Loading...
HomeMy WebLinkAbout2008-12-08-Meeting Agendawww.augustaga.gov Public Safety Committee Meeting Committee Room- 12/8/2008- 12:25 PM PUBLIC SAFETY 1. Motion to approve entering into a contract with QORE Property Sciences for National Pollutant Discharge Elimination System (NPDES) monitoring and testing services associated with construction of the Webster Detention Center Expansion. Attachments Public Safety Committee Meeting 12/8/2008 12:25 PM APPROVE CONTRACT AWARD TO QORE PROPERTY SCIENCES FOR NPDES TESTING FOR THE JAIL EXPANSION Department:CIPM for the RCSO Caption:Motion to approve entering into a contract with QORE Property Sciences for National Pollutant Discharge Elimination System (NPDES) monitoring and testing services associated with construction of the Webster Detention Center Expansion. Background:McKnight Construction was awarded the contract to build the jail expansion on November 5th, 2008. Land disturbance activities associated with the jail expansion are scheduled to commence in mid-December, 2008. Proposals to perform NPDES services were received from two firms. Review and analysis of the two proposals were performed by the Procurement Office, assisted by Capital Improvements Program Management (CIPM). The proposal from QORE was judged to be in the best interests of the project and Augusta. Analysis:NPDES testing and monitoring are required by Augusta Richmond County and the Environmental Protection Division of the Georgia Department of Natural Resources. The services will be performed on a weekly basis for the duration of the project, along with post-precipitation turbidity testing as determined by weather conditions. Proposals were required to include a cost component based on uniform assumptions, enabling a fair and consistent comparison. The contract will be established with stated assumptions serving as a “Not to Exceed” Contract, with actual fees determined by actual quantities of tests/inspections, as determined by field and weather conditions. Financial Impact:The services will be performed on an “as needed” basis, with a “not to exceed” contract amount of $30,355.00. Alternatives:There are no good alternatives. This work is required by State and Local regulations. Recommendation:Approve entering into a contract with QORE Property Sciences for National Pollutant Discharge Elimination System (NPDES) monitoring and testing services associated with construction of the Webster Detention Center Expansion. Funds are Available in the Following Accounts: Funds are available in accounts:GL – 325-05-1130 / 206351101 Cover Memo Item # 1 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Attachment number 1 Page 1 of 13 Item # 1 Attachment number 1 Page 2 of 13 Item # 1 Attachment number 1 Page 3 of 13 Item # 1 Attachment number 1 Page 4 of 13 Item # 1 Attachment number 1 Page 5 of 13 Item # 1 Attachment number 1 Page 6 of 13 Item # 1 Attachment number 1 Page 7 of 13 Item # 1 Attachment number 1 Page 8 of 13 Item # 1 Attachment number 1 Page 9 of 13 Item # 1 Attachment number 1 Page 10 of 13 Item # 1 Attachment number 1 Page 11 of 13 Item # 1 Attachment number 1 Page 12 of 13 Item # 1 Attachment number 1 Page 13 of 13 Item # 1