Loading...
HomeMy WebLinkAbout2015-10-27-Meeting Agenda Engineering Services Committee Meeting Commission Chamber- 10/27/2015- 1:10 PM ENGINEERING SERVICES 1. Consider a petition Mr. Douglas Jackson on behalf of residents of Shiloh subdivision, Lucie Street requesting the installation of speed bumps. Attachments 2. Motion to authorize condemnation to acquire title of a portion of property for right of way Parcel 052-0-049-00-0) 3802 Belair Road. Attachments 3. Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 059-3-407-00-0) 1567 M.L. King Jr. Blvd. Attachments 4. Motion to authorize condemnation to acquire title of a portion of property for permanent easement (Parcel 069-3-079-00-0) 3420 Milledgeville Road. Attachments 5. Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 059-4-092-00-0) 1526 Twiggs Street. Attachments 6. Motion to authorize condemnation to acquire title of a portion of property for right of way, permanent easement, and temporary driveway easement (Parcel 069-3-001-00-0) 3378 Milledgeville Road. Attachments 7. Motion to authorize condemnation to acquire title of a portion of property for right of way and temporary construction easement (Parcel 024-4-079-00-0) 702 Aumond Road. Attachments 8. Motion to authorize condemnation to acquire title of a portion of property for right of way and temporary construction easement (Parcel 024-4-038-00-0) 705 Aumond Road. Attachments 9. Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 053-0-018-00-0) 3629 Belair Road. Attachments 10. Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 059-2-559-00-0) 913 Wrightsboro Road. Attachments 11. Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 059-3-406-00-0) 1546 Picquet Avenue. Attachments 12. Consider approval of payment in the amount of $520,605.50 to reimburse GDOT for the bid amount to relocate AUD utilities in GDOT P.I. No. 245320 Windsor Spring Road Phase 5. Attachments 13. Consider proposal from McKim & Creed to perform RFP 15- 189 flow monitoring analysis of the Rock Creek Sanitary Sewer Basin. Attachments 14. Update from the Engineering Department staff regarding the new locations of the goats at secured ponds. (Referred from September 29 Engineering Services Committee) Attachments 15. Accept Economic Development Subcommittee recommendation for enhancements to James Brown Plaza Attachments 16. Consider approval of five year lease to upgrade Utilities Department GPS Equipment in the amount of $119,879.40. Attachments 17. Motion to approve the minutes of the Engineering Services Committee held on October 13, 2015. Attachments 18. Motion to authorize condemnation to acquire title of a portion of property for permanent easement (Parcel 069-3-079-00-0) 3420 Milledgeville Road. Attachments 19. Motion to consider the appeal from Margie Stokes of the denial of the petition from residents for the creation of a streetlight district along Peach Orchard Pass. (Requested by Commissioner Ben Hasan) Attachments www.augustaga.gov 20. Recommendation to award Bid Item #15-192 Fiber Optic Supplies. Attachments 21. Consider Awarding Bid #15-210 to Quality Stormwater Solutions in the amount of $53,978.00. Attachments Engineering Services Committee Meeting 10/27/2015 1:10 PM Speed Bumps Department: Caption:Consider a petition Mr. Douglas Jackson on behalf of residents of Shiloh subdivision, Lucie Street requesting the installation of speed bumps. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 1 3428Lucie Street Augusta, Georgia 30906 September 24,2A15 Commissioner William Locket Municipal Building 503 Greene Street Augusta, GA 30901 Commissioner Locket: We, the residents of Richmond County, the Shiloh sub-division, Lucie Street, respectfully submit this petition of signatures to your attention and ask the Commission to consider placing speed bumpers on our street. This request is being made based on the fact that cars and trucks routinely speed up and down the street which can cause a child, a senior citizen, or any person harm or injury if hit by these speeding vehicles. Hopefully by placing these speed bumpers on our street and by being proactive ratherthan reactive, we may decrease the probability of someone being injured. Attached is an enumerated list of signatures from residents who reside on Lucie Street who support having speed bumps placed on our street. Your support regarding this matter of concern is appreciated in advance. L--- /ol-aq6- / 7/D Attachment number 1 \nPage 1 of 4 Item # 1 Shiloh Sub-Division Augusta, Georgia 30906 Iuly 21,2015 Commissioners 530 Greene Stred Augusta, Georgia 30901 Commissioners: We, the signers and petitioners, who reside in the Shilo sub-division located in south Augusta, respectfully request that speed bumpers be placed in our neighborhood due to the excessive speed of motorists observed on a daily basis. Attachment number 1 \nPage 2 of 4 Item # 1 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 2L. 22. 23. 24. 25. Shilo-Sub-Divion Pelitioners 26. 27. 28. 29. 30. 31. 37. 33. 34- 35. 36. 37. 38. 39. 40. 47. 47.. 43. M. 45. 46. 47. 48. 49. 50. Attachment number 1 \nPage 3 of 4 Item # 1 Shilo-Sub-Divion 1. 7. 3. 4. 5. 6. 7. 8. 9. 27. 28. 2,9. 30. 3L. 32. 34. 35. \/36. t- ( 37. 38. 39. 40. ]-2. L3. L4. 15. 16. t7. 18. 19. 20. 2L. 22. 23., 4t. 42. 43.' Attachment number 1 \nPage 4 of 4 Item # 1 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of a Portion of Property for right of way to Richmond County, Georgia from John T. Carter (3802 Belair Road Parcel 052-0-049-00-0) Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way Parcel 052-0-049-00-0) 3802 Belair Road. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 364 square feet of Right-of Way. The appraised value is $901.00. The counter offer is $1200.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS G/L 323-041110-52.1211 J/L 201823332-52.12116 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Attachment number 1 \nPage 1 of 1 Item # 2 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of a Portion of Property for right of way to Richmond County, Georgia from Louise Tarver (1567 MLKing Jr. Blvd. Parcel 059-3-407-00-0) Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 059-3-407-00-0) 1567 M.L. King Jr. Blvd. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 0.094 acre of Right-of Way. The appraised value is $12,200.00. The counter offer is $150,000.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS G/L 32304110-52.12122 J/L 296823220-52.12116 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 3 Attachment number 1 \nPage 1 of 1 Item # 3 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of permanent easement to Richmond County, Ga at 3420 Milledgeville Road Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for permanent easement (Parcel 069-3-079-00-0) 3420 Milledgeville Road. Background:The City has been unable to reach an agreement with the property owner and therefore seeks to acquire title through condemnation In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 1,341.21 square feet of permanent easement. The appraised value is $675.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 328-041110-5411120 J/L 212828014-5411120 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Law Finance. Law. Cover Memo Item # 4 Administrator. Law Finance. Law. Administrator. Law Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Attachment number 1 \nPage 1 of 1 Item # 4 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of Property for right of way to Richmond County, Georgia from Edgar Brown- 1526 Twiggs Street (Parcel 059-4-092-00-0) Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 059-4-092-00-0) 1526 Twiggs Street. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 0.003 acre of Right-of Way. The appraised value is $1,100.00. Analysis:Condemnation is necessary in order to acquire the required property Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS G/L 3234110-52.12122 J/L 296823220-52.12116 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 5 Attachment number 1 \nPage 1 of 1 Item # 5 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of right of way & permanent easement, and temporary driveway easement to Richmond County, Ga from PR Odenton, LLC Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way, permanent easement, and temporary driveway easement (Parcel 069-3-001-00-0) 3378 Milledgeville Road. Background:The City has been unable to reach an agreement with the property owner and therefore seeks to acquire title through condemnation In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 2,159.56 square feet of right of way, 4,440.56 square feet of permanent easement, and 1,568.99 square feet of temporary driveway easement. The appraised value is $4,400.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 328-041110-5411120 J/L 212828014-5411120 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Cover Memo Item # 6 Clerk of Commission Cover Memo Item # 6 Attachment number 1 \nPage 1 of 1 Item # 6 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of right of way and temporary construction easement to Richmond County, Georgia from Cherry McPherson (702 Aumond Road). Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way and temporary construction easement (Parcel 024-4-079-00-0) 702 Aumond Road. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 743.01 square feet of right of way and 1,121.42 square feet of temporary construction easement. The appraised value is $3,925.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 328-041110-52.12122 J/L 212828014-52.12122 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 7 Attachment number 1 \nPage 1 of 1 Item # 7 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of right of way and temporary construction easement to Richmond County, Georgia from Lauren B. Stiefvater 705 Aumond Road . Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way and temporary construction easement (Parcel 024-4-038-00-0) 705 Aumond Road. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 678.16 square feet of right of way and 2,369.24 square feet of temporary construction easement. The appraised value is $4,175.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 328-041110-52.12122 J/L 212828014-52.12122 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 8 Attachment number 1 \nPage 1 of 1 Item # 8 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of Right of Way to Richmond County, Georgia from Charles Emmert- 3629 Belair Road Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 053-0-018-00-0) 3629 Belair Road. Background: Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 3,066 square feet of permanent construction Easement and 900 square feet of temporary construction Easement. The appraised value is $2,435.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS G/L 323-041110-52.1211 J/L 201823332-52.12116 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 9 Attachment number 1 \nPage 1 of 1 Item # 9 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of right of way to Richmond County, Georgia from Harry D. Moore (913 Wrightsboro Road Parcel 059-2-559-00-0) Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 059-2-559-00-0) 913 Wrightsboro Road. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 0.003 acre of Right-of Way. The appraised value is $1600.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS G/L 32304110-52.12122 J/L 296823220-52.12116 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 10 Attachment number 1 \nPage 1 of 1 Item # 10 Engineering Services Committee Meeting 10/27/2015 1:10 PM Acquisition of right of way to Richmond County, Georgia from James Dukes(1546 Picquet Ave Parcel 059-3- 406-00-0) Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way ( Parcel 059-3-406-00-0) 1546 Picquet Avenue. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 0.17 acres or 722 feet and Remainder 0.056 acre of Right-of Way, for a total of 0.226 acre. The appraised value is $7,100.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS G/L 32304110-52.12122 J/L 296823220-52.12116 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 11 Attachment number 1 \nPage 1 of 1 Item # 11 Engineering Services Committee Meeting 10/27/2015 1:10 PM Consider approval of payment in the amount of $520,605.50 to reimburse GDOT for the bid amount to relocate AUD utilities in GDOT P.I. No. 245320 Windsor Spring Road Phase 5. Department:Utilities Caption:Consider approval of payment in the amount of $520,605.50 to reimburse GDOT for the bid amount to relocate AUD utilities in GDOT P.I. No. 245320 Windsor Spring Road Phase 5. Background:Georgia Department of Transportation (GDOT) Windsor Spring Road Phase 5 (P.I. No. 245320) project widens C.R. 65/Windsor Spring Road from SR 88 to Willis Foreman Road. Augusta agreed to a Memorandum of Understanding (MOU) and Contract Item Agreement (CIA) with GDOT concerning the costs of relocating AUD water mains. Per the attached correspondence, GDOT has requested reimbursement from Augusta for the actual bid cost in the amount of $520,605.50. Purchase Order No. P244657 funds both Windsor Spring Road Phase 4 (P.I. No. 250610) and Windsor Spring Road Phase 5 (P.I. No. 245320). Per the attached summary, the remaining purchase order amount after the Phase 4 payment to GDOT is $160,913.56. Thus, the purchase order would need to increase by $359,691.94 to fund the Phase 5 project. Analysis:Augusta Utilities Department reviewed the utility relocation portion of the bid tabulation has found it acceptable. Therefore, we request approval of the payment in the amount of $520,605.50 to GDOT for AUD utility relocation in Windsor Spring Road Phase 5. Financial Impact:Additional funding in the amount of $359,691.94, available in the 2012 Bond Fund. Alternatives:No alternatives are recommended. Recommendation:Approve reimbursement payment to GDOT in the amount of $520,605.50. Approve additional funding in the amount of $359,691.94.Cover Memo Item # 12 Funds are Available in the Following Accounts: 512043410-5425110 / 80210208-5425110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 12 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 3 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 4 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 5 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 6 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 7 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 8 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 9 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 1 0 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 1 1 o f 1 1 It e m # 1 2 At t a c h m e n t n u m b e r 2 \ n P a g e 1 o f 8 It e m # 1 2 At t a c h m e n t n u m b e r 2 \ n P a g e 2 o f 8 It e m # 1 2 At t a c h m e n t n u m b e r 2 \ n P a g e 3 o f 8 It e m # 1 2 At t a c h m e n t n u m b e r 2 \ n P a g e 4 o f 8 It e m # 1 2 At t a c h m e n t n u m b e r 2 \ n P a g e 5 o f 8 It e m # 1 2 At t a c h m e n t n u m b e r 2 \ n P a g e 6 o f 8 It e m # 1 2 At t a c h m e n t n u m b e r 2 \ n P a g e 7 o f 8 It e m # 1 2 At t a c h m e n t n u m b e r 2 \ n P a g e 8 o f 8 It e m # 1 2 ...\dgn\245320-ph 5\245320urcv.dgn 4/2/2015 4:09:07 PM At t a c h m e n t n u m b e r 3 \ n P a g e 1 o f 1 It e m # 1 2 10/9/2015 Augusta Commission approval on 5/6/14 for: GDOT P.I. No. 250610 Windsor Spring Road Phase 4 Contract Item  Agreement (CIA) Non‐binding Pre‐bid Estimate $1,377,845.00 GDOT P.I. No. 245320 Windsor Spring Road Phase 5 Contract Item  Agreement (CIA) Non‐binding Pre‐bid Estimate $595,943.56 Purchase Order No. 244657 Amount $1,973,788.56 Augusta Commission approval on 11/4/14 for: Payment for GDOT Reimbursement for GDOT P.I. No. 250610 Windsor  Spring Road Phase 4 CIA Actual Bid Amount $1,812,875.00 Remaining Purchase Order No. 244657 Amount $160,913.56 Submission to Engineering Committee Meeting on 10/27/15 for: Payment request for GDOT Reimbursement for GDOT P.I. No. 245320  Windsor Spring Road Phase 5 CIA Actual Bid Amount $520,605.50 Remaining Purchase Order No. 244657 Amount ‐$359,691.94 $359,691.94  for AUD Utility Relocation for GDOT P.I. No. 250610 Windsor Spring Road Phase 4  Purchase Order Summary RESULTS:  Additional funding needed for Purchase Order No. 244657 is and GDOT P.I. No. 245320 Windsor Spring Road Phase 5  Attachment number 4 \nPage 1 of 1 Item # 12 Engineering Services Committee Meeting 10/27/2015 1:10 PM Consider proposal from McKim & Creed to perform RFP 15-189 flow monitoring analysis of the Rock Creek Sanitary Sewer Basin. Department:Utilities Caption:Consider proposal from McKim & Creed to perform RFP 15-189 flow monitoring analysis of the Rock Creek Sanitary Sewer Basin. Background:The Utilities Department continues to evaluate the existing sanitary sewer collection system to determine locations of excessive rainfall-derived inflow and infiltration (RD I/I). Reducing RD I/I entering the system improves the available sewer pipe transmission capacity as well as reduces the flow to the treatment plant. To perform these engineering services, RFP 15- 189 Infiltration and Inflow Investigation Through Flow Monitoring and Rain Gauging Services was issued, and McKim and Creed was selected. Previous RD I/I studies have identified significant RD I/I flow from the Rock Creek sanitary sewer basin. In accordance with RFP 15-189, McKim and Creed submitted the attached proposal to perform flow monitoring of the Rock Creek basin. Analysis:The Utilities Department has evaluated the McKim and Creed proposal and has determined the proposed fee of $32,750.00 to be reasonable based on the scope of work. Financial Impact:Funds are available in 512043420-5212115 / 80413008-5212115. Alternatives:No alternatives are recommended. Recommendation:We recommend approval for McKim and Creed to perform the RFP 15-189 Rock Creek flow monitoring analysis for a fee of $32,750.00. Funds are Available in the Following Accounts: Funds are Available in the Following Accounts: 512043420- 5212115 / 80413008-5212115 Cover Memo Item # 13 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 13 Preliminary Scoping Document City of Augusta – Utilities Department Rock Creek Sanitary Sewer Open Channel Flow Monitoring Date: October 5, 2015 (REV4)                 Prepared for: Augusta Utilities Department 360 Bay Street Suite 180, Augusta, GA 30901 Prepared by: McKim & Creed, Inc. 431 West 24th Street Norfolk, VA 23517 Attachment number 1 \nPage 1 of 6 Item # 13 Project Understanding It is understood that the City of Augusta Utilities Department, AUD, desires to evaluate the existing sanitary sewer collection/conveyance system within the Rock Creek service area in an effort to determine locations where excessive groundwater infiltration and storm water inflow, I/I, exists. The Rock Creek service area includes approximately 267,100 linear feet of gravity sewers ranging in size from 8” to 24”. To determine which areas within the service area are more prone to excessive I/I the wastewater collection system will be divided into multiple catchments and open channel flow monitors will be deployed in each catchment area. Rainfall gauging will be performed concurrently with the flow monitoring activity and wastewater flow volumes during wet weather periods will be compared to flow volumes established during dry weather periods to determine which portions of the collection system have the greatest levels of rainfall dependent I/I, RDI/I. Flow Monitoring Flow monitoring will include installation and maintenance of eight (8) open channel flow meters within the Rock Creek basin, as depicted by the attached map. The Rock Creek flow monitoring effort will provide information on sewer flows in the basin and assist in determining critical areas requiring further field investigations to determine the sources of RDI/I contribution. A. Sanitary Sewer Flow Monitoring 1. Project Kick-off Meeting with AUD staff. 2. Historical Data Collection – After receiving formal notice-to-proceed McKim & Creed staff members will obtain any legacy information that may pertain to the flow metering effort. Information may include, but not be limited to, previous monthly flow meter/rainfall gauging reports, collection system maps and pumping station records, if applicable. The Project Team shall review the existing information to provide a better understanding of historical conditions of the wastewater collection/conveyance system. The Project Team may also conduct interviews and discussions with AUD staff to gain better operational knowledge of the collection/conveyance systems and identify any known existing problem areas. 3. Mapping Preparation – AUD’s existing GIS will be utilized to develop an overall planimetric map that depicts the location of streets, property lines, buildings, political boundaries, wastewater infrastructure and topography. The prepared map will also identify the wastewater infrastructure that is within each flow meter basin as a means to calculate apparent groundwater infiltration, GWI, volumes based on inch-diameter-mile of gravity piping. Attachment number 1 \nPage 2 of 6 Item # 13 4. Flow Meter and Rainfall Gauge Installation – Eight (8) McKim & Creed flow meters and two (2) AUD rainfall gauges will be installed in the Rock Creek Sewershed. All equipment locations will be approved by AUD prior to installation. Flow monitoring and rainfall gauging will be performed for sixty (60) calendar days. 5. Flow Meter Maintenance – McKim & Creed staff will perform flow meter maintenance on a weekly basis. Each site will be visited to ensure that no conditions exist that could be detrimental to the recording and collection of quality flow data. During each site visit flow depth and velocity calibrations will be performed to ensure accurate readings are being obtained. Each flow meter/rainfall gauge will be programmed to record instantaneous measurements during fifteen (15) minute intervals and will also be checked twice daily remotely using McKim & Creed’s Telog Enterprise system. Any inconsistent data will warrant an additional site visit from the maintenance crew. 6. Flow Meter Data Retrieval – The data from McKim & Creed’s flow meters and AUD’s rainfall gauging equipment will be transferred daily to McKim & Creed’s Telog Enterprise server and AUD will be able to access and download the data through the Telog Enterprise web browser. While AUD will not be able to change any of the operational characteristics of the equipment, AUD will be able to monitor the flow parameters at every site and visualize the effects of wet weather events prior to receiving monthly flow monitoring summary reports from McKim & Creed. 7. Flow Data Analysis – The following identifies the analysis that will be performed for each of the 8 flow monitoring sites on a monthly basis. Data Analysis and Reporting Monthly reports shall contain charts, tables, hydrographs and figures demonstrating at a minimum, the following quantities and calculations:  ADF, Average Daily Flow  ABF, Average Base Flow, established during periods of dry weather.  ASF, Average Daily Sanitary Sewer Flow, determined by calculation  ASF = ABF - GWI  GWI, Non-Rainfall Groundwater Infiltration, estimated by analysis of early morning flows when the sanitary sewer contribution is very low. GWI will be calculated as 90 percent of the lowest recorded flow value after all upstream contributing flow has been subtracted.  MSF, Minimum Sanitary Flow, by calculation, MSF = 0.12*ASF.  MBF, Minimum Base Flow, by calculation, MBF = MSF + GWI.  Ratio of MBF/ABF.  Ratio of GWI/ABF.  Rainfall Amount and Intensity. Attachment number 1 \nPage 3 of 6 Item # 13  Rainfall Dependent Infiltration/Inflow, (RDI/I), directly resulting from rainfall.  RDI/I = Total Flow Volume – ABF  Peak RDI/I, maximum difference between the ABF and Total Flow hydrographs.  PHF, Peak Hour Flow  Peaking Factor = PHF/ADF  Peak 15-minute Flow Depth  Peak 15-minute Flow Velocity  Peak 15-minute Flow Volume  Current Full Pipe Capacity  Total Monthly Flow  Ratio of GWI/Inch-Diameter Miles of Upstream Contributing Sewer Mains for each meter basin. The McKim & Creed monthly flow monitoring reports, will be submitted and presented to AUD, and will include all of the data conditions presented above. Included in the monthly report will be raw 15 minute flow data, edited 15 minute flow data, (changes highlighted in yellow), and raw 15 minute rainfall data. In an effort to compress the abundance of 15 minute data, daily minimum, average and peak 24-hour flow rates as well as daily rainfall will be presented separately. The monthly flow/rain data will also be supplemented with hydrographs for each site that depict 24-hour dry weather flow, as well as, 24-hour flow rates recorded during wet weather events. The hydrographs will also include depiction of the magnitude and duration of each rainfall event. In an effort to isolate the impact RDI/I in each particular flow meter basin, upstream dry and wet weather flow volumes will be subtracted from the total volume measured at the metering point. 8. Technical Memorandum - Upon review and acceptance of all monthly reports McKim & Creed will prepare a Technical Memorandum, TM, describing the results of the flow monitoring/rainfall gauging effort. The TM will identify the same information provided in the monthly reports, as well as, summarizing the projected groundwater infiltration levels and the experienced RDI/I in each flow meter basin. Each flow meter basin will also be ranked on groundwater infiltration and RDI/I susceptibility, based on both pure volume and volume per gallons/inch diameter mile of piping. The basins with the highest RDI/I contribution will be recommended for additional evaluation. Additional evaluation may include night flow isolation, to determine groundwater infiltration sources, and smoke testing to identify RDI/I sources. McKim & Creed will provide the TM in draft form for AUD review and conduct a follow up review meeting to discuss findings, comments, additional field services and permanent flow meter recommendations. Attachment number 1 \nPage 4 of 6 Item # 13 Fee Schedule For the services outlined above, the McKim & Creed shall be compensated for the services as follows: Attachment number 1 \nPage 5 of 6 Item # 13 Attachment number 1 \nPage 6 of 6 Item # 13 Attachment number 2 \nPage 1 of 1 Item # 13 UTILITIES DEPARTMENT Tom Wiedmeier, P.E. Director MEMORANDUM Deanna Davis, P.E. Assistant Director DATE: TO: FROM: Septernber 9,2015 Geri A. Sams, Procurement Director Tom Wiedmeier, P.8., Utilities Director SUBJECT: RFP 15-189 Infiltration & Inflow Investigation, Flow Monitoring and Rain Gauging Services I concur with the Selection Board's evaluation and recommendation that McKim and Creed, Inc. perform the RFP 15-189Infiltration & Inflow Investigation, Flow Monitoring and Rain Gauging Services. AUD requests to enter into contract negotiations to clariff the terms of the proposal. Upon completion of the negotiation and Procurement's receipt of the required consultant's documents, AUD will submit a Muni-Agenda Item for Commission approval. 'fl1:F H'i{ti d3$ G'[.' Augusta Utilities Department 360 Bay Street, Suite 180 - Augusta, GA 30901 (706) 3124132 -Fax (706) 312-4133 WWW.AUGUSTAGA.GOV Attachment number 3 \nPage 1 of 2 Item # 13 Comulative Evaluation Sheet _ RFp ttem f15-lg9 lnfiltration & lnflow lnvestigation through Flow Monitoring & Rain Gauging Services for Augusta, Georgia - Utilities Department Thursday, July 9,ZOI;S @ 3:00 p.m. MCKIM & CREED, INC. GREG ANDERSON, PE 365 NORTHRIDGE ROAD, sulTE 200 ATLANTA GA 303flI WOOLPERT 375 NORTHRIDGE ROAD, sulTE 300 ATLANTA, GA 30350 w. K. DTCKSON & co. 1450 GREENE STREET AUGUSTA!GA 3O9OI Firms experience and performance onects of similar size and scope in thefive years Firms Quality Control, euatity Proiect Approach and Understanding Proposats: experience, refu rences and ,rTT:e? Hd 1}T d3S ST, - Attachment number 3 \nPage 2 of 2 Item # 13 W. K. DICKSON & CO. ATTN: WILLIAMS “TREY” WINGATE 1450 GREENE STREET AUGUSTA, GA 30901 CH2MHILL ATTN: BETSY MASSIE 1000 ABERNATHY ROAD ATLANTA, GA 30328 WOOLPERT ATTN: ERIC MCDONALD 375 NORTHRIDGE RD, #100 ATLANTA, GA 30350 ATTN: MIKE OSBORNE ATTN: MCKIM & CREED 8020 TOWER POINT DRIVE CHARLOTTE, NC 28227 MWH ATTN: DEBRA JAMES 230 PEACHTREE ST., S470 ATLANTA, GA RETURNED MAIL Updated Address Listed Below STEVEN BEHREND UTILITIES DEPARTMENT BAY STREET TOM WIEDMEIER UTILITIES DEPARTMENT BAY STREET DEANNA DAVIS UTILITIES DEPARTMENT BAY STREET YVONNE GENTRY LSBOP RFP 15-189 Infiltration & Inflow Investigation through Flow Monitoring & Rain Gauging Services Mailed: June 4, 2015 RFP 15-189 Infiltration & Inflow Investigation through Flow Monitoring & Rain Gauging Services For Utilities Department RFP Due: Fri. 6/26/15 @ 11:00 a.m. MWH ATTN: DOUG EDWARDS 235 PEACHTREE STREET NE SUITE 2200 ATLANTA, GA 30303 PAGE 1 OF 1 RFP 15-189 Attachment number 4 \nPage 1 of 1 Item # 13 Request for Proposal Request for Proposals will be received at this office until Friday, June 26, 2015 @ 11:00 a.m. for furnishing: RFP Item #15-189 Infiltration & Inflow Investigation through Flow Monitoring & Rain Gauging Services for Utilities Department RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, June 12, 2015, @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 60 days after time has been called on the date of opening. Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Revised: 1/12/2015 Attachment number 5 \nPage 1 of 1 Item # 13 VENDORS Attachment B E-Verify # SAVE Form Fee Proposal Original 7 Copies MCKIM & CREED, INC. GREG ANDERSON, PE 365 NORTHRIDGE ROAD, SUITE 200 ATLANTA GA 30350 YES 68813 YES YES YES YES WOOLPERT 375 NORTHRIDGE ROAD, SUITE 300 ATLANTA, GA 30350 YES 636331 YES YES YES YES W. K. DICKSON & CO. 1450 GREENE STREET AUGUSTA, GA 30901 YES 110665 YES YES YES YES Proposal Opening RFP Item #15-189 Infiltration & Inflow Investigation through Flow Monitoring & Rain Gauging Services for Augusta, Georgia - Utilities Department RFP Due: Friday, June 26, 2015 @ 11:00 a.m. Total Number Specifications Mailed Out: 6 Total Number Specifications Download (Demandstar): N/A Total Electronic Notifications (Demandstar): N/A Mandatory Pre-proposal/Telephone Conference Attendees: N/A Total packages submitted: 3 Total Noncompliant: 0 Page 1 of 1 Attachment number 6 \nPage 1 of 1 Item # 13 Request for Proposal Request for Proposals will be received at this office until Friday, June 26, 2015 @ 11:00 a.m. for furnishing: RFP Item #15-189 Infiltration & Inflow Investigation through Flow Monitoring & Rain Gauging Services for Utilities Department RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, June 12, 2015, @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 60 days after time has been called on the date of opening. Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Revised: 1/12/2015 Attachment number 7 \nPage 1 of 1 Item # 13 Evaluation Criteria PTS MCKIM & CREED, INC. GREG ANDERSON, PE 365 NORTHRIDGE ROAD, SUITE 200 ATLANTA GA 30350 WOOLPERT 375 NORTHRIDGE ROAD, SUITE 300 ATLANTA, GA 30350 W. K. DICKSON & CO. 1450 GREENE STREET AUGUSTA, GA 30901 1 Firms experience and performance on projects of similar size and scope in the last five years 25 23 23 24 2. Firms Quality Control, Quality Assurance and Project Tracking 25 23 19 22 3 Project Approach and Understanding 25 24 23 22 4 Proposals: experience, references and availability of Key Staff 25 24 19 21 Total 100 92 83 89 Comulative Evaluation Sheet - RFP Item #15-189 Infiltration & Inflow Investigation through Flow Monitoring & Rain Gauging Services for Augusta, Georgia - Utilities Department Thursday, July 9, 2015 @ 3:00 p.m. Attachment number 8 \nPage 1 of 1 Item # 13 Engineering Services Committee Meeting 10/27/2015 1:10 PM Goat Program Department:Clerk of Commission Caption:Update from the Engineering Department staff regarding the new locations of the goats at secured ponds. (Referred from September 29 Engineering Services Committee) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 14 Engineering Services Committee Meeting 10/27/2015 1:10 PM James Brown Plaza enhancements Department:Engineering Caption:Accept Economic Development Subcommittee recommendation for enhancements to James Brown Plaza Background:The Economic Development Subcommittee has been discussing improvements to the landscaping, lighting and hardscape features at the James Brown plaza downtown. Analysis:The Cooper Carry engineering firm has prepared preliminary plans and recommendations for landscaping, lighting and hardscape features, and proposed exhibits that highlight important information related to James Brown’s legacy. The Subcommittee is recommending these improvements be authorized by the Augusta Commission, for implementation by the Engineering Department within existing public rights-of-way. Financial Impact:Engineering is preparing cost estimates for these improvements. Alternatives:Defer changes to existing landscape, lighting and hardscape features at the plaza. Recommendation:Accept the Economic Development Subcommittee recommendation for enhancements to James Brown plaza and authorize the Engineering department to proceed with installation once we have firm cost estimates and an identified funding source. Funds are Available in the Following Accounts: To be determined. REVIEWED AND APPROVED BY: Finance. Cover Memo Item # 15 Law. Administrator. Clerk of Commission Cover Memo Item # 15 Engineering Services Committee Meeting 10/27/2015 1:10 PM Leasing Contract to upgrade Utilities Department GPS Equipment Department:Utilities Caption:Consider approval of five year lease to upgrade Utilities Department GPS Equipment in the amount of $119,879.40. Background:The Augusta Utilities Department currently owns one Trimble survey grade GPS unit. This single unit serves the needs of the AUD Engineering Department to support Utilities Engineering design functions for Augusta-Richmond County and our Fort Gordon Operations as well as our GIS / water and wastewater infrastructure asset management programs. This survey grade unit provides three dimensional centimeter accuracy. AUD currently owns and operates seven "mapping grade" units to support our GIS functions, Engineering functions and Fort Gordon Operations. However, these seven units only provide 3 meter accuracy and two dimensional coordinate capabilities. Analysis:With only one survey grade unit to support our operations across the County and at Fort Gordon, AUD is limited in the accuracy of the data we can obtain from our current mapping grade GPS units. In order to gain greater accuracy for our engineering and mapping requirements, AUD is proposing to upgrade and replace our seven GPS mapping grade units to survey grade GPS units capable of three dimensional centimeter accuracy. In addition we would like to add two additional survey grade units and dedicate their use to serve Fort Gordon. The cost of the two units for Fort Gordon would be reimbursable via our contract with the Federal Government. AUD has used Trimble GPS units for over 10 years. In order to maintain standardization of equipment and avoid additional training costs, we are recommending and requesting to lease the new nine Trimble survey grade GPS units in the attached quote from Navigation Electronics, Inc. (NEI). NEI is the sole authorized dealer for Trimble Mapping /GIS Solutions for the state of Georgia. The attached lease contract is for 5 years. The 60 month lease provides all warranty, software upgrades and software licensing for the survey grade GPS units. At the conclusion of the lease contract, AUD has the option to purchase each unit for $1.00.Cover Memo Item # 16 Financial Impact:Monthly lease cost is $1,998.29; total for five year contract is $119,897.40. Alternatives:The Commission could elect to not approve this lease. Recommendation:We recommend approval of a 60 month lease contract with NEI. Funds are Available in the Following Accounts: Funds are available in 506043110-5224219 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 16 Attachment number 1 \nPage 1 of 5 Item # 16 Attachment number 1 \nPage 2 of 5 Item # 16 Attachment number 1 \nPage 3 of 5 Item # 16 Attachment number 1 \nPage 4 of 5 Item # 16 Attachment number 1 \nPage 5 of 5 Item # 16 Attachment number 2 \nPage 1 of 1 Item # 16 Attachment number 3 \nPage 1 of 1 Item # 16 Attachment number 4 \nPage 1 of 1 Item # 16 Engineering Services Committee Meeting 10/27/2015 1:10 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Engineering Services Committee held on October 13, 2015. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 17 Engineering Services Committee Meeting 10/27/2015 1:10 PM Motion to authorize condemnation to acquire title of a portion of property for permanent easement (Parcel 069-3-079-00-0) 3420 Milledgeville Road. Department:LAW Caption:Motion to authorize condemnation to acquire title of a portion of property for permanent easement (Parcel 069-3-079-00-0) 3420 Milledgeville Road. Background:The City has been unable to reach an agreement with the property owner and therefore seeks to acquire title through condemnation In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 1,341.21 square feet of permanent easement. The appraised value is $675.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 328-041110-5411120 J/L 212828014-5411120 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 18 Engineering Services Committee Meeting 10/27/2015 1:10 PM Peach Blossom Street Lights Department: Caption:Motion to consider the appeal from Margie Stokes of the denial of the petition from residents for the creation of a streetlight district along Peach Orchard Pass. (Requested by Commissioner Ben Hasan) Background:Peach Orchard Pass is an approximately 1800-foot residential street located within The Orchard subdivision off of Brown Road. Along Peach Blossom Pass, there are 41 residential lots, however, only 19 lots have been developed since the first house was constructed in 2008. When development of The Orchard first commenced, the developer created and had approved a streetlight district along the first two roads constructed within the subdivision: Orchard Drive and Sunny Day Drive. Future plans of expansion of the streetlight district would then occur as the subdivision expanded through petitions from the residents of the new streets. However, residential lots along Peach Orchard Pass have been slow to develop with only 19 of the 41 lots being developed since 2008. This has resulted in frustration from residents along Peach Orchard Pass because Augusta’s Streetlight Policy requires that owners of 50% of the street’s roadside frontage agree, through petition, of the creation of the streetlight district. Because the 19 developed lots along Peach Orchard Pass only account for approximately 35% of the total frontage, even 100% support from owner’s of the occupied lots along the street would result in the denial of the district creation. To that end, a petition for the creation of a streetlight district along Peach Orchard Pass that had signatures from 15 of the 19 was received by Traffic Engineering on or about September 30, 2015 and, for the reasons stated above, a letter of denial was sent on October 1, 2015. Subsequently and in accordance with Augusta’s Streetlight Policy, a letter was received by Traffic Engineering from Margie Stokes of 2305 Peach Blossom Pass for the purpose of appealing this decision to the Augusta Commission. Additionally, to allow for transparency and to allow all property owners the ability to express their support or lack thereof, a letter was mailed from Traffic Engineering to all property owners along Cover Memo Item # 19 Peach Blossom Pass informing them of the appeal and dates on which the appeal will be heard. Analysis:Currently, street lighting is non-existent along Peach Blossom Pass and has been shown to be an effective measure to improve pedestrian and vehicle safety as well as crime prevention. For these reasons, the majority of the residents along the street are left frustrated due to the lack of movement in the creation of a street light district for reasons beyond their control. Financial Impact:Street lighting districts are funded through a self-supporting fund. Street lighting charges to individual property owners vary based on property frontage. For the proposed street light district, residents will be charged $0.95/foot Alternatives:1)Approve the appeal and direct Traffic Engineering to create a street light district for Peach Blossom Pass. 2) Do not approve. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 19 ENGINEERING DEPARTMENT To: From cc: Date: RE: Abie L, Ladson, P.E. Director Memorandum Peach Blossom Pass Resi Steven J. Cassell, PE, Assistant Director - Traffic Section Janice Allen Jackson, Administrator Ted Rhinehart, Deputy Administrator Wayne Brown, Deputy General Counsel Augusta Commissioners October 15,2015 Peach Blossom Road Sheetlight Distict Appeal Steyen J. Cassell, PD, PTOE Assistant Director Traffc Eneinceriaq Dear Resident, On Septernber 23,2015, a petition was received by the Traffic Engineering office from residents along Peach Blossom Pass for the purpose of creating a new streetlight district. While this potition was successful in obtaining signatures from ovvners of 15 of the 19 and 74Yo of the total frontage of the developed lots along the street, the petition f-ailed to achieve the required 50% of the totalfrontage of alllots along the street as required by city code. 'Iherefore, this petition was denied by the Traffic Engineering 0ffice. To that end and in accordance with city code, an appeal was filed with the Augusta Commission througlr the Traffic Engineering Office on October 2,2015. If successful, this appeal will result in the creation bf a streetlight district along Peach Blossom Pass and each lot, developed or not, will be assessed an aunual streetlight fee at $0.95/foot of frontage. Based on this rate, tle assessment of each individual lot will vary from a high of approximately $160.00 to a low of approximately $48.00 with an average assessment of approxirnately $84.00. The purpose of this memorandum is to inform you that this appeal will be hoard beforo the Augusta Englneering Services Commiffee on October 27,2015 at approximately 1:00 pm and before the Augusta Commissiou on November3,2015 at 2:00 pm. The looation for both of these meetings will be in the Lee Beard Commission Chambers in the Augusta-Richmond County Municipal Building located at 535 Tellhir Street, Augusta, Georgia 30901. Each resident/property owner is strongly encouraged to attend one or both ofthese meetings to express their support or lack ofsupport for this appoal and allow the commission to make an informed decision in taking action upon this appeal. In the intervening time, if you should have any questions about this appeal or the streetlight program as awhole, please foel frce to contact the Traffic Engineering office Lt (706) 82l-1.850. Tralfic Engineering Section 50TTelfair Slreet - Augustq cA 30901 (706) 82 l -l 850 - Fax (706) 82t-1724 WWW.AUCUSTAGA.GOV Attachment number 1 \nPage 1 of 8 Item # 19 ENGINEERING DEPARTMENT Stcven J. C*srell, P.8., PT0EAbie L. Ladron, P.E. Direstor Assistant Dircctor Tlaf6o Engineering October 1,2015 Margre Stokes 2305 Peach Blossom Pass Hephziball Georgia 308 I 5 RE: Neighborhood skeet lighting request Ms. Stokes: We have received the petition request from you regarding the installation of street lights on Peaclr Blossom Pass dated Septernber 23,2015. Acmrding to our records there are 37 lots which would be included within the proposed new steet light distict and your submiued petition has 15 signatures in support of adding street lights. The County policy requires at least 50% of the property owners to be in agreemelrt with adding the additional cost of steet lighting to their annual tax bill before we can epprovo the request. Therefore, based on the submitted petition at this time we are unable to take this forward to the Board of Commissioner's for thsir approval. Within the Corurty policy there is provision to appeal this disappmval direotly to the Board of Commissioner's provided that the appeal is rec.eived within thirty (30) days after receipt of this notice. If you should w"ish to make an appeal, please send a letter of request stating such to: Steve Cassell, Assistaat Director Engineering Departrrent Building 4000 535 Telfair St Augusta, GA 30901 If you should have any questions or need any assistance, please contact me. ""rMl Clen Bollinfer, Traffic Engineering Manager Tnfrc EngineednS Sectio a 535 Tclfair, BIdg 5000, Srect - August4 CA 30901 (706) Ezl - I 841 - Far. (106) EZt -1724 WWW.AUCUSTAGA.GOV Attachment number 1 \nPage 2 of 8 Item # 19 :u6(5\ "' lf lighting fixtures of a lYPe other than those ln the clisslfi- catlonofstreetorroodrraylumlnalrEsaretobeusedorli.the proposed llghtlng is to be fbi other than d.rives' parkiilg areas or other simlrar area. lightingr" the plans and specifications cubmittedwlllbesufficientlydetailedtoclearlyshov'lthatsuch -*nl ilrnia bri th these standardt and ri t I nota ProPosal is in conPliancs with ' Gaugc a hazard t6, or interfere with' ihe normal use of the public strcets, roads or highwaYs' Anv dis the Richmond c"@ a I ight the Riclimond CountYl 0eorgia,or I lshting system 'nay EjPPealed to Board of Corrnisslo@ appeal is filed with the Board "t t*.;ners wit t- apiroval or changi':;Jli' ;' I >) u..ffi-AsaPre.cautiona9ainstimproFer5trGetlightin9 andinordertoassurefullcontroloverst,reetli.ghting,itisrecfimended that the Richrpnd CountY Co"'ission adopt the following resolution: - .i .--.-*L(\ 3E 1T REsoLvED TIIAT: No I i'ghting f lxtures w[l t be instal led' 1f)r'n '1- operatei or maintained rerthrn the rights,:of-way of any pubilc street,road'hlghxay'alleyorsidewalkwithlntheunlncor* 'poratedareaofRictmondCounty'Georgia'orfixedtoanY pole, standard or other supPorting device which Is located ithinsuchrights-of-wa1'unlesssuchfixturesconforma5 ao toa"tion, instcllation, equipment, oPeration and nainte' nance'' to the Roadway and Strcet Lighting itandards and Procedur:s establ ished by the Board' of Cqrrnissioners of -'t;;:' ''o"tt'' Georgla' Fixtures iocated outside of the -t2- Attachment number 1 \nPage 3 of 8 Item # 19 :li':i.:r.:i:..,,,.,.:7 Upon considering these foetors conditions, it bcccmas obvious are out of the question. and the constant changes of topographic that. predetermlned strect I ight dis.tricts tt Is reiormsnded tlat in order to Preserve the equality of every- gners. voice ln whether or not street lights should be lnstalled.ln a distrlct, the petitlon should be based on street':ide footaga raqer than on a populrtlon basis.. ln grder t'o obtaln street Ilghts in any district, the rasidents should circulate a patition throughout that dis- trict obtaining the signatures of the pr_gp-erty gglgj!, not tenants, who -, - r..r..- -tu\t/{ ouln f!.f.!y-,?gcent (50fl} or more of the street,side footage tn that dls- tri'ct. Tha actual slze of a dlstrlct will be determlned by the-iumber .of signatsres and area covered by the petition. Hsdever, all strset Iight'distrlct boundaries will be decided by the Street Light Coordinator. Eqggv,gy an{.,!itreqt Ligllltinq Jtal!|"?rds-a}d Prosedures - The fol Ia,tring standards ond procedures should'be adopted by the Conrmission prior to the lnitlation of the program: .'fpte | . The responslbi'l ity for providing street I ighting for the publ ic streets, roads, highways, sidbwalks and alleys in the unincorporated .area of dichmond Countyr Georgia, rests wlth the Board of Cormlssioners of Richmond County, Georgla. llq street or roadway.lighting of the' -public strects, rbads, highways, s'ldcwalks or alleys In the unlncor- porated arga of Richmond County, Georgla, is permltted unlesi pro- vided for'by the Eoard of Conmissloners of Richmond County, Georgia. .rs*'r(s) 2,thg fimerican Stendard Practlce for Roadway lighttng, as.sponsored by the lllumlnatlqg Engineering Society and approved by the Ameriean Standards Association, will be used as standards for installation -t0- Attachment number 1 \nPage 4 of 8 Item # 19 October 2,2015 Steve Cassell, Assistant Director [.,.-i-. ,. r, ' : '.. i' i". Engineering Deparhent Building 400053srefairst Wf -62015 Augusta, GA 30901 f, ,.....11 RE: Neighborhood steet lighting request Mr. Cassell: I am submitting this appeal letter in response to your recflrt disapproval of our request for street lights on Peach Blossom Pass. Yes sr, the 15 signatures that we provided are ofthe 19 property owners on our steet, The remainder of the lots are either empty oe$y built homes or empty lots. We ask that you please reconsider our request. It is extremely dark in our area. This poses mnjor safety concems such as not being able to adequately see when we entef and exit our homes. Our children have to walk under these conditions to get to the bus stop located in the front of the suMivision. We are very concerned that this may entice the acts of the& vandalism, vagrancy and any otler mlavrful act. We the homeowners on Peach Blossom Pass are at a great disadvantage without adequate lighting. Thank you in advance for all of your assistance. Hepbzibah, Ga30815 Attachment number 1 \nPage 5 of 8 Item # 19 pq r0a PETITION TOR INSTALLING STREET LIGHTS RICHMOND COUNTY, GEORGIA TO THE COMMISSION4OUNCIL The undersigrred owncrs of p,roperty in Street Light Disric tNo, r'// -* hereby requsst the Comnission4ourcil to contrast with the Jcffarson Elecric Compani foi ru instatlation ancl scrvicing of stred lights on all streets ia the District. It is wderstood that the annual cost of servicing will be assessed against ttre abufling property at thc rate of ninety-firrc cents (.95) per front foot per pr subject !o futurc furgdtublic Scrvice Commission approved rarc adjusunents and in accordance with computatiou procedures outtined in the Street Lightirg Pmgram general information aheet. This pctition shows that thc owncrs of ovor fiffy percem (507o) of thc properry to be affccted hereby join in this request. ,*, u1..3Qd *r*.5dt,,,.fu<, ,*jg- Addtesr of Attachment number 1 \nPage 6 of 8 Item # 19 ILIGHTS H AtE RICHMOI{D COUNTY, GEORGIA TOTHE COMMISSION-COUNCIL r Thc undcnigncd owners of propcrty in Srrea LieUr lisrrig tNo. - /ff hacby request thecommissioa{ouncil tocontra& wittr tbrefrerson.Eqti; c;ffiforG6.ax#;;;;icingof srreettights on all streets in the District. lt ir uoi"*tood that the *orut-# orr"ririrg will be assessd against theabuttins propcrtyat thc retc ornircty'6[ r*r, r.ry1 p* e"" f*;*pr.ycar subject to future GcorgiaRrbricservice commission approved ot" nqirutoumt "ru io rcc"ruaoc" J*i "o*p,rt tioo procodures outlined in thcShea Lighting program gerreral informafim slc*. ff#*'- shows that thc owrcrs of over fiftypuccfli (50%) ofthcpropcrty to be affecred lre.rebyjoin in rhis rhi- Q)fM d,"* -20*le_. Addrcrs 0f Frcnt I-t. Attachment number 1 \nPage 7 of 8 Item # 19 l/| *--e" # / w ) Attachment number 1 \nPage 8 of 8 Item # 19 Engineering Services Committee Meeting 10/27/2015 1:10 PM Recommendation to award Bid Item #15-192 Fiber Optic Supplies. Department:Utilities Caption:Recommendation to award Bid Item #15-192 Fiber Optic Supplies. Background:With the approval of the Commission, the Utilities Department has established a fiber installation and maintenance crew for the purpose of interconnecting our various sites and devices while allowing us to control outside access to the system. We have also committed to preform fiber installation and maintenance for other departments within the consolidated government as resources are available. We have found that the demand for the fiber and associated materials is very high and our ability to obtain best pricing is limited if we purchase material on a project-by-project basis. We prepared a specification for the materials that we use and the Procurement Department advertised and received bids for Fiber Optic Supplies (Bid Item #15-192). Analysis:We received two qualified bids which meet all of our requirements. The lowest qualified bidder is Georgia Underground & Supply, Inc. The total cost for the requested quantities is $697,297.56. A copy of the bid tabulation and our recommendation memo are attached. Budgeted funds are available in account 506043580-5424910. Financial Impact:$697,297.56 from Budget Account 506043580-5424910 Alternatives:Purchase material on a per project basis (not recommended) Recommendation:Award Bid Item #15-192 Fiber Optic Supplies to the low bidder, Georgia Underground & Supplies, Inc., at a total cost of $697,297.56. Funds are Available in the Following Accounts: 506043580-5424910 Cover Memo Item # 20 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 20 UTILITIES DEPARTMENT Tom Wiedmeler Director MEMORANDUM TO: FROM: DATE: Geri Sams Director - Procurement Department Tom Wiedmeier, Director - Augusta Utilities Department Date: f/"ft'/---------------- Augusta Utilities Administration 360 Eay Street * Suito I E0 - Augusta, OA 30901 (706) 3t24154 - Fax (706) 3 t24t23 WWW.AUGUSTAGA.GOV SUBJECT: BID RECOMMENDATTON (20 l 5) August 19,2015 Attached is the Bid Tabulation Sheet for Bid Item #l ,Jf*rT*ric Supplies. It is our recommendation that this bid be awarded to Georgia Underground & Supply, Inc. We have reviewed the bids submitted by the five compliant vendors. l. We would like to disqualifu two of the bids (Utilicom Supply and Power & Telephone Supply) because they did not send supporting specifications for our review. Bid Page 6, Section 2.10 requires that they send a Description of Material: ...."copies of detailed factory specifications, rating, technical data..." These vendors only listed the manufacturer or model number of the items they bid.2. We would also like to disqualifo a third company (VOCOM International). They sent one spec sheet titled "Optical Fiber Cable". It is not clear if this is the Specification Sheet is for ltem I or Item 2. 3. Vocom also only bid on two items (the first two). Their "Exception Sheet" noted that they were bidding on only the two items based on Page 6, Section 2.7 "Bids for all or Part.o' However, the paragraph further states "Unless otherwise specified by Augusta, GA'o...we did specifu within the bid on page 21, next to last paragraph, "Award will be made as a whole to one bidder."4. Vocom can be funher disqualified due to their specs stating that their product has a'Jelly-filled core". Our specifications for ltem #2 indicates "96 Fiber SM Gel Free Cable". 5. The two remaining vendors, Georgia Underground & Supply and Mayer Electric Supply both meet the specifications for all of the items within the bid.6. Georgia Underground has quoted the lowest prices for most of the items. Based on the estimated quantities to be purchased, Georgia Underground is the lowest bid. We recommend the bid be awarded to Georgia Underground. Thank you! -G^D. (J.) Recommended by: Tom Wiedmeier, Director CC: Steve Little, CPA, Assistant Director-Finance & Administration Allen Saxon, Assistant Director-Facilities WaterAVastewater Stephen Orton, Maintenance Superintendent Ellie Hazel, Administrative Services Manager Attachment number 1 \nPage 1 of 1 Item # 20 Invitation To Bid Sealed bids will be received at this office until Friday, July 24, 2015 at 11:00 a.m. for furnishing: Bid Item 15-192 Fiber Optic Supplies for Utilities Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing by fax to 706-821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, July 10, 2015 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference an eligible bidder must submit a completed and signed written application to become a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project. An eligible bidder who fails to submit an application for approval as a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project, and who otherwise meets the requirements for approval as a local bidder, will not be qualified for a bid preference on such eligible local project. No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle June 18, 25, July 2, 9, 2015 Metro Courier June 24, 2015 Revised: 1/8/2015 Attachment number 2 \nPage 1 of 1 Item # 20 VENDORS VOCOM INTERNATIONAL TELECOMMUNICATIO N INC 8453 MISSION DR ROSEMEAD CA 91770 UTILICOM SUPPLY ASSOCIATES, LLC 4400 SHACKLEFORD RD NORCROSS, GA 30093 GEORGIA UNDERGROUND & SUPPLY, INC 5158-G KENNEDY RD FOREST PARK, GA 30297 POWER & TELEPHONE SUPPLY CO. 2668 YALE AVE MEMPHIS, TN 38112 MAYER ELECTRIC SUPPLY CO. INC 1259 AUGUSTA WEST PARKWAY AUGUSTA, GA 30909 GRAYBAR 2050 NANCY HANKS DR NORCROSS, GA 30071 Attachment "B"YES YES YES YES YES non-compliant E-Verify #943317708 898405 421709 360365 359507 630274133 100392 140845 Addendum #1 YES YES YES YES YES YES Addendum #2 YES YES YES YES YES non-compliant SAVE Form YES yes YES YES YES non-compliant Air Blown Fiber 150,000 Ft $0.502 $0.69 $0.54 $0.5995 $0.69563 Direct Burial Fiber 200,000 Ft. $0.690 $0.73 $0.7242 $0.706 $0.81972 Fiber Holder NO BID $325.00 $253.16 $454.28 $251.33 Fiber Hot Jacket Stripper 3 each NO BID $700.00 $926.08 $864.98 $676.64 Micro Duct 150,000 Ft NO BID $1.385 $1.3182 $1.3196 $1.40 Epoxy for Trench Fill 500 Gallons NO BID $69.80 $53.35 $55.13 $65.33 Fiber Pedestal Boxes 300 each NO BID $410.17 $379.95 $418.89 $429.20 Hand Hole Boxes 300 each NO BID $562.00 $432.61 $532.30 $544.50 TOTAL $213,300.00 $786,551.00 $697,297.56 $745,231.00 $864,397.73 The following vendor submitted a statement of "No Bid": DITCH WITCH / GEORGIA EQUIPMENT SPECIALIST L.L.C. / 5430 GA HIGHWAY 85 / FOREST PARK, GA 30297 VERMEER SOUTHEAST / ATTN: CURT KOPARCEK / PO BOX 7269 / MARIETTA, GA 30065 Bid Opening Bid Item #15-192 Fiber Optic Supplies for Augusta, Georgia - Utilities Department Bid Due: Friday, July 31, 2015 @ 11:00 a.m. Total Number Specifications Mailed Out: 36 Mandatory Pre-Bid/Telephone Conference: NOT APPLICABLE Total packages submitted: 6 Total Noncompliant: 1 Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 20 Attachment number 4 \nPage 1 of 4 Item # 20 Attachment number 4 \nPage 2 of 4 Item # 20 Attachment number 4 \nPage 3 of 4 Item # 20 Attachment number 4 \nPage 4 of 4 Item # 20 Engineering Services Committee Meeting 10/27/2015 1:10 PM Water line extension, Doug Barnard Parkway Department:Augusta Utilities Department Caption:Consider Awarding Bid #15-210 to Quality Stormwater Solutions in the amount of $53,978.00. Background:In its meeting of December 16, 2014, the Commission approved a cost-sharing agreement to extend a water line to the site of the proposed Palmetto Propane facility. This extension would also serve future development in the area. Analysis:This project was bid among our approved Task Order Contractors; Quality Storm Water Solutions was the low bidder at $53,978. Augusta Utilities will be reimbursed approximately $26,989 by the developer pending final contract amount. Financial Impact:Funds for this work are available in account number 507043490-54- 25410/88886666-54-25410 Alternatives:No alternatives are recommended. Recommendation:We recommend award to Quality Stormwater Solutions at a cost of $53,978, with $26,989 being reimbursed by the developer. Funds are Available in the Following Accounts: FUNDS AVAILABLE IN THE FOLLOWING ACCOUNTS: 507043490-54-25410/88886666-54-25410 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 21 Augusta Utilities Department o"",.SlIf H,x,.l;k 3i:::::l DATE: TO: FROM: MEMOR,ANDUM September 1612015 Geri Sams, Procurement Director Tom Wiedmeier, P.E.; Director of Utilities t),r'rl SUBJECT: Bid Item 15-210 Palmetto Propane 8" Water Main Based on the fair and reasonable proposal provided by Quality Storm Water Solutions Company, Inc. for REF:1S-2t0, and with the best interest of the City of Augusta in mind, I recommend that Quality Storm Water Solutions Company be awarded the Palmetto Propane 8" Water Main Project contract in the amount of $53,978.00. 360 Bay Street, Suite 180, Augusta, Georgia 30901 (7 06) 312-4132 Fax (7 06) 3t2-4133 WWW.AUGUSTAGA.GOV Attachment number 1 \nPage 1 of 1 Item # 21 @@aoo o 0t d d %e Attachment number 2 \nPage 1 of 1 Item # 21 Invitation to Bid Sealed bids will be received at this office on Tuesday, September 8, 2015 @ 3:00 p.m. for furnishing: Bid Item 15-210 Palmetto Propane Water Line Project for Utilities Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from ARC Southern. The fees for the plans and specifications which are non-refundable are $30.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC Southern (706 821-0405) beginning Thursday, August 13, 2015. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Bid Conference will be held on Thursday, August 27, 2015 @ 10:00 a.m. in the Procurement Department, 530 Telfair Street, Room 605. A mandatory site visit will follow. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, August 28, 2015 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference an eligible bidder must submit a completed and signed written application to become a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project. An eligible bidder who fails to submit an application for approval as a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project, and who otherwise meets the requirements for approval as a local bidder, will not be qualified for a bid preference on such eligible local project. No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Revised: 8/15/2011 Attachment number 3 \nPage 1 of 1 Item # 21 Attachment number 4 \nPage 1 of 1 Item # 21 Au gusta Utiliti.rffi i?t f;8fl t Tom Wiedmeier, P,E,, Director Deanna Davis, P,E., Assistant Director DATE: TO: FROM: SUBJECT: MEMORANDUM September 16,2015 Geri Sams, Procurement Director Tom Wiedmeier, P.E.; Director of Utilities dl^) Bid Item 15-210 Palmetto Propane 8" Water Main \ Based on the fair and reasonable proposal provided by Quality Storm Water Solutions Conlepy, Inc. for REF:I5-2t0, and with the best interest of the City of Augusta in mind, I recommend that Quality Storm Water Solutions Company be awarded the Palmetto Propane 8" Water Main Project contract in the amount of $53,978.00. 360 Bay Street, Suite 180, Augusta, Georgia 30901 (706) 312-4132 Fax (706) 312-4133 WWW.AUGUSTAGA.GOV Attachment number 5 \nPage 1 of 1 Item # 21 Attachment number 6 \nPage 1 of 2 Item # 21 Attachment number 6 \nPage 2 of 2 Item # 21 VENDORS BLAIR CONSTRUCTION PO BOX 770 EVANS, GA 30809 CONTRACT MANAGEMENT INC 1827 KILLINGSWORTH AUGUSTA GA 30904 QUALITY STORM WATER SOLUTIONS 437 CAMBRIDGE CIRCLE MARTINEZ GA 30907 Attachment "B"YES YES YES E-Verify #224004 225306 233338 SAVE Form YES YES YES Bid Bond YES YES YES BASE BID TOTAL $101,270.62 $63,205.80 $50,478.00 Alternate Bid Item $2,025.00 $3,500.00 $3,500.00 Bid Opening Bid Item #15-210 Palmetto Propane Water Line Project for Augusta, Georgia - Utilities Department Bid Due: Tuesday, September 8, 2015 @ 3:00 p.m. Total Number Specifications Mailed Out: 4 Total Number Specifications Download (Demandstar): n/a Total Electronic Notifications (Demandstar): n/a Mandatory Pre-Bid/Telephone Conference: 3 Total packages submitted: 3 Total Noncompliant: 0 Page 1 of 1 Attachment number 7 \nPage 1 of 1 Item # 21