Loading...
HomeMy WebLinkAbout2020-03-20 Meeting AgendaEngineering Services Committee Meeting Commission Chamber- 3/10/2020- 1:20 PM ENGINEERING SERVICES 1.Approve and authorize the Engineering Department (AED) to accept and receive Federal Financial Assistance through Section 319(h) Nonpoint Source Implication Grant Program, grant authorization permitting Augusta, GA’s Mayor to sign all documentation as requested by the AED. Attachments 2.Approve supplemental funding (SA4) for Construction Phase of Design Engineering Consultant Agreement to Civil Services, Inc. in the amount of $161,465.60 for 5th Street Bridge over the Savannah River (Bridge Repair and Restoration) as requested by AED. RFQ 16-247. Attachments 3.Approve funding for Design Consultant Services Supplemental Agreement Two to Cranston Engineering Group, Inc. in the amount of $72,640.00 for the James Brown Blvd. (9th Street) Improvement Project as requested by the AED. RFQ 16-246. Attachments 4.Approve the continued funding of the current On-Call Field and Laboratory Testing for Soil and Construction Material, and Geotechnical Inspection and Investigation (CMT Geotech) Services contract in the amount of $180,240 for James Brown Blvd. Improvements Project. Requested by AED. RFP 19-179. Attachments 5.Approve and accept Section of Harper Franklin Ave. (from Jimmie Dyess Pkwy to its West 1761.46ft) and associated Improvements within road Right-of-Way into Augusta, Georgia Public Roadway System upon receipt of its certified Plat, Deed of Dedication, 18-month Road Maintenance Agreement and required other Legal Documentation as determined by Augusta Engineering Department and Augusta Legal Department. Requested by AED. Attachments 6.Approve award of Lake Olmstead Dredging-Sediment Disposal Site Preparation Construction Services Phase 1 Contract in the amount of $742,856.25 to Waterfront Property Services, LLC dba Gator Dredging in the amount as requested by the AED. RFP 20-121. Attachments 7.Consider approving an Easement Deed of Dedication and a Release of Aeronautical Use Provisions for Daniel Field. Attachments 8.Approve and authorize Budget Transfer as a Separate Line Item to Augusta Engineering Department (AED) FY2020 Operational Budget to pay for Georgia Municipal Association, Inc. (GMA) FY2020 Services for Telecommunication and Right-of-Way Management. Also, approve such line funding in AED subsequent years operational budgets to pay for yearly future payments to GMA for such services. Requested by AED. Attachments 9.Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering Department and the Augusta Utilities Department for Granite Hill Subdivision, Section Four, Phase Two. Attachments 10.Motion to approve the minutes of the Engineering Services Committee held on February 11, 2020.Attachments 11.Motion to approve exercising the 3rd option to renew with Georgia-Carolina Paving to provide on-call asphalt and concrete repairs for Bid 16-224. Attachments 12.Consider proposal from McKim & Creed to perform smoke and dye testing in the 2nd Street Lift Station Sanitary Sewer Collection Area. Attachments 13.Approve Supplemental Agreement Four for the Phinizy Center for Watershed Assessment & Inventory Project in amount of $89,500 for the continue Watershed Geomorphic data collection and Monitoring System maintenance as requested by AED. RFQ 13-149. Attachments 14.Approve supplemental funding (SA1) for Engineering Phases of Design Consultant Services Agreement to Goodwyne, Mills & Attachments Cawood (GMC) in the amount of $183,540.00 for the Telfair Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-266. www.augustaga.gov Engineering Services Committee Meeting 3/10/2020 1:20 PM 319(h) Nonpoint Source Implementation Grant_FY18 Stormwater BMP Installation and Performance Comparison File Reference: 20 – 014(A) Department:Engineering Presenter: Caption:Approve and authorize the Engineering Department (AED) to accept and receive Federal Financial Assistance through Section 319(h) Nonpoint Source Implication Grant Program, grant authorization permitting Augusta, GA’s Mayor to sign all documentation as requested by the AED. Background:The Clean Water Act Section 319(h) Water Quality grant funds support activities to identify and implement projects for reduction of prioritized risks and concerns in the community such as source assessment and control of pollutant of interest load within state listed impaired water bodies. During 2016, Augusta Engineering Department in partnering with Phinizy Center for Water Sciences (PCWS) submitted two (2) separate applications to seek federal funds for various activities associated with surface water quality improvement program. BMP assessment grant targeted compare the performance of stormwater BMPs to reduce adverse hydrologic and pollutant loading from impervious surfaces. As a team, AED and PCWS staff will work together to install and manage various BMPs features, and monitor performance. This program will allow AED to optimize its MS4 NPDES stormwater Management Program. Analysis:With increasing regulatory demand for stormwater point source pollutants load reduction in receiving waterbodies, the management of stormwater quantity and quality through regulatory permitting is taking a focal point. Three of Augusta creeks are listed as impaired waterbodies and do not support their designated use. The pollutant of concern is fecal coliform (FC) and sediment. Under MS4 stormwater management permitting program US Environmental Protection Agency (EPA) and Georgia Environmental Protection Division (EPD) are requiring localities to develop and implement programs to Cover Memo Item # 1 manage and reduce pollutants of concerns in impaired watersheds. AED will utilize this grant to support this program. AED will meet fund matching need by offering approximately 48% in-kind services such as staff time and balance by stormwater program funds. Financial Impact:By accepting this grant, AED will receive $196,450.00 in federal funds. AED will provide $132,418.00 matching non-federal funds (i) in-kind = $64,118 and (ii) $68,300 from its stormwater services program. Alternatives:1). Do not approve and identify alternate funding source to complete BMPs performance assessment. Recommendation:Approve and Authorize the Engineering Department (AED) to Accept and Receive Federal Financial Assistance through Section 319(h) Nonpoint Source Implication Grant Program, grant Authorization permitting Augusta, GA’s Mayor to sign all documentation as requested by the AED. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: $64,118 in-kind; $68,300 from SWU 581 044320 5213118 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project APPENDIX A SCOPE OF WORK Section 319(h) FY2018Grant – Element 15 1. Project Title: Stormwater BMP Installation and Performance Comparison 2. Lead Organization: Augusta, GA (AKA Augusta-Richmond County) 535 Telfair Street, Bldg.4000 Augusta, GA 30901 706-796-5040 Primary Contact: Hameed Malik, Ph.D., P.E. Assistant Director of Engineering Augusta-Richmond County 535 Telfair Street, Bldg.4000 Augusta, GA 30901 706-796-5040 hmalik@augustaga.gov Project Start Date: February 2020 Project End Date: March 31, 2023 Federal Amount Requested: $196,450 Match Amount to be Contributed: $132,418 Total Project Amount: $328,868 3. Project Goals: The objective of this project is to compare the performances of stormwater BMPs to reduce adverse hydrologic and pollutant loading impacts from impervious surfaces. Performances of existing conventional BMPs will be compared to newly installed GI/LID BMPs at selected locations. Pre- and post-installation comparisons will focus on storm runoff capture and infiltration rates as well as sediment/fecal coliform transport to the impaired watersheds. Installed GI/LID BMPs will strive for reductions outlined in the Georgia Stormwater Management Manual and are estimated to result in higher load reductions than from the conventional BMPs. 4. Project Background: This proposal implements a 2018 Nine-Element Watershed Management Plan (WMP) for the Augusta Canal (HUC-12 #030601060601) / Butler Creek (HUC-12 #030601060602) / Attachment number 1 \nPage 1 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 2 Beaverdam Ditch (HUC-12 #030601060607) Watersheds in the Savannah River Basin (Fig. 1). Most of Augusta’s watersheds flow to the Augusta Canal and Phinizy Swamp, including Butler Creek, Rock Creek, Rocky Creek, Oates Creek, Rae’s Creek and Reed Creek (Columbia County). A six-mile segment of Rocky Creek (Headwaters to SR 56) is currently listed on Georgia’s 2018 Integrated 305(b)/303(d) List of Waters as not supporting the designated use of fishing based on degraded aquatic insect (Bio M) and fish (Bio F) populations due to sediment loads. Another 2 miles of the creek (SR 56 to below New Savannah Road) are listed due to degraded Bio M and Bio F populations plus fecal coliform bacteria loads. In addition, the portion of the Savannah River that runs through Richmond County has been designated by the Savannah-Upper Ogeechee Regional Water Planning Council as a High Priority Species and Aquatic Community Stream (SUOWP, 2006; Section 3, p.12-13). The Rocky Creek watershed has been heavily impacted by urban development (ARCCP, 2008; p. 136) with 78% of the watershed considered urban/residential land use, 16% of which is considered high density (GAEPD, 2015; Table 7). A Total Maximum Daily Load (TMDL) to address the Bio M and Bio F impairments was finalized in 2016. A TMDL established in 2000 and a TMDL Implementation Plan developed in 2002 address the fecal coliform impairment. The 2018 Nine-Element WMP identified the runoff from impervious surfaces alone topped 2,500 MPN/100 mL in E. coli loadings, which exceeds USEPA’s standard for E. coli (410 cfu/100 mL for the statistical threshold value). In addition, stream sediment samples were higher in E. coli concentration than the overlying water, indicating Figure 1. Map showing Augusta Canal HUC12 (upper pink and Beaverdam Ditch HUC12 (lower pink) with listed section of Rocky Creek (yellow) within HUC12 boundary. Attachment number 1 \nPage 2 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 3 stream sediments likely serve as a reservoir for enteric bacteria. Since the bed material is mostly sand, much of Rocky Creek is subject to in-stream erosion. This means that fish and aquatic insect populations are vulnerable to sedimentation during increased flows due to stormwater runoff. Work proposed in this project builds upon these discoveries by addressing the volume of stormwater flow and transport of bacteria and sediment within the Rocky Creek watershed. This project will address impervious surface/stormwater issues by installing GI/LID BMPs within the impaired Rocky Creek watershed where conventional stormwater practices already exist on-site. A comparison of BMP practices will be measured by, but not be limited to, the following: attenuation of stormwater volume and velocity and retention of bacteria/sediment. Each BMP will be fitted with instrumentation to develop an Arduino-based data collection platform (www.arduino.cc) (or equivalent) and with sensors to measure water quantity (e.g. rain gauges, ground and surface water level loggers, lysimeters, etc.) and water quality (e.g. temperature). Data from the instruments will be used to analyze pre/post testing metrics to compare effectiveness between conventional and GI/LID-based BMPs. Study sites will include areas within the watershed that currently show signs of poorly performing conventional stormwater BMPs. Poorly performing BMPs will be tested and sampled as pre-condition, then replaced by GI/LID BMPs. An example of one such site is in the Chester Avenue residential zone, a neighborhood in the proximity of a former wetlands/floodplain prone to flooding during storm events due to overflowing stream banks from Rocky Creek and its tributaries. In addition, the location provides a unique setting for this project because of the available land for installing GI/LID BMPs and the presence of current conventional BMPs, which include catch basins and pipes as well as a large ditch that was installed to relieve flooding. Sandy soils along with the large available area provide many GI/LID options for this site. Other potential projects within this watershed include developing bioretention and/or rain gardens at some of the seven city-owned parks within this watershed (Henry Brigham Park, Elliot Park, Doughty Park, Fleming Sports Complex, Fleming Tennis Center, Apple Valley Park, Valley Park). Most of these sites have paved parking areas and buildings, some have curb-gutter-catch basins and pipes which lead to dry detention ponds. Proposed GI/LID projects for these sites would receive and retain/treat stormwater from impervious surfaces and rooftops in an effort to decrease water volume and pollutants reaching Rocky Creek above and beyond the current conventional systems. High visibility projects bring attention to important issues and help educate the general public. Educational outreach to Chester Avenueadjacent property owners and citizens that use the park facilities will include information on stormwater characteristics and management efforts at local site, neighborhood and regional landscape levels to harness and treat what is considered a valuable water resource. To that end, outcomes from this BMP installation project will be used to develop an educational tool (e.g. brochures, course modules, 3-D model) that will be made available to k-12 public school students throughout Augusta-Richmond County. In addition, the Chester Avenueadjacent neighborhoods will receive updates on the BMP comparison project by mail (water/sewer bill inserts) and/or at appropriate events or meetings. The comparison of conventional and GI/LID BMPs will provide valuable discoveries that could also be expanded regionally. Attachment number 1 \nPage 3 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 4 5. Project Activities: Project Activity: Project kickoff and a minimum of two team meetings on BMP selection and post-BMP monitoring. Georgia’s Statewide NPS Management Plan: 319 Grants, Key Stakeholders, Funding, p. 92: Priority watershed management approach that promotes a high level of stakeholder involvement & uses the expertise & authority of multiple agencies. Task 1: Convene kickoff and a minimum of two meetings with partners in BMP installation (by phone or in person) for the remainder of the project Deliverables: • List