Loading...
HomeMy WebLinkAbout2014-11-24-Meeting Agenda Public Service Committee Meeting Commission Chamber- 11/24/2014- 1:00 PM PUBLIC SERVICES 1. New Ownership Application: A.N. 14-49: A request by Pritalkumar Patel for a retail package Beer & Wine License to used in connection with Wheeler Express located at 3011 Wheeler Rd. District 7. Super District 10. Attachments 2. New Ownership Application: A.N. 14-50: A request by Yashikazu Kurokawa for an on premise consumption Liquor, Beer, & Wine License to be used in connection with Kawa Japanese Grill located at 1135 Broad Street. District 1. Super District 9. Attachments 3. New Ownership Application: A.N. 14-51: A request by Henry Todd Schafer for an on premise consumption Liquor, Beer & Wine License to be used in connection with ILBI LLC dba Abel Brown located at 491 Highland Ave. District 7. Super District 10. Attachments 4. New Ownership Application: A.N. 14-52: A request by Matthew G. Widener for an on premise consumption Liquor,Beer & Wine License to be used in connection with Surrey Tavern located at 471 Highland Ave. District 7. Super District 10. Attachments 5. Presentation by Mr. Billy Franke of the Pendleton King Park Foundation regarding lease/revenue sharing/SPLOST match for Pendleton King Park. Attachments 6. Motion to approve the Daniel Field Airport hangar doors renovated through the use of T-SPLOST funding. Re-Bid Item 14-186A Attachments 7. Motion to approve an updated Airport Layout Plan for the Daniel Field Airport. Attachments www.augustaga.gov 8. Determine the language for the sign at the New Entrance for the Augusta, Georgia Municipal Building. (Referred from November 10 Public Services Committee) Attachments 9. Motion to approve the minutes of the Public Services Committee held on November 10, 2014. Attachments 10. Motion to approve an Ordinance to amend the Personnel Policies and Procedures Manual of Augusta, GA Code Section 1-7-51; to approve edits to the following sections of Chapters III, V and VIII of the Personnel Policies and Procedures Manual relating to Augusta Regional Airport Personnel: 300.001, 300.002, 300.011, 300.012, 300.013, 300.014, 500.001, 500.104, 500.108, 500.121, 500.308, 500.316, 800.001, 800.004, 800.005, 800.009, 800.010, 800.013 and 800.014, to repeal all manual provisions, Code Sections and Ordinances and parts of Code Sections and Ordinances in conflict herewith; to provide an effective date and for other purposes. (Requested by Commissioner Smith) Attachments 11. Motion to approve an Ordinance to amend the Augusta, GA Code Title One Chapter Three Article One Section 1-3-6 and 1-3-7 relating to the powers of the Augusta Aviation Board and the powers, duties, salary and title of Airport Manager; to repeal all Code Sections and Ordinances and parts of Code Sections and Ordinances in conflict herewith; to provide an effective date and for other purposes. (Requested by Commissioner Smith) Attachments 12. Approve the selection of and contract with McCarthy Improvement Company for the Rehabilitation of the Air Carrier & General Aviation Apron Project as approved by the Augusta Aviation Commission at their October 30, 2014 meeting. Attachments Public Service Committee Meeting 11/24/2014 1:00 PM Alcohol Application Department:Planning & Development Caption:New Ownership Application: A.N. 14-49: A request by Pritalkumar Patel for a retail package Beer & Wine License to used in connection with Wheeler Express located at 3011 Wheeler Rd. District 7. Super District 10. Background:This is a New Ownership Application formerly in the name of John M. Bryant. Analysis:The applicant meets of the requirements of The City of Augusta Ordinance. Financial Impact:The Applicant will pay a pro-rated fee of $665.00 Alternatives: Recommendation:Planning & Development recommends approval. The R.C.S.O recommends approval. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Attachment number 1 \nPage 1 of 2 Item # 1 Attachment number 1 \nPage 2 of 2 Item # 1 Public Service Committee Meeting 11/24/2014 1:00 PM Alcohol Application Department:Planning & Development Caption:New Ownership Application: A.N. 14-50: A request by Yashikazu Kurokawa for an on premise consumption Liquor, Beer, & Wine License to be used in connection with Kawa Japanese Grill located at 1135 Broad Street. District 1. Super District 9. Background:This is a new ownership application. Formerly in the name of Musa Anderson. Analysis:The applicant meets the requirements of the City of Augusta Alcohol Ordinance. Financial Impact:The applicant will pay a fee of $4,365.00. Alternatives: Recommendation:Planning & Development recommends approval. The R.C.S.O. recommends approval. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Attachment number 1 \nPage 1 of 2 Item # 2 Attachment number 1 \nPage 2 of 2 Item # 2 Public Service Committee Meeting 11/24/2014 1:00 PM Alcohol Application Department:Planning & Development Caption:New Ownership Application: A.N. 14-51: A request by Henry Todd Schafer for an on premise consumption Liquor, Beer & Wine License to be used in connection with ILBI LLC dba Abel Brown located at 491 Highland Ave. District 7. Super District 10. Background:This is a new ownership application. Formerly in the name of Henry Todd Schafer. Analysis:The applicant meets the requirements of the City of Augusta Alcohol Ordinance. Financial Impact:The applicant will pay $4,445.00. Alternatives: Recommendation:Planning & Development recommends approval. The R.C.S.O. recommends approval. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 3 Attachment number 1 \nPage 1 of 2 Item # 3 Attachment number 1 \nPage 2 of 2 Item # 3 Public Service Committee Meeting 11/24/2014 1:00 PM Alcohol Application Department:Planning & Development Caption:New Ownership Application: A.N. 14-52: A request by Matthew G. Widener for an on premise consumption Liquor,Beer & Wine License to be used in connection with Surrey Tavern located at 471 Highland Ave. District 7. Super District 10. Background:This is a new ownership application. Formerly in the name of Matthew G. Widener. Analysis:The applicant meets the requirements of the City of Augusta Alcohol Ordinance. Financial Impact:The applicant will pay $4,445.00. Alternatives: Recommendation:Planning & Development recommends approval. The R.C.S.O. recommends approval. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Attachment number 1 \nPage 1 of 2 Item # 4 Attachment number 1 \nPage 2 of 2 Item # 4 Public Service Committee Meeting 11/24/2014 1:00 PM Billy Franke/Pendleton King Park Foundation Department:Clerk of Commission Caption:Presentation by Mr. Billy Franke of the Pendleton King Park Foundation regarding lease/revenue sharing/SPLOST match for Pendleton King Park. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 5 Attachment number 1 \nPage 1 of 1 Item # 5 Public Service Committee Meeting 11/24/2014 1:00 PM Daniel Field Airport Hangar Door Renovation Department:Daniel Field Airport Caption:Motion to approve the Daniel Field Airport hangar doors renovated through the use of T-SPLOST funding. Re-Bid Item 14-186A Background:The Daniel Field Airport is included in the T-SPLOST funding in the amount of $990,000 for the renovation of the hangar doors for both hangars located on the field. These doors are in immediate need of renovation as they are considered a safety hazard. The top tracks of these doors are deteriorating and the molding holding the glass in the panels is starting to crumble, making the glass suseptable to falling out of the doors. Analysis:None Financial Impact:100% funding is through T-SPLOST (TIA). The amount of $990,000 was alloted for this project. APD, Inc. submitted a bid in the amount of $945,075. Alternatives:None Recommendation:The recommendation is to award Atlanta Professional Door, (APD, Inn.) the bid for the hangar door renovation as APD has performed renovations similar to the one necessary at Daniel Field. Funds are Available in the Following Accounts: 100% of the funding is through T-SPLOST (TIA). GDOT has approved the funding in Tier 1 and has given Augusta Richmond County a Notice to Proceed with this project. REVIEWED AND APPROVED BY: Finance. Cover Memo Item # 6 Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 6 Sealed re-bids will be received at this office on Wednesday, October 8,2014 @ 3:00 p.m. for furnishing: Re-Bid ltem 14-186A Hanger Door Renovation for Daniel Field Airport Re-Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: GeriA. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Re-Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street - Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable is $40.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.auqustablue.com) at no charge through Augusta Blue Print (706 722-6488) beginning Tuesday, September 16, 2014. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@auqustaqa.qov to the office of the Procurement Department by Tuesday, September 23,2014 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mailor hand delivered. No Re-Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 1oo/o Bid bond is required to be submitted along with the bidders' qualifications; a 100% performance bond and a 100o/o payment bond will be required for award. lnvitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director tothe appropriate commiftee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of RE-BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RE-BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERIA. SAMS, Procurement Director Revised: SlLsl2ott Attachment number 1 \nPage 1 of 1 Item # 6 UNOFFICIAL Re-Bid Item #14-186A Hanger Door Renovation for the City of Augusta - Daniel Field Airport Re-Bid Opening Date: Wednesday, October 8, 2014 @ 3:00 p.m. Vendors APD INC., 125 CARNES DRIVE FAYETTEVILLE, GA 30214 Attachment B Yes E-Verify Number 55078 SAVE Form Yes Bid Bond Yes Base Bid Price $888,075.00 Total Addictive Bid $57,000.00 Total Base Bid + Additive Bid $945,075.00 The following vendor did not respond: DABBS-WILLAIMS / 319 S.WALNUT ST. / STATESBORO, GA 30468 Page 1 of 1 Attachment number 2 \nPage 1 of 1 Item # 6 Palmetto Overhead Door 168 Sweetwater Rd. North Augusta, SC 29860 Atlanta’s Professional Door Attn: Wendell Yoder 125 Carnes Dr. Fayetteville, GA 30214 Overhead Door Company of Atlanta 221 Armour Dr. Atlanta, GA 30324 Industrial Door Contractors, Inc. P.O. Box 158 Columbia, TN 38402-0158 Dabbs-Williams Attn: Jay James 318 S. Walnut Street Statesboro, GA 30458 Aero-Door International, LLC 2459 Clark St. Apopka, FL 32703 Industrial Door 1020 W. 14 Mile Rd. Clawson, MI 48017-1408 Michael R. Joseph, P.E. Croy Engineering, LLC 200 North Cobb Pkwy. Bldg. 400, Suite 413 Marietta, GA 30062 National Door Service, Inc. 3501 Century Ave. Baltimore, MD 21227 Americkko P.O. Box 7057 New Castle, PA 16107-7057 Aerospace Facilities Group, Inc. 4080 Paradise Rd., 15-128 Las Vegas, NV 89169 International Door, Inc. 8001 Ronda Dr. Canton, MI 48187 Re-Bid Item 14-186A Hanger Door Renovation for Daniel Field Airport Re-Bid Due: Wed. 10/8/14 @ 3:00 P.M. Re-Bid Item 14-186A Hanger Door Renovation for Daniel Field Airport Mailed September 16, 2014 Steve Gay Daniel Field Airport Becky Shealy Daniel Field Airport Yvonne Gentry LSBOP Attachment number 3 \nPage 1 of 1 Item # 6 /- Dedicated-(- 1-44- A GENERAL AVIATION COMMISSION DANIEL FIELD AIRPORT Dedicated-October 27, 1927 I775 HIGHLAND AVE. AUGUSTA, GA 30904 (706)733-164',7AIRPORTMANAGER '14$itlU tSr*'rll:X# November 6,2A1.4 Mrs. Geri A. Sams Director, Procurement Departrnent City of Augusta Room 605- 530 Greene Street August4 GA 30901 Dear Mrs. Sams, Thank you for your recent conespondence and accompanymg bid tabulation sheet withthe submittal for Bid Item 14-1804 Hangar Door Renovation for the Daniel FieldAirport. ADP Inc., our preferred vendor, met all of the bid criteria, and we are pleasedto recommend them for this project. We look forward to working with you and ADP hrc. on this major project which willsignificantly improve the safety and appearance of Daniel Fietd- Interim Manager, Daniel Field Airport C: Kay Roland, Chair, General Aviation Commission Becky Shealy,Interim Manager, Daniel Field Airport Sincerely, (-*-__<>? Steve Gay \ Attachment number 4 \nPage 1 of 1 Item # 6 Public Service Committee Meeting 11/24/2014 1:00 PM Daniel Field Airport Layout Plan Update Department:Daniel Field Airport Caption:Motion to approve an updated Airport Layout Plan for the Daniel Field Airport. Background:The Federal Aviation Administration requires that all airports receiving AR-21 federal grant money have an updated airport layout plan (ALP). This is a planning document for future federal dollars to be allocated to projects that are listed on the Capital Improvement Plan (CIP) for the airport. Analysis:The current ALP for Daniel Field is out of date. Without updating the ALP, Daniel Field will not be eligible to receive federal funding for future projects. Financial Impact:The total amount approved by the FAA for this project is as follows: FAA FUNDS = 90,386.00 GDOT FUNDS = 5,021.00 LOCAL SHARE = 5,022.00 TOTAL =100,429.00 Alternatives:None Recommendation:The recommendation is to approve WK Dickson, the civil engineer of record for Daniel Field, to perform the actions needed to update the Airport Layout Plan. Funds are Available in the Following Accounts: FAA FUNDS = 90,386.00 GDOT FUNDS = 5,021.00 LOCAL SHARE = 5,022.00 TOTAL =100,429.00 REVIEWED AND APPROVED BY: Procurement Cover Memo Item # 7 Public Service Committee Meeting 11/24/2014 1:00 PM Language for the Sign at the New Entrance for the Augusta, Georgia Municipal Building Department:Recreation, Parks and Facilities Caption:Determine the language for the sign at the New Entrance for the Augusta, Georgia Municipal Building. (Referred from November 10 Public Services Committee) Background:Recently the entrance to the Municipal Building was relocated from the Greene Street side of the building to the Telfair Street side. The design calls for a new sign over the new entrance. This is a request for direction on how the city wishes the language of the sign to read. Analysis:The sign above the former Greene Street entrance reads “Augusta – Richmond County Municipal Building” It is our understanding that the official name for the Unified Government is “Augusta, Georgia. This language was used on the renderings of the building as a place holder and reads “Augusta, Georgia Municipal Building”. Both have the address 530 under them. Before ordering the signage for the building, direction is needed on how the city wishes the language to read. Financial Impact:The Construction Manager at Risk has included this signage in their GMP and there should not be any financial impact unless there is a significant addition to the language. Alternatives:1. Go with “Augusta Georgia Municipal Building” the language used as a place holder on the renderings. 2. Match the existing language on the Greene Street side of the building, which reads “Augusta – Richmond County Municipal Building”. 3. Determine different language from alternatives given above. Recommendation:Use the language “Augusta, Georgia Municipal Building” for the sign above the new entrance. Funds are Available in the Following Municipal Building Renovations: JL: 212 05 5101 Ob Code: 52- 12119 GL: 328 05 1120 Cover Memo Item # 8 Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 8 Attachment number 1 \nPage 1 of 1 Item # 8 Attachment number 2 \nPage 1 of 1 Item # 8 Public Service Committee Meeting 11/24/2014 1:00 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Public Services Committee held on November 10, 2014. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 9 Attachment number 1 \nPage 1 of 6 Item # 9 Attachment number 1 \nPage 2 of 6 Item # 9 Attachment number 1 \nPage 3 of 6 Item # 9 Attachment number 1 \nPage 4 of 6 Item # 9 Attachment number 1 \nPage 5 of 6 Item # 9 Attachment number 1 \nPage 6 of 6 Item # 9 Public Service Committee Meeting 11/24/2014 1:00 PM Ordinance amending PPPM to approve edits to sections of Chapters III, V and VIII of PPPM relating to Augusta Regional Airport Personnel Department:Clerk of Commission Caption:Motion to approve an Ordinance to amend the Personnel Policies and Procedures Manual of Augusta, GA Code Section 1-7-51; to approve edits to the following sections of Chapters III, V and VIII of the Personnel Policies and Procedures Manual relating to Augusta Regional Airport Personnel: 300.001, 300.002, 300.011, 300.012, 300.013, 300.014, 500.001, 500.104, 500.108, 500.121, 500.308, 500.316, 800.001, 800.004, 800.005, 800.009, 800.010, 800.013 and 800.014, to repeal all manual provisions, Code Sections and Ordinances and parts of Code Sections and Ordinances in conflict herewith; to provide an effective date and for other purposes. (Requested by Commissioner Smith) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 10 Attachment number 1 \nPage 1 of 77 Item # 10 Attachment number 1 \nPage 2 of 77 Item # 10 Attachment number 1 \nPage 3 of 77 Item # 10 Attachment number 1 \nPage 4 of 77 Item # 10 Attachment number 1 \nPage 5 of 77 Item # 10 Attachment number 1 \nPage 6 of 77 Item # 10 Attachment number 1 \nPage 7 of 77 Item # 10 Attachment number 1 \nPage 8 of 77 Item # 10 Attachment number 1 \nPage 9 of 77 Item # 10 Attachment number 1 \nPage 10 of 77 Item # 10 Attachment number 1 \nPage 11 of 77 Item # 10 Attachment number 1 \nPage 12 of 77 Item # 10 Attachment number 1 \nPage 13 of 77 Item # 10 Attachment number 1 \nPage 14 of 77 Item # 10 Attachment number 1 \nPage 15 of 77 Item # 10 Attachment number 1 \nPage 16 of 77 Item # 10 Attachment number 1 \nPage 17 of 77 Item # 10 Attachment number 1 \nPage 18 of 77 Item # 10 Attachment number 1 \nPage 19 of 77 Item # 10 Attachment number 1 \nPage 20 of 77 Item # 10 Attachment number 1 \nPage 21 of 77 Item # 10 Attachment number 1 \nPage 22 of 77 Item # 10 Attachment number 1 \nPage 23 of 77 Item # 10 Attachment number 1 \nPage 24 of 77 Item # 10 Attachment number 1 \nPage 25 of 77 Item # 10 Attachment number 1 \nPage 26 of 77 Item # 10 Attachment number 1 \nPage 27 of 77 Item # 10 Attachment number 1 \nPage 28 of 77 Item # 10 Attachment number 1 \nPage 29 of 77 Item # 10 Attachment number 1 \nPage 30 of 77 Item # 10 Attachment number 1 \nPage 31 of 77 Item # 10 Attachment number 1 \nPage 32 of 77 Item # 10 Attachment number 1 \nPage 33 of 77 Item # 10 Attachment number 1 \nPage 34 of 77 Item # 10 Attachment number 1 \nPage 35 of 77 Item # 10 Attachment number 1 \nPage 36 of 77 Item # 10 Attachment number 1 \nPage 37 of 77 Item # 10 Attachment number 1 \nPage 38 of 77 Item # 10 Attachment number 1 \nPage 39 of 77 Item # 10 Attachment number 1 \nPage 40 of 77 Item # 10 Attachment number 1 \nPage 41 of 77 Item # 10 Attachment number 1 \nPage 42 of 77 Item # 10 Attachment number 1 \nPage 43 of 77 Item # 10 Attachment number 1 \nPage 44 of 77 Item # 10 Attachment number 1 \nPage 45 of 77 Item # 10 Attachment number 1 \nPage 46 of 77 Item # 10 Attachment number 1 \nPage 47 of 77 Item # 10 Attachment number 1 \nPage 48 of 77 Item # 10 Attachment number 1 \nPage 49 of 77 Item # 10 Attachment number 1 \nPage 50 of 77 Item # 10 Attachment number 1 \nPage 51 of 77 Item # 10 Attachment number 1 \nPage 52 of 77 Item # 10 Attachment number 1 \nPage 53 of 77 Item # 10 Attachment number 1 \nPage 54 of 77 Item # 10 Attachment number 1 \nPage 55 of 77 Item # 10 Attachment number 1 \nPage 56 of 77 Item # 10 Attachment number 1 \nPage 57 of 77 Item # 10 Attachment number 1 \nPage 58 of 77 Item # 10 Attachment number 1 \nPage 59 of 77 Item # 10 Attachment number 1 \nPage 60 of 77 Item # 10 Attachment number 1 \nPage 61 of 77 Item # 10 Attachment number 1 \nPage 62 of 77 Item # 10 Attachment number 1 \nPage 63 of 77 Item # 10 Attachment number 1 \nPage 64 of 77 Item # 10 Attachment number 1 \nPage 65 of 77 Item # 10 Attachment number 1 \nPage 66 of 77 Item # 10 Attachment number 1 \nPage 67 of 77 Item # 10 Attachment number 1 \nPage 68 of 77 Item # 10 Attachment number 1 \nPage 69 of 77 Item # 10 Attachment number 1 \nPage 70 of 77 Item # 10 Attachment number 1 \nPage 71 of 77 Item # 10 Attachment number 1 \nPage 72 of 77 Item # 10 Attachment number 1 \nPage 73 of 77 Item # 10 Attachment number 1 \nPage 74 of 77 Item # 10 Attachment number 1 \nPage 75 of 77 Item # 10 Attachment number 1 \nPage 76 of 77 Item # 10 Attachment number 1 \nPage 77 of 77 Item # 10 Attachment number 2 \nPage 1 of 41 Item # 10 Attachment number 2 \nPage 2 of 41 Item # 10 Attachment number 2 \nPage 3 of 41 Item # 10 Attachment number 2 \nPage 4 of 41 Item # 10 Attachment number 2 \nPage 5 of 41 Item # 10 Attachment number 2 \nPage 6 of 41 Item # 10 Attachment number 2 \nPage 7 of 41 Item # 10 Attachment number 2 \nPage 8 of 41 Item # 10 Attachment number 2 \nPage 9 of 41 Item # 10 Attachment number 2 \nPage 10 of 41 Item # 10 Attachment number 2 \nPage 11 of 41 Item # 10 Attachment number 2 \nPage 12 of 41 Item # 10 Attachment number 2 \nPage 13 of 41 Item # 10 Attachment number 2 \nPage 14 of 41 Item # 10 Attachment number 2 \nPage 15 of 41 Item # 10 Attachment number 2 \nPage 16 of 41 Item # 10 Attachment number 2 \nPage 17 of 41 Item # 10 Attachment number 2 \nPage 18 of 41 Item # 10 Attachment number 2 \nPage 19 of 41 Item # 10 Attachment number 2 \nPage 20 of 41 Item # 10 Attachment number 2 \nPage 21 of 41 Item # 10 Attachment number 2 \nPage 22 of 41 Item # 10 Attachment number 2 \nPage 23 of 41 Item # 10 Attachment number 2 \nPage 24 of 41 Item # 10 Attachment number 2 \nPage 25 of 41 Item # 10 Attachment number 2 \nPage 26 of 41 Item # 10 Attachment number 2 \nPage 27 of 41 Item # 10 Attachment number 2 \nPage 28 of 41 Item # 10 Attachment number 2 \nPage 29 of 41 Item # 10 Attachment number 2 \nPage 30 of 41 Item # 10 Attachment number 2 \nPage 31 of 41 Item # 10 Attachment number 2 \nPage 32 of 41 Item # 10 Attachment number 2 \nPage 33 of 41 Item # 10 Attachment number 2 \nPage 34 of 41 Item # 10 Attachment number 2 \nPage 35 of 41 Item # 10 Attachment number 2 \nPage 36 of 41 Item # 10 Attachment number 2 \nPage 37 of 41 Item # 10 Attachment number 2 \nPage 38 of 41 Item # 10 Attachment number 2 \nPage 39 of 41 Item # 10 Attachment number 2 \nPage 40 of 41 Item # 10 Attachment number 2 \nPage 41 of 41 Item # 10 Public Service Committee Meeting 11/24/2014 1:00 PM Ordinance relating to Powers of Augusta Aviation Board and Powers, Duties, Salary and Title of Airport Manager Department:Clerk of Commission Caption:Motion to approve an Ordinance to amend the Augusta, GA Code Title One Chapter Three Article One Section 1-3-6 and 1-3-7 relating to the powers of the Augusta Aviation Board and the powers, duties, salary and title of Airport Manager; to repeal all Code Sections and Ordinances and parts of Code Sections and Ordinances in conflict herewith; to provide an effective date and for other purposes. (Requested by Commissioner Smith) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 11 Attachment number 1 \nPage 1 of 8 Item # 11 Attachment number 1 \nPage 2 of 8 Item # 11 Attachment number 1 \nPage 3 of 8 Item # 11 Attachment number 1 \nPage 4 of 8 Item # 11 Attachment number 1 \nPage 5 of 8 Item # 11 Attachment number 1 \nPage 6 of 8 Item # 11 Attachment number 1 \nPage 7 of 8 Item # 11 Attachment number 1 \nPage 8 of 8 Item # 11 Attachment number 2 \nPage 1 of 1 Item # 11 Public Service Committee Meeting 11/24/2014 1:00 PM REHABILITATE AIR CARRIER & GENERAL AVIATION APRON PROJECT Department:Augusta Regional Airport Caption:Approve the selection of and contract with McCarthy Improvement Company for the Rehabilitation of the Air Carrier & General Aviation Apron Project as approved by the Augusta Aviation Commission at their October 30, 2014 meeting. Background:The purpose of this project is for the rehabilitation of the existing pavements associated with the Air Carrier and General Aviation Aprons. The current pavements are in poor condition and in need of repair. This work is critical to the Airport. Should the repairs not be performed in a timely manner, the pavement could fail structurally and create an unsafe condition, which would close the apron area until repairs are made. The County Procurement Department issued a Request for Bids (RFB) for a Contractor to perform the tasks required by the design documents. As a result, two (2) bids were received. McCarthy Improvement Company $24,387,071.00 (Low Bidder) Reeves Construction Company $26,345,093.83 The project is funded by T-SPLOST. Analysis:In reviewing the bids, it was determined that McCarthy Improvement Company was the lowest, responsible and responsive bidder with a bid of $24,387,071.00 which includes the base bid