Loading...
HomeMy WebLinkAbout2012-12-10-Meeting Agenda Engineering Services Committee Meeting Commission Chamber- 12/10/2012- 2:00 PM ENGINEERING SERVICES 1. Approve award of the Alexander Drive Overhead Signage Installation CPB 323-041110-296823215 to B & E Electrical in the amount of $35,275.00. Award will be contingent upon receipt of signed contracts and proper bonds as requested by AED. Attachments 2. Authorize and approve Change Number Three and Supplemental Agreement Number Eight for the Augusta Levee Certification Project (CPB 324-041110-209824001) in the amount of $69,140.00 for Cranston Engineering Group, P. C as requested by AED. Funding is available through SPLOST IV Fund Recapture. Attachments 3. Approve Augusta Utilities and Tag Office Peach Orchard Road Lease Proposal and Design Build RFQ. Attachments 4. Approve the deeds of dedication, maintenance agreements, and road resolution submitted by the Engineering Department for Alexander Drive. Also approve Augusta Utilities Department easement deeds and maintenance agreements for Village at Riverwatch and Costco as requested by Augusta Engineering. Attachments 5. Motion to approve a request to the Georgia Department of Transportation to have Augusta-Richmond County assume the responsibilities of all maintenance and ownership of Doug Barnard Parkway and have it removed from the state route system. Attachments 6. Approve funding source to construct the Frontage Road Extension Project. Funds are available in SPLOST Phase III and SPLOST Phase IV Fund Balance as requested by AED. Attachments 7. Report/update from the Administrator/staff regarding the Attachments sewer line tie-in for Ms. Gail Kelly. 8. Approve application from Georgia DOT for fiscal year 2013 Local Maintenance and Improvement Grant to be used for resurfacing roads as requested by AED/TE . Attachments 9. Approve change in the Maintenance Highway Agreement between Augusta, Georgia and Georgia Department of Transportation to allow GDOT to maintain Guardrails along State Routes in the Old City as requested by AED. Attachments 10. Discuss mechanisms that may be utilized to eliminate parade traffic and other activities that disrupt business activities in the downtown business districts during the busiest shopping periods of the year. (Requested by Commissioner Lockett) Attachments 11. Approve award of the Milledgeville Road at Barton Chapel Road Signal Installation to B & E Electrical in the amount of $128,715.46. Award will be contingent upon receipt of signed contracts and proper bonds as requested by AED. Attachments 12. Motion to approve the minutes of the Engineering Services Committee held on November 26, 2012. Attachments 13. Notification of payment in the amount of $185,596.52 to Utility Service Co. for executing maintenance to 13 water tanks in 2012 utilizing the Water Tank Maintenance Contract. Attachments 14. Approve a two year extension and $1,500,000 to continue the funding for the current On-Call Concrete and Emergency Services Contract for on-call concrete repair, concrete construction & emergency repairs with Horizon Construction, Larry McCord LLC, and SITEC LLC., as requested by AED. Funding is available in the Grading & Drainage, Suburban Forces and Resurfacing Phase VI accounts as requested by AED. Attachments 15. Approve a one year extension for On-Call Construction Management, Construction Inspection, and Field Engineering Services Agreement with EMC Engineering, Moreland Altobelli, and LPA Group., as requested by AED. Also, approve CPB Change Number Five in the amount of $300,000 Attachments www.augustaga.gov to continue to fund the On-Call Construction Services. Funding is available in SPLOST Ph VI in the On Call Emergency Construction Services account. 16. Motion to approve an Option for the purposes of acquiring a Right-of-Way between Wayne J. Guilfoyle and Anita Guilfoyle, as owner(s), and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project (STP00-1105-00(004)), (N/A sq. ft.) in fee and (0.003 sq. ft.) of permanent construction and maintenance easement and one temporary driveway easement from the property located at 4940 Windsor Spring Rd., Hephzibah, GA 30815, private, at the purchase price of $500.00. Attachments 17. Presentation by Mr. Rajesh Kumar regarding a severe drainage/flooding issue in the area of Summerchase Circle. Attachments 18. Award Design Consultant Services Agreement to Kimley- Horne and Associates in the amount of $290,685 for the initial phases of the Roundabout Evaluation and Design Services Project to be funded from for the Capital Project Budget/SPLOST Phase VI as requested by AED. Attachments 19. Authorize AED to extend Supplemental Agreement #7 with Jacobs Engineering Group Inc. to continue providing project management support via staff augmentation in the amount not to exceed $350,000 which will be funded from SPLOST Contingency funds. Attachments Engineering Services Committee Meeting 12/10/2012 2:00 PM Alexander Drive Overhead Signage Installation - Contract Award Department:Abie L. Ladson, PE, CPESC, Director Caption:Approve award of the Alexander Drive Overhead Signage Installation CPB 323-041110-296823215 to B & E Electrical in the amount of $35,275.00. Award will be contingent upon receipt of signed contracts and proper bonds as requested by AED. Background:The Alexander Drive widening project was completed in early 2012 as a four-lane roadway that runs between Washington Road and Riverwatch Parkway. Although the roadway is functioning safely and efficiently, there is some confusion experienced by unfamiliar users as they approach both Washington Road and Riverwatch Parkway due to the fact that the inside through lane of each approach terminates into a left-turn lane at each intersection which results in unnecessary weaving near the intersections. This weaving can be reduced through the installation of overhead signage in advance of each intersection that shows the approaching lane assignments as well as trail blazing signs to I- 20. This installation will drivers with better information and allow them to make lane choices in advance of the intersection. Moreover, to maintain the aesthetics of the area and reduce maintenance, this installation will include black powder- coated, mast arms as opposed to concrete poles with span wire. Analysis:Bids were received on October 26, 2012 with B and E Electrical being the only compliant bidder. Below is a summary of the bids received for this project: Vendor Bid B & E Electrical $35,275.00 It is the recommendation of the Engineering Department, Traffic Engineering Section to award this project to the low bidder, B & E Electrical subject to receipt of signed contracts and proper bonds. Financial Impact:Funding is available in the project contingency account to be transferred to the Signal account number 323-041110- 5414610/296823215-5414610 upon Commission approval. Alternatives:1) Approve award of the Alexander Drive Overhead Signage Installation CPB 323-041110-296823215 to B & E Electrical in the amount of $35,275.00. Award will be contingent upon receipt Cover Memo Item # 1 of signed contracts and proper bonds as requested by AED. 2) Do not approve. Recommendation:Approve Alternative Number One Funds are Available in the Following Accounts: 323-041110-5414610/296823215-5414610 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project be set up is authorized to CPB#323-041110-296823215. Funding is to approve award of the Alexander Drive Overhead Signage Installation to B & E Electrical in the amount of $35,275.00. Award will be contingent upon receipt of signed contracts and proper bonds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase II Recapture 500,000$ Special 1% Sales Tax, Phase III Recapture 2,522,795$ Augusta Utilities 24,768$ Special 1% Sales Tax, Phase III Recapture 86,680$ Special 1% Sales, Tax Fund Balance 2,500,000$ Special 1% Sales Tax, Phase III Recapture 117,680$ Augusta Utilities 112,330$ 5,864,253$ Section 3: The following amounts are appropriated for the project: By Basin By District Rock Creek $5,864,253 5,864,253$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB#323-041110-296823215 Honorable Deke Copenhaver, Mayor CAPITAL PROJECT BUDGET ALEXANDER DRIVE IMPROVEMENTS (WASHINGTON ROAD TO RIVERWATCH PARKWAY) Please do not process this document. Once approved by the Commission, the original will be sent to Clerk of Commission for execution. For information reference this request contact Shelette @ ext 5070. 1 of 2 10.8.09 Attachment number 1 \nPage 1 of 2 Item # 1 Augusta-Richmond County, Georgia CPB#323-041110-296823215 CAPITAL PROJECT BUDGET ALEXANDER DRIVE IMPROVEMENTS (WASHINGTON ROAD TO RIVERWATCH PARKWAY) Please do not process this document. Once approved by the Commission, the original will be sent to Clerk of Commission for execution. For information reference this request contact Shelette @ ext 5070. CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPLOST, PHASE II 322-04-1110-6011110-292822333 ($500,000) ($500,000) SPLOST, PHASE III 323-04-1110-000000-000000000 ($2,522,795) ($2,522,795) AUGUSTA UTILITIES 507043420-5212115/89800510-5212115 ($24,768) ($24,768) SPLOST PHASE III 323-04-1110-6011111-296823333 ($86,680) ($86,680) SPLOST, FUND BALANCE 322-000-000000/39-52110 ($2,500,000) ($2,500,000) SPLOST PHASE III 323-04-1110-6011110-296823333 ($117,680) ($117,680) AUGUSTA UTILITIES ($105,850) ($105,850) 507043410-5212115-80800030 ($6,480) ($6,480) TOTAL SOURCES: ($5,864,253) ($5,864,253) USE OF FUNDS ENGINEERING 323-04-1110-5212115-296823215 $729,287 $729,287 RIGHT OF WAY 323-04-1110-5411120-296823215 $4,503,752 $4,503,752 (Demolition $44,400 Thompson ) CONSTRUCTION 323-04-1110-5414110-296823215 $100,000 $100,000 Bath Branch Augusta, LLC $77,647.50 UTILITIES 323-04-1110-5414510-296823215 $24,734 $24,734 SIGNALS 323-041110-5414610-296823215 $35,275 $35,275 UTILITIES 507043410-5212115-80800030 $6,480 $6,480 CONTINGENCY 323-04-1110-6011110-296823215 $500,000 ($35,275) $464,725 TOTAL USES:$5,864,253 $5,864,253 2 of 2 10.8.09 Attachment number 1 \nPage 2 of 2 Item # 1 Invitation To Bid Sealed bids will be received at this office until Friday, October 26, 2012 @ 3:00 p.m. for furnishing: Bid Item #12-207 Alexander Drive Overhead Signage Installation Plans for Engineering Department BID’s will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 BID documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from ARC. The fees for the plans and specifications which are non-refundable are $50.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.itrepro.com) at no charge through ARC (706) 821-0405 beginning Thursday, September 20 2012. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre-Bid Conference will be conducted at the Procurement Department, 530 Greene Street, Room 605 on Friday, October 12, 2012 @ 10:00 a.m. in the conference room. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, October 16, 2012 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No BID may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid Bond is required to be submitted in a separate envelope so marked along with the bidder’s qualifications’ a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle September 20, 27, October 4, 11, 2012 Metro Courier September 26, 2012 cc: Tameka Allen Deputy Administrator Abie Ladson Engineering Hameed Malik Engineering Steve Cassell Engineering – Traffic Engineering Revised: 8/15/2011 Attachment number 2 \nPage 1 of 1 Item # 1 VENDORS Attachment B E-Verify # Addendum 1 Bid Bond Lump Sum B & E Electrical 6136 Columbia Road Grovetown, GA 30813 Yes 336650 Yes Yes $35,275.00 Bid Item #12-207 Alexander Drive Overhead Signage Installation Plans for Augusta, Georgia - Engineering-Traffic Engineering Department Bid Due: Friday, October 26, 2012 @ 3:00 p.m. Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 1 Attachment number 4 \nPage 1 of 1 Item # 1 Attachment number 5 \nPage 1 of 1 Item # 1 Attachment number 6 \nPage 1 of 1 Item # 1 Engineering Services Committee Meeting 12/10/2012 2:00 PM Augusta Levee USACE Periodic Inspection Report Department:Abie L. Ladson, PE, CPESC, Director Caption:Authorize and approve Change Number Three and Supplemental Agreement Number Eight for the Augusta Levee Certification Project (CPB 324-041110-209824001) in the amount of $69,140.00 for Cranston Engineering Group, P. C as requested by AED. Funding is available through SPLOST IV Fund Recapture. Background:The Periodic Inspection (PI) for the Augusta Levee was completed in March 2010 by the Corps of Engineers (COE) and as a result the Levee status was changed from “Active” to “Inactive”. AED and the COE have been in constant communications developing an acceptable plan of action for bringing the Levee to “Active” status. Noted deficiencies are of two types: Structural Encroachments and Trees. Most of the structural deficiencies have been addressed except; Riverwatch Parkway, Port Royal Building, and Water Edge Subdivision. The COE has requested additional information concerning these three remaining structural encroachments. Analysis:Addressing the remaining structural deficiencies is a proactive path forward to bringing the Levee to “Active” Status. Phasing of the work will be in two parts. This request is for the first phase. The first phase will include the coordination with the COE, the work involving Port Royal, and the conceptual and schematic phases of Waters Edge. Upon concurrence by the COE, the second phase will consist of the design, bidding and construction phases of Waters Edge. Financial Impact:Funding in the amount of $69,140.00 is available through Engineering SPLOST IV Fund Recapture, to be transferred to the Augusta Levee Certification Project as upon Commission approval Alternatives:1) Authorize and approve Change Number Three and Supplemental Agreement Number Eight for the Augusta Levee Certification Project (CPB 324-041110-209824001) in the amount of $69,140.00 for Cranston Engineering Group, P. C as requested Cover Memo Item # 2 by AED. Funding is available through SPLOST IV Fund Recapture. 2) Do not approve and keep Augusta Levee out of compliance from COE Periodic Inspection program. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: SPLOST IV Fund Recapture REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 2 AUGUSTA-RICHMOND COUNTY ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, Cranston Engineering Group, PC Consultants entered into a contract with Augusta-Richmond County on February 17, 2009, for engineering design services associated with the Augusta Canal FERC Licensing Process Project, Project No. 324-041110-209824001, and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Corps of Engineers Response and Coordination Port Royal and Waters Edge Structural Encroachment It is agreed that as a result of the above modification the contract amount is increased by $69,140.00 from $1,191,367.00. to a total of $1,260,507.00. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, Cranston Engineering Group, PC Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY AUGUSTA, GEORGIA Deke Copenhaver, Mayor Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Augusta Richmond County Project Number(s): 324-041110-209824001 Supplemental Agreement Number: 8 Purchase Order Number: P162085 Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Attachment number 1 \nPage 1 of 1 Item # 2 Augusta-Richmond County, Georgia CHANGE NUMBER THREE BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: The project change is authorized to CPB# 324-041110-209824001. This project Supplemental Agreement Number Eight proposes to provide additional Corps Response and Port Royal and Waters Edge Structural Encroachment. Funding in the amount of $69,140 for Supplemental Agreement Number Eight is available in the project Engineering Account. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. SPLOST Lake Aumond Dam 340,975$ Special 1% Sales Tax, Phase IV Recapture 283,495$ Special 1% Sales Tax, Phase IV Contingency 19,895$ Re-Appropriation of Funds 3rd Level Improvements Project 100,000$ Phase IV Recapture 69,140$ 813,505$ Section 3: The following amounts are appropriated for the project: By Basin By District Varies $813,505 Varies 813,505$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB# 324-04-209824001 CAPITAL PROJECT BUDGET AUGUSTA LEVEE Honorable Deke Copenhaver, Mayor Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1 of 2 9.24.2012 Attachment number 2 \nPage 1 of 2 Item # 2 Augusta-Richmond County, Georgia CHANGE NUMBER THREE CPB# 324-04-209824001 CAPITAL PROJECT BUDGET AUGUSTA LEVEE CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPLOST PHASE IV 324-041110-5414910-203824088 ($330,000)$0 ($330,000) SPLOST PHASE IV 324-041110-6011110-203824088 ($10,975)$0 ($10,975) SPLOST PHASE IV RECAPTURE 324-041110-207824999 ($303,390)($69,140)($372,530) Re-Appropriation of Funds 3rd Level 326-041110-288811014 ($100,000)($100,000) TOTAL SOURCES:($744,365)($69,140)($813,505) USE OF FUNDS ENGINEERING 324-04-1110-5212115-209824001 $744,365 $69,140 $813,505 TOTAL USES: $744,365 $69,140 $813,505 Attachment number 2 \nPage 2 of 2 Item # 2 Attachment number 3 \nPage 1 of 7 Item # 2 Attachment number 3 \nPage 2 of 7 Item # 2 Attachment number 3 \nPage 3 of 7 Item # 2 Attachment number 3 \nPage 4 of 7 Item # 2 Attachment number 3 \nPage 5 of 7 Item # 2 Attachment number 3 \nPage 6 of 7 Item # 2 Attachment number 3 \nPage 7 of 7 Item # 2 Engineering Services Committee Meeting 12/10/2012 2:00 PM Augusta Utilities and Tag Office Peach Orchard Road Lease Proposal and Design Build RFQ Department: Caption:Approve Augusta Utilities and Tag Office Peach Orchard Road Lease Proposal and Design Build RFQ. Background:The Augusta Utilities Department (AUD) Peach Orchard Road location has long been plagued by poor traffic patterns and a building that is in desperate need of repairs, including new HVAC, a new roof and mold problems. Furthermore the area is too small and the lobby is not large enough to hold our walk-in customers. After considering ARC Customer’s needs, the decision was made to move the Customer Service office out of the current location to a more suitable site with an additional drive- thru lane for better customer service. The Tag Office is also looking for a new site in this area of town. Analysis:AUD wanted to refurbish and improve the existing location at a minimum due to the issues noted above. We were approached by Mr. Kendrick of the Tag Office to consider a combined site for the convenience of our customers. After considering several options, we have found a place that will fit the needs of both departments. The space is a total of 17,500 s.f. of which about 2/3 will house AUD and the rest for the Tag Office. We will also be able to put in a two-lane drive-thru. Lease payments, overhead and build-outs will be split pro-rate by actual square footage and direct costs. It is located at Peach Orchard Road Commons and the owner is Delta Peachtree, LLC. It is a 10-year lease and the lease amount is $10.50 per s.f per year, with an annual increase of greater of 2.5% or CPI per year. Landlord will pay for up to $875,000 for improvements and leasee will pay approximately $1.85 per s.f per year for its share of taxes, insurance and common maintenance. The Design/Build RFQ execution approach is considered the most appropriate method to have renovations in place timely and effectively. The leaser prefers that Augusta executes the renovations to assure the construction work is to our standards and meets our operational requirements. The Design/Build method will allow control of the design and construction and assure funded renovations are optimized for AUD and the Tag Office. Cover Memo Item # 3 Financial Impact:The cost for rent and estimated overhead is budgeted in 2013 in account 506-04-3210-5224111 for Utilities and 101-01-5611- 5224111 for the Tag Office. The cost for improvements in excess of the $875,000 allowance from the landlord, are budgeted in 2013 in account 506-04-3210-5413120 for Utilities. If there are any excess build-out costs applicable to the Tag Office, they will be reimbursed by the Tag Office to Utilities. Alternatives:None Recommendation:Approve Augusta Utilities and Tag Office Peach Orchard Road Lease Proposal and Design Build RFQ. Funds are Available in the Following Accounts: 506-04-3210-5224111 for Utilities and 101-01-5611-5224111 for the Tag Office. 506-04-3210-5413120 for the cost of improvements. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 3 Engineering Services Committee Meeting 12/10/2012 2:00 PM Dedication of Portion of Alexander Drive Department:Engineering Department-Abie L. Ladson, P.E., CPESC, Director Caption:Approve the deeds of dedication, maintenance agreements, and road resolution submitted by the Engineering Department for Alexander Drive. Also approve Augusta Utilities Department easement deeds and maintenance agreements for Village at Riverwatch and Costco as requested by Augusta Engineering. Background:The final plat for this portion of Alexander Drive was approved by the Commission on September 18, 2012. The subdivision design and plat for this section have been reviewed and accepted by our engineering staff and the construction has been reviewed by our inspectors. The Utilities Department has inspected and reviewed the water and sanitary sewer installations, and hereby requests acceptance of the utility deed. Analysis:This section meets all codes, ordinances and standards. Portions of this subdivision lie within the jurisdiction boundaries of the Corps of Engineers wetlands, which are noted on the final plat. Acceptance of said utility deed shall dedicate, as required, the water and sanitary sewer mains along with the applicable easements to Augusta, Georgia for operation and maintenance. Financial Impact:By accepting this road and storm drainage installations into the County system and after the 18-month maintenance warranty by the developer/contractor for the roads and storm drainage has expired, all future maintenance and associated costs will be borne by Augusta, Georgia. By acceptance of the utility deeds and maintenance agreements, all future maintenance and associated costs for water and sanitary sewer installations will be borne by Augusta, Georgia, and positive revenue will be generated from the sale of water and sanitary sewer taps and monthly billing of same. Alternatives:1. Approve the deeds of dedication, maintenance agreements, and road resolution submitted by the Engineering Department for Alexander Drive. Also approve Augusta Utilities Department easement deeds and maintenance agreements for Village at Riverwatch and Costco, as requested by Augusta Engineering. 2. Cover Memo Item # 4 Do not approve and risk litigation. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Attachment number 1 \nPage 1 of 1 Item # 4 Attachment number 2 \nPage 1 of 1 Item # 4 Attachment number 3 \nPage 1 of 7 Item # 4 Attachment number 3 \nPage 2 of 7 Item # 4 Attachment number 3 \nPage 3 of 7 Item # 4 Attachment number 3 \nPage 4 of 7 Item # 4 Attachment number 3 \nPage 5 of 7 Item # 4 Attachment number 3 \nPage 6 of 7 Item # 4 Attachment number 3 \nPage 7 of 7 Item # 4 Item # 4 Item # 4 Attachment number 5 \nPage 1 of 1 Item # 4 Attachment number 6 \nPage 1 of 8 Item # 4 Attachment number 6 \nPage 2 of 8 Item # 4 Attachment number 6 \nPage 3 of 8 Item # 4 Attachment number 6 \nPage 4 of 8 Item # 4 Attachment number 6 \nPage 5 of 8 Item # 4 Attachment number 6 \nPage 6 of 8 Item # 4 Attachment number 6 \nPage 7 of 8 Item # 4 Attachment number 6 \nPage 8 of 8 Item # 4 Attachment number 7 \nPage 1 of 3 Item # 4 Attachment number 7 \nPage 2 of 3 Item # 4 Attachment number 7 \nPage 3 of 3 Item # 4 Attachment number 8 \nPage 1 of 8 Item # 4 Attachment number 8 \nPage 2 of 8 Item # 4 Attachment number 8 \nPage 3 of 8 Item # 4 Attachment number 8 \nPage 4 of 8 Item # 4 Attachment number 8 \nPage 5 of 8 Item # 4 Attachment number 8 \nPage 6 of 8 Item # 4 Attachment number 8 \nPage 7 of 8 Item # 4 Attachment number 8 \nPage 8 of 8 Item # 4 Attachment number 9 \nPage 1 of 6 Item # 4 Attachment number 9 \nPage 2 of 6 Item # 4 Attachment number 9 \nPage 3 of 6 Item # 4 Attachment number 9 \nPage 4 of 6 Item # 4 Attachment number 9 \nPage 5 of 6 Item # 4 Attachment number 9 \nPage 6 of 6 Item # 4 Attachment number 10 \nPage 1 of 3 Item # 4 Attachment number 10 \nPage 2 of 3 Item # 4 Attachment number 10 \nPage 3 of 3 Item # 4 Engineering Services Committee Meeting 12/10/2012 2:00 PM Doug Barnard Parkway (SR 56 Spur) Department:Administrator Caption:Motion to approve a request to the Georgia Department of Transportation to have Augusta-Richmond County assume the responsibilities of all maintenance and ownership of Doug Barnard Parkway and have it removed from the state route system. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Administrator Clerk of Commission Cover Memo Item # 5 Engineering Services Committee Meeting 12/10/2012 2:00 PM Frontage Road Extension Construction Department:Abie L. Ladson, PE, CPESC, Director Caption:Approve funding source to construct the Frontage Road Extension Project. Funds are available in SPLOST Phase III and SPLOST Phase IV Fund Balance as requested by AED. Background:On August 13, 2012, the Augusta Commission approved the construction of Frontage Road extending to Mason McKnight Parkway. The Commission also tasked the Administrator to identify funds for construction. Analysis:On August 13, 2012, the Augusta Commission approved the construction of Frontage Road extending to Mason McKnight Parkway. The Commission also tasked the Administrator to identify funds for construction. Financial Impact:Funds have been identified as SPLOST Phase III and SPLOST Ph IV Fund Balance. Alternatives:1) Approve Funding Source to construct Frontage Road Extension. Funds are available in SPLOST Phase III and SPLOST Ph IV Fund Balance as requested by AED. 2) Do not approve project funding. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: Fund Balance SPLOST III and IV REVIEWED AND APPROVED BY: Finance. Law. Cover Memo Item # 6 Administrator. Clerk of Commission Cover Memo Item # 6 Engineering Services Committee Meeting 12/10/2012 2:00 PM Gail Kelly Department:Clerk of Commission Caption:Report/update from the Administrator/staff regarding the sewer line tie-in for Ms. Gail Kelly. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 7 Attachment number 1 \nPage 1 of 1 Item # 7 Engineering Services Committee Meeting 12/10/2012 2:00 PM GDOT Local Maintenance and Improvement Grant Application-2012 Department:Abie L. Ladson, PE, CPESC, Director Caption:Approve application from Georgia DOT for fiscal year 2013 Local Maintenance and Improvement Grant to be used for resurfacing roads as requested by AED/TE . Background:The Local Maintenance and Improvement Grant is an annual formula-based grant from Georgia DOT that is funded through the motor fuel tax. Grant funds are typically used to supplement local resurfacing efforts based on priority. Each year Augusta receives approximately $1.4 million through this grant. Analysis:Georgia DOT will inspect each roads and make a final determination as to which roads will be resurfaced based on priority, condition, and fund availability. Financial Impact:The resurfacing will be let to bid by Georgia DOT. Any required patching and/or milling will be the responsibility of Augusta. The resurfacing costs will be borne by Georgia DOT through this grant. Any required patching will be done by the Engineering Departments Maintenance Division. Alternatives:1) Approve and execute application for submittal to Georgia DOT. 2) Do not approve Recommendation:Approve Alternative Number One Funds are Available in the Following Accounts: n/a REVIEWED AND APPROVED BY: Finance. Cover Memo Item # 8 Law. Administrator. Clerk of Commission Cover Memo Item # 8 Please do not pq#Rgs^thiAdpgUntg!!__O,ryce approved by Commission , docume"tnrutt&?Uf rmation CONIACI CXt 5070, APPLICATION FOR FISCAL YEAR 2OI3TYPE OR PRINT LEGIBLY. ALL SECTIONS TIAST BE COMPLETED. All Applications must be submitted by the Local Governing official to the Georgia Department of rransportation, office ofLocal Grants' 600 west Peachtree Street NW, Atlanta, Georgia 30308 between July I and March 3l of each fiscal vear. Date ofApplication: b I t A l/L- Name of local government: Contact Person's Fax Number: Address: <o f fCtQ,... "S+. , ?l."Contact Person and Title: ,+br€- I acl r6J ContactPerson'sPhoneNumber: _JoC -7qt- *r''4o .,,,,, f Contact Person's Email: Is the Priority List attached? f,yes uNo I,(Name), the (Title), on behalf of :::"ilffi ",.:};HT#: j,-,"##il.::,*::T:lT,T#'35';: understands the LMIG General Guidelines and Rules and that it has complied with and will comply with the same. Local government further swears and certifies that it has read and understands the regulations for the Georgia planning Act of 1989 (O.C.G.A. Q 45-12-200, et seq,), Service Delivery straregy Act (o.c.G.A. g 36-70-20, et seq.), and the LocalGovemment Budgets and Audits Act (o.c.G.A. 36-81-l et seq.) and will comply in full with said provisions. Localgovernment further swears and certifies that the roads or sections of roads described and shown on the local government,sProject List are dedicated public roads and are part of the Public Road system in said county/city. Local governmentfurther swears and certifies thatit complied wirh federal and/or state environmental protection laws and at the completionof the project(s), it met the match iequirements as stated in the Transportation Investment ACT (TIA). Further, the local government shall be responsible for any claim, damage, loss or expense that is attributable to negligentacts' errors, or omissions related to the designs, drawings, specifications, work and other services furnished by or onbehalf of the local govemment pursuant to this Application ("Loss"). To the extent provided by 1aw, the local governmentfurther agre€s to hold harmless and indemnify the DEPARTMENT and the state of Georgia from all suits or claims thatmay arise from said Loss. Page I Attachment number 1 \nPage 1 of 3 Item # 8 GEORGIA DEPARTMENT OF TRANSPORTATION LOCAL MAINTENANCE & IMPROVEMENT GRANT (LMIG) APPLICATION FOR FISCAL YEAR 2013 If the local government fails to comply with these General Guidelines and Rules, or fails to comply with its Application and Certification, or fails to cooperate with the auditor(s) or fails to maintain and retain sufficient records, the DEPARTMENT may, at its discretion, prohibit the local government from participating in the LMIG program in the future and may pursue any available legal remedy to obtain reimbursement of the LMIG funds. Furthermore, if in the estimation of the DEPARTMENT, a roadway or bridge shows evidence of failure(s) due to poor workmanship, the use of substandard materials, or the failure to follow the required design and construction guidelines as set forth herein, the Department may pursue any available legal remedy to obtain reimbursement of the allocated LMIG funds or prohibit local government from participating in the LMIG program until such time as corrections are made to address the deficiencies or reimbursement is made. Local Government: (Signature) (Print) (Date) E-Verifi Number Sworn to and subscribed before me, This day ol_ _, 20- Mayor / Commission Chairperson SEAL: My Commission Expires: In the presence of: NOTARY PUBLIC FOR GDOT USE ONLY The local government's Application is hereby granted and the amount allocated to the local government is . Such allocation must be spent on any or all of those projects listed in the Project List. This day of _,20-. Terry L Gable Local Grants Administrator Page2 Attachment number 1 \nPage 2 of 3 Item # 8 T l- l/)L, a)z '-. t!L rl moq F{ (o R (o N cf)N In -i sry s rn Fi (\cntiA Ol(\ -i q rn (9zoz IJJ -_L CJJL F -Y o E o = E o.xz oo FvlooJ tu E qJ oOI E vl(! (I' I z P stc{ EE =o (E(9 o o.c, (J (! =Eoo3 (J.= (9zzz(, |jJco EE ,9 (! F OI v\ L 6E 3 o xo \Z (u t z oL -o P L = E&. OJo CJ E & 3o c)3 o6 trl 6 = E ox =o3 ttl lnrl 3 co IJJ z o o t^o E(o .2 (!L- OJ L PL z E c, = oo ttl OJ o F PQo (uEobI e, 3L OJ Etr E -:z IAoLL t! L -> o) o '15d. (u (o ttl .Y =o)t! z OJ E, L(! E OJU |EPo Fao F N an sl In (o N 00 orl F N F #l (JI I ol -cl(JI +l(olPIvrl oo <lt o Fz:)oU th =OEe0ca IJ UJ oc,r (9 (Yl oN Attachment number 1 \nPage 3 of 3 Item # 8 Engineering Services Committee Meeting 12/10/2012 2:00 PM Maintenance of Highway Agreement Department:Abie L. Ladson, PE, CPESC, Director Caption:Approve change in the Maintenance Highway Agreement between Augusta, Georgia and Georgia Department of Transportation to allow GDOT to maintain Guardrails along State Routes in the Old City as requested by AED. Background:Each year Augusta, Georgia and Georgia Department of Transportation enter into an agreement for Augusta, GA to maintain State routes in the old city limits. The maintenance scope includes patching and leveling, mowing and cleaning, roadway shoulders, ditch cleaning, seeding and sodding, snow and ice removal, emergency services, and guardrails. Recently, GDOT has agreed to assume responsibility of maintaining the guardrails. This will create a significant relief financially for Augusta Engineering Department. Analysis:This change in the agreement will allow GDOT to take over the maintenance of the guardrails. Financial Impact:No financial impact. Alternatives:1. Approve change in the Maintenance Highway Agreement between Augusta, Georgia and Georgia Department of Transportation to allow GDOT to maintain Guardrails along State Routes in the Old City as requested by AED. 2.Do not approve and continue maintaining the guardrails. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Cover Memo Item # 9 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 9 CONTRACT FOR MAINTENANCE OF HIGHWAYS THIS AGREEMENT made and entered into this the I't day of July , 20l2,by and between the Department of Transportation, State of Georgia, (hereinafter called the Department) and the City of Augusta' (hereinafter called the City), to be effective the lst day of July, 2012. WITNESSETH: WHEREAS, the Department and the City have agreed that it will be advantageous to both parties hereto, as well as to the traveling public, for the City to maintain State highways and Interstate highways together with bridges and approaches thereto within the City limits of said City as herein provided; and WHEREAS, the parties hereto are acting under the authority of the Constitution of the State of Georgia, Section 2-5901. NOW, THEREFORE, in consideration of the sum of One Dollar ($1.00) by each of the parties to the other in hand paid, the receipt whereof is hereby acknowledged, and the mutual covenants herein contained, the parties hereto agree as follows: l. The City will initially maintain 13.6 miles of State Highway (including 0.00 miles of Interstate Highway) together with all bridges and approaches within the City limits of said City as more particularly described according to the sketch or plat hereto attached and marked "Exhibit A" which exhibit by reference is incorporated herein and made a part of this instrument for the purpose of describing the highways to be maintained under this agreement. 2' The number of miles of State Highways within the City will be adjusted every 12 months from the date of this contract based on the latest available figures on file in the Department and "Exhibit A" will likewise be adjusted every l2 months from the date of this contract. 3' The number of miles of State Highways within the City shall be as published by the planning Division of the Department of Transportation. Attachment number 1 \nPage 1 of 5 Item # 9 4' The City will furnish all labor, materials and equipment for the proper maintenance of these highways, bridges and approaches thereto which shall consist of but not be limited to the following: (1) Patching and leveling of pavement (2) Mowing and cleaning of right-of-way (3) Shoulder maintenance (4) Ditch cleaning (5) Reseeding and re-sodding of right-of-way (6) Snow and ice removal (7) All necessary emergency services (8) Any other pertinent maintenance function needed to keep the State Highways in proper and safe operating condition. The Department will pay $3,000.00 per mile per year for maintenance of said highways, bridges and approaches thereto, payment to be made on a prorated monthly basis. The City will invoice the Department monthly. The Department will continue to perform the following services: (l) Maintain all highway signs and markers but the Department will not delineate any "parking or pedestrian" areas (2) Maintain, install, and replace all guardrail where necessary (3) Perform or have performed under contract any necessary reconstruction of bridges and other heavy or substantial maintenance activities The Department expressly reserves the right to make periodic inspections of the aforementioned highways and to make whatever recommendations necessary to insure proper maintenance of said hishwavs. 5. 6. 7. Attachment number 1 \nPage 2 of 5 Item # 9 8' The City agrees to indemnify and hold harmless the Department from all suits, claims for damages, or causes of action brought on account of City's failure to perform any maintenance activities set out in paragraph 4 of this agreement. 9. This agreement will be automatically renewed every twelve (12) months beginning with the effective date of this agreement. The Department or City reserves the right to terminate this agreement by giving notice in writing to the other party at least 30 days prior to the end of the twelve (12) month agreement period. 10. In the event it is determined by the Department that the City is not properly performing any maintenance function under this agreement, the Department will notiSr the city in writing of such deficiency. If such deficiency is not corrected within 30 days from the date of such notice, the Department may proceed to correct such deficiency and deduct the cost of such correction from amounts otherwise due the city under this agreement. Attachment number 1 \nPage 3 of 5 Item # 9 IN WITNESS WHEREOF, this instrument has been and is executed on behalf of the Department of Transportation by the Director of the Department of Transportation, and on behalf of the City of Augusta, By he being duly authoizedto do so by of said City. On this the day and year below written. GEORGIA DEPARTMENT OF TRANSPORTATION Commissioner (sEAL) ATTEST: Treasurer (Title) IN THE PRESENCE OF: Witness Sworn and subscribed before me this day of _,20 _, in the presence of: Notary Public (sEAL) FEDERAL EMPLOYER IDENTIFICATION NUMBER: CITY OF AUGUSTA By (sEAL) Attachment number 1 \nPage 4 of 5 Item # 9 STATE OF GEORGIA COLINTY OF RICHMOND Be it resolved by the city council of the city of Aueusta, and foregoing attached contract for Maintenance of Highways be entered day of it is hereby resolved, that the into by the City of Augusta and that ,as Mayor or (Chairman), and Clerk, be, and they are, thereby authorized and directed to execute the same for and in behalf of said Citv Council of the City of Augusta. Passed and adopted this ATTEST: AS 2012. By: (Clerk)MAYOR (CHAIRMAN) I hereby certify that I am Clerk of the city, town or municipality (as the case may be) of the official acts of the authorities charged with the management of the business of said municipality; and the written and foregoing constitutes a true and correct copy ofa resolution passed on the day of , 2012, and entered on the minutes of said officers. This the day of 2012. CLERK Attachment number 1 \nPage 5 of 5 Item # 9 Engineering Services Committee Meeting 12/10/2012 2:00 PM Mechanisms eliminating parade traffic and activities downtown Department:Clerk of Commission Caption:Discuss mechanisms that may be utilized to eliminate parade traffic and other activities that disrupt business activities in the downtown business districts during the busiest shopping periods of the year. (Requested by Commissioner Lockett) Background:These activities could be diverted to Reynolds Street or other side streets that will not have an adverse impact on downtown business operations. Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 10 Attachment number 1 \nPage 1 of 1 Item # 10 Engineering Services Committee Meeting 12/10/2012 2:00 PM Milledgeville Road at Barton Chapel Road Signal Installation – Contract Award Department:Abie L. Ladson, PE, CPESC, Director Caption:Approve award of the Milledgeville Road at Barton Chapel Road Signal Installation to B & E Electrical in the amount of $128,715.46. Award will be contingent upon receipt of signed contracts and proper bonds as requested by AED. Background:Currently, this intersection is along and adjacent to a major commuter route for Fort Gordon. As such, this all-way stop controlled intersection experiences significant congestion during peak periods of travel. Moreover, in the most recent three-year period, this intersection has experienced between six and eleven right-angle accidents which are considered correctable through signalization; several of these accidents resulted in injuries. As such a signal warrant study was performed at the intersection in accordance with the criteria set forth in the Manual on Uniform Traffic Control Devices. Based on this study, this intersection meets more than one of these warrants. Therefore, an in-house signal design was performed and bid. Analysis:Bids were received on October 17, 2012 with B and E Electrical being the lowest compliant bidder. Below is a summary of the bids received for this project: Vendor Bid B & E Electrical $128,715.46 RJ Haynie and Assoc. $152,587.50 It is the recommendation of the Engineering Department, Traffic Engineering Section to award this project to the low bidder, B & E Electrical subject to receipt of signed contracts and proper bonds. Financial Impact:Funding is available in account number 272-041710-5414610. Alternatives:1) Approve award of the Milledgeville Road at Barton Chapel Road Signal Installation to B & E Electrical in the amount of $128,715.46. Award will be contingent upon receipt of signed contracts and proper bonds as requested by AED. 2) Do not approve. Recommendation:Approve Alternative Number One Cover Memo Item # 11 Funds are Available in the Following Accounts: 272-041710-5414610 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 11 Invitation To Bid Sealed bids will be received at this office until Wednesday, October 17, 2012 @ 3:00 p.m. for furnishing: Bid Item #12-199 Signal Installation – Milledgeville Road @ Barton Chapel Road for Engineering Department BID’s will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 BID documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from ARC. The fees for the plans and specifications which are non-refundable are $50.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.itrepro.com) at no charge through ARC (706) 821-0405 beginning Thursday, September 6, 2012. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre-Bid Conference will be conducted at the Procurement Department, 530 Greene Street, Room 605 on Friday, September 28, 2012 @ 10:00 a.m. in the conference room. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, October 2, 2012 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No BID may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid Bond is required to be submitted in a separate envelope so marked along with the bidder’s qualifications’ a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle September 6, 13, 20, 27, 2012 Metro Courier September 12, 2012 cc: Tameka Allen Deputy Administrator Abie Ladson Engineering Hameed Malik Engineering Revised: 8/15/2011 Attachment number 1 \nPage 1 of 1 Item # 11 VENDORS Attachment B E-Verify # Addendum 1 Bid Bond Lump Sum B & E Electrical 6136 Columbia Road Grovetown, GA 30813 Yes 336650 Yes Yes $128,715.46 R J Haynie & Assoc 1551 Forest Parkway Lake City, GA 30260 Yes 43674 Yes Yes $152,587.50 Bid Item #12-199 Signal Installation - Milledgeville Road @ Barton Chapel Road for Augusta, Georgia - Engineering-Traffic Engineering Department Bid Due: Wednesday, October 17, 2012 @ 3:00 p.m. Page 1 of 1 Attachment number 2 \nPage 1 of 1 Item # 11 Attachment number 3 \nPage 1 of 1 Item # 11 Attachment number 4 \nPage 1 of 1 Item # 11 Attachment number 5 \nPage 1 of 2 Item # 11 Attachment number 5 \nPage 2 of 2 Item # 11 Engineering Services Committee Meeting 12/10/2012 2:00 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the Engineering Services Committee held on November 26, 2012. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 12 Attachment number 1 \nPage 1 of 2 Item # 12 Attachment number 1 \nPage 2 of 2 Item # 12 Engineering Services Committee Meeting 12/10/2012 2:00 PM Notification of payment for Water Tank Maintenance thru the Utility Service Co. Water Tank Maintenance Contract Department:Augusta Utilities Department Caption:Notification of payment in the amount of $185,596.52 to Utility Service Co. for executing maintenance to 13 water tanks in 2012 utilizing the Water Tank Maintenance Contract. Background:The Augusta Utilities Department (AUD) has 13 elevated and ground water tanks that require constant maintenance to assure continued service. The tanks located throughtout the Augusta- Richmond County require interior/exterior inspection, periodical drainage, repainting and other specilized services. The contractor is required to have the appropriate labor and equipment to perform both routine and emergency services during the contract period. AUD has utililized the services of Utility Service Co. in 2012 to execute the needed services under the current Water Tank Maintenance Contract. Analysis:Utility Service Co. has performed the required water tank maintenance services per the existing contract requirements in 2012. AUD will submit payment per the terms of the contract. Financial Impact:$185,596.52 under account number 506043410-5223211 Alternatives:No alternatives due to the contract being previously awarded with option years elected Recommendation:We are informing the Commission of the department's payment for services performed by Utility Service Co. for the maintenance of the 13 Water Tanks in the year 2012. Funds are Available in the Following Accounts: $185,596.52 from account 506043410-5223211 Cover Memo Item # 13 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 13 Utility Service Co. Maintenance Contracts Regarding the term of the listed contracts: All of the contracts listed below have a clause in them stating: Tank Date of Original Contract Termination Dates: Payment For 2012 Services Highway 56 Tank 3/21/2000 Extended by 3 year increments 15,421.23 Fairington Drive 3/21/2000 Extended by 3 year increments 10,979.01 Tobacco Rd 3/21/2000 Extended by 3 year increments 15,420.12 RCCI - Prison Tank 4/1/1996 Extended by 3 year increments 8,665.02 Belair Rd.1/20/2000 Extended by 3 year increments 21,163.35 Georgetown Tank 1/20/2000 Extended by 3 year increments 16,529.65 Berckman Rd.1/20/2000 Extended by 3 year increments 16,529.65 Wallie Drive Tank 9/20/2002 Extended by 3 year increments 7,266.93 Golden Camp Tank 9/20/2002 Extended by 3 year increments 6,648.41 Lumpkin Road 9/20/2002 Extended by 3 year increments 11,014.97 Richmond Hill Tank 9/20/2002 Extended by 3 year increments 7,183.14 Old Waynesboro Rd. 2/16/2006 Extended by 3 year increments 14,216.30 Brown Rd/Pine Hill Tank 2/16/2006 Extended by 3 year increments 34,558.74 185,596.52 With regard to termination of the contracts: "The Owner shall have the right to continue this contract for an indefinite period of time providing the annual fee is paid in accordance with the terms of payment. A base fee of ($ noted on each contract) has been established for this tank. In year (first year of contract) and each third year thereafter, the annual fee will be adjusted to reflect the current cost of service. The adjustments, either up or down shall be "This contract is subject to cancellation by the Owner only if intent to cancel is received by Company ninety (90) days prior to the anniversary date. Notice of Cancellation to be delivered by registered mail, and signed by three (3) authorized voting officias of the owner's management and/or Commissioners." Attachment number 1 \nPage 1 of 2 Item # 13 Attachment number 1 \nPage 2 of 2 Item # 13 Attachment number 2 \nPage 1 of 56 Item # 13 Attachment number 2 \nPage 2 of 56 Item # 13 Attachment number 2 \nPage 3 of 56 Item # 13 Attachment number 2 \nPage 4 of 56 Item # 13 Attachment number 2 \nPage 5 of 56 Item # 13 Attachment number 2 \nPage 6 of 56 Item # 13 Attachment number 2 \nPage 7 of 56 Item # 13 Attachment number 2 \nPage 8 of 56 Item # 13 Attachment number 2 \nPage 9 of 56 Item # 13 Attachment number 2 \nPage 10 of 56 Item # 13 Attachment number 2 \nPage 11 of 56 Item # 13 Attachment number 2 \nPage 12 of 56 Item # 13 Attachment number 2 \nPage 13 of 56 Item # 13 Attachment number 2 \nPage 14 of 56 Item # 13 Attachment number 2 \nPage 15 of 56 Item # 13 Attachment number 2 \nPage 16 of 56 Item # 13 Attachment number 2 \nPage 17 of 56 Item # 13 Attachment number 2 \nPage 18 of 56 Item # 13 Attachment number 2 \nPage 19 of 56 Item # 13 Attachment number 2 \nPage 20 of 56 Item # 13 Attachment number 2 \nPage 21 of 56 Item # 13 Attachment number 2 \nPage 22 of 56 Item # 13 Attachment number 2 \nPage 23 of 56 Item # 13 Attachment number 2 \nPage 24 of 56 Item # 13 Attachment number 2 \nPage 25 of 56 Item # 13 Attachment number 2 \nPage 26 of 56 Item # 13 Attachment number 2 \nPage 27 of 56 Item # 13 Attachment number 2 \nPage 28 of 56 Item # 13 Attachment number 2 \nPage 29 of 56 Item # 13 Attachment number 2 \nPage 30 of 56 Item # 13 Attachment number 2 \nPage 31 of 56 Item # 13 Attachment number 2 \nPage 32 of 56 Item # 13 Attachment number 2 \nPage 33 of 56 Item # 13 Attachment number 2 \nPage 34 of 56 Item # 13 Attachment number 2 \nPage 35 of 56 Item # 13 Attachment number 2 \nPage 36 of 56 Item # 13 Attachment number 2 \nPage 37 of 56 Item # 13 Attachment number 2 \nPage 38 of 56 Item # 13 Attachment number 2 \nPage 39 of 56 Item # 13 Attachment number 2 \nPage 40 of 56 Item # 13 Attachment number 2 \nPage 41 of 56 Item # 13 Attachment number 2 \nPage 42 of 56 Item # 13 Attachment number 2 \nPage 43 of 56 Item # 13 Attachment number 2 \nPage 44 of 56 Item # 13 Attachment number 2 \nPage 45 of 56 Item # 13 Attachment number 2 \nPage 46 of 56 Item # 13 Attachment number 2 \nPage 47 of 56 Item # 13 Attachment number 2 \nPage 48 of 56 Item # 13 Attachment number 2 \nPage 49 of 56 Item # 13 Attachment number 2 \nPage 50 of 56 Item # 13 Attachment number 2 \nPage 51 of 56 Item # 13 Attachment number 2 \nPage 52 of 56 Item # 13 Attachment number 2 \nPage 53 of 56 Item # 13 Attachment number 2 \nPage 54 of 56 Item # 13 Attachment number 2 \nPage 55 of 56 Item # 13 Attachment number 2 \nPage 56 of 56 Item # 13 Engineering Services Committee Meeting 12/10/2012 2:00 PM On-Call Concrete – (Contract/Funding Extension) Department:Abie L. Ladson, PE, CPESC, Director Caption:Approve a two year extension and $1,500,000 to continue the funding for the current On-Call Concrete and Emergency Services Contract for on-call concrete repair, concrete construction & emergency repairs with Horizon Construction, Larry McCord LLC, and SITEC LLC., as requested by AED. Funding is available in the Grading & Drainage, Suburban Forces and Resurfacing Phase VI accounts as requested by AED. Background:Due to the increase in maintenance and emergency repairs to aging infrastructures and sidewalks within the county, AED has determined that supplementing engineering maintenance resources with the existing contract will be a practical approach to sustain much needed repairs, it will also allow AED to complete critical repairs in a timely manner to minimize public safety risks, damaged property and any associated potential hazard liabilities. Analysis:On February 7, 2012, the Augusta Commission approved the On- Call Concrete Repair, Concrete Construction & Emergency Repair Contract to Horizon Construction, Larry McCord LLC, and SITEC LLC. Additional funds allocation to this contract is needed to help improve the current level of services. Also, in the initial proposal it is stated that the contract can be extended for an additional two years. Financial Impact:Funds are available in the amount of $700,000 Grading & Drainage, (328-041110-211828001), $300,000 Suburban Forces (328-041110-211828007) and $500,000 Resurfacing (328- 041110-211828011) to be transferred to the On-Call Concrete Construction Services Contract upon Commission approval. Alternatives:1) Approve a two year extension and $1,500,000 to continue the funding for the current On-Call Concrete and Emergency Services Contract for on-call concrete repair, concrete construction & emergency repairs with Horizon Construction, Larry McCord LLC, and SITEC LLC., as requested by AED. Funding is available in the Grading & Drainage, Suburban Forces and Cover Memo Item # 14 Resurfacing Phase VI accounts as requested by AED. 2)Do not approve requested fund allocation and accept extended delay in completion maintenance work and increase liability risk. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: Phase VI Grading & Drainage, Suburban Forces and Resurfacing REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 14 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project change is authorized to CPB#N/A. This request is to approve $1,500,000 and a two-year extension to continue to fund the current contract services that include available in the Grading & Drainage ($700,000), $300,000 Suburban Forces and Resurfacing contracts ($500,000) Phase VI accounts respectively. Contract services to Horizon Construction, Larry McCord, LLC and Sitec, LLC. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Grading and Drainage 1,650,000$ Sidewalks-Rehab-Replacement 350,000$ Suburban Forces-Resurfacing 450,000$ Resurfacing Contracts 500,000$ 2,950,000$ Section 3: The following amounts are appropriated for the project: By Basin By District Varies Varies Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor CAPITAL PROJECT BUDGET CPB#N/A On-Call Concrete Repair, Concrete Construction, and Emergency Repair (Bid 11-159) emergency concrete construction, concrete repair, andemergency repair services. Funding is Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1.13.2012 Attachment number 1 \nPage 1 of 3 Item # 14 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#N/A On-Call Concrete Repair, Concrete Construction, and Emergency Repair (Bid 11-159) 1.13.2012 Attachment number 1 \nPage 2 of 3 Item # 14 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#N/A On-Call Concrete Repair, Concrete Construction, and Emergency Repair (Bid 11-159) CPB AMOUNT CHANGE CPB AMOUNT SOURCE OF FUNDS CPB GRADING & DRAINAGE PHASE VI $950,000 $700,000 $1,650,000 SUBURBAN FORCES RESURFACING PHASE VI $150,000 $300,000 $450,000 SIDEWALKS-REHAB-REPLACEMENT $350,000 $350,000 RESURFACING CONTRACTS $500,000 $500,000 $500,000 TOTAL SOURCES: $1,950,000 $1,500,000 $2,950,000 USE OF FUNDS CONTINGENCY PHASE VI $1,450,000 $1,500,000 $2,950,000 TOTAL USES: $1,450,000 $1,500,000 $2,950,000 1.13.2012 Attachment number 1 \nPage 3 of 3 Item # 14 Request for Proposal Request for Proposals will be received at this office until Friday, December 2, 2011 @ 11:00 a.m. for furnishing: RFP Item #11-159 On-Call Concrete Repair, Concrete Construction & Emergency Repair for Engineering Department RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Monday, November 14, 2011 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Bidders are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle October 20, 27, November 3, 10, 2011 Metro Courier October 27, 2011 cc: Tameka Allen Deputy Administrator Abie Ladson Engineering Department Hameed Malik Engineering Department Revised: 8/15/2011 Attachment number 2 \nPage 1 of 1 Item # 14 VENDORS Attachment B E-Verify # Addendum Original 7 Copies Fee Proposal Horizon Construction Po Box 798 Evans, GA 30809 Yes HHEN4748 Yes Yes Yes Yes Larry L Mccord LLC Design/Build 2016 Highland Avenue Augusta, GA 30904 Yes LMCC8957 Yes Yes Yes Yes Mabus Bros. Construction 920 Molly Pond Road Augusta, GA 30901 Yes 91818 Yes Yes Yes Yes Sitec LLC 217 Fairfield Street Aiken, SC 29801 Yes 212379 Yes Yes Yes Yes Contract Management Inc 1827 Killingsworth Road Augusta, GA 30904 Continental Construction 4190 Crosstown Court Evans, GA 30809 Ammar Construction P O Box 1877 Evans, GA 30809 Beam’s Contracting 2335 Atomic Road Beech Island, SC 29842 Blair Construction P.O. Box 770 Evans, GA 30809 C & H Paving, Inc. 167 Knox Rivers Road Thomson, GA 30824 Harris Construction 1736 Barton Chapel Road Augusta, GA 30909 International Construction 4205 Hard Scrabble Road Columbia, SC 29223 J&B Construction & Srvc Inc 3550 Gordon Highway Grovetown, GA 30813 JBC Construction 118 N Belair Road Suite 1 Evans, GA 30809 LJ Inc 220 Stoneridge Drive Suite 405 Columbia, SC 29210 RFP Item #11-159 On-Call Concrete Repair, Concrete Construction & Emergency Repair for Augusta, Georgia - Engineering Department RFP Due: Friday, December 2, 2011 @ 11:00 a.m. Submitted No Bid Response Non-Compliant Attachment B is not Properly Notorized Did not acknowledge Addendum Page 1 of 2 Attachment number 3 \nPage 1 of 2 Item # 14 VENDORS Attachment B E-Verify # Addendum Original 7 Copies Fee Proposal RFP Item #11-159 On-Call Concrete Repair, Concrete Construction & Emergency Repair for Augusta, Georgia - Engineering Department RFP Due: Friday, December 2, 2011 @ 11:00 a.m. Palmetto Site/Traksouth 1190 Interstate Parkway Augusta, GA 30919 Reeves Construction P.O. Box 1129 Augusta, GA 30903 Sikes Brothers, Inc 150 Aline Avenue Metter, GA 30439 T. B. Bulldozing, Inc 1579 Edgefield Highway Aiken, SC 29801 Page 2 of 2 Attachment number 3 \nPage 2 of 2 Item # 14 Evaluation Criteria PTS Horizon Construction Po Box 798 Evans, GA 30809 Larry L Mccord LLC Design/Build 2016 Highland Avenue Augusta, GA 30904 Mabus Bros. Construction 920 Molly Pond Road Augusta, GA 30901 Sitec LLC 217 Fairfield Street Aiken, SC 29801 1) Qualifications of company (company profile).15.0 13.0 12.3 13.3 12.7 2) Qualifications and experience of key professionals that will be assigned to the projects. 15.0 11.3 12.0 12.0 13.0 3) Specific relevant experience of your company.15.0 13.3 10.0 12.3 14.3 4) A detailed description of prior type services rendered 30.0 25.3 19.3 16.7 24.7 5) References (include specific individuals with addresses and telephone numbers). 10.0 8.3 5.0 6.7 8.3 6) Proposal fees - Lowest - 10 - Second Lowest - 8 - Third Lowest - 6 - fourth - 4 - fifth - 2 10.0 10.0 8.0 4.0 6.0 7) Proximity to Augusta (5 points) - Within Augusta-Richmond County - 5 - Within the CSRA - 4 - Within Georgia - 3 - Within SE United States (includes AL, TN, NC, FL) - 2 - All Others - 1 5.0 4.0 5.0 5.0 4.0 Total 100.0 85.3 71.7 70.0 83.0 Cumulative Evaluation Sheet RFP Item #11-159 On-Call Concrete Repair, Concrete Construction & Emergency Repair Augusta, Georgia - Engineering Department Attachment number 4 \nPage 1 of 1 Item # 14 Attachment number 5 \nPage 1 of 2 Item # 14 Attachment number 5 \nPage 2 of 2 Item # 14 Attachment number 6 \nPage 1 of 3 Item # 14 Attachment number 6 \nPage 2 of 3 Item # 14 Attachment number 6 \nPage 3 of 3 Item # 14 Attachment number 7 \nPage 1 of 3 Item # 14 Attachment number 7 \nPage 2 of 3 Item # 14 Attachment number 7 \nPage 3 of 3 Item # 14 Engineering Services Committee Meeting 12/10/2012 2:00 PM On-Call Construction Management Contract Extension Department:Abie L. Ladson, PE, CPESC, Director Caption:Approve a one year extension for On-Call Construction Management, Construction Inspection, and Field Engineering Services Agreement with EMC Engineering, Moreland Altobelli, and LPA Group., as requested by AED. Also, approve CPB Change Number Five in the amount of $300,000 to continue to fund the On-Call Construction Services. Funding is available in SPLOST Ph VI in the On Call Emergency Construction Services account. Background:Due to thecontinuing increase in maintenance and emergency repairs to aging infrastructures and sidewalks within the county and the number of SPLOST projects scheduled for construction letting in 2013, AED has determined to continue supplementing engineering construction management resources with an on-call contract that includes Construction Management & Field Engineering Services is a practical approach to sustain much needed construction quality assurance & quality control (QA/QC) during the critical repairs of aging infrastructure and major road & drainage projects. Construction QA/QC is essential to construction of good roads and stormwater infrastructure Analysis:Proposals were evaluated on Augusta 12, 2009 with EMC Engineering, Moreland Altobelli, and The LPA Group being the selected firms. In the initial proposal for Professional Services it is stated that the Agreement can be extended for an additional year. Financial Impact:Funding is available in the amount of $300,000.00 in SPLOST Ph VI On Call Emergency Construction Services 328-041110- 211828005 account upon Commission approval Alternatives:1) Approve a one year extension for On-Call Construction Management, Construction Inspection, and Field Engineering Services Agreement with EMC Engineering, Moreland Altobelli, and LPA Group., as requested by AED. Also, approve CPB Change Number Five in the amount of $300,000 to continue to fund the On-Call Construction Services. Funding is available in Cover Memo Item # 15 SPLOST Ph VI in the On Call Emergency Construction Services account. 2) Do not approve bid award and find alternative way to provide required Construction Management, Inspection, and Field Engineering Services. Recommendation:Approve Alternative Number One Funds are Available in the Following Accounts: 328-041110-211828005 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 15 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB# 328-041110-211828005 for Change Number Five for one year extension for On-Call Construction Management, Construction Inspection and and Field Engineering Services Agreement with EMC Engineering, Moreland Altobelli, and LPA Group., Funding in the amount of $300,0000 is available SPLOST Phase VI On Call Emergency Construction Services. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Resurfacing 56,920$ SPLOST Phase IV Fund Account Balance 170,400$ SPLOST Phase VI 300,000$ 527,320$ Section 3: The following amounts are appropriated for the project: By Basin By District Varies $527,320 Varies 527,320$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Mayor, Deke Copenhaver CAPITAL PROJECT BUDGET ON-CALL CONSTRUCTION SERVICES CPB#328-041110-211828005 CHANGE NUMBER FIVE as requested by AED. Also approve $300,000 to continue to fund the On-Call Construction Services Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1.4.11 Attachment number 1 \nPage 1 of 2 Item # 15 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET ON-CALL CONSTRUCTION SERVICES CPB#328-041110-211828005 CHANGE NUMBER FIVE CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB RESURFACING 324-04-1110-5411120-201824044 ($66,920)($66,920) SPLOST PHASE IV FUND ACCOUNT 000-00-0000-0000000-000000000 ($170,400)($170,400) SPLOST PHASE VI 328-041110-211828005 ($300,000) ($300,000) TOTAL SOURCES: ($237,320) ($300,000) ($537,320) USE OF FUNDS PROFESSIONAL SERVICES 328-041110-5212119-211828005 $237,320 $300,000 $537,320 TOTAL USES: $237,320 $300,000 $537,320 1.4.11 Attachment number 1 \nPage 2 of 2 Item # 15 Engineering Services Committee Meeting 12/10/2012 2:00 PM Option for Right-of-Way Department:Law Caption:Motion to approve an Option for the purposes of acquiring a Right-of-Way between Wayne J. Guilfoyle and Anita Guilfoyle, as owner(s), and Augusta, Georgia, as optionee, in connection with the Windsor Spring Road Phase V Project (STP00-1105-00 (004)), (N/A sq. ft.) in fee and (0.003 sq. ft.) of permanent construction and maintenance easement and one temporary driveway easement from the property located at 4940 Windsor Spring Rd., Hephzibah, GA 30815, private, at the purchase price of $500.00. Background:The property owner has agreed to convey a certain option for easement to Augusta, Georgia, for the the Windsor Spring Road Phase V Road Improvement Project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the Motion Recommendation:Approve the Motion Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Cover Memo Item # 16 Administrator. Clerk of Commission Cover Memo Item # 16 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 4 It e m # 1 6 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 4 It e m # 1 6 At t a c h m e n t n u m b e r 1 \ n P a g e 3 o f 4 It e m # 1 6 At t a c h m e n t n u m b e r 1 \ n P a g e 4 o f 4 It e m # 1 6 Engineering Services Committee Meeting 12/10/2012 2:00 PM Rajesh Kumar Department:Clerk of Commission Caption:Presentation by Mr. Rajesh Kumar regarding a severe drainage/flooding issue in the area of Summerchase Circle. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 17 Attachment number 1 \nPage 1 of 1 Item # 17 Engineering Services Committee Meeting 12/10/2012 2:00 PM Roundabout Evaluation and Design Services Project - Contract Award Department:Abie L. Ladson, PE, CPESC, Director Caption:Award Design Consultant Services Agreement to Kimley-Horne and Associates in the amount of $290,685 for the initial phases of the Roundabout Evaluation and Design Services Project to be funded from for the Capital Project Budget/SPLOST Phase VI as requested by AED. Background:Over the last decade in the United States, roundabouts have become more and more common as being the preferred intersection control option. This is due to the fact that roundabouts have demonstrated substantial safety and operational benefits compared to other forms of intersection control, with reductions in serious crashes from 60-87 percent. The benefits apply to roundabouts in urbanand rural areas and freeway interchange ramp terminals under a wide range of traffic conditions. Roundabouts can be an effective tool for managing speed and transitioning traffic form a high speed to a low speed environment and their aesthetic benefits have been shown to create a “gateway’ feel to an area. In fact many state DOT’s, including Georgia now require that a roundabout analysis be performed at all intersections prior to their being considered for signalization. In SPLOST VI, Augusta created an Intersection Operational and Safety Initiative project to look at several existing intersections that are either all- way stop controlled or signalized in order to provide alternatives analyses to determine if a roundabout or other type of type treatment could achieve operational or safety improvements. The initial phases of this project will be to perform studies at each intersection to develop the alternative analysis, to develop concepts and models for each intersection, and perform public outreach in the form of public meetings, informational materials, and websites. Subsequent phases of the project will include design services at up to three intersections to implement the preferred improvement. In June 2012 a Request for Qualifications was released for qualified firms to provide these services. Analysis:The following firms were evaluated based on qualifications, project approach, experience, and interviews in September 2012. The following firms submitted RFQs and were evaluated: 1.URS Cover Memo Item # 18 Corporation 2.Kimley-Horn and Associates 3.Moreland-Altobelli Associates 4. Arcadis 5. Parsons Brinckerhoff 6. Moore and Associates Kimley-Horn and Associates was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in SPLOST Phase VI account number 328- 041110- 5212115/212828014-5212115. Alternatives:1). Award Design Consultant Services Agreement to Kimley- Horne and Associates in the amount of $290,685 for the initial phases of the Roundabout Evaluation and Design Services Project to be funded from for the Capital Project Budget/SPLOST Phase VI as requested by AED. 2) Do not approve Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 328-041110-5212115/212828014- REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 18 Attachment number 1 \nPage 1 of 8 Item # 18 Attachment number 1 \nPage 2 of 8 Item # 18 Attachment number 1 \nPage 3 of 8 Item # 18 Attachment number 1 \nPage 4 of 8 Item # 18 Attachment number 1 \nPage 5 of 8 Item # 18 Attachment number 1 \nPage 6 of 8 Item # 18 Attachment number 1 \nPage 7 of 8 Item # 18 Attachment number 1 \nPage 8 of 8 Item # 18 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project change is authorized to CPB# 328-041110-212828014 to award design services in the amount of $290,685.00 to Kimley-Horne for the initial phases of the Roundabout Evaluation and Design Services project to be funded from SPLOST Ph VI. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase VI 300,000$ 300,000$ Section 3: The following amounts are appropriated for the project: By Basin By District 300,000$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Please Do Not process this document. Once approved by Commission, original will be forwarded for execution. For additional information call ext 5070. Thanks Deke Copenhaven, Mayor CAPITAL PROJECT BUDGET INTERSECTION SAFETY ROUNDABOUT CPB#328-041110-212828014 7.12.2012 Attachment number 2 \nPage 1 of 2 Item # 18 Augusta-Richmond County, Georgia Please Do Not process this document. Once approved by Commission, original will be forwarded for execution. For additional information call ext 5070. Thanks CAPITAL PROJECT BUDGET INTERSECTION SAFETY ROUNDABOUT CPB#328-041110-212828014 CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPECIAL 1% SALES TAX, PHASE VI 328-04-1110-6011110-212828012 ($300,000)($300,000) TOTAL SOURCES: ($300,000)($300,000) USE OF FUNDS ENGINEERING 328-041110-5212115-212828012 $300,000 $300,000 TOTAL USES: $300,000 $300,000 7.12.2012 Attachment number 2 \nPage 2 of 2 Item # 18 Request for Qualifications Request for Qualifications will be received at this office until Friday, July 20, 2012 @ 11:00 a.m. for furnishing: RFQ Item #12-170 Roundabout Evaluation & Design Services for Augusta Engineering Department RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFQ documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFQ documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Monday, July 9, 2012 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFQ number on the outside of the envelope. Bidders are cautioned that acquisition of RFQ documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle June 14, 21, 28, July 5, 2012 Metro Courier June 20, 2012 cc: Tameka Allen Deputy Administrator Abie Ladson Engineering Department Hameed Malik Engineering Department Steve Cassell Engineering Department Revised: 8/15/2011 Attachment number 3 \nPage 1 of 1 Item # 18 Evaluation Criteria PTS URS Corporation 1000 Abernathy Rd, NE Suite 900 Atlanta, GA 30328 Arcadis 2410 Paces Ferry Road, Suite 400 Atlanta, GA 30339 Kimley-Horn and Associates 817 West Peachtree Street NW Atlanta, GA 30308 Parsons Brinckerhoff 2202 N West Shore Blvd., Suite 300 Tampa, FL 33607 Moreland Altobelli Associates 2211 Beaver Ruin Rd., Suite 190 Norcross, GA 30071 Moore and Associates 1009 East Avenue North Augusta, SC 29841 1) Qualifications of Company 15 12.7 14.3 12.3 13.3 12.7 6.0 2) Qualifications of Key Personnel that will actually perform the design services. 35 28.3 31.0 28.7 27.7 23.7 13.3 3) Experience on similar projects.35 28.7 30.0 29.7 25.3 25.0 13.3 4) References including specific individuals, address, phone number, and e-mail address. 10 8.3 9.3 9.0 8.3 8.3 6.7 5) Proximity to Area 5 3.0 3.0 3.0 3.0 3.0 4.0 Phase 1 - Total 100 81.0 87.7 82.7 77.7 72.7 43.3 2 3 1 Cumulative Evaluation Sheet - Phase 2 RFQ Item #12-170 Roundabout Evaluation & Design Services for Augusta, Georgia – Engineering Department Phase 2 - Presentation (Number 1 recommendation receiving a 1) Attachment number 4 \nPage 1 of 1 Item # 18 Attachment number 5 \nPage 1 of 1 Item # 18 Attachment number 6 \nPage 1 of 4 Item # 18 Attachment number 6 \nPage 2 of 4 Item # 18 Attachment number 6 \nPage 3 of 4 Item # 18 Attachment number 6 \nPage 4 of 4 Item # 18 Attachment number 7 \nPage 1 of 4 Item # 18 Attachment number 7 \nPage 2 of 4 Item # 18 Attachment number 7 \nPage 3 of 4 Item # 18 Attachment number 7 \nPage 4 of 4 Item # 18 VENDORS Attachment B E-Verify Original 6 Copies URS Corporation 1000 Abernathy Rd, NE Suite 900 Atlanta, GA 30328 Yes 66814 Yes Yes Arcadis 2410 Paces Ferry Road, Suite 400 Atlanta, GA 30339 Yes 39845 Yes Yes Kimley-Horn and Associates 817 West Peachtree Street NW Atlanta, GA 30308 Yes 412062 Yes Yes Zell Engineers 435 Telfair Street Augusta, GA 30901 Cranston Engineering 452 Ellis Street Augusta, GA 30901 Parsons Brinckerhoff 2202 N West Shore Blvd., Suite 300 Tampa, FL 33607 Yes 203121 Yes Yes Moreland Altobelli Associates 2211 Beaver Ruin Rd., Suite 190 Norcross, GA 30071 Yes 53328 Yes Yes Moore and Associates 1009 East Avenue North Augusta, SC 29841 Yes 230493 Yes Yes W R Toole Engineers 1005 Broad Street Augusta, GA 30901 RFQ Opening RFQ Item #12-170 Roundabout Evaluation & Design Services for Augusta, Georgia - Engineering Department RFQ Due: Friday, July 20, 2012 @ 11:00 a.m. Page 1 of 1 Attachment number 8 \nPage 1 of 1 Item # 18 Engineering Services Committee Meeting 12/10/2012 2:00 PM Staff Augmentation & Professional Services Extension (SA7) Department: Caption:Authorize AED to extend Supplemental Agreement #7 with Jacobs Engineering Group Inc. to continue providing project management support via staff augmentation in the amount not to exceed $350,000 which will be funded from SPLOST Contingency funds. Background:Augusta-Richmond County is responsible for Preliminary Engineering activities on several Georgia Department of Transportation (GDOT) projects including Windsor Spring Road Phase IV & Phase V, Wrightsboro Road, and improvements to Riverwatch Parkway. These projects are in various stages of development and require knowledgeable, efficient and effective interaction and coordination with GDOT, the respective Design Consultants and work units within Augusta-Richmond County. Analysis:On June 7, 2005 the Commission approved the initial agreement with Jacobs Engineering Group Inc. for David Griffith to provide staff support as Project Manager. This agreement has proven to be very effective and beneficial to AED. David’s knowledge of the GDOT processes and understanding of how to request assistance on projects has resulted in saving AED millions of dollars. He has also been successful in finding and securing funds for projects after the original funds for these projects had been reallocated to other projects. In November 2011 GDOT advised AED that it is our responsibility to take over the coordination of relocation of utilities on the Windsor Spring Road Phase IV and Phase V projects which David is managing. It is the desire of AED to extend this agreement. Financial Impact:Funding for Supplemental Agreement Number Seven will come from the SPLOST contingency funds ($87,500) in respective to projects Windsor Spring Road, Section IV, Windsor Spring Road, Section V, Wrightsboro Road and Riverwatch Parkway not to exceed $350,000 transferred to the current contract with Jacobs Engineering Group Cover Memo Item # 19 Alternatives:1) Authorize AED to extend Supplemental Agreement #7 with Jacobs Engineering Group Inc. to continue providing project management support via staff augmentation in the amount not to exceed $350,000 which will be funded from SPLOST Contingency funds. 2) Deny and acknowledge that ARC managed GDOT projects may jeopardize funding opportunities and experience delays. Recommendation:Approve Alternative 1 Funds are Available in the Following Accounts: SPLOST Contingency funds REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 19 (SA02 – For changes greater than $20,000) April 2005 AUGUSTA-RICHMOND COUNTY AUGUSTA, GA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, Jacobs Engineering Group Inc., Consultant, entered into a contract with Augusta-Richmond County on June 7, 2005, to provide Project Management support associated with the “Temporary Professional Services Support”, File Reference No. 12-005 (F), and WHEREAS, changes are incorporated into the original contract to provide clarity and project management guidance: 1) The Consultant will provide a Project Manager to assist Augusta Engineering Department (AED). 2) The Consultant’s Project Manger will assist in managing the Georgia Department of Transportation (GDOT) federal aid projects that are currently in the Work Program for which AED has preliminary engineering responsibility. The priority projects are Wrightsboro Road and Windsor Spring Road. 3) The Consultant’s Project Manager will provide training to AED’s Engineering Manager or designee to manage transportation projects that are fully or partially funded by GDOT and/or FHA. The Consultant’s Project Manager and the AED designee shall work as a team. 4) The Consultant’s Project Manager will coordinate all activities requiring AED’s decisions or funds with AED’s Assistant Director of Engineering. 5) The Consultant’s Project Manager will have bi-weekly progress meetings with AED’s designated staff to discuss project progress, scheduling, coordination status and any key item effecting progress of the projects. WHEREAS, management support services are requested by Augusta, George for a period that is not covered by the scope of the original contract and associated supplemental agreements, we desire to submit the Supplemental Agreement #7 to-wit: It is agreed that as a result of the above described modification the contract amount is increased by $350,000 from $1,287,600 to a new total of $1,637,600. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Jacobs Engineering Group Inc., Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This day of , 2012 RECOMMEND FOR APPROVAL: CITY OF AUGUSTA, GEORGIA JACOBS ENGINEERING GROUP INC Mayor Deke S. Copenhaver Approved: Date Approved: Date: [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Augusta Richmond County Project Number(s): N/A Supplemental Agreement Number: 7 Purchase Order Number: P113792 Professional advice and consulting services regarding project management support via staff augmentation. Attachment number 1 \nPage 1 of 1 Item # 19 Attachment number 2 \nPage 1 of 10 Item # 19 Attachment number 2 \nPage 2 of 10 Item # 19 Attachment number 2 \nPage 3 of 10 Item # 19 Attachment number 2 \nPage 4 of 10 Item # 19 Attachment number 2 \nPage 5 of 10 Item # 19 Attachment number 2 \nPage 6 of 10 Item # 19 Attachment number 2 \nPage 7 of 10 Item # 19 Attachment number 2 \nPage 8 of 10 Item # 19 Attachment number 2 \nPage 9 of 10 Item # 19 Attachment number 2 \nPage 10 of 10 Item # 19