Loading...
HomeMy WebLinkAbout2014-03-10-Meeting Agenda Engineering Services Committee Meeting Commission Chamber- 3/10/2014- 1:05 PM ENGINEERING SERVICES 1. Authorize continued funding of a U. S. Geological Survey (USGS) Gage on the Augusta Canal. Attachments 2. Award the purchase of three bulldozers to Flint Equipment Company, the lowest compliant bidder, for the Environmental Services Department. Attachments 3. Presentation from Terri Turner concerning the flood plain in Augusta Richmond County and the insurance rates in Richmond County. (Requested by Commissioner Donnie Smith) Attachments 4. Approve Renewal of Water Audit Professional Services for 2014. Attachments 5. Presentation by Mr. John D. Hatney, Jr. regarding the illegal use by the City of two parcels of property with an easement for a drainage ditch located at 1537 Wooten Road. Attachments 6. Approve award of the Design Consultant Service Agreement Contract to Civil Services, Inc. (CSI) in the amount of $38,866.00 for Milledgeville Road Bridge at Rocky Creek – Bridge Maintenance, subject to receipt of signed contracts and bonds if applicable as requested by AED. (RFP 13-182) Attachments 7. Motion to approve the minutes of the Engineering Services Committee held on February 24, 2014. Attachments 8. Approve award of the Design Consultant Service Agreement Contract to Civil Services, Inc. (CSI) in the amount of $284,602 for Old Waynesboro Road Bridge over Spirit Creek – Bridge Replacement, subject to receipt of signed contracts and bonds if applicable as requested by AED. (RFP 13-210) Attachments www.augustaga.gov 9. Motion to determine that any and all roads, or portions of roads within Cherry Tree Crossing, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Attachments 10. Motion to determine that South Boundary Lane, as shown on the attached plat/legal description, has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32- 7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and restrictions and easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Attachments 11. Authorize to execute Feasibility Cost Share Agreement with US Army Corps of Engineers and approve Capital Project Budget Change Number One (CBP 324-041110-209824002) for the Augusta Regional Flood Control Feasibility Study in the amount of $318,950.00 to complete the Rocky Creek Flood Risk Management, Section 205 Feasibility Study in the amount of $318,950.00. Funding is available in the project contingency account for the AED. Attachments 12. Approve award of the Design Consultant Service Agreement Contract to Cranston Engineering in the amount of $100,780.00 for Scotts Way Over Rae’s Creek – Bridge Replacement, subject to receipt of signed contracts and bonds if applicable as requested by AED. Attachments 13. Request authorization to allow temporary employees to operate Utilities’ vehicles on Fort Gordon. Attachments Engineering Services Committee Meeting 3/10/2014 1:05 PM Authorize continued funding of a U. S. Geological Survey (USGS) Gage on the Augusta Canal. Department:Utilities Caption:Authorize continued funding of a U. S. Geological Survey (USGS) Gage on the Augusta Canal. Background:In January 2005 Augusta entered into an agreement with the U. S. Geological Survey (USGS) to operate and maintain a gaging station on the Augusta Canal. This gage is used to measure and record the flows in the canal. The gage has been in service since the early 1900's and had previously been operated by the U. S. Corps of Engineers for many years but the Corps decided to no longer operate the gage and transferred their operating responsibilities to the USGS in 2005. The agreement with the USGS included a provision for Augusta to pay a portion of the cost of the gage operation. For the current year the cost to Augusta is $16,250.00. Analysis:The continued operation of the Augusta Canal Gaging Station is of mutual benefit to Augusta and the USGS. The shared costs have been reasonable and we would like to continue to fund this work at an annual cost not to exceed $20,000. This upper limit will allow for potential costs increases. Financial Impact:Annual cost not to exceed $20,000. Alternatives:Discontinue participation in the cost of maintaining the gage thereby causing the gage to be removed from service (not recommended). Recommendation:We recommend that the Commission approve the expenditure of up to $20,000 annually to support the continued operation of the Augusta Canal Gage by the USGS. Funds are Available in the Following Accounts: 506043510-5213115 Cover Memo Item # 1 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Engineering Services Committee Meeting 3/10/2014 1:05 PM Award the purchase of three bulldozers to Flint Equipment Company, the lowest, compliant bidder. Department:Environmental Services Caption:Award the purchase of three bulldozers to Flint Equipment Company, the lowest compliant bidder, for the Environmental Services Department. Background:Over the years, the Environmental Services Department (ESD) has operated a variety of sizes and types of dozers designed for the waste industry. Currently, the ESD operates with three dozers, one large and two midsized dozers, of which two are designed as a waste-handling dozer and the other is limited to dirt work. This configuration has allowed us to work efficiently. The large dozer is required for high volume operations, and the midsized dozers are needed for daily cover, building slopes, landfill maintenance, as well as borrow pit projects. Looking at the last year of operations, we continuously need an additional mid-sized dozer. This need arises from aging equipment, and that the size and scope of landfill operations has increased over the years. To meet the demands, we have historically borrowed a dozer from public works (if available) or rented a dozer when the need arose. However, the one constant has been the need for an additional dozer. The ESD in conjunction with the