HomeMy WebLinkAbout2016-01-26-Meeting Agendawww.augustaga.gov
Engineering Services Committee
Meeting
Commission Chamber- 1/26/2016- 1:05 PM
ENGINEERING SERVICES
1.Motion to authorize condemnation to acquire title of a portion
of property for right of way and temporary construction
easement (Parcel 045-2-349-01-0) 1551 Laney Walker
Boulevard.
Attachments
2.Approve and receive as information the Emergency
Construction Services on the 1918 Colony Park Rd. Creek Bank
Eroding Repair in the amount of $64,751.67 to Blair
Construction, Inc., funded from SPLOST VI as requested by
AED.
Attachments
3.Motion to approve the minutes of the Engineering Services
Committee held on January 12, 2016.
Attachments
4.Authorize award of contract to Roofing Professionals, Inc., in
the amount of $144,900.00 to replace the roof on the AUD
Construction and Maintenance Buildings. (Bid Item 15-208)
Attachments
5.Discuss the development by Augusta, Georgia of an in-house
solar energy program. (Requested by Commissioner Hasan)
Attachments
Engineering Services Committee Meeting
1/26/2016 1:05 PM
Acquisition of right of way and temporary construction easement to Richmond County, Georgia from
RFW Enterprise, Inc.
Department:Engineering
Presenter:Traffic Engineering
Caption:Motion to authorize condemnation to acquire title of a portion of
property for right of way and temporary construction easement
(Parcel 045-2-349-01-0) 1551 Laney Walker Boulevard.
Background:The City has been unable to reach an agreement with the property
owner and therefore seeks to acquire title through condemnation
In order to proceed and avoid further project delays, it is necessary
to condemn a portion of subject property. The required property
consists of 66.13 square feet of right of way and 271.45 square
feet of temporary construction easement. The appraised value is
$950.00.
Analysis:Condemnation is necessary in order to acquire the required
property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available
in the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: G/L 371-041110-57.51110 J/L T13041219-
57.51110
REVIEWED AND APPROVED BY:
Finance.
Law.
Cover Memo
Item # 1
Administrator.
Clerk of Commission
Cover Memo
Item # 1
Item # 1
Engineering Services Committee Meeting
1/26/2016 1:05 PM
Emergency Construction Services - 1918 Colony Park Rd. Creek Bank Eroding Repair
Department:Engineering Department
Presenter:Abie L. Ladson, Director
Caption:Approve and receive as information the Emergency Construction
Services on the 1918 Colony Park Rd. Creek Bank Eroding Repair
in the amount of $64,751.67 to Blair Construction, Inc., funded
from SPLOST VI as requested by AED.
Background:This work was done under an emergency situation that warranted
timely response by the AED to minimize public exposure to
identified hazards, and also minimize the Augusta exposure to
potential liability. The Engineering Department did not have
sufficient in-house resources to complete all the required tasks in a
timely manner and has had to hire Blair Construction, Inc. for
assistance on an emergency basis
Analysis:Work was done under an emergency situation that warranted
timely response by the AED to minimize public exposure to
identified hazards,and also minimize the Augusta exposure to
potential liability. The Engineering Department did not have
sufficient in-house resources to complete all the required tasks in a
timely manner and has had to hire Blair Construction, Inc.
Financial Impact:Funds are available in the Emergency Construction Services
account.
Alternatives:1). Approve and receive as information the Emergency
Construction Services on the 1918 Colony Park Rd. Creek Bank
Eroding Repair in the amount of $64,751.67 to Blair Construction,
Inc., funded from Emergency Construction Services as requested
by AED. 2). Do not approve.
Recommendation:Approve Alternative Number One.
Funds are Available Cover Memo
Item # 2
in the Following
Accounts:Emergency Construction Services 328-041110-211828005
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 2
Attachment number 1 \nPage 1 of 17
Item # 2
Attachment number 1 \nPage 2 of 17
Item # 2
Attachment number 1 \nPage 3 of 17
Item # 2
Attachment number 1 \nPage 4 of 17
Item # 2
Attachment number 1 \nPage 5 of 17
Item # 2
Attachment number 1 \nPage 6 of 17
Item # 2
Attachment number 1 \nPage 7 of 17
Item # 2
Attachment number 1 \nPage 8 of 17
Item # 2
Attachment number 1 \nPage 9 of 17
Item # 2
Attachment number 1 \nPage 10 of 17
Item # 2
Attachment number 1 \nPage 11 of 17
Item # 2
Attachment number 1 \nPage 12 of 17
Item # 2
Attachment number 1 \nPage 13 of 17
Item # 2
Attachment number 1 \nPage 14 of 17
Item # 2
Attachment number 1 \nPage 15 of 17
Item # 2
Attachment number 1 \nPage 16 of 17
Item # 2
Attachment number 1 \nPage 17 of 17
Item # 2
Engineering Services Committee Meeting
1/26/2016 1:05 PM
Minutes
Department:Clerk of Commission
Presenter:
Caption:Motion to approve the minutes of the Engineering Services
Committee held on January 12, 2016.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 3
Attachment number 1 \nPage 1 of 4
Item # 3
Attachment number 1 \nPage 2 of 4
Item # 3
Attachment number 1 \nPage 3 of 4
Item # 3
Attachment number 1 \nPage 4 of 4
Item # 3
Engineering Services Committee Meeting
1/26/2016 1:05 PM
Roof Replacement for AUD Construction and Maintenance Buildings, Bid # 15-208
Department:Utilities Department
Presenter:Tom Wiedmeier
Caption:Authorize award of contract to Roofing Professionals, Inc., in the
amount of $144,900.00 to replace the roof on the AUD
Construction and Maintenance Buildings. (Bid Item 15-208)
Background:There have been several leaks repaired in both the AUD
Construction and Maintenance main office building and the
warehouse over the last 5 years. It was recommended to AUD by
the Facilities Maintenance Department to seek bids for total roof
replacements for both buildings. The bids sought were for the
main office building roof replacement, and an alternate bid for the
warehouse was included.
Analysis:We received bids from 3 qualified contractors with the lowest
bidder being Roofing Professionals, Inc. for both the main office
building and the warehouse.
Financial Impact:$144,900.00
Alternatives:No alternatives are recommended
Recommendation:Recommend awarding Roofing Professionals, Inc. the contract to
replace the C&M main office building roof and the warehouse
roof in the amount of $144,900.
Funds are Available
in the Following
Accounts:
506043410-5413120
REVIEWED AND APPROVED BY:Cover Memo
Item # 4
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 4
Attachment number 1 \nPage 1 of 1
Item # 4
Invitation To Bid
Sealed bids will be received at this office until Friday, September 25, 2015 at 11:00 a.m. for furnishing:
Bid Item 15-208 Roof Replacement for Construction & Maintenance Building for Utilities
Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
706-821-2422
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid.
Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street
– Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices
of Augusta, GA Procurement Department.
A Mandatory Pre Bid Conference will be held on Wednesday, September 9, 2015 @ 10:00 a.m. in the
Procurement Department 535 Telfair Street, Room 605, Augusta, GA 30901. A mandatory site visit will
follow.
All questions must be submitted in writing by fax to 706-821-2811 or by email to
procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday,
September 11, 2015 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand
delivered.
No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A
10% Bid bond is required to be submitted along with the bidders’ qualifications; a 100% performance
bond and a 100% payment bond will be required for award.
No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall
include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms
and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid
including, but not limited to, the number of copies needed, the timing of the submission, the required
financial data, and any other requirements designated by the Procurement Department are considered
material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All
requests to waive or modify any such material condition shall be submitted through the Procurement Director
to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia
Commission. Please mark BID number on the outside of the envelope.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed
the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle August 13, 20, 27, September 3, 2015
Metro Courier August 19, 2015
Revised: 1/8/2015
Attachment number 2 \nPage 1 of 1
Item # 4
Vendors
BONE DRY ROOFING
120 BEN BURTON ROAD
BOGART, GA 30622
ROOF PROF. INC
505 CDP INDUSTRIAL
BLVD
GROVETOWN, GA 30813
THOMSON ROOFING &
METAL CO.
