HomeMy WebLinkAbout2012-07-09-Meeting Agendawww.augustaga.gov Special Called Meeting Commission Chamber- 7/9/2012- 12:00 PM Executive Session 1. Motion to approve Choate Construction Change Order #7 - New Fixed Base Operations (FBO) in the amount of $78,492.62 as approved by the Augusta Aviation Commission at their May 31st, 2012 meeting. (No recommendation by Public Services Committee June 11, 2012) Attachments 2. LEGAL MEETING A. Pending and potential litigation B. Real estate C. Personnel Attachments 3. Motion to authorizing execution by the Mayor of the affidavit of compliance with Georgia's Open Meeting Act. Attachments Legal Administration Committee Meeting 7/9/2012 12:00 PM Choate Construction Change Order #7 Department:Augusta Regional Airport Caption:Motion to approve Choate Construction Change Order #7 - New Fixed Base Operations (FBO) in the amount of $78,492.62 as approved by the Augusta Aviation Commission at their May 31st, 2012 meeting. (No recommendation by Public Services Committee June 11, 2012) Background:The Augusta Commission through the Augusta Aviation Commission awarded a contract to Choate Construction Company on June 30, 2011 for the construction of the new Fixed Base Operation (FBO) building at the Augusta Regional Airport. The original contract was for $5,045,461.00. Analysis:Contract Modification #7 is a request for Choate to make revisions in the following areas: • Building Interior Finishes $13,152.16 • Building Exterior $12,600.57 • IT Additions $21,959.44 • Parking Lot Area $40,410.44 • Credits & No-Cost Proposals ($9,630.00) TOTAL $78,492.61 Below is a change order log for the Choate FBO contract project that details CM #7. Original Contract $5,045,461.00 Previous Contract Modifications $131,211.56 This Contract Modification $78,492.61 Revised Contract Total $5,255,165.17 Financial Impact:The original project budget included $100,000.00 in owner contingency for a total project budget of $5,145,461.00. Due to the modifications, the project budget is exceeded by $109,704.17 (2.1%). Alternatives:Deny request. Recommendation:Approve Choate Construction Change Order #7 for construction of the new FBO in the amount of $78,492.62. Funds are Available in the Following 551-08-1206/54-13130 Cover Memo Item # 1 Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 1 Contract Modification #7 Airport: Augusta Regional Airport Date Initiated: 17 May 12 Owner: City of Augusta Project: New FBO Terminal Contractor: Choate Construction Company Project Number: 0733-17 The contractor is requested to perform the following work described upon receipt of an approved copy of this document or as directed by the engineer. Item # Choate Contract Mod #Description Unit Quantity Line Item Price 1 27 Irrigation Sleeves LS 1 $0.00 2 29 Acoustical Ceiling Change LS 1 $7,321.23 3 32 Exterior Soffit Revisions LS 1 $3,746.82 4 33 Roof Expansion Joint LS 1 $847.18 5 34 Light Fixture Allowance Reconciliation LS 1 $2,626.25 6 35 Light Fixture Revisions LS 1 $1,775.22 7 36 Delete Temp/Permanent Power Budget LS 1 ($9,630.00) 8 37 Additional Concrete Apron LS 1 $5,737.55 9 38 Pole Base Revisions LS 1 $7,079.08 10 39 Floor Leveling at Rooms #119 and #120 LS 1 $0.00 11 42 IT Room HVAC LS 1 $0.00 12 43 Relocate Access Control Panel LS 1 $5,053.58 13 44 IT Room Electrical Addition LS 1 $3,189.21 14 47 Conduit from HH7 to HH-C2 LS 1 $9,823.61 15 50 Gate “N” Revision LS 1 $4,783.84 16 51 Canopy Drop Off Island LS 1 $3,222.73 17 52 IT Room Cabinets and Accessories LS 1 $3,893.04 18 53 Landscaping and Irrigation LS 1 $26,119.00 19 55 Granite at Fireplace Hearth LS 1 $1,429.46 20 57 Yard Drain at SW Corner of Building LS 1 $1,474.81 $78,492.61 Total Contract Amount Original Contract Total $5,045,461.00 Previous Contract Modification Total (CM #1 -6)$131,211.56 This Contract Modification Total (CM #7)$78,492.61 Revised Contract Total $5,255,165.17 Attachment number 1 \nPage 1 of 5 Item # 1 Total Contract Time Original Contract Time 250 calendar days Changes to Contract Time from Previous Contract Modifications 2 calendar days Changes to Contract Time from This Contract Modification 0 calendar days Revised Contract Time Total 252 calendar days This document shall become an amendment to the contract and all provisions of the contract will apply. Justification for Change Brief description of the proposed contract changes and locations: Brief description of the proposed contract changes and locations: 1.Irrigation Sleeves.This COP is to provide sleeves required for irrigation lines to be installed under pavement. The cost to install the sleeves is associated with the irrigation and landscape budget. Therefore, there are no separate costs associated with this item. Refer to Choate Change Order Proposal #27. 2.Acoustical Ceiling Change.As a result to the submittal associated with the acoustical ceiling tile (ACT), it was determined the quantities of the three (3) types of ACT did not match the intent of the ACT layout. The type of the ACT listed in the plans was not correct. This COP ensures the quantity of the ACT iscorrect, and increases the contract amount by $7,321.23.Refer to ChoateChange Order Proposal #29. 3.Exterior Soffit Revisions.As a result to the revised architectural drawings A5.0, A5.1 and A6.6R, additional framing at the soffits of the line room andcupolais required. This COP also accounts for the incorporation of vented soffitmaterials per the architect.This COP is an increase to the contract amount by $3,746.82. Refer to Choate Change Order Proposal # 32. 4.Roof Expansion Joint.This COP is associated with RFI #41 and includes the addition of roof expansion joints.This COP is an increase to the contract amountby $847.18. Refer to Choate Change Order Proposal # 33. 5.Light Fixture Allowance Reconciliation.This COP reconciles the actual costs of the light fixtures against the light fixture allowance. In addition, this COP includes the cost to install four (4) additional Type M fixtures which requiresadditional power circuits. This COP is an increase to the contract amount by $2,626.25. Refer to Choate Change Order Proposal # 34. 6.Light Fixture Revisions.This COP includes additional light fixtures that were not previously included in the office or fireplace additions.This COP is an Attachment number 1 \nPage 2 of 5 Item # 1 increase to the contract amount by $1,775.22. Refer to Choate Change Order Proposal # 35. 7.Delete Temp/Permanent Power Budget.Choate offered to credit the budgetamount associated with the temporary and permanent power associated with the FBO.This COP is a credit to the contract amount by $9,630.00. Refer to Choate Change Order Proposal # 36. 8.Additional Concrete Apron.Originally, the plans called for a landscaped areaon the apron side of the FBO. It was felt the vegetation could have created a FOD issue. Therefore, the landscape area was removed and concrete was placed instead of the vegetation.This COP is an addition to the contract amount by $5,737.55. Refer to Choate Change Order Proposal # 37. 9.Pole Base Revisions.This COP is associated with the base/foundation associated with the 53’ light poles that illuminate the apron area. The architectural plans did not include a pole base/foundation for this specific pole. However, the contractor utilized the pole base/foundation for the parking lot lights, which was determined to be undersized for the 53’ pole. A design wasperformed for the 53’ pole base/foundation, which increased the diameter of the base/foundation. This COP is an addition to the contract amount by $7,079.08. Refer to Choate Change Order Proposal # 38. 10.Floor Leveling at Rooms at Rooms #119 and #120.A COP request to levelthese rooms was made. However, an alternative was determined to accomplishthe concerns at no cost to the client. This COP does not increase the contract amount. Refer to Choate Change Order Proposal # 39. 11.IT Room HVAC.This COP does not increase the contract amount. Refer toChoate Change Order Proposal #42. 12.Relocate Access Control Panel.A revision to the plans was made to relocate the access control panel in the IT Room. However, the panel and wiring was installed as originally shown in the plans. This COP reflects relocating the panel and wiring to the IT Room as requested by IT Department. This COP is anadditionto the contract amount by $5,053.58. Refer to Choate Change Order Proposal #43. 13.IT Room Electrical Addition.This COP is associated with the revisions made to the IT Room. This includes additional power and date circuits as requested byIT Department. This COP is an addition to the contract amount by $3,189.21. Refer to Choate Change Order Proposal #44. 14.Conduit from HH7 to HH-C2.This work is associated with the rerouting of the COMCAST service which feeds the terminal building, new FBI and the buildings Attachment number 1 \nPage 3 of 5 Item # 1 south the new FBO. This COP is an addition to the contract amount by $9,823.61. Refer to Choate Change Order Proposal #47. 15.Gate “N” Revision. The original plans required a chain link gate be used atGate “N”. However, it was noted the gate needed to be similar to the ornamental fence type on the observation brick wall. This COP is an addition to the contract amount by $4,783.84. Refer to Choate Change Order Proposal #50. 16.Canopy Drop Off Island.This COP includes a sidewalk area around thecanopy columns as a precautionary measure to protect the columns from damage from vehicles. This COP is an addition to the contract amount by $3,222.73. Refer to Choate Change Order Proposal #51. 17.IT Room Cabinets and Accessories.This COP is associated with a changerequired by IT Department to meet their requirements for cabinets used in the IT Room. The originally proposed cabinet was not of sufficient dimensions. This COP is an addition to the contract amount by $3,893.04. Refer to Choate Change Order Proposal #52. 18.Landscaping and Irrigation.This COP is associated with the required landscaping in the parking lot, as well as the irrigation required to assure the growth of the vegetation. This COP is an addition to the contract amount by $26,119.00. Refer to Choate Change Order Proposal #53. 19.Granite at Fireplace Hearth.This COP is associated with a change in thematerial of the fireplace hearth. It was highly recommended to use a granite material as opposed to corian due to the heat from the fireplace.This COP is an addition to the contract amount by $1,428.46. Refer to Choate Change Order Proposal #55. 20.Yard Drain at SW Corner of Building.This COP proposes to install a yard drain in area that potential could hold water near the southwest corner of the new FBO building. This COP is an addition to the contract amount by $1,474.81. Refer to Choate Change Order Proposal #57. C&PE Project #: 0733-18 Contract Modification #7 Recommended by:___________________________________Campbell & Paris Engineers May 17,2012Date Accepted by:_______________________________________________ Attachment number 1 \nPage 4 of 5 Item # 1 Choate Construction Company Date Approved by:___________________________________ Augusta Regional Airport ____________ Date Approved by:_____________________________________ City of Augusta _____________ Date Submit 4 original copies to the City of Augusta. Attachment number 1 \nPage 5 of 5 Item # 1 Legal Administration Committee Meeting 7/9/2012 12:00 PM Legal Meeting Department:Clerk of Commission Caption:LEGAL MEETING A. Pending and potential litigation B. Real estate C. Personnel Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 2 Legal Administration Committee Meeting 7/9/2012 12:00 PM Legal Meeting Affidavit Department:Clerk of Commission Caption:Motion to authorizing execution by the Mayor of the affidavit of compliance with Georgia's Open Meeting Act. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 3