HomeMy WebLinkAbout2016-08-30-Meeting Minutes Engineering Services Committee Meeting Commission Chamber - 8/30/2016
ATTENDANCE:
Present: Hons. Hardie Davis, Jr., Mayor; Fennoy, Chairman; Hasan, Vice
Chairman; Guilfoyle, member.
Absent: Hon. Smith, member.
ENGINEERING SERVICES
1. Motion to authorize condemnation to acquire of a portion of property for right of
way and temporary construction easement, (Parcel 045-4-202-00-0) 1550
Wrightsboro Road.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Ben Hasan
Commissioner
Wayne Guilfoyle Passes
2. Motion to approve RFQ #16-178: Task Order Program (2016) for Utilities
Department in the amount of $5,000,000.00 for execution by JAMCO Civil Inc.;
Blair Construction, Inc., CHB, and Beams Contracting as qualified and selected
contractors.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Ben Hasan Passes
3. Discuss ways to implement a "Gateways enhancement plan" focus throughout
Richmond County in the 2017 budget. (Requested by Commissioner
Frantom)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve
receiving this item as
information.
Motion Passes 3-0.
Commissioner
Ben Hasan
Commissioner
Wayne Guilfoyle Passes
4. Consider proposal from ZEL Engineering for Hydraulic Model Update and
Water System Improvements.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Ben Hasan
Commissioner
Wayne Guilfoyle Passes
5. Motion to approve the minutes of the Engineering Services Committee held on
August 9, 2016.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Ben Hasan
Commissioner
Wayne Guilfoyle Passes
6. Discuss the obstruction of storm drains along the face of any street or gutter
curbing as enumerated in the attached City Code Section 3-8-9. (Requested
by Commissioner Fennoy)
Item
Action:
Rescheduled
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Defer Motion to refer this
item back to the next
Commissioner
Wayne Commissioner
Passes
committee meeting.
Motion Passes 3-0.
Guilfoyle Ben Hasan
7. Approve award of the On-Call Pothole Repair, Paving and Emergency Repair
Services Contract to Blair Construction, Beam’s Contracting, and Georgia-
Carolina Paving. Award is contingent upon receipt of signed contracts and
proper insurance documents. Also, approve $1,000,000 to fund the proposed
On-Call Pothole Repair, Paving and Emergency Repair Services as requested by
AED. (RFP 16-161)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Ben Hasan Passes
8. Approve award of the On-Call Tree Removal Services Contract to Atlanta
Premier Tree, Big Dog, and Jamco Civil, LLC,. Award is contingent upon
receipt of signed contracts and proper insurance documents. Also, approve
$250,000 to fund the proposed On-Call Tree Removal Services as requested by
AED. (RFP 16-156)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Ben Hasan Passes
9. Approve awarding low bid in the amount of $55,486.00 to Graybar for street
light poles and fixtures for replacements/repairs in the Augusta Richmond
County Urban areas for a period of one year. Funding is available in the Street
Lighting budget account #2760416105311640. Bid 16-142
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Motion to
approve. Commissioner Commissioner
www.augustaga.gov
Approve Motion Passes
3-0.
Ben Hasan Wayne Guilfoyle Passes
10. Task the Mayor and Administrator with developing a functional plan to rid this
city of blighted structures and overgrown vegetation on the right of ways and
vacant lots. Plan must include a means for resurfacing many of our streets and
highways that have been neglected for 10 or more years. Lastly, explain to our
constituents why it's more important to invest millions of taxpayer dollars in
lieu of providing regularly cut right of ways and lots, surfaced streets, and the
demolishing of abandoned structures. (Requested by Commissioner Bill
Lockett)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded
By
Motion
Result
Approve
Motion to approve
receiving this item as
information.
Commissioner
Ben Hasan
Dies for
lack of
Second
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve the item
as written.
Commissioner
Wayne Guilfoyle
Commissioner
William Fennoy Passes
Engineering Services Committee Meeting
8/30/2016 1:05 PM
Attendance 8/30/16
Department:
Presenter:
Caption:
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
8/30/2016 1:05 PM
Acquisition of a portion of property for right of way & temporary construction easement to Richmond
County, Ga from SCIP Augusta, LLC
Department:Law
Presenter:Engineering
Caption:Motion to authorize condemnation to acquire of a portion of
property for right of way and temporary construction easement,
(Parcel 045-4-202-00-0) 1550 Wrightsboro Road.
Background:Despite repeated efforts, the City has been unable to reach an
agreement with the property owner and therefore seeks to acquire
title through condemnation. In order to proceed and avoid further
project delays, it is necessary to condemn a portion of subject
property. The required property consists of 489.39 square feet of
right of way and 497.18 square feet of temporary construction
easement. The appraised value is $270.00.
Analysis:Condemnation is necessary in order to acquire the required
property
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:y condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: G/L 371-041110-52.12122 J/L T13041219-
52.12122
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Request for Qualification
Request for Qualifications will be received at this office until Tuesday, May 24, 2016 @ 11:00 a.m. for furnishing:
RFQ Item #16-178 Task Order Program (2016) for the Utilities Department
Qualifications will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Request for Qualification (RFQ) documents may be viewed on the Augusta Georgia web site under the Procurement
Department ARCbid. RFQ documents may be obtained at the office of the Augusta, GA Procurement Department, 535
Telfair Street – Room 605, Augusta, GA 30901.
A Pre-Qualification meeting will be held on Friday, May 6, 2016 @ 10:00 a.m. in the Procurement Department, 535
Telfair Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, May 10, 2016 @ 5:00
P.M. No RFQ will be accepted by fax, all must be received by mail or hand delivered.
No qualifications may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution
of contract with the successful bidder(s).
Request for qualifications (RFQ) and specifications. An RFQ shall be issued by the Procurement Office and shall include
specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions,
applicable to the procurement. All specific requirements contained in the RFQ including, but not limited to, the
number of copies needed, the timing of the submission, the required financial data, and any other requirements
designated by the Procurement Department are considered material conditions of the RFQ which are not waiveable or
modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be
submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for
approval by the Augusta, Georgia Commission. Please mark RFQ number on the outside of the envelope.
Proponents are cautioned that acquisition of RFQ documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the
Proponent at the risk of receiving incomplete or inaccurate information upon which to base its qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle April 14, 21, 28 May 5, 2016
Metro Courier April 20, 2016
VENDORS Attachment
B E-Verify #SAVE
Form
Addendum
#1 Original 8 Copies
Blair Construction
Po Box 770
Evans, GA 30809
YES 224004 YES YES YES YES
J & B Construction
3550 Gordon Highway
Grovetown, GA 30813
YES Non-
compliant YES YES YES Non-
compliant
Quality Storm Water
Solutions
P. O. 1847
Evans, GA 30809
YES 233338 YES YES YES YES
Garnto Southern
Construction YES 225651 YES Non-
compliant YES YES
JAMCO Civil
1249 Gordon Park Rd.,
Suite 102
Augusta, GA 30901
YES 923698 YES YES YES YES
Sitec LLC
522 Railroad Ave
North Augusta, SC 29841
YES 212379 YES YES YES YES
CBH Construction
678 Heggies Ridge Dr.
Appling, GA 30803
YES 321326 YES YES YES YES
Beams Contracting
15030 Atomic Road
Beech Island, SC 29842
YES 167300 YES YES YES YES
Total Number Specifications Mailed Out: 26
Total Number Specifications Download (Demandstar): 4
Total Electronic Notifications (Demandstar): 218
Pre-Bid/Telephone Conference: 7
Total packages submitted: 8
Total Noncompliant: 2
RFQ Opening
RFQ Item #16-178
Task Order Program (2016)
for Augusta, Georgia - Utilities Department
RFP Due: Tuesday, May 24, 2016 @ 11:00 a.m.
Contract Management P.O.Box 3833, Augusta, GA 30914 Did not submit bid.
Page 1 of 1
Blair Construction
Po Box 770
Evans, GA 30809
Quality Storm Water
Solutions
P. O. 1847
Evans, GA 30809
JAMCO Civil
1249 Gordon Park
Rd.,
Suite 102
Augusta, GA 30901
Sitec LLC
522 Railroad Ave
North Augusta, SC
29841
CHB
678 Heggies Ridge
Dr.
Appling, GA 30803
Beams Contracting
15030 Atomic Road
Beech Island, SC 29842
RANKING SCORING
First Round Elimination Pass/Fail Pass Pass Pass Pass Pass Pass
A. Package
submitted by the
deadline
Pass/Fail Pass Pass Pass Pass Pass Pass
B. Package is
complete
(includes
requested
information as
required per this
solicitation)
Pass/Fail Pass Pass Pass Pass Pass Pass
C. Overall Quality of
RFQ (concise and
to-the-point)
50 47.5 35 47.5 20 47.5 47.5
1. Respondents
Experience 100 97.5 55 97.5 25 90 97.5
2. Financial
Responsibility 100 97.5 65 97.5 50 90 97.5
3. Project
Management 95 92.5 42.5 92.5 45 90 92.5
4. Key Personnel
& Staff 90 90 42.5 90 45 85 92.5
5. Organizational
Qualifications 75 75 32.5 72.5 10 67.5 75
6. Optional
Interview
(Potential
bonus Points)
10 0 0 0 0 0 0
452.5 237.5 450 175 422.5 455
1. Contractor’s
experience in
Water and
Wastewater
Construction
60 60 35 60 5 55 60
2. Experience
with task order
type contracts
50 50 22.5 0 25 30 45
3. Equipment on
hand 50 50 2.5 45 0 45 50
160 60 105 30 130 155
Submittal and Quality of RFQ (MUST PASS FOR CONTINUED CONSIDERATION)
Second Round Elimination
Quality of RFQ(MUST ACHIEVE 35 POINTS FOR CONTINUED CONSIDERATION)
Proposer’s Overall Ability to Provide the Services (TOTAL POINTS 470)
Scope of Services (Total of 160)
Cumulative Evaluation Scoring Sheet
RFQ Item #16-178 - Task Order Program (2016)
for Augusta, Georgia - Utilities Department
RFP Due: Thursday, June 9, 2016 @ 4:00 p.m.
Vendors
E. Scope of Services
Section D Subtotal
Section E Subtotal
D. Narrative
Continued on Page 2
Blair Construction
Po Box 770
Evans, GA 30809
Quality Storm Water
Solutions
P. O. 1847
Evans, GA 30809
JAMCO Civil
1249 Gordon Park
Rd.,
Suite 102
Augusta, GA 30901
Sitec LLC
522 Railroad Ave
North Augusta, SC
29841
CHB
678 Heggies Ridge
Dr.
Appling, GA 30803
Beams Contracting
15030 Atomic Road
Beech Island, SC 29842
Cumulative Evaluation Scoring Sheet
RFQ Item #16-178 - Task Order Program (2016)
for Augusta, Georgia - Utilities Department
RFP Due: Thursday, June 9, 2016 @ 4:00 p.m.
Vendors
1. Federal
Experience 35 30 7.5 30 0 0 30
Within Augusta 10 0 0 10 0 0 0
Within CSRA 8 8 8 0 4 8 8
Within Georgia 6 0 0 0 0 0 0
Within SE United
States (includes AL,
TN, NC, SC, FL)
4 0 0 0 0 0 0
All Others 2 0 0 0 0 0 0
8 8 10 4 8 8
H. References 25 25 2.5 25 0 12.5 25
693 343 637.5 229 620.5 690.5
723 350.5 667.5 229 620.5 720.5
Evaluator: Cumulative Date: 6/9/2016
Procurement Department Representative: Nancy Williams
Procurement Department Completion Date: 6/9/2016
Internal Use Only
Cumulative Total
Note: Respondent/Offeror(s) receiving 600 will be considered for the Utilities Task Order Program.
*To be included in the Fort Gordon Task Order, Respondent/Offeror must receive a minimum of 25 points for item F to be considered for the Fort Gordon Task Order Program.
Cumulative With Section F
Section G Subtotal
F. For Gordon Task Order Program (Only)
Reference(s)
* FORT GORDON TASK ORDER PROGRAM (ONLY)
(MUST ACHIEVE 25 POINTS FOR CONSIDERATION for the Fort Gordon Task Order Program)
G. Proximity to Area
Proximity to Area(Does not apply to Federally Funded Projects)
Engineering Services Committee Meeting
8/30/2016 1:05 PM
Consider approving RFQ #16-178: Task Order Program (2016) for Utilities Department in the amount of
$5,000,000.00 for execution by JAMCO Civil Inc.; Blair Construction Inc., CHB, and Beams Contracting
as qualified and selected contractors
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Motion to approve RFQ #16-178: Task Order Program (2016) for
Utilities Department in the amount of $5,000,000.00 for execution
by JAMCO Civil Inc.; Blair Construction, Inc., CHB, and Beams
Contracting as qualified and selected contractors.
