Loading...
HomeMy WebLinkAbout2021-12-13-Agenda MeetingSpecial Called Meeting Virtual- 12/13/2021- 2:00 PM 1. Motion to approve the price proposal and contract award with Holland and Knight LLC, for State Lobbying and Representation services in an amount not to exceed $102,000 annually. The initial contract period is for one year that is renewable for up to two additional one-year terms if desired by the governing body. Approval to transfer $47,000 from FY2021 general fund contingency to the Administrators office budget to partially fund cost associated with the lobbyist firm’s services. Attachments 2. Motion to approve the price proposal Option B received from JBA Consulting Engineers, Inc. dba NV5 Consultants for Professional Services Performance Contract Evaluation (RFQ #21-249) not to exceed $260,000. Attachments 3. Motion to authorize the Administrator to send a non-binding statement of intent to Trane, Inc. expressing Augusta’s intent to proceed with the Performance Contract and hold contract pricing of $24,778,553 until February 28, 2022. Attachments 4. Motion to authorize execution by the Mayor of the affidavit of compliance with Georgia's Open Meeting Act.Attachments www.augustaga.gov Legal Administration Committee Meeting 12/13/2021 2:00 PM contract award with Holland and Knight LLC, for State Lobbying Department:Administration Presenter:Administrator Odie Donal, II Caption:Motion to approve the price proposal and contract award with Holland and Knight LLC, for State Lobbying and Representation services in an amount not to exceed $102,000 annually. The initial contract period is for one year that is renewable for up to two additional one-year terms if desired by the governing body. Approval to transfer $47,000 from FY2021 general fund contingency to the Administrators office budget to partially fund cost associated with the lobbyist firm’s services. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 1 Attachment number 1 \nPage 1 of 151 Item # 1 Attachment number 1 \nPage 2 of 151 Item # 1 Attachment number 1 \nPage 3 of 151 Item # 1 Attachment number 1 \nPage 4 of 151 Item # 1 Attachment number 1 \nPage 5 of 151 Item # 1 Attachment number 1 \nPage 6 of 151 Item # 1 Attachment number 1 \nPage 7 of 151 Item # 1 Attachment number 1 \nPage 8 of 151 Item # 1 Attachment number 1 \nPage 9 of 151 Item # 1 Attachment number 1 \nPage 10 of 151 Item # 1 Attachment number 1 \nPage 11 of 151 Item # 1 Attachment number 1 \nPage 12 of 151 Item # 1 Attachment number 1 \nPage 13 of 151 Item # 1 Attachment number 1 \nPage 14 of 151 Item # 1 Attachment number 1 \nPage 15 of 151 Item # 1 Attachment number 1 \nPage 16 of 151 Item # 1 Attachment number 1 \nPage 17 of 151 Item # 1 Attachment number 1 \nPage 18 of 151 Item # 1 Attachment number 1 \nPage 19 of 151 Item # 1 Attachment number 1 \nPage 20 of 151 Item # 1 Attachment number 1 \nPage 21 of 151 Item # 1 Attachment number 1 \nPage 22 of 151 Item # 1 Attachment number 1 \nPage 23 of 151 Item # 1 Attachment number 1 \nPage 24 of 151 Item # 1 Attachment number 1 \nPage 25 of 151 Item # 1 Attachment number 1 \nPage 26 of 151 Item # 1 Attachment number 1 \nPage 27 of 151 Item # 1 Attachment number 1 \nPage 28 of 151 Item # 1 Attachment number 1 \nPage 29 of 151 Item # 1 Attachment number 1 \nPage 30 of 151 Item # 1 Attachment number 1 \nPage 31 of 151 Item # 1 Attachment number 1 \nPage 32 of 151 Item # 1 Attachment number 1 \nPage 33 of 151 Item # 1 Attachment number 1 \nPage 34 of 151 Item # 1 Attachment number 1 \nPage 35 of 151 Item # 1 Attachment number 1 \nPage 36 of 151 Item # 1 Attachment number 1 \nPage 37 of 151 Item # 1 Attachment number 1 \nPage 38 of 151 Item # 1 Attachment number 1 \nPage 39 of 151 Item # 1 Attachment number 1 \nPage 40 of 151 Item # 1 Attachment number 1 \nPage 41 of 151 Item # 1 Attachment number 1 \nPage 42 of 151 Item # 1 Attachment number 1 \nPage 43 of 151 Item # 1 Attachment number 1 \nPage 44 of 151 Item # 1 Attachment number 1 \nPage 45 of 151 Item # 1 Attachment number 1 \nPage 46 of 151 Item # 1 Attachment number 1 \nPage 47 of 151 Item # 1 Attachment number 1 \nPage 48 of 151 Item # 1 Attachment number 1 \nPage 49 of 151 Item # 1 Attachment number 1 \nPage 50 of 151 Item # 1 Attachment number 1 \nPage 51 of 151 Item # 1 Attachment number 1 \nPage 52 of 151 Item # 1 Attachment number 1 \nPage 53 of 151 Item # 1 Attachment number 1 \nPage 54 of 151 Item # 1 Attachment number 1 \nPage 55 of 151 Item # 1 Attachment number 1 \nPage 56 of 151 Item # 1 Attachment number 1 \nPage 57 of 151 Item # 1 Attachment number 1 \nPage 58 of 151 Item # 1 Attachment number 1 \nPage 59 of 151 Item # 1 Attachment number 1 \nPage 60 of 151 Item # 1 Attachment number 1 \nPage 61 of 151 Item # 1 Attachment number 1 \nPage 62 of 151 Item # 1 Attachment number 1 \nPage 63 of 151 Item # 1 Attachment number 1 \nPage 64 of 151 Item # 1 Attachment number 1 \nPage 65 of 151 Item # 1 Attachment number 1 \nPage 66 of 151 Item # 1 Attachment number 1 \nPage 67 of 151 Item # 1 Attachment number 1 \nPage 68 of 151 Item # 1 Attachment number 1 \nPage 69 of 151 Item # 1 Attachment number 1 \nPage 70 of 151 Item # 1 Attachment number 1 \nPage 71 of 151 Item # 1 Attachment number 1 \nPage 72 of 151 Item # 1 Attachment number 1 \nPage 73 of 151 Item # 1 Attachment number 1 \nPage 74 of 151 Item # 1 Attachment number 1 \nPage 75 of 151 Item # 1 Attachment number 1 \nPage 76 of 151 Item # 1 Attachment number 1 \nPage 77 of 151 Item # 1 Attachment number 1 \nPage 78 of 151 Item # 1 Attachment number 1 \nPage 79 of 151 Item # 1 Attachment number 1 \nPage 80 of 151 Item # 1 Attachment number 1 \nPage 81 of 151 Item # 1 Attachment number 1 \nPage 82 of 151 Item # 1 Attachment number 1 \nPage 83 of 151 Item # 1 Attachment number 1 \nPage 84 of 151 Item # 1 Attachment number 1 \nPage 85 of 151 Item # 1 Attachment number 1 \nPage 86 of 151 Item # 1 Attachment number 1 \nPage 87 of 151 Item # 1 Attachment number 1 \nPage 88 of 151 Item # 1 Attachment number 1 \nPage 89 of 151 Item # 1 Attachment number 1 \nPage 90 of 151 Item # 1 Attachment number 1 \nPage 91 of 151 Item # 1 Attachment number 1 \nPage 92 of 151 Item # 1 Attachment number 1 \nPage 93 of 151 Item # 1 Attachment number 1 \nPage 94 of 151 Item # 1 Attachment number 1 \nPage 95 of 151 Item # 1 Attachment number 1 \nPage 96 of 151 Item # 1 Attachment number 1 \nPage 97 of 151 Item # 1 Attachment number 1 \nPage 98 of 151 Item # 1 Attachment number 1 \nPage 99 of 151 Item # 1 Attachment number 1 \nPage 100 of 151 Item # 1 Attachment number 1 \nPage 101 of 151 Item # 1 Attachment number 1 \nPage 102 of 151 Item # 1 Attachment number 1 \nPage 103 of 151 Item # 1 Attachment number 1 \nPage 104 of 151 Item # 1 Attachment number 1 \nPage 105 of 151 Item # 1 Attachment number 1 \nPage 106 of 151 Item # 1 Attachment number 1 \nPage 107 of 151 Item # 1 Attachment number 1 \nPage 108 of 151 Item # 1 Attachment number 1 \nPage 109 of 151 Item # 1 Attachment number 1 \nPage 110 of 151 Item # 1 Attachment number 1 \nPage 111 of 151 Item # 1 Attachment number 1 \nPage 112 of 151 Item # 1 Attachment number 1 \nPage 113 of 151 Item # 1 Attachment number 1 \nPage 114 of 151 Item # 1 Attachment number 1 \nPage 115 of 151 Item # 1 Attachment number 1 \nPage 116 of 151 Item # 1 Attachment number 1 \nPage 117 of 151 Item # 1 Attachment number 1 \nPage 118 of 151 Item # 1 Attachment number 1 \nPage 119 of 151 Item # 1 Attachment number 1 \nPage 120 of 151 Item # 1 Attachment number 1 \nPage 121 of 151 Item # 1 Attachment number 1 \nPage 122 of 151 Item # 1 Attachment number 1 \nPage 123 of 151 Item # 1 Attachment number 1 \nPage 124 of 151 Item # 1 Attachment number 1 \nPage 125 of 151 Item # 1 Attachment number 1 \nPage 126 of 151 Item # 1 Attachment number 1 \nPage 127 of 151 Item # 1 Attachment number 1 \nPage 128 of 151 Item # 1 Attachment number 1 \nPage 129 of 151 Item # 1 Attachment number 1 \nPage 130 of 151 Item # 1 Attachment number 1 \nPage 131 of 151 Item # 1 Attachment number 1 \nPage 132 of 151 Item # 1 Attachment number 1 \nPage 133 of 151 Item # 1 Attachment number 1 \nPage 134 of 151 Item # 1 Attachment number 1 \nPage 135 of 151 Item # 1 Attachment number 1 \nPage 136 of 151 Item # 1 Attachment number 1 \nPage 137 of 151 Item # 1 Attachment number 1 \nPage 138 of 151 Item # 1 Attachment number 1 \nPage 139 of 151 Item # 1 Attachment number 1 \nPage 140 of 151 Item # 1 Attachment number 1 \nPage 141 of 151 Item # 1 Attachment number 1 \nPage 142 of 151 Item # 1 Attachment number 1 \nPage 143 of 151 Item # 1 Attachment number 1 \nPage 144 of 151 Item # 1 Attachment number 1 \nPage 145 of 151 Item # 1 Attachment number 1 \nPage 146 of 151 Item # 1 Attachment number 1 \nPage 147 of 151 Item # 1 Attachment number 1 \nPage 148 of 151 Item # 1 Attachment number 1 \nPage 149 of 151 Item # 1 Attachment number 1 \nPage 150 of 151 Item # 1 Attachment number 1 \nPage 151 of 151 Item # 1 1 FYI: Process Regarding Request for Proposals Sec. 1-10-51. Request for proposals. Request for proposals shall be handled in the same manner as the bid process as described above for solicitation and awarding of contracts for goods or services with the following exceptions: (a) Only the names of the vendors making offers shall be