Loading...
HomeMy WebLinkAbout2018-10-09 Meeting AgendaEngineering Services Committee Meeting Commission Chamber- 10/9/2018- 1:20 PM ENGINEERING SERVICES 1.Motion to authorize condemnation to acquire title of a portion of property for permanent easement and temporary construction easement (Parcel 166-0-023-03-0) 4252-D Windsor Spring Road. Attachments 2.Motion to authorize condemnation to acquire title of a portion of property for permanent easement and temporary easement (Parcel 166-0-023-04-0) 4252-E Windsor Spring Road. Attachments 3.Receive as information from AED the update on Stormwater Services for the year 2018 Quarter 1 (Jan. – Mar) and Quarter 2 (Apr – May). Attachments 4.Award Bid Item 18-197 for a Vibration Analysis Program in the amount of $83,731 to Control Southern, Inc. Attachments 5.Approve and receive as information the maintenance and monitoring services for the new Traffic Engineering ITS network in the amount of $75,000 funded thru SPLOST VI. Also receive as information GTS Solutions providing the required emergency services as determined by the Augusta Engineering Department (AED). Attachments 6.Motion to approve Engineering Services for AUD's Fort Gordon 15th Street Collector Sanitary Sewer Project to W.R. Toole Engineers, Inc. in the amount of $209,944.15. Attachments 7.Approve proposal from Goodwyn, Mills and Cawood, Inc. (GMC) to provide engineering services for Utilities Department’s Fort Gordon Cross Basin Lift Station and Force Main project in the amount of $344,000. Attachments 8.Receive as information an update regarding the traffic issues along Gordon Hwy. between Dyess Parkway and Robinson Avenue, including the communities of Haynes Station, Sims Landing, and Willhaven Estates. Attachments 9.Consider approving the Deed of Dedication and Maintenance Agreement from KIR Augusta I 044, LLC. Attachments 10.Motion to approve the minutes of the Engineering Services Committee held on September 25, 2018.Attachments 11.Approve the procurement of Chemical Feed Pumps for Highland Avenue Water Treatment Plant to Tencarva in the amount of $51,845.00. Attachments 12.Approve entering into Memorandum of Understanding (MOU) with two (2) Educational Institutions (Savannah State University, GA and Augusta University, GA), Nonprofit Organization (Phinizy Center) to assist in activities that are designed for stream restoration in local waterbodies. Also authorized Mayor to sign MOU as requested by the Augusta Engineering Department. Attachments 13.Approve the installation of thirteen streetlights on Copse Drive $85.00 per year. This is also to approve a new lighting tax district for the 50 lots associated with the above road. Requested by AED (Traffic). Attachments 14.Approve the installation of fourteen streetlights on Inverness Drive and Bellingham Drive $85.00 per year. This is also to approve a new lighting tax district for the 53 lots associated with the above roads. Requested by AED (Traffic). Attachments 15.Authorize Addendum No 1 to CCI Contract Callers Inc. (CCI) Master Professional Services Agreement with Augusta Utilities Department (AUD), and approve Augusta Engineering Department (AED) entering into Collection Services Agreement with the CCI for Stormwater Utility Fee delinquent accounts collection as requested by AED. Attachments 16.Motion to approve entering into a Construction Contract Agreement with the Georgia Department of Transportation (GDOT) for the Wrightsboro Road Improvements (Marks Church Rd. to Augusta West Pkwy) Project (PI #015976) as requested by AED. Bid Item 18-127 Attachments www.augustaga.gov Engineering Services Committee Meeting 10/9/2018 1:20 PM Acquisition of permanent easement & temporary construction easement from Patrick Norris et al. Department:Engineering Services Presenter:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for permanent easement and temporary construction easement (Parcel 166-0-023-03-0) 4252-D Windsor Spring Road. Background:There are title issues therefore seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 10,377 square feet of permanent easement and 3,016 square feet of temporary construction easement. The appraised value is $2,745.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 514043490-5411120 J/L 81500100-5411120 REVIEWED AND APPROVED BY: Cover Memo Item # 1 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Attachment number 1 \nPage 1 of 1 Item # 1 Attachment number 2 \nPage 1 of 1 Item # 1 Engineering Services Committee Meeting 10/9/2018 1:20 PM Acquisition of permanent easement and temporary construction easement to Richmond County, Georgia from the property of the Estate of Betty Jean Nixon. Department:Engineering Services Presenter:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for permanent easement and temporary easement (Parcel 166-0-023-04-0) 4252-E Windsor Spring Road. Background:Due to the property owner being deceased, the City seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 7,221 square feet of permanent easement and 2,491 square feet of temporary easement. The appraised value is $1,930.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 514043490-5411120 J/L 81500100-5411120 REVIEWED AND APPROVED BY: Cover Memo Item # 2 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Attachment number 1 \nPage 1 of 1 Item # 2 Attachment number 2 \nPage 1 of 1 Item # 2 Engineering Services Committee Meeting 10/9/2018 1:20 PM AED Stormwater Services Program Quarterly Update Quarter 1 and Quarter 2 FY 2018 Department:Engineering Presenter: Caption:Receive as information from AED the update on Stormwater Services for the year 2018 Quarter 1 (Jan. – Mar) and Quarter 2 (Apr – May). Background:N/A Analysis:N/A Financial Impact:N/A Alternatives:N/A Recommendation:N/A Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 3 Engineering Services Committee Meeting 10/9/2018 1:20 PM Augusta Utilities Vibration Analysis Program Department:Utilities Presenter:Tom Wiedmeier Caption:Award Bid Item 18-197 for a Vibration Analysis Program in the amount of $83,731 to Control Southern, Inc. Background:The Utilities Department has worked with the Procurement Department to solicit bids for a vibration analysis program for use in our equipment predictive maintenance program. The only bid for this equipment is from Control Southern, Inc. Analysis:Our review of the bid has determined that it meets the specification requirements and the bid amount of $83,731.00 for the system is reasonable. This program will be used to improve our ability to assess the condition of operating equipment and make repairs as needed prior to an actual equipment failure. This capability will allow us to perform less costly maintenance in advance of a more costly total failure. Financial Impact:$83,731.00 from budgeted funds. Alternatives:Reject the bids received from Bid Item #18-197. Recommendation:We recommend approval of award of bid item #18-197 to Control Southern, Inc. at a cost of $83,731.00. Funds are Available in the Following Accounts: 506043580-5425110 REVIEWED AND APPROVED BY: Cover Memo Item # 4 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Attachment number 1 \nPage 1 of 2 Item # 4 Attachment number 1 \nPage 2 of 2 Item # 4 Invitation to Bid Sealed bids will be received at this office until Friday, April 27, 2018 @ 11:00 a.m. for furnishing: Bid Item #18-197 Vibration Analysis Program for Augusta, Georgia – Utilities Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, April 13, 2018 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference an eligible bidder must submit a completed and signed written application to become a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project. An eligible bidder who fails to submit an application for approval as a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project, and who otherwise meets the requirements for approval as a local bidder, will not be qualified for a bid preference on such eligible local project. No bids may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of contract with the successful bidder. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov No bid will be accepted by fax, all must be received by mail or hand delivered. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle March 22, 29, April 5, 12, 2018 Metro Courier March 22, 2018 Attachment number 2 \nPage 1 of 1 Item # 4 OFFICIAL Vendor Control Southern 3850 Lakefield Drive Suwanee, GA 30041 Hines Industries 240 Metty Drive Ann Arbor, MI 48103 Attachment B Yes E-Verify Number 1265507 SAVE Form Yes Make Emerson Model AMS 2140 Bid Price $83,731.00 Approximate Delivery Date 6 weeks ARO Vibration Analysis Program Total Number Specifications Mailed Out: 17 Total Number Specifications Download (Demandstar): 5 Total Electronic Notifications (Demandstar): 136 Total Number Specifications Mailed to Local Vendors: 1 Mandatory Pre-Bid/Telephone Conference: NA Total packages submitted: 2 Total Non-Compliant: 0 No Bid Bid Opening Item #18-197 Vibration Analysis Program for Augusta, Georgia – Utilities Department Bid Due: Friday, April 27, 2018 @ 11:00 a.m. Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 4 Attachment number 4 \nPage 1 of 2 Item # 4 Attachment number 4 \nPage 2 of 2 Item # 4 Attachment number 5 \nPage 1 of 1 Item # 4 Engineering Services Committee Meeting 10/9/2018 1:20 PM Emergency Network Services ITS Network Maintenance and Monitoring Department:Engineering Presenter: Caption:Approve and receive as information the maintenance and monitoring services for the new Traffic Engineering ITS network in the amount of $75,000 funded thru SPLOST VI. Also receive as information GTS Solutions providing the required emergency services as determined by the Augusta Engineering Department (AED). Background:The Intelligent Transportation System (ITS) Project is currently under construction by the AED. This project, when complete, will connect numerous traffic engineering devices together utilizing fiber optics and high speed communications in one cohesive network. Analysis:During the design and implementation of this project, no consideration was given to how to maintain and secure the network after it had been completed. The Traffic Engineering network is not complete, but it is far enough along to need immediate monitoring and ongoing maintenance. This emergency procurement will provide the Augusta Engineering Department with a highly qualified contractor to protect the network from outside intrusion, as well as allow him to monitor and maintain the network hardware and software systems. Financial Impact:The cost to provide the network monitoring and security services is $14,640 per month for a period of 5 months for a total of approximately $75,000 and all costs are funded thru SPLOST VI account number 328-041110-52.12999/212828104-52.12999. Alternatives:1)Approve and receive as information the maintenance and monitoring services for the new Traffic Engineering ITS network in the amount of $75,000 funded thru SPLOST VI. Also receive as information GTS Solutions providing the required emergency services as determined by the Augusta Engineering Cover Memo Item # 5 Department (AED). 2)Do not approve and seek alternate funding source. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 328-041110-52.12999/212828104-52.12999 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 5 Attachment number 1 \nPage 1 of 9 Item # 5 Attachment number 1 \nPage 2 of 9 Item # 5 Attachment number 1 \nPage 3 of 9 Item # 5 Attachment number 1 \nPage 4 of 9 Item # 5 Attachment number 1 \nPage 5 of 9 Item # 5 Attachment number 1 \nPage 6 of 9 Item # 5 Attachment number 1 \nPage 7 of 9 Item # 5 Attachment number 1 \nPage 8 of 9 Item # 5 Attachment number 1 \nPage 9 of 9 Item # 5 Engineering Services Committee Meeting 10/9/2018 1:20 PM Engineering Services for Utilities Department’s Fort Gordon 15th Street Collector Sanitary Sewer Project Department:Utilities Presenter:Tom Wiedmeier Caption:Motion to approve Engineering Services for AUD's Fort Gordon 15th Street Collector Sanitary Sewer Project to W.R. Toole Engineers, Inc. in the amount of $209,944.15. Background:Augusta Utilities Department (AUD) is the contracted water, sanitary sewer, and irrigation utility provider for Fort Gordon. Fort Gordon is undergoing a post-wide transformation with extensive new construction on the west side of post. This growth requires upgrading the 15th Street sanitary sewer to increase capacity. The cost for W.R. Toole’s engineering services will be recovered within AUD’s project budget paid by Fort Gordon. Analysis:Based upon their qualifications as preapproved consultants under RFQ #18-132 Engineering Consultant Services for Utilities, the Utilities Department recommends contracting with W.R. Toole Engineers, Inc. to perform engineering services for the Fort Gordon 15th Street Collector Sanitary Sewer project. Utilities Department requests approval in the amount of $209,944.15 to fund the proposed services. Financial Impact:$209,944.15 funding is available from the following accounts: 507043420-5212115 / 88880180-5212115 Alternatives:No alternatives are recommended. Recommendation:Recommend approval for Utilities Department to contract with W.R. Toole Engineers, Inc. for the proposed services in the amount of $209,944.15.Cover Memo Item # 6 Funds are Available in the Following Accounts: Funds are available in the following accounts: 507043420- 5212115 / 88880180-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 6 PR O J E C T M A P 15 T H . S T R E E T C O L L E C T O R S A N I T A R Y S E W E R AU G U S T A U T I L I T I E S DE P A R T M E N T 45 2 W A L K E R S T R E E T , S U I T E 2 0 0 AU G U S T A , G A 3 0 9 0 1 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 1 It e m # 6 1005 Broad Street, Suite 200, Augusta, GA 30901 phone – 706.722.4114 * fax - 706.722.6219 * www.wrtoole.com W. R. Toole Engineers, Inc. Engineers * Consultants * Planners September 25, 2018 Augusta Utilities Department 360 Bay Street, Suite 180 Augusta, GA 30901 Attention: Mr. Steven M. Behrend, PE Subject: Professional Services Task Order #9 – 15th Street Sanitary Sewer Improvements TE Proposal # P-16052I Mr. Behrend: W. R. Toole Engineers, Inc. (WRTE) appreciates this opportunity to submit a proposal for Task Order #9. We understand that services completed under this second task order are to include the design of the 15th Street Sanitary Sewer Improvements Project. This proposal package includes our project approach, deliverables, schedule, and manhour/fee estimate. We appreciate this opportunity to continue our work on the Base and are available to initiate services immediately upon your notice to proceed. Sincerely, W. R. TOOLE ENGINEERS, INC. Erik Hammarlund, PE Vice President Attachments Attachment number 2 \nPage 1 of 10 Item # 6 Augusta Utilities Department – 15th Street Sanitary Sewer Improvements Project Project Location & Background The proposed route for the sewer will generally follow the existing sanitary sewer alignment starting in the vicinity of the equalization basin and continuing north for approximately 3,000 linear feet to Range Road. The sewer then continues north along Range Road for approximately another 2,000 linear feet and finally along the east side of 15th Street for approximately 4,000 linear feet to the intersection of Lane Avenue. We assume that the new sewer will be located along the west side of 15th Street. 30% Preliminary Plans ▪ Using the field surveyed basemap, WRTE will develop 30% Preliminary Construction Plans. Preliminary Plans will include plan and profile and will be established for alignment verification. ▪ Specific attention will be directed to the tie-in- location, the road crossings, the coordination of future road improvements along 15th Street, and utility coordination. ▪ WRTE will initiate coordination with Fort Gordon DPW for proposed improvements along Range Road and 15th Street. ▪ WRTE will prepare a hydraulic model for confirming system flows and evaluating pipe size alternatives. ▪ WRTE will prepare an opinion of probable construction cost. ▪ WRTE will distribute digital copies of 30% plans to utility companies for review. WRTE will schedule a review meeting with utilities to review alignment proximity to other lines/structures. ▪ WRTE will facilitate a 30% Project Team Review Meeting. Easement Maps ▪ WRTE assumes that all proposed improvements will be located on Fort Gordon and will not require the preparation of separate easement maps. We will show project limits on the construction plans to define allowable work space for the contractors. Geotechnical Investigations ▪ Following the completion of 30% Preliminary Plans, WRTE will identify project areas with potentially deep excavation (greater than 10’). We will then discuss the need for soil borings to classify the soil and determine water table. ▪ Should any geotechnical investigations be necessary we will submit a separate proposal for these services. At this time we have budgeted a $10,000 allowance. ▪ WRTE proposes to utilize Soil and Materials Engineers, Inc (S&ME). Environmental Documentation/Studies • WRTE has contacted Kristi Hagood and requested any information on environmentally sensitive areas within proximity of the project. We will show these areas on our mapping as provided by Fort Gordon. • WRTE will continue to coordinate submittals with Kristi Hagood for NEPA document as prepared by others. • WRTE does not anticipate any additional environmental tasks/studies/permits. 60% Preliminary Plans ▪ Based on comments received from the 30% review meeting and utility coordination efforts, WRTE will complete 60% plans in a plan and profile format. ▪ During the 60% task WRTE will continue coordination with Fort Gordon DPW for proposed improvements and road encroachments. ▪ WRTE will continue utility coordination efforts with utility companies. ▪ WRTE will prepare an opinion of probable construction cost. ▪ WRTE will facilitate a 60% Project Team Review Meeting. Attachment number 2 \nPage 2 of 10 Item # 6 90% Preliminary Plans ▪ Based on comments received from the 60% review meeting and utility coordination efforts, WRTE will complete 90% plans in a plan and profile format. ▪ WRTE will prepare draft Contract Documents and Technical Specifications. ▪ During the 90% task WRTE will complete Fort Gordon DPW coordination. ▪ WRTE will prepare Erosion, Sedimentation, and Pollution Control Plans. We anticipate a three- phase (initial, intermediate, and final) erosion control plan format. ▪ WRTE will coordinate ES&PC design with DPW. ▪ WRTE will finalize utility coordination efforts with utility companies. ▪ WRTE will prepare an opinion of probable construction cost. ▪ WRTE will facilitate a 90% Project Team Review Meeting. 100% Final Construction Drawings ▪ WRTE will prepare a final deliverable for construction based on comments received during the 90% Plan review. ▪ Final plans will include all project specific and AUD details for construction. ▪ WRTE will prepare a final opinion of probable construction cost. Pre-Construction Services ▪ WRTE will assist AUD with bidding and advertising. ▪ WRTE will attend one (1) pre-bid meeting and will respond to contractor requests for information (RFI). ▪ WRTE will issue addenda as necessary prior to bid. ▪ WRTE will attend a bid opening, will review bids for general compliance and responsiveness. ▪ WRTE will issue a recommendation of award following bid review. ▪ WRTE will review material submittals. ▪ WRTE will complete a Notice of Intent prior to the pre-construction meeting. ▪ WRTE will attend one (1) pre-construction meeting. Contingency Allowance: A $20,000 contingency allowance has been established for this project for unforeseen project conditions that may warrant additional services. No work or fees will be invoiced towards this allowance budget without prior approval from AUD. Deliverables: The following deliverables were considered for calculation of direct costs and fee estimates. Each deliverable will include 3 hard copy sets and one complete digital file (pdf) unless otherwise noted. • 30% Preliminary Plans • Sub-surface investigation Report (If required) • 60% Preliminary Plan • 90% Plans and Contract Documents & Technical Specifications. We understand AUD will submit 90% Plans to the City of Augusta Planning & Development Department for distribution through the City review process (if necessary). WRTE will provide seven (7) sets of plans for the City review process. • 100% Construction Drawings, including Soil Erosion, Sedimentation and Pollution Control Plans and Contract Documents and Technical Specifications • Project Addenda, RFI responses. Anticipated Permits: The following permits are anticipated for construction: • Approval of Plans by DPW Attachment number 2 \nPage 3 of 10 Item # 6 9/25/2018 Fort Gordon ‐ 15th Street AUD Task Order #9 ‐ 15th St SS Engineering Design Item/ Task Description Pr i n c i p a l ‐In ‐Ch a r g e Se n i o r  En g i n e e r Pr o j e c t  Ma n a g e r En g i n e e r St a f f  En g i n e e r CA D  Op e r a t o r Ad m i n To t a l 30% Plans Project Management (2 Monthly Meetings) & Administrative (Invoicing)20 4 24 Site Visit 666 18 Utility Coordination (Distribute Plans to Utilities) ‐ Facilitate 1 Meeting 10 10 10 30 Prepare Plan Front End Sheets (Cover, Notes, Standard Details)24 20 26 Prepare Sanitary Sewer Plan and Profile 20 10 80 80 190 Prepare Quantity Take‐Off and Cost Estimate 220 22 Prepare hydraulic model to validate CH2 model ‐ confirm flows 420 24 Internal Quality Control (Plan Review)10 10 Initial DPW Coordination for 15th Street and Range Road  ‐ Future Road Improvements 10 20 Prepare 30% Submittal (3 Hardcopies and Digital Submittal)210 10 22 Attend 30% Plan Review Meeting & Prepare Meeting Minutes 10 8 18 Total 0 36 76 178 0 120 0 410 Personnel Est. Hours Rate/Hour Cost ($) Totals Principal‐In‐Charge 0 $215.00 $0.00 Senior Engineer 36 $195.00 $7,020.00 Project Manager 76 $155.00 $11,780.00 Engineer 178 $110.00 $19,580.00 Staff Engineer 0 $95.00 $0.00 Designer/CAD Operator 120 $75.00 $9,000.00 Administrator 0 $50.00 $0.00 1.  Total per Rate Schedule $47,380.00 $47,380.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) 5.  Total Other Direct Costs $0.00 6.  Maximum Amount of Contract Proposal (3) + (4) + (5)$47,380.00 Date: Project Location: Owner: Project Name: Attachment number 2 \nPage 4 of 10 Item # 6 9/25/2018 Fort Gordon ‐ 15th Street AUD Task Order #9 ‐ 15th St SS Engineering Design Item/ Task Description Pr i n c i p a l ‐In ‐Ch a r g e Se n i o r  En g i n e e r Pr o j e c t  Ma n a g e r En g i n e e r St a f f  En g i n e e r CA D  Op e r a t o r Ad m i n To t a l Geotechnical Project Management & Administrative 224 Coordinate with Geotechnical Subconsultant to determine drilling locations/provide mapping 24 6 Review geotechnical data and report recommendations 24 6 0 0 0 0 0 0 0 0 0 0 0 0 0 Total0 0 6 8 00014 Personnel Est. Hours Rate/Hour Cost ($) Totals Principal‐In‐Charge 0 $215.00 $0.00 Senior Engineer 0 $195.00 $0.00 Project Manager 6 $155.00 $930.00 Engineer 8 $110.00 $880.00 Staff Engineer 0 $95.00 $0.00 Designer/CAD Operator 0 $75.00 $0.00 Administrator 0 $50.00 $0.00 1.  Total per Rate Schedule $1,810.00 $1,810.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($)      Travel (Miles) 0 $0.565 $0.00      Geotechnical Allowance 1 $10,000.00 $10,000.00 5.  Total Other Direct Costs $10,000.00 6.  Maximum Amount of Contract Proposal (3) + (4) + (5)$11,810.00 Date: Project Location: Owner: Project Name: Attachment number 2 \nPage 5 of 10 Item # 6 9/25/2018 Fort Gordon ‐ 15th Street AUD Task Order #9 ‐ 15th St SS Engineering Design Item/ Task Description Pr i n c i p a l ‐In ‐Ch a r g e Se n i o r  En g i n e e r Pr o j e c t  Ma n a g e r En g i n e e r St a f f  En g i n e e r CA D  Op e r a t o r Ad m i n To t a l 60% Plans Project Management (2 Monthly Meetings) & Administrative (Invoicing)20 4 24 Site Visit 44 8 Continue Utility Coordination 10 10 10 30 Revise Plan Front End Sheets (Cover, Notes, Standard Details, Special Details)220 20 42 Revise Sanitary Sewer Plan and Profile Sheets 10 10 60 60 140 Revise Quantity Take‐Off and Cost Estimate 210 12 Internal Quality Control (Plan Review)10 10 Continue coordination with DPW and future road improvements 10 10 Prepare hydraulic model ‐ evaluate alternatives 410 Prepare 60% Submittal (3 Hardcopies and Digital)210 10 22 Attend 60% Plan Review Meeting & Prepare Meeting Minutes 10 8 18 Total 0 20 74 142 0 100 0 336 Personnel Est. Hours Rate/Hour Cost ($) Totals Principal‐In‐Charge 0 $215.00 $0.00 Senior Engineer 20 $195.00 $3,900.00 Project Manager 74 $155.00 $11,470.00 Engineer 142 $110.00 $15,620.00 Staff Engineer 0 $95.00 $0.00 Designer/CAD Operator 100 $75.00 $7,500.00 Administrator 0 $50.00 $0.00 1.  Total per Rate Schedule $38,490.00 $38,490.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) 5.  Total Other Direct Costs $0.00 6.  Maximum Amount of Contract Proposal (3) + (4) + (5)$38,490.00 Date: Project Location: Owner: Project Name: Attachment number 2 \nPage 6 of 10 Item # 6 9/25/2018 Fort Gordon ‐ 15th Street AUD Task Order #9 ‐ 15th St SS Engineering Design Item/ Task Description Pr i n c i p a l ‐In ‐Ch a r g e Se n i o r  En g i n e e r Pr o j e c t  Ma n a g e r En g i n e e r St a f f  En g i n e e r CA D  Op e r a t o r Ad m i n To t a l 90% Plans Project Management (2 Monthly Meetings) & Administrative (Invoicing)20 4 24 Site Visit 44 8 Finalize Utility Coordination 10 10 10 30 Revise Plan Front End Sheets (Cover, Notes, Standard Details, Special Details)220 20 42 Revise Sanitary Sewer Plan and Profile Sheets 10 10 40 40 100 Prepare Three‐Phase Erosion Control Plans 40 40 80 Finalize Quantity Take‐Off and Cost Estimate 210 12 Prepare draft bid documents 10 20 30 Internal Quality Control (Plan Review)10 10 Revise hydraulic model ‐ evaluate alternatives 24 Final Coordination with DPW and future road improvements 44 Prepare 90% Submittal (3 Hardcopies and Digital)210 10 22 Attend 90% Plan Review Meeting & Prepare Meeting Minutes 10 8 0 Total 0 20 76 170 0 120 0 386 Personnel Est. Hours Rate/Hour Cost ($) Totals Principal‐In‐Charge 0 $215.00 $0.00 Senior Engineer 20 $195.00 $3,900.00 Project Manager 76 $155.00 $11,780.00 Engineer 170 $110.00 $18,700.00 Staff Engineer 0 $95.00 $0.00 Designer/CAD Operator 120 $75.00 $9,000.00 Administrator 0 $50.00 $0.00 1.  Total per Rate Schedule $43,380.00 $43,380.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) 5.  Total Other Direct Costs $0.00 6.  Maximum Amount of Contract Proposal (3) + (4) + (5)$43,380.00 Date: Project Location: Owner: Project Name: Attachment number 2 \nPage 7 of 10 Item # 6 9/25/2018 Fort Gordon ‐ 15th Street AUD Task Order #9 ‐ 15th St SS Engineering Design Item/ Task Description Pr i n c i p a l ‐In ‐Ch a r g e Se n i o r  En g i n e e r Pr o j e c t  Ma n a g e r En g i n e e r St a f f  En g i n e e r CA D  Op e r a t o r Ad m i n To t a l 100% Plans Project Management (2 Monthly Meetings) & Administrative (Invoicing)10 10 20 Finalize Construction Plans/Erosion Control Plans 10 40 40 90 Finalize Quantity Take‐Off and Cost Estimate 210 Finalize Bid Documents 420 Internal Quality Control (Plan Review)10 10 Prepare Final Plan Submittal (3 Hard Copies & Digital)220 20 42 0 0 0 0 0 0 0 0 Total 0 10 28 90 0 60 0 188 Personnel Est. Hours Rate/Hour Cost ($) Totals Principal‐In‐Charge 0 $215.00 $0.00 Senior Engineer 10 $195.00 $1,950.00 Project Manager 28 $155.00 $4,340.00 Engineer 90 $110.00 $9,900.00 Staff Engineer 0 $95.00 $0.00 Designer/CAD Operator 60 $75.00 $4,500.00 Administrator 0 $50.00 $0.00 1.  Total per Rate Schedule $20,690.00 $20,690.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($)      Reproduction 1 $500.00 $500.00 5.  Total Other Direct Costs $500.00 6.  Maximum Amount of Contract Proposal (3) + (4) + (5)$21,190.00 Date: Project Location: Owner: Project Name: Attachment number 2 \nPage 8 of 10 Item # 6 9/25/2018 Fort Gordon ‐ 15th Street AUD Task Order #9 ‐ 15th St SS Engineering Design Item/ Task Description Pr i n c i p a l ‐In ‐Ch a r g e Se n i o r  En g i n e e r Pr o j e c t  Ma n a g e r En g i n e e r St a f f  En g i n e e r CA D  Op e r a t o r Ad m i n To t a l Pre‐Construction  Assist with Bidding and Advertising 224 0 Attend Pre‐Bid Meeting 22 4 0 Prepare Notice of Intent 24 2 0 Address RFI's and Issue Addenda 48 214 0 Attend Bid Opening, Review Bids, Prepare Recommendation for Award 44 2 0 Attend Pre‐Construction Meeting 2 2 0 Review Material Submittals 48 12 0 0 0 Total0 0 20 26 00652 Personnel Est. Hours Rate/Hour Cost ($) Totals Principal‐In‐Charge 0 $215.00 $0.00 Senior Engineer 0 $195.00 $0.00 Project Manager 20 $155.00 $3,100.00 Engineer 26 $110.00 $2,860.00 Staff Engineer 0 $95.00 $0.00 Designer/CAD Operator 0 $75.00 $0.00 Administrator 6 $50.00 $300.00 1.  Total per Rate Schedule $6,260.00 $6,260.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($)      Travel (Miles) 0 $0.565 $0.00      Reproduction 5.  Total Other Direct Costs $0.00 6.  Maximum Amount of Contract Proposal (3) + (4) + (5)$6,260.00 Date: Project Location: Owner: Project Name: Attachment number 2 \nPage 9 of 10 Item # 6 Date: 9/25/2018 Project Location: Fort Gordon ‐ 15th Street Owner: AUD Project Name: 15th St Sanitary Sewer Engineering Design Item/ Task Description WRTE Fees Subconsultant Fees and Allowances Design Services Summary Land Survey and Basemapping $3,680.00      Toole Survey Company (Field Surveying and Basemapping)$17,754.15 Task Order #8 30% Preliminary Plans $47,380.00 Task Order #9 Geotechnical Investigations (Allowance) $1,810.00      S&ME (See Note 1 Below)$10,000.00 60% Preliminary Plans $38,490.00 90% Final Plans $43,380.00 100% Final Construction Plans $21,190.00 Pre‐Construction Activities $6,260.00 Contingency Allowance (See Note 2 Below)$20,000.00 Total Fee (Prime) = $162,190.00 Total Fee (Subconsultants) = $47,754.15 Total for Task Order #8 and #9 = $209,944.15 Note 2:  A $20,000 contingency allowance has been established for this project for unforeseen project conditions that may warrant additional services.                 No work or fees will be invoiced towards this allowance budget without prior approval from AUD.  Note 1:  Toole Engineers to provide separate geotechnical scope of work and fee proposal.  No work to be completed without prior approval and authorization. At t a c h m e n t n u m b e r 2 \ n P a g e 1 0 o f 1 0 It e m # 6 Engineering Services Committee Meeting 10/9/2018 1:20 PM Engineering Services for Utilities Department’s Fort Gordon Cross Basin Lift Station and Force Main Project Department:Utilities Presenter:Tom Wiedmeier Caption:Approve proposal from Goodwyn, Mills and Cawood, Inc. (GMC) to provide engineering services for Utilities Department’s Fort Gordon Cross Basin Lift Station and Force Main project in the amount of $344,000. Background:Augusta Utilities Department (AUD) is the contracted water, sanitary sewer, and irrigation utility provider for Fort Gordon. Fort Gordon is undergoing a post-wide transformation with new construction and renovation programs as the Cyber Center of Excellence. One impact of the Fort Gordon’s growth is the increase in wastewater flow in the AUD managed sanitary sewer collection system. AUD plans to accommodate the increase by rerouting more Fort Gordon wastewater flow to AUD’s Butler Creek Sanitary Sewer Interceptor utilizing the Cross Basin Lift Station and Force Main. The cost for GMC to provide engineering services will be recovered within AUD’s project budget paid by Fort Gordon. Analysis:Based upon their qualifications as preapproved consultants under RFQ #18-132 Engineering Consultant Services for Utilities, the Utilities Department recommends contracting with Goodwyn, Mills and Cawood, Inc. to perform engineering services for the Fort Gordon Cross Basin Lift Station and Force Main project. Utilities Department requests approval in the amount of $344,000.00 to fund the proposed services. Financial Impact:$344,000.00 funding is available from the following accounts: 507043420-5212115 / 88880190-5212115 Alternatives:No alternatives are recommended.Cover Memo Item # 7 Recommendation:Recommend approval for Utilities Department to contract with Goodwyn, Mills and Cawood, Inc. for the proposed services in the amount of $344,000.00. Funds are Available in the Following Accounts: Funds are available in the following accounts: 507043420- 5212115 / 88880190-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 7 14 8 9 13 CHAMBERLAIN AVE RICE RD CENTRAL HOSPITAL RD N HOSPITAL RD BARNES AVEBARNES AVE BRAINARD AVE LANE AVELANE AVE CHAMBERLAIN AVE 8th AVE 41s t S T 38th S T 39th S T 19 t h S T 19 t h S T 22 n d S T 22 n d S T 23 r d S T 25 t h S T 25 t h S T 3rd AVE 3r d A V E B Y P A S S 28 t h S T 31 s t S T 32 n d S T RI C E R D 37th S T 36th S T B R A I N A R D A V E 40th S T RI C E D R KI L L B O U R N E S T 22nd S T 21712 TNG 013 34600 36700 36706 36710 36708 CROSS BASIN PUMPING STATION PROPOSED FORCE MAIN CONNECTION POINT TO COE CAMPUS SEWER SYSTEM EQUIPMENT: 01658 LIFT STATION NUMBER - EXISTING IS S U E D A T E DR A W I N G F I L E : W : \ C i v i l \ C A U G D w g \ C A U G 1 8 0 0 4 - A u g u s t a - F o r t G o r d o n U t i l i t y - C M A R \ C A D \ 0 1 B I D D R A W I N G S \ 0 1 G E N E R A L \ G 1 0 1 - S i t e P l a n . d w g PL O T T E D : A u g 1 6 , 2 0 1 8 - 3 : 5 0 p m 14 5 0 G r e e n e S t r e e t Su i t e 5 0 5 T 7 0 6 . 2 5 1 . 9 0 9 9 G M C N E T W O R K . C O M Au g u s t a , G A 3 0 9 0 1 DE S I G N E R : DR A W N B Y : EN G I N E E R : PR O J E C T M A N A G E R : MFMF 30 % S U B M I T T A L 60 % S U B M I T T A L 90 % S U B M I T T A L FI N A L 1 2 3 4 65 7 8 9 10 A E D G F H B C 1 2 3 4 65 7 8 9 10 FO R T G O R D O N - C M A R 15 T H S T . S E W E R - C R O S S B A S I N F O R C E M A I N AU G U S T A U T I L I T I E S D E P A R T M E N T GM C P r o j e c t C A U G 1 8 0 0 0 4 AJ SCALE: 0'200'400'400'800' 1" = 800' PROJECT SITE PLAN1 G-101 PR O J E C T S I T E P L A N CR O S S B A S I N F O R C E M A I N & P U M P I N G S T A T I O N G- 1 0 1 Attachment number 1 \nPage 1 of 1 Item # 7 Attachment number 2 \nPage 1 of 7 Item # 7 Attachment number 2 \nPage 2 of 7 Item # 7 Attachment number 2 \nPage 3 of 7 Item # 7 Attachment number 2 \nPage 4 of 7 Item # 7 Attachment number 2 \nPage 5 of 7 Item # 7 Attachment number 2 \nPage 6 of 7 Item # 7 Attachment number 2 \nPage 7 of 7 Item # 7 Engineering Services Committee Meeting 10/9/2018 1:20 PM Gordon Hwy Traffic Update Haynes Station, Sims Landing, Willhaven Department:Engineering Presenter: Caption:Receive as information an update regarding the traffic issues along Gordon Hwy. between Dyess Parkway and Robinson Avenue, including the communities of Haynes Station, Sims Landing, and Willhaven Estates. Background:Recently, the Willhaven Estates Home Owners Association came before the Commission to address traffic and safety concerns at the entrance to their subdivision. In response, several traffic studies were performed and a meeting was setup between all relevant parties to discuss this issue and how to proceed in addressing those concerns. Analysis:Augusta Traffic Engineering has already conducted a traffic signal study at the intersection of Gordon Hwy and Willhaven Estates. This location did meet signal warrants under state and federal guidelines. A meeting was conducted on August 17, 2018, to discuss the issues facing not only Willhaven Estates, but also Sims Landing and Haynes Station. Attendees at the meeting included Augusta Engineering, Augusta Planning, Georgia DOT, a Willhaven HOA representative, Sims Landing representatives, and Haynes Station representatives. Several items were discussed including the problems facing this area and how to proceed in the future. Financial Impact:No immediate fiscal impact, future fiscal impacts to be determined. Alternatives:1) Approve and receive as information the update for traffic issues along Gordon Hwy. 2) Do not approve. Recommendation:Approve Alternative Number One.Cover Memo Item # 8 Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 8 Engineering Services Committee Meeting 10/9/2018 1:20 PM KIR Augusta I 044, LLC at the Augusta Exchange Deed of Dedication and Maintenance Agreement Department:Augusta Utilities Presenter:Tom Wiedmeier Caption:Consider approving the Deed of Dedication and Maintenance Agreement from KIR Augusta I 044, LLC. Background:The Deed of Dedication and Maintenance Agreement are for 229 Robert C. Daniel Parkway (023-3-054-00-0) and 223 Robert C. Daniel Parkway (023-0-004-05-0), which are in front of the existing Target store. When developing these sites, KIR constructed a water distribution system and a gravity sanitary sewer system. Analysis:The systems have been completed and have passed all inspections. Financial Impact:None Alternatives:Disapprove the Deed of Dedication and Maintenance Agreement, from KIR Augusta I 044, LLC., and let the systems remain private. Recommendation:Approve the Deed of Dedication and Maintenance Agreement, from KIR Augusta I 044, LLC., and accept the water and gravity sanitary sewer into Augusta's systems. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Cover Memo Item # 9 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 9 Attachment number 1 \nPage 1 of 4 Item # 9 Attachment number 1 \nPage 2 of 4 Item # 9 Attachment number 1 \nPage 3 of 4 Item # 9 Attachment number 1 \nPage 4 of 4 Item # 9 Attachment number 2 \nPage 1 of 3 Item # 9 Attachment number 2 \nPage 2 of 3 Item # 9 Attachment number 2 \nPage 3 of 3 Item # 9 At t a c h m e n t n u m b e r 3 \ n P a g e 1 o f 1 It e m # 9 Engineering Services Committee Meeting 10/9/2018 1:20 PM Minutes Department: Presenter: Caption:Motion to approve the minutes of the Engineering Services Committee held on September 25, 2018. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 10 Engineering Services Committee Meeting Commission Chamber - 9l25l20l} ATTENDANCE: Present: Hons. Fennoy, Chairman; Hasan, Vice Chairman; Smith, member. Absent: Hon. Hardie Davis, Jr., Mayor; Frantom, member. ENGINEERING SERVICES 1. Motion to approve the minutes of the Engineering Services Commiuee held Item on September 11, 2018. Action: Approved Motions Motion Type Approve Made By Seconded By 2. Approve the purchase of Water Network Optimization Implementation and ltem Training Services. Action: Approved Motions Motion Type Approve Made By Seconded By Commissioner Commissioner Ben Hasan Grady Smith Passes Motion Text Motion to approve. Motion Passes 3-0. Motion Text Motion to approve. Motion Passes 3-0. Motion Result Motion Result Commissioner Commissioner Ben Hasan Grady Smith Passes www.augustaga.qov Attachment number 1 \nPage 1 of 1 Item # 10 Engineering Services Committee Meeting 10/9/2018 1:20 PM Procurement of Chemical Feed Pumps for Highland Avenue Water Plant Backup Disinfection System. Department:Utilities Presenter:Tom Wiedmeier Caption:Approve the procurement of Chemical Feed Pumps for Highland Avenue Water Treatment Plant to Tencarva in the amount of $51,845.00. Background:The Highland Avenue Water Treatment Plant includes a system to generate a sodium hypochlorite solution for use in water disinfection. The primary material used in the generation process is rock salt. We have experienced situations when the delivery of this material is unpredictable due to severe weather events. We are installing a secondary disinfection system using a higher concentration of sodium hypochlorite that we can purchase in bulk. We would prefer to use the same type of chemical feed equipment that is in use in other parts of our system. The feed pumps are Verderflex pumps and the sole supplier for these pumps in Georgia is Tencarva Machinery. The manufacturer has confirmed that Tencarva is the sole source supplier of their equipment to municipalities in Georgia. Analysis:is the only vendor allowed to sell Verderflex pumps in Georgia to water utilities. We have multiple installations of these pumps in our water treatment system and we would like to use the same pumps in this new application. This will provide efficiencies due to familiarity of the equipment by both operations and maintenance personnel, uniformity of spare parts and interchangeability within our system. Financial Impact:$51,845.00 From Budgeted Funds Alternatives:None Recommended Recommendation:Approve the sole source procurement of a Verderflex chemical feed system from Tencarva Machinery at a cost of $51,845.00. Cover Memo Item # 11 Funds are Available in the Following Accounts: 506043520-5425110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 11 Attachment number 1 \nPage 1 of 5 Item # 11 Attachment number 1 \nPage 2 of 5 Item # 11 Attachment number 1 \nPage 3 of 5 Item # 11 Attachment number 1 \nPage 4 of 5 Item # 11 Attachment number 1 \nPage 5 of 5 Item # 11 Engineering Services Committee Meeting 10/9/2018 1:20 PM Section 319(h) CWA Grant - Biota Improvement in an Urban Stream Augusta Engineering Impaired Creeks Restoration Program Memorandum of Understanding with Savannah State University, Augusta University, and Phinizy Center Department:Engineering Presenter: Caption:Approve entering into Memorandum of Understanding (MOU) with two (2) Educational Institutions (Savannah State University, GA and Augusta University, GA), Nonprofit Organization (Phinizy Center) to assist in activities that are designed for stream restoration in local waterbodies. Also authorized Mayor to sign MOU as requested by the Augusta Engineering Department. Background:Augusta, Georgia three creeks are listed impaired due to not meeting instream water quality standards. Augusta, Georgia has been tasked through the stormwater NPDES MS4 Permit to develop and implement integrated management practices (IMP) designed to restore impaired waterbodies. The listed institutions/organization have professional staff with expertise related to design and study of IMPs for waterbody restoration. Augusta Engineering Department (AED) is presently working with these organizations on limited basis but there is a need to expand this limited professional partnership. Analysis:Partnering with these institutions will be a more cost effective approach and the MOU would allow these organizations to function as an extended arm of AED in delivery and implementation of received section 319(h) grant tasks described in the associated workplan. It will also provide continuity of ongoing efforts and assistance in seeking additional grants. Financial Impact:Grant is 60/40 federal/local funds match. Local match primarily in-kind match (staff time). Alternatives:1). Do not approve and lose received section 319(h) grant. Cover Memo Item # 12 Recommendation:Approve entering into Memorandum of Understanding (MOU) with two (2) Educational Institutions (Savannah State University, GA and Augusta University, GA), Nonprofit Organization (Phinizy Center) to assist in activities that are designed for stream restoration in local waterbodies. Also authorized Mayor to sign MOU as requested by the Augusta Engineering Department. Funds are Available in the Following Accounts: Activities are supported through AED engineering staff time (in- kind) and operational funds. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 12 1 | 4 P a g e P h i n i z y C e n t e r f o r W a t e r S c i e n c e s M O U 1 0 3 1 2 0 1 4 v e r 1 MEMORANDUM OF UNDERSTANDING between Augusta, Georgia and [Entity Name] This Memorandum of Understanding (hereinafter “Memorandum”) made this _____ day of ___________________, 2018, by and between AUGUSTA, GEORGIA, as a political subdivision of the State of Georgia (hereinafter referred to as “Augusta, Georgia” or “Augusta”), as Party of the First Part, and [Entity Name] ___ (hereinafter referred to as “Institution “’) as Party of the Second Part. WHEREAS, the [Entity Name] is a professional/Nonprofit partnering entity assisting Augusta Engineering Department (AED) with the Section 319(h) Grant entitled, “Biota Improvement in an Urban Stream through Aquatic Habitat Restoration”; NOW, THEREFORE, as a desire of Augusta and [Entity Name] to properly coordinate the development and implementation of this grant, the parties hereby agree as follows: UNDERSTANDING: Augusta, Georgia and [Entity Name] do hereby agree to the following: 1. The [Entity Name] will provide services related to engineering design and study of Best Management Practices (BMPs) for aquatic habitat restoration, assistance in installation of those BMPs, field reconnaissance efforts, site and BMP selection efforts, survey assistance, data analysis, and report writing efforts as shown in the awarded grant document scope of work document. These activities will primarily be conducted through the work of professionals, as shown in the awarded grant document (Appendix A). These professional will be approved by Augusta Engineering Department prior to execution of MOU. 2. The [Entity Name] will provide Augusta with timesheets for each project task, using format approved by Augusta Engineering Department, for all personnel involved in this project as well as a brief summary of activities and percent completion for each project task for each quarterly reporting period as required by the grant. 3. Augusta shall contribute funds not to exceed the designated amount within the approved grant as shown in the 319(h) grant Scope of Work document. Attachment number 1 \nPage 1 of 3 Item # 12 2 | 3 P a g e 3 1 9 ( h ) G r a n t S c o p e o f W o r k D e l i v e r y M O U 09262018/V1 4. The [Entity Name] shall submit quarterly reimbursement claims with detailed description of work done during that quarter to AED within five days by end of the respective quarter. These reimbursement claims shall be prepared in a format acceptable by the AED with payment to University once funds have been received by the granting agency 5. Upon completion of the activities funded by Augusta, material produced under this MOU will become property of Augusta. However, with written permission from Augusta Engineering Department, the [Entity Name] has rights to use this material for their activities and scientific research purposes but must include Augusta personnel as designated collaborators and the following as proper identification of funding for the project: “The preparation of this report, map, document, project, etc., was financed in part through a grant from the U.S. Environmental Protection Agency under the Provisions of Section 319(h) of the Federal Water Pollution Control Act, as amended and Augusta, Georgia / Augusta Engineering Department.” Together with the month and year, the document was prepared and credit being given to the Environmental Protection Division of the Department of Natural resources, State of Georgia. DELIVERABLES: The [Entity Name] agrees to provide to Augusta Engineering Department any requested documentation required under this MOU. TIME: This MOU will remain in effect for the duration of the 319(h) awarded grant duration unless otherwise amended. TERMINATION: Both parties may terminate this MOU at any time by giving of forty-five (45) days written notice of such termination. Upon receipt of such notice of termination, [Entity Name] shall discontinue all work under this MOU. Data gathered and material produced will become property of Augusta. MISCELLANEOUS: 1. This Memorandum of Understanding shall be controlled by and construed in accordance with the laws of the State of Georgia. Attachment number 1 \nPage 2 of 3 Item # 12 3 | 3 P a g e 3 1 9 ( h ) G r a n t S c o p e o f W o r k D e l i v e r y M O U 09262018/V1 2. Any notice given under this Memorandum shall be deemed given when provided in writing to the following persons: TO AUGUSTA, GA: AUGUSTA, ENGINEERING DEPARTMENT ENGINEERING ADMINISTRATION ATTN: DIRECTOR OF ENGINEERING 452 WALKER STREET, SUITE 110, AUGUSTA, GEORGIA 30901 TO: [Entity Name]: ATTENTION: ______________________________ Address This Memorandum of Understanding is the entire agreement between the parties, and may not be amended, except by a writing executed by both parties. APPROVED: [Entity Name] AUGUSTA, GEORGIA By: _____________________________ By: ____________________________ Date: ___________________________ Date: __________________________ ATTEST: ATTEST: __________________________ Date:______________________________ Date:______________________________ Attachment number 1 \nPage 3 of 3 Item # 12 Attachment number 2 \nPage 1 of 62 Item # 12 Attachment number 2 \nPage 2 of 62 Item # 12 Attachment number 2 \nPage 3 of 62 Item # 12 Attachment number 2 \nPage 4 of 62 Item # 12 Attachment number 2 \nPage 5 of 62 Item # 12 Attachment number 2 \nPage 6 of 62 Item # 12 Attachment number 2 \nPage 7 of 62 Item # 12 Attachment number 2 \nPage 8 of 62 Item # 12 Attachment number 2 \nPage 9 of 62 Item # 12 Attachment number 2 \nPage 10 of 62 Item # 12 Attachment number 2 \nPage 11 of 62 Item # 12 Attachment number 2 \nPage 12 of 62 Item # 12 Attachment number 2 \nPage 13 of 62 Item # 12 Attachment number 2 \nPage 14 of 62 Item # 12 Attachment number 2 \nPage 15 of 62 Item # 12 Attachment number 2 \nPage 16 of 62 Item # 12 Attachment number 2 \nPage 17 of 62 Item # 12 Attachment number 2 \nPage 18 of 62 Item # 12 Attachment number 2 \nPage 19 of 62 Item # 12 Attachment number 2 \nPage 20 of 62 Item # 12 Attachment number 2 \nPage 21 of 62 Item # 12 Attachment number 2 \nPage 22 of 62 Item # 12 Attachment number 2 \nPage 23 of 62 Item # 12 Attachment number 2 \nPage 24 of 62 Item # 12 Attachment number 2 \nPage 25 of 62 Item # 12 Attachment number 2 \nPage 26 of 62 Item # 12 Attachment number 2 \nPage 27 of 62 Item # 12 Attachment number 2 \nPage 28 of 62 Item # 12 Attachment number 2 \nPage 29 of 62 Item # 12 Attachment number 2 \nPage 30 of 62 Item # 12 Attachment number 2 \nPage 31 of 62 Item # 12 Attachment number 2 \nPage 32 of 62 Item # 12 Attachment number 2 \nPage 33 of 62 Item # 12 Attachment number 2 \nPage 34 of 62 Item # 12 Attachment number 2 \nPage 35 of 62 Item # 12 Attachment number 2 \nPage 36 of 62 Item # 12 Attachment number 2 \nPage 37 of 62 Item # 12 Attachment number 2 \nPage 38 of 62 Item # 12 Attachment number 2 \nPage 39 of 62 Item # 12 Attachment number 2 \nPage 40 of 62 Item # 12 Attachment number 2 \nPage 41 of 62 Item # 12 Attachment number 2 \nPage 42 of 62 Item # 12 Attachment number 2 \nPage 43 of 62 Item # 12 Attachment number 2 \nPage 44 of 62 Item # 12 Attachment number 2 \nPage 45 of 62 Item # 12 Attachment number 2 \nPage 46 of 62 Item # 12 Attachment number 2 \nPage 47 of 62 Item # 12 Attachment number 2 \nPage 48 of 62 Item # 12 Attachment number 2 \nPage 49 of 62 Item # 12 Attachment number 2 \nPage 50 of 62 Item # 12 Attachment number 2 \nPage 51 of 62 Item # 12 Attachment number 2 \nPage 52 of 62 Item # 12 Attachment number 2 \nPage 53 of 62 Item # 12 Attachment number 2 \nPage 54 of 62 Item # 12 Attachment number 2 \nPage 55 of 62 Item # 12 Attachment number 2 \nPage 56 of 62 Item # 12 Attachment number 2 \nPage 57 of 62 Item # 12 Attachment number 2 \nPage 58 of 62 Item # 12 Attachment number 2 \nPage 59 of 62 Item # 12 Attachment number 2 \nPage 60 of 62 Item # 12 Attachment number 2 \nPage 61 of 62 Item # 12 Attachment number 2 \nPage 62 of 62 Item # 12 Engineering Services Committee Meeting 10/9/2018 1:20 PM Street Light Request Haynes Station Section 7 (Copse Drive) Department:Engineerin (Traffic Engineering Division) Presenter:Hammed Malik Caption:Approve the installation of thirteen streetlights on Copse Drive $85.00 per year. This is also to approve a new lighting tax district for the 50 lots associated with the above road. Requested by AED (Traffic). Background:The upfront cost of installation to include trenching, conductor, poles and lights is $23,206.00. The yearly cost for these lights will be $4,056.00 which is to be paid for by the 50 lots associated with the road in a special taxing district to appear on the 2018 tax bill. The cost per lot to be added to the tax bill is $317.06 the first two years and $85.00 each year thereafter to cover the cost of the lights and maintenance. Analysis:The cost proposal was received by Georgia Power on July 23, 2018 in the amount of CONTRACTOR BID 1.Georgia Power Upfront Cost $23,206.00 Yearly Cost - $4,056.00 Financial Impact:Adequate funds are available and expenditure of this amount will leave sufficient funds for any emergencies that may arise before the end of the year. Alternatives:Do not approve and disregard proposal. Recommendation:Approve the installation of thirteen streetlights on Copse Drive $85.00 per year. This is also to approve a new lighting tax district for the 50 lots associated with the above road. Funds are Available in the Following Accounts: 276-04-1610-5312310 Cover Memo Item # 13 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 13 Engineering Services Committee Meeting 10/9/2018 1:20 PM Street Light Request Southampton Section 6 (Inverness Drive and Bellingham Department:Engineering (Traffic Engineering Division) Presenter:Hammed Malik Caption:Approve the installation of fourteen streetlights on Inverness Drive and Bellingham Drive $85.00 per year. This is also to approve a new lighting tax district for the 53 lots associated with the above roads. Requested by AED (Traffic). Background:Jefferson Energy Cooperative will install fourteen streetlights in the Southampton Subdivision on Inverness Drive and Bellingham Drive. The upfront cost of this installation is $6,869.52. The yearly cost for these lights will be $2,250.00 paid for by the 53 lots associated with these roads in a special taxing district to appear on the 2018 tax bill. The cost per lot added to the tax bill is $214.60 for the first year to cover up front cost and $85.00 per year thereafter to cover the cost of the light and maintenance. Analysis:The cost proposal was received by Jefferson Energy Cooperative on May 24, 2018 in the amount of: CONTRACTOR BID 1.Jefferson Energy Upfront Cost - $6,869.52 Yearly Cost - $2,250.00 Financial Impact:Adequate funds are available and expenditure of this amount will leave sufficient funds for any emergencies that may arise before the end of the year. Alternatives:Do not approve and disregard proposal. Recommendation:Approve the installation of fourteen streetlights on Inverness Drive and Bellingham Drive $85.00 per year. This is also to approve a new lighting tax district for the 53 lots associated with the above roads. 