Background:The types of work anticipated for the Task Order Program are
emergency repairs or smaller construction projects that require
resources beyond those of the Department. Larger projects would
still be bid in the normal fashion. The purpose of the Task Order
Program is to solicit competitive bids from the pool as projects
arise.
Analysis:AUD has evaluated JAMCO Civil Inc.; Blair Construction, Inc.,
CHB, and Beams Contracting proposal(s) to participate in the
Task Order Program and has considered the proposal(s) fair and
reasonable to accomplish the task.
Financial Impact:The construction funds available for this project are
$5,000,000.00. These funds are available from account
507043490-5425410 / 88886666-5425410
Alternatives:Rejection of this RFQ Contractor Selection would delay the
Utilities Department’s ability to execute planned and emergency
repairs of the water/sewer infrastructure system throughout
Augusta-Richmond County.
Recommendation:Recommend Commission approve RFQ #16-178: Task Order
Program (2016) for Utilities Department in the amount of
$5,000,000.00
Funds are Available
in the Following
Accounts:
$5,000,000.00 from account 507043490-5425410 / 88886666-
5425410
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/30/2016 1:05 PM
Gateways Enhancement Plan
Department:Clerk of Commission
Presenter:
Caption:Discuss ways to implement a "Gateways enhancement plan" focus
throughout Richmond County in the 2017 budget. (Requested by
Commissioner Frantom)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
ZIMMERMAN, EVANS & LEOPOLD, INC.
706-724-5627 | Fax 706-724-5789 | 435 Telfair Street | Augusta, GA 30901
zelengineers.com
August 10, 2016 Mr. Tom Wiedmeier, P. E.
Director, AUD Augusta, Ga. 30901 VIA ELECTRONIC COMMUNICATION
RE: Task Order work scope and proposal.
Dear Mr. Wiedmeier:
This is our proposal to provide task order work products to the Augusta Utilities Department for functions determined by the Department that outside assistance is necessary. At present we have
responded to two tasks:
1.- H2OMap modeling update of AUD’s existing model. Cost$ 128,613.00 2.- Water Main replacement program. Cost $ 125,758.39
Total $ 254,371.39
1.- We propose that the Department allow us to assist it in bring the computer model to geographic information system (GIS) geometry based on the City’s GIS. Our intimate knowledge
of your system and confirmation against your GIS will update the model back into good form and
allow your staff to utilize the final product to solve problems.
In particular, the model is most useful in predicting: water quality issues, the ability of the water
system to meet specific conditions, pressure ranges to be expected, alternative routings for redundant service, and fire flow capability in areas of high risk and high value.
Our approach will be to update each pressure system as a separate part that is useful in itself.
Since a large part of the water system is supplied by gravity, we would begin with the 417 and 310 systems, then 500, 564, 600, etc. The demands will be refigured based on GIS queries of
areas near previously established junction nodes. Finally, the most important phase: establishing
the proper controls for the 50+ pumps in the system and establishing the acceptable variations of all the water storage tanks.
Once the model is complete, we will produce the operations manual to prevent the disassembly of
the model and enable security protocols with input from your staff and the GIS Department.
We have estimated the effort/costs for the work as follows:
August 10, 2016 Page 2
AUD Task Order Proposal 2016 R1 (3).docx
We have the latest edition of the H2OMap software in house. Using Innovyze advanced Object-
Oriented Geospatial Component model, H2OMAP Water provides the most powerful and practical GIS platform for water utility solutions. Our version has no pipe limits. We have a lull
in our workload and can attack this project at once.
2.- Our proposal is to provide design services in support of the Augusta Utilities Department
(AUD) Waterline Replacement Program. We have developed the proposal based on preliminary investigations of AUD defined locations. The primary steps in developing the plans include:
1. Defining Scope
a. Verify which streets are included
b. Verify Construction method (Task Order or Bid) c. Confirm schedule
2. Verify existing utilities and/or conflicts
3. Propose New design/Line sizes 4. Finalize Design
5. Finalize Specifications, if required
6. Submit Final Drawing Sheets and/or Bid Plans
The timeframe to complete each section of streets will vary depending on the number of streets
awarded. A schedule will be developed and submitted once the final scope is defined.
Augusta Water System H2OMap Model update
Model Corrections and Checks:
Item Quantity Allowance,
minutes
time,
minutes
Node/Junctions 1083 2.5 2,708
Pipe Links 1441 5 7,205
Link Vertex 5305 2.5 13,263
Tanks 38 20 760
Pumps, Control 63 45 2,835
PRV 19 25 475
Minutes 27,245
Hours 454
Cost 68,113$
Guidance and Protocols for Proper Model Maintenance
Documentation 80 135$ 10,800$
Visual Aids 40 135$ 5,400$
Firewall Access 40 135$ 5,400$
Procedures 80 150$ 12,000$
Seminar 16 150$ 2,400$
Reporting 40 150$ 6,000$
Hrs 296 42,000$
Software 1 18,000$ 18,000$
Printing, 5 copies 100$ 500$
Total 128,613$
August 10, 2016 Page 3
AUD Task Order Proposal 2016 R1 (3).docx
Existing utility locates and potential conflict identification is included. However, surveying services are not included in the current scope of work as new line layouts are to be added to drawings provided by AUD.
The cost proposal is presented per street and/or street section, with separate costs provided for options to construct via Task Order or Bid. The Task Order estimate provides a construction drawing plan sheet only. The Bid proposal estimate adds specification and detail sheets for use in
developing a bid package. While development of the cost proposal allows for the project to be defined by Individual Street, there is the potential opportunity for adjustments to the proposal cost
based on economy of scale resulting from bundling several streets in the same Exhibit area and
the number of overall streets awarded. We have the appropriate resources and personnel allocated to support the successful completion of the project. We also believe that the above-
described scope reflects the need for services previously discussed and are in line with the
objectives outlined in discussions. Involvement and participation in the selection of streets for inclusion will greatly enhance the opportunity for success and allow for further refining of the
task at hand.
Please accept our regards,
ZIMMERMAN, EVANS & LEOPOLD, Inc.
Jorge E. Jimenez, P. E.
Principal
Encl: Water line replacement Costs
JEJ:sv
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits Page 1 of 2
Exhibit
# Street Name From To Length Current
Line Sze
New Pipe
size
Construction
Estimate
Cost
(markups for
TO
construction)
Cost
(electronic
W/bid
specs)
Notes/Comments
1 Jefferson Street Jackson Street Harding Road 1165.2 2 6 $17,478.00 $1,747.80 $2,309.43
1 Jackson Street Jefferson Street Lumpkin Road 1082.9 6 6 $16,243.50 $1,624.35 $2,146.31
1 Howell Road Harding Road Dead End 617.7 2 6 $9,265.50 $1,250.00 $1,224.28
1 Harding Court Harding Road Dead End 184.2 2 6 $2,763.00 $1,250.00 $1,500.00
1 Harding Road Jefferson Street
Peach Orchard
Road 1982.5 2 8 $37,667.50 $2,973.75 $3,929.32
2 Lovett Drive
Peach Orchard
Road Dead End 1025.4 2 8,6 $19,482.60 $1,538.10 $2,032.34
2 Floyd Road Lovett Drive Reedale Avenue 2796.4 6 8 $53,131.60 $4,194.60 $5,542.46
3 Kenny Road Mason Road
Old McDuffle
Road 2063.3 2 6 $30,949.50 $3,094.95 $4,089.46
3 Winn Drive
Old McDuffle
Road Kenny Road 1895.8 2 6 $28,437.00 $2,843.70 $3,757.48
3 Pecan Street Winn Drive Dead End 724.8 ? 6 $10,872.00 $1,087.20 $1,436.55
4 Vera Drive Dorn Drive Dead End 2864.7 2 8 $54,429.30 $4,297.05 $5,677.84
4 Nellie Drive
Peach Orchard
Road Dead End 2090.8 2 8 $39,725.20 $3,136.20 $4,143.97
4 Dorn Drive Vera Drive Nellie Drive 1519.3 2.5 8 $28,866.70 $2,278.95 $3,011.25
5 Fairbluff Road Brown Road Forest Road 4091.3 4 8 $77,734.70 $6,136.95 $8,108.96
5 Fairbluff Road Forest Road Dead End 2507.9 4 6 $37,618.50 $3,761.85 $4,970.66
5 Forest Road Pineridge Drive N Fairbluff Road 6246.5 4 8 $118,683.50 $9,369.75 $12,380.56
5 Forest Road Fairbluff Road Dead End 3892.9 4 6 $58,393.50 $5,839.35 $7,715.73
6 Westbrook Road McComb Road
Hephzibah
McBean Rd 3074.9 2 8 $58,423.10 $4,612.35 $6,094.45
6 Westbrook Road
Hephzibah
McBean Rd Dead End 2129.8 2 6 / ??? $31,947.00 $3,194.70 $4,221.26
Verify if this area is 6" line or
upgrade to 6" line
6 Crockett McComb Road
Hephzibah
McBean Rd 1248.5 6 N/A 6" line. Do not include
5
Pine Ridge Drive
E Cedar Ridge N Dead End 2152.2 6 $32,283.00 $3,228.30 $4,265.66
Verify if this area is 6" line or
upgrade to 6" line
5
Pine Ridge Drive
N Cedar Ridge N Dead End 3942.8 6 $59,142.00 $5,914.20 $7,814.63
Verify if this area is 6" line or
upgrade to 6" line
7
Bennock Mill
Loop
Bennock Mill
Road Horseshoe Road 2821.4 2
abandone
d
2" line is abandoned. Do not
include.
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
7
Benncock Mill
Road
Bennock Mill
Loop Horseshoe Road 2472.9 2
abandone
d
2" line is abandoned. Do not
include.
7 Horseshoe Road
Bennock Mill
Loop Bennock Mill oad 2228.1 10
N/A
delete line is 10" do not include
8 Ruffin Drive
Willis Foreman
Road Dead End 1945.3 3 $29,179.50 $2,917.95 $3,855.58
8 English Road
Willis Foreman
Road Dead End 896.8 2 8 $17,039.20 $1,345.20 $1,777.46
8 Foreman CT Foreman Way to valve 527.3 6 line is 6" do not include
8 Foreman CT valve to Dead End 228.6 3 6 $3,429.00 $1,250.00 $1,500.00
8 Foreman Way
Willis Foreman
Road 1st red dot 645.5 8 line is 8" do not include
8 Foreman Way 1st red dot Dead End 1777.3 8 line is 8" do not include
8 Crossing Ct Foreman Way Dead End 234.6 2 6 $3,519.00 $1,250.00 $1,500.00
9 Keys Road
Liberty Church
Road Dead End 3167.3 2 8 $60,178.70 $4,750.95 $6,277.59
10 Getzen Street Henry Circle Neal Street 1489 2 6 $22,335.00 $2,233.50 $2,951.20
10 Neal Street Ruby Drive Henry Circle 1606.7 2 6 $24,100.50 $2,410.05 $3,184.48
10 Henry Circle Ruby Drive Neal Street 1987.2 2 6 $29,808.00 $2,980.80 $3,938.63
11 Eustis Drive Redbird Road #1015 / red dot 803.4 2 6 line is 6" do not include
11 Eustis Drive #1015/ red dot #2301B 1196.6 6
N/A
delete line is 6" do not include
11 Eustis Drive #2301B Lakemont Drive 399.7 6
N/A
delete line is 6" do not include
11 Stewart Avenue Redbird Road Bluebird Road 411.9 4 6 $6,178.50 $1,000.00 $1,500.00
11 Bluebird Road Woodbine Road
1017 Bluebird
Road 1186.7 6 line is 6" do not include
11 Woodbine Road
Washington
Road Valve at 2324 1463.6 4 6 $21,954.00 $1,829.50 $2,900.86
Totals 63472.4 $1,041,258.10 $95,342.05 $125,758.39
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Augusta Utilities Department Waterline Replacement Program
Cost Proposal Exhibits
Engineering Services Committee Meeting
8/30/2016 1:05 PM
Hydraulic Model Update and Miscellaneous Water System Improvements
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Consider proposal from ZEL Engineering for Hydraulic Model
Update and Water System Improvements.
Background:Augusta Utilities utilizes a digital hydraulic model to predict
conditions within the water distribution system and to evaluate
alternatives for system improvements. We met with the Fire
Department recently to discuss the upcoming ISO (Insurance
Services Office) inspection scheduled for late 2016.
Analysis:The ISO inspection will determine the City's fire rating for the
next 5 years. This inspection evaluates the fire department and the
water system's capacity to deliver water for fire suppression. One
criteria of the inspection is whether a functional hydraulic model
of the distribution system exists. ZEL Engineering is the firm best
suited to update our model due to their extensive knowledge of
our system. Also, this project will serve to design various system
improvements where small diameter water lines are not sufficient
to provide fire protection.
Financial Impact:We recommend the Commission approve the Professional
Services proposals to ZEL Engineering in the amount of
$254,371.39 for the AUD Waterline Replacement Program
($125,758.39) and H2OMap Modeling Update ($128,613.00).
Funding in the amount of $254,371.39 is available from accounts:
514043410-5212115/81600080-5212115 (AUD Waterline
Replacement Program) and 514043410-5212115/81600090-
5212115 (H2OMap Modeling Update)
Alternatives:No alternatives are recommended.
Recommendation:
Augusta Utilities Department recommends the Commission
approve the proposal from ZEL Engineering in the amount of
$254,371.39 for the hydraulic model update and design of water
system improvements.
Funds are Available
in the Following
Accounts:
Funds are available in the following accounts: 514043410-
5212115/81600080-5212115 (AUD Waterline Replacement
Program) and 514043410-5212115/81600090-5212115 (H2OMap
Modeling Update)
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/30/2016 1:05 PM
Minutes
Department:Clerk of Commission
Presenter:
Caption:Motion to approve the minutes of the Engineering Services
Committee held on August 9, 2016.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
8/30/2016 1:05 PM
Obstruction of Storm Drains
Department:Clerk of Commission
Presenter:
Caption:Discuss the obstruction of storm drains along the face of any street
or gutter curbing as enumerated in the attached City Code Section
3-8-9. (Requested by Commissioner Fennoy)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Request for Proposal
Request for Proposals will be received at this office until Thursday, May 5, 2016 @ 11:00 a.m. for furnishing
for the Augusta Engineering Department:
RFP Item #16-161 On Call Pothole Repair, Paving and Emergency Repairs
RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP
documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605,
Augusta, GA 30901.
All questions must be submitted in writing by fax to 706 821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, April 15, 2016 @ 5:00
P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered.
No proposal may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of
contract with the successful bidder.
Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include
specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions,
applicable to the procurement. All specific requirements contained in the request for proposal including, but not
limited to, the number of copies needed, the timing of the submission, the required financial data, and any other
requirements designated by the Procurement Department are considered material conditions of the bid which are
not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition
shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia
Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the
envelope.
Proponents are cautioned that acquisition of RFP documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the
proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle March 10, 17, 24, 31, April 7, 14, 2016
Metro Courier March 16, 2016
VENDORS Attachment B E-Verify #SAVE
Form
Addendum
#1 Original 7 Copies Fee
Proposal
Blair Construction
4308 Evans to Locks Road
Evans, GA 30809
Yes 224004 Yes Yes Yes Yes Yes
Georgia-Carolina Paving
3020 Milledgeville Rd
Augusta, GA 30904
Yes 100183 Yes Yes Yes Yes Yes
Beam's Contracting
15030 Atomic Rd
Beech Island, SC 29842
Yes 167300 Yes Yes Yes Yes Yes
Horizon Construction
P. O. Box 798
Evans, GA 30809
Yes 229921 Yes Yes Yes Yes Yes
Jamco Civil
1249 Gordon Park Road,
Suite 102
Augusta, GA 30901
Yes 923698 Yes Yes Yes Yes Yes
Sitec
522 Railroad Ave.
North Augusta, SC 29841
Non-compliant 212379 Non-compliant Yes Yes Yes Yes
Total Number Specifications Mailed Out: 17
Total Number Specifications Download (Demandstar): 1
Total Electronic Notifications (Demandstar): 62
Mandatory Pre-Bid/Telephone Conference: NA
Total packages submitted: 6
Total Noncompliant: 1
RFP Opening
RFP Item #16-161
On Call Pothole Repair, Paving and Emergency Repairs
for Augusta, Georgia - Engineering Department
RFP Due: Thursday, May 5, 2016 @ 11:00 a.m.
The following company did not respond:
Larry L. Mccord LLC / 2016 Highland Ave., / Augusta, GA 30904
Page 1 of 1
Blair Construction
4308 Evans to
Locks Road
Evans, GA 30809
Georgia-Carolina
Paving
3020 Milledgeville Rd
Augusta, GA 30904
Beam's Contracting
15030 Atomic Rd
Beech Island, SC
29842
Horizon Construction
P. O. Box 798
Evans, GA 30809
Jamco Civil, LLC
1249 Gordon Park Rd., Ste 102
Augusta, Ga 30901
A. Package submitted by
the deadline
Pass/
Fail PASS PASS PASS PASS PASS
B. Package is complete
(includes requested
information as required
per this solicitation)
Pass/
Fail PASS PASS PASS PASS PASS
C. Overall Quality of RFP
(concise and to-the-point) 50 47.5 40 50 40 40
1. Qualifications of
company (company
profile)
100 92.5 90 95 70 72.5
2. Financial Responsibility 100 92.5 82.5 97.5 90 87.5
3. Project Management 95 90 87.5 90 82.5 80
4. Key Personnel & Staff 90 85 85 87.5 77.5 77.5
5. Organizational
Qualifications 75 70 70 70 67.5 70
6.Optional Interview
(Potential bonus Points) 10
430 415 440 387.5 387.5
Scope of Services (Total
1. Technical Approach 50 42.5 42.5 42.5 42.5 42.5
2. Specific relevant
experience of your 35 32.5 32.5 32.5 30 28.5
3. A detailed description
of prior type services
rendered.
40 40 37.5 40 30 32.5
4. Resource Availability
(Labor and Equipment) 75 70 67.5 70 65 62.5
185 180 185 167.5 166
Cumulative Evaluation Sheet - RFP Item #16-161
On Call Pothole Repair, Paving and Emergency Repairs
for Augusta, Georgia - Engineering Department
Wednesday, May 18, 2016 @ 2:00 p.m.