disclosed at the proposal opening. (b) Content of the proposals submitted by competing persons shall not be disclosed during the process of the negotiations. (c) Proposals shall be open for public inspection only after the award is made. (d) Proprietary or confidential information, marked as such in each proposal, shall not be disclosed without the written consent of the offeror. (e) Discussions may be conducted with responsible persons submitting a proposal determined to have a reasonable chance of being selected for the award. These discussions may be held for the purpose of clarification to assure a full understanding of the solicitation requirement and responsiveness thereto. (f) Revisions may be permitted after submissions and prior to award for the purpose of obtaining the best and final offers. (g) In conducting discussions with the persons submitting the proposals, there shall be no disclosure of any information derived from the other persons submitting proposals. Sec. 1-10-52. Sealed proposals. (a) Conditions for use. In accordance with O.C.G.A. § 36-91-21(c)(1)(C), the competitive sealed proposals method may be utilized when it is determined in writing to be the most advantageous to Augusta, Georgia, taking into consideration the evaluation factors set forth in the request for proposals. The evaluation factors in the request for proposals shall be the basis on which the award decision is made when the sealed proposal method is used. Augusta, Georgia is not restricted from using alternative procurement methods for Attachment number 2 \nPage 1 of 4 Item # 1 2 obtaining the best value on any procurement, such as Construction Management at Risk, Design/Build, etc. (b) Request for proposals. Competitive sealed proposals shall be solicited through a request for proposals (RFP). (c) Public notice. Adequate public notice of the request for proposals shall be given in the same manner as provided in section 1-10- 50(c)(Public Notice and Bidder's List); provided the normal period of time between notice and receipt of proposals minimally shall be fifteen (15) calendar days. (d) Pre-proposal conference. A pre-proposal conference may be scheduled at least five (5) days prior to the date set for receipt of proposals, and notice shall be handled in a manner similar to section 1-10-50(c)-Public Notice and Bidder's List. No information provided at such pre-proposal conference shall be binding upon Augusta, Georgia unless provided in writing to all offerors. (e) Receipt of proposals. Proposals will be received at the time and place designated in the request for proposals, complete with bidder qualification and technical information. No late proposals shall be accepted. Price information shall be separated from the proposal in a sealed envelope and opened only after the proposals have been reviewed and ranked. The names of the offerors will be identified at the proposal acceptance; however, no proposal will be handled so as to permit disclosure of the detailed contents of the response until after award of contract. A record of all responses shall be prepared and maintained for the files and audit purposes. (f) Public inspection. The responses will be open for public inspection only after contract award. Proprietary or confidential information marked as such in each proposal will not be disclosed without written consent of the offeror. (g) Evaluation and selection. The request for proposals shall state the relative importance of price and other evaluation factors that will be used in the context of proposal evaluation and contract award. (Pricing proposals will not be opened until the proposals have been reviewed and ranked). Such evaluation factors may include, but not be limited to: (1) The ability, capacity, and skill of the offeror to perform the contract or Attachment number 2 \nPage 2 of 4 Item # 1 3 provide the services required; (2) The capability of the offeror to perform the contract or provide the service promptly or within the time specified, without delay or interference; (3) The character, integrity, reputation, judgment, experience, and efficiency of the offeror; (4) The quality of performance on previous contracts; (5) The previous and existing compliance by the offeror with laws and ordinances relating to the contract or services; (6) The sufficiency of the financial resources of the offeror relating to his ability to perform the contract; (7) The quality, availability, and adaptability of the supplies or services to the particular use required; and (8) Price. (h) Selection committee. A selection committee, minimally consisting of representatives of the procurement office, the using agency, and the Administrator's office or his designee shall convene for the purpose of evaluating the proposals. (i) Preliminary negotiations. Discussions with the offerors and technical revisions to the proposals may occur. Discussions may be conducted with the responsible offerors who submit proposals for the purpose of clarification and to assure full understanding of, and conformance to, the solicitation requirements. Offerors shall be accorded fair and equal treatment with respect to any opportunity for discussions and revision of proposals and such revisions may be permitted after submission and prior to award for the purpose of obtaining best and final offers. In conducting discussions, there shall be no disclosure of information derived from proposals submitted by competing offerors. (j) From the date proposals are received by the Procurement Director through the date of contract award, no offeror shall make any substitutions, deletions, Attachment number 2 \nPage 3 of 4 Item # 1 4 additions or other changes in the configuration or structure of the offeror’s teams or members of the offeror’s team. (k) Final negotiations and letting the contract. The Committee shall rank the technical proposals, open and consider the pricing proposals submitted by each offeror. Award shall be made or recommended for award through the Augusta, Georgia Administrator, to the most responsible and responsive offeror whose proposal is determined to be the most advantageous to Augusta, Georgia, taking into consideration price and the evaluation factors set forth in the request for proposals. No other factors or criteria shall be used in the evaluation. The contract file shall contain a written report of the basis on which the award is made/recommended. The contract shall be awarded or let in accordance with the procedures set forth in this Section and the other applicable sections of this chapter. Attachment number 2 \nPage 4 of 4 Item # 1 OFFICIAL VENDORS Attachment "B" E-Verify # SAVE Form Original 7 Copies Fee Proposal DENTOS US LLP 303 PEACHTREE STREET NE SUITE 5300 ATLANTA, GA 30308 Yes 231591 Yes Yes Yes Yes A.R. LONG COMPANY LLC 5605 VININGS RETREAT PASS SW MABLETON, GA 30126 Yes 1764133 Yes Yes Yes Yes HOLLAND & KNIGHT 1180 WEST PEACHTREE ST. NW SUITE 1800 ATLANTA, GA 30309 Yes 166390 Yes Yes Yes Yes ROBBINS GOVERNMENT RELATIONS 500 14TH ST. NW ATLANTA, GA 30318 Yes 1764066 Yes Yes Yes Yes GEORGIA PUBLIC AFFAIRS PO BOX 78602 ATLANTA, GA 30357 Yes 570625 Yes Yes Yes Yes RFP Oppening - RFP Item #22-300 State Lobbying and Legislative Representation Services for Augusta, GA – Administrator's Office RFP Date: Thursday, December 2, 2021 @ 11:00 a.m. Total Number Specifications Mailed Out: 50 Total Number Specifications Download (Demandstar): 11 Total Electronic Notifications (Demandstar): 453 Georgia Procurement Registry: 13596 Total packages submitted: 5 Total Noncompliant: 0 Attachment number 3 \nPage 1 of 1 Item # 1 Attachment number 4 \nPage 1 of 8 Item # 1 Attachment number 4 \nPage 2 of 8 Item # 1 Attachment number 4 \nPage 3 of 8 Item # 1 Attachment number 4 \nPage 4 of 8 Item # 1 Attachment number 4 \nPage 5 of 8 Item # 1 Attachment number 4 \nPage 6 of 8 Item # 1 Attachment number 4 \nPage 7 of 8 Item # 1 Attachment number 4 \nPage 8 of 8 Item # 1 Request for Proposal Request for Proposals will be received at this office until Thursday, December 2, 2021 @ 11:00 a.m. via ZOOM Meeting ID: 831 7619 4686 Passcode: 428517 for furnishing: RFP Item # 22-300 State Lobbying and Legislative Representation Services for Augusta, GA – Administrator’s Office RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901 (706-821-2422). All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, November 23, 2021 @ 5:00 P.M. No RFP will be accepted by fax or email, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 120 days after bids have been opened, pending the execution of contract with the successful bidder(s). Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. GEORGIA E-Verify and Public Contracts: The Georgia E-Verify law requires contractors and all sub-contractors on Georgia public contract (contracts with a government agency) for the physical performance of services over $2,499 in value to enroll in E-Verify, regardless of the number of employees. They may be exempt from this requirement if they have no employees and do not plan to hire employees for the purpose of completing any part of the public contract. Certain professions are also exempt. All requests for proposals issued by a city must include the contractor affidavit as part of the requirement for their bid to be considered. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base their qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov GERI A. SAMS, Procurement Director Publish: Augusta Chronicle November 12, 18, 22, 2021 Metro Courier November 12, 2021 Revised: 8/11/2016 Attachment number 5 \nPage 1 of 1 Item # 1 DENTOS US LLP 303 PEACHTREE STREET NE SUITE 5300 ATLANTA, GA 30308 A.R. LONG CO. 5605 VININGS RETREAT PASS SW MABLETON, GA 30126 HOLLAND & KNIGHT 1180 WEST PEACHTREE ST. NW SUITE 1800 ATLANTA, GA 30309 ROBBINS GOVERNMENT RELATIONS 500 14TH ST. NW ATLANTA, GA 30318 GEORGIA PUBLIC AFFAIRS PO BOX 78602 ATLANTA, GA 30357 DENTOS US LLP 303 PEACHTREE STREET NE SUITE 5300 ATLANTA, GA 30308 A.R. LONG CO. 5605 VININGS RETREAT PASS SW MABLETON, GA 30126 HOLLAND & KNIGHT 1180 WEST PEACHTREE ST. NW SUITE 1800 ATLANTA, GA 30309 ROBBINS GOVERNMENT RELATIONS 500 14TH ST. NW ATLANTA, GA 30318 GEORGIA PUBLIC AFFAIRS PO BOX 78602 ATLANTA, GA 30357 Evaluation Criteria Ranking Points 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation) • Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS 2. Qualifications & Experince (0-5)15 3.9 3.4 5.0 3.5 4.1 58.1 51.4 75.0 52.5 61.9 3. Organizaiton & Aproach (0-5)10 3.8 3.9 4.3 3.6 3.7 37.5 38.8 42.5 36.3 36.8 4. Scope of Services Firms professional experience as representative and liaison services as a State Representative Lobbyist to include but not limited to the items listed under Section II Scope Statement of Work, A. (0-5)30 4.0 3.1 4.7 3.1 3.6 120.0 93.8 140.3 93.8 108.8 5. Financial Stability (0-5)5 4.8 4.0 5.0 4.3 4.4 23.8 20.0 25.0 21.3 21.9 6. References (0-5)5 4.0 4.5 4.5 4.3 4.3 20.0 22.5 22.5 21.3 21.3 Within Richmond County 5 10 0 0 0 0 0 Within CSRA 5 6 0 0 0 0 0 Within Georgia 5 4 5 5 5 5 5 20 20 20 20 20 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 0 0 0 0 0 • All Others 5 1 0 0 0 0 0 25.4 23.9 28.4 23.8 25.1 279.4 246.4 325.3 245.0 270.5 8. Presentation by Team (0-5)10 0 0 0 0 0 9. Q&A Response to Panel Questions (0-5)5 0 0 0 0 0 Lowest Fees 5 10 5 5 0 50 0 0 50 Second 5 6 0 0 0 0 0 Third 5 4 5 5 0 0 20 20 0 Forth 5 2 0 0 0 0 0 Fifth 5 1 5 5 0 0 0 0 Total Phase 2 - (Total Maximum Ranking 15 - Maximum Weighted Total Possible 125) 5 5 5 5 5 5 50 20 20 50 30.4 28.9 33.4 28.8 30.1 284.4 296.4 345.3 265.0 320.5 Procurement DepartmentRepresentative:_________Nancy Williams_________________________________ Procurement Department Completion Date: 12/6/21 RFP Item #22-300 State Lobbying and Legislative Representation Services for Augusta, GA - Administrator's Office RFP Date: Friday, December 3, 2021 @ 1:00 p.m. 7. Proxomity to Area (Ony choose 1 line according to the location of the company - enter the ranking value for the one line only) Phase 2 (Option - Numbers 8-9) (Vendors May Not Receive Less Than a 3 Ranking in Any Category to be Considered for Award) Internal Use Only Evaluator: Cumulative Date: 12/6/21 10. Cost/Fee Proposal Consideration (only choose 1 line according to dollar value of the proposal in relation to all fee proposals - enter the point value for the one line only) Phase 1 Total - (Total Maximum Ranking 30 - Maximum Weighted Total Possible 375) Vendors Phase 1 Ranking of 0-5 (Enter a number value between 0 and 5) Scale 0 (Low) to 5 (High) Weighted Scores Total Cumulative Score (Maximum point is 500) Total (Total Possible Score 500) Total (May not Receive Less Than a 3 Ranking in Any Category to be Cost/Fee Proposal Consideration Attachment number 6 \nPage 1 of 1 Item # 1 Legal Administration Committee Meeting 12/13/2021 2:00 PM Approve Price Proposal for Contract Evaluation - RFQ 21-249 Department:Central Services - Facilities Presenter:Takiyah A. Douse Caption:Motion to approve the price proposal Option B received from JBA Consulting Engineers, Inc. dba NV5 Consultants for Professional Services Performance Contract Evaluation (RFQ #21-249) not to exceed $260,000. Background:An RFP was submitted for the Professional Services Performance Contract Evaluation. Two vendors responded. NV5 was selected by the evaluation committee to provide performance contract evaluation services for the upcoming Trane, Inc. performance contract. Analysis:NV5 has proposed services to include construction oversight, construction close out and limited performance period services. With a potential investment of more than $25M, it is in Augusta’s best interest to take advantage of the above services to ensure our interest is protected. Financial Impact:not to exceed $260K financed with the performance contract Alternatives:(1) Approve the price proposal received from JBA Consulting Engineers, Inc. dba NV5 Consultants for Professional Services Performance Contract Evaluation (Bid #21-249) not to exceed $260,000 ; (2) Do not approve the request Recommendation:Approve the price proposal received from JBA Consulting Engineers, Inc. dba NV5 Consultants for Professional Services Performance Contract Evaluation (Bid #21-249) not to exceed $260,000 Funds are Available in the not to exceed $260K financed with the performance contractCover Memo Item # 2 Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 2 Aldo Mazzaferro, PE, CEM, CEA Executive Director of Business Development NV5 Energy Efficiency Services 32 Old Slip, Suite #401 New York, NY 10005 Aldo.mazzaferro@NV5.com C: 516.567.2337 PRICE PROPOSAL (BAFO) FOR PROFESSIONAL SERVICES PERFORMANCE CONTRACT EVALUATION SOLUTION FOR AUGUSTA, GA – CENTRAL SERVICES DEPARTMENT / RFQ#21-249 PROPOSAL NUMBER P63021-0007023.00 NOVEMBER 30TH, 2021 Prepared For: CITY OF AUGUSTA, GEORGIA Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street – Room 605 Augusta, Georgia 30901 (610) 570-5350 Attachment number 1 \nPage 1 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 2 of 13 November 30th, 2021 Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street – Room 605 Augusta Georgia 30901 Subject: Price Proposal – Best and Final Offer (BAFO) for Performance Contract Evaluation NV5 Proposal No. P63021-0007023.00 Dear Ms. Sams: We appreciate the time the City of Augusta representatives have spent on our previous calls to discuss this opportunity. Thank you for requesting our services for your ESPC project. In accordance with your request, JBA Consulting Engineers, Inc. dba NV5 Consultants (NV5) is pleased to offer our Best and Final Offer (BAFO) Price Proposal for the following professional services. For clarity, our BAFO is presented as Options A & B as follows Option A - Phase 1 – Performance Contract Evaluation Option B – Phases 1-3 – Performance Contract Evaluation, Construction Oversight & Close-out Services, and First Year Performance Period Services PROJECT BACKGROUND We understand the project as proposed will impact nearly 80 facilities across the City, generate over $1 Million in annual savings, and invest nearly $25 Million in Energy Conservation Measures. Based on our discussions, we also understand the City is seeking to sign a Letter of Intent to execute the PACT with the ESCO (Trane) by December 31st, 2021. Afterwards, the full contract will be executed upon finalization of legal, financial, and technical terms and conditions of both the PACT and the Investment Grade Audit (IGA). However, the PACT, IGA, and the Financing Agreement need to be approved by February 28th, 2022. SCOPE OF SERVICES We are proposing two options for our Scope of Services: Option A is to perform only our Phase 1 – Performance Contract Evaluation. This will be done in two phases: (A) Initial Evaluation & (B) Detailed Review & Negotiation of IGA & PACT. This is modified from our typical approach since the draft IGA has already been completed and there is an expedited timeline. Phase 1 – Performance Contract Evaluation (A) – Initial Evaluation of Investment Grade Audit & PACT Agreement proposed by Trane 1. Conduct an initial review of the IGA & PACT submitted by Trane and provided to NV5 via DropBox on November 19th, 2021. The goal of the cursory review is to identify any and all potential, “showstoppers” or “deal breakers” that may prevent the City from executing a Letter of Intent (LOI) to Execute the PACT by December 31st, 2021. 2. The scope of the initial review will include some or all of the following activities: a. Confirmation that all the proper documentation and components of an ESPC are included in the IGA and PACT b. Confirmation that industry best practices have been employed by Trane in the development of the IGA, the proposed scope of work, and the costs/savings for each Energy Conservation Measure (ECM) c. Cursory review of the proposal’s various cost components including development costs, ECM costs, on- going services, etc. Attachment number 1 \nPage 2 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 3 of 13 d. Preliminary evaluation of proposed savings for individual Energy Conservation Measures (ECMs) including methodology, baseline assumptions, future conditions, etc. e. Review proposed approach to Measurement & Verification with adherence to the industry’s best practices and standardized protocols f. Participation in calls with the City’s technical, financial, and legal representatives to address questions related to the ESPC, this specific proposal, terms, and/or conditions. Additionally, participate in calls with Trane as needed to expeditiously address any concerns or confusion from our initial findings. g. Upon completion of initial review, NV5 will issue a formal recommendation based on our findings including next steps. 3. Timeline a. Our initial review will require approximately 2 weeks of effort from our team. Accordingly, we have expedited preparation of this proposal, so that the City can bring this to council for approval at the December 7th meeting. b. If the proposal is approved on December 7th, we ask that the City please execute and return this agreement by Friday, December 10th, 2021, so that we can provide you with our initial findings and recommendation for next steps by Friday, December 24th, 2021. c. Please note: Although it is unlikely, if our initial findings result in the City choosing not to proceed with executing the LOI, our fees for this portion of the work (Phase 1 – A) are presented below. (B) – Detailed Evaluation of Investment Grade Audit & PACT Agreement proposed by Trane 1. Conduct a detailed technical and financial evaluation of all proposal components, files, attachments, appendices, terms, and conditions. Additionally, NV5 team will assist your legal counsel in the legal negotiations of the contract. At the conclusion of this phase, NV5 will issue an executive summary of our findings and recommendations for next steps. 2. The detailed scope of work for Phase 1(B) is as follows: a. Participate in an introductory call with Trane and the City of Augusta to discuss project objectives, information requests, engineering methodologies, and expectations of cooperation, communication, review and response timeframes, etc. After the call we will prepare a Request for Information (RFI) based on outstanding information. b. Conduct review of information submitted by Trane and submit a report that will include an Executive Summary of our findings, and a Comment/Response/Resolution (CRR) log with the details of our initial findings, as well as which items that still must be supplied. We will use our CRR log to work with Trane and the City to resolve any questions or additional RFIs. c. Once Trane has submitted all requested information (listed above) in full, NV5 will conduct a comprehensive review of the Revised IGA focusing on validating energy savings calculations (review energy simulation models), Baseline calculations, Commissioning Plan, M&V Plan, Risk-Responsibility- Performance Matrix (RRPM), O&M Plan, and Close-out and Training plans. We will also conduct a cost- reasonableness check on Trane’s price buildup. d. Participate in “Workshops” with Trane and the City officials to discuss Baseline development, ECM development, Cx Plan, M&V Plan, O&M Plan, PIR / Close-out / Training Plan. e. NV5 will review the existing facility/facility baseline calculations along with associated supporting information such as field data/measurements/data logging, light level readings, equipment inventories, historical utility/metering analysis, facility descriptions, etc. If Trane is using spreadsheets, we will review the live MS Excel spreadsheets, with intact formulae, so we can check the calculation logic. If Trane is utilizing a computer energy simulation model, NV5 will ensure this powerful tool is being constructed and utilized properly to depict the proposed ECM intent/scope of work and the proposed energy usage and costs (and associated savings). This task is unique to NV5 in an Owner’s Agent role and has been immensely useful in uncovering mistakes in savings estimates, providing the City with tremendous value. f. NV5 will review Trane’s proposed ECMs and draft scope of work, energy savings calculation projections, utility escalation rates, etc. NV5 will work with the City reps to determine if the proposed ECMs and technologies are appropriate for the facilities and other energy-using systems, and for the maintenance staff to maintain over the contract term. NV5 will review any preliminary project and ECM cost estimates to ensure reasonableness. NV5 will facilitate appropriate discussions regarding inclusion of proposed ECMs and projected savings as part of the overall proposed program. We will make sure discussions include all ECMs being evaluated, intended to be evaluated, or determined by Trane to not be cost- effective, so that the City can be the ultimate decision maker on which ECMs will be included for further evaluation and ultimate inclusion in final project. Attachment number 1 \nPage 3 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 4 of 13 g. NV5 will review the parameters and measurement strategies of the M&V plan to determine if they are in line with appropriate measurement and verification protocols and guidelines as defined by the International Performance Measurement & Verification Protocols (IPMVP) for each piece of equipment and/or system, without unnecessarily burdening the project with extra costs. Specifically, NV5 evaluates the performance measurement strategies to ensure that the appropriate level of rigor and accuracy is used to protect the City and fulfill the intent of the contractual requirements. NV5 will evaluate the risk and cost of the performance measurement strategies and detailed project specific M&V plan according to the methodology described in the M&V guidelines. h. NV5 will review the proposed Commissioning Plan submitted by Trane to ensure it meets ESPC industry best practices. A robust and transparent commissioning process is key to the success of any ESPC project. i. NV5 will review Trane’s project cost buildup for accuracy and compliance with industry standards using our experience with 150+ other ESPC projects we have overseen. This includes a thorough analysis of the whole project cost pro forma to ensure reasonableness of subcontractor costs, and proper application of expected and negotiated design, construction management, commissioning, measurement & verification, O&M oversight, and training fees, as well as overhead and markups. j. NV5 will work with the City and Trane to develop the Risk/Responsibility/Performance Matrix which clearly explains all of the main risks associated with the development, implementation, and monitoring of the ESPC, and details who is responsible for mitigating each risk throughout the contract term. k. Discussions and review will also include the key economic and cash flow assumptions being utilized by Trane for the total project, such as contract term, escalation rates, financing rate, payment methods, etc. l. NV5 will submit our comments for the IGA through a Comment/Response/Resolution document, which tracks all comments and questions until they are resolved to the satisfaction of the City and NV5; this later will become an appendix in the ESA to memorialize final agreements reached on issues. m. NV5 will conduct a detailed analysis of the Final IGA report and prepare a list of questions, and clarifications for Trane to address. We will also review the City’s comments and combine them with NV5's to submit to Trane. We will follow-up with Trane until all the questions have been answered to the satisfaction of NV5 and the City. n. Review the Draft Energy Services Agreement (ESA) and assist the City in negotiating and executing the ESA and Financing Agreement. It is important to ensure that the language in the ESA matches the risk presented by the development and implementation of the proposed ECMs. We will also check that the information presented in the IGA gets fully and accurately transferred into the appropriate appendices in the ESA. 3. Timeline a. Depending on the time it takes for Trane to submit the requested information in the format required and how long it takes to resolve IGA and ESA review comments with Trane, the timeframe to complete the Phase 1 Services tasks could range from 21 to 60 days. NV5 is only providing the expressly identified foregoing services and as such NV5 shall not be responsible or liable for any other area or portion of the Project. *End of Option A Services* Option B is to perform comprehensive services. This include the services described in Phase 1 above, but also Phases 2 & 3 as presented below. Comprehensive Owner’s Representative (OR) services are considered best practice in the ESPC industry and our service pays for itself when we are involved throughout the project. A simple, static evaluation of an IGA is rarely sufficient to protect an Owner during a complex ESPC project across many facilities. This is especially true when the Owner is investing millions of dollars and it is expecting millions of dollars in future savings to pay for the project. Phase 2 – Construction Oversight & Close-out Services 1. Construction a. Attend all construction meetings hosted by Trane and/or City staff b. Review all subcontractors c. Review proposed ECM designs and all submittals of equipment for ECMs to ensure efficiency, energy savings and environmental benefits can be realized. d. Provide a system for tracking the resolution of any issues that are identified at such meetings. e. Review and comment on the Trane’s baseline and planned schedule including but not limited to, completeness, accuracy, conformance with