HomeMy WebLinkAbout2014-11-10-Meeting Agenda
Public Service Committee Meeting Commission Chamber- 11/10/2014- 1:00 PM
PUBLIC SERVICES
1. Approve the Resolution authorizing the Airport Executive
Director and Airport Finance Director take all necessary
actions to redeem the required services and all required
resolutions or ordinance amendments to conduct the
redemption of the below listed bonds as approved by the
Augusta Aviation Commission at their October 30, 2014
meeting.
Attachments
2. New Ownership Application: A.N. 14-43: A request by Kyung
Hee No for a retail package Beer & Wine License to be used in
connection with Juno & Jaehee, Inc. located at 1713 M L King
Blvd. Commission District 2 Super District 9.
Attachments
3. New Ownership Application: A. N. 44: A request by Aritiben
Vijaybhai Patel for a retail package Liquor License to be used
in connection with Inwood Spirits located at 2940 Inwood
Drive Ste B. Commission District 5. Super District 9.
Attachments
4. New Ownership Application: A.N. 14-45: A request by
Aratiben Vijaybhai Patel for a retail package Beer & Wine
License to be used in connection with Mahakali Food Store,
located at 2940 Inwood Dr. Commission District 5. Super
District 9.
Attachments
5. New Application: A.N. 14-46: A request by Lawanda Pugh for
an on premise consumption Liquor, Beer, & Wine License to
be used in connection with Cosmos located at 980 Broad St.
There will be Dance. Commission District 1. Super
District 9.
Attachments
6. New Application: A.N. 14-47: A request by James R. Key for
an on premise consumption Liquor, Beer, & Wine License to
be used in connection with Executive Inn located at 1238
Gordon Hwy. There will be Dance. There will be Sunday
Attachments
Sales. Commission Disrtict 1. Super District 9.
7. New Ownership Application: A.N. 14-48: A request by Clay
C. Mingus for an on premise consumption Liquor, Beer &
Wine License to be used in connection with Twin Peaks
Augusta located at 277 Robert C. Daniel Pkwy. There will be
Sunday Sales. Commission District 3. Super District 10.
Attachments
8. Discussion: A request by the Planning & Development
Department to renew all of the existing alcohol beverage
licenses, and licenses for the adult entertainment
establishments, amusement arcades, adult bookstores, and
dance halls in the City of Augusta. Districts 1 thru 8. Super
Districts 9 and 10.
Attachments
9. Motion to approve the Christman Company, Construction
Manager at Risk Contract for the Augusta, Georgia Transit
Operation and Maintenance Facility on Highway 56.
Attachments
10. Dedication of Advance Voting Center and Community Room
in honor of Linda W. Beazley.
Attachments
11. Motion to approve and authorize the execution of an Augusta
and the Board of Education jointly purchased a tract of land on
Highway 56 in June, 2009 for a common maintenance
facility. However, in order to utilize FTA grants to improve the
site for a bus maintenance facility, Augusta must solely own
the tract of land where the grants will be used. The BOE has
agreed to convey its half interest in the tract where Augusta
will relocate its bus maintenance facility. To reallocate the
ownership of the land and to account for investments by the
parties in the joint property, an Intergovernmental Agreement
must be executed between the parties and the Mayor and Clerk
of Commission need to be authorized to accept the deed from
the BOE regarding the allocation of ownership of the Highway
56 Bus Barn property by the Mayor and Clerk of Commission
and to authorize the Mayor to accept a deed from the Board of
Education conveying its half interest in the 8.06 acre tract
where Augusta is to relocate its bus maintenance facility.
Attachments
12. Determine the language for the sign at the New Entrance for
the Augusta, Georgia Municipal Building.
Attachments
www.augustaga.gov
13. Motion to approve the minutes of the Public Services
Committee held on October 27, 2014.
Attachments
14. Discussion: A request by Jason Voulgaris for a Therapuetic
Massage Operators license to be used in connection with AA
Massage located at 3540 Wheeler Rd. District 3. Super District
10.
Attachments
Public Service Committee Meeting
11/10/2014 1:00 PM
2005 AUGUSTA REGIONAL AIRPORT BONDS SERIES A, B & C REDEMPTION AND
DEFEASANCE
Department:Augusta Regional Airport
Caption:Approve the Resolution authorizing the Airport Executive
Director and Airport Finance Director take all necessary actions to
redeem the required services and all required resolutions or
ordinance amendments to conduct the redemption of the below
listed bonds as approved by the Augusta Aviation Commission at
their October 30, 2014 meeting.
Background:In 2005, Augusta-Richmond County and the Augusta Aviation
Commission authorized the issuance of bonds not to exceed
$14,500,000 aggregate principal amount of its Airport Passenger
Facility Charge and General Revenue Bonds, Series A (Non-
AMT) (the "Series 2005A Bonds") and Series B (AMT) (the
"Series 2005B Bonds"; the Series 2005A Bonds and the Series
2005B Bonds are sometimes collectively referred to as the "Series
2005A/B Bonds") and a third not to exceed $7,000,000 aggregate
principal amount of its Airport General Revenue Bonds, Series C
(the "Series 2005C Bonds" and, together with the Series 2005A/B
Bonds, the "Series 2005 Bonds").
Analysis:The Bond covenants require the bonds to be redeemed and
provide that the first Optional Redemption can take place
beginning January 1, 2015. Based upon a preliminary financial
analysis conducted by staff, we believe that it is in the best interest
of the Augusta Aviation Commission to redeem the Bonds during
2015 due to the current market conditions and the Airport’s
financial position. The Airport needs to engage the services of the
County’s Bond Counsel; Financial advisor company and other
consultants as necessary to conduct the required due diligence.
The expenses for this refunding would be known as bond
refunding issuance expenses and be incorporated into the
aggregate amount of the new bonds being issued. A resolution
authorizing staff to proceed with this process is attached.
Financial Impact:Preliminary Feaseability estimated annual savings of $578,534.74.Cover Memo
Item # 1
Alternatives:Deny request.
Recommendation:Approve the Resolution authorizing the Airport Executive
Director and the Airport Director of Finance to take all necessary
actions to redeem the Series 2005A, Series 205B, and the Series
2005 C Bonts.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 1
STATE OF GEORGIA
RICHMOD COUTY
RESOLUTIO O. -______
A RESOLUTIO BY THE AUGUSTA, GEORGIA AVIATIO
COMMISSIO TO AUTHORIZE THE EXECUTIVE DIRECTOR
AD THE DIRECTOR OF FIACE TO TAKE ALL ECESSARY
ACTIOS TO REDEEM THE SERIES 2005A (O-AMT), SERIE S
2005B (AMT) AD THE "SERIES 2005C BODS" (THE "SERI ES
2005 BODS"); TO PROVIDE FOR A EFFECTIVE DATE AD
FOR OTHER PURPOSES.
WHEREAS, the Master Bond Resolution (the "Master Bond Resolution") and
the First Supplemental Bond Resolution (the "First Supplemental Bond Resolution") for
the Augusta Aviation Airport was adopted by the Augusta-Richmond County
Commission on February 1, 2005 and by the Augusta Aviation Commission on January
20, 2005, authorizing the issuance of bonds not to exceed $14,500,000 aggregate
principal amount of its Airport Passenger Facility Charge and General Revenue Bonds,
Series 2005A (Non-AMT) (the "Series 2005A Bonds") and Series 2005B (AMT) (the
"Series 2005B Bonds"; the Series 2005A Bonds and the Series 2005B Bonds are
sometimes collectively referred to as the "Series 2005A/B Bonds") and its not to exceed
$7,000,000 aggregate principal amount of its Airport General Revenue Bonds, Series
2005C (the "Series 2005C Bonds" and, together with the Series 2005A/B Bonds, the
"Series 2005 Bonds"); and
WHEREAS, the Bonds are required to be redeemed and provide that the first
Optional Redemption can take place beginning January 1, 2015; and
WHEREAS, it is in the best interest of the Airport to redeem the Bonds during
this time due to the current market conditions and the Airport’s financial position; and
OW THEREFORE, LET IT BE RESOLVED AS FOLLOWS:
Section 1. The Augusta, Aviation Commission hereby authorizes the
Executive Director and the Finance Director to take the actions necessary to
redeem the 2005 Series A, B and C Bonds, including working with Bond Counsel,
the County’s Financing company and other consultants as necessary and the
expenditure of funds for the required services.
Section 2. All required resolutions or ordinance amendments to conduct the
redemption of the bonds will be brought back to the Augusta, Georgia
Attachment number 1 \nPage 1 of 2
Item # 1
Commission to be approved and spread upon its minutes within thirty (30) days of
approval by the Aviation Commission.
Section 3. Severability. If any section, sentence, clause or phrase of this
Resolution is for any reason held to be invalid or unconstitutional by a decision of
any court of competent jurisdiction, such decision shall not affect the validity of
the remaining portions of this Resolution, and such remainder shall remain in full
force and effect.
Section 4. Effective Date. This Resolution shall be in full force and effect
immediately upon and after its final passage.
SO RESOLVED this ______ day of ___________________, 2014.
Approved:
COUTY: AVIATIO COMMISSIO:
Approved: Approved:
David Copenhaver, Mayor Douglas Lively, Chairman
Attest: Attest:
Clerk of Commission Commission Secretary
Clerk (Seal) Secretary (Seal)
Approved as to form:
County Attorney
Attachment number 1 \nPage 2 of 2
Item # 1
Public Service Committee Meeting
11/10/2014 1:00 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A.N. 14-43: A request by Kyung
Hee No for a retail package Beer & Wine License to be used in
connection with Juno & Jaehee, Inc. located at 1713 M L King
Blvd. Commission District 2 Super District 9.
Background:This is a New Ownership Application. Formerly in the name of
Manoj Patel.
Analysis:The applicant meets all the requirements of The City of Augusta's
Alcohol Ordinance.
Financial Impact:The applicant will pay a pro-rated fee of $665.00
Alternatives:
Recommendation:Planning & Development recommends Approval. The R.C.S.O.
recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 2
Attachment number 1 \nPage 1 of 2
Item # 2
Attachment number 1 \nPage 2 of 2
Item # 2
Public Service Committee Meeting
11/10/2014 1:00 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A. N. 44: A request by Aritiben
Vijaybhai Patel for a retail package Liquor License to be used in
connection with Inwood Spirits located at 2940 Inwood Drive Ste
B. Commission District 5. Super District 9.
Background:This is a New Ownership Application. Formerly in the name of
Mrunalina Monalisa Gandhi.
Analysis:The applicant meets all of the requirements of the City of
Augusta's Alcohol Ordinance.
Financial Impact:The applicant will pay a pro-rated fee of $1,665.00
Alternatives:
Recommendation:The Planning & Development recommends Approval. The
R.C.S.O. recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 3
Attachment number 1 \nPage 1 of 2
Item # 3
Attachment number 1 \nPage 2 of 2
Item # 3
Public Service Committee Meeting
11/10/2014 1:00 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A.N. 14-45: A request by Aratiben
Vijaybhai Patel for a retail package Beer & Wine License to be
used in connection with Mahakali Food Store, located at 2940
Inwood Dr. Commission District 5. Super District 9.
Background:This is a New Ownership Application. Formerly in the name of
Mrunalina Monlisa Gandhi.
Analysis:The applicant meets all of the requirements of the City of
Augusta's Alcohol Ordinance.
Financial Impact:The applicant will pay a pro-rated fee of $665.00
Alternatives:
Recommendation:The Planning & Development recommends Approval. The
R.C.S.O. recommends Approval
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 4
Attachment number 1 \nPage 1 of 2
Item # 4
Attachment number 1 \nPage 2 of 2
Item # 4
Public Service Committee Meeting
11/10/2014 1:00 PM
Alcohol Application
Department:Planning & Development
Caption:New Application: A.N. 14-46: A request by Lawanda Pugh for an
on premise consumption Liquor, Beer, & Wine License to be used
in connection with Cosmos located at 980 Broad St. There will be
Dance. Commission District 1. Super District 9.
Background:This is a New Application.
Analysis:The applicant meets all of the requirements of the City of
Augusta's Alcohol Ordinance.
Financial Impact:The applicant will pay a pro-rated fee of $2,303.50
Alternatives:
Recommendation:The Planning & Development recommends Approval. The
R.C.S.O. recommends Approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 5
Attachment number 1 \nPage 1 of 2
Item # 5
Attachment number 1 \nPage 2 of 2
Item # 5
Public Service Committee Meeting
11/10/2014 1:00 PM
Alcohol Application
Department:Planning & Development
Caption:New Application: A.N. 14-47: A request by James R. Key for an
on premise consumption Liquor, Beer, & Wine License to be used
in connection with Executive Inn located at 1238 Gordon Hwy.
There will be Dance. There will be Sunday Sales. Commission
Disrtict 1. Super District 9.
Background:This is a New Application.
Analysis:The applicant meets all of the requirements of the City of
Augusta's Alcohol Ordinance.
Financial Impact:The applicant will pay a pro-rated fee of $3,562.50.
Alternatives:
Recommendation:Planning & Development recommends Approval. The R.C.S.O.
recommends Approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 6
Attachment number 1 \nPage 1 of 2
Item # 6
Attachment number 1 \nPage 2 of 2
Item # 6
Public Service Committee Meeting
11/10/2014 1:00 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A.N. 14-48: A request by Clay C.
Mingus for an on premise consumption Liquor, Beer & Wine
License to be used in connection with Twin Peaks Augusta
located at 277 Robert C. Daniel Pkwy. There will be Sunday
Sales. Commission District 3. Super District 10.
Background:This is a New Ownership Application. Formerly in the name of
John T. Walker.
Analysis:The applicant meets all of the requirements of the City of
Augusta's Alcohol Ordinance.
Financial Impact:The applicant will pay a pro-rated fee of $3,660.00.
Alternatives:
Recommendation:The Planning & Development recommends Approval. the
R.C.S.O. recommnds Approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 7
Attachment number 1 \nPage 1 of 2
Item # 7
Attachment number 1 \nPage 2 of 2
Item # 7
Public Service Committee Meeting
11/10/2014 1:00 PM
Alcohol Applications
Department:Planning & Development
Caption:Discussion: A request by the Planning & Development
Department to renew all of the existing alcohol beverage licenses,
and licenses for the adult entertainment establishments,
amusement arcades, adult bookstores, and dance halls in the City
of Augusta. Districts 1 thru 8. Super Districts 9 and 10.
Background:This is the yearly renewal of all alcohol and adult entertainments
licenses as well as the regulated licenses associated with them.
Analysis:The applicants meet the requiremnts for renewal of their current
licenses.
Financial Impact:
Alternatives:
Recommendation:Planning & Development recommends approval. The RCSO
recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 8
Attachment number 1 \nPage 1 of 1
Item # 8
Public Service Committee Meeting
11/10/2014 1:00 PM
Christman Company Contract
Department:Augusta Public Transit
Caption:Motion to approve the Christman Company, Construction
Manager at Risk Contract for the Augusta, Georgia Transit
Operation and Maintenance Facility on Highway 56.
Background:During the January 27, 2014 Committee meeting, a motion to
approve the Christman Company as the Construction Manager at
Risk for Augusta, Georgia Transit Operation and Maintenance
Facility on Highway 56 moved forward to full Commission with
no recommendation. On February 2, 2014, Commission Meeting,
the Christman Company was approved as the Construction
Manager at Risk with a vote of 7-3.
Analysis:The approval of this contract will allow Augusta Public Transit to
move forward with the contruction of it Maintenance Facility.
Financial Impact:This item will be 80% federally funded and 20% locally funded.
The total amount of $744,084 for the General Conditions,
Preconstruction Services and Management Fees is included in the
overall total project budget of $9,480,660 million.
Alternatives:None practical if grants are to be used.
Recommendation:Approve the contract for the Christman Company, Construction
Manager at Risk for the Augusta, Georgia Transit Operations and
Maintenance Facility.
Funds are Available
in the Following
Accounts:
54709-1210-54-13130 and 54709-1213-52-12115
REVIEWED AND APPROVED BY:
Cover Memo
Item # 9
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 9
Public Service Committee Meeting Commission Chamber- 1/27/2014- 12:45 PM
PUBLIC SERVICES
1. New Ownership Application: A. N. 14 - 02: A request by
Olegario Orozco for an on premise consumption Liquor &
Beer license to be used in connection with The Reven, LLC.
located at 2925 Peach Orachard Rd. There will be Dance.
District 6. Super District 10.
Attachments
2. New Ownership Application: A. N. 14 - 03: A request by
Mrunalini M. Gandhi for a retail package Beer & Wine license
to be used in connection with Ethan Food Store located at 2940
Inwood Dr. District 5. Super District 9.
Attachments
3. New Ownership Application: A. N. 14 - 04: A request by
Mrunalini M. Gandhi for a retail package Liquor license to be
used in connection with Inwood Spirits located 2940 Inwood
Dr. Suite B. District 5. Super District 9.
Attachments
4. New Ownership Application: A. N. 14 - 05: A request by Chin
H. Kim for a retail package Beer & Wine license to be used in
connection with Yeung Supermarket located at 1671 Olive Rd.
District 2. Super District 9.
Attachments
5. New Ownership Application: A. N. 14 - 06: A request by
Voncellies Allen for an on premises consumption Liquor, Beer
and Wine license to be used in connection with Level 9 Sports
Bar & Grill located at 3054 Damascus Rd. There will be
Dance. District 2. Super District 9.
Attachments
6. New Ownership Application: A. N. 14 - 07: A request by
Alpeshkumar M. Patel for a retail package Beer & Wine
license to be used in connection with Old Town BP located at
443 Broad St. District 1. Super District 9.
Attachments
7. Motion to approve the Guaranteed Maximum Price (GMP)
submitted by the Construction Manager (Turner Construction
Attachments
Attachment number 1 \nPage 1 of 92
Item # 9
www.augustaga.gov
Company) for a new Information Technology (IT) Building.
8. Motion to approve the Christman Company as the
Construction Manager at Risk for the Augusta, Georgia Transit
Operation and Maintenance Facility on Highway 56.
Attachments
9. Presentation by Mr. Horace Lee Jamison regarding his
wrongful termination by McDonald Transit.
Attachments
10. Motion to approve the minutes of the Public Services
Committee held on January 13, 2014.
Attachments
11. Presentation by Ms. Pamela M. Williams regarding her
wrongful termination by the Transit Department.
Attachments
12. Motion to approve the bid selection and contract from Peek
Pavement Marking, LLC regarding the rubber removal from
runway 17-35 as approved by the Augusta Aviation
Commission at their December 19, 2013 meeting.
Attachments
13. Update from staff on the RFP process for "The Patch" golf
course. (Requested by Commissioner Mary Davis)
Attachments
Attachment number 1 \nPage 2 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A. N. 14 - 02: A request by Olegario
Orozco for an on premise consumption Liquor & Beer license to
be used in connection with The Reven, LLC. located at 2925
Peach Orachard Rd. There will be Dance. District 6. Super District
10.
Background:This is a new ownership application. Formerly in the name of
Daniel Magana.
Analysis:The applicant meets the requirements of the City of Augusta's
Alcohol Ordinance.
Financial Impact:The applicant will pay a fee of $3,931.00.
Alternatives:
Recommendation:Planning & Development recommends approval. The RCSO
recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 1
Attachment number 1 \nPage 3 of 92
Item # 9
Attachment number 1 \nPage 1 of 2
Item # 1
Attachment number 1 \nPage 4 of 92
Item # 9
Attachment number 1 \nPage 2 of 2
Item # 1
Attachment number 1 \nPage 5 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A. N. 14 - 03: A request by
Mrunalini M. Gandhi for a retail package Beer & Wine license to
be used in connection with Ethan Food Store located at 2940
Inwood Dr. District 5. Super District 9.
Background:This is a new ownership application. Formerly in the name of
Falguni Patel.
Analysis:The applicant meets the requirements of the City of Augusta's
Alcohol Ordinance.
Financial Impact:The applicant will pay a fee of $1,330.00.
Alternatives:
Recommendation:Planning & Development recommends approval. The RCSO
recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 2
Attachment number 1 \nPage 6 of 92
Item # 9
Attachment number 1 \nPage 1 of 2
Item # 2
Attachment number 1 \nPage 7 of 92
Item # 9
Attachment number 1 \nPage 2 of 2
Item # 2
Attachment number 1 \nPage 8 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A. N. 14 - 04: A request by
Mrunalini M. Gandhi for a retail package Liquor license to be
used in connection with Inwood Spirits located 2940 Inwood
Dr. Suite B. District 5. Super District 9.
Background:This is a new ownership application. Formerly in the name of
Falguni Patel.
Analysis:The applicant meets the requirements of the City of Augusta's
Alcohol Ordinance.
Financial Impact:The applicant will pay a fee of $3175.00.
Alternatives:
Recommendation:Planning & Development recommends approval. The RCSO
recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 3
Attachment number 1 \nPage 9 of 92
Item # 9
Attachment number 1 \nPage 1 of 2
Item # 3
Attachment number 1 \nPage 10 of 92
Item # 9
Attachment number 1 \nPage 2 of 2
Item # 3
Attachment number 1 \nPage 11 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A. N. 14 - 05: A request by Chin H.
Kim for a retail package Beer & Wine license to be used in
connection with Yeung Supermarket located at 1671 Olive Rd.
District 2. Super District 9.
Background:This is a new ownership application. Formerly in the name of
Kyong Gleason.
Analysis:The applicant meets the requirements of the City of Augusta's
Alcohol Ordinance.
Financial Impact:The applicant will pay a fee of $1,330.00.
Alternatives:
Recommendation:Planning & Development recommends approval. The RCSO
recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 4
Attachment number 1 \nPage 12 of 92
Item # 9
Attachment number 1 \nPage 1 of 2
Item # 4
Attachment number 1 \nPage 13 of 92
Item # 9
Attachment number 1 \nPage 2 of 2
Item # 4
Attachment number 1 \nPage 14 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A. N. 14 - 06: A request by
Voncellies Allen for an on premises consumption Liquor, Beer
and Wine license to be used in connection with Level 9 Sports Bar
& Grill located at 3054 Damascus Rd. There will be Dance.
District 2. Super District 9.
Background:This is a new ownership application. Formerly in the name of
Edward Hawthorne.
Analysis:The applicant meets the requirements of the City of Augusta's
Alcohol Ordinance.
Financial Impact:The applicant will pay a fee of $4.566.00.
Alternatives:
Recommendation:Planning & Development recommends approval. The RCSO
recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 5
Attachment number 1 \nPage 15 of 92
Item # 9
Attachment number 1 \nPage 1 of 2
Item # 5
Attachment number 1 \nPage 16 of 92
Item # 9
Attachment number 1 \nPage 2 of 2
Item # 5
Attachment number 1 \nPage 17 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Alcohol Application
Department:Planning & Development
Caption:New Ownership Application: A. N. 14 - 07: A request by
Alpeshkumar M. Patel for a retail package Beer & Wine license to
be used in connection with Old Town BP located at 443 Broad St.
District 1. Super District 9.
Background:This is a new ownership application. Formerly in the name of Ky
S. S. Sanders.
Analysis:The applicant meets the requirements of the City of Augusta's
Alcohol Ordinance.
Financial Impact:The applicant will pay a fee of $1330.00.
Alternatives:
Recommendation:Planning & Development recommends approval. The RCSO
recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 6
Attachment number 1 \nPage 18 of 92
Item # 9
Attachment number 1 \nPage 1 of 2
Item # 6
Attachment number 1 \nPage 19 of 92
Item # 9
Attachment number 1 \nPage 2 of 2
Item # 6
Attachment number 1 \nPage 20 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Approve the Guaranteed Maximum Price (GMP) submitted by the Construction Manager (Turner
Construction Company) for the construction of a new Information Technology (IT) Building
Department:Recreation, Parks and Facilities
Caption:Motion to approve the Guaranteed Maximum Price (GMP)
submitted by the Construction Manager (Turner Construction
Company) for a new Information Technology (IT) Building.
Background:Turner Construction Company was selected under RFQ 10-039 as
the project’s Construction Manager at Risk for the Augusta
Georgia Municipal Building Interior Renovations project by the
Augusta Commission on January 17, 2012. In a special called
meeting by the Augusta Commission held on March 11, 2013, a
new IT Building was approved for inclusion as part of
the Municipal Building Renovations project.
Analysis:The proposed monetary modification is required with the
inclusion of the IT Building construction and bringing the overall
project to a final Guaranteed Maximum Price. Proceeding with
approval of this change order will allow construction to continue
in an expedited fashion, leading to a quicker completion of the
project.
Financial Impact:Guaranteed Maximum Price for the new IT Building:
$5,599,926.00 (See Attached Exhibit G), Overall construction cost
for the project is within the construction budget.
Alternatives:1) Approve the GMP for the new IT Building in the amount of
$5,599,926 submitted by Turner Construction Company 2) Reject
the GMP for the new IT Building submitted by Turner
Construction Company
Recommendation:1) To Approve the GMP (Change Order #1) for the IT Building
submitted by Turner Construction Company
Funds are Available
in the Following Funds from URA Bonds to be issued Cover Memo
Item # 7
Attachment number 1 \nPage 21 of 92
Item # 9
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 7
Attachment number 1 \nPage 22 of 92
Item # 9
Attachment number 1 \nPage 1 of 2
Item # 7
Attachment number 1 \nPage 23 of 92
Item # 9
Attachment number 1 \nPage 2 of 2
Item # 7
Attachment number 1 \nPage 24 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Augusta Public Transit CM at Risk
Department:Augusta Public Transit
Caption:Motion to approve the Christman Company as the Construction
Manager at Risk for the Augusta, Georgia Transit Operation and
Maintenance Facility on Highway 56.
Background:During the Programming Phase of the project, a Request for
Qualifications (RFQ) was prepared to solicit qualification
statements and proposals for Construction Management at Risk
Services for the Transit Operation and Maintenance Facility.
Analysis:We received five (5) compliant responses for the Phase I
qualifications submittals, after there were evaluated by the
selection committee, a short list of four (4) firms was selected,
based on scoring according to the scoring matrix included in the
Phase II submittals requirements.
Financial Impact:This item will be 80% federally funded and 20% locally funded.
The total amount of $744,084 for the General Conditions,
Preconstruction Services and Management Fees is included in the
overall total project budget of $9,480,660 million.
Alternatives:1. Approve the selection committee’s recommendation to select
The Christman Company as the Construction Manager at Risk for
the Augusta, Georgia Transit Operation and Maintenance Facility.
2. Select a different method of procuring the Construction
Management at Risk services and award the total contract to a
lump sum bidder, which will delay the completion date of the
project and increase the total project costs.
Recommendation:Approve the selection committee’s recommendation to select the
Christman Company as the Construction Manager at Risk for the
Augusta, Georgia Transit Operations and Maintenance Facility.
Funds are Available
in the Following 54709-1210-54-13130 and 54709-1213-52-12115 Cover Memo
Item # 8
Attachment number 1 \nPage 25 of 92
Item # 9
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 8
Attachment number 1 \nPage 26 of 92
Item # 9
Exhibit G
Authorization for Pre - Construction
Pursuant to this agreement, the Owner and The Christman Company the Construction Manager
hereby execute this Exhibit G and further agree as follows:
1. The Construction Manager’s Guaranteed Maximum Price (“GMP”) proposal dated
_______________, attached hereto and incorporated herein, is accepted by the
Owner.
2. The General Conditions Guaranteed Maximum Cost for
the Project, including this Bid Package, is:
$ 524,084.00
3. Preconstruction Services is:
$ 35,000.00
4. The Subcontracts Cost is:
Bid Package #1
Bid Package #2
Bid Package #3
Bid Package #4
$ TBD
$ TBD
$ TBD
$ TBD
5.
6.
The Lump Sum Fixed Management Fee is:
The Guaranteed Maximum Price is:
$ 185,000.00
$ TBD
7. The Date of Substantial Completion shall be 12 months after
Notice-to-Proceed
Owner: Construction Manager:
Augusta, Georgia
By:
(Signature) (Seal) (Signature) (Seal)
Deke Copenhaver
(Name) (Name)
Mayor
(Title) (Title)
530 Greene Street, Suite 806
(Street Address – No PO Box) (Street Address – No PO Box)
Augusta, Georgia 30901
(City, State, Zip) (City, State, Zip)
Date of Signature Date of Signature
Attachment number 1 \nPage 1 of 2
Item # 8
Attachment number 1 \nPage 27 of 92
Item # 9
Attachment number 1 \nPage 2 of 2
Item # 8
Attachment number 1 \nPage 28 of 92
Item # 9
Request for Qualifications
Request for Qualifications will be received at this office until Wednesday, July 31, 2013 @ 3:00 p.m. for
furnishing:
RFQ Item #13-165 Construction Manager @ Risk Transit Operations and Maintenance Facility for
Augusta Transit Department
RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
RFQ documents may be viewed on the Augusta Georgia web site under the Procurement Department
ARCbid. RFQ documents may be obtained at the office of the Augusta, GA Procurement Department, 530
Greene Street – Room 605, Augusta, GA 30901.
A Mandatory Pre-Qualification Conference will be held on Tuesday, July 9, 2013 @ 10:00 a.m. A
mandatory site visit will follow. All questions must be submitted in writing by fax to 706 821-2811 or
by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by
Thursday, July 11, 2013 @ 5:00 P.M. No RFQ will be accepted by fax, all must be received by mail or
hand delivered.
No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and
shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual
terms and conditions, applicable to the procurement. All specific requirements contained in the invitation
to bid including, but not limited to, the number of copies needed, the timing of the submission, the
required financial data, and any other requirements designated by the Procurement Department are
considered material conditions of the bid which are not waiveable or modifiable by the Procurement
Director. All requests to waive or modify any such material condition shall be submitted through the
Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the
Augusta, Georgia Commission. Please mark RFQ number on the outside of the envelope.
Bidders are cautioned that acquisition of RFQ documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places
the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle June 13, 20, 27, July 4, 2013
Metro Courier June 19, 2013
Revised: 8/15/2011
Attachment number 2 \nPage 1 of 1
Item # 8
Attachment number 1 \nPage 29 of 92
Item # 9
VENDORS Attachment B E-Verify # Addendum 1 SAVE Form Original 6 Copies
RW Allen
1015 Broad Street
Augusta, GA 30901
Yes 46611 Yes Yes Yes Yes
Dabbs Williams
319 S Walnut Street
Statesboro, GA 30459
Yes 222733 Yes Yes Yes Yes
The Christman Company
2812-B Hillcreek Drive
Augusta, GA 30909
Yes KGAF1622/
142894 Yes Yes Yes Yes
Allen-Batchelor
1063 Franke Industial Drive
Augusta, GA 30909
Yes 210879 Yes Yes Yes Yes
ACC Construction
635 NW Frontage Road
Augusta, GA 30907
Yes 261774 Yes Yes Yes Yes
Contract Management
1827 Killingsworth Rd
Augusta, GA 30904
J & B Construction
3550 Gordon Highway
Grovetown, GA 30813
AJAX Building Corp
1004 Sterling Court
Roswell, GA
Yes No/Non-
Compliant Yes Yes Yes Yes
Manhattan Construction
5871 Glenridge Drive
Atlanta, GA 30328
Brasfield & Gorrie
1990 Vaughn, Suite 100
Kennesaw, GA 30144
No
Response
RFQ Opening
RFQ Item #13-165
Construction Manager @ Risk Transit Operations and Maintenace Facility
for Augusta, Georgia - Transit Department
RFQ Due: Wednesday, July 31, 2013 @ 10:00 a.m.
Page 1 of 1
Attachment number 3 \nPage 1 of 1
Item # 8
Attachment number 1 \nPage 30 of 92
Item # 9
AUGUSTAPUBLIC TRANSIT
SHARON DOTTERY, TRANSIT CONTRACT MANAGER
November 14,2013
Ms. Geri Sams
Director of Procurement
Augusta Richmond County
530 Greene Street, Room 605
Augusta, GA 30901
RE: Bid #13-165 -CM@ Risk Transit Operations & Maintenance Facility
Dear Ms. Sams:
We received five (5) compliant responses for Phase I qualifications submittals, after these were evaluated
by the selection committee, a short list of Four (4) firms was selected, based on the scoring for Phase I, to
participate in the Phase II Interviews.
The selection committee completed the evaluations of Phase I and Phase II submittals.
Allen-Batchelor's DBE submittals did not acknowledge the DBE goals which were established in the
RFP package and were therefore non-compliant. Each of the three remaining proposals were reviewed
and discussed.
The selection committee recommends that Augusta-Richmond County begin contract negotiations with
The Christman Company.
Thank you for your assistance in this selection process. If you have any questions or require any
additional information, please don't hesitate to contact me.
Sincerely,
/r/o'trtW
Sharon Dottery
Transit Contract Manager
cc: Tameka Allen, Deputy Administrator
Augusta Public Transit
1535 Fenwick Street - Augustq GA 30904
(706) 82 1 -l 81 8 - Fax (706) 821-17 s2
www.augustaga.gov
Attachment number 4 \nPage 1 of 1
Item # 8
Attachment number 1 \nPage 31 of 92
Item # 9
Transit Phase II CM Summary
Phase II Scoring Cumulative including Phase I
ACC Construction Co., Inc.Allen + Batcher Construction RW Allen The Christman Company
Dabbs Williams General
Contractors, LLC
Category and Description Pts.635 NW Frontage Road
Augusta, GA 30907
1063 Franke Industial Drive
Augusta, GA 30909
1015 Broad Street
Augusta, GA 30901
2812-B Hillcreek Drive
Augusta, GA 30909
319 S Walnut Street
Statesboro, GA 30459
Technical Approach 15 12.75 13.50 14.25 14.63 10.10
Firm Organizational Overview 10 8.75 9.00 9.50 9.75 7.30
Company Experience and
Performance 15 12.00 11.60 12.00 15.00 9.80
Experience, Competence and
Commitment of Key Personnel 10 6.75 7.80 8.25 9.50 6.30
Project Management and Controls 10 8.75 8.50 9.50 9.75 6.50
Peer References 10 8.00 10.00 9.25 9.75 6.00
Augusta Metropolitan Area
Experience 5 3.63 4.40 4.63 3.88 3.90
Financial Strength 5 4.75 1.10 2.38 5.00 2.00
Backlog 5 4.25 3.30 4.63 4.63 4.10
Legal Matters 5 3.00 3.10 4.88 4.88 4.10
Pre-Construction Services 10 8.25 9.00 9.50 9.75 6.00
Total Points 100 80.9 81.3 88.8 96.5 66.1
Category and Description Pts.
Project Director 4 3.4 3.6 2.8 0.0
Preconstruction Manager 5 3.9 4.5 3.3 0.0
Senior Project Manager 6 4.8 5.4 4.2 0.0
Project Manager 20 15.5 18.0 13.5 0.0
Superintendent 25 20.0 22.5 18.1 0.0
Presentation 10 8.3 8.8 6.8 0.0
Q & A 10 8.8 9.0 6.8 0.0
Fee Proposal 20 20.0 16.0 18.0 0.0
Total Points 100 84.6 87.8 73.4 0.0
Evaluation Committee Comments: During Phase I - RW Allen, The Christman Company, ACC Construction, and Allen-Batchelor Corporation were shortlisted. During
Phase II, the shortlisted firms were required to submit an RFP Package and were also requested to make a presentation to the committee. Allen-Batchelor was deemed
as non-compliant and was therefore not allowed to make a presentation to the committee. All other firms were evaluated per the RFP criteria which was listed in the RFP
package. Per the cumulative evaluation scores, The Christman Company received the highest score and was therefore recommended for the award of RFP 13-165.
Phase 1 - Cumulative Evaluation Sheet
RFQ 13-165 Construction Mananger @ Risk Transit Operations and Maintenance Facility
For Augusta, Georgia - Tranist Department
The Christman Company
2812 Hillcreek Drive
Suite B
Augusta, Georgia 30909
ACC Const. Co, Inc.
635 NW Frontage Road
Augusta, Georgia 30907
Allen-Batchelor Construction
1063 Franke Industrial Drive
Augusta, Georgia 30909
RW Allen, LLC
1015 Broad Street
Augusta, Georgia 30901
Phase II Cumulative Evaluation Sheet
Transit Operations and Maintenance Facility
Construction Manager at Risk Evaluation
Attachment number 5 \nPage 1 of 1
Item # 8
Attachment number 1 \nPage 32 of 92
Item # 9
Attachment number 6 \nPage 1 of 4
Item # 8
Attachment number 1 \nPage 33 of 92
Item # 9
Attachment number 6 \nPage 2 of 4
Item # 8
Attachment number 1 \nPage 34 of 92
Item # 9
Attachment number 6 \nPage 3 of 4
Item # 8
Attachment number 1 \nPage 35 of 92
Item # 9
Attachment number 6 \nPage 4 of 4
Item # 8
Attachment number 1 \nPage 36 of 92
Item # 9
Attachment number 7 \nPage 1 of 4
Item # 8
Attachment number 1 \nPage 37 of 92
Item # 9
Attachment number 7 \nPage 2 of 4
Item # 8
Attachment number 1 \nPage 38 of 92
Item # 9
Attachment number 7 \nPage 3 of 4
Item # 8
Attachment number 1 \nPage 39 of 92
Item # 9
Attachment number 7 \nPage 4 of 4
Item # 8
Attachment number 1 \nPage 40 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Horace Lee Jamison
Department:Clerk of Commission
Caption:Presentation by Mr. Horace Lee Jamison regarding his wrongful
termination by McDonald Transit.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 9
Attachment number 1 \nPage 41 of 92
Item # 9
Attachment number 1 \nPage 1 of 1
Item # 9
Attachment number 1 \nPage 42 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Minutes
Department:Clerk of Commission
Caption:Motion to approve the minutes of the Public Services Committee
held on January 13, 2014.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 10
Attachment number 1 \nPage 43 of 92
Item # 9
Attachment number 1 \nPage 1 of 3
Item # 10
Attachment number 1 \nPage 44 of 92
Item # 9
Attachment number 1 \nPage 2 of 3
Item # 10
Attachment number 1 \nPage 45 of 92
Item # 9
Attachment number 1 \nPage 3 of 3
Item # 10
Attachment number 1 \nPage 46 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Pamela M. Williams
Department:Clerk of Commission
Caption:Presentation by Ms. Pamela M. Williams regarding her wrongful
termination by the Transit Department.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 11
Attachment number 1 \nPage 47 of 92
Item # 9
Attachment number 1 \nPage 1 of 1
Item # 11
Attachment number 1 \nPage 48 of 92
Item # 9
Attachment number 2 \nPage 1 of 4
Item # 11
Attachment number 1 \nPage 49 of 92
Item # 9
Attachment number 2 \nPage 2 of 4
Item # 11
Attachment number 1 \nPage 50 of 92
Item # 9
Attachment number 2 \nPage 3 of 4
Item # 11
Attachment number 1 \nPage 51 of 92
Item # 9
Attachment number 2 \nPage 4 of 4
Item # 11
Attachment number 1 \nPage 52 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Professional Airfield Pavement Maintenance Services
Department:Augusta Regional Airport
Caption:Motion to approve the bid selection and contract from Peek
Pavement Marking, LLC regarding the rubber removal from
runway 17-35 as approved by the Augusta Aviation Commission
at their December 19, 2013 meeting.
Background:Two years ago, the Runway 17-35 project was successfully
completed, transitioning our original asphalt runway to a concrete
runway. Since that time, the touchdown zones and centerline have
accumulated rubber deposits from the landing gear wheels of
arriving aircraft. These rubber deposits have caused the
touchdown zones and centerline to become 75% obscured,
meaning that these areas are becoming increasingly difficult to see
for landing aircraft. The Airport put this project out for bid with
three airfield pavement maintenance contractors, of which only
one responded. The total project price is $15,250.
Analysis:The sole bid was submitted by Peek Pavement Markings, LLC out
of Columbus, GA. The bid is for removal of rubber deposits of
approximately 9,720 square feet of runway 17-35; the painting of
two lead on/off lines totaling 750 square feet; and the painting of
shoulder markings on Taxiway Delta totaling 1,575 square feet.
The contract identifies the terms and responsibilities of Peek
Pavement Marking, LLC and the Augusta Regional Airport during
the project.
Financial Impact:The total project price is $15,250.
Alternatives:Deny request.
Recommendation:Approve Peek Pavement Marking, LLC contract in the amount of
$15,250.
Funds are Available
in the Following 551-08-1112/5238210 Cover Memo
Item # 12
Attachment number 1 \nPage 53 of 92
Item # 9
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 12
Attachment number 1 \nPage 54 of 92
Item # 9
CONTRACT
FOR
RUNWAY RUBBER REMOVAL AND PAINTING
BETWEEN
AUGUSTA-RICHMOND COUNTY
FOR THE
AUGUSTA REGIONAL AIRPORT
AND
PEEK PAVING MARKING CO.