plus all alternates. County Procurement has reviewed the information provided at the bid opening and found the information provided to be complete. Due to funds availability, Airport Staff recommends awarding only Schedules 1, 3, 5, Bid Alternative 1 – Schedule 7, and Bid Alternative 2 – Schedule 8 to McCarthy Improvement Company in the amount of $7,034,186.00. The bid amount for the Schedules and Bid Alternative noted above is within the budgeted amount and reasonable considering the confining conditions for the project construction. This combination of schedules has been discussed with McCarthy Improvement Company and they have stated that they will hold their original bid prices for this approach. McCarthy Improvement Company’s total for this combination of schedules is also lower than the other bid of $7,690,590.43 received by Reeves Cover Memo Item # 12 Construction Company for the same combination of schedules. A contract which includes all terms and conditions of the scope of work to be performed by McCarthy Improvement Company is attached. Financial Impact:This project is funded by TIA (STPLOST in the amount of $7,790,093. Funds will be reimbursed to Augusta from GDOT TIA funds. Alternatives:Deny request. Recommendation:Approve request. Funds are Available in the Following Accounts: 371081130-5412110/T13355001-5412110 - $7,034,186.00 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 1 of 17 COTRACT AUGUSTA-RICHMOD COUTY FOR THE AUGUSTA REGIOAL AIRPORT AD MCCARTHY IMPROVEMET COMPAY REHABILITATE AIR CARRIER AD GEERAL AVIATIO APRO PROJECT Attachment number 1 \nPage 1 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 2 of 17 This Contract for the provision of Rehabilitate Air Carrier and General Aviation Apron Project (hereinafter designated as the "Contract") made and entered into as of this ____ day of __________________ 2014, by and between the City of Augusta (City) for the AUGUSTA REGIONAL AIRPORT, (hereinafter designated as "Airport”) and McCarthy Improvement Company (hereinafter designated as “Contractor”). WITESSETH: WHEREAS, the City is the owner and operator of a full service commercial airport known as the Augusta Regional Airport at Bush Field (the Airport); WHEREAS, the City solicited bids for the provision of Rehabilitate Air Carrier and General Aviation Apron Project at the Airport; and Whereas, Contractor provided a bid in compliance with City, Georgia Department of Transportation (GDOT), Federal Aviation Administration (FAA) and all other applicable federal regulations. OW, THEREFORE , in consideration of the mutual covenants, promises, and agreements herein contained, the City and Contractor hereby agree as follows: OBJECTIVES OF SERVICES The objective of contracting the services described in this Contract is the provision of Rehabilitate Air Carrier and General Aviation Apron Project in accordance with the plans and specifications set forth herein. The Airport is a full-service commercial airport, served by Delta (ASA) Airlines, American and U.S. Airways routinely provide 100% of the commercial arrival and departure traffic. The commercial traffic is comprised of sixteen (16) daily arrivals and sixteen (16) daily departures, seven (7) days per week. The facilities are operated twenty four (24) hours/day, seven (7) days/week and three hundred sixty-five days per year. The work involves the repair of selected pavement areas within the air carrier and general aviation aprons at the Airport. SECTIO 1.0 ARTICLE I SCOPE OF WORK 1.1 The term “Work” means the construction, labor, materials, equipment, tools, machinery, testing, temporary services and utilities, supervision, administration, coordination, planning, insurance, bonds, transportation, security, and all other services and things necessary to provide the Owner with the facilities, improvements, features, and functions described in the Specifications identified in Attachment 1, and the Drawings identified in Attachment 2. The Specifications and the Plans are hereby incorporated into and made a part of this Contract. The Contractor shall complete the Work in a good, firm, substantial and workmanlike manner in strict conformity with this Contract. 1.2 Additionally, the following specific items shall be considered a part of the Contract Documents by reference when appropriately executed. 1.2.1 100% Labor and Materials Payment Bond. 1.2.2 100% Performance Bond. 1.2.3 The Certificate of Insurance 1.2.4 The Contractor's completed Bid Form dated August 5, 2014. 1.2.5 All required submittals. Attachment number 1 \nPage 2 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 3 of 17 1.3 The Contractor shall furnish all of the materials and all of the equipment and labor necessary and to perform all of the work entitled Rehabilitate Air Carrier and General Aviation Apron Project in compliance with the Specifications and Drawings dated May 15, 2014, prepared by Mead & Hunt, Inc., 307 W. Main Street, Lexington, South Carolina, 29072, and in accordance with the requirements and provisions of these Contract Documents. 1.4 Unless otherwise modified, the Contractor shall furnish all of the Work in accordance with the Contract and all incidental work necessary to complete the Project in an acceptable manner, ready for use, occupancy, or operation by the Airport. The Contractor shall be responsible for the entire Work and every part thereof. ARTICLE II. TIME, TERM AD PAYMET 2.1 Contract Time. The Contractor shall commence the Work under this Contract within ten (10) calendar days from the date of receiving the Notice to Proceed, as evidenced by official receipt of certified mail or acknowledgment of personal delivery, and shall fully complete the Work within 153 days after receiving such Notice to Proceed. The Contract Time may be extended only by Change Order approved and executed by the Aviation Commission, the County and the Contractor in accordance with the terms of this Contract. 2.2 Contract Price. As full payment for the faithful performance of this Contract, the County shall pay the Contractor the Contract Price, which is an amount not to exceed $7,034,186.00 unless changed by written Change Order in accordance with the terms of this Contract. Any increase of the Contract Price shall be by Change Order adopted and approved by the Aviation Commission, the City and the Contractor in accordance with the terms of this Contract. 2.3 Subject to satisfactory completion of work performed, payments on account thereof shall be made as set forth in Section GP-90 Measurement and Payment: 2.4 Contractor and City agree to abide by all applicable provisions of Georgia state law concerning retainage, including but not limited to O.C.G.A. §13-10-80. If the terms of this Contract concerning retainage conflict with state law, state law governs. 2.5 Invoices. Original invoice(s) must be submitted as follows: Gary Siegfried Mead & Hunt, Inc. 307 W. Main Street Lexington, SC 29072 With a Copy to: Risa Bingham Augusta Regional Airport 1501 Aviation Way Augusta, GA 30906 Ph: (706) 798-3236 FAX: (706) 798-1551 Attachment number 1 \nPage 3 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 4 of 17 ARTICLE III FEDERAL WORK AUTHORIZATIO Pursuant to O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02, the City cannot enter a contract for the physical performance of services unless the Contractor and its subcontractors register and participate in the Federal Work Authorization Program to verify specific information on all new employees. 3.1 Contractor certifies that it has complied and will continue to comply with O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02. 3.2 Contractor agrees to sign an affidavit evidencing its compliance with O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02. The signed affidavit is attached to this Contract as Attachment 4. 3.3 Contractor agrees that in the event that it employs or contracts with any subcontractor(s) in connection with this Contract, Contractor will secure from each subcontractor an affidavit that indicates the employee-number category applicable to that subcontractor and certifies the subcontractor’s current and continuing compliance with O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02. Any signed subcontractor affidavit(s) obtained in connection with this Contract shall be attached hereto as Attachment 6. ARTICLE IV CORPORATE AUTHORITY Contractor executed the Certificate of Corporate Authority attached hereto as Attachment 5. The officials of the Contractor executing this Contract are duly and properly in office and are fully authorized and empowered to execute the same for and on behalf of the Contractor. Contractor has all requisite power and authority to enter into and perform its obligations under this Contract. The execution and delivery by the Contractor of this Contract and the compliance by the Contractor with all of the provisions of this Contract (i) is within the purposes, powers, and authority of the Contractor; (ii) has been done in full compliance with applicable law and has been approved by the governing body of the Contractor and is legal and will not conflict with or constitute on the part of the Contractor a violation of or a breach of or a default under any indenture, mortgage, security deed, pledge, note, lease, loan, or installment sale agreement, contract, or other agreement or instrument to which the Contractor is a party or by which the Contractor is otherwise subject or bound, or any license, judgment, decree, law, statute, order, writ, injunction, demand, rule, or regulation of any court or governmental agency or body having jurisdiction over the Contractor; and (iii) has been duly authorized by all necessary action on the part of the Contractor. This Contract is the valid, legal, binding and enforceable obligation of the Contractor. ARTICLE VI IDEPEDET COTRACTOR Contractor is acting, in performance of this Contract, as an independent contractor. Personnel supplied by the Contractor or its agents or subcontractors hereunder are not the City’s or the Airport’s employees or agents and Contractor assumes full responsibility for their acts. Contractor shall be solely responsible for the payment of compensation to its employees and subcontractors. The City shall not be responsible for payment of Worker's Compensation, disability benefits, and unemployment insurance or for withholding and paying employment taxes for any Contractor employee, or Contractor's subcontractors or agent's employees, but such responsibility shall be solely that of Contractor. This clause of the contract does not prevent the Airport from requiring Contractor to have its employees follow normal rules and guidelines for work performance, redirecting the efforts of the employees to meet the needs of the facilities, performing safety or from requiring Contractor to perform the requirements of this Contract satisfactorily, according to the terms set forth herein. No act or direction of the City or Airport shall be deemed to be the exercise of supervision or control of the Contractor’s performance hereunder. Attachment number 1 \nPage 4 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 5 of 17 ARTICLE VII COTRACTOR'S PERFORMACE 7.1 Contractor shall, at its own expense, furnish all necessary equipment, management, supervision, labor, technical support and other accessories and services for maintenance, and the performance of other services as described in these Contract Documents. Such services shall be performed in strict accordance with the terms herein, Specifications and Plans. 7.2 All performance shall be subject to inspection and approval by the Aviation Director or his designee as provided in said Performance Work Statement. If the Contractor's performance is, or becomes unsatisfactory, as determined by the Aviation Director, an appropriate reduction in payment due may be made from Contractor's invoice and Contractor shall correct any unsatisfactory performance. The correction of unsatisfactory performance shall be at no additional cost to Airport. ARTICLE VIII AUTHORIZED REPRESETATIVES 8.1 CITY/AIRPORT’S REPRESETATIVES AIRPORT’S REPRESETATIVE: shall be Clarence Fennell, Engineering Division or his designee. 8.2 COTRACTOR’S REPRESETATIVE(S) Contractor must designate in writing a person(s) acceptable to Airport to serve as its representative ("Contractor’s Representative”) in all dealings with Airport. Contractor’s Representative may be changed upon prior written notice delivered to Airport’s Representative. Contractor’s representative shall be Ben Robuck. ARTICLE XIV PATET IDEMITY Except as otherwise provided, the Contractor shall indemnify the City and its Board of Commissioners, the Aviation Commission, and their officers, agents and employees against liability, including costs and expenses for infringement upon any letters or patent of the United States arising out of the performance of this Contract or out of the use or disposal by or for the account of the City of the equipment furnished or construction work performed hereunder. ARTICLE X CHAGES The City may, during the Contract period, make changes to the Scope of Work, which may result in changes to the general scope of the Contract and its provisions. Written agreements, changes, or amendments to this Contract shall not be binding upon the City unless signed by the Aviation Commission and City Commission. ARTICLE XI COTRACTOR’S OBLIGATIOS The Contractor shall, in good workmanlike manner, do and perform, all work and furnish all supplies and materials, machinery, equipment, facilities, and means, except as herein otherwise expressly specified, necessary, or proper to perform and complete all the Work required by this Contract, within the time herein specified, in accordance with the provisions of this Contract and said Specifications and in accordance with the Plans and Drawings of the Work covered by this Contract and any and all supplemental drawings of the Work covered by this Contract. Contractor shall furnish, erect, maintain, and remove such equipment, construction, and such temporary works as may be required. Contractor alone shall be responsible for the safety, efficiency, and adequacy of its equipment, installations, and methods, and for any damage which may result from their failure or their improper construction, Attachment number 1 \nPage 5 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 6 of 17 installation, maintenance, or operation. The Contractor shall observe, comply with, and be subject to all terms, conditions, requirements and limitations of the Contract and Specifications, local ordinances, and state and federal laws; and shall do, carry on, and complete the entire Work. ARTICLE XII TEMPORARY SUSPESIO OR DELAY OF PERFOR MACE OF COTRACT To the extent that it does not alter the scope of this Contract, the County may unilaterally order a temporary stopping of the work, or delaying of the work to be performed by Contractor under this Contract. ARTICLE XIII COMMERCIAL ACTIVITIES Neither Contractor nor its employees may establish any commercial activity or issue concessions or permits of any kind to third parties for establishing activities at the Airport. ARTICLE XVI COTIGET FEES Contractor warrants that it has not employed or retained any company or person, other than a bona fide employee working for Contractor, to solicit or secure this Contract; and that Contractor has not paid or agreed to pay any company, association, corporation, firm or person, other than a bona fide employee working for Contractor, any fee, commission, percentage, gift or any other consideration contingent upon or resulting from the award or making of this Contract. For the breach or violation of this warranty and upon a finding after notice and hearing, the City may terminate the Contract and, at its discretion, may deduct from the Contract Sum, or otherwise recover the full amount of any such fee, commission, percentage, gift or consideration. ARTICLE XV RIGHTS AD REMEDIES The rights and remedies of City provided in this paragraph are not exclusive and are in addition to any other rights and remedies provided by law or under this Contract. ARTICLE XVI REPRESETATIOS AD WARRATIES 16 Contractor’s Representations and Warranties Regarding Capacity to Contract and Perform Work/Services. In order to induce the City to enter into this Contract, Contractor hereby represents and warrants to the City as of the date above written that: 16.1. Contractor is duly organized and validly existing in good standing under the laws of the state of Iowa in which it is organized, is qualified to do business in all jurisdictions in which it is operating, and has the power and authority to execute and deliver and to perform its obligations under this Contract and the documents to which it is signatory; and 16.2 The execution, delivery and performance by Contractor and its undersigned representative(s) of this Contract and other documents to which Contractor is a signatory do not require the approval or consent of any other person, entity or government agency and do not result in any breach of any agreement to which Contractor is a party or by which it is bound; and 16.3 The execution, delivery and performance by Contractor of this Contract and other documents to which it is a signatory have been duly authorized by all necessary action, and constitute legal, valid and binding obligations of Contractor, enforceable against Contractor in accordance with its terms; 16.4 No action, suit or proceeding to which Contractor is a party is pending or threatened that may restrain or question this Contract, or any other document to which it is a signatory, or the enjoyment of rights or benefits contemplated herein; and 16.5 Contractor has not been debarred by any city, state or federal agency. Attachment number 1 \nPage 6 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 7 of 17 ARTICLE XVII ASSIGMET 17. Without the prior written consent of City, Contractor may not assign, transfer or convey any of its interests under this Contract, nor delegate any of its obligations or duties under this Contract except as provided herein. 17.1 Consent of City Required. Any assignment of this Contract or rights under this Contract, in whole or part, without the prior written consent of City will be void, except that, upon ten (10) calendar days prior written notice to City, Contractor may assign monies due or to become due under this Contract. Any assignment of monies will be subject to proper setoffs in favor of City and to any deductions provided for in this Contract. 17.2 o Relief of Responsibilities . No assignment will be approved which would relieve Contractor of its responsibilities under this Contract. 17.3 Parties Bound. This Contract will be binding upon and inure to the benefit of City and Contractor and their respective successors and assigns. ARTICLE XVIII OTICES 18. Delivery. All notices given by either party to the other under this Contract must be in writing and may be delivered by: (i) regular mail, postage prepaid; (ii) certified or registered mail; (iii) facsimile; or (iv) hand- delivery, to the parties at the addresses and facsimile numbers set forth in the Clause titled “Addresses”. 18.1 Receipt. Notices sent by mail will be deemed to be received upon deposit in the mail, properly addressed. Notices sent by certified or registered mail will be deemed to be received upon the date of the acknowledgment. Notices sent by facsimile will be deemed to be received upon successful transmission to the proper facsimile number. Notices delivered by hand-delivery will be deemed to be received upon acceptance by the respective party or its agent. 18.2 Change of Address or Facsimile Number. Either party may, at any time, change its respective address or facsimile number by sending written notice to the other party of the change. 18.3 Addresses. To CITY: For all notices to City the address will be: Executive Director Augusta Regional Airport 1501 Aviation Way Augusta, Georgia 30906 With a copy to: Augusta General Counsel Augusta Richmond County Department of Law 501 Greene St. Augusta, Georgia 30901 To COTRACTOR: For all notices to Contractor the address will be: McCarthy Improvement Company 5401 Victoria Avenue Davenport, IA 52807 ARTICLE XIV WAIVER Attachment number 1 \nPage 7 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 8 of 17 The failure of the City to seek redress for any violation of or to insist upon the strict performance of, any term of this Contract will not prevent a subsequent violation of this Contract from being actionable by the City. The provision in this Contract of any particular remedy will not preclude the City from seeking any other remedy. ARTICLE XX COMPLIACE WITH APPLICABLE LAWS AD REGU LATIOS Contractor covenants and agrees that it, its agents and employees will comply with all Georgia, county, state, and federal laws, rules, regulations, Airport Rules and Regulations and City ordinances applicable to the work to be performed under this Contract, and that it shall obtain all necessary permits, pay all license fees and taxes to comply therewith. Further, Contractor agrees that it, its agents, and employees will abide by all rules, regulations, and policies of Airport during the term of this Contract, including any renewal periods. All references to City or Federal codes, provisions, regulations, and rules are incorporated by reference as if fully set forth herein. ARTICLE XXII RIGHT TO ISPECT PREMISES . The City may, at reasonable times, inspect the part of the plant, place of business, or work site of Contractor or any of its subcontractor or subunit thereof which is pertinent to the performance of this contract. ARTICLE XXIII ROYALTIES AD PATETS The Contractor shall indemnify, hold and save Augusta, GA, its officers, elected officials, employees, agents and the Aviation Commission and its employees harmless from liability of any nature or kind, including cost and expenses for, or on account of, any patented or unpatented invention, process, article, equipment or appliance manufactured or used in the performance of the Contract, including its use by the City, unless otherwise specifically stipulated in the Contract. ARTICLE VVX ISURACE During the term of this Contract, Contractor shall provide, pay for, and maintain with companies reasonably satisfactory to the City and the Aviation Commission, the types of insurance as set forth in the Augusta-Richmond County Code, and Georgia law as the same may be amended from time to time, and as described herein. All insurance shall be issued by insurance companies eligible to do business in the State of Georgia and with an Insurer rated “A” or better by AM Best. All policies shall include hold harmless provisions. In the event of a conflict between the provisions of the Augusta-Richmond County Code and this Contract, the more stringent requirement shall govern. In no event shall Contractor maintain any insurance less than the requirements set forth in the Augusta-Richmond County Code, as amended. 25.1 All liability policies of Contractor and its subcontractors shall provide coverage that includes, or has the same substantive effect as the following: 25.2 The Contractor shall procure and maintain continuously in effect throughout the term of its activities upon the Airport at Contractor’s sole expense, insurance of the types and in at least such minimum amounts as set forth in this Section. 25.3 The Contractor’s insurance policies as required by this Contract shall apply separately to the City as if separate policies had been issued to Contractor and City. The Contractor’s Comprehensive General Liability policy shall protect Augusta, GA, its officers, elected officials, employees, agents and the Aviation Commission and its employees against any and all liability created by reason of Contractor’s conduct. 25.4 The Contractor’s insurance shall not be subject to cancellation or material alteration until at least thirty (30) days written notice has been provided to the City’s Risk Manager. Contractor shall furnish to the Risk Manager Certificates of Insurance evidencing that all of the herein stated Attachment number 1 \nPage 8 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 9 of 17 requirements have been met. The amount or amounts of all required policies shall not be deemed a limitation of the Contractor’s Contract to indemnify and hold harmless Augusta, GA, its officers, elected officials, employees, agents and the Aviation Commission and its employees; and in the event Contractor or Augusta, GA shall become liable in an amount in excess of the amount or amounts of such policies, then the Contractor shall save Augusta, GA, its officers, elected officials, employees, agents and the Aviation Commission and its employees harmless from the whole thereof, except in the event of gross negligence of Augusta, GA. 25.5 The Contractor is required to maintain minimum insurance to protect the Contractor and Augusta, GA from the normal insurable liabilities that may be incurred by Contractor. In the event such insurance as required shall lapse, Augusta, GA and the Aviation Commission reserve the right to obtain such insurance at the Contractor’s sole expense. 25.6 The insurance policies for coverage listed in this Section shall contain a provision that written notice of cancellation or any material change in policy by the insurer shall be delivered to the City no less than thirty (30) days prior to cancellation or change. 25.7 Contractor shall carry the following types and minimum amounts of insurance coverage at the Airport: (a) Worker’s Compensation Insurance - With employer’s liability coverage of at least $1,000,000 each accident, $1,000,000 each employee and a $1,000,000 disease policy limit. The foregoing insurance shall be endorsed to state that that the workers’ compensation carrier waives its right of subrogation against the Augusta-Georgia its officers, agents, elected and appointed officials, representatives, volunteers, and employees, and the Aviation Commission its employees. (b) Comprehensive General Liability Insurance – In the amount of Five Million ($5,000,000) against claims for bodily injury, death or property damage occurring on, in about the Contractor’s premises and the Airport, in an amount recommended by the Risk Manager and acceptable to the City. Said coverage shall include products and completed operations. The foregoing insurance shall be endorsed to state that it will be primary to the City and the Aviation Commission’s insurance and that the carrier waives its right of subrogation against Augusta-GA, the Aviation Commission, , and their officers, agents, elected and appointed officials, representatives, volunteers, and employees. Augusta, GA, the Aviation Commission, their officers, employees, agents, elected and appointed officials shall be added as additional insureds on said policies, including products and completed operations. Said policy shall contain Severability of Interest Clause and shall include Contractual Liability coverage at least as broad as that given in the most current CG 00 01 ISO form. (c) Automobile Insurance. For any vehicles authorized in writing by the Executive Director to operate on the Aircraft Operating Area (AOA) of the Airport, Automobile Insurance in the minimum amount of Five Million Dollars ($5,000,000.00) combined single limit coverage. If the Contractor’s Comprehensive General Liability coverage includes vehicular operations on the Airport, separate automobile insurance shall not be required. The foregoing insurance shall be endorsed to state that it will be primary to the Augusta GA and the Aviation Commission’s insurance and that the carrier waives its right of subrogation against Augusta, GA, the Aviation Commission, and their officers, agents, elected and appointed officials, representatives, volunteers, and employees. Augusta, GA, the Aviation Commission, and their officers, agents, employees, elected and appointed officials shall be added as additional insureds on said policies. Said policy shall contain Severability of Interest Clause and shall include contractual liability coverage at least as broad as that given in the most current CA 00 01 ISO form. Attachment number 1 \nPage 9 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 10 of 17 (d) All such evidence of insurance shall be in the form of certificates of insurance satisfactory to the City and its Risk Manager, accompanied by a certified true copy of an endorsement to each policy containing the above language. The insurance coverage and limits required shall be evidenced by properly executed certificates of insurance. These certificates shall be signed by the authorized representative of the insurance company shown on the certificate. The required policies of insurance shall be in compliance with the laws of the State of Georgia. 25.8 If at any time the Aviation Director requests a written statement from the insurance company as to any impairments to the aggregate limit, Contractor shall promptly authorize and have delivered such statement to the Aviation Commission. Contractor authorizes the Aviation Commission and/or the City’s Risk Manager to confirm with Contractor’s insurance agents, brokers, and insurance companies all information furnished. 25.9 The acceptance of delivery to the City and the Aviation Commission of any certificate of insurance evidencing the insurance coverage and limits required under this Contract does not constitute approval or acceptance by the City or the Aviation Commission that the insurance requirements in this Contract have been met. No operations shall commence at the Airport unless and until the required certificates of insurance are in effect and approved by the City. 25.10 The Contractor and the City understand and agree that the minimum limits of the insurance herein required may, from time to time, become inadequate, and Contractor agrees that it will increase such minimum limits upon receipt of written notice defining the basis of the increase. The Contractor shall furnish the City, within ten (10) days of the effective date thereof, a certificate of insurance evidencing that such insurance is in force. 25.11 If at any time the Airport Director requests a written statement from the insurance companies as to any impairments to the Aggregate Limit, prompt authorization and delivery of all requested information will be given to the Aviation Commission. Renewal Certificates of Insurance must be provided to the City and Aviation Commission as soon as practical but in every instance prior to expiration of current coverage. 25.12 The amounts and types of insurance shall conform to the following minimum requirements with the use of Insurance Service Office policies, forms, and endorsements or broader, where applicable. Notwithstanding the foregoing, the wording of all policies, forms, and endorsements must be reasonably acceptable to the City and Aviation Commission. 25.13 An insurance binder letter or a Certificate of Insurance must be sent to: City of Augusta Risk Manager 530 Greene Street Room 217 Augusta, Ga. 30901 (706) 821-2502 (Fax) ARTICLE XXVI IDEMIFICATIO AD HOLD HARMLESS Contractor agrees to indemnify and hold harmless the Augusta Aviation Commission, Augusta, GA and their members, officers, elected officials, agents, servants, employees and successors in office, as set forth in the Augusta- Richmond County Code, and particularly Article 1, Chapter 3, Division 1, Section 1-3-8.5, Indemnity and Insurance, as the same may be amended from time to time, and described herein, from any and all claims including reasonable Attachment number 1 \nPage 10 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 11 of 17 attorney's fees and expenses of litigation incurred by the Augusta GA and the Augusta Aviation Commission, in connection therewith related to or arising out of any damage or injury to property or persons, occurring or allegedly occurring in, on or about Airport property which are in any way related to or arising out of any failure of Contractor to perform its obligations hereunder. Contractor further agrees that the foregoing contract to indemnify and hold harmless applies to any claims for damage or injury to any individuals employed or retained by Contractor in connection with any changes, additions, alterations, modifications and/or improvements made to the premises, and hereby releases the Augusta, GA and the Augusta Aviation Commission, from liability in connection with any such claims. In the event of a conflict between the provisions of the Augusta-Richmond County Code and this Contract, the more stringent requirement shall govern. ARTICLE XXVII BODS 27.1 The Contractor’s payment and performance bonds are attached hereto as Attachment 3. Each bond shall: (a) Be in a form approved by the City; (b) Incorporate by reference the terms of this Contract For Fiber Optic and Security Camera Upgrade Project (c) Be executed by a company certified by the Secretary of the United States Department of Treasury pursuant to the Act of July 30, 1947 (61 Stat. 646, as amended; 6 U.S.C. 6-13) and listed in the most current U.S. Treasury Circular 570 document “Surety Companies Acceptable on Federal Bonds,” as published in the Federal Register, and having a current A.M. Best rating of "A" (Superior) with a Financial Size Category of XII or better. (d) Be executed by a company licensed and authorized to do business in the state of Georgia; (e) Be accompanied by a power of attorney certifying that the persons executing the bond have the authority to do so. 27.2 The Contractor shall deliver any required bonds and powers of attorney to the City prior to commencement of the Work. 27.3 The bonding company that issues the bonds must be registered with The Surety Association of America (SAA). 27.4 The bonds shall remain in effect for a period of not less than two (2) years following the date of delivery or the time required to resolve any items of incomplete work and payment of any disputed amounts whichever time period is longer, or any statutory period applicable to City. 27.5 No surety will be accepted who is now in default or delinquent on any bonds or who is interested in any litigation against City. 27.6 Each surety shall designate an agent resident in the State of Georgia to whom any requisite notices may be delivered and on whom services of process may be had in matters arising out of such surety provider. ARTICLE XXVIII FORCE MAJEURE 28.1 Neither party hereto shall be considered in default in the performance of its obligations hereunder to the extent that the performance of any such obligation, except the payment of money, is prevented or delayed by any cause, existing or future, which is beyond the reasonable control of the affected party, or by a strike, lockout or other labor difficulty, the settlement of which shall be within the sole discretion of the party involved. 28.2 Each party hereto shall give notice promptly to the other of the nature and extent of any Force Majeure claimed to delay, hinder or prevent performance of the services under this Contract. In the event either party is prevented or delayed in the performance of this obligation by reason of such Force Majeure, there shall be an equitable adjustment of the schedule. 28.3 Contractor will not be liable for failure to perform or for delay in performance as a result of Force Majeure, including the following: Attachment number 1 \nPage 11 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 12 of 17 (a) Any cause beyond its reasonable control; (b) Any act of God; (c) Inclement weather; (d) Earthquake; (e) Fire; (f) Explosion; (g) Flood; (h) Strike or other labor dispute; 28.4 Any shortage or disruption of or inability to obtain labor, material, manufacturing facilities, power, fuel or transportation from unusual sources, or any other transportation facility; 28.5 Delay or failure to act of any governmental or military authority; 28.6 Any war, hostility or invasion; 28.7 Any embargo, sabotage, civil disturbance, riot or insurrection; 28.8 Any legal proceedings; or 28.9 Failure to act by Contractor’s suppliers due to any cause which Contractor is not responsible, in whole or in part. ARTICLE XXIV PERMITS 29.1 Contractor shall obtain and maintain at all times all necessary licenses, permits and certifications to perform the work described in the Contract. Contractor shall furnish copies of all licenses, permits, and certifications to the Airport prior to commencement of Work. 29.2 WORK PERMITS REQUIRED Contractor agrees and acknowledges that its employees and agent's employees, as well as any subcontractors or subcontractors' personnel, working on the Contract must be United States citizens, or must be lawfully admitted for residence and be permitted to work in the United States under the Immigration and Naturalization Act, 8 U.S.C. 1101, et seq. ARTICLE XXX AIRPORT SECURITY REQUIREMETS/ SPECIAL IDETIFICATIO DISPLAY AREA (SIDA) BADGES 30. Contractor’s employees may be required to operate in Airport secure areas. Contractor shall be required to obtain the Airport’s Security Identification Display Area (SIDA) badges for any employee working in the secured area. Contractor shall comply, at its own expense, with the Transportation Security Authority (TSA) and the Airport’s security requirements for the Airport including, but not limited to employee training and badging. Contractor shall cooperate with the TSA and the Airport on all security matters and shall promptly comply with any project security arrangements established by the Airport. Compliance with such security requirements shall not relieve Contractor of its responsibility for maintaining proper security for the above-noted items, nor shall it be construed as limiting in any manner Contractor’s obligation with respect to all applicable federal, state and local laws and regulations and its duty to undertake reasonable action to establish and maintain secure conditions at and around the Premises and throughout the Airport. All employees shall be properly badged and comply with all Airport safety and security rules. 