. Calhoun Expressway to Veterans
Expressway. (Requested by Commissioner Bill Fennoy)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting Commission Chamber - 81812017
ATTENDANCE:
Present: Hons. Fennoy, Chairman; Hasan, Vice Chairman; Smith and
Frantom, members.
Absent: Hon. Hardie Davis, Jr., Mayor.
ENGINEERING SERVICES
1. Receive as information on-call emergency construction repairs provided by Item
Georgia-Carolina Paving Company on Central Ave and Meigs Street Action:
intersection for a total of $1 15,689.42 funded through the Grading and Drainage Approved
(Stormwater) SPLOST VII for the AED.
Motions
Motion Motion TextI ype
Motion to approve
A ---^-.^ receiving this item asADDTOVCI r lnlormatlon.
Motion Passes 4-0.
Motions
Y91i"" Motion Textr ype
Motion to
^ aDDrove.APProve vtotio, passes
4-0.
Made By
Made By
Commissioner Ben
Hasan
seconded By Motion
Result
Commisioner Commissioner
Sean Frantom Ben Hasan Passes
2. Approve the emergency storm clean-up for the storm that occurred on April 3, Item
2017. Clean up consists of tree cutting and debris removal for actual cost of Action:
$173,345.81, to be funded through the general fund contingency as requested by Approved
AED.
Seconded By Motion
Result
Commisioner SeaFrantom n passes
3. Motion to approve the minutes of the Engineering Services Committee held on Item
July 25,2017. Action:
4. Motion to determine that the Alley between Heard Avenue and Russell Street as
shown on the attached plat has ceased to be used by the public to the extent that
no substantial public purpose is served by it or that its removal from the county
road system is otherwise in the best public interest, pursuant to O.C.G. A. 532-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies),
as provided by law and an easement to be retained over the entire abandoned
portion for existing or future utilities as directed by Augusta Engineering
Department and Augusta Utilities Department.
Motions
r#:" Motion rext Made Bv
Motion to
^ aDDrove.APProve vtotion passes
4-0.
Motions
ffi':"' Motion rext
Commissioner Ben Commisioner Sean passesHasan Frantom
Seconded By
Seconded By
Motion
Result
Motion
Result
Motion
Result
Approved
Item
Action:
Approved
Motions
*j:"' Motion Text Made By Seconded Byr ype
Motion to
^ dDDrove.APProve vtltio, passes
4-0.
Commissioner Ben Commisioner Sean passesHasan Frantom
5. Approve and authorize supplemental reimbursement to Georgia Transmission Item
Co.p (GTC) in amount of $32,589.63 for cost to relocate their transmission Action:
facilities for improving Windsor Spring Road Phase IV (Willis Foreman Road to Approved
Tobacco Road) improvements project. Also approve modi$ring the Utility
Relocation Agreement between GTC and the City from $1,086,587.50 to
$l,l19,177.13 as requested by AED.
Approve
Motion to
approve.
Motion Passes
4-0.
a request from Mr.
Made By
Commissioner Ben
Hasan
Wright Mcleod
CommisionerSean passes
-rrantom
for permission to draft an6. Consider Item
amendment to Section 24 of the Comprehensive Zoning Ordinance adding Action:
"Construction and Demolition Landfill" to the list of permitted uses in HI Disapproved
zones.
Motions
Motion Motion Text Made By seconded By f;tjilI ype
Motion to deny. Mr.
r\^__. Fennoy and Mr. Commissioner Commisioner .r.Ijeny Smith vote No. Ben Hasan s"u, rrunto* I les
Motion Ties 2-2.
www.ausustasa.sov
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Minutes
Department:Clerk of Commission
Presenter:
Caption:Motion to approve the minutes of the Engineering Services
Committee held on August 8, 2017.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Policy for cutting vacant lots
Department:
Presenter:Commissioner Bill Fennoy
Caption:Discuss Policy for cutting vacant lots. (Requested by
Commission Bill Fennoy)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Recommended Changes ESD Operations
Department:Administrator's Office
Presenter:Lori Videtto
Caption:Motion to approve the recommendations as presented herein on
behalf of the Environmental Services Department.
Background:With the changes in leadership and all of the recent events, there
are changes and efficiencies that need to be made within the
Department in order to realize savings, refocus service delivery,
and create greater accountability.
Analysis:The Commission, with an effective date of September 1, 2017,
previously authorized the mixing of yard/bulk waste. The contract
amendment is being prepared. We are able to accommodate this
change in that the landfill’s operational permit has changed and
the material now gets disposed in the same landfill cell. This
change effectively allows the contractors to collect yard waste and
bulky waste in the same truck, which is a relief to the haulers in
terms of fuel and labor. In addition, the Administrator has released
an RFP seeking the services of a consulting firm to conduct a
programmatic, operational and financial review of Environmental
Services. We will keep the Commission posted on the status of
engaging the consultant and commencing the project. As you
heard in the presentation, several other recommendations are
being made to improve further the operation of the Department: 1.
Establish Keep Augusta Beautiful Program effective January
2018. We estimate an annual cost of up to $200,000 for three staff
(Coordinator, Finance Professional and Administrative Support),
operating costs and special events. The goal is to have a sharper
focus on coordinated community events and outreach activities
that will make Augusta a cleaner and friendlier place to live. 2.
Allow Recycling Perks Program to sunset December 31, 2017.
While a good idea, the program simply was very successful in the
beginning, but interest and participation has waned. The
anticipated annual cost savings is $273,806. 3. End the privatized
street sweeping contract effective March 2018 for an annual
savings of $750,000. The Engineering Department has agreed to
absorb the function and its assets under the storm water program.
4. Mosquito Control (a State function) exists within both budgets.
Environmental Services proposes to transfer all funding and
management responsibility for Mosquito Control to Engineering
effective January 2018. Engineering management concurs in the
change. 5. Consolidate all storm water functions under the
supervision of Engineering, including the industrial
responsibilities currently performed by Environmental Services.
Financial Impact:1. Elimination of the Perks Program will generate savings to
establish the Keep Augusta Beautiful Program. 2. The savings
from transfer of street sweeping will be a direct efficiency move
for the Department. 3. The Department will transfer current
funding level to continue supporting Mosquito Control. 4. The
cost of the consultant is unknown until proposals are received. We
will follow procurement policy in terms of contract award.
Alternatives:Accept the recommendations as presented and allow staff to move
forward. Delay some or all of the recommendations.
Recommendation:Accept the recommendations as presented and allow staff to move
forward.
Funds are Available
in the Following
Accounts:
Waste Management Fund Garbage Collection Fund
REVIEWED AND APPROVED BY:
Stormwater Utility
Fund 581
2016 Encumbrance Carryover into 2017
12/31/2016
Object Description Encumbrances
5211110 Management Consultants 764,028.60$
5211120 Contractual Services 1,244,148.25$
5222199 Other Disposal 58,849.36$
5223110 Repairs & Maint 166,869.28$
5422210 Trucks All Sizes 258,237.00$
5424120 Software 191,301.50$
2,683,433.99$
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Stormwater Encumbrance Carryover
Department:Engineering
Presenter:Abie L. Ladson - Director
Caption:Approve funding of encumbrance carryover from the 2016
Stormwater Budget for the AED.
Background:The Stormwater Program began in 2016 and as with most new
programs estimates were used in determining the level and speed of
service delivery.
Analysis:Several large contracts for services were awarded in 2016. The
funding for the contracts was collected in 2016. In accordance with
budgetary policy commission, approval is required to carry over
funding from prior years. Approval will allow the program to
continue without any disruption of service.
Financial Impact:Funding is available in Stormwater fund balance.
Alternatives:Require the use of current year funding.
Recommendation:Approve use of fund balance for encumbrance carryover.
Funds are Available
in the Following
Accounts:
581-00-0000/1336110
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/29/2017 1:15 PM
Amendment Regarding Residential Parking Permit Zones
Department:Engineering
Presenter:Abie L. Ladson - Director
Caption:Motion to request authorization to proceed with drafting edits to
the Augusta, Georgia code 3-5-95.11 to create a Residential
Parking Permit Program.
Background:The residents of the neighborhoods in and around the Augusta
University downtown campus have brought forward concerns
regarding nuisance parking related to students. Many residents
claim that students that attend the nearby colleges are parking for
long hours in front of their homes to avoid paying parking pass
fees. This influx of vehicles is creating a hardship and safety
issues for residents who live in these neighborhoods.
Analysis:Throughout the county, many communities who have similar
problems have programs in place to deal with nuisance parking
created by nearby facilities. The potential ordinance modification
would involve revising the residential parking section of the code
to allow for an application and study process, a public hearing,
and a petition and designation process.
Financial Impact:NONE
Alternatives:Do not allow staff to draft an amendment to the residential parking
section of the Augusta Code.
Recommendation:Approve request
Funds are Available
in the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission