Loading...
HomeMy WebLinkAbout2014-01-13-Meeting Agendawww.augustaga.gov Public Service Committee Meeting Commission Chamber- 1/13/2014- 12:45 PM PUBLIC SERVICES 1. Motion to approve Augusta Public Transit’s purchase of maintenance equipment. Attachments 2. Motion to approve the Christman Company as the Construction Manager at Risk for the Augusta, Georgia Transit Operation and Maintenance Facility on Highway 56. Attachments 3. Receive a report from the Administrator regarding a plan of action concerning the establishment of a bus route to Fort Gordon. (Referred from November 25 Public Services Committee) Attachments 4. Motion to approve the minutes of the Public Services Committee held on November 25, 2013. Attachments 5. Provide an update on the status of the 56 Project (Transit) to include, but not limited to, the following: (a) Current status of project, (b) Construction completion date, (c) Renovation or new construction, (d) Project cost, (e) Funding source(s), (f) Detailed information on contamination at site, (g) Annual projected cost for dead head miles, (h) Additional relevant information not specified. (Requested by Commissioner Bill Lockett) Attachments 6. Receive an update from staff on the progress of repairs on Riverwalk. (Requested by Mayor Pro Tem Corey Johnson) (Referred from December 17 Commission meeting) Attachments Public Service Committee Meeting 1/13/2014 12:45 PM Augusta Public Transit Maintenance Lifts Department:Augusta Public Transit Caption:Motion to approve Augusta Public Transit’s purchase of maintenance equipment. Background:The Capital Assistance Grant is being used to purchase t he Mobile Column Lift System, 4 Columns consist of, Mobile Support Stands, 16,000 lbs, Small Wheel Adapter – 6” for R, Light Vehicle Adapter, 16000 lbs, Cart for LVA-8-W, Extension Kit – 2”, 4”, 6”, 8”, and Cross-Beam – 32k lbs capacity. The lift system will be utilized by Maintenance for vehicle repairs of the Rural Vehicles. Analysis:The maintenance equipment will be purchased from Reliable Hydraulics, Inc. Financial Impact:The Lifts are $39,246. FTA pays 80% of the cost, $31,396.80 and Augusta-Richmond County the remaining 20%, $7,849.20. The impact of approving this purchase will be an upgrade to the safety and repair of Transit vehicles. Alternatives:Non-approval. Recommendation:Approve the purchase of the Mobile Column Lift System, 4 Columns. Funds are Available in the Following Accounts: 54709-1209-5316110 and 54709-1210-5316210. REVIEWED AND APPROVED BY: Finance. Procurement. Cover Memo Item # 1 Law. Administrator. Clerk of Commission Cover Memo Item # 1 Invitation to Bid Sealed bids will be received at this office on Friday, July 26, 2013 @ 11:00 a.m. for furnishing: Bid Item 13-162 Maintenance Equipment for Augusta Public Transit Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, July 12, 2013 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Augusta Chronicle June 20, 27, July 4, 11, 2013 Metro Courier June 26, 2013 Revised: 8/15/2011 Attachment number 1 \nPage 1 of 1 Item # 1 VENDORS Description Est Quan Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Mobile Column Lift System, 4 Columns, 1 $30,400.00 $30,400.00 Non- Compliant Non- Compliant Mobile Support Stands, 16,000 lbs 4 $624.00 $2,496.00 Non- Compliant Non- Compliant Small Wheel Adapter – 6” for R 4 Included Included Non- Compliant Non- Compliant Light vehicle adapter, 16,000 lbs 1 $1,740.00 $1,740.00 Non- Compliant Non- Compliant Cart for LVA-8-W 1 Included Included Non- Compliant Non- Compliant Extension Kit – 2”, 4”, 6”, 8”1 $1,630.00 $1,630.00 Non- Compliant Non- Compliant Main Control Box – to allow 1 N/A N/A Non- Compliant Non- Compliant Dummy Plug – to allow separating 1 N/A N/A Non- Compliant Non- Compliant Cross-Beam – 32 k lbs capacity 1 $2,980.00 $2,980.00 Non- Compliant Non- Compliant ATTACHMENT B E-VERIFY NUMBER SAVE FORM Yes Yes Creative Bus Sales 8600 Atlantic Blvd Jacksonville, FL 32211 Yes No Bid No Bid Item #13-162 Maintenance Equipment For Augusta, Georgia - Transit Department Bid Opening: Friday, July 26, 2013 @ 11:00 a.m. 449557 Yes Reliable Hydraulics