30.1 To qualify for the badge, individual must be fingerprinted and have a background investigation completed. In addition, the Airport will conduct a background inquiry and require finger printing of all individuals who will be working on the secured side of the Airport screening point. This may also include collection of appropriate criminal history information, contractual and business associations and practices, employment histories, reputation in the business community and credit reports for the Contractor, as well as, its employees. 30.2 Contractor consents to such an inquiry and agrees to make available to the Airport such books and records the Airport deems necessary to conduct the review. 30.3 Contractor shall pay all costs associated with providing SIDA badges. Attachment number 1 \nPage 12 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 13 of 17 ARTICLE XXXI HAZARDOUS MATERIALS Contractor shall not cause or permit any Hazardous Material to be brought, kept or used in or about the Airport by Contractor, its agents, employees, subcontractors, or invitees. Without limiting the foregoing, if the presence of any Hazardous Material in the Airport caused or permitted by Contractor results in any contamination of the Airport, Contractor shall promptly take all actions at its sole expense as are necessary to return the Airport to the conditions existing prior to the introduction of such Hazardous Material to the Airport; provided that Airport’s approval of such actions, and the corrective actions to be used by Contractor in connection therewith, shall first be obtained. The term “Hazardous Material” means any hazardous or toxic substance, material, or waste, which is or becomes regulated by any local governmental authority or the United States Government. The term “Hazardous Material” includes, without limitation, any material or substance which is (i) defined as a “hazardous waste”, “extremely hazardous waste”, or “restricted hazardous waste” or similar term under any laws now or hereafter enacted by the United States or the State of Georgia or any political subdivision thereof, or (ii) designated a “hazardous substance” pursuant to the Federal Water Pollution Control Act, 33 U.S.C. § 1317, or (iii) defined as a “hazardous waste” pursuant to the Federal Resource Conservation and Recovery Act, 42 U.S.C.§ 6901 et seq., or (iv) defined as a “hazardous substance” pursuant to the Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. § 9601 et seq. ARTICLE XXXII GOODS, PRODUCTS AD MATERIALS 32.1 The Contractor shall furnish goods, products, materials, equipment and systems which: 32..2 Comply with this Contract for; 32.3 Conform to applicable regulations, specifications, descriptions, instructions, data and samples; 32.4 Are new and without damage; 32.5 Are of quality, strength, durability, capacity or appearance equal to or higher than that required by the Contract Documents; 32.6 Are free from defects; and 32.7 Are beyond and in addition to those required by manufacturers' or suppliers' specifications where such additional items are required by the Contract Documents. 32.8 All goods, products, materials, equipment and systems named or described in the Contract Documents, and all others furnished as equal thereto shall, unless specifically stated otherwise, be furnished, used, installed, employed and protected in strict compliance with the specifications, recommendations and instructions of the manufacturer or supplier, unless such specifications, recommendations or instructions deviate from applicable FAA advisory circulars or the Contract Documents, in which case the Contractor shall so inform the City and shall proceed as directed by the City. The Contractor shall coordinate all subcontracts to verify compatibility of goods, products, materials, equipment and systems, and the validity of all warranties and guarantees, required by the Contract Documents. ARTICLE XXXIII PROHIBITIO AGAIST COTIGET FEES The Contractor by execution of this Contract warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for it, to solicit or secure this Contract and that it has not paid or agreed to pay any person, company, corporation, individual, or firm, other than a bona fide employee working solely for it, any fees, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this Contract. ARTICLE XXXIV USE OF AUGUSTA, GEORGIA LADFILL All contracts for Contractors performing demolition and/or construction projects for Augusta, Georgia shall contain a provision requiring that all debris, trash and rubble from the project be transported to and disposed of at the Augusta, Georgia Solid Waste Landfill in accordance with local and state regulations. The Contractor shall provide evidence of proper disposal through manifests, which shall include the types of material disposed of, the name and location of the disposal facility, date of disposal and all related fees. Attachment number 1 \nPage 13 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 14 of 17 ARTICLE XXXV WARRATIES AD CORRECTIO OF WORK 35.1 The Contractor shall guarantee all Work to have been accomplished in conformance with this Contract. Neither the final certificate of payment nor any provision of the Contract, nor partial or entire occupancy or use of the Work by the City, shall constitute an acceptance of any part of the Work not done in accordance with the Contract, or relieve the Contractor of liability for incomplete or faulty materials or workmanship. The Contractor shall promptly remedy any omission or defect in the Work and pay for any damage to other improvements or facilities resulting from such omission or defect which shall appear within a period of one year from the date of final acceptance, unless a longer period is elsewhere specified. In the event that the Contractor should fail to make repairs, adjustments, or other remedy that may be made necessary by such defects, the City may do so and charge the Contractor the cost thereby incurred. The Performance Bond shall remain in full force and effect through the guarantee period. 35.2 The Contractor warrants to the City that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permitted by the Contract, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform to the requirements of the Contract. Work not conforming to these requirements, including substitutions not properly approved and authorized, is considered defective. The City, in its sole discretion, may exclude from the Contractor's warranty, remedies for damage or defect which the City determines were caused by abuse, modifications not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the City, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. All warranties and guaranties shall extend for the greatest of one year commencing on the date of Substantial Completion of the Project or such longer period of time as is required by the Contract. The one year period shall be extended with respect to portions of the Work first performed after Substantial Completion for a period of one year after the actual performance of the Work. If any defect or deviation should exist, develop, be discovered or appear within such one year period, the Contractor, at its sole cost and expense and immediately upon demand, shall fully and completely repair, correct, and eliminate such defect. The foregoing warranties and guarantees are cumulative of and in addition to, and not restrictive of or in lieu of, any and all other warranties and guarantees provided for or required by law. No one or more of the warranties contained herein shall be deemed to alter or limit any other. 35.3 The obligation of this Section shall survive acceptance of the Work and termination of the Contract. All manufacturer warranties and guarantees shall be delivered to the City prior to Substantial Completion and such delivery shall be a condition precedent to the issuance of the Certificate of Substantial Completion. Before Final Payment the Contractor shall assign and transfer to the City all guarantees warranties and agreements from all contractors, Subcontractors, vendors, Suppliers, or manufacturers regarding their performance quality of workmanship or quality of materials supplied in connection with the Work. The Contractor represents and warrants that all such guarantees, warranties and agreements will be freely assignable to the City, and that upon Final Completion of the Work, all such guarantees, warranties and agreements shall be in place and enforceable by the City in accordance with their terms. ARTICLE XXXVI COFLICT I DOCUMETS AD PRESET DOC UMETS The Contractor shall in no case claim a waiver of any specification requirements on the basis of previous approval of material or workmanship on other jobs of like nature or on the basis of what might be considered “standard” for material or workmanship in any particular location. The Contract for this Project shall govern the Work. If any portion of the Contract shall be in conflict with any other portion, the various documents comprising the Contract shall govern in the following order of precedence: Contract, Change Orders or modifications issued after execution of the Contract; the General Requirements of the Contract; the Specifications; the Drawings; as between schedules and information given on the drawings, the schedules shall govern; as between figures given on Drawings and the scaled measurements, the figures shall govern; as between large-scale Drawings and small-scale Drawings, the larger scale shall govern; and detailed drawings shall govern over general drawings; the Bid Document Package. Attachment number 1 \nPage 14 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 15 of 17 ARTICLE XXXVII JUDICIAL ITERPRETATIO Should any provision of this Contract require judicial interpretation, it is agreed that the court interpreting or construing the same shall not apply a presumption that the terms hereof shall be more strictly construed against one party by reason of the rule of construction that a document is to be construed more strictly against the party who itself or through its agent prepared same, it being agreed that the agents of all parties have participated in the preparation hereof and all parties have had an adequate opportunity to consult with legal counsel. ARTICLE GOVERIG LAW This Contract will be construed under Georgia law, including the Georgia Uniform Commercial Code; all remedies available under that code are applicable to this Contract. Contractor and Augusta-Richmond County fix jurisdiction and venue for any action brought with respect to this Contract in Augusta-Richmond County, Georgia. Contractor specifically consents to venue in Richmond County and waives any right to contest the venue in the Superior Court of Richmond County, Georgia or the Southern District Court of Georgia. ARTICLE ETIRE AGREEMET This Contract constitutes the sole Contract between the County and the Contractor. No representations oral or written not incorporated herein shall be binding on the parties. No Change Order, Field Order, amendment or modification of this Contract shall be enforceable unless approved by official action as provided in this Contract. Attached hereto and incorporated herein as part of this Contract are Addendums, Insurance, Statement