HomeMy WebLinkAbout2012-07-30-Meeting Agenda
Engineering Services Committee
Meeting
Commission Chamber- 7/30/2012- 1:00 PM
ENGINEERING SERVICES
1. Award Design Consultant Services Agreement to Cranston
Engineering Group, Inc. in the amount of $207,540.00 for 15th
Street Bridge over The Augusta Canal, and Broad Street On-
Ramp over Lake Olmstead. This Project will be funded through
SPLOST PHASE VI for the Engineering Department.
Attachments
2. Motion to approve the 2013 Solid Waste Collections Contracts
with Advanced Disposal Services and Inland Services
Corporation. (Referred from July 17 Commission meeting)
Attachments
3. Approve the deeds of dedication, maintenance agreements and
road resolution submitted by the Engineering and Augusta
Utilities Departments for Breckenridge Subdivision, Section
Four, Phase 2.
Attachments
4. Receive as information an update on Environmental Services
fees for 2012.
Attachments
5. Discuss the Augusta, Georgia Municipal Building Renovations
and Modernization Project.
Attachments
6. Presentation by Kelvin and Julie Deaton regarding the ongoing
flooding of their home at 1722 Wrightsboro Road.
Attachments
7. Motion to approve the minutes of the Engineering Services
Committee held on June 11, 2012.
Attachments
8. Approve $1,000,000 to fund the current On-Call Concrete and
Emergency Services Contract. Funding is available in the
Grading & Drainage and Sidewalk Rehab/Replacement Phase
VI accounts respectively as requested by AED.
Attachments
www.augustaga.gov
9. Motion to approve an Option for the purposes of acquiring an
easement between Marcus A. Reid & Katrina Reid, as owner
(s), and Augusta, Georgia, as optionee, in connection with the
East Augusta Roadway Drainage Improvement Project, said
perpetual easement consists of 0.42 acre (18,106.25 sq. ft.)
permanent drainage, utility and maintenance easement and
(7,710.38 sq. ft.) of temporary construction easement from the
property located at 544 Laney Walker Blvd. Ext., private, at the
purchase price of $4,913.00.
Attachments
10. Motion to approve an Option for the purposes of acquiring an
easement between Marcus A. Reid & Katrina Reid, as owner
(s), and Augusta, Georgia, as optionee, in connection with the
East Augusta Roadway Drainage Improvement Project, said
perpetual easement consists of 0.80 acre (34,780.33 sq. ft.)
permanent drainage, utility and maintenance easement and
(3,825.53 sq. ft.) of temporary construction easement from the
property located at 540 Laney Walker Blvd. Ext., private, at the
purchase price of $8,886.00.
Attachments
11. Motion to approve the placement of a monument
commemorating the life and achievements of Montgomery
Meigs, quartermaster general for the US Army during the Civil
War.
Attachments
12. Approve the deeds of dedication, maintenance agreements, and
road resolution submitted by the Engineering and Augusta
Utilities Departments for Willhaven Subdivision, Phase III,
Section I.
Attachments
13. Approve and authorize the Engineering Department (AED) to
purchase up to 9,800 stream mitigation credits at a total cost of
$563,500 ($57.50 per mitigation credit) from the Bath Branch
Augusta, LLC (Bath Branch Mitigation Bank) and up to 14
wetland mitigation credits at a total cost of $210,000 ($15,000
per credit) from the Mitigation Management, LLC, (Brushy
Creek Mitigation Bank) to mitigate stream & wetlands impacts
as determined necessary by the US Army Corps of Engineers
and Georgia Environmental Protection Division in regards to
the Wrightsboro Rd. from Jimmie Dyess Pkwy. to I-520
Improvements Project, CPB #323-041110-296823309. Funding
is available through Engineering SPLOST III Fund Recapture.
Attachments
Engineering Services Committee Meeting
7/30/2012 1:00 PM
15th Street Bridge over the Augusta Canal, and Broad Street On-Ramp overLake Olmstead (Bid
Item#11-134)
Department:Abie L. Ladson, PE, CPESC, Director
Caption:Award Design Consultant Services Agreement to Cranston
Engineering Group, Inc. in the amount of $207,540.00 for 15th
Street Bridge over The Augusta Canal, and Broad Street On-Ramp
over Lake Olmstead. This Project will be funded through SPLOST
PHASE VI for the Engineering Department.
Background:The 15th Street Bridge over The Augusta Canal, and Broad Street
On-Ramp over Lake Olmstead structures are in need of major
repair and maintenance. It requires painting, sidewalk repairs,
expansion joint repairs, lighting repairs, sub-structure and super-
structure repairs, barrier repairs, and restoring the historical
significance and aesthetics of the structure. Services will consist
of bridge studies/reports, preliminary and final construction plans,
construction contract documents, construction cost and schedules,
life cycle cost analyses, field surveys, and construction
observations.
Analysis:On July 12, 2011, the following firms submitted RFPs and were
evaluated based on qualifications, project approach, experience,
and schedule: 1. Civil Services, Inc. 2. Cranston Engineering 3.
Moreland Altobelli Associates, Inc. 4. R S & H 5. T.Y. Lin
International Once the RFPs were evaluated, the three highest
scored firms were scheduled for interviews on Augusta 22, 2011.
Cranston Engineering Group, Inc. was selected based on the
evaluation procedures used for this project.
Financial Impact:Funds are available in SPLOST PHASE VI account number 328-
041110-5212115/211828012-5212115 upon Commission
approval.
Alternatives:1) Award Design Consultant Services Agreement to Cranston
Engineering Group, Inc. in the amount of $207,540.00 for 15th
Street Bridge over The Augusta Canal, and Broad Street On-Ramp
over Lake Olmstead. This Project will be funded through SPLOST
PHASE VI for the Engineering Department. 2) Do not approve
Cover Memo
Item # 1
and cancel project.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
328-041110-5212115/211828012-5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 1
Attachment number 1 \nPage 1 of 6
Item # 1
Attachment number 1 \nPage 2 of 6
Item # 1
Attachment number 1 \nPage 3 of 6
Item # 1
Attachment number 1 \nPage 4 of 6
Item # 1
Attachment number 1 \nPage 5 of 6
Item # 1
Attachment number 1 \nPage 6 of 6
Item # 1
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project change is authorized to CPB# 328-041110-211828012 15th St. Bridge
over the Augusta Canal & the Broad Street On-Ramp over Lake Olmstead to award
the Design Consultant Agreement to Cranston Engineering, Group in the amount of
$207,540.00 to be funded from SPLOST PHASE VI.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase VI 207,540$
207,540$
Section 3: The following amounts are appropriated for the project:
By Basin By District
Raes Creek 3rd 207,540$
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
Deke Copenhaver, Mayor
CAPITAL PROJECT BUDGET
BRIDGE REHABILATION & REPAIRS
Bid Item 11-134
CPB#328-041110-211828012
( 15th St Bridge over the Augusta Canal, & Broad St On-Ramp over Lake Olmstead )
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information
reference this request, contact Engineering at ext 5070. Thanks
5.24.2012
Attachment number 2 \nPage 1 of 2
Item # 1
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
BRIDGE REHABILATION & REPAIRS
Bid Item 11-134
CPB#328-041110-211828012
( 15th St Bridge over the Augusta Canal, & Broad St On-Ramp over Lake Olmstead )
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB CHANGE CPB
SPECIAL 1% SALES TAX, PHASE VI
328-041110-6011110-211828012 ($207,540)($207,540)
TOTAL SOURCES: ($207,540)($207,540)
USE OF FUNDS
ENGINEERING
328-041110-5212115-211828012 $207,540 $207,540
TOTAL USES: $207,540 $207,540
5.24.2012
Attachment number 2 \nPage 2 of 2
Item # 1
Attachment number 3 \nPage 1 of 1
Item # 1
Attachment number 4 \nPage 1 of 5
Item # 1
Attachment number 4 \nPage 2 of 5
Item # 1
Attachment number 4 \nPage 3 of 5
Item # 1
Attachment number 4 \nPage 4 of 5
Item # 1
Attachment number 4 \nPage 5 of 5
Item # 1
TVS DESIGN
2700 PROMEANADE TWO
1230 PEACHTREE ST., NE
ATLANTA, GA 30309
ATTN: MARK VIDEKOVICH
BRPH, INC.
2000 POWERS FERRY RD., SUITE 600
MARIETTA, GA 30067
ATTN: MICHAEL A. CLIFFORD
LINDSAY, POPE, BRAYFIELD, CLIFFORD
& ASSOCIATES, INC.
344 WEST PIKE STREET
LAWRENCEVILLE, GA 30046
ATTN: DOUG STRAUGHAN
HUSSEY, GAY, BELL & DEYOUNG INT.
625 GREEN STREET, NE
GAINESVILLE, GA 30501
ATTN: KYLE F. EPSTEIN
WARREN EPSTEIN & ASSOCIATES
1785 CHESIRE BRIDGE RD., NE
ATLANTA, GA 30324
ATTN: SCOTT WILLIAMS
CRANSTON ENGINEERING
OLD ENGINE CO. NO. 1 BLDG
452 ELLIS STREET
AUGUSTA, GA 30901
THE POLOTE CO.
1810 MILL B LANE
SAVANNAH, GA 31405
ATTN: TREY WINGATE
W. K. DICKSON
1450 GREENE ST. SUITE 225
AUGUSTA, GA 30901
T Y LIN INTERNATIONAL
260 PEACHTREE STREET
SUITE 900
ATLANTA, GA 30303
ATTN: TONY JOHNSON
AECOM
1360 PEACHTREE ST NE STE 500
ATLANTA GA 30309
P M & A CONSULTING ENGINEERS
609 BROAD STREET
AUGUSTA, GA 30901
RETURNED MAIL
ATTN: PHILLIP GREENE
SOUTHERN PARTNERS
1233 AUGUSTA WEST PARKWAY
AUGUSTA, GA 30909
ATTN: BOB MUNGER
MUNGER ASSOCIATES CONSULTING
596 LINKS LANE
MARTINEZ, GA 30907
ATTN: TONY AECK
LORD, AECK & SARGENT
1201 PEACHTREE ST, NE STE 300
ATLANTA, GA 30361
PBS & J
5665 NEW NORTHSIDE DR. SUITE 400
ATLANTA, GA 30328
ATTN: RICHARD LASCHOBER
JOHNSON LASCHOBER & ASSOCIATES
1296 BROAD STREET
AUGUSTA, GA 30901
EMC ENGINEERING SERVICES
4106 COLBERN BLVD, SUITE 105
EVANS, GA 30809
WR TOOLE ENGINEERS
1005 BROAD STREET
AUGUSTA, GA 30901
ATTN: TONY PARKER
POND & COMPANY
3500 PARKWAY LANE
SUITE 600
NORCROSS, GA 30092
KRAFRA
418 8TH STREET
AUGUSTA, GA 30901
ATTN: EDWARD LEHMAN
ARCHETYPE DESIGN
4860 LEISURE DRIVE
DUNWOODY, GA 30338
ATTN: JOANNA HENDERSON
STEWART-COOPER-NEWELL
719 E. SECOND AVENUE
GASTONIA, NC 28504
ATTN: JETAYA MCGHEE
ROSSER INTERNATIONAL
524 W PEACHTREE ST. NW
ATLANTA, AG 30308
ATTN: TERESA C. SMITH
A & S ENGINEERING
P. O. BOX 2413
EVANS, GA 30809
ATTN: JOSEPH PORTER, JR
S. L. KING TECHNOLOGIES
270 PEACHTREE ST, NW.
STUITE 1600
ATLANTA, GA 30303
ATTN: JOHN EISENLAU
HO & K
191 PEACHTREE ST. NE
SUITE 4100
ATLANTA, GA 30303
YVONNE GENTRY
500/HATCHER BUILDING
ATTN: SANDIE VANVALKENBURG
ZEL ENGINEERS
435 TELFAIR STREET
AUGUSTA GA 30901
ABIE LADSON
ENGINEERING ADMIN
HAMEED MALIK
ENGINEERING ADMIN
RFQ ITEM #11-134 MAILED 5/27/11
RFP Item #11-134
Design & Field Engineering Services for
Bridge Rehabilitation & Repairs
For Engineering Department
RFP Due: Tue 7/12/11 @ 3:00 p.m.
Attachment number 5 \nPage 1 of 1
Item # 1
VENDORS Attachment B Addendum Original 9 Copies Fee Proposal
Civil Services Inc
2394 St Johns Bluff Rd South
Jacksonville, FL 32246
Yes Yes Yes Yes Yes
Cranston Engineering
Old Engine Co. No. 1 Bldg
452 Ellis Street
Augusta, GA 30901
Yes Yes Yes Yes Yes
Moreland Altobelli Associates, Inc
2211 Beaver Ruin Road, Suite 100
Norcross, GA 30071
Yes Yes Yes Yes Yes
RS&H
730 Peachtree Street, Suite 430
Atlanta, GA 30308
Yes Yes Yes Yes Yes
T Y Lin International
260 Peachtree Street, Suite 900
Atlanta, GA 30303
Yes Yes Yes Yes Yes
Heath & Lineback Engineering Inc
209 Corporate Dr. Suite 300
Carollton, GA 30117
ZEL Engineers
435 Telfair Street
Augusta, GA 30901
A & S Engineering
P. O. Box 2413
Evans, GA 30809
AECOM
1360 Peachtree St Ne Ste 500
Atlanta, GA 30309
Archetype Design
4860 Leisure Drive
Dunwoody, GA 30338
Atkins Global
1600 River Edge Parkway
Atlanta, GA 30328
BRPH, Inc.
2000 Powers Ferry Rd., Suite 600
Marietta, GA 30067
EMC Engineering Services
4106 Colbern Blvd, Suite 105
Evans, GA 30809
Enercon
500 Townpark Lane, Suite 275
Kennesaw, GA 30144
HO & K
191 Peachtree St. NE, Suite 4100
Atlanta, GA 30303
Hussey, Gay, Bell & Deyoung Int.
625 Green Street, Ne
Gainesville, GA 30501
Johnson Laschober & Associates
1296 Broad Street
Augusta, GA 30901
RFP Item #11-134
Design & Field Engineering Services for Bridge Rehabilitation & Repairs
for the City of Augusta - Engineering Department
RFP Due: Tuesday, July 12, 2011 @ 3:00 P.M.
Submitted No Bid Response
Non-Compliant
Missing E-Verify Number
Page 1 of 2
Attachment number 6 \nPage 1 of 2
Item # 1
VENDORS Attachment B Addendum Original 9 Copies Fee Proposal
RFP Item #11-134
Design & Field Engineering Services for Bridge Rehabilitation & Repairs
for the City of Augusta - Engineering Department
RFP Due: Tuesday, July 12, 2011 @ 3:00 P.M.
Krafra
418 8th Street
Augusta, GA 30901
Lindsay, Pope, Brayfield, Clifford &
Associates, Inc.
344 West Pike Street
Lawrenceville, GA 30046
Lord, Aeck & Sargent
1201 Peachtree St, Ne Ste 300
Atlanta, GA 30361
Munger Associates Consulting
596 Links Lane
Martinez, GA 30907
Parsons Brinckerhff
3340 Peach Tree Road NE
Ste 2400 Tower Place 100
Atlanta GA 30326
PBS & J
5665 New Northside Dr. Suite 400
Atlanta, GA 30328
Pond & Company
3500 Parkway Lane, Suite 600
Norcross, GA 30092
Rosser International
524 W Peachtree St. NW
Atlanta, GA 30308
S. L. King Technologies
270 Peachtree St, NW, Suite 1600
Atlanta, GA 30303
Southern Partners
1233 Augusta West Parkway
Augusta, GA 30909
Stewart-Cooper-Newell
719 E. Second Avenue
Gastonia, NC 28504
The Polote Co.
1810 Mill B Lane
Savannah, GA 31405TVS Design
2700 Promeanade Two
1230 Peachtree St., NE
Atlanta, GA 30309W. K. Dickson
1450 Greene St. Suite 225
Augusta, GA 30901
Warren Epstein & Associates
1785 Chesire Bridge Rd., Ne
Atlanta, GA 30324
Wilbur Smith Associates
2835 Brandywine Rd Ste 400
Atlanta GA 30341
WR Toole Engineers
1005 Broad Street
Augusta, GA 30901
Page 2 of 2
Attachment number 6 \nPage 2 of 2
Item # 1
Attachment number 7 \nPage 1 of 1
Item # 1
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Approve the 2013 Solid Waste Collections Contract
Department:Environmental Services
Caption:Motion to approve the 2013 Solid Waste Collections Contracts
with Advanced Disposal Services and Inland Services
Corporation. (Referred from July 17 Commission meeting)
Background:In the early 2000’s Augusta chose to implement mandatory trash
collection service to residents in Augusta. As the years progressed,
and contracts were continued, the service levels changed and the
area that received serviced expanded. We are currently in the final
extension period of the current contract – and that has been
extended on a purely month-to-month basis with our current
service providers. In 2011, Augusta released RFP 11-112 – Solid
Waste and Recyclables Collection Services, to which there were
four (4) compliant respondents.
Analysis:The four compliant respondents were scored and based upon that
scoring; contract negotiations were entered. During those
negotiations, it became apparent that Augusta had two basic
options for service – one company performing collection services
for the entire county, or dividing the service area into two areas
and allow two companies to provide services. At the recent
Commission meetings, it was the will of the body that the service
area be awarded to two companies and one-time-per-week trash
services be offered. In addition, an incentive-based recycling
program was included as well. At this time, and per the body’s
instruction, the Department is providing and requesting approval
of the Solid Waste Collections Contract for 2013. The Contract
provides for very detailed daily service-level data to be provided
electronically by each provider which will allow the Department
to know and verify whether service was provided at a specific
address. In addition, all the trash collection vehicles will operate
on compressed natural gas, and have increased safety devices such
as backup alarms which adjust to be louder than the surrounding
background noise. The Contract also provides for the incentive-
based recycling program (Recycle Perks) as requested by the
Commission; and one-time per week trash collection services with
variable cart sizes, and a comprehensive marketing and
communication campaign to allow the Department to
Cover Memo
Item # 2
communicate and notify our customers of changes to their
services.
Financial Impact:Our budgeted rate for 2012 is $320 per year and we believe that
rate should be appropriate for the new contract starting in 2013.
Alternatives:1. Approve the Contract. 2. Do not approve the Contract.
Recommendation:Alternative 1.
Funds are Available
in the Following
Accounts:
542-04-4110/5222110
REVIEWED AND APPROVED BY:
Cover Memo
Item # 2
REQUEST FOR PROPOSALS
Request for Proposals will be received at this office until Wednesday, April 27, 2011 @ 3:00 p.m. for furnishing:
RFP Item #11-112 Solid Waste & Recyclable Collection Services for Solid Waste Department
RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
RFP documents may be viewed on the Augusta Richmond County web site under the Procurement Department
ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 530
Greene Street – Room 605, Augusta, GA 30901. A Mandatory Pre-Proposal Meeting will be held on Friday,
April 1, 2011 @ 11:00 a.m. in the Procurement Department 530 Greene Street, Room 605. All questions must
be submitted by fax at 706 821-2811 or by email to procbidandcontract@augustaga.gov by Monday,
April 11, 2011 @ 5:00 p.m. No RFP will be accepted by fax, all must be received by mail or hand delivered.
The local bidder preference program is applicable to this project. To be approved as a local bidder and
receive bid preference on an eligible local project, the certification statement as a local bidder and all
supporting documents must be submitted to the Procurement Department with your bonafide bid
package.
No RFP may be withdrawn for a period of 120 days after time has been called on the date of opening.
An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in
accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number
of copies needed, the timing of the submission, the required financial data, and any other requirements
designated by the Procurement Department are considered material conditions of the bid which are not
waiveable or modifiable by the Procurement Director. Please mark RFP number on the outside of the envelope.
Bidders are cautioned that sequestration of RFP documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the
bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Funding for this project may include federal funds provided by the U. S. Department of Transportation (DOT)
and/or other federal agencies. All DOT funded projects are subject to the requirements of 49 CFR Part 26.
These requirements are mandatory and non-negotiable. Augusta enforces Disadvantage Business Enterprise
(DBE) requirements and/or DBE goals set by Federal and/or State Agencies in accordance with State and
Federal laws. Please be advised that the U. S. District Court for the Southern District of Georgia has entered
on Order enjoining the Race-Based portion of Augusta, Georgia’s DBE Program. Thus, Augusta, Georgia
does not have or operate a DBE, MBE or WBE Program for projects (or portions of projects) having Augusta,
Georgia s the source of funding.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle March 10, 17, 24, 31, 2011
Metro Courier March 16, 2011
cc: Tameka Allen Interim Deputy Administrator
Mark Johnson Solid Waste
Lori Videtto Solid Waste
Attachment number 1 \nPage 1 of 1
Item # 2
RFP Item #11-112
Solid Waste Recyclables Collection Services
for the City of Augusta - Solid Waste Department
RFP Due: Thursday, June 23, 2011 @ 3:00 p.m.
VENDORS Attachment B Bidders
Form Bid Bond Addendums
1 - 6 Original 6 Copies Fee Proposal
Advanced Disposal
5734 Columbia Road
Grovetown GA 30813
YES YES YES YES YES YES YES
Inland Service Corp
1561 Doug Barnard Pkwy
Augusta GA 30906
YES YES YES YES YES YES YES
Waste Management
208 Prep Phillips Drive
Augusta GA 30901
YES YES YES YES YES YES YES
Waste Pro
1405 Danielsville Road
Athens GA 30601
YES YES YES YES YES YES YES
Berry Smith Sanitation
1308 New Savannah Road
Augusta GA 30901
A-1 Sanitation Service
3452-B Peach Orchard Road
Augusta GA 30906
Metro-Waste
1824 Wylds Road Suite A5
Augusta GA 30909
Republic Services, Inc.
84 Clifton Blvd
Savannah GA 31408
Veolia ES Solid Waste
1101 Hawkins Street
Valdosta GA 31601
Augusta Disposal
Po Box 334
Evans GA 30809
Choice Environmental
2860 State Road 84
Fort Lauderdale, FL 33312
Clean Energy
3988 Shadow Loch Drive
Suwanee GA 30024
Coleman Sanitation
3010 Georgia Road
Augusta GA 30906
Columbia Waste
1064 Franke Industrial Boulevard
Augusta GA 30901
Dorado Services Inc
195 W Seminole Boulevard
Sanford FL 32771
Gallop & Associates
2911 Point West Drive
Augusta GA 30909
Inland Service Corp
1561 Doug Barnard Pkwy
Augusta GA 30906
Precision Waste Services
Po Box 446
Thomson GA 30824
Richmond Waste Inc
Po Box 6887
Augusta GA 30916
Submitted No Bid Response
Submitted No Bid Response
Submitted No Bid Response
Submitted No Bid Response
Non-Compliant
Attachment B missing E-Verify Number
Page 1 of 2
Attachment number 2 \nPage 1 of 2
Item # 2
RFP Item #11-112
Solid Waste Recyclables Collection Services
for the City of Augusta - Solid Waste Department
RFP Due: Thursday, June 23, 2011 @ 3:00 p.m.
VENDORS Attachment B Bidders
Form Bid Bond Addendums
1 - 6 Original 6 Copies Fee Proposal
Schaefer Systems
4235 Marsh Landing Blvd Apt 432
Jacksonville Beach FL 32250
Spartan Waste
3668 Sterling Ridge Way
Decatur GA 30032
Unity Disposal & Recycling Llc
14862 Old Gunpowder Road
Laurel MD 20707
Waste Industries
2699 Cochran Industrial Blvd
Douglasville GA 30134
World Waste Recycling Inc
3547 Nw 49th Street
Miami FL 33142
Page 2 of 2
Attachment number 2 \nPage 2 of 2
Item # 2
Evaluation Criteria
PTS
Advanced Disposal
5734 Columbia Road
Grovetown GA 30813
Inland Service Corp
1561 Doug Barnard Pkwy
Augusta GA 30906
Waste Management
208 Prep Phillips Drive
Augusta GA 30901
Waste Pro
1405 Danielsville Road
Athens GA 30601
1. Staffing 10 6 6 9 7
2. Experience 20 14 17 17 14
3. Available Resources 10 8 8 8 8
4. Financial Stability
&Financial Statement 10 6 4 9 7
5. Implementation Plan 5 3 3 5 4
6. Customer Service Procedures 5 2 3 5 4
8. Litigation History 5 4 4 5 4
9. Criminal Convictions /
Environmental iolations 5 5 5 5 5
10. Cost for Service 10 10 8 4 6
11. Other Benefits to the
County 15 3 7 5 0
11. Proximity to Area
Within Augusta 5 pts
Within the CSRA 4 pts
Within Georgia 3 pts
Within Southeast US 2 pts
All Others 1 pt
5 4 5 5 3
TOTAL 100 64 71 77 62
Cumulative Evaluation Sheet - RFP Item #11-112
Solid Waste & Recyclables Collection Services
For The City of Augusta – Solid Waste Department
Comments:
Attachment number 3 \nPage 1 of 1
Item # 2
Attachment number 4 \nPage 1 of 5
Item # 2
Attachment number 4 \nPage 2 of 5
Item # 2
Attachment number 4 \nPage 3 of 5
Item # 2
Attachment number 4 \nPage 4 of 5
Item # 2
Attachment number 4 \nPage 5 of 5
Item # 2
Attachment number 5 \nPage 1 of 4
Item # 2
Attachment number 5 \nPage 2 of 4
Item # 2
Attachment number 5 \nPage 3 of 4
Item # 2
Attachment number 5 \nPage 4 of 4
Item # 2
Attachment number 6 \nPage 1 of 3
Item # 2
Attachment number 6 \nPage 2 of 3
Item # 2
Attachment number 6 \nPage 3 of 3
Item # 2
Attachment number 7 \nPage 1 of 1
Item # 2
AUGUSTA, GEORGIA SOLID WASTE AD 1
RECYCLABLES COLLECTIO AGREEMET 2
3
THIS AGREEMENT (the "Agreement") is effective as of the day of ____________ ___, 2012 (the 4
"Effective Date"), with the first day of service being April 1, 2013 (the “Starting Date”) by and between 5
Augusta, Georgia, a political subdivision of the state of Georgia (hereinafter referred to as the "Augusta"), 6
and ______________, a _________ corporation doing business as _________________ (hereinafter 7
referred to as "Contractor"). 8
9
WHEREAS, Augusta, Georgia owns and operates a Subtitle D and inert landfill known as Deans Bridge 10
Road Landfill; and 11
12
WHEREAS, the Deans Bridge Road Landfill is the destination for the solid waste to be collected under 13
this Agreement; and 14
15
WHEREAS, Augusta desires the Contractor to provide Residential Units with Residential Garbage, 16
Recyclables, Yard Waste and Bulky Waste collection to its citizens; and 17
18
WHEREAS, Augusta desires the Contractor to provide Designated Non-Residential Locations with 19
Residential Garbage and Recyclables, collection to its citizens; and 20
21
WHEREAS, Augusta desires the Contractor to provide Unoccupied Locations with Yard Waste and 22
Bulky Waste collection to its citizens; and 23
24
WHEREAS, the Contractor desires to provide such solid waste and recyclables collection services; and 25
26
WHEREAS, Augusta desires the Contractor to provide vehicles that operate solely on compressed natural 27
gas (hereinafter referred to as “CNG”); and 28
29
WHEREAS, Augusta desires to provide the Contractor with CNG; and 30
31
WHEREAS, the Contractor agrees to purchase CNG from Augusta; and” 32
33
WHEREAS, all parties hereto desire to set forth the rights and obligations of the parties in this 34
Agreement. 35
36
NOW, THEREFORE, in consideration of the promises, the mutual premises and the compensation as 37
defined below and other good and valuable consideration, the parties hereto hereby agree as follows: 38
39
40
SECTIO 1 - DEFIITIOS 41
42
For the purpose of this collection services contract, hereinafter referred to as "Contract", the definitions 43
contained in this Section shall apply unless otherwise specifically stated. When not inconsistent with the 44
context, words used in the present tense include the future, words in the plural include the singular, and 45
words in the singular include the plural. To the extent the definitions contained herein conflict with 46
similar definitions in any federal, state or local law, the definition in the Contract shall prevail. Use of the 47
masculine gender shall include the feminine gender. The word "shall" is always mandatory and not 48
merely discretionary. 49
50
Attachment number 8 \nPage 1 of 73
Item # 2
Page 2 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Area Miss means missed collection involving one hundred (100) or more Residential Units, Designated 51
Non-Residential Locations, and Unoccupied Locations in the Designated Collection Area on one 52
collection day. 53
54
Appliances see White Goods. 55
56
Building Material see Construction Debris. 57
58
Bulky Waste means large items of solid waste such as furniture, mattresses, and other items too large for 59
the Roll-Out Cart, including any oversized wastes whose large size precludes or complicates their 60
handling by normal solid waste collection. Bulky Waste as defined here shall include property owner or 61
tenant generated building materials. Bulky Waste is divided into two (2) distinct categories; a) piles less 62
than 10 cubic yards; and b) piles 10 cubic yards or greater. 63
64
Carry-Out Collection means special handling service provided to those individuals unable to place their 65
Residential Garbage or Recyclables curbside for collection due to Physical Impairment and where no 66
person(s) capable of placing the Residential Garbage or Recyclables curbside resides at the dwelling. 67
Carry-Out Collection services are not available for Yard Waste or Bulk Waste. In no event will the 68
quantity of persons receiving Carry-Out Collection services exceed three percent (3%) of the total 69
Residential Units located within the Designated Collection Area. Carry-Out Collections shall be limited 70
to a maximum of 200 feet from the public right of way. 71
72
Collection Schedule means the days of collection authorized by the Contract. 73
74
Collection Services means Residential Garbage, Recyclables, Yard Waste and Bulky Waste collection, as 75
described herein. 76
77
Construction Debris means waste building materials resulting from construction, remodeling, repair, or 78
demolition operations. 79
80
Contract means this Agreement as executed for the provision of solid waste collection services in 81
Augusta, including all of the provisions, responsibilities, procedures, remedies, and attachments without 82
exception. 83
84
Contract Administrator means Augusta’s Environmental Services Director, or designee, assigned to 85
administer this Contract on behalf of Augusta. 86
87
Contract Term means the duration of the Contract, measured from the Starting Date as set forth in this 88
Agreement. 89
90
Courtesy Collections means special collection requests by Augusta that the Contractor shall be 91
responsible for providing within the same time period as regularly scheduled collections. 92
93
Customer means the recipient of collection services within Augusta, provided through this Contract, and 94
includes Residential Units, Designated Non-Residential Locations, and Unoccupied Locations. 95
96
Damages means agreed to, actual, compensatory, consequential, continuing, direct, irreparable, punitive, 97
presumptive, proximate and/or recissory damages incurred by Augusta, the payment of which shall not be 98
an exclusive remedy. 99
100
Attachment number 8 \nPage 2 of 73
Item # 2
Page 3 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Dead Animals means animals or portions thereof equal to or less than 100 pounds in weight, which have 101
expired. 102
103
Designated Collection Area means the geographic area of which the Contractor will provide collection 104
and other services pursuant to the Contract. Collection points will be at the curb or other Augusta 105
determined locations for Customers receiving Carry-Out Collection service. 106
107
Designated Disposal Facility means a facility to which Garbage, Yard Waste and Bulky Waste collected 108
under the Contract must be delivered. The disposal facility for Residential Garbage, Yard Waste and 109
Bulky Waste collected as part of this Contract will be the Deans Bridge Road Landfill located in Augusta, 110
Georgia. 111
112
Designated on-Residential Location means a non-residential location in the Service Area that receives 113
collection and other solid waste services from the Contractor. An example would be public facilities or 114
small businesses serviced by Roll-Out Carts. 115
116
Designated Recycling Facility means a Materials Recovery Facility or transfer station selected by 117
Augusta for delivery of Recyclables and/or White Goods collected under this Contract. 118
119
District Manager means the employee designated by the Contractor as the Contractor's primary 120
representative with regard to matters involving this Contract. 121
122
Fiscal Year means Augusta’s fiscal year that runs from January 1 through December 31. 123
124
Garbage, Residential See Residential Garbage 125
126
Hazardous Waste means waste, in any amount, which is defined, characterized, or designated as 127
hazardous by the United States Environmental Protection Agency or appropriate State agency by or 128
pursuant to federal or state law, or waste, in any amount, which is regulated under federal or state law; as 129
well as all waste defined as "Hazardous Waste" in this Agreement. For the purposes of this Agreement, 130
the term Hazardous Waste shall also include, but is not limited to, motor oil, gasoline, and liquid paint. 131
132
Hot Load means any vehicle carrying solid waste observed to be smoldering, smoking, on fire, giving off 133
odors, or leaking a caustic or corrosive substance. 134
135
Implementation Plan means a document describing in detail the activities that will be undertaken and 136
the schedule that will be followed to successfully implement the Contractor’s collection services under 137
this Contract on the Start Date. The Implementation Plan shall include a description of how the 138
Contractor will evaluate routing and determine routes. 139
140
Littering means allowing spilled or wind-blown materials to come from the vicinity of the Contractor's 141
truck hopper or to fall to the ground as the Roll-Out Carts are emptied. 142
143
Maintenance Director means the person the Contractor has assigned to Augusta, and shall be a qualified 144
person to be in charge of maintenance associated with providing Collection Services within the Service 145
Area. The Maintenance Director shall be physically stationed in the Service Area and available to 146
Augusta through the use of telecommunications equipment at all times that the Contractor is providing 147
Collection Services. 148
149
Material Recovery Facility or MRF means a site used for the collection, storage, and processing of 150
Recyclables. 151
Attachment number 8 \nPage 3 of 73
Item # 2
Page 4 of 73
Solid Waste & Recyclables Collection
Augusta, GA
152
Miss means any Request for Service of a missed collection reported to Augusta. 153
154
Physical Impairment means a condition that renders an individual physically unable to bring a Roll-Out 155
Cart either to the curb or for whom the undertaking of such an act would clearly and seriously threaten 156
that person's health. 157
158
Putrescible means wastes that will decay or become rotten such as meats, dairy products, vegetables, 159
fruits, etc. that are normally the source of odors and are attractive to insects. 160
161
Producer means a property owner or tenant of a Residential Unit, Designated Non-Residential Location 162
and Unoccupied Location who generates solid waste. 163
164
Recyclables means solid waste including but not limited to newsprint and inserts; junk mail, cardboard, 165
books and phone books, food packaging (not contaminated by food), magazines, paper bags and boxes; 166
plastic bottles and containers to include items labeled #1 and #2, plastic milk containers, detergent bottles 167
and plastic soft drink and liquor bottles; aluminum, steel, or tin cans; and other items determined to be 168
recyclable by Augusta. Augusta may amend this list from time to time. 169
170
Recyclables Cart means the container designated and authorized by Augusta based upon the container's 171
depth, size, and material and identified solely for Recyclables. It shall be subject to the collection 172
regulations pertaining to Recyclables. 173
174
Refuse means all nonputrescible material discarded for disposal as Residential Garbage. 175
176
Repeat Collection Miss means two or more collection misses at any one Residential Unit, Designated 177
Non-Residential Location, Unoccupied Location, or other designated collection point during any thirty 178
(30) day period or four (4) or more collection misses in a ninety (90) day period. 179
180
Request for Service means reported customer service requests or discovered missed collection of 181
Residential Garbage, Recyclables, Yard Waste or Bulky Waste from any one Residential Unit, 182
Designated Carry-out Collection Locations, Designated Non-Residential Locations, Unoccupied Location 183
or Courtesy Collections on the form used by Augusta to document customer service requests. Usually this 184
request is transmitted electronically to the Contractor and can also be referred to as an "Insight" or "GBA" 185
work order. 186
187
Residential Garbage means residential waste including but not limited to animal and vegetable matter; 188
non-hazardous residential waste materials; properly contained medical waste; discarded food or beverage 189
containers; discarded toys, clothing and other residential items; but excluding liquids of any kind. For the 190
purpose of this Contract, Residential Garbage also includes garbage generated by Designated Non-191
Residential Locations. 192
193
Residential Unit means any single-family dwelling, condominium, or rental unit with four (4) or fewer 194
dwelling units at one location. Each dwelling unit contained in a condominium and each dwelling unit in 195
apartment complexes with four (4) or fewer rental units will be counted as separate collection points. 196
197
Roll-Out Cart means the gray (or any other color) plastic Roll-Out Cart supplied by Augusta to 198
Customers or other designated Producers for the collection of Residential Garbage or Recyclables. 199
200
Service Area means the area(s) within Augusta limits served by the Contractor(s) and any annexations, if 201
granted. 202
Attachment number 8 \nPage 4 of 73
Item # 2
Page 5 of 73
Solid Waste & Recyclables Collection
Augusta, GA
203
Supervisor means the person the Contractor has assigned to Augusta, and shall be a qualified supervisor 204
to be in charge of the operations within the Service Area. The supervisor shall be physically stationed in 205
the Service Area and available to Augusta through the use of telecommunications equipment at all times 206
that the Contractor is providing Collection Services. 207
208
Valid Miss means any missed Request for Service or solid waste collection determined by Augusta to 209
result from Contractor negligence or omission. 210
211
Vehicle Leaks and Spills means leaks consisting of a constant drip of fluids or fluid spills that leave 212
visible puddles or "staining" upon the pavement. These fluids can be any of the motor fluids, hydraulic 213
fluids, or waste liquids from the compactor unit. 214
215
White Goods includes refrigerators, ranges, water heaters, freezers, unit air conditioners, washing 216
machines, dishwashers, clothes dryers, any others similar domestic appliances that are collected by the 217
Contractor for recycling. 218
219
Yard Waste means grass, leaves, limbs, trimmings, or other plant or vegetative material generated by the 220
Customer and separated and placed at curbside for collection. Yard Waste is divided into two (2) distinct 221
categories; a) quantities less than 10 cubic yards; and b) quantities 10 cubic yards or greater. 222
223
Unoccupied Locations means a vacant or unoccupied Residential Unit, unimproved property or vacant 224
lot. 225
226
SECTIO 2 - COTRACT TERM AD COMMECEMET 227
228
2.1 Performance Commencement 229
The term of this Agreement shall commence on April 1, 2013, and terminate on December 31, 2021 (the 230
“Initial Term”) unless this Agreement is terminated earlier by Augusta as herein provided. This 231
Agreement may be renewed for two (2) or more successive two (2) year terms (the “Renewal Terms”) 232
upon mutual agreement of the parties at the rates herein (as may be adjusted as provided herein) no less 233
than sixty (60) days prior to the expiration of the Initial Term or the then current Renewal Term. 234
235
2.2 Transition prior to Commencement Date of this Contract. 236
Contractor understands and agrees that the time between the formal Contract signing and April 1, 2013 is 237
intended to provide the Contractor with sufficient time to, among other things, order equipment, prepare 238
necessary routing changes, and prepare to start services. Contractor shall be responsible for the provision 239
of all collection services beginning April 1, 2013. Accordingly, Contractor shall provide collection 240
services as set forth in this Contract no later than April 1, 2013. 241
242
2.3 Deadlines for the Contractor's Implementation Planning. 243
At a minimum, the Contractor must address the following specific performance requirements in the 244
Implementation Plan and accomplish them according to the following deadlines. Dates may be modified 245
by mutual agreement. 246
By June 29, 2012 Contractor shall hire the District Manager, who shall attend the Implementation 247
Plan discussion meeting. 248
By July 13, 2012 Contractor shall provide Augusta’s Contract Administrator with a collection and 249
maintenance plan, which shall be subject to the approval of Augusta’s Contract Administrator. 250
The maintenance plan shall include a description of how emergency maintenance issues will be 251
handled. Ten days after receiving Augusta Contract Administrator’s comments, the Contractor 252
Attachment number 8 \nPage 5 of 73
Item # 2
Page 6 of 73
Solid Waste & Recyclables Collection
Augusta, GA
shall provide Augusta Contract Administrator with a revised collection and maintenance plan, if 253
necessary. 254
By July 13, 2012 Contractor shall submit to Augusta’s Contract Administrator documentation 255
demonstrating that: (a) all necessary vehicles, equipment, and containers have been ordered and 256
will be delivered to Contractor's equipment yard no later than January 11, 2013. 257
By July 13, 2012 Contractor and Augusta shall meet and discuss the Contractor’s Implementation 258
Plan. 259
By July 13, 2012 Contractor shall request a detailed customer list from Augusta to show all 260
Residential Garbage, Designated Non-Residential, and Unoccupied Locations. The Contractor 261
shall also request other information that the Contractor may reasonably need for an effective 262
implementation. This may include lists of Carry-Out Collection locations, exempt locations from 263
services, and locations with multiple Roll-Out Carts. 264
By Augusta 10, 2012 Contractor and Augusta shall meet and discuss the Contractor’s 265
Implementation Plan. 266
By September 7, 2012 Contractor and Augusta shall meet and discuss the Contractor’s 267
Implementation Plan. 268
By September 14, 2012 the Contractor shall have audited the detailed customer list from Augusta 269
to show all Residential Garbage, Designated Non-Residential, and Unoccupied Locations and 270
provide discrepancies back to Augusta in a format acceptable to Augusta. 271
By October 5, 2012 Contractor and Augusta shall meet and discuss the Contractor’s 272
Implementation Plan. 273
By November 9, 2012 Contractor and Augusta shall meet and discuss the Contractor’s 274
Implementation Plan. 275
By December 7, 2012 Contractor and Augusta shall meet and discuss the status of the 276
Contractor’s Implementation Plan and its completion. 277
By January 11, 2013 Contractor and Augusta shall meet and discuss the status of the Contractors 278
Implementation Plan and its completion. 279
By January 11, 2013 Contractor shall confirm in writing to Augusta Contract Administrator that 280
all of the vehicles and equipment necessary to provide Collection Services have been delivered to 281
the Contractor's equipment yard. 282
By January 18, 2013 Contractor shall confirm in writing to Augusta Contract Administrator that 283
all of the vehicles necessary to provide collection services have been registered, licensed, tagged, 284
and equipped, and are ready to perform in compliance with the requirements of this Contract. 285
By January 18, 2013 Contractor shall provide Augusta Contract Administrator with a vehicle and 286
equipment list, which shall identify the make, type, year, license number, and identification 287
number for each Collection vehicle. 288
By January 25, 2013, Contractor shall ensure that all collection vehicles have been properly 289
permitted, inspected, and have an established tare weight with the Designated Disposal Facility. 290
By January 25, 2013 Contractor shall confirm in writing to Augusta Contract Administrator that: 291
(a) Contractor has hired and trained all of the employees needed to provide Collection Service in 292
compliance with the requirements in this Contract; (b) all of the Contractor's drivers have 293
inspected their collection routes and confirmed their ability to complete their routes on the 294
scheduled collection work day; (c) drivers have been made aware of all Carry-Out Collection 295
locations; (d) provide a certification that all employees working under this contract have passed 296
the Contractors background check; (e) provide a certification that all employees working under 297
this contract have passed a pre-employment drug test; and (f) provide a certification that all 298
employees working under this contract have agreed to abide the operating rules of the Designated 299
Disposal Facility and Designated Recycling Facility. 300
301
2.3.1 CG Station Implementation Planning 302
Attachment number 8 \nPage 6 of 73
Item # 2
Page 7 of 73
Solid Waste & Recyclables Collection
Augusta, GA
At a minimum, the Contractor must address the following specific performance requirements in 303
the Implementation Plan and accomplish them according to the following deadlines. Dates may 304
be modified by mutual agreement. 305
306
Within one week of Contract award, Contractor shall meet with Augusta to discuss the 307
implementation of the CNG stations. 308
By June 29, 2012, Contractors and Augusta shall meet and discuss locations as well as site 309
design, specifications and the companies who will construct the stations. 310
By July 20, 2012, Contractors shall finalize design of the station and an Agreement shall be 311
entered into with a development partner. 312
By August 13, 2012, Construction commencement. 313
By January 18, 2013, Construction completion and facility operational.” 314
By April 1, 2013, title of said property, equipment and the station shall be turned over to Augusta. 315
316
2.4 Transition upon Expiration of this Contract 317
318
2.4.1 Continuation of Contractor’s Service 319
If Augusta does not exercise its right to renew this Contract or if there are no renewal options 320
remaining, Augusta will attempt to award a new agreement at least six (6) months prior to the 321
expiration of this Contract. In the event a new agreement has not been awarded within such time 322
frame, Contractor shall provide Collection Services to Augusta on a month-to-month basis after 323
the expiration of this Contract, at the then established rates, if Augusta requests this service with 324
at least thirty (30) days notice to the Contractor. 325
326
2.4.2 Schedule for Termination of Contractor’s Service 327
Prior to the termination of this Contract, Contractor shall work with Augusta to ensure that there 328
is no interruption or reduction of service when the Contractor ends its services to Augusta. If a 329
new contract is awarded to a hauler other than the Contractor, the Contractor shall coordinate and 330
cooperate with the newly selected hauler, as well as Augusta, to minimize any disruptions in the 331
service provided to the public. 332
333
334
SECTIO 3 - GEERAL COLLECTIO REQUIREMETS 335
336
3.1 Scope of Service 337
Commencing on the Starting Date, the Contractor shall collect and transfer, in a workmanlike manner, 338
according to the Collection Service Frequency in Section 3.5; the following: 339
340
3.1.1 Residential Garbage 341
Residential Garbage and Recyclables in Augusta-provided Roll-Out Carts placed at curbside, 342
Yard Waste placed at curbside, and Bulky Waste placed at curbside at each Residential Unit. 343
344
3.1.2 Designated on-Residential Location 345
Residential Garbage and Recyclables in Augusta-provided Roll-Out Carts placed at curbside, at 346
each Designated Non-Residential Location. 347
348
3.1.3 Unoccupied Locations 349
Yard Waste placed at curbside, and Bulky Waste placed at curbside at each Unoccupied 350
Location. 351
352
Attachment number 8 \nPage 7 of 73
Item # 2
Page 8 of 73
Solid Waste & Recyclables Collection
Augusta, GA
3.1.4 Roll-out Carts 353
Approved Roll-Out Carts have been or shall be provided by Augusta to each Residential Unit 354
and Designated Non-Residential Location. Additionally, the Contractor shall provide Carry-Out 355
Collection for those residents qualifying for this special service and all Courtesy Collections 356
when requested by Augusta. The Contractor shall furnish all labor, equipment materials, tools, 357
storage, insurance, supervision, and all other items incidental thereto and to perform all work 358
necessary and specified in the prescribed manner and time, to provide Collection Services, in the 359
Designated Collection Area, as described herein. 360
a. Residential and Designated on-Residential Location Roll-Out Carts – Garbage: 361
Each Residential Unit and Designated Non-Residential Locations is initially authorized 362
one (1) gray topped Roll-Out Cart with an Augusta, Georgia logo, should the volume 363
needs for Residential Garbage increase for a specific Residential Unit or Designated 364
Non-Residential Locations, Augusta may authorize additional Roll-Out Cart(s) for that 365
location. Augusta will then pay for the additional Roll-Out Cart(s) at the rates specified. 366
Multiple Augusta, Georgia Roll-Out Carts beyond those authorized at each location, 367
personal carts or cans, and Roll-Out Carts from other hauling services containing 368
Residential Garbage shall not be emptied, and the Contractor shall report these 369
unauthorized carts immediately to Augusta for investigation. 370
371
b. Residential and Designated on-Residential Location Roll-Out Carts – Recyclables: 372
Each Residential Unit and Designated Non-Residential Locations are authorized one (1) 373
blue topped Roll-Out Cart with an Augusta, Georgia logo, should the volume needs for 374
Recyclables increase for a specific location, Augusta may authorize additional Roll-Out 375
Cart(s). 376
377
3.1.5 Extra Residential Garbage Collection 378
Residential Garbage placed outside the Roll-Out Cart on a regular basis shall not be collected, 379
and the Contractor shall report the address to Augusta for investigation. A maximum of five (5) 380
bags of Residential Garbage placed outside the Roll-Out Cart no more than once per quarter will 381
be allowed to accommodate special occasions, but the Contractor shall report the address for 382
entry into the Insight Work Order System for monitoring purposes. Residential Garbage shall 383
not be collected as Bulky Waste except as otherwise allowed by the Agreement. 384
3.1.6 Bulky Waste Collection 385
The Contractor shall collect Category One (1) Bulky Waste once per week from Residential Units 386
and Unoccupied Locations. Contractor shall strictly follow established process as written herein 387
or as later modified in writing. Bulky Waste is divided into two distinct categories as described 388
below: 389
a. Category One (1): Bulky piles less than 10 cubic yards that do not require scheduling, qualify 390
for curb-side collection, and are collected by the Contractor as part of the residential route 391
collection process; and 392
393
b. Category Two (2): Bulk Waste piles 10 cubic yards or greater that do not qualify for curbside 394
collection, must be placed for Augusta grapple truck collection. When the Contractor 395
encounters a Bulk Waste pile 10 cubic yards or greater the Contractor shall NOT collect any 396
portion of this Bulk Waste pile and report the location immediately to Augusta for 397
investigation. 398
399
c. Reporting of Category Two bulky waste shall be either through an automated on-board 400
software solution or via email from the Contractor. 401
402
Attachment number 8 \nPage 8 of 73
Item # 2
Page 9 of 73
Solid Waste & Recyclables Collection
Augusta, GA
3.1.7 Yard Waste Collection 403
The Contractor shall collect Category One (1) Yard Waste from Residential Units and 404
Unoccupied Locations according to Section 3.5. Yard Waste shall be placed in Kraft paper bags, 405
in Customer provided cans, clearly identifiable as Yard Waste, or in piles. Contractor shall 406
strictly follow established process as written herein or as modified later in writing. Yard Waste is 407
divided into two distinct categories as described below: 408
a. Category One (1): Yard Waste Piles less than 10 cubic yards that do not require scheduling, 409
qualify for curb-side collection, and are collected by the contractor as part of the residential 410
route collection process, provided that any material shall be no longer than 5 feet in length 411
and be reasonably accessible by manpower. Christmas trees will be eligible for collection as 412
Yard Waste and are not required to meet the stated standards, so long as lights and 413
decorations have been removed; and 414
415
b. Category Two (2): Yard Waste piles 10 cubic yards or greater that do not qualify for curbside 416
collection must be placed for Augusta grapple truck collection. When the Contractor 417
encounters a Yard Waste pile 10 cubic yards or greater Contractor shall NOT collect any 418
portion of this Yard Waste pile and report the location immediately to Augusta for 419
investigation. 420
421
c. Reporting of Category Two yard waste shall be either through an automated on-board 422
software solution of via email from the Contractor. 423
424
3.1.8 Residential Recyclables Collection 425
The Contractor shall collect Recyclables from Residential Units, and Designated Non-Residential 426
Locations. Operation and expansion of the residential recycling program is a high priority for 427
Augusta. 428
a. The Contractor shall provide an incentive based recycling program offered by Recycling 429
Perks. The Recycling Perks scope of services is listed as Appendix D and shall be 430
considered a material requirement of this Contract. 431
432
b. The Contractor shall exercise due care not to contaminate the Recyclables. 433
c. The Contractor shall ensure that its provision of the services does not in any manner 434
contribute to contamination levels and shall adhere to the collection vehicle cleaning 435
requirements described herein. 436
437
3.1.9 Roll-Out Cart and Recyclable Cart Placement 438
Contractor shall return Roll-Out Carts and Recyclable Carts to their original position, as provided 439
by Section 5.4; taking care not to block access to driveways or mailboxes after it has been 440
emptied. Contractor shall reasonably attempt to close Roll-Out Cart and Recyclable Cart lids. 441
442
3.2 Designated Collection Area 443
Augusta hereby gives, grants, and awards to the Contractor the exclusive right to pickup, collect, and 444
transport for disposal or processing Residential Garbage, Recyclables, Yard Waste and Bulky Waste from 445
all Residential Unit, Designated Non-Residential Location and Unoccupied Location collection points 446
within the Designated Collection Area, as described herein. For this Agreement, Advanced Disposal 447
Services Augusta, LLC, shall provide service to Designated Collection Area 1 (DCA 1) and Inland 448
Services Corporation shall provide service to Designated Collection Areas 2 and 3 (DCA 2 and DCA 3). 449
A map of the Designated Collection Areas is presented in Appendix A. 450
3.3 Monthly Performance Summary 451
Attachment number 8 \nPage 9 of 73
Item # 2
Page 10 of 73
Solid Waste & Recyclables Collection
Augusta, GA
