HomeMy WebLinkAbout2022-07-12-Meeting AgendaEngineering Services Committee Meeting Commission Chamber- 7/12/2022- 1:15 PM
ENGINEERING SERVICES
1.Motion to approve additional fees in the amount of $131,531 to ZEL Engineers for
engineering services supporting the FERC licensing of the Augusta Canal. Attachments
2.Award Bid Item 22-204 for the Purchase of Multiple Onsite Generators.Attachments
3.Consider award of Bid #22-178 to Blair Construction, Inc. to perform asphalt patch repair,
concrete curb and sidewalk replacement for the Utilities Department. Attachments
4.Approve and authorize Augusta Utilities Department (AUD) to enter into an MOU with
the Phinizy Center for Water Sciences (PCWS), a contract with Georgia EPD (GAEPD),
and accept awarded grant from GAEPD.
Attachments
5.Motion to approve the minutes of the Engineering Services Committee held on June 14,
2022.Attachments
www.augustaga.gov
Engineering Services Committee Meeting
7/12/2022 1:15 PM
Augusta Canal Engineering Support Change Order
Department:Utilities
Presenter:Wes Byne
Caption:Motion to approve additional fees in the amount of $131,531 to ZEL
Engineers for engineering services supporting the FERC licensing of the
Augusta Canal.
Background:AUD is currently engaged in licensing of the Canal through the Federal
Energy Regulatory Commission. This is a very thorough and extensive
review, and requires substantial interaction with several agencies, as well
as ancillary design work.
Analysis:This scope of work includes summary documents of two years of
negotiations and analysis about the FERC license for the canal. In
addition, the documents include analysis of the fish passage requirements,
and the regulatory history of the licensing process. AUD has reviewed
ZEL’s proposal and found it acceptable given the requirements of the
permit.
Financial Impact:Funding in the amount of $131,531 is available from accounts: G/L
507043410-5212999/82200060-5212999
Alternatives:No alternatives are recommended.
Recommendation:AUD recommends that these engineering services with ZEL be approved.
Funds are Available in
the Following
Accounts:
Funding are available in the following accounts: G/L 507043410-
5212999/82200060-5212999
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 1
Cover Memo
Item # 1
Engineering Services Committee Meeting
7/12/2022 1:15 PM
Award Bid Item 22-204 for the Purchase of Multiple Onsite Generators
Department:Utilities
Presenter:Wes Byne
Caption:Award Bid Item 22-204 for the Purchase of Multiple Onsite Generators.
Background:The Utilities Department maintains the water booster stations and
wastewater pumping stations within our systems. Some of these sites are in
need of backup power in order to maintain water pressure in the system
and prevent wastewater spills in the event of power disruptions. We have
worked with the Procurement Department to solicit bids for backup power
systems for use at these locations.
Analysis:The apparent low bidder from this process is Yancey Power Systems. We
have reviewed their bid and found that it meets all of our requirements. We
recommend awarding bid item 22-204 to Yancey Power Systems at a total
cost of $310,414.00 for four 300ekW generators.
Financial Impact:$310,414.00 from budgeted funds
Alternatives:None Recommended
Recommendation:Award Bid Item 22-204 to Yancey Power Systems at a total cost of
$310,414.00
Funds are Available in
the Following
Accounts:
506043580-5421110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 2
Invitation to Bid
Sealed bids will be received at this office until Monday, April 25, 2022 @ 1:00 p.m. via ZOOM, Meeting ID: 882 8093
4155; Passcode: 512677 for furnishing:
Bid Item #22-204 Onsite Generators for Augusta, GA – Utilities Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid
documents may be obtained at the offices of Augusta, GA Procurement Department, 535 Telfair Street – Suite 605,
Augusta, GA 30901 (706-821-2422).
All questions must be submitted in writing by fax to 706 821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, April 8, 2022 @ 5:00
P.M. No bid will be accepted by fax or email, all must be received by mail or hand delivered.
No bids may be withdrawn for a period of ninety (90) days after bids have been opened, pending the execution of
contract with the successful bidder.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall
include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and
conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including,
but not limited to, the number of copies needed, the timing of the submission, the required financial data, and
any other requirements designated by the Procurement Department are considered material conditions of the
bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such
material condition shall be submitted through the Procurement Director to the appropriate committee of the
Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the
outside of the envelope.
GEORGIA E-Verify and Public Contracts: The Georgia E-Verify law requires contractors and all sub-contractors on
Georgia public contract (contracts with a government agency) for the physical performance of services over $2,499
in value to enroll in E-Verify, regardless of the number of employees. They may be exempt from this requirement if
they have no employees and do not plan to hire employees for the purpose of completing any part of the public
contract. Certain professions are also exempt. All requests for proposals issued by a city must include the contractor
affidavit as part of the requirement for their bid to be considered.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the
bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax or email, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle March 17, 24, 31, 2022 and April 7, 2022
Metro Courier March 17, 2022
Attachment number 1 \nPage 1 of 1
Item # 2
OFFICIAL
~~~ Bid Opening Bid Item #22-204 Multiple Onsite Generators
for Augusta, Georgia -Utilities Department
Bid Due: Monday, April 25, 2022 @ 1 :00 p.m.
