HomeMy WebLinkAbout2017-03-14 Meeting Minutes Engineering Services Committee Meeting Commission Chamber - 3/14/2017
ATTENDANCE:
Present: Hons. Fennoy, Chairman; Hasan, Vice Chairman; Smith and
Frantom, members.
Absent: Hon. Hardie Davis, Jr., Mayor.
ENGINEERING SERVICES
1. Approve Amendment No. 6 to Agreement with ESG Operations, Inc. to
establish the final budget amount for 2017.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commisioner Sean
Frantom Passes
2. Approve and authorize the Augusta Engineering Department (AED) to accept
and receive Georgia Department of Transpiration (GDOT) Financial Assistance
through the GDOT FY16 & FY17 Local Maintenance and Improvement Grant
(LMIG) for Road & Drainage Improvements & maintenance projects as
requested by AED.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commissioner Ben
Hasan Passes
3. Approve award of Construction Contract to E.R. Snell Contractor, Inc. in the
amount of $8,960,927.08 for the Transportation Investment Act (TIA) Project,
Mark Church Road & Drainage Improvement project - Phase II. Award is
Item
Action:
Approved
contingent upon receipt of signed contracts and proper bonds, and development
of LSBOP utilization action plan as requested by AED. (Bid 16-261)
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner
Grady Smith Passes
4. Motion to approve the minutes of the Engineering Services Committee held on
February 28, 2017.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner
Grady Smith Passes
5. Motion to authorize condemnation to acquire property in fee simple (Parcel 087-
4-033-00-0) - 204 Dan Bowles Road.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Grady Smith Passes
6. Motion to authorize condemnation to acquire property in fee simple interests
(Parcel 087-2-110-00-0) - 201 A Aragon Drive.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Motion to
Approve
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Grady Smith Passes
7. Motion to authorize Condemnation to acquire Title of a Portion of Property
(Parcel 087-2-221-00-0) - 2006 Willow Street.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Grady Smith Passes
8. Motion to authorize Condemnation to acquire Title of a Portion of Property
(Parcel 087-4-100-00-0) - 2034 Golden Rod Street.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Grady Smith Passes
9. Motion to authorize Condemnation to acquire Title of a Portion of Property
(Parcel 087-4-164-00-0) - 2024 Leona Street.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Grady Smith Passes
10. Motion to authorize Condemnation to acquire Title of a Portion of Property
(Parcel 088-1-019-00-0) - 1921 Florida Drive.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Grady Smith Passes
11. Motion to authorize Condemnation to acquire Title of a Portion of Property for
Right-of-Way (Parcel 061-2-125-00-0) - 517 Fairhope Street.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Grady Smith Passes
12. Consider awarding contract to Cranston Engineering Group, P.C. for RFP Item
#16-260 NPDES Storm Water Monitoring and Inspections.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commissioner
Ben Hasan Passes
13. Consider approval of purchase of Q-Matic Customer Service Flow
Management System for Augusta Utilities Customer Service to be located at
452 Walker Street.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Grady Smith Passes
14. Recommendation of Award for Bid Item #16-243 Electric Motor Bake Oven. Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Grady Smith Passes
15. Recommendation of Award for Bid Item #16-254 Motor Balance Machine. Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Grady Smith Passes
16. Consider proposal from McKim & Creed to perform smoke and dye testing in
the Rock Creek Sanitary Sewer Basin.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Grady Smith Passes
17. Consider Professional Services Proposal from WR Toole Engineers, Inc. for
the Rocky Creek Force Main Design Project in the amount of $ 106,145.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve Motion to
approve. Commissioner Commissioner
Passes
Motion Passes
4-0.
Grady Smith Ben Hasan
18. Consider Professional Services Proposal from Goodwyn, Mills and Cawood
for the Rocky Creek Pump Station Design Project in the amount of $264,641.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commissioner
Ben Hasan Passes
19. Approve Sole Source Procurement of Replacement Pump for Large
Wastewater Pumping Stations.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Grady Smith Passes
20. Approve Supplemental Agreement Two for the Phinizy Center for Watershed
Assessment & Inventory Project in amount of $142,000 for the completion of
phase three of Task C-Inventory Receiving Streams as requested by AED.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Grady Smith Passes
21. Approve recapture and reallocation of Utilities related SPLOST funding. Item
Action:
Approved
Motions
www.augustaga.gov
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve with
money being reallocated
to provide trunk lines to
small areas where they
are needed or where no
sewerage lines currently
exist.
Motion Passes 4-0.
Commissioner
Ben Hasan
Commissioner
William
Fennoy
Passes
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Attendance 3/14/17
Department:
Presenter:
Caption:
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
AMENDMENT NO. 6
to the
AGREEMENT Between
ESG Operations, Inc.
And
Augusta, Georgia
For
Operations, Maintenance and Management Services
This Amendment is made and entered into this 1st day of January, 2017, between AUGUSTA,
GEORGIA, by and through the Augusta, Georgia Commission, a political subdivision of the State of
Georgia (hereinafter “Augusta”), and ESG OPERATIONS, INC., a Georgia corporation, (hereinafter
“ESG”). This is Amendment No. 6 to the Agreement dated the 16th day of December 2009, between Augusta
and ESG.
NOW THEREFORE, Augusta and ESG agree to amend the Agreement as follows:
REPLACE Article 4.1 with the following new Article:
4.1 Augusta shall pay to ESG a base fee equal to the Augusta budget shown in Appendix F. This
includes the actual cost of the Scope of Services performed by ESG plus a Management and
Administrative Fee. The base fee shall not include services that are not specifically defined by
Section 2 of this Agreement. The base fee for this Amendment shall be Five Million Ninety-Five
Thousand Twenty Dollars ($5,095,020) and the Management and Administrative Fee shall be Six
Hundred Eleven Thousand Four Hundred Two Dollars ($611,402). The base fee and the
Management and Administrative Fee shall be payable in advance in equal monthly installments and
for the sixth term of this Agreement the monthly amount shall be Four Hundred Seventy-Five
Thousand Five Hundred Thirty-Five Dollars and Sixteen Cents ($475,535.16). Said base fee shall
be for the period beginning on January 1st, 2017 and ending on December 31st, 2017. Thereafter,
the Base Fee will be negotiated as described in Article 4.2. The Management and Administrative
Fee shall increase proportionally with the base fee adjustments described in Articles 4.2 and 4.4.
REPLACE Appendix F with the following new Appendix F.
REPLACE Appendix I with the following new Appendix I.
ADD Appendix J and K.
All other terms and conditions remain in effect in accordance with the Agreement referenced in this
Amendment.
Both parties indicate their approval of this Amendment by signature below.
Authorized signatures:
ESG OPERATIONS, INC.
By: ________________________________
John Clay Sykes, PE, Principal
By: ________________________________
Daniel E. Groselle, Jr., PE, Principal
Date: _____________________________
AUGUSTA, GEORGIA
By: ________________________________
Hardie Davis, Jr.
Mayor
Date: _____________________________
ATTEST: ___________________________
Clerk of Commission
Date: _____________________________
Appendix F
2017 Project Budget and Staffing Plan
Project Budget
PERSONNEL SERVICES $ 1,800,020.00
ADMINISTRATIVE EXPENSES $ 100,000.00
UTILITIES $ 190,000.00
CHEMICALS $ 620,000.00
MATERIALS & SUPPLIES $ 120,000.00
VEHICLES & EQUIPMENT $ 115,000.00
OUTSIDE SERVICES $ 320,000.00
BIOSOLIDS MANAGEMENT $ 1,160,000.00
MAINTENANCE & REPAIR $ 420,000.00
TOTAL OPERATING BUDGET $4,845,020.00
MANAGEMENT & ADMINISTRATIVE FEE
(12%) 581,402.00
CONTRACTOR’S SUBTOTAL $ 5,426,422.00
DIRECTOR’S ALLOWANCE $ 250,000.00
MANAGEMENT & ADMINISTRATIVE FEE
(12%) 30,000.00
DIRECTOR’S ALLOWANCE SUBTOTAL 280,000.00
TOTAL 2017 BUDGET $ 5,706,422.00
Appendix F (Continued)
2017 Project Budget and Staffing Plan
Project Staffing Plan
Budgeted Position Budgeted Number
Project Director 1
Assistant Project Manager 1
Operations Manager 1
Lab/SSES Manager 1
Maintenance Manager 1
Land Application Manager 1
Operators 10
Lab Analysts 2
IPP Technicians 2
Mechanics 5
Maintenance Support 3
Administrative 1
Education Specialist 2
Appendix I
2017 Sewer Assessment Project Budget
Project Budget
PERSONNEL SERVICES $ 324,495.00
MATERIAL & SUPPLIES $ 49,050.00
MISCELLANEOUS $ 3,775.00
TOTAL OPERATING BUDGET $ 377,320.00
MANAGEMENT & ADMINISTRATIVE FEE
(12%) $ 45,278.00
TOTAL 2017 BUDGET $ 422,598.00
Appendix J –
JB Messerly Influent Emergency Pump
The JB Messerly WPCP struggles to transport all influent wastewater to the main treatment units during
excessive rain events. ESG proposes to install a portable diesel driven pump capable of transporting at least
13 mgd to the effluent flume through which it will be carried to the Constructed Wetland Treatment System.
The Constructed Wetland Treatment System will provide both primary and biological treatment. The
estimated cost is as follows:
Portable Pump
Item Description Cost
1 Pump $ 110,000
2 Mechanical $ 25,000
3 Trailer $ 10,000
Subtotal $ 145,000
4 Contingency $ 14,500
5 Design $ 5,000
Subtotal $ 164,500
Mark Up (5%) $ 8,225
Total $ 172,725
ESG’s cost estimate is One Hundred Seventy-Two Thousand Seven Hundred and Twenty-Five dollars
($172,725) inclusive of a five percent markup. ESG will invoice Augusta monthly on a percent complete
basis for this work.
Appendix K –
JB Messerly Influent Pump Upgrade
The JB Messerly WPCP is limited by the amount of influent wastewater it can transport to the main treatment
processes. The electrical carrying capacity the influent pump station is also limited by the breaker and wire
size supporting that building.
ESG is proposing to install breakers in the Main MCC and pull new wire through conduit to the influent
pump building to support increasing the horsepower of two influent pumps resulting in additional pumping
capacity. Additionally, two new larger pumps and properly sized soft starts will be installed as part of this
scope of service. Following is a summary of estimated costs to perform the scope of service:
Influent Pump Upgrade
Item Description Cost
1 Pumps $ 172,000
2 Electrical $ 253,950
3 Mechanical $ 51,700
Subtotal $ 477,650
4 Contingency $ 47,765
5 Design $ 42,033
Subtotal $ 567,448
Mark Up (12%) $ 68,094
Total $ 635,542
ESG’s cost estimate is Six Hundred Thirty-Five Thousand Five Hundred and Forty-Two Hundred dollars
($635,552) inclusive of a five percent markup. ESG will invoice Augusta monthly on a percent complete
basis for this work.
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Amendment No. 6 to the Contract with ESG Operations, Inc. for the Operation of Water Pollution
Control Facilities.
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Approve Amendment No. 6 to Agreement with ESG Operations,
Inc. to establish the final budget amount for 2017.
Background:On December 16, 2009 Augusta and ESG Operations, Inc. (ESG)
entered into an Agreement for Operations, Maintenance and
Management Services. The Agreement provides that ESG will
prepare an annual amendment to the Agreement which establishes
the budget for the year. Attached is a proposed Amendment No. 6
from ESG, which sets forth a 2017 budget of $5,706,422.00. The
estimated cost of wastewater treatment services for 2017 is
$5,426,422.00. We have also included an allowance of
$280,000.00 to provide for ESG assistance with maintenance as
may be needed at the water treatment facilities and other areas
within our system. The proposed amendment also includes three
special projects that provide benefit to Augusta through assisting
us in sewer system evaluation and improvements to AUD
facilities. These projects are included in the attached amendment
as Appendices I, J & K along with the additional cost of each
project.
Analysis:The proposed budget for the operation of our water pollution
control facilities appears reasonable for this work. This proposed
budget represents only an 8% increase over the original ESG
contract year of 2010 (or about 1.1% per year). Attached is a copy
of the proposed 2017 budget and the proposed Amendment No. 6.
The proposed additional work will provide us with supplemental
staff to focus on the task of assessing the condition of our
wastewater collection system and provide needed improvements at
our Messerly facility. Having these projects managed by ESG
allows for expedited performance of the work and avoids conflict
with plant operations during construction. The total cost of the
proposed additional work is $1,230,865.00.
Financial Impact:$5,706,422.00 for estimated annual Operation and Maintenance
cost. $1,230,865.00 for additional work as described
Alternatives:Pursue other delivery methods for the proposed additional work.
Recommendation:We recommend approval of the Operation and Maintenance
budget as presented and the proposed additional work described in
the attached amendment.
Funds are Available
in the Following
Accounts:
506043310-5211110; 506043410- 521111; 514043420-
5421110/81700020-5421110; 514043420-5421110/81700010-
5421110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
3/14/2017 1:10 PM
GDOT Local Maintenance and Improvement Grant (LMIG) FY16 & FY17
Department:Engineering
Presenter:Abie L. Ladson - Director
Caption:Approve and authorize the Augusta Engineering Department
(AED) to accept and receive Georgia Department of Transpiration
(GDOT) Financial Assistance through the GDOT FY16 & FY17
Local Maintenance and Improvement Grant (LMIG) for Road &
Drainage Improvements & maintenance projects as requested by
AED.
Background:GDOT restructured its State Aid Program and named it “Local
Maintenance and Improvement Grant (LMIG).” LMIG is a
formula-based grant from GDOT that is funded through the motor
fuel tax. Grant funds are typically used to supplement local
projects for road/drainage improvements and road resurfacing
efforts based on priority. Each year Augusta is eligible to receive
approximately $1.5 to $2 million through this LMIG Program.
Analysis:GDOT LMIG financial assistance is critical for completing AED
projects such as roadway improvements and maintenance
construction projects. This financial assistance is available on
yearly basis. In addition to this yearly assistance, GDOT also
provides LMIG funds to AED on a “as requested” basis depending
on LMIG additional funds availability on state level, demonstrated
need, and local project connectivity to state road system.
Financial Impact:City of Augusta AED will receive approximately $1.5 to $2
million. A local funding match of 10% is required. 2016 -
Allocation: $1,556.607 Project: Wheeler Road at Aumond Road
Roundabout 2017 - Allocation: $2,033,677 Projects: Richmond
Hill Road Resurfacing - $ 979,982 : Mark Church Road
improvements - $1,053,695
Alternatives:1). Approve and authorize the Augusta Engineering Department
(AED) to accept and receive Georgia Department of Transpiration
(GDOT) Financial Assistance through the GDOT FY16 & FY17
Local Maintenance and Improvement Grant (LMIG) for Road &
Drainage Improvements & maintenance projects as requested by
AED. 2). Do not approve and identify alternate supplemental
funds for completing road improvements, maintenance projects,
and do not claim future LMIG Funds that are designated for
Augusta.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
Fund 335 2016 - Allocation: $1,556.607.30 2017 - Allocation:
$2,033,677.43
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Invitation to Bid
Sealed bids will be received at this office until Tuesday, December 20, 2016 @ 3:00 p.m. for furnishing:
ITB Item #16-261 Marks Church Road Improvements Project – Phase II for Augusta Engineering Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Bid documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605,
Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers
exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable is $455.00.
It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the
Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706
722-6488) beginning Thursday, November 10, 2016. Bidders are cautioned that submitting a package without Procurement
of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other
work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through
any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of
receiving incomplete or inaccurate information upon which to base his qualifications.
A Pre Bid Conference will be held on Friday, December 2, 2016 @ 10:00 a.m. in the Procurement Department, 535 Telfair
Street, Room 605.
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the
office of the Procurement Department by Tuesday, December 6, 2016 @ 5:00 P.M. No ITB will be accepted by fax, all must
be received by mail or hand delivered.
No proposal may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of contract
with the successful bidder. A 10% Bid Bond is required to be submitted along with the bidders’ qualifications; a 100%
performance bond and a 100% payment bond will be required for award.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications
prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies
needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement
Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director.
All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate
committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the
outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department
is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or
inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle November 10, 17, 24, December 1, 2016
Metro Courier November 16, 2016
OFFICIAL
Reeves Construction
1 APAC Industrial Way
Augusta, GA 30907
Beams Contracting
15030 Atomic Rd
Beech Island, SC 29842
E.R. Snell
5102 Pierce Ct
Evans, GA 30809
YES YES YES
48048 167300 22114
YES YES YES
YES YES YES
YES YES YES
$9,606,961.24 $9,403,307.46 $8,960,927.08
Bid Item #16-261
Marks Church Road Improvements Project – Phase II
for Augusta, Georgia - Engineering Department
Bid Due: Tuesday, December 20, 2016 @ 3:00 p.m.
The following vendor did not respond:
Blair Construction / P.O. Box 770 / Evans, GA 30809
Bid Bond
Bid Price
Total Number Specifications Mailed Out: 24
Total Number Specifications Download (Demandstar): 13
Total Electronic Notifications (Demandstar): 285
Mandatory Pre-Bid Conference: 4
Total packages submitted: 3
Total Noncompliant: 0
Vendors
Attachment B
E-Verify Number
SAVE Form
Addendums 1-2
Page 1 of 1
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Mark Church Road & Drainage Improvements - Phase II- Bid Item #16-261
Department:Engineering
Presenter:Abie L. Ladson - Director
Caption:Approve award of Construction Contract to E.R. Snell Contractor,
Inc. in the amount of $8,960,927.08 for the Transportation
Investment Act (TIA) Project, Mark Church Road & Drainage
Improvement project - Phase II. Award is contingent upon receipt
of signed contracts and proper bonds, and development of LSBOP
utilization action plan as requested by AED. (Bid 16-261)
Background:Mark Church Road Improvements Project is an approved
SPLOST project and also one (1) of fifty (50) City of Augusta,
Georgia TIA (aka TSPLOST) projects. Project limits are
Wrightsboro Road to I-520/Wheeler Road off ramp. This project
consists of widening the existing two-lane roadway to a three-lane
roadway, and adding curb & gutter, sidewalks and a storm sewer.
Project will be completed in two phases (Phase 1 and Phase 2).
This is Phase 2 of the project. Phase 2 scope consist of roadway
widening & improvements, drainage improvements, Curb &
Gutter, water & sewer improvements, sidewalk, traffic signal
upgrade, and bridge replacement.
Analysis:Bids were received on December 20, 2016 with E.R. Snell
Contractor being the low bidder. The bid results are as follow:
CONTRACTORS BID 1. Reeves Construction $9,606,961.24 2.
Beams Contraction $9,403,307.46 3. E.R. Snell Contractor
$8,960,927.08 It is the recommendation of the Engineering
Department to award this project to E.R. Snell Contractor, Inc.
Financial Impact:Funds are available in amount of $8,960,927.08 upon commission
approval. Funding allocations are as follows: $5,560,012 (Project
TIA); $1,800,000 (SPLOST Fund Balance); $567,916 (TIA
Discretionary); and $1,033,000 (GDOT LMIG).