Vendors
Quality of RFP
RANKING - First Round Elimination
(MUST PASS FOR CONTINUED CONSIDERATION)
Second Round Elimination (Total Points 50) (MUST ACHIEVE 35 POINTS FOR CONTINUED CONSIDERATION)
Submittal and Quality of RFP
D. Narrative
TOTAL
TOTAL
E. Scope of Services
Blair Construction
4308 Evans to
Locks Road
Evans, GA 30809
Georgia-Carolina
Paving
3020 Milledgeville Rd
Augusta, GA 30904
Beam's Contracting
15030 Atomic Rd
Beech Island, SC
29842
Horizon Construction
P. O. Box 798
Evans, GA 30809
Jamco Civil, LLC
1249 Gordon Park Rd., Ste 102
Augusta, Ga 30901
Cumulative Evaluation Sheet - RFP Item #16-161
On Call Pothole Repair, Paving and Emergency Repairs
for Augusta, Georgia - Engineering Department
Wednesday, May 18, 2016 @ 2:00 p.m.
Vendors
RANKING - First Round Elimination
Within Richmond County 10 10 10
Within CSRA 8 8 8
Within Georgia 6
Within SE United States
(includes AL, TN, NC, SC,
FL)
4 4
All Others 2
8 10 4 8 10
Lowest 10 10
Second 8 8
Third 6 6
Fourth 4 4
14 2 2
2 6 4 10 8
H. References 10 0 0 0 0 0
Total 750 665.3 651 683 612.5 611.5
Cost/Fee Consideration (Total Points 10)
Proximity to Area (Total Points 10)
F. Proximity to Area
Procurement DepartmentRepresentative: Nancy Williams
Procurement Department Completion Date: 5/18/16
Internal Use Only
Reference(s) (Total Points 10
TOTAL
TOTAL
Note: Respondent/Offeror(s) receiving 600 or more points will be invited to do presentations to provide additional information if deemed necessary.
Evaluator: Cumulative Date: 5/18/16
Total (Total Possible Score 750)
Engineering Services Committee Meeting
8/30/2016 1:05 PM
On-Call Pothole Repair, Paving and Emergency Repair Services Contract Award (Bid Item #16-161)
Department:Engineering
Presenter:Abie Ladson - Director
Caption:Approve award of the On-Call Pothole Repair, Paving and
Emergency Repair Services Contract to Blair Construction,
Beam’s Contracting, and Georgia-Carolina Paving. Award is
contingent upon receipt of signed contracts and proper insurance
documents. Also, approve $1,000,000 to fund the proposed On-
Call Pothole Repair, Paving and Emergency Repair Services as
requested by AED. (RFP 16-161)
Background:Effective January 1, 2016, the Augusta Commission authorized a
Stormwater Utility (SWU) Program be implemented. One of the
key elements of the SWU Program is establishing a proactive
Infrastructure Program, that would include repair of storm
conveyance systems, restoration of drainage impacted areas, to
include roadways, and improving local watersheds. It was
determined by AED to supplement AED’s present infrastructure
resources with on-call services such as pothole repairs, paving,
and emergency repairs. This additional resource would afford
AED a practical approach to completing and sustaining much
needed infrastructure services in a timely and efficient
manner. Such services are essential to minimizing public safety
risks, damages to public property and associated potential hazard
liabilities.
Analysis:RFPs were evaluated on May 5, 2016 with Blair Construction,
Beam’s Contracting, and Georgia-Carolina Paving being the
selected firms. Firms were evaluated based on qualifications,
relevant experience, and ability to provide requested services.
Negotiated unit fees of the requested primary services are listed on
the attachment labeled Unit Fees. It is the recommendation of the
Engineering Department to award this project to aforementioned
firms.
Financial Impact:Funds are available in the amount of $700,000 in OC and
Emergency Construction and $300,000 in Stormwater Utility
Funds.
Alternatives:1). Approve award of the On-Call Pothole Repair, Paving and
Emergency Repair Services Contract to Blair Construction,
Beam’s Contracting, and Georgia-Carolina Paving. Award is
contingent upon receipt of signed contracts and proper insurance
documents. Also, approve $1,000,000 to fund the proposed On-
Call Pothole Repair, Paving and Emergency Repair Services as
requested by AED. 2). Do not approve and identify alternate way
to provide needed maintenance services.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
$700,000 OC Emergency Construction SPLOST VII and
$300,000 Stormwater Utility.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Request for Proposal
Request for Proposals will be received at this office until Tuesday, May 3, 2016 @ 11:00 a.m. for furnishing
for the Augusta Engineering Department:
RFP Item #16-152 On Call Maintenance Vegetation Control and Right-of Way Mowing
RFP Item #16-155 On Call Concrete Repair, Concrete Construction, and Emergency Repair
RFP Item #16-156 On Call Tree Removal & Tree Removal Services
RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP
documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605,
Augusta, GA 30901.
All questions must be submitted in writing by fax to 706 821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Monday, April 11, 2016 @
5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered.
No proposal may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of
contract with the successful bidder.
Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include
specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions,
applicable to the procurement. All specific requirements contained in the request for proposal including, but not
limited to, the number of copies needed, the timing of the submission, the required financial data, and any other
requirements designated by the Procurement Department are considered material conditions of the bid which are
not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition
shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia
Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the
envelope.
Proponents are cautioned that acquisition of RFP documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the
proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle March 3, 10, 17, 24, 31, April 7, 2016
Metro Courier March 9, 2016
VENDORS Attachment B E-Verify #SAVE
Form Original 7 Copies Fee
Proposal
Arbor Equity
713 Dixie Road
Convington, GA 30014
Yes 464808 Yes Yes No Yes
Atlanta Premier Tree
Solutions
5200 Bluffton Rd
Atlanta, GA 30349
Yes 867963 Yes Yes Yes Yes
Big Dog Stump & Tree
237 Settlement Road
Martine, GA 30907
Yes 443850 Yes Yes Yes Yes
Winsay, Inc
P. o. Box 55
Harlem, GA 30814
Yes 494613 Yes Yes Yes Yes
JAMCO Civil
1249 Gordon Park Rd.
Suite 102
Augusta, GA 30901
Yes 923698 Yes Yes Yes Yes
Southern Tree Care
5603 Story Mill Road
Keysville, GA 30816
Yes 446429 Yes Yes Yes Yes
Total Number Specifications Mailed Out: 20
Total Number Specifications Download (Demandstar): 6
Total Electronic Notifications (Demandstar): 85
Mandatory Pre-Bid/Telephone Conference: NA
Total packages submitted: 6
Total Noncompliant: 0
RFP Opening
RFP Item #16-156
On Call Tree Removal
for Augusta, Georgia - Engineering Department
RFP Due: Tuesday, May 3, 2016 @ 11:00 a.m.
Page 1 of 1
Atlanta Premier
Tree Solutions
5200 Bluffton Rd
Atlanta, GA 30349
Big Dog Stump &
Tree
237 Settlement
Road
Martinez, GA
30907
Winsay, Inc
P. o. Box 55
Harlem, GA 30814
Jamco Civil, LLC
1249 Gordon Park Rd.,
Ste 102
Augusta, Ga 30901
Southern Tree Care
5603 Story Mill Road
Keysville, GA 30816
A. Package submitted
by the deadline
Pass/
Fail PASS PASS PASS PASS PASS
B. Package is complete
(includes requested
information as
required per this
solicitation)
Pass/Fail PASS PASS PASS PASS PASS
C. Overall Quality of
RFP (concise and to-the-
point)
50 42.5 42.5 37.5 37.5 35
1. Qualifications of
company (company
profile)
100 90 95 82.5 83.5 85
2. Financial
Responsibility 100 80 85 85 90 82.5
3. Project
Management 95 82.5 85 75 80 77.5
4. Key Personnel &
Staff 90 80 82.5 82.5 80 77.5
5. Organizational
Qualifications 75 70 70 67.5 70 57.5
6.Optional Interview
(Potential bonus
Points)
10
402.5 417.5 392.5 403.5 380
1. Technical
Approach 50 42.5 42.5 40 42.5 35
2. Specific relevant
experience of your
company.
35 32.5 32.5 32.5 30 30
3. A detailed
description of prior
type services
rendered.
40 40 40 30 35 32.5
4. Resource
Availability (Labor
and Equipment)
75 70 70 57.5 57.5 62.5
185 185 160 165 160
Submittal and Quality of RFP
D. Narrative
E. Scope of Services
E. TOTAL
D. TOTAL
Cumulative Evaluation Sheet - RFP Item #16-156
On Call Tree Removal
for Augusta, Georgia -
Engineering Department
Wednesday, May 18, 2016 @ 2:00 p.m.
Vendors
Scope of Services (Total Points 200)
Proposer’s Overall Ability to Provide the Services (Total Points 470)
Quality of RFP
RANKING - First Round Elimination
(MUST PASS FOR CONTINUED CONSIDERATION)
Second Round Elimination (Total Points 50) (MUST ACHIEVE 35 POINTS FOR CONTINUED CONSIDERATION)
Atlanta Premier
Tree Solutions
5200 Bluffton Rd
Atlanta, GA 30349
Big Dog Stump &
Tree
237 Settlement
Road
Martinez, GA
30907
Winsay, Inc
P. o. Box 55
Harlem, GA 30814
Jamco Civil, LLC
1249 Gordon Park Rd.,
Ste 102
Augusta, Ga 30901
Southern Tree Care
5603 Story Mill Road
Keysville, GA 30816
Cumulative Evaluation Sheet - RFP Item #16-156
On Call Tree Removal
for Augusta, Georgia -
Engineering Department
Wednesday, May 18, 2016 @ 2:00 p.m.
Vendors
RANKING - First Round Elimination
Within Richmond
County 10 10 10
Within CSRA 8
Within Georgia 6 6 6 6
Within SE United
States (includes
AL, TN, NC, SC, FL)
4
All
Others
2
6 10 6 10 6
Lowest 10 10
Second 8 8
Third 6 6
Fourth 4 4
Fifth 2 2
10 6 8 2 4
H. References 10 0 0 0 0 0
Total 750 640 651 598 608 579
Internal Use Only
F. Proximity to Area
G. Total
F. TOTAL
Total (Total Possible Score 750)
Evaluator: Cumulative Date: 5/18/16
Procurement DepartmentRepresentative: Nancy Williams
Procurement Department Completion Date: 5/18/16
G. Cost/Fee Proposal (Enclose in a separate sealed envelope)
Reference(s) (Total Points 10
Cost/Fee Consideration (Total Points 10)
Proximity to Area (Total Points 10)
Note: Respondent/Offeror(s) receiving 600 or more points will be invited to do presentations to provide additional information if deemed
necessary.
.-/,*
ENGINEERING DEPARTMENT
Director
Hameed Malik, Ph.D., PE,
Assistant Direstor
TO: Ms GeriSams, Procurernent - Director
FROM: fu f"L. Ladson, PE, CPESC, Director- AED
MEMORANDUM
DATE:
SUBJECT:
Friday, July 01, 2016
Bid 16-156 - On CallTree Removal
File reference: 15-014
Ms. Sams it is AED's recommendation that the subject be awarded to the companies listed below
at the negotiated price.
U Atlanta Premier Tree
2l Big Dog
3) Jamco Civil, LLC
Should you require additional information, please do not hesitate to contact Hameed Malik at ext
5o4o/so7o.
ALL|scm
cc: Hameed Malik, Ph.D., PE, Assistant Director - AED
Tony Williams, Construction Manager- AED
Valerie R. Jenkins, Department Accountant - AED
Nancy Williams, Quality Assurance Analyst
Phyllis Johnson, Procurement Compliance Officer
File
Augusta Engineerlng Administration Division
535 Telfair Street, Bldg 4000- Augusta, GA 30901
(706) 796-s040 - Fax (706) 795-504s
www.auqustaEa.gov
Engineering Services Committee Meeting
8/30/2016 1:05 PM
On-Call Tree Removal Services - Bid Item #16-156
Department:Engineering
Presenter:Abie Ladson - Director
Caption:Approve award of the On-Call Tree Removal Services Contract to
Atlanta Premier Tree, Big Dog, and Jamco Civil, LLC,. Award is
contingent upon receipt of signed contracts and proper insurance
documents. Also, approve $250,000 to fund the proposed On-Call
Tree Removal Services as requested by AED. (RFP 16-156)
Background:Effective January 1, 2016, the Augusta Commission authorized a
Stormwater Utility (SWU) Program be implemented. One of the
key elements of the SWU Program is establishing a proactive
Infrastructure Maintenance Program, that would include
maintenance of storm sewer systems and watershed management.
It was determined by AED to supplement AED’s present
maintenance resources with on call services such as tree removal.
This additional resource would afford AED a practical approach to
complete and sustain much needed maintenance services in a
timely and efficient manner. Such services are essential to
minimizing public safety risks, damages to public property and
associated potential hazard liabilities
Analysis:RFPs were evaluated on May 5, 2016 with Atlanta Premier Tree,
Big Dog, and Jamco Civil, LLC being the selected firms. Firms
were evaluated based on qualifications, relevant experience, and
ability to provide requested services. Following is negotiated Unit
Fee of requested primary services. ITEM UNIT UNIT VALUE
Hourly Cost Per Individual HR $85.00 Hourly Cost Per
Equipment HR $102.50 Material EA $125.00 Service Fee EA
$312.50 It is the recommendation of the Engineering Department
to award this project to aforementioned firms.
Financial Impact:Funds are available in the amount of $250,000 in Stormwater
Utility Program.
Alternatives:1). Approve award of the On-Call Tree Removal Services
Contract to Atlanta Premier Tree, Big Dog, and Jamco Civil,
LLC,. Award is contingent upon receipt of signed contracts and
proper insurance documents. Also, approve $250,000 to fund the
proposed On-Call Tree Removal Services as requested by AED.
2). Do not approve and identify alternate way to provide needed
maintenance services.
Recommendation:Approve alternative one
Funds are Available
in the Following
Accounts:
Stormwater Utility Program FY-2016 Budget.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total
3 $644.00 $1,932.00 $640.00 $1,920.00
32 $739.00 $23,648.00 $735.00 $23,520.00
24 $873.00 $20,952.00 $869.00 $20,856.00
5 $1,840.00 $9,200.00 $1,838.00 $9,190.00
NON-COMPLIANTTOTAL COST $55,732.00 $55,486.00
TE2
TE3
TE4
TE1
Total Number Specifications Mailed Out:9
Mandatory Pre-Bid/Telephone Conference: NA
Total packages submitted: 3
Total Noncompliant: 1
SAVE Form
HAGEMAYER
1730 BARTON CHAPEL RD.
AUGUSTA, GA 30909
YES
GRAYBAR ELECTRIC CO.
3222 MIKE PADGETT HWY
AUGUSTA, GA 30906
106386
VENDORS
Attachment B
YES
140845
YES
E-Verify Number
Bid Item #16-142
Street Light Poles and Fixtures
For Augusta, Georgia – Engineering-Traffic Engineering Department
Bid Due: Thursday, April 21, 2016 @ 11:00 a.m.
Description
NO
YES
YES
LED LIGHTING WHOLESALE
4203 PORTAGE ST.
KALAMAZOO, MI 49001
YES
Page 1 of 1
Invitation To Bid
Sealed bids will be received at this office until Thursday, April 21, 2016 @ 11:00 a.m. for furnishing:
Bid Item #16-142 Street Light Poles and Fixtures for Engineering Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid.
Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street –
Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of
Augusta, GA Procurement Department.
All questions must be submitted in writing by fax to 706 821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, April 1, 2016 @
5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered.
No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening.
The local bidder preference program is applicable to this project. To be approved as a local bidder and receive
bid preference an eligible bidder must submit a completed and signed written application to become a local
bidder at least thirty (30) days prior to the date bids are received on an eligible local project. An eligible bidder
who fails to submit an application for approval as a local bidder at least thirty (30) days prior to the date bids
are received on an eligible local project, and who otherwise meets the requirements for approval as a local
bidder, will not be qualified for a bid preference on such eligible local project.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall
include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms
and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid
including, but not limited to, the number of copies needed, the timing of the submission, the required financial
data, and any other requirements designated by the Procurement Department are considered material
conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive
or modify any such material condition shall be submitted through the Procurement Director to the appropriate
committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark
BID number on the outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the
bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle February 25, March 3, 10, 17, 24, 31, 2016
Metro Courier March 2, 2016
Engineering Services Committee Meeting
8/30/2016 1:05 PM
Street Lights, Poles and Fixtures -Bid Item #16-142
Department:Engineering
Presenter:Abie L. Ladson, Director - Enginering
Caption:Approve awarding low bid in the amount of $55,486.00 to
Graybar for street light poles and fixtures for replacements/repairs
in the Augusta Richmond County Urban areas for a period of one
year. Funding is available in the Street Lighting budget account
#2760416105311640. Bid 16-142
Background:The Traffic Division of the Engineering Department is responsible
for maintenance of over 6,000 streetlights in Augusta which are
essential to the safety of no only the monitoring of the public but
pedestrians as well. In the course of their function, streetlights
receive a significant amount of wear and tear and require periodic
replacement due to factors such as exposure to the elements,
traffic accidents, vandalism, etc. To that end, the traffic
engineering streetlight division budgets for replacement poles and
equipment that it purchases through a bid process.
Analysis:Bids were received on April 21, 2016 with Graybar being the low
bidder. The bid results are as follow: CONTRACTORS BIDS:
1.Graybar $55,486.00 2.Hagemeyer $55,732.00
Financial Impact:Adequate funds are available and expenditure of this amount will
leave sufficient funds for any emergencies that may arise before
the end of the year.
Alternatives:1). Approve awarding low bid in the amount of $55,486.00 to
Graybar for street light poles and fixtures for replacements/repairs.
2). Do not approve and cancel the BID.
Recommendation:Approve alternative one
Funds are Available
in the Following 276-04-1610-5311640
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/30/2016 1:05 PM
Plan for Removal of Blighted Structures and Overgrown Vegetation
Department:Clerk of Commission
Presenter:
Caption:Task the Mayor and Administrator with developing a functional
plan to rid this city of blighted structures and overgrown
vegetation on the right of ways and vacant lots. Plan must include
a means for resurfacing many of our streets and highways that
have been neglected for 10 or more years. Lastly, explain to our
constituents why it's more important to invest millions of taxpayer
dollars in lieu of providing regularly cut right of ways and lots,
surfaced streets, and the demolishing of abandoned structures.
(Requested by Commissioner Bill Lockett)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY: