HomeMy WebLinkAbout2015-04-28-Meeting Mintues
Engineering Services Committee Meeting Commission Chamber - 4/28/2015
ATTENDANCE:
Present: Hons. Hasan, Vice Chairman; Smith and Guilfoyle, members.
Absent: Hons. Hardie Davis, Jr., Mayor; Fennoy, Chairman.
ENGINEERING SERVICES
1. Motion to authorize condemnation to acquire title of a portion of property for
right of way, temporary construction easement, and one driveway easement
(Parcel 041-1-110-00-0) 3390 Tanglewood Drive.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
2. Approve award of Bid Item 14-238, Storage & Site Improvements, to Gearig
Brothers Civilworks, LLC for the Environmental Services Department.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
3. Award bid to Georgia-Carolina Paving for repairs of asphalt and concrete which
has been removed for repairs to Utility lines.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
4. Approve funding for the final phases of the Consultant Services Agreement for
the ADA Self-Evaluation and Transition Plan to Cranston Engineering Group in
the amount of $235,796.00 as requested by Augusta Engineering Department.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
5. Approve award of the Construction Contract to E.R. Snell Contracting, Inc. in
the amount of $11,291,651.80 for Transportation Investment Act (TIA) Project,
Berckmans Road Widening & Realignment, Phase 1, as requested by AED. The
Award is contingent upon receipt of signed contracts and proper bonds.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
6. Approve application to Georgia DOT for Local Maintenance and Improvement
Grant in the amount of $100,000 to be distributed to Georgia Regents University
for the Laney Boulevard Project as requested by AED.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve Motion to
approve. Commissioner Commissioner
Passes
Motion Passes
3-0.
Wayne Guilfoyle Grady Smith
7. Motion to approve the minutes of the Engineering Services Committee held on
April 14, 2015.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
8. Approve award of Construction Contract to Reeves Construction Co. in the
amount of $828,451.66 for the Transportation Investment Act (TIA) Project,
Pleasant Home Resurfacing from Riverwatch Parkway to Walton Way Ext. The
Award is contingent upon receipt of signed contracts and proper bonds as
requested by AED.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
9. Approve Procurement of Replacement Parts for Hypochlorite Generation
Equipment.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
3-0.
Commissioner
Wayne Guilfoyle
Commissioner
Grady Smith Passes
10. Discuss the use of solar energy in order to save money and simultaneously
reduce carbon footprint. Consider the use of solar panels and geothermal
systems in government, businesses, and residences. Inform the public of the
Item
Action:
Approved
www.augustaga.gov
importance of utilizing solar energy and the negative impact of carbon dioxide
and other carbon compounds emitted into the atmosphere. (Requested by
Commissioner Lockett) (Referred from April 14 Engineering Services
Committee)
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve
tasking the Administrator
with contacting the
companies enumerated by
Mr. Lockett who utilize
solar energy to set up a
date for a workshop with
the Commission to
discuss this issue.
Motion Passes 3-0.
Commissioner
Wayne
Guilfoyle
Commissioner
Grady Smith Passes
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Attendance 4/28/15
Department:
Caption:
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Acquisition of right of way, temporary easement for construction, and one easement driveway easement
to Richmond County, Georgia from Dorothy M. Kendrick- 3390 Tanglewood Dr
Department:Law
Caption:Motion to authorize condemnation to acquire title of a portion of
property for right of way, temporary construction easement, and
one driveway easement (Parcel 041-1-110-00-0) 3390
Tanglewood Drive.
Background:Due to tax liens and a bank lis pendens the City seeks to acquire
title through condemnation. In order to proceed and avoid further
project delays, it is necessary to condemn a portion of subject
property. The required property consists of 520.99 square feet of
right of way, 1,444.35 square feet of temporary construction
easement, and one driveway easement. The appraised value is
$1,800.00
Analysis:Condemnation is necessary in order to acquire the required
property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: G/L 325041120-52.12122 J/L 209825201-52.12122
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Invitation to Bid
Sealed bids will be received at this office on Tuesday, January 27, 2015 @ 3:00 p.m. for furnishing: Bid Item 14-238 Storage and Site Improvements for Environmental Services Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 600A
Augusta, Georgia 30901
706-821-2422
Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street –
Room 600A, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime,
subcontractors and suppliers exclusively from ARC Southern. The fees for the plans and specifications
which are non-refundable is $125.00.
It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this
policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC
Southern (706 821-0405) beginning Thursday, December 18, 2014. Bidders are cautioned that submitting a
package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of
goods or services, or coordination with other work that is material to the successful completion of the project.
Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of
documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate
information upon which to base his qualifications.
A Mandatory Pre Bid Conference will be held on Friday, January 9, 2015 @ 10:00 a.m. in the Procurement
Department, 530 Greene Street, Room 600A with a mandatory site visit to follow.
All questions must be submitted in writing by fax to 706 821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, January 13,
2015 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered.
No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid
bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond
and a 100% payment bond will be required for award.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall
include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and
conditions, applicable to the procurement. All specific requirements contained in the invitation to bid
including, but not limited to, the number of copies needed, the timing of the submission, the required
financial data, and any other requirements designated by the Procurement Department are considered
material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All
requests to waive or modify any such material condition shall be submitted through the Procurement Director to
the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia
Commission. Please mark BID number on the outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the
bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
GERI A. SAMS, Procurement Director
Augusta Chronicle December 18, 25, 2014 January 1, 8, 2015
Metro Courier December 24, 2014
Revised: 8/15/2011
ENVIRONMENTAL SERVICES DEPARTMENT
Mark Johnson
Director
MEMORANDUM
TO:
FROM:
DATE:
Geri Sams
Director - Procurement
I
Markrono.o, /1'iDirector ,l
March 13,2015
SSBJECT: Bid Item 14-238 Storage & Site Improvements - Award Recommendation
In response to Bid Item 14-238 - Storage & Site Improvements, three compliant bids were received from
the following companies: Richardson Construction, Gearig Brother Civilworks, and Dabbs-Williams.
