HomeMy WebLinkAbout2014-05-27-Meeting Agendawww.augustaga.gov Finance Committee Meeting Commission Chamber- 5/27/2014- 1:05 PM FINANCE 1. Approve the replacement of 2 cars for Augusta Richmond County Correctional Institute. Attachments 2. Approve the replacement of 1-F-250 and 1- F-350 Crew Cab pickup truck for Augusta Engineering Department-Maintenance Division. Attachments 3. Approve the replacement of 2 vehicles for Augusta Richmond County Code Enforcement Department. Attachments 4. Approve the replacement of 3 vehicles for the Richmond County Tax Assessor’s Office. Attachments 5. Motion to approve agreement with Rachel Longstreet Foundation, Inc. (Jessye Norman School of the Arts) for funding as authorized in SPLOST VI. Attachments 6. Motion to authorize the Finance and Utility departments to begin the process of issuing bonds to refund the Augusta, Georgia Water and Sewer Revenue Bonds, Series 2004, currently outstanding in the aggregate principal amount of $160,000,000 and up to $30,000,000 of additional bonds for new water and sewer projects, with PFM, Inc. serving as financial advisor, McKenna Long & Aldridge, LLP serving as bond counsel and Murray Barnes Finister, LLP serving as disclosure counsel. Attachments 7. Motion to approve a request from the Richmond County Sheriff's Office to apply for and accept the JAG 2014 grant award and increase the 2014 budget in the amount of $92,103. Attachments 8. Motion to approve the minutes of the Finance Committee held on May 12, 2014. Attachments 9. Motion to approve adjusting the funding level provided to Augusta's Accountability Court. Attachments Finance Committee Meeting 5/27/2014 1:05 PM 2014 - ARCCI Vehicles Department:Finance Department-Fleet Management Division Caption: Approve the replacement of 2 cars for Augusta Richmond County Correctional Institute. Background:Fleet Management would like to request replacement of 2 older vehicles used by their road supervisors; F02325 a 2003 Ford Crown Victoria with 134,146 miles and F02326 a 2003 Ford Crown Victoria with 147,869 miles.. The designated vehicles are in dire need of replacement. These vehicles are used by Road Supervisors that check on the work details throughout the day. They also transport sick or injured prisoners from work details to ARCCI. Vehicle evaluations and bid tabsheet results are attached for your review. Analysis:The Procurement Department published a competitive bid using the Demand Star application for the 2014 Dodge Charger certified police vehicle: Bid 14-120 results were as follows: Akins Ford Corp. = $25,755.00 each; Butler Dodge = Non-Compliant Bid; Carl Gregory = Bid Incomplete; Emergency Equipment Specialists = Non-Compliant Bid; Thomson Motor Centre = $25,780.00 each. Financial Impact:Two Dodge Chargers @ $25,755.00 each for a total cost of $51,510.00. The funds will be provided by the Special Purpose Local Sales Tax Phase VI - 4th Year Alternatives:1. Approve the request, 2. Disapprove the request. Recommendation:Approve the purchase of 2 Dodge Chargers and declare the replaced vehicles as surplus and available for auction Funds are Available in the Following Accounts: SPLOST VI - 4th Year Public Safety Vehicles Cover Memo Item # 1 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Attachment number 1 \nPage 1 of 2 Item # 1 Attachment number 1 \nPage 2 of 2 Item # 1 Attachment number 2 \nPage 1 of 1 Item # 1 Attachment number 3 \nPage 1 of 1 Item # 1 Attachment number 4 \nPage 1 of 3 Item # 1 Attachment number 4 \nPage 2 of 3 Item # 1 Attachment number 4 \nPage 3 of 3 Item # 1 Attachment number 5 \nPage 1 of 3 Item # 1 Attachment number 5 \nPage 2 of 3 Item # 1 Attachment number 5 \nPage 3 of 3 Item # 1 Attachment number 6 \nPage 1 of 1 Item # 1 Finance Committee Meeting 5/27/2014 1:05 PM 2014 - Engineering F-250-F-350 Department:Finance Department - Fleet Management Caption:Approve the replacement of 1-F-250 and 1- F-350 Crew Cab pickup truck for Augusta Engineering Department-Maintenance Division. Background:Fleet Management would like to request replacement of 2 older pickup trucka used in the department’s daily work activities. The designated vehicles are in need of replacement. The older vehicles are: 994198 a 2000 model Ford F250 with 254,194 miles and 994487 a 2001 F-350 crew truck with 183,449 miles on it. Vehicle evaluations and bid tab sheets are attached for your review. Analysis:The Procurement Department published a competitive bid using the Demand Star application for the 8,500 and 10,000 GVW pickup trucks: Bid 14-116 (8,500 GVW) results were as follows for this model truck: Allan Vigil-Fayetteville = $27,063.00 each; Allan Vigil-Morrow = $24,103.00 each; Bobby Jones Ford = $24,848.00 each; and Thomson Motor Centre = Truck Model Not Available NOTE: Bobby Jones Ford will meet the non-local low bid of $24,103.00 utilizing the Local Vendor Preference Bid 14- 118 (10,000 GVW) results were as follows for this model truck: Allan Vigil-Fayetteville = $38,577.00 each; Allan Vigil-Morrow = $36,331.00 each; Bobby Jones Ford = $35,963.00 each; Fairway Ford = $38,701.00 each; and Thomson Motor Centre = $37,239.00 each. Financial Impact:One F250 pickup truck @ $24,103.00 and one F350 pickup truck @ $35,963.00 for a total cost of $60,066.00. The funds will be provided by the City Capital outlay account. Alternatives:: (1) Approve the request; (2) Do not approve the request (3) approve the request in part. Recommendation:: Approve the purchase of 2 pickup trucks and declare the replaced vehicles as surplus and available for auction Cover Memo Item # 2 Funds are Available in the Following Accounts: Capital Outlay for 2014 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Attachment number 1 \nPage 1 of 2 Item # 2 Attachment number 1 \nPage 2 of 2 Item # 2 Attachment number 2 \nPage 1 of 1 Item # 2 Vendors Bobby Jones Ford P.O. Box 15398 Augusta, GA 30919 Fairway Ford 4333 Washington Rd Evans, GA 30809 Allan Vigil Ford 6790 Mt. Zion Blvd Morrow, GA 30260 Allan Virgil Ford 275 Glynn St N Fayetteville, GA 30214 Thomson Chrysler Dodge Jeep Ram 2158 Washington Road Thomson, GA 30824 Attachment B YES YES YES YES YES E-Verify Number 117480 689847 94460 224348 369935 SAVE Form YES YES YES YES YES 5.01 Fullsize Truck, Rg Cab $28,796.00 $30,698.00 $28,225.00 $30,243.00 $33,840.00 5.02 Fullsize Truck, Rg Cab $30,012.00 $32,114.00 $29,441.00 $31,659.00 $34,168.00 5.03 Fullsize Truck, R 8FT $31,232.00 $33,134.00 $30,661.00 $32,679.00 $36,740.00 5.04 Fullsize Truck, R 8FT $32,444.00 $34,546.00 $31,873.00 $34,091.00 $37,068.00 5.05 Fullsize Truck, Ext C $31,084.00 $32,986.00 $30,513.00 $32,531.00 N/A 5.06 Fullsize Truck, Ext C $32,100.00 $34,202.00 $31,529.00 $33,747.00 N/A 5.07 Fullsize Truck Ext C $33,627.00 $35,422.00 $32,949.00 $34,967.00 N/A 5.08 Fullsize Truck , Ext C $34,639.00 $36,634.00 $33,961.00 $36,179.00 N/A 5.09 Fullsize Truck, Crew $32,302.00 $34,404.00 $31,731.00 $33,949.00 $32,450.00 5.10 Fullsize Truck, Crew $33,314.00 $35,416.00 $32,743.00 $34,961.00 $33,278.00 5.11 Fullsize Truck, Crew $34,845.00 $36,840.00 $34,167.00 $36,385.00 $37,907.00 5.12 Fullsize Truck, Crew $35,857.00 $37,852.00 $35,179.00 $37,397.00 $38,235.00 5.13 Min 6.2L Gas Engine -$6,976.00 STANDARD -$6,500.00 -$8,480.00 EXCEPTION NOTED 5.00 Vehicle/Options Required Bid #14-118 10,000 GVW Series Pickup Truck for Augusta, Georgia - Fleet Management Bid Opening Date: Wednesday, January 22, 2014 @ 11:00 a.m. Page 1 of 5 At t a c h m e n t n u m b e r 3 \ n P a g e 1 o f 5 It e m # 2 Vendors Bobby Jones Ford P.O. Box 15398 Augusta, GA 30919 Fairway Ford 4333 Washington Rd Evans, GA 30809 Allan Vigil Ford 6790 Mt. Zion Blvd Morrow, GA 30260 Allan Virgil Ford 275 Glynn St N Fayetteville, GA 30214 Thomson Chrysler Dodge Jeep Ram 2158 Washington Road Thomson, GA 30824 Bid #14-118 10,000 GVW Series Pickup Truck for Augusta, Georgia - Fleet Management Bid Opening Date: Wednesday, January 22, 2014 @ 11:00 a.m. 5.14 Heavy Duty Tow Pkge STANDARD $425.00 N/A N/A $395.00 5.15 Heavy Duty Suspen Package front and rear Stabilizer $137.00 $125.00 $107.00 $125.00 STANDARD 5.16 Rear Seat deleted N/A N/A N/A N/A N/A 5.17 Pickup Box deleted -$258.00 -$281.00 -$225.00 $625.00 N/A 5.18 Trailer Tow Mirrors STANDARD STANDARD STANDARD STANDARD STANDARD 5.19 Roof Clearance Lights $48.00 $55.00 $48.00 $55.00 STANDARD 5.20 Speed Con/Tilt Steer $200.00 $595.00 $200.00 $235.00 STANDARD 5.21 Skid Plate Pkg (4X4)$85.00 $125.00 $85.00 $185.00 $50.00 5.22 Power Take-Off Provis $239.00 $280.00 $239.00 $280.00 $295.00 5.23 Black Platform Run Bd $273.00 $495.00 $316.00 $370.00 $594 - $734 5.24 Electric Win & Dor Lck $763.00 $1,190.00 $942.00 $1,105.00 EXCEPTION NOTED 5.25 All veh keyed diff 3 ste $19.85 $75.00 $25.00 $100.00 STANDARD 6.01 Fire Extinguisher $49.00 $48.00 $85.00 $81.12 $82.00 6.02 Outlet receptacle $55.00 $55.00 $40.00 $38.95 $39.00 6.03 Bedliner $300.00 $300.00 $375.00 $370.00 $370.00 6.00 Outfitter's Speciality Items Page 2 of 5 At t a c h m e n t n u m b e r 3 \ n P a g e 2 o f 5 It e m # 2 Vendors Bobby Jones Ford P.O. Box 15398 Augusta, GA 30919 Fairway Ford 4333 Washington Rd Evans, GA 30809 Allan Vigil Ford 6790 Mt. Zion Blvd Morrow, GA 30260 Allan Virgil Ford 275 Glynn St N Fayetteville, GA 30214 Thomson Chrysler Dodge Jeep Ram 2158 Washington Road Thomson, GA 30824 Bid #14-118 10,000 GVW Series Pickup Truck for Augusta, Georgia - Fleet Management Bid Opening Date: Wednesday, January 22, 2014 @ 11:00 a.m. 6.04 Electric brake contro $230.00 $125.00 $205.00 $160.00 $160.00 6.05 Service body $4,549.00 $4,549.00 $5,150.00 $5,102.75 $5,103.00 6.06 Service body-dual $5,195.00 $5,195.00 $4,890.00 $4,840.00 $4,840.00 6.07 Crane service body $7,100.00 $7,100.00 $7,582.00 $7,542.00 $7,542.00 6.08 Service crane $8,700.00 $8,700.00 $9,791.00 $9,721.00 $9,721.00 6.09 J-hook railing $220.00 $220.00 $190.00 $180.00 $180.00 6.10 Panel top-60 inch $3,400.00 $3,400.00 $4,275.00 $4,226.00 $4,226.00 6.11 Panel Top-72 inch $3,950.00 $3,950.00 $4,830.00 $4,700.00 $4,700.00 6.12 Service body bump SR $346.00 $346.00 $425.00 $426.00 $426.00 6.13 Service body bump D $413.00 $413.00 $525.00 $514.00 $514.00 6.14 Service body bump, S $276.00 $276.00 $415.00 $410.00 $410.00 6.15 Service body bump, D $343.00 $343.00 $515.00 $500.00 $500.00 6.16 Flatbed Body $3,000.00 $3,000.00 $2,625.00 $2,600.00 $2,600.00 6.17 Tool box $500.00 $500.00 $360.00 $347.00 $347.00 6.18 Spotlight $295.00 $295.00 $415.00 $402.00 $402.00 6.19 Spotlights $590.00 $590.00 $825.00 $804.00 $804.00 6.20 Toolbox $240.00 $240.00 $415.00 $403.00 $403.00 Page 3 of 5 At t a c h m e n t n u m b e r 3 \ n P a g e 3 o f 5 It e m # 2 Vendors Bobby Jones Ford P.O. Box 15398 Augusta, GA 30919 Fairway Ford 4333 Washington Rd Evans, GA 30809 Allan Vigil Ford 6790 Mt. Zion Blvd Morrow, GA 30260 Allan Virgil Ford 275 Glynn St N Fayetteville, GA 30214 Thomson Chrysler Dodge Jeep Ram 2158 Washington Road Thomson, GA 30824 Bid #14-118 10,000 GVW Series Pickup Truck for Augusta, Georgia - Fleet Management Bid Opening Date: Wednesday, January 22, 2014 @ 11:00 a.m. 6.21 Trailer hitch $250.00 $250.00 $360.00 $355.00 $355.00 6.22 Trailer Wiring $35.00 $35.00 $80.00 $75.00 STANDARD 6.23 Trailer Ball $10.00 $10.00 $95.00 $90.00 $90.00 6.24 Pintle Hook $100.00 $100.00 $55.00 $50.56 $51.00 6.25 Pintle Hook-Dual $125.00 $125.00 $190.00 $183.00 $183.00 6.26 Tommy Lift Gate $2,250.00 $2,250.00 $2,096.00 $2,076.00 $2,076.00 6.27 Pipe Vise $2,580.00 $258.00 $305.00 $294.00 $294.00 6.28 Spot mirrors STANDARD $40.00 $2.00 $1.76 $2.00 6.29 Window tint, reg cab $95.00 $140.00 $165.00 $150.00 $140.00 6.30 Window tint, ext cab $125.00 $145.00 $189.00 $175.00 $140.00 6.31 Window tint, cre cab $150.00 $155.00 $210.00 $200.00 $140.00 6.32 Safety Cone Holder $45.00 $45.00 $17.00 $16.75 $17.00 6.33 Safety Cones $60.00 $120.00 $59.00 $56.78 $57.00 7.01 Backup alarm $35.00 $35.00 $80.00 $75.00 $75.00 7.02 Magnetic LED light $355.00 $355.00 $660.00 $645.00 $645.00 7.03 Cab Mount Light $462.00 $462.00 $675.00 $660.00 $660.00 7.04 Traffic advisor light br $605.00 $605.00 $760.00 $746.74 $747.00 7.00 Alert Warning Systems Page 4 of 5 At t a c h m e n t n u m b e r 3 \ n P a g e 4 o f 5 It e m # 2 Vendors Bobby Jones Ford P.O. Box 15398 Augusta, GA 30919 Fairway Ford 4333 Washington Rd Evans, GA 30809 Allan Vigil Ford 6790 Mt. Zion Blvd Morrow, GA 30260 Allan Virgil Ford 275 Glynn St N Fayetteville, GA 30214 Thomson Chrysler Dodge Jeep Ram 2158 Washington Road Thomson, GA 30824 Bid #14-118 10,000 GVW Series Pickup Truck for Augusta, Georgia - Fleet Management Bid Opening Date: Wednesday, January 22, 2014 @ 11:00 a.m. 7.05 Traffic advisor light br $1,210.00 $1,210.00 $1,515.00 $1,493.48 $1,494.00 Year 2015 2015 2015 2015 2014 Make FORD FORD FORD FORD RAM Model F-350 F-350 F-350 F-350 3500 Delivery Date 60 TO 90 DAYS AFTER 3/15/14 30 TO 120 DAYS NONE LISTED 18 TO 22 WEEKS 10 TO 12 WEEKS Page 5 of 5 At t a c h m e n t n u m b e r 3 \ n P a g e 5 o f 5 It e m # 2 Attachment number 4 \nPage 1 of 2 Item # 2 Attachment number 4 \nPage 2 of 2 Item # 2 Attachment number 5 \nPage 1 of 1 Item # 2 Invitation to Bid Sealed bids will be received at this office on