Total Number Specifications Mailed Out: 22
Total Number of Specifications Download (Demandstar): 6
Total Electronic Notifications (Demandstar): 119
Georgia Registry: 554
Total packages submitted: 2
Total Noncompliant: 0
Ramsay Bliese Corp Yancey Power Systems dba Leete Generators VENDORS 259 Lee Industrial Blvd. 3360 McMaude Place
Santa Rosa, CA 95407 Austell, GA 30168
Attachment B Yes Yes
E-Verify Number 1314772 146813
SAVE Form Yes Yes
Addendum 1 Yes Yes
250ekW 300ekW 250ekW 300ekW
Generator $89,793.00 $94,344.00 $75,982.00 $75,403.00
Automatic Transfer
Switch $13,035.00 $13,035.00 Included Included
Sub-Base Fuel Tank Included Included Included Included
Sound Enclosure Included Included Included Included
Total Price-Generator $102,828.00 $107,379.00 $75,982.00 $75,403.00
Delivery Charges Included Included $2,200.00 $2,200.00
Additional One (1) Year Included Included Included Included Warranty Service
Total Price
(Generator, Delivery and $102,828.00 $107,379.00 $78,182.00 $77,603.00
Warranty)
Attachment number 2 \nPage 1 of 1
Item # 2
Attachment number 3 \nPage 1 of 4
Item # 2
Attachment number 3 \nPage 2 of 4
Item # 2
Attachment number 3 \nPage 3 of 4
Item # 2
Attachment number 3 \nPage 4 of 4
Item # 2
YANCEY BROS/CATERPILLAR
4165 MIKE PADGETT HWY
AUGUSTA, GA 30906
TEC-TRACTOR EQUIPMENT COMPANY
3809 MIKE PADGETT HWY
AUGUSTA, GA 30906
MSC INDUSTRIAL SUPPLY
525 HARBOUR PLACE DRIVE
DAVIDSON, NC 28036
ASC CONSTRUCTION EQUIP
2303 AIRPORT BOULEVARD
CAYCE SC 29033
HERTZ EQUIPMENT RENTAL
2017 RAWLEY ROAD
AUGUSTA, GA 30906
BORDER EQUIPMENT
2804 WYLDS ROAD
AUGUSTA GA 30909
GLOBE TRAILERS
3101 59TH AVE DR. EAST
BRADENTON, FL 34203
SHEALY ELECTRICAL
120 MEIROVAN DR
NORTH AUGUSTA, SC 29860
TECHNOLOGY INTERNATIONAL INC
1349 S. INTERNATIONAL PARKWAY
SUITE 2411
LAKE MARY, GL 32746
YANCEY POWER SYSTEMS
259 LEE INDUSTRIAL BLVD
AUSTELL, GA 30168
COMMERCIAL SERVICE SOUTH
COORDINATOR
YANCEY POWER SYSTEMS
1459 HWY 80 EAST
POOLER, GA 31322
W.W WILLIAMS
2610 AUGUSTA ROAD WEST
COLUMBIA, SC 29169
POWER & ENERGY SERVICES INC
PO BOX 637
POWDER SPRING, GA 30127
J & B TRACTOR COMPANY
3585 MIKE PADGETT HIGHWAY
AUGUSTA, GA 30906
CONTINENTAL GENERATORS
60 PELHAM DAVIS CIRCLE
GREENVILLE,SC 29615
BORDER STATE INDUSTRIES INC.
SHEALY ELECTRICAL
120 MEROVAN DR.
NORTH AUGUSTA, SC 29860
HI-TECH POWER SYSTEMS
ATTN: BEVERLY WHITESIDE
2479 DOUG BARNARD PKWY
AUGUSTA, GA 30906
MSC INC.
4809 TECHNOLOGY DRIVE
MARTINEZ, GA 30907
RETURNED MAILED: 03/22/2022
TOMAHAWK
501 SILVERSIDE ROAD, SUITE 87
WILMINGTON, DE 19809
SIGNAL POINT SYSTEMS
1270 SHILOH ROAD
KENNESAW, GA 30145
PRIME POWER SERVICE
8225 TROON CIRCLE
AUSTELL, GA 30168
WES BYNE
AUGUSTA UTILITIES DEPT STEPHEN ORTON
AUGUSTA UTILITIES DEPT PHYLLIS JOHNSON
COMPLIANCE DEPT
BID ITEM# 22-204
ONSITE GENERATORS
FOR AUGUSTA UTILITIES DEPARTMENT
BID DUE: MONDAY 04/25/2022 @ 1:00P.M.
BID ITEM# 22-204
ONSITE GENERATORS
FOR AUGUSTA UTILITIES DEPARTMENT
BID MAILED: 03/13/2022
1 of 1
Attachment number 4 \nPage 1 of 1
Item # 2
Engineering Services Committee Meeting
7/12/2022 1:15 PM
ITB 22-178 Asphalt Patch Repair, Concrete Curb and Sidewalk Replacement for Utilities
Department:Utilities
Presenter:Wes Byne
Caption:Consider award of Bid #22-178 to Blair Construction, Inc. to perform
asphalt patch repair, concrete curb and sidewalk replacement for the
Utilities Department.
Background:This service will be used when repair of Augusta Utilities underground
assets requires removal of asphalt or concrete. By utilizing an on-call
contractor, we can limit the amount of time that a road cut or sidewalk cut
remains unrestored. Expedient repairs to the roadway and sidewalk limits
the potentially negative impact on our customers and community.
Augusta Utilities has been successful in past years with this type of
service. The bid was prepared for aninitial contract period of one year
with the option to extendforadditionalone-yearperiodsuptoatotalof
threeadditionalyears.
Analysis:Blair Construction, Inc. submitted an acceptable bid package and was the
lowest compliant bidder. The Utilities Department reviewed the bid and
found it to be fair and reasonable.
Financial Impact:$231,900 funding is available from account: 506043410-5311920.
Alternatives:No alternatives are recommended.
Recommendation:Recommend approval for Utilities Department to contract with Blair
Construction, Inc for this service in the amount of $231,900.00.
