HomeMy WebLinkAbout2013-01-07-Meeting Agenda Engineering Services Committee Meeting Commission Chamber- 1/7/2013- 1:00 PM ENGINEERING SERVICES 1. Approve award of construction project to subject contractor, Strack, Inc., in the amount of $1,229,030.45 for construction of the Butler Creek West Sanitary Sewer Upgrades Project 60106, Ph. 2. This award will include installation of sanitary sewer mains, manholes, and associated sanitary sewer branch lines. Attachments 2. Motion to approve a request to the Georgia Department of Transportation to have Augusta-Richmond County assume the responsibilities of all maintenance and ownership of Doug Barnard Parkway and have it removed from the state route system. (Referred from December 10 Engineering Services Committee) Attachments 3. Update from HCD/Engineering Department on Hyde Park. (Requested by Commissioner Williams) Attachments 4. Presentation by Ms. Marian Moseley regarding the realignment of Berckmans Road. Attachments 5. Discuss mechanisms that may be utilized to eliminate parade traffic and other activities that disrupt business activities in the downtown business districts during the busiest shopping periods of the year. (Requested by Commissioner Lockett) (Referred from December 10 Engineering Services) Attachments 6. Motion to approve the minutes of the Engineering Services Committee held on December 10, 2012. Attachments 7. Motion to approve Option for the purpose of acquiring a Right- of-Way between Ruth’s Lake, Inc., as owner and Augusta, Georgia as optionee, in connection with the Windsor Spring Road Phase V Project, consisting of 0.021 acre in fee and 0.012 acre of permanent construction and maintenance easement, Attachments more or less. Also granted is One temporary driveway easement on Project Windsor Spring Road, Phase V, STP00- 1105-00(004) from the property located at 4698 Windsor Spring Road at the purchase price of $500.00. 8. Motion to approve an Option for the purposes of acquiring a Right-of-Way between David Joe Castro, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, 0.018 acre (769.05 sq. ft.) in fee simple and 0.015 acre (638.56 sq. ft.) of permanent construction & maintenance easement, more or less. Also granted is a temporary driveway easement on Project Windsor Spring Road, Phase V, STP00-1105-00(004) from property located at: 4656 Windsor Spring Road, private, at the purchase price of $500.00. Attachments 9. Motion to approve an Option for the purposes of acquiring a Right-of-Way between Leon T. Register, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, 0.026 acre in fee simple and N/A acre (N/A sq. ft.) of permanent construction & maintenance easement, more or less. Also granted is a temporary driveway easement on Project Windsor Spring Road, Phase V, STP00-1105-00(004) from property located at: 2523 Patterson Bridge Road, private, at the purchase price of $500.00. Attachments 10. Motion to approve an Option for the purposes of acquiring a Right-of-Way between Julia Phillips, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, N/A acre (N/A sq. ft.) in fee simple and 0.0035 acre (149.85 sq. ft.) of permanent construction & maintenance easement, more or less on Project Windsor Spring Road, Phase V, STP00-1105-00(004) from property located at: 2561 Patterson Bridge Road, private, at the purchase price of $500.00. Attachments 11. Motion to approve an Option for the purposes of acquiring a Right-of-Way between David Joe Castro, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, 0.018 acre (771.36 sq. ft.) in fee simple and 0.01 acre (437.79 sq. ft.) of permanent construction & maintenance easement, more or less. Also granted is a temporary driveway easement on Project Windsor Spring Attachments www.augustaga.gov Road, Phase V, STP00-1105-00(004) from property located at: 4644 Windsor Spring Road, private, at the purchase price of $500.00. 12. Motion to approve an Option for the purposes of acquiring a Right-of-Way between Lula J. Reese, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, N/A acre (N/A sq. ft.) in fee simple and 0.043 acre of permanent construction & maintenance easement, more or less. Also granted is a temporary driveway easement on Project Windsor Spring Road, Phase V, STP00- 1105-00(004) from property located at: 4932 Windsor Spring Road, private, at the purchase price of $500.00. Attachments 13. Authorize AED to extend Supplemental Agreement #7 with Jacobs Engineering Group Inc. to continue providing project management support via staff augmentation in the amount not to exceed $350,000 which will be funded from SPLOST Contingency funds. (Referred from December 10 Engineering Services Committee) Attachments 14. Motion to approve Change Order #1 for an additional $473,858.00 in fees to Virgo Gambill Architects on the Augusta, Georgia Municipal Building Renovations and Modernization due to an increase in their scope of work. (No recommendation from Public Services Committee December 10, 2012) (No action in Commission meeting December 18, 2012) (Requested by the Administrator) Attachments Engineering Services Committee Meeting 1/7/2013 1:00 PM Approve Strack, Inc. to construct the Butler Creek West Sanitary Sewer Upgrades, project number 60106 Ph. 2. Department:Tom Wiedmeier, PE, Director-Augusta Utilities Department Caption:Approve award of construction project to subject contractor, Strack, Inc., in the amount of $1,229,030.45 for construction of the Butler Creek West Sanitary Sewer Upgrades Project 60106, Ph. 2. This award will include installation of sanitary sewer mains, manholes, and associated sanitary sewer branch lines. Background:Sanitary sewer upgrades are needed in the western Butler Creek Basin area of Augusta-Richmond County. The project is designed to provide for the installation of a new gravity sanitary sewer main which will provide upgrade of sewer service to subject areas due to population growth and the need for Augusta to replace sanitary sewer mains that have reached their life expectancy. Analysis:Johnson, Laschober, and Associates, P.C. (JLA) has provided a bid tabulation for the work to be performed by Strack, Inc. Augusta Utilities Department has reviewed the subject documents prepared by JLA, and found the documents to be in order and tabulated correctly. Approval of Strack, Inc. is needed to move the Butler Creek West Ph. 2 project forward to construction. Financial Impact:Funds for the project are provided in 511043420- 5212115/80360106-5212115 Alternatives:No alternatives are recommended. Recommendation:Augusta Utilities Department recommends the Commission approve Strack, Inc. in the amount of $1,229,030.45 to construct the Butler Creek West Ph. 2 Sanitary Sewer Upgrades Project. Funds are Available in the Following Accounts: FUNDS AVAILABLE IN THE FOLLOWING ACCOUNTS: 511043420-5212115/80360106-5212115 Cover Memo Item # 1 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Attachment number 1 \nPage 1 of 1 Item # 1 Attachment number 2 \nPage 1 of 1 Item # 1 Attachment number 3 \nPage 1 of 3 Item # 1 Attachment number 3 \nPage 2 of 3 Item # 1 Attachment number 3 \nPage 3 of 3 Item # 1 Invitation To Bid Sealed bids will be received at this office until Tuesday, November 20, 2012 @ 3:00 p.m. for furnishing: Bid Item #12-208 Butler Creek Interceptor Upgrade West – Phase II for Utilities Department BID’s will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 BID documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non- refundable are $100.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706) 722-6488 beginning Thursday, October 18, 2012. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre-Bid Conference will be conducted at the Procurement Department, 530 Greene Street, Room 605 on Friday, November 9, 2012 @ 10:00 a.m. in the conference room. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, November13, 2012 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No BID may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid Bond is required to be submitted in a separate envelope so marked along with the bidder’s qualifications’ a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle October 18, 25, November 1, 8, 2012 Metro Courier October 24, 2012 cc: Tameka Allen Deputy Administrator Tom Wiedmeier Utilities Department Jerry Delaughter Utilities Department Joe Holland Utilities Department Revised: 8/15/2011 Attachment number 4 \nPage 1 of 1 Item # 1 VENDORS Attachment B E-Verify # SAVE Form Addendum 1 Bid Bond Base Bid BLAIR CONSTRUCTION PO BOX 770 EVANS, GA 30809 Yes 224004 Yes Yes Yes $1,310,352.68 MABUS BROTHERS CONSTRUCTION 920 MOLLY POND ROAD AUGUSTA, GA 30901 Yes 91818 Yes Yes Yes $1,327,416.50 STRACK INC 125 LASER INDUSTRIAL FAIRBURN, GA 30213 Yes 49792 Yes Yes Yes $1,229,030.45 GARNEY CONSTRUCT 2001 WESTSIDE PKWY, SUITE 180 ALPHARETTA, GA 30004 Yes 33975 Yes Yes Yes $1,850,383.00 WCMS 1003 S. HARRIS STREET SANDERSVILLE, GA 31082 LAYNE HEAVY CIVIL 300 EAST BROAD ST FAIRBURN, GA 30213 MOORHEAD CONSTR 1513 ANDERSON STREET BELTON, SC 29627 EAGLE UTILITY 1350 BRANCH ROAD BISHOP, GA 30627 CMI 1878 KILLINGWORTH DR AUGUSTA, GA 30904 NAPM 4779 S ATLANTA RD ATLANTA, GA 30030 Bid Item #12-208 Butler Creek Interceptor Upgrade West - Phase II for Augusta, Georgia - Utilities Department Bid Due: Tuesday, November 27, 2012 @ 3:00 p.m. Page 1 of 1 Attachment number 5 \nPage 1 of 1 Item # 1 Attachment number 6 \nPage 1 of 2 Item # 1 Attachment number 6 \nPage 2 of 2 Item # 1 Attachment number 7 \nPage 1 of 1 Item # 1 Engineering Services Committee Meeting 1/7/2013 1:00 PM Doug Barnard Parkway (SR 56 Spur) Department:Administrator Caption:Motion to approve a request to the Georgia Department of Transportation to have Augusta-Richmond County assume the responsibilities of all maintenance and ownership of Doug Barnard Parkway and have it removed from the state route system. (Referred from December 10 Engineering Services Committee) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 2 Engineering Services Committee Meeting 1/7/2013 1:00 PM Hyde Park Update Department:Clerk of Commission Caption:Update from HCD/Engineering Department on Hyde Park. (Requested by Commissioner Williams) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 3 Engineering Services Committee Meeting 1/7/2013 1:00 PM Marian Moseley Department:Clerk of Commission Caption:Presentation by Ms. Marian Moseley regarding the realignment of Berckmans Road. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 4 Attachment number 1 \nPage 1 of 29 Item # 4 Attachment number 1 \nPage 2 of 29 Item # 4 Attachment number 1 \nPage 3 of 29 Item # 4 Attachment number 1 \nPage 4 of 29 Item # 4 Attachment number 1 \nPage 5 of 29 Item # 4 Attachment number 1 \nPage 6 of 29 Item # 4 Attachment number 1 \nPage 7 of 29 Item # 4 Attachment number 1 \nPage 8 of 29 Item # 4 Attachment number 1 \nPage 9 of 29 Item # 4 Attachment number 1 \nPage 10 of 29 Item # 4 Attachment number 1 \nPage 11 of 29 Item # 4 Attachment number 1 \nPage 12 of 29 Item # 4 Attachment number 1 \nPage 13 of 29 Item # 4 Attachment number 1 \nPage 14 of 29 Item # 4 Attachment number 1 \nPage 15 of 29 Item # 4 Attachment number 1 \nPage 16 of 29 Item # 4 Attachment number 1 \nPage 17 of 29 Item # 4 Attachment number 1 \nPage 18 of 29 Item # 4 Attachment number 1 \nPage 19 of 29 Item # 4 Attachment number 1 \nPage 20 of 29 Item # 4 Attachment number 1 \nPage 21 of 29 Item # 4 Attachment number 1 \nPage 22 of 29 Item # 4 Attachment number 1 \nPage 23 of 29 Item # 4 Attachment number 1 \nPage 24 of 29 Item # 4 Attachment number 1 \nPage 25 of 29 Item # 4 Attachment number 1 \nPage 26 of 29 Item # 4 Attachment number 1 \nPage 27 of 29 Item # 4 Attachment number 1 \nPage 28 of 29 Item # 4 Attachment number 1 \nPage 29 of 29 Item # 4 Attachment number 2 \nPage 1 of 2 Item # 4 Attachment number 2 \nPage 2 of 2 Item # 4 Engineering Services Committee Meeting 1/7/2013 1:00 PM Mechanisms eliminating parade traffic and activities downtown Department:Clerk of Commission Caption:Discuss mechanisms that may be utilized to eliminate parade traffic and other activities that disrupt business activities in the downtown business districts during the busiest shopping periods of the year. (Requested by Commissioner Lockett) (Referred from December 10 Engineering Services) Background:These activities could be diverted to Reynolds Street or other side streets that will not have an adverse impact on downtown business operations. Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 5 Attachment number 1 \nPage 1 of 1 Item # 5 Engineering Services Committee Meeting 1/7/2013 1:00 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Engineering Services Committee held on December 10, 2012. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 6 Attachment number 1 \nPage 1 of 7 Item # 6 Attachment number 1 \nPage 2 of 7 Item # 6 Attachment number 1 \nPage 3 of 7 Item # 6 Attachment number 1 \nPage 4 of 7 Item # 6 Attachment number 1 \nPage 5 of 7 Item # 6 Attachment number 1 \nPage 6 of 7 Item # 6 Attachment number 1 \nPage 7 of 7 Item # 6 Engineering Services Committee Meeting 1/7/2013 1:00 PM Option for Right-of-Way Department:Law Caption:Motion to approve Option for the purpose of acquiring a Right-of- Way between Ruth’s Lake, Inc., as owner and Augusta, Georgia as optionee, in connection with the Windsor Spring Road Phase V Project, consisting of 0.021 acre in fee and 0.012 acre of permanent construction and maintenance easement, more or less. Also granted is One temporary driveway easement on Project Windsor Spring Road, Phase V, STP00-1105-00(004) from the property located at 4698 Windsor Spring Road at the purchase price of $500.00. Background:The property owner has agreed to convey a certain Right-of-Way and Easement to Augusta, Georgia, for the Windsor Spring Road Improvement Project, Phase V, STP00-1105-00(004). Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the Motion Recommendation:Approve the Motion Funds are Available in the Following Accounts: GL 323041110-54.11120 JL 299823786-54.11120 REVIEWED AND APPROVED BY: Finance. Law. Cover Memo Item # 7 Administrator. Clerk of Commission Cover Memo Item # 7 Attachment number 1 \nPage 1 of 4 Item # 7 Attachment number 1 \nPage 2 of 4 Item # 7 Attachment number 1 \nPage 3 of 4 Item # 7 Attachment number 1 \nPage 4 of 4 Item # 7 Engineering Services Committee Meeting 1/7/2013 1:00 PM Option for Right-of-Way Department:Law Caption:Motion to approve an Option for the purposes of acquiring a Right-of-Way between David Joe Castro, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, 0.018 acre (769.05 sq. ft.) in fee simple and 0.015 acre (638.56 sq. ft.) of permanent construction & maintenance easement, more or less. Also granted is a temporary driveway easement on Project Windsor Spring Road, Phase V, STP00-1105-00(004) from property located at: 4656 Windsor Spring Road, private, at the purchase price of $500.00. Background:The property owner has agreed to convey a certain Right-of-Way and easement to Augusta, Georgia, for the Windsor Spring Road, Phase V, STP00-1105-00(004) Project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the Motion Recommendation:Approve the Motion Funds are Available in the Following Accounts: 323041110-5212122 299823786-5212122 REVIEWED AND APPROVED BY: Finance. Law. Cover Memo Item # 8 Administrator. Clerk of Commission Cover Memo Item # 8 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 4 It e m # 8 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 4 It e m # 8 At t a c h m e n t n u m b e r 1 \ n P a g e 3 o f 4 It e m # 8 At t a c h m e n t n u m b e r 1 \ n P a g e 4 o f 4 It e m # 8 Engineering Services Committee Meeting 1/7/2013 1:00 PM Option for Right-of-Way Department:Law Caption:Motion to approve an Option for the purposes of acquiring a Right-of-Way between Leon T. Register, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, 0.026 acre in fee simple and N/A acre (N/A sq. ft.) of permanent construction & maintenance easement, more or less. Also granted is a temporary driveway easement on Project Windsor Spring Road, Phase V, STP00-1105-00(004) from property located at: 2523 Patterson Bridge Road, private, at the purchase price of $500.00. Background:The property owner has agreed to convey a certain Right-of-Way and easement to Augusta, Georgia, for the Windsor Spring Road, Phase V, STP00-1105-00(004) Project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the Motion Recommendation:Approve the Motion Funds are Available in the Following Accounts: 323041110-5212122 299823786-5212122 REVIEWED AND APPROVED BY: Finance. Law. Cover Memo Item # 9 Administrator. Clerk of Commission Cover Memo Item # 9 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 4 It e m # 9 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 4 It e m # 9 At t a c h m e n t n u m b e r 1 \ n P a g e 3 o f 4 It e m # 9 At t a c h m e n t n u m b e r 1 \ n P a g e 4 o f 4 It e m # 9 Engineering Services Committee Meeting 1/7/2013 1:00 PM Option for Right-of-Way Department:Law Caption:Motion to approve an Option for the purposes of acquiring a Right-of-Way between Julia Phillips, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, N/A acre (N/A sq. ft.) in fee simple and 0.0035 acre (149.85 sq. ft.) of permanent construction & maintenance easement, more or less on Project Windsor Spring Road, Phase V, STP00-1105-00(004) from property located at: 2561 Patterson Bridge Road, private, at the purchase price of $500.00. Background:The property owner has agreed to convey a certain Right-of-Way and easement to Augusta, Georgia, for the Windsor Spring Road, Phase V, STP00-1105-00(004) Project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the Motion Recommendation:Approve the Motion Funds are Available in the Following Accounts: 323041110-5212122 299823786-5212122 REVIEWED AND APPROVED BY: Finance. Law. Cover Memo Item # 10 Administrator. Clerk of Commission Cover Memo Item # 10 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 4 It e m # 1 0 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 4 It e m # 1 0 At t a c h m e n t n u m b e r 1 \ n P a g e 3 o f 4 It e m # 1 0 At t a c h m e n t n u m b e r 1 \ n P a g e 4 o f 4 It e m # 1 0 Engineering Services Committee Meeting 1/7/2013 1:00 PM Option for Right-of-Way Department:Law Caption:Motion to approve an Option for the purposes of acquiring a Right-of-Way between David Joe Castro, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, 0.018 acre (771.36 sq. ft.) in fee simple and 0.01 acre (437.79 sq. ft.) of permanent construction & maintenance easement, more or less. Also granted is a temporary driveway easement on Project Windsor Spring Road, Phase V, STP00-1105-00(004) from property located at: 4644 Windsor Spring Road, private, at the purchase price of $500.00. Background:The property owner has agreed to convey a certain Right-of-Way and easement to Augusta, Georgia, for the Windsor Spring Road, Phase V, STP00-1105-00(004) Project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the Motion Recommendation:Approve the Motion Funds are Available in the Following Accounts: 323041110-5212122 299823786-5212122 REVIEWED AND APPROVED BY: Finance. Law. Cover Memo Item # 11 Administrator. Clerk of Commission Cover Memo Item # 11 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 4 It e m # 1 1 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 4 It e m # 1 1 At t a c h m e n t n u m b e r 1 \ n P a g e 3 o f 4 It e m # 1 1 At t a c h m e n t n u m b e r 1 \ n P a g e 4 o f 4 It e m # 1 1 Engineering Services Committee Meeting 1/7/2013 1:00 PM Option for Right-of-Way Department:Law Caption:Motion to approve an Option for the purposes of acquiring a Right-of-Way between Lula J. Reese, as owners, and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project, N/A acre (N/A sq. ft.) in fee simple and 0.043 acre of permanent construction & maintenance easement, more or less. Also granted is a temporary driveway easement on Project Windsor Spring Road, Phase V, STP00-1105-00(004) from property located at: 4932 Windsor Spring Road, private, at the purchase price of $500.00. Background:The property owner has agreed to convey a certain Right-of-Way and easement to Augusta, Georgia, for the Windsor Spring Road, Phase V, STP00-1105-00(004) Project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the Motion Recommendation:Approve the Motion Funds are Available in the Following Accounts: 323041110-5212122 299823786-5212122 REVIEWED AND APPROVED BY: Finance. Law. Cover Memo Item # 12 Administrator. Clerk of Commission Cover Memo Item # 12 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 4 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 4 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 3 o f 4 It e m # 1 2 At t a c h m e n t n u m b e r 1 \ n P a g e 4 o f 4 It e m # 1 2 Engineering Services Committee Meeting 1/7/2013 1:00 PM Staff Augmentation & Professional Services Extension (SA7) Department: Caption:Authorize AED to extend Supplemental Agreement #7 with Jacobs Engineering Group Inc. to continue providing project management support via staff augmentation in the amount not to exceed $350,000 which will be funded from SPLOST Contingency funds. (Referred from December 10 Engineering Services Committee) Background:Augusta-Richmond County is responsible for Preliminary Engineering activities on several Georgia Department of Transportation (GDOT) projects including Windsor Spring Road Phase IV & Phase V, Wrightsboro Road, and improvements to Riverwatch Parkway. These projects are in various stages of development and require knowledgeable, efficient and effective interaction and coordination with GDOT, the respective Design Consultants and work units within Augusta-Richmond County. Analysis:On June 7, 2005 the Commission approved the initial agreement with Jacobs Engineering Group Inc. for David Griffith to provide staff support as Project Manager. This agreement has proven to be very effective and beneficial to AED. David’s knowledge of the GDOT processes and understanding of how to request assistance on projects has resulted in saving AED millions of dollars. He has also been successful in finding and securing funds for projects after the original funds for these projects had been reallocated to other projects. In November 2011 GDOT advised AED that it is our responsibility to take over the coordination of relocation of utilities on the Windsor Spring Road Phase IV and Phase V projects which David is managing. It is the desire of AED to extend this agreement. Financial Impact:Funding for Supplemental Agreement Number Seven will come from the SPLOST contingency funds ($87,500) in respective to projects Windsor Spring Road, Section IV, Windsor Spring Road, Section V, Wrightsboro Road and Riverwatch Parkway not to exceed $350,000 transferred to the current contract with Jacobs Engineering Group Cover Memo Item # 13 Alternatives:1) Authorize AED to extend Supplemental Agreement #7 with Jacobs Engineering Group Inc. to continue providing project management support via staff augmentation in the amount not to exceed $350,000 which will be funded from SPLOST Contingency funds. 2) Deny and acknowledge that ARC managed GDOT projects may jeopardize funding opportunities and experience delays. Recommendation:Approve Alternative 1 Funds are Available in the Following Accounts: SPLOST Contingency funds REVIEWED AND APPROVED BY: Cover Memo Item # 13 (SA02 – For changes greater than $20,000) April 2005 AUGUSTA-RICHMOND COUNTY AUGUSTA, GA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, Jacobs Engineering Group Inc., Consultant, entered into a contract with Augusta-Richmond County on June 7, 2005, to provide Project Management support associated with the “Temporary Professional Services Support”, File Reference No. 12-005 (F), and WHEREAS, changes are incorporated into the original contract to provide clarity and project management guidance: 1) The Consultant will provide a Project Manager to assist Augusta Engineering Department (AED). 2) The Consultant’s Project Manger will assist in managing the Georgia Department of Transportation (GDOT) federal aid projects that are currently in the Work Program for which AED has preliminary engineering responsibility. The priority projects are Wrightsboro Road and Windsor Spring Road. 3) The Consultant’s Project Manager will provide training to AED’s Engineering Manager or designee to manage transportation projects that are fully or partially funded by GDOT and/or FHA. The Consultant’s Project Manager and the AED designee shall work as a team. 4) The Consultant’s Project Manager will coordinate all activities requiring AED’s decisions or funds with AED’s Assistant Director of Engineering. 5) The Consultant’s Project Manager will have bi-weekly progress meetings with AED’s designated staff to discuss project progress, scheduling, coordination status and any key item effecting progress of the projects. WHEREAS, management support services are requested by Augusta, George for a period that is not covered by the scope of the original contract and associated supplemental agreements, we desire to submit the Supplemental Agreement #7 to-wit: It is agreed that as a result of the above described modification the contract amount is increased by $350,000 from $1,287,600 to a new total of $1,637,600. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Jacobs Engineering Group Inc., Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This day of , 2012 RECOMMEND FOR APPROVAL: CITY OF AUGUSTA, GEORGIA JACOBS ENGINEERING GROUP INC Mayor Deke S. Copenhaver Approved: Date Approved: Date: [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Augusta Richmond County Project Number(s): N/A Supplemental Agreement Number: 7 Purchase Order Number: P113792 Professional advice and consulting services regarding project management support via staff augmentation. Attachment number 1 \nPage 1 of 1 Item # 13 Attachment number 2 \nPage 1 of 10 Item # 13 Attachment number 2 \nPage 2 of 10 Item # 13 Attachment number 2 \nPage 3 of 10 Item # 13 Attachment number 2 \nPage 4 of 10 Item # 13 Attachment number 2 \nPage 5 of 10 Item # 13 Attachment number 2 \nPage 6 of 10 Item # 13 Attachment number 2 \nPage 7 of 10 Item # 13 Attachment number 2 \nPage 8 of 10 Item # 13 Attachment number 2 \nPage 9 of 10 Item # 13 Attachment number 2 \nPage 10 of 10 Item # 13 Engineering Services Committee Meeting 1/7/2013 1:00 PM Change Order # 1 for Virgo Gambill Architects for the Augusta, Georgia Municipal Building Renovations and Modernization Department: Caption:Motion to approve Change Order #1 for an additional $473,858.00 in fees to Virgo Gambill Architects on the Augusta, Georgia Municipal Building Renovations and Modernization due to an increase in their scope of work. (No recommendation from Public Services Committee December 10, 2012) (No action in Commission meeting December 18, 2012) (Requested by the Administrator) Background:The design for the Municipal Building Renovations has progressed through the Design Narrative and Schematic Design phases and is ready to move into the Construction Document phase. During the Code Review process it was discovered that the stairways and elevators did not meet current code requirements. The stairway can be brought up to code with some modifications and by moving meeting and training rooms down to the first level. This required an increase in the size of the planed Board of Elections. However, the optimum solution for the elevators, which require an enclosed smoke lobby and are not ADA Compliant, is to construct a 9-story addition to the building to house new code compliant elevators. At their regular meeting held on Tuesday, September 4, 2012, the Augusta Georgia Commission approved the recommendation of the Administrator to proceed with Option 2d for the Augusta Georgia Municipal Building Renovations and Modernization project. In order to evaluate construction of all phases and to same future costs the architect was asked to design the entire project now and produce a set of construction documents for Option 2d as a Phase I package. Accomplishing this adds to the scope of services being performed by Virgo Gambill Architects and a need for an increase in their fees. Analysis:Approving the additional fees will allow Virgo Gambill Architects to proceed with the design incorporating the modifications necessary to bring the building up to life safety and ADA codes and produce construction documents for Option 2d. The end result will be a safer and more accessible building. Cover Memo Item # 14 Financial Impact:The additional fee of $473,858.00 requested by Virgo Gambill Architect is within the current Total Project Budget of $18,000,000.00. Alternatives:1) Approve change order #1, the additional fees of $473,858.00 to Virgo Gambill Architects allowing the design incorporating the life safety, ADA modifications and Option 2d to be completed. 2) Do not approve the additional fees and stop the project. Recommendation:1) Approve the additional fees of $473,858.00 to Virgo Gambill Architects allowing the design incorporating the life safety, ADA modifications and Option 2d to be completed. Funds are Available in the Following Accounts: Municipal Building GL 328-05-1120/5212112 JL 212055101/5212112 REVIEWED AND APPROVED BY: Cover Memo Item # 14 Attachment number 1 \nPage 1 of 2 Item # 14 Attachment number 1 \nPage 2 of 2 Item # 14