Each submission was evaluated per the criteria in the bid (Bid Abstract attached). Upon careful
consideration, it is my recommendation to award the bid to Gearig Brother Civilworks. They submitted an
acceptable bid and after thorough examination, we found all aspects of the submitted bid documents to
have met the specifications as requested.
Thank you in advance for your time and attention. Please feel free to contact me at7O6-592'3201, should
you have any questions or require any additional information.
MJitgh
Attachment
Cc: Nancy Williams
Phyllis Johnson
File
Environmental Services Depsrtment
4330 Deans Bridge Road, Blythe, GA 30805
(706) 592-3200 - Fax (706) s92-325s
WWW.AUGUSTAGA.GOV
'i-5 !{*# i",T ric 4:5?
oo 400egeoaeooooo9*0eo o000000GoG90 000
oooqqq900
oooqqcN@O
oooqqqooooNo
F OO OOFOOtsOOOOOOFFOO NOO OOOOOOOOOFFFq q q o? q ot q d? a q e a q q e q q q q q a 0q o? al al q q q i? q ol q q q@ oo ooooF{Nooooo@@oo o{t oNoooooood@o(o oo o oN N ooN@@ o {@@@$ odoooN(o Ol- N t HOoNq A o@o @ oaA t'e ai r\ir'i or..i r' oi.ioi q
H6dd'H
o oo ooooooooooooo oo oo6 0000000009496 06 0qqqqcr:eaqqee eq u?qq gqqqqu?qqqqqqei dci d.idicict.,i.j-icidctctct .ici dttt Fctcicid=idddututd6 66 6 6a N 6666 6 oto@N FddFNds 6- 'a-6- (.- d, oloa6 6 {6@ 6 FNt d ij.j .i e !i =i .iO rA o@
.i
o oo ooooooDoooooo oo ooo ooooooooooooE EE EEOecedlqu?qeqq qe qqq qqqqqqqqqqqqd cici ct+r;cicid.,idddddd cici {'{d dcidcidrtdrtddctut6 60 6 6r { OOOO iO *@OOONON@OAO
- 6 6N 6 @ DOFD O Od( O NOd.t d dd rt dd d d +c,int o' .i
= o 6d NroN.i
ooooqoo00000QQOo 90q 9qoaoooooooo aao
aooaaoaG9ooa ooo50 0GoooaooooGaooao
OOAAOq69qqAoq qO 9qq
OOOOOOOQOOeeA OO OOO 69OgOOOOoOoO OOA
8 88 E8E8EEgARE888EqA 888 EEEEEEEsEEEE 8883 Hg B:isEislHBegsgSS gEg *s*33EBHt3gs :g:E nto N tsNNg ;, og8 d @No.i.i
o oo 00000-oooo0*o990 000 00a0qo00ao00 000
9 29 5556d,d6d466669s6 666 556665655665 d,d,d
ooooooDo60000 00 00D oooooooooooo ooooN@oo@\qrtqqqq qe FoF oo0oo9Q9QQoo ooo<icidcicid j-.ictcicidct ctc, dic'r ggCeqqgqqedd utctcio od N oooo do Foooooo@@oad oN@@ 6 NOtO O OTOOO FddON.i -i + sli 5 .i
EEEEEEsssEEE 888es.EBEnE$EBBs es$$Nd dd{oidHN@ otsodoHd@o{
aooeeoooos60 09e
JJUU@JTJJE@J OOO
oooooooooooo ooooooooooooooq qqqqqqqqqqqqqrtri c,i@ct{NOOOdO@OOOO OdOa66@NOd@ts<dr.o6 q FdFd
AO9990AA*OqA OOO
E eS E8t8Eesc8EE8E8EE 888s EiR s.h.H.s$.$*$3EssssflB. E.ERI i--@ ooio Dtjqidoidsd@riHF dOqq ,s N oNNo d i o93^
.i.i
o oo 9000q9eo900ooooe aae
) JJ DJJUOOOA OrrrrJJU OOO
o60000boooooo Do 660otsooo@oo{oooo @o N6@ci.i rtddc'ici+o'o'ou, o' .id { {'{oooN66Noon o \..!$o. (o.o dN @ o
q9a o94499490005 099
OOO JJUdUJUJJdUJ AAA
ooo oooooooooooo oooooo oooooooooooo oooFi+d qqqqqqqqqecict riddoooooooo{ooo odoo.388.8*N8od
dcidt d jN
O00 soAG9oeeeOoe 00O
9 00 40Go*00a99Qo9099
J JJ dJJUOOOO OUUUdIJU
ooooooooaoooo ooooooooooooooo ooo {' dt o o d.i o d o' o' o' d d cio oi s oooo oo@ooF60rt ctd ci d
o
Eo
GcUo
E
Coo
66
E
BF6
oU=2
rJJUO@O@@UUUTdJUEaOA>JJUf UJf JJf E J t@@@>QE,z
=3-=Eo@oitsooFD<N@d oNEoooEoo<dNoNNoN@oEooo$@ oootsN o N 9000yoo ts H6 626d6ts-@ dN-clqq o E'D-o.qi;. .-! @a - t6-qt^6o NNHO .@66 i d id6tHddo'doN,N I NO (o
= >>4 AA
=x33i--Fo
IN
q 88 8888888838888888 888 888888888888 888E gs g$EEsg$EisEi gggEgB EEs g$HsEfigg3gsg fiEefi 88 g$'i ''d3Eg.g5.iE{9 dg8 {'i{ci.'ReR'dcid6 EESij-i
AOOOO9Og49Aq0 OO
cooEE-aE{o
.E .F
Ed
EEcE
.sEo
o
GoI
@
EEEEE g
s.sh
550ccEE
ccoB3=
E
a
c.9
o.a6
ocou'-o
o
@UoLz
co
.EoooaEo
EoF
@+E
oEo
co
@
a6EE
,5 .E
.958EUfi
coco
E
c
E
EJooG
_oG
!:osGo
E
a
co
.EEo6
o?
6iE
oI
66<o
adFts
co'a
coo
dUc
o.Eo
Ea
ooEoi
io
o
oo
o,o
Eoo
oa
oo
t-to
Ic.9
G
G
a
Eoo
EoF
E.sEtoo
6
a oEFzoozots
FzUE6uo6z
zIooEE
Io
@
N
*
!in
FT9oSE-todta:i6llc< s>OE6;2
!cG
@@o
o
ou!
o
!
E
E
=foc
?-
c
.EoE
E
E,
d
coo)!o
bo
5
.E
io4
F
@ts
o
io
!
E!t
F
oEc,
o
E!f
co!
a
c,oE
!5!
5
o
-!.9
F
I
=z
QooooQ o ooYOOOO9 0 00edcicicig d c,irt6.8889E '|', .,@
e gg8'8'p INdNd I
ooooooooo6dc,iodidONOOTIi#\ rrqiln, @2
*QOO9 q4 044q9A O OO
oooo.iaFl r,
l6
4@(o'osc
o ooq qeN do
G006e 40
cqEqqEooooooooooo6o9aoa6dddddd<OOOONNdNH
aaooo0
ooooo ooooooooo.i !t o'ci d rJ oiodood.F:@-:fl N
o,
D)d
ooqqo6
o
oF
ooqqoiNN
8888888888886-qo.qo-o-oOOOOhdOOOOdNdNd
oo4050
oooooooooooooooooNod-o. No-00 a
GCOCO
Ia
x,Eor
E
3
!oo
00 00a900 e
)J O
oo ooo oF:d ci
ooooct c;oooo.d .i
oo
oooodo'o6
88 888888 8pa eggeg.E E.d (tooOO6- ddooooNNdNd
88888ooci.iciP-8-898NF d
00000
<EE<EdJJUJ
oooooooo60ddiciddooooNF6ei o'
ogooo
u
uIf,
ou?o(oo.ooo.
66J
oE
.!9
(9
ooooci ctooo{ o-NN
oo
oo
.id
EEEEs 88 888888s.Esss Fs EEgsEgoN@N d dOOdduidoo@D6iNdNd
q000a oo 444aq9
<EL<rrrUJJUJJJ
ooooo ooooooo 60ddtdciqi tsdi6dN6dq N@-6N
eqoag o4
8ooolN
o
oo{'
oodto\tsoo{
o
.l6:EUE
oqo@\Noc
eo
J
FoF
o6otoNo'66{
aoJ
tso
c.9,
co
co!
E.9
ooooci ctooOFa- dt
oo
ooeqo6NF
88 8EqEE8 Igg gEg.EEE Eoi+ gRgRER di
ooooQoooo9cicid.iA3R88Saidi.id
99090
<rr<uUJJdJ
oooooqqeqco@oo@od60do- o-oo
ooeeo
qa ooo90Q o
JJ O
a9 0oo od+ dNN F
o4aioqo66rt
o*o:
E
o
.g EEEOv" E=EEI E=€#tr $Eg3z w2s 3HHEF.UeiocrqEFo>5gro-*. EEY ]Ol: @Bfr za=Z=>o>>OFOTOOE6 afE68.ER3
*lo OH
=>H*H,^
gEEH
o.=-B;of=J
-qoorg;sE9g.U.b.EEEEE:.FE=ig!tr6
o
5HEE.E EE HEE5g5* gg tE.EE5*E Ei *E€:HgE EE EEEe.6BP eE -(5
dg d
qE
5tsf6EU6s56:9=:359
'BB*sHcs#N =dN8*;
UU
@mN
st
+
i5
FCL,O<trs6a:ots<ooEroo!
!cG
@uo
o
Disadvantaged Business Enterprise Department
MEMORANDUM
Mark Johnson, Environmental Services
Yvonne Gentry, Director
Disadvantaged Business Enterprise Department
March 17,2015
REVIEW AND APPROVAL OF RECOMMMENDED CONTRACTOR
B,d#14-238 Storage and Site lmprovements
Yvonne Gentry
DBE Director
TO:
FROM:
DATE:
SUBJECT:
This memo is to transmit the review and concurrence of compliance by Gearig Brothers Civil
Works. The Augusta, Georgia code requires a contractor to meet the assign LSBOP Utilization
goal or provide evidence of completing good faith efforts.
The goal established for Storage and Site lmprovements project is 5%. The bidder/offeror has
committed to a minimum of 1.5o/o and has satisfied the good faith efforts.
The next phase of this process will be for the DBE Department to work with the bidder/offeror to
develop a plan of action to increase their proposed committed LSBOP Utilization goal. The
bidder/offeror has agreed to work in cooperation with the DBE Department if awarded the project.
The goal setting methodology included the following factors based on good faith efforts of the
contractor:o The project total estimated cost. Value of the scope of work where availability exists. Maximum participation to be achieved through locally owned small business
Contractor must prepare and submit a monthly utilization report with each pay request to the
DBE Department. lf you have questions, please contact me at (706) 821-2406.