Funds are Available in
the Following
Accounts:
Funds are available in account: 506043410-5311920
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Cover Memo
Item # 3
Administrator.
Clerk of Commission
Cover Memo
Item # 3
Invitation to Bid
Sealed bids will be received at this office until Thursday, March 31, 2022 @ 3:00 p.m. via ZOOM Meeting ID: 824 5498
1414; Passcode: 779980 for furnishing:
Bid Item #22-178 Asphalt Patch Repair, Concrete Curb, and Sidewalk Replacement for Augusta, GA – Utilities
Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid
documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605,
Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA
Procurement Department.
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov
to the office of the Procurement Department by Friday, March 18, 2022 @ 5:00 P.M. No bid will be accepted by fax
or email, all must be received by mail or hand delivered.
No bids may be withdrawn for a period of ninety (90) days after bids have been opened, pending the execution of
contract with the successful bidder.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include
specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions,
applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited
to, the number of copies needed, the timing of the submission, the required financial data, and any other
requirements designated by the Procurement Department are considered material conditions of the bid which are
not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition
shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission
for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope.
GEORGIA E-Verify and Public Contracts: The Georgia E-Verify law requires contractors and all sub-contractors on
Georgia public contract (contracts with a government agency) for the physical performance of services over $2,499 in
value to enroll in E-Verify, regardless of the number of employees. They may be exempt from this requirement if they
have no employees and do not plan to hire employees for the purpose of completing any part of the public contract.
Certain professions are also exempt. All requests for proposals issued by a city must include the contractor affidavit as
part of the requirement for their bid to be considered.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement
Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of
receiving incomplete or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax or email, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle February 24, 2022 and March 3, 10, 17, 2022
Metro Courier February 24, 2022
Attachment number 1 \nPage 1 of 1
Item # 3
Attachment number 2 \nPage 1 of 1
Item # 3
UTILITIES DEPARTMENT
Wes Byne, P.E.
Director
Augusta Utilities Department
452 Walker Street, Suite 200 - Augusta, GA 30901
(706) 312-4132 – Fax (706) 312-4133
WWW.AUGUSTAGA.GOV
MEMORANDUM
DATE: May 27, 2022
TO: Geri A. Sams
Director, Procurement
FROM: Wes Byne, P.E.
Director, Utilities Department
SUBJECT: Bid Item #22-178 Asphalt Patch Repair, Concrete Curb and Sidewalk
Replacement for Augusta , Georgia – Utilities Department
_____________________________________________________________________________
We reviewed the bid tabulation and submittals received for the subject project. Considering that
two bids were deemed non-compliant, the lowest compliant bidder was Blair Construction, Inc.
We recommend awarding Bid Item #22-178 to Blair Construction in the amount of $231,900.00.
Attachments:
1. Augusta Procurement Department Bid Tabulation Sheet
Cc: Kelsey Henderson
Attachment number 3 \nPage 1 of 3
Item # 3
Attachment number 3 \nPage 2 of 3
Item # 3
Attachment number 3 \nPage 3 of 3
Item # 3
Attachment number 4 \nPage 1 of 3
Item # 3
Attachment number 4 \nPage 2 of 3
Item # 3
Attachment number 4 \nPage 3 of 3
Item # 3
Engineering Services Committee Meeting
7/12/2022 1:15 PM
Memorandum of Understanding (MOU) with Phinizy Center for Water Sciences (PCWS) and acceptance of contract
and grant with Georgia Environmental Protection Division (GAEPD)
Department:Utilities
Presenter:Wes Byne
Caption:Approve and authorize Augusta Utilities Department (AUD) to enter into
an MOU with the Phinizy Center for Water Sciences (PCWS), a contract
with Georgia EPD (GAEPD), and accept awarded grant from GAEPD.
Background:The State of Georgia passed the Georgia Comprehensive Statewide Water
Management Plan in 2008. That plan calls for each water region to manage
water resources in a sustainable manner to support the state’s economy, to
protect public health and natural systems, and to enhance the quality of life
for all citizens”. To that end, Augusta and all other water users in the
Savannah River Basin are required to share the available water and to
ensure pollution is kept to a minimum. The Water Plan identifies problem
areas within the basin and best management practices to address those
problem areas. This agenda item will allow Augusta to implement one of
those management practices with two partnering agencies (PCWS and
GAEPD).
Analysis:Augusta is a key stakeholder in protecting and preserving water quantity
and water quality within the Savannah River Basin. Since this natural
resource is shared, Augusta also needs to proactively work toward
ensuring this limited resource will be available for Augusta’s future
growth and that the quality of that water remains safe for our citizens.
Approving this action works toward those responsibilities and also
continues to strengthen the working relationships between two critical
partners, GAEPD and PCWS. This grant has been awarded to Augusta and
is pending Commission approval.
Financial Impact:Augusta will contribute $69,320 of cash and $11,653.85 of in-kind labor
while GAEPD will provide $75,000 in cash for this project. Augusta’s
cash portion will come from AUD’s “Other Professional Services” account
which has available funds.
Alternatives:1) Approve and authorize Augusta Utilities Department to accept the
grant, enter into a contract with GAEPD to implement the grant
deliverables, and enter into an MOU with PCWS to implement to the
grant. 2) Do not approve and reject the grant funds and opportunity from
GAEPD.
Cover Memo
Item # 4
Recommendation:Approve alternative 1
Funds are Available in
the Following
Accounts:
Augusta’s cash portion will come from AUD’s “Other Professional
Services” account which has available funds: GL# 506 04 3110-5212999
JL# 820 000 50-52 12999
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 4
City of Augusta
Development of a pilot study to preserve in-stream water quality and in-stream flows below an
urban pond complex using a real-time control system
APPENDIX A
SCOPE OF WORK
SFY2022 REGIONAL WATER PLAN SEED GRANT
1. Project Title: Development of a pilot study to preserve in-stream water quality and
in-stream flows below an urban pond complex using a real-time control
system
2. Lead Organization: Augusta Utilities Department
535 Telfair St
Augusta, GA 30901
Phone: missing phone number
Primary Contact: F. Wes Byne, P.E.
Director
Augusta Utilities Department
452 Walker St
Suite 200
Augusta, GA 30901
Phone: missing phone number
E-mail:wbyne@augustaga.gov
Project Start Date: March 2022
Project End Date: February 2024
Grant Amount: $75,000
Match Amount: $11,653.85
Cash Amount: $69,320
Total Project
Amount: $155,973.85
3. Project Goals:
The goal of this project is to determine if real-time control of detention pond discharge decreases
overall negative impacts to receiving streams relative to stream erosion, water quality, and aquatic
insect dynamics compared to conventional detention pond discharge scenario.
Attachment number 1 \nPage 1 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
2
This project will develop a real-time control structure at the outlet of a detention pond and/or
conventional detention pond facilities with the goal of controlling the overall discharge to the
receiving stream so that erosive flows are minimized. Benefits of this approach will be to preserve
aquatic habitat and decrease pollutants to the stream via creek sediment re-entrainment.
This project will be accomplished by comparing stream impacts downstream of a detention pond
under designed discharge conditions and under real-time control discharge conditions.
Measurements that will allow this comparison to be elucidated will be 15-minute interval water
levels, total suspended solids, the full nitrogen suite (nitrate/nitrite, ammonia, Total Kjeldall
Nitrogen), stream cross sectional area, and aquatic insect dynamics. Each of these measurements
will be conducted at a site upstream of the detention pond outfall, downstream of the outfall, and
from the detention pond effluent. Water samples will be collected approximately monthly during
rain events from each location, using an automated sampler for 6 months from the conventional
condition and 6 months under the real-time control condition. Approximately quarterly (2 under
conventional and 2 under real-time control), samples will be collected using the 14-bottle
automated sampler array to obtain a time series condition of the rainfall event. Aquatic insects will
be sampled at all three sites once at the end of the conventional scenario and once at the end of the
real-time control scenario to determine impacts to the aquatic insect community.
4. Project Background:
Nonpoint source pollution is the largest contributor to overall water quality degradation in streams
throughout the United States. Urban settings are a unique subset of nonpoint source pollution and
contribute to overall degradation of water quality by carrying pollutants directly from impervious
surfaces to streams via stormwater runoff. Sediment, oil, grease, pesticides, nutrients, bacteria, and
heavy metals are some of the most common pollutants in urban runoff. Once these pollutants enter
streams, they may impact aquatic biota directly or may be stored in stream sediments. Some
pollutants trapped in stream sediments may not impact water quality and aquatic organisms if they
are neutralized by chemical and biological transformations. However, some pollutants may remain
dormant in sediments until an event remobilizes and reactivates the pollutant from the buried
sediment and exposes it to the present day environment and stream ecosystem; this is an often
overlooked source of pollutants to modern day stream water quality impairments.
Increased impervious surfaces in urban settings increases runoff to local streams. Compared to
pre-impervious conditions, this increased water exceeds the volumetric capacity and critical sheer
stress of the receiving stream and causes flooding and erosion. Over the past 10 years, Augusta
has done extensive assessments on urban streams within Richmond County. Fluvial
geomorphological results for several Richmond County streams is shown below. Four of the
streams showed low to moderate degradation (erosional lowering of the stream bed elevation),
low, moderate and high widening (lateral erosion of stream channel due to erosion), and low,
moderate, and high aggradation (increased elevation of stream bed as a result of sediment
deposition).
Attachment number 1 \nPage 2 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
3
For example, Rocky Creek, which has 303(d) segments listed for fecal coliform and sediment
(BioF and BioM impairments), showed that the stream had the highest widening, degradation, and
aggradation scores of all sampled creeks. As supported by another study in Rocky Creek, Augusta
showed that stream bed sediments had higher concentrations of E. coli compared to the overlying
creek water column. That study also showed that E. coli loading increased nearly linearly with
increasing creek mile over 4 miles of sampled creek length in the fall of 2014; this showed that
increased groundwater flowing through creek sediments, during fall leaf-off conditions, were
remobilizing sediment bound bacteria and acting as a source of E. coli to water in this stream.
Attachment number 1 \nPage 3 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
4
These studies showed that increased erosion of bank and bottom stream sediments contributed to
the listed impairments of fecal bacteria and sediment in Rocky Creek. Therefore, any measures
that decrease stream bed and bank erosion will improve overall water quality for this urban stream.
Decreasing stream erosion requires decreasing the total volume and erosive velocities of water
during stormwater events.
Decreasing the amount of stormwater in urban streams is more challenging as the impervious
surface area increases. That challenge stems from the fact that modern stormwater design
principles only account for the timing of peak flows released from each individual site and does
not account for the timing of total water volume released from each site. This approach neglects
whether the stream is already at volumetric capacity during a storm event before adding more
water from a new project area. Recent approaches to ameliorate this volumetric issue includes the
implementation of Green Infrastructure (GI) and Low Impact Development (LID) practices. A
goal of LID is to work with the existing landscape to minimize removal of natural areas that
decrease runoff, such as forested areas and wetlands. A goal of GI is to decrease runoff by
implementing practices that decrease overall surface water runoff, mostly through infiltration
practices. While these practices show some promise, they are mostly applied to new site
developments only and do nothing to address the existing challenges of urban stream erosion.
