Loading...
HomeMy WebLinkAbout2011-11-28-Meeting Agenda Engineering Services Committee Meeting Commission Chamber- 11/28/2011- 1:00 PM ENGINEERING SERVICES 1. Motion to approve the donation of TPN 183-0-111-00-0 (aka 1768 Tamarind Way) containing 10.80 acres to the City of Augusta for its Greenspace Program and TPN 183-1-083-00-0 (aka 2002 Pondcypress Court) containing 0.20 acres to the City of Augusta to be combined with TPN 183-0-075-00-0, which is currently a detention pond owned by the City of Augusta. The property being donated is currently in the ownership of Jutco, Inc. Attachments 2. Award change order to construction contract with L-J, Inc. in the amount of $20,849.42 regarding the installation of new sanitary sewer and storm water mains in the 1200 Block of Broad Street. Attachments 3. Approve and authorize the Engineering Department to 1) Accept and receive federal financial assistance through Section 319 FY11Water Quality grant program; 2) Submit similar future grant application when it becomes available, and 3) Partner with Southeastern National Science Academy (Phinizy Swamp Nature Park) for Public Outreach and Watershed Restoration Activities. Also, grant authorization permitting Augusta, GA’s Mayor the right to sign of all documentation. Attachments 4. Approve Change Number Two and Supplemental Agreement Two (CPB #325-041120-209825201) in the amount of $38,038.00 for the Marks Church Road Reconstruction project to W. R .Toole Engineers, Inc. Funding is available in the project account for the Engineering Department. Attachments 5. Approve mowing and maintenance agreement, encroachment permit, and indemnity form between Augusta, Georgia and Georgia DOT for fencing off an area under the Calhoun Expressway overpass adjacent to the canal between 15th and 13th Street. Attachments www.augustaga.gov 6. Consider a request by the members of the Augusta Fire Dept. for a Public Hearing to discuss the placement of a 30” tall bronze casting of fire gear on a 24” wide x 16” wide x 36” tall black granite on a 36” x 36” deep greystone blue base to honor all past, present and future members of the Augusta Fire Dept. which if approved will be placed at the Hero's Overlook on the River Walk. Attachments 7. Consider a request from Rev. Larry Fryer regarding the naming of the bridge at 5th and 7th as The Children Memorial Bridge. (Referred from November 7 Engineering Services Committee) Attachments 8. Adoption of the revised Draft Hazard Mitigation Plan for Augusta, GA. Attachments 9. Approve the deed of dedication, maintenance agreement, and road resolutions submitted by the Engineering Department for Willhaven, Phase II, Section II. Attachments Engineering Services Committee Meeting 11/28/2011 1:00 PM Acceptance of donated property for the City's Greenspace Program and for detention pond purposes Department:Clerk of Commission Caption:Motion to approve the donation of TPN 183-0-111-00-0 (aka 1768 Tamarind Way) containing 10.80 acres to the City of Augusta for its Greenspace Program and TPN 183-1-083-00-0 (aka 2002 Pondcypress Court) containing 0.20 acres to the City of Augusta to be combined with TPN 183-0-075-00-0, which is currently a detention pond owned by the City of Augusta. The property being donated is currently in the ownership of Jutco, Inc. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 1 Attachment number 1 \nPage 1 of 2 Item # 1 Attachment number 1 \nPage 2 of 2 Item # 1 Attachment number 2 \nPage 1 of 7 Item # 1 Attachment number 2 \nPage 2 of 7 Item # 1 Attachment number 2 \nPage 3 of 7 Item # 1 Attachment number 2 \nPage 4 of 7 Item # 1 Attachment number 2 \nPage 5 of 7 Item # 1 Attachment number 2 \nPage 6 of 7 Item # 1 Attachment number 2 \nPage 7 of 7 Item # 1 Engineering Services Committee Meeting 11/28/2011 1:00 PM Construction services associated with 1200 Block of Broad Street Sewer Separation Project. Department:Utilities Caption:Award change order to construction contract with L-J, Inc. in the amount of $20,849.42 regarding the installation of new sanitary sewer and storm water mains in the 1200 Block of Broad Street. Background:The Augusta Utilities Department and Augusta Engineering Department jointly managed the 1200 Block of broad Street Separation Project. The project included installing a new sanitary sewer main and a new storm sewer main in the 1200 Block of Broad Street. Analysis:Approving this change order to the contract will allow for fair compensation of the contractor for unforeseen field conditions as well as additional paving that was needed. The installation of the new storm line was in an area where the existing roadway was built over concrete that was installed almost the entire length of the project. The removal of the concrete was not expected and therefore required additional cost. Additional asphalt was authorized in order to make the transition point in the roadway between new asphalt and existing asphalt in a better place than was originally designated. Financial Impact:Funds for this work are available in account number 507043420- 5425210 / 81000025-55425210 ($8,622.00) and 323-041110- 296823333 ($12,227.42) Alternatives:No alternatives are recommended Recommendation:We recommend the Commission award change order to L-J, Inc. in the amount of $20,849.42. Funds are Available in the Following Accounts: 507043420-5425210 / 81000025-55425210 ($8,622.00) and 323- 041110-296823333 ($12,227.42) Cover Memo Item # 2 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Engineering Services Committee Meeting 11/28/2011 1:00 PM GAEPD 319(h) FY11 Federal Grant Acceptance Surface Water Quality Assessment and Public Outreach Funding Department:Abie L. Ladson, PE, CPESC, Director Caption:Approve and authorize the Engineering Department to 1) Accept and receive federal financial assistance through Section 319 FY11Water Quality grant program; 2) Submit similar future grant application when it becomes available, and 3) Partner with Southeastern National Science Academy (Phinizy Swamp Nature Park) for Public Outreach and Watershed Restoration Activities. Also, grant authorization permitting Augusta, GA’s Mayor the right to sign of all documentation. Background:The Clean Water Act Section 319(h) Water Quality grant funds support activities to identify and implement projects for reduction of prioritized risks and concerns in the community such as source assessment and control of pollutant of interest load within state listed impaired water bodies. During 2010, Augusta Engineering Department (AED) submitted two (2) separate applications to seek federal funds for various activities associated with the surface water quality improvement program. Targeted activities include public outreach, source assessment, and best management practices. The other key team member is Southeastern Natural Science Academy (SNSA). SNSA maintains a strong involvement in Public Outreach and Regional Water Quality assessment programs and is a good technical local resource. As a team, SNSA and AED staff will work together and establish a comprehensive cost effective water quality assessment and outreach program. This program will allow AED to optimize its MS4 NPDES Stormwater Management Program. Analysis:With increasing regulatory demand for point source pollutants load reduction in receiving water bodies, the management of stormwater quantity and quality through regulatory permitting is taking a focal point. Four Augusta creeks are listed as impaired water bodies and do not support their designated use. The pollutant of concern is fecal coliform (FC). Under the stormwater management permitting program, EPA/GAEPD is requiring localities to develop and implement programs to reduce FC load in impaired watersheds. AED will utilize the grant funds to support Cover Memo Item # 3 this program. AED will meet fund matching need primarily by offering in-kind services such as staff time. AED will also utilize its Operational Environmental and Engineering funds to satisfy the remaining matching fund requirement and to support expanded surface water quality monitoring activities. Expanded water quality data gathering efforts are warranted for identifying problematic areas prior to implementation of best management practices as required under MS4 NPDES permit. Financial Impact:By accepting this grant, AED will receive $86,350.00 in federal funds. AED will provide $51,515 matching non-federal funds in- kind and $6,540 from its environmental (stormwater) operational funds. AED will also utilize approximately $24,000 from its environmental (stormwater) and engineering operational funds to support expanded water quality assessment activities. Alternatives:1) Approve and authorize the Engineering Department to 1) Accept and receive federal financial assistance through Section 319 FY11Water Quality grant program; 2) Submit similar future grant application when it becomes available, and 3) Partner with Southeastern National Science Academy (Phinizy Swamp Nature Park) for Public Outreach and Watershed Restoration Activities. Also, grant authorization permitting Augusta, GA’s Mayor the right to sign of all documentation. 2) Do not approve and identify alternate funding source to complete needed activities. Recommendation:Approve Alternative Number One Funds are Available in the Following Accounts: $51,515 in kinds; $22,540 in 101041110-5213118; $8,000 in 101041110-5212115 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 3 Engineering Services Committee Meeting 11/28/2011 1:00 PM Marks Church Road Reconstruction Project - CO#2/SA#2 Department:Abie L. Ladson, PE, CPESC, Director Caption:Approve Change Number Two and Supplemental Agreement Two (CPB #325-041120-209825201) in the amount of $38,038.00 for the Marks Church Road Reconstruction project to W. R .Toole Engineers, Inc. Funding is available in the project account for the Engineering Department. Background:The Marks Church Road Reconstruction Project was approved by Commission on 03/04/09; and is funded in SPLOST V. Marks Church Road is currently a two-lane road with side ditches. Design efforts are underway to upgrade the existing roadway, curb and gutter, an enclosed storm drainage system, sidewalks, and the Marks Church Road Bridge. Supplemental services are needed to extend project limits for tie-in to recently improved section of this road. This section was improved as part of GDOT Bobby Jones Intersection Improvement contract. Analysis:WR Toole Engineers (WRTE) will provide supplemental services to complete the topographic survey, extend & update roadway design to include an additional 950 feet of roadway section and to update the project database. These services are critical to completing the ongoing design efforts. Financial Impact:Funds are available in the project construction account to be transferred to the engineering account 325-041120-5212115 upon Commission approval. Alternatives:1) Approve Change Number Two and Supplemental Agreement Two (CPB #325-041120-209825201) in the amount of $38,038.00 for the Marks Church Road Reconstruction project to W. R .Toole Engineers, Inc. Funding is available in the project account for the Engineering Department. 2) Do not approve and identify alternate plan to complete needed improvement at this added section. Recommendation:Approve Alternative Number One Cover Memo Item # 4 Funds are Available in the Following Accounts: 325-041120-5212115/209825201-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is authorized to CPB#325-041120-209825201 for Supplemental Agreement Number Two for additional engineering services to complete the topographic survey and update the project database on the Marks Church Road project. Funds in the amount available of $38,038.00 are in the project construction account to be transferred to the engineering account. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase V 2,500,000$ 2,500,000$ Section 3: The following amounts are appropriated for the project: By Basin By District Raes Creek $2,500,000 2,500,000$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB#325-041120-209825201 Honorable Deke Copenhaver, Mayor CAPITAL PROJECT BUDGET MARKS CHURCH ROAD RECONSTRUCTION PROJECT CHANGE NUMBER TWO information reference this request, contact Engineering at ext 5070. Thanks 1 of 2 10.24.2011 Attachment number 1 \nPage 1 of 2 Item # 4 Augusta-Richmond County, Georgia CPB#325-041120-209825201 CAPITAL PROJECT BUDGET MARKS CHURCH ROAD RECONSTRUCTION PROJECT CHANGE NUMBER TWO information reference this request, contact Engineering at ext 5070. Thanks CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPLOST, PHASE V 325-04-1120-6011110 ($2,500,000)($2,500,000) TOTAL SOURCES: ($2,500,000) ($2,500,000) USE OF FUNDS ENGINEERING 325-04-1120-5212115-209825201 $622,240 $38,038 $660,278 CONSTRUCTION 325-04-1120-5414110-209825201 $1,877,760 ($38,038)$1,839,722 TOTAL USES:$2,500,000 $0 $2,500,000 2 of 2 10.24.2011 Attachment number 1 \nPage 2 of 2 Item # 4 (SA02 – For changes greater than $20,000) AUGUSTA-RICHMOND COUNTY AUGUSTA, GA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, “W.R. Toole Engineers, Inc.” Consultant, entered into a contract with Augusta- Richmond County on “August 4, 2009”, for the “Marks Church Road Reconstruction ”, Project No. 325-041120-209825201, File Reference No. 11-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Additional Engineering Services to complete the topographic Survey and update the project database. It is agreed that as a result of the above described modification the contract amount is increased by $38,038.00.00 from $622,240.00 to a new total of $660,278.00. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, “W.R. Toole Engineers, Inc.”, Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This day of , 2011. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY AUGUSTA, GEORGIA Honorable Mayor, Deke Copenhaver Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: __________________________ Title: ___________________________ Augusta Richmond County Project Number(s): 325-041120-209825201 Supplemental Agreement Number: 2 Purchase Order Number: 170337 Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Attachment number 2 \nPage 1 of 1 Item # 4 Engineering Services Committee Meeting 11/28/2011 1:00 PM Mowing and Maintenance Agreement Department:Planning and Development Caption:Approve mowing and maintenance agreement, encroachment permit, and indemnity form between Augusta, Georgia and Georgia DOT for fencing off an area under the Calhoun Expressway overpass adjacent to the canal between 15th and 13th Street. Background:The purpose of the project is to protect the surrounding area from trespassing, crime, and other problems associated with uncontrolled public access to this area under the Calhoun Expressway overpass. It’s a small project consisting of approximately 140 feet of chained link fencing but the land under the expressway is owned by GDOT, therefore the subject documents are needed. Analysis:Illegal activities on property are destroying the value of adjacent properties. The area needs to be secured. Financial Impact:Illegal activities on property are destroying the value of adjacent properties. The area needs to be secured. Alternatives:Approve or disapprove Recommendation:Approve Funds are Available in the Following Accounts: Approve REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 5 Attachment number 1 \nPage 1 of 1 Item # 5 Attachment number 2 \nPage 1 of 1 Item # 5 Attachment number 3 \nPage 1 of 9 Item # 5 Attachment number 3 \nPage 2 of 9 Item # 5 Attachment number 3 \nPage 3 of 9 Item # 5 Attachment number 3 \nPage 4 of 9 Item # 5 Attachment number 3 \nPage 5 of 9 Item # 5 Attachment number 3 \nPage 6 of 9 Item # 5 Attachment number 3 \nPage 7 of 9 Item # 5 Attachment number 3 \nPage 8 of 9 Item # 5 Attachment number 3 \nPage 9 of 9 Item # 5 Engineering Services Committee Meeting 11/28/2011 1:00 PM Request for Fireman's Monument Department:Planning Commission Caption:Consider a request by the members of the Augusta Fire Dept. for a Public Hearing to discuss the placement of a 30” tall bronze casting of fire gear on a 24” wide x 16” wide x 36” tall black granite on a 36” x 36” deep greystone blue base to honor all past, present and future members of the Augusta Fire Dept. which if approved will be placed at the Hero's Overlook on the River Walk. Background:The necessary staff meeting and public hearing has been conducted. Statue and marble is already complete and in the possession of the Fire Dept. Analysis: Financial Impact:no cost to the City for construction or placement Alternatives:approve placement or deny placement of the proposed monument Recommendation:approve placement of proposed Fireman's Monument Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 6 Attachment number 1 \nPage 1 of 5 Item # 6 Attachment number 1 \nPage 2 of 5 Item # 6 Attachment number 1 \nPage 3 of 5 Item # 6 Attachment number 1 \nPage 4 of 5 Item # 6 Attachment number 1 \nPage 5 of 5 Item # 6 Engineering Services Committee Meeting 11/28/2011 1:00 PM Rev. Larry Fryer Department:Clerk of Commission Caption:Consider a request from Rev. Larry Fryer regarding the naming of the bridge at 5th and 7th as The Children Memorial Bridge. (Referred from November 7 Engineering Services Committee) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 7 Attachment number 1 \nPage 1 of 1 Item # 7 Engineering Services Committee Meeting 11/28/2011 1:00 PM Revised Draft Hazard Mitigation Plan Department:Clerk of Commission Caption:Adoption of the revised Draft Hazard Mitigation Plan for Augusta, GA. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 8 Attachment number 1 \nPage 1 of 3 Item # 8 Attachment number 1 \nPage 2 of 3 Item # 8 Attachment number 1 \nPage 3 of 3 Item # 8 Attachment number 2 \nPage 1 of 6 Item # 8 Attachment number 2 \nPage 2 of 6 Item # 8 Attachment number 2 \nPage 3 of 6 Item # 8 Attachment number 2 \nPage 4 of 6 Item # 8 Attachment number 2 \nPage 5 of 6 Item # 8 Attachment number 2 \nPage 6 of 6 Item # 8 Engineering Services Committee Meeting 11/28/2011 1:00 PM Willhaven Subdivision, Phase II, Section II Department:Engineering Department-Abie L. Ladson, P.E., CPESC, Director Caption:Approve the deed of dedication, maintenance agreement, and road resolutions submitted by the Engineering Department for Willhaven, Phase II, Section II. Background:The final plat for Phase II, Section II, was approved by the Commission on August 17, 2010. The subdivision design and plat for this section, including the storm drain system, have been reviewed and accepted by our engineering staff and the construction has been reviewed by our inspectors. Analysis:This section meets all codes, ordinances and standards. There are no wetlands or 100-year flood plain boundaries involved in this section. Financial Impact:By accepting these roads and storm drainage installations into the County system and after the 18-month maintenance warranty by the developer/contractor for the roads and storm drainage has expired, all future maintenance and associated costs will be borne by Augusta, Georgia. Alternatives:1. Approve the deed of dedication, maintenance agreement, and road resolutions submitted by the Engineering Department for Willhaven, Phase Two, Section II. 2. Do not approve and risk litigation. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: Not required at this time. REVIEWED AND APPROVED BY:Cover Memo Item # 9 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 9 Attachment number 1 \nPage 1 of 1 Item # 9 Attachment number 2 \nPage 1 of 1 Item # 9 Attachment number 3 \nPage 1 of 2 Item # 9 Attachment number 3 \nPage 2 of 2 Item # 9 Attachment number 4 \nPage 1 of 2 Item # 9 Attachment number 4 \nPage 2 of 2 Item # 9 Attachment number 5 \nPage 1 of 2 Item # 9 Attachment number 5 \nPage 2 of 2 Item # 9