of contacts, letters, emails, phone calls to potential partners • Project summary document • Invitations, agendas, emails, sign-in sheets, presentations Measures of Success: Meeting attendance by at least three of the partnering organizations Project Activity: Assess stormwater management strategies based on available options (Georgia Stormwater Management Manual or other approved design source) to determine which GI/LID BMPs will optimize the ecological and economic benefits. Georgia’s Statewide NPS Management Plan: Urban, p. 54: Economics/Funding – Document and disseminate the costs and benefits of GI/LID practices and ensure that adequate resources are available for their implementation. Task 2: Determine best fit of GI/LID BMP type and size for selected sites based upon available space, soils, slope, and cost/benefit Deliverables: GPS waypoints, cross-section survey, meeting & field notes, final BMP construction/ installation plan Measures of Success: GI/LID BMPs will be prioritized for engineering design and placement Task 3: Develop engineering/structural designs Deliverables: Drawings and specifications for construction appropriate to GI/LID designs, local and state level land-disturbing activity permits Measures of Success: Completion and approval by appropriate agency of final plans, drawings, and permits prior to construction Project Activity: Conduct pre-BMP monitoring of existing conventional stormwater controls to compare with GI/LID to be installed. Georgia’s Statewide NPS Management Plan, Urban nonpoint source program- stormwater, short-term goal 1.1, p. 57 Encourage and support performance monitoring of installed GI/LID practices in order to provide local-specific data on BMP cost, performance, and installation and maintenance requirements. Task 4: Finalize QA/QC pre-BMP Water Quality Monitoring Plan Attachment number 1 \nPage 4 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 5 Deliverables: Final plan document that includes parameters, GPS and map of selected sites, sampling schedule, field workers and certification/training, QA/QC methodology, chain of custody, etc. Measures of success: GAEPD approval of QA/QC Monitoring Plan Task 5: Collect and analyze pre-BMP water quality parameters (fecal coliform/E. coli, Total Suspended Solids (TSS), and nutrients) and water quantity parameters (rain gauges, groundwater levels, runoff volume) from conventional stormwater system components Deliverables: Pictures of site installations, sample data, sample log, and analytical results Measures of success: Samples and results collected on schedule Project Activity: Install appropriate GI/LID BMPs based on available options (Georgia Stormwater Management Manual or other approved design source). Georgia’s Statewide NPS Management Plan: Urban, p. 54: Economics/Funding – Document and disseminate the costs and benefits of GI/LID practices and ensure that adequate resources are available for their implementation. Task 6: Install GI/LID stormwater control structures according to Georgia Stormwater Management Manual or other approved design source Deliverables: Construction contracts, receipts, photos Measures of Success: Completion of GI/LID structural practice installations Task 7: Provisions for Operations and Maintenance Structural Best Management Practices (BMPs) shall be operated and maintained for the expected lifespan of the specific practice and in accordance with commonly accepted standards to ensure the proper functioning of the system as designed. Records of inspections and BMP maintenance shall be kept and shall be available for review upon request. This provision will survive the expiration of this contract. Deliverables: None: Records of BMP inspections and maintenance kept on file with Contractor Measures of Success: Properly functioning BMPs Project Activity: Conduct post-BMP monitoring of newly installed GI/LID stormwater controls and compare data to pre-BMP measurements in final report. Georgia’s Statewide NPS Management Plan, Urban nonpoint source program- stormwater, short-term goal 1.1, p. 57 Encourage and support performance monitoring of installed GI/LID practices in order to provide local-specific data on BMP cost, performance, and installation and maintenance requirements. Task 8: Finalize QA/QC post- BMP Water Quality Monitoring Plan Deliverables: Final plan document that includes parameters, GPS and map of selected sites, sampling schedule, field workers and certification/training, QA/QC methodology, chain of custody, etc. Measures of success: GAEPD approval of final QA/QC Monitoring Plan Attachment number 1 \nPage 5 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 6 Task 9: Install and collect post-BMP water quality parameters (fecal coliform/E. coli, Total Suspended Solids (TSS), and nutrients) and water quantity parameters (rain gauges, groundwater levels, runoff volume) from newly installed BMPs Deliverables: Pictures of site installations; continuous water level, TSS, fecal coliform, E. coli, and nutrient data and analytical results Measures of Success: 100% of devices installed and measuring post-BMP data Project Activity: Educational outreach to demonstrate effectiveness of conventional BMPs compared to GI/LID BMPs. Georgia’s Statewide NPS Management Plan, 319 grants, Key Stakeholders, Funding, p. 92: Priority watershed management approach that promotes a high level of stakeholder involvement & uses the expertise & authority of multiple agencies. Task 10: Introduce and update residents, patrons of county-owned park sites, and property-owners and businesses in other county-owned areas of Augusta-Richmond County within the Rocky Creek watershed to BMP comparison project by mail (water/sewer bill inserts) and/or at appropriate events or meetings Deliverables: • Water/sewer bill insert (brochure, Fact Sheet, flyer) • Project summary documents and final reports on BMP installation and effectiveness comparison • Invitations, agendas, emails, sign-in sheets, presentations • Project updates on website Measures of Success: • Insert mailed to a at least 75% of addresses in project areas • Events or meetings attended by at least 10 property-owners, residents or business operators in project areas Task 11: Identification of BMP Projects to give Augusta-Richmond County recognition Deliverables: Provide the following notation on conspicuous educational signage at all BMP site locations: “The preparation of this stormwater management project was financed in part through a grant from the U.S. Environmental Protection Agency under the Provisions of Section 319(h) of the Federal Water Pollution Control Act, as amended.” – followed by the month and year the project was completed and giving credit to the Environmental Protection Division of the Department of Natural Resources, State of Georgia. Measures of Success: Properly installed and worded signage at BMP sites Task 12: Develop k-12 educational tool that demonstrates stormwater scenarios and compares BMP strategies, challenges and successes Deliverables: • Outline/framework of educational tool (target audiences, format/methods/components, adaptations, delivery/distribution) • Final educational tool for k-12 students Attachment number 1 \nPage 6 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 7 Measures of Success: 100% completion of k-12 educational tool and strategy for delivery/distribution Project Activity: Data analysis, load reduction estimates, and reporting on effectiveness of conventional BMP compared to GI/LID BMPs. Georgia’s Statewide NPS Management Plan, Urban nonpoint source program- stormwater, long-term goal 1- research, p. 57: Remain informed on the rapidly growing body of research on the performance and effectiveness of GI/LID practices, as well as collect performance data from Georgia projects in a range a locations and applications in order to ensure the highest levels of effectiveness, ongoing. Task 13: Compare conventional and GI/LID structural practice conditions using pre- and post-BMP water quality and quantity data for E. coli/fecal coliform, TSS and nutrient retention and stormwater volume changes according to the approved sampling plans Deliverables: Quality-controlled pre- and post-BMP data and analytical results (charts, statistics), final report of findings on BMP effectiveness comparison Measures of Success: Comparison between conventional and GI/LID BMPs in fecal coliform and E. coli levels, TSS, nutrients and stormwater runoff volume Task 14: Estimate pollutant load reductions (fecal coliform/E. coli, TSS, and nutrients) using data from comparison of conventional to GI/LID BMP installations Deliverables: Load reduction estimates based on Region V, STEPL or other appropriate statistical data analyses/models to serve as a new data set for Georgia GI/LID practices Measures of Success: Recorded pollutant load reductions from GI/LID BMPs within documented USEPA and/or GSMM range Project Activity: Develop and submit reports to GAEPD. Georgia’s Statewide Nonpoint Source Management Plan: 319 Grants, Long Term Goal 13, p. 99 –Effectively manage Section 319(h) grant funds. Task 15: Submit Quarterly Reports, including WBE/MBE reports, and invoices by the 15th of January, April and July of each year during the grant period. Deliverables: Quarterly deliverables, monitoring data reports, invoices and supporting documentation reporting progress on project and using template provided by GAEPD. Measures of Success: Timely submission of Quarterly Reports and invoices to GAEPD for inclusion in the USEPA Grants Reporting and Tracking System. Task 16: Submit FFY Annual Report and Quarterly Invoice/Quarterly Report to GAEPD due October 15th of each year during the grant period. Deliverables: One (1) FFY Annual Report that summarizes project activities from October 1st of the previous year to September 30th of the reporting year. Measures of Success Timely submission of FFY Annual Report to GAEPD for inclusion in the USEPA Grants Reporting and Tracking System. Attachment number 1 \nPage 7 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 8 Task 17: Submit Final Invoice and Close-Out Report Deliverables: Final invoice & close-out report on entire program Measures of Success: Final Invoice and completed Close-Out Report delivered within 30 days of contract term 6. Roles and Responsibilities of Participating Organizations: Augusta-Richmond County’s Engineering Department will oversee and participate in all aspects of the project. Augusta University or the Phinizy Center for Water Sciences will develop the k-12 educational tool. The Phinizy Center will conduct the pre- and post-BMP monitoring and provide technical assistance in all aspects of this project. Organization Name Specific Responsibilities Augusta-Richmond County (Engineering Department) • Execute grant contract with GAEPD • Contribute to and account for 40% of total project costs in matching funds or in-kind services • Subcontract for development of k-12 educational tool • Pay funds to appropriate subcontractor(s) and vendor(s) • Request reimbursements from GAEPD on a quarterly basis • Track the progress of project activities completed, grant funds expended, and match values provided in accordance with the project schedule • Oversee & participate in BMP design and installation • Participate in comparative analysis of BMP effectiveness • Participate in post-BMP monitoring • Complete and submit Quarterly progress reports and invoices by January 15th, April 15th and July 15th, and Fiscal Year Annual/Quarterly Report and invoice by October 15th of each project year • Complete & submit final invoice and close-out report at conclusion of project GAEPD • Provide 60% of total project costs • Review and approve project deliverables • Participate in meetings, as appropriate • Review and assist as needed with 319(h) Grant protocols • Provide project oversight and contract management • Provide monitoring guidance and training Phinizy Center for Water Sciences (and/or Augusta University) • Subcontract for technical assistance on BMP comparison project and educational outreach • Participate in BMP design and installation • Participate in analysis of BMP effectiveness • Participate in pre/post- BMP monitoring • Assist in quarterly report writing Attachment number 1 \nPage 8 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 9 7. Project Location: Rocky Creek runs through and lies entirely within Richmond County. It is a tributary to Butler Creek, which flows into the Savannah River. Rocky Creek lies within the upper portion of the Beaverdam Ditch (HUC-12 #030601060607) watershed. a) Project Area Description and Map: Projects will be located in the Chester Avenue neighborhoods, county-owned park sites, and other county-owned areas of Augusta-Richmond County within the Rocky Creek watershed (Figure 2.). Figure 2. Rocky Creek watershed showing Chester Avenuepotential neighborhoods and county park locations (shown in red). Attachment number 1 \nPage 9 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 10 b) Project Area Size (Acres): 12,702 acres (Rocky Creek watershed size) c) County or Counties: Richmond County d) Land Uses within the Watershed(s) or Project Area (Percentages): Agricultural 6% Commercial Forestry 0% Urban/Residential 78% Mining/Extraction 1% Forest/Natural Areas 13% Water/Wetlands 2% TOTAL 100% Data Source & Date: Draft Total Maximum Daily Load Evaluation for Seven Stream Segments in the Savannah River Basin for Sediment, 2015 e) Hydrologic Unit Code(s), Watershed Name(s) and Priority Watershed(s): HUC #: 030601060602 Name: Rocky Creek Priority: No 8. Nonpoint Source Pollution Impairments and Healthy Waters: a) Section 305(b)/303(d) List of Waters: Water Body Segment Name (Segment Length (Miles) or Embayment Acreage) County Location(s) Criterion Violated or Water Quality Concern (Healthy Water) Listing Status Category 4a, 5 or 1 Rocky Creek (2 miles) Richmond Fecal Coliform Bio M, Bio F 4a 5 Rocky Creek (6 miles) Richmond Bio M, Bio F 5 9. Monitoring: DRAFT QA/QC Water Quality Monitoring Plan (Attachment 2) Attachment number 1 \nPage 10 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 11 10. Project Budget: Line Item Line Item Description 319(h) Grant Funds (60% Maximum) Non-Federal Matching Funds (40% Minimum) Total A Personnel One (1) Staff Position - 0.035 FTE ($130,650/year) for 3 years Description of Duties: City Project Management, Reporting (AED) 0 13,718 13,718 One (1) Staff Position - 0.05 FTE ($92,000/year) for 3 years Description of Duties: Assessment, Monitoring, and BMP approval (AED) 0 13,800 13,800 One (1) Staff Position - 0.10 FTE ($92,000/year) for 3 years Description of Duties: Administration and Project management (AED) 0 27,600 27,600 One (1) Staff Position - 0.05 FTE ($60,000/year) for 3 years Description of Duties: Sampling, Project management (AED) 9,000 9,000 Sub Total: 0 64,118 64,118 B Fringe Benefits for Four (4) Staff Positions - various FTE at 30% for 3 years Included in A Included in A Included in A Sub Total: Included in A Included in A Included in A C Travel: Purpose of Travel: NA NA NA Sub Total: NA NA NA D Equipment: NA NA NA Sub Total: NA NA NA Attachment number 1 \nPage 11 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 12 Line Item Line Item Description 319(h) Grant Funds (60% Maximum) Non-Federal Matching Funds (40% Minimum) Total E Supplies Purpose/Use: measuring rainfall and ground/surface water levels & water quality in BMPs • Hobo water level loggers 3,600 2,400 6,000 • E. coli testing supplies 900 600 1,500 • Suspended sSediment testing supplies 600 400 1,000 • Rain gauges/ loggers (3) 4,320 2,880 7,200 • Nutrient analysis 1,500 1,000 2,500 Sub Total: 10,920 7,280 18,200 F Contractual: Contractor Name: TBD Description of Duties: GI/LID BMP installation 145,000 35,000 180,000 Number and Type of BMP: Mixed GI/LID (to be determined during Project Tasks 2-3) Contractor Name: Phinizy Center for Water Sciences Description of Duties: Assessment, monitoring, data analysis, reports, education tool 40,530 24,020 64,550 Sub Total 185,530 59,020 244,550 G Construction: (Does not apply to GAEPD Section 319(h) Grants) N/A N/A N/A H Other: Signage 0 2,000 2,000 Sub Total 0 2,000 2,000 I Total Direct Charges: (Sum of A-H) 196,450 132,418 328,868 J Indirect Charges: (100% eligible for reimbursement) Attachment number 1 \nPage 12 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 13 Line Item Line Item Description 319(h) Grant Funds (60% Maximum) Non-Federal Matching Funds (40% Minimum) Total K Total: (Sum of I and J) 196,450 132,418 328,868 Narrative Justification for Item Class Categories: • Personnel (A): (1) Director of Engineering, $130,650/year, 0.035 FTE, $13,718, 3 years (1) Engineering Manager, - $92,000/year,0.05 FTE, $13,800, 3 years (1) Stormwater Manager, $92,000/year, 0.10 FTE, $27,600, 3 years (1) MS4 Coordinator, $60,000/year, 0.05 FTE, $9,000, 3 years Narrative Justification (A): ▪ Director of Engineering, Dr Hameed Malik (AED)- Description of Duties: Dr Malik will provide budgetary oversite and participate in all aspects of project as needed. ▪ Engineering Manager, Walt Corbin (AED) - Description of Duties: Mr. Corbin will approve BMP plans for Augusta-Richmond County and will participate in all aspects of project as needed. ▪ Stormwater Manager, Dr Oscar Flite (AED) - Description of Duties: Dr. Flite will be responsible for overall project management for Augusta-Richmond County, including reporting to GAEPD, and participate in all aspects of the project. ▪ MS4 Coordinator, Russell Barnes (AED) - Description of Duties: Mr. Barnes will assist in BMP monitoring and participate in all aspects of the project. • Fringe Benefits (B): Included in A Narrative Justification (B): NA • Travel (C): NA • Equipment (D): NA • Supplies (E): Grant funds Non Federal match Total water level loggers 3600 2400 6000 E. coli analyses 900 600 1500 Sediment testing 600 400 1000 rain gauges 4320 2880 7200 nutrient analyses 1500 1000 2500 10920 7280 18200 Narrative Justification (E): ▪ Twenty water level loggers (Onset Hobo loggers) Attachment number 1 \nPage 13 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 14 These loggers will be used to continuously measure surface and ground water levels within the BMPs to track volume reductions, percolation and evapotranspiration rates. A logger will also be placed in Rocky Creek to allow for the development of a stage/discharge curve. Data will be used to measure BMP effectiveness ▪ Three rain gauges and tipping buckets Rain gauges will include a Davis Instruments tipping bucket (or equivalent) connected to an Arduino microcontroller (or equivalent). The microcontroller will count the number of tips, calculate the rainfall rate and total rainfall from the tipping bucket, and transmit the data to central server that will house the data. A website will be developed to show the data in near-real time. Data will be used to measure BMP effectiveness. ▪ Nutrient, TSS, E. coli/fecal coliform consumables and analysis While this project will focus on TSS and coliform impairment in Rocky Creek, nutrient concentrations will also be monitored within the BMPs and creek to assess removal efficiencies. Phinizy Center has the capability to run all analyses except fecal coliform, which will be analyzed by the Augusta Utilities Department. • Contractual (F): Narrative Justification (F): ▪ Contractor: (TBD) BMP Construction This component includes all costs associated with construction of GI/LID BMPs. The BMPs and contractor will be chosen during Project Activity Tasks 2-3: BMP placement based upon site footprints, soils, slopes, current infrastructure (e.g. curbing, existing stormwater structures, etc.), and BMP installation. Once defined, the BMPs and contractor(s) will be selected. Feasibility of this grant relative to construction cost estimates was based upon estimates provided in the following documents (implementation of GI/LID practices will be limited to the available funds outlined in this budget line item): o Cost sheet provided in the Green Values National Stormwater Management Calculator ▪ https://greenvalues.cnt.org/national/cost_detail.php o Memorandum from Karen Mateleska, EPA Region-1: Methodology for developing cost estimates for Opti-Tool ▪ https://www3.epa.gov/region1/npdes/stormwater/ma/green- infrastructure-stormwater-bmp-cost-estimation.pdf ▪ Contractor: Phinizy Center for Water Sciences (1) Phinizy Research Manager– 0.1251 FTE ($50,000/year) for 3 years Research manager will install and download samplers, collect and analyze water samples, and participate in all aspects of the project. (2) Phinizy Researcher, TBD– 0.08 FTE ($70,000/year) for 3 years This researcher will provide BMP design drawings to AED for approval and will participate in all aspects of the project. (3) Phinizy Researcher, TBD– 0.03 FTE ($100,000/year) for 3 years Attachment number 1 \nPage 14 of 15 Item # 1 Stormwater BMP Performance Comparison Augusta-Richmond County Section 319(h) FY2018 Project 15 This researcher will provide support for the rain gauge network and participate in all aspects of the project. (4) Phinizy Center Education Department (or Augusta University)- Lump sum amount of $20,000 Phinizy’s Education Department (or Augusta University) will develop the educational outreach components of the project • Construction (G): NA • Other (H): BMP Identification Signage Narrative Justification (H): Educational project signage will be posted at each installed BMP with appropriate description of project and recognition provided. Augusta Engineering Department has an in-house sign shop and will provide signage for all project sites at a cost of ~$150 per sign (total of up to 13 signs). • Indirect Charges (J): NA Narrative Justification (J): NA 11. Project Attachment(s): Attachment 1: Augusta-Richmond County Nine-Element Watershed Management Plan for the Augusta Canal (HUC-12 #030601060601), Butler Creek (HUC-12 #030601060602) and Beaverdam Ditch (HUC-12 #030601060607) Watersheds in Savannah River Basin (July 2018) Attachment 2: DRAFT QA/QC Water Quality Monitoring Plan Attachment number 1 \nPage 15 of 15 Item # 1 Attachment number 2 \nPage 1 of 1 Item # 1 Engineering Services Committee Meeting 3/10/2020 1:20 PM 5th Street over the Savannah River-Bridge Repair and RestorationEngineering Services TIA Project RC07-001217/PI#0011418 RFQ Item#16-247 Department:Engineering Presenter: Caption:Approve supplemental funding (SA4) for Construction Phase of Design Engineering Consultant Agreement to Civil Services, Inc. in the amount of $161,465.60 for 5th Street Bridge over the Savannah River (Bridge Repair and Restoration) as requested by AED. RFQ 16-247. Background:The 5th Street Bridge over Savannah River (Bridge Repair and Restoration) is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in the July 31, 2012 referendum. The 5th Street Bridge is a Band 2 project and is under construction. In March 2017, commission approved award of the design phases of the project to Civil Services, Inc. On December 17, 2019 Augusta Commission awarded the bridge repair and restoration construction bid to Superior Construction Company Southeast, LLC. Construction Phase of bridge improvements require design related coordination with utilities, resolution of constructability conflicts, review of contractor construction documents submittals, and request for field information that warrants design engineer services . Analysis:In 2017, commission approved award of the design phases of the project to Civil Services, Inc. The project is now under construction. This supplemental agreement covers services during the construction phase for contractor request for field information, utility conflicts assessment & resolution, field engineering, and attending construction progress meetings. Financial Impact:Funds are available in the amount of $161,465.60 AED TIA Project Management fund. Alternatives:1). Do not approve and find alternative to complete the project and meet TIA project completion schedule Cover Memo Item # 2 Recommendation:Approve supplemental funding (SA4) for Construction Phase of Design Engineering Consultant Agreement to Civil Services, Inc. in the amount of $161,465.60 for 5th Street Bridge over the Savanah River (Bridge Repair and Restoration) as requested by AED. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: AED TIA Project Management Funds ($161,465.60) 371-041110-T15041217-52-12115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB #371-041110-T15041217. This request is to supplement the Construction Phase of Design consultant Services Agreement to Civil Services, Inc. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 1,178,570$ TIA Construction 8,000,000$ GDOT Funds 1,000,000$ TIA Discretionary 1,500,000$ 11,678,570$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15041217 5th Street Bridge over the Savannah River (Bridge Repair and Restoration) (Bid 19-291 in the amount of $161,470 for the 5th Street Bridge over the Savannah River (Bridge Repair and Restoration). Funding is available in the TIA project budget: 2/28/2020 Attachment number 1 \nPage 1 of 2 Item # 2 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15041217 5th Street Bridge over the Savannah River (Bridge Repair and Restoration) (Bid 19-291 CPB AMOUNT CPB New SOURCE OF FUNDS CPB Addition CPB TIA Project 371-041110/5212115-T15041217 ($200,920) (24,900.00)$ ($225,820) TIA Project 371-041110/5212115-T15041217 ($791,280) (161,470.00)$ ($952,750) TIA Project 371-041110-T15041217 ($8,000,000) ($8,000,000) GDOT Funds ($1,000,000) ($1,000,000) TIA Discretionary ($1,500,000) ($1,500,000) TOTAL SOURCES: ($992,200) ($10,686,370) ($11,678,570) USE OF FUNDS ENGINEERING TIA Projects 371-041110-5414210/T15041217 $992,200 $24,900 $1,017,100 TIA Projects $161,470 371-041110-5212115/T15041217 TIA Project 371-041110-5414110-T15041217 $8,000,000 $8,000,000 GDOT Funds 371-041110-5414110 $1,000,000 $1,000,000 TIA Discretionary 371-041110-5414110 $1,500,000 $1,500,000 TOTAL USES: $992,200 10,686,370$ $11,678,570 2/28/2020 Attachment number 1 \nPage 2 of 2 Item # 2 (SA04 – For changes greater than $25,000) February 2020 ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT Augusta Richmond County Project Number(s): 371-041110-T15041217 GDOT Number (s): RC07-001217 PI 0011418 Supplemental Agreement Number: 4 Purchase Order Number: 17ENG245 WHEREAS, We, Civil Services, Inc., Consultant, entered into a contract with Augusta-Richmond County on March 7, 2017, for engineering design services associated with the improvements to 5th Street over Savannah River Bridge, project RC07-001217, PI 0011418, File Reference No. 17-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Additional Engineering Services to consist of per contractor request for field information, utility conflicts assessment & resolution, field engineering and attending construction progress meetings. It is agreed that as a result of the above described modifications the contract amount is increased by $161,465.60 from $1,017,087.12 to a new total of $1,178,552.72 Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Civil Services, Inc., Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned item, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY Civil Services, Inc. AUGUSTA, GEORGIA Hardie Davis, Mayor Approved Date: Approved: Date: [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Attachment number 2 \nPage 1 of 1 Item # 2 Engineering Services Committee Meeting 3/10/2020 1:20 PM 9th Street (James Brown Blvd.) Improvements Design Services for ReconstructionTIA Project Number: RC07-001218 / PI#0013703 Department:Engineering Presenter: Caption:Approve funding for Design Consultant Services Supplemental Agreement Two to Cranston Engineering Group, Inc. in the amount of $72,640.00 for the James Brown Blvd. (9th Street) Improvement Project as requested by the AED. RFQ 16-246. Background:The 9th Street (James Brown Blvd.) Improvements is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in the July 31, 2012 referendum. The 9th Street is a Band 2 project and TIA funds are allocated for design & construction. In 2018, the Augusta Commission approved award of design phases of the project to Cranston Engineering. On December 17, 2019 Augusta Commission awarded the road construction bid to E.R. Snell Contractor, Inc. Construction Phase of roadway and drainage improvements require design related coordination with utilities, resolution of constructability conflicts, review of contractor construction documents submittals, and request for field information that warrants design engineer services . Analysis:In 2018, commission approved award of design phases of the project to Cranston Engineering. The project is now under construction. This supplemental agreement covers services during the construction phase for contractor request for field information, utility conflicts assessment & resolution, field engineering, and attending construction progress meetings. Financial Impact:Funds are available in Project TIA funds. Alternatives:Do not approve and find alternative to complete the project and meet TIA project completion schedule.Cover Memo Item # 3 Recommendation:Approve funding for Design Consultant Services Supplemental Agreement two to Cranston Engineering Group, Inc. in the amount of $72,640.00 for the James Brown Blvd. (9th Street) Improvement Project as requested by the AED. Funds are Available in the Following Accounts: Project TIA Funds: 371-041110-T15041218-52-12115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 3 (SA02 – For changes greater than $25,000) February 2020 ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT Augusta Richmond County Project Number(s): 371-041110-T15041218 GDOT Number (s): RC07-001218 PI 0011419 Supplemental Agreement Number: 2 Purchase Order Number: P360121 WHEREAS, We, Cranston Engineering Group, Inc. Consultant, entered into a contract with Augusta- Richmond County on August 7, 2018 for engineering design services associated with the improvements to 9th Street (James Brown Blvd.). Project RC07-001218, PI 0011419, File Reference No. 19-014 (T), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Additional Engineering Services for Design Consultants Services. It is agreed that as a result of the above described modifications the contract amount is increased by $72,640.00 from $606,822.92 to a new total of $679,462.92 Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Cranston Engineering Group, Inc. Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned item, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY Cranston Engineering Group, Inc. AUGUSTA, GEORGIA Hardie Davis, Mayor Approved Date: Approved: Date: [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Attachment number 1 \nPage 1 of 1 Item # 3 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#371-041110-T15041218. This request is for Supplemental Agreement Number Two to Cranston Engineering Group, Inc. in the amount of $72,640.00 for the Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 576,923$ TIA Funds 7,900$ TIA Discretionary 22,000$ TIA Funds 3,386,198$ TIA Funds 72,640$ 4,065,661$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15041218 9th Street(James Brown Blvd.) Improvements (RFP #19-292) James Brown Blvd. (9th Street) Improvement Project. Funding is available in the TIA project budget. 2/27/2020 Attachment number 2 \nPage 1 of 2 Item # 3 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15041218 9th Street(James Brown Blvd.) Improvements (RFP #19-292) CPB AMOUNT CPB New SOURCE OF FUNDS CPB ADDITION CPB TIA Project 371-041110/5212115-T15041218 ($3,971,021) ($72,640) ($4,043,661) TIA Discretionary 235-041110/5212115-T19041026 ($22,000) -$ ($22,000) TOTAL SOURCES: ($3,993,021) ($72,640) ($4,065,661) USE OF FUNDS ENGINEERING 371-041110-5414210/T15041218 $3,971,021 $72,640 $4,043,661 TIA Discretionary 235-041110/5212115-T19041026 $22,000 $0 $22,000 TOTAL USES: $3,993,021 $72,640 $4,065,661 2/27/2020 Attachment number 2 \nPage 2 of 2 Item # 3 February 25, 2019 Mrs. June Hamal, P.E. Project Manager Augusta Engineering Department City of Augusta, Georgia 452 Walker Street Augusta, Georgia 30901 Re: 9th Street (James Brown Blvd) Improvements P.I. No.: # 0011419 TIA #: RC07—001218 Supplemental Agreement #2 Our File No.: 2016-0160 Dear Mrs. Hamal: As we have previously discussed, we are submitting a supplemental agreement to our contract now that the project has been let and is moving into the construction phase. Our original scope of work included a scope for construction phase services, but it was requested to be removed prior to the construction beginning. Please find the revised scope of work listed below along with the respective fees. SCOPE OF WORK The Cranston design team will provide the following construction engineering services for the 9th Street Improvements project: we will attend the pre-construction meeting to discuss all relevant project information with the contractor, we will review all submittals and answer requests for information (RFI), we will provide on-call field conflict resolution and answer survey questions. It is assumed that Cranston will spend an average of 8 hours per week. We have included time each month to attend a construction status meeting or to regularly coordinate with the construction manager to be aware of the construction progress and help reduce the response times for contractor questions or field conflicts. These services will coincide with the 15-month duration of the construction contract and will terminate on July 31, 2021 or upon project closeout, whichever occurs first. Should there be a need for significantly more time than this, additional fees can be negotiated. These additional services would be a result of extensive field observation and inspections, extensive contractor coordination, and/or project time extensions. Attachment number 3 \nPage 1 of 2 Item # 3 Attachment number 3 \nPage 2 of 2 Item # 3 Engineering Services Committee Meeting 3/10/2020 1:20 PM 9th Street (James Brown Blvd.) ImprovementsConstruction Material Inspection and Testing, Construction Monitoring and QualityAssurance/ Quality Control, and Geotechnical ServicesProject Number: N/A Department:Engineering Presenter: Caption:Approve the continued funding of the current On-Call Field and Laboratory Testing for Soil and Construction Material, and Geotechnical Inspection and Investigation (CMT Geotech) Services contract in the amount of $180,240 for James Brown Blvd. Improvements Project. Requested by AED. RFP 19-179. Background:The 9th Street (James Brown Blvd.) Improvements is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The 9th Street is a Band 2 project and TIA funds are allocated for construction. On December 17, 2019, Augusta Commission awarded the road construction bid to E.R. Snell Contractor, Inc. Field and Laboratory Testing for Soil and Construction Material, and Geotechnical Inspection and Investigation Services are integral parts of construction activities to ensure improvements quality control, quality assurance and construction are per design. Construction quality assurance & quality control (QA/QC) are essential to construction of good roads and are TIA program requirements. Analysis:On August 2019, the Augusta Commission approved the award of CMT Geotech Services contract with ATC Group Services LLC, Matrix Engineering Group, Inc. (MEG), and MC Squared, Inc. as the selected firms. MEG is assigned to James Brown Blvd. The assistance of outside construction services will help AED to ensure a quality finished roadway infrastructure. It is a practical approach to sustain much needed construction QA/QC during the construction phase of a project. Financial Impact:Funds are available in Project TIA Funds. Cover Memo Item # 4 Alternatives:1. Do not approve and find alternative way to provide required CMT_Geotech, Construction QA/QC Services and meet TIA construction QA/QC requirements. Recommendation:Approve the continued funding of the current On-Call Field and Laboratory Testing for Soil and Construction Material and Geotechnical Inspection and Investigation Services contract in the amount of $180,240 for James Brown Blvd. Improvements Project as requested by AED. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: Project TIA Funds – 371-041110 – T15041218- 5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorize to CPB# N/A. This request is to continue funding of the current On-Call Field and Laboratory Testing for Soil and Construction Material, and Geotechnical Inspection, Field Engineering Services Consulting Agreement in the amount of $180,240 Section 2: The following revenues are anticipated to available to the Consolidated Government to complete the project. TIA DISCRETIONARY FUNDS 500,000$ TIA FUNDS 180,240$ 680,240$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB# N/A On-Call Construction Management, Construction Inspection, and Field Engineering Services (Bid 19-179) for the James Brown Blvd Improvements project. Funding is available in project TIA Funds. Hardie Davis, Jr., Mayor CAPITAL PROJECT BUDGET 02.27.2020 Attachment number 1 \nPage 1 of 2 Item # 4 Augusta-Richmond County, Georgia CPB# N/A On-Call Construction Management, Construction Inspection, and Field Engineering Services (Bid 19-179) CAPITAL PROJECT BUDGET CPB AMOUNT ADDITION CPB AMOUNT SOURCE OF FUNDS CPB REQUEST TIA Discretionary ($500,000)($500,000) TIA Funds ($180,240)($180,240) 371-041110-T15041218 TOTAL SOURCES: ($680,240) $0 ($680,240) USE OF FUNDS TIA Discretionary $500,000 $500,000 TIA Funds $180,240 $180,240 371-041110-T15041218 TOTAL USES: $680,240 $0 $680,240 02.27.2020 Attachment number 1 \nPage 2 of 2 Item # 4 Request for Proposal Request for Proposals will be received at this office until Friday, March 22, 2019 @ 11:00 a.m. for furnishing: RFP Item #19-179 On-Call Construction Material Inspection and Testing, Construction Monitoring and Quality Assurance/Quality Control and Geotechnical Inspections and Investigations for the Augusta, GA - Engineering Department RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, March 8, 2019 @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of ninety (90) days after bids have been opened, pending the execution of contract with the successful bidder(s). A 100% performance bond and a 100% payment bond will be required for award. Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base their qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov GERI A. SAMS, Procurement Director Publish: Augusta Chronicle February 14, 21, 28, March 7, 2019 Metro Courier February 14, 2019 Attachment number 2 \nPage 1 of 1 Item # 4 OFFICIAL VENDORS Attachment "B"E-Verify Save Form Addendum 1 Fee Proposal Original 7 Copies CSRA TESTING & ENGINEERING 1005 EMMETT STREET, SUITE A AUGUSTA, GA 30904 Yes 138689 Yes Yes Yes Yes Yes NOVA ENGINEERING 3900 KENNESAW 75 PKWY SUITE 100 KENNESSAW, GA 30144 Yes 124398 Yes Yes Yes Yes Yes MC SQUARED INC 1275 SHILOH RD NW SUITE 2620 KENNESAW, GA 30144 Yes 228126 Yes Yes Yes Yes Yes WOOD 2677 BUFORD HWY ATLANTA, GA 30324 Yes 44372 Yes Yes Yes Yes Yes ATC 1453 GREENE STREET AUGUSTA, GA 30901 Yes 46692 Yes Yes Yes Yes Yes GMC 1450 GREENE STREET, SUITE 505 AUGUSTA, GA 30901 Yes 425070 Yes Yes Yes Yes Yes MATRIX ENGINEERING 3459 WRIGHTSBORO RD, SUITE B AUGUSTA, GA 30909 Yes 46339 Yes Yes Yes Yes Yes S & ME 1527 CRESCENT DRIVE AUGUSTA, GA 30909 Yes 53285 Yes Yes Yes Yes Yes EMC ENGINEERING 4424 COLUMBIA RD, SUITE B MARTINEZ, GA 30907 Yes 324715 Yes Yes Yes Yes Yes Total Number Specifications Mailed Out: 10 Total Number Specifications Download (Demandstar): 8 Total Electronic Notifications (Demandstar): 125 Georgia Procurement Registry: 448 Mandatory Pre-Qualifications Conference Attendees: N/A Total Number Mailed to Local Vendors: 3 Total packages submitted: 9 Total Noncompliant: 0 RFP 19-179 On-Call Construction Material Inspection and Testing, Construction Monitoring and Quality Assurance/Quality Control and Geotechnical Inspections and Investigations for Augusta, GA – Engineering Department RFP Due: Friday, March 29, 2019 @ 11:00 a.m. Page 1 19-179 Official Tab Attachment number 3 \nPage 1 of 1 Item # 4 CSRA TESTING & ENGINEERING 1005 EMMETT STREET, SUITE A AUGUSTA, GA 30904 NOVA ENGINEERING 3900 KENNESAW 75 PKWY SUITE 100 KENNESSAW, GA 30144 MC SQUARED INC 1275 SHILOH RD NW SUITE 2620 KENNESAW, GA 30144 WOOD 2677 BUFORD HWY ATLANTA, GA 30324 ATC 1453 GREENE STREET AUGUSTA, GA 30901 GMC 1450 GREENE STREET, SUITE 505 AUGUSTA, GA 30901 MATRIX ENGINEERING 3459 WRIGHTSBORO RD, SUITE B AUGUSTA, GA S & ME 1527 CRESCENT DRIVE AUGUSTA, GA 30909 EMC ENGINEERING 4424 COLUMBIA RD, SUITE B MARTINEZ, GA 30907 CSRA TESTING & ENGINEERING 1005 EMMETT STREET, SUITE A AUGUSTA, GA 30904 NOVA ENGINEERING 3900 KENNESAW 75 PKWY SUITE 100 KENNESSAW, GA 30144 MC SQUARED INC 1275 SHILOH RD NW SUITE 2620 KENNESAW, GA 30144 WOOD 2677 BUFORD HWY ATLANTA, GA 30324 ATC 1453 GREENE STREET AUGUSTA, GA 30901 GMC 1450 GREENE STREET, SUITE 505 AUGUSTA, GA 30901 MATRIX ENGINEERING 3459 WRIGHTSBORO RD, SUITE B AUGUSTA, GA 30909 S & ME 1527 CRESCENT DRIVE AUGUSTA, GA 30909 EMC ENGINEERING 4424 COLUMBIA RD, SUITE B MARTINEZ, GA 30907 Ranking of 0-5 Ranking of 0-5 Ranking of 0-5 Ranking of 0-5 Ranking of 0-5 Ranking of 0-5 Ranking of 0-5 Ranking of 0-5 Ranking of 0-5 Evaluation Criteria Ranking Points Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) Scale 0 (Low) to 5 (High) 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation) • Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS 2. Qualifications & Experience (0-5)10 3.0 5.0 5.0 5.0 5.0 4.0 5.0 4.0 2.5 30.0 50.0 50.0 50.0 50.0 40.0 50.0 40.0 25.0 3. Organization & Approach (0-5)10 3.0 4.0 5.0 5.0 5.0 3.0 5.0 4.0 2.5 30.0 40.0 50.0 50.0 50.0 30.0 50.0 40.0 25.0 Scope of Services 1. Qualifications of key Professionals that will be assigned to inspection and testing and other listed tasks 2. Specific relevant experience of your company (specific to soil and material testing to local & state entities) (0-5)30 2.3 3.8 5.0 4.0 4.3 3.5 5.0 3.0 2.3 67.5 112.5 150.0 120.0 127.5 105.0 150.0 90.0 67.5 5. Schedule of Work (0-5)5 3.0 3.0 5.0 3.0 5.0 3.0 5.0 4.0 3.0 15.0 15.0 25.0 15.0 25.0 15.0 25.0 20.0 15.0 6. References (0-5)10 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 Within Richmond County 5 10 5 5 5 5 5 50.0 0.0 0.0 0.0 50.0 50.0 50.0 50.0 0.0 Within CSRA 5 6 5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 Within Georgia 5 4 5 5 5 0.0 20.0 20.0 20.0 0.0 0.0 0.0 0.0 0.0 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0  All Others 5 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 21.25 25.75 30 27 29.25 23.5 30 25 20.25 242.5 287.5 345.0 305.0 352.5 290.0 375.0 290.0 212.5 8. Presentation by Team (0-5)10 0 0 0 0 0 0 0 0 0 9 Q&A Response to Panel Questions (0-5)5 0 0 0 0 0 0 0 0 0 Lowest Fees 5 10 5 0 0 0 0 0 0 50 0 0 Second 5 6 5 0 0 0 30 0 0 0 0 0 Third 5 4 5 0 0 0 0 0 20 0 0 0 Forth 5 2 5 0 0 0 0 10 0 0 0 0 Fifth 5 1 5 0 0 5 0 0 0 0 0 0 Total Phase 2 - (Total Maximum Ranking 35 - Maximum Weighted Total Possible 125) 0 0 5 5 5 5 5 0 0 0 0 5 30 10 20 50 0 0 21.25 25.75 35 32 34.25 28.5 35 25 20.25 242.5 287.5 350.0 335.0 362.5 310.0 425.0 290.0 212.5 RFP 19-179 On-Call Construction Material Inspection and Testing, Construction Monitoring and Quality Assurance/Quality Control and Geotechnical Inspections and Investigations for Augusta, GA – Engineering Department Evaluation Meeting: Friday, May 3, 2019 @ 10:00 a.m. Weighted Scores Total (Total Possible Score 500) Total (May not Receive Less Than a 3 Ranking in Any Category to be Considered for Award) 7. Proximity to Area (only choose 1 line according to location of the company - enter the ranking value for the one line only) Vendors Phase 1 Total - (Total Maximum Ranking 30 - Maximum Weighted Total Possible 375) Phase 1 Weighted Scores Weighted Scores Weighted Scores Weighted Scores Weighted Scores Weighted Scores Weighted ScoresWeighted Scores Procurement DepartmentRepresentative:_______Nancy Williams_____________________________________ Procurement Department Completion Date: ____5/3/19_________________________ Phase 2 (Option - Numbers 8-9) (Vendors May Not Receive Less Than a 3 Ranking in Any Category to be Considered for Award) Internal Use Only Total Cumulative Score (Maximum point is 500) Evaluator: ___Cumulative ___________________________ Date: _______5/3/19_____________________ 10. Cost/Fee Proposal Consideration (only choose 1 line according to dollar value of the proposal in relation to all fee proposals - enter the point value for the one line only) Attachment number 4 \nPage 1 of 1 Item # 4 Attachment number 5 \nPage 1 of 1 Item # 4 Attachment number 6 \nPage 1 of 3 Item # 4 Attachment number 6 \nPage 2 of 3 Item # 4 Attachment number 6 \nPage 3 of 3 Item # 4 Attachment number 7 \nPage 1 of 2 Item # 4 Attachment number 7 \nPage 2 of 2 Item # 4 Attachment number 8 \nPage 1 of 1 Item # 4 Engineering Services Committee Meeting 3/10/2020 1:20 PM ACCEPTANCE OF SECTION OF HARPER FRANKLIN AVENUE AND ASSOCIATED IMPROVEMENTS WITHIN ITS RIGHT-OF-WAY INTOAUGUSTA GEORGIA PUBLIC ROADWAY SYSTEM Department:Engineering Presenter: Caption:Approve and accept Section of Harper Franklin Ave. (from Jimmie Dyess Pkwy to its West 1761.46ft) and associated Improvements within road Right-of-Way into Augusta, Georgia Public Roadway System upon receipt of its certified Plat, Deed of Dedication, 18-month Road Maintenance Agreement and required other Legal Documentation as determined by Augusta Engineering Department and Augusta Legal Department. Requested by AED. Background:Harper Franklin to be deeded section was constructed around 2016. This road section was constructed in conjunction with Belair K-8 school. Since road primary service area initially was limited to Belair 8-K school, it was kept as a private road. At present road services expanded beyond the school to several developed and undeveloped residential and commercial properties. Recently a request was made for acceptance of this roadway into Augusta Public Road System. Accordingly, Augusta Engineering Department (AED) completed its assessment and determined that the road way satisfy right-of- way width requirements and appears to be in satisfactory condition. Analysis:Given that the road in question provides access to a school, several developed and undeveloped residential and commercial properties and is in public use, it is AED's recommendation to accept this roadway into Augusta Georgia roadway system upon receipt of certified plat, deed of dedication, 18 month maintenance agreement and required documentations as determined by Augusta Engineering Department and Augusta Law Department.Cover Memo Item # 5 Financial Impact:No direct financial impact. The road will be included into the city roadway maintenance program. Alternatives:Do not approve. Recommendation:Approve and Accept Section of Harper Franklin Ave. (from Jimmie Dyess Pkwy to its West 1761.46ft) and associated improvements within road Right-of-Way into Augusta, Georgia Public Roadway System upon receipt of its certified Plat, Deed of Dedication, 18 month Road Maintenance Agreement and required other Legal Documentation as determined by Augusta Engineering Department and Augusta Legal Department. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 5 STATE OF GEORGIA ) MAINTENANCE AGREEMENT ) (Roads and Storm Drainage) COUNTY OF RICHMOND ) THIS AGREEMENT, entered into this ___ day of February, 2020, by and between COUNTY BOARD OF EDUCATION OF RICHMOND COUNTY and hereinafter referred to as "Developer," and AUGUSTA, GEORGIA, a political subdivision of the State of Georgia, acting by and through its Commission, hereinafter referred to as "Augusta." WHEREAS, Developer requested that Augusta, accept certain road, storm drains and appurtenances for HARPER FRANKLIN AVENUE, as shown by deed contemporaneously tendered and recorded in the office of the Clerk of the Superior Court of Richmond County, Georgia, in Deed Book ________, Page _______, and WHEREAS, the City has adopted a policy requiring the Developer to maintain all installations laid or installed in the subdivision for a period of eighteen months, which Augusta accepts by deed; NOW, THEREFORE, in consideration of the premises, the expense previously incurred by Developer and the mutual agreements hereinafter set out, IT IS AGREED that: (1) Augusta, Georgia, accepts the road and appurtenances, storm drains and appurtenances, respectfully described in the deed contemporaneously tendered herewith to the Augusta, Georgia, Commission, recorded in the office of the Clerk of the Superior Court of Richmond County, Georgia, in Deed Book _______, Page _______. (2) The Developer agrees to maintain all the installations laid or installed in said subdivision as described in said deed for a period of eighteen months from the date herein. Attachment number 1 \nPage 1 of 2 Item # 5 (3) The Developer agrees that if during said eighteen month period there is a failure of the installations laid or installed in said subdivision described in the deed due to failure of material or poor workmanship, the Developer shall be responsible for adequate maintenance and repair. (4) In the event of such failure of the improvements, the City shall notify the Developer and set forth in writing the items in need of repair. The Developer shall present within fifteen business days its proposed plan of repair and shall have the repairs completed at a reasonable time, as determined by Augusta. (5) In the event of an emergency, as determined by Augusta, the Developer is unable to respond in a timely manner, the City shall be authorized to erect barricades, traffic direction devices and such other temporary measures as are necessary to remedy the emergency nature of the problem at the Developer's expense and to allow the Developer time to make the needed repairs. (6) In the event the Developer fails to comply with the terms of this agreement, then Augusta shall proceed to have the necessary corrective work done, and the Developer agrees to be responsible to Augusta for payment in full of costs of repairing the improvements due to failure of material or poor workmanship as liquidated damages. IN WITNESS WHEREOF, Developer has hereunto set his hand and seal, and Augusta has caused the execution of this agreement by and through its duly authorized officers and agents, with its seal affixed, the day and year first above written. COUNTY BOARD OF EDUCATION OF RICHMOND COUNTY BY:______________________(L.S.) AS ITS: AUGUSTA, GEORGIA _________________________(L.S.) As Its Mayor ATTEST: ___________________________ Clerk of Commission Attachment number 1 \nPage 2 of 2 Item # 5 At t a c h m e n t n u m b e r 2 \ n P a g e 1 o f 2 It e m # 5 At t a c h m e n t n u m b e r 2 \ n P a g e 2 o f 2 It e m # 5 STATE OF GEORGIA ) ) COUNTY OF RICHMOND ) DEED OF DEDICATION (Roads, and Storm Drainage) THIS INDENTURE, made and entered into this ____ day of February, 2020, by and between COUNTY BOARD OF EDUCATION OF RICHMOND COUNTY, hereinafter referred to as the Party of the FIRST PART, and AUGUSTA, GEORGIA, a political subdivision of the State of Georgia, acting by and through the Augusta Commission, hereinafter referred to as the Party of the SECOND PART. WITNESSETH: THAT the said Party of the FIRST PART, for and in consideration of the sum of One Dollar ($1.00) in cash to it in hand paid by the Party of the SECOND PART, the receipt of which is hereby acknowledged, at and/or before the sealing and delivery of these presents, and other good and valuable considerations, has granted, bargained, sold, released, conveyed and confirmed and by these presents does grant, bargain, sell, release, convey and confirm unto the said Party of the SECOND PART, its successors and assigns, the following described property, to-wit: ALL PORTION OF PROPERTY SHOWN ON THE PLAT HEREIN REFERRED TO AS all those streets and storm drainage systems known as HARPER FRANKLIN AVENUE, according to the plat prepared by Georgia Civil, dated July 12, 2015, shown and designated on said plat as recorded in the Office of the Clerk of Superior Court, of Richmond County, Georgia in Plat Book 12, Page 102, to which reference is made for a more complete and accurate description as to the metes, courses, bounds, dimensions and location of said property. TOGETHER with an easement to enter upon all areas shown as drainage and utility easements shown on said plat. The Party of the First Part further grants to the Party of the Second Part an easement to discharge stormwater off Harper Franklin Avenue into the stormwater detention systems located on the Party of the First Part’s adjacent real property. The Party of the Second Part shall have no obligation to maintain Attachment number 3 \nPage 1 of 2 Item # 5 the stormwater detention systems located on the adjacent real property owned by the Party of the First Part. TO HAVE AND TO HOLD SAID property and all the members and appurtenances therein belonging as aforesaid, and every part thereof, unto the said party of the SECOND PART, its successors and assigns, forever. IN WITNESS WHEREOF, the said Party of the FIRST PART has caused these presents to be executed the day and year first above written as the date of these presents. SIGNED, SEALED AND DELIVERED in our presence: COUNTY BOARD OF EDUCATION OF RICHMOND COUNTY ________________________________ Witness By: _________________________ (Seal) ________________________________ As its: Notary Public, Georgia ACCEPTED BY: AUGUSTA, GEORGIA By: _________________________ Its: Mayor Attest: _______________________ Its: Clerk of Commission (SEAL) Attachment number 3 \nPage 2 of 2 Item # 5 Engineering Services Committee Meeting 3/10/2020 1:20 PM Construction Services for Lake Olmstead DredgingSediment Disposal Site PreparationRFP ITEM #20- 121 Department:Engineering Presenter: Caption:Approve award of Lake Olmstead Dredging-Sediment Disposal Site Preparation Construction Services Phase 1 Contract in the amount of $742,856.25 to Waterfront Property Services, LLC dba Gator Dredging in the amount as requested by the AED. RFP 20-121. Background:Augusta Canal Basin Dredging (Lake Olmstead, Lake Aumond, Heirs Ponds and Rae’s Creek) are approved projects. In 2017 the Corps released dredging permit for Hiers Pond and Lake Aumond and dredging of these two waterbodies was completed in 2018. AED continued to work with the Corps for release of Lake Olmstead and Warren Lake dredging permits. In July 2019 AED secured the permits and initiated letting the project for preparation of Disposal Site drainage system as a first phase of Lake Olmstead sediment removal. Letting of Lake Olmstead sediment removal will be followed by substantial completion of phase 1 . Analysis:RFPs were received on January 7, 2020 and firms were evaluated based on qualifications, project approach, and experience. The following firms submitted RFPs for evaluations: 1. Waterfront Property Services, LLC (dba Gator Dredging). Waterfront Property Services, LLC (dba Gator Dredging) was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in Project SPLOST Funds. Alternatives:1). Do not approve and find alternative to complete the project. Recommendation:Approve award of Lake Olmsted Dredging-Sediment Disposal Site Preparation Construction Services Phase 1 Contract in the Cover Memo Item # 6 amount of $742,856.25 to Waterfront Property Services, LLC Waterfront Property Services, LLC dba Gator Dredging in amount as requested by the AED. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: Project SPLOST Funds: 328-041110-5414110 / 211828103-5414110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 6 Attachment number 1 \nPage 1 of 1 Item # 6 Attachment number 2 \nPage 1 of 2 Item # 6 Attachment number 2 \nPage 2 of 2 Item # 6 Attachment number 3 \nPage 1 of 1 Item # 6 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#328-041110-211828103. This request is to award the Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. SPLOST Ph VI 742,856$ 742,856$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#328041110/54.14110 Lake Olmstead and Warren Lake Sediment Dredging and Disposal (RPF 20-121) Construction Services Phase1 contract for the Lake Olmstead Dredging-Sediment Disposal Site Preparation to Waterfront Property Services, LLC dba Gator Dredging in the amount of $742,856. Funding is available in SPLOST VI 1.14.2015 Attachment number 4 \nPage 1 of 2 Item # 6 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#328041110/54.14110 Lake Olmstead and Warren Lake Sediment Dredging and Disposal (RPF 20-121) CPB AMOUNT CPB New SOURCE OF FUNDS CPB Addition CPB Lake Olmstead SPLOST PHASE VI ($742,856)($742,856) TOTAL SOURCES: ($742,856)($742,856) USE OF FUNDS ENGINEERING 328-041110-5414110/211828103 $742,856 $742,856 TOTAL USES: $742,856 $742,856 1.14.2015 Attachment number 4 \nPage 2 of 2 Item # 6 Request for Proposal Request for Proposals will be received at this office until Tuesday January 7, 2020 @ 3:00 p.m. for furnishing: RFP Item #20-121 Construction Services for Lake Olmstead Dredging – Sediment Disposal Site Preparation for Augusta, GA – Engineering Department – Commodity Code: 022-968-34 RFP documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime contractors, subcontractors and suppliers exclusively from ARC. The fees for the plans and specifications which are non-refundable are $75.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC Southern (706 821-0405) beginning Thursday, November 14, 2019. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Proposal Conference will be held on Friday, December 6, 2019 @ 10:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. A Mandatory Site Visit will follow. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, December 10, 2019 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 90 days after bids have been opened, pending the execution of contract with the successful bidder(s). A 10% Bid Bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base their qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov No RFP will be accepted by fax, all must be received by mail or hand delivered. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle November 14, 21, 28, December 5, 2019 Metro Courier November 14, 2019 Revised: 2/2/2016 Attachment number 5 \nPage 1 of 1 Item # 6 OFFICIAL VENDORS Attachment "B"E-Verify #Addendum 1 SAVE Form Original 7 Copies Fee Proposal Compliance Review 7% Goal Haren Construction 1715 Highway 441 N P. O. Box 350 Etowah, TN 37331 Gearig Brothers Civilworks 322 Grimaude Blvd Grovetown, GA 30813 Blair Construction Co. Inc. 4308 Evans to Lock Road Evans, GA 30809 L-J Inc 615 Knox Abbot Drive Cayce, SC 29033 J Mitchell Contracting 1576 Doster Rd. Winder, GA 30680 McElroy Inc 8945 US Highway 19 Zebulon, GA 30295 Waterfront Property Svcs, LLC d.b.a. Gator Dredging 13630 50th Way North Clearwater, FL 33760 Yes 976491 Yes Yes Yes Yes Yes Yes RFP Opening RFP Item #20-121 Construction Services for Lake Olmstead Dredging – Sediment Disposal Site Preparation for Augusta, GA – Engineering Department RFP Date: Tuesday, January 7, 2020 @ 3:00 p.m. Total Number Specifications Mailed Out: 38 Total Number Specifications Download (Demandstar): 7 Total Electronic Notifications (Demandstar): 71 Georgia Procurement Registry: 58 Mandatory Pre-Proposal/Telephone Conference Attendees: 8 Total packages submitted: 1 Total Noncompliant: 1 Page 1 of 1 Attachment number 6 \nPage 1 of 1 Item # 6 Waterfront Property Svcs, LLC d.b.a. Gator Dredging 13630 50th Way North Clearwater, FL 33760 Waterfront Property Svcs, LLC d.b.a. Gator Dredging 13630 50th Way North Clearwater, FL 33760 Ranking of 0-5 (Enter a Evaluation Criteria Ranking Points Scale 0 (Low) to 5 (High) 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation) • Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS 2. Qualifications & Experience To includepast utility constructionexperience in orclosevicinity to environmental sensitive areas (0-5)15 5.0 75.0 3. Organization & Approach (0-5)15 4.3 63.8 Scope of Services a. Detailed scope of Services to be provided - Scope addresses all known services needed and appears achievable in the period set forth in the project schedule. b. Deliverables are appropriate to schedule and scope set forth in above requirements c. Firms experience, capabilities and other qualifications for this project in reference to dredging and sediment disposal as one of the primary area of specialization. d. Firms organizational and management approach to the requested services (0-5)15 4.5 67.5 5. Resources and Schedule of Work (0-5)10 5.0 50.0 6. References (0-5)5 5.0 25.0 7. Financial Stability (0-5)5 5.0 25.0 Within Richmond County 5 10 0 Within CSRA 5 6 0 Within Georgia 5 4 0 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 5 10  All Others 5 1 0 23.8 316.3 8. Presentation by Team (0-5)10 0 9 Q&A Response to Panel Questions (0-5)5 0 Lowest Fees 5 10 5 50 Second 5 6 0 Third 5 4 0 Forth 5 2 0 Fifth 5 1 0 Total Phase 2 - (Total Maximum Ranking 15 - Maximum Weighted Total Possible 125) 5 50 28.8 366.3 Procurement DepartmentRepresentative:____Nancy Williams_______________________________________ Procurement Department Completion Date: ______1/24/19______________________ Phase 2 (Option - Numbers 8-9) (Vendors May Not Receive Less Than a 3 Ranking in Any Category to be Considered for Award) Internal Use Only Total Cumulative Score (Maximum point is 500) Evaluator: _Cumulative __________________________ Date: 1/24/20 10. Cost/Fee Proposal Consideration (only choose 1 line according to dollar value of the proposal in relation to all fee proposals - enter the point value for the one line only) RFP Item #20-121 Construction Services for Lake Olmstead Dredging – Sediment Disposal Site Preparation for Augusta, GA – Engineering Department RFP Date: Friday, January 24, 2020 @ 2:00 p.m. Weighted Scores Total (Total Possible Score 500) Total (May not Receive Less Than a 3 Ranking in Any Category to be 8 Proximity to Area Vendors Phase 1 Total - (Total Maximum Ranking 25 - Maximum Weighted Total Possible 375) Phase 1 Attachment number 7 \nPage 1 of 1 Item # 6 Attachment number 8 \nPage 1 of 3 Item # 6 Attachment number 8 \nPage 2 of 3 Item # 6 Attachment number 8 \nPage 3 of 3 Item # 6 Attachment number 9 \nPage 1 of 3 Item # 6 Attachment number 9 \nPage 2 of 3 Item # 6 Attachment number 9 \nPage 3 of 3 Item # 6 Attachment number 10 \nPage 1 of 3 Item # 6 Attachment number 10 \nPage 2 of 3 Item # 6 Attachment number 10 \nPage 3 of 3 Item # 6 Attachment number 11 \nPage 1 of 1 Item # 6 Engineering Services Committee Meeting 3/10/2020 1:20 PM Easement Deed of Dedication and Release Agreement for Daniel Field Department:Augusta Utilities Presenter:Tom Wiedmeier Caption:Consider approving an Easement Deed of Dedication and a Release of Aeronautical Use Provisions for Daniel Field. Background:AUD is in the process of acquiring easements, for the Alternated Downtown Feed Water Main. To this end, an easement is needed across the Daniel Field Property. Analysis:The existing water main providing water to downtown Augusta is over 100 years old and in need of replacing. A project has been designed to provide a route for a new water main. This route call for the pipeline to cross the Daniel Field property, at the corner of Wrightsboro Road and Highland Avenue, where a Popeye's is located. Daniel Field and the General Aviation Commission have agreed, to the proposal. The FAA has also agreed, but require that the Release of Aeronautical Use Provisions Letter Agreement be signed. The property in question is across the street from the Highland Avenue WTP and is necessary, for this project. Financial Impact:$34,114.00 Alternatives:Disapprove an Easement Deed of Dedication and a Release of Aeronautical Use Provisions, for Daniel Field. Recommendation:Approve an Easement Deed of Dedication and a Release of Aeronautical Use Provisions, for Daniel Field. Funds are Available in the Following Accounts: G/L 514043410-5411110 J/L 81500110-5411110 Cover Memo Item # 7 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 7 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 4 It e m # 7 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 4 It e m # 7 At t a c h m e n t n u m b e r 1 \ n P a g e 3 o f 4 It e m # 7 At t a c h m e n t n u m b e r 1 \ n P a g e 4 o f 4 It e m # 7 At t a c h m e n t n u m b e r 2 \ n P a g e 1 o f 1 It e m # 7 Attachment number 3 \nPage 1 of 4 Item # 7 Attachment number 3 \nPage 2 of 4 Item # 7 Attachment number 3 \nPage 3 of 4 Item # 7 Attachment number 3 \nPage 4 of 4 Item # 7 Engineering Services Committee Meeting 3/10/2020 1:20 PM GEORGIA MUNICIPAL ASSOCIATION, INC. SERVICES FOR TELECOMMUNICATION AND RIGHT OF WAY MANAGEMENT AUGUSTA ENGINEERING DEPARTMENT Department:Engineering Presenter: Caption:Approve and authorize Budget Transfer as a Separate Line Item to Augusta Engineering Department (AED) FY2020 Operational Budget to pay for Georgia Municipal Association, Inc. (GMA) FY2020 Services for Telecommunication and Right-of-Way Management. Also, approve such line funding in AED subsequent years operational budgets to pay for yearly future payments to GMA for such services. Requested by AED. Background:Augusta, Georgia (City) right-of-way (ROW) usage is managed by Augusta Engineering (AED) by ROW encroachment permit and franchise agreement. Private and Public utilities, and telecommunication entities are significant users of ROW. In the past ROW usage by such entities was managed under Franchise Agreement. However, with increased demand for providing enhanced fast telecommunication services and expanding service areas, the state made significant changes in ROW usage regulations that resulted in managing City ROW very challenging. Accordingly, changing regulations warranted review of the collection of ROW usage fee under franchise agreement. For aforementioned reasons, AED sought GMA assistance in 2017. GMA has available resources to assist in compliance with state regulations and collection of ROW usage funds from the City ROW users. Analysis:GMA services significantly contributed collecting ROW usage fees from user entities. GMA recently recovery included $250,000 from Crown Castle and $176,000 from Unitie Private network. Continuity of GMA services is critical to maintain compliance with changing regulations and fee recovery from ROW users. Financial Impact: Cover Memo Item # 8 GMA service fee for FY2020 is $15,000. Expenditure would be charged to 101-04-1110/5211110 Alternatives:Do not approve and identify alternate funding source for GMA services payment. Or terminate GMA contact and face possibility of revenue loss. Recommendation:Approve and Authorize Budget Transfer as a Separate Line Item to Augusta Engineering Department (AED) FY2020 Operational Budget to Pay for Georgia Municipal Association, Inc. (GMA) FY2020 Services for Telecommunication and Right-of-Way Management. Also, approve such line funding in AED subsequent years operational budgets to pay for yearly future payments to GMA for such services. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: 101-04-1110/5212115 $7,500 General Fund contingency $7,500 Expenditure would be charged to 101-04- 1110/5211110 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 8 Attachment number 1 \nPage 1 of 7 Item # 8 Attachment number 1 \nPage 2 of 7 Item # 8 Attachment number 1 \nPage 3 of 7 Item # 8 Attachment number 1 \nPage 4 of 7 Item # 8 Attachment number 1 \nPage 5 of 7 Item # 8 Attachment number 1 \nPage 6 of 7 Item # 8 Attachment number 1 \nPage 7 of 7 Item # 8 Engineering Services Committee Meeting 3/10/2020 1:20 PM GRANITE HILL, SECTION FOUR, PHASE TWO, Department:Engineering Presenter:Hameed Malik, P.E., PhD, Director Caption:Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering Department and the Augusta Utilities Department for Granite Hill Subdivision, Section Four, Phase Two. Background:The final plat for Granite Hill, Section Four, Phase Two, was approved by the Commission on June 18, 2019. The subdivision design and plat for this section, including the storm drain system, have been reviewed and accepted by our engineering staff and the construction has been reviewed by our inspectors. The Utilities Department has inspected and reviewed the water and sanitary sewer installations, and hereby requests acceptance of the utility deed. Analysis:This section meets all codes, ordinances and standards. There are no wetlands or 100-year flood plain boundaries involved in this section. Acceptance of said utility deed shall dedicate, as required, the water and sanitary sewer mains along with the applicable easements to Augusta, Georgia for operation and maintenance. Financial Impact:By accepting these roads and storm drainage installations into the County system and after the 18-month maintenance warranty by the developer/contractor for the road and storm drainage has expired, all future maintenance and associated costs will be borne by Augusta, Georgia. By acceptance of the utility deed and maintenance agreement, all future maintenance and associated costs for water and sanitary sewer installations will be borne by Augusta, Georgia, and positive revenue will be generated from the sale of water and sanitary sewer taps and monthly billing of same. Alternatives: Cover Memo Item # 9 1. Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering and Augusta Utilities Departments for Granite Hill, Section Four, Phase Two. 2. Do not approve and risk litigation. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 9 Attachment number 1 \nPage 1 of 16 Item # 9 Attachment number 1 \nPage 2 of 16 Item # 9 Attachment number 1 \nPage 3 of 16 Item # 9 Attachment number 1 \nPage 4 of 16 Item # 9 Attachment number 1 \nPage 5 of 16 Item # 9 Attachment number 1 \nPage 6 of 16 Item # 9 Attachment number 1 \nPage 7 of 16 Item # 9 Attachment number 1 \nPage 8 of 16 Item # 9 Attachment number 1 \nPage 9 of 16 Item # 9 Attachment number 1 \nPage 10 of 16 Item # 9 Attachment number 1 \nPage 11 of 16 Item # 9 Attachment number 1 \nPage 12 of 16 Item # 9 Attachment number 1 \nPage 13 of 16 Item # 9 Attachment number 1 \nPage 14 of 16 Item # 9 Attachment number 1 \nPage 15 of 16 Item # 9 Attachment number 1 \nPage 16 of 16 Item # 9 Engineering Services Committee Meeting 3/10/2020 1:20 PM Minutes Department: Presenter: Caption:Motion to approve the minutes of the Engineering Services Committee held on February 11, 2020. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 10 Engineering Services Committee Meeting Commission Chamber - 2llll2020 ATTENDANCE: Present: Hons. M. Williams, Chairman; Hasan, Vice Chairman; Garrett, member. Absent: Hons. Hardie Davis, Jr., Mayor; Frantom, member. ENGINEERING SERVICES l. Mr. Corey Rogers Lucy C. Laney Museum of History regarding historical Item markers and monuments in the City of Augusta. (Requested by Action: commissioner Bill Fennoy) Rescheduled Motions |r'J:"' Motion rext Made Seconded MotionBy By Result It was the consensus of the committee that this item be referred to the next committee meeting. 2. Award Bid Item #19-008 for HDPE Pipe and Fittings Annual Contract.Item Action: Approved Motions Motion Type Approve Motion Text Made By Seconded By Motion to approve. Commissioner Commissioner Motion Passes Ben Hasan Brandon Garrett Motion Result Passes 3-0. 3. Receive recommendations from staff regarding the use of TIA Item Discretionary funds to repair Barnes and Stevens Roads. (Refened from Action: January 28 Engineering Services) Rescheduled Attachment number 1 \nPage 1 of 4 Item # 10 Motions fr'J:" Motion rext Made Bv seconded Bv Motion--------- -" Result Commissioner Ben Hasan rasses 4. Approve Motion to on January Motions Motion Type Approve Motion to approve receiving this item as information and getting a report back at the April meeting. Motion Passes 3-0. approve the minutes 29,2420. Commissioner Brandon Garrett of the Engineering Services Committee held Item Action: Approved Motion Text Made By Seconded By Motion to approve. Commissioner Commissioner Motion Passes Brandon Garrett Ben Hasan Motion Result Passes Motion Result Motion Result Passes 3-0. 5. Consider approving and accepting a sanitary sewer easement from Thomas Item Concrete of South Carolina, Inc. Action: Approved Motion to approve . with no costs. Commissioner CommissionerApprove ruro,ion Passes Ben Hasan Brandon Garrett Passes 3-0. 6. Consider approval of supplemental funding for on-call engineering services by Item Alfred Benesch & Company for Utilities Department on Fort Gordon. Action: Approved Motions fr'J:"' Motion rext Motions fr"J:"' Motion rext Approve Made By Seconded By Made By Seconded By Attachment number 1 \nPage 2 of 4 Item # 10 Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commissioner Brandon Garreff www.augustaga.gov Attachment number 1 \nPage 3 of 4 Item # 10 Attachment number 1 \nPage 4 of 4 Item # 10 Engineering Services Committee Meeting 3/10/2020 1:20 PM On-Call Asphalt and Concrete Services Department:Utilities Presenter:Tom Wiedmeier Caption:Motion to approve exercising the 3rd option to renew with Georgia-Carolina Paving to provide on-call asphalt and concrete repairs for Bid 16-224. Background:Georgia Carolina Paving has been providing this service and was approved by Commission on 12/20/16, with an option for up to three additional one-year period renewals. The service provided by Georgia Carolina Paving has been excellent and by utilizing an on-call contractor, we can limit the amount of time before a road cut or sidewalk cut is repaired. The timely repairs to these roadway and sidewalk prevent public hazards and provide positive impact on our customers. Analysis:AUGUSTA UTILITIES WOULD LIKE TO EXERCISE THE 3RD OF 3 ONE-YEAR RENEWAL FOR 2020. THE AUGUSTA COMPLIANCE DEPARTMENT HAS REGISTERED GEORGIA-CAROLINA PAVING AS A LOCAL SMALL BUSINESS. Financial Impact:THE REQUESTED AMOUNT FOR THIS RENEWAL IS $240,000.00 AND THE FUNDS WILL BE SPLITTED BETWEEN THESE ACCOUNTS: $100,000 FROM ACCOUNT 506043410-5311912 (CONCRETE) $140,000.00 FROM ACCOUNT 506043410-5311920 (ASPHALT) Alternatives:DENY THE REQUEST Recommendation:WE RECOMMEND APPROVAL FOR THE 3RD AND LAST RENEWAL OF THE ON-CALL ASPHALT AND CONCRETE SERVICES TO BE PROVIDED BY THE GEORGIA CAROLINA PAVING COMPANY.Cover Memo Item # 11 Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE FROM: 506043410-5311912 506043410-5311920 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 11 Attachment number 1 \nPage 1 of 27 Item # 11 Attachment number 1 \nPage 2 of 27 Item # 11 Attachment number 1 \nPage 3 of 27 Item # 11 Attachment number 1 \nPage 4 of 27 Item # 11 Attachment number 1 \nPage 5 of 27 Item # 11 Attachment number 1 \nPage 6 of 27 Item # 11 Attachment number 1 \nPage 7 of 27 Item # 11 Attachment number 1 \nPage 8 of 27 Item # 11 Attachment number 1 \nPage 9 of 27 Item # 11 Attachment number 1 \nPage 10 of 27 Item # 11 Attachment number 1 \nPage 11 of 27 Item # 11 Attachment number 1 \nPage 12 of 27 Item # 11 Attachment number 1 \nPage 13 of 27 Item # 11 Attachment number 1 \nPage 14 of 27 Item # 11 Attachment number 1 \nPage 15 of 27 Item # 11 Attachment number 1 \nPage 16 of 27 Item # 11 Attachment number 1 \nPage 17 of 27 Item # 11 Attachment number 1 \nPage 18 of 27 Item # 11 Attachment number 1 \nPage 19 of 27 Item # 11 Attachment number 1 \nPage 20 of 27 Item # 11 Attachment number 1 \nPage 21 of 27 Item # 11 Attachment number 1 \nPage 22 of 27 Item # 11 Attachment number 1 \nPage 23 of 27 Item # 11 Attachment number 1 \nPage 24 of 27 Item # 11 Attachment number 1 \nPage 25 of 27 Item # 11 Attachment number 1 \nPage 26 of 27 Item # 11 Attachment number 1 \nPage 27 of 27 Item # 11 Engineering Services Committee Meeting 3/10/2020 1:20 PM Smoke and Dye Testing of the 2nd Street Lift Station Sanitary Sewer Collection Area Department:Utilities Presenter:Tom Wiedmeier Caption:Consider proposal from McKim & Creed to perform smoke and dye testing in the 2nd Street Lift Station Sanitary Sewer Collection Area. Background:The Utilities Department continues to evaluate the existing sanitary sewer collection system to determine locations of excessive rainfall-derived inflow and infiltration (RD I/I). Reducing RD I/I entering the system improves the available sewer pipe transmission capacity, improves lift station operations, and reduces the flow to the treatment plant. In 2014, McKim and Creed performed extensive flow monitoring of the downtown area as part of the Glass Factory Drainage Basin CSO Abatement Phase I – Sewer Flow Monitoring Study. That study identified excessive RD I/I in the 2 nd Street area. While we have completed numerous repairs and projects resulting from that study, we are now ready to further evaluate the 2 nd Street area. In accordance with RFP 15-189, Augusta Utilities requests to contract McKim & Creed to perform smoke and dye testing to identify the locations of the storm water inflow. Their services will include submitting a technical memorandum that documents the inflow locations, methodologies for removing the inflow sources, and cost opinions for completing the necessary storm water inflow abatement activities. Analysis:The Utilities Department evaluated the McKim and Creed proposal and has determined the proposed fee of $86,186.00 to be reasonable based on the scope of work. Financial Impact:Funds are available in account 514043420-5213119/ 82000010- 5213119. Alternatives:No alternatives are recommended. Cover Memo Item # 12 Recommendation:We recommend approval for McKim & Creed to perform smoke and dye testing in the 2nd Street area for the fee of $86,186.00. Funds are Available in the Following Accounts: Funds are available in account 514043420-5213119/ 82000010- 5213119. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 12 Preliminary Scoping Document City of Augusta – Utilities Department Pump Station #2 Sanitary Sewer Smoke Testing Date: March 21, 2018 (REV0) Prepared for: Steve Behrend, PE Augusta Utilities Department 360 Bay Street Suite 180, Augusta, GA 30901 Prepared by: Greg Anderson, PE McKim & Creed, Inc. 2400 Colley Avenue Norfolk, VA 23517 Attachment number 1 \nPage 1 of 7 Item # 12 Project Understanding It is understood that the City of Augusta Utilities Department, AUD, desires to contract with McKim & Creed, Inc. to conduct a storm water inflow identification effort in the Pump Station #2 service area. The Pump Station #2 service area includes approximately 169,818 linear feet of gravity sewers ranging in size from 8” to 24”. In 2014 McKim & Creed completed an open channel flow monitoring project to identify the source(s) of extraneous wet weather flow. As part of that effort the Pump Station #2 collection system was divided into multiple catchments, four (4), and open channel flow monitors were deployed in each catchment area; see attached maps for the limits of each catchment area. The results of the flow monitoring effort identified excessive wet weather flow in each catchment. This project will utilize smoke testing and dye water tracing/flooding activities to pin- point the locations of the storm water inflow sources and a Technical Memorandum will be prepared that identifies the location of the sources, methodologies for removing the inflow sources and projected cost opinions for completing the necessary storm water inflow abatement activities. Scope of Services As previously described, smoke testing will be completed in the four (4) catchment areas that exhibited excessive wet weather flow. These catchment areas include sub- basins 3, 4, 5, and 6. The table below highlights the pipe sizes and lengths of the gravity collection sewers in each sub-basin. Meter Sub- Basin 8-Inch Piping (LF) 10-Inch Piping (LF) 12-Inch Piping (LF) 14/15-Inch Piping (LF) 18-Inch Piping (LF) 24-Inch Piping (LF) Total Length (LF) 3 5,598.44 0 8020.69 1,274.16 234.06 2,199.63 17,326.98 4 13,543.23 0 5,600.02 456.03 477.61 0 20,076.89 5 18,629.15 65.97 11,687.46 2,041.97 3,930.45 362.07 36,717.07 6 72,804.83 375.22 8,070.52 1,681.26 5,173.39 7,592.01 95,697.22 Totals 110,575.65 441.19 33,378.69 5,453.42 9,815.51 10,153.71 169,818.16 A. Smoke Testing – Smoke testing will be conducted to detect specific inflow points such as storm sewer cross connections and point source inflow leaks in drainage paths or ponding areas, roof leaders, cellar, yard and area drains, foundation drains, abandoned building sewers, and faulty service connections. Smoke generators will be used to produce the smoke required for testing. The smoke shall be non-toxic, odorless, and non-staining. Photographs shall be taken of smoke emitting from the ground, catch basins, pipe, or other inflow sources during the tests. Attachment number 1 \nPage 2 of 7 Item # 12 McKim & Creed shall isolate the line sections being tested by using sandbags or plugs. No more than three (3) reaches, or a maximum of 800 feet of sewer piping will be tested at a time. Smoke testing will not be conducted on rainy days or when groundwater conditions are to a point that would hamper accurate testing results. McKim & Creed understands that AUD reserves the right to make final determinations of favorable conditions for conducting smoke testing. Testing shall be closely monitored on windy days. If smoke coming out of the ground is blown away so quickly as to escape accurate detection, testing will cease until such a time that conditions are more favorable. Observations regarding each leak identified shall be documented in a smoke testing journal based on the distance of the defect from the upstream manhole and distance to the left or right from the mainline gravity sewer. The journal shall include address, sewer line identification, personnel, defect data, and a schematic layout of the manhole, surrounding area, and sewer line under test. All smoke leaks discovered shall be photographed and each leak location shall be shown on a smoke sketch. All information recorded in each smoke testing journal will be compiled onto a Smoke Testing Form for each test setup where a defect was recorded. At a minimum the following information shall be included on the forms:  Manhole numbers of reach smoked and length of piping  Description of leak, including address  Ties to leak, including at least two measured distances from the upstream manhole and from the centerline of the gravity sewer  Area and type of surface drained by leak  Approximate volume of inflow contribution based on 1 inch of rainfall All smoke defects will be quantified by giving consideration to the surrounding area contributing to the defect and the size and density of the smoke encountered. A mass balance will be undertaken based on flow monitoring results to insure proper RDI/I quantification. During the smoke testing phase it will be necessary for McKim & Creed to communicate daily with the fire department and citizens being affected by the testing. The location of the crews will be communicated to the fire department each day prior to commencing the tests and smoke testing “Notice to Property Owners/Residences” will be distributed prior to testing. The I/I Field Investigation Procedures for Smoke Testing are as follows: a) Select area to be tested and develop working field maps of the area. b) Field review the area selected and note on the map all “hundred block” addresses. c) Distribute smoke notice to all homes, businesses, schools, etc. Attachment number 1 \nPage 3 of 7 Item # 12 d) During the initial field review, identify all types of businesses, specifically any doctors offices, hospitals, schools, retirement homes (communities) or any other establishment that may need special consideration and coordination during the actual smoke test. Strict consideration and coordination with customers who have sensitive needs must be adhered to, some of whom will not be included on any smoke testing schedule as the nature of their business, such as hospitals, is far too delicate. e) Forty eight hours minimum must expire from the issuance of smoke testing notices to allow all affected to prepare for the testing or call with special exceptions, such as persons with health problems living at home or working elsewhere in the study area, etc. f) On the day of the testing a selected portion of the smoke testing area will be identified and all street names and related hundred block addresses will be provided to the fire department in the area where the testing will occur. UNDER NO CIRCUMSTANCES WILL THE AREA SELECTED FOR THAT DAY’S TESTING BE MODIFIED TO INCLUDE ADDITIONAL WORK UNLESS THE FIRE DEPARTMENT HAS BEEN NOTIFIED FIRST. The name and contact number of the fire department person spoken to must be documented on the appropriate form. The fire department must know the exact locations and specific time frames of where and when the tests will be performed. g) Multi day scheduling with one time reporting to the fire department is not permitted. Daily scheduling and contact with the appropriate fire department will be performed. h) AUD’s Project Manager will be notified on a daily basis with the same information. i) Should the fire department respond to the target area during the actual smoke testing, all testing will cease immediately and the McKim & Creed field supervisor in charge will contact the fire unit responding to answer any questions that the fire department officer may have. j) All testing activity must cease when any resident/occupant complains of smoke entering their residence/establishment. McKim & Creed’s field personnel will then attempt to isolate where the smoke is entering the affected building and make the occupant aware of what the problem may be. All defective plumbing found inside will be documented appropriately for future reference. The occupant will be advised to have the defect repaired by a registered plumber. k) During the actual smoke testing, McKim & Creed field personnel will scout the area for smoke escaping from ground sources, area way drains, roof Attachment number 1 \nPage 4 of 7 Item # 12 vents, storm drain structures, etc. All sources of RDI/I should be photographed, measured, drawn, and documented accordingly with addresses, data, and sketches. The smoke test form will identify which sewer reach is being tested by its component identification. A Smoke Testing Letter Report will be prepared to identify the results of the smoke testing activity. The report will also include identification of the proposed scope of work associated with the necessary dye water tracing/flooding activity. B. Dye Water Testing - Dyed water testing/flooding will be used to perform leak investigations, test manhole connections and locate cross connections between sanitary and storm sewer systems. Dyed water flooding will be accomplished by flooding the ground surface or a pipe segment with color-dyed water to simulate a storm water runoff condition. Dyed water flooding may or may not be performed in conjunction with CCTV inspection. McKim & Creed assumes up to fifteen (15) dyed water tests will be required as part of the storm water inflow source identification. Dyed water testing shall be performed on questionable or suspected inflow sources, so that positive identification and quantification can be made. Dyed water testing locations shall be approved by AUD prior to implementation. Water for dye testing will be furnished by AUD from approved locations. Public sector dyed water flooding shall be conducted through an injection of a large volume of water, colored by non-toxic dye, into a designated catch basin or storm drain section that crosses or is in close proximity to a sanitary sewer. Priority shall be given to storm drains that tested positive during smoke testing. The storm drain will normally be plugged to simulate surcharged conditions. The flooding results shall include the following information:  Evidence of dyed water in manholes downstream from the ponding area, stream crossing, or other suspected sources where the dyed water is placed;  Time of travel from contributing source to manhole sampled, and the concentration of the dyed water;  A CCTV camera shall be used in the suspected sewer that crosses under the storm drain pipe to document any direct or indirect cross connection. During each test, sanitary sewers, storm drains, and curb lines located downstream of the sources shall be monitored for signs of dyed water. The quantity of dye concentrate and water used will vary depending on pipe size and the quantity of flow and debris in each line section. Documentation shall be a combination of handwritten log sheets, sketches, and photographs. The I/I Field Inspection Procedures for Dyed Water Flooding are as follows: Attachment number 1 \nPage 5 of 7 Item # 12 a) There will be no testing performed on days when the ambient temperature does not rise above the freezing point. b) A mixture of water and any approved dye coloring substance will be introduced to the identified source. McKim & Creed field staff will be stationed immediately downstream on the local sanitary and storm sewer lines. Observations, whether positive or negative, will be documented appropriately. Whenever possible the dyed water point of exit will be recorded by closed circuit television inspection equipment. c) Prior to any testing, the appropriate AUD staff shall be notified of the specific location of testing and what waterways may be affected. d) Fire hydrants used to supply the water source needed will be opened very slowly and closed in the same manner. Should the water be running cloudy or dirty after use, the fire hydrant will be left open at a slow pace until the water clears up. If long term draining is required, McKim & Creed shall notify AUD. Dye testing will also be used to establish which sewer flows have been combined and how the systems are interconnected. The results of the observations of dye testing shall be summarized on standardized forms. The information recorded on the form shall include the upstream manhole number, location of the manhole or line flooding, locations of leaks observed in sanitary sewer pipe, and any other pertinent information regarding the test results. C. Technical Memorandum - Upon completion of the field investigations a Technical Memorandum will be prepared which highlights the work which was completed, identifies the locations where storm water inflow sources were encountered and presents the results of the associated dye water flooding activities. The Technical Memorandum will also include recommendations to abate the storm water inflow sources. The recommendations for repair, rehabilitiation, or replacement will be developed with corresponding budgetary cost opinions. Repair methodologies that will be considered include traditional replacement, and various forms of rehabilitation. Work which can be completed by AUD forces versus a third party contractor will be presented separately. Maps and graphics will be developed illustrating the location of degraded infrastructure and recommended repairs. McKim & Creed will provide the Technical Memorandum in ‘draft form’ for AUD review and comment and schedule a review meeting to discuss the Report results and recommendations. Fee Schedule For the services outlined above, the McKim & Creed shall be compensated for the services as follows: Attachment number 1 \nPage 6 of 7 Item # 12 Attachment number 1 \nPage 7 of 7 Item # 12 2nd Street Lift Station Smoke and Dye Testing Area SMB 01.30.2020 2n d S t . L S Attachment number 2 \nPage 1 of 1 Item # 12 Engineering Services Committee Meeting 3/10/2020 1:20 PM Stormwater Program-Watershed Assessment & Analyses, & Inventory &Mapping stormwater Facilities & Storm Conveyance SystemFile reference: 20-014(A) Department:Engineering Presenter: Caption:Approve Supplemental Agreement Four for the Phinizy Center for Watershed Assessment & Inventory Project in amount of $89,500 for the continue Watershed Geomorphic data collection and Monitoring System maintenance as requested by AED. RFQ 13-149. Background:Watershed assessment & analysis, and Inventory and mapping of stormwater conveyance system are warranted to address increasing maintenance needs and comply with federally mandated regulations. Historically, watershed assessments and flood mapping and modeling have provided Augusta-Richmond County with limited data to make informed decisions about flooding, creek health relative to Georgia water quality standards, and planning. Receiving Streams Inventory and Raingage Operation (Tasks C&D) provide significantly more actionable data that can be integrated into better stormwater management decisions for the county and also lays the foundation for more detailed water quality work in the future. Analysis:Augusta Commission on February 18, 2014 approved funding for phase 1 of the project for data inventory and assessment. A Phase approach was developed as a result of available funding constraints to complete the project. Tasks C & D are in progress and funds are needed to continue progressively constructing Raingage network and stream hydrologic data gathering work in local creek basins. Financial Impact:Funds are available in Stormwater Utility Funds. Alternatives:1) Do not approve and find alternative ways to continue stream hydrologic data gathering needed for stormwater system and drainage system improvements. Cover Memo Item # 13 Recommendation:Approve Supplemental Agreement four for the Phinizy Center for Watershed Assessment & Inventory Project in amount of $89,500 for the continue Watershed Geomorphic data collection and Monitoring System maintenance as requested by AED. Funds are Available in the Following Accounts: Funds are available in SWU Funds 581-044320-5211110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 13 Part 2. Stormwater Utility: Watershed Assessment Phase • Rain gauge network development and maintenance: $70,000 This program forms the data backbone for Augusta-Richmond County’s stormwater program. Data from this network will allow for more accurate assessments of creek basin water budgets, which will be important for flood risk, MS4 compliance, and stormwater maintenance schedules. o Maintain existing rain gauge network of 12 sites at 2-4 week intervals (as needed) ▪ Maintain 3 additional level logger sites (5 loggers) • Service 5 hobo loggers ($1600 - batteries/calibration) o Add 3-5 new rain gauge stations o Maintain website, and maintain data backup o Maintain 3 additional level logger sites (5 loggers) ▪ Service 5 hobo loggers ($1600 - batteries/calibration) o Constantine Engineering will be responsible for website, data backup, and annual report • Bathymetric monitoring at rain gauge sites: $19,500 This project is intended to provide data on channel stability to supplement information gathered during previous geomorphic assessments and on-going TSS (total suspended solids) monitoring. Data gathered will aid in understanding whether specific stream segments are in disequilibrium by monitoring for changes in channel shape and size to detect signs of excessive erosion or deposition. These data can be used as a check on the results of the geomorphic assessment, to identify whether there is a relationship between rates of change and TSS data, to identify potentially problematic areas, and to provide a data set for comparison among sites to aid in further investigations of factors related to the presence and magnitude of channel instability. o Perform quarterly bathymetric measurements at rain gauge/water level sites where possible (10 sites existing sites, 3-5 new sites) o Deliverable: Annual report that summarizes data Attachment number 1 \nPage 1 of 1 Item # 13 (SA04) – For changes greater than $20,000) AUGUSTA-RICHMOND COUNTY AUGUSTA, GA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, Phinizy Center for Water Sciences, Consultant, entered into a contract with Augusta- Richmond County on February 18, 2014, for Engineering Design Services associated with the Stormwater Utility Fee Implementation Project No. 581-044320-5211120, File Reference No. 20-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: It is agreed that as a result of the above described modification the contract amount is increased by $89,500.00 from $607,760.00 to a new total of $697,260.00. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Phinizy Center for Water Sciences, Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This day of , 2020 RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY PHINIZY CENTER FOR WATER SCIENCES AUGUSTA, GEORGIA Hardie Davis, Jr., Mayor Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Augusta Richmond County Project Number(s): 581-044320-5211120 Supplemental Agreement Number: 4 Purchase Order Number: 242217 Additional services for the continued Watershed Geomorphic Data collection & Monitoring System Attachment number 2 \nPage 1 of 1 Item # 13 Engineering Services Committee Meeting 3/10/2020 1:20 PM Telfair Street Improvements Project Design Services for Roadway ImprovementsTIA Project Number: RC07-000148 / PI#0011409RFP Item: 18-266 Department:Engineering Presenter: Caption:Approve supplemental funding (SA1) for Engineering Phases of Design Consultant Services Agreement to Goodwyne, Mills & Cawood (GMC) in the amount of $183,540.00 for the Telfair Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-266. Background:The Telfair Street Improvements is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in the July 31, 2012 referendum. The Telfair Street is a Band 3 project. The project improvements consist of improving roadway safety by resurfacing, reconstructing the existing curb and gutter, replacing sidewalks and improving the storm water system. The project will improve pedestrian safety at intersections with new high visibility crosswalks. New street landscaping will be provided, where possible, to enhance pedestrian use and improvement of roadway aesthetics. In May 2019, commission approved award of the design phase of the project to GMC. The roadway design is in progress and supplement services are warranted for gathering additional survey data, including auxiliary efforts. Analysis:On May 7, 2019 the Augusta Commission approved to move the project from preliminary initial concept to design. The project is in the design phase and supplemental professional services are needed for design completion. The purpose of this supplement is to complete needed survey data. Financial Impact:Project TIA Funds. Alternatives:1). Do not approve and find alternative to complete the project and meet TIA project completion schedule. Cover Memo Item # 14 Recommendation:Approve supplemental funding (SA1) for Engineering Phases of Design Consultant Services Agreement to Goodwyne, Mills & Cawood (GMC) in the amount of $183,540.00 for the Telfair Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. Funds are Available in the Following Accounts: Project TIA Funds: 371-041110 (JL T15040148)-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 14 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#371-041110-T15040148. This request if for Supplemental Agreement Number One to Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 1,076,550$ TIA Funds 183,540$ 1,260,090$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15040148 Telfair Street Improvements (RFP #18-266) Goodwyne, Mills & Cawood (GMC) in the amount of $183,540.00 for the Telfair Street Improvement Project. Funding is available in the TIA project budget. 2/28/2020 Attachment number 1 \nPage 1 of 4 Item # 14 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15040148 Telfair Street Improvements (RFP #18-266) CPB AMOUNT CPB ADDITION New SOURCE OF FUNDS CPB CPB TIA Project 371-041110/5212115-T15040148 ($1,076,550) ($183,540) ($1,260,090) TOTAL SOURCES: ($1,076,550) ($183,540) ($1,260,090) USE OF FUNDS ENGINEERING 371-041110-5212115/T15040148 $1,076,550 $183,540 $1,260,090 TOTAL USES: $1,076,550 $183,540 $1,260,090 2/28/2020 Attachment number 1 \nPage 2 of 4 Item # 14 CPB#371-041110-T15040148 2/28/2020 Attachment number 1 \nPage 3 of 4 Item # 14 CPB#371-041110-T15040148 2/28/2020 Attachment number 1 \nPage 4 of 4 Item # 14 (SA1 – For changes greater than $25,000) February 2020 ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT Augusta Richmond County Project Number(s): 371-041110-T15040148 GDOT Number (s): RC07-000148 PI 0011409 Supplemental Agreement Number: 1 Purchase Order Number: 19ENG736 WHEREAS, We, Goodwyne, Mills, & Cawood (GMC)., entered into a contract with Augusta- Richmond County on July 31, 2012 for engineering design services associated with the improvements to Telfair Street. Project RC07-000148, PI 0011409, File Reference No. 19-014 (T), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Additional Engineering Services to include additional survey for Telfair and ancillary roadways. It is agreed that as a result of the above described modifications the contract amount is increased by $183,540.00 from $1,076,541.00 to a new total of $1,260,081.00 Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Goodwyne, Mills & Cawood (GMC). Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned item, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY Goodwyne, Mills & Cawood (GMC). AUGUSTA, GEORGIA Hardie Davis, Mayor Approved Date: Approved: Date: [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Attachment number 2 \nPage 1 of 1 Item # 14 Attachment number 3 \nPage 1 of 2 Item # 14 Attachment number 3 \nPage 2 of 2 Item # 14