276-04-1610-5312310 Cover Memo Item # 14 Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 14 Engineering Services Committee Meeting 10/9/2018 1:20 PM Supplement to AUD Agreement for Collection Services Stormwater Utility Fee - Delinquent Accounts Department:Engineering Presenter: Caption:Authorize Addendum No 1 to CCI Contract Callers Inc. (CCI) Master Professional Services Agreement with Augusta Utilities Department (AUD), and approve Augusta Engineering Department (AED) entering into Collection Services Agreement with the CCI for Stormwater Utility Fee delinquent accounts collection as requested by AED. Background:Currently CCI Contract Callers Inc. is under contract with AUD for water & sewer accounts collection. AED is in need of similar services for stormwater utility (SWU) fee accounts collection. The purpose of this item is to supplement CCI Master Professional Services Agreement with AUD, and include AED as additional “client” for AED SWU accounts collection services and executing agreement for such collections. Analysis:CCI current agreement with AUD was reviewed and determined to be reasonable and cost effective for the type of services performed. Executing requested addendum and service agreement provide AED the needed mechanism for recovery of SWU balance fee designated delinquent accounts. Financial Impact:CCI will receive a fee of 25% on all monies collected on primary accounts place for collection. Alternatives:Do not approve and identify alternate options for recovery of SWU delinquent accounts. Recommendation:Authorize Addendum No 1 to CCI Contract Callers Inc. (CCI) Master Professional Services Agreement with Augusta Utilities Department (AUD), and Approve Augusta Engineering Department (AED) entering into Collection Services Agreement Cover Memo Item # 15 with the CCI for Stormwater Utility Fee delinquent accounts collection as requested by AED. Funds are Available in the Following Accounts: None REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 15 Augusta Stormwater Services Program Augusta Engineering Department Stormwater Utility Fee–Delinquencies and Collections Legal Authority: Stormwater Management Ordinance Section 5-1-18: Stormwater Services fee charge shall be declared delinquent if not paid within sixty (60) days of the date of billing. Delinquency occurs when a full payment is not made by the due date. Unpaid Fee Collection Policy and Process: A) Augusta Engineering Department Policy: If full payment is not received by the end of December of the current year, the unpaid balance will be certified by the Augusta Engineering Department (AED) and Finance and Administration Division, and record forwarded to the AED or AUD (Augusta Utilities Department) contracted collection agency for follow-up and additional collections efforts. For example: the 2017 stormwater utility fee must be paid by December 31, 2017 in order to avoid collection agency action. B) Augusta Engineering Department Process: AED adopted a three steps process for collection of unpaid stormwater fee charges. Step 1: Contact by Mail This is the initial step in the Account Balance Due Recovery Process. AED Stormwater Services Group reviews Delinquent Account Report as a part of their oversight. Review efforts routinely begin after an account has become 90 days delinquent. The customer is contacted by US Mail. An account-specific letter is generated with the intent to initiate dialogue with the account holder, answer any questions about user fee or the stormwater management program, and to see if AED can assist clearing the balance due and moving forward. Step 2: Contact by AED Stormwater Services Group This is an intermediate step in the Account Balance Due Recovery Process . Stormwater Services Group reviews the High-level Delinquent Account list (defined as accounts that have balances exceeding $1,000) and a Detailed Delinquent Report is generated as a part of their oversight. Collection efforts begin after 90 days of no response to Contact by Mail letter. Through available information within the city’s available databases (e.g. billing software, tax assessors office, etc.), attempts are made to contact the customer. If the customer is successfully contacted, attempts are made to address account holder concerns (if any) and collect the full amount of the balance due or to obtain a payment agreement. If current information is not available for successful contact of account holder, the account moves to Step 3. Step 3: Contact by Contracted Collection Agency This is final step in the Account Balance Due Recovery Process. This step is initiated after Steps 1 and 2 in the process have been unsuccessful. If full payment is not received by the end of December of the current year, the AED Stormwater Services Group reviews the High-level Delinquent Account list (defined as accounts that have balances exceeding $1,000), the unpaid balance is certified by the Augusta Engineering Department (AED) and Finance and Administration Division and record forwarded to on-contract collection agency for follow-up and additional collection efforts. The unpaid account is flagged as a “Write-off” account and is reset to “zero balance due” in the billing software for the next year. Augusta also can exercise option to get judgement from the court against responsible party for recovery of unpaid stormwater fee. Attachment number 1 \nPage 1 of 1 Item # 15 AGREEMENT FOR COLLECTION SERVICE This agreement for collection services is entered into this ___ of , _2018____, by and between CONTRACT CALLERS, INC. (hereinafter “agency”) and __Augusta Engineering Department _________________________. (hereinafter “client”). I. COLLECTION SERVICES AND PROCEDURES 1.1 Agency agrees to accept all accounts receivable (hereinafter “accounts”) referred to Agency by Client (Storm Water). It is expressly agreed that any and all Account information disclosed to Agency through placement of Accounts will remain in the strictest confidence and will not be disclosed to any other party without Client’s written authorization. 1.2 Agency will use reasonable efforts to collect Accounts referred by client. Agency agrees that it shall comply with all provisions of the Fair Debt Collection Practices Act (FDCPA) and all applicable state statutes. 1.3 Client authorizes agency to commence collection procedures when client provides Agency with the information pertaining to the account. Agency has determined that the following information constitutes the minimum necessary to perform the services of paragraph 1.2 hereof. Client is relying on Agency’s determination of the minimum information it requires hereunder. If, during performing services hereunder, Agency determines that it requires additional information from Client, Agency’s request for such additional information will be considered a representation by Agency that the requested information is reasonable and necessary for the performance of duties hereunder. The parties agree that the following information is reasonably necessary to effectuate services under this agreement: A. Name and address of the consumer and responsible party if different from consumer. B. Social Security Number for consumer and responsible party if different from consumer if available C. Date of Service on Accounts D. Balance Owed E. Phone number to contact consumer and type of telephone (mobile, POE, Home) F. Place of Employment if available 1.4 Client may withdraw any Account assigned to Agency at any time for any reason provided there is no active payment plan in effect. 501 Greene Street Suite 302 Augusta, GA 30901 Attachment number 2 \nPage 1 of 4 Item # 15 1.5 Agency will report all Accounts to Equifax, Experion, and Transunion if the Client selects this service by initialing here. ____ 1.6 Agency will promptly advise Client of any Account on which a notice of bankruptcy has been received. 1.7 Client will promptly advise Agency of any account on which a notice of bankruptcy has been received. 1.8 Client will promptly notify Agency of any payments that have been received by Client on Accounts that have been placed with Agency. 1.9 Client authorizes Agency to endorse negotiable instruments made payable to Client for purposes of depositing funds into Agency’s escrow account. 1.10 Client acknowledges that in connection with the collection of delinquent consumer debts, the FDCPA requires that an Agency provide the consumer with verification of the underlying obligation if that request is made to Agency, in writing, by the consumer within 30 days of our initial communication with the consumer. The law prohibits an Agency from collecting on any obligation once said verification has been requested, until such time as said verification has been mailed by the Agency to the consumer. Client acknowledges that in any situation in which it does not provide Agency with the requested verification; Agency can no longer legally attempt to collect on said account. In such case, Client acknowledges that the Agency will return said account to Client. 1.11 Client acknowledges that Agency will not be held liable for any payment that is returned unpaid from consumer’s bank. If Agency has already made payment to Client on said account, then Client agrees that Agency will be reimbursed the full amount. II. FEES FOR SERVICES 2.1 As full compensation for it services, Agency shall receive a contingency fee of ___25___% on all monies collected on “Primary Accounts” placed for collection. For this contract “Primary Accounts” shall be defined as all Accounts that have not been worked by another collection agency prior to being placed with Agency. III. REMITTANCES 3.1 Agency shall remit by the 20th of the month all monies collected during the preceding month and shall invoice Client with a statement summary. 501 Greene Street Suite 302 Augusta, GA 30901 Attachment number 2 \nPage 2 of 4 Item # 15 IV. REPORTING 4.1 Agency shall submit to Client an “Acknowledgement Report” of all Accounts received for collection within one week of receipt of Accounts. 4.2 Agency shall submit to Client a “Remittance Report” every month outlining all monies collected on Accounts. 4.3 Agency shall submit to Client a “Close Report” every month outlining all accounts that have been returned to Client. This report will include, but is not limited too bankruptcies, deceased, and Client recalls. V. COMPLIANCE 5.1 Agency agrees to collect Accounts in strict compliance with the Fair Debt Collection Practices Act (FDCPA). 5.2 Agency agrees to collect Accounts in strict compliance with all State Law. 5.3 Agency agrees to collect Accounts in strict compliance with all Local Laws. 5.4 Agency agrees to collect Accounts in strict compliance with all of the Clients’ guidelines and rules. VI. TERMS AND TERMINATION 6.1 The Term of this agreement shall become effective when both parties have signed said Agreement. The Agreement is for one year and will automatically renew each year on signature date. 6.2 Cancellation of Agreement can be made with a 90-day written notice by either Agency or Client. (a) This termination does not apply to any accounts where legal action has already been approved by Client and started by Agency or its’ agents. (b) This termination does not apply to any accounts where payment plans are in effect and Agency has received a payment in the previous 45 days. VII. INDEMNIFICATION 7.1 If the acts of employees, agents, designates, servants or representatives of Agency result in any legal action or suit be initiated against Client, Agency will accept full responsibility for defense of said action and payment of litigation expenses incurred in any resulting judgment. 7.2 Client agrees to accept full responsibility for any legal action or suit initiated against Agency if said suit or legal action is from the attempts to collect on an Account that has been determined to be a legally unenforceable debt. 501 Greene Street Suite 302 Augusta, GA 30901 Attachment number 2 \nPage 3 of 4 Item # 15 VIII. ASSIGNABILITY 8.1 This Agreement is not assignable by either party without the prior written consent of the other. IX. APPLICABLE LAW 9.1 The Laws of the State of Georgia shall govern this Agreement. If any provisions are deemed unenforceable all other provisions shall remain valid and in full effect. X. ENTIRE AGREEMENT 10.1 This Agreement constitutes the entire Agreement and understanding between the parties. Any prior Agreements, written and verbal, shall become null and void with the signing of this Agreement. XI. AMENDMENT 11.1 This Agreement or any of it provisions, may be modified or amended at any time during its term, but only by an amendment in writing, signed by both parties setting out such amendment or modification in full. In witness whereof, the parties have caused this agreement to be duly executed this _____________ of ___________________________. ___________________________ CONTRACT CALLERS, INC. BY: _______________________ BY: Title: ______________________ Title: VP of Special Operations Date: ____________ Date: 501 Greene Street Suite 302 Augusta, GA 30901 Attachment number 2 \nPage 4 of 4 Item # 15 ADDENDUM No. 1 TO MASTER PROFESSIONAL SERVICES AGREEMENT This Addendum No. 1 ("Addendum"), made effective as of , ("Effective Date"), is between the Augusta Engineering Department (referred to hereinafter as the “Client”) and Contract Callers Inc., (referred to hereinafter as “Agency”). WHEREAS, effective on October 29, 2001 Augusta Utilities Department and Agency entered into a Master Professional Services Agreement ("Agreement"); and, WHEREAS, client desires to more expressly set for the parties’ rights and obligations with respect to Customer Information (as defined below) and Consultant is agreeable to this; NOW THEREFORE, in consideration of mutual covenants and agreements set forth herein, the parties agree as follows: 1. Agency will accept accounts for collections from the Engineering Department of Augusta Georgia starting with the effective date of this agreement. 2. Except as expressly, or by clear implication, modified by this Addendum, all other terms and conditions of the Agreement are unchanged by this Addendum. 3. Agency will report accounts with balance as determined by the Client and up to Experian, Equifax and TransUnion. IN WITNESS WHEREOF, the parties have caused this Addendum to be executed by their duly authorized representatives as of the Effective Date. For purposes of this Addendum, signed copies shall be considered the same as signed originals of this Addendum. Client Agency By: _____________________________ By: Name: __________________________ Name: __ _________ Title: ___________________________ Title: _Vice President of Special Operations Date: ___________________________ Date: _ Attachment number 3 \nPage 1 of 1 Item # 15 Engineering Services Committee Meeting 10/9/2018 1:20 PM Wrightsboro Road Widening Improvements Project (Marks Church Road to Augusta West Parkway) Department:Engineering Presenter: Caption:Motion to approve entering into a Construction Contract Agreement with the Georgia Department of Transportation (GDOT) for the Wrightsboro Road Improvements (Marks Church Rd. to Augusta West Pkwy) Project (PI #015976) as requested by AED. Bid Item 18-127 Background:Wrightsboro Road Widening Improvements project is an approved SPLOST project. This project consists of roadway widening and intersection modifications for Wrightsboro Road from Augusta West Parkway to Marks Church Road. The widening will result in improvements to side roads, I-520 ramps, and various driveways within the project corridor. The proposed work will accommodate the addition of turn lanes, bicycle lanes, sidewalks, landscaped medians, traffic and pedestrian signals, and contraflow left turn lanes for improving the I-520 intersection. The contraflow left design for the two I-520 on- ramps will result in greater vehicle queuing length, thus improving traffic flow through the corridor. The project is under construction. Additional funds are needed to complete designed improvements while taking into consideration unknown field conditions, and Augusta Engineering Department requested funding assistance from GDOT. Analysis:Agreement allows GDOT funding assistance to complete roadway improvements as designed. Financial Impact:GDOT is providing $1M state funds to complete construction phase of the project. Alternatives:Do not approve and identify alternate funding source to complete the needed improvements.Cover Memo Item # 16 Recommendation:Motion to approve entering into a Construction Contract Agreement with the Georgia Department of Transportation (GDOT) for the Wrightsboro Road Improvements (Mark Church Rd. to Augusta West Pkwy) Project (PI #015976). Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 16 Attachment number 1 \nPage 1 of 38 Item # 16 Attachment number 1 \nPage 2 of 38 Item # 16 Attachment number 1 \nPage 3 of 38 Item # 16 Attachment number 1 \nPage 4 of 38 Item # 16 Attachment number 1 \nPage 5 of 38 Item # 16 Attachment number 1 \nPage 6 of 38 Item # 16 Attachment number 1 \nPage 7 of 38 Item # 16 Attachment number 1 \nPage 8 of 38 Item # 16 Attachment number 1 \nPage 9 of 38 Item # 16 Attachment number 1 \nPage 10 of 38 Item # 16 Attachment number 1 \nPage 11 of 38 Item # 16 Attachment number 1 \nPage 12 of 38 Item # 16 Attachment number 1 \nPage 13 of 38 Item # 16 Attachment number 1 \nPage 14 of 38 Item # 16 Attachment number 1 \nPage 15 of 38 Item # 16 Attachment number 1 \nPage 16 of 38 Item # 16 Attachment number 1 \nPage 17 of 38 Item # 16 Attachment number 1 \nPage 18 of 38 Item # 16 Attachment number 1 \nPage 19 of 38 Item # 16 Attachment number 1 \nPage 20 of 38 Item # 16 Attachment number 1 \nPage 21 of 38 Item # 16 Attachment number 1 \nPage 22 of 38 Item # 16 Attachment number 1 \nPage 23 of 38 Item # 16 Attachment number 1 \nPage 24 of 38 Item # 16 Attachment number 1 \nPage 25 of 38 Item # 16 Attachment number 1 \nPage 26 of 38 Item # 16 Attachment number 1 \nPage 27 of 38 Item # 16 Attachment number 1 \nPage 28 of 38 Item # 16 Attachment number 1 \nPage 29 of 38 Item # 16 Attachment number 1 \nPage 30 of 38 Item # 16 Attachment number 1 \nPage 31 of 38 Item # 16 Attachment number 1 \nPage 32 of 38 Item # 16 Attachment number 1 \nPage 33 of 38 Item # 16 Attachment number 1 \nPage 34 of 38 Item # 16 Attachment number 1 \nPage 35 of 38 Item # 16 Attachment number 1 \nPage 36 of 38 Item # 16 Attachment number 1 \nPage 37 of 38 Item # 16 Attachment number 1 \nPage 38 of 38 Item # 16