A monthly performance summary form ("Monthly Performance Summary") has been established to assist 452
Augusta in evaluating Contractor performance under this Agreement. The Monthly Performance 453
Summary consists of the following two elements, which are further described in Appendix B: 454
455
3.3.1 The Monthly Performance Summary 456
The Summary will include a listing of key performance measures profiling the Contractor's 457
service level. These measures may be reviewed with the Contractor throughout the month in an 458
effort to identify potential service issues and to work proactively toward a resolution of any 459
deficiencies. 460
461
3.3.2 Annual Customer Satisfaction Survey 462
An annual customer satisfaction survey that will be administered by a professional survey 463
company selected by Augusta and paid for by the Contractor. This survey will target areas where 464
service problems or poor participation are observed. 465
Augusta will evaluate the results of the survey in conjunction with the profile of the key 466
performance measures to determine the overall performance of the Contractor. Augusta will 467
review the results of the Monthly Performance Summary with the Contractor on at least a 468
quarterly basis and the Contractor agrees to implement measures as necessary to improve areas 469
identified as requiring improvement. The Contractor recognizes that these results will be 470
compiled by Augusta and may be presented internally or publically. 471
472
Contractor acknowledges that its performance relative to the Monthly Performance Summary 473
shall not be construed to mean that the Contractor is meeting its performance obligations as 474
required by this Agreement. Should the Contractor not comply with any other material provision 475
of this Agreement, Augusta may declare the Contractor in default notwithstanding its 476
performance levels relative to the Monthly Performance Summary. 477
478
3.4 Materials to be Collected 479
480
The Contractor shall provide alley collection and curbside collection of Residential Garbage, Yard Waste, 481
Recyclables and Bulky Waste placed for collection in accordance with the Collection Schedule in the 482
Designated Collection Area, and as further described in this document. 483
484
3.4.1 Mixing 485
The Contractor shall not mix Garbage and Bulky Waste with any Yard Waste or Recyclables. 486
Further, the Contractor shall not mix any Yard Waste and Recyclables. The Contractor shall 487
not collect material in the same truckload from both Recyclables Carts and Roll-Out Carts, 488
unless Augusta has identified the Recyclables Carts as containing an excess of non-recyclable 489
material. 490
491
3.4.2 Damages 492
If the Contractor's equipment operator collects one or more commodities in the same 493
truckload without permission, or as otherwise allowed by this Agreement, from Augusta, the 494
Contractor shall be assessed Damages in the amount of one thousand dollars ($1,000) per 495
incident and Augusta may declare it an event of default. 496
3.5 Collection Service Frequency 497
The Contractor shall collect Residential Garbage, Recyclables in Augusta-provided Roll-Out Carts placed 498
at curbside, Yard Waste placed at curbside, and Bulky Waste placed at curbside at each Residential Unit 499
and Designated Non-Residential Location. Yard Waste placed at curbside, and Bulky Waste placed at 500
Attachment number 8 \nPage 10 of 73
Item # 2
Page 11 of 73
Solid Waste & Recyclables Collection
Augusta, GA
curbside at each Unoccupied Location shall also be collected. Each Customer's Residential Garbage, 501
Recyclables, Yard Waste and Bulky Waste must be collected on the same day of the week (i.e., the 502
collection of Residential Garbage, Recyclables, Yard Waste and Bulky Waste for a single Customer shall 503
be coordinated so that the designated collection day of each type of material occurs on the same day of 504
the week at the Customer's collection point). The Customers' collection day shall be in accordance with 505
the approved Collection Schedule. Augusta expects Roll-Out Carts, Recyclables Carts, Yard Waste and 506
Bulky Waste to be placed at curbside by 7:00 a.m. on the designated collection day. Table 1, below, 507
describes the service frequencies. 508
Table 1: Service Levels 509
510
Service Levels
Residential Unit Designated on-Residential Locatio n Unoccupied Location
Garbage - Once per week Garbage - Once per week Yard Waste - Once per week
Recyclables - Once per week Recyclables - Once per week Bulky Waste - Once per week
Yard Waste - Once per week
Bulky Waste - Once per week
511
512
3.6 Collection Days 513
Routes for Residential Garbage, Recyclables, Yard Waste and Bulky Waste must be spread out evenly 514
over five (5) collection days, Monday through Friday. For each Residential Unit, Designated Non-515
Residential Location, and Unoccupied Location, all services will be performed on the same day as 516
Residential Garbage. 517
518
3.7 Hours of Collection 519
No Residential Garbage, Recyclables, Yard Waste or Bulky Waste collection shall commence prior to 520
7:00 a.m., and the Contractor must request permission to continue collection after 8:00 p.m. 521
3.8 Holiday Collection 522
Attachment number 8 \nPage 11 of 73
Item # 2
Page 12 of 73
Solid Waste & Recyclables Collection
Augusta, GA
The Contractor shall provide Collection Services on all legal holidays except New Years Day, Memorial 523
Day, Fourth of July, Labor Day, Thanksgiving and Christmas. Collection services shall be delayed one 524
(1) day for each observed holiday. For example, if Friday is a holiday then collections normally scheduled 525
on Friday will be collected on Saturday. 526
527
3.8.1 Extra Holiday Collections 528
Contractor shall provide adequate resources to collect the increased holiday waste loads during 529
the five (5) work day(s) following the holiday, as listed in Section 3.8. Extra bags of Refuse and 530
Residential Garbage placed outside the Roll-Out Carts shall be collected, and may be collected as 531
Bulky Waste. 532
533
3.9 Extra Masters Collections 534
Contractor shall provide adequate resources to collect the increased waste loads during the week prior to, 535
the week of, and the week after the Masters Golf Tournament. Extra bags of Refuse and Residential 536
Garbage placed outside the Roll-Out Carts during that period shall be collected, and may be collected as 537
Bulky Waste. 538
539
3.10 Dead Animals 540
Augusta personnel will pick up Dead Animals within Augusta limits. Augusta reserves the right to 541
transfer these Dead Animals to any of the Contractor's solid waste trucks operating in the vicinity when 542
Dead Animals are collected by Augusta crews. Contractor’s Supervisor shall provide immediate direction 543
and/or location of nearest Contractor solid waste collection truck upon request. Dead Animals shall not be 544
placed in a Collection Vehicle collecting Yard Waste or Recyclables. 545
3.11 Requests for Service 546
Once any route has been completed, or is scheduled to have been completed, any Customer missed will 547
be designated as a Request for Service, regardless of the time of day. 548
549
3.11.1 Communication of Requests for Service and Completion 550
a. Upon the receipt of a Request for Service, Augusta will notify the Contractor immediately, 551
through the issuance of a Request for Service, with the date and address where the Request 552
for Service occurred. 553
554
b. If Augusta sends a Request for Service, or provides verbal notification of a Request for 555
Service to the Contractor between the hours of 7:00 a.m. to 5:30 p.m. on any given collection 556
day, the Contractor shall provide collection by 8 p.m. on the same day. The Contractor shall 557
collect any Request for Service received after 5:30 p.m. by noon of the following scheduled 558
collection day. Once Augusta has sent a Request for Service, it shall be considered received 559
by the Contractor, in accordance with Section 10.1. 560
561
c. When Contractor's equipment operators are collecting material based on Requests for 562
Service, they shall be responsible for checking other Residential Units, Designated Carry-out 563
Collection Locations, Designated Non-Residential Locations and Unoccupied Locations in 564
the same vicinity for other possible misses in order to prevent additional calls from other 565
Customers reporting collection misses. 566
567
d. Requests for Service and other emergency calls received by Augusta on non-collection days 568
and evenings will be conveyed to the Contractor's representative, as designated in Section 569
10.1. The Contractor shall respond to such requests in the same timeframe and manner as 570
Attachment number 8 \nPage 12 of 73
Item # 2
Page 13 of 73
Solid Waste & Recyclables Collection
Augusta, GA
specified in Section 3.11 for Requests for Service, or as specified in other sections of this 571
Agreement for other requests. 572
573
e. The Contractor shall collect solid waste based on Requests for Service and shall transport the 574
materials to the appropriate and approved Designated Disposal Facility or Designated 575
Recycling Facility, as appropriate, during normal business hours. 576
577
f. The Contractor shall notify Augusta, through its response to the Request for Service, of the 578
date and time that collection was completed. 579
580
3.11.2 Route Status 581
Communication from the Contractor on the status of each day's route completion is vital so that 582
Augusta can adequately respond to Customer complaints as they are received. If the Contractor 583
does not keep Augusta so informed, any reported or discovered collection misses for routes, 584
which should have been completed for that collection day, will be designated as Valid Collection 585
Misses. Therefore, the Contractor shall notify Augusta immediately of the following: 586
a. The status of Contractor collection service. 587
b. Unresolved Requests for Service from the previous day and plans to resolve these 588
outstanding requests. 589
c. Any changes or delays in route completion. 590
d. Any open routes not covered in the morning. 591
e. Equipment breakdowns. 592
f. Any other event, which could affect the normal time of completion of any route. 593
594
3.11.3 Missed Collections 595
Augusta employees will investigate Request for Service(s), and classify it as a "Valid Miss" if, in 596
their opinion, the reported miss is due to Contractor negligence or omission. Otherwise, it will 597
remain classified as a Request for Service. 598
599
The Contractor is responsible for avoiding Repeat Collection Misses. 600
601
Requests for Service result in additional work for Augusta, requiring customer service staff to 602
handle customer service requests, and field and office staff to provide follow-up to ensure 603
completion. Therefore, the Contractor shall use its best efforts to minimize the number of Missed 604
Collections. 605
606
3.11.4 Damages 607
If the Contractor fails to provide collection of a Request for Service by the times specified in 608
Section 3.11, the Contractor shall pay Augusta Damages in the following amounts: 609
610
a. One hundred dollars ($100) for each violation of Section 3.11.1.b during any one 611
(1) calendar month; 612
613
b. The Contractor shall also pay Augusta additional Damages of five thousand dollars 614
($5,000) per month for any month in which there are two hundred (200) or more 615
violations of Section 3.11.1.b 616
617
c. The Contractor shall remain responsible for providing collection. However, if the 618
Contractor fails to pick up the Request for Service by the times specified in Section 619
3.11.1.b Augusta may elect to provide the service and charge the Contractor Damages in 620
Attachment number 8 \nPage 13 of 73
Item # 2
Page 14 of 73
Solid Waste & Recyclables Collection
Augusta, GA
the amount of $500 per missed collection to cover crew mobilization, collection, 621
transport for disposal, and staff costs. The intent is to ensure that quality customer service 622
is provided to each Customer. 623
624
d. Repeat Collection Miss: Should Contractor fail to provide immediate collection of a 625
Repeat Collection Miss, Augusta may, in its sole discretion, provide the collection 626
service and charge the Contractor Damages of $500 for each collection point serviced by 627
Augusta. The Contractor shall also pay Augusta Damages as follows for Repeat 628
Collection Misses: 629
630
(i) Five hundred dollars ($500.00) for the second and third Collection Miss of 631
any one (1) Residential Unit, Designated Non-Residential Location, or 632
Unoccupied Locations location during any thirty (30) day period. 633
634
(ii) One thousand dollars ($1,000.00) for each Collection Miss for four or more 635
Collection Misses of any one (1) Residential Unit, Designated Non-Residential 636
Location, or Unoccupied Locations location during any ninety-(90) day period. 637
638
e. Route Changes: When approved route changes are implemented, the Contractor will 639
be given a four week grace period beginning with the Contractor's first collection day 640
under the approved transition schedule during which misses will be noted but no 641
Damages will be assessed. The grace period is intended solely for one (1) to five (5) 642
Residential Units, Designated Non-Residential Locations, and Unoccupied Locations 643
missed on any one (1) route due to driver unfamiliarity with new routes, therefore any 644
misses of six (6) or more Residential Units, Designated Non-Residential Locations, and 645
Unoccupied Locations on any one (1) route will not be covered by the grace period. Any 646
such misses shall be designated as Valid Misses and shall be subject to Damages. The 647
Contractor shall use its best efforts to limit the number of collection misses, and shall 648
remain responsible for the timely collection of any collection misses during the grace 649
period. 650
651
f. Area Misses: The Contractor shall respond to Area Misses in the same timeframe 652
and manner as specified above. The Contractor shall pay Augusta Damages in the amount 653
of: 654
655
(i) Two thousand dollars ($2,000) for the first one hundred (100) 656
Residential Units, Designated Non-Residential Locations and 657
Unoccupied Locations missed, and 658
(ii) Twenty dollars ($20) for each Residential Unit, Designated Non-659
Residential Location or Unoccupied Location missed over the first one 660
hundred (100) Residential Units, Designated Non-Residential Locations 661
and Unoccupied Locations. 662
(iii) In addition, if the Contractor fails to provide collection by the times 663
specified in Section 3.11.1 (b), Augusta may elect to provide the service 664
and charge the Contractor Augusta's fee for such service as specified in 665
Section 3.11.4 (c). 666
667
3.11.5 Courtesy Collections 668
The Contractor shall be responsible for providing Courtesy Collections, upon request by Augusta. 669
Contractor shall limit Courtesy Collections to a number not to exceed the number of Residential 670
Attachment number 8 \nPage 14 of 73
Item # 2
Page 15 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Units times 0.15% percent in any calendar week. This service consists of collections of 671
Residential Garbage, Recyclables, Yard Waste and Bulky Waste from specific Residential Units, 672
Designated Non-Residential Locations and Unoccupied Locations. 673
674
The Contractor shall respond to Courtesy Collection requests from Augusta in the same 675
timeframe and manner as specified in Section 3.11.1.b. Augusta shall designate Courtesy 676
Collection requests that are not collected in the specified timeframe to be a Valid Miss, which 677
shall be subject to the Damages specified in Section 3.11.4 678
679
3.11.6 Review of Damages Assessed 680
If Augusta assesses damages that the Contractor believes are not justified by the facts, the 681
Contractor will provide its evidence and schedule a meeting with the Contract Administrator to 682
review. If the matter is not resolved at the review meeting the Contractor may ask the Contract 683
Administrator (or his designee) in writing to review the record and make a determination as to the 684
amount of damages assessed. The Contract Administrator's review shall be made and a written 685
answer provided to the Contractor no later than ten (10) Augusta working days following the 686
receipt of the request for review by the Contract Administrator. Upon receipt of any decision 687
finding liability following the review, the amount of the damages for which liability is found may 688
be withheld by Augusta from the next payment due to Contractor without such withholding being 689
considered a breach of this Agreement. 690
3.12 Designated on-Residential Location Collection 691
The Contractor shall provide collection service to Designated Non-Residential Locations identified and 692
designated by Augusta, which may include facilities such as fire stations, schools, churches, non-profit 693
agencies, businesses, and public buildings. Each Designated Non-Residential Location shall be counted as 694
one stop. Payment for collection at Designated Non-Residential Locations will be based on the actual 695
number of Roll-Out Carts at each location. Each Designated Non-Residential Location is required to be 696
served by a Grey, Augusta, Georgia Roll-Out Cart. Any Roll-Out Carts without the Augusta, Georgia hot-697
stamp on the cart shall not be emptied, but shall be reported immediately to Augusta for investigation. 698
3.13 Unoccupied Location Collection 699
The Contractor shall provide collection service to Unoccupied Locations identified and designated by 700
Augusta. Each Unoccupied Location shall be counted as one stop, and therefore the Contractor shall be 701
paid for one stop for each Yard Waste pick up and each Bulky Waste pickup. Unoccupied Locations will 702
not be issued Roll-Out carts, and any Roll-Out carts at these locations shall not be emptied but shall be 703
reported to Augusta for investigation. 704
3.14 Carry-Out Collection 705
The Contractor shall provide Carry-Out Collection for those individuals who are unable to place their 706
solid waste for collection in the usual manner due to severe physical disability. The Contractor shall not 707
receive special payment for this service. 708
709
Augusta will investigate new requests for Carry-Out Collection. If approved, Augusta will notify the 710
Contractor to start the service on the next regularly scheduled collection day. 711
712
At its discretion, Augusta will re-confirm the need for Carry-Out Collection. However, if the Contractor 713
has reason to believe that Carry-Out Collection is no longer required at any Residential Unit, the 714
Contractor shall notify Augusta. Augusta will investigate and confirm the need for Carry-Out Collection 715
and notify the Contractor of the result of the investigation and whether the service is to be continued or 716
discontinued. 717
Attachment number 8 \nPage 15 of 73
Item # 2
Page 16 of 73
Solid Waste & Recyclables Collection
Augusta, GA
718
3.15 Service Verification and Documentation 719
The Contractor shall purchase, install, and utilize on-board technologies on each of the collection vehicles 720
and supervisor vehicles. This technology will be used to perform a variety of tasks which will provide 721
necessary data and service validation both for Augusta and for our customers. All data should be 722
available to Augusta on a real-time basis. This technology shall, at a minimum: 723
724
3.15.1 Fully Automated Service Verification 725
The RFID technology shall be capable of reading Augusta’s RFID tags in each Roll-Out 726
Cart and shall verify the accuracy of containers being serviced, including positively 727
identifying which Customers were not serviced and why; identify which containers were 728
not out for collection; and which customers had extra materials for collection. It should 729
also identify containers that have been moved, stolen, or relocated. All such actions 730
should be captured by photograph attached to the customer and/or container. 731
732
3.15.2 Provide Detailed Route Sheets 733
Driving directions to the next stop based on the route sheets, also allow the driver to 734
choose the next stop manually when running the route out of sequence. When this 735
occurs, the system shall recalculate the route. 736
737
3.15.3 On-Board Scale Technology 738
Automatically record lift events and lift weights for Roll-Out carts and Recyclables Roll-739
Out carts for each Customer. 740
741
3.15.4 Roll-Out Carts 742
Capable of automating the delivery, damage, exchanges, returns, and removals of Roll-743
Out Carts for each Customer. This will be performed by Augusta, but the software 744
should be capable of supporting cart data. 745
746
3.15.5 Hand-Held Devices 747
A hand-held device which integrates with the on-board computer that will allow the 748
driver and/or supervisor to collect information while outside of the vehicle. The hand-749
held device shall have at least signature verification and RFID reader capabilities. 750
751
3.15.6 Global Positioning System 752
All data gathering and tracking shall be geo-coded and provide real-time vehicle location 753
(within 2 minutes), route driven, and stops made. 754
755
3.15.7 Messaging 756
Wireless communication to each vehicle while in the yard, en-route, or at the Designated 757
Disposal facility, and real-time messaging between the driver and the back-office 758
software. 759
760
3.15.8 Reporting 761
A report center that allows the logging of time for breaks, customer stops, refueling, 762
landfill, and others. This should also provide the recording of detailed events during 763
accident situations, and the exact route each vehicle took any day. Reports should be 764
customizable. 765
766
SECTIO 4 - ROUTIG AD COLLECTIO SCHEDULES 767
768
Attachment number 8 \nPage 16 of 73
Item # 2
Page 17 of 73
Solid Waste & Recyclables Collection
Augusta, GA
4.1 Route Maps 769
The Contractor shall annually review the existing collection maps and evaluate workloads and service 770
areas for effectiveness and efficiency in light of changed population density and/or distribution. Augusta 771
will review the Contractor's route maps to ensure that all areas to be collected are included, and that 772
routing does not result in dangerous collection practices. 773
774
4.1.1 Route Details 775
Each set of detailed route maps must show, for each collection day, the areas to be collected, the 776
starting point for collection, and the exact direction and sequence of travel of the streets and 777
alleys for each route to be collected. The Contractor shall use its best efforts to minimize the 778
number of Residential Units, Designated Non-Residential Locations and Unoccupied Locations 779
that are affected by collection day changes as a result of its initial routing plans. 780
781
The Contractor is responsible for ensuring that all routes are accurately populated in the on-board 782
vehicle technology. 783
784
4.1.2 Route Summary Information 785
The Contractor shall include a summary of the route maps, indicating the number of Residential 786
Units, Designated Non-Residential Locations and Unoccupied Locations to be collected each 787
collection day, and the number of Residential Units, Designated Non-Residential Locations and 788
Unoccupied Locations per route, for Residential Garbage, Recyclables, Yard Waste and Bulky 789
Waste collection. The summary shall also show the number of Residential Units, Designated 790
Non-Residential Locations and Unoccupied Locations, which would be affected by any changes 791
in their current collection days, and an explanation of those changes. 792
793
4.1.3 Route Boundaries 794
Routes shall be bounded by natural boundaries, such as bodies of water, major highways or 795
arterials. Any boundaries that are on secondary or residential roads shall be divided on the back 796
of property lines to ensure both sides of the street are collected on the same day and route. 797
798
4.1.4 Route Map Format 799
Route maps shall be submitted in reproducible, approved GIS format. All street names must be 800
legible. The Contractor may request current street maps showing parcel information from 801
Augusta's GIS manager. Once a format is agreed upon, all future route maps shall be prepared 802
using the same format. 803
804
4.2 Routing and Collection Day Changes 805
When adjustments are warranted, the Contractor shall submit detailed route maps, one (1) set each for 806
Residential Garbage, Recyclables, Yard Waste and Bulky Waste collection, to Augusta for Augusta's 807
review. Any routing change, which results in a change of collection days for any Residential Units, 808
Designated Non-Residential Locations and Unoccupied Locations, requires compliance with the 809
notification process described in Section 4.3. Augusta may require the Contractor to phase in collection 810
day changes and any changes affecting more than five (5) routes. 811
812
4.2.1 Route Change Requests 813
In the event collection days or routes become unbalanced due to population changes or other 814
reason, Augusta may allow the Contractor to make revisions to its initial approved route maps. 815
The Contractor shall submit any requests for changes in routing or collection schedules to 816
Augusta for Augusta's review and approval as follows: 817
Attachment number 8 \nPage 17 of 73
Item # 2
Page 18 of 73
Solid Waste & Recyclables Collection
Augusta, GA
a. Not less than six (6) weeks prior to the week proposed for a routing change for five 818
(5) routes or less to become effective. Augusta will approve or disapprove the request 819
within three (3) week of receipt. 820
b. Not less than twelve (12) weeks prior to the week proposed for a routing change for 821
more than five (5) routes or a collection day change to become effective. Augusta 822
will approve or disapprove the request within six (6) weeks of receipt. 823
824
4.2.2 Route Change Documentation 825
All such changed routes must be documented in the same detail as the original route maps 826
supplied by the Contractor, as described in Section 4.1, and must include the reasons for the 827
requested change and the number of Residential Units, Designated Non-Residential Locations 828
and Unoccupied Locations affected in each route. Changes shall involve easily identifiable route 829
and area boundaries for ease in communicating the change to Customers. 830
831
4.2.3 Route Change Justification 832
The Contractor shall not request any routing or collection day changes without a valid reason 833
because of the resulting confusion to Customers and increases in the number of customer service 834
calls which must be handled by Augusta staff. In addition to the Courtesy Collections provided by 835
the Contractor in accordance with Section 3.11.5, the Contractor shall provide Courtesy 836
Collection to any Residential Units, Designated Non-Residential Locations and Unoccupied 837
Locations affected by a routing or collection day change, upon request from Augusta, for a two-838
week period following implementation of the change. 839
840
4.3 Collection Day Change otification Process 841
The Contractor shall be responsible for the full cost and provision of notification to all Residential Units, 842
Designated Non-Residential Locations and Unoccupied Locations affected by any change in routes or 843
collection schedules, which has been approved by Augusta, which alters the day of collection. The 844
Contractor shall submit a notification plan for Augusta's review and approval, at the time of submittal of 845
any request for collection day changes. The notification plan shall outline the process recommended by 846
the Contractor. 847
848
Notification must be received by each affected Residential Unit, Designated Non-Residential Location or 849
Unoccupied Location not less than one (1) week or more than two (2) weeks prior to the starting date of 850
such change. Notice shall be made in writing to each individual Customer. Such notice shall include the 851
reason for the change and a Augusta telephone number and e-mail address to contact if further 852
information is desired. The method of notification may be a letter sent through the U.S. Postal Service to 853
every affected Customer of record, or the same letter or a door hanger hand-delivered door-to-door (either 854
handed to the Customer or left at each service address). Notification to Unoccupied Locations shall be a 855
letter sent through the U.S. Postal Service. Notification by notice attached to Roll-Out Carts is not 856
permitted. The method and date of notification and the proposed content of the notice letter or door 857
hanger must be reviewed and approved by Augusta. Augusta may conduct random inspections to ensure 858
notification procedures are being followed. 859
860
The Contractor is also responsible for ensuring that its equipment operators are fully informed of any 861
approved change, and that the change is accomplished with a minimum of disruption to Customers and 862
daily operations. 863
864
4.4 Route Order 865
866
The Contractor shall always collect each route in the order approved by Augusta. Route maps are used by 867
Augusta to document and monitor areas to be collected in order to provide good customer service to the 868
Attachment number 8 \nPage 18 of 73
Item # 2
Page 19 of 73
Solid Waste & Recyclables Collection
Augusta, GA
public and to respond to Customer complaints and reported collection misses. Should there be an 869
equipment failure reported to Augusta, the Contractor may request authorization from Augusta for a 870
temporary route change. 871
872
4.4.1 Damages 873
Should the Contractor collect Residential Garbage, Recyclables, Yard Waste and Bulky 874
Waste in any other order without obtaining approval of Augusta in accordance with Section 875
4.4 and 4.2, and without providing notification to affected residents before the change, the 876
Contractor shall pay Augusta Damages of five hundred dollars ($500) per route for each 877
daily occurrence. 878
879
4.4.2 Route Audits 880
Augusta shall have the right to be a passenger in the collection vehicles for the purposes of 881
auditing routes and services. Augusta shall request such activity at least 48-hours in 882
advance. 883
884
4.5 Collection Impediments 885
A number of collection impediments may require special effort by the Contractor to provide collection 886
service. Collection impediments of any type, in any portion of the Service Area including streets and 887
alleys, shall not result in disruption of collection service. When conditions require special efforts to 888
complete collection service, the Contractor shall make these additional efforts at no additional cost to 889
Augusta. 890
891
4.5.1 Adverse Weather 892
If the impassability of the street or alley due to extreme weather conditions is anticipated to last 893
for only one or two scheduled collection days, Augusta may elect to delay collection services until 894
conditions improve. When this occurs, the Contractor shall resume collection services on the next 895
scheduled collection day. 896
897
4.5.2 Infrastructure Construction 898
Periodically major renovation is necessary to maintain the infrastructure of Augusta. This 899
renovation includes such activities as replacing gas, water, and sewer lines, surfacing or 900
resurfacing streets, and replacing wiring for telephone, electricity, or cable television. If the 901
Contract Administrator is notified in advance of these activities, the Department will notify the 902
Contractor. However, it is not uncommon for work to be initiated without prior notification. 903
Alternate collection service must be provided during this period of disruption. Each circumstance 904
must be evaluated individually to determine the appropriate alternative. The Contractor shall 905
notify Augusta of the nature of the disruption, its location, and the Contractor's recommended 906
alternative to provide service. Augusta will either approve the alternative method or require the 907
Contractor to use a different collection method. 908
909
4.5.3 Materials Blocking the Street or Alley 910
When materials of any kind are placed in the street or alley in such a way that the collection 911
vehicle cannot proceed down the street or alley, the Contractor shall immediately notify Augusta. 912
Augusta will attempt to locate the individual responsible for the material and have them remove it. 913
However, if the responsible party cannot be located immediately and Augusta determines that the 914
amount of material is too large for the Contractor to move or to collect, Augusta will remove the 915
material blocking the street or alley and the Contractor shall provide collection service as 916
scheduled at no extra charge to Augusta. If Augusta determines that the Contractor should collect 917
Attachment number 8 \nPage 19 of 73
Item # 2
Page 20 of 73
Solid Waste & Recyclables Collection
Augusta, GA
the material, the Contractor shall remove the material and provide collection service as scheduled 918
at no extra charge to Augusta. 919
920
4.5.4 Illegally Parked Vehicles 921
If an illegally parked vehicle blocks a street or alley, the Contractor must inform Augusta of the 922
situation and request removal of the vehicle. Removal of the vehicle usually occurs in a matter of 923
hours, thus collection must be provided on the scheduled day. If the vehicle is not removed by the 924
end of the collection day and there is no other access to the Roll-Out Carts, the Contractor shall, 925
upon notification to and approval by Augusta, provide collection at start of shift on the following 926
day. The Contractor is responsible for follow-up with Augusta until the vehicle is removed and 927
shall inform Augusta when the vehicle is removed. 928
929
SECTIO 5 - ROLL-OUT CARTS AD RECYCLABLES CARTS 930
5.1 Provision & Maintenance of Roll-Out and Recyclables Carts 931
Except as otherwise provided for in this Agreement, Augusta will be responsible for providing and 932
delivering Roll-Out and Recyclables Carts to Customers, and delivering replacement Roll-Out and 933
Recyclables Carts for those which are lost, stolen, damaged or worn beyond their useful life. Augusta will 934
also be responsible to repair or replace all Roll-Out and Recyclables Carts as needed. 935
5.2 Roll-Out and Recyclables Cart Size & Types 936
Roll-Out and Recyclables Carts provided to Customers by Augusta include 35-gallon, 64-gallon and 95-937
gallon nominal capacity carts. Augusta may distribute Roll-Out and Recyclables Carts of other sizes; 938
however, all such Roll-Out and Recyclables Carts will be compatible with the approved collection 939
equipment. The number of Roll-Out and Recyclables Carts distributed will be at the sole discretion of 940
Augusta. 941
5.3 Roll-Out and Recyclables Cart Loss & Damage 942
943
The Contractor shall exercise all reasonable care and diligence to ensure that Roll-Out and Recyclables 944
Carts are not damaged by its collection vehicles while providing collection service. 945
946
When Contractor's equipment operators observe any damaged Roll-Out Cart or Recyclables Cart, the 947
Contractor shall report the address and description of the damaged Roll-Out Cart or Recyclables Cart to 948
Augusta through the onboard computer. If, in Augusta's judgment following inspection, the Contractor is 949
responsible for damaging a Roll-Out Cart or Recyclables Cart, the Contractor shall pay Augusta's fee to 950
cover the costs to repair or replace the damaged Roll-Out Cart or Recyclables Cart. Augusta will adjust 951
the payment of the Contractor's next monthly invoice in an amount equal to the cost of these repairs or 952
replacements. 953
954
From the Start Date, the Contractor will be given a waiver on Roll-Out Cart and Recyclables Cart 955
damages for a period of ninety (90) days. This time shall be used by the Contractor to identify any 956
current damages to Roll-Out and Recyclables Carts and afford Augusta time to make such repairs or 957
replacements. 958
959
5.4 Roll-Out and Recyclables Cart Placement 960
Contractor shall return Roll-Out and Recyclables Carts to their original location, or to a safe location, 961
taking special care not to create a hazard to the traveling public, not to block access to driveways or 962
mailboxes. The Roll-Out and Recyclables Carts shall be located a safe distance from either side of the 963
driveway to assure Customers are not impeded in entering their driveway. Roll-Out Carts and Recycling 964
Attachment number 8 \nPage 20 of 73
Item # 2
Page 21 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Carts shall not be left in the gutter line of the street, but shall be placed behind the curb where curb and 965
gutter exist and off the road, on public right-of-way when no curb and gutter exist. When the Contractor 966
shall fail to meet these performance standards, the Contractor shall pay Augusta damages described 967
herein. 968
969
5.4.1 Due Care 970
The Contractor shall exercise all reasonable care and diligence to ensure that Roll-Out and 971
Recyclables Carts are not damaged by its collection vehicles while providing collection service. 972
973
5.4.2 Damages by Collection Vehicles, Actions, or eglect 974
The Contractor shall be responsible for any damage to or loss of Roll-Out or Recyclables Carts 975
resulting from misplacement (if hit by vehicle because they are placed too near to the travel lane), 976
mishandled (damaged by or falls into the Contractor's collection truck), abuse (slinging or 977
throwing) or crushed (either by the packing blade or automated arm). The Contractor shall 978
immediately notify Augusta of any damaged Roll-Out or Recyclables Carts caused by 979
Contractor's collection vehicles, action or neglect. 980
981
a. One hundred dollars ($100) for each offense starting at the eleventh (11) violation of 982
Sections 5.4, 5.4.1, and 5.4.2 during any one (1) calendar month; 983
984
b. An additional five thousand dollars ($5,000) for each month in which there are two 985
hundred (200) or more violations of Sections 5.4, 5.4.1, and 5.4.2 in any one (1) 986
calendar month. 987
988
5.4.3 Damages - Wheels 989
The Contractor shall be responsible for any damage to or loss of Roll-Out or Recyclables Carts 990
wheels. If, in Augusta's judgment, following inspection, the Contractor is responsible for 991
damaging a Roll-Out Cart or Recyclables Cart, the Contractor shall pay Augusta's fee to cover the 992
costs to repair or replace the damaged Roll-Out Cart or Recyclables Cart. 993
994
a. Twenty-five ($25) for each offense starting at the eleventh (11) violation of Sections 995
5.4.3. during any one (1) calendar month; 996
997
b. An additional five thousand dollars ($5,000) for each month in which there are two 998
hundred (200) or more violations of Sections 5.4.3 in any one (1) calendar month. 999
1000
1001
SECTIO 6 – EQUIPMET/FACILITIES 1002
6.1 Collection Vehicles 1003
1004
The Contractor shall provide and maintain during the Contract a fleet of collection vehicles sufficient in 1005
number and capacity to perform the services described in this Agreement. All vehicles shall be 1006
appropriately licensed with the State of Georgia in Richmond County and comply with all applicable 1007
federal, state, and local laws and regulations. 1008
1009
The Contractor shall provide and use only such equipment, material, and facilities as are capable of 1010
performing quality and timely services required by this Agreement. The fleet shall be sufficient to handle 1011
the special requirements of adverse weather, holiday and Masters overloads. The Contractor's collection 1012
vehicles shall be maintained by the Contractor, kept clean, neat, kept in good repair and working order. 1013
The Contractor shall furnish, at its sole expense, whatever backup or substitute equipment may be 1014
required to continue performance of the services. 1015
Attachment number 8 \nPage 21 of 73
Item # 2
Page 22 of 73
Solid Waste & Recyclables Collection
Augusta, GA
1016
6.1.1 Vehicle Specifications 1017
a. All collection vehicles shall have enclosed bodies. 1018
1019
b. The Contractor may use new or used equipment so long as the equipment is capable 1020
of performing the required services in accordance with this Agreement. Collection 1021
equipment utilized in this Agreement shall not be more than three (3) years old at the 1022
Starting Date of this Agreement. In no event shall a vehicle operating under this 1023
Agreement exceed a maximum age of ten (10) years. 1024
1025
c. The noise level for collection vehicles during the stationary compaction process shall 1026
not exceed seventy-five (75) decibels at a distance of twenty-five (25) feet from the 1027
collection vehicle and at an elevation of five (5) feet from the ground elevation of 1028
such vehicle. 1029
1030
d. Prior to the Starting Date and then quarterly thereafter, the Contractor shall supply 1031
Augusta with a list of all equipment to be used in providing services and shall notify 1032
Augusta of additions or deletions as they occur. 1033
1034
e. The Contractor shall maintain a dedicated fleet solely for use to provide Augusta, 1035
Georgia collection services included in this Contract. With Augusta approval, and at 1036
the sole discretion of Augusta, vehicles used in the provision of services under this 1037
Agreement may be used for other purposes, provided that the Contractor has made a 1038
request in writing, and such request was approved by Augusta in writing. Any such 1039
use shall not interfere in any way with the Contractor's provision of services under 1040
this Agreement. Augusta reserves its right to revoke such authorization at any time 1041
for any reason. 1042
1043
f. The Contractor shall be responsible for arranging for tare weights with the 1044
Designated Disposal Facility and the Designated Recycling Facility for all collection 1045
vehicles prior to the Starting Date, and shall periodically, upon request from Augusta, 1046
arrange for updating tare weights. 1047
g. All vehicles collecting Roll-Out or Recyclables Carts shall have cart tippers/dumpers 1048
on the collection vehicles which are operational. All such tipper/dumpers shall be 1049
designed to empty carts pursuant to ANSI Z245.30-2008 and ANSI Z245.60-2008. 1050
Cart tippers/dumpers shall be operated at the original equipment manufacturers 1051
specifications. Cart tippers/dumpers which do not meet this requirement shall not be 1052
used. Augusta has the right to inspect and test cart tipper/dumpers. Should a cart 1053
tipper/dumper not pass inspection, the collection vehicle shall be removed from 1054
service until such time as the deficiency has been remedied. 1055
1056
If a cart tipper/dumper is used that does not meet the above specifications, the 1057
Contractor risks being responsible for additional damages to Roll-Out Carts and 1058
Recyclables Carts to include the cost of repair or replacement under Section 5.4. 1059
1060
h. All collections vehicles used to perform functions under this Contract shall be 1061
equipped with the following in complete and sound working order: 1062
1063
1. Progressive ambient noise back-up alarm. 1064
Attachment number 8 \nPage 22 of 73
Item # 2
Page 23 of 73
Solid Waste & Recyclables Collection
Augusta, GA
2. Back-up camera with monitor visible from any driving position. 1065
3. A 10 pound fire extinguisher. 1066
4. A 25 person first aid kit. 1067
5. Minimum of three safety marking devices (flares, or reflective triangles). 1068
6. Rear-mounted strobe light(s) activated while collecting materials. 1069
7. A spill kit with a minimum size of 10 gallons to handle operational spills. 1070
8. Onboard computer hereinafter defined. 1071
i. All supervisors vehicles used to perform functions under the Contract shall be 1072
equipped with the following in complete and sound working order: 1073
1074
1. A 10 pound fire extinguisher. 1075
2. A 25 person first aid kit. 1076
3. Minimum of three safety marking devices (flares, or reflective triangles). 1077
4. A spill kit with a minimum size of 10 gallons to handle operational spills. 1078
5. Onboard computer hereinafter defined. 1079
j. All collection vehicles or personnel must be equipped with a communication device 1080
(i.e. cell phone or radio) which allows for immediate communication between the 1081
collection vehicle and a supervisor, and/or the Contractor’s office. 1082
k. All vehicles operated under the authority of this Contract shall be driven in 1083
compliance with Uniform Rules of the Road and Georgia State traffic laws and, 1084
where applicable, Augusta’s codes, ordinances, and rules. 1085
l. The Contractor shall make a reasonable effort to empty each collection vehicle at the 1086
end of each day. 1087
m. The Contractor is responsible for any and all fees associated with disposal permits, 1088
inspection fees, IFTA stickers, etc. These permits shall be timely obtained. 1089
n. Prior to the Starting Date, and annually thereafter, the Contractor shall have a D.O.T. 1090
inspection performed on all vehicles operating under this Contract by a competent 1091
third party firm to perform such inspections. Copies of said inspection shall be 1092
supplied to Augusta within 30 days of the inspection taking place. Should a vehicle 1093
not pass inspection, it shall be removed from service until such time as the deficiency 1094
has been remedied. 1095
o. Augusta shall have the right to inspect all vehicles used in performing this Contract. 1096
Augusta shall have the right to do random spot inspections as it deems reasonably 1097
necessary. Should a vehicle not pass inspection, it shall be removed from service 1098
until such time as the deficiency has been remedied. 1099
p. All vehicles operated under this Agreement, to include collection vehicles and 1100
supervisor’s vehicles, shall operate solely on Compressed Natural Gas (CNG). 1101
1. Vehicles operating on CNG shall be able to be filled at a minimum 1102
flow rate of six (6) diesel gallon equivalents (DGE) per minute. 1103
2. All vehicles operating on CNG shall be equipped with a 1000 scfm 1104
fill port for fast filling and it is recommended that they also have a 1105
5000 scfm fast fill port. 1106
3. All vehicles shall be equipped with Syntech-Fuelmaster Systems, 1107
AIMS II product which will communicate directly with the fueling 1108
island. 1109
6.2 Smart Vehicle Onboard Technology 1110
Attachment number 8 \nPage 23 of 73
Item # 2
Page 24 of 73
Solid Waste & Recyclables Collection
Augusta, GA
The Contractor shall purchase, install, and utilize on-board technologies on each of the collection vehicles 1111
and supervisor vehicles. This technology will be used to perform a variety of tasks which will provide 1112
necessary data and service validation both for Augusta and for our customers. 1113
1114
6.2.1 Fully Automated Service Verification 1115
The RFID technology shall be capable of reading Augusta’s RFID tags in each Roll-Out 1116
Cart and shall verify the accuracy of containers being serviced, including positively 1117
identifying which customers were not serviced and why; identify which containers were 1118
not out for collection; and which customers had extra materials for collection. It should 1119
also identify containers that have been moved, stolen, or relocated. All such actions 1120
should be captured by photograph attached to the customer and/or container. 1121
1122
6.2.2 Provide Detailed Route Sheets 1123
Driving directions to the next stop based on the route sheets, also allow the driver to 1124
choose the next stop manually when running the route out of sequence. When this 1125
occurs, the system shall recalculate the route. 1126
1127
6.2.3 On-Board Scale Technology 1128
Automatically record lift events and lift weights for Roll-Out carts and Recyclables Roll-1129
Out carts for each customer. 1130
1131
6.2.4 Roll-Out Carts 1132
Automate the delivery, damage, exchanges, returns, and removals of Roll-Out Carts for 1133
each customer. This function will be performed by Augusta, but the software should be 1134
capable of supporting cart data. 1135
1136
6.2.5 Hand-Held Devices 1137
A hand-held device which integrates with the on-board computer that will allow the 1138
driver and/or supervisor to collect information while outside of the vehicle. The hand-1139
held device shall have signature verification and RFID reader capabilities. 1140
1141
6.2.6 Global Positioning System 1142
All data gathering and tracking shall be geo-coded and provide real-time vehicle 1143
locations (within 2 minutes), route driver, and stops made. 1144
1145
6.2.7 Messaging 1146
Wireless communication to each vehicle while in the yard, en-route, or at the Designated 1147
Disposal facility, and real-time messaging between the driver and the back-office 1148
software. 1149
1150
6.2.8 Reporting 1151
A report center that allows the logging of time for breaks, customer stops, refueling, 1152
landfill, and others. This should also provide the recording of detailed events during 1153
accident situations, and the exact route each vehicle took any day. Reports should be 1154
customizable. 1155
6.3 Collection Vehicle Cleaning 1156
All collection vehicles must be kept clean, in sanitary condition, and good repair at all times. The 1157
Contractor shall ensure that all collection vehicles are washed as required to reduce possible odor, reduce 1158
vector problems and provide a positive image. 1159
1160
Attachment number 8 \nPage 24 of 73
Item # 2
Page 25 of 73
Solid Waste & Recyclables Collection
Augusta, GA
6.4 Emergency Unloading 1161
1162
While Augusta recognizes that an occasional emergency such as a Hot Load may require unloading a 1163
collection vehicle in the field, the Contractor shall recollect this material within two (2) hours of the 1164
unloading. The Contractor shall notify Augusta immediately of such an event and shall take whatever 1165
measures are necessary to ensure that no fire danger exists. The area must be litter free after the re-1166
collection. The Contractor shall notify Augusta when the material has been collected; at which time 1167
Augusta may conduct a follow-up inspection to ensure that the cleanup has been completed to the 1168
satisfaction of Augusta. 1169
1170
6.4.1 Damages 1171
If the Contractor fails to collect the load and notify Augusta of such collection within two 1172
(2) hours, the Contractor shall pay Augusta in Damages one hundred dollars ($100) for 1173
each two- (2) hour period such load is not collected. If the material is not collected in a 1174
timely manner, Augusta may, in addition to assessing Damages for time delays, assess 1175
Damages of $2,000 to collect the load, and will invoice the Contractor the cost to repair 1176
any damage to Augusta's streets, sidewalks or other infrastructure as soon as Augusta can 1177
assess the costs of such damages to infrastructure. All repairs to Augusta property shall 1178
be completed by a licensed professional and in a means and matter approved by Augusta. 1179
1180
Augusta shall not be liable to Contractor for any damage to Contractor's collection 1181
vehicles or injury to Contractor's personnel, or any other damage or injury, as a result of a 1182
Hot Load. 1183
6.5 Vehicle Leaks & Spills 1184
Minimizing hydraulic fluid, oil leaks and spills on public or private streets and parking lots is a high 1185
priority for Augusta, Georgia. The Contractor shall maintain equipment in top mechanical condition, and 1186
the operator shall exercise vigilance in observing for leaks and spills that may develop during the 1187
collection day and take immediate corrective action to stop the leak or spill and call for cleanup of 1188
hydraulic fluid, oil, other vehicle fluids or other leaks or spills present upon the public or private streets or 1189
parking lots in accordance to the following standards. 1190
1191
6.5.1 Removal from Service/Spill Cleanup 1192
The Contractor’s vehicles shall be repaired or removed from service immediately if any spill or 1193
leak is a result of a mechanical problem, or poor seal(s). The Contractor shall be responsible for 1194
applying absorbent materials, clean up, and disposal in a manner which complies with all federal, 1195
state, and local laws and regulations, of all oil spills, hydraulic fluid or other leaks or spills 1196
associated with its provision of services. In the event of a spill or leak, the Contractor shall 1197
immediately notify Augusta and shall send a representative to the location of the incident. If the 1198
spill or leak is in a street location and/or is a public safety hazard, the Contractor shall also 1199
immediately request traffic control and any other required public safety personnel. Augusta and 1200
the Contractor will evaluate the spill or leak to determine proper handling. Augusta must approve 1201
the Contractor's recommended clean-up plan, which may require steam cleaning. The clean up 1202
must commence as soon as possible but no later than two (2) hours following the spill or leak. 1203
After application of absorbent materials is complete, the Contractor is responsible for removal of 1204
the absorbent material and/or cleaning of the street, if necessary. The Contractor shall notify 1205
Augusta when the cleanup is completed so that a follow-up inspection can be conducted to ensure 1206
that the cleanup has been completed to the satisfaction of Augusta. Any fluids associated with the 1207
spill or the cleanup shall be recovered for proper disposal and shall OT be released into the 1208
storm water system. 1209
1210
Attachment number 8 \nPage 25 of 73
Item # 2
Page 26 of 73
Solid Waste & Recyclables Collection
Augusta, GA
6.5.2 Damages 1211
In the event the vehicle operator fails to remove the leaking vehicle from service or call for the 1212
on-call mechanic to make field repairs, and continues collecting the route spreading puddles of 1213
hydraulic fluid, oil, other vehicle fluids or other leaks or spills throughout the road system, the 1214
Contractor shall be subject to Damages in the amount of $3,000, plus the damages described 1215
below. 1216
a. In the event that Contractor does not clean up any spill or leak within the time 1217
specified above, the Contractor shall be subject to Damages in the amount of one 1218
thousand five hundred dollars ($1,500) for each such occurrence. The Contractor 1219
shall endeavor to prevent such occurrences by whatever means possible. 1220
1221
b. If the Contractor fails to initiate proactive measures necessary to reduce the 1222
frequency and severity of vehicle leaks or spills the Contractor shall, in addition to 1223
the Damages described above, be subject to the following Damages: 1224
(i) One thousand dollars ($1,000.00) for each leak or spill during any 1225
one- (1) month period in which there were three (3) or more leaks or 1226
spills; 1227
1228
6.6 Vehicle Identification and Presentation 1229
Each Contractor vehicle will be clearly identified with the Contractor name, a vehicle number, and a local 1230
telephone number that can be clearly read from a distance of 100 feet. 1231
1232
6.6.1 Marketing Campaign – Vehicles 1233
The Contractor shall provide trucks that have been wrapped in a marketing campaign that address 1234
the following issues. At a minimum, it shall include Augusta phone number and Augusta email 1235
and/or web site information. Wraps may need to be replaced from time to time, to ensure that 1236
their appearance is acceptable to Augusta. 1237
a. Recycling awareness and participation 1238
b. Waste reduction strategies 1239
c. Eco friendly solutions 1240
d. Composting 1241
e. CNG Benefits 1242
f. Others as approved 1243
1244
6.7 Facilities 1245
The Contractor shall operate a facility within Augusta, Georgia, and will license/tag all vehicles utilized 1246
by the Contractor in the performance of this Contract in Augusta. 1247
1248
SECTIO 7 - DISPOSAL AD PROCESSIG SITES 1249
7.1 Ownership of Solid Waste Materials 1250
The Contractor shall have ownership of solid waste from the time of collection until the materials are 1251
deposited at the Designated Disposal Facility or the Designated Recycling Facility. 1252
7.2 Designated Disposal and Recycling Facilities 1253
The Contractor shall be responsible for abiding by all rules and policies pertaining to the delivery of 1254
Residential Garbage, Yard Waste and Bulky Waste as directed by the Designated Disposal Facility, and 1255
delivery of Recyclables as directed by the Designated Recycling Facility. A copy of the current policies 1256
Attachment number 8 \nPage 26 of 73
Item # 2
Page 27 of 73
Solid Waste & Recyclables Collection
Augusta, GA
and procedures for the Designated Disposal Facility and Designated Recycling Facility will be provided 1257
to the Contractor by Augusta, and are subject to modification from time to time. 1258
1259
7.2.1 Designated Disposal Facility 1260
All Residential Garbage, Yard Waste and Bulky Waste shall be delivered to the Deans Bridge 1261
Road Landfill, located at 4330 Deans Bridge Road, Blythe, Georgia 30805. 1262
1263
Disposal of Residential Garbage, Yard Waste and Bulky Waste will be provided by Augusta at no 1264
charge to the Contractor for all materials delivered to the Designated Disposal Facility. 1265
1266
Mixing of non-contract solid waste is strictly prohibited, and will be considered a breach of 1267
contract. 1268
1269
7.2.2 Designated Recycling Facility 1270
All Recyclables shall be delivered to the transfer station located at 3946 Goshen Industrial Blvd, 1271
Augusta, Georgia, 30906 or other location as may be determined by Augusta from time to time. 1272
1273
Disposal of Recyclables will be provided by Augusta at no charge to the Contractor for all 1274
materials delivered to the Designated Recycling Facility. 1275
1276
7.2.3 Damages 1277
If the Contractor delivers Recyclables to the landfill, Damages in the amount of five hundred 1278
dollars ($500.00) per incident will be assessed. 1279
1280
7.3 on-Contract Waste 1281
1282
Beginning on the Effective Date, the Contractor servicing Designated Collection Area 1 has the right to 1283
bring Augusta non-contract waste collected, or under its control, where economically feasible, in the areas 1284
surrounding Richmond County. The Contractor shall pay Augusta the standard volume based disposal 1285
rates from 0-5000 tons per month. The Contractor shall pay Augusta $17.00 dollars per ton on the 5001-1286
10,000 tons per month. After that the standard volume based disposal rates shall apply. 1287
1288
a. The tons being charged at the reduced rate will factor into the standard volume based rates 1289
tonnages. 1290
1291
b. Augusta shall be entitled to the same CPI Adjustment as afforded the Contractor in Section 12.3. 1292
All the same general conditions of adjustment shall apply with the exception that Augusta does 1293
not have to provide notice as required under Section 12.3.1 (b). 1294
1295
7.4 Additional on-Contract Waste 1296
The Contractor, with Augusta’s prior approval, may market Augusta’s landfill in an effort to generate 1297
additional revenues for both the Contractor and Augusta. Negotiated disposal pricing must be approved 1298
by the Environmental Services Director and Augusta’s Administrator. 1299
1300
SECTIO 8 – MEDIA AD CAPITAL COSTS 1301
1302
8.1 Media Design and Distribution 1303
Between the Effective Date and the Start Date, the Contractor shall provide a Media Design and 1304
Distribution firm capable of designing, distributing, and producing the following items. The estimated 1305
expense per Designated Collection Area awarded is $75,000.00. The schedule of such services shall be 1306
coordinated with Augusta to insure a timely implementation. 1307
Attachment number 8 \nPage 27 of 73
Item # 2
Page 28 of 73
Solid Waste & Recyclables Collection
Augusta, GA
1308
8.1.1 Internet Site 1309
This shall include the acquiring and hosting of the domain name “augustasolidwaste.com”. The 1310
website shall be interactive and capable of providing fill-able forms, customer service 1311
information, and educational items, at a minimum. The content will be coordinated, specified, 1312
and approved by Augusta. Said domain name will be transferred to free and clear to Augusta at 1313
the termination of this Agreement. 1314
1315
8.1.2 Truck Media 1316
The Media firm will design, produce, and install various vehicle media and wraps as approved by 1317
Augusta. The Contractor shall bear all costs for the production and installation of media items on 1318
their collection vehicles. All vehicles shall state that they are fueled by CNG”. See Section 6.6.1 1319
for details. 1320
1321
8.1.3 Pamphlets, Handouts, Advertising, Public Service Announcements 1322
The Media firm will be capable of designing pamphlets, handouts, large advertising pieces (such 1323
as newspaper advertisements and billboards), as well as Public Service Announcements at the 1324
direction and approval of Augusta. 1325
1326
8.1.4 Other Media 1327
Augusta may utilize the funds for other media which may include newspaper advertisement, 1328
billboards, or other forms of advertisement or public relations as Augusta deems appropriate. 1329
1330
8.1.5 Annual Media 1331
The Contractor will provide additional funds in the amount of $50,000 per year per Designated 1332
Collection Area for updates to the media items, as well as additional media items as Augusta 1333
deems appropriate. 1334
1335
8.2 Capital Costs 1336
Between the Effective Date and the Start Date, the Contractor shall provide the following items per 1337
Designated Collection Area awarded. 1338
1339
8.2.1 Roll-Out Carts 1340
The Contractor awarded Designated Collection Area One (1) and Designated Collection Area 1341
Two (2) shall each provide: 1342
1. 8,000 96-gallon Cascade Engineering Roll-Out Carts to Augusta. Such Roll-Out Carts 1343
will be the same specification as Augusta currently owns. These Roll-Out Carts shall 1344
include in their cost, the RFID Chip, and Assembly and Delivery. These shall be 1345
provided prior to the Start Date. 1346
2. 1,000 96-gallon Cascade Engineering Recyclables Carts. Such Recyclables Carts will be 1347
the same specification as Augusta currently owns. Those Recyclables Carts shall include 1348
in their cost, the RFID Chip, In-mold recycling label and delivery to Augusta’s Solid 1349
Waste Facility. These shall be provided prior to the Start Date. 1350
3. At a mutually agreeable time, 2,000 96-gallon Cascade Engineering Roll-Out Carts to 1351
Augusta. Such Roll-Out Carts will be the same specification as Augusta currently owns. 1352
These Roll-Out Carts shall include in their cost, the RFID Chip and delivery to Augusta’s 1353
Solid Waste facility. 1354
4. At a mutually agreeable time, 2,500 96-gallon Cascade Engineering Recyclables Carts. 1355
Such Recyclables Carts will be the same specification as Augusta currently owns. Those 1356
Attachment number 8 \nPage 28 of 73
Item # 2
Page 29 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Recyclables Carts shall include in their cost, the RFID Chip, In-mold recycling label and 1357
delivery to Augusta’s Solid Waste Facility. 1358
1359
The Contractor awarded Designated Collection Area Three (3) shall provide, prior to the Start 1360
Date, spare parts from Cascade Engineering. This shall include 30 pallets of wheels and axles, as 1361
well as 200 bars, and 200 Recyclables Cart lids. All items will be of a size and type to match the 1362
existing Augusta inventory. 1363
1364
8.2.2 Management Software 1365
A one-time fee of $100,000 for software licensing, set up, and integration will be provided at the 1366
inception of the contract per Designated Collection Area. Each contract year thereafter, $50,000 1367
will be provided for ongoing licenses, technology support, and programming per Designated 1368
Collection Area. 1369
1370
8.2.3 Hand-Held Solutions 1371
Three portable Windows CE-based hand-held devices will be provided to Augusta for their use in 1372
support and management of this Contract per Designated Collection Area. The devices will be 1373
capable of integrating with the on-board vehicle units and will be equipped with RFID readers, 1374
signature capture, and the ability to enter data. This shall include the cost of any monthly access 1375
or service fees. 1376
1377
8.2.4 CG Station 1378
The Contractor awarded Designated Collection Area One (1) and Designated Collection Area 1379
Two (2) shall design and build a CNG station for the use under this Agreement. Such station 1380
shall be designed with Augusta’s input. For Designated Collection Area One (1), a one-time fee 1381
of $2,650,000.00, for Designated Collection Area Two (2), a one-time fee of $2,650,000.00, for 1382
the development of CNG and LFG infrastructure, at an Augusta identified location and 1383
constructed by a mutually-agreed upon contractor. The CNG stations shall be operational by 1384
January 18, 2013, and on or before that date, the title to such property, equipment and 1385
improvements shall be transferred to Augusta, free and clear. Specifications for the construction 1386
of the station shall be provided once the Contract is awarded. 1387
1388
8.2.5 Additional CG Infrastructure 1389
The Contractor awarded Designated Collection Area Two (2) and Designated Collection Area 1390
Three (3) shall provide an additional $2,650,000.00 for Augusta’s use. Such funds shall be paid 1391
in the fifty fourth (54) month of the Agreement. 1392
8.3 Annual Survey 1393
An annual customer satisfaction survey that will be administered by a professional survey company 1394
selected by Augusta and paid for by the Contractor. This survey will target areas where service problems 1395
or poor participation are observed, and for the purpose of this Contract is valued at $15,000.00 per 1396
Designated Collection Area. 1397
Augusta will evaluate the results of the survey in conjunction with the profile of the key performance 1398
measures to determine the overall performance of the Contractor. Augusta will review the results of the 1399
Monthly Performance Summary with the Contractor on at least a quarterly basis and the Contractor 1400
agrees to implement measures as necessary to improve areas identified as requiring improvement. The 1401
Contractor recognizes that these results will be compiled by Augusta and may be presented internally or 1402
publically. 1403
1404
Attachment number 8 \nPage 29 of 73
Item # 2
Page 30 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Contractor acknowledges that its performance relative to the Monthly Performance Summary shall not be 1405
construed to mean that the Contractor is meeting its performance obligations as required by this 1406
Agreement. Should the Contractor not comply with any other material provision of this Agreement, 1407
Augusta may declare the Contractor in default notwithstanding its performance levels relative to the 1408
Monthly Performance Summary. 1409
1410
8.4 Unused Funds 1411
Any unused funds from the activities in this Section shall be credited to Augusta on the final statement of 1412
each year. 1413
1414
SECTIO 9 - CUSTOMER SERVICE 1415
1416
9.1 Requests for Service 1417
Augusta's Customer Care Center is responsible for receiving Customer inquiries, Requests for Service, 1418
and complaints related to service in the Service Area. Upon receipt of a call requiring follow-up by the 1419
Contractor, the Customer Care Center will prepare a Request for Service form and send such forms 1420
electronically to both the Contractor and the Environmental Services Department representative 1421
responsible for monitoring the Contractor's services under this Contract. The Contractor shall provide a 1422
computer system that is in compliance with Section 9.3 below. In the event that the Contractor receives 1423
any telephone calls from Customers, other than in response to follow-up property damage calls as 1424
described in Section 10.3, the Contractor shall refer such calls to Augusta. 1425
1426
9.1.1 Receipt of Requests for Service 1427
Once a Request for Service has been sent by Augusta, it shall be considered as received by the 1428
Contractor, therefore the Contractor shall ensure that its system for receipt of Requests for 1429
Service is operational at all times and monitored, at a minimum, at all times during the office 1430
hours set forth in Section 10.1 and any other time as necessary for the Contractor to comply with 1431
the requirements of this Agreement. 1432
1433
9.1.2 Completion of Service Request 1434
The Contractor shall notify Augusta, through its response to the Request for Service, of the 1435
Contractor's actions taken in response to the Request for Service including the date and time the 1436
request was completed. 1437
1438
9.1.3 Monthly Reports 1439
Augusta shall keep a record of the total number of Requests for Service received related to the 1440
Service Area by the Contractor under this Agreement. These records will be transmitted to the 1441
Contractor monthly. 1442
9.2 Customer Service 1443
The Contractor shall be responsible for responding to Customer requests for information that may be 1444
received by its employees in the course of providing services. To assist the Contractor in providing such 1445
information, Augusta will supply the Contractor with literature regarding Augusta services and the 1446
Contractor shall ensure that such literature is available at all times in all collection vehicles for use by its 1447
equipment operators. All literature used by the Contractor for this purpose must either be supplied by or 1448
approved by Augusta prior to use. 1449
9.3 Computer Hardware and Software Requirements 1450
The Contractor shall provide network access with sufficient bandwidth and speed to transfer data in a 1451
timely manner between the Customer Care Center and the Contractor's operation center in a manner 1452
Attachment number 8 \nPage 30 of 73
Item # 2
Page 31 of 73
Solid Waste & Recyclables Collection
Augusta, GA
acceptable to Augusta. The Contractor's computer system shall be capable of running in a Windows 1453
environment and at an appropriate version of Windows to be compatible with Augusta’s software. 1454
1455
9.3.1 Software Requirements 1456
The Contractor shall acquire and operate at least one stand-alone license for Insight of the 1457
appropriate release to support the customer service software. The customer service software 1458
(Insight) and data shall remain the sole property of Augusta. 1459
1460
Augusta shall provide a customer service software capable of tracking complaints by street 1461
address. The data collected shall include route number, scheduled day of pickup, type of 1462
complaint, date, time, method of resolution, and related comments such as special conditions or 1463
services provided at the location. The ability to maintain a historical record of complaints and 1464
activities at this address, to transmit work orders, and to prepare daily or monthly reports sorted 1465
by day of week, address, street or neighborhood, and the ability to transmit data to remote 1466
locations are also required. 1467
1468
Augusta shall be responsible for all data integrity including routine system maintenance, backups, 1469
and data recovery. The Contractor shall be responsible for system maintenance includes 1470
troubleshooting at the Contractor's facility. 1471
1472
System availability will be a minimum of 12 hours per day, 5 days per week as defined by 1473
Augusta. 1474
1475
The Contractor shall provide a firewall between their facilities and Augusta facilities acceptable 1476
to Augusta for the protection and integrity of Augusta's network. 1477
1478
SECTIO 10 - PERSOEL AD SAFETY 1479
10.1 Contact with Contractor 1480
1481
10.1.1 Contractor Facility 1482
Throughout the Contract Term, the Contractor shall establish and maintain a local facility 1483
capable of receiving Requests for Service electronically and by telephone, and to dispatch 1484
appropriate trucks and personnel to respond to Request for Service or to respond to service 1485
complaints such as Littering, property damage, or Vehicle Leaks and Spills within the time 1486
limits established in this Agreement. 1487
1488
The contractor facility should be of sufficient size and type to house all vehicles used under 1489
this contract, maintenance and cleaning for all vehicles operated under this contract, an office 1490
of sufficient size for contractor staff, and storage space for equipment as needed. 1491
1492
10.1.2 District Manager 1493
All Contractor personnel shall be directed by a District Manager permanently stationed 1494
within Augusta. The Contractor shall furnish Augusta the name of the District Manager prior 1495
to the Starting Date and shall notify Augusta immediately if the District Manager is changed 1496
at any time. The Contractor's District Manager shall serve as the contact person for dealings 1497
and communications with the Contractor. A request to the Contractor's representative shall 1498
always constitute a request to the Contractor. 1499
1500
10.1.3 Office Hours and Contact Personnel 1501
Attachment number 8 \nPage 31 of 73
Item # 2
Page 32 of 73
Solid Waste & Recyclables Collection
Augusta, GA
A responsible person in charge shall be present at the Contractor's local office during the 1502
time period of 8:00 a.m. to 5:15 p.m. Monday through Friday, and on Saturday when 1503
collection is scheduled, with the authority to make decisions relevant to operations under this 1504
Agreement. 1505
1506
Route supervisors will be accessible by telephone between the hours from 6:30 a.m. to 8:00 1507
p.m. on all days when collection operations are in progress. The names and phone numbers 1508
of emergency representatives shall be given to Augusta prior to the Starting Date, and shall 1509
be updated as soon as any changes are made. Contractor's emergency representative shall be 1510
responsible for responding to any Requests for Service from Augusta on non-collection days 1511
and evenings, as described in this Agreement. If Friday is a scheduled collection day, misses 1512
will be collected on Saturday. 1513
1514
10.1.4 Augusta Contact Persons 1515
Augusta will designate a contact person for operational issues and a contact person for 1516
Agreement administration issues. It is, however, recognized that daily operational 1517
communications will occur at all levels of staff. To the extent that these communications 1518
facilitate job performance, they are encouraged. 1519
1520
10.1.5 Communication Devices 1521
The Contractor shall provide, at the Contractor's cost, sufficient communicating devices to 1522
facilitate good two-way communication between Contractor personnel, Augusta Customer 1523
Care Center, and Augusta Environmental Services Department supervisory staff and support 1524
personnel. 1525
10.2 Employees: Character of Workers 1526
All employees, subcontractors, superintendents, foremen, and workers employed by the Contractor shall 1527
be competent and careful workers, skilled in their respective trades. The Contractor shall not employ any 1528
person who repeatedly engages in misconduct or is incompetent or negligent in the due and proper 1529
performance of his or her duties under this Agreement. The Contractor shall furnish such supervision, 1530
labor, and equipment as is considered necessary for the fulfillment of the services in an acceptable 1531
manner at a satisfactory rate of progress. 1532
1533
10.2.1 Drug-Free Work Place 1534
The Contractor shall prohibit the use of intoxicating and/or illegal substances by its employees, 1535
subcontractors, superintendents, foremen, and workers while on duty or in the course of 1536
performing their duties under this Agreement. Records of any such substance testing will be 1537
provided to Augusta upon written request. 1538
1539
10.2.2 Uniforms 1540
The Contractor's employees, subcontractors, superintendents, foremen, and workers shall be 1541
required to wear a clean uniform bearing the Contractor's name. The uniform shall meet an ANSI 1542
class II standard for reflectivity and visibility. Employees, who normally and regularly come into 1543
direct contact with the public, including drivers, shall bear some means of individual 1544
identification such as a nametag or identification card. 1545
1546
10.2.3 Driver Credentials 1547
Employees driving the Contractor's vehicles shall at all times possess and carry a valid 1548
Commercial Driver's License issued by the State of Georgia or South Carolina for the class 1549
appropriate to the weight of the vehicle being driven. Augusta reserves the right to require the 1550
Attachment number 8 \nPage 32 of 73
Item # 2
Page 33 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Contractor to provide proof of compliance with federal laws regarding Commercial Driver's 1551
Licenses, specifically information regarding drug testing. 1552
1553
10.2.4 Contract Employees 1554
The Contractor's employees, officers, agents, and subcontractors shall, at no time, be allowed to 1555
identify themselves or in any way represent themselves as being employees of Augusta. 1556
1557
10.2.5 Removal of Contractor Employee 1558
Augusta shall have the sole right to require the removal and replacement of a Contractor’s or 1559
subcontractor’s employee working under this Contract. Augusta shall exercise such a right by 1560
providing written notice to the Contractor. 1561
1562
Contractor will replace any personnel who separate from the Contractors employment with equivalently 1563
qualified persons. The Contractor will replace such personnel as soon as reasonably possible. 1564
10.3 Property Damage/Accidents 1565
10.3.1 Property Damage 1566
As between Augusta and the Contractor, the Contractor shall retain full responsibility for all 1567
claims of damage to private property caused by the negligence or willful misconduct of the 1568
Contractor. In the event of any property damage caused by the Contractor, the Contractor shall: 1569
a. Immediately notify Augusta Customer Care Center and Environmental Services 1570
Department by telephone. 1571
b. Leave a notice at the time of the damage at the Residential Unit, Designated Non-1572
Residential Location, Unoccupied Location or the location where the damage occurred, 1573
informing the Customer of the damage and the telephone number of the Contractor to call for 1574
follow-up. 1575
c. Provide a written explanation to Augusta of the circumstances, results of any 1576
investigation, and disposition of the claim. 1577
d. Notify the Customer within ten (10) working days in writing of the disposition of the 1578
claim and provide a copy to Augusta. If the Contractor assumes responsibility for the 1579
damages, the notification shall include a date by which remedial action will be completed. 1580
e. The Contractor shall refer all calls regarding reporting of property damage to Augusta 1581
and Augusta will forward such claims to the Contractor in the form of a Request for Service. 1582
f. Should repair be required, the Contractor shall provide appropriately licensed personnel 1583
to complete the repair. 1584
1585
10.3.2 Claims Resolution 1586
The Contractor shall use its best efforts to promptly and expeditiously resolve claims. In the 1587
event that the Contractor denies responsibility for damages and the Customer pursues a remedy, 1588
Augusta may investigate. If Augusta believes that the Contractor is responsible and the 1589
Contractor continues to deny responsibility, Augusta may pursue, and the Contractor shall be 1590
obligated to the dispute settlement procedures as described in Section 20.16. 1591
1592
10.3.3 Damages 1593
If the Contractor does not notify Augusta of damages, the Contractor shall pay damages in the 1594
amount of $2,000.00 for each occurrence. 1595
1596
10.3.4 Accidents 1597
The Contractor shall immediately notify by telephone Augusta Customer Care Center and the 1598
Environmental Services Department of all vehicular accidents in which there is serious personal 1599
Attachment number 8 \nPage 33 of 73
Item # 2
Page 34 of 73
Solid Waste & Recyclables Collection
Augusta, GA
injury or a fatality. The Contractor shall notify Augusta Customer Care Center and the 1600
Environmental Services Department of all other accidents in a timely manner. 1601
1602
10.4 Care and Diligence/Littering 1603
1604
The Contractor shall exercise all reasonable care and diligence in collecting Residential Garbage, 1605
Recyclables, Yard Waste and Bulky Waste. Collection service shall be accomplished in a manner, which 1606
contributes to a litter-free environment. Every effort must be made to prevent spilling, scattering, 1607
dropping, or littering of Residential Garbage, Recyclables, Yard Waste and Bulky Waste during the 1608
collection process and during transit to and from the Designated Disposal Facility, or Designated 1609
Recycling Facility. However, in the event that Residential Garbage, Recyclables, Yard Waste, or Bulky 1610
Waste are spilled, scattered, dropped, or littered, the Contractor's equipment operator shall immediately 1611
clean up the material, place it in the Roll-Out or Recyclables Cart, and collect the Cart contents. If any 1612
litter escapes from Contractor's collection vehicles on any roadways, the Contractor's equipment operator 1613
must immediately collect such litter. In the event that Contractor does not immediately collect such litter, 1614
the Contractor shall be subject to Damages in the amount of two hundred and fifty dollars ($250.00) for 1615
each such occurrence. The Contractor shall endeavor to prevent such occurrences by whatever means 1616
possible. 1617
1618
The Contractor acknowledges that streets and alleys frequently include multiple utility features. 1619
Therefore, particular attention shall be given to the location of water meters, transformers, guy wires, 1620
utility poles, irrigation sprinkler heads and other private property features. Authorization to use the street 1621
or alley does not abrogate the Contractor's responsibility to exercise caution in relationship to the property 1622
of other authorized users. 1623
1624
10.4.1 Damages 1625
As stated above, in the event that Contractor does not immediately collect such litter, the 1626
Contractor shall be subject to Damages in the amount of two hundred and fifty dollars 1627
($250.00) for each such occurrence. 1628
1629
10.5 Operator Awareness Training 1630
The Contractor shall be responsible for maintaining levels of operator participation regarding correct 1631
collection of Residential Garbage, Recyclables, Yard Waste and Bulky Waste; additional Carts; holiday 1632
collection, safe driving and operations, as well as all other contract provisions. 1633
1634
The Contractor shall be responsible for ongoing training of existing and new employees. 1635
1636
10.6 Communication Plan 1637
Within 30-days of approval of this Contract and by January 1 and July 1 of each year the Contract 1638
remains in effect, the Contractor shall submit a written Communication Plan to Augusta for review and 1639
approval. The Communication Plan shall identify key operations and administrative personnel and 1640
include the contacts’ name, title, primary area of responsibility, immediate supervisor including his/her 1641
office, home and cellular telephone number, pager number and email addresses for work day and after 1642
hour contact. The Communication Plan and/or contact names shall be updated as changes are made, but in 1643
no event less than semi-annually. The Communication Plan shall be included as an Appendix to this 1644
Contract once completed and approved by Augusta. 1645
1646
SECTIO 11 - REPORTIG REQUIREMETS 1647
1648
11.1 Daily Communication/Reports 1649
Attachment number 8 \nPage 34 of 73
Item # 2
Page 35 of 73
Solid Waste & Recyclables Collection
Augusta, GA
In addition to communications requirements described throughout this Contract, the Contractor shall be 1650
responsible for providing, at a minimum, the following information and reports to Augusta on a daily 1651
basis: 1652
1653
1. Listing of missed collections, or other problems remaining unresolved from the previous 1654
day and how they will effect today's operations. 1655
2. Listing of all confirmed, collected locations. 1656
3. Listing of all locations which were not collected which could include locations which 1657
were not out or available for service, services which were blocked, routes which did not get 1658
completed, or non-collected Solid Waste due to contract limits being exceeded. 1659
4. Responses to Requests for Service. 1660
5. Production data to include fuel usage, hours, and mileage. 1661
6. Roll-Out and Recyclables Cart repair needs identified by the Contractor. 1662
7. Street or alley repair needs identified by the Contractor. 1663
8. Other information as requested by Augusta. 1664
1665
The information listed above shall be submitted in a format approved by Augusta. 1666
1667
Augusta and the Contractor shall meet on a monthly basis, or as often as deemed necessary by Augusta, to 1668
review and discuss any operational issues, Contractor's performance, and any other issues pertaining to 1669
services provided under this Agreement. 1670
1671
11.2 Monthly Reports 1672
The Contractor shall submit monthly reports via an electronic format acceptable to Augusta during the 1673
Contract Term commencing one (1) month after Contractor commences services. These reports shall be 1674
due by the 20th day of the month following the month for which the services were performed. Augusta 1675
may withhold up to twenty-five percent (25%) of the latest monthly invoice until all items required in the 1676
report are submitted to Augusta. Augusta will pay the balance of the invoice after the required items are 1677
provided. At a minimum, the monthly report shall include: 1678
1. Deliver a trends report on the utilization and weights of the Recyclables collection 1679
program. 1680
2. Deliver a trends report on the utilization and weights of the Yard Waste collection 1681
program. 1682
3. Summary description of any property damage, including status and/or final 1683
disposition. 1684
4. A narrative description of any significant operational issues during the month. 1685
5. Required forms relating to section 11.6 of the Agreement. 1686
6. Other information as requested by Augusta. 1687
1688
11.3 Record Keeping, Accounting, and Auditing 1689
The Contractor shall keep and maintain complete and detailed records including, but not limited to the 1690
following: 1691
1. Records that provide the basis for the reports required under Section 12 including all matters 1692
affecting amounts payable by or to Augusta or the Contractor, 1693
2. Policies for required insurance, policy amendments, and all other related insurance 1694
documents, 1695
3. Accounting records and vouchers evidencing all costs, receipts, payments, and any other 1696
matter of accounting associated with the Contractor's performance in accordance with generally 1697
accepted accounting principles and 1698
Attachment number 8 \nPage 35 of 73
Item # 2
Page 36 of 73
Solid Waste & Recyclables Collection
Augusta, GA
4. Copies of bond documents for both payment and performance bonds. 1699
1700
11.3.1 Auditing 1701
The Contractor's books, records, and accounts shall accurately, fairly, and in reasonable detail 1702
reflect all Contractor's dealings and transactions, and shall contain sufficient data to enable those 1703
dealings and transactions to be audited in accordance with generally accepted governmental 1704
accounting and auditing standards. 1705
1706
Augusta, or its audit representative, shall have the right at any reasonable time to inspect, copy, 1707
and audit records relating to the services accounting records, vouchers, and their source 1708
documents which serve as the basis for costs, receipts, and payments. The said records shall be 1709
available for Augusta's inspection and audit for a period of three (3) years following the 1710
termination of this Agreement, and any extension of this Agreement and for such further periods 1711
as may be necessary to resolve any matters which may be pending at that time or any longer 1712
period required by applicable law. The Contractor shall make available at Contractor's Augusta 1713
offices any such records to Augusta upon request. 1714
1715
11.3.2 Financial Condition 1716
The Contractor shall immediately notify Augusta should it become apparent that the Contractor 1717
is unable to pay its debts as they become due and payable or if there is an adverse change in the 1718
Contractor's financial condition. The Contractor shall, upon Augusta's request, provide to 1719
Augusta the Contractor's most recent audited financial statements or un-audited statements if the 1720
audited statements are not then available. 1721
11.4 Reliability of Reports 1722
The Contractor represents that all information the Contractor has provided or will provide to Augusta is 1723
true and correct and can be relied upon by Augusta. Any material false or misleading information or 1724
omission shall be just cause for Augusta to terminate this Agreement and/or pursue any other appropriate 1725
remedy. 1726
11.5 Observation and Inspection 1727
1728
Augusta, its representatives, and invitees shall have the right to observe and inspect operations at all 1729
times, provided it is conducted in such a manner so as to minimize interference with the Contractor's 1730
performance and operations. The inspection may review operating records for the current and previous 1731
contract years, and may consist of an inspection of the physical areas of operations and equipment with 1732
emphasis on contract compliance, safety and hazard mitigation. 1733
1734
Augusta, at its own expense, may at any commercially reasonable time inspect any and all records 1735
relating to the services performed to verify that the services are being performed in accordance with this 1736
Agreement. 1737
1738
Augusta's inspections shall not relieve the Contractor of any of its obligations herein or impose any 1739
liability upon Augusta. 1740
11.6 Local Small Business Language 1741
In accordance with Chapter 10B of the AUGUSTA, GA. CODE, Contractor expressly agrees to collect and 1742
maintain all records necessary to for Augusta, Georgia to evaluate the effectiveness of its Local Small 1743
Business Opportunity Program and to make such records available to Augusta, Georgia. The requirements 1744
of the Local Small Business Opportunity Program can be found at www.augustaga.gov. In accordance 1745
with AUGUSTA, GA. CODE § 1-10-129(d)(7), for all contracts where a local small business goal has been 1746
Attachment number 8 \nPage 36 of 73
Item # 2
Page 37 of 73
Solid Waste & Recyclables Collection
Augusta, GA
established, the contractor is required to provide local small business utilization reports. Contractor shall 1747
report to Augusta, Georgia the total dollars paid to each local small business on each contract, and shall 1748
provide such payment affidavits, regarding payment to subcontractors as may be requested by Augusta, 1749
Georgia. Such documents shall be in the format specified by the Director of minority and small business 1750
opportunities, and shall be submitted at such times as required by Augusta, Georgia. Failure to provide 1751
such reports within the time period specified by Augusta, Georgia shall entitle Augusta, Georgia to 1752
exercise any of the remedies set forth, including but not limited to, withholding payment from the 1753
contractor and/or collecting liquidated damages. 1754
1755
Contractor has agreed to a Local Small Business goal of twenty-five percent (25%). In accordance with 1756
Augusta, GA. Code § 1-10-129(d)(7), Contractor will submit local small business utilization reports and 1757
any additionally required information as provided for in Appendix F 1758
1759
SECTIO 12 - COMPESATIO 1760
1761
12.1 Basis and Method of Payment 1762
The Contractor shall offer the services described herein at the following rates beginning at the 1763
commencement of the Contract Term: 1764
1765
Advanced Disposal Inland Services
Residential Unit Residential Unit
Garbage - Once per week Garbage - Once per week
Recyclables - Once per week Recyclables - Once per week
Yard Waste - Once per week Yard Waste - Once per week
Bulky Waste - Once per week Bulky Waste - Once per week
Rate per unit per month: Rate per unit per month:
DCA 1: $ 13.68 DCA 2/3 $ 13.75
Recycling Perks $ 0.35 Recycling Perks $ 0.35
Designated on-Residential Location Designated on-Residential Location
Garbage - Once per week Garbage - Once per week
Recyclables - Once per week Recyclables - Once per week
Rate per unit per month: Rate per unit per month:
DCA 1: $ 9.00 DCA 2/3 $ 9.74
Recycling Perks $ 0.35 Recycling Perks $ 0.35
Unoccupied Location Unoccupied Location
Yard Waste - Once per week Yard Waste - Once per week
Bulky Waste - Once per week Bulky Waste - Once per week
Rate per unit per month: Rate per unit per month:
DCA 1: $ 0.00 DCA 2/3 $ 4.54
Extra Cart Fee: $ 8.50 Extra Cart Fee: $ 6.31
1766
1767
The listed unit price shall be adjusted annually for inflation beginning January 2015 in accordance with 1768
Section 12.3. 1769
1770
Attachment number 8 \nPage 37 of 73
Item # 2
Page 38 of 73
Solid Waste & Recyclables Collection
Augusta, GA
12.2 umber of Collection Points 1771
Augusta shall pay the Contractor monthly for all services rendered as defined by this Contract. Payment 1772
shall be based on the actual number of Residential Units, Designated Non-Residential Location(s) and 1773
Unoccupied Locations serviced as well as additional services as allowed by this Contract. Adjustments in 1774
the Residential Unit count, Designated Non-Residential Location count and Unoccupied Location(s) 1775
count shall be made each month. A unit shall be considered billable if the Residential Unit, Designated 1776
Non-Residential Location or Unoccupied Location had been receiving services for the majority of the 1777
month. After services have been rendered, a Residential Unit, Designated Non-Residential Location or 1778
Unoccupied Location will be removed from billing if services were not rendered for the majority of the 1779
month. 1780
1781
12.3 Inflation Factor - CPI Adjustment 1782
The Contractor shall be entitled to seventy percent (70%) of the actual percentage change in the CPI (as 1783
hereinafter defined). 1784
1785
The “CPI”. Means the Consumer Price Index for All Urban Consumers (“CPI-U”), Atlanta, Georgia – 1786
Atlanta, Georgia, All Items, 1982-1984 equals 100, published by the United States Department of Labor, 1787
Bureau of Labor Statistics (“BLS”), or its successor. If BLS designates an index with a nes title or code 1788
number or table number as being the continuation of the index cited above, the new index will be used, or 1789
if no new index is designated, the most nearly compatible index shall be used. 1790
1791
12.3.1 General Conditions for Adjustments 1792
1793
a. The CPI Index percentage change will be determined from January 1st to December 31st 1794
of the previous year, with an implementation of any adjustment being made on January 1795
1st, and every January 1st thereafter with the first adjustment starting in January of 2015. 1796
1797
b. The Contractor must notify Augusta in writing by April 30th of each year beginning in 1798
April of 2014, of the percentage of any rate adjustment as well as the new rates to be 1799
implemented as allowed under this section. If timely notice is not received by Augusta, 1800
no increase will be allowed for that year. 1801
1802
c. Should the CPI Index show a decrease, Augusta will automatically be entitled to a 1803
reduced cost up to the allowable limits as defined hereinafter. 1804
1805
d. In any event, the adjustment will be limited to a maximum increase or decrease of four 1806
percent (4%) annually. 1807
12.4 Payment Reduction for Damages 1808
1809
Damage charges will be monitored monthly and reviewed with the Contractor each month. Augusta will 1810
deduct any damages owed Augusta from the next payment owed to the Contractor. If the contract is not 1811
extended or renewed in accordance with the contract conditions, Augusta will deduct any remaining 1812
damages owed Augusta from the last payment. However, in no event is Augusta prohibited from taking 1813
actions to collect any unpaid amount owed to Augusta. 1814
1815
12.5 Fuel 1816
Augusta shall provide CNG for use by the Contractors performing under this Agreement. The 1817
Contractors shall pay Augusta $4.00 per Diesel Gallon Equivalent (DGE) for vehicles operated under this 1818
Agreement. Augusta will provide monthly fuel usage to the Contractor and the cost of fuel will be 1819
Attachment number 8 \nPage 38 of 73
Item # 2
Page 39 of 73
Solid Waste & Recyclables Collection
Augusta, GA
credited to Augusta on the Contractor’s monthly invoice. For non-contract vehicles operating on CNG 1820
(those not operating under this Agreement), Augusta may negotiate a CNG fuel price separate from this 1821
Agreement. 1822
12.5.1 Augusta shall be entitled to the same CPI adjustment as afforded the Contractor in 12.3. 1823
All of the same general conditions of adjustments shall apply with the exception that 1824
Augusta does not have to provide notice as required under 12.3.1 (b). 1825
12.5.2 The first price adjustment shall not go into effect until January 2015. 1826
12.5.3 In any event, the adjustment will be limited to a maximum increase or decrease of four 1827
percent (4%) annually. 1828
12.5.4 Should the Contractor not receive an Adjustment, Augusta reserves the right to adjust the 1829
price of fuel. 1830
1831
1832
1833
SECTIO 13 - ISURACE AD PERFORMACE SURETY 1834
13.1 Coverages 1835
The Contractor shall at all times during the Agreement maintain in full force and effect General Liability 1836
and Workmen's Compensation Insurance. All insurance shall be by insurers reasonably acceptable to 1837
Augusta and be in full force and effect before commencement of work. 1838
13.2 Insurance Limits 1839
For the purpose of the Agreement, the Contractor shall carry the following types of insurance in at least 1840
the limits specified below: 1841
1842
Coverages Limits of Liability
Workers’ Compensation Statutory
Employer’s Liability
$500,000 each accident limit
$500,000 Disease Policy Limit
$500,000 Each Employee Limit
Contractors and lessees shall be
responsible for workers’ compensation
insurance for subcontractors or sub
lessees who directly or indirectly provide
services or lease premise under the
Augusta, Georgia’s contract.
General Liability $2,000,000 per accident
$2,000,000 aggregate
Excess Umbrella Policy $2,000,000 per accident
Pollution Liability Insurance
Automobile Bodily Injury and Property
Damage Liability
$1,000,000 per claims made basis. The
Contractor needs to warrant any
retroactive date applicable to coverage
under the policy precedes the effective
date of the contract.
$1,000,000 per accident
1843
Attachment number 8 \nPage 39 of 73
Item # 2
Page 40 of 73
Solid Waste & Recyclables Collection
Augusta, GA
As an alternative to the above, the Contractor may insure the above public liability and property 1844
coverages under a plan of self-insurance. The Contractor’s parent corporation may provide the required 1845
coverages to certify that their program is funded to actuarial projected losses. 1846
13.3 Certificate of Insurance 1847
a. The Contractor agrees to furnish Augusta certificates of insurance or other evidence 1848
satisfactory to Augusta to the effect that such insurance has been procured and is in force. 1849
The certificates shall contain the following express obligations: 1850
1851
"This is to certify that the policies of insurance described herein have 1852
been issued to the named insured for which this certificate is executed 1853
and are in force at this time. In the event of cancellation of a policy 1854
affecting the certificate holder, thirty (30) days prior written notice will 1855
be given to the certificate holder." 1856
1857
b. It is agreed that the Contractor will be responsible for notifying Augusta of any material 1858
change in a policy. 1859
1860
c. The certificates shall also include Augusta as an additional insured. 1861
13.4 Special Requirements 1862
The following special conditions shall apply to the insurance coverage: 1863
a. Augusta is to be included as an additional insured on both the commercial general liability 1864
and business auto liability policies. The Contractor providing the automobile liability coverage 1865
must include all vehicles owned, leased, hired, non-owned, and the employee non-owned 1866
vehicles Personal Injury Protection (when applicable). 1867
b. Commercial General Liability. The Commercial General Liability required coverage is 1868
ISO CG0001 or a substitute form providing equivalent coverage. Coverage must include: 1869
· Premises and Operations 1870
· Personal Injury/Advertising Liability 1871
· Products/ Completed Operations 1872
· Liability assumed under an Insured Contract (including tort liability of another assumed 1873
in a business contract) 1874
· Independent Contractors 1875
c. Pollution Liability. Contractors shall provide pollution liability coverage to cover bodily 1876
injury; property damage, (including natural resource damage), cleanup costs, removal, storage, 1877
disposal, and or use of the pollutant; and defense, including costs and expenses incurred in the 1878
investigation, defense, or settlement of claims. Coverage shall apply to the sudden and gradual 1879
pollution conditions resulting from the escape of smoke vapors, fumes, acids, alkalis, toxic 1880
chemicals, liquids, or gases, natural gases, waste materials, or other irritants, contaminants or 1881
pollutants (including asbestos). The Contractor needs to warrant any retroactive date applicable 1882
to coverage under the policy precedes the effective date of the contract 1883
1884
d. Current, valid insurance policies meeting the requirements herein identified shall be 1885
maintained during the Contract Term. Renewal certificates shall be sent to Augusta 30 days prior 1886
to an expiration date. There shall also be a 30-day notification to Augusta in the event of 1887
cancellation, modification of coverage, or reduction of aggregate limits below those required in 1888
Attachment number 8 \nPage 40 of 73
Item # 2
Page 41 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Section 13.2. Certificates of insurance meeting the required insurance provisions shall be 1889
forwarded to Augusta. Wording on the certificate that states that no liability shall be 1890
imposed upon the company for failure to provide such notice is not acceptable. 1891
1892
e. It is agreed that the Contractor will be responsible for notifying Augusta of any material 1893
changes in a policy. 1894
1895
f. It shall be the Contractor's responsibility to ensure that all subcontractors comply with the 1896
same insurance requirements that the Contractor is required to meet. 1897
1898
g. All Certificates of Insurances shall be furnished on an ACORD form or equivalent as require 1899
by this contract. The certificates for each insurance policy are to be signed by a person 1900
authorized by that insurer to bind coverage on its behalf. 1901
13.5 Surety 1902
1903
13.5.1 Performance Bond 1904
A performance bond and payment bond will be provided to Augusta prior of the execution of this 1905
Contract, the Contractor shall provide Augusta with a surety bond from a company rated A or better 1906
by A.M Best's Rating Service in an amount equal to 100% of the Contract’s value. With each 1907
submittal of a bond, the Contractor shall furnish a current copy of the A.M Best’s rating for the 1908
surety company providing the bonds. 1909
1910
For the first year, assume that Designated Collection Area 1 has 30,701, Designated Collection Area 1911
2 has 24,056 and Designated Collection Area 3 has 13,007 Residential Units. For each awarded 1912
Designated Collection area, take the number of assumed Residential Units and multiply by the 1913
Residential Unit rate in this Contract. 1914
1915
For each subsequent year, use the amount of the prior year’s actual payments received from January 1916
1st through December 31st to establish the surety amount, in a form acceptable to Augusta, to ensure 1917
the performance of the Contractor. Updated bonds shall be received by Augusta no later than January 1918
31, for each subsequent year of the contract. The form and amount of this surety bond shall be 1919
reviewed annually and updated as may be required by Augusta upon 30 days written notice to the 1920
Contractor. 1921
1922
1923
1924
SECTIO 14 - REPRESETATIOS AD WARRATIES 1925
1926
14.1 Representations and Warranties 1927
The Contractor represents and warranties satisfactory performance in accordance with this Contract as 1928
well as: 1929
a. Organization and Qualification. The Contractor is duly incorporated or otherwise legally 1930
organized and, validly existing and in good standing under the laws of the State of Georgia, 1931
and has all requisite power and authority to enter into and perform its obligations under this 1932
Contract. 1933
1934
b. Authority. 1935
1936
Attachment number 8 \nPage 41 of 73
Item # 2
Page 42 of 73
Solid Waste & Recyclables Collection
Augusta, GA
1. The Contractor has the authority to execute this Contract, to make the representations and 1937
warranties set forth in it and is appropriately skilled, organized and financially able to 1938
perform the obligations of Contractor under this Contract in accordance with its terms. 1939
1940
2. This Contract has been validly executed by the authorized representatives of the Contractor 1941
and constitutes a legally binding, enforceable obligation of Contractor. 1942
1943
c. Government Authorizations and Consents. The Contractor has or will obtain prior to the 1944
Effective Date such licenses, permits, and other authorizations from federal, state, and other 1945
governmental authorities, as are necessary for the performance of its obligations under this 1946
Contract. 1947
1948
d. Compliance with Laws. The Contractor is not in violation of any applicable law, ordinance 1949
or regulation, the consequence of which will or may materially affect Contractor’s ability to 1950
perform its obligations under this Contract. The Contractor is not subject to any order or 1951
judgment of any court, tribunal, or governmental agency which could materially and 1952
adversely affects its operations or assets in the State of Georgia, or its ability to perform its 1953
obligations under this Contract. 1954
1955
e. Accuracy of Information. None of the representations or warranties in this Contract and none 1956
of the documents, statements, certificates or schedules furnished or to be furnished by 1957
Contractor pursuant hereto or in connection with the performance of the obligations 1958
contemplated under this Contract, contains or will contain any untrue statement of a material 1959
fact or omits or will omit to state a material fact necessary to make the statements of fact 1960
contained therein not misleading. 1961
1962
f. Independent Examination. In accepting these responsibilities, the Contractor represents and 1963
affirms that it has made its own examination of all conditions, facilities, and properties 1964
affecting the performance of this Contract and of the quantity and expense of labor, 1965
equipment, materials needed, and of applicable taxes permits and laws. The Contractor 1966
affirms that within the Designated Collection Area, it is aware of the present placement of 1967
Roll-Out Carts and Recyclables Carts at the curb, alley, or Carry-Out Collection locations, 1968
and the present location of Carry-Out Collection customers. The Contractor represents and 1969
warranties that it is capable of continuing to collect Roll-Out Carts and Recyclable Carts from 1970
their present locations. 1971
1972
SECTIO 15 - IDEMITY 1973
1974
15.1 Indemnity 1975
The Contractor(s) shall defend, indemnify and save harmless Augusta and Augusta’s officers, employees 1976
and agents from any and every claim and risk, and from all losses, damages, demands, suits, judgments 1977
and attorney fees, and other expenses of any kind (collectively “losses”) arising out of this Contract or the 1978
performance thereof; including but not limited to any personal injury, or death of any and all persons 1979
(including but not limited to the Contractor, its agents, employees, subcontractors and their successors 1980
and assignees, as well as Augusta or Augusta’s agents and all third parties); and including any property 1981
damage of any kind, whether tangible or intangible, including loss of use resulting there from, in 1982
connection with or related to the negligent or willful act(s) or omissions of the Contractor or its 1983
subcontractor which were caused in whole or in part by the Contractor or its subcontractor while 1984
performing work under this Contract, or in connection with or related to (in whole or in part by reason of) 1985
the presence of the Contractor or its subcontractors or their property, employees or agents, upon or in 1986
Attachment number 8 \nPage 42 of 73
Item # 2
Page 43 of 73
Solid Waste & Recyclables Collection
Augusta, GA
proximity to the property of Augusta or any other property (upon which the Contractor is performing any 1987
work called for), except only those losses resulting solely from the negligence of Augusta. 1988
1989
SECTIO 16 - DEFAULT AD TERMIATIO 1990
1991
16.1 Default and Termination 1992
This section is independent, notwithstanding any other provisions of this Contract. The Contractor may 1993
be held in default of the Contract in the event the Contractor: 1994
1995
a. Fails to perform ninety percent (90%) of the collections required by this Contract and 1996
appears, to Augusta, to have abandoned the work, or to be unable to resume collections 1997
within forty-eight (48) hours. 1998
1999
b. Has failed on any occasion of two (2) consecutive working days, in any year, or ten (10) 2000
days in a calendar year to perform the collections required by the Contract. 2001
2002
c. Mixes Contract materials with materials collected from outside this Contract. 2003
2004
d. Fails to furnish and maintain a Performance and/or Payment Bond per Section 13. 2005
2006
e. Fails to furnish and maintain the Insurance requirements per Section 13. 2007
2008
f. Fails to be granted and/or receive prior written approval of a change of control or other 2009
provision as defined in Sections 20.3 and 20.4. 2010
2011
g. Fails to perform any material obligation of the Contractor under the terms of this 2012
Contract, and continuance of such failure after receiving written notice by Augusta 2013
specifying such failure, and Contractor’s failure to cure the default or immediately 2014
initiate and diligently pursue reasonable action to cure such non-performance within the 2015
thirty (30) day period. 2016
2017
To initiate proceedings under this Section, Augusta shall give notice to the Contractor and its 2018
surety. Within 7 days, Contractor may demand a hearing at which the Contractor may show 2019
cause as to why it should not be declared in default or why it should be given the opportunity 2020
to cure said default. In the event the Contractor fails to show cause, to the reasonable 2021
satisfaction of Augusta, why the Contractor should not be declared to be in default of this 2022
Contract, Augusta may make a declaration of default. In evaluating whether to make such a 2023
declaration of default, Augusta may, in its sole discretion, consider the severity of the alleged 2024
violations, and the overall performance of the Contractor under the Contract. 2025
2026
In declaring the Contractor to have defaulted on the Contract, Augusta also may order the 2027
Contractor to discontinue further performance of work under the Contract and transfer the 2028
obligation to perform such work from the Contractor to the surety on the Contractor’s 2029
performance bond and take any other action it deems advisable. 2030
2031
Under receipt of a notice that the work has been transferred to the surety without termination 2032
of the Contract, the surety shall take possession of all materials and equipment described in 2033
the most recent inventory submitted to Augusta, for the purpose of completing the work 2034
under the Contract, employ, by the Contract or otherwise, any person and/or all persons 2035
needed to perform the work; and provide materials and equipment required therefore. Such 2036
Attachment number 8 \nPage 43 of 73
Item # 2
Page 44 of 73
Solid Waste & Recyclables Collection
Augusta, GA
employment shall not relieve the surety of its obligations under the Contract of bond. If there 2037
is a transfer to the surety, payments shall be made to the surety or its agent for all work 2038
performed under the Contract subsequent to such transfer, in amounts equal to those that 2039
would have been made to the Contractor had it performed in the manner and to the extent of 2040
the surety’s performance, and the Contractor shall have no claim upon the same. 2041
2042
In the event the surety on the Contractor’s performance bond fails to assume or continue 2043
performance within two (2) days after its receipt of notice that the work has been transferred 2044
to such surety, the Contractor shall be deemed to have leased, subleased, or otherwise license 2045
Augusta to use all, or whatever portion is desired by Augusta, of the materials and equipment 2046
described on the most recent inventory submitted to Augusta pursuant to Section 6 hereof, for 2047
collection (and processing) purposes for a period of up to one (1) year following the date of 2048
the declaration of default by Augusta without requiring Augusta to execute any other 2049
document whatsoever to accomplish such lease, sublease, or license and without requiring 2050
Augusta to post any bond, pledge, deposit or other security for such equipment and materials, 2051
but upon the condition that Augusta pay for the equipment and materials actually used for 2052
such collection, a market rental that is no greater than (i) the monthly lease, in the event such 2053
property is leased by the Contractor, (ii) the periodic installment, in the event such property is 2054
being acquired under a purchase Contract, (iii) the periodic financing interest and principal, in 2055
the event such property is being acquired under a purchase Contract, or (iv) the financing 2056
arrangement; provided, that under no circumstances shall Augusta be liable during its use of 2057
such property for any arrearages, balloon payment, accrued interest, accelerated charges in 2058
the event of a default, or other extraordinary payment; nor shall the satisfaction thereof be a 2059
condition of Augusta’s interim use of such property; provided, further, that such lease, sub-2060
lease, or license shall be suspended the date the surety on the Contractor’s bond or its agent 2061
accepts the transfer of work under the Contract. 2062
2063
In the event Augusta secures the performance of work under the Contract at a lesser cost than 2064
would have been payable to the Contractor had the Contractor performed the same, then 2065
Augusta shall retain such difference; but in the event such cost to Augusta is greater, the 2066
Contractor and its surety shall be liable for and pay the amount of such excess to Augusta. 2067
2068
All payments due the Contractor at the time of default, less amounts due Augusta from the 2069
Contractor, shall be applied by Augusta against damages suffered and expense incurred by 2070
Augusta to reason of such default, any excess shall be paid to the Contractor unless otherwise 2071
provided herein. 2072
2073
Notwithstanding the provisions of this Section, a delay or interruption in the performance of 2074
all or any part of the Contract resulting from causes beyond the Contractor’s control, as 2075
defined in section 20.28, shall not be deemed to be a default and the rights and remedies of 2076
Augusta provided for herein shall be inapplicable; provided that all labor disputes as defined 2077
in section 20.28 hereof shall not be considered a cause beyond the Contractor’s control as 2078
defined in section 20.28. 2079
2080
Augusta shall have the unilateral right to order in writing a temporary stopping of the work, 2081
or delaying performance that does not alter the scope, of the contract. 2082
2083
Augusta shall have the unilateral right to terminate this Contract in whole or in part for the 2084
convenience of Augusta, Georgia; provided however, 2085
2086
a. For the Contractor servicing Designated Collection Area 1, in the event that Augusta 2087
Attachment number 8 \nPage 44 of 73
Item # 2
Page 45 of 73
Solid Waste & Recyclables Collection
Augusta, GA
elects to terminate this Agreement, Augusta agrees to pay all costs associated with the 2088
CNG infrastructure at one hundred and five percent (105%) of the then outstanding 2089
amount owed on the CNG infrastructure. The amount shall be calculated by dividing the 2090
total amount of money spent on the CNG infrastructure pursuant to Section 8.2.4, divided 2091
by 107 (months of the agreement) and multiplied by the remaining full months of the 2092
then terminated agreement. 2093
2094
b. For the Contractor servicing Designated Collection Area Two (2) and Designated 2095
Collection Area Three (3), in the event that Augusta elects to terminate the Agreement in 2096
the first 53 months of the agreement, Augusta agrees to pay all costs associated with the 2097
initial CNG infrastructure expense at one hundred and five percent (105%) of the then 2098
outstanding amount owed on the CNG infrastructure. The amount shall be calculated by 2099
dividing the total amount of money spent on the CNG infrastructure pursuant to Section 2100
8.2.4, divided by 53 and multiplied by the remaining full months through the 53 month. 2101
2102
c. For the Contractor servicing Designated Collection Area Two (2) and Designated 2103
Collection Area Three (3), in the event that Augusta elects to terminate the Agreement in 2104
the last 54 months of the agreement, Augusta agrees to pay all costs associated with the 2105
second CNG expense at one hundred and five percent (105%) of the then outstanding 2106
amount owed on the CNG infrastructure. The amount shall be calculated by dividing the 2107
total amount of money spent on the CNG infrastructure pursuant to Section 8.2.5, divided 2108
by 54 and multiplied by the remaining full months of the then terminated agreement. 2109
2110
d. In the event that Augusta terminates this contract for convenience, Augusta shall pay 2111
Contractor three months straight line depreciation on the collection vehicles operated 2112
under this agreement. A month of straight line depreciation shall be defined as the 2113
amount of money paid for the collection vehicles operating under this Agreement divided 2114
by 107 months. 2115
2116
SECTIO 17 – COMMITMET OF EQUIPMET 2117
2118
1. Unless a replacement or substitute is provided, all vehicles, facilities, equipment and property 2119
identified in the Contractor’s inventory under Section 6 for use in the performance of this 2120
Contract (called “such property”) shall be available for use in collecting Refuse, Garbage, 2121
Yard Waste, Recyclables, White Goods, and Bulky Waste. When provided, this Section 2122
applies to the replacement and substitute. 2123
2124
2. For the duration of this Contract, any document (including a lease to or by the Contractor, 2125
financing Contract, acquisition over time, mortgage, or other instrument establishing a 2126
security interest) that encumbers or limits the Contractor’s interest in such property shall: 2127
2128
a. Allow the surety on the Contractor’s performance bond to take over the Contractor’s 2129
obligations and to continue the use of the equipment in service for performance of the 2130
Contract; 2131
2132
b. Allow Augusta to take over the Contractor’s obligations and to continue the use of the 2133
equipment in service for performance of the Contract; 2134
2135
c. Exempt Augusta from liability during its usage of such property for arrearages, balloon 2136
payments, accrued interest, accelerated charges on account of a default, or other 2137
Attachment number 8 \nPage 45 of 73
Item # 2
Page 46 of 73
Solid Waste & Recyclables Collection
Augusta, GA
extraordinary payments, and not make satisfaction thereof a condition of Augusta’s 2138
interim usage; and 2139
2140
d. Forbare any foreclosure, trustee’s sale or other dispossession of the Contractor’s interest 2141
in such property without giving both Augusta and surety on the Contractor’s performance 2142
bond sixty (60) days prior notice, and then make any termination of the Contractor’s 2143
interest in such property pursuant to such action or the enforcement thereof subject to the 2144
requirement of Subsections a, b, and c of this section. 2145
2146
3. To assure compliance with this Section, the Contractor shall submit to Augusta for review 2147
and approval or disapproval prior to execution all contracts, leases, or other documents for 2148
acquisition of, or encumbering or limiting the Contractor’s interest in, such property or for 2149
replacements thereof and any proposed agreement that would encumber or transfer any 2150
interest of the Contractor in such property before the Contractor’s execution of such 2151
agreement. Augusta’s approval shall not be unreasonably withheld. 2152
2153
SECTIO 18 - AFFIRMATIVE ACTIO AD O-DISCRIMIAT IO SERVICE 2154
2155
The Contractor shall not discriminate against any employee or applicant for employment because of race, 2156
religion, creed, color, sex, marital status, sexual orientation, political ideology, ancestry, national origin, 2157
or the presence of any sensory, mental, or physical handicap, unless based upon a bonafide occupational 2158
qualification. The Contractor will take affirmative action to ensure that applicants are employed, and that 2159
employees are treated during employment, without regard to their of race, religion, creed, color, sex, 2160
marital status, sexual orientation, political ideology, ancestry, national origin, or the presence of any 2161
sensory, mental, or physical handicap. Such action shall include, but not be limited to the following: 2162
employment, upgrading, promotion, demotion, transfer, recruitment or recruitment advertising, layoff or 2163
termination, rates of pay or other forms of compensation, and selection for training, including 2164
apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and 2165
applicants for employment, notices are provided, setting forth the provisions of this non-discrimination 2166
clause. 2167
2168
The Contractor will not discriminate against any Customer or Augusta resident in the provision of service 2169
or quality of service on account of race, religion, creed, color, sex, marital status, sexual orientation, 2170
political ideology, ancestry, national origin, or the presence of any sensory, mental, or physical handicap, 2171
unless based upon a bona fide qualification to or for service. The Contractor shall provide the same good 2172
quality service throughout Augusta without regard to racial, ethnic, or cultural characteristics or relative 2173
standard of living of the neighborhood. 2174
2175
SECTIO 19 – DRUG AD ALCOHOL FREE WORKPLACE 2176
2177
19.1 Drug and Alcohol Free Workplace 2178
Augusta is a drug-free workplace employer. The Contractor hereby certifies that it has or it will within 2179
thirty (30) days prior to the Start Date of the Contract: 2180
2181
a. Notify employees that the unlawful manufacture, distribution, dispensation, possession, or 2182
use of alcohol or a controlled substance is prohibited in the workplace and specifying actions 2183
that will be taken for violations of such prohibition; 2184
2185
b. Establish an alcohol and drug-free awareness program to inform employees about (i) the 2186
dangers of alcohol and drug abuse in the workplace, (ii) the Contractor’s policy of 2187
maintaining an alcohol and drug-free workplace, (iii) any available alcohol and drug 2188
Attachment number 8 \nPage 46 of 73
Item # 2
Page 47 of 73
Solid Waste & Recyclables Collection
Augusta, GA
counseling, rehabilitation, and employee assistance programs, and (iv) the penalties that may 2189
be imposed upon employees for alcohol and drug abuse violations; 2190
2191
c. Notify each employee that as a condition of employment, the employee will (i) abide by the 2192
terms of the prohibition outlined above, and (ii) notify the Contractor of any alcohol or drug 2193
statute conviction for a violation occurring in the workplace, or that could affect the 2194
employees ability to perform their job, not later that five (5) days after such conviction; 2195
2196
d. Impose a sanction on, or requiring the satisfactory participation in an alcohol or drug 2197
counseling, rehabilitation or abuse program by, an employee convicted of an alcohol or drug 2198
crime; 2199
2200
e. Make a good faith effort to continue to maintain an alcohol and drug-free workplace for 2201
employees; and require any party to which it subcontracts any portion of the work under the 2202
Contract to comply with the above provisions. 2203
2204
f. A false certification or the failure to comply with the above alcohol and drug-free workplace 2205
requirements during the performance of the Contract shall be grounds for suspension, 2206
termination or debarment. 2207
2208
g. The foregoing provisions will be inserted in all subcontracts for work covered by this 2209
Contract. 2210
2211
SECTIO 20 - GEERAL PROVISIOS 2212
20.1 Taxes 2213
The Contractor shall promptly pay all taxes and license fees required by Augusta and by the State of 2214
Georgia. 2215
20.2 Permits 2216
The Contractor shall obtain all licenses and permits (other than the license and permit granted by the 2217
Agreement) required by Augusta, by the State of Georgia, or by the federal government. 2218
20.3 on-Assignment; Subcontracting; Delegation of Dutie s 2219
Except for the subcontracting identified in the Contractor’s proposal, the Contractor shall not assign or 2220
subcontract or transfer any of the work or delegate any of its duties under the Contract without the prior 2221
written approval of Augusta, which approval may be withheld in Augusta’s sole discretion. 2222
Notwithstanding the foregoing, Augusta’s approval shall not unreasonably be withheld if the Contractor 2223
proposes to assign or transfer this Contract to an affiliate of the Contractor or to Contractor’s parent 2224
corporation, provided that Contractor can establish to the reasonable satisfaction of Augusta that (i) the 2225
assignee or transferee will operate the Contract in substantially the same manner as the Contractor, will 2226
use substantially the same management and collection personnel as Contractor, and possesses 2227
substantially the same financial capabilities as Contractor and (ii) the assignee or transferee is not 2228
affiliated in any way with the company that has a Contract for collection with Augusta for any portion of 2229
Augusta outside the Contractors current Designated Collection Area. 2230
2231
In the event of an assignment, subcontract, or delegation of duties, the Contractor shall remain responsible 2232
for the full and faithful performance of the Contract and the assignee, subcontractor, or other obligor shall 2233
also become responsible to Augusta for the satisfactory performance of the work assumed. Augusta may 2234
Attachment number 8 \nPage 47 of 73
Item # 2
Page 48 of 73
Solid Waste & Recyclables Collection
Augusta, GA
condition its approval upon the delivery by the assignee, subcontractor or other obligor of its covenant to 2235
Augusta to fully and faithfully complete the work or responsibility undertaken. 2236
2237
During the term of this Contract, the Contractor shall not have an ownership interest in any other 2238
company that has a Contract for residential collection with Augusta. 2239
2240
Should a Contractor sub-contract work under this contract, a sub-contract contract/agreement shall be 2241
generated in writing. This agreement shall at a minimum include the area to be serviced, the price that the 2242
sub-contractor shall be paid, and the required sections under this contract that flow through to a sub-2243
contractor. A copy of said agreement(s) shall be provided to Augusta within fourteen (14) days of 2244
execution. 2245
2246
20.4 Change in Control 2247
In the event of a change in “Control” of the Contractor (as defined below), Augusta shall terminate the 2248
Contract for default unless Augusta has granted prior written approval. Such approval shall be at the sole 2249
discretion of Augusta. Any approval by Augusta for transfer of ownership or control shall be contingent 2250
upon the perspective controlling party becoming a signatory to the Contract and otherwise complying 2251
with the terms of the Contract. The Contractor shall notify Augusta within ten (10) days after it becomes 2252
aware that a change in Control will occur. As used in the Contract, the term “Control” shall mean the 2253
possession, direct or indirect of either; 2254
2255
a. The ownership of or ability to direct the voting of, as the case may be fifty one (51%) or 2256
more of the equity interest, value or voting power of the Contractor; or 2257
2258
b. The power to direct or cause the direction of the management and policies of the 2259
Contractor whether through the ownership of voting securities, by Contract or otherwise. 2260
20.5 Laws and Regulations 2261
The Contractor shall conduct operations under this Agreement in compliance with all applicable laws, 2262
rules or standards. These shall include OSHA, EPA, EPD, Federal Highway Safety, as well as state and 2263
local rules, regulations, and practices. 2264
20.6 Governing Law; Forum; Venue 2265
The terms, conditions and provisions in the Request for Proposal may supplement the Contract between 2266
Augusta and the Contractor. The order of precedence will be the Contract, the RFP, the winning 2267
proposer’s response and general law. This Agreement shall be governed under the laws of the State of 2268
Georgia. The appropriate forum for judicial interpretation of this Agreement and the sole venue for legal 2269
actions concerning this Contract shall be the Superior Courts of Richmond County Georgia. 2270
20.7 o Other Parties to Benefit 2271
This Agreement is for the benefit of the parties hereto and does not enlarge any party's liability to any 2272
third party. The provisions of this Agreement shall not be construed to create a higher standard of safety 2273
or care in any evidentiary sense with respect to third party claims. 2274
20.8 Appropriation of Funds 2275
This Agreement, and Augusta’s payment obligation for succeeding fiscal periods shall be subject to the 2276
budget process, availability and appropriation of funds. In the event that Augusta does not appropriate 2277
funds, said agreement shall terminate as required by statute. 2278
20.9 Headings 2279
Attachment number 8 \nPage 48 of 73
Item # 2
Page 49 of 73
Solid Waste & Recyclables Collection
Augusta, GA
The headings of the paragraphs and subparagraphs shall not be interpreted as a limitation upon the 2280
language contained therein. 2281
20.10 Severability 2282
Should any term, provision, condition, or other portion of this Contract or its application be held to be 2283
inoperative, invalid, or unenforceable, and the remainder of the Contract still fulfills its purposes, the 2284
remainder of this Contract or its application in other circumstances shall not be affected thereby and shall 2285
continue in force and effect. 2286
20.11 Indulgences ot Waivers 2287
A waiver of any breach of any provision of the Agreement shall not constitute or operate as a waiver of 2288
any breach of such provision or any other provision, nor shall any failure to enforce any provision hereof 2289
operate as a waiver of such provision. 2290
20.12 Modifications and Waiver 2291
The parties must mutually agree upon any changes in the Agreement and must be incorporated by written 2292
amendments to the Agreement. The Augusta Administrator or their designee shall have the authority to 2293
amend the Agreement on behalf of Augusta. 2294
2295
This Agreement constitutes the entire agreement of the parties regarding the subject matter hereof and 2296
may be amended or modified only by a written agreement signed by both parties. 2297
20.13 Independent Contractor 2298
The Contractor and Augusta agree that the Contractor is an independent contractor and not an employee 2299
nor agent of Augusta. The Contractor shall have exclusive control of and the exclusive right to control the 2300
details of the services and work performed, and such action does not create a partnership, agency, joint 2301
venture or other similar relationship between Augusta and the Contractor. 2302
2303
The Contractor agrees that it will not represent to anyone that its relationship with Augusta is other than 2304
that of an independent contractor, and Augusta and the Contractor may so inform any parties with whom 2305
they deal and may take any other responsible steps to carry out the intent of this section. The Contractor 2306
shall be fully and solely responsible for its own acts and omissions and those of its employees, officers, 2307
agents, and subcontractors. 2308
2309
20.14 otices 2310
Any notice required herein shall be given by certified mail to: 2311
2312
For Augusta: 2313
2314
Fred Russell 2315
Administrator 2316
530 Greene Street, Room 802 2317
Augusta, Georgia 30901 2318
2319
2320
Mark Johnson 2321
Director of Solid Waste 2322
Augusta, Georgia 2323
4330 Deans Bridge Road 2324
Blythe, GA 30805 2325
Attachment number 8 \nPage 49 of 73
Item # 2
Page 50 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Telephone: 706-592-3201 2326
2327
2328
Lori Videtto 2329
Deputy Director of Solid Waste 2330
Augusta, Georgia 2331
4330 Deans Bridge Road 2332
Blythe, GA 30805 2333
Telephone: 706-592-3206 2334
2335
For the Contractor: 2336
Name 2337
Title 2338
Address 2339
County, State Zip 2340
Telephone: 2341
Fax: 2342
2343
20.15 Exclusive Agreement 2344
The Contractor is granted an exclusive Agreement to provide Garbage, Recyclables, Yard Waste and 2345
Bulky Waste collection services, as described herein, within the Designated Service Area. Augusta 2346
intends to Contract ONLY with the Contractor for routine collection services as described herein. In the 2347
event of an emergency declared by the appropriate governmental authorities, an event of Force Majeure 2348
or breach of this Agreement by the Contractor, Augusta may provide alternative collection services. 2349
20.16 Dispute Settlement 2350
Any claim, dispute, or other matter concerning the performance of the Contractor shall initially be 2351
referred to the Environmental Services Director in writing, for a decision. Such decision shall be 2352
rendered within thirty (30) days in writing, following the final presentation by the Contractor of evidence 2353
or argument relative to such claim, dispute, or matter. The decision of the Director may be appealed to 2354
Augusta’s Administrator or his designee, in writing, within fifteen (15) days from the date of the 2355
Director's decision. Augusta’s Administrator must render a written decision to the Contractor within thirty 2356
(30) days from the date of the appeal. The decision of the Administrator shall be subject to formal 2357
mediation between the parties. The cost of mediation shall be shared equally by the parties. If mediation 2358
is not successful, either party may bring an action in a court of appropriate venue. In the event of any 2359
litigation between the parties, each party shall pay their own attorney fees and despite who is the 2360
prevailing party, neither party shall be entitled to reimbursement of attorney's fees in any litigation 2361
between the parties. 2362
20.17 Augusta ot Liable for Delays 2363
It is further expressly agreed that in no event shall Augusta be liable for or responsible to the Contractor 2364
for or because of any stoppages or delay in the work herein provided for by injunction or other legal or 2365
equitable proceedings or due to any delay for any cause over which Augusta has insufficient control to 2366
cause a different result. 2367
2368
20.18 Contractor Will ot Sell or Disclose Data 2369
The Contractor will treat as confidential information, all data in connection with the Contract. Augusta 2370
data processed by the Contractor shall remain the exclusive property of Augusta. The Contractor will not 2371
Attachment number 8 \nPage 50 of 73
Item # 2
Page 51 of 73
Solid Waste & Recyclables Collection
Augusta, GA
reproduce, copy, duplicate, disclose or in any way treat the data supplied by Augusta in any manner 2372
except as contemplated by this Contract. 2373
2374
20.19 o Publicity 2375
No advertising, sales promotion or other materials of the Contractor or its agents or representatives may 2376
be distributed to Customers without prior written approval of Augusta. The Contractor, its agents or 2377
representatives shall not reference this Contract or Augusta in any manner without the prior written 2378
consent of Augusta. 2379
2380
20.20 Contract Rights 2381
2382
1. The parties reserve the right to amend this Contract from time to time by mutual agreement in 2383
writing. 2384
2385
2. Rights under this contract are cumulative, and in addition to rights existing at common law. 2386
2387
3. Payment by Augusta and performance by the contractor do not waive their Contractual rights. 2388
2389
4. Failure by either party on any occasion to exercise a Contractual right shall not forfeit or 2390
waive the right to exercise the right of another occasion. The use of one remedy does not 2391
exclude or waive the right to use another. 2392
2393
20.21 Open Records Act 2394
2395
Contractor acknowledges that Augusta records including this Contract are subject to Georgia’s Open 2396
Records Act. 2397
2398
20.22 Interpretation 2399
2400
1. This Contract shall be interpreted as a whole and to carry out its purpose. This Contract is an 2401
integrated document and contains all the promises of the parties; no earlier oral 2402
understandings modify its provisions. 2403
2404
2. Captions are for convenient reference only. A caption does not limit the scope or add 2405
commentary to the text. 2406
2407
20.23 Law; Venue 2408
2409
The laws of the State of Georgia shall govern the validity, construction and effect of this Contract. The 2410
venue for any claims, litigation or causes of action between the parties shall be in the Superior Court of 2411
Richmond County, Georgia. 2412
2413
20.24 Discretionary Waiver of Right to a Jury Trial 2414
2415
The Contractor and Augusta may waive all rights to have a trial by jury in any action, proceeding, claim, 2416
or counterclaim brought by either of them against the other on any matter whatsoever arising out of or in 2417
any way related to or connected with the Contract. 2418
2419
20.25 Specific Performance and Injunctive Relief 2420
2421
Attachment number 8 \nPage 51 of 73
Item # 2
Page 52 of 73
Solid Waste & Recyclables Collection
Augusta, GA
The Contractor agrees that the services are critical to Augusta’s operation and that monetary damages are 2422
not an adequate remedy for the Contractors failure to provide services as required by the Contract, nor 2423
could damages be the equivalent of the performance of such obligation. Accordingly, the Contractor 2424
hereby consents to an order granting specific performance of such obligations of the Contractor in a court 2425
of competent jurisdiction within the State of Georgia. The Contractor further agrees that a failure by it to 2426
perform the services in the manner required by the Contract will entitle Augusta to injunctive relief. 2427
2428
20.26 Severability 2429
2430
Should any term, provision, condition, or other portion of this Contract or its application be held to be 2431
inoperative, invalid, or unenforceable, and the remainder of the Contract still fulfills its purposes, the 2432
remainder of this Contract or its application in other circumstances shall not be affected thereby and shall 2433
continue in force and effect. 2434
2435
20.27 Interest of the Parties 2436
2437
The Contractor covenants that its officers, employees and shareholders have no interest and shall not 2438
acquire any interest, direct or indirect, which would conflict in any manner of degree with the 2439
performance of services required under the Contract. 2440
2441
2442
20.28 Force Majeure 2443
2444
1. The Contractor shall not be liable for any failure or delay in the performance of its 2445
obligations pursuant to this Contract (and such failure or delay shall not be deemed a default 2446
of this Contract or grounds for termination hereunder if all of the following conditions are 2447
satisfied: 2448
2449
a. If such failure or delay 2450
2451
i. could not have been prevented by reasonable precaution, and 2452
2453
ii. cannot reasonably be circumvented by the non-performing party through the use of 2454
alternate sources, work around plans, or other means, and 2455
2456
b. If and to the extent such failure or delay is caused, directly or indirectly by fire, flood, 2457
hurricanes, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance, 2458
sabotage, and governmental actions. 2459
2460
2. Upon the occurrence of an event which satisfies all of the conditions set forth above, the 2461
Contractor shall be excused from any further performance of those obligations pursuant to 2462
this Contract affected by the Force Majeure for as long as; 2463
2464
a. Such Force Majeure event continues and, 2465
2466
b. The Contractor continues to use commercially reasonable efforts to recommence 2467
performance whenever and to whatever extent possible without delay. 2468
2469
3. Upon the occurrence of a Force Majeure event, the Contractor shall immediately notify 2470
Augusta by telephone and confirmed in writing within two (2) days of the occurrence of a 2471
Force Majeure and shall describe in reasonable detail the nature of the Force Majeure. If any 2472
Attachment number 8 \nPage 52 of 73
Item # 2
Page 53 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Force Majeure prevents the Contractor from performing its obligations for more than five (5) 2473
days, Augusta may terminate this Contract. 2474
2475
4. Strikes, slow-downs, walkouts, lockouts and individual disputes are not excused under this 2476
provision. 2477
2478
5. Augusta may grant variances in routes, schedules and materials collected as are reasonably 2479
required and in the best interest of Augusta. 2480
2481
6. Augusta may negotiate with the Contractor fees for any additional work which the Contractor 2482
may agree to perform in the event of a disaster. 2483
2484
20.29 E-Verify 2485
2486
All contractors and subcontractors entering into contracts with Augusta, Georgia for the physical 2487
performance of services shall be required to execute an Affidavit verifying its compliance with O.C.G.A. 2488
§ 13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with 2489
Augusta, Georgia has registered with and is participating in a federal work authorization program. All 2490
contractors and subcontractors must provide their E-Verify number and must be in compliance with the 2491
electronic verification of work authorized programs operated by the United States Department of 2492
Homeland Security or any equivalent federal work authorization program operated by the United States 2493
Department of Homeland Security to verify information of newly hired employees, pursuant to the 2494
Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603, in accordance with the applicability 2495
provisions and deadlines established in O.C.G.A. § 13-10-91 and shall continue to use the federal 2496
authorization program throughout the contract term. All contractors shall further agree that, should it 2497
employ or contract with any subcontractor(s) in connection with the physical performance of services 2498
pursuant to its contract with Augusta, Georgia the contractor will secure from such subcontractor(s) each 2499
subcontractor’s E-Verify number as evidence of verification of compliance with O.C.G.A. § 13-10-91 on 2500
the subcontractor affidavit provided in Rule 300-10-01-.08 or a substantially similar form. All contractors 2501
shall further agree to maintain records of such compliance and provide a copy of each such verification to 2502
Augusta, Georgia at the time the subcontractor(s) is retained to perform such physical services 2503
2504
2505
“Contractor acknowledges that this contract and any changes to it by amendment, modification, 2506
change order or other similar document may have required or may require the legislative 2507
authorization of the Board of Commissioners and approval of the Mayor. Under Georgia law, 2508
Contractor is deemed to possess knowledge concerning Augusta, Georgia's ability to assume 2509
contractual obligations and the consequences of Contractor's provision of goods or services to 2510
Augusta, Georgia under an unauthorized contract, amendment, modification, change order or 2511
other similar document, including the possibility that the Contractor may be precluded from 2512
recovering payment for such unauthorized goods or services. Accordingly, Contractor agrees 2513
that if it provides goods or services to Augusta, Georgia under a contract that has not received 2514
proper legislative authorization or if the Contractor provides goods or services to Augusta, 2515
Georgia in excess of the any contractually authorized goods or services, as required by Augusta, 2516
Georgia's Charter and Code, Augusta, Georgia may withhold payment for any unauthorized 2517
goods or services provided by Contractor. Contractor assumes all risk of non-payment for the 2518
provision of any unauthorized goods or services to Augusta, Georgia, and it waives all claims to 2519
payment or to other remedies for the provision of any unauthorized goods or services to 2520
Augusta, Georgia, however characterized, including, without limitation, all remedies at law or 2521
equity." This acknowledgement shall be a mandatory provision in all Augusta, Georgia contracts 2522
for goods and services, except revenue producing contracts 2523
2524
Attachment number 8 \nPage 53 of 73
Item # 2
Page 54 of 73
Solid Waste & Recyclables Collection
Augusta, GA
SIGATURES O FOLLOWIG PAGE 2525
2526
Attachment number 8 \nPage 54 of 73
Item # 2
Page 55 of 73
Solid Waste & Recyclables Collection
Augusta, GA
I WITESS HEREOF, the parties hereto have caused this Agreement to be executed by 2527
duly authorized officers on this the ___day of ___________________, 20____. 2528
2529
2530
BY: 2531
2532
Augusta, Georgia 2533
2534
2535
_______________________ 2536
As its Mayor 2537
2538
2539
Attest: 2540
2541
________________________ 2542
Clerk of Commission 2543
2544
2545
The foregoing contract is hereby executed by the below-listed parties: 2546
2547
Contractor: ____________________________________ 2548
2549
By: __________________________________________ 2550
2551
As its: ________________________________________ 2552
2553
2554
2555
Sworn to and subscribed before me on this _____ day of _________________, 20___. 2556
2557
______________________ 2558
Notary Public 2559
2560
My Commission Expires: _____________________ 2561
2562
2563
Attachment number 8 \nPage 55 of 73
Item # 2
Page 56 of 73
Solid Waste & Recyclables Collection
Augusta, GA
2564
2565
2566
2567
2568
2569
APPEDIX A 2570
2571
Designated Collection Area Map(s) 2572
2573
2574
2575
2576
2577
2578
Attachment number 8 \nPage 56 of 73
Item # 2
Page 57 of 73
Solid Waste & Recyclables Collection
Augusta, GA
2579
2580
2581
2582
APPEDIX B 2583
2584
Monthly Performance Summary 2585
Attachment number 8 \nPage 57 of 73
Item # 2
Page 58 of 73
Solid Waste & Recyclables Collection
Augusta, GA
MONTHLY PERFORMANCE SUMMARY
UNITS UNITS
KEY PERFORMANCE AREAS OBSERVED PENALIZED
Number of Requests for Services
Number of Valid Misses
Number of Requests for Services not
collected within specific timeframe
Number of Courtesy Collections
Number of Service Complaints
Number of Repeat Collection Misses
Number of Area Misses
Property Damage/Claims
Container (Damage/Loss)
Roll Out Container/Bin Placement
Leaks & Spills
Littering
Mixed Loads
Emergency Unload Cleanup
Deliver Recycling to Landfill
2586
Attachment number 8 \nPage 58 of 73
Item # 2
Page 59 of 73
Solid Waste & Recyclables Collection
Augusta, GA
Liquidated Damages: $
Attachment number 8 \nPage 59 of 73
Item # 2
Summary of Damages for Performance Criteria
List of Damages Units Collection Contract Damages
Damage TOTAL
Request for Service [3.11.4]
each $100
Per Month When Misses >200 Lump Sum $5,000
Repeat Collection Miss [3.11.4.d]
2nd and 3rd Miss each $500
4 or more Misses each $1,000
Area Misses [3.11.4.f]
1 – 100 Misses Lump Sum $2,000
>100 Misses each $20
Augusta clean-up Service Lump Sum $500
Property Damage/Accidents [10.3.3]
Failure to notify Augusta of Damages each $2,000
Rollout Container Loss or Damage [5.3]
each TBD
Rollout Container Damage – Wheels
11+ each
[5.4.3]
$25
Rollout Container Placement [5.4.2]
11+ each $100
Per Month When Misses >200 Lump Sum $5,000
Vehicle Leaks & Spills [6.5.2]
Failure to remove from service each $3,000
Failure to cleanup spill each $1,500
1 to 3 leaks or spills per month each $1,000
Care & Diligence/Littering [10.4.1]
Failure to clean up litter each $500
Mixed Loads [Garbage/Recycling] [7.2.3]
Per Incident Lump Sum $500
Collecting Route Out of Order [4.4.1]
Per Route per Daily Occurrence Lump Sum $500
Emergency Unload Cleanup [6.4.1]
For each 2-hr delay in clean-up each $100
Augusta provided clean-up each $2,000
Deliver Recycling to Landfill [7.2.3]
For each incident each $500
Augusta Provided Collection [3.11.4]
each $500
TOTAL
Attachment number 8 \nPage 60 of 73
Item # 2
Attachment number 8 \nPage 61 of 73
Item # 2
APPEDIX D
Proposal for Incentive Based Rewards Program for Advanced
Disposal for the city of Augusta, Georgia.
Waste Diversion through Incentivized Recycling
April 25, 2012
Overview
Recycling Perks partners with municipalities, haulers and local businesses to improve and enhance residential curbside
recycling while supporting the local economy. Recycling Perks provides residents and cities with a unique incentive
based recycling rewards program that includes reward program management, community outreach and marketing, as
well as measurement and performance tracking. The Recycling Perks program will be heavily weighted towards local
businesses to help drive local revenue and increase program participation.
City of Augusta
Recycling Perks will work with the city and hauler to implement an Incentive based Recycling Rewards program. The
incentive based recycling program will be implemented city wide and participating residents will be rewarded for
their recycling efforts. Participation will be tracked using Radio Frequency Identification (RFID) tags which will be
provided by the city. Recycling will be collected from a residents recycling container and will be dumped into the
collection vehicle. Each container will have a RFID tag affixed, allowing us to compile data on which home’s
recycling containers have been collected.
Technical Plan
Recycling Perks will work with Hauler to establish RFID technology data capturing.
The RFID data will be delivered to Recycling Perks through an active data feed containing collection records and
addresses within the program.
The Recycling Perks system records participation and awards points for each collection. Each collection period,
participating households will receive points for their participation.
Attachment number 8 \nPage 62 of 73
Item # 2
Recycling Perks Program utilizes an exclusive website area for each city. The Recycling Perks platform allows
residents to view content that is specifically for Augusta residents.
Customer Service and Reward Fulfillment
Recycling Perks points are used to claim Rewards offered by Local Reward Partners.
Residents can obtain their rewards online, print immediately and redeem the rewards with the local business offering
a reward.
Recycling Perks will consult with local businesses to offer free reward content on Recycling Perks and will procure
all reward offerings.
Recycling Perks will maintain a Customer Service Department to answer resident’s questions relating to the incentive
program by phone or email. The privacy of all residents will be protected and managed in accordance with State and
Federal regulations.
Costs
· $0.35 per household/month for length of contract.
· A one month activation fee is required prior to contract launch.
Contractor will provide the following:
· RFID technology on all Collection Vehicles and Containers.
· Maintain RFID Software to provide collection data reports in real time through a data feed directly to
Recycling Perks.
· Provide a list of container deliveries identifying residential address, container serial number, RFID number,
route, zip code and ongoing updates relating to new, moved or replaced containers within the program.
· A willingness to participate in community events that will promote the Perks program.
· Introduction Letter to all residents announcing the program.
Recycling Perks to provide the following:
· Timely awarding of Recycling Perks points for all approved containers collected by hauler.
· Pricing is not affected by the size or type of container collected.
· Participation is recorded automatically and the Recycling Perks Program awards points automatically upon
the collection of each container.
· RFID technology is used to automatically identify each resident’s participation, each day.
· Recycling Perks points will be calculated and distributed based on the participation of the household.
Weight per individual household will not be used in determining points.
· Businesses in Augusta will be offered the opportunity to be a Reward Partner free of charge.
· Recycling Perks points do not expire.
· Recycling Perks will be available for all residents prior to the first collection day.
· Recycling Perks provides a dedicated, toll free number and customer service team specific for each
municipality offering incentives through Recycling Perks.
· Pricing for Recycling Perks is unaffected by the contractors choice of container.
Attachment number 8 \nPage 63 of 73
Item # 2
· Recycling Perks will hire and manage a Municipal Market Manger as the single point of contact for all
aspects of the incentive program in Augusta.
· Recycling Perks will also initiate a local charity campaign designed to give back to the community based on
the success and viability of our rewards program.
Attachment number 8 \nPage 64 of 73
Item # 2
Attachment number 8 \nPage 65 of 73
Item # 2
APPEDIX E
Communications Plan
The communication plan shall consist of the following Contractor contract information for Contractor staff. These
staff shall be available as per the provisions above.
For the Contractor:
Title: District Manager
Office Phone:
Cellular Phone:
Email:
Title: Emergency Contact
Office Phone:
Cellular Phone:
Email:
Title: Operations Manager
Office Phone:
Cellular Phone:
Email:
Title: Customer Service/Dispatch
Office Phone:
Cellular Phone:
Email:
Attachment number 8 \nPage 66 of 73
Item # 2
APPEDIX F
AUGUSTA-RICHMOND COUNTY - LOCAL SMALL BUSINESS OPPORTUNITY PROGRAM
MONTHLY SUBCONTRACTOR/SUPPLIER UTILIZATION REPORT
List all subcontractors/suppliers, including lower tiers, to be used on this project.
PROJECT AME __________________________________________________________ PROJECT O.
________________ BASE BID $___________________
REPORT PERIOD FROM _____________ TO ______________, 20____ PAY REQUEST
AMOUT_______________ PROPOSED LSB UTILIZATIO _______%
AME OF SUB-COTRACTOR/
SUPPLIER
COMPAY AME, ADDRESS,
AD PHOE #
COTRACT
AMOUT
TYPE OF WORK
PERFORMED
LSB BUSIESS
YES/O
TOTALS
Total LSB%___________________
COTRACTOR : AUTHORIZED SIGATURE ________________
________________________
PAY REQUEST O. ____________________________________ PERCETAGE OF TOTAL COTRACT COMPLETED
TO DATE ____________% DATE ___________________
This form is to be submitted MOTHLY by the success ful vendor only –after the bid is awarded.
Questions: Contact Ms. Yvonne Gentry – Office: (706) 821-2406 or Fax: (706) 821-4228
Attachment number 8 \nPage 67 of 73
Item # 2
START DATE: ______________________________________________________
COMPLETIO DATE: ________________________________________________
Complete the Following Information for Each Contract/Purchase Order Identified
Business Name: __________________________________________________________
Business Contact Person Information:
Name: ___________________________________________________________
Title: _____________________________ Telephone: (____)_______________
E-mail: __________________________________________________________
Business Address: _____________________________________________________
_______________________________________________________________________
City, State, Zip: _____________________________________________________
Total Award Amount (including all Change Orders): $______________________
Total Amount Paid: $______________________
Brief Description of Work Performed by Prime Contractor: _______________________
_______________________________________________________________________
_______________________________________________________________________
Business Owner(s) Primary Race/Ethnicity (White, Black, Hispanic, Asian, Native American, or Other):
_____________________________________________________
Business Owner(s) Primary Gender (Male or Female):____________________________
Total No. of First-Tier Subcontractors/Sub-consultants/Suppliers on this Contract: ______
(This number should match the number of entries on Attachment B)
Attachment number 8 \nPage 68 of 73
Item # 2
ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form
PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________
PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________
START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________
Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS AD/OR
PERFORMED SERVICES O THIS COTRACT OR PURCHASE ORD ER. umber of subcontractor lines must match the to tal number of first-tier subcontractors
indicated in the last line of Attachment A (include Additional Pages if ecessary)
PAGE ___ OF ___
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in
dollars)
Total Amount Paid (in
dollars) Owner(s) Race/Ethnicity Owner(s)
Gender Brief Description of Work Performed
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in
dollars)
Total Amount Paid (in
dollars) Owner(s) Race/Ethnicity Owner(s)
Gender Brief Description of Work Performed
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in Total Amount Paid (in Owner(s) Race/Ethnicity Owner(s) Brief Description of Work Performed
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
8
\
n
P
a
g
e
6
9
o
f
7
3
It
e
m
#
2
ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form (Continued)
PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________
PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________
START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________
Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS AD/OR
PERFORMED SERVICES O THIS COTRACT OR PURCHASE ORD ER. umber of subcontractor lines must match the to tal number of first-tier subcontractors
indicated in the last line of Attachment A (include Additional Pages if ecessary)
PAGE ___ OF ___
dollars) dollars) Gender
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in
dollars)
Total Amount Paid (in
dollars) Owner(s) Race/Ethnicity Owner(s)
Gender Brief Description of Work Performed
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in
dollars)
Total Amount Paid (in
dollars) Owner(s) Race/Ethnicity Owner(s)
Gender Brief Description of Work Performed
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
8
\
n
P
a
g
e
7
0
o
f
7
3
It
e
m
#
2
ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form (Continued)
PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________
PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________
START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________
Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS AD/OR
PERFORMED SERVICES O THIS COTRACT OR PURCHASE ORD ER. umber of subcontractor lines must match the to tal number of first-tier subcontractors
indicated in the last line of Attachment A (include Additional Pages if ecessary)
PAGE ___ OF ___
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in
dollars)
Total Amount Paid (in
dollars) Owner(s) Race/Ethnicity Owner(s)
Gender Brief Description of Work Performed
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in
dollars)
Total Amount Paid (in
dollars) Owner(s) Race/Ethnicity Owner(s)
Gender Brief Description of Work Performed
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in Total Amount Paid (in Owner(s) Race/Ethnicity Owner(s) Brief Description of Work Performed
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
8
\
n
P
a
g
e
7
1
o
f
7
3
It
e
m
#
2
ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form (Continued)
PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________
PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________
START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________
Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS AD/OR
PERFORMED SERVICES O THIS COTRACT OR PURCHASE ORD ER. umber of subcontractor lines must match the to tal number of first-tier subcontractors
indicated in the last line of Attachment A (include Additional Pages if ecessary)
PAGE ___ OF ___
dollars) dollars) Gender
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in
dollars)
Total Amount Paid (in
dollars) Owner(s) Race/Ethnicity Owner(s)
Gender Brief Description of Work Performed
Line
o. Business ame Address City State Zip Telephone Cont act Person/Title
Total Award Amount (in
dollars)
Total Amount Paid (in
dollars) Owner(s) Race/Ethnicity Owner(s)
Gender Brief Description of Work Performed
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
8
\
n
P
a
g
e
7
2
o
f
7
3
It
e
m
#
2
ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form (Continued)
PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________
PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________
START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________
Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS
AD/OR PERFORMED SERVICES O THIS COTRACT OR PURCH ASE ORDER. umber of subcontractor lines must match the total number of first-
tier subcontractors indicated in the last line of Attachment A (include Additional Pages if ecessary)
PAGE ___ OF ___
I attest, to the best of my knowledge and belief, that the information furnished in Attachment A and Attachment B is correct and accurate.
By: ____________________________________________
Name and Title of Company Officer
____________________________________________
PRINTED NAME AND TITLE
Company: ____________________________________________
Name of Company
Phone Number: ____________________________________________
Date: ____________________________________________
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
8
\
n
P
a
g
e
7
3
o
f
7
3
It
e
m
#
2
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Breckenridge, Section Four, Phase 2
Department:Engineering Department-Abie L. Ladson, P.E., CPESC, Director
Caption:Approve the deeds of dedication, maintenance agreements and
road resolution submitted by the Engineering and Augusta
Utilities Departments for Breckenridge Subdivision, Section Four,
Phase 2.
Background:The final plat for Breckenridge Subdivision, Section Four, Phase
2, was approved by the Commission on December 21, 2010. The
subdivision design and plat for this section have been reviewed
and accepted by our engineering staff and the construction has
been reviewed by our inspectors. The Utilities Department has
inspected and reviewed the water and sanitary sewer installations,
and hereby requests acceptance of the utility deed.
Analysis:This section meets all codes, ordinances and standards. There are
no wetlands or 100-year flood plain boundaries involved in this
section. Acceptance of said utility deed shall dedicate, as required,
the water and sanitary sewer mains along with the applicable
easements to Augusta, Georgia for operation and maintenance.
Financial Impact:By accepting this road into the County system and after the 18-
month maintenance warranty by the developer/contractor for the
road has expired, all future maintenance and associated costs will
be borne by Augusta, Georgia. By acceptance of the utility deeds
and maintenance agreements, all future maintenance and
associated costs for water and sanitary sewer installations will be
borne by Augusta, Georgia, and positive revenue will be generated
from the sale of water and sanitary sewer taps and monthly billing
of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements, and
road resolutions submitted by the Engineering and Augusta
Utilities Departments for Breckenridge Subdivision, Section Four,
Phase 2. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.Cover Memo
Item # 3
Funds are Available
in the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 3
Attachment number 1 \nPage 1 of 1
Item # 3
Attachment number 2 \nPage 1 of 1
Item # 3
Attachment number 3 \nPage 1 of 2
Item # 3
Attachment number 3 \nPage 2 of 2
Item # 3
Attachment number 4 \nPage 1 of 2
Item # 3
Attachment number 4 \nPage 2 of 2
Item # 3
Attachment number 5 \nPage 1 of 1
Item # 3
Attachment number 6 \nPage 1 of 4
Item # 3
Attachment number 6 \nPage 2 of 4
Item # 3
Attachment number 6 \nPage 3 of 4
Item # 3
Attachment number 6 \nPage 4 of 4
Item # 3
Item # 3
Item # 3
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Environmental Services Fees for 2012
Department:Environmental Services
Caption:Receive as information an update on Environmental Services fees
for 2012.
Background:Augusta Richmond County started solid waste collections through
contract providers in approximately 2001. Since that time, the
program has grown and evolved to offer most of Augusta solid
waste collections services. In 2005 the commission approved a
resolution, the "Resolution Defining a Unit of Service for Solid
Waste Collections", which authorized the Director of Solid Waste
to, “adjust annually all full and fractional service unit rates by an
amount equal any increase in the CPI for the previous year". Since
the end of 2005, the department has brought forward rate
adjustments a total of three times out of the 6 years. The cost of
services were $276 in 2006; 2007, the cost changed to $287; in
2008, costs were adjusted to $296.50; in 2009 and in 2010 they
were adjusted to $302 which is the current rate as of today.
From a starting point of $276 through our current fee of $302 that
is a total increase of $26 dollars over 6 years. This equates to a
current contract increase of 10.62% over 6 years, and if this were
straight lined would be 1.77% per year. The consumer price index
for the same period shows a total, non-compounded increase of
10.70%. Using these statistics shows that our cost of service has
generally kept up with inflation over the life of the contract.
In the 2012 budget, the Environmental Services Department
recommended a fee increase that would allow for a 6% increase in
fees. We budgeted that fees would go to $320.12 per year or
$26.68 per month. The reason for the increase was that the
General Fund has added in a 3.5% franchise fee which the
enterprise fund must now pay. This was the first year that such a
fee would be paid for by the 542 enterprise fund. The remaining
2.5% was the estimated CPI increase which would keep us in line
with inflation.
Analysis:The Environmental Services Department stands by its budget
recommendation of a 6% increase to the fees, taking the monthly
Cover Memo
Item # 4
cost to the citizen to $26.68 for services provided. This increase
was approved in the budget process and it affords the General
Fund a franchise fee of 3.5% from the enterprise fund. However,
by the Resolution, authorizes the Director of Solid Waste to,
“adjust annually all full and fractional service unit rates by an
amount equal any increase in the CPI for the previous year". By
this approval, the increase would be 2.8%, raising fees to 310.50,
or a monthly fee of $25.88. Understand that if we merely proceed
with the 2.8% increase, the department will be taking a significant
step backwards financially if it is required to pay the franchise fee.
Financial Impact:The current budgets for both the General Fund and the 542
enterprise funds were build off the 6% increase. At the 6%
budgeted increase, revenues go up by approximately $926,414
with approximately $680,500 of that going to the General Fund as
a franchise fee. At the resolution allowed 2.8% revenues increase
by $432,326 and does not account for funds for the General Fund.
Alternatives:1. Receive as information, and fees will be adjusted by the
allowance under the Resolution, with limited money to pay the
franchise fees to the General Fund, making the fee for 2012 be
$310.50. 2. Approve an increase of 3.5% plus 2.8% which is the
franchise fee, plus the actual increase in the CPI index which
would make the fee for 2012 be $321.03.
Recommendation:Approve the 6% increase allowing the general fund to charge a
3.5% franchise fee as approved in the budget making the fee for
2012 be $320.12.
Funds are Available
in the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 4
Attachment number 1 \nPage 1 of 2
Item # 4
Attachment number 1 \nPage 2 of 2
Item # 4
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Georgia Municipal Building Renovations and Modernization
Department:Recreation, Parks and Facilities
Caption:Discuss the Augusta, Georgia Municipal Building Renovations and
Modernization Project.
Background:The design for the Municipal Building Renovations has progressed
through the Design Narrative and Schematic Design phases and is
ready to move into the Construction Document phase.
Analysis:Architects - Virgo Gambill Architects Construction Manager at
Risk - Turner Construction Company.
Financial Impact:N/A
Alternatives:N/A
Recommendation:N/A
Funds are Available
in the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Recreation & Parks
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 5
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Kelvin and Julie Deaton
Department:Clerk of Commission
Caption:Presentation by Kelvin and Julie Deaton regarding the ongoing
flooding of their home at 1722 Wrightsboro Road.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 6
Attachment number 1 \nPage 1 of 1
Item # 6
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Minutes
Department:Clerk of Commission
Caption:Motion to approve the minutes of the Engineering Services
Committee held on June 11, 2012.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 7
Attachment number 1 \nPage 1 of 3
Item # 7
Attachment number 1 \nPage 2 of 3
Item # 7
Attachment number 1 \nPage 3 of 3
Item # 7
Engineering Services Committee Meeting
7/30/2012 1:00 PM
On-Call Concrete and Emergency Services Contract
Department:Abie L. Ladson, PE, CPESC, Director
Caption:Approve $1,000,000 to fund the current On-Call Concrete and
Emergency Services Contract. Funding is available in the Grading
& Drainage and Sidewalk Rehab/Replacement Phase VI accounts
respectively as requested by AED.
Background:Due to the increase in maintenance and emergency repairs to
aging infrastructures and sidewalks within the county, AED has
determined that supplementing engineering maintenance resources
with the existing contract will be a practical approach to sustain
much needed repairs, it will also allow AED to complete critical
repairs in a timely manner to minimize public safety risks,
damaged property and any associated potential hazard liabilities.
Analysis:On February 7, 2012, the Augusta Commission approved the On-
Call Concrete Repair, Concrete Construction & Emergency Repair
Contract to Horizon Construction, Larry McCord LLC, and
SITEC LLC. Additional funds allocation to this contract is needed
to help improve the current level of services.
Financial Impact:Funds are available in the amount of $800,000 in Grading &
Drainage, and $200,000 in Sidewalk Rehab/Replacement,
respectively to be transferred to the On-Call Concrete
Construction Services Contract upon Commission approval.
Alternatives:1) Approve $1,000,000 to fund the current On-Call Concrete and
Emergency Services Contact. Funding is available in the Grading
& Drainage, and Sidewalk Rehab/Replacement Phase VI accounts
respectively as requested by AED. 2) Do not approve requested
fund allocation and accept extended delay in completion
maintenance work and increase liability risk.
Recommendation:Approve Alternative Number One.
Funds are Available Cover Memo
Item # 8
in the Following
Accounts:Phase VI Grading & Drainage and Sidewalk Rehab/Replacement
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 8
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project change is authorized to CPB#N/A. This request is to continue to fund the
current contract services that include concrete repair, concrete construction, and emergency
repair services. Funding is available in the Grading & Drainage ($800,000) and
Sidewalk Rehab/Replacement ($200,000) Phase VI accounts respectively.
Contract services to Horizon Construction, Larry McCord, LLC and Sitec, LLC.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Grading and Drainage 150,000$
Sidewalks-Rehab-Replacement 150,000$
Suburbah Forces-Resurfacing 150,000$
Grading and Drainage 800,000$
Sidewalks-Rehab-Replacement 200,000$
1,450,000$
Section 3: The following amounts are appropriated for the project:
By Basin By District
Varies Varies
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
Honorable Deke Copenhaver, Mayor
CAPITAL PROJECT BUDGET
CPB#N/A
On-Call Concrete Repair, Concrete Construction, and
Emergency Repair (Bid 11-159)
1.13.2012
Attachment number 1 \nPage 1 of 3
Item # 8
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
CPB#N/A
On-Call Concrete Repair, Concrete Construction, and
Emergency Repair (Bid 11-159)
1.13.2012
Attachment number 1 \nPage 2 of 3
Item # 8
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
CPB#N/A
On-Call Concrete Repair, Concrete Construction, and
Emergency Repair (Bid 11-159)
CPB AMOUNT CHANGE CPB AMOUNT
SOURCE OF FUNDS CPB
GRADING & DRAINAGE
PHASE VI ($150,000) ($800,000) ($950,000)
SUBURBAN FORCES RESURFACING
PHASE VI ($150,000)($150,000)
SIDEWALKS-REHAB-REPLACEMENT ($150,000) ($200,000) ($350,000)
TOTAL SOURCES: ($450,000) ($1,000,000) ($1,450,000)
USE OF FUNDS
CONTINGENCY
PHASE VI $450,000 $1,000,000 $1,450,000
TOTAL USES: $450,000 $1,000,000 $1,450,000
1.13.2012
Attachment number 1 \nPage 3 of 3
Item # 8
Attachment number 2 \nPage 1 of 2
Item # 8
Attachment number 2 \nPage 2 of 2
Item # 8
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Option for Easement
Department:Law Department
Caption:Motion to approve an Option for the purposes of acquiring an
easement between Marcus A. Reid & Katrina Reid, as owner(s),
and Augusta, Georgia, as optionee, in connection with the East
Augusta Roadway Drainage Improvement Project, said perpetual
easement consists of 0.42 acre (18,106.25 sq. ft.) permanent
drainage, utility and maintenance easement and (7,710.38 sq. ft.)
of temporary construction easement from the property located at
544 Laney Walker Blvd. Ext., private, at the purchase price of
$4,913.00.
Background:The property owner has agreed to convey a certain option for
easement to Augusta, Georgia, for the East Augusta Roadway &
Drainage Improvement Project.
Analysis:The purchase of the referenced property is necessary for the
project.
Financial Impact:The costs necessary for this purchase will be covered under the
project budget.
Alternatives:Deny the Motion
Recommendation:Approve the Motion
Funds are Available
in the Following
Accounts:
327041110-5411120 209812101-5411120
REVIEWED AND APPROVED BY:
Finance.
Law.
Cover Memo
Item # 9
Administrator.
Clerk of Commission
Cover Memo
Item # 9
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
1
\
n
P
a
g
e
1
o
f
2
It
e
m
#
9
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
1
\
n
P
a
g
e
2
o
f
2
It
e
m
#
9
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Option for Easement
Department:Law
Caption:Motion to approve an Option for the purposes of acquiring an
easement between Marcus A. Reid & Katrina Reid, as owner(s),
and Augusta, Georgia, as optionee, in connection with the East
Augusta Roadway Drainage Improvement Project, said perpetual
easement consists of 0.80 acre (34,780.33 sq. ft.) permanent
drainage, utility and maintenance easement and (3,825.53 sq. ft.)
of temporary construction easement from the property located at
540 Laney Walker Blvd. Ext., private, at the purchase price of
$8,886.00.
Background:The property owner has agreed to convey a certain option for
easement to Augusta, Georgia, for the East Augusta Roadway &
Drainage Improvement Project.
Analysis:The purchase of the referenced property is necessary for the
project.
Financial Impact:The costs necessary for this purchase will be covered under the
project budget.
Alternatives:Deny the Motion
Recommendation:Approve the Motion
Funds are Available
in the Following
Accounts:
327041110-5411120 209812101-5411120
REVIEWED AND APPROVED BY:
Finance.
Law.
Cover Memo
Item # 10
Administrator.
Clerk of Commission
Cover Memo
Item # 10
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
1
\
n
P
a
g
e
1
o
f
2
It
e
m
#
1
0
At
t
a
c
h
m
e
n
t
n
u
m
b
e
r
1
\
n
P
a
g
e
2
o
f
2
It
e
m
#
1
0
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Request for Marker Monument
Department:Planning and Development
Caption:Motion to approve the placement of a monument commemorating
the life and achievements of Montgomery Meigs, quartermaster
general for the US Army during the Civil War.
Background:Place a monument in the median at approximately at 658 Broad
Street (his birthplace) In front of either the Commerce Building or
the old Chateau Restaurant building. To commemorate the life
and achievements of Montgomery Meigs, quartermaster general
for the US Army during the Civil War, an engineer and architect
contributing to the expansion of the US Capital building, the
Washington Aqueduct, the Cabin John Bridge and the Old
Pension Office Building, both also located in Washington D.C.
Meigs is also credited as the creator of Arlington National
Cemetery. It was Meigs who suggested to Abraham Lincoln that
Arlington would be an appropriate site for a national cemetery.
He is buried there.
Analysis:The marker will be the standard double sided cast aluminum
plaque, approximately 42” by 42” with the GA Historical Seal and
commemorative language placed on an aluminum post.
Financial Impact:no cost to City
Alternatives:Allow placement or deny placement
Recommendation:Allow placement
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:Cover Memo
Item # 11
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 11
Attachment number 1 \nPage 1 of 10
Item # 11
Attachment number 1 \nPage 2 of 10
Item # 11
Attachment number 1 \nPage 3 of 10
Item # 11
Attachment number 1 \nPage 4 of 10
Item # 11
Attachment number 1 \nPage 5 of 10
Item # 11
Attachment number 1 \nPage 6 of 10
Item # 11
Attachment number 1 \nPage 7 of 10
Item # 11
Attachment number 1 \nPage 8 of 10
Item # 11
Attachment number 1 \nPage 9 of 10
Item # 11
Attachment number 1 \nPage 10 of 10
Item # 11
Birthplace of Montgomery C. Meigs
One of two native Georgians who served as
generals in the U.S. Army during the Civil War,
Montgomery C. Meigs was born here on May 3, 1816,
grandson of a University of Georgia president.
After graduating from West Point, he oversaw
construction of some of Washington D.C.’s
greatest engineering feats, including the U.S.
Capitol dome. Meigs became Quartermaster General
of the U.S. Army in 1861, coordinating the
massive supply effort throughout the Civil War,
and continuing in that position until he retired
in 1882. His organizational genius created an
efficient war machine that helped destroy the
Confederacy. In 1864, Meigs ordered that
Arlington, the confiscated plantation of Robert
E. Lee’s wife, be used for military burials,
creating the nation’s premier national cemetery.
Meigs was buried there when he died Jan. 2, 1892.
Erected for the Civil War 150 commemoration by the
Georgia Historical Society, the Georgia Department of
Economic Development, and the Georgia Battlefields
Association
Item # 11
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Willhaven Subdivision, Phase III, Section I
Department:Engineering-Abie L. Ladson, P.E., CPESC, Director
Caption:Approve the deeds of dedication, maintenance agreements, and
road resolution submitted by the Engineering and Augusta
Utilities Departments for Willhaven Subdivision, Phase III,
Section I.
Background:The final plat for Willhaven Subdivision, Phase III, Section I was
approved by the Commission on September 20, 2011. The
subdivision design and plat for this section, including the storm
drain system, have been reviewed and accepted by our
engineering staff and the construction has been reviewed by our
inspectors. The Utilities Department has inspected and reviewed
the water and sanitary sewer installations, and hereby requests
acceptance of the utility deed.
Analysis:This section meets all codes, ordinances and standards. There are
no wetlands or 100-year flood plain boundaries involved in this
section. Acceptance of said utility deed shall dedicate, as required,
the water and sanitary sewer mains along with the applicable
easements to Augusta, Georgia for operation and maintenance.
Financial Impact:By accepting these roads and storm drainage installations into the
County system and after the 18-month maintenance warranty by
the developer/contractor for the roads and storm drainage has
expired, all future maintenance and associated costs will be borne
by Augusta, Georgia. By acceptance of the utility deeds and
maintenance agreements, all future maintenance and associated
costs for water and sanitary sewer installations will be borne by
Augusta, Georgia, and positive revenue will be generated from the
sale of water and sanitary sewer taps and monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements, and
road resolutions submitted by the Engineering and Augusta
Utilities Departments for Willhaven Subdivision, Phase III,
Section I. 2. Do not approve and risk litigation.
Cover Memo
Item # 12
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 12
Attachment number 1 \nPage 1 of 1
Item # 12
Attachment number 2 \nPage 1 of 1
Item # 12
Attachment number 3 \nPage 1 of 2
Item # 12
Attachment number 3 \nPage 2 of 2
Item # 12
Attachment number 4 \nPage 1 of 2
Item # 12
Attachment number 4 \nPage 2 of 2
Item # 12
Attachment number 5 \nPage 1 of 3
Item # 12
Attachment number 5 \nPage 2 of 3
Item # 12
Attachment number 5 \nPage 3 of 3
Item # 12
Attachment number 6 \nPage 1 of 5
Item # 12
Attachment number 6 \nPage 2 of 5
Item # 12
Attachment number 6 \nPage 3 of 5
Item # 12
Attachment number 6 \nPage 4 of 5
Item # 12
Attachment number 6 \nPage 5 of 5
Item # 12
Attachment number 7 \nPage 1 of 2
Item # 12
Attachment number 7 \nPage 2 of 2
Item # 12
Engineering Services Committee Meeting
7/30/2012 1:00 PM
Wrightsboro Road Improvements-Stream Mitigation Credits
Department:Abie L. Ladson, PE, CPESC, Director
Caption:Approve and authorize the Engineering Department (AED) to
purchase up to 9,800 stream mitigation credits at a total cost of
$563,500 ($57.50 per mitigation credit) from the Bath Branch
Augusta, LLC (Bath Branch Mitigation Bank) and up to 14
wetland mitigation credits at a total cost of $210,000 ($15,000 per
credit) from the Mitigation Management, LLC, (Brushy Creek
Mitigation Bank) to mitigate stream & wetlands impacts as
determined necessary by the US Army Corps of Engineers and
Georgia Environmental Protection Division in regards to the
Wrightsboro Rd. from Jimmie Dyess Pkwy. to I-520
Improvements Project, CPB #323-041110-296823309. Funding is
available through Engineering SPLOST III Fund Recapture.
Background:This is a Georgia Department of Transportation (GDOT) managed
project that will widen & reconstruct Wrightsboro Road from
Jimmie Dyess Parkway to I-520. AED is responsible for funding
engineering activities, road design, right-of-way plans,
construction plans and environmental permitting. GDOT is
funding the right of way acquisition ($11.9 million) and the
construction ($23 million). Project construction tentative let date
is in September 2012. It has been determined by the US Corps of
Engineers (USACE) and Georgia Department of Environmental
Protection (GAEPD) that 9766.30 stream mitigation credits and
13.97 wetland mitigation credits will have to be purchased to
mitigate the impacts to Rae’s Creek, its associated tributaries and
wetlands. The stream mitigation credits will be purchased from
Bath Branch Augusta LLC (a local credit bank) at a cost of $57.5
per stream credit. The wetland mitigation credit will be purchased
from Mitigation Management, LLC (Brushy Creek wetland
bank) at a cost of $15,000 per wetland credit.
Analysis:Purchase of Mitigation Credit is pre-requisite of Environmental
Permits and GDOT to commence construction activities at this
project. A timely purchase of required credits is critical to
maintain project letting schedule and project construction funds as
allocated.Cover Memo
Item # 13
Financial Impact:Funding in amount of $773,500 is available through Engineering
SPLOST III Fund Recapture to be transferred to the Wrightsboro
Road Improvements Project upon Commission approval.
Alternatives:1) Approve and authorize the Engineering Department (AED) to
purchase up to 9,800 stream mitigation credits at a total cost of
$563,500 ($57.50 per mitigation credit) from the Bath Branch
Augusta, LLC (Bath Branch Mitigation Bank) and up to 14
wetland mitigation credits at a total cost of $210,000 ($15,000 per
credit) from the Mitigation Management, LLC, (Brushy Creek
Mitigation Bank) to mitigate stream & wetlands impacts as
determined necessary by the US Army Corps of Engineers and
Georgia Environmental Protection Division in regards to the
Wrightsboro Rd from Jimmie Dyess Pkwy to I-520 Improvements
Project, CPB #323-041110-296823309. Funding is available
through Engineering SPLOST III Fund Recapture. 2) Do not
approve purchase of mitigation credit as requested and lose
designated State & Federal funding, and identify alternate ways to
complete the project.
Recommendation:Approve Alternative Number One.
Funds are Available
in the Following
Accounts:
Phase III Recapture
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 13
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project change is authorized to CPB# 323-041110-296823309 Change Number Eighteen.
This is to purchase stream and wetland mitigation credits at a cost of $773,500 as determined
necessary by the US Army Corps of Engineers. Funding is available in SPLOST III
Fund Recapture accounts.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase III 1,984,000$
SPLOST III Recapture 773,500$
2,757,500$
Section 3: The following amounts are appropriated for the project:
By Basin By District
Raes Creek 3rd 2,757,500$
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
Deke Copenhaven, Mayor
CAPITAL PROJECT BUDGET
WRIGHTSBORO ROAD IMPROVEMENTS
CHANGE NUMBER EIGHTEEEN
CPB#323-041110-296823309
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information
reference this request, contact Engineering at ext 5070. Thanks
7.12.2012
Attachment number 1 \nPage 1 of 2
Item # 13
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
WRIGHTSBORO ROAD IMPROVEMENTS
CHANGE NUMBER EIGHTEEEN
CPB#323-041110-296823309
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information
reference this request, contact Engineering at ext 5070. Thanks
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB CHANGE CPB
SPECIAL 1% SALES TAX, PHASE III
323-04-1110-6011110-296823309 ($1,984,000) $0 ($1,984,000)
SPECIAL 1% SALES TAX, PHASE III
323-04-1110-6011110-296823333 ($773,500) ($773,500)
TOTAL SOURCES: ($1,984,000) ($773,500) ($2,757,500)
USE OF FUNDS
ENGINEERING
323-04-1110-5212115-296823309 $1,676,006 $773,500 $2,449,506
ADVERTISING
323-04-1110-5233119-296823309 $1,000 $1,000
RIGHT-OF-WAY
323-04-1110-5411120/296823309 $43,894 $43,894
CONTINGENCY
323-04-1110-6011110/296823309 $23,100 $23,100
TRAFFIC SIGNAL
323-04-1110-5414610/296823309 $40,000 $40,000
UTILITY RELOCATION
323-04-1110-5414510/296823309 $200,000 $200,000
TOTAL USES: $1,984,000 $773,500 $2,757,500
7.12.2012
Attachment number 1 \nPage 2 of 2