Inc 2600 South Cobb Drive Symyrna, GA 30080 Napa Auto Parts 1337 Reynolds St. Augusta, GA 30901 At t a c h m e n t n u m b e r 2 \ n P a g e 1 o f 1 It e m # 1 AUGUSTAPUBLIC TRANSIT SHARON DOTTERY, TRANSIT CONTRACT MANAGER November 14,2013 Ms. Geri Sams Director of Procurement Augusta Richmond County 530 Greene Street, Room 605 Augusta, GA 30901 RiE: RFP Bid #13-162 -Maintenance Equipment Dear Ms. Sams: We received one (l) compliant response for RFP 13-162 Maintenance Equipment. After review and discussions with Maintenance, I am requesting that we move forward with the award to Reliable Hydraulics lnc. Thank you for your assistance in this selection process. If you have any questions or require any additional information, please don't hesitate to contact me. Sincerely, qill'L Sharon Dottery Transit Contract Manager cc: Tameka Allen, Deputy Administrator Augusta Public Transit 1535 Fenwick Street - Augusta GA 30904 (706) 821-1818 -Fax (706) 821-1752 www.augustaga.gov Attachment number 3 \nPage 1 of 1 Item # 1 Attachment number 4 \nPage 1 of 3 Item # 1 Attachment number 4 \nPage 2 of 3 Item # 1 Attachment number 4 \nPage 3 of 3 Item # 1 Public Service Committee Meeting 1/13/2014 12:45 PM Augusta Public Transit CM at Risk Department:Augusta Public Transit Caption:Motion to approve the Christman Company as the Construction Manager at Risk for the Augusta, Georgia Transit Operation and Maintenance Facility on Highway 56. Background:During the Programming Phase of the project, a Request for Qualifications (RFQ) was prepared to solicit qualification statements and proposals for Construction Management at Risk Services for the Transit Operation and Maintenance Facility. Analysis:We received five (5) compliant responses for the Phase I qualifications submittals, after there were evaluated by the selection committee, a short list of four (4) firms was selected, based on scoring according to the scoring matrix included in the Phase II submittals requirements. Financial Impact:This item will be 80% federally funded and 20% locally funded. The total amount of $744,084 for the General Conditions, Preconstruction Services and Management Fees is included in the overall total project budget of $9,480,660 million. Alternatives:1. Approve the selection committee’s recommendation to select The Christman Company as the Construction Manager at Risk for the Augusta, Georgia Transit Operation and Maintenance Facility. 2. Select a different method of procuring the Construction Management at Risk services and award the total contract to a lump sum bidder, which will delay the completion date of the project and increase the total project costs. Recommendation:Approve the selection committee’s recommendation to select the Christman Company as the Construction Manager at Risk for the Augusta, Georgia Transit Operations and Maintenance Facility. Funds are Available in the Following 54709-1210-54-13130 and 54709-1213-52-12115 Cover Memo Item # 2 Accounts: REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Exhibit G Authorization for Pre - Construction Pursuant to this agreement, the Owner and The Christman Company the Construction Manager hereby execute this Exhibit G and further agree as follows: 1. The Construction Manager’s Guaranteed Maximum Price (“GMP”) proposal dated _______________, attached hereto and incorporated herein, is accepted by the Owner. 2. The General Conditions Guaranteed Maximum Cost for the Project, including this Bid Package, is: $ 524,084.00 3. Preconstruction Services is: $ 35,000.00 4. The Subcontracts Cost is: Bid Package #1 Bid Package #2 Bid Package #3 Bid Package #4 $ TBD $ TBD $ TBD $ TBD 5. 6. The Lump Sum Fixed Management Fee is: The Guaranteed Maximum Price is: $ 185,000.00 $ TBD 7. The Date of Substantial Completion shall be 12 months after Notice-to-Proceed Owner: Construction Manager: Augusta, Georgia By: (Signature) (Seal) (Signature) (Seal) Deke Copenhaver (Name) (Name) Mayor (Title) (Title) 530 Greene Street, Suite 806 (Street Address – No PO Box) (Street Address – No PO Box) Augusta, Georgia 30901 (City, State, Zip) (City, State, Zip) Date of Signature Date of Signature Attachment number 1 \nPage 1 of 2 Item # 2 Attachment number 1 \nPage 2 of 2 Item # 2 Request for Qualifications Request for Qualifications will be received at this office until Wednesday, July 31, 2013 @ 3:00 p.m. for furnishing: RFQ Item #13-165 Construction Manager @ Risk Transit Operations and Maintenance Facility for Augusta Transit Department RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFQ documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFQ documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. A Mandatory Pre-Qualification Conference will be held on Tuesday, July 9, 2013 @ 10:00 a.m. A mandatory site visit will follow. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Thursday, July 11, 2013 @ 5:00 P.M. No RFQ will be accepted by fax, all must be received by mail or hand delivered. No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFQ number on the outside of the envelope. Bidders are cautioned that acquisition of RFQ documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle June 13, 20, 27, July 4, 2013 Metro Courier June 19, 2013 Revised: 8/15/2011 Attachment number 2 \nPage 1 of 1 Item # 2 VENDORS Attachment B E-Verify # Addendum 1 SAVE Form Original 6 Copies RW Allen 1015 Broad Street Augusta, GA 30901 Yes 46611 Yes Yes Yes Yes Dabbs Williams 319 S Walnut Street Statesboro, GA 30459 Yes 222733 Yes Yes Yes Yes The Christman Company 2812-B Hillcreek Drive Augusta, GA 30909 Yes KGAF1622/ 142894 Yes Yes Yes Yes Allen-Batchelor 1063 Franke Industial Drive Augusta, GA 30909 Yes 210879 Yes Yes Yes Yes ACC Construction 635 NW Frontage Road Augusta, GA 30907 Yes 261774 Yes Yes Yes Yes Contract Management 1827 Killingsworth Rd Augusta, GA 30904 J & B Construction 3550 Gordon Highway Grovetown, GA 30813 AJAX Building Corp 1004 Sterling Court Roswell, GA Yes No/Non- Compliant Yes Yes Yes Yes Manhattan Construction 5871 Glenridge Drive Atlanta, GA 30328 Brasfield & Gorrie 1990 Vaughn, Suite 100 Kennesaw, GA 30144 No Response RFQ Opening RFQ Item #13-165 Construction Manager @ Risk Transit Operations and Maintenace Facility for Augusta, Georgia - Transit Department RFQ Due: Wednesday, July 31, 2013 @ 10:00 a.m. Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 2 AUGUSTAPUBLIC TRANSIT SHARON DOTTERY, TRANSIT CONTRACT MANAGER November 14,2013 Ms. Geri Sams Director of Procurement Augusta Richmond County 530 Greene Street, Room 605 Augusta, GA 30901 RE: Bid #13-165 -CM@ Risk Transit Operations & Maintenance Facility Dear Ms. Sams: We received five (5) compliant responses for Phase I qualifications submittals, after these were evaluated by the selection committee, a short list of Four (4) firms was selected, based on the scoring for Phase I, to participate in the Phase II Interviews. The selection committee completed the evaluations of Phase I and Phase II submittals. Allen-Batchelor's DBE submittals did not acknowledge the DBE goals which were established in the RFP package and were therefore non-compliant. Each of the three remaining proposals were reviewed and discussed. The selection committee recommends that Augusta-Richmond County begin contract negotiations with The Christman Company. Thank you for your assistance in this selection process. If you have any questions or require any additional information, please don't hesitate to contact me. Sincerely, /r/o'trtW Sharon Dottery Transit Contract Manager cc: Tameka Allen, Deputy Administrator Augusta Public Transit 1535 Fenwick Street - Augustq GA 30904 (706) 82 1 -l 81 8 - Fax (706) 821-17 s2 www.augustaga.gov Attachment number 4 \nPage 1 of 1 Item # 2 Transit Phase II CM Summary Phase II Scoring Cumulative including Phase I ACC Construction Co., Inc.Allen + Batcher Construction RW Allen The Christman Company Dabbs Williams General Contractors, LLC Category and Description Pts.635 NW Frontage Road Augusta, GA 30907 1063 Franke Industial Drive Augusta, GA 30909 1015 Broad Street Augusta, GA 30901 2812-B Hillcreek Drive Augusta, GA 30909 319 S Walnut Street Statesboro, GA 30459 Technical Approach 15 12.75 13.50 14.25 14.63 10.10 Firm Organizational Overview 10 8.75 9.00 9.50 9.75 7.30 Company Experience and Performance 15 12.00 11.60 12.00 15.00 9.80 Experience, Competence and Commitment of Key Personnel 10 6.75 7.80 8.25 9.50 6.30 Project Management and Controls 10 8.75 8.50 9.50 9.75 6.50 Peer References 10 8.00 10.00 9.25 9.75 6.00 Augusta Metropolitan Area Experience 5 3.63 4.40 4.63 3.88 3.90 Financial Strength 5 4.75 1.10 2.38 5.00 2.00 Backlog 5 4.25 3.30 4.63 4.63 4.10 Legal Matters 5 3.00 3.10 4.88 4.88 4.10 Pre-Construction Services 10 8.25 9.00 9.50 9.75 6.00 Total Points 100 80.9 81.3 88.8 96.5 66.1 Category and Description Pts. Project Director 4 3.4 3.6 2.8 0.0 Preconstruction Manager 5 3.9 4.5 3.3 0.0 Senior Project Manager 6 4.8 5.4 4.2 0.0 Project Manager 20 15.5 18.0 13.5 0.0 Superintendent 25 20.0 22.5 18.1 0.0 Presentation 10 8.3 8.8 6.8 0.0 Q & A 10 8.8 9.0 6.8 0.0 Fee Proposal 20 20.0 16.0 18.0 0.0 Total Points 100 84.6 87.8 73.4 0.0 Evaluation Committee Comments: During Phase I - RW Allen, The Christman Company, ACC Construction, and Allen-Batchelor Corporation were shortlisted. During Phase II, the shortlisted firms were required to submit an RFP Package and were also requested to make a presentation to the committee. Allen-Batchelor was deemed as non-compliant and was therefore not allowed to make a presentation to the committee. All other firms were evaluated per the RFP criteria which was listed in the RFP package. Per the cumulative evaluation scores, The Christman Company received the highest score and was therefore recommended for the award of RFP 13-165. Phase 1 - Cumulative Evaluation Sheet RFQ 13-165 Construction Mananger @ Risk Transit Operations and Maintenance Facility For Augusta, Georgia - Tranist Department The Christman Company 2812 Hillcreek Drive Suite B Augusta, Georgia 30909 ACC Const. Co, Inc. 635 NW Frontage Road Augusta, Georgia 30907 Allen-Batchelor Construction 1063 Franke Industrial Drive Augusta, Georgia 30909 RW Allen, LLC 1015 Broad Street Augusta, Georgia 30901 Phase II Cumulative Evaluation Sheet Transit Operations and Maintenance Facility Construction Manager at Risk Evaluation Attachment number 5 \nPage 1 of 1 Item # 2 Attachment number 6 \nPage 1 of 4 Item # 2 Attachment number 6 \nPage 2 of 4 Item # 2 Attachment number 6 \nPage 3 of 4 Item # 2 Attachment number 6 \nPage 4 of 4 Item # 2 Attachment number 7 \nPage 1 of 4 Item # 2 Attachment number 7 \nPage 2 of 4 Item # 2 Attachment number 7 \nPage 3 of 4 Item # 2 Attachment number 7 \nPage 4 of 4 Item # 2 Public Service Committee Meeting 1/13/2014 12:45 PM Fort Gordon Bus Route Department:Clerk of Commission Caption:Receive a report from the Administrator regarding a plan of action concerning the establishment of a bus route to Fort Gordon. (Referred from November 25 Public Services Committee) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 3 Public Service Committee Meeting 1/13/2014 12:45 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Public Services Committee held on November 25, 2013. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 4 Attachment number 1 \nPage 1 of 4 Item # 4 Attachment number 1 \nPage 2 of 4 Item # 4 Attachment number 1 \nPage 3 of 4 Item # 4 Attachment number 1 \nPage 4 of 4 Item # 4 Public Service Committee Meeting 1/13/2014 12:45 PM New Transit Project Hwy.56 Department: Caption:Provide an update on the status of the 56 Project (Transit) to include, but not limited to, the following: (a) Current status of project, (b) Construction completion date, (c) Renovation or new construction, (d) Project cost, (e) Funding source(s), (f) Detailed information on contamination at site, (g) Annual projected cost for dead head miles, (h) Additional relevant information not specified. (Requested by Commissioner Bill Lockett) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 5 Public Service Committee Meeting 1/13/2014 12:45 PM Update Riverwalk Repairs Department: Caption:Receive an update from staff on the progress of repairs on Riverwalk. (Requested by Mayor Pro Tem Corey Johnson) (Referred from December 17 Commission meeting) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 6