Alternatives:1). Approve award of Construction Contract to E.R. Snell
Contractor, Inc. in the amount of $8,960,927.08 for Transportation
Investment Act (TIA) Project, Mark Church Road & Drainage
Improvement project - Phase II as requested by Augusta
Engineering Department. Award is contingent upon receipt of
signed contracts and proper bonds, and development of LSBOP
utilization action plan as requested by AED. 2). Do not approve
and find alternative to complete the project and meet TIA project
completion schedule.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
5,560,012 (Project TIA Funds); $1,800,000 (SPLOST Fund
Balance); $567,916 (TIA Discretionary), and $1,033,000 (GDOT
LMIG Funds)
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting Commission Chamber - 212812017
ATTENDANCE:
Present: Hons. Hardie Davis, Jr., Mayor; Fennoy, chairman; Hasan, vice
Chairman; Smith and Frantom, members.
ENGINEERING SERVICES
1. Motion to supplement the Augusta Utilities Department contract with Blair ItemConstruction, Inc., not to exceed $l14,945 to cover the additional costs of water Action:line relocation for the l5th Street Bridge Rehabilitation Project as requested by Approved
AED.
Motion to approve
Approve adding tnit iti- to Commissioner Commisioner
the agenda. urady smith Sean Frantom Passes
Motions
il,'r':" Motion rext
Motions
l^#:" Motion rext
Motions
i',[t:"' Motion rext
Made By Seconded By
Made By Seconded By
Motion
Result
Motion
Result
Motion
Result
Motion to approve.
Approve Mr. Frantom out. Commissioner Commissioner
Motion passes 3-0. Ben Hasan Grady smith Passes
2. Approve entering into a Mowing and Maintenance and Indemnity Agreement ltemwith the Georgia Department of Transportation. Also, obtain u dOOT permit Action:for Gordo, H"ry3t Doug Barnard Entryway Landscape Improvements Project as Approvedrequested by AED.
Motion to approve
Made By Seconded By
a. .-_.-_- adding this item to Commissioner CommisionerApprove tn. ug?"da. Grady Smith Sean Frantom Passes
Motions
f#:"" Motion rext Seconded By Motion
ResultMade By
Motion to approve.
Approve Mr. Frantom out. Commissioner Commissioner
Motion passes 3_0. Ben Hasan Grady Smith Passes
3. Approve and authorize the Engineering Department (AED) to accept and receive Item
federal financial assistance through Section 319(h) Nonpoint Source Implication Action:
Grant Program. Also, grant authorization permitting the Augusta, GAh Mayor Approved
to sign all documentation as requested by the AED.
Motions
|'#:" Motion Text Made By Seconded By Motion
Result
Approve
Motion toapprove. Commissioner Ben Commisioner Sean passesMotion Passes Hasan Frantom
4-0.
4. Approve award of preliminary engineering phase of Design Consultant Services Item
Agreement to Civil Services, Inc., in the amount of $200,916.27 for the 5th Action:
Street Bridge over the Savannah River (Bridge Repair and Restoration), subject Approved
to receipt of signed Agreement as requested by AED.
Motion
Result
Approve
Motion toapprove. Commisioner Sean Commissioner Ben passesMotion Passes Frantom Hasan
4-0.
5. Motion to determine that the alley between Hogan Street and Adrian Street, as Itemshown on the attached plat has ceased to be used by the public to the extent that Action:no substantial public purpose is served by it or thai its removal from the county Approved
road system is otherwise in the best public interest, pursuant to O.C.G. A. 532-i-2, with the abandoned property to be quit-claimed to the appropriate party(ies),
as provided by law and an easement to be retained orer ilie enti.e aUanaonea
portion for existing or future utilities as directed by Augusta Engineering
Motions
i'#:" Motion rext Made Bv Seconded By
Department and Augusta Utilities Department.
Motions
f#:"' Motion rext Made Bv
Approve
Approve
Motion to
approve.
Motion Passes
4-0.
Motion to
approve.
Motion Passes
4-0.
Seconded By
Seconded By
Motion
Result
Motion
Result
Motion
Result
Commissioner Ben Commisioner Sean passesHasan Frantom
6. Motion to approve the minutes of the Engineering Services Committee held on ltem
February 14,2017 . Action:
Approved
Motions
f#:" Motion rext Made Bv
Commissioner Ben Commisioner Sean passesHasan Frantom
7. Motion to determine that 0.06 acres adjacent to 1507 Saint Luke Street, shown Item
as "Tract B" on the attached plat has ceased to be used by the public to the Action:
extent that no substantial public pu{pose is served by it or that its removal from Approved
the county road system is otherwise in the best public interest, pursuant to
O.C.G.A. $32-7-2, with the abandoned property to be quit-claimed to the
appropriate party(ies), as provided by law and an easement to be retained overthe entire abandoned portion for existing or future utilities as directed by
Augusta Engineering Department and Augusta utilities Department.
Motions
f#:" Motion Text Made By seconded By
Approve
Motion toapprove. Commissioner Ben Commisioner Sean passesMotion Passes Hasan Frantom
4-0.
8. Motion to approve Tower Cloud, Inc.'s Formal Registration Application to Item
ac_cess the public right of way within the Augusta, Georgia for the provisions of Action:
telecommunications services as a State-certified utility. Approved
Motions
X:j:"' Motion Text Made By seconded By Motion'l YPe -'---- -J Result
Motion to approve.
Approve Mr. Frantom out. commissioner commissioner
Motion passes 3-0. Ben Hasan Grady Smith Passes
9. Motion to authorize condemnation to acquire property in fee simple interests Item
(Parcel 087-2-134-00-0) - 2017 walnut Street. Action:
Approved
Motions
f.,o::" Motion Text Made By Seconded By MotionlYPe - ---- -r Result
Motion to
Approve ixffi**r., fi;mmissioner
Ben
f;mmisioner
sean passes
4_0.
10. Motion to authorize condemnation to acquire property in fee simple interests Item
(Parcel 087-2-192-00-0) - 167 Aragon Drive. Action:
Approved
Motions
Motion r,n^4:^- rr!^--a f,,r^r- n-- d r r h Motioniil" Motion Text Made By Seconded By Result
Motion to
Approve ffiffi*u*., ;:r#::f*' f;mmisioner
Sean passes
4-0.
11. Motion to authorize condemnation to acquire property in fee simple interests Item
(Parcel 087-2-193-00-0) - 173 Aragon Drive. Action:
Approved
Motions
X:'1" Motion Text Made By seconded By Motion
r YPe vvlu.sls ,-J Result
Motion to
Approve iff,1Xl'r^,., S:fffi::f*' f;mrnisioner
Sean passes
4-0.
12. Motion to authorize condemnation to acquire property in fee simple interests ltem
(Parcel 087-4-055-00-0) - 2029 Golden Rod Street. Action:
Approved
Motions
Motion Motion Text Made By seconded By MotionType rv^uaru' r E^'' rvraut 'a'y DtsCUIIUetI lly ReSUlt
Motion to
a _-_----_-_ approve. Commissioner Commisioner SeApprove irotion passes Ben Hasan Frantom 'u' Purr.,
4-0.
13. Motion to authorize condemnation to acquire property in fee simple interests ltem(Parcel 087-4-056-00-0) - 2033 Golden Rod Strbet. Action:
Approved
Motions
X:j:" Motion Text Made By Seconded By Motion
t YPe vvvv.slu YJ Result
Motion to
^ approve. Commissioner Commisioner SeApprove iaotion passes Ben Hasan Frantom u' Purr.,
4-0.
14. Motion to authorize condemnation to acquire property in fee simple interests Item(Parcel 087-4-072-00-0) - 2}GlGolden Rod Street. Action:
Approved
Motions
Motion rir^+:^- 'T,^--4 f,,r^r^ n-- d r r n Motion;--'-- Motion Text Made By Seconded BylYPe ''---- -r Result
Motion to
Approve ffi3,1:h^.., s:rff;::f*' f;misioner
Sean passes
4-0.
15. Motion to authorize condemnation to acquire property in fee simple interests Item(Parcel 087-4-073-00-0) - 2063 Golden Rod Street. Action:
Approved
Motions
X*:" Motion Text Made By Seconded By Motion
f YPe "'--- -r svlv'svs ,-J ReSUlt
Approve Motion to passesapprove. Commissioner Commisioner Sean
Motion Passes Ben Hasan
4-0.
Frantom
16. Motion to authorize condemnation to acquire prope$z in fee simple interests Item(Parcel 088-l-032-00-0) - 149 Aragon Drive. Action:
Approved
Motions
+'#:" Motion rext Made By
Motion to
Approve i[5,1X1'r*,.,
4_0.
Commissioner Commisioner S
Ben Hasan Frantom tu' Pu"t'
Seconded By Motion
Result
Motion
Result
17. Motion to determine that a portion of Heath Street, East of Berckmans Road as Itemshown on the attached plat has ceased to be used by the public to the extent that Action:
no substantial public purpose is served by it or that its removal from the county Approved
road system is otherwise in the best public interest, pursuant to O.C.G.A. $3i-7-2, with the abandoned property to be quit-claimed to the appropriate iurt1(ies), as provided by law and an easement to be retained
-over the entirL
abandoned portion for existing or future utilities as directed by Augusta
Engineering Department and Augusta Utilities Department.
Motions
i#:" Motion Text Made By seconded By
Motion to
^ aDDrove.APProve uotion passes
4-0.
Commissioner Commisioner S
Ben Hasan Frantom tun Pu"t'
18. Approve the amount of $7,108.72 to have 17 Streetlights added to Ashton Item
Drive and Ardwick Drive in the Southampton subdivision at a cost of $255.00 Action:
per month for a total of $3,060.00 per year thereafter. This is also to approve a Approved
new lighting tax district for the 52 lots associated with above roads. funding is
available in the Street Lighting budget account #2760416105312310.
Motions
Motion
Type
Approve
Motion Text
Motion to approve.
Mr. Frantom out.
Made By
Commissioner
seconded By f"".Xil
commissioner Passes
Motion Passes 3-0.Ben Hasan Grady Smith
www.augustasa.sov
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Minutes
Department:Clerk of Commission
Presenter:
Caption:Motion to approve the minutes of the Engineering Services
Committee held on February 28, 2017.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Motion to Authorize Condemnation to Acquire Property in Fee Simple (Parcel 087-4-033-00-0) - 204 Dan
Bowles Road
Department:Law
Presenter:Andrew Mackenzie
Caption:Motion to authorize condemnation to acquire property in fee simple
(Parcel 087-4-033-00-0) - 204 Dan Bowles Road.