Attachment number 1 \nPage 1 of 32
Item # 12
Attachment number 1 \nPage 55 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 2 of 32
TABLE OF CONTENTS
Item Description Page
Article 1 Scope of Work ................................................................................................ 3
Article 2 Time, Term & Payment .................................................................................. 5
Article 3 Federal Work Authorization ........................................................................... 5
Article 4 Corporate Authority ....................................................................................... 6
Article 5 Contractor’s Performance & Warranties ........................................................ 6
Article 6 Authorized Representatives ............................................................................ 7
Article 7 Changes ..................................................................................................... 7
Article 8 Temporary Suspension or Delay of Performance of Contract ....................... 8
Article 9 Representations & Warranties ........................................................................ 8
Article 10 Assignment ..................................................................................................... 8
Article 11 Notices ..................................................................................................... 9
Article 12 Compliance with Applicable Laws and Regulations ..................................... 9
Article 13 Right to Inspect Premises ............................................................................. 10
Article 14 Royalties & Patents ...................................................................................... 10
Article 15 Prohibited Interests ....................................................................................... 10
Article 16 Insurance ................................................................................................... 10
Article 17 Indemnification & Hold Harmless ............................................................... 13
Article 18 Airport Security Requirements/Special ...........................................................
Identification Display Area (SIDA) Badges ................................................ 13
Article 19 Hazardous Materials ..................................................................................... 14
Article 20 Miscellaneous Provisions ............................................................................. 14
EXHIBITS
Exhibit A (Bid Price Sheet) ..............................................................................................
Exhibit B (Required Submittals) .......................................................................................
Exhibit C (Insurance) .......................................................................................................
Exhibit D (Plans/Map) ......................................................................................................
Attachment number 1 \nPage 2 of 32
Item # 12
Attachment number 1 \nPage 56 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 3 of 32
This Contract for the provision of Runway Rubber Removal and Painting (hereinafter designated
as the "Contract") made and entered into as of __________________2013, by and between the City of
Augusta (City) for the Augusta Regional Airport, (hereinafter designated as "Airport”) and Peek
Pavement Marking Company (Hereinafter designated as “Contractor”) a Georgia corporation, whose
principal office is located at 4600 Peek Industrial Drive, Columbus, GA 31909.
WITNESSETH:
WHEREAS, the City is the owner and operator of a full service commercial airport known as the
Augusta Regional Airport;
WHEREAS, the City issued a Request for Bids (RFB) for the removal of rubber from the
runways and painting at the Augusta Regional Airport; and
WHEREAS, Contractor provided a bid in compliance with the City’s Request for Bids; and
WHEREAS, the Parties desire to enter into a contract for services.
NOW, THEREFORE, in consideration of the mutual covenants, promises, and agreements
herein contained, the City and Contractor hereby agree as follows:
ARTICLE 1
SCOPE OF WORK
1.1 The Airport is required to perform specialized Airport maintenance including the removal of
rubber deposits off the Centerline, of its Concrete Runway 17-35. The Airport is required, by
Federal Aviation Administration (FAA) standards, to remove the rubber deposits so that the
centerline may be un-obscured.
1.2 Contractor shall use very high pressurized hydro blasting equipment to remove the rubber
embedded into the concrete.
1.3 Contractor shall adhere to the FAA’s specialized criteria for the painting of runway pavements, to
include runways and taxiways. These markings require specialized paint and beads per FAA AC
NO. 150/5370-10F. The taxiway shoulder painting to be marked out and painted with the
appropriate paint specifications.
1.4 Contractor shall be escorted at all times while on Airport movement areas.
1.5 All work to be completed during business hours 7am-5pm. Airport OPS will work with
Contractor on a pullback basis, working with Air Traffic Control, during daylight hours.
1.6 Details: Taxiway Shoulder Markings
1.6.1 Paint yellow shoulder markings for Taxiway Delta/Charlie (See Attached Map Exhibit
D).
1.6.2 All paint should meet specifications as outlined in FAA AC NO. 150/5370-lOF Dated:
09/30/2011
1.6.3 Markings should be 3' by 25' with 25' spacing between markings. Refer to attached
map.
1.6.4 Paint for Taxiway Shoulder Markings DOES NOT need to include reflective beads.
1.6.5 Paint Lead-on/off lines.
1.6.6 All paint should meet specifications as outlined in FAA AC NO. 150/5370-lOF Dated:
09/30/2011
1.6.7 Lead On/Off lines- One 235' section and one 265' totaling 500' by 18".
Attachment number 1 \nPage 3 of 32
Item # 12
Attachment number 1 \nPage 57 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 4 of 32
1.6.8 Yellow paint/markings must include TYPE I glass beads to meet specifications found in
FAA AC 150/5370-lOF, P-620.
1.6.9 Application rates are listed below:
1.6.10 WEATHER LIMITATIONS. The painting shall be performed only when the surface is
dry and when the surface temperature is at least 45° (7° C) and rising and the pavement
surface temperature is at least 5°f (2. 7 °C) above the dew point. Markings shall not be
applied when the pavement temperature is greater than 120° (49° C).
1.6.11 EQUIPMENT. Equipment shall include the apparatus necessary to properly clean the
existing surface, a mechanical marking machine, a bead dispensing machine, and such
auxiliary hand-painting equipment as may be necessary to satisfactorily complete the Job.
The mechanical marker shall be an atomizing spray-type or airless-type marking machine
suitable for application of traffic paint. It shall produce an even and uniform film
thickness at the required coverage and shall apply markings of uniform cross-sections and
clear-cut edges without running or spattering and without over spray.
1.6.12 PREPARATION OF SURFACE. Immediately before application of the paint, the
surface shall be dry and free from dirt, grease, oil, laitance, or other foreign material that
would reduce the bond between the paint and the pavement. The area to be painted shall
be cleaned by sweeping and blowing or by other methods as required to remove all dirt,
laitance, and loose materials without damage to the pavement surface. Use of any
chemicals or impact abrasives during surface preparation shall not be used.
1.7 RUBBER REMOVAL. Contractor shall remove the rubber as follows:
1.7.1 Centerline- Only touchdown areas (27 centerlines: 120' by 3' totaling 9720 square feet).
1.7.2 Rubber Removal shall be done by Water Blasting Only. The use of Chemicals, Sand/
Bead Blasting or Milling/Grinding will not be accepted.
1.7.3 Pressure for water blasting to be set and tested in designated area, by Airport Operations,
before blasting starts.
1.7.4 The Airport will be responsible for sweeping the centerline once all rubber removal is
complete.
1.7.5 The Airport will be responsible for sweeping Taxiway D where shoulder markings will
be put down.
1.8 The term “Work” means the labor, materials, equipment, tools, machinery, supervision,
administration, coordination, planning, transportation, security, and all other services and things
necessary to provide the Airport with the services required. The Contractor agrees to complete the
Work in a good, firm, substantial and professional manner in strict conformity with the
requirements and provisions of this Contract and FAA regulations.
1.9 Unless otherwise modified, the Contractor shall furnish all of the Work in accordance with the
Contract and all incidental work necessary to complete the Project in an acceptable manner, ready
PAINT COLOR PAINT TYPE PAINT APPLICATION RATE GLASS BEADS TYPE AND APPLICATION RATE
YELLOW YELLOW-33538 OR 33655
TT-P-1952E TYPE II 115 SQ FEET PER GALLON TT-B-1325D, TYPE III, 7 LBS PER GALLON OF PAINT
Attachment number 1 \nPage 4 of 32
Item # 12
Attachment number 1 \nPage 58 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 5 of 32
for use, occupancy, or operation by the Airport. The Contractor shall be responsible for the entire
project and every part thereof.
ARTICLE 2
TIME, TERM AND PAYMENT
2.1 Contract Time. The Contractor shall commence the Work under this Contract within ten (10 )
calendar days from the date of receiving the Notice to Proceed, as evidenced by official receipt of
certified mail or acknowledgment of personal delivery, and shall fully complete the Work within
sixty (60) calendar days from receiving such Notice to Proceed. The Contract Time may be
extended only by Change Order approved and executed by the Aviation Commission, the City
and the Contractor in accordance with the terms of this Contract.
2.2 Contract Price. As full payment for the faithful performance of this Contract, the City shall pay
the Contractor the Contract Price, which is an amount not to exceed Fifteen Thousand two
hundred fifty dollars and zero cents ($15,250.00) unless changed by written Change Order in
accordance with the terms of this Contract. Any increase of the Contract Price shall be by
Change Order adopted and approved by the Aviation Commission, the City and the Contractor in
accordance with the terms of this Contract. Contractor’s bid form is attached hereto as Exhibit A.
2.3 Invoices. Original invoice(s) shall be submitted as follows:
Risa Bingham
Augusta Regional Airport
1501 Aviation Way
Augusta, GA 30906
Ph: (706) 798-3236
FAX: (706) 798-1551
ARTICLE 3
FEDERAL WORK AUTHORIZATION
Pursuant to O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02, the City cannot
enter a contract for the physical performance of services unless the Contractor and its Subcontractors
register and participate in the Federal Work Authorization Program to verify specific information on all
new employees.
3.1 Contractor certifies that it has complied and will continue to comply with O.C.G.A. §13-10-91
and Georgia Department of Labor Rule 300-10-1-.02.
3.2 Contractor agrees to sign an affidavit evidencing its compliance with O.C.G.A. §13-10-91 and
Georgia Department of Labor Rule 300-10-1-.02. The signed affidavit is attached to this Contract
as Attachment B.
3.3 Contractor agrees that in the event that it employs or contracts with any Subcontractor(s) in
connection with this Contract, Contractor will secure from each Subcontractor an affidavit that
indicates the employee-number category applicable to that Subcontractor and certifies the
Subcontractor’s current and continuing compliance with O.C.G.A. §13-10-91 and Georgia
Department of Labor Rule 300-10-1-.02. Any signed Subcontractor affidavit(s) obtained in
connection with this Contract and shall be attached hereto as Exhibit C.
Attachment number 1 \nPage 5 of 32
Item # 12
Attachment number 1 \nPage 59 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 6 of 32
ARTICLE 4
CORPORATE AUTHORITY
Contractor has executed the Certificate of Corporate Authority attached hereto as Exhibit C. The officials
of the Contractor executing this Contract are duly and properly in office and are fully authorized and
empowered to execute the same for and on behalf of the Contractor. Contractor has all requisite power
and authority to enter into and perform its obligations under this Contract. The execution and delivery by
the Contractor of this Contract and the compliance by the Contractor with all of the provisions of this
Contract (i) is within the purposes, powers, and authority of the Contractor; (ii) has been done in full
compliance with applicable law and has been approved by the governing body of the Contractor and is
legal and will not conflict with or constitute on the part of the Contractor a violation of or a breach of or a
default under any indenture, mortgage, security deed, pledge, note, lease, loan, or installment sale
agreement, contract, or other agreement or instrument to which the Contractor is a party or by which the
Contractor is otherwise subject or bound, or any license, judgment, decree, law, statute, order, writ,
injunction, demand, rule, or regulation of any court or governmental agency or body having jurisdiction
over the Contractor; and (iii) has been duly authorized by all necessary action on the part of the
Contractor. This Contract is the valid, legal, binding and enforceable obligation of the Contractor.
ARTICLE 5
CONTRACTOR'S PERFORMANCE AND WARRANTIES
5.1 Contractor shall, at its own expense, furnish all necessary equipment, management, supervision,
labor, technical support and other accessories and services for the performance of the services as
described in these Contract Documents. Such services shall be performed in strict accordance
with the General Conditions, Special Conditions, and current versions of FAA Advisory Circular
150/5370-10F.
5.2 All performance shall be subject to inspection and approval by the Aviation Director or his
designee as provided in said Performance Work Statement. If the Contractor's performance is, or
becomes unsatisfactory, as determined by the Aviation Director, an appropriate reduction in
payment due will be made from Contractor's invoice and Contractor will be directed to correct the
unsatisfactory performance. The correction of unsatisfactory performance shall be at no
additional cost to the City or the Airport.
5.3 Contractor alone shall be responsible for the safety, efficiency, and adequacy of his plants,
appliances, and methods, and for any damage that may result from their failure or their improper
maintenance, or operation. The Contractor shall observe, comply with, and be subject to all
terms, conditions, requirements and limitations of the Contract and Specifications, local
ordinances, and state and federal laws; and shall do, carry on, and complete the entire Work.
5.4 The Contractor shall guarantee all Work to have been accomplished in conformance with the
Contract. Neither the final certificate of payment nor any provision of the Contract, nor partial or
entire occupancy or use of the Work by the City, shall constitute an acceptance of any part of the
Work not done in accordance with the Contract, or relieve the Contractor of liability for
incomplete or faulty materials or workmanship. The Contractor shall promptly remedy any
omission or defect in the Work and pay for any damage to other improvements or facilities
resulting from such omission or defect which shall appear within a period of one year from the
date of final acceptance, unless a longer period is elsewhere specified. In the event that the
Contractor should fail to make repairs, adjustments, or other remedy that may be made necessary
by such defects, the City may do so and charge the Contractor the cost thereby incurred. The
Performance Bond shall remain in full force and effect through the guarantee period.