of Non- Discrimination, Non-Collusion Affidavit of Prime Bidder, Non-Collusion Affidavit of Sub-Contractor(s), Conflict of Interest and Contractor Affidavit and Agreement, Bidder’s Form/Acknowledgement of Addenda, Georgia Security and Immigration Contractor Affidavit and Georgia Security and Immigration Subcontractor Affidavit. ARTICLE COUTERPARTS This Contract may be executed in several counterparts, each of which shall be deemed an original, and all such counterparts together shall constitute one and the same Contract. ARTICLE CAPTIOS The section captions contained in this Contract are for convenience only and do not in any way limit or amplify any term or provision hereof. The use of the terms "hereof," "hereunder" and "herein" shall refer to this Contract as a whole, inclusive of the Attachments, except when noted otherwise. The use of the masculine or neuter genders herein shall include the masculine, feminine and neuter genders and the singular form shall include the plural when the context so requires. ARTICLE FURTHER ACTS City and Contractor each agrees to perform any additional acts and execute and deliver any additional documents as may reasonably be necessary in order to carry out the provisions and effectuate the intent of this Contract. Attachment number 1 \nPage 15 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 16 of 17 I WITESS WHEREOF , the parties hereto have caused this Contract to be executed by their appropriate officials, as of the date first written above. ____________________________ DOUGLAS LIVELY, CHAIRMA AUGUSTA AVIATIO COMMISSIO ATTEST:____________________________ CONTRACTOR AUGUSTA-RICHMOND COUNTY, GA BY:_____________________________ BY:___________________________ TITLE:__________________________ TITLE:________________________ ATTEST: ATTEST: ________________________________ ______________________________ County Clerk ___________________________ City of Augusta General Counsel Reviewed as to form Attachment number 1 \nPage 16 of 17 Item # 12 Contract for Bid 14-180 Rehabilitate Air Carrier and General Aviation Apron Project Page 17 of 17 SECTIO 2.0 GEERAL PROVISIOS, TECHICAL SPECIFICATIOS AD AP PEDICES ATTACHMET A Attachment number 1 \nPage 17 of 17 Item # 12 Invitation to Bid Sealed bids will be received at this office on Friday, July 25, 2014 @ 11:00 a.m. for furnishing: Bid Item 14-180 Rehabilitate Air Carrier & General Aviation Apron for Augusta Regional Airport Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable is $200.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706 722-6488) beginning Thursday, June 12, 2014. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Bid Conference will be held on Wednesday, July 9, 2014, @ 10:00 a.m. in the Procurement Department, 530 Greene Street, Room 200 West. Mandatory site visit to follow. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, July 11, 2014 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Augusta Chronicle June 12, 19, 26, July 3, 2014 Metro Courier June 18, 2014 Revised: 8/15/2011 Attachment number 2 \nPage 1 of 1 Item # 12 UNOFFICIAL Vendors McCARTHY 100 HARTSFIELD PARKWAY STE 140 ATLANTA, GA REEVES CONSTRUCTION CO 1 APAC INDUSTRIAL WAY AUGUSTA GA Attachment B YES YES E-Verify Number 104193 48048 Bid Bond YES YES Addendum 1-2 YES YES SAVE Form YES YES Base Bid - Schedule 1 Total Bid $4,536,300.00 $5,632,357.05 Base Bid - Schedule 2 Total Bid $3,220,570.00 $3,576,122.20 Base Bid - Schedule 3 Total Bid $1,144,430.00 $1,180,207.00 Base Bid - Schedule 4 Total Bid $2,080,217.50 $2,308,288.75 Base Bid - Schedule 5 Total Bid $955,450.00 $626,429.50 Base Bid - Schedule 6 Total Bid $2,600,250.00 $2,268,426.50 Bid Alternative 1 Schedule 7 Total Bid $298,606.00 $167,081.88 Bid Alternative 2 Schedule 8 Total Bid $99,400.00 $84,515.00 Bid Alternative 3 - Schedule 9 Total Bid $539,900.00 $405,061.00 Bid Alternative 4 - Schedule 1 Total Bid $4,692,307.50 $5,480,042.75 Bid Alternative 5 - Schedule 4 Total Bid $1,456,540.00 $1,563,537.00 Bid Alternative 6 - Schedule 2 Total Bid $1,769,500.00 $2,326,731.50 Bid Alternative 6 - Schedule 6 Total Bid $993,600.00 $726,293.70 TOTAL BID $24,387,071.00 $26,345,093.83 The following vendors did not respond: PITTMAN CONSTRUCTION / 1487 FARMER ROAD / CONVERS GA GRIFFIN FOLSOM / P.O. BOX 682 / CORDELE, GA THE SCRUGGS CO / PO BOX 2065 / VALDOSTA GA ER SNELL CONTRUCTION / 5102 PIERCE COURT / EVANS GA 30809 Bid Item #14-180 Rehabilitate Air Carrier & General Aviation Apron for Augusta, GA - Augusta Regional Airport Bid Opening Date: Tuesday August 5, 2014 @ 3:00 p.m. Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 12 @ Regional Airport (106)798-3236 . (706) 798-1551 .l50l Aviation way ' Augusta, Georgia 30906 . www.AugustaRegionalAirport.com October L4,2014 Ms. Geri Sams Director of Procurement Augusta Richmond County 530 Greene Street, Room 605 Augusta, GA 30901 '14 fief ?S filr3.*:dl RE: Letter of Recommendation - McCarthy Improvement Company Rehabilitate Air Carrier & General Aviation Apron Project for Augusta Regional Airport - Bid Item 14-180 Dear Ms. Sams: We received two (2) compliant responses to the solicitation regarding the airport's Rehabilitate Air Carrier & General Aviation Apron Project. McCarthy Improvement Company was the apparent low bidder with a total amount of $24,387,071.00 which includes the base bid plus all alternates. Due to funds availability, we will award only that Schedules l, 3, 5, Bid Alternative I - Schedule 7, and Bid Alternative 2 - Schedule 8 to McCarthy Improvement Company in the amount of $7,034,186.00. The bid amount for the Schedules and Bid Alternative noted above is within the budgeted amount and reasonable considering the confining conditions for the project construction. This combination of schedules has been discussed with McCarthy Improvement Company and they have stated that they will hold their original bid prices for this approach. McCarthy Improvement Company's total for this combination of schedules is also lower than the other bid of $7,690,5 90.43 received by Reeves Construction Company for the same combination of schedules. The unit costs for each of the items and the overall project cost are in line with costs for similar projects in the region. After evaluating the costs for this work, we believe that it is an appropriate amount for the work involved. We also believe that awarding Schedules 1,3, 5, Bid Alternative 1, and Bid Alternative 2 - Schedule 8 is in the best interests of the Airport and Augusta-Richmond County as rebidding would likely result in a similarly priced project and only serve to delay construction. Attachment number 4 \nPage 1 of 2 Item # 12 Thank you for your assistance in this process. If you have any questions or require any additional information, please do not hesitate to contact me. Sincerely, Augusta Aviation Commission eugtrsA Regional Airport tH*G,-' c*v fr. Le Tellier. AAE Executive Director Phyllis Mills, Quality Assurance Analyst Darrell White, Bids & Contract Specialist Clarence Fennell, PE C: Attachment number 4 \nPage 2 of 2 Item # 12 October 10, 2014 Mr. Clarence J. Fennell, P.E. Director of Engineering and Maintenance Augusta Regional Airport 1501 Aviation Way Augusta, Georgia 30906 Re: Rehabilitate Air Carrier and General Aviation Apron Augusta, Georgia Dear Mr. Fennell: Mead and Hunt, Inc. has reviewed the response to the advertisement for bids (IFB 14-180) for this project. Based on that review, we recommend that Schedules 1, 3, 5, Bid Alternative – Schedule 7, and Bid Alternative 2 – Schedule 8 be awarded to McCarthy Improvement Company in the amount of $7,034,186.00. The bid amount for the Schedules and Bid Alternative noted above is within the budgeted amount and reasonable considering the confining conditions for the project construction. This combination of schedules has been discussed with McCarthy Improvement Company and they have stated that they will hold their original bid prices for this approach. McCarthy Improvement Company’s total for this combination of schedules is also lower than the other bid of $7,690,590.43 received by Reeves Construction Company for the same combination of schedules. The unit costs for each of the items and the overall project cost are in line with costs for similar projects in the region. After evaluating the costs for this work, we believe that it is an appropriate amount for the work involved. We also believe that awarding Schedules 1, 3, 5, Bid Alternative 1, and Bid Alternative 2 – Schedule 8 is in the best interests of the Airport and Augusta-Richmond County as rebidding would likely result in a similarly priced project and only serve to delay construction. Should you have any questions concerning this matter, please do not hesitate to contact us at your earliest convenience. Sincerely, MEAD & HUNT, INC. Christopher J. Birkmeyer Project Manager, Aviation Services Attachment number 5 \nPage 1 of 1 Item # 12 Consultant: Mead & Hunt Bid Date: 7/25/2014 Bid Time: DBE Goals: 9.8% SCHEDULE 1 SPEC. NO.Bid Item Description Bid Quantity Revised Quantity Unit Unit $ Total Unit $ Total Unit $ Total P-100.1 MOBILIZATION, CLEANUP, AND DEMOBILIZATION 11LS1,435,715.00 1,435,715.00 427,000.00 427,000.00 0.00 SP-10-1 AIRFIELD SAFETY AND TRAFFIC CONTROL 11LS590,430.00 590,430.00 1,500,000.00 1,500,000.00 0.00 P-101.1 ASPHALT CONCRETE PAVEMENT REMOVAL, FULL DEPTH 21500 8240 SY 8.07 66,496.80 9.25 76,220.00 0.00 P-101.2 PCC PAVEMENT DEMOLITION AND REMOVAL 125 125 SY 123.59 15,448.75 15.00 1,875.00 0.00 X-105.5 REMOVE PAVEMENT MARKINGS 4700 4700 SF 4.73 22,231.00 7.50 35,250.00 0.00 P-152.1 UNCLASSIFIED EXCAVATION-BELOW PAVEMENT SECTION 15900 8152 CY 14.87 121,220.24 16.75 136,546.00 0.00 P-152.2 SELECT FILL 13200 5515 CY 16.44 90,666.60 13.75 75,831.25 0.00 P-156.1 SILT FENCE-TYPE C 10700 1070 LF 5.91 6,323.70 3.00 3,210.00 0.00 P-156.3 INLET SEDIMENT TRAP-SILT SAVER 44EA625.00 2,500.00 500.00 2,000.00 0.00 P-156.4 INLET SEDIMENT TRAP-SILT SACK 15 15 EA 300.00 4,500.00 250.00 3,750.00 0.00 P-156.5 CRUSHED STONE CONSTRUCTION OUTLET 22EA1,910.00 3,820.00 3,000.00 6,000.00 0.00 P-156.6 EROSION CONTROL MOBILIZATION 11EA8,840.00 8,840.00 1,000.00 1,000.00 0.00 P-156.7 EMERGENCY EROSION CONTROL MOBILIZATION 11EA1,685.00 1,685.00 1,000.00 1,000.00 0.00 P-209.1 CRUSHED AGGREGATE BASE COURSE 19500 8020 EA 13.92 111,638.40 8.50 68,170.00 0.00 P-301.1 SOIL-CEMENT BASE COURSE 700 95 SY 70.14 6,663.30 81.00 7,695.00 0.00 P-310.1 GEOTEXTILE FABRIC 19500 8020 SY 1.66 13,313.20 1.25 10,025.00 0.00 P-310.2 GEOGRID 19500 8020 SY 2.67 21,413.40 3.00 24,060.00 0.00 P-401.1 ASPHATL CONCRETE SURFACE COURSE 180 430 SY 141.66 60,913.80 155.00 66,650.00 0.00 P-401.2 ASPHALT CONCRETE BASE COURSE 1200 181 TON 116.22 21,035.82 125.00 22,625.00 0.00 P-501.1 PORTLAND CEMENT CONCRETE PAVEMENT (8")650 285 SY 133.24 37,973.40 130.00 37,050.00 0.00 P-501.2 PORTLAND CEMENT CONCRETE PAVEMENT (11")5400 0 SY 111.00 0.00 56.50 0.00 0.00 P-501.3 PORTLAND CEMENT CONCRETE PAVEMENT (14"12000 7735 SY 111.00 858,585.00 64.75 500,841.25 0.00 X-501.1 PORTLAND CMENET CONCRETE CURING FACILITY 11LS69,750.00 69,750.00 28,500.00 28,500.00 0.00 P-620.1 TEMPORARY RUNWAY AND TAXIWAY PAINTING (WHITE, YELLOW, BLACK)250 250 SF 5.91 1,477.50 9.50 2,375.00 0.00 P-620.2 PERMANENT PAVEMENT MARKINGS (WHITE, YELLOW, BALCK, RED)2600 2600 SF 8.87 23,062.00 14.25 37,050.00 0.00 D-701.1 CONCRETE SEWER PIPE, 36-INCH, CLASS V 450 0 LF 142.68 0.00 107.00 0.00 0.00 D-705.1 6-INCH PERFORATED POLYEHTYLENE PIPE, SCHEDULE 80 900 572 LF 44.13 25,242.36 48.50 27,742.00 0.00 D-751.2 CATCH BASIN, TYPE I 10EA10,065.00 0.00 3,000.00 0.00 0.00 D-751.3 CATCH BASIN, TYPE II 10EA10,065.00 0.00 3,000.00 0.00 0.00 D-751.4 CLEANOUT, TYPE I 12EA775.00 1,550.00 1,025.00 2,050.00 0.00 D-751.5 CLEANOUT, TYPE II 93EA705.00 2,115.00 1,150.00 3,450.00 0.00 T-901.1 GRASSING AND MULCHING 11LS5,950.00 5,950.00 25,000.00 25,000.00 0.00 T-905.1 IMPORT TOPSOIL 11LS4,950.00 4,950.00 1,000.00 1,000.00 0.00 F-162.1 CHAIN LINK FENCE 1200 1200 LF 24.00 28,800.00 19.00 22,800.00 0.00 F-162.4 DOUBLE SWING GATE 33EA1,300.00 3,900.00 1,300.00 3,900.00 0.00 Reeves Construction Co. McCarthy Tabulation of Bids 3,668,210.27 Base Bid: Reconstruct Portion of Air Carrier and General Aviation Apron Pavement DESCRIPTION: Project Manager: Airport: Bid for: Augusta Regional Airport GDOT PI #0011399 Rehabilitate Portion of Air Carrier and GA Apron Pavement Schedule 1: Full Depth PCC between ACA and FBO Terminal Project: Chris Birkmeyer 0.00TOTAL SCHEDULE 1 BID 3,160,665.50 Alternate 5: 3" AC Mill/Fill North of ACA Terminal Schedule 3: Full Depth PCC East of ACA Terminal Schedule 5: Full Depth AC and Mill/Fill East of ACA Terminal Alternate 1: Schedule 7: Fuel Containment Pad Alternate 2: Schedule 8: New Security Gates Page 1 of 6 9/4/2014 At t a c h m e n t n u m b e r 6 \ n P a g e 1 o f 6 It e m # 1 2 Consultant: Mead & Hunt Bid Date: 7/25/2014 Bid Time: DBE Goals: 9.8% Reeves Construction Co. McCarthy Tabulation of Bids Base Bid: Reconstruct Portion of Air Carrier and General Aviation Apron Pavement DESCRIPTION: Project Manager: Airport: Bid for: Augusta Regional Airport GDOT PI #0011399 Rehabilitate Portion of Air Carrier and GA Apron Pavement Schedule 1: Full Depth PCC between ACA and FBO Terminal Project: Chris Birkmeyer Alternate 5: 3" AC Mill/Fill North of ACA Terminal Schedule 3: Full Depth PCC East of ACA Terminal Schedule 5: Full Depth AC and Mill/Fill East of ACA Terminal Alternate 1: Schedule 7: Fuel Containment Pad Alternate 2: Schedule 8: New Security Gates SCHEDULE 3 SPEC. NO.Bid Item Description Bid Quantity Revised Quantity Unit Unit $ Total Unit $ Total Unit $ Total P-100.1 MOBILIZATION, CLEANUP, AND DEMOBILIZATION 1 LS 142,825.00 142,825.00 110,000.00 110,000.00 0.00 SP-10-1 AIRFIELD SAFETY AND TRAFFIC CONTROL 1 LS 93,305.00 93,305.00 427,500.00 427,500.00 0.00 P-101.1 ASPHALT CONCRETE PAVEMENT REMOVAL, FULL DEPTH 5000 SY 6.28 31,400.00 8.00 40,000.00 0.00 P-101.2 PCC PAVEMENT DEMOLITION AND REMOVAL 235 SY 92.38 21,709.30 20.00 4,700.00 0.00 P-152.1 UNCLASSIFIED EXCAVATION-BELOW PAVEMENT SECTION 3500 CY 19.96 69,860.00 14.25 49,875.00 0.00 P-152.2 SELECT FILL 2800 CY 18.02 50,456.00 14.75 41,300.00 0.00 P-156.6 EROSION CONTROL MOBILIZATION 1 EA 3,475.00 3,475.00 1,000.00 1,000.00 0.00 P-156.7 EMERGENCY EROSION CONTROL MOBILIZATION 1 EA 1,685.00 1,685.00 1,000.00 1,000.00 0.00 P-209.1 CRUSHED AGGREGATE BASE COURSE 4000 EA 15.71 62,840.00 8.50 34,000.00 0.00 P-301.1 SOIL-CEMENT BASE COURSE 850 SY 59.32 50,422.00 45.00 38,250.00 0.00 P-310.1 GEOTEXTILE FABRIC 4000 SY 1.66 6,640.00 1.25 5,000.00 0.00 P-310.2 GEOGRID 4000 SY 2.67 10,680.00 3.00 12,000.00 0.00 P-401.1 ASPHATL CONCRETE SURFACE COURSE 230 SY 162.67 37,414.10 180.00 41,400.00 0.00 P-401.2 ASPHALT CONCRETE BASE COURSE 320 TON 126.15 40,368.00 140.00 44,800.00 0.00 P-501.3 PORTLAND CEMENT CONCRETE PAVEMENT (14"4000 SY 114.37 457,480.00 65.50 262,000.00 0.00 X-501.1 PORTLAND CMENET CONCRETE CURING FACILITY 1 LS 69,750.00 69,750.00 1,725.00 1,725.00 0.00 D-705.1 6-INCH PERFORATED POLYEHTYLENE PIPE, SCHEDULE 80 480 LF 44.12 21,177.60 48.50 23,280.00 0.00 D-751.1 60-INCH MANHOLE 1 EA 7,240.00 7,240.00 4,450.00 4,450.00 0.00 D-751.4 CLEANOUT, TYPE I 1 EA 775.00 775.00 1,025.00 1,025.00 0.00 D-751.5 CLEANOUT, TYPE II 1 EA 705.00 705.00 1,125.00 1,125.00 0.00 1,180,207.00 1,144,430.00 0.00TOTAL SCHEDULE 3 BID Page 2 of 6 9/4/2014 At t a c h m e n t n u m b e r 6 \ n P a g e 2 o f 6 It e m # 1 2 Consultant: Mead & Hunt Bid Date: 7/25/2014 Bid Time: DBE Goals: 9.8% Reeves Construction Co. McCarthy Tabulation of Bids Base Bid: Reconstruct Portion of Air Carrier and General Aviation Apron Pavement DESCRIPTION: Project Manager: Airport: Bid for: Augusta Regional Airport GDOT PI #0011399 Rehabilitate Portion of Air Carrier and GA Apron Pavement Schedule 1: Full Depth PCC between ACA and FBO Terminal Project: Chris Birkmeyer Alternate 5: 3" AC Mill/Fill North of ACA Terminal Schedule 3: Full Depth PCC East of ACA Terminal Schedule 5: Full Depth AC and Mill/Fill East of ACA Terminal Alternate 1: Schedule 7: Fuel Containment Pad Alternate 2: Schedule 8: New Security Gates SCHEDULE 5 SPEC. NO.Bid Item Description Bid Quantity Revised Quantity Unit Unit $ Total Unit $ Total Unit $ Total P-100.1 MOBILIZATION, CLEANUP, AND DEMOBILIZATION 1 LS 45,675.00 45,675.00 90,000.00 90,000.00 0.00 SP-10-1 AIRFIELD SAFETY AND TRAFFIC CONTROL 1 LS 66,160.00 66,160.00 293,000.00 293,000.00 0.00 P-101.1 ASPHALT CONCRETE PAVEMENT REMOVAL, FULL DEPTH 3200 SY 10.21 32,672.00 8.00 25,600.00 0.00 P-101.3 MILLING AND SURFACE PREP FOR OVERLAY 3100 SY 7.08 21,948.00 11.00 34,100.00 0.00 X-105.5 REMOVE PAVEMENT MARKINGS 550 SF 4.73 2,601.50 19.00 10,450.00 0.00 P-152.1 UNCLASSIFIED EXCAVATION-BELOW PAVEMENT SECTION 900 CY 32.20 28,980.00 18.00 16,200.00 0.00 P-156.6 EROSION CONTROL MOBILIZATION 1 EA 3,475.00 3,475.00 1,000.00 1,000.00 0.00 P-156.7 EMERGENCY EROSION CONTROL MOBILIZATION 1 EA 1,685.00 1,685.00 1,000.00 1,000.00 0.00 P-301.1 SOIL-CEMENT BASE COURSE 3050 SY 23.48 71,614.00 26.00 79,300.00 0.00 P-401.1 ASPHATL CONCRETE SURFACE COURSE 1500 SY 123.42 185,130.00 140.00 210,000.00 0.00 P-401.2 ASPHALT CONCRETE BASE COURSE 1100 TON 107.94 118,734.00 120.00 132,000.00 0.00 X-107.1 PAVING FABRIC 2900 SY 12.39 35,931.00 12.00 34,800.00 0.00 P-620.1 TEMPORARY RUNWAY AND TAXIWAY PAINTING (WHITE, YELLOW, BLACK)800 SF 5.91 4,728.00 17.00 13,600.00 0.00 P-620.2 PERMANENT PAVEMENT MARKINGS (WHITE, YELLOW, BALCK, RED)800 SF 8.87 7,096.00 18.00 14,400.00 0.00 626,429.50 955,450.00TOTAL SCHEDULE 5 BID 0.00 Page 3 of 6 9/4/2014 At t a c h m e n t n u m b e r 6 \ n P a g e 3 o f 6 It e m # 1 2 Consultant: Mead & Hunt Bid Date: 7/25/2014 Bid Time: DBE Goals: 9.8% Reeves Construction Co. McCarthy Tabulation of Bids Base Bid: Reconstruct Portion of Air Carrier and General Aviation Apron Pavement DESCRIPTION: Project Manager: Airport: Bid for: Augusta Regional Airport GDOT PI #0011399 Rehabilitate Portion of Air Carrier and GA Apron Pavement Schedule 1: Full Depth PCC between ACA and FBO Terminal Project: Chris Birkmeyer Alternate 5: 3" AC Mill/Fill North of ACA Terminal Schedule 3: Full Depth PCC East of ACA Terminal Schedule 5: Full Depth AC and Mill/Fill East of ACA Terminal Alternate 1: Schedule 7: Fuel Containment Pad Alternate 2: Schedule 8: New Security Gates ALTERNATE 1: SCHEDULE 7 SPEC. NO.Bid Item Description Bid Quantity Revised Quantity Unit Unit $ Total Unit $ Total Unit $ Total P-100.1 MOBILIZATION, CLEANUP, AND DEMOBILIZATION 1 LS 43,400.00 43,400.00 28,000.00 28,000.00 0.00 SP-10-1 AIRFIELD SAFETY AND TRAFFIC CONTROL 1 LS 24,750.00 24,750.00 160,000.00 160,000.00 0.00 P-101.1 ASPHALT CONCRETE PAVEMENT REMOVAL, FULL DEPTH 550 SY 9.57 5,263.50 8.00 4,400.00 0.00 P-156.6 EROSION CONTROL MOBILIZATION 1 EA 1,700.00 1,700.00 1,000.00 1,000.00 0.00 P-156.7 EMERGENCY EROSION CONTROL MOBILIZATION 1 EA 1,685.00 1,685.00 1,000.00 1,000.00 0.00 P-209.1 CRUSHED AGGREGATE BASE COURSE 500 SY 16.34 8,170.00 10.00 5,000.00 0.00 P-501.1 PORTLAND CEMENT CONCRETE PAVEMENT (8")500 SY 151.39 75,695.00 157.00 78,500.00 0.00 P-501.3 PORTLAND CEMENT CONCRETE PAVEMENT (14"18 SY 177.41 3,193.38 317.00 5,706.00 0.00 X-109 FUELD CONTAINMENT PIPING 1 EA 3,225.00 3,225.00 15,000.00 15,000.00 0.00 298,606.00167,081.88TOTAL ALTERNATE 1: SCHEDULE 7 BIID 0.00 Page 4 of 6 9/4/2014 At t a c h m e n t n u m b e r 6 \ n P a g e 4 o f 6 It e m # 1 2 Consultant: Mead & Hunt Bid Date: 7/25/2014 Bid Time: DBE Goals: 9.8% Reeves Construction Co. McCarthy Tabulation of Bids Base Bid: Reconstruct Portion of Air Carrier and General Aviation Apron Pavement DESCRIPTION: Project Manager: Airport: Bid for: Augusta Regional Airport GDOT PI #0011399 Rehabilitate Portion of Air Carrier and GA Apron Pavement Schedule 1: Full Depth PCC between ACA and FBO Terminal Project: Chris Birkmeyer Alternate 5: 3" AC Mill/Fill North of ACA Terminal Schedule 3: Full Depth PCC East of ACA Terminal Schedule 5: Full Depth AC and Mill/Fill East of ACA Terminal Alternate 1: Schedule 7: Fuel Containment Pad Alternate 2: Schedule 8: New Security Gates ALTERNATE 2: SCHEDULE 8 SPEC. NO.Bid Item Description Bid Quantity Revised Quantity Unit Unit $ Total Unit $ Total Unit $ Total P-100.1 MOBILIZATION, CLEANUP, AND DEMOBILIZATION 1 LS 10,410.00 10,410.00 6,000.00 6,000.00 0.00 SP-10-1 AIRFIELD SAFETY AND TRAFFIC CONTROL 1 LS 18,530.00 18,530.00 41,000.00 41,000.00 0.00 X-105.3 REMOVE CHAIN-LINK FENCE 40 LF 24.00 960.00 10.00 400.00 0.00 X-105.4 REMOVE SWING ARM GATE AND CONTROLLER 2 EA 890.00 1,780.00 5,000.00 10,000.00 0.00 P-156.6 EROSION CONTROL MOBILIZATION 1 EA 1,685.00 1,685.00 1,000.00 1,000.00 0.00 P-156.7 EMERGENCY EROSION CONTROL MOBILIZATION 1 EA 1,685.00 1,685.00 1,000.00 1,000.00 0.00 F-162.1 CHAIN LINK FENCE 40 LF 24.00 960.00 50.00 2,000.00 0.00 F-162.2 14' CANTILEVER GATE 1 EA 23,800.00 23,800.00 18,000.00 18,000.00 0.00 F-162.3 18' CANTILEVER GATE 1 EA 24,705.00 24,705.00 20,000.00 20,000.00 0.00 F-162.4 DOUBLE SWING GATE 0 EA 0.00 0.00 0.00 0.00 0.00 X-109 FUELD CONTAINMENT PIPING 0 EA 0.00 0.00 0.00 0.00 0.00 84,515.00 99,400.00TOTAL ALTERNATE 2: SCHEDULE 8 BID 0.00 Page 5 of 6 9/4/2014 At t a c h m e n t n u m b e r 6 \ n P a g e 5 o f 6 It e m # 1 2 Consultant: Mead & Hunt Bid Date: 7/25/2014 Bid Time: DBE Goals: 9.8% Reeves Construction Co. McCarthy Tabulation of Bids Base Bid: Reconstruct Portion of Air Carrier and General Aviation Apron Pavement DESCRIPTION: Project Manager: Airport: Bid for: Augusta Regional Airport GDOT PI #0011399 Rehabilitate Portion of Air Carrier and GA Apron Pavement Schedule 1: Full Depth PCC between ACA and FBO Terminal Project: Chris Birkmeyer Alternate 5: 3" AC Mill/Fill North of ACA Terminal Schedule 3: Full Depth PCC East of ACA Terminal Schedule 5: Full Depth AC and Mill/Fill East of ACA Terminal Alternate 1: Schedule 7: Fuel Containment Pad Alternate 2: Schedule 8: New Security Gates ALTERNATE 5 SPEC. NO.Bid Item Description Bid Quantity Revised Quantity Unit Unit $ Total Unit $ Total Unit $ Total P-100.1 MOBILIZATION, CLEANUP, AND DEMOBILIZATION 1 LS 316,660.00 316,660.00 140,000.00 140,000.00 0.00 SP-10-1 AIRFIELD SAFETY AND TRAFFIC CONTROL 1 LS 153,715.00 153,715.00 440,000.00 440,000.00 0.00 P-101.1 ASPHALT CONCRETE PAVEMENT REMOVAL, FULL DEPTH 2700 SY 8.04 21,708.00 13.00 35,100.00 0.00 P-101.2 PCC PAVEMENT DEMOLITION AND REMOVAL 145 SY 103.61 15,023.45 18.00 2,610.00 0.00 P-101.3 MILLING AND SURFACE PREP FOR OVERLAY 9800 SY 6.35 62,230.00 3.00 29,400.00 0.00 X-105.1 REMOVE STORM SEWER 450 LF 90.17 40,576.50 33.00 14,850.00 0.00 X-105.2 REMOVE CATCH BASIN / INLET 2 EA 1,225.00 2,450.00 1,025.00 2,050.00 0.00 P-152.1 UNCLASSIFIED EXCAVATION-BELOW PAVEMENT SECTION 1500 CY 23.06 34,590.00 14.00 21,000.00 0.00 P-152.2 SELECT FILL 50 CY 68.50 3,425.00 14.00 700.00 0.00 P-156.2 SILT FENCE-COMPOST FILTER SOCK 500 LF 16.95 8,475.00 3.00 1,500.00 0.00 P-156.6 EROSION CONTROL MOBILIZATION 1 EA 86,550.00 86,550.00 1,000.00 1,000.00 0.00 P-156.7 EMERGENCY EROSION CONTROL MOBILIZATION 1 EA 1,685.00 1,685.00 1,000.00 1,000.00 0.00 P-209.1 CRUSHED AGGREGATE BASE COURSE 2300 EA 16.24 37,352.00 8.50 19,550.00 0.00 P-301.1 SOIL-CEMENT BASE COURSE 235 SY 210.65 49,502.75 125.00 29,375.00 0.00 P-310.1 GEOTEXTILE FABRIC 2300 SY 1.67 3,841.00 1.25 2,875.00 0.00 P-310.2 GEOGRID 2300 SY 2.70 6,210.00 3.00 6,900.00 0.00 P-401.1 ASPHATL CONCRETE SURFACE COURSE 2650 SY 125.11 331,541.50 140.00 371,000.00 0.00 P-401.2 ASPHALT CONCRETE BASE COURSE 80 TON 107.60 8,608.00 120.00 9,600.00 0.00 X-107.1 PAVING FABRIC 9800 SY 8.21 80,458.00 8.00 78,400.00 0.00 P-501.1 PORTLAND CEMENT CONCRETE PAVEMENT (8")2300 SY 110.65 254,495.00 71.75 165,025.00 0.00 X-501.1 PORTLAND CMENET CONCRETE CURING FACILITY 1 LS 69,750.00 69,750.00 1,725.00 1,725.00 0.00 P-620.1 TEMPORARY RUNWAY AND TAXIWAY PAINTING (WHITE, YELLOW, BLACK)160 SF 5.91 945.60 52.00 8,320.00 0.00 P-620.2 PERMANENT PAVEMENT MARKINGS (WHITE, YELLOW, BALCK, RED)110 SF 8.87 975.70 76.00 8,360.00 0.00 D-705.1 6-INCH PERFORATED POLYEHTYLENE PIPE, SCHEDULE 80 650 LF 44.13 28,684.50 48.50 31,525.00 0.00 D-751.1 60-INCH MANHOLE 1 EA 7,280.00 7,280.00 4,450.00 4,450.00 0.00 D-751.4 CLEANOUT, TYPE I 4 EA 775.00 3,100.00 1,025.00 4,100.00 0.00 D-751.5 CLEANOUT, TYPE II 1 EA 705.00 705.00 1,125.00 1,125.00 0.00 T-901.1 GRASSING AND MULCHING 1 LS 5,950.00 5,950.00 5,000.00 5,000.00 0.00 T-905.1 IMPORT TOPSOIL 1 LS 4,950.00 4,950.00 20,000.00 20,000.00 0.00 TOTAL BID 7,367,880.65$ 7,115,091.50$ 1,641,437.00 1,456,540.00TOTAL ALTERNATE 5 BID 0.00 Page 6 of 6 9/4/2014 At t a c h m e n t n u m b e r 6 \ n P a g e 6 o f 6 It e m # 1 2 Attachment number 7 \nPage 1 of 4 Item # 12 Attachment number 7 \nPage 2 of 4 Item # 12 Attachment number 7 \nPage 3 of 4 Item # 12 Attachment number 7 \nPage 4 of 4 Item # 12