2292 WASHINGTON
ROAD, P.O. BOX 185
THOMSON, GA 30824
PORTER ROOFING
CONTRACTORS INC
2454 NASHVILLE
HIGHWAY
MCMINNVILLE,
TN 37110
RDS CONST. LLC
3330 CUMBERLAND
PARKWAY SE.
SUITE 500
ATLANTA,
GA 30334
Original YES YES YES YES YES
4 Copies YES YES YES YES NO
Attachment B YES YES YES YES YES
Addendum # 1-3 YES YES YES NO
E-Verify # 230110 63141 698747 213560 507569
SAVE Form YES YES YES YES YES
Bid Bond YES YES YES YES YES
BASE PRICE $188,700.00 $61,950.00 $82,858.00
Add Alternate No. 1 $275,200.00 $82,950.00 $136,950.00
Total Number Specifications Mailed Out: 120
Pre-Bid Conference/Telephone Conference Attendees: 10
Total packages submitted: 5
Total Noncompliant: 2
Bid Opening
Bid Item #15-208
Roof Replacement for Construction & Maintenance Building
for Augusta, Georgia - Utilities Department
Bid Due: Friday, November 6, 2015 @ 11:00 a.m.
non-compliantnon-compliant
Page 1 of 1
Attachment number 3 \nPage 1 of 1
Item # 4
Attachment number 4 \nPage 1 of 2
Item # 4
Attachment number 4 \nPage 2 of 2
Item # 4
ENON HOPKINS ROOFING
789 ROCKY BRANCH
EVANS, GA 30809
MODERN ROOFING AND METAL WORK
1241 GORDON PARK ROAD
AUGUSTA, GA 30901
ROOF PROFESSIONALS INC
505 CDP INDUSTRIAL BLVD
GROVETOWN, GA 30813
THOMSON ROOFING & METAL CO.
P.O. BOX 185
THOMSON, GA 30824
BONE DRY ROOFING
120 BEN BARTON ROAD
BOGART, GA 30622
COMMERCIAL ROOF MANAGEMENT
125 TRADE STREET
BOGART, GA 30622
PORTER ROOFING CONTRACTORS INC
421ASH STRETT
MURFREESBORO, TN 37130
THOMSON ROFFING
2292 WASHINGTON ROAD
P.O. BOX 185
THOMSON, GA 30824
I & E SPECIALTIES, INC.
141 RIVERCHASE WAY
LEXINGTON, SC 29072
RPI
505 CDP INDUSTRIAL BLVD
GROVETOWN, GA 30813
YOUNGS ROOFING
311 PATRICK ST
MARTINEZ, GA 30907
Returned Mail
RDS CONSTRUCTION
2744 LYTHAM DRIVE
3330 Cumberland Parkway
CHARLOTTE, NC 28210
Atlanta, GA 30339
ROOF MANAGEMENT SERVICES
2803 WRIGHTSBORO RD. STE15-336,
AUGUSTA, GA 30909
COMMERCIAL ROOFING SPECIALTIES
INC
2703 PEACHTREE SQUARE
480 AIRPORT SOUTH PARKWAY
DORAVILLE , GEORGIA 30360
BONE DRY ROOFING
3066 DAMASCUS ROAD
AUGUSTA, GA 30909
Returned Mail
HBJ Enterprises
Attn: Henry Bryant
2124 Pepperidge Drive
Augusta, GA 30906
Tom Wiedmeier
Utilities Department
Deanna Davis
Utilities Department Joe Holland
Utilities Department
YVONNE GENTRY
LSBOP
Bid Item 15-208
Roof Replacement for Construction &
Maintenance Building
for Utilities Department
Bid Due: 25 Sept 2015 @ 11a.m.
Bid Item 15-208
Roof Replacement for Construction
& Maintenance Building
for Utilities Department
mailed 13 Aug 2015
Bid Item # 15-208
pg 1 of 1
Attachment number 5 \nPage 1 of 1
Item # 4
Engineering Services Committee Meeting
1/26/2016 1:05 PM
Solar Energy Program
Department:Clerk of Commission
Presenter:
Caption:Discuss the development by Augusta, Georgia of an in-house solar
energy program. (Requested by Commissioner Hasan)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 5