Loading...
HomeMy WebLinkAbout2014-05-27-Meeting Agenda Engineering Services Committee Meeting Commission Chamber- 5/27/2014- 1:00 PM ENGINEERING SERVICES 1. Motion to authorize condemnation to acquire title of a portion of property for right of way and permanent easement, (Parcel 053-0-007-00-0) 3741 Belair Road. Attachments 2. Motion to authorize the Finance and Utility departments to begin the process of issuing bonds to refund the Augusta, Georgia Water and Sewer Revenue Bonds, Series 2004, currently outstanding in the aggregate principal amount of $160,000,000 and up to $30,000,000of additional bonds for new water and sewer projects, with PFM, Inc. serving as financial advisor, McKenna Long & Aldridge, LLP serving as bond counsel and Murray Barnes Finister, LLP serving as disclosure counsel. Attachments 3. Discuss the ESD approach for tire collection in residential areas. Attachments 4. Motion to approve funding final phases of Augusta, Georgia’s existing Design Services Agreement with Kimley-Horn and Associates for the Druid Park Avenue Road Diet Project (RC07-001219) $328,581. This project is on the approved Band 1 list of Richmond County’s Transportation Investment Act of 2010 (aka, TIA, TSPLOST) projects as requested by AED/TE. Attachments 5. Notification of emergency repairs performed by Avrett Plumbing. Attachments 6. Environmental Services Department Update on Solid Waste Collection fees for the Urban Services District. Attachments 7. Environmental Services Department Update on Solid Waste Collection fees for Vacant Lots. Attachments 8. Recommendation to exercise option to extend agreement between Augusta and ESG Operations, Inc. for a period of five years beginning January 1, 2015 and ending December 31, 2019. Attachments 9. Motion to approve the minutes of the Engineering Services Committee held on May 12, 2014. Attachments 10. Approve Supplemental Agreement Two, CPB 371041110/T13047139 with LPA Group in the amount of $61,190 to render design services for fiber optic communication lines that will be part of the River Watch Parkway Adaptive Signal Systems Project (RC07- 000139). This project is on the approved Band 1 list of Richmond County’s Transportation Investment Act of 2010 (aka, TIA, TSPLOST) projects. This supplement will also be for the design and coordination with utility companies and Georgia DOT, as requested by AED. Attachments 11. Motion to determine that any and all roads, or portions of roads within Cherry Tree Crossing, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached resolution. Attachments 12. Motion to determine that South Boundary Lane, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, and to receive as information the results of the public hearing pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party (ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached resolution. Attachments www.augustaga.gov 13. Approve and authorize Augusta Engineering Department (AED) to offer five percent above mid-range salary to a potential candidate for the Traffic Engineering Manager position as requested by the Augusta Engineering Department - Traffic Engineering Division. Attachments 14. Approve Supplemental Agreement Eighteen, CPB 323-041110- 296823309, Change Number Twenty One with Atkins North America, Inc. in the amount of $71,417 to prepare Use On Construction Plan Revisions for submission to GDOT for the design of two (2) limited access median openings, changes in access for parcels 93 and 95, and design of landscape plans and an irrigation system on the project to improve Wrightsboro Road from Jimmie Dyess Parkway to I-520. Attachments Engineering Services Committee Meeting 5/27/2014 1:00 PM Acquisition of Right-of-Way & Permanent Easement -Maldonado Monalvo Department:Law Caption:Motion to authorize condemnation to acquire title of a portion of property for right of way and permanent easement, (Parcel 053-0- 007-00-0) 3741 Belair Road. Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 1,182 square feet of right of way and 748 square feet of permanent easement. The appraised value is $2,334.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 323-041110-52.12122 J/L 201823332-5212122 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Attachment number 1 \nPage 1 of 1 Item # 1 Engineering Services Committee Meeting 5/27/2014 1:00 PM Augusta Utilities Refunding 2004 series bonds Department:Utilities Caption:Motion to authorize the Finance and Utility departments to begin the process of issuing bonds to refund the Augusta, Georgia Water and Sewer Revenue Bonds, Series 2004, currently outstanding in the aggregate principal amount of $160,000,000 and up to $30,000,000of additional bonds for new water and sewer projects, with PFM, Inc. serving as financial advisor, McKenna Long & Aldridge, LLP serving as bond counsel and Murray Barnes Finister, LLP serving as disclosure counsel. Background:Augusta issued bonds in 2004 to finance various water and sewer improvements. The bond documents provided that the bonds could be called after ten years. Analysis:Current interest rates on tax exempt municipal bonds are lower that the rates on the existing bonds which makes refunding these bonds a prudent financial decision. Current projections show present value interest savings of approximately $17,600,000 if the bonds are refunded at today’s prevailing interest rates. In addition, the Utilities Department has needed projects that cannot be timely funded through cash flow. These projects are estimated to total between $20 million and $30 million. Financial Impact:Described above Alternatives:a) Issue bonds to refund the existing bonds and issue additional bonds for needed projects. b) Not refund the existing bonds and not issue bonds for new projects. c) Either refund the existing bonds and not issue additional bonds or not refund the existing bonds and issue additional bonds. Recommendation:Refund the existing bonds and issue bonds to include additional funds of up to $30 million for new projects. Funds are Available This is an enterprise fund and does not impact the General Fund Cover Memo Item # 2 in the Following Accounts: budget. Receipts from operations will pay debt service. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Engineering Services Committee Meeting 5/27/2014 1:00 PM Discuss the ESD approach for tire collection in residential areas Department:Environmental Services Caption:Discuss the ESD approach for tire collection in residential areas. Background:In the solid waste collections contract that ended in May of 2013, the collection of two tires per resident each week was an included service. In the contract that began June 1, 2013, this provision was not included. This was traditionally both an under-utilized and an abused service, on top of being inefficient and expensive. Many residents did not place two tires out for collection, however, the tire shops and shade-tree mechanics that participated in the collection program often placed out many extra tires. Further, because so few people placed tires out for collection and they could not be mixed with any other type of trash according to Georgia rules for solid waste disposal; the contractors had to have a separate truck drive every road in Augusta each week looking for tires to collect. Since June 2013, ESD has tried a variety of approaches to collect tires. The department used internal staff to travel various areas of the county, contractors were used and paid an hourly rate, the vacant lot cutting and cleaning contractors, and free tire collection events were implemented each month. Analysis:Through the trial and error process described above, ESD has determined that the use of staff or contractors to travel the county each week is inefficient and expensive. However, the free tire collection events are typically well utilized with hundreds of tires dropped off each month. As such, ESD is proposing a hybrid approach to tire collection. The tire collection events will be going back out to bid for 2015, as the current bid award is only good through December 2014; but ESD is also preparing an annual bid item for the collection of tires. We are proposing to designate one week out of the month when residents can place tires at the curb for collection and an ESD contractor would come through and collect no more than four tires. This collection week would be advertised so that all property owners would be aware and so that ESD can schedule this work in between other services that are provided (such as street sweeping services and regular solid waste collections). In addition, ESD is meeting and working with Planning and Development management and staff to review and Cover Memo Item # 3 possibly update applicable ordinances. The goal is to hold tire purchasers, re-sellers, and other users accountable for the tires they possess; and to prevent the mishandling or dumping of used tires. Financial Impact:The financial impact is unknown at this time; however it is the opinion of the department that the annual bid methodology, with one week of collection per month, will control costs and also provide an adequate level of service to the residents. ESD anticipates the cost of this service to be in the ballpark of $30,000 per year. Alternatives: Recommendation:Receive as information. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 3 Engineering Services Committee Meeting 5/27/2014 1:00 PM Druid Park Avenue Road Diet Project - Design Services Final Phase Department:Abie Ladson, Director Caption:Motion to approve funding final phases of Augusta, Georgia’s existing Design Services Agreement with Kimley-Horn and Associates for the Druid Park Avenue Road Diet Project (RC07- 001219) $328,581. This project is on the approved Band 1 list of Richmond County’s Transportation Investment Act of 2010 (aka, TIA, TSPLOST) projects as requested by AED/TE. Background:A “Road Diet” is technique employed in transportation engineering whereby the number of travel lanes or travel-lane widths are reduced in order to achieve other systemic benefits such as bike lanes, wider sidewalks, shorter crossings, and traffic calming. This concept has been shown to encourage multi-modal transportation use as well as improve safety for all roadway users. In addition to Druid Park Avenue, other areas that road diets are being considered include 15th Street, Upper Broad Street, and Laney Walker Boulevard. The extents of this project run from Wrightsboro Road to Walton Way and includes its intersection with Laney Walker Boulevard where a roundabout is currently proposed. Analysis:In February 2014, commission approved the initial design phases of the project that included traffic studies, data collection, renderings, and future public involvement. The purpose of this item is to move the project forward to full design. Financial Impact:Funds are available in the TIA budget account numbers 371-04- 1110-5212115/T13041219-5212115: Druid Park Improvements (Walton Way to Wrightsboro Road) in the amount of $328,581. Alternatives:1) Approve funding for the final design phases of the Design Consultant Services Agreement with Kimley-Horn and Associates in the amount of $328,581 for the Druid Park Avenue Road Diet Project. 2) Do not approve. Recommendation:Approve alternative #1 Cover Memo Item # 4 Funds are Available in the Following Accounts: 371-04-1110-5212115/T13041219-5212115: REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 4 c kimley-horn.com 2 Sun Court, Suite 450, Peachtree Corners, GA 30092 770 825 0744 May 16, 2014 Steve Cassell Assistant Director Traffic Engineering Division City of Augusta Engineering Department 505 Telfair Street Augusta, Georgia 30901 RE:Laney Walker Boulevard at Druid Park Avenue Design of Intersection Improvements Professional Services Fee Proposal – Next Phase Engineering Design Project Number: 328-041110-212828014 Purchase Order Number: 219302 Dear Steve: Kimley-Horn and Associates, Inc. (“Kimley-Horn” or “Consultant”) is pleased to submit this letter agreement (the “Agreement”) to the City of Augusta (“Client” or “the City”) for providing design services for the above referenced project. Project Understanding The existing signalized intersection of Laney Walker Boulevard at Druid Park Avenue is located adjacent to Paine College inside the city limits of Augusta, Georgia approximately 0.3 miles south of Walton Way. Laney Walker Boulevard terminates at Druid Park Avenue and consists of two westbound through lanes (acting as dual left turn lanes), one eastbound through lane (that quickly widens into a second eastbound through lane), a narrow flush median, and a channelized, stop- controlled westbound right turn lane. Druid Park Avenue consists of two northbound and two southbound through lanes with no median south of the intersection with Laney Walker Boulevard and one northbound and one southbound through lane north of the intersection. The signal also controls Mulherin Street, a two-lane local road, which parallels Laney Walker Boulevard to the south. Both Laney Walker Boulevard and Druid Park Avenue have urban shoulders with header curb and sidewalk, except for the southern shoulder of Laney Walker Boulevard which has no sidewalk. Both facilities have a mixture of residential, commercial, and educational land usages and are posted at 35 MPH. Druid Park Avenue is approximately 0.7 miles in length terminating at Wrightsboro Road to the south and Walton Way to the north, both of which are signalized intersections. The intersection of Druid Park Avenue at Central Avenue, approximately 0.2 miles north of Wrightsboro Road, is also signalized. South of Central Avenue and north of McAnally Street, Druid Park Avenue consists of one northbound and one southbound through lane, both wide enough to allow for on-street parking. Attachment number 1 \nPage 1 of 17 Item # 4 Page 2 kimley-horn.com 2 Sun Court, Suite 450, Peachtree Corners, GA 30092 770 825 0744 Kimley-Horn has already coordinated with the Client on concept design and public involvement activities for the above, referenced project. The Client has requested that Kimley-Horn move forward with design services to include the conversion of the intersection of Laney Walker Boulevard at Druid Park Avenue from a traffic signal to a single-lane roundabout. Along the portion of Druid Park Avenue adjacent to Paine College, from just north of Central Avenue to McAnally Street, the project will consist of adding a center raised median, conversion of two general purpose lanes in each direction to one general purpose lane and one dedicated bike lane in each direction, replacement of existing header curb, closed system drainage, and sidewalks, with curb and gutter, new closed system drainage, and six-foot sidewalks. Lighting and landscaping on the shoulders are both anticipated in this corridor as are minor gravity walls to avoid impacts outside of the existing right-of-way corridor. The existing pedestrian activated traffic signal south of Laney Walker Boulevard will be replaced by a HAWK signal. No median break will be provided at Mulherin Street as the Client anticipates relocating this driveway from Druid Park Avenue to Laney Walker Boulevard. Kimley-Horn will design this driveway on the existing right-of-way segment at the intersection of Laney Walker Boulevard and Emmett Street. The removal of existing, mature trees within the right-of-way, except where requested to be retained by the Client, will be shown to be removed. The remaining segments of Druid Park Avenue, from Wrightsboro Road to Central Avenue and from McAnally Street to Walton Way, will consist of curb-to-curb milling and inlay of pavement with no change in laneage, other than the potential addition of sharrows/shared-use signage. The existing closed system drainage will be analyzed for spread capacity only – no pipe replacements are anticipated as part of this effort – and additional drainage structures may be required. With the exception of improving crosswalk ramps to ADA compliant versions, no improvements are anticipated to the shoulders, including no changes to curbing, driveways, sidewalks, landscaping, utilities, etc. Laney Walker Boulevard, will be slightly realigned to tie to the proposed roundabout location. This realignment will result in the removal of an existing building. Curb and gutter and sidewalks will be added to the road along with necessary closed system drainage. This project will utilize Transportation Investment Act (“TIA”) funding and will therefore be required to follow the Georgia Department of Transportation (“GDOT”) TIA Manual (current as of this agreement). Kimley-Horn’s understanding of this project is that it will be 100% TIA funded, locally let, and is not on or does not cross/impact the GDOT State Route System. The TIA Manual sets forth guidance on the process for developing these types of projects. Scope of Services Kimley-Horn will provide the services specifically set forth below. TASK 1 – CONCEPT DEVELOPMENT Upon Notice to Proceed from the Client, Kimley-Horn will prepare a project schedule in Microsoft Project (not in Primavera) and will team with Edwards-Pitman Environmental, Inc. to perform an ecology screening to verify the presence, if any, of wetlands, buffered state waters, etc. In addition, Attachment number 1 \nPage 2 of 17 Item # 4 Page 3 kimley-horn.com 2 Sun Court, Suite 450, Peachtree Corners, GA 30092 770 825 0744 Kimley-Horn will team with S&ME to perform a Phase I Environmental Study of the existing building structure in the northeast quadrant of Druid Park Avenue at Laney Walker Boulevard. The project concept report will be prepared by W.R. Toole Engineers, Inc. (“WRTE”) under a separate authorization. TASK 2 – DATABASE PREPARATION Upon Notice to Proceed from the Client, Kimley-Horn will team with Toole Surveying Company, Inc. (“TSC”) to perform topographic survey of the proposed project area. This area is defined as the existing right-of-way corridor along Druid Park Avenue from Wrightsboro Road to Walton Way, 100’ past the intersections at the signalized sideroads, and approximately 600’ along Laney Walker Boulevard. The survey will be performed per GDOT specifications and will be delivered in InRoads for design in MicroStation V8i. Storm and sanitary sewer lines will be located within the project area as well as above ground utility facilities, including existing traffic signal equipment. Trees with a caliper of 12” and above will be located. Property lines will be located as well. TSC will coordinate with CSRA Utility Marking to provide “spray locations,” though no direct location methods (including potholing) or subsurface utility exploration activities will occur. No formal Client review and approval is anticipated. TASK 3 – PRELIMINARY PLANS Upon the GDOT Chief Engineer’s approval of the Concept Report, completion of the database collection, and Notice to Proceed from the TIA Program Manager and Client; Kimley-Horn will proceed with preliminary plans design of the project. Plans will be designed in MicroStation V8i and any coordinate geometry work will be performed in InRoads. Kimley-Horn will coordinate with the Client for submission of plans to utility facility owners within the project limits. Kimley-Horn will coordinate with MTJ Engineers, Inc., who will utilize the topographic survey to generate the horizontal geometric design of the roundabout and approach tie-ins for incorporation into the design plans. Kimley-Horn will use MTJ’s horizontal alignments and layout as a beginning and advance the design through preliminary plans. Kimley-Horn will partner with WRTE to prepare full Erosion, Sedimentation, and Pollution Control (“ES&PC”) Plans as more than one acre of disturbance is predicted. In addition, WRTE will perform water quality volume calculations. Because the total additional impervious area may not exceed 5,000 square feet, no design of water quality feature(s) has been assumed – this will need to occur as additional services if needed. Staging plans are anticipated, but no off-site detours are under consideration. In addition, Kimley-Horn anticipates that landscaping plans, planting details, and lighting plans will be required for this project. Kimley-Horn will coordinate with Electrical Design Consultants, Inc. (“EDC”) to prepare the lighting plans for the roundabout area and the portion of Druid Park Avenue between Central Avenue and McAnally Street only. Kimley-Horn does not anticipate any environmentally sensitive areas and/or buffered waters within the project limits. Kimley-Horn will again coordinate with MTJ, who will perform a quality control review of the design plans, prior to submission to the Client. At the Client’s discretion, MTJ will perform an optional operational analysis of the proposed roundabout to determine expected operations under normal and event traffic conditions. Attachment number 1 \nPage 3 of 17 Item # 4 Page 4 kimley-horn.com 2 Sun Court, Suite 450, Peachtree Corners, GA 30092 770 825 0744 Kimley-Horn will team with S&ME, Inc. who will prepare a memo-style pavement evaluation, consisting of four sampling locations, intended for Client information only (no formal review or GDOT involvement is anticipated). Minor clearing may be required and it is assumed that cleared vegetation will not be removed from areas of pedestrian and vehicular travel. Minor gravity walls are anticipated, though no wall foundation investigations are required or included with this effort. Once preliminary plans are completed, Kimley-Horn will submit five (5) sets of plans to the Client for review. To complete the review process, the appropriate representatives from Kimley-Horn and WRTE will attend a Client-administered Preliminary Field Plan Review (“PFPR”) to review the plans and perform a site visit. Kimley-Horn will also provide formal responses to any Client comments. TASK 4 – PUBLIC INVOLVEMENT Upon updating the plans per the Client PFPR comments, Kimley-Horn will revise the original concept layouts to incorporate any changes. Kimley-Horn representatives will attend a Client-administered public information session dry run and both Kimley-Horn and WRTE representatives will attend the actual public information session. It is not anticipated that public feedback will be sought. In addition three representatives from Kimley-Horn and one representative from WRTE will attend up to one stakeholder meeting, anticipated to occur with representatives from Paine College. At the Client’s discretion, MTJ will be available to prepare support materials for public involvement (i.e. 3- dimensional modeling). TASK 5 – RIGHT-OF-WAY PLANS Upon updating the plans per the Client PFPR comments, Kimley-Horn will prepare right-of-way plans and data tables for submission to the Client. It is anticipated that approximately six (6) parcels will be impacted. If necessary, Kimley-Horn will address Client comments and resubmit for approval. Kimley-Horn assumes that up to four rounds of formal right-of-way revisions will be necessary due to property owner negotiations and/or condemnations. Kimley-Horn will team with TSC to provide one round of right-of-way and easement staking services. No GDOT involvement or review is anticipated. TASK 6 – FINAL PLANS Kimley-Horn and WRTE will incorporate County and internal PFPR review comments as well as any changes resulting from right-of-way acquisition. Quantities will be verified and reported within the plans per the County standards, current as of this agreement. Again, Kimley-Horn will coordinate with MTJ, who will perform a quality control review of the final design plans, prior to submission to the Client and GDOT. As part of the submittal package of the field plan review (FPR) plans, which will occur at 80-85% completion, the quantities will be compiled into a construction cost estimate that will be provided to the Client and to GDOT. Kimley-Horn and WRTE will attend a GDOT FPR and provide responses to any comments received. Design plans will be revised per these comments and submitted, along with an updated construction cost estimate, to the Client for advertisement and construction. Kimley-Horn and WRTE will attend both a pre-bid meeting and a pre-construction meeting and assist with responses/requests for information. Shop drawings are not anticipated as part of this project. Attachment number 1 \nPage 4 of 17 Item # 4 Page 5 kimley-horn.com 2 Sun Court, Suite 450, Peachtree Corners, GA 30092 770 825 0744 As it is assumed that this project will result in the disturbance of more than one acre, WRTE will submit plans to the City of Augusta to be reviewed on behalf of the EPD. Any comments received from the City will be addressed and if necessary, revisions provided. One seven-day inspection, including a report documenting the inspection findings, will be conducted by WRTE at the appropriate time. Services Not Included Any other services, including but not limited to the following, are not included in this Agreement: l Traffic studies, roundabout validation efforts, and laneage recommendations (beyond previous efforts) l Signal warrant analyses l Survey database accuracy review l NEPA/GEPA Environmental Documentation l Hydraulic/Hydrologic Design Services l Attendance at meetings not specified in the attached fee proposal Additional Services Any services not specifically provided for in the above scope will be billed as additional services and performed at our then current rate schedule, as previously provided to the Client. Additional services we can provide include, but are not limited to, the following: l Concept Report l Concept Team Meeting l Value Engineering l Operational Analysis of Roundabout l Design of structural components, including bridges and walls l Design of water quality features/Best Management Practices l Detour Plans l Detailed analysis of identified state waters l Ecology-related Agency/Client coordination, meetings, or submittals l Preparation of permit applications for ecology resources l Stream Buffer Variances l ATMS/Interconnect Design l Preparation of design variances/exceptions l Preparation of responses to public comments l Soil Surveys or wall foundation investigations l Construction Administration Services (per Client request, a separate task has been included for this specific effort, but will not be used unless authorized by the Client) l Coordination involving any TIA auditing Information Provided By Client Attachment number 1 \nPage 5 of 17 Item # 4 Page 6 kimley-horn.com 2 Sun Court, Suite 450, Peachtree Corners, GA 30092 770 825 0744 Kimley-Horn shall be entitled to rely on the completeness and accuracy of all information provided by the Client or the Client’s consultants or representatives. The Client shall provide all information requested by Kimley-Horn during the project, including but not limited to the following: l GIS, Cadd, and database files l Client design criteria, including water quality/MS4 and traffic signal improvement requirements l Traffic Data/Laneage Recommendations l Current Client notes for inclusion in the plans l Water and sewer facilities design and corresponding quantities/pay items l Utility coordination and costs l Right-of-way costs l Environmental resource information, delineations, documentation, surveys, etc., that are not part of the Consultant’s scope Responsibilities of Client In addition to other responsibilities set out in this Agreement, the Client shall: l Complete a Local Project Delivery Application l Prepare written requests for extension of completion date (if required) l Perform the certification of Right-of-Way, Utilities, and Environmental including preparation of required forms l Prepare a request to eliminate Concept Team Meeting and required coordination with GDOT Program Manager l Coordinate with GDOT for issuing phased Notices to Proceed Schedule We will provide our services as expeditiously as practicable with the goal of meeting a schedule to be agreed upon after being given Notice to Proceed by the Client. The project is currently shown as being let in October 2015. Fees and Expenses Kimley-Horn will perform the services in Tasks 1 – 6, as well as having separate funding set aside for future client authorized tasks, for the total lump sum fee below. Individual task amounts are informational only. All permitting, application, and similar project fees will be paid directly by the Client. Task 1 Concept Summary Report $ 9,285 Task 2 Database Preparation $ 56,823 Task 3 Preliminary Plans $101,421 Task 4 Public Involvement $ 23,755 Task 5 Right-of-Way Plans $ 16,274 Task 6 Final Plans $ 80,822 Attachment number 1 \nPage 6 of 17 Item # 4 Page 7 kimley-horn.com 2 Sun Court, Suite 450, Peachtree Corners, GA 30092 770 825 0744 Const. Admin. (used per Client’s written authorization only)$ 10,330 Force Account (used per Client’s written authorization only)$ 29,871 Total Lump Sum Fee $328,581 Lump sum fees will be invoiced monthly based upon the overall percentage of services performed and using the invoicing guidance previously provided by the Client. Payment will be due within 25 days of your receipt of the invoice. Closure With Kimley-Horn, you should expect more and will experience better. Please contact me at (678) 533-3930 or kevin.ergle@kimley-horn.com should you have any questions. Sincerely, Kevin Ergle, P.E.John Walker, P.T.O.E., P.E. Project Manager Senior Vice President Attachment: Fee Schedule Attachment number 1 \nPage 7 of 17 Item # 4 5/16/2014 Augusta, GA Kimley-Horn Druid Park Ave/Laney Walker Blvd. Roundabout Design Position Hourly Rate Principal-In-Charge 225 Project Manager 165 Senior Engineer - PE 165 Staff Engineer - PE 110 Staff Engineer - EIT 95 CAD Operator 80 Administrator 80 Phase #Phase Name Phase 1 Concept Summary Phase 2 Database Phase 3 Preliminary Plans Phase 4 Public Involvement Phase 5 Right-of-Way Plans Phase 6 Final Plans Phase 7 Bidding / Advertising Phase 8 Const. Admin & Inspection Project Location: Owner: Project Name: Date: Attachment number 1 \nPage 8 of 17 Item # 4 Kimley-Horn and Associates, Inc. Design Services Hour and Fee Summary Item/ Task Description Principal-In-Charge Project Manager Senior Engineer - PE Staff Engineer - PE Staff Engineer - EIT CAD Operator Administrator Total Concept Summary Develop project schedule 3 3 Project management, sub coordination/contracting, & admin 2 12 12 26 0 0 0 0 0 0 0 0 0 0 0 0 Total = 2 15 0 0 0 0 12 29 Personnel Est. Hours Rate/Hour Cost ($)Totals Principal-In-Charge 2 $225.00 $450.00 Project Manager 15 $165.00 $2,475.00 Senior Engineer - PE 0 $165.00 $0.00 Staff Engineer - PE 0 $110.00 $0.00 Staff Engineer - EIT 0 $95.00 $0.00 CAD Operator 0 $80.00 $0.00 Administrator 12 $80.00 $960.00 1. Total per Rate Schedule $3,885.00 $3,885.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) Mileage (0 Trip)$0.550 $0.00 Sub-Consultants Edwards-Pitman (Ecology Screening)1 $2,600.00 $2,600.00 S&ME - Phase I Analysis 1 $2,800.00 $2,800.00 5. Total Other Direct Costs $5,400.00 6. Maximum Amount of Contract Proposal (3) + (4) + (5) Estimate Total:$9,285.00 Druid Park Ave/Laney Walker Blvd. Roundabout Design Date: Project Location: 5/16/2014 Augusta, GA Owner: Project Name: Kimley-Horn Attachment number 1 \nPage 9 of 17 Item # 4 Kimley-Horn and Associates, Inc. Design Services Hour and Fee Summary Item/ Task Description Principal-In-Charge Project Manager Senior Engineer - PE Staff Engineer - PE Staff Engineer - EIT CAD Operator Administrator Total Database Coord w/Surveyor 1 2 4 4 11 Review Database 4 4 8 Project management & administration 3 3 6 0 0 0 0 0 0 0 0 0 0 0 Total = 1 9 0 8 0 0 7 25 Personnel Est. Hours Rate/Hour Cost ($)Totals Principal-In-Charge 1 $225.00 $225.00 Project Manager 9 $165.00 $1,485.00 Senior Engineer - PE 0 $165.00 $0.00 Staff Engineer - PE 8 $110.00 $880.00 Staff Engineer - EIT 0 $95.00 $0.00 CAD Operator 0 $80.00 $0.00 Administrator 7 $80.00 $560.00 1. Total per Rate Schedule $3,150.00 $3,150.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) Sub-Consultants Toole Surveying (topo survey, utility spray locate)1 $48,173.00 $48,173.00 S&ME - Pavement Evaluation 1 $5,500.00 $5,500.00 5. Total Other Direct Costs $53,673.00 6. Maximum Amount of Contract Proposal (3) + (4) + (5) Estimate Total:$56,823.00 Project Name:Druid Park Ave/Laney Walker Blvd. Roundabout Design Date:5/16/2014 Project Location:Augusta, GA Owner:Kimley-Horn Attachment number 1 \nPage 10 of 17 Item # 4 Kimley-Horn and Associates, Inc. Design Services Hour and Fee Summary Item/ Task Description Principal-In-Charge Project Manager Senior Engineer - PE Staff Engineer - PE Staff Engineer - EIT CAD Operator Administrator Total Preliminary Plans Develop Horizontal Geometry 2 8 10 Develop Vertical Geometry 2 12 14 Develop Templates 12 12 20% Internal QC Check 6 6 Drainage calculations 2 2 40 44 Prepare Cover Sheet 2 1 1 4 Prepare Index Sheet, General Notes 1 1 1 3 Prepare Typical Section Sheets 2 8 1 1 12 Prepare Constr. Stakeout sheets 2 2 1 5 Prepare Construction Plan sheets 2 4 40 12 58 Prepare profile sheets 1 4 4 9 Prepare Driveway Profiles 1 2 6 9 Prepare roadway cross-sections 16 4 20 Plot construction limits on Constr. Plans 4 1 5 Submit plans/files to Utility Owners 2 4 1 7 Add existing utilities to Utility Plan sheets 2 8 16 26 Prepare Pipe Profiles 1 2 16 8 27 Prepare grading plan/apron detail 8 1 9 Prepare Staging Plans 4 20 8 32 Prepare Signing and Marking Plans 1 1 8 8 18 Prepare retaining wall envelopes (2)2 32 16 50 Prepare Landscaping Plans 2 6 40 48 Prepare Signal Plans (3 intersection modifications)6 12 48 48 114 Prepare HAWK Signal Plans 2 4 16 16 38 Set up DE & SOQ sheets 2 2 8 12 QC Preliminary Plans 2 2 16 2 22 Revise Plans per Internal QC Review 1 8 8 4 21 Prepare MTJ submittal 4 4 1 9 Revise plans per MTJ review commments 1 8 9 Prepare Augusta PFPR Package 4 2 4 1 11 Attend Augusta PFPR 10 10 20 Prepare responses to PFPR Report 2 8 10 Project management & administration 4 12 12 28 0 0 Total = 16 71 42 265 230 83 15 722 Personnel Est. Hours Rate/Hour Cost ($)Totals Principal-In-Charge 16 $225.00 $3,600.00 Project Manager 71 $165.00 $11,715.00 Senior Engineer - PE 42 $165.00 $6,930.00 Staff Engineer - PE 265 $110.00 $29,150.00 Staff Engineer - EIT 230 $95.00 $21,850.00 CAD Operator 83 $80.00 $6,640.00 Administrator 15 $80.00 $1,200.00 1. Total per Rate Schedule $81,085.00 $81,085.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) Reproduction - 5 sets, 150 sheets 750 $0.20 $150.00 Mileage (1 Trip)300 $0.550 $165.00 Sub-Consultants MTJ Engineering (Horizontal Design)1 $12,666.00 $12,666.00 EDC (Lighting)1 $2,025.00 $2,025.00 W.R. Toole Engineering (ES&PC, MS4)1 $5,330.00 $5,330.00 5. Total Other Direct Costs $20,336.00 6. Maximum Amount of Contract Proposal (3) + (4) + (5) Estimate Total:$101,421.00 Project Name:Druid Park Ave/Laney Walker Blvd. Roundabout Design Date:5/16/2014 Project Location:Augusta, GA Owner:Kimley-Horn Attachment number 1 \nPage 11 of 17 Item # 4 Kimley-Horn and Associates, Inc. Design Services Hour and Fee Summary Item/ Task Description Principal-In-Charge Project Manager Senior Engineer - PE Staff Engineer - PE Staff Engineer - EIT CAD Operator Administrator Total Public Involvement Revise Layouts 4 24 4 32 Attend Dry Run 10 10 20 Update Layouts per Dry Run comments 2 6 8 Attend Public Information Session (1)10 10 10 30 Attend Stakeholder Meeting with Paine College (1)10 10 10 4 34 Project Management & administration 4 4 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total = 30 40 0 50 0 4 8 132 Personnel Est. Hours Rate/Hour Cost ($)Totals Principal-In-Charge 30 $225.00 $6,750.00 Project Manager 40 $165.00 $6,600.00 Senior Engineer - PE 0 $165.00 $0.00 Staff Engineer - PE 50 $110.00 $5,500.00 Staff Engineer - EIT 0 $95.00 $0.00 CAD Operator 4 $80.00 $320.00 Administrator 8 $80.00 $640.00 1. Total per Rate Schedule $19,810.00 $19,810.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) Mileage (3Trips)900 $0.550 $495.00 Sub-Consultants W.R. Toole (Stakeholder Meeting/Public Meeting)1 $3,450.00 $3,450.00 5. Total Other Direct Costs $3,945.00 6. Maximum Amount of Contract Proposal (3) + (4) + (5) Estimate Total:$23,755.00 Project Name:Druid Park Ave/Laney Walker Blvd. Roundabout Design Date:5/16/2014 Project Location:Augusta, GA Owner:Kimley-Horn Attachment number 1 \nPage 12 of 17 Item # 4 Kimley-Horn and Associates, Inc. Design Services Hour and Fee Summary Item/ Task Description Principal-In-Charge Project Manager Senior Engineer - PE Staff Engineer - PE Staff Engineer - EIT CAD Operator Administrator Total Right-of-Way Plans R/W Plan Cover 1 1 1 3 Set up R/W & ESMT chains 1 16 17 Prepare Data Tables 6 6 Prepare R/W Plans Sheets 1 4 8 2 15 Internal QC 2 2 Prepare Initial R/W Plans Submittal 1 2 1 4 Address Client Comments 2 4 4 10 Prepare Final R/W Plans Submittal 1 2 1 4 Prepare Data for R/W Staking 1 2 3 Project management & administration 5 5 10 Formal R/W Revisions (Assume 4)4 20 24 Generate Output Files 4 4 0 0 Total = 0 16 2 61 13 3 7 102 Personnel Est. Hours Rate/Hour Cost ($)Totals Principal-In-Charge 0 $225.00 $0.00 Project Manager 16 $165.00 $2,640.00 Senior Engineer - PE 2 $165.00 $330.00 Staff Engineer - PE 61 $110.00 $6,710.00 Staff Engineer - EIT 13 $95.00 $1,235.00 CAD Operator 3 $80.00 $240.00 Administrator 7 $80.00 $560.00 1. Total per Rate Schedule $11,715.00 $11,715.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) Reproduction - 5 sets, 20 sheets 100 $0.20 $20.00 Mileage (0 Trip)0 $0.550 $0.00 Sub-Consultants Toole Surveying (R/W Staking - 1 round)1 $4,539.00 $4,539.00 5. Total Other Direct Costs $4,559.00 6. Maximum Amount of Contract Proposal (3) + (4) + (5) Estimate Total:$16,274.00 Project Name:Druid Park Ave/Laney Walker Blvd. Roundabout Design Date:5/16/2014 Project Location:Augusta, GA Owner:Kimley-Horn Attachment number 1 \nPage 13 of 17 Item # 4 Kimley-Horn and Associates, Inc. Design Services Hour and Fee Summary Item/ Task Description Principal-In-Charge Project Manager Senior Engineer - PE Staff Engineer - PE Staff Engineer - EIT CAD Operator Administrator Total Final Plans Finalize Cover Sheet 1 1 Finalize Index Sheet 1 1 Prepare Revision Summary Sheet 1 1 Finalize Typical Sections Sheets 2 2 Finalize Constr. Plan Sheets 2 4 12 6 24 Finalize Profile Sheets 1 1 2 Finalize drainage designs 4 8 4 16 Second Utility Submission 2 4 1 7 Finalize Utility Plans 4 12 16 Finalize roadway cross-sections 4 4 Finalize Landscaping Plans 2 1 20 40 12 75 Finalize Signal Plans (3 intersection modifications)3 6 24 24 57 Finalize HAWK Signal Plans 1 2 8 8 19 Finalize Driveway Profiles 2 2 Finalize Signing and Marking Plans 4 1 5 Finalize Details of Proposed Signs 4 4 Finalize Staging Plans 2 8 2 12 Finalize retaining wall envelopes (2)2 16 8 26 Quantify Pay Items, Add to SOQ/DE 2 4 32 38 Prepare final construction cost estimate 2 8 10 QC Final plans 2 2 16 2 22Revise Plans per Internal QC Review 1 8 4 8 21 Prepare 80% FPR Package, incl QC checklist 4 2 6Attend GDOT FPR 8 8 16 Prepare responses to GDOT FPR Report 2 8 4 14Incorporate comments from GDOT FPR 4 24 24 8 60 QC Contract Plans 8 8 16Final submittal of electronic files 1 1 2 Attend Pre-Bid Meeting, generate minutes 10 10Respond to Contractor Questions 8 8 Attend Pre-Construction Meeting 10 10 Project Closeout Submittal 2 2 1 5 Project management & administration 4 16 8 28 0 0 Total = 36 73 34 153 139 96 9 540 Personnel Est. Hours Rate/Hour Cost ($)Totals Principal-In-Charge 36 $225.00 $8,100.00 Project Manager 73 $165.00 $12,045.00 Senior Engineer - PE 34 $165.00 $5,610.00 Staff Engineer - PE 153 $110.00 $16,830.00 Staff Engineer - EIT 139 $95.00 $13,205.00 CAD Operator 96 $80.00 $7,680.00 Administrator 9 $80.00 $720.00 1. Total per Rate Schedule $64,190.00 $64,190.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) Reproduction - 10 sets, 175 sheets 1,750 $0.20 $350.00 Mileage (3 Trips)900 $0.550 $495.00 Sub-Consultants MTJ Engineering (RAB Review)1 $5,932.00 $5,932.00 EDC (Lighting)1 $4,725.00 $4,725.00 W.R. Toole Engineering (ES&PC, MS4, Meetings)1 $5,130.00 $5,130.00 5. Total Other Direct Costs $16,632.00 6. Maximum Amount of Contract Proposal (3) + (4) + (5) Estimate Total:$80,822.00 Project Name:Druid Park Ave/Laney Walker Blvd. Roundabout Design Date:5/16/2014 Project Location:Augusta, GA Owner:Kimley-Horn Attachment number 1 \nPage 14 of 17 Item # 4 Kimley-Horn and Associates, Inc. Design Services Hour and Fee Summary Item/ Task Description Principal-In-Charge Project Manager Senior Engineer - PE Staff Engineer - PE Staff Engineer - EIT CAD Operator Administrator Total Bidding / Advertising N/A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total = 0 0 0 0 0 0 0 0 Personnel Est. Hours Rate/Hour Cost ($)Totals Principal-In-Charge 0 $225.00 $0.00 Project Manager 0 $165.00 $0.00 Senior Engineer - PE 0 $165.00 $0.00 Staff Engineer - PE 0 $110.00 $0.00 Staff Engineer - EIT 0 $95.00 $0.00 CAD Operator 0 $80.00 $0.00 Administrator 0 $80.00 $0.00 1. Total per Rate Schedule $0.00 $0.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) Mileage (1 Trip)0 $0.550 $0.00 Sub-Consultant 0 $0.00 $0.00 5. Total Other Direct Costs $0.00 6. Maximum Amount of Contract Proposal (3) + (4) + (5) Estimate Total:$0.00 Project Name:Druid Park Ave/Laney Walker Blvd. Roundabout Design Date:5/16/2014 Project Location:Augusta, GA Owner:Kimley-Horn Attachment number 1 \nPage 15 of 17 Item # 4 Kimley-Horn and Associates, Inc. Design Services Hour and Fee Summary Item/ Task Description Principal-In-Charge Project Manager Senior Engineer - PE Staff Engineer - PE Staff Engineer - EIT CAD Operator Administrator Total Const. Admin & Inspection 0 N/A - Treat as expense 0 0 0 0 0 0 0 0 0 0 0 0 0 Total = 0 0 0 0 0 0 0 0 Personnel Est. Hours Rate/Hour Cost ($)Totals Principal-In-Charge 0 $225.00 $0.00 Project Manager 0 $165.00 $0.00 Senior Engineer - PE 0 $165.00 $0.00 Staff Engineer - PE 0 $110.00 $0.00 Staff Engineer - EIT 0 $95.00 $0.00 CAD Operator 0 $80.00 $0.00 Administrator 0 $80.00 $0.00 1. Total per Rate Schedule $0.00 $0.00 Additional Costs Other Direct Costs Number Rate Est. Cost ($) Mileage (2Trip)600 $0.550 $330.00 KHA (Const. Admin)1 $10,000.00 $10,000.00 5. Total Other Direct Costs $10,330.00 6. Maximum Amount of Contract Proposal (3) + (4) + (5) Estimate Total:$10,330.00 Project Name:Druid Park Ave/Laney Walker Blvd. Roundabout Design Date:5/16/2014 Project Location:Augusta, GA Owner:Kimley-Horn Attachment number 1 \nPage 16 of 17 Item # 4 Kimley-Horn and Associates, Inc. Design Services Hour and Fee Summary Principal-In-Charge Project Manager Senior Engineer - PE Staff Engineer - PE Staff Engineer - EIT CAD Operator Administrator Total Concept Summary 2 15 0 0 0 0 12 29 Database 1 9 0 8 0 0 7 25 Preliminary Plans 16 71 42 265 230 83 15 722 Public Involvement 30 40 0 50 0 4 8 132 Right-of-Way Plans 0 16 2 61 13 3 7 102 Final Plans 36 73 34 153 139 96 9 540 Bidding / Advertising 0 0 0 0 0 0 0 0 Const. Admin & Inspection 0 0 0 0 0 0 0 0 Totals 85 224 78 537 382 186 58 1550 Total Task Fees Concept Summary $9,285.00 Database $56,823.00 Preliminary Plans $101,421.00 Public Involvement $23,755.00 Right-of-Way Plans $16,274.00 Final Plans $80,822.00 Bidding / Advertising $0.00 Const. Admin & Inspection $10,330.00 Subconsultant $298,710.00 W.R. Toole Engineering, Inc. Toole Surveying Co., Inc. MTJ Engineering Force Account (10%) =29,871.00$ Edwards-Pitman S&ME EDC Subconsultant Totals Total =328,581.00$ $20,336.00 $19,810.00 $3,945.00 Phase Description Phase Description $3,885.00 $5,400.00 $3,150.00 Cost Summary 5/16/2014 Augusta, GA Date: $64,190.00 $4,559.00 $53,673.00 Project Location: KHA Man-Hour Summary Kimley-Horn Druid Park Ave/Laney Walker Blvd. Roundabout DesignProject Name: Owner: Estimated Total = KHALabor Costs Sub-Consultant Costs and Direct Costs $0.00 $0.00 $10,330.00 $16,632.00 $11,715.00 $0.00 $81,085.00 13,910.00$ 52,712.00$ 18,598.00$ 6,750.00$ 102,870.00$ Fee 8,300.00$ 2,600.00$ Attachment number 1 \nPage 17 of 17 Item # 4 Engineering Services Committee Meeting 5/27/2014 1:00 PM Emergency Repair Lumpkin Road Sanitary Sewer Department:Utilities Caption:Notification of emergency repairs performed by Avrett Plumbing. Background:Augusta Utilities was notified of collapsing pavement in Lumpkin Road, west of Peach Orchard Road. Upon investigation, we determined that a 15 inch line had deteriorated to the point that it was beginning to collapse. This situation required that we barricade the outside lane of Lumpkin Road. Analysis:Because of the risk to traffic, we proceeded with an emergency project to install a structural liner in the pipe. Avrett Plumbing, a local contractor, performed the work at a cost of $42,475. Financial Impact:The cost for this emergency work was $42,475. There were sufficient funds in Utilities' budget for this work. Alternatives:No viable alternative. Recommendation:No action required. Funds are Available in the Following Accounts: 511043420-5212115 / 80313120-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 5 Attachment number 1 \nPage 1 of 4 Item # 5 Attachment number 1 \nPage 2 of 4 Item # 5 Attachment number 1 \nPage 3 of 4 Item # 5 Attachment number 1 \nPage 4 of 4 Item # 5 Engineering Services Committee Meeting 5/27/2014 1:00 PM Environmental Services Department Update on Solid Waste Collection fees for the Urban Services District. Department:Environmental Services Caption:Environmental Services Department Update on Solid Waste Collection fees for the Urban Services District. Background:Prior to consolidation, the old city received solid waste collections. Those collections were paid for through the millage rate set by the city. In approximately late 2000 to early 2001, solid waste services became mandatory by the consolidated government. At that time, the Urban District (Old City) and the Suburban District (Old County) had not determined a way to consolidate into one taxing entity, and the government is still split into an Urban Tax District and a Suburban Tax district. This split methodology gave the Environmental Services Department grief in 2005 when fees needed to be raised as the department was operating at a loss for several years. Revenues had to be increased; however, the political will to raise taxes was not evident. Therefore, the department proposed a split fee system. In 2013 that fee structure was Urban paid its millage rate plus $115.50, and suburban paid $310.50. Mind you that there are approximately 13,000 units in Urban and approximately 50,000 units in suburban. This simply highlights that the all fee system comprises about 20% of all customers. This system has created issues over the years. As we developed methodologies for exempting locations from solid waste, in suburban the entire fee came off, while in urban, they still paid the millage rate whether service was rendered or not. Second, there are a variety of businesses, industry, and other properties which are supplementing the cost of solid waste services for the urban area, as they pay the millage and do not receive service, which is not happening in the suburban area. At the Commission meeting on June 4, 2013, the Resolution and policies regarding Solid Waste collection in Augusta were approved. This resolution coordinated with the change to one time per week trash collection, and the change in contractors and collection rules for those property owners in Augusta that participate in the solid waste and recyclables collection program. The resolution specifically addresses fees by saying, “WHEREAS, it has been determined by Cover Memo Item # 6 the Augusta Commissioners that there is a need to fund the ESD through a fee based system, where all property owners pay fees for services, in a similar fee based system, allowing for revenues for various ESD functions to be consolidated and collected through a single fee system.” The resolution further supports a universal fee structure when it adopted the initial policies for fees and exemptions, as well as “directs and authorizes the Director of Environmental Services to establish a billing system for the collection of fees and charges for solid waste and recycling collection services and other ESD functions, and said fees shall minimally cover the full cost of the ESD services and programs.” Additionally at that meeting, a policy that goes along with the Resolution which is applicable for this discussion is “Solid Waste Collection Fees”. This policy generally defines the types of services offered, the service levels which are available, as well as the customer’s options for service flexibility. This policy ties directly to the commissions contract approval, which included incentive based recycling, as well as a pay as you through concept. Simply put, the more you recycle, and/or the less you dispose of, offers the customer the opportunity to reduce the container sizes and the associated costs of service. Analysis:By moving to an all fee based system, eliminates confusion and the numerous calls each year that are generated by having two different fees for the same service. The citizens generally do not understand the difference between Old City and Old County this long after consolidation. Additionally, moving to an all fee system standardizes the fees. Residential waste collection would not be subsidized by commercial businesses and others in one part of the city and not the other. Further, when a millage system is used, the cost of service is based on the property value in the urban district, while the suburban district pays a standardized rate for services. This creates a direct inequity of the cost of services not only between urban and suburban, but also all the way down to an individual customer within the urban district. With the commission approving a contract with incentive based recycling, as well as a fee structure that promotes “pay as you through”, (the less waste you have, the less you could pay), having a split fee system truly magnifies the inequities of our current program. Should an urban customer reduce can sizes, they will get the reduced rate for service. However, when the value of the home is included, that discount could make all services provided by the government free, and to the contrary, when a home with a high value asks for a reduced service level they will only get the value of the fee adjustment, and will still be paying more for solid waste than others. Financial Impact: Cover Memo Item # 6 Alternatives: Recommendation:Receive as information Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 6 Attachment number 1 \nPage 1 of 5 Item # 6 Attachment number 1 \nPage 2 of 5 Item # 6 Attachment number 1 \nPage 3 of 5 Item # 6 Attachment number 1 \nPage 4 of 5 Item # 6 Attachment number 1 \nPage 5 of 5 Item # 6 Attachment number 2 \nPage 1 of 9 Item # 6 Attachment number 2 \nPage 2 of 9 Item # 6 Attachment number 2 \nPage 3 of 9 Item # 6 Attachment number 2 \nPage 4 of 9 Item # 6 Attachment number 2 \nPage 5 of 9 Item # 6 Attachment number 2 \nPage 6 of 9 Item # 6 Attachment number 2 \nPage 7 of 9 Item # 6 Attachment number 2 \nPage 8 of 9 Item # 6 Attachment number 2 \nPage 9 of 9 Item # 6 Engineering Services Committee Meeting 5/27/2014 1:00 PM Environmental Services Department Update on Solid Waste Collection fees for Vacant Lots Department:Environmental Services Caption:Environmental Services Department Update on Solid Waste Collection fees for Vacant Lots. Background:At the Commission meeting on June 4, 2013, the Resolution and policies regarding Solid Waste collection in Augusta were approved. This resolution coordinated with the change to one time per week trash collection, and the change in contractors and collection rules for those property owners in Augusta that participate in the solid waste and recyclables collection program. The policies that go along with the Resolution which are applicable for this discussion are “Solid Waste Collection Fees” and “Solid Waste and Recycling Exemptions”. These two policies define the service types, fees, and qualifications to be released from services. The “Solid Waste Collection Fees” policy defines an Unoccupied Location as a “vacant or unoccupied residential unit, unimproved property or vacant lot”. It further states that to reclassify a residential unit as an Unoccupied Location, the property must be uninhabitable due to fire, flood, or natural disaster; meet the terms of the Mothball ordinance; be condemned; or the property has no dwelling. At this level of service the owner is entitled to receive weekly yard waste and bulky waste collection as an easy and effective means to maintain their property at a rate of $155.25 per year, or $12.93 per month. Analysis:The 2014 tax year is the first time this fee for Unoccupied Locations has been implemented. It has, however, highlighted the fact that the various qualifications for exemption from service need to be expanded. Currently, a customer can be released from services for one of the following reasons: the dwelling is 200+ feet from the right of way; a tract of land greater than 10 acres in size used for agricultural, forestry, or farming; or there is a high potential risk to safety or high potential to damage property. It does not include an exemption for undeveloped lots that are less than 10 acres in size. It is therefore the recommendation from ESD that an exemption be included for those properties that have no dwelling as of January 1 of the current tax year. This would go into effect for the 2014 tax year. This change would affect Cover Memo Item # 7 approximately 11,800 parcels out of 75,200, or 16% of the properties in Augusta. Further, this change would need to be implemented as soon as possible to provide adequate notice to the property owners and to provide ESD adequate time to amend the billing data prior to the digest being frozen at the end of July in preparation for the annual property tax statement mailing. Financial Impact:The financial impact will be sizeable to ESD, as this service was budgeted and approved for 2014. The impact will be a reduction in revenues of approximately $1.3M due to the department assuming roughly 8000 vacant lots would remain after exemptions were granted. Further, if this service is eliminated altogether, this changes the value of the solid waste collections contract for the contracted haulers – Advanced Disposal and Inland Services, who entered into an agreement with Augusta to provide collection services to these properties. For both contractors, this would directly impact their subcontractors – A1 Sanitation and Metropolitan Waste, as these companies purchased trucks and are servicing the yard waste and bulky waste routes each day. With potentially 8000 fewer collections each month, the amount the subcontractors would earn would decrease greatly. Alternatives:1. Approve the inclusion of an exemption option for those properties that have no dwelling as of January 1 of the current tax year. 2. Do not approve Recommendation:Approve the inclusion of an exemption option for those properties that have no dwelling as of January 1 of the current tax year. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 7 Attachment number 1 \nPage 1 of 9 Item # 7 Attachment number 1 \nPage 2 of 9 Item # 7 Attachment number 1 \nPage 3 of 9 Item # 7 Attachment number 1 \nPage 4 of 9 Item # 7 Attachment number 1 \nPage 5 of 9 Item # 7 Attachment number 1 \nPage 6 of 9 Item # 7 Attachment number 1 \nPage 7 of 9 Item # 7 Attachment number 1 \nPage 8 of 9 Item # 7 Attachment number 1 \nPage 9 of 9 Item # 7 Attachment number 2 \nPage 1 of 8 Item # 7 Attachment number 2 \nPage 2 of 8 Item # 7 Attachment number 2 \nPage 3 of 8 Item # 7 Attachment number 2 \nPage 4 of 8 Item # 7 Attachment number 2 \nPage 5 of 8 Item # 7 Attachment number 2 \nPage 6 of 8 Item # 7 Attachment number 2 \nPage 7 of 8 Item # 7 Attachment number 2 \nPage 8 of 8 Item # 7 Attachment number 3 \nPage 1 of 5 Item # 7 Attachment number 3 \nPage 2 of 5 Item # 7 Attachment number 3 \nPage 3 of 5 Item # 7 Attachment number 3 \nPage 4 of 5 Item # 7 Attachment number 3 \nPage 5 of 5 Item # 7 Engineering Services Committee Meeting 5/27/2014 1:00 PM J. B. Messerly Contract Operations Department:Utilities Caption:Recommendation to exercise option to extend agreement between Augusta and ESG Operations, Inc. for a period of five years beginning January 1, 2015 and ending December 31, 2019. Background:Augusta entered into an agreement with ESG Operations, Inc. on December 16, 2009 for Operations, Management and Management Services. Section 7.1 of that agreement states that "The initial term of this Agreement shall be five (5) years commencing on January 1st, 2010. Thereafter, this Agreement may be renewed by Augusta for successive five (5) year terms subject to the mutual agreement of the parties to the terms and conditions of such renewal." ESG has offered the attached proposal for extending the current agreement for an additional five years. This proposal continues the current agreement terms with the exception of a change in the Management Fee which would decrease from 12.5% to 12.0%. In order to properly plan and budget for the future we need to determine the desire of the Commission regarding exercising the renewal option mentioned in agreement section 7.1. Analysis:We have had a good experience working with ESG under their current agreement. We have found them to be responsive to our needs and able to mobilize quickly to address equipment or operational issues at our facilities. They have consistently met the requirements of their agreement and have managed to accomplish this without any increase in their annual budget since 2010 (the first year of the current agreement). In addition, the average operating expenses over the first four years of the agreement have been approximately $225,000 below the approved budget. Financial Impact:Operations Contract cost of $5,504,558.00 from account 506043310-5211110. Collection System Assessment cost of $489,800.00 from account 506043410-5211110. Alternatives:The Commission could choose to not exercise the renewal option.Cover Memo Item # 8 Recommendation:We recommend that the agreement with ESG Operations, Inc. be renewed for a 5 year term. Funds are Available in the Following Accounts: 506043310-5211110 & 506043410- 521111 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 8 MEMORANDUM 1 ESG Operations 2015 Budget Proposal PREPARED FOR: Allen Saxon, AUD PREPARED BY: Paul Tickerhoof, ESG COPIES: DATE: May 8, 2014 ESG has reviewed last year’s expenditures of our wastewater treatment O&M agreement in an effort to prepare a budget for AUD’s consideration for the 2015 fiscal year. The following table summarizes 2014’s budget and ESG’s requested 2015 budget. ESG Budget Comparison 2014 2015 Delta Personnel Services $ 2,011,384.00 $ 1,991,384.00 $ (20,000.00) Administrative Expenses $ 110,000.00 $ 110,000.00 $ - Utilities $ 190,000.00 $ 190,000.00 $ - Chemicals $ 433,400.00 $ 433,400.00 $ - Materials & Supplies $ 110,000.00 $ 110,000.00 $ - Vehicles & Equipment $ 125,000.00 $ 115,000.00 $ (10,000.00) Outside Services $ 200,000.00 $ 200,000.00 $ - Biosolids Management $ 1,160,000.00 $ 1,160,000.00 $ - Maintenance & Repair $ 325,000.00 $ 355,000.00 $ 30,000.00 Total Operating Budget $4,664,784.00 $4,664,784.00 $ - Management & Administrative Fee $ 583,098.00 $ 559,774.00 $ (23,324.00) Contractor’s Subtotal $5,247,882.00 $5,224,558.00 $ (23,324.00) $ - Director’s Allowance $250,000.00 $250,000.00 $ - Management & Administrative Fee $ 31,250.00 $ 30,000.00 $ ( 1,250.00) Director’s Allowance Subtotal $ 281,250.00 $ 280,000.00 $ ( 1,250.00) Total Budget $5,529,482.00 $5,504,558.00 $ (24,574.00) ESG is recommending the overall budget remain the same as last year and reallocating more funds to the repair account. Additionally, ESG has reduced our management and administrative fee by 0.5% and plans to perform our scope of service without an increase for the 2015 fiscal year. Attachment number 1 \nPage 1 of 7 Item # 8 TECHNICAL MEMORANDUM—ESG OPERATIONS 2015 BUDGET PROPOSAL 2 Additionally, ESG proposes to continue the sewer assessment service without any change in budget. Details of the allocation is as follows: Estimated Cost $437,320 Mark Up (12.0%) $ 52,480 Total $489,800 Should you have any questions or need further clarification contact me at 770-918-6572. Attachment number 1 \nPage 2 of 7 Item # 8 AMENDMENT NO. 5 to the AGREEMENT Between ESG Operations, Inc. And Augusta, Georgia For Operations, Maintenance and Management Services This Amendment is made and entered into this ____ day of ____________, 2014, between AUGUSTA, GEORGIA, by and through the Augusta-Richmond County Commission, a political subdivision of the State of Georgia (hereinafter “Augusta”), and ESG OPERATIONS, INC., a Georgia corporation, (hereinafter “ESG”). This is Amendment No. 5 to the Agreement dated the 16th day of December 2009, between Augusta and ESG whereby both parties mutually agree to exercise the five year renewal in accordance with Article 7.1. NOW THEREFORE, Augusta and ESG agree to amend the Agreement as follows: REPLACE Article 4.1 with the following new Article: 4.1 Augusta shall pay to ESG a base fee equal to the Augusta budget shown in Appendix F. This includes the actual cost of the Scope of Services performed by ESG plus a Management and Administrative Fee. The base fee shall not include services which are not specifically defined by Section 2 of this Agreement. The base fee for this Amendment shall be Four Million Nine Hundred Fourteen Thousand Seven Hundred Eighty Four Dollars ($4,914,784) and the Management and Administrative Fee shall be Five Hundred and Eighty-Nine Thousand Seven Hundred and Seventy-Four Dollars ($589,774). The base fee and the Management and Administrative Fee shall be payable in advance in equal monthly installments and for the sixth term of this Agreement the monthly amount shall be Four Hundred Fifty-Eight Thousand Seven Hundred Thirteen Dollars and Thirteen Cents ($458,713.13). Said base fee shall be for the period beginning on January 1st, 2015 and ending on December 31st, 2015. Thereafter, the Base Fee will be negotiated as described in Article 4.2. The Management and Administrative Fee shall increase proportionally with the base fee adjustments described in Articles 4.2 and 4.4. REPLACE Article 4.3 with the following new Article: 4.3 A Management And Administrative Fee of 12.0% shall be added to all costs with the exception of costs resulting from the providing of unrelated services as may be directed by Augusta pursuant to Paragraph 2.37, Owner Directed Capital Improvement costs as provided by Paragraph 2.29. It is specifically understood that the Management and Administrative Fee is included in the calculation of the annual base fee. The Management and Administrative Fee shall include all charges for personnel not assigned to the Project on a full time basis (those working in Augusta, Georgia, and approved as part of the Project budget). ESG support is included in the Management and Administrative Fee, and any request for additional support is to be made to Augusta. From time to time ESG may seek approval from Augusta for Attachment number 1 \nPage 3 of 7 Item # 8 additional ESG staff as necessary to fulfill ESG’s contractual obligations or in response to Augusta’s request for additional services. REPLACE Appendix F with the following new Appendix F: ADD a new Appendix I, attached to this Amendment. All other terms and conditions remain in effect in accordance with the Agreement referenced in this Amendment. Both parties indicate their approval of this Amendment by signature below. Authorized signatures: ESG OPERATIONS, INC. By: ________________________________ John Clay Sykes, PE, Principal By: ________________________________ Daniel E. Groselle, Jr., PE, Principal Date: _____________________________ AUGUSTA, GEORGIA By: ________________________________ David S. Copenhaver Mayor Date: _____________________________ ATTEST: ___________________________ Clerk of Commission Date: _____________________________ Attachment number 1 \nPage 4 of 7 Item # 8 Appendix F 2015 Project Budget and Staffing Plan Project Budget PERSONNEL SERVICES $ 1,991,384.00 ADMINISTRATIVE EXPENSES $ 110,000.00 UTILITIES $ 190,000.00 CHEMICALS $ 433,400.00 MATERIALS & SUPPLIES $ 110,000.00 VEHICLES & EQUIPMENT $ 115,000.00 OUTSIDE SERVICES $ 200,000.00 BIOSOLIDS MANAGEMENT $ 1,160,000.00 MAINTENANCE & REPAIR $ 355,000.00 TOTAL OPERATING BUDGET $4,664,784.00 MANAGEMENT & ADMINISTRATIVE FEE (12.0%) 559,774.00 CONTRACTOR’S SUBTOTAL $ 5,224,558.00 DIRECTOR’S ALLOWANCE $ 250,000.00 MANAGEMENT & ADMINISTRATIVE FEE (12.0%) 30,000.00 DIRECTOR’S ALLOWANCE SUBTOTAL 280,000.00 TOTAL 2015 BUDGET $ 5,504,558.00 Attachment number 1 \nPage 5 of 7 Item # 8 Appendix F (Continued) 2015 Project Budget and Staffing Plan Project Staffing Plan Budgeted Position Budgeted Number Project Director 1 Assistant Project Manager 1 Operations Manager 1 Lab/IPP Manager 1 Maintenance Manager 1 Land Application Manager 1 Operators 10 Lab Analysts 2 IPP Technicians 3 Mechanics 5 Maintenance Support 5 Administrative 2 Education Specialist 2 Attachment number 1 \nPage 6 of 7 Item # 8 Appendix I 2015 Sewer Assessment Project Budget Project Budget PERSONNEL SERVICES $ 379,773.00 MATERIAL & SUPPLIES $ 53,432.00 MISCELLANEOUS $ 4,115.00 TOTAL OPERATING BUDGET $ 437,320.00 MANAGEMENT & ADMINISTRATIVE FEE (12.0%) $ 52,480.00 TOTAL 2013 BUDGET $ 489,800.00 Attachment number 1 \nPage 7 of 7 Item # 8 AGREEMENT for OPERATIONS MAINTENANCE AND MANAGEMENT SERVICES for AUGUSTA GEORGIA THIS AGREEMENT is made on this day of December 2009 between AUGUSTA GEORGIA by and through the Augusta Richmond County Commission a political subdivision of the State of Georgia hereinafter Augusta and ESG OPERATIONS INC a Georgia corporation hereinafter ESG Augusta and ESG for and in consideration of the mutual covenants agreements and promises as hereinafter set forth do hereby agree and contract as follows 1 GENERAL 1 1 All definitions of words or phrases used in this Agreement are contained in Appendix A which is herewith incorporated by reference and made a part hereof 12 All grounds facilities equipment and vehicles owned by Augusta as of the date of this Agreement or acquired by Augusta during the term of this Agreement shall remain the property of Augusta 1 3 This Agreement shall be governed by and interpreted in accordance with the laws of the State of Georgia 14 This Agreement shall be binding upon the successors and assigns of each of the parties but neither party will assign this Agreement without the prior written consent of the remaining party to this Agreement Consent concerning a proposed assignment shall not be unreasonably withheld 1 5 All notices required or permitted to be made under this Agreement shall be in writing signed by the party giving such notice and delivered personally sent by certified mail or sent by overnight mail to the other party at the address set forth below or at such other address as the other party may hereafter designate in writing City of Augusta City Administrator 530 Greene Street Room 801 Augusta GA 30911 Utilities Director 360 Bay St Suite 180 Augusta GA 30901 ESG Operations Inc 6400 Peake Road Macon Georgia 31210 Page 1 of 23 Attachment number 2 \nPage 1 of 23 Item # 8 1 6 This Agreement including Appendices is the entire Agreement of the parties This Agreement may be modified only by written agreement signed by both parties Wherever used the terms ESG and Augusta shall include the respective officers agents directors elected or appointed officials and employees 2 ESG s SCOPE OF SERVICES ESG shall pursuant to the terms and conditions of this Agreement perform the following services as may be related to the Project collectively the Scope of Services 21 Operate and maintain the Project over a 24 hour per day seven day per week period under full service contract operations and maintenance The agreed on initial budgeted staffing levels to provide adequate operation and maintenance of the Project is identified in Appendix F The Messerly facility shall be staffed continuously however ESG may utilize off site staff to meet staffing requirements regarding the remaining Project facilities ESG shall make every reasonable effort to maintain the agreed to staffing levels but will not be in breach of this agreement for mutually agreed upon deviations in actual staffing or for short term fluctuations due to the time required to hire replacement employees ESG and Augusta acknowledge that staffing for the Project may require modification due to changes in the requirements of proper operation and the services to be provided pursuant to the terms of this Agreement Following the initial six 6 months of this Agreement ESG may at any time during the term of this Agreement recommend an alteration in staffing for consideration and approval by Augusta 2 2 Staff the Project with qualified personnel inclusive of management administrative operational technical laboratory and clerical who meet the applicable certification requirements of the State of Georgia as may be specifically related to the Project tasks performed by each such employee ESG staff shall be capable and demonstrate the necessary experience to operate and maintain the Project 23 Provide a minimum of 26 hours per year per employee prorated for those not working a full year of training for personnel in areas of operation maintenance and safety with additional training as appropriate for professional and specific skills development 24 Augusta shall have the right to approve each and every resident Project Manager that ESG assigns to direct the management operation and maintenance of the Project The initial Project Manager shall be Paul Tickerhoof ESG agrees not to reassign the initial Project Manager for at least the initial three years of this Agreement unless directed or agreed by Augusta Augusta agrees not to unreasonably withhold approval of a proposed Project Manager in the event the initial Project Manager is a reassigned by ESG following the completion of the initial three year period b voluntarily terminates his or her employment with ESG or c is terminated by ESG 2 5 Within the design capacity and capability of the Messerly WPCP Spirit Creek WPCP and Spirit Creek Pump Station facilities manage operate and maintain said facilities in full compliance with the requirements of the applicable NPDES permit for each facility Page 2 of23 Attachment number 2 \nPage 2 of 23 Item # 8 and all applicable federal state and local laws or regulations Meet reporting requirements as provided by all applicable laws and regulations concerning the operation management and maintenance of the Messerly and Spirit Creek facilities 2 6 The Messerly and Spirit Creek facilities shall be operated in a manner that effectively controls odor and noise so that no avoidable disruption of adjacent neighborhoods or businesses results 2 7 Provide for monitoring and control of septage deliveries as provided by Augusta s applicable sewer use ordinance 2 8 Provide for the collection and hauling of screenings grit sludge and scum Waste to Augusta s existing or approved disposal sites All Waste andor byproduct generated during ESG s performance of services are and shall remain the sole and exclusive property of the Augusta All manifests or other documentation required for disposal of Waste shall be signed by or in the name of Augusta 2 9 Effective January 1 2010 provide for the disposal of sludges and biosolids to disposal utilization sites consistent with industry accepted management practices ESG will maintain adequate records regarding disposal or utilization of residuals and make reasonable efforts to minimize associated cost Any permits for sludge disposal or utilization shall remain in the name of Augusta 2 91 Industry accepted management practices shall include but shall not be limited to the following 2 9 1 1 General ESG shall be responsible for removing sludges and biosolids from the Messerly facility for transporting said sludges and biosolids to destination points at approved sites and for applying the biosolids to Approved sites in an approved manner ESG shall be responsible for acquiring operating and maintaining all equipment and for providing sufficient trained personnel required for its operations described herein 2 9 12 Utilization at Approved Sites ESG shall 2 9 12 1 Arrange for utilization of all of the biosolids on approved sites ESG acknowledges that Augusta currently has contracts in place for the utilization of biosolids on certain sites within Richmond County Burke County and Jefferson County Georgia which sites shall be Approved sites ESG agrees to continue the utilization of biosolids on said sites and to comply with all terms and conditions contained in those existing contracts Owner and ESG may open new sites with the mutual consent of the parties which sites will then become Approved sites In such instance ESG and Owner shall collaborate in negotiating contracts acceptable to Augusta for the utilization ofbiosolids on the site for Page 3 of23 Attachment number 2 \nPage 3 of 23 Item # 8 executing any and all contacts required for use of any approved site and in advance of utilization obtain all permits provided however that any such permits shall be in the name of Augusta Georgia Augusta may in its sole discretion direct ESG to develop and use a particular site as an Approved site pending necessary regulatory and or landowner approval Any such directive shall comply with all applicable environmental laws and all other applicable laws Such agreements shall be between Augusta and the site owners 2 9 1 22 Obtain when contracting for the use of any approved site the long term continued right of ingress and egress by Augusta for the purpose of testing and monitoring each approved site to review compliance by ESG with all federal state and local Environmental Laws 2 9 1 2 3 Not place hold locate release or dispose of or knowingly permit others to place hold locate release or dispose of any hazardous substance hazardous waste or other toxic substance on under or at any Approved site 2 9 2 Utilization of Biosolids ESG shall dispose of and utilize the biosolids in accordance with the Rules of the Georgia Environmental Protection Division Chapter 391 3 4 all Federal Statutes rules and regulations including without limitation 40 CFR Part 503 and all applicable State and local statutes rules and regulations 2 93 Equipment and Vehicles ESG shall be responsible for providing all equipment and vehicles necessary to remove transport and utilize the biosolids without unreasonable interruption of operation due for example to breakdown or in operation of such equipment and vehicles ESG will maintain all of its equipment and vehicles including any which are leased by ESG in good working order and clean free from any buildup of mud dirt rock gravel and other sediment ESG shall take every precaution reasonably necessary to prevent its equipment and vehicles from depositing Biosolids mud dirt rock gravel or other sediment on public roadways or rights of way 2 9 31 ESG further acknowledges and agrees that it is responsible for procuring any and all licenses and permits and making all filings with the State of Georgia andor other applicable regulatory authorities necessary in connection with operation of the vehicles 2 94 Liming Program ESG shall operate a liming program in conjunction with the biosolids services to be performed hereunder as follows Page 4 of23 Attachment number 2 \nPage 4 of 23 Item # 8 2 94 1 ESG shall be responsible for taking annual soil samples of approved sites and applying lime to said sites in accordance with the results recommendations of the soil samples 2 942 ESG shall not apply nor invoice Augusta for more lime than is indicated by the soil samples 2 94 3 ESG agrees that it will avoid liming of any approved sites as to which past liming practices have been poor with the intent of this subsection that Augusta not be required to pay for reclamation liming of such sites but be required to apply only for liming which is part of a soil pH maintenance program 2 9 5 Federal Permit Requirements ESG shall abide by all federal rules and regulations governing the land application of wastewater and water residuals This includes the self implementing provision of 40 CFR Part 503 ESG shall abide by all federal monitoring and reporting requirements applicable to land appliers This includes preparation of an annual report to Augusta meeting the monitoring and reporting requirements of 40 CFR Part 503 that are applicable to land application for submittal by Augusta to Region IV of the EPA 2 9 6 State Land Application Permit Requirements ESG shall abide by all requirements and conditions of the State of Georgia Environmental Protection Division Permit No GA0037621 that are applicable to the land applier for the continued operation of Augusta s wastewater residual land application program This includes preparation of an annual report to Augusta meeting the monitoring and reporting requirements of State Regulations to land application for submittal by Augusta 2 9 7 Local Requirements and Issues ESG shall comply with the following local requirements 2 9 7 1 ESG shall endeavor to maintain excellent working relationships with the landowners Periodic work shops shall be held to inform the landowners of the current status of the program and of any changes 2 9 72 ESG shall maintain equipment in a condition that is reasonably acceptable to maintain a positive image for Augusta 2 9 7 3 ESG shall develop a spill protection plan for transport and land application sites and submit the plan for approval prior to beginning operations 2 9 74 ESG shall inspect ESG s residuals storage transport and application facilities to prevent malfunctions and deterioration operator errors and wastewater residual discharges which may cause or lead or the release of wastes to the environment a threat to human health or a nuisance ESG Page 5 of 23 Attachment number 2 \nPage 5 of 23 Item # 8 shall maintain an inspection log or summary including at least the date and time of the inspection observations made and any maintenance repairs or corrective actions taken by ESG 2 9 7 5 ESG shall maintain and submit to Owner as requested a 6 month look ahead schedule to facilitate communication with program participants regarding potential application dates This schedule will be updated monthly 2 9 8 If any part of the work under this Agreement is sublet or if any independent contractor is hired to perform any part of the work under this Agreement the Subcontractor andor independent contractor shall be required to meet all insurance requirements set forth in Appendix C to the Agreement dated January 1 2010 and the provision for Automobile Liability Insurance hereinafter set forth However this will in no way relieve ESG from meeting all insurance requirements or otherwise being responsible for the subcontractor andor independent contractor 2 9 81 Automobile Liability For each vehicle whether owned non owned or hired utilized by ESG or any independent contractor or subcontractor working with ESG in the performance of this Agreement automobile liability insurance must be carried as follows bodily injury and property damage liability covering all owned non owned and hired automobiles for limits of not less than One Million Dollars 1 000 000 bodily injury each person each accident and One Million Dollars 1 000 000 combined single limit bodily injury and property damage 210 Be responsible for maintaining all manufacturers warranties on new equipment purchased by Augusta for Project use and assist Augusta in enforcing existing warranties and guarantees applicable to equipment in use for the Project as of the effective date of this Agreement 2 11 Provide Augusta with a schedule for preventive and corrective maintenance on all Augusta owned equipment utilized to execute the Scope of Services to be performed by ESG in accordance with manufacturer s recommendations or good maintenance practices at intervals and in sufficient detail as may be determined by Augusta Provide Augusta with complete documentation of maintenance performed inclusive of corrective and preventive maintenance and a spare parts inventory 2 12 Maintain the present industrial waste sampling and laboratory analysis program as described in the Augusta Pretreatment Ordinance Results of all industrial sampling and testing shall be reported to Augusta in a timely manner 2 13 Be responsible for all laboratory testing and sampling required by any current or future NPDES permit for the Project or for any other current or future permits required for the Page 6 of 23 Attachment number 2 \nPage 6 of 23 Item # 8 Project excluding air quality testing except as related to odor control system performance testing 2 14 Prepare state and federal plant performance reports and submit them to Augusta for review and approval prior to transmittal by ESG to appropriate agencies Any unreasonable costs incurred in preparing said reports on account of an error or omission by ESG shall be borne by ESG and not Augusta 2 15 Prepare all NPDES permit reports related to the Scope of Services performed by ESG or any report as may be required by any administrative order issued by the Georgia Environmental Protection Division Any such report shall be submitted to Augusta for approval ESG shall transmit approved reports to the appropriate agency In the event a fine is levied as a result of the submission of a late report ESG shall be responsible for payment of the fine if ESG failed to complete the report secure Owner approval and file the report in a timely manner 2 16 Implement and maintain an operator safety program in compliance with all applicable laws rules and regulations and make recommendations to Augusta regarding the need if any for Augusta to rehabilitate expand or modify the Project to comply with governmental safety regulations applicable to ESG s operations hereunder 2 17 Develop and implement an Emergency Response Plan ERP on or before April 1S 2010 The ERP shall be submitted to Augusta for approval prior to implementation Approval by Augusta of the ERP shall not be unreasonably withheld 2 18 Provide an inventory of equipment chemicals and lubricants as set forth in Appendix D that are presently being used for the Project as of the Effective Date of this Agreement Such inventory shall be provided on an annual basis to Augusta at the conclusion of each contract year 2 19 Provide and document all chemicals for the Project Provide Augusta with an accounting of actual chemical expenditures and consumption on not less than a quarterly basis ESG will provide Augusta with a detailed invoice of chemical expenditures over the annual chemical expenditure budget Should Augusta and ESG fail to agree for any given Contract Year the chemical expenditure budget will be determined by the application of the Consumer Price Index adjusted for actual consumption in the prior year and any flow increases over the prior year Upon termination of this Agreement ESG shall leave all unused chemicals purchased by Augusta for operation of the wastewater treatment facilities 220 Provide and document repairs for a cost not to exceed the budget shown in Appendix F for the initial year of this Agreement January 1 S 2010 through December 31 S 2010 and for a cost not to exceed the established amount for repairs as established for each subsequent Contract Year In the event actual repair costs exceed the repair cost limit established ESG shall invoice and Augusta shall pay excess repair costs on a monthly Page 7 of 23 Attachment number 2 \nPage 7 of 23 Item # 8 basis Said repairs will be invoiced at direct costs with no markup for overhead or profit ESG shall rebate to Augusta the entire amount that actual repair costs are less than the repair limit established for any year of this Agreement Repair costs below or in excess of annual repairs limits shall not contribute to base fee overages or underages ESG shall notify Augusta in writing as soon as repair trend provides a reasonable indication that actual repair costs may exceed annual budget ESG shall not exceed repair budget without written authorization from Augusta s Designated Representative 221 ESG may alter the process andor facilities to achieve the objectives of this Agreement provided however no alteration shall be made without Augusta s written approval if alteration shall cost in excess of Two Thousand Dollars 2 000 00 Further no material alternation shall be made without ESG providing written documentation of such to Augusta s Designated Representative to document said modification or alternation 222 Interface with state regulatory agencies and represent Augusta as may be necessary concerning operation maintenance and management of the Project relative to all permits issued by the state of Georgia directly related to the operations associated with the Project Coordinate and facilitate permit renewals and expansions related to the Project 2 23 Investigate and respond to citizen complaints 2 24 Assist Augusta on an as needed basis when Augusta undertakes grant applications related to the Project 2 25 Utilize Augusta s computerized maintenance management and asset management system that furnishes complete and accurate records and is capable of readily providing historical data and trends 226 Provide Augusta within the first ninety 90 days of the term of this Agreement a listing of any recommended capital improvements inclusive of safety improvements that ESG believes will be required for any of the facilities covered under this Agreement In the event a recommended capital improvement does not require immediate implementation such recommendation shall be included in the five year capital plan 227 Provide an updated recommended five year capital plan each year for the wastewater facilities ESG shall work with Augusta staff and the engineer designated by Augusta in the development and providing of each five year capital plan 2 28 Provide Augusta with a full accounting of all project specific expenditures at intervals and in sufficient detail as may be determined by Augusta and assist Augusta in the preparation of annual operating budgets Augusta shall be allowed to conduct or have conducted audits at Augusta s sole cost and expense of all accounting related to the direct performance of the Scope of Services pursuant to the terms of this Agreement at times to be mutually agreed by the parties To the extent possible all ESG project specific expenditures with take place in Augusta Georgia unless otherwise agreed ESG shall provide that all accounts operating records documents spreadsheets and correspondence Page 8 of23 Attachment number 2 \nPage 8 of 23 Item # 8 relating to the performance of the Scope of Services under the terms of this Agreement shall be open to inspection to Augusta during normal business hours upon the providing of reasonable notice for the purpose of auditing costs or verifying ESG s performance ESG shall provide to Augusta copies of all records accounts operating records documents spreadsheets and all correspondence relating to the performance of the Scope of Services under the terms of this Agreement within thirty days of the termination of this Agreement 2 29 Owner Directed Capital Improvements to be funded by Augusta and which are not included in Appendix F are provided for during the term of this Agreement with an annual allowance of Five Hundred Thousand Dollars 500 000 for each year in order to provide funding for ESG to perform major corrective repair replacement rehabilitation andor construction of facilities and equipment associated directly with or peripheral to Augusta s wastewater conveyance and treatment facilities Augusta has the sole authority to identify specific projects and issue formal written requests to ESG to perform Owner Directed Capital Improvements ESG may accept or reject a project based upon ESG s determination if the company has the expertise or resources available to perform the project ESG s compensation for Owner Directed Capital Improvement projects is direct cost plus five percent rather than the Management and Administrative Fee established in Article 4 On site labor already covered under this Agreement shall not be billed against the Owner Directed Capital Improvements account 2 30 Operate and maintain the present Industrial Pretreatment Program IPP including all monitoring inspections sampling testing reporting and record keeping consistent with Augusta s existing NPDES permits and IPP program Results of all industrial sampling and testing shall be made available to Owner upon request 2 31 Provide 24 hour per day access to Project for Owner s personnel Visits may be made at any time by any of Owner s employees so designated by Owner s Representative Keys for the Project shall be provided Owner by ESG All visitors to the Project shall comply with ESG s operating and safety procedures 2 32 Acknowledge that under Georgia law its records accounts operating records documents spreadsheets and all correspondence relating to the Scope of Services and other documentation pertaining to the Scope of Services may be public records subject to Georgia s Open Records Act O CG A 50 18 70 et seq ESG agrees to deliver immediately to Augusta s Designated Representative any request made to ESG under Georgia Open Records Act and to cooperate fully in responding to any request made to either Owner or ESG and making all records not exempt available for inspection and copying as provided by Georgia Law 233 Provide Owner a statement of annual operating expenses prepared by ESG s external auditor within one hundred twenty 120 days of year end April 30th with the auditor to perform an agreed upon procedure certifying that expenses and fees are calculated in accordance with this Agreement This statement shall be prepared in accordance with generally accepted accounting principles Page 9 of 23 Attachment number 2 \nPage 9 of 23 Item # 8 234 Submit a written report to Owner s Designated Representative outlining the complete details of any incidents of violations of Local Regulations environmental requirements or an employee behavior resulting in a complaint from the public 2 35 Provide Owner with a copy of ESG s Employee Manual and make every effort to conform to guidelines contained within said manual 2 36 Provide Owner with a copy of ESG s site specific Emergency Response Plan and Safety Plan 237 Perform other services that are incidental to but not included in the Scope of Services as directed by Augusta Such services will be invoiced to Augusta based upon a mutual agreement between Augusta and ESG regarding scope and fee 3 SCOPE OF SERVICE AUGUSTA Augusta shall 3 1 Pay all Capital Expenditures inclusive of owner directed Capital Improvements 32 Maintain all existing Project warranties guarantees easements and licenses that have been granted to Augusta 33 Pay all property franchise or other taxes associated with the Project 34 Provide ESG within a reasonable time after a request by ESG use at no cost of any piece of Augusta s heavy equipment that is available so that ESG may discharge its obligations under this Agreement in the most cost effective manner ESG shall not use or allow the use of any of Augusta s heavy equipment under ESG s control by any person who is not trained and qualified in the operation of the heavy equipment in question including licensing and certification where appropriate Such use may not be granted if Augusta determines that removing the equipment from its normal activities for the time period requested will be detrimental to Augusta s operations 3 5 Provide all licenses and tags for vehicles owned by Augusta used in connection with the Project 3 6 Provide for ESG s use all vehicles computers copy machines tools and equipment currently owned by Augusta and in use at the Project including the vehicles described in Appendix D 3 7 Pay directly to the vendors or suppliers the following Project costs 3 7 A All electrical power costs associated with the Project 3 7 B All potable water costs associated with the Project Page 10 of23 Attachment number 2 \nPage 10 of 23 Item # 8 3 8 Pay ESG the amount specified in Article 41 to operate the Project 3 9 Provide access to Augusta s computerized maintenance management system 3 10 Carry out enforcement of the IPP in accordance with State and EPA requirements including issuance of Notices of Violation NOVs Further issue Significant Industrial User SID permits which meet all State and EPA requirements Permits shall be prepared for Owner issuance by ESG per historical precedence 4 COMPENSATION 4 1 Augusta shall pay to ESG a base fee equal to the Augusta budget shown in Appendix F This includes the actual cost of the Scope of Services performed by ESG plus a Management and Administrative Fee The base fee shall not include services which are not specifically defined by Section 2 of this Agreement The base fee for the initial term of this Agreement shall be Four Million Seven Hundred Fifteen Thousand Two Hundred Thiry Four Dollars 4 715 234 00 and the Management and Administrative Fee shall be Five Hundred Eighty Nine Thousand Four Hundred Four Dollars and Twenty Five Cents 589 404 25 The base fee and the Management and Administrative Fee shall be payable in advance in equal monthly installments and for the initial term of this Agreement the monthly amount shall be Four Hundred Forty Two Thousand Fifty Three Dollars and Nineteen Cents 442 053 19 Said base fee shall be for the period beginning on January 1St 2010 and ending on December 31St 2010 Thereafter the Base Fee will be negotiated as described in Article 42 The Management and Administrative Fee shall increase proportionally with the base fee adjustments described in Articles 42 and 44 42 The parties agree that the base fee represents an estimate of the cost of providing the Scope of Services for the Contract Year in question In the event actual expenditures are projected to exceed the established base fee for a Contract Year by more than Twenty Thousand Dollars 20 000 00 the approval of Augusta of such costs shall be required ESG shall notify Augusta in writing as soon as trend of actual costs provides a reasonable indication that the actual costs may exceed annual budget ESG shall not exceed the Augusta budget shown in Appendix F without written authorization from Augusta s Designated Representative The Management and Administrative Fee will not be applied to any amounts in excess of the base fee in any contract year without prior approval of Augusta ESG shall perform a reconciliation of estimated to actual cost attributable to the performance of the Scope of Services on a quarterly basis and submit the reconciliation to Augusta within thirty days following the conclusion of the quarter A year end reconciliation shall be performed by ESG following ESG s annual audit and submitted to Augusta within one hundred twenty days of the conclusion of the Contract Year in question Any difference due to Augusta will be paid within thirty days of the submission Page 11 of23 Attachment number 2 \nPage 11 of 23 Item # 8 of the reconciliation by ESG Augusta will pay ESG any amount due within 21 days of final Augusta Richmond County Commission approval The base fee shall be negotiated and agreed each year not less than three 3 months prior to the beginning of each subsequent Contract Year An increase or decrease in the annual base fee may be based upon legal or regulatory changes that relate to the operation of the Project regulatory reporting or monitoring requirements treatment level requirements and personnel qualifications for staffing requirements In the event Augusta and ESG fail to agree the base fee will be determined by the application of the base fee adjustment formula shown in Appendix E which is incorporated by reference and made a part hereof ESG shall provide Augusta written notice no later than September 1 st of each Contract Year to initiate the negotiation process 4 3 A Management And Administrative Fee of 12 5 shall be added to all costs with the exception of costs resulting from the providing of unrelated services as may be directed by Augusta pursuant to Paragraph 2 37 Owner Directed Capital Improvement costs as provided by Paragraph 229 It is specifically understood that the Management and Administrative Fee is included in the calculation of the annual base fee The Management and Administrative Fee shall include all charges for personnel not assigned to the Project on a full time basis those working in Augusta Georgia and approved as part of the Project budget ESG support is included in the Management and Administrative Fee and any request for additional support is to be made to Augusta From time to time ESG may seek approval from Augusta for additional ESG staff as necessary to fulfill ESG s contractual obligations or in response to Augusta s request for additional services 44 ESG s compensation for Owner Directed Capital Improvements shall be as follows 1 programs undertaken by ESG personnel shall be subject to mutually agreeable terms and conditions of compensation and payment 2 programs which ESG assigns to subcontractor personnel shall be billed at cost plus a fee of five percent of direct costs in lieu of the Management and Administrative Fee On site labor already covered under this Agreement shall not be billed against the Owner Directed Capital Improvements account The total annual compensation limit for Owner Directed Capital Improvements for each year ofthis Agreement shall be as defined in 229 The costs for Owner Directed Capital Improvements are not included in the annual base fee 45 In the event a change in the scope of services becomes necessary as a result of ESG s obligations under Section 2 Augusta and ESG will negotiate a commensurate adjustment in base fee 5 PAYMENT OF COMPENSATION 5 1 One twelfth 1112 of the base fee the Management and Administration Fee for the initial year and each subsequent Contract Year shall be due and payable on the first day of the month for each month that services are provided assuming that the Augusta Page 12 of23 Attachment number 2 \nPage 12 of 23 Item # 8 Representative receives an accurate and payable invoice by the 15th of the previous month 52 All other compensation in addition to the monthly base fee Management Fee and Administrative Fee is due on receipt of ESG s invoice and payable within thirty 30 days provided however Augusta may contest any such invoice in the exercise of good faith and may delay payment of sums that are being contested 6 INDEMNITY LIABILITY AND INSURANCE 6 1 ESG hereby agrees to and shall hold Augusta and its agents assigns officers and employees harmless from any liability or damages for property damage or bodily injury including death which may arise from ESG s negligent operations willful misconduct or material breach of contract under this Agreement to the proportion such negligence willful misconduct or material breach of contract contributed to the damages injury or loss Augusta to the extent allowed by law agrees to and shall hold ESG harmless from any liability or damages for property damage or bodily injury including death which may arise from Augusta s negligence to the proportion such negligence contributed to the damages injury or loss 62 In any Contract Year ESG shall be liable for those fines or civil penalties to a maximum aggregate of Five Hundred Thousand Dollars 500 000 for the Contract Year in question which may be imposed by a regulatory agency having jurisdiction for violations of the effluent quality requirements specified in Article 2 1 or which result from the failure to comply with the terms and conditions of any duly authorized permit court order administrative order law statute or ordinance that are a result of ESG s negligent operation Augusta will assist ESG to contest any such fines in administrative proceedings andor in court prior to any payment by ESG ESG shall pay the costs of contesting any such fines 6 3 ESG s liability to Augusta under this Agreement specifically excludes any and all indirect or consequential damages arising from the operation maintenance and management of Project However in the event the indirect or consequential damages incurred are the direct result of ESG s sole negligence or material breach of the terms of this Agreement this exclusion shall not be applicable Augusta s liability to ESG under this Agreement specifically excludes any and all indirect or consequential damages arising from Augusta s negligence 64 ESG and Augusta recognize that existing conditions within the sanitary sewer collection system vary and that failures may occur in the system over time ESG s scope of work is limited to operation and maintenance of Augusta s two wastewater treatment facilities and one pumping station Augusta is responsible for maintenance of free flowing conditions within the collection system and to clean the sanitary collection system as needed over the course of this Agreement ESG shall be responsible only for injury property damage or economic loss that was caused by ESG s negligence or willful misconduct Furthermore Augusta to the extent allowed by law agrees to indemnify Page 13 of23 Attachment number 2 \nPage 13 of 23 Item # 8 ESG against such claims for injury property damage or economic loss arising from failures in the sanitary collection system unless such claims are caused by ESG s negligence willful misconduct or material breach by ESG of its obligations pursuant to the terms of this Agreement This Article takes precedence over any conflicting Article of this Agreement and extends to ESG its officers employees and subcontractors 65 ESG shall obtain and maintain during the term of this Agreement insurance coverage of the type and in the amounts described in Appendix C which is incorporated by reference and made a part hereof Augusta shall be named as an additional insured on each policy of insurance ESG shall provide to Augusta a certificate evidencing such insurance upon execution of this Agreement and as may be requested by Augusta during the term of this Agreement 6 6 It is understood and agreed that in seeking the services of ESG under this Agreement Augusta is requesting ESG to undertake uninsurable obligations for Augusta s benefit involving the presence or potential presence of hazardous substances Therefore Augusta to the extent allowed by law agrees to hold harmless indemnify and defend ESG from and against any and all claims losses damages liability and costs including but not limited to costs of defense arising out of or in any way connected with the presence discharge release or escape of contaminants of any kind excepting only such liability as may arise out of the sole negligence willful misconduct or breach of contract of ESG in the performance of services under this Agreement 7 TERM AND TERMINATION DEFAULT REMEDIES 71 The initial term of this Agreement shall be five 5 years commencing on January 1St 2010 Thereafter this Agreement may be renewed by Augusta for successive five 5 year terms subject to the mutual agreement of the parties to the terms and conditions of such renewal 72 Notwithstanding the other terms and conditions set forth herein Augusta and ESG maintain the right to terminate this Agreement for the following reasons a ESG management is not performing satisfactorily and reasonable efforts are not being made on ESG s behalf to correct the problem If reasonable efforts have not been initiated by ESG and reported to Augusta in writing by ESG within 45 days of ESG s receipt of written notice from Augusta specifying the performance for which Augusta is dissatisfied Augusta may terminate this Agreement by providing 15 days written notice to ESG of termination and the basis thereof b Sufficient documentation is provided to ESG not less than 120 days prior to the close of any fiscal year of Augusta that Augusta will be unable financially due to budgetary constraints to continue the services provided by ESG under the terms of this Agreement in the forthcoming fiscal year of Augusta Page 14 of23 Attachment number 2 \nPage 14 of 23 Item # 8 c Owner may terminate this Agreement at any time after giving ESG four 4 months notice of intent to terminate Should Augusta exercise termination for convenience on or before December 31st 2010 Augusta shall Pay ESG a lump sum payment of 100 000 00 for demobilization and transition costs This lump sum payment shall be in addition to any other compensation due ESG under the terms of this Agreement as of the effective date of the termination by Augusta In the event Augusta terminates this Agreement for convenience after December 31 st 2010 ESG shall only be entitled to compensation due under the terms of this Agreement as of the effective date of termination by Augusta d Upon a four 4 month written notice to Augusta ESG may terminate this Agreement for convenience 73 Upon notice of termination by Augusta ESG shall assist Augusta at a mutually agreeable price for the purpose of assisting Augusta s resumption of the operation of the Project ESG will provide Augusta at the date of termination the quantities of chemicals shown in Appendix D which is incorporated by reference and made a part hereof Augusta will pay ESG for the cost of quantities in excess of the quantities shown in Appendix D If additional cost is incurred by ESG at request of Augusta Augusta shall pay ESG such cost in accordance with Article 52 8 LABOR DISPUTES FORCE MAJEURE 81 In the event activities by Augusta s or ESG s employee groups or unions cause a disruption in ESG s ability to perform at the Project Augusta with ESG s assistance or ESG at its own option may seek appropriate injunctive court orders During any such disruption ESG shall operate the facilities on a best efforts basis until any such disruptions cease 82 Neither party shall be liable for its failure to perform its obligations under this Agreement if performance is made impractical abnormally difficult or abnormally costly as a result of any unforeseen occurrence beyond its reasonable control The party invoking this Force Majeure clause shall notify the other party immediately by verbal communication and in writing by certified mail of the nature and extent of the contingency within ten 10 working days after its occurrence 9 MISCELLANEOUS 9 1 Augusta and ESG agree that ESG is an independent contractor and not an employee or agent of Augusta ESG shall have exclusive control of and the exclusive right to control the details of the services and work performed hereunder and nothing herein shall be construed as creating a partnership agency joint venture or other similar relationship between ESG and Augusta ESG agrees that it will not represent to anyone that its relationship with Augusta is other than that of an independent contractor Page 15 of23 Attachment number 2 \nPage 15 of 23 Item # 8 92 Augusta and ESG recognize that the environment of Augusta specifically its rivers springs bays and estuaries are a vital part of the fragile environment and economy of Augusta and that Augusta has long been dependent on same for industry tourism and its economy Therefore it is imperative that the parties continue protection of the environment foremost in all their action under this Agreement at all times 9 3 In the event a civil action is initiated by either party to this Agreement concerning a claim a dispute or the enforcement of the terms of this Agreement said action shall be brought in Augusta and ESG hereby submits to the jurisdiction and venue of said court The prevailing party in any such litigation shall be entitled to reasonable attorney fees and costs Both parties indicate their approval of this Agreement by their signatures below Authorized signatures AUGUSTA GEORGIA By Daniel E Groselle Jr PE Principal By CS2 David S Cope er Mayor Date j z D1 h t d o Date l zl Oi I I Date IvfIII 1 Page 16 of23 Attachment number 2 \nPage 16 of 23 Item # 8 Appendix A DEFINITIONS A l The Project means all facilities equipment vehicles and grounds described in Appendix B and where appropriate in accordance with the terms of this Agreement the management operation and maintenance of such As of the effective date of this Agreement the facilities are comprised of the James B Messerly WPCP Messerly the Spirit Creek WPCP Spirit Creek and the Spirit Creek Pump Station A2 Capital Expenditures means any expenditures for 1 the purchase ofnew equipment or facility items that cost Five Thousand Dollars 5 000 00 or more or 2 major repairs that significantly extend equipment or facility service life and cost Five Thousand Dollars 5 000 00 or more or 3 expenditures that are planned non routine and budgeted by Owner A3 Cost means the total of costs for the scope of work defined by this Agreement as determined on an accrual basis in accordance with generally accepted accounting principles including but not limited to direct labor labor overhead chemicals materials supplies utilities equipment maintenance repair and outside services A4 Maintenance means the cost ofthose routine andor repetitive activities required or recommended by the equipment or facility manufacturer or ESG to maximize the service life of the equipment sewer vehicles and facility A5 Repairs means the cost of those nonroutine nonrepetitive activities required for operational continuity safety and performance generally resulting from failure or to avert a failure of the equipment sewer vehicle or facility or some component thereof A6 Biologically Toxic Substances means any substance or combination of substances contained in the plant influent in sufficiently high concentrations so as to interfere with the biological processes necessary for the removal of the organic and chemical constituents of the wastewater required to meet the discharge requirements of Augusta s NPDES permit Biologically toxic substances include but are not limited to heavy metals phenols cyanides pesticides and herbicides A7 Adequate Nutrients means plant influent nitrogen phosphorous and iron contents proportional to BODS in the ratio of five 5 parts nitrogen one 1 part phosphorous and one half 05 part iron for each one hundred 100 parts BODS A8 Contract Year means each year subsequent to the initial year of January IS 2010 through December 31s 2010 for which this Agreement is in effect A9 Fiscal Year shall mean for Augusta that period beginning any January I and ending the next following December 31 A I0 Augusta s Designated Representative shall mean Assistant Director for Wastewater Treatment Page 17 of23 Attachment number 2 \nPage 17 of 23 Item # 8 Appendix B WASTEWATER PROJECT CHARACTERISTICS NPDES PERMIT AND PROJECT CHARACTERISTICS B l ESG will operate Project so that effluent will meet the requirement ofNPDES Permits No GA0037621 and GA0047147 copies attached ESG shall be responsible for meeting the effluent quality requirements of Augusta s NPDES permit unless one or more of the following occurs 1 the Project influent does not contain Adequate Nutrients to support operation of Project biological processes andor contains Biologically Toxic Substances that cannot be removed by the existing process and facilities 2 dischargers into Augusta s sewer system violate any or all regulations as stated in the Water and Sewer Ordinance 3 the flow influent BOD5 suspended solids andor ammonia loading exceeds the Project design parameters for the WWTP facility which are million gallons of flow per day pounds of BOD5 per day pounds of suspended solids pounds of ammonia and a daily peaking factor of times flow Define Maximum Month Average Daily Values for JB Messerly WPCP 461 mgd 90 000Ibs day 90 000Ibs day 8000 Ibs day 15 Flow MGD Influent BOD Lbs Day Influent TSS LbsDay Influent Ammonia Lbs Day Daily Hydraulic Peaking Factor Spirit Creek WPCP 224 mgd 4200 Ibs day 4200 Ibs day 375 Ibs day 15 B2 In the event of permit violation and anyone ofthe Project influent characteristics suspended solids BOD5 ammonia or flow exceeds the design parameters stated above ESG shall return the plant effluent to the characteristics required by the NPDES permit in accordance with the following schedule after Project influent characteristics return to within design parameters Characteristics Exceeding Design Parameters By Recovery Period Maximum 10 or Less Above 10 Less than 20 20 and Above 5 days 10 days 30 days Not withstanding the above schedule if the failure to meet effluent quality limitations is caused by the presence of Biologically Toxic Substances or the lack of Adequate Nutrients in the influent then ESG will have a thirty 30 day recovery period after the influent is free from said substances or contains Adequate Nutrients B3 ESG shall not be responsible for fines or legal action as a result of discharge violations within the period that influent exceeds design parameters does not contain Adequate Nutrients contains Biologically Toxic Substances and the subsequent recovery period Page 18 of23 Attachment number 2 \nPage 18 of 23 Item # 8 Appendix C INSURANCE COVERAGE ESG shall maintain 1 Statutory workers compensation for all of ESG s employees at the Project as required by the State of Georgia 2 Comprehensive general liability insurance in a minimum amount not less than Five Million Dollars 5 000 000 00 combined single limits for bodily injury andor property damage 3 Property damage and liability insurance in a minimum amount not less than One Million Dollars 1 000 000 00 for all vehicles owned and operated by ESG under this Agreement 4 Contractor s Pollution Liability insurance for pollution events arising from operation ofthe Project in a minimum amount of not less than Two Million Dollars 2 000 000 00 per claim and in the aggregate Page 19 of23 Attachment number 2 \nPage 19 of 23 Item # 8 Appendix D DESCRIPTION OF FACILITIES AND INVENTORY OF CHEMICALS LUBRICANTS EQUIPMENT DESCRIPTION OF FACILITIES The Facilities shall include all of the following in existence as of the commencement date hereof James B Messerly WPCP 46 1 MCG advanced secondary treatment facility followed by a 360 acre constructed treatment wetland Spirit Creek WPCP 224 MGD aerated lagoon facility employing parallel treatment trains Spirit Creek Pump Station located adjacent to the Spirit Creek WPCP INVENTORY OF CHEMICALS LUBRICANTS EQUIPMENT To be completed on January 1 2010 Page 20 of23 Attachment number 2 \nPage 20 of 23 Item # 8 Appendix E BASE FEE ADJUSTMENT FORMULA BF BFa x C Co Where BFa Base fee specified in Article 4 1 for previous contract year BF Adjusted base fee Co CPI for All Urban Consumers U S City Average as published by U S Department of Labor Bureau ofLabor Statistics in the CPI Detailed Report for the month three 3 months prior to ESG beginning service of previous year under this Agreement C CPI for All Urban Consumers U S City Average as published by U S Department of Labor Bureau of Labor Statistics in the CPI Detailed Report for the month three 3 months prior to the beginning of the period for which an adjusted base fee is being calculated Page 21 of23 Attachment number 2 \nPage 21 of 23 Item # 8 Appendix F 2010 Project Budget and Staffing Plan Project Budget PERSONNEL SERVICES 1 926 234 00 ADMINISTRATIVE EXPENSES 119 000 00 UTILITIES 96 000 00 CHEMICALS 399 000 00 MATERIALS SUPPLIES 110 000 00 VEHICLES EQUIPMENT 125 000 00 OUTSIDE SERVICES 285 000 00 BIOSOLIDS MANAGEMENT 1 105 000 00 MAINTENANCE REPAIR 300 000 00 TOTAL OPERATING BUDGET 4 465 234 00 MANAGEMENT ADMINISTRATIVE FEE 12 5 558 154 25 CONTRACTOR S SUBTOTAL 5 023 388 25 DIRECTOR S ALLOWANCE 250 000 00 MANAGEMENT ADMINISTRATIVE FEE 12 5 31 250 00 DIRECTOR S ALLOWANCE SUBTOTAL 281 250 00 TOTAL 2010 BUDGET 5 304 638 25 Page 22 of 23 Attachment number 2 \nPage 22 of 23 Item # 8 Appendix F Continued 2010 Project Budget and Staffing Plan Project Staffing Plan Bud2eted Position Bud2eted Number Project Director 1 Assistant Project Manager 1 LabIPP Manager 1 Maintenance Manager 1 Land Application Manager 1 Operators 10 Lab Analysts 2 IPP Technicians 3 Mechanics 8 Maintenance Support 3 Administrative 1 Page 23 of23 Attachment number 2 \nPage 23 of 23 Item # 8 Attachment number 3 \nPage 1 of 1 Item # 8 Engineering Services Committee Meeting 5/27/2014 1:00 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Engineering Services Committee held on May 12, 2014. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 9 Attachment number 1 \nPage 1 of 3 Item # 9 Attachment number 1 \nPage 2 of 3 Item # 9 Attachment number 1 \nPage 3 of 3 Item # 9 Engineering Services Committee Meeting 5/27/2014 1:00 PM River Watch Parkway at I-20 Corridor Improvement Project (Design Services Fiber Optic Communication Lines – SA2) Department:Abie Ladson, Director Caption:Approve Supplemental Agreement Two, CPB 371041110/T13047139 with LPA Group in the amount of $61,190 to render design services for fiber optic communication lines that will be part of the River Watch Parkway Adaptive Signal Systems Project (RC07-000139). This project is on the approved Band 1 list of Richmond County’s Transportation Investment Act of 2010 (aka, TIA, TSPLOST) projects. This supplement will also be for the design and coordination with utility companies and Georgia DOT, as requested by AED. Background:The River Watch Parkway Adaptive Signal Systems project will ultimately utilize state-of-the-art sensor technology, image processing, and artificial intelligence to automatically optimize local traffic signals and provides coordination of the system according to real-time traffic demand, thus, eliminating the need for static signal timing and coordination plans. The fiber optic communications is essential to the function of the system. Installation will result in reduced travel times and fuel usage for the general motoring public along one of the more traveled corridors in Richmond County. The extents of this project run along River Watch Parkway from Fury’s Ferry Road to River Shoals Drive. In June 2013, Augusta, Georgia approved the final design phases of the contract with LPA group for design of the River Watch Parkway at I-20 Corridor Project. The majority of the design work required for the installation of the Adaptive Signal System Project overlaps the Corridor Project and, therefore, it will be a cost-effective practice to supplement the LPA Group’s contract to provide design services for this project as well Analysis:Because a majority of the required design services overlap the River Watch Parkway at I-20 Corridor project, the purpose of this item is to supplement LPA Group’s contract in order to expand the scope to include the design services. Financial Impact:Funds are available in the TIA budget account numbers: River Cover Memo Item # 10 Watch Parkway Adaptive Signal System Project in the amount of $61,190. Account Number: 371041110- 5212115/T13047139/5212115 Alternatives:1) Approve the proposed supplement. 2) Do not approve. Recommendation:Approve alternative one Funds are Available in the Following Accounts: 371041110-5212115/T13047139/5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 10 Sr. Traffic Engineer Traffic Engineer Utility Coordinator Total Task Traffic Engineering Services A Signal Permit Modification Forms 4.0 10.0 - 1,890.00$ 1 Riverwatch Pkwy at Riverwest Dr - 2.0 - 250.00$ 2 Riverwatch Pkwy at I-20 WB Ramps - 2.0 - 250.00$ 3 Riverwatch Pkwy at I-20 EB Ramps - 2.0 - 250.00$ 4 Riverwatch Pkwy at Alexander Dr - 2.0 - 250.00$ 5 Riverwatch Pkwy at River Shoals Pkwy - 2.0 - 250.00$ B Signal Design 30.0 230.0 - 33,550.00$ 1 Riverwatch Pkwy at Riverwest Dr 6.0 46.0 - 6,710.00$ a Review Intersection Markings - 8.0 - 1,000.00$ b Prepare Preliminary Signal Plan - 24.0 - 3,000.00$ c Respond to City / GDOT Comments - 2.0 - 250.00$ d Prepare Final Signal Plan - 12.0 - 1,500.00$ 2 Riverwatch Pkwy at I-20 WB Ramps 6.0 46.0 - 6,710.00$ a Review Intersection Markings - 8.0 - 1,000.00$ b Prepare Preliminary Signal Plan - 24.0 - 3,000.00$ c Respond to City / GDOT Comments - 2.0 - 250.00$ d Prepare Final Signal Plan - 12.0 - 1,500.00$ 3 Riverwatch Pkwy at I-20 EB Ramps 6.0 46.0 - 6,710.00$ a Review Intersection Markings - 8.0 - 1,000.00$ b Prepare Preliminary Signal Plan - 24.0 - 3,000.00$ c Respond to City / GDOT Comments - 2.0 - 250.00$ d Prepare Final Signal Plan - 12.0 - 1,500.00$ 4 Riverwatch Pkwy at Alexander Dr 6.0 46.0 - 6,710.00$ a Review Intersection Markings - 8.0 - 1,000.00$ b Prepare Preliminary Signal Plan - 24.0 - 3,000.00$ c Respond to City / GDOT Comments - 2.0 - 250.00$ d Prepare Final Signal Plan - 12.0 - 1,500.00$ 5 Riverwatch Pkwy at River Shoals Pkwy 6.0 46.0 - 6,710.00$ a Review Intersection Markings - 8.0 - 1,000.00$ b Prepare Preliminary Signal Plan - 24.0 - 3,000.00$ c Respond to City / GDOT Comments - 2.0 - 250.00$ d Prepare Final Signal Plan - 12.0 - 1,500.00$ C Fiber Optic Communications Design 18.0 78.0 74.0 21,510.00$ 1 Aerial Fiber Optic Design 8.0 18.0 58.0 10,490.00$ a Field Visit - - 8.0 960.00$ b Attachment Coordination with Georgia Power - 8.0 24.0 3,880.00$ c Make Ready Plans (25 poles) - 8.0 24.0 3,880.00$ d 2 drop locations - 2.0 2.0 490.00$ 2 Underground Fiber Optic Design 6.0 28.0 16.0 6,380.00$ a Field Visit - - 8.0 960.00$ b 2/3 mile underground routing - 24.0 4.0 3,480.00$ c 4 drop locations - 4.0 4.0 980.00$ 3 Communications Plan Sheets 4.0 32.0 - 4,640.00$ a Prepare Preliminary Communications Sheets - 24.0 - 3,000.00$ b Respond to City / GDOT Comments - 2.0 - 250.00$ c Prepare Final Communications Sheets - 6.0 - 750.00$ D Project Coordination 8.0 16.0 8.0 4,240.00$ TOTAL 60.0 334.0 82.0 61,190.00$ Task Riverwatch Parkway Corridor Traffic Fee Estimate Page 1 of 1 4/23/2014 Attachment number 1 \nPage 1 of 1 Item # 10 February 2011 AUGUSTA, GEORGIA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, LPA Group, entered into a contract with Augusta, GA., on February 15, 2011, for Engineering Design Services for I-20 Eastbound/Riverwatch Parkway at Corridor Improvements Project, File Reference No.09-014 (A), and WHEREAS, certain revisions to the design requested by Augusta, Georgia are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: To include design services for fiber optic communication line that will be part of the River Watch Parkway Adaptive Signal Systems Project (RC07-001139). This project is on the approved Band 1 list of Richmond County’s Transportation Investment Act of 2010 (aka, TIA, TSPLOST) projects. This supplement will be for the design and coordination with utility companies and Georgia DOT. ` It is agreed that as a result of the above described modification the contract amount is increased by $61,190.00 from $862,549.00 to a new total of $923,739. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, LPA Group, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This _________ day of _____________, 2014. RECOMMEND FOR APPROVAL: AUGUSTA, GEORGIA Honorable Deke S. Copenhaver, Mayor Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Augusta Richmond County Project Number(s): 371041110/T13047139 Supplemental Agreement Number: 2 Purchase Order Number: 193696 Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Attachment number 2 \nPage 1 of 1 Item # 10 Engineering Services Committee Meeting 5/27/2014 1:00 PM Road Abandonment - Cherry Tree Department:Law Caption:Motion to determine that any and all roads, or portions of roads within Cherry Tree Crossing, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit- claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached resolution. Background:The Augusta Housing Authority has requested that any and all roads, or portions of roads within Cherry Tree Crossing, as shown on the attached plat be abandoned. The Housing Authority plans to redevelop Cherry Tree/Sunset Homes. The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. Pursuant to O.C.G.A. § 32-7-2, a public hearing was held on April 29, 2014 for this matter. The legal description and plat of said portion of any and all roads, or portions of roads within Cherry Tree Crossing are attached. Analysis:In addition to the information provided in the above Background section, results of the public hearing will be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b) (1). Financial Impact:Cost of publication and advertisement of public hearing. Alternatives:Approve or deny request to determine that any and all roads, or portions of roads within Cherry Tree Crossing be abandoned. Recommendation:Approve determination and request for abandonment of any and all roads, or portions of roads within Cherry Tree Crossing , with Cover Memo Item # 11 public hearing to be held regarding the issue of abandonment pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage and adopt the attached resolution. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 11 Attachment number 1 \nPage 1 of 1 Item # 11 THIS RESOLUTIO OF THE AUGUSTA-RICHMOD COUTY COMM ISSIO TO ABADO ALL ROADS, OR PORTIOS OF ROADS WITHI CHER RY TREE CROSSIG AS A PART OF THE ROAD SYSTEM OF AUGUSTA-RI CHMOD COUTY; THIS RESOLUTIO, adopted by the Augusta-Richmond County Commission (“Commission”); WHEREAS, it has been proposed that the Commission make a determination that all roads, or portions of roads within Cherry Tree Crossing, as shown on the attached plat, have ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest and that the right-of-way should be abandoned as part of the Richmond County Road System; and WHEREAS, it has been Augusta, Georgia’s policy, pursuant to O.C.G.A § 32-7-2, to reduce the number of roads in Augusta, Georgia that are not utilized or useful to the public and to abandon such roads; and WHEREAS, a Public Hearing was held on April 29, 2014 at the Augusta-Richmond County Municipal Building, Room 803, 530 Greene Street, Augusta, Georgia; and WHEREAS, notice of such Public Hearing was published in The Augusta Chronicle, the newspaper in which Sheriff’s advertisements for Richmond County are published, on April 3, 2014 and April 10, 2014, and that the property owners located on all roads, or portions of roads within Cherry Tree Crossing were given notice; and WHEREAS, the results of the Public Hearing were reported to the Board of Commissioners and considered thereby; and WHEREAS, the Commission, at their meeting held May 22, 2014, approved the proposed abandonment, pursuant to O.C.G.A. § 32-7-2 and the requirements of said statute having been met; Attachment number 2 \nPage 1 of 2 Item # 11 OW THEREFORE, be it resolved by the Commission and it is hereby resolved by the authority of same as follows: 1. It is hereby determined that all requirements of O.C.G.A. § 32-7-2 have been met for the abandonment and removal above-said of the Right-of-Way and such Right-of-Way no longer serves a substantial public purpose or that its removal from the county road system is otherwise in the best public interest and is hereby abandoned as part of the Richmond County Road System; 2. The land formerly comprising the Right-of-Way shall be quitclaimed as permitted by law to the adjoining property owner, subject to easements and restrictions deemed necessary by the Augusta Engineering Department and the Augusta Utilities Department, and the Mayor and Clerk of Commission are hereby authorized to execute the documents necessary to effectuate such transfer as directed by the Augusta Law Department. 3. This Resolution shall be recorded in the Minutes of the Augusta-Richmond County Commission, accompanied by the exhibits referred to herein; 4. This Resolution shall become effective immediately upon its adoption. DULY ADOPTED by the Augusta-Richmond County, Georgia Commission this ______ day of _____________________, 2014. AUGUSTA-RICHMOD, COUTY, GEORGIA COMMISSIO By: ________________________________ David S. Copenhaver As its Mayor Attest: ______________________________ Lena J. Bonner As its Clerk Attachment number 2 \nPage 2 of 2 Item # 11 Attachment number 3 \nPage 1 of 2 Item # 11 Attachment number 3 \nPage 2 of 2 Item # 11 Engineering Services Committee Meeting 5/27/2014 1:00 PM Road Abandonment - South Boundary Lane Department:Law Caption:Motion to determine that South Boundary Lane, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, and to receive as information the results of the public hearing pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached resolution. Background:The Augusta Housing Authority has requested that South Boundary Lane, as shown on the attached plat be abandoned in connection with the Laney-Walker redevelopment project. The Housing Authority plans to convert portions of the road to a parking area and park. The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. Pursuant to O.C.G.A. §32-7-2, a public hearing was held on April 29, 2014. The legal description and plat of said portion of South Boundary Lane are attached. Analysis:In addition to the information provided in the above Background section, results of the public hearing will be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b) (1). Financial Impact:Cost of publication and advertisement of public hearing. Alternatives:Approve or deny request to determine that South Boundary Lane be abandoned. Recommendation:Approve determination and request for abandonment of South Boundary Lane, with public hearing to be held regarding the issue Cover Memo Item # 12 of abandonment pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party (ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage and adopt the attached resolution. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 12 Attachment number 1 \nPage 1 of 1 Item # 12 THIS RESOLUTIO OF THE AUGUSTA-RICHMOD COUTY COMM ISSIO TO ABADO SOUTH BOUDARY LAE AS A PART OF THE ROAD S YSTEM OF AUGUSTA-RICHMOD COUTY; THIS RESOLUTIO, adopted by the Augusta-Richmond County Commission (“Commission”); WHEREAS, it has been proposed that the Commission make a determination that South Boundary Lane, as shown on the attached plat, has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest and that the right-of-way should be abandoned as part of the Richmond County Road System; and WHEREAS, it has been Augusta, Georgia’s policy, pursuant to O.C.G.A § 32-7-2, to reduce the number of roads in Augusta, Georgia that are not utilized or useful to the public and to abandon such roads; and WHEREAS, a Public Hearing was held on April 29, 2014 at the Augusta-Richmond County Municipal Building, Room 803, 530 Greene Street, Augusta, Georgia; and WHEREAS, notice of such Public Hearing was published in The Augusta Chronicle, the newspaper in which Sheriff’s advertisements for Richmond County are published, on April 3, 2014 and April 10, 2014, and that the property owners located on all roads, or portions of roads within Cherry Tree Crossing were given notice; and WHEREAS, the results of the Public Hearing were reported to the Board of Commissioners and considered thereby; and WHEREAS, the Commission, at their meeting held May 22, 2014, approved the proposed abandonment, pursuant to O.C.G.A. § 32-7-2 and the requirements of said statute having been met; Attachment number 2 \nPage 1 of 2 Item # 12 OW THEREFORE, be it resolved by the Commission and it is hereby resolved by the authority of same as follows: 1. It is hereby determined that all requirements of O.C.G.A. § 32-7-2 have been met for the abandonment and removal above-said of the Right-of-Way and such Right-of-Way no longer serves a substantial public purpose or that its removal from the county road system is otherwise in the best public interest and is hereby abandoned as part of the Richmond County Road System; 2. The land formerly comprising the Right-of-Way shall be quitclaimed as permitted by law to the adjoining property owner, subject to easements and restrictions deemed necessary by the Augusta Engineering Department and the Augusta Utilities Department, and the Mayor and Clerk of Commission are hereby authorized to execute the documents necessary to effectuate such transfer as directed by the Augusta Law Department. 3. This Resolution shall be recorded in the Minutes of the Augusta-Richmond County Commission, accompanied by the exhibits referred to herein; 4. This Resolution shall become effective immediately upon its adoption. DULY ADOPTED by the Augusta-Richmond County, Georgia Commission this ______ day of _____________________, 2014. AUGUSTA-RICHMOD, COUTY, GEORGIA COMMISSIO By: ________________________________ David S. Copenhaver As its Mayor Attest: ______________________________ Lena J. Bonner As its Clerk Attachment number 2 \nPage 2 of 2 Item # 12 At t a c h m e n t n u m b e r 3 \ n P a g e 1 o f 2 It e m # 1 2 16OVERVIEW /  STATUS & UPDATES /  WHERE WE’RE HEADED/ WHAT YOU CAN DO / HOME  OWNERSHIP  OPPORTUNITIES / CONTACT At t a c h m e n t n u m b e r 3 \ n P a g e 2 o f 2 It e m # 1 2 Engineering Services Committee Meeting 5/27/2014 1:00 PM Traffic Engineering Manager - Position Filling Department:Abie Ladson, Director Caption:Approve and authorize Augusta Engineering Department (AED) to offer five percent above mid-range salary to a potential candidate for the Traffic Engineering Manager position as requested by the Augusta Engineering Department - Traffic Engineering Division. Background:This is a Manager Position in AED-Traffic Engineering Division. managing the Traffic Engineering Division and directing programs that include signal timing, ITS design and operation, traffic engineering studies, resurfacing, striping, signage, road- side safety, land development engineering review, ADA compliance, construction quality control, construction standards compliance, Georgia Department of Transportation federal aid projects, county wide right-of-way, and other related engineering assignments. Report directly to the Assistant Director over the Traffic Engineering Division. This position will also work closely with the Engineering Manager, Construction Manager and Land Acquisition Manager. This position will also work with Georgia DOT personnel, design consultants, developers, surveyors, citizens, and other city departments This position also frequently interacts with consulting engineers designing Augusta infrastructure projects or private land development projects. The Job Grade is 59 with mid salary range of $89,093.19. Analysis:Salary is in line with parallel position within AED and approving this action will enable AED to get a skilled Traffic Engineer with over 29 years of experience in transportation and traffic engineering that will enhance AED’s ability to complete in-house engineering design, ITS and traffic operations as well land development issues in more efficient and cost effective way. Approving the request will also yield cost saving for the City as improved traffic operations have been shown to provide savings in both fuel and time to the general motoring public. Financial Impact:This is an approved position and included in 2014 budget. The position will be funded 75% from general fund (101-04-1110) and Cover Memo Item # 13 25% from SPLOST funds (328-04-1197). Alternatives:1) Approve and authorize Augusta Engineering Department (AED) to offer five percent above mid-range salary to a Potential Candidate for Traffic Engineering Manager Position as Requested by the Augusta Engineering Department- Traffic Engineering Division. 2) Do not approve and identify alternative for continue working without a Traffic Engineering Section Manager. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 101-04-1110/5111110 75% 328-04-1197/5111110 25% REVIEWED AND APPROVED BY: Finance. Human Resources. Law. Administrator. Clerk of Commission Cover Memo Item # 13 Engineering Services Committee Meeting 5/27/2014 1:00 PM Wrightsboro Road Improvements - From Jimmie Dyess Parkway to I-520 (SA18/CPB 21) Department:Abie Ladson, Director Caption:Approve Supplemental Agreement Eighteen, CPB 323-041110- 296823309, Change Number Twenty One with Atkins North America, Inc. in the amount of $71,417 to prepare Use On Construction Plan Revisions for submission to GDOT for the design of two (2) limited access median openings, changes in access for parcels 93 and 95, and design of landscape plans and an irrigation system on the project to improve Wrightsboro Road from Jimmie Dyess Parkway to I-520. Background:This is a GDOT project that will widen & reconstruct Wrightsboro Road from Jimmie Dyess Parkway to I-520. AED was responsible for the development of the preliminary engineering activities and hired Atkins North America, Inc. to accomplish these activities. GDOT funded and acquired the right of way ($12,356,600) and provided the construction funding ($18,632,365.50). The project was awarded to Reeves Construction Company October 5, 2012 and construction is approximately 42% complete. The current completion date is July 4, 2015. Analysis:The design changes associated with the additional median openings and change in access for parcel 95 will require revisions to the final construction plans. Revisions include, but not limited to, the summary of quantities sheets, plan sheets, staging plans, cross sections, driveway profiles, utility plans, street lighting plans, erosion control plans, and signing & marking plans. The cost to prepare the Use On Construction Revisions is $19,450. The effort to design the landscape plans and irrigation system is quite extensive. This will require meetings with the appropriate city representatives and GDOT, and preparation of the landscape plans and irrigation system in accordance with the Augusta Public Works and Engineering Department Plan Preparation guidelines and the Augusta Entry and Corridor Beautification guidelines. The cost to prepare the landscape plans and irrigation system is $51,967. Cover Memo Item # 14 Financial Impact:The total requested budget is $71,417. Alternatives:1) Approve Supplemental Agreement Eighteen, CPB 323-041110- 296823309, Change Number Twenty One with Atkins North America, Inc. in the amount of $71,417 to prepare Use On Construction Plan Revisions for submission to GDOT for the design of two (2) limited access median openings, changes in access for parcels 93 and 95, and design of landscape plans and an irrigation system on the project to improve Wrightsboro Road from Jimmie Dyess Parkway to I-520. 2) If not approved, the cost to construct these revisions will become the responsibility of Augusta, Ga. Recommendation:Approve caption. Funds are Available in the Following Accounts: TIA Discretionary Funds REVIEWED AND APPROVED BY: Cover Memo Item # 14 (SA02) – For changes greater than $20,000) AUGUSTA-RICHMOND COUNTY AUGUSTA, GA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, Atkins North America, Inc., Consultant, entered into a contract with Augusta-Richmond County on October 19, 1999, for engineering design services associated with the widening and reconstruction of Wrightsboro Road from Jimmie Dyess Parkway to I-520, GDOT Project No. STP00-7001- 00 (009), File Reference No. 11-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: It is agreed that as a result of the above described modification the contract amount is increased by $71,417.00 from $1,686,426.95 to a new total of $1,757,843.95. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Atkins North America, Inc, Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This day of , 2014 RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY ATKINS NORTH AMERICA, INC. AUGUSTA, GEORGIA Deke Copenhaver, Mayor Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Augusta Richmond County Project Number(s): 323-041110-296823309 Supplemental Agreement Number: 18 Purchase Order Number: 04471 To prepare Use on Construction plan revisions to submit to GDOT for the design of 2 limited access median openings, change in access for parcels 93 and 95, and design of landscape plans and an irrigation system. Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Attachment number 1 \nPage 1 of 1 Item # 14 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project change is authorized to CPB# 323-041110-296823309 SA #Eighteen in the amount of $71,417.00 for change in access for parcels 93 and 95 with Atkins North America Funding is available through TIA Discretionary Funds transferred to the project Engineering account. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase III 1,984,000$ SPLOST III Recapture 773,500$ TIA Discretionary 71,417$ 2,828,917$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Deke Copenhaven, Mayor CAPITAL PROJECT BUDGET WRIGHTSBORO ROAD IMPROVEMENTS CHANGE NUMBER TWENTY ONE CPB#323-041110-296823309 Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 3.19.2014 Attachment number 2 \nPage 1 of 2 Item # 14 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET WRIGHTSBORO ROAD IMPROVEMENTS CHANGE NUMBER TWENTY ONE CPB#323-041110-296823309 Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks CPB AMOUNT ADDITION NEW SOURCE OF FUNDS CPB REQUEST CPB SPECIAL 1% SALES TAX, PHASE III 323-04-1110-6011110-296823309 ($1,984,000)($1,984,000) SPECIAL 1% SALES TAX, PHASE III 323-04-1110-6011110-296823333 ($773,500)($773,500) TIA Discretionary ($71,417) ($71,417) TOTAL SOURCES: ($2,757,500) ($71,417) ($2,828,917) USE OF FUNDS ENGINEERING 323-04-1110-5212115-296823309 $2,460,106 $71,417 $2,531,523 ADVERTISING 323-04-1110-5233119-296823309 $1,000 $1,000 RIGHT-OF-WAY 323-04-1110-5411120/296823309 $43,894 $43,894 CONTINGENCY 323-04-1110-6011110/296823309 $12,500 $12,500 TRAFFIC SIGNAL 323-04-1110-5414610/296823309 $0 $0 UTILITY RELOCATION 323-04-1110-5414510/296823309 $240,000 $240,000 TOTAL USES: $2,757,500 $71,417 $2,828,917 3.19.2014 Attachment number 2 \nPage 2 of 2 Item # 14