Procurement Department released bid 13-201 in an effort to procure waste handling dozers. There were four responsive bidders to the solicitation. The initial low bidder was Border Equipment. They indicated that the Case product line had a machine which met specifications. Upon a detailed review of the dozer, and an on-site demonstration, it became clear that both Case and Border Equipment were eager and willing to produce a waste handler dozer, however, the product requested had never been built by the equipment manufacturer. Therefore, it was determined that the bid was not compliant with the requested specifications. The ESD recommended that we move to the second lowest bidder, as their product did meet the specifications in the bid. Analysis:To meet the needs of ESD daily landfill operations, three mid-size dozers with waste-handling packages are necessary, in addition to our large dozer. We are proposing the purchase of two-six way blade machines with small trash racks, as well as one straight- Cover Memo Item # 2 blade with a full trash rack. By having this number and configuration, it will allow the department much more flexibility in its daily operations. First, by having a second straight blade dozer, which allows the department to have a spare available when the large dozer requires service; and secondly, it further allows us to operate a mid-sized machine during non-peak hours of operation, reducing our operational costs. Additionally, by purchasing the two six way blade dozers with specifications designed for landfill use, allows the ESD additional flexibility in our operations. Currently we are limited, as only one of our existing dozers was designed for waste operations and the other was designed for dirt work. Placing a dozer that is not guarded for waste handling in the trash is detrimental to the useful life of the machine and increases the overall operational cost. One of the greatest benefits to the purchase of three dozers is a standardized fleet of mid-sized dozers. This reduces the amount of parts required to have on hand for repairs. A further cost saving benefit will be the inclusion of a GPS system included on each dozer. This will allow us to operate much more cost effectively. This cost savings is done by completing the project right the first time. In addition, the straight blade dozer will communicate with the compactor to show proper waste placement and areas which need compaction. By ensuring proper compaction, the need to construct additional airspace or landfill cells is reduced, which increases the time we operate and amount of trash that can be placed in any one cell. Simply put, we get more revenue produced per cubic yard of airspace consumed. Financial Impact:The purchase price of the three dozers is $1,492,755. In addition to a purchase price, we asked the vendor for a 5 year lease to own price. The combined monthly cost for the 5 year lease to own is $26,313 per month, or $315,756 per year. Augusta has an additional financing method which is financing the purchase through the Georgia Municipal Association, better known as GMA. With information provided by Fleet Management, it appears that the utilization of GMA is a more cost effective tool when financing this equipment. The estimated combined monthly cost for the same 5 year term would be $24,879.25 per month, or $282,951 per year. By utilizing the GMA program the ESD will save $17,208 per year. Additionally, GMA will extend our term longer than 5 years if requested, improving cash flow resulting from such a large purchase. Therefore the ESD is recommending utilizing the GMA financing versus what the dealer has offered. Alternatives:1. Approve the purchase of three bulldozers from Flint Equipment Company, the lowest, compliant bidder. 2. Do not approve purchase Recommendation:Approve the purchase of three bulldozers from Flint Equipment Cover Memo Item # 2 Company, the lowest, compliant bidder. Funds are Available in the Following Accounts: Move the estimated GMA cost of $282,951 from 541-04- 4210/5224219 to 541-04-4210/6111631. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Invitation to Bid Sealed bids will be received at this office on Thursday, October 3, 2013 @ 11:00 a.m. for furnishing: Bid Item 13-201 Waste Handler for Environmental Services Department Bid Item 13-202 CNG Honda Civic for Environmental Services Department Bid Item 13-203 Enviro Cover Deployer for Environmental Services Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, September 20, 2013 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference an eligible bidder must submit a completed and signed written application to become a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project. An eligible bidder who fails to submit an application for approval as a local bidder at least thirty (30) days prior to the date bids are received on an eligible local project, and who otherwise meets the requirements for approval as a local bidder, will not be qualified for a bid preference on such eligible local project. No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Augusta Chronicle August 29, September 5, 12, 19, 2013 Metro Courier September 4, 2013 Revised: 3/7/2013 Attachment number 1 \nPage 1 of 1 Item # 2 VENDORS Yancy Brothers/Caterpillar 4165 Mike Padgett Hwy Augusta, GA 30906 Flint Equipment 1900 William Few Pkwy Grovetown, GA 30813 Tractor & Equipment 3809 Mike Padgett Hwy Augusta, GA 30906 Border Equipment 2804 Wylds Road Augusta GA 30909 ASC Construction 2303 Edmund Hwy Cayce, SC 28269 Waste Management 1571 Burks Drive Lake City, GA 30260 Attachment B YES YES YES YES E-Verify Number 686717 339942 49526 705362 SAVE Form YES YES YES YES Waste Handler Year 2013 2014 2013 2013 Brand CATERPILLAR JOHN DEERE KOMATSU CASE Model D6TXWWHA 850K D65PX-17 2050M Bid Price 416,404.00$ 399,777.00$ 421,767.00$ 375,196.00$ Lease Price 5-yr Lease/per month 4,093.00$ 7,047.00$ 7,438.00$ 6,615.81$ Optional Equipment Purchase Price Incr Semi-U Blade (5,500.00)$ $0.00 (33,501.00)$ 21,000.00$ Air Conditioner unit 2,356.00$ 9,950.00$ $0.00 $0.00 Carlson GPS System 90,200.00$ $ 95,033.00 89,952.00$ 88,000.00$ Zonar System 1,188.00$ $ 2,775.00 1,075.00$ 1,674.00$ Bid Opening Bid Item #13-201 Waste Handler for Augusta, Georgia - Environmental Services Department Bid Due: Thursday, October 3, 2013 @ 11:00 a.m. NO BID RESPONSE NO BID RESPONSE Page 1 of 2 At t a c h m e n t n u m b e r 2 \ n P a g e 1 o f 2 It e m # 2 VENDORS Yancy Brothers/Caterpillar 4165 Mike Padgett Hwy Augusta, GA 30906 Flint Equipment 1900 William Few Pkwy Grovetown, GA 30813 Tractor & Equipment 3809 Mike Padgett Hwy Augusta, GA 30906 Border Equipment 2804 Wylds Road Augusta GA 30909 ASC Construction 2303 Edmund Hwy Cayce, SC 28269 Waste Management 1571 Burks Drive Lake City, GA 30260 Bid Opening Bid Item #13-201 Waste Handler for Augusta, Georgia - Environmental Services Department Bid Due: Thursday, October 3, 2013 @ 11:00 a.m. Monthly Lse Price In Semi-U Blade (99.00)$ $0.00 (591.00)$ 370.30$ Air Conditioner unit 43.00$ $ 176.00 $0.00 $0.00 Carlson GPS System 1,629.00$ 1,675.00$ 1,587.00$ 1,551.70$ Zonar System 22.00$ $ 49.00 19.00$ 29.52$ Trade-In Value 2007 Cat D6K Dozer Current Hrs-6794 35,000.00$ $ 51,000.00 52,000.00$ 35,000.00$ 2007 Cat D6N Waste Current Hrs-7988 48,000.00$ $ 73,000.00 60,000.00$ 35,000.00$ Delivery Date 90 DAYS ARO 12/31/2013 70 DAYS ARO 120 - 150 DAYS Page 2 of 2 At t a c h m e n t n u m b e r 2 \ n P a g e 2 o f 2 It e m # 2 Attachment number 3 \nPage 1 of 3 Item # 2 Attachment number 3 \nPage 2 of 3 Item # 2 Attachment number 3 \nPage 3 of 3 Item # 2 Attachment number 4 \nPage 1 of 2 Item # 2 Attachment number 4 \nPage 2 of 2 Item # 2 Engineering Services Committee Meeting 3/10/2014 1:05 PM Flood Plain Presentation Department:Clerk of Commission Caption:Presentation from Terri Turner concerning the flood plain in Augusta Richmond County and the insurance rates in Richmond County. (Requested by Commissioner Donnie Smith) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 3 Engineering Services Committee Meeting 3/10/2014 1:05 PM Utilities Water Audit and Efficiency Program Department:Utilities Caption:Approve Renewal of Water Audit Professional Services for 2014. Background:The Georgia Water Stewardship Act of 2010 requires that water systems prepare and submit annual water audits in accordance with American Water Works Association standards. In conjunction with our water audit activities, Augusta Utilities is undertaking a comprehensive water loss control program. Cavanaugh and Associates has been providing professional services related to these activities for the past two years. Analysis:Cavanaugh and Associates has contracted with the Georgia Environmental Protection Division to develop water audit guidance and conduct training statewide. The ongoing Water Efficiency Program they are assisting us with has greatly improved Utilities’ efficiency and accountability, and helped us reduce our non-revenue water. Financial Impact:The cost for professional services for 2014 is $150,000. Alternatives:The Commission could elect not to approve the renewal. Recommendation:We recommend that the renewal of professional services of Cavanaugh and Associates be approved. Funds are Available in the Following Accounts: Funding is available in Account #506043110-5212999 REVIEWED AND APPROVED BY: Finance. Procurement. Cover Memo Item # 4 Law. Administrator. Clerk of Commission Cover Memo Item # 4 Attachment number 1 \nPage 1 of 3 Item # 4 Attachment number 1 \nPage 2 of 3 Item # 4 Attachment number 1 \nPage 3 of 3 Item # 4 Engineering Services Committee Meeting 3/10/2014 1:05 PM John D. Hatney, Jr. Department:Clerk of Commission Caption:Presentation by Mr. John D. Hatney, Jr. regarding the illegal use by the City of two parcels of property with an easement for a drainage ditch located at 1537 Wooten Road. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 5 Item # 5 Item # 5 Item # 5 Item # 5 Item # 5 Engineering Services Committee Meeting 3/10/2014 1:05 PM Milledgeville Road Bridge at Rocky Creek- Bridge Maintenance Contract Award (13-182) Department:Abie Ladson, Director Caption:Approve award of the Design Consultant Service Agreement Contract to Civil Services, Inc. (CSI) in the amount of $38,866.00 for Milledgeville Road Bridge at Rocky Creek – Bridge Maintenance, subject to receipt of signed contracts and bonds if applicable as requested by AED. (RFP 13-182) Background:The Milledgeville Road Bridge at Rocky Creek – Bridge Maintenance is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The Milledgeville Road Bridge is a Band 1 project that will begin the design process once approved by the Augusta, Georgia Commission. Analysis:Request for Proposals (RFP) were evaluated on November 11, 2013 with Civil Services, Inc being the selected consultant. The following firms submitted RFPs and were evaluated based on the evaluation procedures used for this project. 1. Civil Services, Inc. 2. Heath & Lineback 3. KSGW 4. Moreland Altobelli and Associates Financial Impact:Funds are available in the TIA project budget account numbers: The Milledgeville Road Bridge at Rocky Creek - Bridge maintenance in the amount of $38,866.00. Account #: 371- 041110/T13049127 and TIA Discretionary Funds Account. Alternatives:1) Approve award of Design Consultant to Civil Services, Inc. in the amount of $$38,866.00 for Milledgeville Road Bridge at Rocky Creek (Bridge maintenance), subject to receipt of signed contracts and proper Insurance Documents as requested by AED. 2) Do not approved, and abandon project. Recommendation:Approve Alternative Number One. Funds are Available TIA Design Funds – Acct #: 371-041110-5212115/T13049127- Cover Memo Item # 6 in the Following Accounts: 5212115 in the amount of $30,000.00 and TIA Discretionary Funds in the amount of $8,866.00. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 6 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to CPB#371-041110/T13049127. This project consists of design services for the Milledgeville Road Bridge at Rocky Creek - Bridge Maintenance. Also award the Design Consultant Contract to Civil Service, Inc. (CSI) in the amount of $38,866. Funding is available in TIA project budget account numbers: $30,000 in Design and $8,866 in Discretioanry Funds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. 30,000$ 8,866$ 38,866$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Deke Copenhaver, Mayor Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB#371-041110/T13049127 CAPITAL PROJECT BUDGET Milledgeville Road Bridge @ Rocky Creek - Bridge Maintenance TIA Design TIA Discretionary Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1 of 4 12.12.2013 Attachment number 1 \nPage 1 of 4 Item # 6 Augusta-Richmond County, Georgia CPB#371-041110/T13049127 CAPITAL PROJECT BUDGET Milledgeville Road Bridge @ Rocky Creek - Bridge Maintenance CPB AMOUNT NEW SOURCE OF FUNDS CPB CPB TIA Discretionary Funds Design (30,000)$ (30,000)$ 371-04-1110-5212115/T13049127 TIA Discretionary Funds (8,866)$ (8,866)$ TOTAL SOURCES:(38,866)$ (38,866)$ USE OF FUNDS ENGINEERING 371-04-1110-5212115/T13049127 30,000$ 30,000$ TIA Discretionary XXXXX 8,866$ 8,866$ TOTAL USES:38,866$ 38,866$ 2 of 4 12.12.2013 Attachment number 1 \nPage 2 of 4 Item # 6 project consists of design services for the Milledgeville Road Bridge at Rocky Creek - 3 of 4 12.12.2013 Attachment number 1 \nPage 3 of 4 Item # 6 4 of 4 12.12.2013 Attachment number 1 \nPage 4 of 4 Item # 6 Request for Proposal Request for Proposals will be received at this office until Tuesday, September 17, 2013 @ 11:00 a.m. for furnishing: RFP Item #13-182 Milledgeville Road Bridge Maintenance at Rocky Creek for Engineering Department RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, August 30, 2013 @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 90 days after time has been called on the date of opening. Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle August 8, 15, 22, 29, 2013 Metro Courier August 14, 2013 Revised: 3/5/2013 Attachment number 2 \nPage 1 of 1 Item # 6 VENDORS Attachment B E-Verify #SAVE Form Original 7 Copies Addendum 1 Fee Proposal Moreland Altobelli Asso 2211 Beaver Ruin Road Norcross, GA 30071 Yes 53328 Yes Yes Yes Yes Yes Cranston Engineering 452 Ellis Street Augusta, GA 30901 ZEL Engineers 435 Telfair Street Augusta, GA 30901 No Bid Response Heath & Lineback Engineers 2390 Canton Rd., Building 200 Marietta, GA 30066 Yes 64937 Yes Yes Yes Yes Yes KSGW 2500 Norhtwinds Pkwy Suite 250 Alpharetta, GA 30009 Yes 177771 Yes Yes Yes Yes Yes Civil Services Inc 620 Peachtree St., Suite 300-R Atlanta, GA 30308 Yes 387871 Yes Yes Yes Yes Yes RFP Opening RFP Item #13-182 Milledgeville Road Bridge Maintenance at Rocky Creek for Augusta, Georgia - Engineering Department RFP Due: Tuesday, September 17, 2013 @ 11:00 a.m. Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 6 Evaluation Criteria PTS Civil Services Inc 620 Peachtree St., Suite 300-R Atlanta, GA 30308 Heath & Lineback Engineers 2390 Canton Rd., Building 200 Marietta, GA 30066 KSGW 2500 Norhtwinds Pkwy Suite 250 Alpharetta, GA 30009 Moreland Altobelli & Assoc 2211 Beaver Ruin, Ste 190 Norcross, GA 30071 1) Qualifications of Company (company profile).25 24.7 24.0 20.3 23.0 2) Qualifications and experience of key professionals that will be assigned to the projects.30 28.3 27.3 22.7 26.7 3) Specific relevant experience of your company.10 9.3 9.0 5.7 8.3 4) A detailed description of the proposed technical approach to be taken for the performance of the required services for each culvert/bridge. 15 13.7 13.0 9.7 14.0 5) Submit a conceptual project schedule for each bridge (NOTE: The critical path method (CPM) should be used including milestones, tasks and sub-tasks). 5 4.7 4.7 0.0 5.0 6) References (include specific individuals with addresses and telephone numbers)5 5.0 5.0 5.0 5.0 7) Proximity to Area • Within Richmond County - 5 pts • Within CSRA - 4 pts • Within Georgia - 3 pts • Within SE United States (includes AL, TN, NC, SC, FL) 2 pts • All Others - 1 pt 5 3.0 3.0 3.0 3.0 8) Proposed Fee (include hourly cost per individual to be included in the proposal) • Lowest 5 points • Second 4 points • Third 3 points • Fourth 2 points • Highest 1 point 5 4.0 3.0 2.0 5.0 Total 100 92.7 89.0 68.3 90.0 Cumulative Evaluation Sheet RFQ Item #13-182 Milledgeville Road Bridge Maintenance at Rocky Creek for Augusta, Georgia - Engineering Department Attachment number 4 \nPage 1 of 1 Item # 6 Attachment number 5 \nPage 1 of 2 Item # 6 Attachment number 5 \nPage 2 of 2 Item # 6 Attachment number 6 \nPage 1 of 3 Item # 6 Attachment number 6 \nPage 2 of 3 Item # 6 Attachment number 6 \nPage 3 of 3 Item # 6 Attachment number 7 \nPage 1 of 5 Item # 6 Attachment number 7 \nPage 2 of 5 Item # 6 Attachment number 7 \nPage 3 of 5 Item # 6 Attachment number 7 \nPage 4 of 5 Item # 6 Attachment number 7 \nPage 5 of 5 Item # 6 Engineering Services Committee Meeting 3/10/2014 1:05 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Engineering Services Committee held on February 24, 2014. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 7 Attachment number 1 \nPage 1 of 2 Item # 7 Attachment number 1 \nPage 2 of 2 Item # 7 Engineering Services Committee Meeting 3/10/2014 1:05 PM Old Waynesboro Road Over Spirit Creek- Bridge Replacement Contract Award (13-210) Department:Abie Ladson, Director Caption:Approve award of the Design Consultant Service Agreement Contract to Civil Services, Inc. (CSI) in the amount of $284,602 for Old Waynesboro Road Bridge over Spirit Creek – Bridge Replacement, subject to receipt of signed contracts and bonds if applicable as requested by AED. (RFP 13-210) Background:The Old Waynesboro Road Bridge over Spirit Creek – Bridge Replacement is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The Old Waynesboro Road Bridge is a Band 1 project that will begin the design process once approved by the Augusta, Georgia Commission. Analysis:Request for Proposals (RFP) were evaluated on December 6, 2013 with Civil Services, Inc being the selected consultant. The following firms submitted RFPs and were evaluated based on the evaluation procedures used for this project. 1. Moreland Altobelli and Associates 2. Cranston Engineering 3. Heath & Lineback 4. Civil Services, Inc 5. Gresham, Smith & Part Financial Impact:Bids came in over S119,602.00 above the TIA budgeted amount. Proposed project funds are presented below: 1.TIA Budgeted Amount: $165,000.00 2.TIA Discretionary Funds: $119,602.00 TOTAL: $284,602.00 Alternatives:1) Approve award of Design Consultant to Civil Services, Inc. in the amount of $284,602.00 for Old Waynesboro Road Bridge over Spirit Creek (Bridge Replacement), subject to receipt of signed contracts and proper Insurance Documents as requested by AED. 2) Do not approved, and abandon project. Recommendation:Approve Alternative Number One. Funds are Available 371-041110-5212115/T13048130-5212115 in the amount of Cover Memo Item # 8 in the Following Accounts: $165,000.00 and TIA Discretionary Funds in the amount of $119,602.00. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 8 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to CPB#371-041110/T13048130. This project consists of design services for the Old Waynesboro Road over Spirit Creek (Bridge Replacement). Also award the Design Consultant Contract to Civil Service, Inc. (CSI) in the amount of $284,602. Funding is available in TIA project budget account numbers: $165,000 in Design and $120,000 in Discretioanry Funds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. 165,000$ 120,000$ 285,000$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Deke Copenhaver, Mayor Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB#371-041110/T13048130 CAPITAL PROJECT BUDGET Old Waynesboro Road Over Spirit Creek - Bridge Replacement TIA Design TIA Discretionary Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1 of 6 12.12.2013 Attachment number 1 \nPage 1 of 6 Item # 8 Augusta-Richmond County, Georgia CPB#371-041110/T13048130 CAPITAL PROJECT BUDGET Old Waynesboro Road Over Spirit Creek - Bridge Replacement 2 of 6 12.12.2013 Attachment number 1 \nPage 2 of 6 Item # 8 Augusta-Richmond County, Georgia CPB#371-041110/T13048130 CAPITAL PROJECT BUDGET Old Waynesboro Road Over Spirit Creek - Bridge Replacement CPB AMOUNT NEW SOURCE OF FUNDS CPB CPB TIA Discretionary Funds Design (165,000)$ (165,000)$ 371-04-1110-5212115/T13048130 TIA Discretionary Funds (120,000)$ (120,000)$ xxxx TOTAL SOURCES:(285,000)$ (285,000)$ USE OF FUNDS ENGINEERING 371-04-1110-5212115/T13048130 165,000$ 165,000$ TIA Discretionary Funds XXXXX 120,000$ 120,000$ TOTAL USES:285,000$ 285,000$ 3 of 6 12.12.2013 Attachment number 1 \nPage 3 of 6 Item # 8 4 of 6 12.12.2013 Attachment number 1 \nPage 4 of 6 Item # 8 5 of 6 12.12.2013 Attachment number 1 \nPage 5 of 6 Item # 8 6 of 6 12.12.2013 Attachment number 1 \nPage 6 of 6 Item # 8 Request for Proposal Request for Proposals will be received at this office until Tuesday, November 5, 2013 @ 11:00 a.m. for furnishing: RFP Item #13-210 Replacement of Old Waynesboro Road Over Spirit Creek for Engineering Department RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, October 18, 2013 @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 90 days after time has been called on the date of opening. Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle September 26, October 3, 10, 17, 2013 Metro Courier October 2, 2013 Revised: 3/5/2013 Attachment number 2 \nPage 1 of 1 Item # 8 VENDORS Attachment B E-Verify #SAVE Form Original 7 Copies Fee Proposal Moreland Altobelli Asso 2211 Beaver Ruin Road Norcross, GA 30071 Yes 53328 Yes Yes Yes Yes Cranston Engineering 452 Ellis Street Augusta, GA 30901 Yes 64684 Yes Yes Yes Yes ZEL Engineers 435 Telfair Street Augusta, GA 30901 Heath & Lineback Engineers 2390 Canton Rd., Building 200 Marietta, GA 30066 Yes 64937 Yes Yes Yes Yes Hatch Mott MacDonald 2550 Hertage Ct., SE Suite 250 Atlanta, GA 30339 Civil Services, Inc 851 Laney Walker Blvd., Suite A Augusta, GA 30901 Yes 387871 Yes Yes Yes Yes Gresham, Smith & Part 511 Union St., Suite 1400 Nashville, TN 37219 Yes 52704 Yes Yes Yes Yes KSGW 2500 Northwinds Parkway Suite 250 Alpharetta, GA 30006 Yes 177771 Yes Yes No Non- Compliant Yes RFP Opening RFP Item #13-210 Replacement of Old Waynesboro Road Over Spirit Creek for Augusta, Georgia - Engineering Department RFP Due: Tuesday, November 5, 2013 @ 11:00 a.m. No Bid Response Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 8 Evaluation Criteria PTS Moreland Altobelli Asso 2211 Beaver Ruin Road Norcross, GA 30071 Cranston Engineering 452 Ellis Street Augusta, GA 30901 Heath & Lineback Engineers 2390 Canton Rd., Building 200 Marietta, GA 30066 Civil Services, Inc 851 Laney Walker Blvd., Suite A Augusta, GA 30901 Gresham, Smith & Part 511 Union St., Suite 1400 Nashville, TN 37219 1) Qualifications of Company 20 16.7 16.0 17.3 17.3 16.7 2) Qualifications and experience of key professionals that will be assigned to the project 30 25.0 23.7 26.7 27.3 24.0 3) Specific relevant experience of your company 15 11.7 11.3 14.0 14.7 11.3 4) A detailed description of the proposed technical approach to be taken for the performance of the required services for each culvert/bridge. 15 11.3 11.7 13.7 15.0 10.0 5) Submit a conceptual project schedule for each bridge (Note: The critical path method (CPM) should be used including milestones, tasks and sub-tasks. 5 4.7 4.7 4.7 5.0 3.3 6) References (include specific individuals with addresses and telephone numbers 5 5.0 4.7 4.7 5.0 4.7 7) Proximity to Area • Within Richmond County 5 pts • Within CSRA 4 pts • Within Georgia 3 pts • Within SE United States (includes AL, TN, NC, SC, FL) 2 pts • All Others 1 pt. 5 3.0 5.0 3.0 5.0 2.0 8) Proposed Fee (include hourly cost per individual to be included in the proposal) • Lowest 5 points • Second 4 points • Third 3 points • Fourth 2 points • Highest 1 point 5 4.0 5.0 3.0 2.0 1.0 Total 100 81.3 82.0 87.0 91.3 73.0 Cumulative Evaluation Sheet RFP Item #13-210 Replacement of Old Waynesboro Road Over Spirit Creek for Augusta, Georgia - Engineering Departmen Attachment number 4 \nPage 1 of 1 Item # 8 Attachment number 5 \nPage 1 of 2 Item # 8 Attachment number 5 \nPage 2 of 2 Item # 8 Attachment number 6 \nPage 1 of 3 Item # 8 Attachment number 6 \nPage 2 of 3 Item # 8 Attachment number 6 \nPage 3 of 3 Item # 8 Attachment number 7 \nPage 1 of 3 Item # 8 Attachment number 7 \nPage 2 of 3 Item # 8 Attachment number 7 \nPage 3 of 3 Item # 8 Engineering Services Committee Meeting 3/10/2014 1:05 PM Road Abandonment - Cherry Tree Crossing Department:Law Caption:Motion to determine that any and all roads, or portions of roads within Cherry Tree Crossing, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit- claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Background:The Augusta Housing Authority has requested that any and all roads, or portions of roads within Cherry Tree Crossing, as shown on the attached plat be abandoned. The Housing Authority plans to redevelop Cherry Tree/Sunset Homes. The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. The legal description and plat of said portion of any and all roads, or portions of roads within Cherry Tree Crossing are attached Analysis:In addition to the information provided in the above Background section, publication notices will be made for a public hearing to be held, with results to be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b) (1). Financial Impact:Cost of publication and advertisement of public hearing. Alternatives:Approve or deny request to determine that any and all roads, or portions of roads within Cherry Tree Crossing be abandoned. Recommendation:Approve determination and request for abandonment of any and all roads, or portions of roads within Cherry Tree Crossing , with public hearing to be held regarding the issue of abandonment Cover Memo Item # 9 pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 9 Attachment number 1 \nPage 1 of 3 Item # 9 Attachment number 1 \nPage 2 of 3 Item # 9 Attachment number 1 \nPage 3 of 3 Item # 9 Attachment number 2 \nPage 1 of 1 Item # 9 Engineering Services Committee Meeting 3/10/2014 1:05 PM Road Abandonment- South Boundary Lane Department:Law Caption:Motion to determine that South Boundary Lane, as shown on the attached plat/legal description, has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party (ies), as provided by law and restrictions and easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Background:The Augusta Housing Authority has requested that South Boundary Lane, as shown on the attached plat/legal description, be abandoned in connection with the Laney-Walker redevelopment project. The Housing Authorityplans to convert portions of the road to a parking area and park. The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. The legal description and plat of said portion of South Boundary Lane are attached. Analysis:In addition to the information provided in the above Background section, publication notices will be made for a public hearing to be held, with results to be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b) (1). Financial Impact:Cost of publication and advertisement of public hearing Alternatives:Approve or deny request to determine that South Boundary Lane be abandoned. Recommendation:Approve determination and request for abandonment of South Boundary Lane, with public hearing to be held regarding the issue of abandonment pursuant to O.C.G.A. §32-7-2, with the Cover Memo Item # 10 abandoned property to be quit-claimed to the appropriate party (ies) as allowed by law, and restrictions and easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 10 Attachment number 1 \nPage 1 of 1 Item # 10 At t a c h m e n t n u m b e r 2 \ n P a g e 1 o f 2 It e m # 1 0 16OVERVIEW /  STATUS & UPDATES /  WHERE WE’RE HEADED/ WHAT YOU CAN DO / HOME  OWNERSHIP  OPPORTUNITIES / CONTACT At t a c h m e n t n u m b e r 2 \ n P a g e 2 o f 2 It e m # 1 0 Engineering Services Committee Meeting 3/10/2014 1:05 PM Rocky Creek Flood Hazard Mitigation, Bid#10-199 Department:Abie Ladson, Director Caption:Authorize to execute Feasibility Cost Share Agreement with US Army Corps of Engineers and approve Capital Project Budget Change Number One (CBP 324-041110-209824002) for the Augusta Regional Flood Control Feasibility Study in the amount of $318,950.00 to complete the Rocky Creek Flood Risk Management, Section 205 Feasibility Study in the amount of $318,950.00. Funding is available in the project contingency account for the AED. Background:On November 3. 1999 the Augusta Commission authorized execution of an agreement with the US Army Corps of Engineers (USACE) to perform a Flood Control Feasibility Study for Rocky Creek, Augusta Canal, Phinizy Swamp and Rae’s Creek Drainage Basins; i t is a 50/50 cost sharing project. On August 12, 2013, members of USACE Planning and Project Management staff met with ARC Administrator and members of the city’s management team to discern the city’s continuing interest in maintaining the congressionally authorized Augusta Flood Risk Management Study in the Investigation program. In addition, the concept of converting the Rocky Creek portion of the Augusta Flood Control study to a Continuing Authorities Program (CAP) study was also discussed. The CAP will allow the Rocky Creek feature to be addressed expeditiously and yield needed improvements while also maintaining the flexibility to address other requirements that may arise in the near term. Analysis:The CAP will allow the Rocky Creek flood control features to be addressed expeditiously and yield needed improvements while also maintaining the flexibility to address other requirements that may arise in the near term. Financial Impact:Funds in the amount of 318,950 are available in the project Contingency account to be transferred to the Engineering account 324-041110-5212115/209824002-5212115 upon Commission approval. Cover Memo Item # 11 Alternatives:1) Approve caption. 2) Do not approve and identify alternate funding to complete ongoing Flood Control Feasibility Study for Rocky Creek. Recommendation:Approve alternative #1. Funds are Available in the Following Accounts: 324-041110-5212115/209824002-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 11 Attachment number 1 \nPage 1 of 26 Item # 11 Attachment number 1 \nPage 2 of 26 Item # 11 Attachment number 1 \nPage 3 of 26 Item # 11 Attachment number 1 \nPage 4 of 26 Item # 11 Attachment number 1 \nPage 5 of 26 Item # 11 Attachment number 1 \nPage 6 of 26 Item # 11 Attachment number 1 \nPage 7 of 26 Item # 11 Attachment number 1 \nPage 8 of 26 Item # 11 Attachment number 1 \nPage 9 of 26 Item # 11 Attachment number 1 \nPage 10 of 26 Item # 11 Attachment number 1 \nPage 11 of 26 Item # 11 Attachment number 1 \nPage 12 of 26 Item # 11 Attachment number 1 \nPage 13 of 26 Item # 11 Attachment number 1 \nPage 14 of 26 Item # 11 Attachment number 1 \nPage 15 of 26 Item # 11 Attachment number 1 \nPage 16 of 26 Item # 11 Attachment number 1 \nPage 17 of 26 Item # 11 Attachment number 1 \nPage 18 of 26 Item # 11 Attachment number 1 \nPage 19 of 26 Item # 11 Attachment number 1 \nPage 20 of 26 Item # 11 Attachment number 1 \nPage 21 of 26 Item # 11 Attachment number 1 \nPage 22 of 26 Item # 11 Attachment number 1 \nPage 23 of 26 Item # 11 Attachment number 1 \nPage 24 of 26 Item # 11 Attachment number 1 \nPage 25 of 26 Item # 11 Attachment number 1 \nPage 26 of 26 Item # 11 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby authorized: Section 1: The project is authorized for Capital Project Budget for the Rocky Creek Drainage Basin & Flood Hazard Mitigation in the amount of $318,950 for the Augusta Regional Flood Control Feasibility Study to complete the Rocky Creek Flood Risk Mgmt, Section 205 study. Funding is available in the project contingency account to be transferred to the project engineering account. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase IV 3,621,900$ Special 1% Sales Tax, Phase VI 3,500,000$ 7,121,900$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor 324-041110-209824002 CAPITAL PROJECT BUDGET ROCKY CREEK FLOOD HAZARD MITIGATION CHANGE NUMBER ONE Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1 of 2 6.22.2011 Attachment number 2 \nPage 1 of 2 Item # 11 Augusta-Richmond County, Georgia 324-041110-209824002 CAPITAL PROJECT BUDGET ROCKY CREEK FLOOD HAZARD MITIGATION CHANGE NUMBER ONE Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPECIAL 1% SALES TAX, PHASE IV FUND BALANCE $3,621,900 $0 $3,621,900 SPECIAL 1% SALES TAX, PHASE VI 000-0000-0000000 $3,500,000 $3,500,000 TOTAL SOURCES: $7,121,900 $0 $7,121,900 USE OF FUNDS ENGINEERING 324-04-1110-5212115-$500,000 $319,000 $819,000 CONTINGENCY 324-04-1110-6011110-$6,621,900 ($319,000)$6,302,900 TOTAL USES: $7,121,900 $0 $7,121,900 2 of 2 6.22.2011 Attachment number 2 \nPage 2 of 2 Item # 11 Engineering Services Committee Meeting 3/10/2014 1:05 PM Scotts Way Over Rae’s Creek- Bridge Replacement Contract Award(13-214) Department:Abie Ladson, Director Caption:Approve award of the Design Consultant Service Agreement Contract to Cranston Engineering in the amount of $100,780.00 for Scotts Way Over Rae’s Creek – Bridge Replacement, subject to receipt of signed contracts and bonds if applicable as requested by AED. Background:The Scotts Way Over Rae’s Creek – Bridge Replacement is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The Scotts Way Bridge is a Band 1 project that will begin the design process once approved by the Augusta, Georgia Commission. Analysis:Request for Proposals (RFP) were evaluated on December 6, 2013 with Cranston Engineering being the selected consultant. The following firms submitted RFPs and were evaluated based on the evaluation procedures used for this project. 1. Moreland Altobelli and Associates 2. Cranston Engineering 3. Heath & Lineback 4. Civil Services, Inc. 5. KSGW 6. Gresham, Smith & Part Financial Impact:Funds are available in the TIA project budget account numbers: 371-04-1110-T13047216 - The Scotts Way Bridge over Rae’s Creek - Bridge replacement in the amount of $100,780.00 Alternatives:1) Approve award of Design Consultant to Contract to Cranston Engineering in the amount of $100,780.00 for Scotts Way Over Rae’s Creek – Bridge Replacement, subject to receipt of signed contracts and proper Insurance Documents as requested by AED. 2) Do not approved, and abandon project. Recommendation:Approve alternative number one. Funds are Available in the Following Accounts: 371-041110-T13047216 Cover Memo Item # 12 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 12 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to CPB#371041110-T13047216. This project consists of design services for the Scotts Way Over Rae's Creek - Bridge Replacement. Also award the Design Consultant Contract to Cranston Engineering in the amount of $100,780.00 Funding is available in TIA project budget account numbers: $100,780.00 in Design. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. 100,780$ 100,780$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Deke Copenhaver, Mayor Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB#371-04-1110/T13047216 CAPITAL PROJECT BUDGET Scotts Way Over Rae's Creek _ Bridge Replacement TIA Design Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1 of 3 12.12.2013 Attachment number 1 \nPage 1 of 3 Item # 12 Augusta-Richmond County, Georgia CPB#371-04-1110/T13047216 CAPITAL PROJECT BUDGET Scotts Way Over Rae's Creek _ Bridge Replacement 2 of 3 12.12.2013 Attachment number 1 \nPage 2 of 3 Item # 12 Augusta-Richmond County, Georgia CPB#371-04-1110/T13047216 CAPITAL PROJECT BUDGET Scotts Way Over Rae's Creek _ Bridge Replacement CPB AMOUNT NEW SOURCE OF FUNDS CPB CPB TIA Discretionary Funds Design (100,780)$ (100,780)$ 371-04-1110-5212115/T13047216 - TOTAL SOURCES:(100,780)$ (100,780)$ USE OF FUNDS ENGINEERING 371-04-1110-5212115/T13047216 108,780$ 108,780$ - - TOTAL USES:108,780$ 108,780$ 3 of 3 12.12.2013 Attachment number 1 \nPage 3 of 3 Item # 12 Request for Proposal Request for Proposals will be received at this office until Wednesday, November 6, 2013 @ 11:00 a.m. for furnishing: RFP Item #13-214 Scotts Way Over Rae’s Creek for Engineering Department RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, October 25, 2013 @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 90 days after time has been called on the date of opening. Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle October 3, 10, 17, 24, 2013 Metro Courier October 9, 2013 Revised: 3/5/2013 Attachment number 2 \nPage 1 of 1 Item # 12 VENDORS Attachment B E-Verify #SAVE Form Original 7 Copies Fee Proposal Moreland Altobelli Asso 2211 Beaver Ruin Road Norcross, GA 30071 yes 53328 yes yes yes yes Cranston Engineering 452 Ellis Street Augusta, GA 30901 yes 64684 yes yes yes yes ZEL Engineers 435 Telfair Street Augusta, GA 30901 Heath & Lineback Engineers 2390 Canton Rd., Building 200 Marietta, GA 30066 yes 64937 yes yes yes yes Gresham Smith and Partners 511 Union Street Suite 1400 Nashville, TN 37219 yes 52704 yes yes yes yes Civil Services 851 Laney Walker Blvd Suite A Augusta, Georgia 30901 yes 387871 yes yes yes yes KSGW 2500 Northwinds Parkway Suite 250 Alpharetta, GA 30006 yes 177771 yes yes yes yes RFP Opening RFP Item #13-214 Scotts Way Over Rae’s Creek for Augusta, Georgia - Engineering Department RFP Due: Wednesday, November 6, 2013 @ 11:00 a.m. Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 12 Evaluation Criteria PTS Moreland Altobelli Asso 2211 Beaver Ruin Road Norcross, GA 30071 Cranston Engineering 452 Ellis Street Augusta, GA 30901 Heath & Lineback Engineers 2390 Canton Rd., Building 200 Marietta, GA 30066 Civil Services, Inc 851 Laney Walker Blvd., Suite A Augusta, GA 30901 KSGW 2500 Northwinds Parkway Suite 250 Alpharetta, GA 30006 Gresham, Smith & Part 511 Union St., Suite 1400 Nashville, TN 37219 1) Qualifications of Company (company profile)20 16.7 16.7 17.3 17.3 14.3 16.7 2) Qualifications and experience of key professionals that will be assigned to the project 30 26.7 27.3 26.7 23.0 22.7 25.7 3) Specific relevant experience of your company 15 11.7 14.7 14.0 14.0 11.7 11.3 4) A detailed description of the proposed technical approach to be taken for the performance of the required services for each bridge. 15 11.3 14.0 13.3 14.0 10.7 10.7 5) Submit a conceptual project schedule for each bridge (Note: The critical path method (CPM) should be used including milestones, tasks and sub-tasks. 5 4.7 4.7 4.7 4.0 3.3 4.0 6) References (include specific individuals with addresses and telephone numbers 5 4.7 5.0 4.7 4.7 4.3 4.7 7) Proximity to Area • Within Richmond County 5 pts • Within CSRA 4 pts • Within Georgia 3 pts • Within SE United States (includes AL, TN, NC, SC, FL) 2 pts • All Others 1 pt. 5 3.0 5.0 3.0 5.0 3.0 2.0 8) Proposed Fee (include hourly cost per individual to be included in the proposal) • Lowest 5 points • Second 4 points • Third 3 points • Fourth 2 points • Highest 1 point 5 5.0 3.0 2.0 1.0 4.0 0.0 Total 100 83.7 90.3 85.7 83.0 74.0 75.0 Cumulative Evaluation Sheet RFP Item #13-214 Scotts Way Over Rae's Creek for Augusta, Georgia - Engineering Department Attachment number 4 \nPage 1 of 1 Item # 12 Attachment number 5 \nPage 1 of 2 Item # 12 Attachment number 5 \nPage 2 of 2 Item # 12 Attachment number 6 \nPage 1 of 3 Item # 12 Attachment number 6 \nPage 2 of 3 Item # 12 Attachment number 6 \nPage 3 of 3 Item # 12 Attachment number 7 \nPage 1 of 3 Item # 12 Attachment number 7 \nPage 2 of 3 Item # 12 Attachment number 7 \nPage 3 of 3 Item # 12 Engineering Services Committee Meeting 3/10/2014 1:05 PM Utilities Fort Gordon Division Department:Utilities Caption:Request authorization to allow temporary employees to operate Utilities’ vehicles on Fort Gordon. Background:Augusta Utilities operates the water and sewer facilities on Fort Gordon. Recent capital improvements on the Fort included the conversion of the old water treatment plant to an irrigation plant. We operate this new facility with the help of two temporary staff.We will soon undertake a reevaluation of the resources and costs required to operate the facilities on Fort Gordon, especially related to the new facilities that have come online. We fully expect that this reevaluation will result in the authorization of additional staff through our contract with the Army. At that time, we will request that these temporary positions become permanent. Analysis:The irrigation system extends throughout the developed areas of the Fort, and requires regular maintenance. Currently the temporary employees are not allowed to operate Augusta vehicles because of current policy. We would be able to operate much more efficiently if these employees could operate vehicles on the Fort. If approved, temporary employees would be required to submit to a Motor Vehicle Records Review by Augusta Risk Management prior to hiring and annually thereafter. They will also be required to attend Augusta’s Driver Education Program and their driving will be restricted to Fort Gordon. Financial Impact:This action would allow us to operate more efficiently and therefore at less cost. Alternatives:This request could be rejected. Recommendation:We recommend that these employees be authorized to operate Augusta vehicles on Fort Gordon. We also request that this authorization be granted for any future temporary employees we may need at Fort Gordon.Cover Memo Item # 13 Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 13