5.5 The Contractor warrants to the City that materials and equipment furnished under the Contract
will be of good quality and new unless otherwise required or permitted by the Contract, that the
Work will be free from defects not inherent in the quality required or permitted, and that the
Attachment number 1 \nPage 6 of 32
Item # 12
Attachment number 1 \nPage 60 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 7 of 32
Work will conform to the requirements of the Contract. Work not conforming to these
requirements, including substitutions not properly approved and authorized, is considered
defective. The City, in its sole discretion, may exclude from the Contractor's warranty, remedies
for damage or defect, which the City determines, were caused by abuse, modifications not
executed by the Contractor, improper or insufficient maintenance, improper operation, or normal
wear and tear and normal usage. If required by the City, the Contractor shall furnish satisfactory
evidence as to the kind and quality of materials and equipment. All warranties and guaranties
shall extend for the greatest of one year commencing on the dates of Completion of the Work or
such longer period of time as is required by the Contract. If any defect or deviation should exist,
develop, be discovered or appear within such one year period, the Contractor, at it sole cost and
expense and immediately upon demand, shall fully and completely repair, correct, and eliminate
such defect. The foregoing warranties and guarantees are cumulative of and in addition to, and
not restrictive of or in lieu of, any and all other warranties and guarantees provided for or required
by law. No one or more of the warranties contained herein shall be deemed to alter or limit any
other.
5.6 The obligation of this Section shall survive acceptance of the Work and termination of the
Contract. All manufacturer warranties and guarantees shall be delivered to the City prior to
Substantial Completion and such delivery shall be a condition precedent to the issuance of the
Certificate of Substantial Completion. Before Final Payment, the Contractor shall assign and
transfer to the City all guarantees warranties and agreements from all contractors, Subcontractors,
vendors, Suppliers, or manufacturers regarding their performance quality of workmanship or
quality of materials supplied in connection with the Work. The Contractor represents and
warrants that all such guarantees, warranties and agreements will be freely assignable to the City,
and that upon Final Completion of the Work, all such guarantees, warranties and agreements shall
be in place and enforceable by the City in accordance with their terms.
ARTICLE 6
AUTHORIZED REPRESENTATIVES
6.1 CITY/AIRPORT’S REPRESENTATIVE
AIRPORT’S REPRESENTATIVE: shall be Tim Weegar, Aviation Division or his designee.
6.2 CONTRACTOR’S REPRESENTATIVE(S)
Contractor must designate in writing a person(s) acceptable to Airport to serve as its
representative ("Contractor’s Representative”) in all dealings with Airport. Contractor’s
Representative may be changed upon prior written notice delivered to Airport’s Representative.
Contractor’s representative shall be Brad Dye.
ARTICLE 7
CHANGES
The City may, during the Contract period, make changes to the Scope of Work, which may result in
changes to the general scope of the Contract and its provisions. Written agreements, changes, or
amendments to this Contract shall not be binding upon the City unless signed by the Aviation
Commission.
Attachment number 1 \nPage 7 of 32
Item # 12
Attachment number 1 \nPage 61 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 8 of 32
ARTICLE 8
TEMPORARY SUSPENSION OR DELAY OF PERFORMANCE OF CONTRACT
To the extent that it does not alter the scope of this Contract, the City may unilaterally order a temporary
stopping of the work, or delaying of the work to be performed by Contractor under this Contract.
ARTICLE 9
REPRESENTATIONS AND WARRANTIES
Contractor’s Representations and Warranties Regarding Capacity to Contract and Perform
Work/Services. In order to induce the City to enter into this Contract, Contractor hereby represents and
warrants to the City as of the date above written that:
9.1. Contractor is duly organized and validly existing in good standing under the laws of the state of
Georgia in which it is organized, is qualified to do business in all jurisdictions in which it is
operating, and has the power and authority to execute and deliver and to perform its obligations
under this Contract and the documents to which it is signatory; and
9.2 The execution, delivery and performance by Contractor and its undersigned representative(s) of
this Contract and other documents to which Contractor is a signatory do not require the approval
or consent of any other person, entity or government agency and do not result in any breach of
any agreement to which Contractor is a party or by which it is bound; and
9.3 The execution, delivery and performance by Contractor of this Contract and other documents to
which it is a signatory have been duly authorized by all necessary action, and constitute legal,
valid and binding obligations of Contractor, enforceable against Contractor in accordance with its
terms;
9.4 No action, suit or proceeding to which Contractor is a party is pending or threatened that may
restrain or question this Contract, or any other document to which it is a signatory, or the
enjoyment of rights or benefits contemplated herein; and
9.5 Contractor has not been debarred by any city, state or federal agency.
ARTICLE 10
ASSIGNMENT
Without the prior written consent of City, Contractor may not assign, transfer or convey any of its
interests under this Contract, nor delegate any of its obligations or duties under this Contract except as
provided herein.
10.1 Consent of City Required. Any assignment of this Contract or rights under this Contract, in
whole or part, without the prior written consent of City will be void, except that, upon ten (10)
calendar days prior written notice to City, Contractor may assign monies due or to become due
under this Contract. Any assignment of monies will be subject to proper setoffs in favor of City
and to any deductions provided for in this Contract.
10.2 No Relief of Responsibilities. No assignment will be approved which would relieve Contractor
of its responsibilities under this Contract.
10.3 Parties Bound. This Contract will be binding upon and inure to the benefit of City and
Contractor and their respective successors and assigns.
Attachment number 1 \nPage 8 of 32
Item # 12
Attachment number 1 \nPage 62 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 9 of 32
ARTICLE 11
NOTICES
11.1 Delivery. All notices given by either party to the other under this Contract must be in writing and
may be delivered by: (i) regular mail, postage prepaid; (ii) certified or registered mail; (iii)
facsimile; or (iv) hand-delivery, to the parties at the addresses and facsimile numbers set forth in
the Clause titled “Addresses”.
11.2 Receipt. Notices sent by mail will be deemed to be received upon deposit in the mail, properly
addressed. Notices sent by certified or registered mail will be deemed to be received upon the
date of the acknowledgment. Notices sent by facsimile will be deemed to be received upon
successful transmission to the proper facsimile number. Notices delivered by hand-delivery will
be deemed to be received upon acceptance by the respective party or its agent.
11.3 Change of Address or Facsimile Number. Either party may, at any time, change its respective
address or facsimile number by sending written notice to the other party of the change.
11.4 Addresses.
To Airport: For all notices to City the address will be:
Executive Director
Augusta Regional Airport
1501 Aviation Way
Augusta, Georgia 30906
With a copy to: Augusta General Counsel
Augusta Richmond City
Department of Law
501 Greene St.
Augusta, Georgia 30901
To CONTRACTOR: For all notices to CONTRACTOR the address will be:
Peek Pavement Marking Co.
4600 Peek Industrial Drive
Columbus, GA 31909
Attn: Brad Dye
(706) 563-7959 (phone)
(706) 563-7762 (fax)
ARTICLE 12
COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS
Contractor covenants and agrees that it, its agents and employees will comply with all Georgia, City,
state, and federal laws, rules, regulations, Airport Rules and Regulations and City ordinances applicable
to the work to be performed under this Contract, and that it shall obtain all necessary permits, pay all
license fees and taxes to comply therewith. Further, Contractor agrees that it, its agents, and employees
will abide by all rules, regulations, and policies of Airport during the term of this Contract, including any
renewal periods. In the event that any governmental authority imposes new or materially increased taxes
upon the Contractor’s operations, the parties agree to negotiate changes in billing reflecting such
increased tax costs. All references to Federal codes, provisions, regulations, and rules are incorporated by
reference as if fully set forth herein.
Attachment number 1 \nPage 9 of 32
Item # 12
Attachment number 1 \nPage 63 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 10 of 32
ARTICLE 13
RIGHT TO INSPECT PREMISES
The City may, at reasonable times, inspect the part of the plant, place of business, or work site of
Contractor or any of its subcontractor or subunit thereof which is pertinent to the performance of any
Contract awarded or to be awarded.
ARTICLE 14
ROYALTIES AND PATENTS
The Contractor shall hold and save the City and its elected officials, officers, agents, servants, and
employees, harmless from liability of any nature or kind, including cost and expenses for, or on account
of, any patented or unpatented invention, process, article, or appliance manufactured or used in the
performance of the Contract, including its use by the City, unless otherwise specifically stipulated in the
Contract.
ARTICLE 15
PROHIBITED INTERESTS
No official of the City who is authorized in such capacity and on behalf of the City to negotiate, make,
accept, or approve, or to take part in negotiating, making, accepting, or approving any architectural,
engineering, inspection, construction, or material supply contract, or any subcontract in connection with
the construction of the Project, shall become directly or indirectly interested personally in this Contract or
in any part hereof. No officer, employee, architect, attorney, engineer, or inspector of or for the City who
is authorized in such capacity and on behalf of the City to exercise any legislative, executive, supervisory,
or other similar functions in connection with the construction of the Project, shall become directly or
indirectly interested personally in this Contract or in any part thereof, any material supply contract,
subcontract, insurance contract, or any other contract pertaining to the Project.
ARTICLE 16
INSURANCE
During the term of this Contract, Contractor shall provide, pay for, and maintain with companies
reasonably satisfactory to the City and the Aviation Commission, the types of insurance as set forth in the
Augusta-Richmond County Code, and Georgia law as the same may be amended from time to time, and
as described herein. All insurance shall be issued by insurance companies eligible to do business in the
State of Georgia and with an Insurer rated “A” or better by AM Best. All policies shall include hold
harmless provisions. In the event of a conflict between the provisions of the Augusta-Richmond County
Code and this Contract, the more stringent requirement shall govern. In no event shall Contractor
maintain any insurance less than the requirements set forth in the Augusta-Richmond County Code, as
amended.
16.1 All liability policies of Contractor and its subcontractors shall provide coverage that includes, or
has the same substantive effect as the following:
16.2 The Contractor shall procure and maintain continuously in effect throughout the term of its
activities upon the Airport at Contractor’s sole expense, insurance of the types and in at least such
minimum amounts as set forth in this Section.
16.3 The Contractor’s insurance policies as required by this Contract shall apply separately to the City
as if separate policies had been issued to Contractor and City. The Contractor’s Comprehensive
General Liability policy shall protect the City, its officers, elected officials, employees, agents
Attachment number 1 \nPage 10 of 32
Item # 12
Attachment number 1 \nPage 64 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 11 of 32
and the Aviation Commission and its employees against any and all liability created by reason of
Contractor’s conduct.
16.4 The Contractor’s insurance shall not be subject to cancellation or material alteration until at least
thirty (30) days written notice has been provided to the City’s Risk Manager.
(a) Contractor shall furnish to the Risk Manager Certificates of Insurance evidencing
that all of the herein stated requirements have been met. The amount or amounts
of all required policies shall not be deemed a limitation of the Contractor’s
Contract to indemnify and hold harmless the City, its officers, elected officials,
employees, agents and the Aviation Commission and its employees; and in the
event Contractor or the City shall become liable in an amount in excess of the
amount or amounts of such policies, then the Contractor shall save the City, its
officers, elected officials, employees, agents and the Aviation Commission and
its employees harmless from the whole thereof, except in the event of the sole
gross negligence of the City.
16.5 The Contractor is required to maintain minimum insurance to protect the Contractor and Augusta,
GA from the normal insurable liabilities that may be incurred by Contractor. In the event such
insurance as required shall lapse, the City and the Aviation Commission reserve the right to
obtain such insurance at the Contractor’s sole expense.
16.6 The insurance policies for coverage listed in this Section shall contain a provision that written
notice of cancellation or any material change in policy by the insurer shall be delivered to the
City no less than thirty (30) days prior to cancellation or change.
16.7 Contractor shall carry the following types and minimum amounts of insurance coverage at the
Airport:
(a) Worker’s Compensation Insurance - With employer’s liability coverage of at
least $1,000,000 each accident, $1,000,000 each employee and a $1,000,000
disease policy limit. The foregoing insurance shall be endorsed to state that that
the workers’ compensation carrier waives its right of subrogation against the
Augusta Richmond County Board of Commissioners, their officers, agents,
elected and appointed officials, representatives, volunteers, and employees and
the Aviation Commission.
(b) Comprehensive General Liability Insurance – In the amount of Five Million
($5,000,000) against claims for bodily injury, death or property damage
occurring on, in about the Contractor’s premises and the Airport, in an amount
recommended by the Risk Manager and acceptable to the City. Said coverage
shall include products and completed operations. The foregoing insurance shall
be endorsed to state that it will be primary to the Aviation Commission’s
insurance and that the carrier waives its right of subrogation against Augusta-
Richmond County, the Aviation Commission, and their officers, agents, elected
and appointed officials, representatives, volunteers, and employees. Augusta-
Richmond County Commission, the Aviation Commission, and their officers,
agents, elected and appointed officials shall be added as additional insureds on
said policies, including products and completed operations. Said policy shall
contain Severability of Interest Clause and shall include Contractual Liability
coverage at least as broad as that given in the most current CG 00 01 ISO form.
(c) Automobile Insurance. For any vehicles authorized in writing by the Executive
Director to operate on the Aircraft Operating Area (AOA) of the Airport,
Attachment number 1 \nPage 11 of 32
Item # 12
Attachment number 1 \nPage 65 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 12 of 32
Automobile Insurance in the minimum amount of Five Million Dollars
($5,000,000.00) combined single limit coverage. If the Contractor’s
Comprehensive General Liability coverage includes vehicular operations on the
Airport, separate automobile insurance shall not be required. The foregoing
insurance shall be endorsed to state that it will be primary to the Aviation
Commission’s insurance and that the carrier waives its right of subrogation
against Augusta-Richmond County, the Aviation Commission, and their officers,
agents, elected and appointed officials, representatives, volunteers, and
employees. Augusta-Richmond County Commission, the Aviation Commission,
and their officers, agents, elected and appointed officials shall be added as
additional insureds on said policies. Said policy shall contain Severability of
Interest Clause and shall include contractual liability coverage at least as broad as
that given in the most current CA 00 01 ISO form.
(d) All such evidence of insurance shall be in the form of certificates of insurance
satisfactory to the City and its Risk Manager, accompanied by a certified true
copy of an endorsement to each policy containing the above language. The
insurance coverage and limits required shall be evidenced by properly executed
certificates of insurance. These certificates shall be signed by the authorized
representative of the insurance company shown on the certificate. The required
policies of insurance shall be in compliance with the laws of the State of Georgia.
16.8 If at any time the Aviation Director requests a written statement from the insurance company as
to any impairments to the aggregate limit, Contractor shall promptly authorize and have delivered
such statement to the Aviation Commission. Contractor authorizes the Aviation Commission
and/or the City’s Risk Manager to confirm with Contractor’s insurance agents, brokers, and
insurance companies all information furnished.
16.9 The acceptance of delivery to the City and the Aviation Commission of any certificate of
insurance evidencing the insurance coverage and limits required under this Contract does not
constitute approval or acceptance by the City or the Aviation Commission that the insurance
requirements in this Contract have been met. No operations shall commence at the Airport unless
and until the required certificates of insurance are in effect and approved by the City.
16.10 The Contractor and the City understand and agree that the minimum limits of the insurance herein
required may, from time to time, become inadequate, and Contractor agrees that it will increase
such minimum limits upon receipt of written notice defining the basis of the increase. The
Contractor shall furnish the City, within sixty (60) days of the effective date thereof, a certificate
of insurance evidencing that such insurance is in force.
16.11 If at any time the Airport Director requests a written statement from the insurance companies as
to any impairments to the Aggregate Limit, prompt authorization and delivery of all requested
information will be given to the Aviation Commission. Renewal Certificates of Insurance must
be provided to the City and Aviation Commission as soon as practical but in every instance prior
to expiration of current coverage.
16.12 The amounts and types of insurance shall conform to the following minimum requirements with
the use of Insurance Service Office policies, forms, and endorsements or broader, where
applicable. Notwithstanding the foregoing, the wording of all policies, forms, and endorsements
must be reasonably acceptable to the City and Aviation Commission.
16.13 An insurance binder letter or a Certificate of Insurance must be sent to:
City of Augusta
Risk Manager
530 Greene Street
Room 217
Attachment number 1 \nPage 12 of 32
Item # 12
Attachment number 1 \nPage 66 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 13 of 32
Augusta, Ga. 30901
(706) 821-2502 (Fax)
ARTICLE 17
INDEMNIFICATION AND HOLD HARMLESS
Contractor agrees to indemnify and hold harmless the Augusta Aviation Commission, Augusta-Richmond
County Board of Commissioners and their members, officers, elected officials, agents, servants,
employees and successors in office, as set forth in the Augusta-Richmond County Code, and particularly
Article 1, Chapter 3, Division 1, Section 1-3-8.5, Indemnity and Insurance, as the same may be amended
from time to time, and described herein, from any and all claims including reasonable attorney's fees and
expenses of litigation incurred by the Augusta-Richmond County Board of Commissioners and the
Augusta Aviation Commission, in connection therewith related to or arising out of any damage or injury
to property or persons, occurring or allegedly occurring in, on or about Airport property which are in any
way related to or arising out of any failure of Contractor to perform its obligations hereunder. Contractor
further agrees that the foregoing contract to indemnify and hold harmless applies to any claims for
damage or injury to any individuals employed or retained by Contractor in connection with any changes,
additions, alterations, modifications and/or improvements made to the premises, and hereby releases the
Augusta-Richmond County Board of Commissioners and the Augusta Aviation Commission, from
liability in connection with any such claims. In the event of a conflict between the provisions of the
Augusta-Richmond County Code and this Contract, the broader requirement shall govern.
ARTICLE 18
AIRPORT SECURITY REQUIREMENTS/ SPECIAL
IDENTIFICATION DISPLAY AREA (SIDA) BADGES
Contractor’s employees may be required to operate in Airport secure areas unless escorted by Airport employees.
Contractor may be required to obtain the Airport’s Special Identification Display Area (SIDA) badges for any
employee working in the secured area. If badges are required, Contractor shall comply, at its own expense, with
the Transportation Security Authority (TSA) and the Airport’s security requirements for the Airport including, but
not limited to employee training and badging. Contractor shall cooperate with the TSA and the Airport on all
security matters and shall promptly comply with any project security arrangements established by the Airport.
Compliance with such security requirements shall not relieve Contractor of its responsibility for maintaining
proper security for the above-noted items, nor shall it be construed as limiting in any manner Contractor’s
obligation with respect to all applicable federal, state and local laws and regulations and its duty to undertake
reasonable action to establish and maintain secure conditions at and around the Premises and throughout the
Airport. All employees shall be properly badged and comply with all Airport safety and security rules.
18.1 To qualify for the badge, individual must be fingerprinted and have a background investigation
completed. In addition, the Airport will conduct a background inquiry and require finger printing
of all individuals who will be working on the secured side of the Airport screening point. This
may also include collection of appropriate criminal history information, contractual and business
associations and practices, employment histories, reputation in the business community and credit
reports for the Contractor, as well as, its employees.
18.2 Contractor consents to such an inquiry and agrees to make available to the Airport such books
and records the Airport deems necessary to conduct the review.
18.3 Contractor shall pay all costs associated with providing SIDA badges.
Attachment number 1 \nPage 13 of 32
Item # 12
Attachment number 1 \nPage 67 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 14 of 32
ARTICLE 19
HAZARDOUS MATERIALS
Contractor shall not cause or permit any Hazardous Material to be brought, kept or used in or about the Airport by
Contractor, its agents, employees, subcontractors, or invitees. Without limiting the foregoing, if the presence of
any Hazardous Material in the Airport caused or permitted by Contractor results in any contamination of the
Airport, Contractor shall promptly take all actions at its sole expense as are necessary to return the Airport to the
conditions existing prior to the introduction of such Hazardous Material to the Airport; provided that Airport’s
approval of such actions, and the corrective actions to be used by Contractor in connection therewith, shall first be
obtained. The term “Hazardous Material” means any hazardous or toxic substance, material, or waste, which is or
becomes regulated by any local governmental authority or the United States Government. The term “Hazardous
Material” includes, without limitation, any material or substance which is (i) defined as a “hazardous waste”,
“extremely hazardous waste”, or “restricted hazardous waste” or similar term under any laws now or hereafter
enacted by the United States or the State of Georgia or any political subdivision thereof, or (ii) designated a
“hazardous substance” pursuant to the Federal Water Pollution Control Act, 33 U.S.C. § 1317, or (iii) defined as a
“hazardous waste” pursuant to the Federal Resource Conservation and Recovery Act, 42 U.S.C.§ 6901 et seq., or
(iv) defined as a “hazardous substance” pursuant to the Comprehensive Environmental Response, Compensation
and Liability Act, 42 U.S.C. § 9601 et seq.
ARTICLE 20
MISCELLANEOUS PROVISIONS
20.1 NO PARTNERSHIP OR JOINT VENTURE; INDEPENDENT CONTRACTOR. Nothing
contained in this Contract will be deemed to create a partnership or joint venture between City
and Contractor or cause City to be responsible for the debts or obligations of Contractor or any
other party. Contractor must not represent to anyone that its relationship to City is other than as
City’s Contractor. Contractor must act as an independent agent and not as the agent of City in
performing this Contract, maintaining complete control over its employees and all of its lower-
tier suppliers and subcontractors. Nothing contained in this Contract or any lower tier purchase
order or subcontract awarded by Contractor will create any contractual relationship between any
lower-tier supplier or subcontractor and City. No act or direction of the City shall be deemed to
be the exercise of supervision or control of the Contractor’s performance hereunder.
Contractor is acting, in performance of this Contract, as an independent Contractor. Personnel
supplied by the Contractor or its agents or subcontractors hereunder are not the City’s or the
Airport’s employees or agents and Contractor assumes full responsibility for their acts.
Contractor shall be solely responsible for the payment of compensation to Contractor's
employees. The City shall not be responsible for payment of Worker's Compensation, disability
benefits, and unemployment insurance or for withholding and paying employment taxes for any
Contractor employee, or Contractor's subcontractors or agent's employees, but such responsibility
shall be solely that of Contractor. This clause of the contract does not prevent Airport from
requiring Contractor to have its employees follow normal rules and guidelines for work
performance, redirecting the efforts of the employees to meet the needs of the facilities,
performing safety or from requiring Contractor to perform the requirements of this Contract
satisfactorily, according to the terms set forth herein.
20.2 PATENT INDEMNITY. Except as otherwise provided, the Contractor agrees to indemnify the
City and its Board of Commissioners, officers, agents and employees against liability, including
costs and expenses for infringement upon any letters or patent of the United States arising out of
Attachment number 1 \nPage 14 of 32
Item # 12
Attachment number 1 \nPage 68 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 15 of 32
the performance of this Contract or out of the use or disposal by or for the account of the City of
supplies furnished or construction work performed hereunder.
20.3 COMMERCIAL ACTIVITY: Neither Contractor nor its employees may establish any
commercial activity or issue concessions or permits of any kind to third parties for establishing
activities at the Airport.
20.4 CONTINGENT FEES. Contractor warrants that it has not employed or retained any company or
person, other than a bona fide employee working for Contractor, to solicit or secure this Contract;
and that Contractor has not paid or agreed to pay any company, association, corporation, firm or
person, other than a bona fide employee working for Contractor, any fee, commission,
percentage, gift or any other consideration contingent upon or resulting from the award or making
of this Contract. For the breach or violation of this warranty and upon a finding after notice and
hearing, City may terminate the Contract and, at its discretion, may deduct from the Contract
Sum, or otherwise recover the full amount of any such fee, commission, percentage, gift or
consideration.
20.5 WAIVER. The failure of City to seek redress for any violation of or to insist upon the strict
performance of, any term of this Contract will not prevent a subsequent violation of this Contract
from being actionable by City. The provision in this Contract of any particular remedy will not
preclude City from any other remedy.
20.6 FORCE MAJEURE. Neither party hereto shall be considered in default in the performance of
its obligations hereunder to the extent that the performance of any such obligation, except the
payment of money, is prevented or delayed by any cause, existing or future, which is beyond the
reasonable control of the affected party, or by a strike, lockout or other labor difficulty, the
settlement of which shall be within the sole discretion of the party involved. Each party hereto
shall give notice promptly to the other of the nature and extent of any Force Majeure claimed to
delay, hinder or prevent performance of the services under this Contract. In the event either party
is prevented or delayed in the performance of this obligation by reason of such Force Majeure,
there shall be an equitable adjustment of the schedule. Contractor will not be liable for failure to
perform or for delay in performance as a result of Force Majeure, including the following:
(a) Any cause beyond its reasonable control;
(b) Any act of God;
(c) Inclement weather;
(d) Earthquake;
(e) Fire;
(f) Explosion;
(g) Flood;
(h) Strike or other labor dispute;
(i) Any shortage or disruption of or inability to obtain labor, material, manufacturing
facilities, power, fuel or transportation from unusual sources, or any other
transportation facility;
(j) Delay or failure to act of any governmental or military authority;
(k) Any war, hostility or invasion;
(l) Any embargo, sabotage, civil disturbance, riot or insurrection;
(m) Any legal proceedings; or
(n) Failure to act by Contractor’s suppliers due to any cause which Contractor is not
responsible, in whole or in part.
20. 7 PERMITS. Contractor shall obtain and maintain at all times all necessary licenses, permits and
certifications to perform the work described in the Contract. Contractor shall furnish copies of all
licenses, permits, and certifications to the Airport.
Attachment number 1 \nPage 15 of 32
Item # 12
Attachment number 1 \nPage 69 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 16 of 32
20.8 WORK PERMITS REQUIRED. Contractor agrees and acknowledges that its employees and
agent's employees, as well as any subcontractors or subcontractors' personnel, working on the
Contract must be United States citizens, or must be lawfully admitted for residence and be
permitted to work in the United States under the Immigration and Naturalization Act, 8 U.S.C.
1101, et seq.
20.9 COUNTERPARTS. This Contract may be executed in several counterparts, each of which shall be
deemed an original, and all such counterparts together shall constitute one and the same Contract.
20.10 CAPTIONS. The section captions contained in this Contract are for convenience only and do not
in any way limit or amplify any term or provision hereof. The use of the terms “hereof,”
“hereunder” and “herein” shall refer to this Contract as a whole, inclusive of the Exhibits, except
when noted otherwise. The use of the masculine or neuter genders herein shall include the
masculine, feminine and neuter genders and the singular form shall include the plural when the
context so requires.
20.11 ARTICLE FURTHER ACTS. City and Contractor each agrees to perform any additional acts,
execute, and deliver any additional documents as may reasonably be necessary in order to carry
out the provisions and effectuate the intent of this Contract.
20.12 USE OF AUGUSTA, GEORGIA LANDFILL. All contracts for contractors performing
demolition and/or construction projects for Augusta, Georgia shall contain a provision requiring
that all debris, trash and rubble from the project be transported to and disposed of at the Augusta,
Georgia Solid Waste Landfill in accordance with local and state regulations. The contractor shall
provide evidence of proper disposal through manifests, which shall include the types of material
disposed of, the name and location of the disposal facility, date of disposal and all related fees.
20.13 PROHIBITION AGAINST CONTINGENT FEES. The Contractor by execution of this
Contract warrants that it has not employed or retained any company or person, other than a bona
fide employee working solely for it, to solicit or secure this Contract and that it has not paid or
agreed to pay any person, company, corporation, individual, or firm, other than a bona fide
employee working solely for it, any fees, commission, percentage, gift, or other consideration
contingent upon or resulting from the award or making of this Contract.
20.14 CONFLICT IN DOCUMENTS AND PRESENT DOCUMENTS. The Contractor shall in no
case claim a waiver of any specification requirements on the basis of previous approval of
material or workmanship on other jobs of like nature or on the basis of what might be considered
“standard” for material or workmanship in any particular location. The Contract for this Project
shall govern the Work. If any portion of the Contract shall be in conflict with any other portion,
the various documents comprising the Contract shall govern in the following order of precedence:
Contract, Change Orders or modifications issued after execution of the Contract; the General
Requirements of the Contract; the Specifications; the Drawings; as between schedules and
information given on the drawings, the schedules shall govern; as between figures given on
Drawings and the scaled measurements, the figures shall govern; as between large-scale
Drawings and small-scale Drawings, the larger scale shall govern; and detailed drawings shall
govern over general drawings; the Bid Document Package.
20.15 GOVERNING LAW. This Contract will be construed under Georgia law, including the Georgia
Uniform Commercial Code; all remedies available under that code are applicable to this Contract.
Contractor and Augusta-Richmond City fix jurisdiction and venue for any action brought with
respect to this Contract in Augusta-Richmond City, Georgia. Contractor specifically consents to
venue in Richmond City and waives any right to contest the venue in the Superior Court of
Richmond City, Georgia or the Southern District Court of Georgia. Should any provision of this
Contract require judicial interpretation, it is agreed that the court interpreting or construing the
same shall not apply a presumption that the terms hereof shall be more strictly construed against
one party by reason of the rule of construction that a document is to be construed more strictly
against the party who itself or through its agent prepared same, it being agreed that the agents of
Attachment number 1 \nPage 16 of 32
Item # 12
Attachment number 1 \nPage 70 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 17 of 32
all parties have participated in the preparation hereof and all parties have had an adequate
opportunity to consult with legal counsel.
20.16 ENTIRE AGREEMENT. This Contract constitutes the sole agreement between the City and the
Contractor. No representations oral or written not incorporated herein shall be binding on the parties. No
Change Order, Field Order, amendment or modification of this Contract shall be enforceable unless
approved by official action as provided in this Contract. Attached hereto and incorporated herein as part
of this Contract are Addendums, Exhibits, Insurance, Statement of Non-Discrimination, Non-Collusion
Affidavit of Prime Bidder Non-Collusion Affidavit of Sub-Contractor(s), Conflict of Interest and
Contractor Affidavit and Agreement, Bidder’s Form/Acknowledgement of Addenda, Georgia Security
and Immigration Contractor Affidavit, Georgia Security and Immigration Subcontractor Affidavit.
IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed by their
appropriate officials, as of the date first written above.
____________________________
Douglas Lively, Chairman
Augusta Regional Airport Aviation Commission
ATTEST:____________________________
CONTRACTOR AUGUSTA-RICHMOND COUNTY COMMISSION
BY:_____________________________ BY:___________________________
TITLE:__________________________ TITLE:________________________
ATTEST: ATTEST:
________________________________ ______________________________
CITY CLERK
Attachment number 1 \nPage 17 of 32
Item # 12
Attachment number 1 \nPage 71 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 18 of 32
EXHIBIT A
BID PRICE SHEET
Attachment number 1 \nPage 18 of 32
Item # 12
Attachment number 1 \nPage 72 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 19 of 32
Attachment number 1 \nPage 19 of 32
Item # 12
Attachment number 1 \nPage 73 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 20 of 32
EXHIBIT B
REQUIRED SUBMITTALS
Attachment number 1 \nPage 20 of 32
Item # 12
Attachment number 1 \nPage 74 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 21 of 32
Attachment number 1 \nPage 21 of 32
Item # 12
Attachment number 1 \nPage 75 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 22 of 32
Attachment number 1 \nPage 22 of 32
Item # 12
Attachment number 1 \nPage 76 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 23 of 32
Attachment number 1 \nPage 23 of 32
Item # 12
Attachment number 1 \nPage 77 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 24 of 32
Attachment number 1 \nPage 24 of 32
Item # 12
Attachment number 1 \nPage 78 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 25 of 32
Attachment number 1 \nPage 25 of 32
Item # 12
Attachment number 1 \nPage 79 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 26 of 32
Attachment number 1 \nPage 26 of 32
Item # 12
Attachment number 1 \nPage 80 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 27 of 32
Attachment number 1 \nPage 27 of 32
Item # 12
Attachment number 1 \nPage 81 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 28 of 32
EXHIBIT C
INSURANCE
Attachment number 1 \nPage 28 of 32
Item # 12
Attachment number 1 \nPage 82 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 29 of 32
Attachment number 1 \nPage 29 of 32
Item # 12
Attachment number 1 \nPage 83 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 30 of 32
EXHIBIT D
PLANS/MAP
Attachment number 1 \nPage 30 of 32
Item # 12
Attachment number 1 \nPage 84 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 31 of 32
Attachment number 1 \nPage 31 of 32
Item # 12
Attachment number 1 \nPage 85 of 92
Item # 9
Contract for Runway Rubber Removal and Painting Page 32 of 32
Attachment number 1 \nPage 32 of 32
Item # 12
Attachment number 1 \nPage 86 of 92
Item # 9
Invitation to Bid Professional Services
Sealed bids will be received at this office until Friday, November 1, 2013 @ 11:00 a.m. for furnishing:
Bid Item 13-227 Runway Rubber Removal & Painting for Augusta Regional Airport
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
706-821-2422
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid
documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room
605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta,
GA Procurement Department. No bid will be accepted by fax, all must be received by mail or hand delivered.
The local bidder preference program is applicable to this project. To be approved as a local bidder and receive
bid preference an eligible bidder must submit a completed and signed written application to become a local
bidder at least thirty (30) days prior to the date bids are received on an eligible local project. An eligible bidder
who fails to submit an application for approval as a local bidder at least thirty (30) days prior to the date bids
are received on an eligible local project, and who otherwise meets the requirements for approval as a local
bidder, will not be qualified for a bid preference on such eligible local project.
No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall
include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and
conditions, applicable to the procurement. All specific requirements contained in the invitation to bid
including, but not limited to, the number of copies needed, the timing of the submission, the required
financial data, and any other requirements designated by the Procurement Department are considered
material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All
requests to waive or modify any such material condition shall be submitted through the Procurement Director to the
appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission.
Please mark BID number on the outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement
Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of
receiving incomplete or inaccurate information upon which to base his qualifications.
GERI A. SAMS, Procurement Director
cc: Tameka Allen Deputy Administrator
Gary LeTellier Augusta Regional Airport
Tim Weegar Augusta Regional Airport
Attachment number 2 \nPage 1 of 1
Item # 12
Attachment number 1 \nPage 87 of 92
Item # 9
VENDORS Attachment B E-Verify # SAVE Form Addendum 1 Bid Price
Peek Pavement Marking
4600 Peek Industrial Dr
Columbus, GA 31908
Yes 41699 Yes Yes $15,250.00
HiI-Lite
18249 Hi-Lite Drive
P. O. Box 46
Adams Center, NY
Road Runner Markings
1151 McFarland Street
Dunedin, FL 34698-3528
Bid Item #13-227
Runway Rubber Removal & Painting
for Augusta, Georgia - Augusta Regional Airport
Bid Due: Thursday, November 7, 2013 @ 11:00 a.m.
Page 1 of 1
Attachment number 3 \nPage 1 of 1
Item # 12
Attachment number 1 \nPage 88 of 92
Item # 9
Attachment number 4 \nPage 1 of 1
Item # 12
Attachment number 1 \nPage 89 of 92
Item # 9
ATTN: BRAD DYE
PEEK PAVEMENT MARKINGS, LLC
4600 PEEK INDUSTRIAL DRIVE
P. O. BOX 7337
COLUMBUS, GA 31908
ATTN: DENNIS HAEFNER
HI-LITE
18249 HI-LITE DRIVE
P. O. BOX 46
ADAMS CENTER, NY
ATTN: JAMES W. SEFCIK
ROAD RUNNER MARKINGS, INC.
1151 MCFARLAND STREET
DUNEDIN, FL 34698-3528
GARY LETELLIER
AUGUSTA REGIONAL AIRPORT
TIM WEEGAR
AUGUSTA REGIONAL AIRPORT
Bid Item 13-227 Runway Rubber
Removal & Painting mailed 10/24/13
Bid Item 13-227
Runway Rubber Removal & Painting
For Augusta Regional Airport
Bid Due: Fri. 11/1/13 @ 11:00 a.m.
Attachment number 5 \nPage 1 of 1
Item # 12
Attachment number 1 \nPage 90 of 92
Item # 9
Public Service Committee Meeting
1/27/2014 12:45 PM
Update on RFP Process for Augusta Municipal Golf Course
Department:Clerk of Commission
Caption:Update from staff on the RFP process for "The Patch" golf
course. (Requested by Commissioner Mary Davis)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 13
Attachment number 1 \nPage 91 of 92
Item # 9
Attachment number 1 \nPage 1 of 1
Item # 13
Attachment number 1 \nPage 92 of 92
Item # 9
Attachment number 2 \nPage 1 of 113
Item # 9
Attachment number 2 \nPage 2 of 113
Item # 9
Attachment number 2 \nPage 3 of 113
Item # 9
Attachment number 2 \nPage 4 of 113
Item # 9
Attachment number 2 \nPage 5 of 113
Item # 9
Attachment number 2 \nPage 6 of 113
Item # 9
Attachment number 2 \nPage 7 of 113
Item # 9
Attachment number 2 \nPage 8 of 113
Item # 9
Attachment number 2 \nPage 9 of 113
Item # 9
Attachment number 2 \nPage 10 of 113
Item # 9
Attachment number 2 \nPage 11 of 113
Item # 9
Attachment number 2 \nPage 12 of 113
Item # 9
Attachment number 2 \nPage 13 of 113
Item # 9
Attachment number 2 \nPage 14 of 113
Item # 9
Attachment number 2 \nPage 15 of 113
Item # 9
Attachment number 2 \nPage 16 of 113
Item # 9
Attachment number 2 \nPage 17 of 113
Item # 9
Attachment number 2 \nPage 18 of 113
Item # 9
Attachment number 2 \nPage 19 of 113
Item # 9
Attachment number 2 \nPage 20 of 113
Item # 9
Attachment number 2 \nPage 21 of 113
Item # 9
Attachment number 2 \nPage 22 of 113
Item # 9
Attachment number 2 \nPage 23 of 113
Item # 9
Attachment number 2 \nPage 24 of 113
Item # 9
Attachment number 2 \nPage 25 of 113
Item # 9
Attachment number 2 \nPage 26 of 113
Item # 9
Attachment number 2 \nPage 27 of 113
Item # 9
Attachment number 2 \nPage 28 of 113
Item # 9
Attachment number 2 \nPage 29 of 113
Item # 9
Attachment number 2 \nPage 30 of 113
Item # 9
Attachment number 2 \nPage 31 of 113
Item # 9
Attachment number 2 \nPage 32 of 113
Item # 9
Attachment number 2 \nPage 33 of 113
Item # 9
Attachment number 2 \nPage 34 of 113
Item # 9
Attachment number 2 \nPage 35 of 113
Item # 9
Attachment number 2 \nPage 36 of 113
Item # 9
Attachment number 2 \nPage 37 of 113
Item # 9
Attachment number 2 \nPage 38 of 113
Item # 9
Attachment number 2 \nPage 39 of 113
Item # 9
Attachment number 2 \nPage 40 of 113
Item # 9
Attachment number 2 \nPage 41 of 113
Item # 9
Attachment number 2 \nPage 42 of 113
Item # 9
Attachment number 2 \nPage 43 of 113
Item # 9
Attachment number 2 \nPage 44 of 113
Item # 9
Attachment number 2 \nPage 45 of 113
Item # 9
Attachment number 2 \nPage 46 of 113
Item # 9
Attachment number 2 \nPage 47 of 113
Item # 9
Attachment number 2 \nPage 48 of 113
Item # 9
Attachment number 2 \nPage 49 of 113
Item # 9
Attachment number 2 \nPage 50 of 113
Item # 9
Attachment number 2 \nPage 51 of 113
Item # 9
Attachment number 2 \nPage 52 of 113
Item # 9
Attachment number 2 \nPage 53 of 113
Item # 9
Attachment number 2 \nPage 54 of 113
Item # 9
Attachment number 2 \nPage 55 of 113
Item # 9
Attachment number 2 \nPage 56 of 113
Item # 9
Attachment number 2 \nPage 57 of 113
Item # 9
Attachment number 2 \nPage 58 of 113
Item # 9
Attachment number 2 \nPage 59 of 113
Item # 9
Attachment number 2 \nPage 60 of 113
Item # 9
Attachment number 2 \nPage 61 of 113
Item # 9
Attachment number 2 \nPage 62 of 113
Item # 9
Attachment number 2 \nPage 63 of 113
Item # 9
Attachment number 2 \nPage 64 of 113
Item # 9
Attachment number 2 \nPage 65 of 113
Item # 9
Attachment number 2 \nPage 66 of 113
Item # 9
Attachment number 2 \nPage 67 of 113
Item # 9
Attachment number 2 \nPage 68 of 113
Item # 9
Attachment number 2 \nPage 69 of 113
Item # 9
Attachment number 2 \nPage 70 of 113
Item # 9
Attachment number 2 \nPage 71 of 113
Item # 9
Attachment number 2 \nPage 72 of 113
Item # 9
Attachment number 2 \nPage 73 of 113
Item # 9
Attachment number 2 \nPage 74 of 113
Item # 9
Attachment number 2 \nPage 75 of 113
Item # 9
Attachment number 2 \nPage 76 of 113
Item # 9
Attachment number 2 \nPage 77 of 113
Item # 9
Attachment number 2 \nPage 78 of 113
Item # 9
Attachment number 2 \nPage 79 of 113
Item # 9
Attachment number 2 \nPage 80 of 113
Item # 9
Attachment number 2 \nPage 81 of 113
Item # 9
Attachment number 2 \nPage 82 of 113
Item # 9
Attachment number 2 \nPage 83 of 113
Item # 9
Attachment number 2 \nPage 84 of 113
Item # 9
Attachment number 2 \nPage 85 of 113
Item # 9
Attachment number 2 \nPage 86 of 113
Item # 9
Attachment number 2 \nPage 87 of 113
Item # 9
Attachment number 2 \nPage 88 of 113
Item # 9
Attachment number 2 \nPage 89 of 113
Item # 9
Attachment number 2 \nPage 90 of 113
Item # 9
Attachment number 2 \nPage 91 of 113
Item # 9
Attachment number 2 \nPage 92 of 113
Item # 9
Attachment number 2 \nPage 93 of 113
Item # 9
Attachment number 2 \nPage 94 of 113
Item # 9
Attachment number 2 \nPage 95 of 113
Item # 9
Attachment number 2 \nPage 96 of 113
Item # 9
Attachment number 2 \nPage 97 of 113
Item # 9
Attachment number 2 \nPage 98 of 113
Item # 9
Attachment number 2 \nPage 99 of 113
Item # 9
Attachment number 2 \nPage 100 of 113
Item # 9
Attachment number 2 \nPage 101 of 113
Item # 9
Attachment number 2 \nPage 102 of 113
Item # 9
Attachment number 2 \nPage 103 of 113
Item # 9
Attachment number 2 \nPage 104 of 113
Item # 9
Attachment number 2 \nPage 105 of 113
Item # 9
Attachment number 2 \nPage 106 of 113
Item # 9
Attachment number 2 \nPage 107 of 113
Item # 9
Attachment number 2 \nPage 108 of 113
Item # 9
Attachment number 2 \nPage 109 of 113
Item # 9
Attachment number 2 \nPage 110 of 113
Item # 9
Attachment number 2 \nPage 111 of 113
Item # 9
Attachment number 2 \nPage 112 of 113
Item # 9
Attachment number 2 \nPage 113 of 113
Item # 9
Public Service Committee Meeting
11/10/2014 1:00 PM
Dedication of Advance Voting Center and Community Room
Department:Board of Elections
Caption:Dedication of Advance Voting Center and Community Room in
honor of Linda W. Beazley.
Background:The new Advance Voting Center and Community Room on the
1st Floor of the Municipal Building provides an easily
accessible, state of the art facility for citizens to use during
Advance Voting or as a multi-purpose room for meetings or
hearings. Linda Beazley was the first Executive Director for the
Richmond County Board of Elections Office and served in that
capacity from 1973 - 1993. Mrs. Beazley also served as County
Administrator from 1993 - 1996, as State Elections Director from
1996 - 2005, and as Chairperson of the Richmond County Board
of Elections from 2005 - 2011. In addition to dedicating the
room in Linda Beazley's honor, we are proposing that heirloom
election memorabilia be displayed in the room for the enjoyment
of the public. The Augusta Museum of History has been
consulted in order to to determine the proper way to display these
documents and memorabilia.
Analysis:Dedicating the room in honor of Linda Beazley is a very
appropriate way to honor this great Augustan and Georgian.
Nancy Glaser with the Augusta Musuem of History has been
consulted and has given an estimate of $5,000 to have her staff
design, build and install 4 displays for election artifacts. The cost
for the displays would include all materials, design labor and
installation. Having the Musuem staff prepare and install the
displays will ensure that the displays are professionally designed
and installed and will meet all ADA requirements. There are other
items for public viewing besides those to be included in displays ,
including election results from 1869, drawings, and general
memorabilia.
Financial Impact:$5,000 paid by the City of Augusta to the Augusta Musuem of
History for the design, construction and installation of 4 displays.
In additon, $2,500 in private donations will be collected to cover
other costs (like framing) related to displaying the heirloom
Cover Memo
Item # 10
election artifacts.
Alternatives:
Recommendation:That the City of Augusta dedicate the Advance Voting Center and
Community Room in the name of Linda W. Beazley and
contribute $5,000 towards the establishment of a public exhibit of
election memorabilia.
Funds are Available
in the Following
Accounts:
Capital outlay contingency - dbw
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 10
Public Service Committee Meeting
11/10/2014 1:00 PM
Intergovernmental Agreement
Department:Law
Caption:Motion to approve and authorize the execution of an Augusta and
the Board of Education jointly purchased a tract of land on
Highway 56 in June, 2009 for a common maintenance
facility. However, in order to utilize FTA grants to improve the
site for a bus maintenance facility, Augusta must solely own the
tract of land where the grants will be used. The BOE has agreed to
convey its half interest in the tract where Augusta will relocate its
bus maintenance facility. To reallocate the ownership of the land
and to account for investments by the parties in the joint property,
an Intergovernmental Agreement must be executed between the
parties and the Mayor and Clerk of Commission need to be
authorized to accept the deed from the BOE regarding the
allocation of ownership of the Highway 56 Bus Barn property by
the Mayor and Clerk of Commission and to authorize the Mayor
to accept a deed from the Board of Education conveying its half
interest in the 8.06 acre tract where Augusta is to relocate its bus
maintenance facility.
Background:Augusta and the Board of Education jointly purchased a tract of
land on Highway 56 in June, 2009 for a common maintenance
facility. However, in order to utilize FTA grants to improve the
site for a bus maintenance facility, Augusta must solely own the
tract of land where the grants will be used. The BOE has agreed to
convey its half interest in the tract where Augusta will relocate its
bus maintenance facility. To reallocate the ownership of the land
and to account for investments by the parties in the joint property,
an Intergovernmental Agreement must be executed between the
parties and the Mayor and Clerk of Commission need to be
authorized to accept the deed from the BOE.
Analysis:None
Financial Impact:None
Alternatives:None practical if grants are to be used.Cover Memo
Item # 11
Recommendation:Approve Motion
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 11
Attachment number 1 \nPage 1 of 11
Item # 11
Attachment number 1 \nPage 2 of 11
Item # 11
Attachment number 1 \nPage 3 of 11
Item # 11
Attachment number 1 \nPage 4 of 11
Item # 11
Attachment number 1 \nPage 5 of 11
Item # 11
Attachment number 1 \nPage 6 of 11
Item # 11
Attachment number 1 \nPage 7 of 11
Item # 11
Attachment number 1 \nPage 8 of 11
Item # 11
Attachment number 1 \nPage 9 of 11
Item # 11
Attachment number 1 \nPage 10 of 11
Item # 11
Attachment number 1 \nPage 11 of 11
Item # 11
Attachment number 2 \nPage 1 of 3
Item # 11
Attachment number 2 \nPage 2 of 3
Item # 11
Attachment number 2 \nPage 3 of 3
Item # 11
Public Service Committee Meeting
11/10/2014 1:00 PM
Language for the Sign at the New Entrance for the Augusta, Georgia Municipal Building
Department:Recreation, Parks and Facilities
Caption:Determine the language for the sign at the New Entrance for the
Augusta, Georgia Municipal Building.
Background:Recently the entrance to the Municipal Building was relocated
from the Greene Street side of the building to the Telfair Street
side. The design calls for a new sign over the new entrance. This
is a request for direction on how the city wishes the language of
the sign to read.
Analysis:The sign above the former Greene Street entrance reads “Augusta
– Richmond County Municipal Building” It is our understanding
that the official name for the Unified Government is “Augusta,
Georgia. This language was used on the renderings of the building
as a place holder and reads “Augusta, Georgia Municipal
Building”. Both have the address 530 under them. Before ordering
the signage for the building, direction is needed on how the city
wishes the language to read.
Financial Impact:The Construction Manager at Risk has included this signage in
their GMP and there should not be any financial impact unless
there is a significant addition to the language.
Alternatives:1. Go with “Augusta Georgia Municipal Building” the language
used as a place holder on the renderings. 2. Match the existing
language on the Greene Street side of the building, which reads
“Augusta – Richmond County Municipal Building”. 3. Determine
different language from alternatives given above.
Recommendation:Use the language “Augusta, Georgia Municipal Building” for the
sign above the new entrance.
Funds are Available
in the Following
Accounts:
Municipal Building Renovations: JL: 212 05 5101 Ob Code: 52-
12119 GL: 328 05 1120 Cover Memo
Item # 12
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 12
Attachment number 1 \nPage 1 of 1
Item # 12
Attachment number 2 \nPage 1 of 1
Item # 12
Public Service Committee Meeting
11/10/2014 1:00 PM
Minutes
Department:Clerk of Commission
Caption:Motion to approve the minutes of the Public Services Committee
held on October 27, 2014.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 13
Attachment number 1 \nPage 1 of 4
Item # 13
Attachment number 1 \nPage 2 of 4
Item # 13
Attachment number 1 \nPage 3 of 4
Item # 13
Attachment number 1 \nPage 4 of 4
Item # 13
Public Service Committee Meeting
11/10/2014 1:00 PM
Therapuetic Massage Operators License
Department:Planning & Development
Caption:Discussion: A request by Jason Voulgaris for a Therapuetic
Massage Operators license to be used in connection with AA
Massage located at 3540 Wheeler Rd. District 3. Super District
10.
Background:This is a new application.
Analysis:It is our belief that the applicant does not meet the intent of the
City of Augusta's Ordinance regulating Therapuetic Massage
Operators Licenses.
Financial Impact:The applicant will pay a fee of $121.00.
Alternatives:
Recommendation:Planning & Development recommend Denial. The RCSO
recommends Denial.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 14
S.^=
ri6O
= <-
flsfl3Er,o xF
D'g 0)
:,q fI: a
.)i sii:
o6Qo-l-oo
onPE;9o/i': rO
€o
J=.
o*
o
IT> -: ]
ta@\'<)+; t F;
!i.xi!
uror:N] /-(,Pl:.
ou5 -6
N,'- @ )a,".lA o'!uY' rj
6-,'' C::oP3autOOu^!V IUE0);1:o
T:;.: r.)
U, I
-{ a)<J
o3oQ
5r
:o-=ml
-s 9.95',:o
o
a
!
o
3:o
=
o
D
9.
o0
Io
o
3.g.of
ao
o
o
C)oCz-lof o0r.;c9nUts0 =)+mo'X U)PZa
B-o -rioD'Ex2nmm91U', C,inxzo
Lr);iZ
5
ooooot
o
0JOlc
3cpqc
rO9il'
-dq+ori
= gB'
o@q-^5oXon
A f 5*O tuoQdA: P(-lo+
€&g
s-o
oo
6Pd3c-rO-o5ootci
5--lO-
rOoc$foaooqD
=@95go
€-oio@ogf.j-<
6--OOtul?: l
-d I
oE I6'Q I)6 Ig5 I6l
?
E
b
lc
le.)
i0r
E
I
Attachment number 1 \nPage 1 of 3
Item # 14
AUUUSIA ruCHMUND UUUN I Y
PERSONNEL STATEMENT
1815 MARYIN GRIFFIN ROAD
AUGUSTA GA 30906
FullName of Applicant:r)
2)Home Address:
3) rerephone *, 1Qb?Qtl OlaO ss*,
High School Diploma: Ves U,/ No
4) Trade name of Business of which personnel statement is a part ,t, A A (l A-SSagq-
Business Address:
Date of Birth, Q3 311q
or GED: Yes No
9o95)
6)
7)
8)
e)
Business Telephone:
Position of Applicant in Business; O ulrlQ-n
Other names use by-applicant: maiden name, names used in former maniages, alias, stagename, and or
nicknames
Place of Birth:
Naturalized:
U.S. Citizen t&"t ( ) no
Date, Place and Court:
Certification No:
l0)MartialStatus: (ffianied, ( )Divorced ( ) Separated() Widowed( ) Single( )
11) If married, divorced, or widowed, complete the information requested below.
Fult name of spouse; (i n o H O o! Tong ,ru
l2)Applicants,ueigrrt: 5/()8l/ weight;lfl< lLt eee' t{ 0
ColorHair: At*" k color Eyes: L t n- ^
Occupation and Description of
Duties Performed
Qr4rr[vtOIti,
,U.S. Arbag
Cive most recent first. Ifself-em ive details
Reason for l-caving
To6
oir,q.d 3rs9o4
I
aett
l
.es I
[xt rel
,hor3r
Attachment number 1 \nPage 2 of 3
Item # 14
List in reverse ch ical order all of residence for the
l5) References: Give three personal references, notrelatives, formeremployers, fellow employees, or school teachers, who are responsible,
reputable, adults, business or professional men or women, who have known you well during the past five years. (Name, residence,
business, addr-ess, and nur;rber c.f ye-ars,known).
l6) Military service:( Serial numbers, branch service, period ce, type of disc-f
l7) Have you ever been arrested, or held by Federal, State, or other law enforcement authorities, for any violations ofany federal, state,
county or municipal law, regulation or ordinance? (Do no include traffic violations, unless they are offenses pertaining to alcohol or
drugs, such as driving under the influence.) All other charges be i4cluded even if they were disryrissed:aol<^A,, -Yh c^.^.a't /a.^-smissed:. Cive/'fr^ n'Qs charge{ orheld, date, place where
18) Attach two (2) copies of driver's license and or picture I.D. to application,
Note: Before signing this statement, check all answers and explanations to see that you have answered all questions correctly. 1'his
statement is to be executed under oath and subject to the penalties of false swearing, and it includes all attached sheets submitterl.
herewith.
VERIFICATION
State of Georr,. (i cLr frf Or"J counry
do solemnly swear, subject to the penalties of false swearing that the
statements and answers by me as the applicant in the foregoing personnel statement are true.
I hereby certi0/ that (the above signed person) is personally known to me,
he/she signed his/her name to the foregoing application stating to me that he/she knew and understood all statement and answers
therin, and, under oath
This day of in the year
Notary Public
that
made
(Full name in ink)
Sheriff Department Approval Disapproval
Attachment number 1 \nPage 3 of 3
Item # 14