Disadvantaged Business Enterprise Department
530 Greene Street - Room 6008 - Augusta GA 30901-4414
(706) 82r-2406- Fax (706) 82r-4228
WWW.AUGUSTAGA.GOV 'l-5 i{88 i.S r.i.i 4:5*
VENDOR
DABBS-WILLIAMS
319 S. WALNUT ST.,
STATESBORO, GA 30458
GEARIG CIVILWORKS,
621 PONDER PLACE
DR,
EVANS, GA 30809
RICHARDSON
CONSTRUCTION CO
6806 MONTICELLO
ROAD, COLUMBIA, SC
29203
ATTACHMENT B YES YES YES
ADDENDUMS 1-2 YES YES YES
E-VERIFY NUMBER 222733 226337 287886
SAVE FORM YES YES YES
BID BOND YES YES YES
BASE BID
(ITEMS 1 THROUGH 10)$4,093,065.00 $4,087,783.60 $4,576,713.50
The following vendors submiteed a statement of "No Bid":
PAUL S AKINS COMPANY, INC. / PO BOX 911 / STATESBORO, GA 30459
REEVES CONSTRUCTION CO / PO BOX 1129 / AUGUSTA, GA 30903
SITEC LLC / 217 FAIRFIELD ST., NE / AIKEN, SC 29801
Bid Opening
Bid Item #14-238
Storage and Site Improvements
for Augusta, Georgia - Environmental Services Department
Bid Opening Date: Tuesday, February 3, 2015 @ 3:00 p.m.
Total Number Specifications Mailed Out: 26
Total Number Specifications Download (Demandstar): 3
Total Electronic Notifications (Demandstar): 277
Mandatory Pre-Bid Conference/Telephone Conference Attendees: 6
Total packages submitted: 3
Total No Bid Responses: 3
Total Noncompliant: 0
Page 1 of 1
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Approve award of Bid Item 14-238, Storage & Site Improvements, to Gearig Brothers Civilworks, LLC.
Department:Environmental Services
Caption:Approve award of Bid Item 14-238, Storage & Site
Improvements, to Gearig Brothers Civilworks, LLC for the
Environmental Services Department.
Background:The current landfill property has been owned by the Augusta
government since the late 1980s, and has seen a number of
changes since then – including the development of landfill cells,
gas collection and control system, the addition of the RCSO
training facility, shooting range, buildings, and roads; many of
which were stand-alone projects. However, this bid item is
different – it provides for some much needed site-wide
improvements and modernizations, and those improvements will
be seen throughout the property. First will be the addition of
covered storage which will allow ESD and the RCSO the ability
to store assets and items out of the elements and in a controlled
environment. This allows for a better quality of care for the
equipment than ever before. Secondly, being a good neighbor and
continued permit compliance with state stormwater rules is key to
both the safety of our staff, customers, and neighbors. The ESD
needs to provide better drainage and control of the water flowing
on the property, as well as the water exiting the property – again, a
site-wide improvement that protects not only the solid waste
facility property but also Spirit Creek and other neighboring
infrastructure.
Analysis:Overall this project provides a variety of benefits to the ESD as
well as the government as a whole. First, it provides much needed
storage space for equipment and assets. As the role of the ESD has
grown, so too has the amount of equipment utilized by the
department. By having appropriate storage space for assets and
products will benefit the department in several ways. First, items
stored will be better preserved and extend their usefulness to the
government. Second, based on discussions with the Sheriff’s
department staff, we could store a reasonable amount of their
emergency ready equipment is such a facility. Finally, with the
future plans of relocating the traffic sign shop to the landfill, it
will provide the storage for the line striping plastic and sign
materials. The current sign shop location was slated to become
one of the CNG station locations in the future, as approved in the
2014 budget. This project performs partial excavation of the future
landfill cell, which will be utilized for the disposal of the
residential solid waste collection program. The dirt excavated
from this location will be utilized to fill the old state asphalt plant
pit which sits on landfill property. This portion of the project
serves two major functions. First, it excavates future landfill space
to be utilized by the collections program. Second, it eliminates an
attractive nuisance to neighboring ATV’s who continue to find
ways to enter the property. Finally, it creates a more usable piece
of property. Pinetuckey Shooting Club is located on landfill
property. As a small portion of this project, ESD is will utilize a
portion of the excavated dirt to construct and/or fortify berms used
to catch bullets and protect people. Arguably the largest benefit to
this project is correcting some significant storm water drainage
issues. Several factors have created storm water challenges for the
landfill which need to be addressed. First, with the 2014 ice storm,
the ESD receive a large influx of inert materials. This additional
volume elevated our inert cell to a point that storm water is now
more prevalent, and the area of impact has changed. At this time,
when there is a larger rain event, we have storm water leaving our
property, ultimately un-managed. We have had to work with our
neighbors on several occasions to address our water impacting
their property. Therefore, we developed this plan to address those
issues. Second, in accordance to the updated inert landfill rules,
issued by EPD, our inert landfill much be certified as closed by
June 1, 2015. ESD has already modified its solid waste handling
permit to address the acceptance of inert materials, and there will
be no noticeable change to the public as far as this waste is
concerned. However, by closing this portion of the landfill we
need to construct the permanent solution to better handle storm
water as this area of the landfill will not be a constant. Prior, we
could utilize our inbound materials to temporarily deal with storm
water, however, with the pending closure, that is no longer an
option.
Financial Impact:This project will have a fiscal impact of $4,087,784. This project
will be funded from the unrestricted fund balance of fund 542.
Alternatives:1. Approve award recommendation of Bid Item 14-238, Storage &
Site Improvements, to Gearig Brothers Civilworks, LLC. 2. Do
not approve the award.
Recommendation:Approve award of Bid Item 14-238, Storage & Site
Improvements, to Gearig Brothers Civilworks, LLC.
Funds are Available
in the Following Fund 542 fund balance
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Invitation to Bid
Sealed bids will be received at this office on Thursday, October 30, 2014 @ 3:00 p.m. for furnishing:
Bid Item 14-209 Asphalt Patch Repair, Concrete Curb & Sidewalk Replacement for Utilities
Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
706-821-2422
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department
ARCbid. Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 530
Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business
hours at the offices of Augusta, GA Procurement Department.
All questions must be submitted in writing by fax to 706 821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, October
17, 2014 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered.
The local bidder preference program is applicable to this project. To be approved as a local bidder
and receive bid preference an eligible bidder must submit a completed and signed written application
to become a local bidder at least thirty (30) days prior to the date bids are received on an eligible
local project. An eligible bidder who fails to submit an application for approval as a local bidder at
least thirty (30) days prior to the date bids are received on an eligible local project, and who
otherwise meets the requirements for approval as a local bidder, will not be qualified for a bid
preference on such eligible local project.
No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and
shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual
terms and conditions, applicable to the procurement. All specific requirements contained in the
invitation to bid including, but not limited to, the number of copies needed, the timing of the
submission, the required financial data, and any other requirements designated by the Procurement
Department are considered material conditions of the bid which are not waiveable or modifiable by
the Procurement Director. All requests to waive or modify any such material condition shall be submitted
through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for
approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places
the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
GERI A. SAMS, Procurement Director
Augusta Chronicle September 25, October 2, 9, 16, 2014
Metro Courier October 1, 2014
Revised: 8/15/2011
VENDORS Attachment
B E-Verify #SAVE
Form
Asphalt 2"
Thick 3500
SY
Curb & Gut
200 LF
Concrete
Side
4" 200 SF
Graded Agg
Base
200 CY
Saw Cut
25 LF Total
Blair Construction
P. O. Box 770
Evans, GA 30809
YES 224004 YES $104,160.00 $8,400.00 $1,984.00 $9,860.00 $382.00 $124,786.00
GA-Carolina Paving
3020 Milledgeville Rd.
Augusta, GA 30904
YES 100183 YES $79,665.00 $4,070.00 $1,200.00 $8,820.00 $75.75 $93,830.75
JHC, INC. Harris
Construction
1736 Barton Chapel
Road
Augusta GA 30909
YES 262252 YES $80,500.00 $5,000.00 $1,600.00 $2,200.00 $75.00 $89,375.00
Sitec LLC
217 Fairfield St., NE
Aiken, SC 29801
YES 212379 YES $94,675.00 $4,270.00 $1,570.00 $10,220.00 $456.25 $111,191.25
Contract Management
1827 Killingsworth Rd
Augusta, GA 30904
YES 225306 YES $135,800.00 $13,000.00 $2,000.00 $50,000.00 $625.00 $201,425.00
Lori's Transportation
2824 Frontier Trail
Atlanta, GA 30341
YES 53771 YES $124,950.00 $6,120.00 $1,326.00 $10,812.00 $51.00 $143,259.00
Murphy Bros.
Construction
P.O. Box 459
Appling GA 30802
YES 426742 YES $154,000.00 $8,000.00 $4,000.00 $28,000.00 $500.00 $194,500.00
Richmond Concrete,
LLC
920 Molly Pond Rd.,
Augusta, GA 30901
YES 91818 YES $113,750.00 $6,000.00 $1,700.00 $10,300.00 $125.00 $131,875.00
Total Number Specifications Mailed Out: 22
Total Number Specifications Download (Demandstar): 1
Total Electronic Notifications (Demandstar): 80
Mandatory Pre-Bid Conference: N/A
Total packages submitted: 8
Total Noncompliant: 0
Bid Opening
Bid Item #14-209
Asphalt Patch Repair, Concrete Curb & Sidewalk Replacement
for Augusta, Georgia - Utilities Department
Bid Due: Thursday, October 30, 2014 @ 3:00 p.m.
Page 1 of 1
AUGUSTA UTILITIES
Tom D. Wiedmeicn PE
Director
Date: February 4,2015
To: Ms. Geri Sams, Procurgment Director
From; Tom Wiedmeier EW
Re: Bid Item #-14-2}9,Asphalt Patch Repair, Concrete Curb & Sidewalk Replacement
Bids for the referenced solicitation lryere received on October 30,2014; JHC, Inc. (Jeffrey Haris
Construction) was the apparent low bidder. Because of problems we had with JHC's past perfurmance on
a prior conffact, a meeting was held in Procurement with Utilities and JHC, Inc. to discuss the issues.
Subsequent to this meeting, seven failing pavement patches performed by JHC were discovered. In one
instance, a patch on Robert C. Daniel Parkway failed and several vehicles were damaged. Augusta
Utilities had to dispatch personnel to secure the patch with a steel plate. Invoices and photos related to
the failed work are attached for your refercnce.
In light of the continued substandard work being performed by JHC, we recommend that this bid be
awarded to the next low bidder, GA - Carolina Paving,
@ol"l'
Augusta Utilitiet
360 Bay Street - Suite lE0 - Augusta, GA 30901
l0q 3r24t60 - Fax Qaq 3D41?3
www.augustaSa.gov
ahFzlrt
E
=oL)
tgcr.g
o!c
Eo(J
,h
E'c(E
oEoPt,
(ui,o
-9t^l!
!()
tU.L
v|9Ecrtn|!ot40
-e
o
Eo
(!ac(u
o
J
6)co
'l-aIAg
(U
crtt!
(l)tioe
{nIDS
tlEt!
Eq,
oE
v,
(J
o,EF
oEo
IA
H
tU
q]n(!
(ug,oo
r^tu
.c,
(E
o
oc)
.9
5(J
o
F
oqo
U}
l{l!.cov,t!o.4o
-9.A.u
E
aogo
oca
1l'
a(}
IU
!F
3o
1r\
(J
o;
oc
E
(E
Lc,c!,o
cI
G'o
vt;)
lt
og
tlxE3optrl
Poo
Ei,l
ocl(t!
=0,p
l,
Eg,
a,UIa!ot,'oo
Etu
Eo
(gct
(l,
oc
5(J
coa,COoH
P -o.
E$.G clgto
8E.goSE{, OlA=;jrEg;l,b!rt
$sEOrUo_Egqt8E
(o
TRsbrr*.8trEOorI
=2,
a!cr
lD
Uioc
EoU
ra
1,q
(E
q,
o
vt(,roo
lr,(gs.c(J
(oo-
lt
t4lL)o
z
N(r){gr FIcrt <fOt $tt)({]ol
rl(tl
doct)
6 GIOt
IJF
ll
ulgo
z
!+Flont
<tN
rl
rfdoN
Ol
a\
qfrl()N
qfN
<rrloN
or
11Fl
<tr'io6l
C'}
N
$do(\t
dl
F{
+oc{
st(\l
r{e{
<f
FloN
d
F{
$rlo(r.l
<fN
r{el
ztu
(,
t!F
C)
trlo(\
d
clF{or{
Fl
rlr{
qfrlor!
cl
trlof{
rt
rl
+r,oFI
r{r{
it
or!
rl
Fl
sfFloa!
00ra
rl
F{
iitrr{o(\,
(o
F{d
{t
ofr,l
rl
!-{r{
Ito3
f!<tr!lJ1
T\\t1I)sf
r\rlFr.O
rnoF
ro(os|ro
rot
<t
r{oot\
rnct({}rn
o+trn
a/:tar)lr,&a(:6
o
OIc
L(D6orn(\a!
t,&,
UI
E(J3a,u-
cnofTlN
oa.,
(!6
rONln(o
a
3o{-.oa(
o(u(9
<fol.f)d
6co
o-
(\lr{
E&,
o)
ut'=
o
?o
EE.voll,
(J
IAco
(u
to
dE'
AE
o+ro(
'=
vt(o
=
th
.g
(!d(J
P
r1)llo
CLr{,ror{
tG,
-voo(Ja(,()N
a^
1.,
U
E(Jco(J
g(!
Aor4
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Asphalt patch repair, concrete curb and sidewalk repair replacement for Utilities
Department:Utilities
Caption:Award bid to Georgia-Carolina Paving for repairs of asphalt and
concrete which has been removed for repairs to Utility lines.
Background:Award purchase order to Georgia-Carolina Paving in the amount of
$93,830.75 for repairs to asphalt and concrete paving that are
necessary after utility repairs have been made. This contract will
allow timely, professional repair of paving cuts.
Analysis:Approval of this purchase order will allow the Utilities Department
to move forward with restoring roadways, driveways and sidewalks
in a timely manner after utility cuts have been made for repairs.
Financial Impact:Funds are available in account 506043410 – 5311912
Alternatives:No alternatives recommended.
Recommendation:Award the purchase order in the amount of $93,830.75 to Georgia-
Carolina Paving.
Funds are Available
in the Following
Accounts:
Funds are available in account 506043410 – 5311912
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project change is authorized to CPB#328-041110-211828010 and approves funding for
the final phases of the Consultant Services Agreement for the ADA Self-Evaluation and
Transistion Plan to Cranston Engineering Group in the amount of $235,796.00.
Funding is available in SPLOST VI Reynolds Street Signal Improvements account
to be transferred to the ADA Self-Evaluation and Transition Plan upon Commission approval.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Curb and Sidewalks 300,000$
TIA Discretionary 53,726$
Reynolds St 240,000$
593,726$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
Honorable Hardie Davis, Jr., Mayor
CAPITAL PROJECT BUDGET
CPB#328-041110-211828010
Augusta ADA Self Evaluation & Transition Plan
(Bid 13-180)
Change Number One
4.16.2015
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
CPB#328-041110-211828010
Augusta ADA Self Evaluation & Transition Plan
(Bid 13-180)
Change Number One
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB ADDITION CPB
CURB & SIDEWALKS
328-041110-211828010 ($300,000)($300,000)
TIA Discretionary Funds ($53,726)($53,726)
Reynolds St Impvts
328-041110-211828106 ($240,000) ($240,000)
TOTAL SOURCES: ($353,726) ($240,000) ($593,726)
USE OF FUNDS
ENGINEERING
328-041110-5212115-211828010 $353,726 $240,000 $593,726
TOTAL USES: $353,726 $240,000 $593,726
4.16.2015
(SA02 – For changes greater than $20,000) April 2010
AUGUSTA-RICHMOND COUNTY
AUGUSTA, GA ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Augusta Richmond County Project Number(s): 328-041110-2111828010
Supplemental Agreement Number: 1
Purchase Order Number: P251254
WHEREAS, We, Cranston Engineering Group Consultant, entered into a contract with Augusta-
Richmond County on 9/16/2014, for engineering design services associated with the Augusta ADA
Self Evaluation and Transition Plan, Bid #13-180, File Reference No.15-014 (A), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered
by the scope of the original contract, we desire to submit the following Supplemental Agreement
to-wit:
Additional work for the final phases, Task 1, Task 2, Task 4 and Task 5 of the
Consultant Services Agreement for the project.
It is agreed that as a result of the above described modification the contract amount is increased
by $235,796.00 from $353,726.00 to a new total of $589,522.00.
Any modifications to submittal dates shall be as identified in the attached proposal. This
agreement in no way modifies or changes the original contract of which it becomes a part, except
as specifically stated herein.
NOW, THEREFORE, We, Cranston Engineering Group, Consultant, hereby agree to said
Supplemental Agreement consisting of the above mentioned items and prices, and agree that this
Supplemental Agreement is hereby made a part of the original contract to be performed under the
specifications thereof, and that the original contract is in full force and effect, except insofar as it
might be modified by this Supplemental Agreement.
This day of , 2015
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY
AUGUSTA, GEORGIA
Hardie Davis, Jr., Mayor
Approved: Date Approved: Date
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title: Title:
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Augusta ADA Self Evaluation & Transition Plan
Department:Engineering
Caption:Approve funding for the final phases of the Consultant Services
Agreement for the ADA Self-Evaluation and Transition Plan to
Cranston Engineering Group in the amount of $235,796.00 as
requested by Augusta Engineering Department.
Background:Title II of the Americans with Disabilities ACT (ADA) requires
that municipalities have an ADA Self Evaluation & Transition
Plan for evaluating and implementing ADA upgrades in non-
compliant areas. The City of Augusta submitted a Request of
Qualifications (RFQ Item #13-180) to retain a consultant to
provide these services. The Cranston Engineering Group team
responded to the City’s RFQ, presented an interview, and was
selected to provide the city with a proposal for these services. In
September 2014, Cranston Engineering Group was awarded the
Design Consultant Services Contract for the project and released
for to perform the initial phases which included an Evaluation of
Existing Facilities which is now complete. The purpose of this
item is to continue the project and move it into the final phases to
completion which will include: 1) Community and Staff
Evaluation and Involvement, 2) Program Development, 3) Action
Steps and Timelines, and 4) Final Self-Evaluation and Transition
Plan submitted as proposal for the Augusta ADA Self Evaluation
& Transition Plan on April 21, 2014.
Analysis:AED requested that Cranston Engineering develop a five task
proposal for completing the City’s ADA Self Evaluation &
Transition Plan. The total fee to accomplish these tasks was
$589,522.00. The funding was limited and it was determined that
phasing the tasks would be a method to get the project underway
while spreading the funding between 2014 and 2015. Phase I
which included Task 3 of the proposal was the Evaluation of
Facilities for the amount of $353,726.00 which was
recommended, approved and nearing completion. This Item
represents Phase II of the project which will carry it to completion
with the remaining tasks: Task 1 - Community and Staff
Evaluation and Involvement, Task 2 - Program Development,
Task 4 - Action Steps and Timelines, and Task 5 Final
Deliverables. These tasks will be completed for $235,796.00
Financial Impact:Funds are available in SPLOST PHASE VI Recapture account
number to be transferred to the ADA Self-Evaluation and
Transition Plan project upon Commission approval.
Alternatives:Do not approve and do not complete project.
Recommendation:Approve funding for the final phases of the Consultant Services
Agreement for the ADA Self-Evaluation and Transition Plan to
Cranston Engineering Group in the amount of $235,796.
Funds are Available
in the Following
Accounts:
Recaptured SPLOST VI
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project is authorized to CPB#371-041110-T14041211. This request is to award the
Construction Contract to E.R. Snell Contracting, Inc in the amount of $11,219,651.80
for TIA project Berckmans Road Widening & Relialignment, Phase I. Funding is available
in the TIA Project funds.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Berckman Rd Realignment SPLOST VI 360,000$
Berckman Rd Over Raes Creek 790,000$
TIA Discretionary 30,320$
TIA Project Funds 31,980$
TIA Project Funds 11,291,700$
12,504,000$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Hardie Davis, Mayor
CAPITAL PROJECT BUDGET
CPB#371-041110-T14041211
Berckmans Road Widening, Realignment & Bridge Replacement
(Bid 11-108)
Change Number Four
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks
1.14.2015
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
CPB#371-041110-T14041211
Berckmans Road Widening, Realignment & Bridge Replacement
(Bid 11-108)
Change Number Four
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks
CPB AMOUNT CPB New
SOURCE OF FUNDS CPB Addition CPB
Berckmans Rd Realignment
PHASE VI ($360,000)($360,000)
Berckmans Rd Over Raes Creek ($790,000)($790,000)
TIA Discretionary ($30,320)($30,320)
TIA Project Funds Berckman Road
371-041110-T14041211 ($31,980) ($11,291,700) ($11,323,680)
TOTAL SOURCES: ($1,212,300) ($11,291,700) ($12,504,000)
USE OF FUNDS
ENGINEERING
328-041110-5212115-211828701 $390,320 $390,320
328-041110-5212115-211828704 $790,000 $790,000
371-041110-5414110/T14041211 $31,980 $11,291,700 $11,323,680
TOTAL USES: $1,212,300 $11,291,700 $12,504,000
1.14.2015
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Berckmans Rd Widening & Realignment, Phase 1- 15-214- Contract Award
Department:Abie L. Ladson, Director
Caption:Approve award of the Construction Contract to E.R. Snell
Contracting, Inc. in the amount of $11,291,651.80 for
Transportation Investment Act (TIA) Project, Berckmans Road
Widening & Realignment, Phase 1, as requested by AED. The
Award is contingent upon receipt of signed contracts and proper
bonds.
Background:Berckmans Road Widening & Realignment is one (1) of fifty (50)
City of Augusta, Georgia TIA (aka TSPLOST) projects. This
project will be completed in two phases (Phase 1 and Phase 2).
The Project limits are Washington Road to Wheeler Road. Phase 1
improvements starts at Washington Road and ends approximately
150 feet north of Rae’s Creek Bridge Improvement includes;
constructing, three lane roadway, with curb, gutter, storm
conveyance system, sidewalks, underpasses, lighting and
associated landscaping. In January 2015, a Request For
Qualifications was released for qualified firms to provide
constructing services for this project. Contractors were pre-
qualified using Augusta Request for Qualification Procurement
process.
Analysis:Request for Proposal was received from pre-qualified contractors
on March 31, 2015. Firms were evaluated based on qualifications,
similar projects completion history, project approach, experience,
and construction completion schedule in April 2015. The
following firms submitted RFQs and were evaluated: 1. Reeves
Construction Co. 2. Beams Contracting, Inc. 3. E.R. Snell
Contractor, Inc. Based on the evaluation procedures, E.R. Snell
Contractor, Inc. was selected for this project.
Financial Impact:Funds are allowable in Project TIA funds account number 371-
041110-T14041211 upon Commission approval.
Alternatives:1). Approve award of Construction Contract to E.R. Snell
Contracting, Inc. in the amount of $11,291,651.80 for
Transportation Investment Act (TIA) Project, Berckmans Road
Widening & Realignment, Phase 1 as requested AED. Award is
contingent upon receipt of signed contracts and proper bonds. 2).
Do not approve and find alternative to complete the project and
meet TIA project completion schedule.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
371-041110-T14041211
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
4/28/2015 1:05 PM
GDOT LMIG Grant Application – Laney Walker Boulevard
Department:Abie Ladson - Director
Caption:Approve application to Georgia DOT for Local Maintenance and
Improvement Grant in the amount of $100,000 to be distributed to
Georgia Regents University for the Laney Boulevard Project as
requested by AED.