Wednesday, January 15, 2014 @ 11:00 a.m. for furnishing: Bid Item 14-115 6,000 GVW Series Pickup Truck for Fleet Management Bid Item 14-116 8,500 GVW Series Pickup Truck for Fleet Management Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, January 3, 2014 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Augusta Chronicle December 12, 19, 26, 2013 January 2, 2014 Metro Courier December 18, 2013 Revised: 3/7/2013 Attachment number 6 \nPage 1 of 1 Item # 2 Attachment number 7 \nPage 1 of 4 Item # 2 Attachment number 7 \nPage 2 of 4 Item # 2 Attachment number 7 \nPage 3 of 4 Item # 2 Attachment number 7 \nPage 4 of 4 Item # 2 Attachment number 8 \nPage 1 of 1 Item # 2 Bobby Jones Ford 3480 Wrightsboro Road Augusta, GA 30909 Allan Vigil Ford Lincoln Mercury 6790 Mount Zion Boulevard Morrow, GA 30260 Allan Vigil Ford Fayetteville 275 Glen Street N Fayetteville GA 30214 Thomson Chrysler Dodge Ram 2158 Washington Rd. NE Thomson, GA 30824 YES YES YES YES 117480 94460 224348 369935 YES YES YES YES 5.01 Full-Size Truck-Reg Cab $21,255.00 $19,999.00 $22,220.00 $21,947.00 5.02 Full-Size Truck-Reg Cab $23,586.00 $22,580.00 $24,715.00 $23,513.00 5.03 Full-Size Truck-Ext Cab $23,337.00 $22,092.00 $24,565.00 N/A 5.04 Full-Size Truck-Ext Cab $24,978.00 $24,592.00 $27,078.00 N/A 5.05 Full-Size Truck-Crew Cab4 $24,556.00 $23,295.00 $25,619.00 $24,278.00 5.06 Full-Size Truck-Crew Cab4 $27,096.00 $25,875.00 $28,132.00 $24,943.00 5.07 Diesel Engine, min 6.0 lite $7,088.00 $7,088.00 $8,315.00 SEE EXCEPTIONS 5.08 Heavy Duty tow package STANDARD N/A STANDARD STANDARD 5.09 Rear Seat (Extended Cab)N/A N/A N/A N/A 5.10 Pickup Box Deleted -$281.00 -$250.00 -$533.00 -$127.00 5.11 Trailer Tow Mirrors STANDARD STANDARD STANDARD SEE EXCEPTIONS 5.12 Black platform running brds $273.00 $316.00 $370.00 $560.50-693.00 5.13 Electric windows and do loc $763.00 $942.00 $1,105.00 SEE EXCEPTIONS 5.14 Roof Clearance Lights $48.00 $48.00 $55.00 $68.00 5.15 Speed Control/Tilt Steering $200.00 $200.00 $235.00 STANDARD 5.16 Skid Plate Pack (4X4 only)$85.00 $85.00 $100.00 $43.00 6.01 Fire Extinguisher $48.00 $85.00 $82.00 $81.12 6.02 Outlet Receptacle $55.00 $45.00 $39.00 $38.95 6.03 Bedliner $300.00 $325.00 $370.00 $370.00 6.04 Electric Brake Controller $196.00 $196.00 $160.00 $196.00 6.05 Service Body $4,549.00 $4,200.00 $4,100.00 $4,100.00 6.06 Service Body Bumper BH $346.00 $395.00 $395.00 $395.00 6.07 Service Body Bumper PH $280.00 $435.00 $432.00 $432.00 6.08 Spotlight $295.00 $415.00 $402.00 $402.00 6.09 Spotlights $590.00 $830.00 $804.00 $804.00 6.10 Toolbox $240.00 $300.00 $403.00 $403.00 6.11 Trailer Hitch STANDARD $45.00 $355.00 SEE EXCEPTIONS 6.12 Trailer Wiring STANDARD NO CHARGE $75.00 STANDARD 6.13 Trailer Ball $10.00 $25.00 $90.00 $24.55 5.00 Vehicle/Options Required 6.00 Outfitter's Specialty Items Attachment B E-Verify Number SAVE Form Bid Item #14-116 8500 GVW Series Pickup Truck for Augusta, Georgia - Fleet Department Bid Opening Date: Wednesday, January 15, 2014 @ 11:00 a.m. Vendors Page 1 of 2 Attachment number 9 \nPage 1 of 2 Item # 2 Bobby Jones Ford 3480 Wrightsboro Road Augusta, GA 30909 Allan Vigil Ford Lincoln Mercury 6790 Mount Zion Boulevard Morrow, GA 30260 Allan Vigil Ford Fayetteville 275 Glen Street N Fayetteville GA 30214 Thomson Chrysler Dodge Ram 2158 Washington Rd. NE Thomson, GA 30824 Bid Item #14-116 8500 GVW Series Pickup Truck for Augusta, Georgia - Fleet Department Bid Opening Date: Wednesday, January 15, 2014 @ 11:00 a.m. Vendors 6.14 Pintle Hook $125.00 $155.00 $183.00 $183.00 6.15 Pipe Vise $258.00 $300.00 $294.00 $294.00 6.16 Tommy Gate Lift $2,275.00 $2,200.00 $2,076.00 $2,076.00 6.17 Window Tint, Reg Cab $90.00 $125.00 $150.00 $150.00 6.18 Window Tint, Ext Cab $105.00 $150.00 $175.00 $175.00 6.19 Window Tint, Crew Cab $125.00 $175.00 $200.00 $200.00 7.01 Backup Alarm $35.00 $75.00 $75.00 $75.00 7.02 Magnetic LED Light $355.00 $695.00 $645.00 $645.00 7.03 LED Top Mount Light $462.00 $680.00 $620.00 $620.00 2015 2015 2015 2014 FORD FORD FORD RAM F2B X2A X2B W2A W2B F-250 F-250 $2,500.00 90 DAYS 60 TO 90 DAYS ARO 14 TO 16 WEEKS ARO 6 TO 10 WEEKS The following venodrs submitted a statement of "No Bid": Carl Black Chevrolet / 110 Roberts Blvd. / Kennesaw, GA 30144 7.00 Alert Warning Systems Year Make Model App Delivery Time Page 2 of 2 Attachment number 9 \nPage 2 of 2 Item # 2 Attachment number 10 \nPage 1 of 2 Item # 2 Attachment number 10 \nPage 2 of 2 Item # 2 Invitation to Bid Sealed bids will be received at this office on Wednesday, January 22, 2014 @ 11:00 a.m. for furnishing: Bid Item 14-117 17,500 GVW Series Pickup Truck for Fleet Management Bid Item 14-118 10,000 GVW Series Pickup Truck for Fleet Management Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, January 10, 2014 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference an eligible bidder must submit a completed and signed written application to become a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project. An eligible bidder who fails to submit an application for approval as a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project, and who otherwise meets the requirements for approval as a local bidder, will not be qualified for a bid preference on such eligible local project. No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Augusta Chronicle December 19, 26, 2013 and January 2, 9, 2014 Metro Courier December 25, 2013 Revised: 3/7/2013 Attachment number 11 \nPage 1 of 1 Item # 2 Attachment number 12 \nPage 1 of 4 Item # 2 Attachment number 12 \nPage 2 of 4 Item # 2 Attachment number 12 \nPage 3 of 4 Item # 2 Attachment number 12 \nPage 4 of 4 Item # 2 Finance Committee Meeting 5/27/2014 1:05 PM 2014 - Planning and Zoning Vehicle Replacement Department:Finance Department - Fleet Management Caption:Approve the replacement of 2 vehicles for Augusta Richmond County Code Enforcement Department. Background:Fleet Management would like to request replacement of 2 older vehicles used by Code Enforcement inspectors. The designated vehicles are in need of replacement. The 2 older vehicles are a 2005 model Ford Ranger (asset: 204324)with 135,456 miles, and 1999 Ford Ranger (asset: 994149) with 138,066 miles. Vehicle evaluations and bid tab sheet results are attached for your review. One of the trucks will be a 4x4 truck used by the environmental inspector which is often required to go off road to inspect illegal dump sites. The 4x4 ensures the inspector can safely go into a rough area and return. The second vehicle will be replaced with a Ford Explorer which will increase efficiency of the Department when multiple inspectors go to the same location, when inspectors go to training activities and when the Director is involved in specific issues where inspectors accompany her to locations to resolve issues. Analysis:The Procurement Department published a competitive bid using the Demand Star application for the 6,000 GVW pickup trucks: Bid 14-115 results were as follows for the 4x4 truck: Allan Vigil- Fayetteville = $22,888.00 each; Allan Vigil-Morrow = $21,710.00 each; Bobby Jones Ford = $21,604.00 each; Fairway Ford = $22,071.00 each; Langsdale Chevrolet = $26,059.00 each; Master Buick-GMC = $30,955.00 each; Thomson Motor Centre = $23,462.00 each. Fleet Management has requested to use the Georgia State Wide Contract program to purchase the Ford Explorer. This assures the best competitive pricing across the state. The state contract number for this purchase is 99999-SPD- ES40199373-002. All relative paperwork has been attached for review. Financial Impact:: (1) Ford F150 4x4 @ $21,604.00 and (1) Ford Explorer @ $24,747.00 for a total of $46,351.00. The funds will be provided by the Capital outlay account.Cover Memo Item # 3 Alternatives:(1) Approve the request; (2) Do not approve the request. Recommendation:Approve the replacement of two vehicle of Planning and Zoning/Code Enforcement with a Ford F-150 (4X4) and a Ford Explorer and declare the two replaced vehicles as excess and available for auction. Funds are Available in the Following Accounts: 2014 Capital Outlay REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 3 Attachment number 1 \nPage 1 of 2 Item # 3 Attachment number 1 \nPage 2 of 2 Item # 3 Attachment number 2 \nPage 1 of 1 Item # 3 Attachment number 3 \nPage 1 of 5 Item # 3 Attachment number 3 \nPage 2 of 5 Item # 3 Attachment number 3 \nPage 3 of 5 Item # 3 Attachment number 3 \nPage 4 of 5 Item # 3 Attachment number 3 \nPage 5 of 5 Item # 3 Invitation to Bid Sealed bids will be received at this office on Wednesday, January 15, 2014 @ 11:00 a.m. for furnishing: Bid Item 14-115 6,000 GVW Series Pickup Truck for Fleet Management Bid Item 14-116 8,500 GVW Series Pickup Truck for Fleet Management Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, January 3, 2014 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Augusta Chronicle December 12, 19, 26, 2013 January 2, 2014 Metro Courier December 18, 2013 Revised: 3/7/2013 Attachment number 4 \nPage 1 of 1 Item # 3 UNOFFICIAL Allan Vigil Ford Lincoln Mercury 6790 Mount Zion Boulevard Morrow, GA 30260 Allan Vigil Ford Fayetteville 275 Glen St North Fayetteville GA 30214 Langdale Chevrolet 1006 W Franklin St Sylvester GA 31791 Fairway Ford 4158 Washington Road Evans, GA 30809 Master Buick GMC 3710 Washington Road Augusta, GA 30907 Bobby Jones Ford 3480 Wrightsboro Road Augusta, GA 30909 Thomson Chrysler Dodge Jeep Ram 2158 Washington Road Thomson GA 30824 YES YES YES YES Yes YES YES 94460 224348 523776 689847 665555 117480 369935 SAVE Form YES YES YES YES Yes YES YES 5.01 Full-Size Truck-Reg Cab2W $16,690.00 $17,074.00 $20,900.00 $17,476.00 $26,053.00 $17,072.00 $20,515.00 5.02 Full-Size Truck-Reg Cab4W $19,663.00 $20,197.00 $23,999.00 $20,336.00 $29,717.00 $19,932.00 $21,623.00 5.03 Full-Size Truck-Ext CabSW $18,800.00 $19,021.00 $23,545.00 $19,370.00 $29,559.00 $21,000.00 $20,578.00 5.04 Full-Size Truck-Ext CabSW $21,088.00 $22,009.00 $26,610.00 $22,411.00 $33,221.00 $22,023.00 $23,433.00 5.05 Full-Size Truck-Ext CabSW $19,586.00 $19,781.00 $24,480.00 $20,183.00 $30,490.00 $19,852.00 $20,026.00 5.06 Full-Size Truck-Ext Cab 4D $22,594.00 $22,769.00 $27,540.00 $23,171.00 $34,152.00 $22,784.00 $22,468.00 5.07 Full-Size Truck-Crew Cab 4 $22,993.00 $23,520.00 $27,099.00 $23,922.00 $34,538.00 $23,288.00 $22,321.00 5.08 Full-Size Truck-Crew Cab 4 $25,866.00 $26,303.00 $29,349.00 $26,705.00 $37,436.00 $26,146.00 $24,465.00 5.09 Speed Control/Tilt Steering $192.00 $225.00 STANDARD $225.00 NA $192.00 STANDARD 5.10 Skid Plate Pack (4X4 only)$137.00 $160.00 $129.00 $160.00 $150.00 $137.00 $150.00 5.11 Minimum 8 Foot Bed $375.00 Reg $278.00 Super $1,206.00 $391.00 $325.00 $375.00 $278.00 $340.00 5.12 Black platform running brds $256.00 $250.00 $601.00 $315.00 $690.00 $256.00 $560.50-$693.50 5.13 Electric windows & do locks $981.00 $950.00 $519.00 $1,150.00 NA $811.00 EXCEPTION 5.14 Trailer Tow Package $320.00 $375.00 $326.00 $350.00 $375.00 $320.00 EXCEPTION 6.01 Fire Extinguisher $85.00 $95.00 $73.00 $48.00 $48.00 $81.12 6.02 Outlet Receptacle $45.00 $225.00 $97.00 $55.00 $55.00 $38.95 6.03 Bedliner $325.00 $450.00 $400.00 $300.00 $475.00 $300.00 $370.00 6.04 Toolbox $300.00 $700.00 $331.00 $240.00 $250.00 $403.00 6.05 Trailer Hitch $365.00 $278.00 $38.00 $220.00 $475.00 $30.00 EXCEPTION 6.06 Trailer Wiring $80.00 INCLUDED INCLUDED $25.00 INCLUDED STANDARD 6.07 Trailer Ball $25.00 $24.00 $37.00 $10.00 $40.00 $10.00 $24.55 6.08 Window Tint, Reg Cab $125.00 $200.00 $144.00 $140.00 $100.00 $90.00 $140.00 E-Verify Number Attachment B E-Verify Number Bid Item #14-115 6000 GVW Series Pickup Truck for Augusta, Georgia - Fleet Department Bid Opening Date: Wednesday, November 15, 2014 @ 11:00 a.m. Vendors 5.00 Vehicle/Options Required5.00 Vehicle/Options Required 6.00 Outfitter's Specialty Items Page 1 of 2 At t a c h m e n t n u m b e r 5 \ n P a g e 1 o f 2 It e m # 3 UNOFFICIAL Allan Vigil Ford Lincoln Mercury 6790 Mount Zion Boulevard Morrow, GA 30260 Allan Vigil Ford Fayetteville 275 Glen St North Fayetteville GA 30214 Langdale Chevrolet 1006 W Franklin St Sylvester GA 31791 Fairway Ford 4158 Washington Road Evans, GA 30809 Master Buick GMC 3710 Washington Road Augusta, GA 30907 Bobby Jones Ford 3480 Wrightsboro Road Augusta, GA 30909 Thomson Chrysler Dodge Jeep Ram 2158 Washington Road Thomson GA 30824 Bid Item #14-115 6000 GVW Series Pickup Truck for Augusta, Georgia - Fleet Department Bid Opening Date: Wednesday, November 15, 2014 @ 11:00 a.m. Vendors 6.09 Window Tint, Ext Cab $150.00 $225.00 $181.00 $145.00 $100.00 $105.00 $140.00 6.10 Window Tint, Crew Cab $175.00 $300.00 $206.00 $155.00 $100.00 $130.00 $140.00 6.11 Safety Cone Holder $80.00 $125.00 $94.00 $45.00 $45.00 $75.00 6.12 Safety Cones $80.00 $55.00 $90.00 $120.00 $60.00 $45.00 7.01 Backup Alarm $75.00 $86.00 $63.00 $35.00 $138.00 $65.00 $75.00 7.02 Magnetic LED Light $695.00 $458.00 $462.00 $355.00 $355.00 $645.00 7.03 LED Top Mount Light $680.00 $625.00 $594.00 $462.00 $462.00 $620.00 2014 2014 2014 2014 2014 2014 2014 FORD FORD CHEVROLET FORD GMC FORD RAM F-150 F-150 CC15703 CK15703 CC15753 CK15753 CC15753 CK15753 CC15743 CK15743 F-150 SIERRA F-1C F-1E X1C X1E W1C & W1E 1500 60 TO 90 DAYS 12 TO 14 WEEKS ARO 60 TO 70 DAYS ARO 60 TO 90 DAYS ARO 60 TO 75 DAYS ARO 6 TO 8 WEEKS The following vendor submitted a statement of "No Bid": Carl Black Chevrolet, 110 Roberts Blvd., Kennesaw, GA 30144 Appox Delivery Time Year Make Model 7.00 Alert Warning Systems Page 2 of 2 At t a c h m e n t n u m b e r 5 \ n P a g e 2 o f 2 It e m # 3 Attachment number 6 \nPage 1 of 2 Item # 3 Attachment number 6 \nPage 2 of 2 Item # 3 Attachment number 7 \nPage 1 of 5 Item # 3 Attachment number 7 \nPage 2 of 5 Item # 3 Attachment number 7 \nPage 3 of 5 Item # 3 Attachment number 7 \nPage 4 of 5 Item # 3 Attachment number 7 \nPage 5 of 5 Item # 3 Finance Committee Meeting 5/27/2014 1:05 PM 2014 - Tax Assessor Vehicles Department:Finance Department - Fleet Management Division Caption:Approve the replacement of 3 vehicles for the Richmond County Tax Assessor’s Office. Background:Fleet Management would like to request the replacement of two Ford Crown Victoria’s and one Ford Escort with one Ford F-150 Pickup Truck and 2 Ford Focus’. The three vehicles to be replaced are: (1) a 2003 For Crown Victoria with 152,823 miles, (2) a 1998 Ford Crown Victoria with 160,242 miles on it and a 1998 Ford Escort with 158,814 miles on it. Evaluations on all vehicles are attached. Analysis:The Procurement Department published a competitive bid using the Demand Star electronic bid application for the 6,000 GVW pickup trucks: Bid 14-115 results were as follows for the pickup truck: Allan Vigil-Fayetteville = $19,230.00 each; Allan Vigil- Morrow = $18,280.00 each; Bobby Jones Ford = $18,287.00 each; Fairway Ford = $18,701.00 each; Langsdale Chevrolet = $22,505.00 each; Master Buick-GMC = $26,766.00 each; and Thomson Motor Centre = $21,855.00 each. NOTE: Bobby Jones Ford will meet the non-local low bid of $18,280.00 utilizing the Local Vendor Preference Program. Fleet Management has requested that the 2 automobiles be purchased through the Georgia State Wide Contract bid system, assuring the best pricing for the units, The awarded state contract vendor is Allan Vigil Ford of Morrow, Georgia, and the SWC # is 99999-SPD-ES40199373- 002. The state contract price is $16,041.00 each. The vehicles purchase documentation is attached for your review. Financial Impact:One (1) Ford F150 @ $18,280.00 and two (2) Ford Focus S models @ $16,041.00 each for a total of $50,362.00. The funds will be provided by the Capital Outlay account. Alternatives:1. Approve the recommendation, 2. Approve the recommendation in part, and 3. Disapprove the recommendation. Cover Memo Item # 4 Recommendation:Approve the purchase of 1 F150 pickup truck and 2 ford focus automobiles and declare any replaced vehicles as surplus and available for auction. Funds are Available in the Following Accounts: Capital Outlay for 2014 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Attachment number 1 \nPage 1 of 3 Item # 4 Attachment number 1 \nPage 2 of 3 Item # 4 Attachment number 1 \nPage 3 of 3 Item # 4 Attachment number 2 \nPage 1 of 1 Item # 4 Attachment number 3 \nPage 1 of 6 Item # 4 Attachment number 3 \nPage 2 of 6 Item # 4 Attachment number 3 \nPage 3 of 6 Item # 4 Attachment number 3 \nPage 4 of 6 Item # 4 Attachment number 3 \nPage 5 of 6 Item # 4 Attachment number 3 \nPage 6 of 6 Item # 4 Invitation to Bid Sealed bids will be received at this office on Wednesday, January 15, 2014 @ 11:00 a.m. for furnishing: Bid Item 14-115 6,000 GVW Series Pickup Truck for Fleet Management Bid Item 14-116 8,500 GVW Series Pickup Truck for Fleet Management Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, January 3, 2014 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Augusta Chronicle December 12, 19, 26, 2013 January 2, 2014 Metro Courier December 18, 2013 Revised: 3/7/2013 Attachment number 4 \nPage 1 of 1 Item # 4 UNOFFICIAL Allan Vigil Ford Lincoln Mercury 6790 Mount Zion Boulevard Morrow, GA 30260 Allan Vigil Ford Fayetteville 275 Glen St North Fayetteville GA 30214 Langdale Chevrolet 1006 W Franklin St Sylvester GA 31791 Fairway Ford 4158 Washington Road Evans, GA 30809 Master Buick GMC 3710 Washington Road Augusta, GA 30907 Bobby Jones Ford 3480 Wrightsboro Road Augusta, GA 30909 Thomson Chrysler Dodge Jeep Ram 2158 Washington Road Thomson GA 30824 YES YES YES YES Yes YES YES 94460 224348 523776 689847 665555 117480 369935 SAVE Form YES YES YES YES Yes YES YES 5.01 Full-Size Truck-Reg Cab2W $16,690.00 $17,074.00 $20,900.00 $17,476.00 $26,053.00 $17,072.00 $20,515.00 5.02 Full-Size Truck-Reg Cab4W $19,663.00 $20,197.00 $23,999.00 $20,336.00 $29,717.00 $19,932.00 $21,623.00 5.03 Full-Size Truck-Ext CabSW $18,800.00 $19,021.00 $23,545.00 $19,370.00 $29,559.00 $21,000.00 $20,578.00 5.04 Full-Size Truck-Ext CabSW $21,088.00 $22,009.00 $26,610.00 $22,411.00 $33,221.00 $22,023.00 $23,433.00 5.05 Full-Size Truck-Ext CabSW $19,586.00 $19,781.00 $24,480.00 $20,183.00 $30,490.00 $19,852.00 $20,026.00 5.06 Full-Size Truck-Ext Cab 4D $22,594.00 $22,769.00 $27,540.00 $23,171.00 $34,152.00 $22,784.00 $22,468.00 5.07 Full-Size Truck-Crew Cab 4 $22,993.00 $23,520.00 $27,099.00 $23,922.00 $34,538.00 $23,288.00 $22,321.00 5.08 Full-Size Truck-Crew Cab 4 $25,866.00 $26,303.00 $29,349.00 $26,705.00 $37,436.00 $26,146.00 $24,465.00 5.09 Speed Control/Tilt Steering $192.00 $225.00 STANDARD $225.00 NA $192.00 STANDARD 5.10 Skid Plate Pack (4X4 only)$137.00 $160.00 $129.00 $160.00 $150.00 $137.00 $150.00 5.11 Minimum 8 Foot Bed $375.00 Reg $278.00 Super $1,206.00 $391.00 $325.00 $375.00 $278.00 $340.00 5.12 Black platform running brds $256.00 $250.00 $601.00 $315.00 $690.00 $256.00 $560.50-$693.50 5.13 Electric windows & do locks $981.00 $950.00 $519.00 $1,150.00 NA $811.00 EXCEPTION 5.14 Trailer Tow Package $320.00 $375.00 $326.00 $350.00 $375.00 $320.00 EXCEPTION 6.01 Fire Extinguisher $85.00 $95.00 $73.00 $48.00 $48.00 $81.12 6.02 Outlet Receptacle $45.00 $225.00 $97.00 $55.00 $55.00 $38.95 6.03 Bedliner $325.00 $450.00 $400.00 $300.00 $475.00 $300.00 $370.00 6.04 Toolbox $300.00 $700.00 $331.00 $240.00 $250.00 $403.00 6.05 Trailer Hitch $365.00 $278.00 $38.00 $220.00 $475.00 $30.00 EXCEPTION 6.06 Trailer Wiring $80.00 INCLUDED INCLUDED $25.00 INCLUDED STANDARD 6.07 Trailer Ball $25.00 $24.00 $37.00 $10.00 $40.00 $10.00 $24.55 6.08 Window Tint, Reg Cab $125.00 $200.00 $144.00 $140.00 $100.00 $90.00 $140.00 E-Verify Number Attachment B E-Verify Number Bid Item #14-115 6000 GVW Series Pickup Truck for Augusta, Georgia - Fleet Department Bid Opening Date: Wednesday, November 15, 2014 @ 11:00 a.m. Vendors 5.00 Vehicle/Options Required5.00 Vehicle/Options Required 6.00 Outfitter's Specialty Items Page 1 of 2 At t a c h m e n t n u m b e r 5 \ n P a g e 1 o f 2 It e m # 4 UNOFFICIAL Allan Vigil Ford Lincoln Mercury 6790 Mount Zion Boulevard Morrow, GA 30260 Allan Vigil Ford Fayetteville 275 Glen St North Fayetteville GA 30214 Langdale Chevrolet 1006 W Franklin St Sylvester GA 31791 Fairway Ford 4158 Washington Road Evans, GA 30809 Master Buick GMC 3710 Washington Road Augusta, GA 30907 Bobby Jones Ford 3480 Wrightsboro Road Augusta, GA 30909 Thomson Chrysler Dodge Jeep Ram 2158 Washington Road Thomson GA 30824 Bid Item #14-115 6000 GVW Series Pickup Truck for Augusta, Georgia - Fleet Department Bid Opening Date: Wednesday, November 15, 2014 @ 11:00 a.m. Vendors 6.09 Window Tint, Ext Cab $150.00 $225.00 $181.00 $145.00 $100.00 $105.00 $140.00 6.10 Window Tint, Crew Cab $175.00 $300.00 $206.00 $155.00 $100.00 $130.00 $140.00 6.11 Safety Cone Holder $80.00 $125.00 $94.00 $45.00 $45.00 $75.00 6.12 Safety Cones $80.00 $55.00 $90.00 $120.00 $60.00 $45.00 7.01 Backup Alarm $75.00 $86.00 $63.00 $35.00 $138.00 $65.00 $75.00 7.02 Magnetic LED Light $695.00 $458.00 $462.00 $355.00 $355.00 $645.00 7.03 LED Top Mount Light $680.00 $625.00 $594.00 $462.00 $462.00 $620.00 2014 2014 2014 2014 2014 2014 2014 FORD FORD CHEVROLET FORD GMC FORD RAM F-150 F-150 CC15703 CK15703 CC15753 CK15753 CC15753 CK15753 CC15743 CK15743 F-150 SIERRA F-1C F-1E X1C X1E W1C & W1E 1500 60 TO 90 DAYS 12 TO 14 WEEKS ARO 60 TO 70 DAYS ARO 60 TO 90 DAYS ARO 60 TO 75 DAYS ARO 6 TO 8 WEEKS The following vendor submitted a statement of "No Bid": Carl Black Chevrolet, 110 Roberts Blvd., Kennesaw, GA 30144 Appox Delivery Time Year Make Model 7.00 Alert Warning Systems Page 2 of 2 At t a c h m e n t n u m b e r 5 \ n P a g e 2 o f 2 It e m # 4 Attachment number 6 \nPage 1 of 5 Item # 4 Attachment number 6 \nPage 2 of 5 Item # 4 Attachment number 6 \nPage 3 of 5 Item # 4 Attachment number 6 \nPage 4 of 5 Item # 4 Attachment number 6 \nPage 5 of 5 Item # 4 Attachment number 7 \nPage 1 of 2 Item # 4 Attachment number 7 \nPage 2 of 2 Item # 4 Finance Committee Meeting 5/27/2014 1:05 PM Approve agreement with Rachal Longstreet Foundation, Inc Department:Finance Caption:Motion to approve agreement with Rachel Longstreet Foundation, Inc. (Jessye Norman School of the Arts) for funding as authorized in SPLOST VI. Background:Project funding in the amount of $95,000 for the Jessye Norman School was approved in the SPLOST VI referendum. The Jessye Norman School of the Arts Handicap Access Project will improve access with the installation of an elevator. Analysis:The Jessye Norman School of the Arts has raised the matching funds ($23,750)as required by the SPLOST VI Challenge Grant Guidelines. The agency has provided documentation as required. The SPLOST funding has been collected as is avaiable for disbursement in accordance with the attached agreement upon approval by the governing body. Financial Impact:The funding is available in SPLOST VI. Alternatives:na Recommendation:approve contract Funds are Available in the Following Accounts: 328-06-4310/5721110 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 5 Attachment number 1 \nPage 1 of 9 Item # 5 Attachment number 1 \nPage 2 of 9 Item # 5 Attachment number 1 \nPage 3 of 9 Item # 5 Attachment number 1 \nPage 4 of 9 Item # 5 Attachment number 1 \nPage 5 of 9 Item # 5 Attachment number 1 \nPage 6 of 9 Item # 5 Attachment number 1 \nPage 7 of 9 Item # 5 Attachment number 1 \nPage 8 of 9 Item # 5 Attachment number 1 \nPage 9 of 9 Item # 5 A. B. C. D.District:All E. F. G.Quality of Life A. B. C. D. Total SPLOST VI Request: 1 95,000.00$ Annual Operating Cost: 2 1,000.00$ 1 Figure from section III. Project Costs, first column (Total) for SPLOST VI Project Total 2 Figure from section V. Operating Costs, first column (Annual Costs) for Total Operating Costs for Project. Fax Number:N/A E-mail Address: Contact Person: Work Phone: Project Name Jessye Norman School of Arts Handicap Access Project Project Name / Brief Description: I. PROJECT JUSTIFICATION: 706-860-7477 capital501@hotmail.com Project Name Project Classification Jessye Norman School of Arts Handicap Access Project Check box if Site Selection required: (If site selection is required, fill out section VI. Site Criteria & Standards) Submitting Department, Agency, or Association: PROJECT SUMMARY SHEET Jessye Norman School of the Arts Check box if project represents a continuation from a previous SPLOST: Project Location / Address: In 2008, the Jessye Norman School of the Arts was the recipient of a 20,000 ft2 building located at the corner of Eighth and Greene Streets in Downtown Augusta. Only the 2nd floor was renovated. This project supports the final phase to renovate the first floor. The size of this building enables the school to quadruple the number of children it currently serves. As part of this growth, the school wants to have the ability to serve children with disabilities. In order to accomplish this, this project supports the installation of an elevator and minor building modifications making it completely handicap accessible. 739 Greene Street, Augusta, Georgia Current Property Owner (if applicable):Rachel Longstreet Foundation, Inc. 706-840-0008 Home Phone: Roger Duke Proposed Project Budget (round to nearest thousands): Project Mission Statement / Goals & Objectives: This project needs to be completed by 2011. The Mission of The Jessye Norman School of the Arts (JNSA) is to provide children (5th thru 11th grade) , who may be economically disadvantaged, with a broad-ranged, professional-quality Fine Arts education. The school nurtures and develops youths to respect and appreciate art in its myriad forms and to recognize the role and value of the arts in society. The goal of this project is to modify the school's facilities to accomodate all children, including those that are physically disadvantaged, as well as economically disadvantaged. In order to accomplish this, the objective of this project is to install an elevator. Why should this project be considered for SPLOST 2010 type funding? The Jessye Norman School of the Arts (JSNA) will aggressively begin its first floor renovation project in January 2009. The current plan is to complete the renovations of the first floor within 18 months. The final phase of the project will be the installation of the elevator, which scheduled to take place in 2010 (design) and 2011 (installation). To meet the Project Goals & Objectives, when should this project be completed? How will this project help meet the Public Safety, Basic Facilities / Infrastructure, and/or Quality of Life needs in Augusta Richmond County? The Jessye Norman School of the Arts (JSNA) is an after-school program designed to develop and nurture the artistic and creative talents of students. The School of the Arts serves the cultural and educational needs of these traditionally under-served youth by providing: free fine arts instruction, academic tutoring, an opportunity for advanced study in dance, drama, music, and art exposure to professionals working within the arts fields, information on possible careers in the arts knowledge of technical aspects of presentation and performance. This project will enable the school to better serve youths that are physically challenged, as well as economically challenged. Studies have shown that JNSA students outperform their peers academically, thus improving their overall quality of life. 12/7/2008 1 Attachment number 2 \nPage 1 of 5 Item # 5 E. A. B. C. Check box if site currently owned by Augusta Richmond County: A. YR1 (11)YR2 (12)YR3 (13)YR4 (14)YR5 (15)YR6 (16) 8,000 82,000 5,000 $95,000 $0 $0 $0 $0 $0SPLOST VI Project Total:$95,000 10. Other (describe):$0 11. Other (describe):$0 Project Name Jessye Norman School of Arts Handicap Access Project Is this project recommended / included in any existing Augusta Richmond County Land Use Plan or Masterplan? If yes, please explain and provide necessary information. No. Project Construction Program / Description: Projected Useful Life of Project: 30 to 50 Years. Project Name Site Specific Information: (address, tax map parcel #, etc.) II. PROJECT DESCRIPTION: The installation of the elevator is the final phase of a $500K project to renovate the first floor of the building. The construction program description will approach renovations in the following order: critical structural modifications; utilities (plumbing, electrical, HVAC); ceiling, walls and floors, and the elevator. Detailed construction information will be available during the technical review process. (Provide within this space a Construction Program / Description for the project. Agencies and departments submitting requests should be prepared to submit detailed construction information, etc., as required during the technical review process.) Jessye Norman School of Arts Handicap Access Project $8,000 8. Construction Contingency $0 4. Fixtures, Furniture, and Equipment 2. Design Fees: 5. Construction: $0 1. Land Acquisition / ROW / Easement: Detailed project capital budget costs (to be funded from SPLOST VI only): Project Costs (round to thousand)Total $82,000 6. Testing: $0 $0 739 Greene Street, Augusta, Georgia Project Name III. PROJECT COSTS: 3. Miscellaneous Fees:$0 Jessye Norman School of Arts Handicap Access Project 9. Project Management:$5,000 12/7/2008 2 Attachment number 2 \nPage 2 of 5 Item # 5 A. YR1 (11)YR2 (12)YR3 (13)YR4 (14)YR5 (15)YR6 (16) 95,000 $95,000 $0 $0 $0 $0 $0 B. A. Note: The operating costs are just for the project, i.e., the elevator. B. Full-Time:N/A Part-Time:N/A Sewer:- 4. Equipment Maintenance:1,000 3. Operating Supplies:- 5. Facility Maintenance:- Phone:- Computers:- 1. Personnel Costs: Jessye Norman School of Arts Handicap Access Project -$ V. OPERATING COSTS: - Annual Costs Total Annual Operating Costs when Project is complete: (Estimated) Operating Revenues Operating Cost (round to thousand) 8. Other (describe):$0 As previously described in Section 2A, the elevator ($95,000) is the final part of a $500,000 project to renovate the first floor of the building. The remaining $405,000 is forecasted to come from the following sources: Grants ($200,000), Private Donations, ($150,000), In-Kind Services ($55,000). The JNSA Board of Directors is committed to raising the balance of funding required ($405,000) to complete this project. Project Name 7. Other (describe):$0 Total Sources:$95,000 * Amount from section III.A., “Detailed project capital budget costs” (SPLOST VI Project Total). Describe the current commitments for the other sources funding this project: $95,000 6. Testing:$0 7. Reimbursement Amount 2. ARC General Fund: $0 4. Federal Grant: 3. State Grant: $0 $0 Project Name - Electrical:- Water:- 2. Utilities: Gas:- Detailed project capital budget costs (to be funded from SPLOST VI only): Jessye Norman School of Arts Handicap Access Project IV. PROJECT FINANCING: 5. Previous SPLOST: Project Sources (round to thousand)Total 1. SPLOST VI * 6. Non-Capital: 8. Other (describe):- TOTAL OPERATING COSTS OF PROJECT: (in thousands) 1,000$ There will be no increase in staff as result of the installation of the elevator. - 7. Other (describe):- Additional Personnel Information: 1. Identify the number of additional staff positions needed when project is completed: 2. Briefly describe the responsibilities of each additional staff position: NET INCOME (ESTIMATED):(1,000)$ 12/7/2008 3 Attachment number 2 \nPage 3 of 5 Item # 5 A. 1. Acreage: B. A. B. Jessye Norman School of Arts Handicap Access Project General Criteria: Project Name There will be no increase in staff as result of the installation of the elevator. VI. Site Criteria and Standards (only applicable if site Selection is required): Jessye Norman School of Arts Handicap Access Project 3. Identify the projected salary and fringe benefit cost for each additional staff position:  Size: Minimum acreage necessary for project, inclusive of parking and other  Topography: Describe type of topography necessary to meet Goals and Objectives.  Estimated cost per acre: Provide an estimated cost per acre and an explanation of how 2. Location / Accessibility:  Relative to its service area: Define location relative to the project's service area that  Vehicular: If necessary to meet the Goals and Objectives, describe what types of  Pedestrians: Same as vehicular, but for pedestrians.  Bicycle Access: Same as vehicular, but for bicycles. No further information on site criteria and standards is necessary for the project request form at this time. However, additional information may be requested during the administrative or technical review processes. If applicable, be prepared to furnish  Development / Adjacent Impacts (visibility, compatibility with land use plan, buffering,  Economy / Financing (on- and off-site development costs, joint development  Environmental (historic standards, traffic impacts, aesthetic standards, air quality, noise There are definitely positive impacts in the Richmond County School System and in ARC Criminal Justice Organizations. 90-95% of students accepted are on free or reduced meals, which means very limited incomes. Last year 70% or more were from single parent homes. Studies have shown that juvenile crimes are the highest between 4-6:30 in the afternoon, when many kids are unsupervised. After school programs are known to reduce juvenile crime. Statistics also show that students involved in the arts have better school attendance, and improved academic scores. A comparison of student reading scores revealed that music and music education students had the highest reading scores of any major on campus. While there are positve academic impacts, being a part of JNSA gives these youths opportunities to be with peers of similar interests, and these interests have nothing to do with gangs or cruising the streets after school. Positive / Negative Impacts on existing Infrastructure / Systems:  Community Values (displacements required, security needs, etc.) Positive / Negative Impacts on ARC Departments, Agencies, or other Organizations: Project Name VII. OTHER IMPACTS: There should be no impacts to existing Infrastructure/Systems as a result of this project. 12/7/2008 4 Attachment number 2 \nPage 4 of 5 Item # 5 C. A.Provide other information that would assist in the review of this proposed project: Completing the first floor renovations of the building will increase the property value. N/A Jessye Norman School of Arts Handicap Access Project VIII. OTHER INFORMATION: Project Name Positive / Negative Impacts on Augusta Richmond County Tax Base: 12/7/2008 5 Attachment number 2 \nPage 5 of 5 Item # 5 Finance Committee Meeting 5/27/2014 1:05 PM Augusta Utilities Refunding 2004 series bonds Department:Utilities Caption:Motion to authorize the Finance and Utility departments to begin the process of issuing bonds to refund the Augusta, Georgia Water and Sewer Revenue Bonds, Series 2004, currently outstanding in the aggregate principal amount of $160,000,000 and up to $30,000,000 of additional bonds for new water and sewer projects, with PFM, Inc. serving as financial advisor, McKenna Long & Aldridge, LLP serving as bond counsel and Murray Barnes Finister, LLP serving as disclosure counsel. Background:Augusta issued bonds in 2004 to finance various water and sewer improvements. The bond documents provided that the bonds could be called after ten years. Analysis:Current interest rates on tax exempt municipal bonds are lower that the rates on the existing bonds which makes refunding these bonds a prudent financial decision. Current projections show present value interest savings of approximately $17,600,000 if the bonds are refunded at today’s prevailing interest rates. In addition, the Utilities Department has needed projects that cannot be timely funded through cash flow. These projects are estimated to total between $20 million and $30 million. Financial Impact:Described above Alternatives:a) Issue bonds to refund the existing bonds and issue additional bonds for needed projects. b) Not refund the existing bonds and not issue bonds for new projects. c) Either refund the existing bonds and not issue additional bonds or not refund the existing bonds and issue additional bonds. Recommendation:Refund the existing bonds and issue bonds to include additional funds of up to $30 million for new projects. Funds are Available This is an enterprise fund and does not impact the General Fund Cover Memo Item # 6 in the Following Accounts: budget. Receipts from operations will pay debt service. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 6 Finance Committee Meeting 5/27/2014 1:05 PM JAG 2014 Grant Acceptance Request & Budget Increase Department:Sheriff Caption:Motion to approve a request from the Richmond County Sheriff's Office to apply for and accept the JAG 2014 grant award and increase the 2014 budget in the amount of $92,103. Background:The Richmond County Sheriff's Office has applied annualy for the Edward Byrne Memorial Justice Assistance Grant funding. This 2014 grant has no local match, and will be spent in its entirety to purchase 61 Tasers and associated accessories (batteries, holsters, cartridges, and warranties). This purchase will be made within the 2014 budget year, pending Commission approval. Analysis: Financial Impact: Alternatives: Recommendation:Approve acceptance of grant award and increase of 2014 budget. Funds are Available in the Following Accounts: No local match. All funding to be provided by JAG 2014 program. REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 7 Finance Committee Meeting 5/27/2014 1:05 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Finance Committee held on May 12, 2014. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 8 Attachment number 1 \nPage 1 of 2 Item # 8 Attachment number 1 \nPage 2 of 2 Item # 8 Finance Committee Meeting 5/27/2014 1:05 PM Motion to Approve Adjusting the Funding Level Provided to Augusta's Accountability Court Department:Finance Caption:Motion to approve adjusting the funding level provided to Augusta's Accountability Court. Background:The commission approved, as part of the 2012 budget, the establishment of an Accountability Court operated as a division of the State Court of Richmond County. This court is funded by participant fees, state grants and a transfer from the general fund. The general fund contribution level was approved at $140,000 the first year and $80,000 each subsequent year. Additional general fund monies were provided in 2013 after, State Court Judges requested and commission approved, adding a case manager position at a cost of $75,000. Analysis:At 2013 year end, Accountability Court revenues exceeded expenses by $68,300; this amount will be added to the current fund balance of $92,160. Financial Impact:This motion seeks to allow adjustment of the general fund transfer dependent on Accountability Court's fund balance. A fund balance of $50,000 will be maintained to cover unforeseen situations. Alternatives:Leave the general fund contribution to Accountability Court at $80,000 annually regardless of necessity. Recommendation:Approve motion allowing adjustment of transfer Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Cover Memo Item # 9 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 9 Attachment number 1 \nPage 1 of 4 Item # 9 Attachment number 1 \nPage 2 of 4 Item # 9 Attachment number 1 \nPage 3 of 4 Item # 9 Attachment number 1 \nPage 4 of 4 Item # 9 Attachment number 2 \nPage 1 of 4 Item # 9 Attachment number 2 \nPage 2 of 4 Item # 9 Attachment number 2 \nPage 3 of 4 Item # 9 Attachment number 2 \nPage 4 of 4 Item # 9