HomeMy WebLinkAbout2011-02-07-Meeting Agenda Engineering Services Committee Meeting Commission Chamber- 2/7/2011- 1:05 PM ENGINEERING SERVICES 1. Approve and award of the first three phases of the Design Consultant Services Agreement to URS Corporation on the 15th Street Pedestrian Improvements. The first three phases will include: Public Involvement in the amount not to exceed $85,517.94; Concept Development in the amount of $168,674.13; and Database Preparation in the amount of $119,317.14 ($373,509.21 total) for the Capital Project Budget. Project to be funded from SPLOST Phase VI as requested by AED. Attachments 2. Motion to approve Change Order to the existing construction contract in the amount of $377,564.50 to Blair Construction for additional work and to complete the Fort Gordon Eisenhower Hospital Area Gravity Sewer System. Attachments 3. Motion to approve change order to the existing design contract in the amount of $27,537.00 to Johnson, Laschober & Associates, P.C. (JLA) for additional design work to relocate the proposed Elevated Tank. Attachments 4. Approve subject Change Order Number Three and proposal from Stevenson & Palmer Engineering, Inc. in the amount of $97,630 for inspection services and CAD services for Augusta Utilities Department. Attachments 5. Consider a request from Ms. Barbara Coping for a waiver from garbage collection fees for the property at 1615 Cornell Drive. Attachments 6. Approve and authorize AED to accept the proposal from Duncan-Parnell Geodetic Product Solution to supply GPS/Surveying equipment, associated services and training in the use and maintenance of such equipment in the amount of $78,405.00, subject to receipt of signed contract as requested by AED. Funding is available from Capital Project Budget 272-041110. Attachments 7. Approve and award Design Consultant Services Agreement to LPA Group for the Capital Project Budget in the amount of $245,878 for the initial phases of the Riverwatch Parkway at I-20 Corridor Improvements Project to be funded from SPLOST Phase VI as requested by AED. Attachments 8. Consider Consent Agreement and Final Order from U.S.E.P.A. Attachments 9. Approve funding in the amount of $55,885.00 for the purchase of Attachments www.augustaga.gov additional wetland mitigation credits to offset wetland areas disturbed during the Fort Gordon Forcemain Sanitary Sewer Connection project. 10. Motion to discuss the implementation of Realizing The Garden City: The Augusta Sustainable Development Agenda. Attachments 11. Motion to determine that a portion of Robert C. Daniel, Jr. Parkway, as shown on the attached plat and consisting of approximately 0.101 acre (144.60 square feet), has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies). Attachments 12. Motion to determine that a portion of Oakdale Avenue, as shown on the attached plat and consisting of approximately 0.22 acre (9,574.00 square feet), has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7- 2, with the abandoned property to be quit-claimed to the appropriate party (ies), and an easement to be retained over the entire abandoned portion for existing or future utilities. Attachments 13. Approve ARC to supplement the Kroc Center’s contract with B&E Electrical in the amount of $129,241 to upgrade the traffic signal at Broad Street and Eve Street as well as improve pedestrian facilities and provide signal interconnectivity to Crawford Avenue. Funding is available in the Traffic Safety Improvements project account CPB 324-041110-202824020 as requested by AED. Attachments Engineering Services Committee Meeting 2/7/2011 1:05 PM 15th Street Pedestrian Improvements Project-10-152- Contract Award Department:Abie L. Ladson, PE, CPESC, Director of Engineering Caption:Approve and award of the first three phases of the Design Consultant Services Agreement to URS Corporation on the 15th Street Pedestrian Improvements. The first three phases will include: Public Involvement in the amount not to exceed $85,517.94; Concept Development in the amount of $168,674.13; and Database Preparation in the amount of $119,317.14 ($373,509.21 total) for the Capital Project Budget. Project to be funded from SPLOST Phase VI as requested by AED. Background:The 15th Street corridor between John C. Calhoun Expressway and Central Avenue is one of the more heavily traveled routes in Augusta-Richmond County, carrying approximately 30,000 vehicles per day. This corridor is the primary route into the Augusta Medical District and experiences congestion during peak periods of travel. With the current and proposed expansions of institutions such as Georgia Health Sciences University (formerly the Medical College of Georgia), Paine College and the VA Hospital, pedestrian activity along and crossing this corridor has significantly increased over the past few years and is expected to increase. Moreover, this corridor lacks essential ADA facilities in most areas, which provides a challenge for our disabled population wishing to access the medical facilities and experiences a tremendous amount of “jay walking” on a daily basis. In August 2010, Request for Qualifications was released for qualified firms to provide design services along the 15th Street corridor to improve pedestrian facilities and traffic flow. Analysis:The following firms were evaluated based on qualifications, project approach, experience, and interviews in September 2010. The following firms submitted RFQs and were evaluated: 1. LAI Engineering 2. LPA Group 3. Pond and Company 4. QK4 5. W.R. Toole Engineers, Inc. 6. URS Corporation URS Corporation was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in SPLOST Phase VI. Alternatives:1) Approve and award of the first three phases of the Design Consultant Services Agreement to URS Corporation on the 15th Street Pedestrian Improvements. The first three phases will include: Public Involvement in the amount not to exceed $85,517.94; Concept Development in the amount of $168,674.13; and Database Preparation in the amount of $119,317.14 ($373,509.21 total) for the Capital Project Budget. Project to be funded from SPLOST Phase VI as requested by AED. 2) Do not approve. Cover Memo Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: SPLOST PH VI REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Evaluation Criteria PTS LAI ENGINEERING 1800 PARKWAY PLACE MARIETTA GA 30067 LPA GROUP 3595 ENGINEERING DRIVE NORCROSS GA 30092 POND & COMPANY 3500 PARKWAY LANE STE 600 NORCROSS GA 30092 QK4 3169 HOLCOMB BRIDGE RD #455 NORCROSS GA 30071 URS 400 N PARK TOWN CENTER 100 ABERNATHY ROAD NE STE 900 W.R. TOOLE ENGINEERS 1005 BROAD STREET STE 200 AUGUSTA GA 30901 1) Qualifications of Company 25 19.0 18.3 18.7 18.3 21.0 14.0 2) Qualifications of Key Personnel that will actually perform the design services 30 24.3 19.7 19.7 17.3 29.3 17.7 3) Experience on similar Georgia DOT projects 25 18.0 13.7 20.7 18.3 23.7 9.0 4) References including specific individuals, address, phone number, and e-mail address 15 9.2 15.0 15.0 11.7 10.8 15.0 5) 3UR[LPLW\WR$XJXVWD±3RLQWV Within Augusta Richmond County - 5 pts Within the CSRA - 4 pts Within Georgia - 3 pts Within SE United States - 2 pts (includes AL, TN, NC, SC, FL) All Others - 1 pt 5 3.0 3.0 3.7 3.0 4.3 5.0 Total 100 73.5 69.7 77.7 68.7 89.2 60.7 Ranking 3 4 2 5 1 6 Presentation Ranking 2.7 2.3 1.0 Cumulative - Presentation Evaluation Sheet RFQ Item #10-152 15th Street Pedestrian Improvements for the City of Augusta - Engineering Department Attachment number 1Page 1 of 1 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to CPB#N/A. This project consists of design services along the 15th Street corridor to improve pedestrian facilities and traffic flow and award Consultant Services to URS Corporation in the amount of $789,686.86. Funding available in SPLOST Phase VI. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. SPLOST Phase VI 373,510$ 373,510$ Section 3: The following amounts are appropriated for the project: By Basin By District 373,510$ CAPITAL PROJECT BUDGET 15th Street Pedestrian Improvements Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1 of 4 1.24.2011 Attachment number 2Page 1 of 4 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET 15th Street Pedestrian Improvements CPB AMOUNT NEW SOURCE OF FUNDS CPB CPB SPLOST PHASE VI -373510 -373510 TOTAL SOURCES: ($373,510) ($373,510) USE OF FUNDS ENGINEERING $373,510 $373,510 TOTAL USES:$373,510 $373,510 2 of 4 1.24.2011 Attachment number 2Page 2 of 4 CPB#N/A xecution. For xecution. For 3 of 4 1.24.2011 Attachment number 2Page 3 of 4 CPB#N/A 4 of 4 1.24.2011 Attachment number 2Page 4 of 4 REQUEST FOR QUALIFICATIONS Request for Qualifications will be received at this office until Tuesday, August 24, 2010 @ 11:00 a.m. for furnishing: RFQ Item #10-151 Riverwatch Parkway @ I-20 Corridor Improvements for Engineering Department RFQ Item #10-152 15th Street Pedestrian Improvements for Engineering Department RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFQ documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. A Mandatory Pre-Qualifications Conference will be held on Friday, August 6, 2010 @ 11:00 a.m. in the Procurement Department – Room 605. All questions must be submitted in writing to the office of the Procurement Department by Tuesday, August 10, 2010 @ 5:00 p.m. by fax at 706-821-2811 or by mail. No RFQ will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the Procurement Department with your bonafide bid package. No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark RFQ number on the outside of the envelope. Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Augusta-Richmond County, Georgia does not operate a DBE, MBE or WBE Program but rather pursuant to its code of ordinances, this local government operates instead a Local Small Business Opportunity Program. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle July 15, 22, 29, August 5, 2010 Metro Courier July 21, 2010 cc: Tameka Allen Interim Deputy Administrator Abie Ladson Engineering Department Steve Cassell Engineering Department Attachment number 3Page 1 of 1 VENDORS Attachment B Bidders Form Original 6 Copies Addendum LAI ENGINEERING 1800 PARKWAY PLACE MARIETTA GA 30067 YES YES YES YES YES LPA GROUP 3595 ENGINEERING DRIVE NORCROSS GA 30092 YES YES YES YES YES POND & COMPANY 3500 PARKWAY LANE STE 600 NORCROSS GA 30092 YES YES YES YES YES QK4 3169 HOLCOMB BRIDGE RD #455 NORCROSS GA 30071 YES YES YES YES YES URS 400 N PARK TOWN CENTER 100 ABERNATHY ROAD NE STE 900 ATLANTA GA 30328 YES YES YES YES YES W.R. TOOLE ENGINEERS 1005 BROAD STREET STE 200 AUGUSTA GA 30901 YES YES YES YES YES EMC ENGINEERING 4106 COLBEN BLVD STE 105 EVANS GA 30809 HEATH & LINEBACK ENG 2390 CANTON ROAD BLDG 200 MARIETTA GA 30066 MOORE AND ASSOCIATES 1009 EAST AVENUE NORTH AUGUSTA SC 29841 CRANSTON ENGINEERING GROUP 452 ELLIS STREET AUGUSTA GA 30901 KHAFRA 535 CHESTNUT ST, STE 200 CHATTANOOGA TN 37402 KIMLEY-HORN 3169 HOLCOMB BRIDGE RD NORCROSS GA 30071 MORELAND ALTOBILLI 2211 BEAVER RUIN ROAD STE 190 NORCROSS GA 30071 R.S. & H. 730 PEACHTREE ST STE 430 ATLANTA GA 30308 STREET SMARTS INC 3160 MAIN STREET STE 100 DULUTH GA 30096 RFQ Item #10-152 15th Street Pedestrian Improvements for the City of Augusta - Engineering Department RFQ Due: Tuesday, August 24, 2010 @ 11:00 a.m. NON-COMPLIANT Attachment B Expired Notary Seal NON-COMPLIANT Attachment B Missing Pages 1 & 2 Submitted No Bid Response Letter Page 1 of 1 Attachment number 4Page 1 of 1 Attachment number 5Page 1 of 2 Attachment number 5Page 2 of 2 Attachment number 6Page 1 of 2 Attachment number 6Page 2 of 2 Attachment number 7Page 1 of 3 Attachment number 7Page 2 of 3 Attachment number 7Page 3 of 3 Attachment number 8Page 1 of 6 Attachment number 8Page 2 of 6 Attachment number 8Page 3 of 6 Attachment number 8Page 4 of 6 Attachment number 8Page 5 of 6 Attachment number 8Page 6 of 6 Engineering Services Committee Meeting 2/7/2011 1:05 PM Approve Change Order to the existing construction contract in the amount of $377,564.50 to Blair Construction for the Fort Gordon Eisenhower Hospital Area Gravity Sewer System . Bid item #09-156. Department:Augusta Utilities Department Caption:Motion to approve Change Order to the existing construction contract in the amount of $377,564.50 to Blair Construction for additional work and to complete the Fort Gordon Eisenhower Hospital Area Gravity Sewer System. Background:This project is located at Fort Gordon, Augusta GA. The gravity sewer trunk line will begin near 22nd Street and connect to the existing municipal system just northwest of the National Science Center. It will serve an area of approximately 250 acres bounded to the north by Fort Gordon Highway (Route 10/78/278), west of the Gate I entrance. The trunk line will eliminate the need for 2 existing lift stations and 3,200LF of force main required to convey wastewater to the Fort Gordon wastewater treatment plant. This municipal gravity sewer trunk line will consist of approximately 4,625LF of 8-inch and 2,700LF of 10-inch SDR 26 PVC pipe with an estimated twenty- four 48-inch diameter manhole structures.The modification to this contract will consist of the installation of an additional 700 LF of sewer main and 1,171 LF of water main. This change also include some adjustments to address the additional connections to the existing infrastructure, extra clearing, overlay, and septic tanks removals in conflict with the proposed sewer main. Analysis:AUD has evaluated Blair proposal to Change Order and has considered the proposal fair and reasonable to accomplish the project. Financial Impact:The construction proposal submitted for this project is $377,564.50. These funds are available from account 507043420-5425210/88880069-5425210 Alternatives:Rejection of this change order would delay the construction and delay revenue to Augusta Richmond County. Recommendation:Recommend Commission approve change order to the existing construction contract to Blair Construction in the amount of $377,564.50 Funds are Available in the Following Accounts: 507043420-5425210/88880069-5425210 from account $377,564.50 REVIEWED AND APPROVED BY: Cover Memo Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Blair Construction, Inc.Proposal Asphalt Paving & Underground Utilities 4308 Evans-to-Locks Rd DATE:January 27, 2011 P.O. Box 770, Evans, Georgia 30809 Phone 706.868.1950 Fax 706.868.1855 EISENHOWER HOSPITAL Augusta Utilities Department Attn: Jerry Delaughter / Stanley Aye Item Description Quantity Unit Unit Price Amount WATER MAIN 2" Dia. PVC Water Transmission Main Sch 40 732 LF $8.27 $6,053.64 W-2A 6" Dia. DIP, water transmission, Class 350, standard joint 90 LF $20.54 $1,848.60 W-2B 8" Dia. DIP, water transmission, Class 350, standard joint 1171 LF $24.88 $29,134.48 W-6 Miscellaneous water pipe fittings and connections 1000 LBS $3.50 $3,500.00 W-8 Fire Hydrant, Installed complete with valve, lead pipe, joint restraint, and blocking 2 EA $2,850.00 $5,700.00 W-10B 8" in-line gate valve, including valve box, installed, complete, open right/left 1 EA $1,061.91 $1,061.91 8" tapping sleeve, valve, valve box, complete 2 EA $2,761.67 $5,523.34 W-18 Tie-in to existing line 0 EA $1,135.35 $0.00 W-20 Cut and plug existing line EA $1,080.00 $0.00 W-21 Miscellaneous Class A Concrete 41 SY $28.00 $1,148.00 2" RPZ 3 LS $2,250.00 $6,750.00 Fire Vault / PIV with Double Check 1 LS $13,305.14 $13,305.14 2- 12" Linestops( Includes: 12" Gate Valves, Solid Sleeves, Insert Valve Equipment) 1 LS $82,164.50 $82,164.50 SANITARY SEWER 2" Dia. PVC, san. Sewer pipe HDPE, depth 0- 6', incl. type II (No. 67 stone) bedding material 125 LF $12.11 $1,513.75 4" Dia. PVC, san. Sewer pipe SDR 35, depth 0-6', incl. type II (No. 67 stone) bedding material 211 LF $13.11 $2,766.21 S-1A 8" Dia. PVC, san. Sewer pipe SDR 35, depth 0-6', incl. type II (No. 67 stone) bedding material 700 LF $17.11 $11,977.00 S-3A 8" Dia. PVC, san. Sewer pipe SDR 35, depth 8-10', incl. type II (No. 67 stone) bedding material 305 LF $18.20 $5,551.00 S-19 Miscellaneous Sewer Pipe fittings and connections 1250 LBS $1.50 $1,875.00 S-20A Pre-cast san. Manhole, GDOT STD 1011A, Type 1, deoth 0-6', (48" Dia.)5 EA $1,347.30 $6,736.50 Attachment number 1Page 1 of 2 S-20B Pre-cast san. Manhole, GDOT STD 1011A, Type 1, deoth 0-6', (60" Dia.)EA $1,859.49 $0.00 S-21A Add. San. Manhole depth, Type 1, depth Class 1 (48" Dia.)28 VF $291.06 $8,149.68 S-21B Add. San. Manhole depth, Type 1, depth Class 1 (60" Dia.)VF $375.84 $0.00 S-29 Doghouse/Connector manhole, inc. base, cone, and ring and cover 1 EA $1,833.30 $1,833.30 S-30 6" sanitary sewer service, complete 7 EA $1,157.32 $8,101.24 S-31 Cut and plug existing sanitary sewer, diameter varies 4 EA $1,134.00 $4,536.00 S-32 Cut and plug existing sanitary manhole, 2 EA $1,242.00 $2,484.00 S-33 Tie new san. Sewer to existing manholes, diameter varies 3 EA $1,458.00 $4,374.00 Tie new San. Sewer to existing manholes with Outside Drop 1 EA $2,350.00 $2,350.00 Remove Existing 8" Sewer Line 250 LF $12.00 $3,000.00 Tie in 4" Forcemain 1 LS $1,349.00 $1,349.00 Furnish and install 2 (1000 gal.) tanks and grinder pumps (All electrical work to be performed by AUD) 1 LS $21,000.00 $21,000.00 PAVEMENT STRUCTURES P-1 Asphalt overlay, type F 1.5" thick, minimum 475 SY $8.75 $4,156.25 P-2 Graded aggregate base, 10.5" thick, 7' wide and asphalt patch 2.5" thick, including removal of 2.5" GAB and placement of bituminous tack coat 80 SY $26.00 $2,080.00 MISCELLANEOUS M-1 Flowable Fill 5 CY $94.99 $474.95 Stamped Concrete Sidewalk 50 SY $40.00 $2,000.00 Jack and Bore 16" Casing (50' water & 50' sewer)190 LF $200.00 $38,000.00 LS-1 Lump Sum Construction 1 LS 15% of Task $43,574.62 43492.39 TOTAL $377,564.50 Attachment number 1Page 2 of 2 Engineering Services Committee Meeting 2/7/2011 1:05 PM Approve Change Order to the existing Design Contract for Fort Gordon - Two 1.0 Million Gallon Elevated Storage Tank Project Department:Augusta Utilities Department Caption:Motion to approve change order to the existing design contract in the amount of $27,537.00 to Johnson, Laschober & Associates, P.C. (JLA) for additional design work to relocate the proposed Elevated Tank. Background:The privatization of utilities contract between Fort Gordon and Augusta Richmond County was awarded September 2007. The requirement of the contract includes executing the initial capital upgrades (ICU) of the water and wastewater systems throughout the installation of Fort Gordon. One of the initial capital upgrade projects is to provide a 1.0 Million Gallon Elevated Storage Tank, Analysis on the existing system and Demo the existing standpipe. The proposed site for Tank #1on 8th Avenue was confirmed to be within a waste area (SWMU-46) and has been documented to have ground contaminants. Presently, the site is under evaluation by GA EPD. Consequently, a suitable alternate location for this tank site has been determined by Fort Gordon for construction. In addition the analysis concludes that the tanks will need an additional .250 MG to meet Fort Gordon needs which will make both Tanks 1.25 MG each. This modification will allow JLA to survey the new location and finalize the design for construction. Analysis:AUD evaluated JLA Change Order to the existing Design Contract for Fort Gordon Two 1.0 Million Gallon Elevated Storage Tank Project. This proposal is considered fair and reasonable to accomplish the project. Financial Impact:The amount submitted for the design change order of this project was $27,537.00. These funds are available from the following account:507043410-5212115 / 88880072-5212115 Alternatives:1. Rejection of this change order would delay the existing design of the project and the subsequent construction of the Fort Gordon - Two 1.0 Million Gallon Elevated Storage Tanks. Recommendation:Recommend Commission approve change order to the existing design contract to JLA in the amount of $27,537.00 Funds are Available in the Following Accounts: $27,537.00 from account 507043410-5212115 / 88880072-5212115Cover Memo REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo E N G I N E E R S E N G I N E E R S E N G I N E E R S E N G I N E E R S ♦♦♦♦ D E S I G N E R S D E S I G N E R S D E S I G N E R S D E S I G N E R S ♦♦♦♦ C O N S U L T A N T S C O N S U L T A N T S C O N S U L T A N T S C O N S U L T A N T S ♦♦♦♦ L A N D S C A P E A R C H I T E C T SL A N D S C A P E A R C H I T E C T SL A N D S C A P E A R C H I T E C T SL A N D S C A P E A R C H I T E C T S CHANGE ORDER REQUEST PROJECT #: 3042.0802 DATE: October 28, 2010 TO: Stanley Aye SENT BY: Email: Sayer@augustaga.gov Augusta Utilities Department Engineering and Construction Division 360 Bay Street, Suite 180 Augusta, GA Ref: Project: 2 – 1 MG Elevated Storage Tanks(ESTs) and Demolition of 2.25 MG Standpipe (ICU-0072) Re: Request for Change of Scope to Upgrade the EST’s to 1.25 MG Capacity and to Relocate the 8th Ave. EST to the east side of the intersection of 5th Ave. and 44th St. By: Richard J. Laschober, P.E. Partner A. Reason for Change Order No. 5 and related Scope of Work: Reason for Change Order: The 8th Ave. site was confirmed to be within waste area SWMU-46, has been documented to have ground contaminants, and is presently under evaluation by GA EPD. Consequently, a suitable alternate location for this tank has been determined to allow work to proceed in a timely manner. B. Scope of Work for and Fee for Change Order No. 5: 1. Survey Work: Perform topographic survey of new tank site and along length of supply line from new tank to point of tie-in to the existing 20" transmission water line. Establish datum on new site and, as quality control check independently confirm that new EST site and existing Gate No. 3 EST site are on same datum. Fee for these items: …………………………………………………………………………..$5,497 2. Engineering Design -Revise drawings and specifications: a. Submit new tank location to FAA for determination of warning lights. b. Tank supply lines, valves, and mixing valves and overflow pipe resizing. Confirm maximum anticipated supply and withdrawal rates with Russel Thies, AUD and size pipes and appurtenances and capacity of existing distribution system to accommodate and receive the benefit of an upsized tank at each site. c. Prepare revised design and procurement package for submittal to GA EPD to include: i. Revise Drawings: Prepare revisions to Cover Sheet and drawings C001, C102 (Composite EST Site Plan (Site 2) only, C201, C202, C301 (Detail 11/C301 only) and C302 (Detail 11/C302 only). Delete drawings C101A and C101B and replace with C101 for new site, Delete C301 (Detail 13/C301 only) and Delete C302 (Detail 13 C302 only). Prepare additional drawings as may be required for an NPDES permit at the new tanks site. Assist in preparation of an NOI. ii. Revise Book Specifications – Front end documents and technical specifications to reflect upgraded EST capacity to 1.25 MG for composite tank construction and relocating the 8th Ave. EST to the east side of the intersection of 5th Ave. and 44th St. d. Fee for item B.2…………………...………………………………………………… $ 22,040 C. Total Additional Compensation for Basic Professional Services for C.O. #5, Items B.1 and B.2……………………...…………………………………………………………$ 27,537 D. Contract Amount Summary for Additional Services as a result of C.O. No. 5: 1. Existing Contract as modified by C.O. No. 1 through No.4 …………………………..$240,740 2. Net add to Total Compensation for C.O. No. 5 (Paragraph C, above)……………... $ 27,537 3. Total revised Compensation for Basic Professional Services of original contract….$268,277 Attachment number 1Page 1 of 1 Engineering Services Committee Meeting 2/7/2011 1:05 PM Approve Change Order Number Three and Proposal for Inspection Services and CAD Services for various projects under the Main Interceptor Upgrade Phase 2 (Project 80300007) design contract. Department:Tom Wiedmeier, P.E., Director Augusta Utilities Department Caption:Approve subject Change Order Number Three and proposal from Stevenson & Palmer Engineering, Inc. in the amount of $97,630 for inspection services and CAD services for Augusta Utilities Department. Background:The Utilities Department awarded a construction contract dealing with specialty sewerage conveyance pipe. The project, Main Interceptor Phase 2, was designed by Stevenson & Palmer Engineering. Analysis:The Utilities Department has numerous projects under construction at this time and the in-house inspection staff is already spread quite thin. Stevenson & Palmer Engineering has an experienced inspector available with numerous years of background in engineering and construction practices and is available to utilize for projects under Change Order Three to the Stevenson and Palmer Engineering Contract. Financial Impact:$97,630 in funding is available from 507043420-5212115/80300007-5212115 Alternatives:No alternatives are recommended Recommendation:Augusta Utilities Department recommends approval of the proposal and Change Order Number Three to the Main Interceptor Upgrade Phase 2 design contract from Stevenson & Palmer, Inc. in the amount of $97,630 for inspection services and CAD services associated with on-going utility project inspections and design. Funds are Available in the Following Accounts: FUNDS AVAILABLE IN THE FOLLOWING ACCOUNTS: 507043420- 5212115/80300007-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 8 Attachment number 1Page 2 of 8 Attachment number 1Page 3 of 8 Attachment number 1Page 4 of 8 Attachment number 1Page 5 of 8 Attachment number 1Page 6 of 8 Attachment number 1Page 7 of 8 Attachment number 1Page 8 of 8 Engineering Services Committee Meeting 2/7/2011 1:05 PM Barbara Coping Department:Clerk of Commission Caption:Consider a request from Ms. Barbara Coping for a waiver from garbage collection fees for the property at 1615 Cornell Drive. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Engineering Services Committee Meeting 2/7/2011 1:05 PM GPS/Surveying Equipment and Associated Services – Bid#10-200 Department:Abie L. Ladson, PE, CPESC, Director of Engineering Caption:Approve and authorize AED to accept the proposal from Duncan-Parnell Geodetic Product Solution to supply GPS/Surveying equipment, associated services and training in the use and maintenance of such equipment in the amount of $78,405.00, subject to receipt of signed contract as requested by AED. Funding is available from Capital Project Budget 272-041110. Background:AED has designed several projects in-house that resulted in significant resource saving in terms of labor and time. However, surveying is a critical component of all engineering design and AED has very limited resource in this area. AED provides surveying services to other county departments as well. AED is in need of improving its surveying capabilities to further enhance and improve work efficiency and having the ability to address drainage and infrastructure issues effectively and in a timely manner. Analysis:Bids were received on December 17, 2010 with Duncan-Parnell, being the low responsible bidder. The bid results are as follow: FIRMS BID 1. Duncan-Parnell Geodetic Product Solutions $78,405.00 2. Leica Geosystems, Inc $78,496.00 It is the Engineering Department recommendation to award this project to the low responsible bidder, Duncan-Parnell, subject to receipt of signed contract. Acceptance of this bid will provided much of the needed resources to enhance AED’s ability to complete in-house designs. Financial Impact:Funds are available in Capital Project Budget account 272-041110-5424910 upon Commission approval. Alternatives:1) Approve and authorize AED to accept the proposal from Duncan-Parnell Geodetic Product Solution to supply GPS/Surveying equipment, associated services and training in the use and maintenance of such equipment in the amount of $78,405.00, subject to receipt of signed contract as requested by AED. Funding is available from Capital Project Budget 272-041110. 2) Do not approve and delay the completion of drainage and infrastructure issues. Recommendation:Approve Alternative Number One Funds are Available in the Following Accounts: 272041110-5424910 Cover Memo REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Invitation To Bid Sealed bids will be received at this office until 11:00 a.m. Friday, December 10, 2010 for furnishing: Bid Item #10-200 GPS/Surveying Equipment & Associated Services for Engineering Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing to the office of the Procurement Department by fax at 706-821-2811 or by mail. No bid will be accepted by fax, all must be received by mail or hand delivered. All questions are to be submitted in writing by Friday, December 3, 2010 by 5:00 p.m. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the Procurement Department with your bonafide bid package. No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark BID number on the outside of the envelope. Bidders are cautioned that sequestration of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Disadvantage Business Enterprise (DBE) Augusta-Richmond County, Georgia does not operate a DBE, MBE or WBE Program for Augusta funded projects, as a Federal Court has entered an Order enjoining the Race-Based portion of Augusta’s DBE Program. Instead Augusta operates a Local Small Business Opportunity Program. However, for various projects utilizing the expenditure of State or Federal funds, Augusta enforces DBE requirements and/or DBE goals set by the Federal and/or State Agencies in accordance with State and Federal laws. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle November 18, 25, 30, December 2, 2010 Metro Courier November 24, 2010 cc: Tameka Allen Interim Deputy Administrator Abie Ladson Engineering Department Hameed Malik Engineering Department Attachment number 1Page 1 of 1 DU N C A N - P A R N E L L G E O D E T I C PR O D U C T S O L U T I O N S 12 0 8 C O P E L A N T O A K S D R I V E MO R R I S V I L L E , N C 2 7 5 6 0 LE I C A 15 5 0 B O G G S R O A D , S T E 1 0 0 DU L U T H G A 3 0 0 9 6 RO P E R L A S E R C O I N C 11 7 1 S M A R I E T T A P K W Y MA R I E T T A G A 3 0 0 6 0 EA R L D U D L E Y 19 5 5 E V E R G R E E N B L V D AT L A N T A G A EG P S S O L U T I O N S 43 1 7 P A R K D R I V E , S T E 2 0 0 NO R C R O S S , G A 3 0 0 9 3 HA Y E S I N S T R U M E N T C O . I N C . 50 2 S C A N N O N B L V D . SH E L B Y V I L L E , T N 3 7 1 6 0 GP S N E T W O R K R E C E I V E R S Y S 19 5 5 E V E R G R E E N B L V D , S T E 5 0 AT L A N T A , G A 3 0 0 9 6 YE S Y E S YE S Y E S YE S Y E S $2 0 , 1 2 0 . 0 0 $ 2 7 , 5 0 8 . 0 0 $2 4 , 5 2 0 . 0 0 $ 2 3 , 2 5 2 . 0 0 $2 3 , 9 6 5 . 0 0 $ 2 7 , 7 3 6 . 0 0 $5 , 0 0 0 . 0 0 I N C L U D E D $0 . 0 0 I N C L U D E D $7 3 , 6 0 5 . 0 0 $ 7 8 , 4 9 6 . 0 0 Ite m # Ex h i b i t A P r i c i n g 1 GP S B a s e S t a t i o n R e c e i v e r w/ A n t e n n a a n d C a b l i n g $1 , 3 0 0 . 0 0 $ 1 4 , 5 1 8 . 0 0 2 I n s t a l l a t i o n o f B a s e S t a t i o n $5 , 0 0 0 . 0 0 $ 3 , 5 0 0 . 0 0 3 Ba s e S t a t i o n S o f t w a r e w i t h Ma i n t e n a n c e S u p p o r t $1 , 6 2 0 . 0 0 $ 3 , 1 5 0 . 0 0 4 A c c e s s t o G P S N e t w o r k $0 . 0 0 $ 3 , 8 4 0 . 0 0 5 A c c e s s t o G P S N e t w o r k $0 . 0 0 $ 0 . 0 0 6 Al l D a t a L o g g i n g , Do c u m e n t a t i o n , F i l i n g a n d W o r k Ne c e s s a r y $5 0 0 . 0 0 $ 2 , 5 0 0 . 0 0 Ite m # Ex h i b i t B P r i c i n g 1 GP S R o v e r R e c e i v e r a n d An t e n n a $1 7 , 3 4 0 . 0 0 $ 1 3 , 7 1 2 . 0 0 2 Ba t t e r y C h a r g e r w i t h T w o Ba t t e r i e s IN C L U D E D I N 1 $ 9 2 0 . 0 0 3 Ha r d C a s e f o r S t o r a g e a n d Tr a n s p o r t IN C L U D E D I N 1 $ 1 6 0 . 0 0 4 H a n d H e l d D a t a C o l l e c t o r $3 , 8 7 0 . 0 0 $ 3 , 6 4 7 . 0 0 5 Of f i c e S o f t w a r e f o r Up l o a d i n g / D o w n l o a d $0 . 0 0 $ 5 4 2 . 0 0 6 Of f i c e S o f t w a r e f o r P r o c e s s i n g RT K a n d P o s t - P r o c e s s i n g R a w $2 , 5 5 0 . 0 0 $ 3 , 8 8 9 . 0 0 7 On e C a r b o n F i b e r o r C o m p o s i t e (L i g h t ) P o l e $3 0 0 . 0 0 $ 1 6 3 . 0 0 8 On e P o l e B r a c k e t a n d C r a d l e As s e m b l y $3 1 5 . 0 0 $ 1 1 2 . 0 0 9 O n e B i p o d , T h u m b R e l e a s e $1 4 5 . 0 0 $ 1 0 7 . 0 0 10 Fi v e F u l l D a y s o n O n - S i t e Tr a i n i n g IN C L U D E D I N S U M M A R Y IN C L U D E D NO N - C O M P L I A N T MIS S I N G A T T A C H M E N T B AN D B I D D E R S F O R M NO N - C O M P L I A N T MIS S I N G A T T A C H M E N T B A N D BI D D E R S F O R M DID N O T A C K N O W L E D G E AD D E N D U M On S i t e T r a i n i n g f o r S u r v e y E q u i p m e n t a n d So f t w a r e ( u p t o 5 p e o p l e ) f o r f i v e d a y s Ad d e n d u m Bi d I t e m # 1 0 - 2 0 0 GP S / S u r v e y i n g E q u i p m e n t & A s s o c i a t e d S e r v i c e s fo r t h e C i t y o f A u g u s t a - E n g i n e e r i n g D e p a r t m e n t Bi d D u e : F r i d a y , D e c e m b e r 1 7 , 2 0 1 0 @ 1 1 : 0 0 a . m . GP S S u r v e y i n g B a s e S t a t i o n U n i t P a c k a g e GP S S u r v e y i n g R o v e r U n i t P a c k a g e Te c h n i c a l S u p p o r t a n d A s s i s t a n c e f o r Eq u i p m e n t a n d S o f t w a r e (2 y e a r s m i n i m u m ) IT E M S VE N D O R S At t a c h m e n t B Bi d d e r s F o r m TO T A L 5” R o b o t i c T o t a l S t a t i o n P a c k a g e - [ s e e Ex h i b i t C f o r d e t a i l a n d p r o v i d e i t e m i z e d pr i c e ] Pa g e 1 o f 2 Attachment number 2Page 1 of 2 DU N C A N - P A R N E L L G E O D E T I C PR O D U C T S O L U T I O N S 12 0 8 C O P E L A N T O A K S D R I V E MO R R I S V I L L E , N C 2 7 5 6 0 LE I C A 15 5 0 B O G G S R O A D , S T E 1 0 0 DU L U T H G A 3 0 0 9 6 RO P E R L A S E R C O I N C 11 7 1 S M A R I E T T A P K W Y MA R I E T T A G A 3 0 0 6 0 EA R L D U D L E Y 19 5 5 E V E R G R E E N B L V D AT L A N T A G A EG P S S O L U T I O N S 43 1 7 P A R K D R I V E , S T E 2 0 0 NO R C R O S S , G A 3 0 0 9 3 HA Y E S I N S T R U M E N T C O . I N C . 50 2 S C A N N O N B L V D . SH E L B Y V I L L E , T N 3 7 1 6 0 GP S N E T W O R K R E C E I V E R S Y S 19 5 5 E V E R G R E E N B L V D , S T E 5 0 AT L A N T A , G A 3 0 0 9 6 Bi d I t e m # 1 0 - 2 0 0 GP S / S u r v e y i n g E q u i p m e n t & A s s o c i a t e d S e r v i c e s fo r t h e C i t y o f A u g u s t a - E n g i n e e r i n g D e p a r t m e n t Bi d D u e : F r i d a y , D e c e m b e r 1 7 , 2 0 1 0 @ 1 1 : 0 0 a . m . VE N D O R S Ite m # Ex h i b i t C P r i c i n g 1 O n e 5 ” R o b o t i c T o t a l S t a t i o n $2 2 , 7 4 5 . 0 0 $ 1 9 , 6 2 9 . 5 0 2 B a t t e r y C h a r g e r IN C L U D E D I N 1 $ 3 8 3 . 5 0 3 H a r d C a s e f o r S t o r a g e IN C L U D E D I N 1 $ 1 4 5 . 0 0 4 H a n d H e l d D a t a C o l l e c t o r IN C L U D E D I N 1 $ 4 , 7 5 3 . 5 0 5 Of f i c e S o f t w a r e f o r Up l o a d i n g / D o w n l o a d $4 4 5 . 0 0 $ 4 8 8 . 0 0 6 O n e 3 6 0 P r i s m & A c c e s s o r i e s IN C L U D E D I N 1 $ 1 , 7 1 6 . 0 0 7 On e T e l e s c o p i c R o d , 8 F o o t Mi n i m u m $3 3 5 . 0 0 $ 1 7 5 . 0 0 8 On e P o l e B r a c k e t a n d C r a d l e As s e m b l y IN C L U D E D I N 1 $ 1 0 4 . 0 0 9 O n e B i p o d , T h u m b R e l e a s e $1 4 5 . 0 0 $ 1 1 4 . 0 0 10 O n e H e a v y D u t y T r i p o d $2 9 5 . 0 0 $ 2 2 7 . 5 0 11 Fi v e F u l l D a y s o n O n - S i t e Tr a i n i n g IN C L U D E D I N T H E S U M M A R Y NO C H A R G E Pa g e 2 o f 2 Attachment number 2Page 2 of 2 Attachment number 3Page 1 of 3 Attachment number 3Page 2 of 3 Attachment number 3Page 3 of 3 Attachment number 4Page 1 of 3 Attachment number 4Page 2 of 3 Attachment number 4Page 3 of 3 Engineering Services Committee Meeting 2/7/2011 1:05 PM I-20 Eastbound/Riverwatch Ramp 10-151-CSA Award Department:Abie L. Ladson, PE, CPESC, Director of Engineering Caption:Approve and award Design Consultant Services Agreement to LPA Group for the Capital Project Budget in the amount of $245,878 for the initial phases of the Riverwatch Parkway at I-20 Corridor Improvements Project to be funded from SPLOST Phase VI as requested by AED. Background:The Riverwatch Parkway corridor in the vicinity of Interstate 20 is one of the more heavily traveled routes in Augusta-Richmond County, carrying approximately 30,000 vehicles per day. This corridor is one of the primary routes from West Augusta and Columbia County into the Augusta Downtown and Medical District and experiences congestion during peak periods of travel which can be attributed to several factors including lack of left-turn capacity, lack of signal interconnectivity and unbalanced lane utilization. The purpose of this project is to identify, analyze, model, and design improvements along this corridor to improve traffic flow along the corridor in accordance with Federal Highway Administration as well as the Georgia Department of Transportation Plan Development Process requirements. In August 2010, Request for Qualifications was released for qualified firms to provide design services along the Riverwatch Parkway corridor to improve the traffic Flow. Analysis:The following firms were evaluated based on qualifications, project approach, experience, and interviews in September 2010. The following firms submitted RFQs and were evaluated: 1. Khafra Engineering Consultants, Inc. 2. Kimley-Horn and Associates 3. LAI Engineering 4. LPA Group 5. Pond and Company 6. QK4 7. Street Smarts 8. URS Corporation LPA Group was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in SPLOST Phase VI. Alternatives:1) Approve and award Design Consultant Services Agreement to LPA Group for the Capital Project Budget in the amount of $245,878 for the initial phases of the Riverwatch Parkway at I-20 Corridor Improvements Project to be funded from SPLOST Phase VI for the Engineering Department. 2) Do not approve Recommendation:Approve Alternative Number One. Funds are Available in the Following SPLOST PHASE VI Cover Memo Accounts: REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to CPB#N/A. This project is for the initial phases of the Riverwatch Parkway at I-20 Corridor Improvements. Funding is available in the amount of $245,878 is available in SPLOST Phase VI. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. SPLOST Phase VI 245,878$ 245,878$ Section 3: The following amounts are appropriated for the project: By Basin By District Phinizy 245,878$ CAPITAL PROJECT BUDGET I-20 Eastbount/Riverwatch Ramp Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 1 of 4 1.24.2011 Attachment number 1Page 1 of 4 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET I-20 Eastbount/Riverwatch Ramp CPB AMOUNT NEW SOURCE OF FUNDS CPB CPB SPLOST PHASE VI $245,878 $245,878 TOTAL SOURCES: $245,878 $245,878 USE OF FUNDS ENGINEERING 000000-5212115 $245,878 $245,878 TOTAL USES:$245,878 $245,878 2 of 4 1.24.2011 Attachment number 1Page 2 of 4 Section 1: This project is set up and authorized to CPB#N/A. This project is for the initial phases of the Riverwatch Parkway at I-20 Corridor Improvements. Funding is available in CPB#N/A xecution. For xecution. For 3 of 4 1.24.2011 Attachment number 1Page 3 of 4 CPB#N/A 4 of 4 1.24.2011 Attachment number 1Page 4 of 4 Evaluation Criteria PTS KHAFRA 535 CHESTNUT ST, STE 200 CHATTANOOGA TN 37402 KIMLEY-HORN 3169 HOLCOMB BRIDGE RD NORCROSS GA 30071 LAI ENGINEERING 1800 PARKWAY PLACE MARIETTA GA 30067 LPA GROUP 3595 ENGINEERING DRIVE NORCROSS GA 30092 POND & COMPANY 3500 PARKWAY LANE STE 600 NORCROSS GA 30092 QK4 3169 HOLCOMB BRIDGE RD #455 NORCROSS GA 30071 STREET SMARTS INC 3160 MAIN STREET STE 100 DULUTH GA 30096 URS 400 N PARK TOWN CENTER 100 ABERNATHY ROAD NE STE 900 1) Qualifications of Company 25 16.0 20.0 20.0 19.7 18.0 15.7 13.3 22.0 2) Qualifications of Key Personnel that will actually perform the design services 30 16.0 25.0 23.0 20.7 23.7 16.3 16.3 25.0 3) Experience on similar Georgia DOT projects 25 11.7 19.3 20.3 20.0 14.3 17.7 10.7 22.0 4) References including specific individuals, address, phone number, and e-mail address 15 9.2 15.0 7.5 15.0 12.7 9.0 9.0 10.8 5) 3UR[LPLW\WR$XJXVWD±3RLQWV Within Augusta Richmond County - 5 pts Within the CSRA - 4 pts Within Georgia - 3 pts Within SE United States - 2 pts (includes AL, TN, NC, SC, FL) All Others - 1 pt 5 5.0 4.3 4.3 3.0 4.3 3.0 3.0 3.7 Total 100 57.8 83.7 75.2 78.3 73.0 61.7 52.3 83.5 7 1 4 3 5 6 8 2 2.0 1.7 2.3 Cumulative Evaluation Sheet RFQ Item #10-151 Riverwatch Parkway @ Interstate 20 Corridor Improvements for the City of Augusta - Engineering Department Thursday, October 5, 2010 Ranking Presentation Ranking Attachment number 2Page 1 of 1 REQUEST FOR QUALIFICATIONS Request for Qualifications will be received at this office until Tuesday, August 24, 2010 @ 11:00 a.m. for furnishing: RFQ Item #10-151 Riverwatch Parkway @ I-20 Corridor Improvements for Engineering Department RFQ Item #10-152 15th Street Pedestrian Improvements for Engineering Department RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFQ documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. A Mandatory Pre-Qualifications Conference will be held on Friday, August 6, 2010 @ 11:00 a.m. in the Procurement Department – Room 605. All questions must be submitted in writing to the office of the Procurement Department by Tuesday, August 10, 2010 @ 5:00 p.m. by fax at 706-821-2811 or by mail. No RFQ will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the Procurement Department with your bonafide bid package. No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark RFQ number on the outside of the envelope. Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Augusta-Richmond County, Georgia does not operate a DBE, MBE or WBE Program but rather pursuant to its code of ordinances, this local government operates instead a Local Small Business Opportunity Program. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle July 15, 22, 29, August 5, 2010 Metro Courier July 21, 2010 cc: Tameka Allen Interim Deputy Administrator Abie Ladson Engineering Department Steve Cassell Engineering Department Attachment number 3Page 1 of 1 VENDORS Attachment B Bidders Form Original 6 Copies Addendum KHAFRA 535 CHESTNUT ST, STE 200 CHATTANOOGA TN 37402 YES YES YES YES YES KIMLEY-HORN 3169 HOLCOMB BRIDGE RD NORCROSS GA 30071 YES YES YES YES YES LAI ENGINEERING 1800 PARKWAY PLACE MARIETTA GA 30067 YES YES YES YES YES LPA GROUP 3595 ENGINEERING DRIVE NORCROSS GA 30092 YES YES YES YES YES POND & COMPANY 3500 PARKWAY LANE STE 600 NORCROSS GA 30092 YES YES YES YES YES QK4 3169 HOLCOMB BRIDGE RD #455 NORCROSS GA 30071 YES YES YES YES YES STREET SMARTS INC 3160 MAIN STREET STE 100 DULUTH GA 30096 YES YES YES YES YES URS 400 N PARK TOWN CENTER 100 ABERNATHY ROAD NE STE 900 ATLANTA GA 30328 YES YES YES YES YES HEATH & LINEBACK ENG 2390 CANTON ROAD BLDG 200 MARIETTA GA 30066 MOORE AND ASSOCIATES 1009 EAST AVENUE NORTH AUGUSTA SC 29841 EMC ENGINEERING 4106 COLBEN BLVD STE 105 EVANS GA 30809 R.S. & H. 730 PEACHTREE ST STE 430 ATLANTA GA 30308 RFQ Item #10-151 Riverwatch Parkway @ Interstate 20 Corridor Improvements for the City of Augusta - Engineering Department RFQ Due: Tuesday, August 24, 2010 @ 11:00 a.m. NON-COMPLIANT Attachment B Missing Pages 1 and 2 Did not return Bidders Form Submitted No-Bid Response Letter Page 1 of 1 Attachment number 4Page 1 of 1 Attachment number 5Page 1 of 1 Attachment number 6Page 1 of 2 Attachment number 6Page 2 of 2 Attachment number 7Page 1 of 6 Attachment number 7Page 2 of 6 Attachment number 7Page 3 of 6 Attachment number 7Page 4 of 6 Attachment number 7Page 5 of 6 Attachment number 7Page 6 of 6 Attachment number 8Page 1 of 3 Attachment number 8Page 2 of 3 Attachment number 8Page 3 of 3 Engineering Services Committee Meeting 2/7/2011 1:05 PM Proposed Consent Agreement and Final Order Department:Utilities Caption:Consider Consent Agreement and Final Order from U.S.E.P.A. Background:AUD currently uses gas chlorine at its groundwater treatment plants for disinfection of treated water. The chlorine feed apparatus includes two tanks manifolded together, with an automatic device that switches from the in-use tank to a full tank when the in-use tank is empty. This apparatus includes a standard vent system to vent small amounts of chlorine gas during switchover of the tanks. Sometime during the morning of Sunday June 13, 2010, the switchover of tanks described above activated automatically at Groundwater Plant 1 on Peach Orchard Road. The automatic device hung open during the process, and chlorine gas continued to vent after the tanks had switched. The release was at a slow rate over an extended period of time, and was vented outside the building. Because of the slow rate of release and venting to atmosphere, there was not a danger of a hazardous accumulation of chlorine. At 11:32 that morning an operator trainee was conducting rounds of the groundwater plants and detected a chemical odor. He contacted the lead operator at the Hicks Plant, and the on-call mechanic was called in. Once on-site, the mechanic recognized immediately what was happening and stopped the release. The release was over the reportable quantity defined by EPA of 10 lbs. The operator trainee had not yet received AUD’s standard hazmat training, as at the time, this training was conducted annually. The operator trainee was not aware of reporting requirements for release of hazardous materials. He also was not aware of requirements that releases be reported to the Local Emergency Planning Council. Once AUD management was made aware of the incident, the release was reported immediately. Maintenance records indicated that the malfunctioning switchover device had been serviced seven months prior to the incident; the manufacturer recommends annual preventive maintenance. Analysis:The following steps have been taken to insure the safety of staff and public, and that our response to potential future incidents is consistent with all Federal and State regulations: • All operator trainees receive hazmat training as soon as possible after hire. They are not allowed to conduct rounds of remote treatment sites alone until this training is held. • All operations and maintenance personnel have received refresher hazmat training, including Federal and State reporting requirements. • Department policies and procedures have been strengthened to insure that AUD’s management team is notified of all potentially hazardous situations, especially outside of normal working hours. Also, funds were budgeted in 2011 to change from gas chlorine to sodium hypochlorite for disinfection at the three groundwater plants. Sodium hypochlorite is a less hazardous disinfectant. Cover Memo Financial Impact:Potential fines for not adhering to the reporting requirements total $132,800. EPA has proposed an adjusted penalty of $51,800, based on AUD’s cooperation, and our willingness to recommend acceptance of the proposed Consent Agreement. Funds are available in 506043530-5212123. Alternatives:Commission could opt to contest the proposed Consent Agreement and ask for a formal hearing, however EPA could then pursue the maximum penalties of $132,800. Recommendation:Commission could opt to contest the proposed Consent Agreement and ask for a formal hearing, however EPA could then pursue the maximum penalties of $132,800. Funds are Available in the Following Accounts: Funds are available in 506043530-5212123. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 8 Attachment number 1Page 2 of 8 Attachment number 1Page 3 of 8 Attachment number 1Page 4 of 8 Attachment number 1Page 5 of 8 Attachment number 1Page 6 of 8 Attachment number 1Page 7 of 8 Attachment number 1Page 8 of 8 Engineering Services Committee Meeting 2/7/2011 1:05 PM Purchase of additional wetland mitigation credits for AUD Fort Gordon Forcemain project. Department:Augusta Utilities Department Caption:Approve funding in the amount of $55,885.00 for the purchase of additional wetland mitigation credits to offset wetland areas disturbed during the Fort Gordon Forcemain Sanitary Sewer Connection project. Background:The Fort Gordon Forcemain Sanitary Sewer is a sewer forcemain connecting the fort to the Spirit Creek trunkline. This forcemain will serve approximately 70% of the base flow and will complete the Municipal Services Agreement connection contract signed in September 2006. The sewer line will be constructed through a wetland area, requiring an additional 11.97mitigation credits for the wetland impacts and 235mitigation credits for stream impacts. These credits must be purchased prior to the beginning of construction with proof of purchase presented to the US Army Corps of Engineers. Phinizy Mitigation Bank was contacted to provide wetland mitigation credits and Bath Branch Mitigation Bank was contacted to provide stream credits. Analysis:Both mitigation banks were contacted, and they have provided an invoice for the purchase of wetland mitigation credits. Financial Impact:The cost to purchase these credits is $55,885.00. These funds are available from account 507043420/5212115- 80600040/5212115 Alternatives:The alternatives are: 1. Do not purchase the credits and place the project on hold. 2. Proceed with the current plan to purchase credits from the respective banks. Recommendation:Approve funding in the amount of $55,885.00 for the purchase of wetland mitigation credits to offset wetland and stream areas disturbed during the Fort Gordon Forcemain Sanitary Sewer Connection project. Funds are Available in the Following Accounts: $55,885.00 from account 507043420/5212115- 80600040/5212115 REVIEWED AND APPROVED BY: Finance. Cover Memo Procurement. Law. Administrator. Clerk of Commission Cover Memo Engineering Services Committee Meeting 2/7/2011 1:05 PM Realizing The Garden City Department:Administrator Caption:Motion to discuss the implementation of Realizing The Garden City: The Augusta Sustainable Development Agenda. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Engineering Services Committee Meeting 2/7/2011 1:05 PM Right-of-Way Use Determination Department:Law Caption:Motion to determine that a portion of Robert C. Daniel, Jr. Parkway, as shown on the attached plat and consisting of approximately 0.101 acre (144.60 square feet), has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies). Background:The Engineering Department has been requested to abandon a portion of Robert C. Daniel, Jr. Parkway. This portion of Robert C. Daniel, Jr. Parkway was taken in condemnation by the Georgia Department of Transportation as part of right-of-way work for Robert C. Daniel, Jr. Parkway. The Georgia Department of Transportation has recently re- conveyed the property back to Augusta, Georgia by deed dated November 22, 2010. This property does not serve any parcels with residences or structures. The abandonment request has been reviewed by all essential county departments and administrators and no objections were made to this abandonment request. The Engineering Department requests that a binding agreement be executed by all parties to ensure the stormwater drainage on Parcel C be kept in place until the site’s proposed stormwater system plan is approved by the Engineering Department and constructed in accordance with the proposed approved plan, at which time the existing parcel and stormwater system will no longer be required or needed by Augusta, Georgia. Also, the design firm will be required to provide a study to show existing drainage system will handle any water runoff and provide a site plan to address detention of any water at this site. The legal description and plat of the portion of Robert C. Daniel, Jr. Parkway to be abandoned are attached. Analysis:In addition to the information provided in the above Background section, publication notices will be made for a public hearing to be held, with results to be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b)(1). Financial Impact:Cost of publication and advertisement of public hearing Alternatives:Approve or deny request for determination of no substantial use regarding abandonment of portion of Robert C. Daniel, Jr. Parkway. Recommendation: Approve determination of no substantial use regarding request for Cover Memo abandonment of said portion of Robert C. Daniel, Jr. Parkway, subject to the Engineering Department’s request for restrictions and/or easements to ensure the existing stormwater drainage on Parcel C be kept in place until the site’s proposed stormwater system plan is approved by the Engineering Department and constructed in accordance with the proposed approved plan, at which time the existing parcel and stormwater system will no longer be required or needed by Augusta, Georgia. Also, the design firm will be required to provide a study to show existing drainage system will handle any water runoff and provide a site plan to address detention of any water at this site. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 PROPERTY DESCRIPTION: ALL THAT TRACT OR PARCEL OF LAND LYING AND BEING IN THE 90TH GEORGIA MILITIA DISTRICT, CITY OF AUGUSTA, RICHMOND COUNTY, STATE OF GEORGIA AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: FROM THE POINT OF COMMENCEMENT, BEING A CONCRETE MONUMENT FOUND AT THE INTERSECTION OF THE NORTHERN RIGHT-OF-WAY LINE OF WALTON WAY EXTENSION AND THE EASTERN RIGHT-OF-WAY LINE OF ROBERT C. DANIEL PARKWAY; THENCE, ALONG THE EASTERN RIGHT-OF-WAY LINE OF ROBERT C. DANIEL PARKING NORTH 02°49'30" WEST A DISTANCE OF 62.31 FEET TO A #4 REBAR SET; THENCE, CONTINUING ALONG SAID RIGHT-OF-WAY LINE NORTH 50°00'15" EAST A DISTANCE OF 58.00 FEET TO A CONCRETE MONUMENT FOUND; THENCE, CONTINUING ALONG SAID RIGHT-OF-WAY LINE SOUTH 52°33'38" EAST A DISTANCE OF 19.16 FEET TO A CONCRETE MONUMENT FOUND; THENCE, CONTINUING ALONG SAID RIGHT-OF-WAY LINE NORTH 51°00'38" EAST A DISTANCE OF 10.49 FEET TO A CONCRETE MONUMENT FOUND; THENCE, CONTINUING ALONG SAID RIGHT-OF-WAY LINE NORTH 24°16'05" WEST A DISTANCE OF 20.07 FEET TO A CONCRETE MONUMENT FOUND; THENCE, CONTINUING ALONG THE EASTERN RIGHT-OF-WAY LINE OF ROBERT C. DANIEL PARKWAY NORTH 50°00'15" EAST A DISTANCE OF 102.38 FEET TO A CONCRETE MONUMENT FOUND, BEING THE POINT OF BEGINNING; THENCE TURNING AND LEAVING SAID RIGHT-OF-WAY LINE SOUTH 68°21’15” EAST A DISTANCE OF 56.95 FEET TO A CONCRETE MONUMENT FOUND, THENCE TURNING NORTH 49°41’59” EAST A DISTANCE OF 37.47 FEET TO A CONCRETE MONUMENT FOUND; THENCE TURNING NORTH 43°06’36” WEST A DISTANCE OF 50.18 FEET TO A CONCRETE MONUMENT FOUND ALONG THE SOUTHERN RIGHT-OF-WAY LINE OF ROBERT C. DANIEL PARKWAY; THENCE ALONG SAID RIGHT-OF-WAY LINE SOUTH 49°49’55” EAST A DISTANCE OF 61.80 FEET TO A CONCRETE MONUMENT FOUND, KNOWN AS THE POINT OF BEGINNING. CONTAINING 0.06 ACRE (2,483 SQUARE FEET) Attachment number 2Page 1 of 1 Engineering Services Committee Meeting 2/7/2011 1:05 PM Right-of-Way Use Determination Department:Law Caption:Motion to determine that a portion of Oakdale Avenue, as shown on the attached plat and consisting of approximately 0.22 acre (9,574.00 square feet), has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7- 2, with the abandoned property to be quit-claimed to the appropriate party (ies), and an easement to be retained over the entire abandoned portion for existing or future utilities. Background:The Engineering Department has requested to abandon a portion of Oakdale Avenue. This portion of Oakdale Avenue was never developed or paved and dead-ends into Pineview Drive. This property does not serve any parcels with residences or structures. The abandonment request has been reviewed by all essential county departments and administrators and no objections were made to this abandonment request. The Engineering Department requests that an easement be retained over the entire abandoned portion for existing or future utilities. The legal description and plat of the portion of Oakdale Avenue to be abandoned are attached. Analysis:In addition to the information provided in the above Background section, publication notices will be made for a public hearing to be held, with results to be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b)(1). Financial Impact:Cost of publication and advertisement of public hearing. Alternatives:Approve or deny request to determine that a portion of Oakdale Avenue be abandoned. Recommendation:Approve determination regarding request for abandonment of said portion of Oakdale Avenue, with a public hearing to be held regarding the issue of abandonment pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), and an easement to be retained over the entire abandoned portion for existing or future utilities. Funds are Available in the Following Accounts:Cover Memo REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Attachment number 2Page 1 of 1 Engineering Services Committee Meeting 2/7/2011 1:05 PM Traffic Safety Improvements Department:Abie L. Ladson, PE, CPESC, Director of Engineering Caption:Approve ARC to supplement the Kroc Center’s contract with B&E Electrical in the amount of $129,241 to upgrade the traffic signal at Broad Street and Eve Street as well as improve pedestrian facilities and provide signal interconnectivity to Crawford Avenue. Funding is available in the Traffic Safety Improvements project account CPB 324-041110-202824020 as requested by AED. Background:In conjunction with the construction of their facility, the Kroc Center has contracted with B&E Electrical to upgrade the existing traffic signal at Broad Street and Crawford Avenue to include mast arms, LED’s, and improved pedestrian facilities. The purpose of this project is to supplement their contract with B&E to provide a similar upgrade to the traffic signal at Broad Street and Eve Street. This project will include the upgrade of the signal to black powder-coated mast arms, LED’s, associated signal equipment, interconnection with Crawford Avenue signal as well as upgraded pedestrian facilities. Analysis:Providing this upgrade in connection with the Crawford Avenue signal upgrade will provide a much-needed upgrade while avoiding future disturbance of the new sidewalk, landscaping, and street lighting that will be installed as part of the development of the Kroc Center property. Financial Impact:Funds are available in Traffic Safety Improvement contingency account to be transferred to the project account upon Commission approval. Alternatives:1) Approve ARC to supplement the Kroc Center’s contract with B&E Electrical in the amount of $129,241 to upgrade the traffic signal at Broad Street and Eve Street as well as improve pedestrian facilities and provide signal interconnectivity to Crawford Avenue. Funding is available in the Traffic Safety Improvements project account CPB 324-041110-202824020 as requested by AED. 2) Do not approve and upgrade signal at a later date will result in increased costs due to sidewalk, landscaping, and street lighting replacement Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 324-041110-6011110/202824020-6011110 Cover Memo REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to CPB324-041110-202824020. This project supplements the Kroc Center's contract with B&E Electrical in the amount of $129,241 to upgrade the traffic signal at Broad and Eve St. and improve pedestrian facilities and provide signal interconnectivty to Crawford Ave. Funding is available in the project account. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. SPLOST Phase IV 129,241$ 129,241$ Section 3: The following amounts are appropriated for the project: By Basin By District Phinizy 129,241$ CPB#324-041110-202824020 CAPITAL PROJECT BUDGET Traffic Safety Improvements Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor 1 of 4 1.24.2011 Attachment number 1Page 1 of 4 Augusta-Richmond County, Georgia CPB#324-041110-202824020 CAPITAL PROJECT BUDGET Traffic Safety Improvements CPB AMOUNT NEW SOURCE OF FUNDS CPB CPB SPLOST PHASE IV -129241 -129241 TOTAL SOURCES: ($129,241) ($129,241) USE OF FUNDS OTHER INFRASTRUCTURE $129,241 $129,241 324-041110-5414910 TOTAL USES:$129,241 $129,241 2 of 4 1.24.2011 Attachment number 1Page 2 of 4 Section 1: This project is set up and authorized to CPB324-041110-202824020. This project $129,241 to upgrade the traffic signal at Broad and Eve St. and improve pedestrian facilities and provide signal interconnectivty to Crawford Ave. Funding is available CPB#324-041110-202824020 3 of 4 1.24.2011 Attachment number 1Page 3 of 4 CPB#324-041110-202824020 4 of 4 1.24.2011 Attachment number 1Page 4 of 4