Background:During its March 17, 2015 regular meeting, the Augusta
Commission approved providing $100,000 to Georgia Regents
University in support of the Laney Walker Boulevard
Project. During the previous week’s Engineering Services
committee meeting on March 10, 2015, it was discussed that
Georgia DOT had committed $100,000 to the project. That is the
basis for this agenda item in that Georgia DOT is providing its
contribution as a pass-through grant through the City of Augusta
utilizing Local Maintenance and Improvement Grant Economic
Development funds.
Analysis:Local Maintenance and Improvement Grant will be provided to
the City and passed on to GRU at no cost to the City of Augusta.
Financial Impact:N/A
Alternatives:1) Approve and execute application for submittal to Georgia DOT.
2) Do not approve
Recommendation:Approve alternative one.
Funds are Available
in the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Minutes
Department:Clerk of Commission
Caption:Motion to approve the minutes of the Engineering Services
Committee held on April 14, 2015.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project is authorized to CPB#371-041110-T13047134. This request is to award the
Construction Contract to Reeves Construction in the amount of $828,451.66
for TIA project Pleasant Home Resurfacing. Funding is available
in the TIA Project funds.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
TIA Project Funds 285,470$
TIA Discretionary 112,060$
LMIG Funds 430,930$
828,460$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Hardie Davis, Mayor
CAPITAL PROJECT BUDGET
CPB#371-041110-T13047134
Pleasant Home Resurfacing (Riverwatch to Walton Way Ext)
(Bid 14-242)
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks
1.14.2015
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
CPB#371-041110-T13047134
Pleasant Home Resurfacing (Riverwatch to Walton Way Ext)
(Bid 14-242)
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks
CPB AMOUNT CPB New
SOURCE OF FUNDS CPB Addition CPB
TIA Project ($285,470)($285,470)
371-041110-T14041211
TIA Discretionary ($112,060)($112,060)
LMIG Funds ($430,930)($430,930)
TOTAL SOURCES: ($828,460)($828,460)
USE OF FUNDS
ENGINEERING
371-041110-5414110/T113047134 $828,460 $828,460
TOTAL USES: $828,460 $828,460
1.14.2015
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Pleasant Home Road Resurfacing (Riverwatch to Walton Way Ext)- 14-242- Contract Award
Department:Abie L. Ladson, Director
Caption:Approve award of Construction Contract to Reeves Construction
Co. in the amount of $828,451.66 for the Transportation
Investment Act (TIA) Project, Pleasant Home Resurfacing from
Riverwatch Parkway to Walton Way Ext. The Award is
contingent upon receipt of signed contracts and proper bonds as
requested by AED.
Background:Pleasant Home Resurfacing from Riverwatch Parkway to Walton
Way Ext is one (1) of fifty (50) City of Augusta, Georgia TIA
(aka TSPLOST) projects. This is the fourth resurfacing project
that has been let for construction in Band 1 for the City of
Augusta, Georgia.
Analysis:Bids were received on October 25, 2013 with Reeves Construction
Co. being the low bidder. The bid results are as follow:
CONTRACTORS BID 1. Blair Construction, Inc. $998,595.32 2.
Reeves Construction Company $828,451.66 3. C & H Paving
$828,613.84 4. Beam’s Contracting, Inc. $921,212.83 5. E.R.
Snell Contracting, Inc. $989,183.25 It is the recommendation of
the Engineering Department to award this project to Reeves
Construction Co.
Financial Impact:Bids came in over above the construction TIA budget amount.
Proposed project funds are presented below: 1.Construction TIA
Budgeted Amount:$285,462.24 2.TIA Discretionary Funds:
$112,059.64 3.LMIG Funds $430,929.78 TOTAL: $828,451.66
Alternatives:1). Approve award of Construction Contract to Reeves
Construction Co. in the amount of $828,451.66 for the
Transportation Investment Act (TIA) Project, Pleasant Home
Resurfacing from Riverwatch Parkway to Walton Way Ext. The
Award is contingent upon receipt of signed contracts and proper
bonds as requested by AED. 2). Do not approve and find
alternative to complete the project and meet TIA project
completion schedule.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
371-041110-T13047134, TIA Discretionary and LMIG Funds
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Procurement of Replacement Parts for Hypochlorite Generation Equipment
Department:Utilities
Caption:Approve Procurement of Replacement Parts for Hypochlorite
Generation Equipment.
Background:Augusta's new and upgraded surface water treatment plants utilize
a technology which allows onsite generation of sodium
hypochlorite which is used as a replacement for chlorinegas as a
disinfectant in drinking water. The system used at our facilities
is manufactured by Severn Trent Services. These units require
periodic replacement of generation cells due to normal
deterioration of the electrodes. The purpose of this procurement is
to purchase a replacement cell for one of the units at the Highland
Avenue Water Treatment Plant.
Analysis:This is a replacement part for an existing piece of equipment
which is proprietary in its design and construction. The only
source for this procurement is the equipment manufacturer.
Financial Impact:$58,600.00 from budgeted funds.
Alternatives:No feasible alternatives are available.
Recommendation:Approve the sole source procurement of a replacement cell
assembly from Severn Trent Services at a cost of $58,600.00.
Funds are Available
in the Following
Accounts:
506043520-5425110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
4/28/2015 1:05 PM
Use of Solar Energy
Department:Clerk of Commission
Caption:Discuss the use of solar energy in order to save money and
simultaneously reduce carbon footprint. Consider the use of solar
panels and geothermal systems in government, businesses, and
residences. Inform the public of the importance of utilizing solar
energy and the negative impact of carbon dioxide and other
carbon compounds emitted into the atmosphere. (Requested by
Commissioner Lockett) (Referred from April 14 Engineering
Services Committee)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY: