HomeMy WebLinkAbout2014-07-28-Meeting Agenda Engineering Services Committee Meeting Commission Chamber- 7/28/2014- 12:55 PM ENGINEERING SERVICES 1. Motion to authorize condemnation to acquire title of the entire parcel, (Parcel 087-2-152-00-0) 2015 Willow Street. Attachments 2. Motion to authorize condemnation to acquire title of a portion of property for right-of-way, permanent easement, temporary construction easement, and one temporary driveway easement (Parcel 041-0-020-00-0) 1411 Marks Church Road. Attachments 3. Motion to authorize condemnation to acquire title of a portion of property for right-of-way, temporary construction easement, and two temporary driveway easements (Parcel 041-0-019-00- 0) 1411 Marks Church Road. Attachments 4. Approve award of RFP #14-144, Janitorial Services for Environmental Services Maintenance Building and Scale House, to Easter Seals of East Georgia, Inc. Attachments 5. Approve purchase of an IBAK Sanitary Sewer Inspection System for the bid price of $69,239.00. Attachments 6. Consider assuming responsibility for a highway beautification project for Gordon Highway and Deans Bridge Road extending from Regency Mall to Fort Gordon’s Cyber Command Main Gate and Gate 5 respectively. Task Code Enforcement with ensuring that all properties in referenced areas are compliant with local policies. (Requested by Commissioner Bill Lockett referred from the June 17th Commission meeting) Attachments 7. Approve and accept: Knology Way roadway and associated improvements within its right-of-way into the Augusta Georgia Public Roadway System and accept the sanitary sewer improvements that are adjacent to the Knology Way right of way as shown on attached plat. Acceptance is contingent upon Attachments receipt of its certified plat and proof of ownership, deed of dedication and required other legal documentation as determined by Augusta Engineering Department (AED) and Augusta Utility Department (AUD). 8. Motion to approve the minutes of the Engineering Services Committee held on July 7, 2014. Attachments 9. Motion to determine that the alley between 1264 Greene Street and 1255 Telfair Street, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, and to receive as information the results of the public hearing held regarding the issue of abandonment pursuant to O.C.G.A. §32- 7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached Resolution. Attachments 10. Motion to determinethat South Boundary Lane, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party (ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and right of way property needs. Attachments 11. Approve the continued funding of the current On-Call Tree Removal Services Contract in the amount of $200,000, and the On-Call Vegetation Maintenance Contract in the amount of $500,000 from the Transportation Investment Act (TIA) discretionary account. Funding is solely for the purposes of hazardous tree removal and pruning; and vegetation maintenance along the county’s roadway system, which is within the criteria of transportation discretionary fund usage, as requested by AED. Attachments 12. Approve CPB # 323-041110-5212115/299823786-5212115 Attachments www.augustaga.gov and award of the Construction Contract to Blair Construction in the amount of $166,043.50 for the Paving Dirt Roads, Phase I – Pats Lane Project, subject to receipt of signed contracts and proper bonds as requested by AED. Funding is available through SPLOST phase III and IV recapture as requested by AED. 13. Provide an assessment of any potential progress that has been made relative to the development of the Regency Mall Property. This unsightly property is located at the intersection of two of the most heavily traveled roads in the city. (Gordon Highway/Deans Bridge Road). The condition of this Mall has impeded economic growth in this area for many years. South Augusta development is as important as downtown development and must receive the same amount of attention that is devoted to the development of downtown Augusta. (Requested by Commissioner Bill Lockett referred from the June 17th Commission meeting) Attachments 14. Approve Augusta Utilities and Tax Commissioner Peach Orchard Commons Final Estimated Buildout. Attachments 15. Approve completing funding of Wrightsboro Road and Drainage Emergency Repair in the amount of $800,000 as requested by AED. Attachments Engineering Services Committee Meeting 7/28/2014 12:55 PM Acquisition of entire parcel in fee -2015 Willow Street Department:Law Caption:Motion to authorize condemnation to acquire title of the entire parcel, (Parcel 087-2-152-00-0) 2015 Willow Street. Background:Due to unclear title, the City seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn the parcel. The required property consists of 7,500 square feet. The appraised value is $10,500.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 328-041110-52.12122 J/L 212828203- 52.12122 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Attachment number 1 \nPage 1 of 1 Item # 1 Engineering Services Committee Meeting 7/28/2014 12:55 PM Acquisition of Right -of-Way Permanent Contruction & Maintenance Easement- McNeal Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right-of-way, permanent easement, temporary construction easement, and one temporary driveway easement (Parcel 041-0-020-00-0) 1411 Marks Church Road. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owners and therefore seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 547.47 square feet of right-of-way, 375.16 square feet of permanent easement, 340.33 square feet of temporary construction easement, and one temporary driveway easement. The appraised value is $3,850.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Deny condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 325041120-52.12122 J/L 209825201-52.12122 REVIEWED AND APPROVED BY: Finance. Law. Cover Memo Item # 2 Administrator. Clerk of Commission Cover Memo Item # 2 Attachment number 1 \nPage 1 of 1 Item # 2 Engineering Services Committee Meeting 7/28/2014 12:55 PM Acquisition of Right-of-Way, Temp Contruction & Driveway Easement- McNeal Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right-of-way, temporary construction easement, and two temporary driveway easements (Parcel 041-0-019-00-0) 1411 Marks Church Road. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owners and therefore seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 419.10 square feet of right-of-way, 417.22 square feet of temporary construction easement, and two temporary driveway easements. The appraised value is $2,305.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 325041120-52.12122 J/L 209825201-52.12122 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Cover Memo Item # 3 Clerk of Commission Cover Memo Item # 3 Attachment number 1 \nPage 1 of 1 Item # 3 Engineering Services Committee Meeting 7/28/2014 12:55 PM Approve award of RFP #14-144, Janitorial Services for Environmental Services Maintenance Building and Scale House to Easter Seals of East Georgia, Inc. Department:Environmental Services Caption:Approve award of RFP #14-144, Janitorial Services for Environmental Services Maintenance Building and Scale House, to Easter Seals of East Georgia, Inc. Background:In 2010 The Environmental Services Department moved all office and maintenance staff into the maintenance building. This entailed an increase in office space from approximately 2,500 sq./ft. to over 7,500 sq./ft. plus an additional 10,000 sq./ft. of shop space which we were not equipped to sufficiently maintain. The department realized the need for, went through the RFP process with Procurement, and outsourced janitorial services for the maintenance building and the scale house in August of 2010. The current contract will end on July 31, 2014. However, the services are still required to properly maintain these two buildings at our facility Analysis:The Augusta Environmental Services Department and the Procurement Department have concluded the RFP process for RFP Item #14-144, Janitorial Services for Environmental Services Maintenance Building. After the evaluation process of the eight compliant vendors, Easter Seals of Georgia, Inc. scored higher than the other seven vendors. They have also met all specified requirements of the RFP documents without taking any exceptions and within an acceptable budget amount. Therefore, it is the recommendation of the Augusta Environmental Services Department that Easter Seals of Georgia, Inc. should be awarded the contract for Janitorial Services. Financial Impact:The estimated annual cost of this contract is $40,000.00. Adequate funds are budgeted and available in 542-04-4110/52.22310 custodial services. Alternatives:1. Approve award recommendation of RFP #14-144, Janitorial Services for Environmental Services Maintenance Building and Scale House to Easter Seals of East Georgia, Inc. 2. Do not Cover Memo Item # 4 approve the award. Recommendation:Approve award of RFP #14-144, Janitorial Services for Environmental Services Maintenance Building and Scale House to Easter Seals of East Georgia, Inc. Funds are Available in the Following Accounts: Adequate funds are budgeted and available in 542-04- 4110/52.22310 custodial services. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Request for Proposal Request for Proposals will be received at this office until Thursday, May 1, 2014 @ 11:00 a.m. for furnishing: RFP Item #14-144 Janitorial Services for Environmental Services RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. A Mandatory site visit will be held on Tuesday, April 22, 2014 @ 10:00 a.m. at the Environmental Services Department, 4330 Deans Bridge Road, Blythe, GA. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Thursday, April 24, 2014 @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 90 days after time has been called on the date of opening. Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle March 27, April 3, 10, 17, 2014 Metro Courier April 2, 2014 cc: Tameka Allen Deputy Administrator Mark Johnson Environmental Services Lori Videtto Environmental Services Revised: 8/15/2011 Attachment number 1 \nPage 1 of 1 Item # 4 UNOFFICIAL VENDORS Attachment B E-Verify #SAVE Form Addendum 1 Original 7 Copies Fee Proposal AMERICAN FACILITY SERVICES 1325 UNION HILL INDUSTRIAL COURT, SUITE A, ALPHARETTA, GA 30004 Yes 114358 Yes Yes Yes Yes Yes BIG HEAD FLOOR MASTERS 4321 PARKWOOD DRIVE AUGUSTA, GA 30906 No/Non- Compliant 779620 Yes Yes Yes Yes Yes CSRA BIO-CARE LLC 1003 GRINDSTONE CREEK HEPHZIBAH, GA 30815 Yes 494989 Yes Yes Yes Yes Yes EASTER SEALS 1500 WRIGHTSBORO ROAD AUGUSTA, GA 30904 Yes 176277 Yes Yes Yes Yes Yes EXECUTIVE CLEANING INC. P.O. BOX 1375, MILLEDGEVILLE, GA 31061 Yes 381551 Yes Yes Yes Yes Yes EXECUTIVE JANITORIAL SERVICES 3070 DAMASCUS ROAD, SUITE F AUGUSTA, GA 30909 Yes 240034 Yes Yes Yes Yes Yes IMMACULATE CLEANING 2008 HOPETOWN DRIVE AUGUSTA, GA 30909 Incomplete/ Non- Compliant 570929 Yes Yes Yes Yes Yes M & M MANAGEMENT 3114 AUGUSTA TECH DRIVE AUGUSTA, GA 30906 yes 357593 Yes Yes Yes Yes Yes RICK'S CLEANING SERVICE LLC 3188 LEXINTON WAY AUGUSTA, GA 30909 Yes 701238 Yes Yes Yes Yes Yes The following vendor did not respond: B & B ENTERPRISE / 3033 BREEZE HILL DRIVE / AUGUSTA, GA 30906 JAN PRO CLEANING SYSTEMS / 211 PITCARIN WAY / AUGUSTA, GA 30909 The following vendor submitted a "No Bid" response: IMAGANN CLEANING SERVICES / 2640 LITHONIA INDUSTRIAL BLVD / LITHONIA, GA 30058 RFP Opening RFP Item #14-144 Janitorial Services for Augusta, Georgia - Environmental Services Department RFP Due: Thursday, May 8, 2014 at 11:00 a.m. Attachment number 2 \nPage 1 of 1 Item # 4 Evaluation Criteria PTS AMERICAN FACILITY SERVICES 1325 UNION HILL INDUSTRIAL COURT, SUITE A, ALPHARETTA, GA 30004 BIG HEAD FLOOR MASTERS 4321 PARKWOOD DRIVE AUGUSTA, GA 30906 CSRA BIO-CARE LLC 1003 GRINDSTONE CREEK HEPHZIBAH, GA 30815 EASTER SEALS 1500 WRIGHTSBORO ROAD AUGUSTA, GA 30904 EXECUTIVE CLEANING INC. P.O. BOX 1375, MILLEDGEVILLE, GA 31061 EXECUTIVE JANITORIAL SERVICES 3070 DAMASCUS ROAD, SUITE F AUGUSTA, GA 30909 IMMACULATE CLEANING 2008 HOPETOWN DRIVE AUGUSTA, GA 30909 RICK'S CLEANING SERVICE LLC 3188 LEXINTON WAY AUGUSTA, GA 30909 1. Company Experience (company profile)35 30 20 17 32 23 20 25 23 2. Relevant Projects 25 18 17 13 23 5 13 20 18 3. Personnel 20 18 10 15 18 15 15 18 15 4. References (include specific individuals with addresses and telephone numbers 10 9 10 8 10 0 8 10 8 5. Proximity to Area • Within Richmond County 5 points • Within CSRA 4 points • Within Georgia 3 points • Within SE United States (includes AL, TN, NC, SC, FL) 2 points • All Others 1 point 5 3 5 5 5 3 5 5 5 6. Proposed Fee • Lowest 5 points • Second 4 points • Third 3 points • Fourth 2 points • Highest 1 points 5 4 1 5 3 2 TOTAL 100 83 63 58 88 51 65 78 72 Cumulative Evaluation Sheet / RFP Item #14-144 Janitorial Services for Augusta, Georgia - Environmental Services Department Attachment number 3 \nPage 1 of 1 Item # 4 Attachment number 4 \nPage 1 of 2 Item # 4 Attachment number 4 \nPage 2 of 2 Item # 4 Attachment number 5 \nPage 1 of 3 Item # 4 Attachment number 5 \nPage 2 of 3 Item # 4 Attachment number 5 \nPage 3 of 3 Item # 4 Attachment number 6 \nPage 1 of 2 Item # 4 Attachment number 6 \nPage 2 of 2 Item # 4 Attachment number 7 \nPage 1 of 4 Item # 4 Attachment number 7 \nPage 2 of 4 Item # 4 Attachment number 7 \nPage 3 of 4 Item # 4 Attachment number 7 \nPage 4 of 4 Item # 4 Engineering Services Committee Meeting 7/28/2014 12:55 PM Approve purchase of an IBAK Sanitary Sewer Inspection System Department:Utilities Caption:Approve purchase of an IBAK Sanitary Sewer Inspection System for the bid price of $69,239.00. Background:Through sealed bids, Augusta purchased an IBAK Sanitary Sewer Inspection System. The system has proven to be reliable and has had no down time since its delivery earlier this year. With a sanitary sewer collection system the size of Augusta's, more than one inspection system is a necessity. The success we've experienced with the IBAK system, along with equipment standardization needs, makes the purchase of another IBAK Sanitary Sewer Inspection System attractive. Analysis:P & H Supply has agreed to supply another IBAK Sanitary Sewer Inspection System for the same price as the previously approved purchase. By purchasing another system now, we can have a reliable fleet of two sanitary sewer inspection systems to allow more timely investigations of sanitary sewer issues. This will save the department time and money by not excavating sanitary sewer or storm lines that can be repaired using other methods. Financial Impact:$69,239.00 from account number 50604310-5424130 Alternatives:Reject purchase of the system. Recommendation:We recommend approving the purchase order to P&H Supply in the amount of $69,239.00 for an IBAK Sanitary Sewer Inspection System. Funds are Available in the Following Accounts: $69,239.00 from account number 50604310-5424130 REVIEWED AND APPROVED BY: Cover Memo Item # 5 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 5 Engineering Services Committee Meeting 7/28/2014 12:55 PM Gordon Highway Beautification Project Department: Caption:Consider assuming responsibility for a highway beautification project for Gordon Highway and Deans Bridge Road extending from Regency Mall to Fort Gordon’s Cyber Command Main Gate and Gate 5 respectively. Task Code Enforcement with ensuring that all properties in referenced areas are compliant with local policies. (Requested by Commissioner Bill Lockett referred from the June 17th Commission meeting) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 6 Engineering Services Committee Meeting 7/28/2014 12:55 PM Knology Way Roadway and Improvements (acceptance Augusta Georgia Public Roadway System) Department:Abie L. Ladson, Director Caption:Approve and accept: Knology Way roadway and associated improvements within its right-of-way into the Augusta Georgia Public Roadway System and accept the sanitary sewer improvements that are adjacent to the Knology Way right of way as shown on attached plat. Acceptance is contingent upon receipt of its certified plat and proof of ownership, deed of dedication and required other legal documentation as determined by Augusta Engineering Department (AED) and Augusta Utility Department (AUD). Background:Knology Way and associated improvements were completed in 2009 as a part of the Knology Call Center site development. Knology Way is the primary access for several developed and undeveloped commercial properties. Approved Site Development indicates that this road and associated improvements were intended to be deeded to Augusta but the required documentation was not completed. Recently a request was made through the Planning & Development Department for acceptance of this roadway and associated improvements into the Augusta Road System. Accordingly, AED and AUD completed its assessment and determined that said improvements meet the acceptance criteria, contingent upon receipt of required legal documents Analysis:Given that the road in question provides primary access to Knology Call Center and several commercial developed and undeveloped parcels and sanitary sewer improvements out side the right-of-way, serves multiple facilities , it is AED and AUD recommendation to accept this roadway and said improvements into Augusta Georgia Roadway System upon receipt of certified plat & proof of ownership, deed of dedication and required documentations as determined by Augusta Engineering Department and Augusta Utility Department. Financial Impact:No direct financial impact. The road will be included into city roadway maintenance program and water and sewer improvements will be included in city water and sewer Cover Memo Item # 7 maintenance program. Alternatives:1) Approve and accept: Knology Way roadway and associated improvements within its right-of-way into the Augusta Georgia Public Roadway System and accept the sanitary sewer improvements that are adjacent to the Knology Way right of way as shown on attached plat. Acceptance is contingent upon receipt of its certified plat and proof of ownership, deed of dedication and required other legal documentation as determined by Augusta Engineering Department (AED) and Augusta Utility Department (AUD). 2) Do not approve. Recommendation:Approve alternative 1 Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 7 Attachment number 1 \nPage 1 of 1 Item # 7 Engineering Services Committee Meeting 7/28/2014 12:55 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Engineering Services Committee held on July 7, 2014. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 8 Attachment number 1 \nPage 1 of 9 Item # 8 Attachment number 1 \nPage 2 of 9 Item # 8 Attachment number 1 \nPage 3 of 9 Item # 8 Attachment number 1 \nPage 4 of 9 Item # 8 Attachment number 1 \nPage 5 of 9 Item # 8 Attachment number 1 \nPage 6 of 9 Item # 8 Attachment number 1 \nPage 7 of 9 Item # 8 Attachment number 1 \nPage 8 of 9 Item # 8 Attachment number 1 \nPage 9 of 9 Item # 8 Engineering Services Committee Meeting 7/28/2014 12:55 PM Motion to Abandon Alley Between Telfair and Greene Department:Law Caption:Motion to determine that the alley between 1264 Greene Street and 1255 Telfair Street, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, and to receive as information the results of the public hearing held regarding the issue of abandonment pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party (ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached Resolution. Background:The alley is located between two parcels owned by Wayne G. Damron. Mr. Damron desires to acquire the alley to use as parking for the customers of his business, Damron Numismatics, Inc. The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. Pursuant to O.C.G.A., a public hearing was held on July 1, 2014 for this matter. The legal description and plat of the alley between 1264 Greene Street and 1255 Telfair Street are attached. Analysis:In addition to the information provided in the above Background section, results of the public hearing will be presented to the Commission. Notice to the property owners located thereon has been provided, pursuant to O.C.G.A. §32-7-2(b) (1). Financial Impact:Cost of publication and advertisement of public hearing. Alternatives:Approve or deny request to determine that the alley between 1264 Greene Street and 1255 Telfair Street be abandoned. Recommendation:Approve determination and request for abandonment of the alley between 1264 Greene Street and 1255 Telfair Street, with public Cover Memo Item # 9 hearing to be held regarding the issue of abandonment pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit- claimed to the appropriate party(ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage and adopt the attached Resolution. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 9 Attachment number 1 \nPage 1 of 3 Item # 9 Attachment number 1 \nPage 2 of 3 Item # 9 Attachment number 1 \nPage 3 of 3 Item # 9 Engineering Services Committee Meeting 7/28/2014 12:55 PM Motion to Abandon South Booundary Lane Department:Law Caption:Motion to determinethat South Boundary Lane, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and right of way property needs. Background:The Augusta Housing Authority has requested that South Boundary Lane, as shown on the attached plat be abandoned in connection with the Laney-Walker redevelopment project. The Housing Authority plans to convert portions of the road to a parking area and park. The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. Pursuant to O.C.G.A. §32-7-2, a public hearing was held on April 29, 2014. The legal description and plat of said portion of South Boundary Lane are attached. Analysis:In addition to the information provided in the above Background section, results of the public hearing will be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b) (1). Financial Impact:Cost of publication and advertisement of public hearing. Alternatives:Approve or deny request to determine that South Boundary Lane be abandoned. Recommendation:Approve determination and request for abandonment of South Boundary Lane, with public hearing to be held regarding the issue of abandonment pursuant to O.C.G.A. §32-7-2, with the Cover Memo Item # 10 abandoned property to be quit-claimed to the appropriate party (ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage and right of way property needs and adopt the attached Resolution. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 10 Attachment number 1 \nPage 1 of 2 Item # 10 Attachment number 1 \nPage 2 of 2 Item # 10 Attachment number 2 \nPage 1 of 2 Item # 10 Attachment number 2 \nPage 2 of 2 Item # 10 Engineering Services Committee Meeting 7/28/2014 12:55 PM On-Call Tree and Roadway Vegetation Maintenance 11-137A & 11-172 Department:Engineering Caption:Approve the continued funding of the current On-Call Tree Removal Services Contract in the amount of $200,000, and the On-Call Vegetation Maintenance Contract in the amount of $500,000 from the Transportation Investment Act (TIA) discretionary account. Funding is solely for the purposes of hazardous tree removal and pruning; and vegetation maintenance along the county’s roadway system, which is within the criteria of transportation discretionary fund usage, as requested by AED. Background:The city continues to be challenged with the maintaining of our urban forests, right-of-way and roadway shoulders to minimize safety risk and to accommodate Special Events. The majority of the trees within the city area are aging and pose a high probably of losing limbs. Added to the dangers are the after effects of the February 2014 Ice Storm. It is AED’s determination that supplementing the engineering maintenance resources with the existing contracts will be a practical approach to sustain much needed maintenance of our right-of-ways & to improve our tree maintenance and hazardous tree removal . It will also allow AED to complete critical maintenance tasks in a timely manner thereby minimizing public safety risks, damaged property, and any associated potential hazardous liabilities. Analysis:Augusta, Georgia is currently under contract with Big Dog Tree and Stump, Arbor Equity, and Southern Arbor Tree Care for tree services and Augusta Lawn Care for roadway vegetation maintenance. Additional funds allocation to these contracts are needed to sustain, as well as improve the current level of services. Financial Impact:Funds are available through the TIA discretionary account Alternatives:1) Approve the continued funding of the current On-Call Tree Removal Services Contract in the amount of $200,000, and the On-Call Vegetation Maintenance Contract in the amount of $500,000 from the Transportation Investment Act (TIA) discretionary account. Funding is solely for the purposes of Cover Memo Item # 11 hazardous tree removal and pruning; and vegetation maintenance along the county’s roadway system, which is within the criteria of transportation discretionary fund usage, as requested by AED. 2) Do not approve Recommendation:Approve alternative #1 Funds are Available in the Following Accounts: TIA Discretionary Account REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 11 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#N/A. This project proposes to continue funding of the current On-Call Vegetation Maintenance from the Transprotation Investment Act (TIA) discretionary account in the amount of $500,000. Funding will be used for vegetation maintenance along the County'sroadway system, which is within the criteria of transportation discretionary fund usage. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. 500,000$ Transportation Investment Act 275,000$ Transportation Investment Act 500,000$ Transportation Investment Act 500,000$ 1,775,000$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor CAPITAL PROJECT BUDGET CPB#N/A On-Call Vegetation Maintenance (Bid 12-152) Fund Balance Change Number FOUR Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1.13.2012 Attachment number 1 \nPage 1 of 2 Item # 11 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#N/A On-Call Vegetation Maintenance (Bid 12-152) CPB AMOUNT CPB New SOURCE OF FUNDS CPB Addition CPB Fund Balance (500,000) (500,000) Transportation Investment Act (275,000) (275,000) Transportation Investment Act (500,000) (500,000) Transportation Investment Act (500,000) (500,000) TOTAL SOURCES: (1,275,000) (500,000) (1,775,000) USE OF FUNDS 101-041260-5223114 500,000 500,000 TIA 241-041110/5223114 275,000 275,000 TIA 241-041110/5223114 500,000 500,000 TIA 235-041110/T13241001 500,000 500,000 TOTAL USES: $1,275,000 500,000$ 1,775,000$ Change Number Three 1.13.2012 Attachment number 1 \nPage 2 of 2 Item # 11 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#N/A. This project proposes to establish requested contract services to supplement existing staff services to improve our tree maintenance and hazardous tree services. Funding is available in the Transportation Investment Act (TIA) accounts in the amount of $200,000. Also continue funding the current contract services to Big Dog Tree and Stump, Arbor Equity, and Southern Arbor Tree Care subject to receipt of signed contracts and proper bonds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Tree Removal Phase VI 1,000,000$ General Fund 72,000$ TIA Funds 200,000$ TIA Funds 200,000$ 1,472,000$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor CAPITAL PROJECT BUDGET CPB#N/A On-Call Tree Removal, Pruning and Replacement (Bid 11-137) CHANGE NUMBER FOUR Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1.13.2012 Attachment number 2 \nPage 1 of 2 Item # 11 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#N/A On-Call Tree Removal, Pruning and Replacement (Bid 11-137) CPB AMOUNT NEW SOURCE OF FUNDS CPB ADDITION CPB TREE REMOVAL, REPLACEMENT PHASE VI ($1,000,000) ($1,000,000) GENERAL FUND (2012) ($72,000)($72,000) TIA Funds ($200,000) ($200,000) TIA FUNDS ($200,000) ($200,000) TOTAL SOURCES: ($1,272,000) ($1,472,000) USE OF FUNDS REPAIR/MAINTENANCE 328-041110-52.22199 $1,272,000 $1,272,000 TIA 235-041110/T13241002 $1,272,000 $200,000 $1,472,000 TOTAL USES: 1.13.2012 Attachment number 2 \nPage 2 of 2 Item # 11 Engineering Services Committee Meeting 7/28/2014 12:55 PM Pats Lane Contract - Paving Various Dirt Roads, Phase I –14-135(Contract Award) Department:Abie Ladson, Director Caption:Approve CPB # 323-041110-5212115/299823786-5212115 and award of the Construction Contract to Blair Construction in the amount of $166,043.50 for the Paving Dirt Roads, Phase I – Pats Lane Project, subject to receipt of signed contracts and proper bonds as requested by AED. Funding is available through SPLOST phase III and IV recapture as requested by AED. Background:Pats Lane is one of the five dirt roads to be paved in Phase I of Dirt Road Paving and Road/Street Resurfacing Project; which was Commission approved on November 5, 2013. This project will consist of paving Pats Lane from the existing dirt road and associated improvements. The contract time is 90 calendar days . Analysis:Bids were received on April 16, 2014 with Blair Construction being the low bidder. The bid results are as follow: CONTRACTORS BID 1. Blair Construction $166,093.50 2. Beam’s Contracting $252,382.25 3. SITEC $220,420.00 4. Reeves Construction Co $307,433.50 It is the recommendation of the Engineering Department to award this project to Blair Construction. Financial Impact:Funds are available through SPLOST Phase III and IV roads and bridges recapture funds. Alternatives:1) Approve award of Construction Contract to Blair Construction in the amount of $166,043/50 for the Paving Dirt Roads, Phase I – Pats Lane, subject to receipt of signed contracts and proper bonds as requested by AED. Funding is available through SPLOST phase III and IV recapture. 2) Do not approve and identify alternate ways to complete the project. Recommendation:Approve alternative #1. Funds are Available Cover Memo Item # 12 in the Following Accounts:323-041110-5212115/299823786-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 12 AUGUSTA-RICHMOND COUNTY, GEORGIA CAPITAL PROJECT BUDGET PAVING VARIOUS DIRT ROADS, PHASE I PATS LANE CONTRACT CPB# N/A BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is authorized CPB# N/A. This project consist of paving Pats Lane from the existing dirt road and associated improvements. in the amount of $166,043.50. Funding for this project is available through SPLOST Phase III and IV recapture. Section 2: The following revenues are available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase III and IV 166,044$ 166,044$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved ______________________________________ Deke Copenhaven, Mayor Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1 of 3 Attachment number 1 \nPage 1 of 3 Item # 12 AUGUSTA-RICHMOND COUNTY, GEORGIA CAPITAL PROJECT BUDGET PAVING VARIOUS DIRT ROADS, PHASE I PATS LANE CONTRACT CPB# N/A 2 of 3 Attachment number 1 \nPage 2 of 3 Item # 12 AUGUSTA-RICHMOND COUNTY, GEORGIA CAPITAL PROJECT BUDGET PAVING VARIOUS DIRT ROADS, PHASE I PATS LANE CONTRACT CPB# N/A CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPLOST Phase III and IV Recapture 323-041110-5212115 ($166,044) ($166,044) TOTAL SOURCES: ($166,044) $0 ($166,044) USE OF FUNDS ENGINEERING 323-04-1110-5212115 $166,044 $166,044 TOTAL USES: $166,044 $0 $166,044 3 of 3 Attachment number 1 \nPage 3 of 3 Item # 12 Invitation to Bid Sealed bids will be received at this office on Wednesday, March 19, 2014 @ 3:00 p.m. for furnishing: Bid Item 14-135 Pat Lane Paving for Engineering Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from ARC Southern. The fees for the plans and specifications which are non-refundable is $75.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC Southern (706 821-0405) beginning Thursday, February 6, 2014. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Bid Conference will be held on Friday, February 28, 2014 @ 10:00 a.m. in the Procurement Department, 530 Greene Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, March 4, 2014 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. . A 10% Bid bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Augusta Chronicle February 6, 13, 20, 27, 2014 Metro Courier February 12, 2014 Revised: 8/15/2011 Attachment number 2 \nPage 1 of 1 Item # 12 Attachment number 3 \nPage 1 of 2 Item # 12 Attachment number 3 \nPage 2 of 2 Item # 12 Vendors BLAIR CONSTRUCTION P.O. BOX 770 EVANS, GA 30809 BEAM’S CONTRACTING 15030 ATOMIC ROAD BEECH ISLAND, SC 29842 SITEC 217 FAIRFIELD ST., NE AIKEN, SC 29801 Reeves Construction 1 APAC Industrial Way Augusta, GA 30907 Attachment B Yes Yes Yes Yes E-Verify Number 224004 167300 212379 48048 SAVE Form Yes Yes Yes Yes Addendum 1-3 Yes Yes Yes Yes Bid Bond Yes Yes Yes Yes Base Bid Price $166,043.50 $252,382.25 $220,420.60 $307,433.50 Bid Item #14-135 Pat Lane Paving for the City of Augusta - Engineering Department Bid Opening Date: Wednesday, April 16, 2014 @ 3:00 p.m. Page 1 of 1 Attachment number 4 \nPage 1 of 1 Item # 12 Attachment number 5 \nPage 1 of 2 Item # 12 Attachment number 5 \nPage 2 of 2 Item # 12 Engineering Services Committee Meeting 7/28/2014 12:55 PM Regency Mall Property Department: Caption:Provide an assessment of any potential progress that has been made relative to the development of the Regency Mall Property. This unsightly property is located at the intersection of two of the most heavily traveled roads in the city. (Gordon Highway/Deans Bridge Road). The condition of this Mall has impeded economic growth in this area for many years. South Augusta development is as important as downtown development and must receive the same amount of attention that is devoted to the development of downtown Augusta. (Requested by Commissioner Bill Lockett referred from the June 17th Commission meeting) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 13 Engineering Services Committee Meeting 7/28/2014 12:55 PM Utilities and Tax Commissioner South Augusta Office Department:Utilities Caption:Approve Augusta Utilities and Tax Commissioner Peach Orchard Commons Final Estimated Buildout. Background:The Commission approved the intent to lease Peach Orchard Commons in the December 10, 2012 meeting and the final agreements and estimated costs are available and need to be approved. Analysis:The space is a total of 17,500 sf, of which 2/3 will house AUD and the remainder for the Tag Office. Lease payments, additional construction costs, and overhead will be split pro-rata by actual square footage and direct costs. Based on the lease agreement, the owner selected a contractor by competitive bid and is paying all construction costs and AUD and the Tag Office will be paying anything in excess of $875,000 of build-out cost. The total final budget for construction related cost is $1,646,707. Augusta Utilities will pay $771,707 to the owner. The attached schedule lays out estimated total costs and how they will be allocated. Utilities will pay all the costs upfront and the repayment of the Tax Commissioner's share will be worked out with the Tax Commissioner and Finance Director. Financial Impact:The cost for rent and estimated overhead is budgeted in account 506-04-3210-5224111 for Utilities and 101-01-5611-5224111 for the Tag Office. The cost for improvements in excess of the $875,000 allowance from the landlord, are budgeted in account 506-04-3210-5413120 for Utilities. Utilities will pay for the cost of this project for both departments, and the Tax Commissioner will reimburse their portion of the net cost with a monthly payment to Utilities under a separate rent sharing and maintenance agreement to be presented when all costs of the move are finalized. Alternatives:No practical alternative Cover Memo Item # 14 Recommendation:Approve Augusta Utilities' and Tax Commisioners' Office Peach Orchard Commons Final Estimated Build-Out Funds are Available in the Following Accounts: Capital: 506-04-3210-5413120 Lease payments: 506-04-3210- 5224111 and 101-01-5611-5224111 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 14 EXHIBIT Peach Orchard Commons Occupant: Augusta Utilities Peach Orchard Road Tenant: Augusta, GA Augusta, Georgia Landlord: Delta Peachtree, LLC COST BUDGET: Tenant: Contractor: Kuhlke Construction & Associates, Inc. (Contract) $1,015,000 Architect: Christopher Booker & Associates, PC (Contract) 39,500 Drive-thru: Harper Corp (Contract-Allocated) 150,000 Sub-total $1,204,500 Construction Allocation: (80% to Augusta Utilities) Site Work: Harper Corp (Contract) $189,506 Landscaping, lighting & Irrigation Harper Corp (Allocated) 20,000 Signage Estimated 8,000 Sub-total 217,506 Corollary Fees: (80% to Augusta Utilities) Architect: Narramore & Associates (Contract) $38,253 Civil : BlueWater Civil Design (Contract) 12,948 Landscape Plans: McLeod AIA 4,000 3rd Party: Appraisal, survey, Env. Report - Est 8,000 Legal Fees: Estimated 12,000 Financing Fees: Estimated 8,000 Construction Interest: Estimated 24,000 Lease Commission: Carolina Holdings Inc. (Agreement) 17,500 Sub-total 124,701 TOTAL $1,546,707 Contingency Allowance 100,000 TOTAL $1,646,707 Landlord Share 875,000 Balance by Augusta Utilities $771,707 APPROVAL: Augusta Utilities Augusta, GA Delta Peachtree, LLC By:___________________________ By:______________________________ By: ____________________________ Date: _________________,2014 ________________________,2014 _____________________,2014 Attachment number 1 \nPage 1 of 1 Item # 14 Engineering Services Committee Meeting 7/28/2014 12:55 PM Wrightsboro Road and Drainage Emergency Repair Department:Abie L. Ladson, Director Caption:Approve completing funding of Wrightsboro Road and Drainage Emergency Repair in the amount of $800,000 as requested by AED. Background:In April 2014, AED received complaints of a sinkhole developing in the vicinity of Druid Park and Wrightsboro Road. Staff inspected the sink hole and the surrounding area and determined that a small portion of a 48 inch brick storm sewer pipe along Wrightsboro Road was collapsing. Repairs were immediately made at that location by Engineering Maintenance crews. Approximately, a week later sinkholes began to develop again around the problem area and other areas along the storm sewer line. Another assessment was performed and it was determined that the severity of the sinkholes and the storm sewer line was deemed an emergency. Wrightsboro Road between Holden Street and Emmett Street was immediately closed and emergency repair began. Emergency repair was based on public safety concerns and potential liability risk. Analysis:The estimated cost for construction is $800,000, and completion work is scheduled for August 1, 2014. Other storm sewer lines that connect to the brick sewer are currently being inspected. More repairs maybe warranted. Financial Impact:Funds are available through Engineering SPLOST IV Recapture. Alternatives:1) Approve completing funding of Wrightsboro Road and Drainage Emergency Repair in the amount of $800,000. 2) Do not approve and complete emergency project Recommendation:Approve alternative 1. Funds are Available in the Following Engineering SPLOST IV Recapture. Cover Memo Item # 15 Accounts: REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 15 Attachment number 1 \nPage 1 of 1 Item # 15