Background:The owners are deceased and the City has been unable to reach an
agreement with the heirs. Therefore, the City seeks to acquire the
property through condemnation. In order to proceed and avoid further
project delays, it is necessary to condemn a portion of subject
property. The required property consists of 9,048 sq. ft. in fee. The
appraised value is $12,500.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
G/L: 328-041110-52.12122 J/L: 212828203-52.12122
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Motion to authorize condemnation to acquire property in fee simple interests (Parcel 087-2-110-00-0) - 201
A Aragon Drive
Department:Law
Presenter:Andrew Mackenzie
Caption:Motion to authorize condemnation to acquire property in fee simple
interests (Parcel 087-2-110-00-0) - 201 A Aragon Drive.
Background:The owners cannot be located; therefore, the City seeks to acquire
the property through condemnation. In order to proceed and avoid
further project delays, it is necessary to condemn a portion of
subject property. The required property consists of 7,500 sq. ft. in
fee. The appraised value is $7,000.00.
Analysis:Condemnation is necessary in order to acquire the required
property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
G/L: 328-041110-52.12122 J/L: 212828203-52.12122
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Motion to Authorize Condemnation to Acquire Title of a Portion of Property (Parcel 087-2-221-00-0) - 2006
Willow Street
Department:Law
Presenter:Andrew Mackenzie
Caption:Motion to authorize Condemnation to acquire Title of a Portion of
Property (Parcel 087-2-221-00-0) - 2006 Willow Street.
Background:Despite repeated efforts the city has been unable to reach an
agreement with the property owner as to the property’s value and
therefore seeks to acquire property through condemnation. In order to
proceed and avoid further project delays, condemnation is
recommended to obtain clear title. The required property consists of
7,500 sq. ft. The appraised value is $6,300.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
G/L: 328-041110-52.12122 J/L: 212828203-52.12122
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Motion to Authorize Condemnation to Acquire Title of a Portion of Property (Parcel 087-4-100-00-0) - 2034
Golden Rod Street
Department:Law
Presenter:Andrew Mackenzie
Caption:Motion to authorize Condemnation to acquire Title of a Portion of
Property (Parcel 087-4-100-00-0) - 2034 Golden Rod Street.
Background:The owners are deceased and all heirs cannot be determined or
located. Therefore, the City seeks to acquire the property through
condemnation. In order to proceed and avoid further project delays, it
is necessary to condemn a portion of subject property. The required
property consists of 7,500 sq. ft. in fee. The appraised value is
$6,300.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
G/L: 328-041110-52.12122 J/L: 212828203-52.12122
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Motion to Authorize Condemnation to Acquire Title of a Portion of Property (Parcel 087-4-164-00-0) - 2024
Leona Street
Department:Law
Presenter:Andrew Mackenzie
Caption:Motion to authorize Condemnation to acquire Title of a Portion of
Property (Parcel 087-4-164-00-0) - 2024 Leona Street.
Background:Despite repeated efforts the city has been unable to reach an
agreement with the property owner as to the property’s value and
therefore seeks to acquire property through condemnation. In order to
proceed and avoid further project delays, condemnation is
recommended to obtain clear title. The required property consists of
7,500 sq. ft. The appraised value is $7,400.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
G/L: 328-041110-52.12122 J/L: 212828203-52.12122
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Motion to Authorize Condemnation to Acquire Title of a Portion of Property (Parcel 088-1-019-00-0) - 1921
Florida Drive
Department:Law
Presenter:Andrew Mackenzie
Caption:Motion to authorize Condemnation to acquire Title of a Portion of
Property (Parcel 088-1-019-00-0) - 1921 Florida Drive.
Background:Despite repeated efforts, the City has been unable to reach an
agreement with the property owners and therefore seeks to acquire
through condemnation. In order to proceed and avoid further project
delays, it is necessary to condemn a portion of subject property. The
required property consists of 7,500 sq. ft. The appraised value is
$7,400.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
G/L: 328-041110-52.12122 J/L: 212828203-52.12122
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Motion to Authorize Condemnation to Acquire Title of a Portion of Property for Right-of-Way (Parcel
061-2-125-00-0) - 517 Fairhope Street
Department:Law
Presenter:Andrew Mackenzie
Caption:Motion to authorize Condemnation to acquire Title of a Portion of
Property for Right-of-Way (Parcel 061-2-125-00-0) - 517
Fairhope Street.
Background:Despite repeated efforts, the City has been unable to reach the
property owners who are out-of-state residents and therefore seeks
to acquire the property through condemnation in order to proceed
and avoid further project delays. The required property consists of
1,592.22 sq. ft. for permanent easement and 1,199.01 sq. ft. of
temporary construction easement. The appraised value is $650.00.
Analysis:Condemnation is necessary in order to acquire the required
property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
G/L: 328-041110 J/L: 211828101
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Request for Proposal
Request for Proposals will be received at this office until Tuesday, December 20, 2016 @ 11:00 a.m. for furnishing
for the Augusta Utilities Department:
RFP Item #16-260 NPDES Storm Water Monitoring and Inspections
RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP
documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605,
Augusta, GA 30901.
A Pre Proposal Conference will be held on Tuesday, December 6, 2016 @ 11:00 a.m. in the Procurement
Department, 535 Telfair Street, Room 605.
All questions must be submitted in writing by fax to 706 821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Thursday, December 8, 2016
@ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered.
No proposal may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of
contract with the successful bidder.
Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include
specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions,
applicable to the procurement. All specific requirements contained in the request for proposal including, but not
limited to, the number of copies needed, the timing of the submission, the required financial data, and any other
requirements designated by the Procurement Department are considered material conditions of the bid which are
not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition
shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia
Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the
envelope.
Proponents are cautioned that acquisition of RFP documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the
proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle November 10, 17, 24, December 1, 2016
Metro Courier November 16, 2016
OFFICIAL
VENDORS Attachment
"B"E-Verify #SAVE
Form Original 7
Copies
Fee
Proposal
MC Squared
1601 Hartrich Rd.
Augusta, GA 30906
YES 228126 YES YES YES YES
CSRA Testing & Enginee
1005 Emmett St., Suite A
Augusta, GA 30904
YES 138689 YES YES YES YES
Cranston Engineering
452 Ellis St
Augusta, GA 30901
YES 64684 YES YES YES YES
ATC
1453 Greene St., Suite A
Augusta, GA 30901
YES 46692 YES YES YES YES
Khafra Engineering
225 Peachtree St.,
Suite 1600
Atlanta, GA 30303
YES 55591 YES YES YES YES
Bluewater Engineering
P. O. Box 617
Evans, GA 30809
YES 615987 YES YES YES YES
RFP Item #16-260
NPDES Storm Water Monitoring and Inspections
for Augusta, Georgia - Utilities Department
RFP Date: Tuesday, December 20, 2016 @ 11:00 a.m.
Total Number Specifications Mailed Out: 16
Total Number Specifications Download (Demandstar): 16
Total Electronic Notifications (Demandstar): 385
Mandatory Pre-Proposal/Telephone Conference Attendees: NA
Total packages submitted: 6
Total Noncompliant: 0
Page 1 of 1
MC Squared
1601 Hartrich Rd.
Augusta, GA 30906
CSRA Testing & Enginee
1005 Emmett St., Suite A
Augusta, GA 30904
Cranston Engineering
452 Ellis St
Augusta, GA 30901
ATC
1453 Greene St., Suite A
Augusta, GA 30901
Khafra Engineering
225 Peachtree St.,
Suite 1600
Atlanta, GA 30303
Bluewater Engineering
P. O. Box 617
Evans, GA 30809
A. Package submitted by the deadline Pass/Fail PASS PASS PASS PASS PASS PASS
B. Package is complete (includes requested
information as required per this solicitation)Pass/Fail PASS PASS PASS PASS PASS PASS
C. Overall Quality of RFP
(concise and to-the-point) 50 45 43 48 47.5 45 46.5
1. Technical Approach 100 92.5 90 95 94.5 94 95.5
2. Financial Responsibility 100 95.5 61.5 95 95 62 95
3. Project Management 95 90 90 94.5 93 92 95
4. Key Personnel & Staff 90 80 82.5 86.5 81 81.5 84
5. Organizational Qualifications 75 67.5 65 70 69 67 71
6. Optional Interview (Potential Bonus Points)10
D. TOTAL 470 425.5 389 441 432.5 396.5 440.5
1. Experience with Similar Projects 45 40 35 44 44 44 43.5
2. Company Accreditations 45 42.5 37.5 43.5 42.5 42.5 42
3. NPDES turbidity sampling and testing
experience 50 43.5 31 46.5 45 45 45.5
4. NPDES Field Inspection Experience 60 52.5 35 55 54 54.5 55.5
E. TOTAL 200 178.5 138.5 189 185.5 186 186.5
Within Richmond County 10 10 10 10 10
Within CSRA 8 8
Within Georgia 6 6
Within SE United States (includes AL, TN, NC,
SC, FL) 4
All Others 2
TOTAL 10 10 10 10 10 6 8
Lowest Fees 10 10
Second 8 8
Third 6 6
Forth 4 4
Fifth 2 2
TOTAL 10 4 0 6 8 2 10
H. References 10 10 10 10 10 10 10
Total 750 673 590.5 704 693.5 645.5 701.5
Evaluation Sheet - RFP Item #16-260
NPDES Storm Water Monitoring and Inspections
for Augusta, Georgia - Utilities Department
Evaluation Meeting Date:Monday, January 23, 2017 @ 3:00 p.m.
Vendors
Total (Total Possible Score 750)
Second Round Elimination (Total Points 50) (MUST ACHIEVE 35 POINTS FOR CONTINUED CONSIDERATION)
(MUST PASS FOR CONTINUED CONSIDERATION)
RANKING - First Round Elimination
Proximity to Area (Total Points 10)
F. Proximity to Area
Scope of Services (Total Points 200)
Proposer’s Overall Ability to Provide the Services (Total Points 470)
Cost/Fee Consideration
Reference(s) (Total Points 10
Procurement DepartmentRepresentative:_______Nancy Williams____________________Procurement Department Completion Date: 1/23/17
Evaluator: Cumulative Date: 1/23/17
Internal Use Only
Note: Respondent/Offeror(s) receiving 600 or more points will be invited to do presentations to provide additional information if deemed necessary.
Submittal and Quality of RFP
D. Narrative
E. Scope of Services
G. Proximity to Area
Quality of RFP
Engineering Services Committee Meeting
3/14/2017 1:10 PM
NPDES Storm Water Monitoring & Inspections
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Consider awarding contract to Cranston Engineering Group, P.C.
for RFP Item #16-260 NPDES Storm Water Monitoring and
Inspections.
Background:The RFP was issued to contract services to perform the required
tasks related to National Pollutant Discharge Elimination System
(NPDES) storm water monitoring and inspections associated with
Augusta Utilities projects. These services will be required for one
year with an option for Augusta to renew annually for two
additional one year terms. MC Squared Inc., CSRA Testing and
Engineering Company Inc., Cranston Engineering Group PC,
ATC Group Services LLC, Khafra Engineering Consultants Inc.,
and Bluewater Engineering Services LLC submitted proposals.
The evaluation committee scored the proposals, and Cranston
Engineering Group, P.C. was selected based upon the scoring
results.
Analysis:Augusta Utilities Department evaluated Cranston’s pricing
proposal for services, and found it to be fair and reasonable.
Financial Impact:The requested budget to contract these services is $80,000.00.
Funds are available in account: 512043490-5212115 / 81000010-
5212115.
Alternatives:No alternatives are recommended.
Recommendation:Augusta Utilities recommends awarding the contract to Cranston
Engineering Group, PC in the amount of $80,000.00
Funds are Available
in the Following
Accounts:
Funds are available in account: 512043490-5212115 / 81000010-
5212115.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Purchase of Q-Matic Customer Service Flow Management System for Augusta Utilities Customer Service
to be located at 452 Walker Street.
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Consider approval of purchase of Q-Matic Customer Service Flow
Management System for Augusta Utilities Customer Service to be
located at 452 Walker Street.
Background:The newly renovated building at 452 Walker Street will
house the Administrative and Customer Services Offices. The
Utilities Department will be relocating and consolidating its
Customer Service Office, currently located in the ANIC Building
on Laney Walker Blvd. and its Administrative Services Offices,
currently located Bay St., to the Walker St. location.
Analysis:Augusta Utilities has purchased and installed a Q-Matic Customer
Service Flow Management System at its Peach Orchard Rd.
Customer Service location. AUD has a shared capacity licensee
agreement with the Tax Commissioner’s Southside Tax/Tag
Office for the Q-Matic System. As part of the Customer Service
Operations center at Walker St., AUD would like to purchase and
install the same Q-Matic Customer Service Flow Management
System. This new system will add on to the current licensed
system and utilize the enterprise server that is already in place for
the south side AUD and Tag Offices.
Financial Impact:Funding in the amount of $ 48,320.40 is available from accounts:
506043110/5424510
Alternatives:No alternatives are recommended.
Recommendation:Augusta Utilities Department recommends the Commission
approve the purchase of the Q-Matics Customer Service Flow
Management System for the new Augusta Utilities Walker St.
Administration and Customer Service Office Location
Funds are Available
in the Following
Accounts:
Funding in the amount of $ 48,320.40 is available from accounts:
506043110/5424510
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Invitation to Bid
Sealed bids will be received at this office until Friday, October 7, 2016 @ 11:00 a.m. for furnishing:
Bid Item #16-243 Electric Motor Bake Oven With Track Floor Cart – Augusta Utilities Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents
may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901.
Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department.
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office
of the Procurement Department by Friday, September 23, 2016 @ 5:00 P.M. No bid will be accepted by fax, all must be received
by mail or hand delivered.
No bids may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of contract with the
successful bidder.
The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference an
eligible bidder must submit a completed and signed written application to become a local bidder at least thirty (30) days prior to
the date bids are received on an eligible local project. An eligible bidder who fails to submit an application for approval as a local
bidder at least thirty (30) days prior to the date bids are received on an eligible local project, and who otherwise meets the
requirements for approval as a local bidder, will not be qualified for a bid preference on such eligible local project.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications
prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies
needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement
Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director.
All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate
committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the
outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement
Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of
receiving incomplete or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle September 1, 8, 15,22, 2016
Metro Courier September 7, 2016
OFFICIAL
Bid Item #16-243 Electric Motor Bake Oven with Track Floor Cart
for Augusta, Georgia - Utilities Department
Bid Date: Friday, October 7, 2016 at 11:00 a.m.
VENDORS
Lewco, Inc
706 Lane Street
Sandusky, OH 44870
Attachment B YES
E-Verify Number 229328
SAVE Form YES
Make LEWCO
Model EWR05ED-60-60-60
Price $29,936.00
Make LEWCO
Model NS-OVEN CART
Price $3,636.00
Total Price $33,572.00
Flat Track Cart Model FC555 or Approved Equal:
Total Number Specifications Mailed Out: 16
Total Number Specifications Download (Demandstar): 3
Total Electronic Notifications (Demandstar): 66
Mandatory Pre-Bid/Telephone Conference: NOT APPLICABLE
Total packages submitted: 1
Total Noncompliant: 0
Electric Serviced Model 555 ETC or Approved Equal:
Page 1 of 1
UTILITIES
Tom Wiedmeier, P.E.
Director
DEPARTMENT
Stephen H. Orton
Maintenance Superintendent
DATE:
TO:
FROM:
SUBJECT:
Tom Wiedmeier, P.E., and Utilities nirector{$lt)
Bid rtem #16-243 Electric Motor Bake oven with rrack Floor cart
After reviewing all qualified bid submissions for the above referenced project, Lewco, Inc. wasfound to be the lowest responsive bidder with a bid of $33, 572.00. AUD has the funds for thispurchase.
MEMO
January 25,2017
Geri Sams, Procurement I)irector
Facility Maintenance Division
2822 Cenlral Ave. - Augusta, GA 30901
(706\ 836-7283
WWW.AUGUSTAGA.GOV
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Recommendation of Award for Bid Item #16-243 Electric Motor Bake Oven
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Recommendation of Award for Bid Item #16-243 Electric Motor
Bake Oven.
Background:The Utilities Department has worked with the Procurement
Department to solicit bids for an Electric Motor Bake Oven with
Track Floor Cart. This equipment will be used to remove
moisture from electric motors after cleaning operations and to cure
protective coatings applied to motor windings during repair. The
only bid for this equipment is from Lewco, Inc., Sandusky, Ohio.
Analysis:Our review of the bid has determined that it meets the
specification requirements and the bid amount of $63,508.00 is
reasonable. This equipment will improve our capabilities for
repairing and maintaining our system equipment.
Financial Impact:$63,508.00 from budgeted funds
Alternatives:Reject the bids received from Bid Item #16-254
Recommendation:We recommend approval to award this bid to Lewco, Inc. at a cost
of $63,508.00.
Funds are Available
in the Following
Accounts:
506043580-5421110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Invitation to Bid
Sealed bids will be received at this office until Tuesday, November 29, 2016 @ 11:00 a.m. for furnishing:
Bid Item #16-254 Motor Balance Machine – Augusta Utilities Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents
may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901.
Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department.
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office
of the Procurement Department by Monday, November 14, 2016 @ 5:00 P.M. No bid will be accepted by fax, all must be received
by mail or hand delivered.
No bids may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of contract with the
successful bidder.
The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference an
eligible bidder must submit a completed and signed written application to become a local bidder at least thirty (30) days prior to
the date bids are received on an eligible local project. An eligible bidder who fails to submit an application for approval as a local
bidder at least thirty (30) days prior to the date bids are received on an eligible local project, and who otherwise meets the
requirements for approval as a local bidder, will not be qualified for a bid preference on such eligible local project.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications
prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies
needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement
Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director.
All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate
committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the
outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement
Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of
receiving incomplete or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle October 20, 27, November 3, 10, 2016
Metro Courier October 26, 2016
OFFICIAL
VENDORS
Hines Industries
240 Metty Drive
Ann Arbor, MI 48103
Yonce Electric Motors
243 Ridgeview Lake Road
Ridge Spring, SC 29129
Attachment B YES
E-Verify Number Exempt Affidavit
SAVE Form YES
Make IRD
Model B50 & 2965
Price Non-Compliant $72,100.00
Total Number Specifications Mailed Out: 16
Total Number Specifications Download (Demandstar): 2
Total Electronic Notifications (Demandstar): 260
Mandatory Pre-Bid/Telephone Conference: NOT APPLICABLE
Total packages submitted: 2
Total Noncompliant: 1
B-Series - B50 2300KG (5000lb) Capacity Horizontal Balancing Machine or Approved
Equal and Model 2965 Balancing Computer or equal:
Bid Item #16-254
Motor Balance Machine
for Augusta, Georgia - Utilities Department
Bid Date: Tuesday, November 29, 2016 at 11:00 a.m.
Page 1 of 1
UTILITIES
TomWiedmeier, P.E.
Director
DEPARTMENT
Stephen H. Orton
Maintenance Superintendent
DATE:
TO:
FROM:
SUBJECT:
Tom Wiedmeier, P.E., and Utilities Uirector-{v0fd
MEMO
January 2512017
Geri Sams, Procurement Director
Bid ltem #16-254 Motor Balance Machine
After reviewing all qualified bid submissions for the above referenced project, Yonce Electric
Motors, was found to be the lowest responsive bidder with a bid of $72,100.00. AUD has the
funds for this purchase.