the overall project milestones and the terms of the contract. Attachment number 1 \nPage 4 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 5 of 13 f. Provide written reports including photos for each site visit as requested. g. Advise the City of any construction related issues or risks found in the field or determined by the site visit. h. Submit monthly reports to the City about the project, including but not limited to, progress of the work against approved schedules, potential schedule approval and inspections. i. Ensure all invoices are accurate and complete. j. Assist the City in ensuring all required insurance certificates and other contractually required paperwork has been submitted. k. Monitor and report on any incomplete or nonconforming work. 2. Project Close-out a. Assist the City in the preparation of a project punch list. b. Ensure that the Trane has provided all the required contractual close-out documentation such as operation and maintenance manuals, warranties, punch list close out, training, etc. c. Review final requisitions from the Trane. d. Review Trane’s management of all construction closeout requirements with the City. e. Review Trane’s process to ensure that all final funding, incentive and/or reimbursement paperwork have been properly submitted, processed by the applicable grantor and that the City awards have been received. f. Review Trane’s preparation and issuance of a final closeout report including a final reconciliation. g. Compile all project related documentation representing a complete project record, including the as-builts are turned over to the City. Phase 3– Performance Period Services 1. During the first year of the performance period of the ESPC, NV5 will provide technical support to the City, including the following tasks; a. NV5 will review the monitored data during the first month of operation to ensure that all systems are operating as expected and that the necessary M&V parameters are being generated and logged. During the first year of operation, NV5 will review the quarterly performance and/or M&V reports and Trane invoices to the City to ensure that the energy savings persist or if there are issues that they are identified early on for resolution. b. Review of select ECMs of Trane’s M&V Reports – NV5 will conduct a review of non-stipulated savings ECMs of Trane’s M&V Report. We will submit comments to the City and Trane using our standard Comment/Response/Resolution document. We will assist the City in the resolution of the comments to a satisfactory conclusion. c. If needed, NV5 will also make a brief visit to the City office to review comments with the City and to conduct a short inspection of major ECMs to verify the integrity of the information in Trane’s report. d. If significant operational changes occur, such as building renovations, etc., NV5 will assist the City with any baseline adjustments that may be required. e. NV5 will certify acceptance of annual M&V report following review with the City. 2. Handle miscellaneous emails and telephone calls regarding any other issues that may arise during the term of the contract. 3. Perform a review of the M&V reports for Years 1-3 & issue an Executive Summary of our findings. 4. Additional Services to be considered: Perform annual review of M&V reports for years 4-20, as many years as requested, and/or required by statute. Based upon our experience with past projects, we recommend a minimum of 3 years. REIMBURSABLE EXPENSES 1. Travel expenses for staff traveling to the City to include commercial airfare, car rental/ground transportation, hotel accommodations and meals, and are included in the total below. SUMMARY OF PROPOSED FEES Option A - Performance Contract Evaluation Services NV5 is usually involved from the beginning of the ESPC process, and we have a standard pricing methodology for ESPC Attachment number 1 \nPage 5 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 6 of 13 oversight from conception through IGA Finalization & Contract Execution. In those cases, we usually calibrate our fee to between 20-25% of the ESCO’s IGA fee. In this case, since we were not involved in the development of the IGA or any other prior phases of the project, we have de-rated our fee accordingly based on the estimated hours to complete our reviews. Based on your request for a Best and Final Offer (BAFO) price proposal, we have reduced our FIXED FEE for Phase 1 to $48,000. This is a $12,000 (20%) reduction from our original proposal dated November 19th, 2021. Please note that we are offering this not by reducing our scope of services, but by utilizing other, more cost-effective team members for some portions of the work. By doing so, we are able to offer this reduced fee, continue to provide insight by our team of experts, and thereby maintain our standards of service for the City. OPTION A - SERVICES FEES Performance Contract Evaluation Services Phase 1 – IGA & PACT Evaluation & Negotiation A – Initial Evaluation $7,200 B – Detailed Evaluation $40,800 Expenses (We don’t expect to incur any travel expenses in Phase 1) $0 TOTAL $48,000 Payments are due within thirty (30) days of submission of NV5’s statement of services. Option B – Comprehensive Services We have also developed a pricing proposal for comprehensive services. This includes the scope of services offered in Phases 1, but also Phases 2, and 3. This is the best value for the City. The City will be investing over $24 Million in anticipation of realizing nearly $30 Million in savings over the next 20 years. Our expertise and guidance throughout the term of the project will protect your investment and our services can be incorporated into the project cost and paid for by the savings, at no out-of-pocket cost to the City. If you have any questions as to how this can be structured, please don’t hesitate to reach out. SERVICES FEES Comprehensive Services Phase 1 – IGA & PACT Evaluation & Negotiation A – Initial Evaluation Included B – Detailed Evaluation Included Phase 2 – Construction & Project Close-out Services Included Phase 3 – Performance Period Services (Year 1-3) Included Phase 3 – Performance Period Services (Years 4-20) TBD Expenses Included TOTAL 1% of Final Program Construction Cost Payments are due within thirty (30) days of submission of NV5’s invoices. NV5 will submit invoices in accordance with the following schedule: • 20% upon Approval of PACT and Financial Agreement by City. • 60% to be billed in accordance with percent complete of construction. • 20% Upon Completion of Year 1 review of Measurement & Verification Report and Issuance of an Executive Summary of Findings In the event the City does not approve the PACT and Financing Agreement, NV5 shall submit a pro-rated invoice for our services which shall not exceed $36,000. Payment is due within thirty (30) days of submission of invoice. The hours and fees we have estimated are based on us receiving the full amount of information requested, in the format requested, in a timely manner. Otherwise, we reserve the right to adjust our fees accordingly. Payment for work will not be withheld by Client due to the lack of an executed proposal or contract. NV5 shall have the right to withhold any and all Attachment number 1 \nPage 6 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 7 of 13 deliverables until Client is made current on its payments, and shall be entitled to any collection costs and attorney’s fees in connection with any outstanding payment amount Authorization All services will be conducted in accordance with this Proposal and the attached terms and conditions. To initiate services, please complete and return the attached “Proposal Acceptance Agreement” form. Our Proposal will remain valid for acceptance for up to 90-days from the date of this Proposal. Upon which, we reserve the right to modify the Proposal, scope and fees. We appreciate the opportunity to be of service to you. Sincerely, Aldo Mazzaferro PE, CEM, CEA Executive Director of Business Development NV5 Energy Efficiency Services Attachment number 1 \nPage 7 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 8 of 13 STANDARD TERMS AND CONDITIONS 1. J.B.A. Consulting Engineers Inc. dba NV5 (hereinafter “NV5”) will provide services for the Project as defined in the attached proposal. NV5 shall not have any duties or responsibilities for any other part of the Project. The attached proposal and these terms and conditions together shall be referred to as the “Agreement.” 2. NV5 shall not be responsible for the acts or omissions of the Client, Client’s other consultants, Contractor, subcontractors, their agents or employees, or other persons performing any other portion of the Project. 3. NV5 shall recommend to Client that appropriate investigations, surveys, tests, analyses and reports be obtained as necessary for the proper execution of NV5’s services. 4. Additional Services of NV5, not specifically included as part of the Scope of Services defined in the attached proposal, and compensation for requested Additional Services, shall be mutually agreed upon in writing by the Client and NV5 prior to commencement of such Additional Services. 5. NV5 shall perform services in a manner consistent with the level of care and skill ordinarily exercised by members of NV5’s profession currently practicing in the same locality under similar conditions. 6. Consistent with NV5’s standard of care, NV5’s services shall comply to applicable laws, rules, codes, regulations and orders of applicable governmental or public authority having jurisdiction over the Project in force at time of issuance of the Construction Documents for building permit. Furthermore, Client and NV5 are aware that many factors outside NV5’s control may affect NV5’s ability to complete the services to be provided under this Agreement. NV5 will perform these services with reasonable diligence and expediency consistent with sound professional practices. NV5 shall not be responsible for the methods, means or sequencing of any contractors or any construction work related to the Project. 7. Irrespective of any other provision in any Agreement, nothing contained herein shall be construed: a. to constitute a guarantee, warranty or assurance, either express or implied, that NV5’s services will yield or accomplish a perfect outcome for the Project; or b. to obligate NV5 to exercise professional skill or judgment greater than that which can reasonably be expected from other consultants under similar conditions; or c. as an assumption by NV5 of the liability of any other party. 8. On NV5’s request, if reasonably necessary for the performance of NV5’s services, the Client shall furnish services of other consultants, information, surveys and reports required by law or the Construction Documents. The services, information, surveys, and reports requested shall be furnished at no expense to NV5 and NV5 shall be entitled to rely upon the accuracy and completeness thereof. 9. NV5 shall procure and maintain the following insurance on this Project: (1) Worker’s Compensation at statutory limits: (2) Commercial General Liability at $1M each occurrence / $1M general aggregate; (3) Excess or Umbrella Liability at $1M each occurrence and $2M general aggregate; (4) Professional Liability at $500,000 each claim and $500,000 annual aggregate. NV5 shall deliver to Client a certificate of insurance (ACORD form) evidencing this coverage. Attachment number 1 \nPage 8 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 9 of 13 10. Instruments of Service a. Drawings, specifications, and other documents, including those in electronic form, prepared by NV5 are Instruments of Service for use solely with respect to this Project. NV5 shall be deemed the author and owner of NV5’s Instruments of Service and shall retain all common law, statutory and other reserved rights, including copyrights. b. Upon execution of this Agreement NV5 grants to Client a nonexclusive license to reproduce NV5’s Instruments of Service for purposes of designing, administering, using and maintaining the Project, providing the Client shall comply with all obligations, including prompt payment of all sums when due, under this Agreement. Such license shall permit the Client to include NV5’s Instruments of Service in a similar nonexclusive license to an Owner in a Prime Agreement, authorizing an Owner or an Owner’s contractors or consultants to reproduce applicable portions of NV5’s Instruments of Service solely for the purposes of constructing, using and maintaining this Project. Any termination of this Agreement prior to completion of the Project shall terminate this license. c. Except for the license granted above, no other license or right shall be deemed granted or implied. Client shall not assign, delegate, sublicense, pledge or otherwise transfer any license granted herein to another party without the prior written agreement of NV5. d. Client shall not use the Instruments of Service for future additions or alterations to this Project or for other projects, unless Client obtains the prior written agreement of NV5. Any unauthorized use, reuse or modifications of the Instruments of Service shall be at the Client’s sole risk and without liability to NV5, and Client agrees to defend, indemnify and hold harmless NV5 from all claims and damages arising out of or purported to arise out of the use, reuse, or modification of the Instruments of Service. 11. Waiver of Consequential Damages - Neither NV5 nor the Client, their respective officers, directors, partners, employees, contractors or subconsultants shall be liable to the other for, or shall make any claim for any incidental, indirect or consequential damages arising out of or connected in any way to the Project or to this Agreement. This mutual waiver of consequential damages shall include, but is not limited to, loss of use, loss of profit, loss of business, loss of income, damage to reputation or any other consequential damages either party may have incurred from any cause of action including negligence, strict liability, breach of contract and breach of strict or implied warranty. 12. Sole Corporate Remedy - It is intended by the parties to this Agreement that NV5’s services in connection with the Project shall not subject NV5’s individual shareholders, officers, directors, members, managers or employees to any personal legal exposure for the risks associated with this Project. Therefore, and notwithstanding anything to the contrary contained herein, the Client agrees that as the Client’s sole and exclusive remedy, any claim, demand or suit shall be directed and/or asserted only against NV5 and not against any of the individual shareholders, officers, directors, members, managers or employees. 13. Limitation of Liability - In recognition of the relative risks and benefits of the Project to both the Client and NV5 relating to NV5’s provision of services in accordance with this Agreement, the risks have been allocated such that the Client agrees, to the fullest extent permitted by law, to limit the liability of NV5 for any and all claims, losses, costs, damage of any nature whatsoever or claims expenses from any cause or causes, including attorneys’ fees and costs and expert witness fees and costs, regardless of theories of liability or causes of action, so that the total aggregate liability of NV5 to the Client shall not exceed the sum of $50,000 or NV5’s fee for the Project, whichever is less. 14. Payment – NV5 shall invoice Client monthly for services rendered and for Reimbursable Expenses, and Client shall make payment within thirty (30) days of submission of respective invoice(s). No deductions shall be made from NV5’s compensation on account of penalty, liquidated damages or other sums withheld from payments to contractors, or on account of the cost of changes in the Work other than those for which NV5 has been adjudged to be liable. Client agrees that NV5 shall be entitled to reasonable attorney’s fees and costs of collection in addition to any unpaid amounts due and owing to NV5 under this Agreement. 15. Termination - This Agreement may be terminated by the Client upon not less than seven (7) days’ written notice to NV5 for the Client’s convenience and without cause. This Agreement may be terminated by either party upon not Attachment number 1 \nPage 9 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 10 of 13 less than seven (7) days’ written notice should the other party fail substantially to perform in accordance with the terms of this Agreement through no fault of the party initiating the termination. In addition, if the Client fails to make payments when due or otherwise is in breach of this Agreement, NV5 may, at its option, terminate this Agreement for material breach or suspend performance of services upon five (5) calendar days’ notice to the Client. NV5 shall have no liability whatsoever to the Client for any costs or damages as a result of such suspension caused by any breach of this Agreement by the Client. Upon payment in full by the Client under a suspension, NV5 shall resume services under this Agreement, and the time schedule and compensation shall be equitably adjusted to compensate for the period of suspension. If the Client still fails to make payment or otherwise cure the breach following a suspension of services, NV5 may terminate this Agreement upon an additional seven (7) days' notice. 16. The Client shall not transfer, subject, or assign the rights under or interest in this Agreement (including but not limited to payments that are due or that may be due) to any other party without the prior written consent of NV5. 17. Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either the Client or NV5. 18. NV5 shall have the right to include photographic or artistic representations of the Project among NV5’s promotional and professional materials, including but not limited to its website and tradeshow booths. NV5 shall be given reasonable access to the completed Project to make such representations. NV5’s materials shall not include the Client’s or Owner’s confidential or proprietary information if the Client has previously advised NV5 in writing of the specific information considered by the Client or Owner to be confidential or proprietary. 19. Dispute Resolution - The parties agree to first try in good faith to settle any dispute arising out of or related to this Agreement by mediation pursuant to the Construction Industry Mediation Rules of the American Arbitration Association. If the claim or controversy is not settled by mediation, the claim or controversy may be resolved by final and binding arbitration, if the parties so agree, or by civil litigation. 20. This Agreement shall be venued in Hartford County, CT and otherwise governed by the law of the State of Connecticut. 21. This Agreement represents the entire and integrated agreement between Client and NV5 and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended or modified only by written instrument signed by both Client and NV5. If any term, condition, or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding on Client and NV5. 22. By executing this Agreement both parties acknowledge and agree that this Agreement has been freely negotiated by both parties, and that, in any dispute over the meaning, interpretation, validity or enforceability of this Agreement or any of its terms or conditions, there shall be no presumption whatsoever against either party by virtue of that party having drafted this Agreement or any portion thereof. Attachment number 1 \nPage 10 of 13 Item # 2 NV5 Proposal No. P63021-0007023.00 Page 11 of 13 2021 HOURLY RATE SCHEDULE - Effective January 1, 2021 Vice President $300.00 Sr. Engr/Exec. Dir $289.00 Project Facilitator $289.00 Senior Project Manager $250.00 Director $230.00 Project Manager $215.00 Senior Energy Engineer $180.00 Energy Engineer $150.00 Administrative $ 89.00 ** The above rates are applicable to the 2021 calendar year. Rates may be adjusted for escalation beyond 2021. Attachment number 1 \nPage 11 of 13 Item # 2 OFFICES NATIONWIDE CONSTRUCTION QUALITY ASSURANCE • INFRASTRUCTURE ENGINEERING • ENERGY SERVICES • PROGRAM MANAGEMENT • ENVIRONMENTAL SERVICES PROPOSAL ACCEPTANCE AGREEMENT Description of Services: Performance Contract Evaluation Services (OPTION A) Project Name:City of Augusta, GA - ESPC Project Location:Augusta, GA Proposal No.:P63020-0007023.00 Proposal Date:November 30, 2021 APPROVAL & PAYMENT OF CHARGES Invoices will be charged and mailed to the account of: Client: Attention: Address: Email: Telephone: Fax: PROPOSAL ACCEPTED BY: AUTHORIZED SIGNATURE: NAME & TITLE: DATE ACCEPTED: PAYMENT TERMS: Payments are due within thirty (30) days of submission of NV5’s statement of services. Please remit payments to: P.O. Box 74008680, Chicago, IL 60674-8680 PROPERTY OWNER IDENTIFICATION (If other than above) Name: Address: Telephone: Fax: This Proposal Acceptance Agreement, the Scope of Services outlined in the proposal, Schedule of Fees, and Standard Terms and Conditions constitute the entire agreement between the Client and NV5 and supersede all prior written or oral understandings. Attachment number 1 \nPage 12 of 13 Item # 2 PROPOSAL ACCEPTANCE AGREEMENT Description of Services: Performance Contract Evaluation Services (OPTION B) Project Name: City of Augusta, GA - ESPC Project Location: Augusta, GA Proposal No.: P63020-0007023.00 Proposal Date: November 30, 2021 APPROVAL & PAYMENT OF CHARGES Invoices will be charged and mailed to the account of: Client: Attention: Address: Email: Telephone: Fax: PROPOSAL ACCEPTED BY: AUTHORIZED SIGNATURE: NAME & TITLE: DATE ACCEPTED: PAYMENT TERMS: Payments are due within thirty (30) days of submission of NV5’s invoices in accordance with the schedule presented above. Please remit payments to: P.O. Box 74008680, Chicago, IL 60674-8680 PROPERTY OWNER IDENTIFICATION (If other than above) Name: Address: Telephone: Fax: This Proposal Acceptance Agreement, the Scope of Services outlined in the proposal, Schedule of Fees, and Standard Terms and Conditions constitute the entire agreement between the Client and NV5 and supersede all prior written or oral understandings. Attachment number 1 \nPage 13 of 13 Item # 2 Request for Qualifications Request for Qualifications will be received at this office until Wednesday, November 3, 2021 @ 11:00 a.m. via ZOOM Meeting ID: 842 2142 2757 Passcode: 613569 for furnishing: RFQ #21-249 Professional Services Performance Contract Evaluation Solution for Augusta, GA – Central Services Department RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFQ documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFQ documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, October 26, 2021, @ 5:00 P.M. No RFQ will be accepted by fax or email, all must be received by mail or hand delivered. No RFQ may be withdrawn for a period of ninety (90) days after qualifications have been opened, pending the execution of contract with the successful vendor. Request for qualifications (RFQ) and specifications. An RFQ shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for qualification including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFQ number on the outside of the envelope. GEORGIA E-Verify and Public Contracts: The Georgia E-Verify law requires contractors and all sub-contractors on Georgia public contract (contracts with a government agency) for the physical performance of services over $2,499 in value to enroll in E-Verify, regardless of the number of employees. They may be exempt from this requirement if they have no employees and do not plan to hire employees for the purpose of completing any part of the public contract. Certain professions are also exempt. All requests for proposals issued by a city must include the contractor affidavit as part of the requirement for their bid to be considered. Proponents are cautioned that acquisition of RFQ documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov GERI A. SAMS, Procurement Director Publish: Augusta Chronicle October 14, 21, 25, 2021 Metro Courier October 14, 2021 Attachment number 2 \nPage 1 of 1 Item # 2 OFFICIAL VENDORS Attachment "B" E-Verify # SAVE Form Original 7 Copies 2KB ENERGY SERVICES 1389 PEACHTREE ST NE, SUITE 129 ATLANTA, GA 30309 Yes 1148896 Yes Yes Yes J.B.A. CONSULTING ENGINEERS, INC. DBA NV5 CONSULTANTS 200 SOUTH PARK ROAD, SUITE 350 HOLLYWOOD, FL 33021 Yes 455751 Yes Yes Yes RFQ Opening - RFQ #21-249 Professional Services Performance Contract Evaluation Solution for Augusta, GA – Central Services Department Date: Wednesday, November 3, 2021 @ 11:00 a.m. Total Number Specifications Mailed Out: 38 Total Number Specifications Download (Demandstar): 7 Total Electronic Notifications (Demandstar): 71 Georgia Procurement Registry: 1109 Total packages submitted: 2 Total Noncompliant: 0 Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 2 2KB ENERGY SERVICES 1389 PEACHTREE ST NE, SUITE 129 ATLANTA, GA 30309 J.B.A. CONSULTING ENGINEERS, INC. DBA NV5 CONSULTANTS 200 SOUTH PARK ROAD, SUITE 350 HOLLYWOOD, FL 33021 2KB ENERGY SERVICES 1389 PEACHTREE ST NE, SUITE 129 ATLANTA, GA 30309 J.B.A. CONSULTING ENGINEERS, INC. DBA NV5 CONSULTANTS 200 SOUTH PARK ROAD, SUITE 350 HOLLYWOOD, FL 33021 Ranking of 0-5 (Enter a Ranking of 0-5 (Enter a Ranking of 0-5 (Enter a Ranking of 0-5 (Enter a Evaluation Criteria Ranking Points Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation) • Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS PASS PASS 2. Qualifications & Experience (0-5)25 4.5 5.0 112.5 125.0 3. Organization & Approach Include (0-5)25 3.3 4.9 81.3 121.9 4. Scope of Services The vendor shall review the specifications, terms, conditions, and all exhibits of the proposed Performance Contract with respect to the owner’s best interests. Firm is to include specific details on the following criteria: a. The firm, organization, or company(ies) must be familiar with the details and methodology used to develop energy conservation-based performance contracts. b. The principal assigned to the project by the submitting firm shall have demonstrated experience in at least three (3) projects similar in size and scope to the proposed work. (0-5)25 2.8 5.0 68.8 125.0 5. Referenceds (0-5)5 3.3 3.8 16.3 18.8 6. Financial Stability (0-5)5 3.9 5.0 19.4 25.0 Within Richmond County 5 10 0 0 Within CSRA 5 6 0 0 Within Georgia 5 4 5 20 0 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 5 0 10 • All Others 5 1 0 0 22.6 28.6 318.1 425.6 8. Presentation by Team (0-5)5 0 0 9. Q&A Response to Panel Questions (0-5)5 0 0 Total Phase 2 - (Total Maximum Ranking 10 - Maximum Weighted Total Possible 50) 0 0 0 0 22.6 28.6 318.1 425.6 RFQ Evaluation Sheet RFQ #21-249 Professional Services Performance Contract Evaluation Solution for Augusta, GA – Central Services Department RFQ Evaluation Meeting: Thursday, November 18, 2021 @ 9:00 a.m. Total (Total Possible Score 500) Total (May not Receive Less Than a 3 Ranking in Any Category to be Considered for Award) Vendors Phase 1 Total - (Total Maximum Ranking 30 - Maximum Weighted Total Possible 475) Phase 1 7. Proximity to Area (only choose 1 line according to location of the company - enter the ranking value for the one line only) Procurement DepartmentRepresentative:____Nancy Williams ________________________________________ Procurement Department Completion Date: __11/18/21__________________________ Phase 2 (Option - Numbers 8-9 (Vendors May Not Receive Less Than a 3 Ranking in Any Category to be Considered for Award) Internal Use Only Total Cumulative Score (Maximum point is 525) Evaluator: _______Cumulative ________________________ Date: ________11/18/21____________________ Attachment number 4 \nPage 1 of 1 Item # 2 TO: FROM: DATE: SUBJECT: Z ?":l:l*"*m:es Department A 2700 peach Orchard Road, Augusta GA 30906 Q06) 828-7174 phone ff06)796_5077 Fax MEMORANDUM(- ) - ff"ms, Director, Procurement Department <, Takiyah A. Douse, Director, Central Services Department November 3012021 RFQ #21-249 Professional services performance contract Evaluation Solution Recommendation of Award Two vendors submitted compliant Statements of Qualifications for the referenced project onNovember 2,2021. The information presented by each firm was carefully reviewea Uy tt"Evaluation Committee on November 18, 2o2l.This qualifications-based assessment resulted inJ-'B'.A' Consulting Engineers, Inc dba NV5 Consultanis of Hollywood, Florida being selected asthe best qualified firm for this project. on November 29,2021 the Evaluation Committee met with representatives of the selectedvendor to discuss contract terms, which details phases, services, length of time and associatedpayments. After receiving the vendor's best and final proposal, we i. in agreement and wouldlike to move forward. The Central Services Deparhnent recommends award of the contract to NV5 Consultants. Thank you for your assistance in this matter. Please do not hesitate to contact me with anyquestions. TD/nd LaQuona Sanderson Attachment number 5 \nPage 1 of 1 Item # 2 Attachment number 6 \nPage 1 of 5 Item # 2 Attachment number 6 \nPage 2 of 5 Item # 2 Attachment number 6 \nPage 3 of 5 Item # 2 Attachment number 6 \nPage 4 of 5 Item # 2 Attachment number 6 \nPage 5 of 5 Item # 2 1 FYI: Process Regarding Request for Proposals Sec. 1-10-51. Request for proposals. Request for proposals shall be handled in the same manner as the bid process as described above for solicitation and awarding of contracts for goods or services with the following exceptions: (a) Only the names of the vendors making offers shall be disclosed at the proposal opening. (b) Content of the proposals submitted by competing persons shall not be disclosed during the process of the negotiations. (c) Proposals shall be open for public inspection only after the award is made. (d) Proprietary or confidential information, marked as such in each proposal, shall not be disclosed without the written consent of the offeror. (e) Discussions may be conducted with responsible persons submitting a proposal determined to have a reasonable chance of being selected for the award. These discussions may be held for the purpose of clarification to assure a full understanding of the solicitation requirement and responsiveness thereto. (f) Revisions may be permitted after submissions and prior to award for the purpose of obtaining the best and final offers. (g) In conducting discussions with the persons submitting the proposals, there shall be no disclosure of any information derived from the other persons submitting proposals. Sec. 1-10-52. Sealed proposals. (a) Conditions for use. In accordance with O.C.G.A. § 36-91-21(c)(1)(C), the competitive sealed proposals method may be utilized when it is determined in writing to be the most advantageous to Augusta, Georgia, taking into consideration the evaluation factors set forth in the request for proposals. The evaluation factors in the request for proposals shall be the basis on which the award decision is made when the sealed proposal method is used. Augusta, Georgia is not restricted from using alternative procurement methods for Attachment number 7 \nPage 1 of 4 Item # 2 2 obtaining the best value on any procurement, such as Construction Management at Risk, Design/Build, etc. (b) Request for proposals. Competitive sealed proposals shall be solicited through a request for proposals (RFP). (c) Public notice. Adequate public notice of the request for proposals shall be given in the same manner as provided in section 1-10- 50(c)(Public Notice and Bidder's List); provided the normal period of time between notice and receipt of proposals minimally shall be fifteen (15) calendar days. (d) Pre-proposal conference. A pre-proposal conference may be scheduled at least five (5) days prior to the date set for receipt of proposals, and notice shall be handled in a manner similar to section 1-10-50(c)-Public Notice and Bidder's List. No information provided at such pre-proposal conference shall be binding upon Augusta, Georgia unless provided in writing to all offerors. (e) Receipt of proposals. Proposals will be received at the time and place designated in the request for proposals, complete with bidder qualification and technical information. No late proposals shall be accepted. Price information shall be separated from the proposal in a sealed envelope and opened only after the proposals have been reviewed and ranked. The names of the offerors will be identified at the proposal acceptance; however, no proposal will be handled so as to permit disclosure of the detailed contents of the response until after award of contract. A record of all responses shall be prepared and maintained for the files and audit purposes. (f) Public inspection. The responses will be open for public inspection only after contract award. Proprietary or confidential information marked as such in each proposal will not be disclosed without written consent of the offeror. (g) Evaluation and selection. The request for proposals shall state the relative importance of price and other evaluation factors that will be used in the context of proposal evaluation and contract award. (Pricing proposals will not be opened until the proposals have been reviewed and ranked). Such evaluation factors may include, but not be limited to: (1) The ability, capacity, and skill of the offeror to perform the contract or Attachment number 7 \nPage 2 of 4 Item # 2 3 provide the services required; (2) The capability of the offeror to perform the contract or provide the service promptly or within the time specified, without delay or interference; (3) The character, integrity, reputation, judgment, experience, and efficiency of the offeror; (4) The quality of performance on previous contracts; (5) The previous and existing compliance by the offeror with laws and ordinances relating to the contract or services; (6) The sufficiency of the financial resources of the offeror relating to his ability to perform the contract; (7) The quality, availability, and adaptability of the supplies or services to the particular use required; and (8) Price. (h) Selection committee. A selection committee, minimally consisting of representatives of the procurement office, the using agency, and the Administrator's office or his designee shall convene for the purpose of evaluating the proposals. (i) Preliminary negotiations. Discussions with the offerors and technical revisions to the proposals may occur. Discussions may be conducted with the responsible offerors who submit proposals for the purpose of clarification and to assure full understanding of, and conformance to, the solicitation requirements. Offerors shall be accorded fair and equal treatment with respect to any opportunity for discussions and revision of proposals and such revisions may be permitted after submission and prior to award for the purpose of obtaining best and final offers. In conducting discussions, there shall be no disclosure of information derived from proposals submitted by competing offerors. (j) From the date proposals are received by the Procurement Director through the date of contract award, no offeror shall make any substitutions, deletions, Attachment number 7 \nPage 3 of 4 Item # 2 4 additions or other changes in the configuration or structure of the offeror’s teams or members of the offeror’s team. (k) Final negotiations and letting the contract. The Committee shall rank the technical proposals, open and consider the pricing proposals submitted by each offeror. Award shall be made or recommended for award through the Augusta, Georgia Administrator, to the most responsible and responsive offeror whose proposal is determined to be the most advantageous to Augusta, Georgia, taking into consideration price and the evaluation factors set forth in the request for proposals. No other factors or criteria shall be used in the evaluation. The contract file shall contain a written report of the basis on which the award is made/recommended. The contract shall be awarded or let in accordance with the procedures set forth in this Section and the other applicable sections of this chapter. Attachment number 7 \nPage 4 of 4 Item # 2 Legal Administration Committee Meeting 12/13/2021 2:00 PM TRANE Statement of Intent. Department:Administration Presenter:Administrator Odie Donald Caption:Motion to authorize the Administrator to send a non-binding statement of intent to Trane, Inc. expressing Augusta’s intent to proceed with the Performance Contract and hold contract pricing of $24,778,553 until February 28, 2022. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 3 Legal Administration Committee Meeting 12/13/2021 2:00 PM Legal Meeting Affidavit Department: Presenter: Caption:Motion to authorize execution by the Mayor of the affidavit of compliance with Georgia's Open Meeting Act. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 4