Loading...
HomeMy WebLinkAbout2013-06-10-Meeting Agenda Engineering Services Committee Meeting Commission Chamber- 6/10/2013- 1:00 PM ENGINEERING SERVICES 1. Motion to approve the maintenance agreement with the Georgia Department of Transportation for the installation of a mural on the Wrightsboro Rd. Side of the 15th Street Rosa T. Beard Memorial Bridge. Attachments 2. Approve CPB #323-041110-296823603, Supplemental Agreement Number Four, and Change Number Six with Hussey, Gay, Bell and DeYoung, Inc. in the amount of $41,000.00 to survey, design and construct a 16 inch water main for the Marvin Griffin Road Improvements Project, as requested by the Engineering Department (AED) & the Utilities Department (AUD). Funds are available in the Augusta Utilities Project account. Attachments 3. Motion to approve the minutes of the Engineering Services Committee held on May 28, 2013. Attachments 4. Notification of the award of a contract with Quality Storm Water Solutions for services associated with construction of the Fort Gordon New Water and Sewage Connections under the Task Order Program for Infrastructure RFQ #11-130 in the amount of $587,688.53, Bid item #13-116. Attachments 5. Presentation by Rev. Melvin Ivey regarding who determines what lots are being cut in the grass cutting process. Attachments 6. Discuss the possible contamination and delinquent taxes of the Southern Milling Company property located at 1015 Twiggs Street. (Requested by Commissioner Williams) (Referred from May 28 Engineering Services Committee) Attachments 7. Update/status report from the Director of Engineering Department regarding the Wilkerson Garden Drainage Project. Attachments www.augustaga.gov (Requested by Commissioner Marion Williams) (Referred from June 4 Commission meeting) 8. Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering and Augusta Utilities Departments for Willhaven Subdivision, Phase III, Section III. Attachments Engineering Services Committee Meeting 6/10/2013 1:00 PM Approval of request for maintenance and operating agreement of 15th Street bridge mural Department:Planning and Development Caption:Motion to approve the maintenance agreement with the Georgia Department of Transportation for the installation of a mural on the Wrightsboro Rd. Side of the 15th Street Rosa T. Beard Memorial Bridge. Background:As part of the visioning process of the Augusta Sustainable Development Implementation Program as funded by the DOT Tiger II/ HUD Community Challenge Grant, a mural was designed through public input at multiple public meetings. The mural design and request was sent to the Georgia Department of Transportation, the Federal Department of Transportation, and the Federal Department of Housing and Urban Development. The mural design has been shown at all of the projects public meetings since its creation (8) and was approved by all. Analysis:The mural is to be executed by David, Lucy, and Jace McTier who are professional artists. They took input and design features from the community members at the public meetings and created the mural design. The paint they will be using is a special blend from Sherwin Williams that has specialized pigments that allow for much greater longevity. Also, they will apply a special coating that protects the mural from any potential graffiti by allowing the mural to be pressure washed without negatively impacting the work of art. The mural is a wonderful way to beautify the area while paying tribute to the community’s past and its hopeful future. Financial Impact:There will be no City of Augusta funds required. All mural installation costs are funded through the DOT Tiger II/ HUD Community Challenge Grant. Alternatives:Approve or deny Recommendation:Approve maintenance agreement with Georgia Department of Transportation. Cover Memo Item # 1 Funds are Available in the Following Accounts: 220-01-6313 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Attachment number 1 \nPage 1 of 1 Item # 1 Rev: May 21, 2010 RIGHT OF WAY MOWIG AD MAITEACE AGREEMET By and Between THE GEORGIA DEPARTMET OF TRASPORTATIO AD APPLICAT THIS AGREEMET made and entered into this _____ day of _____________, 20____ by and between the DEPARTMET of Transportation, an agency of the State of Georgia, hereinafter alternately referred to as “DEPARTMET” or “LICESOR”, and the APPLICANT hereinafter referred to as “LICESEE”. WHEREAS, the DEPARTMET desires to enter into a public/private partnership to perform certain services relating to mowing and maintenance within DEPARTMET’S right of way, hereinafter called the “PROJECT”, and WHEREAS, the LICESEE has represented to the DEPARTMET that, if such permission is granted to the LICESEE , LICESEE shall bear all costs and liability associated with the PROJECT; and WHEREAS, the LICESEE has represented to the DEPARTMET that they are qualified and experienced to provide such services and the DEPARTMET has relied upon such representations; OW , THEREFORE, for and in consideration of the mutual promises and covenants as herein contained, it is agreed by and between the parties hereto that: Attachment number 2 \nPage 1 of 10 Item # 1 ARTICLE I SCOPE OF PROJECT The DEPARTMET shall permit the LICESEE to perform or cause to be performed, the PROJECT consisting of certain services related to maintaining an identified section of the DEPARTMET’S rights of way. This permission shall be granted by the means of this Agreement for the entire scope of the PROJECT, as set forth herein. The maintenance duties and responsibilities of the LICESEE are defined and set forth in Article XI – MAITEACE WORK PLA of this Agreement, and further enumerated and described in Exhibit ‘A’ – Application and Permit for Special Encroachment with approved drawings or final working drawings for a Department-approved construction PROJECT. Exhibit ‘A’ is attached hereto and incorporated by reference as if fully set out herein. The PROJECT location shall be defined or delineated as part of Exhibit ‘A’. The required Special Encroachment Permit and/or the construction PROJECT final working drawings are to be approved or issued by the DEPARTMET . Should the LICESEE desire that these maintenance services be performed by a third party, LICESEE and the third party shall enter into subsequent agreement, whereby the LICESEE shall assume all responsibility of repayment to the third party for those services to be rendered as set forth in Article XI - MAITEACE WORK PLA . The Agreement between LICESEE and any third parties to this Agreement, shall meet all operational and administrative requirements, including the provisions of liability insurance, set forth by the DEPARTMET , and all liability associated with the PROJECT shall be borne by LICESEE and any third parties, as set forth in Article VIII, herein. Attachment number 2 \nPage 2 of 10 Item # 1 ARTICLE II EXECUTIO OF COTRACT AD AUTHORIZATIO TIME OF PERFORMACE Time is of the essence in this agreement. The LICESEE shall execute this Agreement and return it to the DEPARTMET within thirty (30) days after receipt of contract forms from the DEPARTMET . The LICESEE shall begin work on the PROJECT under this Agreement immediately after receiving a signed and executed copy of the Agreement (unless noted otherwise in Exhibit A or upon PROJECT construction completion). Subject to the terms and conditions set forth in this Agreement, and upon execution of this Agreement, the DEPARTMET grants the right to the LICESEE to mow, edge, and maintain, as set forth in Article XI- MAITEACE WORK PLA , that specific section of right-of-way identified in this Agreement, and herein defined as the PROJECT. The duration of this Agreement shall be for fifty years from the date above first written unless terminated sooner by the DEPARTMET or LICESEE . ARTICLE III SUBSTATIAL CHAGES If, prior to the satisfactory completion of the services under this Agreement, any party materially alters the scope, character or complexity of the services from those required under the Agreement, a Supplemental Agreement shall be executed between the parties. It is understood, however, that LICESEE shall not engage in any activities or conduct any work which would be considered to be outside the scope of the permission granted to LICESEE by the DEPARTMET . Minor changes in the work which do not involve increased compensation, extensions of time or changes in the goals and objectives of the work may be made by written notification of such change by any party with written approval by the other parties. Attachment number 2 \nPage 3 of 10 Item # 1 ARTICLE IV ASSIGMET It is understood by the LICESEE that the work is considered personal and, except as provided for in Article I, LICESEE agrees not to assign, sublet or transfer any or all of their interest in this Agreement without prior written approval of the DEPARTMET . ARTICLE V COTRACT DISPUTES This Agreement shall be deemed to have been executed in __Fulton__County, Georgia, without reference to its choice of law doctrine, and all questions of interpretation and construction shall be governed by the laws of the State of Georgia. Any litigation arising out of this contract shall be commenced within the State of Georgia. The foregoing provisions shall not be construed as waiving any immunity to suit or liability, including without limitation, sovereign immunity which may be available to the Department. ARTICLE VI ISURACE Prior to beginning work, the LICESEE shall obtain and certify to the DEPARTMET that it has the following minimum amounts of insurance coverage: (a) Workmen’s Compensation Insurance in accordance with the laws of the State of Georgia. (b) Public Liability Insurance in an amount of not less than one hundred thousand dollars ($100,000) for injuries, including those resulting in death to any one person, and in an amount of not less than three hundred thousand dollars ($300,000) on an account of any one occurrence, or proof of self-insurance. (c) Property Damage Insurance in an amount of not less than fifty thousand dollars ($50,000) from damages on account of any occurrence, with an aggregate limit of one hundred thousand dollars ($100,000), or proof of self-insurance. Attachment number 2 \nPage 4 of 10 Item # 1 (d) Valuable Papers Insurance in an amount sufficient to assure the restoration of any plans, drawings, field notes, or other similar data relating to the work covered by the PROJECT. (e) Insurance shall be maintained in full force and effect during the life of the PROJECT. The LICESEE shall furnish upon request to the DEPARTMET , certificates of insurance evidencing such coverage. These certificates shall also provide that the insurance will not be modified or canceled without a 30 day prior written notice to the DEPARTMET . Failure by the LICESEE to procure and maintain the insurance as set forth above shall be considered a default and cause for termination of this Agreement and forfeiture of the Performance and Payment Bonds. The LICESEE shall, at least fifteen (15) days prior to the expiration date or dates of expiring policies, deposit certified copies of renewal, or new policies, or other acceptable evidence of insurance with the DEPARTMET . ARTICLE VII COMPESATIO It is agreed that LICESEE shall conduct all work at no cost to the DEPARTMET , and without compensation from the DEPARTMET . It is further agreed that any and all issues relating to compensation and payment shall be resolved by and between LICESEE and any successors, subcontractors, or assigns thereto. The DEPARTMET and LICESEE further agree that, should the DEPARTMET be required to conduct any inspections and/or supervision of the PROJECT beyond that which would normally occur in the ordinary course of the DEPARTMET’S maintenance activities, LICESEE shall reimburse the DEPARTMET for such inspection and supervision. The rate of reimbursement for the DEPARTMET’S inspection and supervision shall in no case exceed a rate determined to be reasonable by the parties. Should LICESEE and the DEPARTMET desire to change this agreement at a later date to provide for compensation to LICESEE , or any successors or assigns thereto, such change shall only be permitted by a supplemental agreement as set forth in Article III herein. Any supplemental agreements involving compensation shall be subject to the DEPARTMET review and approval. Attachment number 2 \nPage 5 of 10 Item # 1 ARTICLE VIII RESPOSIBILITY FOR CLAIMS AD LIABILITY LICESEE OT AGET OF DEPARTMET LICESEE , and all successors and assigns thereto, shall save harmless the DEPARTMET , its officers, agents, and employees from all suits, claims, actions or damages of any nature whatsoever resulting from the performance of work assigned to LICESEE under this Agreement. LICESEE further agrees that they shall be fully responsible for injury or damage to landscaping, landscape related items, and any other non-standard and decorative elements installed by or for the LICESEE within the right of way, and for any damage to the DEPARTMET’S signs, structures, or roadway fixtures, if LICESEE causes the damage. These indemnities shall not be limited by reason of the listing of any insurance coverage. It is further understood and agreed that LICESEE , or any successor or assigns thereto, in the conduct of any work involved in the PROJECT, shall not be considered the agent of the DEPARTMET or of the State of Georgia. ARTICLE IX TERMIATIO OF COTRACT The DEPARTMET may terminate this contract for just cause at any time by giving of thirty (30) days written notice of such termination. Upon receipt of such notice of termination, LICESEE shall discontinue and cause all work under this contract to terminate upon the date specified in the said notice. In the event of such termination, the DEPARTMET shall be paid for any amounts as may be due it as specified in Article VII up to and including the specified date of termination. LICESEE shall have the right to terminate this contract at any time, provided that such termination is first approved by the DEPARTMET , and that the DEPARTMET is reimbursed in full for all services rendered pursuant to Article VII. The DEPARTMET and LICESEE further agree that, should the DEPARTMET allow the LICESEE to terminate the agreement, the termination, unless determined otherwise in writing by the DEPARTMET , shall be contingent upon the following: Attachment number 2 \nPage 6 of 10 Item # 1 A. The LICESEE, at the discretion of the DEPARTMET , removing the planted landscaping, landscape related items, and any other non-standard and decorative elements that were installed by or for the LICESEE at no cost to the DEPARTMET . B. The LICESEE restoring the removed landscape areas to their original condition or a condition that meets federal standards and is acceptable to the DEPARTMET . C. The LICESEE restoring the removed non-standard and decorative elements with standard DEPARTMET elements that meet federal and state requirements. D. The LICESEE reimbursing the DEPARTMET in full any state and/or federal funds used to purchase and install the landscaping, landscape related items, and other non- standard and decorative elements that are no longer to be maintained by the LICESEE . The DEPARTMET and the LICESEE agree that, should the LICESEE fail to perform the maintenance, as set forth in Article XI - MAITEACE WORK PLA , the DEPARTMET may require the LICESEE to remove, restore, and reimburse according to items “A”, “B”, “C”, and “D” above, as applicable, and then terminate the agreement. ARTICLE X COMPLIACE WITH APPLICABLE LAW The undersigned certify that: A. This Agreement is subject to applicable state and federal laws, standards, and rules and regulations. B. The provisions of Sections 45-10-20 through 45-10-28 of the Official Code of Georgia Annotated relating to Conflict of Interest and State Employees and Officials Trading with the State have been complied with in full. C. The provisions of Section 50-24-1 through 50-24-6 of the Official Code of Georgia Annotated, relating to the “Drug-Free Workplace Act” have been complied with in full. Attachment number 2 \nPage 7 of 10 Item # 1 ARTICLE XI EXHIBIT A: MAITEACE WORK PLA/LADSCAPE MAITEACE AGREEMET For all maintenance activities, at a minimum, abide by the Federal Manual of Uniform Traffic Control Devices (MUTCD) standards, current edition, for temporary traffic control. Move equipment or materials on or across a traveled way in a manner as not to unduly interfere with traffic. Installed Non-standard Fencing/Site Furnishings/Murals/Signs/Walls · Repair and/or replace damaged components. · Replace or install a temporary construction work fence immediately if the damage involves a safety issue. · LICENSEE is responsible for all maintenance of non-standard fencing/site furnishings/murals/signs · Artwork on the mural cannot be copyrighted NOTE: All major maintenance repair activities and activities that may interfere with traffic or pedestrian flow within the right of way project limits, such as travel lane/walkway closures, require the LICENSEE notify the Department at least 48 hours prior to the activity to coordinate and gain Department approval. Attachment number 2 \nPage 8 of 10 Item # 1 The covenants herein contained shall, except as otherwise provided, accrue to the benefit of and be binding upon the successors and assigns of the parties hereto. IN WITNESS WHEREOF, said parties have hereunto set their hand and affixed their seals the day and year above first written. GEORGIA DEPARTMET OF TRASPORTATIO ______________________________________ Commissioner or designee ATTEST: ______________________________________ Angela M. Whitworth Treasurer LICESEE: _______________________________________ (Title) Sworn to before me this _______day of _________________, 20____. ________________________________________ NOTARY PUBLIC My commission expires _____________, ______. Attachment number 2 \nPage 9 of 10 Item # 1 EXHIBIT ‘A’ (Attach the Application and Permit for Special Encroachment with approved drawings or the final working drawings for a Department-approved construction) Attachment number 2 \nPage 10 of 10 Item # 1 Engineering Services Committee Meeting 6/10/2013 1:00 PM Marvin Griffin Road Improvements Project SA #4, and Change #6 Department:Abie Ladson, PE Director Caption:Approve CPB #323-041110-296823603, Supplemental Agreement Number Four, and Change Number Six with Hussey, Gay, Bell and DeYoung, Inc. in the amount of $41,000.00 to survey, design and construct a 16 inch water main for the Marvin Griffin Road Improvements Project, as requested by the Engineering Department (AED) & the Utilities Department (AUD). Funds are available in the Augusta Utilities Project account. Background:The Marvin Griffin Road Improvements Project is an approved project and is under Phase I construction (utility relocations). AUD made an assessment and determined an existing 14 inch water main within the project limits, needs replacing. The attached supplemental cost proposal for additional design work was submitted by Hussey, Gay, Bell, and De Young, the Design Engineering Firm of record. Analysis:Services covered under this supplemental agreement are needed to complete the water main design. A timely completion of this design is critical to maintaining the proposed construction Phase II schedule. Financial Impact:Funds are available in the Augusta Utilities Account #507043410- 5212115/80900030-5212115 upon Commission approval. Alternatives:1) Approve CPB #323-041110-296823603, Supplemental Agreement Number Four, and Change Number Six with Hussey, Gay, Bell and DeYoung, Inc. in the amount of $41,000.00 to survey, design and construct a 16 inch water main for Marvin Griffin Road Improvements Project and the as requested by Engineering Department (AED) & the Utilities Department (AUD). Funds are available in the Augusta Utilities Project account. 2)Do not approve and identify an alternate plan to address identified needed improvement. Cover Memo Item # 2 Recommendation:Approve Alternative Number One Funds are Available in the Following Accounts: 507043410-5212115/80900030-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby authorized: Section 1: The project is authorized to CPB#323-041110-296823603. This project is for Supplemental Agreement Number Four for Hussey, Gay, Bell & DeYoung, Inc in the amount of $41,000.00 to be funded from the Augusta Utilities. requirements of Augusta Utilities for the length of Marvin Griffin Road. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase II 2,091,400$ Special 1% Sales Tax, Phase III 1,375,600$ Augusta Utilities 36,230$ Augusta Utilities 41,000$ 3,544,230$ Section 3: The following amounts are appropriated for the project: By Basin By District Rocky, Butler & Phinzy Swamp 3,544,230$ 1st & 2nd 3,544,230$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Honorable Deke Copenhaver, Mayor (S.R. 56 to S.R. 56 Spur) This agreement is for the design of a new 16" water main meeting the CPB#323-041110-296823603 CAPITAL PROJECT BUDGET MARVIN GRIFFIN ROAD CHANGE NUMBER SIX 1 of 2 Attachment number 1 \nPage 1 of 2 Item # 2 Augusta-Richmond County, Georgia (S.R. 56 to S.R. 56 Spur) CPB#323-041110-296823603 CAPITAL PROJECT BUDGET MARVIN GRIFFIN ROAD CHANGE NUMBER SIX CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB ADDITION CPB SPECIAL 1% SALES TAX, PHASE III 323-041110-0000000-000000000 ($1,375,600) ($1,375,600) 322-041110-0000000-000000000 ($2,091,400) ($2,091,400) 507043410-5212115-80900030 ($36,230) ($41,000) ($77,230) TOTAL SOURCES: ($3,503,230) ($41,000) ($3,544,230) USE OF FUNDS ADVERTISING 323-041110-5233119-296823603 $2,000 $2,000 ENGINEERING 323-041110-5212115-296823603 $150,000 $150,000 RIGHT OF WAY 323-041110-5411120-296823603 $150,000 $150,000 RAILROAD PERMIT 323-041110-5414610-296823603 $30,000 $30,000 CONSTRUCTION 323-041110-5414110-296823603 $2,850,000 $2,850,000 AUGUSTA UTILITIES $36,230 $41,000 $77,230 507043410-5212115-80900030 OTHER FUNDING $36,230 CONTINGENCY 323-041110-6011110-296823603 $285,000 $285,000 TOTAL USES: $3,503,230 $41,000 $3,544,230 2 of 2 Attachment number 1 \nPage 2 of 2 Item # 2 (SA02 – For changes greater than $20,000) April 2005 AUGUSTA-RICHMOND COUNTY ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, Hussey, Gay, Bell & DeYoung International, Inc., Consultant, entered into a contract with Augusta-Richmond County on December 18, 2001, for engineering design services associated with the Marvin Griffin Road Improvements, Project No. 323-041110-296823603, File Reference No. 05-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Additional Engineering services needed for new 16” water main It is agreed that as a result of the above modification the contract amount is increased by $41,000.00 from $208,740.00 to a new total of $249,740.00. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Hussey, Gay, Bell & De Young International, Inc., Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY AUGUSTA, GEORGIA Deke S. Copenhaver, Mayor Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Augusta Richmond County Project umber(s): 323-041110-296823603 Supplemental Agreement umber: 4 Purchase Order umber: 57943 Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Attachment number 2 \nPage 1 of 1 Item # 2 Attachment number 3 \nPage 1 of 4 Item # 2 Attachment number 3 \nPage 2 of 4 Item # 2 Attachment number 3 \nPage 3 of 4 Item # 2 Attachment number 3 \nPage 4 of 4 Item # 2 Engineering Services Committee Meeting 6/10/2013 1:00 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Engineering Services Committee held on May 28, 2013. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 3 Attachment number 1 \nPage 1 of 4 Item # 3 Attachment number 1 \nPage 2 of 4 Item # 3 Attachment number 1 \nPage 3 of 4 Item # 3 Attachment number 1 \nPage 4 of 4 Item # 3 Engineering Services Committee Meeting 6/10/2013 1:00 PM Notification of award for a construction contract to Quality Storm Water Solutions. for construction of the Fort Gordon New Water and Sewage Connections under the Task Order Program for Infrastructure RFQ #11-130 in the amount of $587,688.53. Bid item #1 Department:Augusta Utilities Department Caption:Notification of the award of a contract with Quality Storm Water Solutions for services associated with construction of the Fort Gordon New Water and Sewage Connections under the Task Order Program for Infrastructure RFQ #11-130 in the amount of $587,688.53, Bid item #13-116. Background:The objective of this project is to provide water and sewage connections on Fort Gordon. This project will consist of multiple connections various sizes and installation up to 2300 LF of sewer main and 2550 LF of water main. Some connections to the existing infrastructure will be upgraded and some connections will be for new infrastructures throughout the base. Analysis:Quality Storm Water Solutions. submitted an acceptable bid package and was the lowest responsive bidder. The Utilities Department desires to inform commission of the award of this contract to construct the Fort Gordon New Water and Sewage Connections under the Task Order Program for Infrastructure RFQ #11-130 to Quality Storm Water Solutions. Financial Impact:$587,688.53, under account number 507043490-5425410 / 88886666-5425410 Alternatives:No alternatives due to the contract being awarded under the Task Order Program for Infrastructure RFQ #11-130 Recommendation:We are informing commission of the department's award of the contract with Quality Storm Water Solutions in the amount of $587,688.53 for the construction of the Fort Gordon New Water and Sewage Connections Project under the Task Order Program for Infrastructure RFQ #11-130 Cover Memo Item # 4 Funds are Available in the Following Accounts: $587,688.53 from account 507043490-5425410 / 88886666- 5425410 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Invitation to Bid Sealed bids will be received at this office on Tuesday, May 7, 2013 @ 3:00 p.m. for furnishing: Bid Item 13-116 Fort Gordon New Water & Sewage Connections for Utilities Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from ARC Southern. The fees for the plans and specifications which are non-refundable is $25.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC Southern (706 724-7924) beginning Thursday, April 18, 2013. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Bid Conference will be held on Thursday, April 25, 2013 @ 10:00 a.m. in the Procurement Department, 530 Greene Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, April 26, 2013 @ 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. GERI A. SAMS, Procurement Director Revised: 8/15/2011 Attachment number 1 \nPage 1 of 1 Item # 4 VENDORS Attachment B E-Verify # Bid Bond SAVE Form Lump Sum Blair Construction, Inc. PO Box 770 Evans, GA 30809 Yes 224004 Yes Yes $590,985.87 Quality Storm Water Solutions P.O. Box 1847 Evans, GA 30809 Yes 233338 Yes Yes $587,688.53 Contract Management, Inc. 1827 Killingsworth Augusta, GA 30904 Eagle Utility Contracting, Inc. 1350 Branch Road Bishop, GA 30627 Yes 206663 Yes Yes $725,885.75 Bid Item #13-116 Fort Gordon New Water and Sewage Connections for Augusta, Georgia - Utilities Department Bid Due: Tuesday, May 7, 2013 @ 3:00 p.m. Page 1 of 1 At t a c h m e n t n u m b e r 2 \ n P a g e 1 o f 1 It e m # 4 Attachment number 3 \nPage 1 of 1 Item # 4 Attachment number 4 \nPage 1 of 1 Item # 4 ATTN: THERON SAPP QUALITY STORM WATER SOLUTIONS 437 CAMBRIDGE CIRCLE MARTINEZ GA 30907 ATTN: JAMES WILLIAMS CONTRACT MANAGEMENT INC 1827 KILLINGSWORTH AUGUSTA GA 30904 ATTN: TONY HIGHFIELD EAGLE UTILITY 1350 BRANCH ROAD BISHOP, GA 30627 ATTN: PATRICK DILLARD BLAIR CONSTRUCTION PO BOX 770 EVANS, GA 30809 Tom Wiedmeier Augusta Utilities Bay Street Jerry Delaughter Augusta Utilities Bay Street Stanley Aye Augusta Utilities Bay Street Yvonne Gentry Municipal Building LSB – 3RD FLOOR Bid Item 13-116 Fort Gordon New Water & Sewage Connections Faxed and Mailed 4/19/13 Bid Item #13-116 Fort Gordon New Water & Sewage Connections For Utilities Department Bid Due: Tues 5/7/13 @ 3:00 p.m. Attachment number 5 \nPage 1 of 1 Item # 4 Engineering Services Committee Meeting 6/10/2013 1:00 PM Rev. Melvin Ivey Department:Clerk of Commission Caption:Presentation by Rev. Melvin Ivey regarding who determines what lots are being cut in the grass cutting process. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 5 Attachment number 1 \nPage 1 of 1 Item # 5 Engineering Services Committee Meeting 6/10/2013 1:00 PM Southern Milling Company Department:Clerk of Commission Caption:Discuss the possible contamination and delinquent taxes of the Southern Milling Company property located at 1015 Twiggs Street. (Requested by Commissioner Williams) (Referred from May 28 Engineering Services Committee) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 6 Attachment number 1 \nPage 1 of 4 Item # 6 Attachment number 1 \nPage 2 of 4 Item # 6 Attachment number 1 \nPage 3 of 4 Item # 6 Attachment number 1 \nPage 4 of 4 Item # 6 Engineering Services Committee Meeting 6/10/2013 1:00 PM Wilkerson Garden Drainage Project Department: Caption:Update/status report from the Director of Engineering Department regarding the Wilkerson Garden Drainage Project. (Requested by Commissioner Marion Williams) (Referred from June 4 Commission meeting) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 7 Engineering Services Committee Meeting 6/10/2013 1:00 PM Willhaven Subdivision Phase III, Section 3 Department:Engineering Department-Abie L. Ladson, P.E., CPESC, Director Caption:Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering and Augusta Utilities Departments for Willhaven Subdivision, Phase III, Section III. Background:The final plat for Willhaven Subdivision, Phase III, Section III, was approved by the Commission on January 15, 2013. The subdivision design and plat for this section, including the storm drain system, have been reviewed and accepted by our engineering staff and the construction has been reviewed by our inspectors. The Utilities Department has inspected and reviewed the water and sanitary sewer installations, and hereby requests acceptance of the utility deed. Analysis:This section meets all codes, ordinances and standards. There are no wetlands or 100-year flood plain boundaries involved in this section. Acceptance of said utility deed shall dedicate, as required, the water and sanitary sewer mains along with the applicable easements to Augusta, Georgia for operation and maintenance. Financial Impact:By accepting these roads and storm drainage installations into the County system and after the 18-month maintenance warranty by the developer/contractor for the roads and storm drainage has expired, all future maintenance and associated costs will be borne by Augusta, Georgia. By acceptance of the utility deeds and maintenance agreements, all future maintenance and associated costs for water and sanitary sewer installations will be borne by Augusta, Georgia, and positive revenue will be generated from the sale of water and sanitary sewer taps and monthly billing of same. Alternatives:1. Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering and Augusta Utilities Departments for Willhaven Subdivision, Phase III, Section III. 2. Do not approve and risk litigation. Cover Memo Item # 8 Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 8 Attachment number 1 \nPage 1 of 1 Item # 8 Attachment number 2 \nPage 1 of 1 Item # 8 Attachment number 3 \nPage 1 of 2 Item # 8 Attachment number 3 \nPage 2 of 2 Item # 8 Attachment number 4 \nPage 1 of 2 Item # 8 Attachment number 4 \nPage 2 of 2 Item # 8 Attachment number 5 \nPage 1 of 2 Item # 8 Attachment number 5 \nPage 2 of 2 Item # 8 Attachment number 6 \nPage 1 of 3 Item # 8 Attachment number 6 \nPage 2 of 3 Item # 8 Attachment number 6 \nPage 3 of 3 Item # 8 Attachment number 7 \nPage 1 of 2 Item # 8 Attachment number 7 \nPage 2 of 2 Item # 8