Facility Maintenance Division
2822 Cerltral Ave. - Augusta, GA 30901
(706) 836-7283
WWW.AUGUSTAGA.GOV
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Recommendation of Award for Bid Item #16-254 Motor Balance Machine
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Recommendation of Award for Bid Item #16-254 Motor Balance
Machine.
Background:The Utilities Department has worked with the Procurement
Department to solicit bids for a Motor Balance Machine. The
only compliant bid for this equipment is from Yonce Electric
Motors of Ridge Spring, South Carolina.
Analysis:Our review of the compliant bid has determined that it meets the
specification requirements and the bid amount of $72,100.00 is
reasonable. This equipment will improve our capabilities for
repairing and maintaining our system equipment.
Financial Impact:$72,100.00 from budgeted funds
Alternatives:Reject the bids received from Bid Item #16-254
Recommendation:We recommend approval to award this bid to Yonce Electric
Motors at a cost of $72,100.00.
Funds are Available
in the Following
Accounts:
506043580-5421110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Rock Creek Sanitary Sewer Basin Map
Preliminary Scoping Document
City of Augusta – Utilities Department
Rock Creek Sanitary Sewer Smoke Testing
Date: February 3, 2017 (REV0)
Prepared for:
Steve Behrend, PE
Augusta Utilities Department
360 Bay Street Suite 180, Augusta, GA 30901
Prepared by:
Greg Anderson, PE
McKim & Creed, Inc.
2400 Colley Avenue
Norfolk, VA 23517
Project Understanding
It is understood that the City of Augusta Utilities Department, AUD, desires to contract
with McKim & Creed, Inc. to conduct a storm water inflow identification effort in the
Rock Creek service area. The Rock Creek service area includes approximately
267,100 linear feet of gravity sewers ranging in size from 8” to 24”. In 2016 McKim &
Creed completed an open channel flow monitoring project to identify the source(s) of
extraneous wet weather flow. As part of that effort the Rock Creek collection system
was divided into multiple catchments, eight (8), and open channel flow monitors were
deployed in each catchment area; see map below. The results of the flow monitoring
effort identified five (5) of the eight (8) catchments as having excessive wet weather
flow. The catchments with excessive wet weather flow include sub-basins 2, 3, 5, 6 and
7.
This project will utilize smoke testing and dye water flooding activities to pin-point the
locations of the storm water inflow sources and a Technical Memorandum will be
prepared that identifies the location of the sources, methodologies for removing the
inflow sources and projected cost opinions for completing the necessary storm water
inflow abatement activities.
Scope of Services
As previously described, smoke testing will be completed in five (5) catchment areas
that exhibited excessive wet weather flow. These catchment areas include sub-basins
2, 3, 5, 6 and 7. The table below highlights the pipe sizes and lengths of the gravity
collection sewers in each sub-basin.
Meter
Sub-
Basin
8-Inch
Piping
(LF)
10-Inch
Piping
(LF)
12-Inch
Piping
(LF)
15-Inch
Piping
(LF)
18-Inch
Piping
(LF)
24-Inch
Piping
(LF)
Total
Length
(LF)
Number of
Manholes
2 19,492 825 3,770 0 0 0 24,087 140
3 19,422 2,302 2,922 0 56 0 24,702 111
5 25,680 889 0 1152 0 0 27,721 135
6 40,778 389 480 110 5,413 1,212 48,382 193
7 30,237 0 424 2,171 0 371 33,203 136
Totals 135,609 4,405 7,596 3,433 5,469 1,583 158,095 775
A. Smoke Testing – Smoke testing will be conducted to detect specific inflow points
such as storm sewer cross connections and point source inflow leaks in drainage
paths or ponding areas, roof leaders, cellar, yard and area drains, foundation drains,
abandoned building sewers, and faulty service connections. Smoke generators will
be used to produce the smoke required for testing. The smoke shall be non-toxic,
odorless, and non-staining. Photographs shall be taken of smoke emitting from the
ground, catch basins, pipe, or other inflow sources during the tests.
McKim & Creed shall isolate the line sections being tested by using sandbags or
plugs. No more than three (3) reaches, or a maximum of 800 feet of sewer piping
will be tested at a time. Smoke testing will not be conducted on rainy days or when
groundwater conditions are to a point that would hamper accurate testing results.
McKim & Creed understands that AUD reserves the right to make final
determinations of favorable conditions for conducting smoke testing. Testing shall
be closely monitored on windy days. If smoke coming out of the ground is blown
away so quickly as to escape accurate detection, testing will cease until such a time
that conditions are more favorable.
Observations regarding each leak identified shall be documented in a smoke testing
journal based on the distance of the defect from the upstream manhole and distance
to the left or right from the mainline gravity sewer. The journal shall include address,
sewer line identification, personnel, defect data, and a schematic layout of the
manhole, surrounding area, and sewer line under test. All smoke leaks discovered
shall be photographed and each leak location shall be shown on a smoke sketch. All
information recorded in each smoke testing journal will be compiled onto a Smoke
Testing Form for each test setup where a defect was recorded. At a minimum the
following information shall be included on the forms:
Manhole numbers of reach smoked and length of piping
Description of leak, including address
Ties to leak, including at least two measured distances from the upstream
manhole and from the centerline of the gravity sewer
Area and type of surface drained by leak
Approximate volume of inflow contribution based on 1 inch of rainfall
All smoke defects will be quantified by giving consideration to the
surrounding area contributing to the defect and the size and density of
the smoke encountered. A mass balance will be undertaken based on
flow monitoring results to insure proper RDI/I quantification. During the
smoke testing phase it will be necessary for McKim & Creed to
communicate daily with the fire department and citizens being affected
by the testing. The location of the crews will be communicated to the fire
department each day prior to commencing the tests and smoke testing
“Notice to Property Owners/Residences” will be distributed prior to
testing. The I/I Field Investigation Procedures for Smoke Testing are as
follows:
a) Select area to be tested and develop working field maps of the area.
b) Field review the area selected and note on the map all “hundred block”
addresses.
c) Distribute smoke notice to all homes, businesses, schools, etc.
d) During the initial field review, identify all types of businesses, specifically
any doctors offices, hospitals, schools, retirement homes (communities)
or any other establishment that may need special consideration and
coordination during the actual smoke test. Strict consideration and
coordination with customers who have sensitive needs must be adhered
to, some of whom will not be included on any smoke testing schedule as
the nature of their business, such as hospitals, is far too delicate.
e) Forty eight hours minimum must expire from the issuance of smoke
testing notices to allow all affected to prepare for the testing or call with
special exceptions, such as persons with health problems living at home
or working elsewhere in the study area, etc.
f) On the day of the testing a selected portion of the smoke testing area will
be identified and all street names and related hundred block addresses
will be provided to the fire department in the area where the testing will
occur. UNDER NO CIRCUMSTANCES WILL THE AREA SELECTED
FOR THAT DAY’S TESTING BE MODIFIED TO INCLUDE ADDITIONAL
WORK UNLESS THE FIRE DEPARTMENT HAS BEEN NOTIFIED
FIRST. The name and contact number of the fire department person
spoken to must be documented on the appropriate form. The fire
department must know the exact locations and specific time frames of
where and when the tests will be performed.
g) Multi day scheduling with one time reporting to the fire department is not
permitted. Daily scheduling and contact with the appropriate fire
department will be performed.
h) AUD’s Project Manager will be notified on a daily basis with the same
information.
i) Should the fire department respond to the target area during the actual
smoke testing, all testing will cease immediately and the McKim & Creed
field supervisor in charge will contact the fire unit responding to answer
any questions that the fire department officer may have.
j) All testing activity must cease when any resident/occupant complains of
smoke entering their residence/establishment. McKim & Creed’s field
personnel will then attempt to isolate where the smoke is entering the
affected building and make the occupant aware of what the problem may
be. All defective plumbing found inside will be documented appropriately
for future reference. The occupant will be advised to have the defect
repaired by a registered plumber.
k) During the actual smoke testing, McKim & Creed field personnel will scout
the area for smoke escaping from ground sources, area way drains, roof
vents, storm drain structures, etc. All sources of RDI/I should be
photographed, measured, drawn, and documented accordingly with
addresses, data, and sketches. The smoke test form will identify which
sewer reach is being tested by its component identification.
A Smoke Testing Letter Report will be prepared to identify the results of the smoke
testing activity. The report will also include identification of the proposed scope of
work associated with the necessary dye water flooding activity.
B. Dye Water Testing - Dyed water testing/flooding will be used to perform leak
investigations, test manhole connections and locate cross connections between
sanitary and storm sewer systems. Dyed water flooding will be accomplished by
flooding the ground surface or a pipe segment with color-dyed water to simulate a
storm water runoff condition. Dyed water flooding may or may not be performed in
conjunction with CCTV inspection.
McKim & Creed assumes up to fifteen (15) dyed water tests will be required as part
of the storm water inflow source identification. Dyed water testing shall be performed
on questionable or suspected inflow sources, so that positive identification and
quantification can be made. Dyed water testing locations shall be approved by AUD
prior to implementation. Water for dye testing will be furnished by AUD from
approved locations.
Public sector dyed water flooding shall be conducted through an injection of a large
volume of water, colored by non-toxic dye, into a designated catch basin or storm
drain section that crosses or is in close proximity to a sanitary sewer. Priority shall
be given to storm drains that tested positive during smoke testing. The storm drain
will normally be plugged to simulate surcharged conditions. The flooding results
shall include the following information:
Evidence of dyed water in manholes downstream from the ponding area,
stream crossing, or other suspected sources where the dyed water is
placed;
Time of travel from contributing source to manhole sampled, and the
concentration of the dyed water;
A CCTV camera shall be used in the suspected sewer that crosses under
the storm drain pipe to document any direct or indirect cross connection.
During each test, sanitary sewers, storm drains, and curb lines located downstream
of the sources shall be monitored for signs of dyed water. The quantity of dye
concentrate and water used will vary depending on pipe size and the quantity of flow
and debris in each line section. Documentation shall be a combination of
handwritten log sheets, sketches, and photographs.
The I/I Field Inspection Procedures for Dyed Water Flooding are as follows:
a) There will be no testing performed on days when the ambient temperature
does not rise above the freezing point.
b) A mixture of water and any approved dye coloring substance will be
introduced to the identified source. McKim & Creed field staff will be
stationed immediately downstream on the local sanitary and storm sewer
lines. Observations, whether positive or negative, will be documented
appropriately. Whenever possible the dyed water point of exit will be
recorded by closed circuit television inspection equipment.
c) Prior to any testing, the appropriate AUD staff shall be notified of the specific
location of testing and what waterways may be affected.
d) Fire hydrants used to supply the water source needed will be opened very
slowly and closed in the same manner. Should the water be running cloudy
or dirty after use, the fire hydrant will be left open at a slow pace until the
water clears up. If long term draining is required, McKim & Creed shall
notify AUD.
Dye testing will also be used to establish which sewer flows have been combined
and how the systems are interconnected. The results of the observations of dye
testing shall be summarized on standardized forms. The information recorded on the
form shall include the upstream manhole number, location of the manhole or line
flooding, locations of leaks observed in sanitary sewer pipe, and any other pertinent
information regarding the test results.
C. Technical Memorandum - Upon completion of the field investigations a Technical
Memorandum will be prepared which highlights the work which was completed,
identifies the locations where storm water inflow sources were encountered and
presents the results of the associated dye water flooding activities. The Technical
Memorandum will also include recommendations to abate the storm water inflow
sources. The recommendations for repair, rehabilitiation, or replacement will be
developed with corresponding budgetary cost opinions. Repair methodologies that
will be considered include traditional replacement, and various forms of rehabilitation.
Work which can be completed by AUD forces versus a third party contractor will be
presented separately. Maps and graphics will be developed illustrating the location of
degraded infrastructure and recommended repairs. McKim & Creed will provide the
Technical Memorandum in ‘draft form’ for AUD review and comment and schedule a
review meeting to discuss the Report results and recommendations.
Fee Schedule
For the services outlined above, the McKim & Creed shall be compensated for the
services as follows:
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Rock Creek Sanitary Sewer Basin Smoke and Dye Testing
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Consider proposal from McKim & Creed to perform smoke and
dye testing in the Rock Creek Sanitary Sewer Basin.
Background:The Utilities Department continues to evaluate the existing
sanitary sewer collection system to determine locations of
excessive rainfall-derived inflow and infiltration (RD I/I).
Reducing RD I/I entering the system improves the available sewer
pipe transmission capacity as well as reduces the flow to the
treatment plant. In accordance with RFP 15-189, McKim &
Creed performed flow monitoring analysis of the Rock Creek
Sanitary Sewer Basin, and submitted a technical report
documenting the monitoring data gathered and their analysis. The
flow monitoring study found areas of excessive wet weather flow
(RD I/I). Augusta Utilities requests to contract McKim & Creed
to provide services to continue the evaluation by performing
smoke and dye testing to identify the locations of the storm water
inflow. Their services will include submitting a technical
memorandum that documents the inflow locations, methodologies
for removing the inflow sources, and project cost opinions for
completing the necessary storm water inflow abatement activities.
Analysis:The Utilities Department evaluated the McKim and Creed
proposal and has determined the proposed fee of $82,083.00 to be
reasonable based on the scope of work.
Financial Impact:Funds are available in 512043420-5212999 / 80800010-5212999.
Alternatives:No alternatives are recommended.
Recommendation:We recommend approval for McKim & Creed to perform smoke
and dye testing in the Rock Creek Sanitary Sewer Basin for the
fee of $82,083.00.
Funds are Available
in the Following
Accounts:
Funds are available in the following account: 512043420-
5212999 / 80800010-5212999.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Task Description Fee
Duration
(Calendar Days)
1 Environmental Permitting $8,825 120 Days
Wetland Delineation (Sub-Consultant) $1,350
Jurisdictional Area Determination Request (Sub-Consultant) $2,600
Agency Coordination (Sub-Consultant) $675
Nationwide Permit Application (Sub-Consultant) $3,500
Project Management (WRTE) $700
2 Surveying & Database Preparation $19,700 30 Days
Route Survey (SR 56) (Sub-Consultant) $6,200
Lift Station Topographic Survey (Sub-Consultant) $4,800
Lift Station Plats (Sub-Consultant) $2,400
Wetland Location (Sub-Consultant) $1,600
Easement Maps (Sub-Consultant) $4,000
Project Management (WRTE) $700
3 30% Preliminary Plans - Plan/Profile $6,655 30 Days
Prepare 30% (Plan & Profile) Plans for review with AUD $5,615
Attend 30% Review Meeting with AUD and GMC $1,040
4 60% Preliminary Plans - Alignment Revisions $35,020 120 Days
Prepare 60% Plans (construction plans for permitting) for review with AUD and GMC $14,630
Prepare and submit Environmental Permitting $4,300
Prepare and submit Railroad Coordination/Permitting $4,300
Prepare and submit GDOT Encroachment Permitting $4,300
Prepare and submit Augusta Richmond County Permitting $4,300
Prepare and submit Preliminary Easement Maps $2,150
Attend 60% Review Meeting with AUD and GMC $1,040
5 90% Final Construction Plans and Technical Specs $17,630 30 Days
Prepare 90% Final Construction Documents and Technical Specifications $12,280
Revise Easement Maps and Permitting Documents as Required $5,350
6 100% Final Construction Plans and Technical Specifications $6,465 20 Days
Prepare 100% Final Construction Documents and Technical Specifications $6,465
7 Pre-Construction $5,350 60 Days
8 Construction Phase Services $6,500 180 Days
Total $106,145
Notes
PROFESSIONAL SERVICES PROPOSAL #1 - TE P17014
ROCKY CREEK SANITARY SEWER FORCE MAIN (AUD Project #60135)
Toole Surveying Company, Inc.
308 Fourth Street · Augusta, Georgia 30901
(Voice) 706-722-4115 · (Fax) 706-722-4118 · www. toolesurveying.com
February 6, 2017
Last Revised 2/23/17
W. R. Toole Engineers, Inc.
1005 Broad Street
Augusta, Georgia 30901
Attention: Vic Conover, PE
Subject: Rocky Creek Sanitary Sewer
Database Preparation – Additional Topographic Mapping
TSC Proposal P17025
SCOPE OF SERVICES
Toole Surveying Company will provide the following services:
TSC will provide additional topographical mapping for the Proposed Rocky Creek sanitary sewer as
indicated on a PDF provided by you. The additional mapping will be right of way to right of way on
Mike Padgett Highway between Chester Avenue and Lumpkin Road.
Property lines will be compiled from recorded deeds, plats, GIS information and field-located property
corners where possible.
TSC will locate & map wetland delineations at the three pumping stations and Hwy 56.
A topographic survey of three proposed pumping stations approximately 150’ x 150’ at each site with
1’ contour intervals.
A plat of the 3 proposed pumping stations parcels. This assumes that planning and
Zoning will not require us to survey the parent tract for subdivision approval.
8 compiled easement maps for the proposed sewer.
UTILITIES
TSC will be responsible for the location of on-site sanitary and storm sewer systems and visible above ground
utilities within the project area. TSC assumes no liability for the inclusion or accurate location of non-visible
underground utilities. An option to hire a private spray locate service is available if needed.
FEES These services will be provided for the lump sum fee shown below:
Task 1 Database Preparation – Route Survey Mike Padgett Hwy $6,200.00
Task 2 Topographic mapping of three Proposed Pumping Stations $1600.00 Each $4,800.00
Task 3 A subdivision plat of the three Proposed Pumping Stations $800.00 Each $2,400.00 Task 4 Locate and Map Wetlands at three Proposed Pumping Stations & Hwy 56 $1,600.00
Task 5 Eight compiled Easement Maps (500.00 / per map) $4,000.00
DELIVERABLES
1 Electronic AutoCAD File and XML containing the topographic drawing and DTM surface.
A plat of each of the three pumping stations. The parent tract will not be shown.
TIME-FRAME
Field services will be initiated within four (4) days of written authorization to proceed. The final topographic
survey will be provided to your office within approximately 20 working days thereafter.
Again, Toole Surveying Company, Inc. appreciates the opportunity to propose our professional services to you.
Should you have any questions regarding the information contained herein, please do not hesitate to contact us.
Sincerely,
Toole Surveying Company, Inc.
Barry A. Toole, R.L.S.
Project Manager
Lumpkin Rd M
i
k
e
Pa
d
g
ett H
w
y
Doug Barnard Pkwy
D
o
u
g
B
a
r
n
a
r
d
P
k
w
ySource: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Rocky CreekPump Station and Force Main
Augusta Utilites Department360 Bay Street, Suite 180Augusta, GA 30901
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Rocky Creek Force Main Design
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Consider Professional Services Proposal from WR Toole
Engineers, Inc. for the Rocky Creek Force Main Design Project
in the amount of $ 106,145.
Background:The replacement of the lower section of the Rocky Creek Trunk
Sewer between Doug Barnard Parkway and Mike Padgett
Highway is included in Utilities' Capital Improvements Program.
The extreme rain events that occurred in January resulted in
significant sanitary sewer overflows immediately upstream of
this reach. Because of the severity of the overflows and the
hardship it caused for the Fleming Acres neighborhood, we
proceeded on an emergency basis with the design of a pumping
station and force main to replace the trunk sewer.
Analysis:The construction of a pump station and force main was selected as
the fastest and most reliable means of mitigating future overflows.
Because of their previous design experience in the Rocky Creek
basin, W.R. Toole Engineers was selected to provide professional
services for the force main design.
Financial Impact:WR Toole Engineers, Inc. has proposed to provide professional
design services for this project for a fee of $106,145. We have
reviewed the scope of work and associated fees and find them to
be reasonable.
Alternatives:No alternatives are recommended.
Recommendation:Augusta Utilities Department recommends the proposal from WR
Toole Engineers, Inc. in the amount of $106,145 be approved.
Funds are Available
in the Following Funds are available in the following accounts: 514043420-
Accounts:5212115 / 81700030-5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Lumpkin Rd M
i
k
e
Pa
d
g
ett H
w
y
Doug Barnard Pkwy
D
o
u
g
B
a
r
n
a
r
d
P
k
w
ySource: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Rocky CreekPump Station and Force Main
Augusta Utilites Department360 Bay Street, Suite 180Augusta, GA 30901
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Rocky Creek Pump Station Design
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Consider Professional Services Proposal from Goodwyn, Mills
and Cawood for the Rocky Creek Pump Station Design Project in
the amount of $264,641.
Background:The replacement of the lower section of the Rocky Creek Trunk
Sewer between Doug Barnard Parkway and Mike Padgett
Highway is included in Utilities' Capital Improvements Program.
The extreme rain events that occurred in January resulted in
significant sanitary sewer overflows immediately upstream of
this reach. Because of the severity of the overflows and the
hardship it caused for the Fleming Acres neighborhood, we
proceeded on an emergency basis with the design of a pumping
station and force main to replace the trunk sewer.
Analysis:The construction of a pump station and force main was selected as
the fastest and most reliable means of mitigating future overflows.
Because of their previous experience with similar projects for
AUD, Goodwyn, Mills and Cawood was chosen to perform the
pumping station design.
Financial Impact:Goodwyn, Mills and Cawood has proposed to provide
professional design services for this project for a fee of $264,641.
We have reviewed the scope of work and associated fees and find
them to be reasonable.
Alternatives:No alternatives are recommended.
Recommendation:Augusta Utilities Department recommends the proposal from
Goodwyn, Mills and Cawood in the amount of $264,641 be
approved.
Funds are Available
in the Following
Accounts:
Funds are available in the following accounts: 514043420-
5212115 / 81700030-5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Sole Source Procurement of Replacement Pump for Large Wastewater Pumping Stations
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Approve Sole Source Procurement of Replacement Pump for
Large Wastewater Pumping Stations.
Background:Augusta Utilities is in need of a replacement pump for one of our
large wastewater pumping stations. In order to insure system
compatibility and interchangeability we have solicited a quotation
for a replacement from the manufacturer’s representative Pump &
Process Equipment, Inc. We have determined that they are indeed
the sole source for this replacement equipment. The quoted price
for this replacement equipment is $54,397.00.
Analysis:In order to improve our proficiency in operating and maintaining
our pumping systems we have worked to use the same pumping
equipment where it meets the specific service requirements. We
have in fact installed these same pumps in multiple locations.
Procurement of this pump will provide a replacement for a current
installation and the existing pump will be rebuilt to serve as a
spare that can be used in any of the other locations. Having a spare
will reduce the pumping station interruption in the event of a
pump failure.
Financial Impact:$54,397.00 from budgeted funds
Alternatives:No recommended alternatives.
Recommendation:We recommend approval of the purchase of the quoted pump from
the sole source vendor Pump & Process Equipment, Inc.
Funds are Available
in the Following
Accounts:
506043580-542110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Augusta-Richmond County, Georgia
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase VI 3,460,112$
972,669$
142,000$
4,574,781$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
AMENDMENT NUMBER EIGHT
Stormwater Utility Program
CPB#328-041110-211828002
Honorable Hardie Davis, Jr., Mayor
CAPITAL PROJECT BUDGET
STORMWATER UTILITY Program
Stormwater Utility Program
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia
that the following Capital Project Budget is hereby adopted:
Section 1: This project is authorized to CPB#328-041110-211828002 Change Number Eight for Phinizy Center
for Watershed assessment & Inventory Project in the amount of $142,000.00 from Stormwater. This request is
for the completion of phase three of Task C-Inventoryh Receiving Streams. This project will be funded
through SPLOST PHASE VI as requested by AED
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For
information reference this request, contact Engineering at ext 5070. Thanks
1 of 2 3/3/2017
Augusta-Richmond County, Georgia CPB#328-041110-211828002
CAPITAL PROJECT BUDGET
CPB AMOUNT ADDITION NEW
SOURCE OF FUNDS CPB REQUEST CPB
SPLOST, PHASE VI
328-041110-211828002 ($3,460,112)($3,460,112)
STORMWATER PROGRAM
581-044320 ($972,669)($142,000)($1,114,669)
TOTAL SOURCES:($4,432,781)($142,000)($4,574,781)
USE OF FUNDS
ENGINEERING
328-041110-5212115-211828002 $3,460,112 $3,460,112
SW
581-044320 $972,669 $142,000 $1,114,669
TOTAL USES:$4,432,781 $142,000 $4,574,781
2 of 2 3/3/2017
(SA02) – For changes greater than $20,000)
AUGUSTA-RICHMOND COUNTY
AUGUSTA, GA ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
WHEREAS, We, Phinizy Center for Water Sciences, Consultant, entered into a contract with Augusta-
Richmond County on February 18, 2014, for Engineering Design Services associated with the Stormwater
Utility Fee Implementation Project No. 328-041110-211828002, File Reference No. 15-014 (A), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by
the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit:
It is agreed that as a result of the above described modification the contract amount is increased by
$142,000.00 from $383,760.00 to a new total of $525,760.00.
Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in
no way modifies or changes the original contract of which it becomes a part, except as specifically stated
herein.
NOW, THEREFORE, We, Phinizy Center for Water Sciences, Consultant, hereby agree to said
Supplemental Agreement consisting of the above mentioned items and prices, and agree that this
Supplemental Agreement is hereby made a part of the original contract to be performed under the
specifications thereof, and that the original contract is in full force and effect, except insofar as it might
be modified by this Supplemental Agreement.
This day of , 2017
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY PHINIZY CENTER FOR WATER SCIENCES
AUGUSTA, GEORGIA
Hardie Davis, Jr., Mayor
Approved: Date Approved: Date
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title: Title:
Augusta Richmond County Project Number(s): 328-041110-211828002
Supplemental Agreement Number: 2
Purchase Order Number: 242217
Additional services to Inventory Receiving Streams
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of
Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Stormwater Utility Program-SA2
Department:Engineering
Presenter:Abie L. Ladson - Director
Caption:Approve Supplemental Agreement Two for the Phinizy Center for
Watershed Assessment & Inventory Project in amount of
$142,000 for the completion of phase three of Task C-Inventory
Receiving Streams as requested by AED.
Background:Watershed assessment & analysis, and Inventory and mapping of
stormwater conveyance system are warranted to address
increasing maintenance needs and comply with federally
mandated regulations. Historically, watershed assessments and
flood mapping and modeling have provided Augusta-Richmond
County with limited data to make informed decisions about
flooding, creek health relative to Georgia water quality standards,
and planning. Task C work provides significantly more actionable
data that can be integrated into better stormwater management
decisions for the county and also lays the foundation for more
detailed water quality work in the future. The Center has
completed three basins, Rock Creek, Rae’s Creek, and Rocky
Creek as Phase 1 and phase 2. There are four (4) creek basins,
Oates Creek, Butler Creek, Spirit Creek, and McBean Creek yet to
be completed.
Analysis:Augusta Commission on February 18, 2014 approved funding for
phase 1 the project for data inventory and assessment. A Phase
approach was developed as a result of available funding
constraints to complete the project. Task C is in progress and
funds are needed to complete work in selected remaining creek
basins.
Financial Impact:Funds are available in Stormwater Utility Contract Funds.
Alternatives:1) Approve Supplemental Agreement two for the Phinizy Center
for Watershed Assessment & Inventory Project in amount of
$142,000 for the completion of phase three of Task C-Inventory
Receiving Streams as requested by AED. 2) Do not approve and
find alternative ways to complete stormwater system and drainage
system condition assessment and federally mandated required
stormwater system inventory work.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
Funds are available in SWU contract services
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Utilities SPLOST Funding
Current SPLOST
Funding
Proposed SPLOST
Reallocation
Paving Various Dirt Roads $ 573,840
Davis Road $ 274,047 $ 1,125,962
St. Sebastian Way $ 595,000 $ 615,599
Hollywood SD Wetland Area $ 970,000
Wrightsboro Road Widening Phase I $ 80,000
Carrie Mays Park CNG Remediation $ 1,381
East Boundary Street & Drainage
Improvements.
$ 32,218
Rae's Creek $ 303,332
Morgan Road $ 441,208
Unspecified Utility Relocations $ 1,529,465
Total: $ 3,271,026 $ 3,271,026
Engineering Services Committee Meeting
3/14/2017 1:10 PM
Utilities Department funding in various SPLOST accounts
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Approve recapture and reallocation of Utilities related SPLOST
funding.
Background:Funding for specific Utilities Department projects has been
included in prior SPLOST referendums. Funds remain in these
budgets for projects that either under-ran the approved amount,
the scope of the project was changed , or work was
accomplished by other means . T hese funds were primarily
related to utility relocation associated with road or drainage
projects.
Analysis:We recommend that Utilities related SPLOST funding be
reallocated as indicated on the attached sheet. This reallocation
will allocate undesignated funding to a Utility Relocation budget
to be used in conjunction with road and drainage projects.
Financial Impact:This action would be result in no net change in Utilities’ SPLOST
funding.
Alternatives:The Commission could elect not to adjust funding as
recommended, however some SPLOST funding would not be
available for its intended use.
Recommendation:We recommend that SPLOST funding be reallocated as
recommended.
Funds are Available
in the Following
Accounts:
SPLOST
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission