Loading...
HomeMy WebLinkAbout2015-10-13-Meeting Mintues Engineering Services Committee Meeting Commission Chamber - 10/13/2015 ATTENDANCE: Present: Hons. Fennoy, Chairman; Hasan, Vice Chairman; Smith and Guilfoyle, members. Absent: Hon. Hardie Davis, Jr., Mayor. ENGINEERING SERVICES 1. Consider Award of Bid #15-181 for the Construction of Augusta Canal Bank Leakage Repairs near Rock Creek to Blair Construction, Inc. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Grady Smith Passes 2. Adoption of the Flood Insurance Rate Map (FIRM) as revised by Letter of Map Revision (LOMR) 14-04-8059P. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Grady Smith Passes 3. Approve a Memorandum of Understanding with the Augusta Convention and Visitors Bureau for the Gateway Beautification Initiative. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve finding another funding source other than stormwater for this project and table this initiative at this time. Mr. Fennoy votes No. Motion Passes 3-1. Commissioner Ben Hasan Commissioner Wayne Guilfoyle Passes 4. Motion to approve the minutes of the Engineering Services Committee held on September 29, 2015. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Wayne Guilfoyle Passes 5. Approve a Memorandum of Understanding with the Development Authority of Richmond County for the construction of a roadway project at the Corporate Park using SPLOST funds. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Grady Smith Passes 6. Consider participation in the Savannah River Clean Water Fund. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Mr. Guilfoyle votes Commissioner Commissioner Passes www.augustaga.gov No. Motion Passes 3-1. Ben Hasan Grady Smith 7. Approve purchase of thermoplastic striping material in the amount of $64,130 from Crown Technology. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Grady Smith Passes Engineering Services Committee Meeting 10/13/2015 1:10 PM Attendance 10/13/15 Department: Caption: Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Invitation to Bid Sealed bids will be received at this office on Wednesday, June 24, 2015 @ 3:00 p.m. for furnishing: Bid Item #15-181 Augusta Canal Bank Leakage Repairs Near Rock Creek for Utilities Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from ARC Southern. The fees for the plans and specifications which are non-refundable are $50.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC Southern (706 821-0405) beginning Thursday, May 14, 2015. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Bid Conference will be held on Friday, June 5, 2015 @ 10:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Wednesday, June 10, 2015 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Augusta Chronicle May 14, 21, 28, June 4, 2015 Metro Courier May 20, 2015 Revised: 1/12/2015 DABBA-WILLIAMS 319 S. WALNUT STREET STATESBORO, GA 30458 JHC-CORPORATION 1029 N PEACHTREE PKWY # 359, PEACHTREE CITY, GA 30269 BLAIR CONSTRUCTION PO BOX 770 EVANS, GA 30809 YES YES YES 222733 413897 224004 YES YES YES YES YES YES $105,720.00 $344,000.00 $74,560.00Bid Price Bid Bond E-Verify # Bid Item #15-181 Augusta Canal Bank Leakage Repairs Near Rock Creek for Augusta, Georgia - Utilities Department Bid Due: Wednesday, June 24, 2015 @ 3:00 p.m. SAVE Form Total Number Specifications Mailed Out: 27 Total Number Specifications Download (Demandstar): 8 Total Electronic Notifications (Demandstar): 217 Mandatory Pre-Bid Conference: 5 Total packages submitted: 3 Total Noncompliant: 0 Vendors Attachment B Page 1 of 1 Engineering Services Committee Meeting 10/13/2015 1:10 PM Augusta Canal Bank Leakage Repairs Near Rock Creek Department:Augusta Utilities Department Caption:Consider Award of Bid #15-181 for the Construction of Augusta Canal Bank Leakage Repairs near Rock Creek to Blair Construction, Inc. Background:This Project will repair the canal embankment near Rock Creek to prevent further seepage and stabilize the embankment slope. Analysis:Augusta Utilities Department has reviewed the bid submitted by Blair Construction, Inc. and the recommendation letter from Cranston Engineering Group, P.C. for the project. The bid for construction services was deemed to be fair and reasonable by Augusta Utilities Department. Financial Impact:We have reviewed the bid from Blair Construction, Inc. and find it to be reasonable. Funding in the amount of $74,560.80 is available from accounts: 507043410-5425110 / 80320115-5425110 Alternatives:No alternatives are recommended. Recommendation:Augusta Utilities Department recommends the Commission approve the Construction Services to Blair Construction, Inc. in the amount of $74,560.80 for the Augusta Canal Bank Leakage Repairs Near Rock Creek Project. Funds are Available in the Following Accounts: Funds are available in the following accounts: 507043410- 5425110 / 80320115-5425110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 10/13/2015 1:10 PM Floodplain Map Revision Department:Planning and Development Caption:Adoption of the Flood Insurance Rate Map (FIRM) as revised by Letter of Map Revision (LOMR) 14-04-8059P. Background:A Letter of Map Revision (LOMR) is FEMA’s modification of a Flood Insurance Rate Map (FIRM). Because a LOMR officially revises the FIRM, the flood hazard updates shown are used to rate flood insurance policies and enforce flood insurance and development regulations.In June of 2014, the Cranston Engineering Group, on behalf of Coel Development Company, prepared a LOMR based on a detailed flood study of the portion of Butler Creek that lies along the northern boundary of the Haynes Station subdivision. Haynes Station is located off Gordon Highway between Fort Gordon Gates 1 and 2. Analysis:The study resulted in a 4,000-foot long section of the creek being reclassified from a Zone A to Zone AE, with Base Flood Elevations (BFEs), on Flood Insurance Rate Map (FIRM) 13245C 0085F. The study also revised the Flood Insurance Study (FIS) report for Butler Creek to reflect the new flood hazard boundaries along this section of the creek. The changes do not have any negative impact on the parcels adjoining the creek. The LOMR was advertised, as required by the National Flood Insurance Program (NFIP), in the Augusta Chronicle April 16, 2015 and April 23, 2015. Financial Impact:The financial impact is minimal and involves staff time to incorporate digital data into Augusta’s GIS that reflect the revisions to the FIRM. Alternatives:Not adopting the Letter of Map Revision (LOMR) and falling out of compliance with the National Flood Insurance Program (NFIP) minimum standards. Sanctions and/or suspension are options that could be exercised by FEMA, resulting in property owners not having the ability to purchase federally-backed flood insurance Recommendation:Adoption of the Flood Insurance Rate Map (FIRM) and Flood Insurance Study (FIS) as revised by Letter of Map Revision (LOMR) 14-04-8059P, effective August 21, 2015. Funds are Available in the Following Accounts: Not Applicable REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 10/13/2015 1:10 PM Gateway Beautification program Department:Administrator Caption:Approve a Memorandum of Understanding with the Augusta Convention and Visitors Bureau for the Gateway Beautification Initiative. Background:Commissioner Fennoy, Mayor Davis, the Engineering Department, the Convention and Visitors Bureau, Palmetto Storey LLC, the Georgia DOT and others have been collaborating on projects to improve the medians at gateway entrances to Augusta. With several projects completed, and projects at Sandbar Ferry Road and Doug Barnard Parkway being constructed in the next few months, funding is now needed for ongoing maintenance. Analysis:The Engineering Department has identified funding from TIA discretionary funds and from Storm Water utility funds, in the total of $250,000, that can be matched by private funds, through the Community Foundation's Garden City Improvement Fund, to provide for ongoing gateway maintenance. The attached MOU provides that the public and private funds deposited with the Community Foundation, will be used to jointly pay for maintenance services. Financial Impact:$125,000 in TIA discretionary funds and $125,000 in Storm Water utility funds, for a total of $250,000 in FY 2016 to be paid in two installments to the Garden City Improvement Fund, by March 1, 2016 and July 1, 2016. Alternatives:Reduce the amount of maintenance provided for gateway beautification. Recommendation:Approve the Memorandum of Understanding for Gateway Beautification with the Augusta Convention and Visitors Bureau. Funds are Available in the Following fund 235 - TIA Discretionary fund 581 - Stormwater utiltiy Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 10/13/2015 1:10 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Engineering Services Committee held on September 29, 2015. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting 10/13/2015 1:10 PM MOU with DARC for Corporate Park roadway project Department:Administrator Caption:Approve a Memorandum of Understanding with the Development Authority of Richmond County for the construction of a roadway project at the Corporate Park using SPLOST funds. Background:In SPLOSTS III and VI, funds were approved for construction of a roadway at the Augusta Corporate Park. The Economic Development Authority has completed plans for the roadway, to serve both the light and heavy industrial land available at that site. The SPLOST funds are sufficient, based on engineering estimates, to complete a first phase of the roadway, as a two-lane section, through the light industrial properties and up to the boundary of the heavy industrial section, that can be extended and/or widened as the park develops. Analysis:By completing a first phase of the roadway, it will facilitate business recruitment, demonstrating that these sites have sufficient infrastructure to develop immediately. Financial Impact:Funds are available in SPLOST III of 1,523,300 and SPLOST VI of 1,200,000 for a total of $2,723,300, for this MOU. Alternatives:Delay completion of the roadway. Recommendation:Approve the Memorandum of Understanding with the Development Authority of Richmond County regarding reimbursements for SPLOST projects for the Augusta Corporate Park. Funds are Available in the Following Accounts: Fund 323 - SPLOST phase III Fund 326 - SPLOST phase VI REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 10/13/2015 1:10 PM Savannah River Clean Water Fund Department:Utilities Caption:Consider participation in the Savannah River Clean Water Fund. Background:The Georgia Environmental Protection Division is developing nutrient limits for wastewater discharges. These nutrients, specifically nitrogen and phosphorus, promote harmful aquatic plant growth such as excessive algae. Once nutrient limits are established, it will likely be extremely expensive to construct additional treatment processes at Augusta's wastewater plants to meet these limits. We have been exploring alternate ways to achieve compliance with pending nutrient limits, and see great potential in partnering with the Savannah River Clean Water Fund (SRCWF). Analysis:The SRCWF is non-profit Georgia corporation established to promote permanent land protection, responsible land management practices and scientific research in the lower Savannah River watershed. The initial partners are proposed to be the major utilities in the basin: Augusta, Columbia County, Savannah, and Beaufort - Jasper Water Authority. Aiken County and North Augusta are also potential partners. The SRCWF will permanently protect high value land (from the perspective of water quality protection) through land acquisition and conservations easements. SRCWF will also fund land management practices such as vegetative buffers around agricultural fields, and the scientific research necessary to quantify the resulting water quality benefits. Proposed land protection and management opportunities will be presented to the partners on a case by case basis. We have met with the Director of the Georgia Environmental Protection Division and he has expressed his strong support for this initiative. Financial Impact:The four major utilities are proposed to each fund $300,000 annually for this initiative. $200,000 would be invested in land protection and land management practices while $100,000 would be funded annually to the Phinizy Center for Water Sciences for scientific research to quantify resulting water quality benefits. This research will be necessary to document benefits and support credits in our future nutrient discharge limits. The initial MOU is proposed for a three (3) year period. Alternatives:Augusta could elect not to participate in the Fund and address future nutrient limits through conventional wastewater treatment plant construction. Recommendation:We recommend that participation in the Savannah River Clean Water Fund be approved. Funds are Available in the Following Accounts: 507043410 – 5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 10/13/2015 1:10 PM Thermoplastic Material Purchase Department:Abie Ladson, Director Caption:Approve purchase of thermoplastic striping material in the amount of $64,130 from Crown Technology. Background:The Traffic Division of the Engineering Department is responsible for maintaining the striping on all county roads. As such, every year, traffic engineering budgets and purchases striping material to be used for this purpose, typically through smaller purchase orders due to storage limitations. To that end, Traffic Engineering has identified additional storage space for the materials that will allow for a larger stockpile of material. .Therefore, Traffic Engineering is proposing to purchase $64,130 in thermoplastic materials through the annual Georgia Department of Transportation bid. This amount is within our annual budget, but triggers the amount at which commission approval must be obtained. Analysis:This material is essential to operation of the Traffic Engineering Division at its ability to maintain the striping along county roadways. Financial Impact:The proposed cost is within Traffic Engineering’s 2015 budget. Alternatives:Approve Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 101041710/5311630 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission