Loading...
HomeMy WebLinkAbout2011-05-09-Meeting AgendaEngineeringServicesCommittee Meeting CommissionChamber-5/9/2011-1:05PM ENGINEERINGSERVICES 1.MotiontoapproveChangeOrdertotheEngineering Studyof SewerImprovements,RockCreekBasincontractinth eamount of$135,724.00toZELEngineeringforengineering services to complete the design of the Rock Creek Sanitary S ewer SpihonProject. Attachments 2.Motion to approve and accept a Deed of Dedication a nd a MaintenanceAgreementonthegravitysanitarysewer mainin TheBrownstonesatRae'sCreek. Attachments 3.Authorizethenotificationoftheselectionresults toprospective firmsandproceedwithnegotiationsofacontractw iththetop ranked firm, Westin Engineering Inc., for an Emerge ncy ResponsePlan(RFQ#11-077). Attachments 4.Authorizethenotificationoftheselectionresults toprospective firmsandproceedwithnegotiationsofacontractw iththetop rankedfirm,HDREngineeringInc.,foraLeakDetec tionStudy (RFQ#11-080). Attachments 5.ApproveCapitalProjectBudgetChangeNumberThree 324- 041110-210824002andSupplementalAgreementNumberOne for the On-Call Construction Services Agreement with LPA Group, Inc in the amount of $98,498.60 to construct ion managementservicesontheResurfacingVariousRoad sUrban &SuburbanPhaseIIProjectsasrequestedbyAED.F undingis availableinSPLOSTPhaseIVFundBalanceaccount. Attachments 6.Approvethedeedsofdedication,maintenanceagreem ents,and road resolutions submitted by the Engineering and A ugusta UtilitiesDepartmentsforRichmondEstates,PhaseI I. Attachments 7.Approve Amendment #2 in the amount of $38,900 to th e Attachments www.augustaga.gov Thompson,Ventulett,Stainback&Associates (TVSDe sign) Architectural Contract for the TEE Center to add fu rniture, fixturesandequipment(FF&E)design. 8.Report from the Tree Commission. (Requested by CommissionerAitken)(ReferredfromApril25Engin eering ServicesCommittee) Attachments 9.Authorizethenotificationoftheselectionresults toprospective firmsandproceedwithnegotiationsofacontractw iththetop ranked firm, Dewberry & Davis Inc. for a Watershed Assessment/SourceWaterAssessmentPlan(RFQ#11-05 9). Attachments 10.Approvethedeedsofdedication,maintenanceagreem ents,and road resolutions submitted by the Engineering and A ugusta UtilitiesDepartmentsforWillhaven,PhaseII,Sect ionI. Attachments EngineeringServicesCommitteeMeeting 5/9/20111:05PM ApproveChangeOrdertotheEngineeringStudyofSe werImprovements,RockCreekBasininthe amountof$135,724.00toZELEngineeringforthede signoftheRockCreekSanitarySewerSpihon Project. Department:AugustaUtilitiesDepartment Caption:MotiontoapproveChangeOrdertotheEngineering Studyof SewerImprovements,RockCreekBasincontractinth eamountof $135,724.00toZELEngineeringforengineeringser vicesto completethedesignoftheRockCreekSanitarySewe rSpihon Project. Background:Thestudyprojectislocatedinthenorth-easternp ortionof AugustaGAinthevicinityoftheWashingtonRoadc orridorand RiverwatchParkwaycorridor.Theprojectevaluated the conditionsoftheRockCreekTrunkSewerin2008.Thefindings ofthestudyledtoseveralrecommendationsandsug gestionsfor rehabilitation,repair,replacement,andnewinstal lationsalongthe routeofthetrunksewer.TheUtilitiesDepartment nowisreadyto actononeofthereport'srecommendationsbydesig ningand constructingthesiphonportionoftheproject.Th isportionofthe overallstudywillallowthedepartmenttominimize potential sanitaryseweroverflowsaswellashandletheaddi tional dischargeofsanitarysewerthatisexpectedfromt henewCostco DevelopmentalongRiverwatchParkway.Thedesignpr ojectwill includebutwillnotbelimitedto:thedesignofa reliefsewerby providingengineeringdesign,surveying,environmen taldesign, landacquisition,andbid-phaseservices&engineer ingthrough constructionservices. Analysis:AUDhasevaluatedZELEngineeringproposaltodesig nthe projectandhasconsideredtheproposalfairandre asonableto accomplishthetask. FinancialImpact:Theconstructionproposalsubmittedforthisprojec tis $135,724.00.Thesefundsareavailablefromaccount 509043420- 5425210/80800010-5425210 Alternatives:Rejectionofthischangeorderwoulddelaythedesi gnoftheRock CreekSpihonSewerProjectandpotentiallydelayth eabilitytoCover Memo Item # 1 handletheadditonalsewerdischargefromtheCostc o DevelopmentinAugustaRichmondCounty. Recommendation:RecommendCommissionapprovechangeordertotheex isting contracttoZELEngineeringintheamountof$135,7 24.00 FundsareAvailable intheFollowing Accounts: $135,724.00fromaccount509043420-5425210/80800010 - 5425210 REVIEWEDANDAPPROVEDBY : Finance. Procurement. Law. Administrator. ClerkofCommission Cover Memo Item # 1 [Type text] Municipal Engineering Water Plants – Distribution Wastewater Plants – Collection Investigations – Planning Studies Recreational Facilities Industrial Parks – Roadways Civil – Structural – Mechanical Electrical & Instrumentation Joseph J. Tankersley, P. E. Jorge E. Jiménez, P. E. Charles D. Drown, P. E. Stacey W. Gordon, P. E. Frank W. Byne, P. E. Kenneth M. Wardenski, EIT, MCSE Founded 1946 Zimmerman, Evans and Leopold, inc. (706) 724-5627 – FAX (706) 724-5789 435 Telfair Street Augusta, Ga. 30901-2494 January 21, 2011 Mr. Jerry Delaughter, P.E., Assistant Director, Engineering Augusta Utilities Department 360 Bay Street, Suite 180 Augusta, GA 30901 Dear Mr. Delaughter: Zimmerman, Evans and Leopold, Inc. is pleased to provide a proposal for engineering services for Augusta Utilities Department’s Rock Creek Relief Sewer. This proposal includes the design of a relief sewer to service the upper reaches of the Rock Creek basin. The sewer will operate under low-head operating conditions and provide backup pumping capability, and will provide support service for the Village at Riverwatch. The design includes surveying, environmental, design, land-acquisition, and bid-phase services to Augusta Utilities. We believe that this scope of work is inclusive and will provide a cost- effective solution to the surcharged conditions of the Rock Creek sanitary sewer. The requested fee to complete the design is $117,124.00. Items such as easement plats are included as additional services, and total $18,500. The total cost expected to complete the design is therefore $135,624.00. This proposal includes separate bid packages for the sewer and the pumping station. An itemized schedule of services is included for your review, along with a proposed project schedule. ZEL looks forward to working with AUD to complete this project. Very truly yours, ZIMMERMAN, EVANS AND LEOPOLD, INC. Frank W. Byne, P.E. Principal Attachments Attachment number 1 Page 1 of 5 Item # 1 Description of Services Regulatory Services: Regulatory services include the complete preparation of documents to address environmental and regulatory components of the project. This scope of services includes interaction at the local, state, and federal levels to resolve any permitting issues during the pre- design and design stages. Preliminary Services: Preliminary services are established to provide the design basis for the work to be performed on the project. The services include research on existing facilities and location of utilities along the path of the project, in addition to preliminary cost estimates. At the conclusion of the preliminary services stage, the project should be clearly defined for AUD and ZEL, and the design should be established and a report will be generated to describe the design considerations. Design Services: Design services include the preparation of the electrical, mechanical, and civil plans in addition to environmental plans. The design services stage will bring the conceptual plans to construction. Bid Assistance: Bid Assistance services provide interaction between client, designer, and bidder in order to provide clear understanding of the expectations of AUD to the contracting community. Services include pre-bid meeting attendance and representation, and interpretations and clarifications of pre-bid addenda, in addition to providing expanded bid tabulations and preparing conformed contract documents. Engineering During Construction Services: Engineering During Construction Services include attendance of the pre-construction meeting, review of material submissions, and performing periodic site visits to investigate progress during critical construction times. In addition, this includes conflict resolution in the field, and closure of documents and red-line to as-built drawing conversion. Attachment number 1 Page 2 of 5 Item # 1 3 Professional Services Worksheet ZEL Engineers Contract 1: Rock Creek Siphon Station Contract 2: Pipeline from Rock Creek to Rae's Creek Sewer Task Description MAN - HRS Costs Engineering Services Regulatory 18,860$ 1 NPDES Permit, NOI, Contract 1 18 1,740$ 2 EPD Plan Submittal 30 2,820$ 3 Wetlands Identification & Permitting 120 12,560$ 4 NPDES Permit, NOI, Contract 2 14 1,740$ 18,860$ Preliminary, Contracts 1 & 2 15,290$ 5 Pump Station Design Criteria, Hydraulics 64 6,640$ 6 Pipeline Design Criteria, Hydraulics 32 3,380$ 7 Pipeline path evaluation 53 5,270$ 15,290$ Design Services 65,770$ Contract 1: Pump Station 8 Drawing: Cover Sheet - Contract 1 10 730$ 9 Drawing: General Arrangement - Contract 1 11 860$ 10 Drawing: Site, SE&SC Details, Etc. 14 1,010$ 11 Drawing: Structural and Details 24 1,620$ 12 Drawing: Site Piping Plan 25 1,750$ 13 Drawing: Electrical Power Supply 30 2,400$ 14 Drawing: Electrical Details, Backup Power 30 2,400$ 15 Drawing: Electrical Control, P&ID, & Flow Measurement 42 3,780$ 16 Drawing: Mechanical, Pumps Selection, Piping, Valving 88 7,240$ 17 Drawing: HVAC Contract 1 12 960$ 18 Drawing: Electrical Schedules Contract 1 44 3,440$ 19 Specifications for Equipment Contract 1 43 3,760$ 29,950$ January 21, 2011 Rock Creek Relief Sewer Augusta Utilities Department Attachment number 1 Page 3 of 5 Item # 1 4 Contract 2: Pipeline Rock Creek to Rae's Creek 20 Coordination - Project Review with Staff Contract 2 44 4,820$ 21 Project Management Project Meetings - Contract 2 56 5,480$ 22 Drawing: Cover Sheet - Contract 2 10 730$ 23 Drawing: General Arrangement - Contract 2 11 860$ 24 Drawing: Soil Erosion and Sediment Control Plan 56 3,920$ 25 Drawing: Soil Erosion and Sediment Control Plan Details 37 2,590$ 26 Drawing: Sta 0+00 to 20+00 Plan and Profile 29 2,030$ 27 Drawing: Sta 20+00 to 40+00 Plan and Profile 29 2,030$ 28 Drawing: Sta 40+00 to 60+00 Plan and Profile 29 2,030$ 29 Drawing: Sta 60+00 to 80+00 Plan and Profile 29 2,030$ 30 Drawing: Sta 80+00 to 100+00 Plan and Profile 29 2,030$ 31 Drawing: Bridge Crossing at Lake Shore Loop 29 2,030$ 32 Drawing: Specialty Structures, Details. 80 5,240$ Contract 2 Sub Total 35,820$ Bid Assistance Services 2,400$ Contract 1 33 Pre Bid Conference Contract 1 37 400$ 34 PreBid clarifications and interpretation, addenda, Contract 1 47 400$ 35 Bid Evaluation and Recommendation Contract 1 20 400$ Contract 2 1,200$ 36 Pre Bid Conference Contract 2 21 400$ 37 PreBid clarifications and interpretation, addenda, Contract 2 47 400$ 38 Bid Evaluation and Recommendation Contract 2 12 400$ 1,200$ Engineering During Construction Services 8,600$ Contract 1 39 Pre Construction Conference Contract 1 20 400$ 40 Shop Drawing Review Contract 1 124 1,800$ 41 Bi-Weekly Progress Meeting Contract 1 76 600$ 42 Periodic Site Visits Contract 1 84 800$ 43 Closure Documents Contract 1 52 400$ 44 Certification Contract 1 6 400$ 4,400$ Attachment number 1 Page 4 of 5 Item # 1 5 Contract 2 45 Pre Construction Conference Contract 2 26 400$ 46 Shop Drawing Review Contract 2 68 800$ 47 Bi-Weekly Progress Meeting Contract 2 52 600$ 48 Periodic Site Visits Contract 2 74 800$ 49 Testing, Flushing Assistance 30 800$ 50 Closure Documents Contract 2 44 400$ 51 Certification Contract 2 6 400$ 4,200$ Reimbursable costs (printing and mileage)6,204$ Mileage, Trips x X miles 104$ Printing (includes mailing costs): 30% Submittal 720$ 60% Submittal 720$ 90% Submittal 720$ 100% Submittal 720$ Executed Contracts 420$ Regulatory Submittals 2,800$ 6,204$ Extra Services (Directly Billed)18,500$ Geotechnical Services 2,000$ Easement Plats 16,500$ 18,500$ TOTAL 135,624$ Attachment number 1 Page 5 of 5 Item # 1 EngineeringServicesCommitteeMeeting 5/9/20111:05PM BrownstonesatRae'sCreekDeedofDedicationandM aintenanceAgreement Department:AugustaUtillitiesDepartment Caption:MotiontoapproveandacceptaDeedofDedicationa nda MaintenanceAgreementonthegravitysanitarysewer maininThe BrownstonesatRae'sCreek. Background:BrukerDavis,LLCisconstructingatownhomedevelo pment namedTheBrownstonesatRae'sCreek,onJacksonRo adandhas requestedthatAugustaacceptthegravitysanitary sewermaininto itssystem. Analysis:Thegravitysanitarysewermainhasbeeninspectedb ythe AugustaUtilitiesDepartmentandhaspassedsaidte sting.An eighteenmonthMaintenanceAgreementisbeingsubmi tted,along withtheDeedofDedication. FinancialImpact:N/A Alternatives:DenythemotiontoapproveandacceptaDeedofDed icationand aMaintenanceAgreementonthegravitysanitarysew ermainin TheBrownstonesatRae'sCreek. Recommendation:ApprovethemotiontoapproveandacceptaDeedof Dedication andaMaintenanceAgreementonthegravitysanitary sewermain inTheBrownstonesatRae'sCreek. FundsareAvailable intheFollowing Accounts: N/A REVIEWEDANDAPPROVEDBY : Finance. Procurement.Cover Memo Item # 2 Law. Administrator. ClerkofCommission Cover Memo Item # 2 Attachment number 1 Page 1 of 3 Item # 2 Attachment number 1 Page 2 of 3 Item # 2 Attachment number 1 Page 3 of 3 Item # 2 Attachment number 2 Page 1 of 2 Item # 2 Attachment number 2 Page 2 of 2 Item # 2 Attachment number 3 Page 1 of 1 Item # 2 EngineeringServicesCommitteeMeeting 5/9/20111:05PM EmergencyResponsePlan Department:Utiltiies Caption:Authorizethenotificationoftheselectionresults toprospective firmsandproceedwithnegotiationsofacontractw iththetop rankedfirm,WestinEngineeringInc.,foranEmerge ncyResponse Plan(RFQ#11-077). Background:TheUtilitiesDepartmentthroughtheProcurementDe partment preparedandadvertisedaRequestofQualification foran EmergencyResponsePlan.TheRFQ’swereopenedonJ anuary 26,2011.SincethesubmittaloftheRFQ’s,both theUtilities DepartmentandProcurementDepartmenthavebeeninv olvedin theprocessofrankingthequalifiedfirms.Thispr ocessbeganwith areviewoftheinformationsubmittedfrominterest edfirms, continuedwithashortlistingofqualifiedfirms,andculminated withinterviewsofthetoptwo(2)firmsbyaSelec tionCommittee. Analysis:TheSelectionCommitteeconductedinterviewsonMar ch30, 2011.Atthecompletionoftheinterviews,theSele ction Committeerankedthefirmsasfollows:1.WestinEn gineering Inc.2.TECTONICSUponapprovalbytheAugustaComm ission, theUtilitiesDepartmentwillbeginnegotiationswi ththetop rankedfirm.Ifnegotiationsforamutuallyaccepta bleagreement cannotbereached,wewouldliketoreservetherig httonegotiate withtheremainingfirmsintheorderasshown. FinancialImpact:Nofundsarebeingrequestedatthistime.Thecost forthe EmergencyResponsePlanwillbebroughttotheComm ission whennegotiationsarecompleted. Alternatives:IftheAugustaUtilitiesDepartmentcannotreachas atisfactory agreementwiththetoprankedfirm,theremainingf irmsshouldbe consideredfornegotiationsintheorderasshown. Recommendation:WerecommendtheCommissionauthorizethenotificat ionofthe selectionresultstoprospectivefirmsandproceedw ith negotiationsofacontractwiththetoprankedfirm ,Westin Cover Memo Item # 3 EngineeringInc.foranEmergencyResponsePlan(RF Q#11- 077). FundsareAvailable intheFollowing Accounts: Nofundsarebeingrequestedatthistime. REVIEWEDANDAPPROVEDBY : Finance. Procurement. Law. Administrator. ClerkofCommission Cover Memo Item # 3 Attachment number 1 Page 1 of 2 Item # 3 Attachment number 1 Page 2 of 2 Item # 3 REQUEST FOR QUALIFICATIONS Request for Qualifications will be received at this office until Wednesday, January 12, 2011 @ 3:00 p.m. FOR FURNISHING: RFQ Item #11-054 Water and Wastewater System Master Plan for Utilities Department RFQ Item #11-055 Utility Business Plan for Utilities Department RFQ Item #11-056 Water and Wastewater Rate Study for Utilities Department RFQ Item #11-059 Watershed Assessment/Source Water Assessment Plan for Utilities Department RFQ Item #11-077 Emergency Response Plan for Utilities Department RFQ Item #11-080 Leak Detection Study for Utilities Department RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFQ documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing to the office of the Procurement Department by Tuesday, December 28, 2010 @ 5:00 p.m. by fax at 706-821-2811 or by email @ procbidandcontract@augustaga.gov. No RFQ will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the Procurement Department with your bonafide bid package. No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark RFQ number on the outside of the envelope. Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Disadvantage Business Enterprise (DBE) Augusta-Richmond County, Georgia does not operate a DBE, MBE or WBE Program for Augusta funded projects, as a Federal Court has entered an Order enjoining the Race-Based portion of Augusta’s DBE Program. Instead Augusta operates a Local Small Business Opportunity Program. However, for various projects utilizing the expenditure of State or Federal funds, Augusta enforces DBE requirements and/or DBE goals set by the Federal and/or State Agencies in accordance with State and Federal laws. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle December 2, 9, 16, 23, 2010 Metro Courier December 8, 2010 cc: Tameka Allen Interim Deputy Administrator Tom Wiedmeier Utilities Department Drew Goins Utilities Department Attachment number 2 Page 1 of 1 Item # 3 VENDORS Attachment B Bidders Form Addendums 1 & 2 Original 7 Copies Southeastern Technical Solutions 1722 SW Biltmore Street Port St Lucie FL 34984 YES YES YES YES YES Tectonic Engineering & Surveying 8639 Mayland Drive Suite 102 Richmond VA 23294 YES YES YES YES YES URS Corporation 400 Northpark Town Center 1000 Abernathy Road NE Ste 900 Atlanta GA 30328 YES YES YES YES YES Westin Engineering Inc 260 Peachtree Street NW Ste 2200 Atlanta GA 30303 YES YES YES YES YES Public Safety Consultants PO Box 608 Union WA 98592 Brown & Caldwell 990 Hammond Drive Suite 400 Atlanta GA 30328 Heery International 999 Peachtree St NE Suite 300 Atlanta GA 30309 Jacobs Engineering Group 6801 Governors Lake Parkway Building 200 Norcross GA 30071 Woodard & Curran 2905 Premiere Parkway Ste 175 Duluth GA 30097 Zel Engineers 435 Telfair Street Augusta GA 30901 RFQ Item #11-077 Emergency Response Plan for the City of Augusta - Utilities Department RFQ Due: Wednesday, January 26, 2011 @ 11:00 a.m. SUBMITTED NO BID RESPONSE SUBMITTED NO BID RESPONSE SUBMITTED NO BID RESPONSE SUBMITTED NO BID RESPONSE SUBMITTED NO BID RESPONSE Non-Compliant Submitted only 6 Copies Page 1 of 1 Attachment number 3 Page 1 of 1 Item # 3 Evaluation Criteria PTS Southeastern Technical Solutions 1722 SW Biltmore Street Port St Lucie FL 34984 Tectonic Engineering & Surveying 8639 Mayland Drive Suite 102 Richmond VA 23294 URS Corporation 400 Northpark Town Center 1000 Abernathy Road NE Ste 900 Atlanta GA 30328 Westin Engineering Inc 260 Peachtree Street NW Ste 2200 Atlanta GA 30303 1. Firms experience and performance on projects of similar size and scope 25 15.0 24.3 16.0 18.3 2. Firms Quality Control, Quality Assurance and Project Tracking 20 12.3 16.3 16.3 16.3 3. Project Approach and Understanding 25 18.3 21.7 19.7 22.3 4. Qualifications, experience, references and availability of Key Staff 25 17.7 21.3 22.0 20.0 5. Proximity to Area 5 1.7 1.7 3.3 3.0 Total 100 65.0 85.3 77.3 80.0 1 2 2 1 Cumulative Evaluation Sheet - RFQ Item #11-077 Emergency Response Plan for the City of Augusta - Utilities Department Presentations Shortlist Item # 3 Attachment number 5 Page 1 of 1 Item # 3 Attachment number 6 Page 1 of 2 Item # 3 Attachment number 6 Page 2 of 2 Item # 3 Attachment number 7 Page 1 of 7 Item # 3 Attachment number 7 Page 2 of 7 Item # 3 Attachment number 7 Page 3 of 7 Item # 3 Attachment number 7 Page 4 of 7 Item # 3 Attachment number 7 Page 5 of 7 Item # 3 Attachment number 7 Page 6 of 7 Item # 3 Attachment number 7 Page 7 of 7 Item # 3 EngineeringServicesCommitteeMeeting 5/9/20111:05PM LeakDetectionStudy Department:Utilities Caption:Authorizethenotificationoftheselectionresults toprospective firmsandproceedwithnegotiationsofacontractw iththetop rankedfirm,HDREngineeringInc.,foraLeakDetec tionStudy (RFQ#11-080). Background:TheUtilitiesDepartmentthroughtheProcurementDe partment preparedandadvertisedaRequestofQualification foraLeak DetectionStudy.TheRFQ’swereopenedonJanuary2 6,2011. SincethesubmittaloftheRFQ’s,boththeUtilitie sDepartment andProcurementDepartmenthavebeeninvolvedinth eprocessof rankingthequalifiedfirms.Thisprocessbeganwit hareviewof theinformationsubmittedfrominterestedfirms,co ntinuedwitha shortlistingofqualifiedfirms,andculminatedwi thinterviewsof thetopthree(3)firmsbyaSelectionCommittee. Analysis:TheSelectionCommitteeconductedinterviewsonMar ch31, 2011.Atthecompletionoftheinterviews,theSele ction Committeerankedthefirmsasfollows:1.HDREngin eeringInc. 2.W.K.Dickson3.ShawEnvironmental&Infrastruc tureUpon approvalbytheAugustaCommission,theUtilitiesD epartment willbeginnegotiationswiththetoprankedfirm.I fnegotiations foramutuallyacceptableagreementcannotbereach ed,wewould liketoreservetherighttonegotiatewiththerem ainingfirmsin theorderasshown. FinancialImpact:Nofundsarebeingrequestedatthistime.Thecost fortheLeak DetectionStudywillbebroughttotheCommissionw hen negotiationsarecompleted. Alternatives:IftheAugustaUtilitiesDepartmentcannotreachas atisfactory agreementwiththetoprankedfirm,theremainingf irmsshouldbe consideredfornegotiationsintheorderasshown. Recommendation:WerecommendtheCommissionauthorizethenotificat ionofthe selectionresultstoprospectivefirmsandproceedw ith Cover Memo Item # 4 negotiationsofacontractwiththetoprankedfirm ,HDR EngineeringInc.forLeakDetectionStudy(RFQ#11-080). FundsareAvailable intheFollowing Accounts: Nofundsarebeingrequestedatthistime. REVIEWEDANDAPPROVEDBY : Finance. Procurement. Law. Administrator. ClerkofCommission Cover Memo Item # 4 Attachment number 1 Page 1 of 1 Item # 4 REQUEST FOR QUALIFICATIONS Request for Qualifications will be received at this office until Wednesday, January 12, 2011 @ 3:00 p.m. FOR FURNISHING: RFQ Item #11-054 Water and Wastewater System Master Plan for Utilities Department RFQ Item #11-055 Utility Business Plan for Utilities Department RFQ Item #11-056 Water and Wastewater Rate Study for Utilities Department RFQ Item #11-059 Watershed Assessment/Source Water Assessment Plan for Utilities Department RFQ Item #11-077 Emergency Response Plan for Utilities Department RFQ Item #11-080 Leak Detection Study for Utilities Department RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFQ documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing to the office of the Procurement Department by Tuesday, December 28, 2010 @ 5:00 p.m. by fax at 706-821-2811 or by email @ procbidandcontract@augustaga.gov. No RFQ will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the Procurement Department with your bonafide bid package. No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark RFQ number on the outside of the envelope. Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Disadvantage Business Enterprise (DBE) Augusta-Richmond County, Georgia does not operate a DBE, MBE or WBE Program for Augusta funded projects, as a Federal Court has entered an Order enjoining the Race-Based portion of Augusta’s DBE Program. Instead Augusta operates a Local Small Business Opportunity Program. However, for various projects utilizing the expenditure of State or Federal funds, Augusta enforces DBE requirements and/or DBE goals set by the Federal and/or State Agencies in accordance with State and Federal laws. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle December 2, 9, 16, 23, 2010 Metro Courier December 8, 2010 cc: Tameka Allen Interim Deputy Administrator Tom Wiedmeier Utilities Department Drew Goins Utilities Department Attachment number 2 Page 1 of 1 Item # 4 VENDORS Attachment B Bidders Form Addendums 1 & 2 Original 7 Copies Shaw Environmental & Infrastructure 11560 Great Oaks Way Ste 500 Alpharetta GA 30022 YES YES YES YES YES HDR Engineering Inc 1201 Peachtree Street NE Atlanta GA 30361 YES YES YES YES YES W.K. Dickson 1450 Greene Street, Ste 225 Augusta GA 30901 YES YES YES YES YES Wachs Valve & Hydrant Services LLC 801 Asbury Drive Buffalo Grove, IL 60089 YES YES YES YES YES Woolpert 375 Northridge Road Ste 100 Atlanta GA 30350 YES YES YES YES YES Zel Engineers 435 Telfair Street Augusta GA 30901 YES YES YES YES YES Gannett Fleming 301 South McDowell Street Ste 1008 Charlotte NC 28204 Utilities Services Associates 919 SW 150th Street Ste B Burien WA 98166 Black & Veatch 11401 Lamar Avenue Overland Park KS 66211 Heery International 999 Peachtree Street, NE Ste 300 Atlanta, GA 30309 Jacobs Engineering Group Inc 6801 Governors Lake Pkwy Bldg 200 Norcross, GA 30071 Parsons Brinckerhoff 3340 Peachtree Road, NE Ste 2400 Tower Place 100 Atlanta GA 30326 Woodard & Curran 2905 Premiere Parkway Ste 175 Duluth GA 30097 SUBMITTED NO BID RESPONSE RFQ Item #11-080 Leak Detection Study for the City of Augusta - Utilities Department RFQ Due: Wednesday, January 26, 2011 @ 11:00 a.m. SUBMITTED NO BID RESPONSE SUBMITTED NO BID RESPONSE SUBMITTED NO BID RESPONSE SUBMITTED NO BID RESPONSE Non-Compliant Attachment B Missing Notary Seal Non-Compliant Missing E-Verify Number Missing Business License Info Page 1 of 1 Attachment number 3 Page 1 of 1 Item # 4 Evaluation Criteria PTS Shaw Environmental & Infrastructure 11560 Great Oaks Way Ste 500 Alpharetta GA 30022 HDR Engineering Inc 1201 Peachtree Street NE Atlanta GA 30361 W.K. Dickson 1450 Greene Street, Ste 225 Augusta GA 30901 Wachs Valve & Hydrant Services LLC 801 Asbury Drive Buffalo Grove, IL 60089 Woolpert 375 Northridge Road Ste 100 Atlanta GA 30350 Zel Engineers 435 Telfair Street Augusta GA 30901 1. Firms experience and performance on projects of similar size and scope 25 22.0 21.7 23.3 20.7 19.3 15.0 2. Firms Quality Control, Quality Assurance and Project Tracking 20 17.0 17.0 17.0 15.3 17.0 17.0 3. Project Approach and Understanding 25 22.0 21.0 21.7 21.0 20.3 15.7 4. Qualifications, experience, references and availability of Key Staff 25 21.0 20.0 21.3 19.7 19.0 16.7 5. Proximity to Area 5 2.7 3.3 5.0 2.3 3.3 5.0 Total 100 84.7 83.0 88.3 79.0 79.0 69.3 2 3 1 2.7 1.0 2.3 Cumulative Evaluation Sheet - RFQ Item #11-080 Leak Detection Study for the City of Augusta - Utilities Department Shortlisted Presentation Item # 4 Attachment number 5 Page 1 of 1 Item # 4 Attachment number 6 Page 1 of 2 Item # 4 Attachment number 6 Page 2 of 2 Item # 4 Attachment number 7 Page 1 of 5 Item # 4 Attachment number 7 Page 2 of 5 Item # 4 Attachment number 7 Page 3 of 5 Item # 4 Attachment number 7 Page 4 of 5 Item # 4 Attachment number 7 Page 5 of 5 Item # 4 EngineeringServicesCommitteeMeeting 5/9/20111:05PM On-CallConstructionServices-LPASA#1 Department:AbieL.Ladson,PE,CPESC,Director Caption:ApproveCapitalProjectBudgetChangeNumberThree 324- 041110-210824002andSupplementalAgreementNumber One fortheOn-CallConstructionServicesAgreementwit hLPA Group,Incintheamountof$98,498.60toconstruct ion managementservicesontheResurfacingVariousRoad sUrban& SuburbanPhaseIIProjectsasrequestedbyAED.Fun dingis availableinSPLOSTPhaseIVFundBalanceaccount. Background:OnMay18,2010theAugustaRichmondCountyCommiss ion approvedtheOn-CallProfessionalServicesofconst ruction management,constructioninspectionandfieldengin eering servicesonvariousprojectsunderconstructionfor 2010and2011 toincludetheResurfacingVariousRoadsUrban&Su burban PhaseIIProjects. Analysis:ThisrequestwillallowAEDtomaintainthecurrent levelof existingConstructionManagement(CM)andConstruct ion QualityAssuranceandQualityControl(QA/QC).QA/Q Cand CMarecriticalfactorstoconstructingagoodroad andtoensure theworkiscompletedperdesignstandardsandspec ifications. Also,ResurfacingVariousRoadsUrban&Suburbanpr ojects requiresafull-timeinspector,constructionqualit ycontroland dailyactivitylogging. FinancialImpact:Fundsareavailableintheamountof$98,498.60in SPLOST PhaseIVFundBalanceaccounttobetransferredto theOn-Call ConstructionServicesConsultantAgreementwiththe LPAGroup uponCommissionapproval. Alternatives:1)ApproveCapitalProjectBudgetChangeNumberThr ee324- 041110-210824002andSupplementalAgreementNumber One fortheOn-CallConstructionServicesAgreementwit hLPA Group,Incintheamountof$98,498.60toconstruct ion managementservicesontheResurfacingVariousRoad sUrban& SuburbanPhaseIIProjectsasrequestedbyAED.Fun dingis availableinSPLOSTPhaseIVFundBalanceaccount.2)DonotCover Memo Item # 5 approveandacceptsubstandardroadwaybydiscontin uing QA/QCandCMcontrols. Recommendation:ApproveAlternativeNumberOne. FundsareAvailable intheFollowing Accounts: SPLOSTPhaseIVFundBalancetobetransferredto3 24-041110- 5212119/210824002 REVIEWEDANDAPPROVEDBY : Finance. Law. Administrator. ClerkofCommission Cover Memo Item # 5 (SA02 – For changes more than $20,000) December 2010 AUGUSTA-RICHMOND COUNTY ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, “The LPA Group, Inc.” Consultant, entered into a contract with Augusta- Richmond County on “May 18, 2010”, for On-Call Construction Services”, Project No. 324- 041110-210824002, File Reference No. 10-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Construction Engineering and Inspection Services for Resurfacing Various Roads, Urban and Suburban Phase 2 It is agreed that as a result of the above described modification the contract amount is increased by $98,498.60 from $50,000.00 to a new total of $148,498.60. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, “The LPA Group, Inc.”, Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This day of , 2011. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY AUGUSTA, GEORGIA Honorable Mayor, Deke Copenhaver THE LPA, Group, Inc Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: Title: Augusta Richmond County Project Number(s): 324-041110-210824002 Supplemental Agreement Number: 1 Purchase Order Number: P181968 Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Attachment number 1 Page 1 of 1 Item # 5 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project change is authorized to CPB# 324-041110-210824002 for Supplemental Agreement Number One for The LPA Group. This project proposes to continue to provide professional services on the Resurfacing Various Roads Urban and Suburban Ph II projects. Funding in the amount of $98,498.60 is available SPLOST Phase IV Fund Account Balance and will be transferred to the LPA Agreement upon Commission approval. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Resurfacing 50,000$ Resurfacing 16,920$ SPLOST Phase IV Fund Account Balance 56,400$ SPLOST Phase IV Fund Account Balance 99,000$ 222,320$ Section 3: The following amounts are appropriated for the project: By Basin By District Varies $222,320 Varies 222,320$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Mayor, Deke Copenhaver CAPITAL PROJECT BUDGET ON-CALL CONSTRUCTION SERVICES CPB#324-041110-210824002 CHANGE NUMBER THREE Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1.4.11 Attachment number 2 Page 1 of 2 Item # 5 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET ON-CALL CONSTRUCTION SERVICES CPB#324-041110-210824002 CHANGE NUMBER THREE CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB RESURFACING 324-04-1110-5411120-201824044 ($66,920) $0 ($66,920) SPLOST PHASE IV FUND ACCOUNT 000-00-0000-0000000-000000000 ($56,400) ($99,000) ($155,400) TOTAL SOURCES: ($123,320) ($99,000) ($222,320) USE OF FUNDS PROFESSIONAL SERVICES 324-04-1110-5212119-210824002 $123,320 $99,000 $222,320 TOTAL USES: $123,320 $99,000 $222,320 1.4.11 Attachment number 2 Page 2 of 2 Item # 5 EngineeringServicesCommitteeMeeting 5/9/20111:05PM RichmondEstatesPhaseIIDedication Department:EngineeringDepartment-AbieL.Ladson,P.E.,CPESC,Director Caption:Approvethedeedsofdedication,maintenanceagreem ents,and roadresolutionssubmittedbytheEngineeringandA ugusta UtilitiesDepartmentsforRichmondEstates,PhaseI I. Background:ThefinalplatforPhaseIIwasapprovedbytheCom missionon May4,2010.Thesubdivisiondesignandplatforth issection, includingthestormdrainsystem,havebeenreviewe dand acceptedbyourengineeringstaffandtheconstruct ionhasbeen reviewedbyourinspectors.TheUtilitiesDept.has inspectedand reviewedthewaterandsanitarysewerinstallations ,andhereby requestsacceptanceoftheutilitydeed. Analysis:Thissectionmeetsallcodes,ordinancesandstanda rds.Thereare nowetlandsor100-yearfloodplainboundariesinvo lvedinthis section.Acceptanceofsaidutilitydeedshalldedi cate,asrequired, thewaterandsanitarysewermainsalongwiththea pplicable easementstoAugusta,Georgia,foroperationandma intenance. FinancialImpact:Byacceptingtheseroadsandstormdrainageinstall ationsintothe Countysystemandafterthe18-monthmaintenancewa rrantyby thedeveloper/contractorfortheroadsandstormdr ainagehas expired,allfuturemaintenanceandassociatedcost swillbeborne byAugusta,Georgia.Byacceptanceoftheutilityd eedand maintenanceagreement,allfuturemaintenanceanda ssociated costsforwaterandsanitarysewerinstallationswi llbeborneby Augusta,Georgia,andpositiverevenuewillbegene ratedfromthe saleofwaterandsanitarysewertapsandmonthlyb illingofsame. Alternatives:1.Approvethedeedsofdedication,maintenanceagr eements,and roadresolutionssubmittedbytheEngineering,and Augusta UtilitiesDepartmentsforRichmondEstates,PhaseT wo.2.Donot approveandrisklitigation. Recommendation:ApproveAlternativeNumberOne. Cover Memo Item # 6 FundsareAvailable intheFollowing Accounts: N/A REVIEWEDANDAPPROVEDBY : Finance. Law. Administrator. ClerkofCommission Cover Memo Item # 6 Attachment number 1 Page 1 of 1 Item # 6 Attachment number 2 Page 1 of 1 Item # 6 Attachment number 3 Page 1 of 2 Item # 6 Attachment number 3 Page 2 of 2 Item # 6 Attachment number 4 Page 1 of 1 Item # 6 Attachment number 5 Page 1 of 2 Item # 6 Attachment number 5 Page 2 of 2 Item # 6 Attachment number 6 Page 1 of 4 Item # 6 Attachment number 6 Page 2 of 4 Item # 6 Attachment number 6 Page 3 of 4 Item # 6 Attachment number 6 Page 4 of 4 Item # 6 Attachment number 7 Page 1 of 2 Item # 6 Attachment number 7 Page 2 of 2 Item # 6 EngineeringServicesCommitteeMeeting 5/9/20111:05PM TEECenter–DesignAmendment#2-FF&E Department:PublicServicesDepartment-FacilitiesManagement Division Caption:ApproveAmendment#2intheamountof$38,900toth e Thompson,Ventulett,Stainback&Associates(TVSDe sign) ArchitecturalContractfortheTEECentertoaddfu rniture, fixturesandequipment(FF&E)design. Background:ThearchitecturalcontractfordesignofthenewTEE Centerwas negotiatedandexecutedwithoutadditionalservices offurniture, fixturesandequipment(FF&E)designincluded.The project designhasnowadvancedtothepointthattheseser vicesare neededinordertokeeptheprojectmovingforward inanefficient manner.ThechoiceofthisArchitectwasbasedinp artonthe experienceandtheinteriordesignexpertisetheyb ringtothe projectissubstantial.Includingthisworkwithin theirscopeof responsibilityisinthebestinterestoftheproje ct.Itis recommendedthatapprovalbegiventotheattached proposal,and thattheArchitect’scontractbeamendedaccordingl y. Analysis:Theproject’sFF&Edesignisneededinordertopla npower,data andlightingsystemssothattheirlocationscanbe properly coordinatedbythedesignengineers.Inaddition,s electionand specificationsoffurnishingsisneeded. FinancialImpact:Theamountofadditionalarchitecturalfeesis$38,900.Theoverall architecturalfeefortheTEECenterwillincrease from$2,205,022 to$2,243,922.Theoverallcontractamountforboth Reynolds StreetParkingDeckandtheTEECenterprojectwill increaseto $3,019,469. Alternatives:1.ApproveAmendment#2intheamountof$38,900to the Thompson,Ventulett,Stainback&Associates(TVSDe sign) ArchitecturalContractfortheTEECentertoaddfu rniture, fixturesandequipment(FF&E)design2.Hirealtern ativefirmto designFF&EfortheTEECenterproject Recommendation:ApproveAmendment#2intheamountof$38,900toth e Cover Memo Item # 7 Thompson,Ventulett,Stainback&Associates(TVSDe sign) ArchitecturalContractfortheTEECentertoaddfu rniture, fixturesandequipment(FF&E)design. FundsareAvailable intheFollowing Accounts: GL-325-05-1130;JL-206351102ObjectCode:52-12112 REVIEWEDANDAPPROVEDBY : Cover Memo Item # 7 Attachment number 1 Page 1 of 6 Item # 7 Attachment number 1 Page 2 of 6 Item # 7 Attachment number 1 Page 3 of 6 Item # 7 Attachment number 1 Page 4 of 6 Item # 7 Attachment number 1 Page 5 of 6 Item # 7 Attachment number 1 Page 6 of 6 Item # 7 EngineeringServicesCommitteeMeeting 5/9/20111:05PM TreeCommission Department:ClerkofCommission Caption:ReportfromtheTreeCommission.(RequestedbyCom missioner Aitken)(ReferredfromApril25EngineeringServic es Committee) Background: Analysis: FinancialImpact: Alternatives: Recommendation: FundsareAvailable intheFollowing Accounts: REVIEWEDANDAPPROVEDBY : Cover Memo Item # 8 EngineeringServicesCommitteeMeeting 5/9/20111:05PM WatershedAssessment/SourceWaterAssessmentPlan Department:Utilities Caption:Authorizethenotificationoftheselectionresults toprospective firmsandproceedwithnegotiationsofacontractw iththetop rankedfirm,Dewberry&DavisInc.foraWatershed Assessment/SourceWaterAssessmentPlan(RFQ#11-05 9). Background:TheUtilitiesDepartmentthroughtheProcurementDe partment preparedandadvertisedaRequestofQualification fora WatershedAssessment/SourceWaterAssessmentPlan.The RFQ’swereopenedonJanuary26,2011.Sincethe submittalof theRFQ’s,boththeUtilitiesDepartmentandProcur ement Departmenthavebeeninvolvedintheprocessofran kingthe qualifiedfirms.Thisprocessbeganwithareviewo fthe informationsubmittedfrominterestedfirms,contin uedwitha shortlistingofqualifiedfirms,andculminatedwi thinterviewsof thetopthree(3)firmsbyaSelectionCommittee. Analysis:TheSelectionCommitteeconductedinterviewsonMar ch30, 2011.Atthecompletionoftheinterviews,theSele ction Committeerankedthefirmsasfollows:1.Dewberry &DavisInc. 2.AECOM3.JacobsEngineeringGroupInc.Uponappr ovalby theAugustaCommission,theUtilitiesDepartmentwi llbegin negotiationswiththetoprankedfirm.Ifnegotiati onsfora mutuallyacceptableagreementcannotbereached,we wouldlike toreservetherighttonegotiatewiththeremainin gfirmsinthe orderasshown. FinancialImpact:Nofundsarebeingrequestedatthistime.Thecost forthe WatershedAssessment/SourceWaterAssessmentPlanw illbe broughttotheCommissionwhennegotiationsarecom pleted. Alternatives:IftheAugustaUtilitiesDepartmentcannotreachas atisfactory agreementwiththetoprankedfirm,theremainingf irmsshouldbe consideredfornegotiationsintheorderasshown. Recommendation:WerecommendtheCommissionauthorizethenotificat ionoftheCover Memo Item # 9 selectionresultstoprospectivefirmsandproceedw ith negotiationsofacontractwiththetoprankedfirm ,Dewberry& DavisInc.foraWatershedAssessment/SourceWaterA ssessment Plan(RFQ#11-059). FundsareAvailable intheFollowing Accounts: Nofundsarebeingrequestedatthistime. REVIEWEDANDAPPROVEDBY : Finance. Procurement. Law. Administrator. ClerkofCommission Cover Memo Item # 9 Attachment number 1 Page 1 of 2 Item # 9 Attachment number 1 Page 2 of 2 Item # 9 REQUEST FOR QUALIFICATIONS Request for Qualifications will be received at this office until Wednesday, January 12, 2011 @ 3:00 p.m. FOR FURNISHING: RFQ Item #11-054 Water and Wastewater System Master Plan for Utilities Department RFQ Item #11-055 Utility Business Plan for Utilities Department RFQ Item #11-056 Water and Wastewater Rate Study for Utilities Department RFQ Item #11-059 Watershed Assessment/Source Water Assessment Plan for Utilities Department RFQ Item #11-077 Emergency Response Plan for Utilities Department RFQ Item #11-080 Leak Detection Study for Utilities Department RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFQ documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing to the office of the Procurement Department by Tuesday, December 28, 2010 @ 5:00 p.m. by fax at 706-821-2811 or by email @ procbidandcontract@augustaga.gov. No RFQ will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the Procurement Department with your bonafide bid package. No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark RFQ number on the outside of the envelope. Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Disadvantage Business Enterprise (DBE) Augusta-Richmond County, Georgia does not operate a DBE, MBE or WBE Program for Augusta funded projects, as a Federal Court has entered an Order enjoining the Race-Based portion of Augusta’s DBE Program. Instead Augusta operates a Local Small Business Opportunity Program. However, for various projects utilizing the expenditure of State or Federal funds, Augusta enforces DBE requirements and/or DBE goals set by the Federal and/or State Agencies in accordance with State and Federal laws. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle December 2, 9, 16, 23, 2010 Metro Courier December 8, 2010 cc: Tameka Allen Interim Deputy Administrator Tom Wiedmeier Utilities Department Drew Goins Utilities Department Attachment number 2 Page 1 of 1 Item # 9 VENDORS Attachment B Bidders Form Addendums 1 & 2 Original 7 Copies AECOM 1360 Peachtree Street, NE Ste 500 Atlanta GA 30309 YES YES YES YES YES Dewberry 2835 Brandywine Road Ste 100 Atlanta GA 30341 YES YES YES YES YES Jacobs Engineering Group 6801 Governors Lake Pkwy Bldg 200 Norcross GA 30071 YES YES YES YES YES Mactec 3200 Town Point Drive Suite 100 Kennesaw GA 30144 YES YES YES YES YES Stevenson & Palmer 723 Industrial Park Drive, Suite 2 Evans GA 30809 YES YES YES YES YES Brown & Caldwell 990 Hammond Drive Ste 400 Atlanta GA 30328 Heery International 999 Peachtree Street NE Suite 300 Atlanta Ga 30309 Parsons Brinckerhoff 3340 Peachtree Road, NE Ste 2400 Tower Place 100 Atlanta GA 30326 RFQ Item #11-059 Watershed Assessment/Source Water Assessment Plan for the City of Augusta - Utilities Department RFQ Due: Wednesday, January 26, 2011 @ 11:00 a.m. SUBMITTED NO BID RESPONSE SUBMITTED NO BID RESPONSE SUBMITTED NO BID RESPONSE Page 1 of 1 Attachment number 3 Page 1 of 1 Item # 9 Evaluation Criteria PTS AECOM 1360 Peachtree Street, NE Ste 500 Atlanta GA 30309 Dewberry 2835 Brandywine Road Ste 100 Atlanta GA 30341 Jacobs Engineering Group 6801 Governors Lake Pkwy Bldg 200 Norcross GA 30071 Mactec 3200 Town Point Drive Suite 100 Kennesaw GA 30144 Stevenson & Palmer 723 Industrial Park Drive, Suite 2 Evans GA 30809 1. Firms experience and performance on projects of similar size and scope 25 19.7 23.7 21.3 18.3 18.7 2. Firms Quality Control, Quality Assurance and Project Tracking 20 17.0 17.0 18.7 17.0 18.7 3. Project Approach and Understanding 25 21.3 22.7 20.7 18.3 17.0 4. Qualifications, experience, references and availability of Key Staff 25 20.0 22.0 20.0 20.0 18.7 5. Proximity to Area 5 3.0 3.0 3.0 3.0 3.3 Total 100 81.0 88.3 83.7 76.7 76.3 3 1 2 2 1 3 Cumulative Evaluation Sheet - RFQ Item #11-059 Watershed Assessment/Source Water Assessment Plan for the City of Augusta - Utilities Department Presentation Shortlisted Item # 9 Attachment number 5 Page 1 of 1 Item # 9 Attachment number 6 Page 1 of 2 Item # 9 Attachment number 6 Page 2 of 2 Item # 9 Attachment number 7 Page 1 of 6 Item # 9 Attachment number 7 Page 2 of 6 Item # 9 Attachment number 7 Page 3 of 6 Item # 9 Attachment number 7 Page 4 of 6 Item # 9 Attachment number 7 Page 5 of 6 Item # 9 Attachment number 7 Page 6 of 6 Item # 9 EngineeringServicesCommitteeMeeting 5/9/20111:05PM WillhavenPhaseIISectionIDedication Department:EngineeringDept-AbieL.Ladson,P.E.,CPESC,Direc tor Caption:Approvethedeedsofdedication,maintenanceagreem ents,and roadresolutionssubmittedbytheEngineeringandA ugusta UtilitiesDepartmentsforWillhaven,PhaseII,Sect ionI. Background:ThefinalplatforPhaseII,SectionI,wasapprove dbythe CommissiononMay18,2010.Thesubdivisiondesign andplat forthissection,includingthestormdrainsystem,havebeen reviewedandacceptedbyourengineeringstaffand the constructionhasbeenreviewedbyourinspectors.TheUtilities Departmenthasinspectedandreviewedthewaterand sanitary sewerinstallations,andherebyrequestsacceptance oftheutility deed. Analysis:Thissectionmeetsallcodes,ordinancesandstanda rds.Thereare nowetlandsor100-yearfloodplainboundariesinvo lvedinthis section.Acceptanceofsaidutilitydeedshalldedi cate,asrequired, thewaterandsanitarysewermainsalongwiththea pplicable easementstoAugusta,Georgia,foroperationandma intenance. FinancialImpact:Byacceptingtheseroadsandstormdrainageinstall ationsintothe Countysystemandafterthe18-monthmaintenancewa rrantyby thedeveloper/contractorfortheroadsandstormdr ainagehas expired,allfuturemaintenanceandassociatedcost swillbeborne byAugusta,Georgia.Byacceptanceoftheutilityd eedand maintenanceagreement,allfuturemaintenanceanda ssociated costsforwaterandsanitarysewerinstallationswi llbeborneby Augusta,Georgia,andpositiverevenuewillbegene ratedfromthe saleofwaterandsanitarysewertapsandmonthlyb illingofsame. Alternatives:1.Approvethedeedsofdedication,maintenanceagr eements,and roadresolutionssubmittedbytheEngineering,and Augusta UtilitiesDepartmentsforWillhaven,PhaseTwo,Sec tionI.2.Do notapproveandrisklitigation. Recommendation:ApproveAlternativeNumberOne.Cover Memo Item # 10 FundsareAvailable intheFollowing Accounts: N/A REVIEWEDANDAPPROVEDBY : Finance. Law. Administrator. ClerkofCommission Cover Memo Item # 10 Attachment number 1 Page 1 of 1 Item # 10 Attachment number 2 Page 1 of 1 Item # 10 Attachment number 3 Page 1 of 2 Item # 10 Attachment number 3 Page 2 of 2 Item # 10 Attachment number 4 Page 1 of 2 Item # 10 Attachment number 4 Page 2 of 2 Item # 10 Attachment number 5 Page 1 of 2 Item # 10 Attachment number 5 Page 2 of 2 Item # 10 Attachment number 6 Page 1 of 3 Item # 10 Attachment number 6 Page 2 of 3 Item # 10 Attachment number 6 Page 3 of 3 Item # 10 Attachment number 7 Page 1 of 2 Item # 10 Attachment number 7 Page 2 of 2 Item # 10