HomeMy WebLinkAbout2015-09-29-Meeting Mintues
Engineering Services Committee Meeting Commission Chamber - 9/29/2015
ATTENDANCE:
Present: Hons. Fennoy, Chairman; Hasan, Vice Chairman; Smith and
Guilfoyle, members.
Absent: Hon. Hardie Davis, Jr., Mayor.
ENGINEERING SERVICES
1. Motion to authorize condemnation to acquire title of a portion of property for
right of way, permanent easement, and temporary driveway easement (Parcel
069-3-003-01-0) 3376 Milledgeville Road.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commissioner Ben
Hasan Passes
2. Consider Professional Services Proposal from Cranston Engineering Group, P.C.
for the Alternate Downtown Water Feed 2014 CIP Bond Project in the amount
of $379,370.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner
Grady Smith Passes
3. Approve Johnson, Laschober, and Associates (JLA) Design Change Order 5 in
the amount of $51,584.00 for the Butler Creek West Sanitary Sewer
Upgrades, project number 60106.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner
Grady Smith Passes
4. Consider approval of change order in the amount of $49,563.85 to Blair
Construction for the Pine Log Road Sanitary Sewer Installation Emergency Task
Order Project.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner
Grady Smith Passes
5. Consider awarding a contract to CSRA Testing and Engineering in the amount
of $52,750.00. RFP 15-176
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commissioner Ben
Hasan Passes
6. Consider approval of construction change order in the amount of $156,516.95
for the Gordon Hwy 16” Water Main project by Eagle Utility Contracting,
Inc. Bid item #14-175.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
Commissioner
Grady Smith
Commissioner Ben
Hasan Passes
4-0.
7. Approve and receive as information the Emergency Construction Services on the
Thomas Lane Drainage System Failure in the amount of $89,939.34 to Sitec
LLC; funded from SPLOST Phase VI as requested by AED.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner
Grady Smith Passes
8. Update from staff regarding operational costs associated with the goat cleanup
program. (Requested by Commissioner M. Williams)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve placing
this item on the agenda one
month from now in order to
give the Engineering
Department time to make a
recommendation regarding
three secured locations
where the goats could be
placed.
Motion Passes 4-0.
Commissioner
Wayne
Guilfoyle
Commissioner
Ben Hasan Passes
9. Motion to supplement the city’s contract with RJ Haynie and Associates in the
amount of $39,335 to provide traffic signal mast arm repair services for the
intersection of Sand Bar Ferry Road and Laney Walker Boulevard as requested
by AED/TE.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. Hasan out.
Motion Passes 3-0.
Commissioner
Grady Smith
Commissioner
Wayne Guilfoyle Passes
10. Approve award of Construction Contract to Reeves Construction Company in
the amount of $568,145.00 for Transportation Investment Act (TIA) Project,
Mark Church Road & Drainage Improvement Project - Phase 1 as requested by
AED. Award is contingent upon receipt of signed contracts and proper
bonds. Bid Item 15-159
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. Hasan out.
Motion Passes 3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
11. Motion to approve the minutes of the Engineering Services Committee held on
September 8, 2015.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. Hasan out.
Motion Passes 3-0.
Commissioner
Grady Smith
Commissioner
Wayne Guilfoyle Passes
12. Discuss retainage of contract funds regarding the Environmental Services
Department residential demolition program. (Requested by Commissioner
Marion Williams)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve
receiving this item as
information.
Motion Passes 4-0.
Commissioner
Wayne Guilfoyle
Commissioner
Ben Hasan Passes
13. Consider Resolution to terminate EDA Grant for the Rockwood Pigments
Effluent Force Main Extension Project.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
14. Consider Professional Services Proposal from Johnson, Laschober and
Associates, P.C. for the Spirit Creek Trunk Sewer Rehabilitation 2014 CIP
Bond Project in the amount of $431,500.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commissioner
Ben Hasan Passes
15. Authorize Amendment One to the City of Augusta contract with AMEC Foster
Wheeler Environmental & Infrastructure, Inc. in the amount of $192,500 for
the Stormwater Utility Fee Implementation Project.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Grady Smith Passes
16. Approve award of Construction Contract to R. J. Haynie & Associates, Inc. in
the amount of $5,517,131.00 for Transportation Investment Act (TIA) Project,
Signal Modernization Walton Way – Phases II & III as requested by Augusta
Engineering Department. Award is contingent upon receipt of signed contracts
and proper bonds. Bid Item 15-193
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Grady Smith
Commissioner
Ben Hasan Passes
www.augustaga.gov
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Attendance 9/29/15
Department:
Caption:
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Acquisition of right-of-way, permanent easement & temporary driveway easement to Richmond County,
Ga from James D. Adams & Wanda L. Proden - 3376 Milledgeville Road
Department:Law
Caption:Motion to authorize condemnation to acquire title of a portion of
property for right of way, permanent easement, and temporary
driveway easement (Parcel 069-3-003-01-0) 3376 Milledgeville
Road.
Background:The City has been unable to reach an agreement with the property
owners and therefore seeks to acquire title through condemnation
In order to proceed and avoid further project delays, it is necessary
to condemn a portion of subject property. The required property
consists of 276.36 square feet of right of way, 276.88 square feet
of permanent easement, and 253.63 square feet of temporary
driveway easement. The appraised value is $425.00.
Analysis:Condemnation is necessary in order to acquire the required
property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: G/L 328-041110-5411120 J/L 212828014-5411120
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Alternate Downtown Water FeedProject Map
Augusta Utilites Department360 Bay Street, Suite 180Augusta, GA 30901
Begin Project
End Project
Wrightsboro Rd
VA Hospital
Highlands Ave
H
e
a
r
d
A
v
e
Kissingbower Rd
Oliv
e
R
d
Kimberly Dr
Eastland Dr
2015-0309
Alternate Water Feed to Downtown Augusta (24 inch)
Conceptual Construction Cost Estimate
9/3/2015
Description Quantity Unit Unit Price Total Price
Tie to line @ Highland Ave. Plant 1 ea $25,000.00 $25,000.00
Saw Cut & Demo Existing Streets & Driveways 6,256 sy $18.00 $112,600.00
24-Inch Water Main (Includes Trenching and Back Fill for 8' Depth) 11,800 lf $135.00 $1,593,000.00
24-Inch Restrained Joint Megalugs 88 ea $850.00 $74,800.00
Air Release Valve & Vault 5 ea $10,000.00 $50,000.00
Blow-off Fire Hydrant 10 ea $3,500.00 $35,000.00
24" - 45o Bend 20 ea $3,900.00 $78,000.00
24" Gate Valve 9 ea $16,500.00 $148,500.00
36-Inch Bore @ Wrightsboro Road 100 lf $925.00 $92,500.00
36-Inch Bore @ Highland Ave 80 lf $925.00 $74,000.00
36-Inch Bore @ Ohio Ave 60 lf $925.00 $55,500.00
36-Inch Bore @ Maryland Ave 60 lf $925.00 $55,500.00
36-Inch Bore @ Whitney St 80 lf $925.00 $74,000.00
36-Inch Bore @ Wycliffe St 60 lf $925.00 $55,500.00
36-Inch Bore @ Kissingbower rd 60 lf $925.00 $55,500.00
36-Inch Bore @ Railroad/Creek 200 lf $925.00 $185,000.00
Misc. Concrete for Thrust Blocks, etc… 100 cy $215.00 $21,500.00
Flowable Fill 100 cy $275.00 $27,500.00
Asphalt Patching (includes 8" GAB and 3" Asphalt) 6,256 sy $45.00 $281,500.00
Asphalt Mill and Overlay outside of Trench (2" deep, 24' wide) 12,267 sy $30.00 $368,000.00
Lump Sum Construction (Mobe, Property Restoration, etc..) 12,500 lf $37.00 $462,500.00
Tie to 20-Inch at Olive RD 1 ea $25,000.00 $25,000.00
SubTotal $3,950,400.00
20% Contingency $790,080.00
GRAND TOTAL $4,740,480.00
Wrightsboro Rd
H
e
a
r
d
A
v
e
Heath St
Whitney St
Johns Rd
W h it e R d
Troupe St
W a l d e n D r
Lee St
Maryland Ave
Ohio Ave
Parkway Dr
Hickman Rd
Stovall St
Pendleton Rd
Oak Dr
Wycliffe St
Kissingbower Rd
Kimberly DrKellySt
Pennsylvania Ave
Anthony Rd Winter St
Hillsinger Rd
Davidson Dr
Highland Ave
Meigs St
Berkeley Rd
King Woods Dr
Pi n e tr e e R d
Harvey St
Holly Hill Rd
W h a rt o n D r
Drexel Ave
Birnam Pl
C
o
r
n
ell
D
r
Heard Ln
Clifton St
Trapp Ct
Monte Sano Ave
Wingfield St
Holt St
Craig St
Iris D
r
Schley St
Lyndale St
FreedomWay
AlleyRaymond Ave
O
liv
e
R
d
R y a n R d
McKibben St
P
ri
n
c
e
t
o
n
L
n
Clairm ont Dr
Cascade Dr
L a n i e r D r
Joyce St
Minto St
Milledge Rd
Glenn Ave
B
r
y
n
M
a
w
r
A
v
e
Norman St
Myrtle Ln
H ira m R dDevere St
Richmond Ave
Russell St
Cresswell Dr
Eastland Dr
Ralph Rd
Mi mosa Dr
Montclair St
Forster St
Whitney Ct
F
l
o
ri
d
a
A
v
e
Johns Rd E xt
Dearborn St
S e r vic e D r
RiddleLn
WhitneySo uthDr
Coral Ct
SunsetAv
e
R a n d all R d
Woodland Ave
Dunaway Ct
SpringHillTer
Doublegate Ct
Breckenbridge Ave
J o r d a n R d
Powell Ave
Chateau Thierry Rd
C
l
a
ir
m
o
n
t
C
t CascadeCt
C
asc
a
d
e
D
r
Lee St
Richmond Ave
An
t
h
o
n
y
Rd
Winter St
Service Dr
Woodland AveVeterns V e t e r n s A d m i n s t r a t i o nAdminstrationHospitalHospital
P e n d l e t o nPendletonParkPark
24-Inch Alternate Water Feed (~ 12,500 FT)
ALTERNATE WATER
FEED TO DOWNTOWN AUGUSTA
(SUGGESTED ROUTE)
DATE:
SCALE
JOB No.
DRAWING No.
8/20/2015
1" = 500'
2015-0309
CREATED BY:
AUGUSTA UTILITIES DEPARTMENT
TMP
1
Alternate Water Feed to Downtown Augusta
Proposed Project Schedule
September 3, 2015
Feburary May July Aug. Oct. Nov. Dec. Jan Feb March April May June July Aug. Sept. Oct. Nov. Dec.
Task Description 29 Days 31 Days 31 31 31 30 31 31 29 31 30 31 30 31 31 30 31 30 31
1 Notice to Proceed (Projected for 10/15/2015)
2 Data Gathering and Preliminary Route Analysis M
3 Utility Location Survey
4 Property Research and Boundary Resolution
5 Survey Water Main Route
6 Finalize Alignment (30% Review)M
7 Preliminary Engineering Design (70%)M
8 Final Engineering Design (100%)M
9 Permitting (If Required)
10 Bidding Phase MM
11 Easement Acquisition (Estimated 6 Months)
12 Construction Phase (Estimated 12 Months)MMMMMMMMMMMM M
2016
Sept.
3030 Days
JuneMarch
31 Days
◊
October
30 Days 31 Days
December
31 Days
November
30 Days
2017
Duration
Task
30 Days
2015
September
30 Days
30 Days
30 Days
75 Days
12/01/15
12/15/15
12/15/15
60 Days
180 Days
365 Days
120 Days
75 Days
160 Days 05/01/16
10/01/16
04/01/16
Start
Date
10/15/15
10/15/15
January
31 Days
12/01/16
02/01/16
03/15/16
07/01/16
M = Meeting with AUD/Constantine
April
30 Days
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Alternate Downtown Water Feed
Department:Augusta Utilities Department
Caption:Consider Professional Services Proposal from Cranston
Engineering Group, P.C. for the Alternate Downtown Water Feed
2014 CIP Bond Project in the amount of $379,370.
Background:On November 18, 2014, the Augusta commission approved the
assignment of various capital improvement project to design
firms. Cranston Engineering Group, P.C. was approved for the
Alternate Downtown Water Feed project. The downtown area is
fed primarily through a 24 inch cast iron pipe in Wrightsboro
Road, segments of which are over 100 years old. This project will
provide an alternative feed to downtown.
Analysis:The 24-inch water main will originate at the Highland Avenue
Water Treatment Plant and will terminate on Olive Road. Routing
alternatives will be analyzed to determine the most feasible and
economical alignment.
Financial Impact:Cranston Engineering Group, P.C. has proposed to provide
professional design services for this project for a fee of $379,370.
We have reviewed the scope of work and associated fees and find
them to be reasonable.
Alternatives:The Commission could elect not to proceed with this project.
Recommendation:Augusta Utilities Department recommends the proposal from
Cranston Engineering Group P.C. in the amount of $379,370 be
approved.
Funds are Available
in the Following
Accounts:
Funds are available in the following accounts: 514043410-
212115 / 81500110-5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Butler Creek West Trunk Sewer, Design Services
Department:Utilities
Caption:Approve Johnson, Laschober, and Associates (JLA) Design
Change Order 5 in the amount of $51,584.00 for the Butler Creek
West Sanitary Sewer Upgrades, project number 60106.
Background:Sanitary sewer upgrades were needed in the western Butler Creek
Basin area of Augusta. The project was designed to provide for
the installation of new gravity sewer lines and force mains, as well
as sanitary sewer lift station upgrades which will
provide necessary sewer services to subject areas. This project,
which commenced in 2006, has been designed and constructed in
phases. There have been significant changes to the original scope
and sequence, primarily to respond to the needs of Fort Gordon.
This phase of the project included major pumping station
upgrades that required significant mechanical and electrical
review and inspection. AUD's resources in these areas were
committed and the design engineer was required to spend more
time than initially anticipated. Additional effort was also required
by the design engineer due to contractor inefficiencies.
Analysis:Johnson, Laschober, and Associates, P.C. has provided a thorough
cost breakdown for the additional work and services required from
their firm. Augusta Utilities Department has reviewed the design
Change Order 5 documents prepared by JLA, and found the
associated fees to be acceptable for the work and services
required. Approval of additional funding is needed to compensate
JLA for additional design and construction phase work they
provided for the Butler Creek West project.
Financial Impact:Funds for Change Order 5 are provided in 511043420-
5212115/80360106-5212115
Alternatives:No alternatives are recommended.
Recommendation:Augusta Utilities Department recommends the Commission
approve subject Change Order 5 for JLA in the amount of
$51,584.00.
Funds are Available
in the Following
Accounts:
511043420-5212115/80360106-5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Vicinity Map
176
6,7(
N
Location Map
176
6,7(
N
Pine Log Road Sanitary Sewer
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Consider approval of change order in the amount of $49,563.85 to Blair Construction for the Pine Log
Road Sanitary Sewer Installation Emergency Task Order Project.
Department:Utilities
Caption:Consider approval of change order in the amount of $49,563.85 to
Blair Construction for the Pine Log Road Sanitary Sewer
Installation Emergency Task Order Project.
Background:AUD was notified by the Health Department that a number of
residents who live along Pine Log Rd and Old Waynesboro Rd
were experiencing septic tank failure and needed to connect the
sanitary sewer system. The project consists of installing 1,400 LF
of sewer main, 18 cleanouts and 5 manholes. AUD contacted
Procurement and obtained an emergency bid on the project. Four
bidders listed on the Emergency Task Order list were
contacted. The low bidder was Blair Construction in the amount
of $201,097.05. And due to the urgency of the situation, AUD
instructed Blair to mobilize. During construction of the sewer
line, we elected to also address marginal flow and pressure issues
within the project area. The change order work corrects these
issues by replacing 700 feet of water main and associated water
services and fire hydrant installation. AUD also performed value
engineering with Blair to reduce the contracted line item costs and
task order project costs. This results in a change order in the
amount of $49,563.85 to add the water main installation and
reconcile the final constructed quantities. The cost breakdown is
provided on the attached Pay Estimate.
Analysis:AUD evaluated the task order costs and the resulting change order
amount of $49,563.85, and found it to be fair and reasonable.
Financial Impact:$49,563.85, under account number 507043490-
5425410/88886666-5425410.
Alternatives:No alternatives are recommended.
Recommendation:Recommend approval of change order in the amount of
$49,563.85.
Funds are Available
in the Following
Accounts:
Funds are available in account 507043490-5425410/88886666-
5425410.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Augusta Utilities Department
,.",.S1,X;;HX:'L* Biffifil
DATE:
TO:
FROM:
SUBJECT:
MEMORANDUM
August 12,2015
Geri Sams, Procurement Director
Tom Wiedmeier, P.E.; Director of Utilities f,rr1
RFP 15-176 Soils and Materials Testing Proposal_ Augusta Utilities Projects
Based on the fair and reasonable proposal provided by CSRA Testing and Engineering
Company, Inc. for RFP 15-176, and with the best interest of the City of Augusta in mind, I
recommend that CSRA Testing and Engineering Company be awarded the Soils and Materials
Testing contract in the amount of $52,750.00.
360 Bay Street, Suite 180, Augusta, Georgia 30901
(7 06) 312-4132 F ax (7 06) 312-4133
WWW.AUGUSTAGA.GOV
Request for Proposal
Request for Proposals will be received at this office until Friday, June 12, 2015 @ 11:00 a.m. for furnishing:
RFP Item #15-176 Soils and Material Testing Services for Construction Project for Utilities
Department
RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director Augusta Procurement Department
535 Telfair Street - Room 605 Augusta, Georgia 30901
RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department
ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901.
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, May 29,
2015, @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered.
No RFP may be withdrawn for a period of 90 days after time has been called on the date of opening.
Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and
shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request
for proposal including, but not limited to, the number of copies needed, the timing of the submission,
the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the
Procurement Director. All requests to waive or modify any such material condition shall be submitted
through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope.
Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places
the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle May 7, 14, 21, 28, 2015 Metro Courier May 13, 2015
Revised: 1/12/2015
Page 1 of 1
VENDORS Attachment
B
E-Verify
#
SAVE
Form Original 7
Copies
Fee
Proposal
MC SQUARED, INC
ATTN: SAM MOUSSLY
1275 SHILOH RD, STE 2620
KENNESAW, GA 30144
YES 228126 YES YES YES YES
NOVA ENGINEERING
3900 KENNESAW 75 PARKWAY
SUITE "100'
KENNESAW, GA 30144
YES 124398 YES YES YES YES
CSRA TESTING & ENGINEERING
1005 EMMETT ST, STE A
AUGUSTA, GA 30904 YES 138689 YES YES YES YES
MORELAND ALTOBELLI & ASSOC
2450 COMMERCE AVENUE
SUITE 100
DULUTH, GA 30096
YES 53328 YES YES YES YES
CARDNO ATC
1453 GREENE STREET, SUITE A
AUGUSTA, GA 30901
YES 46692 YES YES YES YES
AMEC E&I
1075 BIG SHANTY RD., SW SUITE 100
KENNESAW, GA 30144
LATE NON-
COMPLIANT
EMC ENGINEERING SERVICES
1344 US HIGHWAY 19 S
LEESBURG, GA 31763
YES 324745 YES YES YES YES
Proposal Opening
RFP Item #15-176
Soils and Material Testing Services for Construction Project
for Augusta, Georgia - Utilities Department
RFP Due: Friday, June 12, 2015 @ 11:00 a.m.
Total Number Specifications Mailed Out:
Total Number Specifications Download (Demandstar):
Total Electronic Notifications (Demandstar):
Mandatory Pre-proposal/Telephone Conference Attendees: NOT APPLICABLE
Total packages submitted:
Total Noncompliant:
Evaluation Criteria
PTS
MC SQUARED, INC
ATTN: SAM MOUSSLY
1275 SHILOH RD, STE 2620
KENNESAW, GA 30144
NOVA ENGINEERING
3900 KENNESAW 75 PARKWAY
SUITE "100'
KENNESAW, GA 30144
CSRA TESTING & ENGINEERING
1005 EMMETT ST, STE A
AUGUSTA, GA 30904
MORELAND ALTOBELLI &
ASSOC
2450 COMMERCE AVENUE
SUITE 100
DULUTH, GA 30096
CARDNO ATC
1453 GREENE STREET, SUITE A
AUGUSTA, GA 30901
EMC ENGINEERING SERVICES
1344 US HIGHWAY 19 S
LEESBURG, GA 31763
1 Field Testing Experience 25 24.5 24.5 24.5 24.5 24.0 24.0
2. Experience with similar projects 25 22.0 24.0 25.0 24.0 21.0 21.0
3 Company accreditations.20 19.0 19.0 19.5 19.0 19.0 19.0
4 Laboratory testing experience 20 19.0 19.0 19.5 19.0 19.0 19.0
5 Proximity to Area
• Within Richmond County
5 points
• Within CSRA
4 points
• Within Georgia
3 points
• Within SE United States (includes AL,
TN, NC, SC, FL) 2 points
• All Others
1 point 5
5 3.0 3.0 5.0 3.0 5.0 4.0
6 Proposed Fee (must provide and
enclose in separate sealed envelope)
• Lowest 5 points
• Second 4 points
• Third 3 points
• Fourth 2 points
• Highest 1 points 5
Total 100
5 2.0 1.0 5.0 3.0 4.0 0.0
Total 100 89.5 90.5 98.5 92.5 92.0 87.0
Cumulative Evaluation Sheet - RFP Item #15-176
Soils and Material Testing Services for Construction Project
for Augusta, Georgia - Utilities Department
Wednesday, July 1, 2015 @ 10:00 a.m.
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Consider Approval of Soils and Materials Testing Services Contract Associated With RFP 15-176.
Department:Utilities
Caption:Consider awarding a contract to CSRA Testing and Engineering
in the amount of $52,750.00. RFP 15-176
Background:The Augusta Utilities Department (AUD) needs to contract with
an engineering testing firm to perform soils and materials testing
for capital improvements projects in Augusta-Richmond
County. RFP 15-176 was developed and advertised through
Augusta’s Procurement Department. The six proposals found to
be in compliance with applicable RFP requirements were from
CSRA Testing and Engineering Company, Cardno ATC, Inc.,
Moreland Altobelli Associates, Inc., MC Squared, Inc., Nova
Engineering, and EMC Engineering Services. After extensive
review of the proposals by a review committee, CSRA Testing
and Engineering was rated as the firm best conforming to the
criteria established.
Analysis:Approving this contract will allow CSRA Testing and
Engineering, to enter into a contract with Augusta-Richmond
County to perform applicable soils and materials testing at capital
improvements projects for AUD.
Financial Impact:Funds for this work are available in account number 511043490-
5212999/80199999-5212999
Alternatives:No alternatives are recommended.
Recommendation:The proposal from CSRA Testing and Engineering Company was
considered fair and reasonable by the Department, therefore we
recommend the Commission award the Soils and Materials
Testing contract to CSRA Testing and Engineering in the amount
of $52,750.00.
Funds are Available
in the Following FUNDS AVAILABLE IN THE FOLLOWING ACCOUNTS:
511043490-5212999/80199999-5212999
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Eagle Utility Contracting,Inc.
1350 Branch Road
Bishop,GA 30621
Phone:(706)769-6015
Fax:(706)769-1638
eagleutility@bellsouth.net
Mr.Stanley Aye
To:Augusta Utilities Department
360 Bay Street;Suite 180
Augusta Ga 30901
For:Gordon Hwy 16"Water Main Date:February 9,2015ChangeOrder1A.
Quantitiy Unit Description Unit Price Total.1305 LF 12"Dia.DIP CL350 Standard Joint Water Main $35.75 46,653.75
200 LF 12"Dia.DIP CL350 Restrained Joint Water Main $41.00 8,200.00
170 LF Jack and Bore 16"Steel Casing $146.55 24,913.50
3065.68 LBS Miscellaneous Fittings $2.20 6,744.50
2 EA Fire Hydrant with Valve,Lead Pipe,Restraint,and Blocking $4,539.00 9,078.00
2 EA 8"In Line Gate Valve Open Right $1,047.05 2,094.10
2 EA 12'In Line Gate Valve Open Right $1,908.30 3,816.60
7 EA Tie to Existing Water Main $2,500.00 17,500.00
410 SY 2"Thick Asphalt Repair $29.50 12,095.00
275 SY 6"Thick Concrete Remove and Replace $55.00 15,125.00
65 LF 24"Concrete Curb and Gutter Remove and Replace $28.00 1,820.00
2000 SF Sod Replacement $0.75 1,500.00
1505 LF Future Path Microduct $3.00 4,515.00
1 LS Lump Sum Construction $12,750.00 12,750.00
1 LS Creek Crossing (Less 16"Dia DIP Restrained Jiont)$24,800.00 24,800.00
65 LF 8"Dia.DIP CL350 Restrained Joint Water Main $29.50 1,917.50
80 LF 16"Dia.Ductile Iron Flex-Lok Boltless Ball Joint Pipe -$556.85 .(44,548.00)
1 LS Landscaping at McCoy's Creek Entrance $7,542.00 7,542.00
0 $0.00 -
0 $0.00 -
0 $0.00 -
-."II ~'$156,516.95
(~-sr:>c ~----/~""""7~hfield,Vice President 219/2015
\.__)c.->
CO-1
CONSTRUCTION CONTRACT CHANGE ORDER
CO NUMBER 1
BID ITEM 14-175
DATE July 14, 2014
PROJECT TITLE Gordon Hwy 16 Water Main
ORIGINAL CONTRACT DATE August 14, 2014 PROJECT NUMBER 10156
OWNER AUGUSTA, GEORGIA PO NUMBER P248820
The following change is hereby made to the contract for the above project:
Description of Change (for a more detailed description see attached proposal):
This project is located at Fort Gordon /Robinson Ave along Gordon Highway. The project consists of
installing approximately 12,325 feet of 16 inch DIP Water Main. AUD desires to expand the water system
to support additional development, which is currently being constructed in the area. Additional funds are
being requested in the sum of $156,516.95 to change the contract with Eagle Utility to add construction of
a 16” Jack and bore casing for future connection to Fort Gordon Gate 2 and install an additional 1,200 LF
of 12” pipe for future connection to Fort Gordon Gate 6 and the Augusta Medical Prison.
PAYEE Eagle Utility
TOTAL AMOUNT OF THIS CHANGE ORDER $ 156,516.95
The contract time will be INCREASED by 14 calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT $ 1,097,298.15
PREVIOUS CHANGE ORDER (INCREASE) $ 0.00
THIS CHANGE ORDER (INCREASE) $ 156,516.95
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 1,253,815.10
FUNDING NUMBER/ACCOUNT NUMBER 511043410 5212115
80310156 5212115
PROPOSED BY:
DATE:
CONTRACTOR
REQUESTED BY:
DATE:
ENGINEER
SUBMITTED BY:
DATE:
DEPARTMENT HEAD
FINANCE ENDORSEMENT:
DATE:
COMPTROLLER
RECOMMENDED BY:
DATE:
ADMINISTRATOR
APPROVED BY:
DATE:
MAYOR
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Construction change order in the amount of $156,516.95 for the Gordon Hwy 16” Water Main project by
Eagle Utility Contracting, Inc. Bid item #14-175.
Department:Utilities
Caption:Consider approval of construction change order in the amount of
$156,516.95 for the Gordon Hwy 16” Water Main project by
Eagle Utility Contracting, Inc. Bid item #14-175.
Background:This project is located at Fort Gordon /Robinson Ave along
Gordon Highway. The project consists of installing approximately
12,325 feet of 16 inch Ductile Iron Pipe Water Main. AUD desires
to expand the water system to support additional development,
which is currently being constructed in the area. Additional funds
are requested in the sum of $156,516.95 to change the contract
with Eagle Utility to add construction of a 16” Jack and bore
casing for future connection to Fort Gordon Gate 2, and install an
additional 1,200 LF of 12” pipe for future connection to Fort
Gordon Gate 6 and the Augusta Medical Prison.
Analysis:Augusta Utilities Department has found the proposal to be fair and
reasonable and is requesting approval of the additional funds at a
cost of $156,516.95 for Eagle Utility.
Financial Impact:Change Order adds $156,516.95 to the contract.
Alternatives:No alternatives are recommended.
Recommendation:Recommend approving the change order to the contract with
Eagle Utility in the amount of $156,516.95.
Funds are Available
in the Following
Accounts:
512043410-5425110/80310156-5425110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Sitec LLC 6/2/2015
217 Fairfield st NE
Aiken SC 29801
David.sitec@comcast.net
706-840-3980
ITEM NO. DESCRIPTION UNITS Proposed
Quantity
Unit Price Total Actuals
150-1000 Traffic Control LS 1 $5,600.00 $5,600.00 1
207-0203 Sand clay backfill material cy 47 $18.00 $846.00 47
207-0203 Backfill type 57# tns 45 $32.00 $1,440.00 45
207-0203 Curb and Gutter LF 200 $21.50 $4,300.00 250
230-1000
The lump Sum Construction LUMP SUM
CONSTRUCTION INCLUDES, BUT IS NOT
LIMITED TO THE FOLLOWING:
MOBILIZATION, ANY OTHER WORK OR
MATERIAL WITHOUT A SPECIFIC PAY ITEM. LS 1 $15,529.00 $15,529.00 1
402-3121
Asphalt patch and overlay 12.5 mm(1.5" to
2") tns 40 $142.00 $5,680.00 123.63
402-3113 Asphalt driveway with 12.5 mm(2") EA 1 $2,800.00 $2,800.00 1
441-0018 Driveway Concrete (6" depth area ) EA 2 $3,200.00 $6,400.00 2
550-1360
Replace the (old 36"RCP to new with O- ring
36" RCP) across road LF 40 $108.00 $4,320.00 32
550-1366 6" DIP to cover water main(if needed) LF 20 $98.00 $1,960.00 16
550-1367 8" Dip to cover san. Sewer(if needed) LF 20 $113.00 $2,260.00 0
668-1100 Catch Basin (DWT) Reconstruct EA 2 $4,800.00 $9,600.00 2
700-5000 Grassing/Sodding LS 1 $1,200.00 $1,200.00 1
TOTAL $61,935.00
Additional Work
Sewer
Remove and replace 8" Sewer line, haul of
demo and unsuitable material ( pipe
material to be supplied by others)LF 180 68.00 $12,240.00 180
Sewer Select sand clay fill to fill sewer pipe trench cy 84 18.00 $1,512.00 65
Sewer Asphalt patch 4"TN 24 142.00 $3,408.00 0
Sewer install 6" GABC to patch area TN 33 27.00 $891.00 121.24
Sewer Backfill type 57#TN 58.95 32.00 $1,886.40 58.95
$19,937.40
TOTAL $81,872.40
PROJECT NAME: 3003 Thomas Ln
IMVOICE 7/20/15
7/9/2015
$5,600.00
$846.00
$1,440.00
$5,375.00
$15,529.00
$17,555.46
$2,800.00
$6,400.00
$3,456.00
$1,568.00
$0.00
$9,600.00
$1,200.00
$71,369.46
$12,240.00
$1,170.00
$0.00
$3,273.48
$1,886.40
$18,569.88
$89,939.34
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Emergency Construction Services (Thomas Lane Drainage System Failure)
Department:Abie L. Ladson, Director
Caption:Approve and receive as information the Emergency Construction
Services on the Thomas Lane Drainage System Failure in the
amount of $89,939.34 to Sitec LLC; funded from SPLOST Phase
VI as requested by AED.
Background:Structural failure was reported near 3003 Thomas Lane. The storm
sewer in this area was failing, undermining the road, and causing
the road to have cave ins. Emergency repair was warranted due to
the impacted area progressively enlarging. Given the nature of the
failure, it was not possible to determine the scope of
work. Therefore, acquiring a cost proposals prior to initiating the
site work was not possible. The work was done under an
emergency situation that needed a timely response to minimize
public exposure to hazards, and also minimize Augusta’s exposure
to possible liabilities. AED does not have sufficient resources to
complete the task therefore, SITEC, LLC an on-call contractor
was hired.
Analysis:Work was done under an emergency situation that warranted a
timely response by AED to minimize public exposure to identified
hazards, and also minimize Augusta’s exposure to any potential
liability. AED does not have sufficient in-house resources to
complete all the required tasks in a timely manner and has had to
hire Sitec, LLC.
Financial Impact:Funds are available in the construction budget 328-041110-
5414110/211828005-5414110.
Alternatives:1). Approve and receive as information the Emergency
Construction Services on the Thomas Lane Drainage System
Failure in the amount of $89,939.34 to Sitec LLC; funded from
SPLOST Phase VI as requested by AED. 2). Do not approve.
Recommendation:Approve alternative one.
Funds are Available
in the Following
Accounts:
328041110-5414110/211828005-5414110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Goat Cleanup Program
Department:Clerk of Commission
Caption:Update from staff regarding operational costs associated with the
goat cleanup program. (Requested by Commissioner M.
Williams)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
CITY OF AUGUSTA
SAND BAR FERRY RD @ LANNY WALKER BLVD EXT
MAST ARM - SIGNAL - CAMERA REPLACEMENT
BID DATE:OCTOBER 29, 2014
COMPLETION DATE: TBD
ACCIDENT NO. 1 - REPAIR ITEMS
LINE NO.ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE EXTENDED PRICE
005 150-1000 TRAFFIC CONTROL LS 1.00 750.00$ 750.00$
010 639-3014 STRAIN POLE, TP IV W/ 54 FT MAST ARM - POWDER COATED BLACK EA 1.00 10,250.00$ 10,250.00$
015 647-1000 TRAFFIC SIGNAL INSTALLATION - REPAIR EA 1.00 11,150.00$ 11,150.00$
020 937-6050 INTERSECTION VIDEO DETECTION SYSTEM ASSEMBLY, TP A (ECONOLITE)EA 1.00 4,100.00$ 4,100.00$
ACCIDENT NO. 1 REPAIR SUBTOTAL:26,250.00$
ACCIDENT NO. 2 - REPAIR ITEMS
005 150-1000 TRAFFIC CONTROL LS 1.00 2,500.00$ 2,500.00$
009 639-3004 CONCRETE STRAIN POLE FOUNDATION EA 1.00 7,960.00$ 7,960.00$
011 639-3000 EXISTING FOUNDATION REMOVAL EA 1.00 2,625.00$ 2,625.00$
ACCIDENT NO. 2 REPAIR SUBTOTAL:13,085.00$
REPAIR TOTAL:39,335.00$
**Traffic signal maintenance is NOT included.
**New pole foundation location assumes pedestrian facilities will remain in compliance with ADA requirements.
Please notify RJH if pedestrian push button post or pedestrian pole is necessary to maintain proper alignment.
**Bid price assumes no pedestrian facilities were damaged or in need of repair.
**Existing foundation removal is only to remove top portion of the existing foundation to include anchor bolts and steel rebar to a depth of 2 feet below existing grade.
**Lead time for pole material is 12 - 14 weeks after approved submittal. Allow two weeks for scheduling after receipt.
**No miscellaneous signage or striping included.
**No civil / geometric work included.
**Bond or Pro-Rata Bond is not included. Please call for pricing.
**Bid is contingent upon a mutually agreeable contract.
**Utility relocation if necessary to be done by others.
**Bid is valid for 45 days.
R.J. Haynie & Associates, Inc.
Brandon Oravetz
404-361-0672 (office)
404-366-9750 (fax)
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Laney Walker Boulevard at Sand Bar Ferry Road Mast Arm Repair- Emergency
Department:Abie Ladson - Director
Caption:Motion to supplement the city’s contract with RJ Haynie and
Associates in the amount of $39,335 to provide traffic signal mast
arm repair services for the intersection of Sand Bar Ferry Road
and Laney Walker Boulevard as requested by AED/TE.
Background:In 2014, the mast arm pole at this intersection was struck and
destroyed by an overturned tractor trailer and in order to maintain
the function of the signal, a temporary pole and span wire was
installed. Subsequently, tests were performed on the existing
foundation to determine the extent of the damage and develop a
path for the permanent repair as well as to coordinate efforts with
Georgia DOT. While tests performed in late 2014 indicated that
foundation was not significantly damaged at the time and could be
reused for the replacement pole, a subsequent accident that
occurred in July 2015, prior to the permanent repair, damaged the
foundation beyond repair. This level of repair is beyond the
capabilities of in-house staff. The city currently has a contract
with RJ Haynie and Associates to provide traffic signal mast arm
installation along Telfair Street and Walton Way which is
identical in nature to the needed repair. Therefore, the purpose of
this item is to supplement the contract with RJ Haynie to provide
the needed repair with funding to be provided through the
insurance claims from both accidents.
Analysis:RJ Haynie and Associates is currently under contract for identical
type work and will provide the needed repair for $39,335. This
cost was analyzed and determined to be reasonable and cost
effective for the type of work being performed.
Financial Impact:None; repair will be funded through the insurance settlements.
Alternatives:Supplement the city’s contract with RJ Haynie and Associates in
the amount of $39,335 to provide traffic signal mast arm repair
services for the intersection of Sand Bar Ferry Road and Laney
Walker Boulevard. 2) Do not approve.
Recommendation:Approve alternative number one.
Funds are Available
in the Following
Accounts:
Fund 611
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby adopted:
Section 1: This project is authorized to CPB#371-041110-T13049126 for the Engineering Department
to award the Construction Contract to Reeves Construction Company in the amount of
$568,145.00 with funding from the TIA Project account.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase V 2,500,000$
TIA Discretionary 195,975$
TIA Project Funds 24,850
TIA Project Funds 568,145
3,288,970$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
CPB#371-041110-T13049126
Honorable Deke Copenhaver, Mayor
CAPITAL PROJECT BUDGET
MARKS CHURCH ROAD RECONSTRUCTION PROJECT
CHANGE NUMBER FIVE
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks
1 of 2 9.18.2014
Augusta-Richmond County, Georgia CPB#371-041110-T13049126
CAPITAL PROJECT BUDGET
MARKS CHURCH ROAD RECONSTRUCTION PROJECT
CHANGE NUMBER FIVE
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB ADDITION CPB
SPLOST, PHASE V
325-04-1120-6011110 ($2,500,000)($2,500,000)
TIA Discretionary ($195,975)($195,975)
371-041110-5212115/T13049126-5212115 ($24,850)(568,145)$ ($592,995)
TOTAL SOURCES: ($2,720,825) ($568,145) ($3,288,970)
USE OF FUNDS
ENGINEERING
325-04-1120-5212115-209825201 $685,128 $685,128
CONSTRUCTION
325-04-1120-5414110-209825201 $396,010 $396,010
CONSTRUCTION
3371-041110-5414110-T13049126 $568,145 $568,145
UTILITY
325-041120-5414510-209825201
$1,639,687 $1,639,687
TOTAL USES:$2,720,825 $568,145 $3,288,970
2 of 2 9.18.2014
Invitation to Bid
Sealed bids will be received at this office on Wednesday, May 6, 2015 @ 3:00 p.m. for furnishing: Bid Item #15-159 Marks Church Road & Drainage Improvements Project for Engineering Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams
Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901 706-821-2422
Bid documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime,
subcontractors and suppliers exclusively from ARC Southern. The fees for the plans and specifications
which are non-refundable are $200.00.
It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this
policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC Southern (706 821-0405) beginning Thursday, March 26, 2015. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Bid Conference will be held on Friday, April 17, 2015 @ 10:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605.
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Wednesday, April 22, 2015 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond
and a 100% payment bond will be required for award.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid
including, but not limited to, the number of copies needed, the timing of the submission, the required
financial data, and any other requirements designated by the Procurement Department are considered
material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All
requests to waive or modify any such material condition shall be submitted through the Procurement Director to
the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia
Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director
Augusta Chronicle March 26, April 2, 9, 16, 2015
Metro Courier April 1, 2015
Revised: 1/12/2015
Page 1 of 1
BLAIR CONSTRUCTION
P.O. BOX 770
EVANS, GA 30809
REEVES CONSTRUCTION
1 APAC INDUSTRIAL WAY
AUGUSTA, GA 30907
BEAM SITE PREP
1456 EDGEFIELD ROAD
NORTH AUGUSTA, GA 29860
YES
48048
YES
YES
YES
$568,145.00
E-Verify #
n
o
b
i
d
n
o
b
i
d
Bid Item #15-159
Marks Church Road & Drainage Improvements Project
for Augusta, Georgia - Engineering Department
Bid Due: Wednesday, May 6, 2015 @ 3:00 p.m.
SAVE Form
Bid Bond
Bid Price
Total Number Specifications Mailed Out: 16
Total Number Specifications Download (Demandstar): 5
Total Electronic Notifications (Demandstar): 239
Mandatory Pre-Bid Conference: 3
Total packages submitted: 1
Total Noncompliant: 0
Vendors
Attachment B
Addendum #1
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Mark Church Road & Drainage Improvements Phase 1- Bid 15-159-Contract Award
Department:Abie Ladson, Director
Caption:Approve award of Construction Contract to Reeves Construction
Company in the amount of $568,145.00 for Transportation
Investment Act (TIA) Project, Mark Church Road & Drainage
Improvement Project - Phase 1 as requested by AED. Award is
contingent upon receipt of signed contracts and proper bonds. Bid
Item 15-159
Background:Mark Church Road Improvements Project is one (1) of fifty (50)
City of Augusta, Georgia TIA (aka TSPLOST) projects. Project
limits are Wrightsboro Road to I-520/Wheeler Road off ramp.
This project consists of widening the existing two-lane roadway to
a three-lane roadway, and adding curb & gutter, sidewalks and a
storm sewer. This Project will be completed in two phases (Phase
1 and Phase 2). Phase I scope consist of clearing the right-of-way
and maintaining soil and erosion control measures throughout the
corridor. Phase I purpose is to allow utility companies (e.g.,
electrical, gas, cable, etc.) to relocate their facilities before
commencing construction work on the corridor (Phase II). The
separation of the project into phases will help reduce delays .
Analysis:Bids were received on May 6, 2015 with Reeves Construction
being the low bidder. The bid results are as follow:
CONTRACTORS BID 1. Reeves Construction Co $568,145.00
Note: Only one bid was received
Financial Impact:Funds are allowable in Project TIA funds upon Commission
approval:
Alternatives:1). Approve award of Construction Contract to Reeves
Construction Company in the amount of $568,145.00 for
Transportation Investment Act (TIA) Project, Mark Church Road
& Drainage Improvement project - Phase 1 as requested by
Augusta Engineering Department. Award is contingent upon
receipt of signed contracts and proper bonds. 2). Do not approve
and find alternative to complete the project and meet TIA project
completion schedule.
Recommendation:Approve alternative number one.
Funds are Available
in the Following
Accounts:
Funds are available in the following account: 371-041110-
T13049126
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Minutes
Department:Clerk of Commission
Caption:Motion to approve the minutes of the Engineering Services
Committee held on September 8, 2015.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
other lot conditons.
Schedule a pre-demolitlon site vish wlth my department so that we can
nrvrryno
lfirrlcJohoron
Dirtctor
review thd site condftions
'l' '{''*'\
$r
SePtember 17,2o+5
I
Mr.iJames Gadson
Gadson Constructlon CorPoration '. l6tlRamseyStreet . ,t t' AuBusta, Georgla 30901 .: ',. , t
" ,', .', t
rr-+.- '-'&bE?F:*-'--1'-
-6+'-'::+'.,/
Mr. Gadson:,.'/
,r'
r wanted to tafe a mrnute to forow up with you regardrng a otipre of requrrements for the demolition
prog6m. t have listed the ltems of concern below'
1.. please be sure to take and submit before inU'after photographs of each'lot' strusture' sidewalks' and
and discuss any ltems of concern on that partiorlar property'
/, ;;;T; i.'r.*,ng and provide adequata coverase of the tot before full payment will be made'
on the lots you have completed, I am apprwing Pavment of 80% of the invoicei with the remainlng
7O/ctobe paid once the grass ls growing'
4, Make sure you are using the correct tlpe of grass or clover, per the bid packaEe'
As always, please conta&.us with any questaons or oonoEms. Wi have met with Atlanta Gas Light this week
and they.are ryilring to increase the speed at whrch they disconnect the services to each structure. ln fact, as
of today,'tfrey have ilready st:?rted doing so'
uestionyo'r rcqU1rgthg.urldltlonal'i6formition;'please dO not hegtap to'contact'me'3t
7 OGS}2-320€ tir via ema il at lvid etto @ a us ust6 ea' aov'
i
2.
Slncerely,
- "*r . i'? ',
Eovlrourciltrl Senticct Daprrtoent
AuqrdE Sotiio wrse & Bcsydioe $Gih.t,
4 3 30- Defi !.Bddgc nosd, Blytb€ GA.'30805
fiO6t 5924m - Fax O06) s97-3?5s :' ivww.euclrsrAcA.Gov\
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Mr. James Gadson
Department:
Caption:Discuss retainage of contract funds regarding the Environmental
Services Department residential demolition program. (Requested
by Commissioner Marion Williams)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
RESOLUTION
RESOLUTION AUTHORIZING THE TERMINATION OF THE EDA
GRANT FOR THE ROCKWOOD PIGMENTS EFFLUENT FORCE MAIN
EXTENSION PROJECT AND FOR OTHER PURPOSES.
WHEREAS, Augusta, Georgia and Development Authority of Richmond County were
awarded an Economic Development Administration (EDA) grant to construct the Rockwood
Pigments Effluent Force Main Extension Project; said project consisting of installation of
approximately 5,900 linear feet of 16 inch effluent force main to connect the on-site Rockwood
Pigments effluent main to Augusta’s James B. Messerly WPCP.
WHEREAS, through no fault of Augusta, Georgia or the Development Authority of
Richmond County, Huntsman Pigments Americas, LLC (formerly Rockwood
Pigments NA, Inc.), the project beneficiary, notified the City of Augusta that the Company
will construct the force main themselves due to time constraints.
WHEREAS, the Award Recipients have determined that it is no longer feasible to proceed
with the proposed sanitary sewer force main project as planned and that an accounting should
now be made and the Financial Assistance Agreement be terminated for convenience of both the
Award Recipients and EDA.
WHEREAS, Augusta, Georgia and the Development Authority of Richmond County
understand that as a condition of said termination for convenience, that EDA will disburse EDA’s
share of the eligible project cost based upon eligible costs incurred on the project through August
28, 2015.
NOW, THEREFORE, be it resolved by the Augusta-Richmond County Commission, as
follows:
Section 1: All acts of the officers and employees of the Consolidated Government
which are in conformity with the purposes and intents of this resolution
shall be, and the same hereby are, in all respects approved and confirmed.
Section 2: This resolution shall take effect immediately upon its adoption.
Section 3: To the extent that any section of the Augusta, GA. Code is in conflict
herewith, that subsection is waived for this instance only.
Adopted this ______day of _________________, 2015.
Hardie Davis, Jr. As its Mayor Attest: Lena J. Bonner, Clerk of Commission Seal:
CERTIFICATION
The undersigned Clerk of Commission, Lena J. Bonner, hereby certifies that the
foregoing Resolution was duly adopted by the Augusta, Georgia Board of Commission
on____________________, 2015 and that such Resolution has not been modified or rescinded
as of the date hereof and the undersigned further certifies that attached hereto is a true copy of
the Resolution which was approved and adopted in the foregoing meeting(s).
______________________________
Lena J. Bonner, Clerk of Commission
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Resolution to Terminate EDA Grant for the Rockwood Pigments Effluent Force Main Extension Project
Department:Utilities
Caption:Consider Resolution to terminate EDA Grant for the Rockwood
Pigments Effluent Force Main Extension Project.
Background:The City of Augusta and Development Authority of Richmond
County were awarded an Economic Development Administration
(EDA) grant to construct the Rockwood Pigments Effluent Force
Main Extension Project. The project consists of installation of
approximately 5,900 linear feet of 16 inch effluent force main to
connect the on-site Rockwood Pigments effluent main to
Augusta’s James B. Messerly WPCP. The EDA grant was
awarded as equal 50% cost share with the EDA grant
reimbursement up to $1,071,305.00, and Augusta’s equal share
listed as $1,071,305.00. However, the Design Engineer’s cost
estimate was $1,437,799.00, which would reduce the expected
EDA grant reimbursement to $718,899.50, and Augusta’s equal
cost would be $718,899.50. Recently, Huntsman Pigments
Americas, LLC (formerly Rockwood Pigments NA, Inc.) notified
Augusta that they will construct the force main themselves due to
time constraints in consideration of the processes required by the
EDA grant.
Analysis:The Utilities Department finds Huntsman’s decision acceptable
and supports their plan to construct the force main themselves. We
recommend that Augusta Utilities continue to share in the cost of
the project as we committed to under the EDA grant, up to
$1,071,305.00.
Financial Impact:Based on current construction estimate, $718,899.50; not to
exceed $1,071,305. The termination of the EDA grant will not
cost Augusta additional funds for the project.
Alternatives:No alternatives are recommended.
Recommendation:Approve resolution to terminate the EDA Grant for the Rockwood
Pigments Effluent Force Main Extension Project and authorize
participation in force main construction up to $1,071,305.
Funds are Available
in the Following
Accounts:
514043420-5425210 / 81500060-5425210
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Spirit Creek Trunk Sewer RehabilitationProject Map
Augusta Utilites Department360 Bay Street, Suite 180Augusta, GA 30901
Peach Orchard Rd
Deans Bridge Rd
Windsor Spring Rd
Tobacco Rd
Old Waynesboro Rd
Mike Padgett Hwy
Legend
SPIRIT CREEK SEWER BASIN
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Spirit Creek Trunk Sewer Rehabilitation
Department:Augusta Utilities Department
Caption:Consider Professional Services Proposal from Johnson, Laschober
and Associates, P.C. for the Spirit Creek Trunk Sewer
Rehabilitation 2014 CIP Bond Project in the amount of $431,500.
Background:On November 18, 2014, the Augusta commission approved the
assignment of various capital improvement projects to design
firms. Johnson, Laschober and Associates, P.C. was approved for
the Spirit Creek Trunk Sewer Rehabilitation project for the
condition assessment and evaluation of the sewer main for
rehabilitation. The Spirit Creek Trunk Sewer is plagued by
excessive inflow and infiltration. Most of the flow in the Spirit
Creek Sewer is diverted to the J.B. Messerly Wastewater
Treatment Plant while the balance is treated at the Spirit Creek
Plant. High flows in the Spirit Creek line have contributed to
overflows at the Messerly Plant and permit exceedances at the
Spirit Creek Plant.
Analysis:The project will consist of two phases. The first phase will be the
study phase that will include the evaluation of the existing sewer
and result in in recommendations for rehabilitation projects
including prioritization and budgeting. The second phase will be a
pilot rehabilitation project to assess rehabilitation methods and the
cost versus benefit of the method.
Financial Impact:Johnson, Laschober and Associates, P.C. has proposed to provide
professional design services for this project for a fee of $431,500.
We have reviewed the scope of work and associated fees and find
them to be reasonable.
Alternatives:The Commission could elect not to proceed with this project.
Recommendation:Augusta Utilities Department recommends the proposal from
Johnson, Laschober and Associates, P.C. in the amount of
$431,500 be approved.
Funds are Available
in the Following
Accounts:
Funds are available in the following accounts: 514043420-
5212115 / 81500120-5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Augusta-Richmond County, Georgia
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase VI 500,000$
1,885,799$
339,500
192,500
2,917,799$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
AMENDMENT NUMBER THREE
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for
execution. For information reference this request, contact Engineering at ext 5070. Thanks
CPB#328-041110-211828002
Honorable Hardie Davis, Jr., Mayor
CAPITAL PROJECT BUDGET
STORMWATER UTILITY Program
Special 1% Sales Tax, Phase VI
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia
that the following Capital Project Budget is hereby adopted:
Section 1: This project is authorized to CPB#328-041110-211828002 Supplemental Agreement Number One to
AMEC, Inc., in the amount of $192,500 for the Stormwater Utility Fee Implementation Project. This
request is based on the refinement of preparation and analysis to complete the project. Funding
Special 1% Sales Tax, Phase VI
Special 1% Sales Tax, Phase VI
is available through Project SPLOST VI project account.
1 of 2 8.25.2015
Augusta-Richmond County, Georgia CPB#328-041110-211828002
CAPITAL PROJECT BUDGET
STORMWATER UTILITY Program
CPB AMOUNT ADDITION NEW
SOURCE OF FUNDS CPB REQUEST CPB
SPLOST, PHASE VI
328-041110-211828002 ($2,725,299) ($192,500) ($2,917,799)
TOTAL SOURCES: ($2,725,299) ($192,500) ($2,917,799)
USE OF FUNDS
ENGINEERING
328-041110-5212115-211828002 $2,725,299 $192,500 $2,917,799
TOTAL USES:$2,725,299 $192,500 $2,917,799
2 of 2 8.25.2015
(SA02) – For changes greater than $20,000)
AUGUSTA-RICHMOND COUNTY
AUGUSTA, GA ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
WHEREAS, We, AMEC, Inc., Consultant, entered into a contract with Augusta-Richmond County on October
15, 2013, for engineering design services associated with the Stormwater Utility Fee Implementation
Project No. 328-041110-211828002, File Reference No. 15-014 (A), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the
scope of the original contract, we desire to submit the following Supplemental Agreement to-wit:
It is agreed that as a result of the above described modification the contract amount is increased by
$192,500.00 from $484,452.54 to a new total of $676,952.54.
Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no
way modifies or changes the original contract of which it becomes a part, except as specifically stated
herein.
NOW, THEREFORE, We, AMEC, Inc, Consultant, hereby agree to said Supplemental Agreement consisting of
the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part
of the original contract to be performed under the specifications thereof, and that the original contract is in
full force and effect, except insofar as it might be modified by this Supplemental Agreement.
This day of , 2015
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY AMEC, INC.
AUGUSTA, GEORGIA
Hardie Davis, Jr., Mayor
Approved: Date Approved: Date
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title: Title:
Augusta Richmond County Project Number(s): 328-041110-211828002
Supplemental Agreement Number: 1
Purchase Order Number: 230614
Additional services to process impervious coverage and billing logistics.
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of
Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Storm Water Utility Implementation
Department:Abie Ladson
Caption:Authorize Amendment One to the City of Augusta contract with
AMEC Foster Wheeler Environmental & Infrastructure, Inc. in the
amount of $192,500 for the Stormwater Utility Fee
Implementation Project.
Background:The Stormwater Utility Fee Implementation Project is a project
that is approved and funded through SPLOST VI, with a budget of
$3,500,000. AMEC, Inc., was selected for an initial contract of
$484,452 to develop the program documents, rate structure, and
billing database. During the public participation process and
Commission review process of alternatives for this program, in
March to July 2015, the Engineering Department required
additional services from AMEC for parcel-account matching,
updates to the impervious surface database, and additional support
services responsive to elected official and public requests to
evaluate various alternatives. These out-of-scope items totaled
$92,000 in additional services. The Program was ultimately
approved by the Commission on July 21, 2015. Implementation
assistance is now needed for the billing database and customer
service preparations prior to go live on January 1, 2016. These
additional services will total $192,500.
Analysis:Data preparation and analysis is complete and warrants refinement
that includes additional efforts to process impervious coverage
and billing logistics.
Financial Impact:Data preparation and analysis is complete and warrants refinement
that includes additional efforts to process impervious coverage
and billing logistics.
Alternatives:1) Approve 2) Approve the out-of-scope items but seek alternative
resources for the database and customer service preparations.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: account number 328-041110 5212115/211828002-
5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia
that the following Capital Project Budget is hereby adopted:
Section 1: This project is set up and authorized to CPB# T13043144 & T13043145. This project
to award construction services for the Walton Way Signal Modernization Ph III (Bransford Rd
to Milledge Rd) and Ph II (Druid Park to Heard Ave) to R. J. Haynie & Associates, Inc.
Funding is available in TIA project budget account numbers:
371-041110-5212115/T13043144 & 371-041110-5212115/T13043145.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
173,030$
TIA Project Funds 346,070$
TIA Project Funds 5,517,131$
6,036,231$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Hardie Davis, Jr., Mayor
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
CPB# T13043144 & T13043145
CAPITAL PROJECT BUDGET
Walton Way Signal Modernization Phase II and III
TIA Project Funds
Change Number One
(Ph III Bransford Rd $3,708,408.50.
in the total amount of $5,517,131 with Ph II (Druid Park to Heard Ave $1,808,650.50) and
1 of 4 1.20.2014
Augusta-Richmond County, Georgia CPB# T13043144 & T13043145
CAPITAL PROJECT BUDGET
Walton Way Signal Modernization Phase II and III
CPB AMOUNT NEW
SOURCE OF FUNDS CPB CPB
TIA Project Funds (173,030)$ (173,030)$
371-041110-5212115/T13043144
TIA Project Funds (346,070) (346,070)
371-041110-5212115/T13043145
TIA Project Funds
371-041110-5212115/T13043144 (1,808,650.50)
371-041110-5212115/T13043145 (3,708,480.50)(5,517,131) (5,517,131)
TOTAL SOURCES:(519,100)$ (5,517,131)$ (6,036,231)$
USE OF FUNDS
ENGINEERING
371-04-1110-5212115/T13043144 173,030$ 173,030$
ENGINEERING 346,070$ 346,070$
371-04-1110-5212115/T13043145
371-041110-5212115/T13043144 (1,808,650.50)
371-041110-5212115/T13043145 (3,708,480.50)5,517,131$ 5,517,131$
TOTAL USES:519,100$ 5,517,131$ 6,036,231$
2 of 4 1.20.2014
to award construction services for the Walton Way Signal Modernization Ph III (Bransford Rd
CPB# T13043144 & T13043145
in the total amount of $5,517,131 with Ph II (Druid Park to Heard Ave $1,808,650.50) and
3 of 4 1.20.2014
CPB# T13043144 & T13043145
4 of 4 1.20.2014
Invitation to Bid
Sealed bids will be received at this office on Wednesday, August 12, 2015 @ 3:00 p.m. for furnishing:
Bid Item #15-193 Signal Modernization Phase 2 & 3 (Walton Way Corridor) for Engineering
Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
706-821-2422
Bid documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street –
Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime,
subcontractors and suppliers exclusively from ARC Southern. The fees for the plans and specifications
which are non-refundable are $215.00.
It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this
policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC
Southern (706 821-0405) beginning Thursday, July 2, 2015. Bidders are cautioned that submitting a package
without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or
services, or coordination with other work that is material to the successful completion of the project. Bidders are
cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from
unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to
base his qualifications.
A Mandatory Pre Bid Conference will be held on Friday, July 24, 2015 @ 10:00 a.m. in the Procurement
Department, 535 Telfair Street, Room 605. A mandatory site visit will follow.
All questions must be submitted in writing by fax to 706 821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, July 28,
2015 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered.
No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid
bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond
and a 100% payment bond will be required for award.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall
include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and
conditions, applicable to the procurement. All specific requirements contained in the invitation to bid
including, but not limited to, the number of copies needed, the timing of the submission, the required
financial data, and any other requirements designated by the Procurement Department are considered
material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All
requests to waive or modify any such material condition shall be submitted through the Procurement Director to
the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia
Commission. Please mark BID number on the outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the
bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
GERI A. SAMS, Procurement Director
Augusta Chronicle July 2, 9, 16, 23, 2015
Metro Courier July 8, 2015
Revised: 1/12/2015
ATTN RICHARD BERRY
TRI-STAR CONTRACTORS INC
47 LEGACY LANE
EDGEFIELD SC 29824
ATTN BARRETT BOWDEN
CONTRACT MANAGEMENT INC
1827 KILLINGSWORTH
AUGUSTA GA 30904
ATTN: DAVID WHEATLEY
COLUMBIA DIVERSIFIED INC.
6677 EUBANKS DRIVE
APPLING, GA 30802
ATTN THERON SAPP
QUALITY STORM WATER SOLUTIONS
437 CAMBRIDGE CIRCLE
MARTINEZ GA 30907
ATTN TIM MCELROY
EAGLE UTILITY
1350 BRANCH ROAD
BISHOP, GA 30627
ATTN PATRICK DILLARD
BLAIR CONSTRUCTION
PO BOX 770
EVANS, GA 30809
ATTN BILL HEAD
D & S UTILITIES
1644 HOLY TRINITY CHURCH ROAD
LITTLE MOUNTAIN, SC 29075
ATTN: RANDALL MCCLAIN
L-J INC
603 PINE LOG ROAD
BEECH ISLAND, SC 29842
ATTN: JEFFERY HARRIS
HARRIS CONSTRUCTION
1736 BARTON CHAPEL ROAD
AUGUSTA, GA 30906
ATTN LARRY GOOLSBY
MABUS BROS CONSTRUCTION
920 MOLLY POND ROAD
AUGUSTA, GA 30901
J&B CONSTRUCTION & SRVC INC
3550 GORDON HIGHWAY
GROVETOWN GA 30813
BEAM’S CONTRACTING
15030 ATOMIC ROAD
BEECH ISLAND, SC 29842
SITEC
ATTN; DAVID MCGHEE
217 FAIRFIELS STREET NE
AIKEN, SC 29801
REEVES CONSTRUCTION
ATTN: GREG HAMILTON
1 APAC INDUSTRIAL WAY
AUGUSTA, GA 30907
CROWDER CONSTRUCTION
ATTN: MARK DICKSON
1229 ROYAL DRIVE, SUITE C
CONYERS, GA 30094
WALL ASPHALT
ATTN: CHARLIE WALL
617 ROCKMART ROAD
VILLA RICA, GA 30108
J & H GRADING & PAVING
ATTN: KEVIN WALTERS
1579 EDGEFIELD HIGHWAY
AIKEN, SC 29801
PAVEWAY OF AUGUSTA/AIKEN
306 SILVER BLUFF RD.
AIKEN, SC 29803
C & H PAVING
167 KNOX RIVERS ROAD
THOMSON, GA 30824
E R SNELL
1785 OAK ROAD
SNELLVILLE, GA 30078
L.C. WHITFORD CO.,
3765 FRANCIS CIRCLE
ALPHARETTA, GA 30004
ATTN: MARK SULLIVANT
RHYTHM ENGINEERING
101 CYPRESS POINT
HENDERSONVILLE, NC 28739
ATTN: DAVID HUTCHINSON
B & E ELECTRICAL
6136 COLUMBIA ROAD
GROVETOWN, GA 30813
ATTN: MARK ROGERS
SIEMENS
5405 METRIC PLACE
NORCROSS, GA 30092
ATTN: JIM HEMRICH
MIDASCO, LLC
500 ABBEY COURT
ALPHARETTA, GA 30004
RETURNED MAIL
ATTN: PHIL D’AMBROGI
OLJ INC
1005 BROAD STREET, STE 100
AUGUSTA, GA 30901
R. J. HAYNIE & ASSOCIATES
ATTN: CHRIS HOENES
1551 FOREST PARKWAY
LAKE CITY, GA 30260
WORLD FIBER TECHNOLOGIES, INC.
ATTN: TOM CROWSON
4070 NINE MCFARLAND DRIVE
ALPHARETTA, GA 30004
RETURNED MAIL
REPUBLIC I.T.S.
ATTN: CHRIS ROMERO
2725 114TH STREET
GRANDE PRAIRIE, TX 77050
RETURNED MAIL
BID ITEM #15-193
PG 1 OF 2
NORTH CHEROKEE ELECTRICAL
P. O. BOX 4098
CANTON, GA 30114
R. W. POWELL CONSTRUCTION
5457 TUBMAN ROAD
APPLING, GA 30802
ROADWORX
ATTN: LOU EHRENHALT
200 BLUFF OAK DRIVE
ROSWELL, GA 30076
BASS SIGNAL CORP
251 INDUSTRIAL PARK DRIVE
MILLEDGEVILLE, GA 31061
SHELETTE C. MCCRAE
ENGINEERING DEPARTMENT
ABIE LADSON
ENGINEERING DEPARTMENT HAMEED MALIK
ENGINEERING DEPARTMENT
YVONNE GENTRY
LSBOP OFFICE
BID ITEM 15-193
SIGNAL MODERNIZATION PHASE 2 & 3
(WALTON WAY CORRIDOR)
FOR ENGINEERING DEPARTMENT
MAILED: 2 JULY 2015
BID ITEM #15-193
SIGNAL MODERNIZATION PHASE 2 & 3
(WALTON WAY CORRIDOR)
FOR ENGINEERING DEPARTMENT
BID DUE: WED., AUG. 12, 2015 @ 3PM
BID ITEM #15-193
PG 2 OF 2
Engineering Services Committee Meeting
9/29/2015 1:15 PM
Walton Signal Signal Upgrades
Department:Abie Ladson
Caption:Approve award of Construction Contract to R. J. Haynie &
Associates, Inc. in the amount of $5,517,131.00 for Transportation
Investment Act (TIA) Project, Signal Modernization Walton Way
– Phases II & III as requested by Augusta Engineering
Department. Award is contingent upon receipt of signed contracts
and proper bonds. Bid Item 15-193
Background:Signal Modernization Walton Way – Phase II (Druid Park to
Heard Avenue) and Phase III (Bransford Road to Milledge Road)
are two (2) of fifty (50) City of Augusta, Georgia TIA (aka
TSPLOST) projects. The project consists of upgrading traffic
signals and street lights along Walton Way corridor.
Analysis:Bids were received on August 12, 2015 with R. J. Haynie &
Associates, Inc. being the low bidder. The bid results are as
follow: CONTRACTORS BID 1. R. J. Haynie & Associates, Inc.
$5,517,131.00 Note: Only one bid was received
Financial Impact:Funds are available in Project TIA funds 371-04110-T13043144
& 371-041110-T13043145.
Alternatives:1). Approve award of Construction Contract to R. J. Haynie &
Associates, Inc. in the amount of $5,517,131.00 for Transportation
Investment Act (TIA) Project, Signal Modernization Walton Way
– Phases II & III as requested by Augusta Engineering
Department. Award is contingent upon receipt of signed contracts
and proper bonds. 2). Do not approve and find alternative to
complete the project and meet TIA project completion schedule.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: 371-04110/5212115-T13043144 & 371-041110-
5212115-T13043145
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.