Clearly the sheer number of impaired streams is an indication that conventional stormwater
practices are not working to protect receiving streams, therefore conventional stormwater practices
will not be able to provide the solution either. Conventional stormwater infrastructure is designed
Attachment number 1 \nPage 4 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
5
to release water at certain rates based upon the amount of rainfall during an event. These systems
were often over-designed for small events in order to be able to handle large events. For example,
many stormwater pipes were designed to handle 25 and 50 year storm events and many detention
ponds were designed to handle volumes of water released during 100 year events. Since many of
the stream erosive events occur at storms less than each of the design storm events, there is
volumetric capacity in pipes and detention ponds available to temporarily store water to be released
at a specific time and rate once the volumetric capacity of the receiving stream allows. Retrofitting
conventional stormwater infrastructure with this approach may be the most cost effective way to
handle the challenge of urban stream protection.
The Savannah Upper Ogeechee Regional Water Plan identifies non-point source water pollution
as the primary cause of surface water impairment in Georgia streams (pg. 5-16). However, the
Water Plan does not provide water management practices specific to addressing challenges for
nonpoint source pollution from stormwater sources. The plan identifies urban development as one
of the primary contributions to non-point source pollution but states that specific pollutant sources
must be identified in order to develop management strategies. As shown, Augusta has an extensive
database of water quality and water quantity data in Richmond County streams for over 10 years
with the specific goal of identifying pollutant sources.
5. Project Activities:
Project Activity #1: Executed project contracts
Task 1:Execute contracts between Augusta and GAEPD, and Augusta and Phinizy
Center
Deliverables: Executed contracts
Measures of Success: Completed contracts
Project Activity #2: Determine pilot study site
Task 2: Determine study site
Deliverables: Site selection analysis to determine pilot study site
Measures of Success: One site selected
Project Activity #3: Monitoring
Task 3: Install pre monitoring equipment and begin data collection
Deliverables: Monitoring data
Measures of Success: Monitoring equipment installed. Monitoring equipment
includes 3 stream water level loggers (1 upstream and 2 downstream of pond
discharge location); 1 detention pond water level logger, 3 automated water
samplers installed (upstream of discharge, downstream of discharge, and 1 in
detention pond); 15 minute interval data collection begun.
Attachment number 1 \nPage 5 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
6
Project Activity #4: Implement Opti product at pilot study site
Task 4: Configure software, model performance, commission equipment and deploy
dashboard
Deliverables: Documentation showing equipment commissioned and dashboard
developed
Measures of Success: 1 Dashboard complete and collecting data; equipment
purchased. Equipment to be purchased will consist of the following items:
• Opti Control Panel with solar kit
• water level sensor
• rain gauge
• actuated valve/gate
Task 5: Opti Control Panel with solar kit, water level sensor, rain gauge, and actuated
valve/gate installed and operating
Deliverables: Equipment installed and reporting to dashboard
Measures of Success: Data collection reports to dashboard and equipment
controlled from dashboard. One actuated valve/gate installed on detention pond
outlet.
Project Activity #5: Data collection for conventional detention pond scenario begins for 6
months
Task 6: Data collection from all continuous loggers and composite samplers; Begin
water collection during rain events, (approximately 1 event per month for 6 months)
Deliverables: Data collected from water level loggers and water samples analyzed
for 6 events, (approximately 1 event per month for 6 months); Water sample
analyses from 3 locations (upstream, downstream and detention pond effluent)
include the following: Total suspended sediment (composite event sample-
approximately 1/month), Total suspended sediment (discrete-14 bottle timed
samples, approximately 1 per quarter), Nitrate/nitrite, Total Kjeldall Nitrogen,
Ammonia (approximately 1 event per month, composite sample), and stream cross
sectional area measurements (one upstream and one downstream, measured
approximately once per month after rain event).
Measures of Success: All data collected from loggers, all water samples analyzed
for all constituents for each of the 6 rain events, stream cross section area
measurements collected from both creek sites and aquatic insects sampled once at
end of conventional scenario 6-month period.
Project Activity #6: Data collection for real-time control of detention pond begins for 6
months
Task 7: Data collection from all continuous loggers and composite samplers begin water
collection during rain events, approximately 1 event per month for 6 months; Write final
report
Attachment number 1 \nPage 6 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
7
Deliverables: Data collected from water level loggers and water samples analyzed
for 6 events, (approximately 1/month for 6 months); Water sample analyses from 3
locations (upstream, downstream and detention pond effluent) include the
following: Total suspended sediment (composite event sample- approximately
1/month), Total suspended sediment (discrete-14 bottle timed samples,
approximately 1 per quarter), Nitrate/nitrite, Total Kjeldall Nitrogen, Ammonia
(approximately 1 event per month, composite sample), and stream cross sectional
area measurements (one upstream and one downstream, measured approximately
once per month after rain event).
Measures of Success: All data collected from loggers, all water samples analyzed
for all constituents for each of the 6 rain events, stream cross section area
measurements collected from both creek sites, aquatic insects sampled once at end
of conventional scenario 6-month period.
Project Activity 7: Provide the Savannah Upper Ogeechee Regional Water Planning
Council with periodic written or verbal project updates
Task 8: Provide the Council with project updates at a minimum of once every six (6)
months via email or during Council meetings
Deliverables: Council meeting minutes containing verbal updates or emails
containing written updates
Measures of Success: Approximately four (4) project updates provided to the
Council informing them of the progress of the watershed management plan
Project Activity 8: Reporting Requirements
Task 9: Submit quarterly financial and progress reports to GAEPD
Deliverables: Complete and submit quarterly progress reports, reimbursement
request invoices, and Minority Business Enterprise/Woman Business Enterprise
(MBE/WBE) reports to GAEPD each by January 15th, April 15th, July 15th, and
October 15th of each project year. Track grant and matching funds according to
implementation schedule and provide supporting documentation for all in-kind and
cash match.
Measures of Success: Documentation for expenditures and match contributions,
status of activities/tasks in progress reports
Task 10: Submit final close-out report to GAEPD.
Deliverables: One (1) electronic DRAFT Closeout Report for review and
comments; One (1) electronic and one (1) paper Final Closeout Report detailing
results of project to GAEPD within 60 days of project completion.
Measures of Success: Demonstrates that all components of the report fulfill
GAEPD directives.
Attachment number 1 \nPage 7 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
8
6. Roles and Responsibilities of Partnering Organizations:
Organization
Name
Specific Responsibilities
Augusta, GA
• Account for/contribute to 52% of total project costs in matching
expenses or in-kind services
• Request payments from GAEPD on a quarterly basis
• Pay funds to appropriate contractor(s) and vendor(s), and request
reimbursements from GAEPD
• Track all grant funds expended and all match values provided in
accordance with the implementation schedule
• Track all project activities in accordance with the implementation
schedule
• Complete and submit quarterly progress reports with invoices to
GAEPD by January 15th, April 15th, July 15th, and October 15th of
each project year (Payment of invoice is contingent on work
completed and a review and approval of the quarterly report.)
• Complete and submit close-out report at conclusion of project
GAEPD
• Provide 48% of total project costs
• Review and approve project deliverables
• Participate in meetings, as appropriate
• Provide project oversight and contract management
• Provide monitoring guidance and training
Other Invited
Partners Specific Responsibilities
Phinizy Center
• Provide maintenance of all sampling equipment and will analyze
all water samples as well as provide real-time control product,
implementation, and service through Opti
7. Project Location:
Exact site will be determined as part of the project but site will be within the Rocky Creek
watershed in Richmond County, GA. Currently Rocky Creek is listed for fecal coliform and
Bio-F and Bio-M for sediment in several segments.
Attachment number 1 \nPage 8 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
9
8. Project Budget:
Item
Item Description
Grant
Funds
(60%
Maximum)
Matching Funds
(40% Minimum,
10% as Cash)
Total
In Kind Cash
A
Personnel:
One (1) (Augusta Utilities Director-
Wes Byne) – 0.026 FTE
($130,000/year) for 25 months
Description of Duties: (Subject
matter expert)
One (1) (Augusta Utilities
Maintenance Superintendent- Steve
Orton)- 0.026 FTE ($65,000/yr) for
25 months
Description of Duties: subject
matter expert
One (1) (Augusta Engineering
Department Stormwater Manager-
Oscar Flite)- 0.038 FTE
($95,000/yr) for 25 months
Description of Duties: subject
matter expert
$0
$0
$0
$3,333.33
$3,653.85
$1,666.67
$0
$0
$0
$3,333.33
$3,653.85
$1,666.67
Sub Total: $0 $8,653.85 $0 $8653.85
B
Fringe Benefits: N/A
$0 $0 $0 $0
Sub Total: $0 $0 $0 $0
C
Travel: N/A
$0 $0 $0 $0
Sub Total: $0 $0 $0 $0
D
Equipment: N/A
$0 $3,000 $0 $3,000
Sub Total: $0 $3,000 $0 $3,000
E
Supplies: N/A
$0 $0 $0 $0
Sub Total: $0 $0 $0 $0
Attachment number 1 \nPage 9 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
10
Item
Item Description Grant
Funds
(60%
Maximum)
Matching Funds
(40% Minimum,
10% as Cash)
Total
In Kind Cash
F
Contractual:
Contractor Name: (Phinizy Center)
Description of Duties:
• maintain sampling equipment
and analyze water samples)
• (provide real-time control
product, implementation, and
service through Opti)
$75,000 $0 $69,320 $144,320
Sub Total $75,000 $0 $69,320 $147,320
G
Other:
$0 $0 $0 $0
Sub Total $0 $0 $0 $0
H Total Direct Charges:
(Sum of A-G) $75,000 $11,653.85 $69,320 $155,973.85
I
Indirect Charges: N/A
Indirect Charge Rate $0 $0 $0 $0
J
Total:
(Sum of H and I) $75,000 $11,653.85 $69,320 $155,973.85
Attachment number 1 \nPage 10 of 11
Item # 4
PROJECT TITLE APPLICANT/LEAD ORGANIZATION NAME
11
Budget Narrative:
(A) Personnel Narrative:
(In-Kind Match) $8,653.85
Wes Byne- Augusta Utilities Director – 0.026 FTE ($130,000/year) for 25 months
Description of Duties: Subject matter expert in stormwater, real-time controls, instrumentation,
and project management
Steve Orton- Augusta Utilities Maintenance Superintendent- 0.026 FTE ($65,000/yr) for 25
months
Description of Duties: subject matter expert in real-time controls and maintenance and
instrumentation
Oscar Flite- Augusta Engineering Department Stormwater Manager- 0.038 FTE ($95,000/yr) for
25 months
Augusta-owned equipment usage, in-kind - $3,000
Description of Duties: subject matter expert in stormwater, water quality, and project
management
(B) Fringe Narrative: N/A
(C) Travel Narrative: N/A
(D) Equipment Narrative: N/A
(E) Supplies Narrative: N/A
(F) Contractual Narrative:
(Grant Funds) $75,000, (Cash Match) $69,320 totaling $144,320
Phinizy Center
Description of Duties:
• Maintain sampling equipment and collect and analyze water samples
• Provide real-time control product with Opti (https://optirtc.com/), implementation,
and service through Opti
(G) Other Narrative: N/A
(I) Indirect Charges Narrative: N/A
9. Project Implementation & Drawdown Schedule: Attached
Attachment number 1 \nPage 11 of 11
Item # 4
SFY2019 Regional Water Plan Seed Grant
Initial Final
Grant Drawdown Amount $0 $75,000
Percent Seed Remaining 100%0%
Match Amount $0 $11,655
Percent Match Accrued 0%100%
Cash Match Amount $0 $69,320.00
Percent Cash Match Accrued 0%100%
Jan 2022 Feb 2022 Mar 2022 Apr 2022 May 2022 Jun 2022 Jul 2022 Aug 2022 Sep 2022 Oct 2022 Nov 2022 Dec 2022 Jan 2023 Feb 2023 Mar 2023 Apr 2023 May 2023 Jun 2023 Jul 2023 Aug 2023 Sep 2023 Oct 2023 Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 Jun 2024
Milestones/Tasks
Section 9: Implementation and Drawdown Schedule
1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 5th Quarter 6th Quarter 7th Quarter 8th Quarter 9th Quarter 10th Quarter
$0 $20,000 $20,000 $10,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0
100% 73% 47% 33% 27% 20% 13% 7% 0% 0%
$1,165 $1,165 $1,165 $1,165 $1,165 $1,165 $1,165 $1,165 $1,165 $1,166
10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
$6,000 $32,000 $30,000 $1,320 $0 $0 $0 $0 $0 $0
9% 55% 98% 100% 100% 100% 100% 100% 100%
Task 5: Data collection from all continuous
loggers and composite samplers begin water
collection during rain events
Task 6: Data collection from all continuous
loggers and composite samplers begin water
collection during rain events, final report
Task 7: Provide the Council with project updates
at a minimum of once every six (6) months via
email or during Council meetings
Submit Quarterly Invoices & Status
Reports
Submit Final Close-Out Report
100%
Execute Contract
Task 1: Execute contracts between Augusta and
GAEPD, and Augusta and contractors Opti and
Phinizy Center
Task 2: Determine study site and install stream
monitoring equipment
Task 3: Configure software, model
performance, commission equipment, deploy
dashboard
Task 4: Equipment installed and
operating
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
2
\
n
P
a
g
e
1
o
f
1
It
e
m
#
4
MEMORANDUM OF UNDERSTANDING
between Augusta,
Georgia and
Phinizy Center for Water Sciences
This Memorandum of Understanding (hereinafter "Memorandum") made this ________day of
_______________________________ 2022, by and between AUGUSTA, GEORGIA, as a political
subdivision of the State of Georgia (hereinafter referred to as "Augusta, Georgia" or "Augusta"), as Party
of the First Part, and Phinizy Center for Water Sciences (hereinafter referred to as "Institution") as Party
of the Second Part.
WHEREAS, the Institution is a professional/Nonprofit partnering entity assisting Augusta Utilities Department (AUD) with the GAEPD Seed Grant entitled, " DEVELOPMENT OF A PILOT STUDY TO
PERESERVE IN-STREAM WATER QUALITY AND IN-STREAM FLOWS BELOW AN URBAN POND COMPLEX USING A REAL-TIME CONTROL SYSTEM ";
NOW, THEREFORE, as a desire of Augusta and Institution to properly coordinate the development and
implementation of this grant, the parties hereby agree as follows:
UNDERSTANDING:
Augusta, Georgia and Institution do hereby agree to the following: 1. The Institution will provide services related to maintenance of sampling equipment, collection and
analysis of water samples, and provide implementation, installation, and service, as needed, for a real-time
control product as outlined in the project activities section of the project contract with GAEPD.
2. The Institution will provide Augusta with timesheets for each project task, using format approved by
Augusta Utilities Department (AUD), for all personnel involved in this project as well as a brief summary
of activities and percent completion for each project task for each quarterly reporting period as required
by the grant.
3. Augusta shall contribute funds of $155,973.85 for the work provided and not to exceed the designated
amount within the approved grant as shown in the SFY2022 Regional Water Plan Seed Grant scope of
work document.
4. The Institution shall submit quarterly reimbursement claims with detailed description of work done
during that quarter to AUD within five days by end of the respective quarter. These reimbursement claims
shall be prepared in a format acceptable by the AUD with payment to the Institution once funds have been
Attachment number 3 \nPage 1 of 3
Item # 4
received by the granting agency.
5. Upon completion of the activities funded by Augusta, material produced under this MOU will become
property of Augusta. However, with written permission from Augusta Utilities Department, the Institution
has rights to use this material for their activities and scientific research purposes but must include GAEPD
and Augusta personnel as designated collaborators and the following as proper identification of funding
for the project:
“The preparation of this report, map, document, project, etc., was financed in part through a
grant from the Georgia Environmental Protection Division and Augusta, Georgia/Augusta Utilities
Department.”
Together with the month and year, the document was prepared and credit being given to the
Environmental Protection Division of the Department of Natural resources, State of Georgia and
Augusta, GA.
DELIVERABLES:
The Institution agrees to provide to Augusta Utilities Department any requested documentation required
under this MOU. See Appendix A for project deliverables.
TIME:
This MOU will remain in effect for the SFY2022 Regional Water Plan Seed Grant awarded grant duration
unless otherwise amended.
TERMINATION:
Both parties may terminate this MOU at any time by giving of forty-five (45) days written notice of such
termination. Upon receipt of such notice of termination, Institution shall discontinue all work under this
MOU. Data gathered and material produced will become property of Augusta.
Attachment number 3 \nPage 2 of 3
Item # 4
MISCELLANEOUS: 1) This Memorandum of Understanding shall be controlled by and construed in accordance with the laws of the State of Georgia. 2) Any notice given under this Memorandum shall be deemed given when provided in writing to
the following persons:
To Augusta, Ga: AUGUSTA, UTILITES DEPARTMENT
ATTN: DIRECTOR OF AUGUSTA UTILITES DEPARTMENT
452 WALKER STREET
AUGUSTA, GEORGIA 30901
To Phinizy Center for Water Sciences:
PHINIZY CENTER FOR WATER
SCIENCES
1858 LOCK AND DAM
ROAD AUGUSTA, GEORGIA
30906
This Memorandum of Understanding is the entire agreement between the parties, and may not be
amended, except by a writing executed by both parties.
APPROVED: PHINIZY CENTER FOR WATER SCIENCES AUGUSTA, GEORGIA By: ____________________________ By: _____________________________
Date: __________________________ Date: ___________________________ Attest: _________________________ Attest: __________________________
Date: __________________________ Date: __________________________
Attachment number 3 \nPage 3 of 3
Item # 4
Engineering Services Committee Meeting
7/12/2022 1:15 PM
Minutes
Department:
Presenter:
Caption:Motion to approve the minutes of the Engineering Services Committee
held on June 14, 2022.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 5
Engineering Services Committee Meeting Commission Chamber - 611412022
ATTENDANCE:
Present: Hons. Hardie Davis, Jr., Mayor; Garrett, Chairman; Hasan,
Vice Chairman; Johnson and McKnight, members.
ENGINEERING SERVICES
1. Approve funding for Design Consultant Services Supplemental Agreement Item
three (SA3) to CHA (formerly Wolverton & Associates) in the amount of Action:
$361,591 .17 for the 15th Street Pedestrian Improvement Project Part 2 Design Approved
Phase. RFQ 16-246. Requested by the AED.
seconded By Motion
Result
Motion to
^ approve. Commissioner CommissionerApprove vtotion passes Jordan Johnson Ben Hasan Passes
4-0.
2. Approve Task Order Three (3) funding for Stormwater System Assessment ltem
and Drainage Improvements Engineering Services Agreement to Cranston Action:
Engineering (Cranston) in the amount of $93,550.00 for Wilkshire Drive Approved
(National Hills) Conveyance System Engineering and Pointe West Regional
Detention Facility Capacity Assessment. Requested by the AED. RFQ l8-148
Motions
f#:" Motion rext Made Bv
Motions
Motion Motion Textr ype
Motion to
^ aDDrove.APProve uotion passes
4_0.
Made By
Commissioner
Jordan Johnson
Seconded By
Commissioner
Ben Hasan
Motion
Result
Passes
Attachment number 1 \nPage 1 of 4
Item # 5
3. Consider award of Bid ltem#22-203 to Beam's Contracting, Inc. to construct Item
the Fort Gordon Cyber CoE Campus Utilities Project E (8th Ave.) under the Action:
Task Order Program RFQ #18-263 in the amount of $1,496,917.53. Approved
4. Motion to approve the minutes of the Engineering Services Committee held Item
on May 31,2022. Action:
Approved
Motions
ryJ:" Motion rext Made Bv
Motion to. aDDrove.APProve rtao,ionPasses
4-0.
Motions
r#:'" Motion rext Made Bv
Motion to
. aDDrove.APProve vtotio, Passes
4-0.
Commissioner
Jordan Johnson
Commissioner
Jordan Johnson
Seconded By
Commissioner
Ben Hasan
Seconded By
Commissioner
Ben Hasan
drafting edits to the
requirements for
Motion
Result
Passes
Motion
Result
Passes
Augusta, Item
personal Action:
Approved
5.Motion to request authorization to proceed with
Georgia Code, 3-5-1 and 3-5-86 to modifr
transportation vehicles.
Motions
Motion
-^--'-- lVlotion Text'l'vne
Motion to approve
authorization to proceed
with the preparation of a
Approve draft of the revised
ordinance to be brought
back for review.
Motion Passes 4-0.
MotionSeconded By ResuttMade By
Commissioner Commissioner
Ben Hasan Jordan Johnson rasses
6. Approve the installation of three (3) speed humps along Flagler Road between Item
Ruth Street and Carolyn Street with a construction cost of $12,000. Funding is Action:
available in Traffic Engineering budget account R&M Pavement. Approved
Attachment number 1 \nPage 2 of 4
Item # 5
Motions
[-o11" Motion Text Made By Seconded By Motion'l'ype --- -'1 --------- -" Result
Motion to
a _.^..^_-^ approve. Commissioner CommissionerApprove Motion passes Jordan Johnson Ben Hasan Passes
4-0.
7. Approve Supplemental Agreement for Wood Environmental & Infrastructure Item
Solutions, Inc. (former AMEC Foster Wheeler Environmental & Action:
Infrastructure, Inc.) in the amount of $86,680.00 for continued support Approved
services for the Stormwater Utility Program. Requested by the AED. Bid 13-
160
Motions
[]11"' Motion Text Made By seconded By MotionlYPe ------ -r --------- -" Result
Motion to
A __..^_-^ approve. Commissioner CommissionerApprove Motion passes Jordan Johnson Ben Hasan Passes
4-0.
8. Receive update on Quick Strike Cleanup program. Also please provide timing Item
of implementation as well as scope of what is covered under this program. Action:
(Requested by Commissioner Brandon Garrett) Approved
Motions
X:tl"' Motion Text Made By seconded By MotionrYPe - ----- -'t Result
Motion to approve
receiving this item as
information without
Approve objection with a full commissioner commissioner
report to be given at the Ben Hasan Jordan Johnson Passes
next Commission
meeting.