Engineering Services Committee Meeting Commission Chamber- 4/12/2010- 12:55 PM
ENGINEERING SERVICES
1. Motion to approve Change Order # 1 to the existing construction contract
in the amount of $147,964.00 to Blair Construction for the additional
work to complete the Water Line Replacements for Fort Gordon
Recreation Area.
Attachments
2. Motion to approve change order #2 to the existing design contract in the
amount of $71,985.45 to ZEL Engineers for additional work to complete
the full Supplemental Environmental Assessment at Fort Gordon.
Attachments
3. Approve Change Order No. 21 in the amount of $90,794.00 to the
Construction Contract for the Webster Detention Center (WDC)
Expansion. This Change Order also includes a contract time extension of
62 days for increase in scope of work with no extended overhead charges.
The revised contract amount is $33,814,805.03.
Attachments
4. Approve Change Order #15 on the Augusta Judicial Center and John H.
Ruffin Courthouse in the amount of $66,588.00 for unforeseen undercut
work on sub-surface conditions on the west side of the Augusta Judicial
Center site along 10th Street between Talcot & Fenwick Streets.
Attachments
5. Motion to approve or deny the use of Compressed Natural Gas as the
required fuel source for the Solid Waste Collections Contract. (Referred
from April 1 Commission meeting)
Attachments
6. Award an emergency contract to Atlantic Coast Consulting for the repair
and upgrade to the gas collection and control system.
Attachments
7. Award an emergency contract to Dabbs-Williams General Contractors for
the construction/construction management of the gas collection and control
system.
Attachments
8. Approve the deed of dedication, maintenance agreement, and road
resolutions submitted by the Engineering Department for Elderberry,
Section III.
Attachments
9. Approve granting Georgia Power an easement for their underground
utilities to provide electrical service to the new Judicial Center and have
the agreement executed by the appropriate City of Augusta official(s).
Attachments
www.augustaga.gov
10. Authorize execution of Change Order # 1 in an amount not to exceed
$127,000.00 to Hagler Systems for additional work on the Goodrich Street
Raw Water Pumping Station contract.
Attachments
11. Motion to approve Georgia Power Company Governmental Encroachment
Agreement 31201 and Municipal Electric Authority of Georgia
Governmental Encroachment Agreement 31202.
Attachments
12. Motion to authorize condemnation to acquire 7,531 sq. ft. of permanent
easement and 3,796 square feet of temporary easement of 4112 Deans
Bridge Road - PIN: 150-0-001-07-0.
Attachments
13. Approve granting Georgia Power an easement for their underground
utilities to provide electrical service to the Newman Tennis Center and
have the agreement executed by the appropriate City of Augusta official(s).
Attachments
14. Motion to authorize condemnation to acquire title of a portion of the
properties for permanent and temporary easements for the 10156 Gordon
Highway 16 Inch Water Main Project, PIN: 080-0-001-12-0 & 080-0-001-
13-0.
Attachments
15. Presentation regarding proposed development on the Savannah River
upstream from the Lock and Dam.
Attachments
16. Motion to approve a resolution creating street lighting districts.
Attachments
17. Authorize the Engineering Department to approve CPB Number Twelve
andSupplemental Agreement Eleven with PBS & J in the amount of
$116,907 to finalize the design of the Barton Chapel Road realignment;
update the plans in accordance with revised guidelines from GDOT, US
Army Corps of Engineers, and EPD; database revisions to incorporate the
changes to 14 parcels that have redeveloped; andextensive coordination
with the GDOT R/W Office during the negotiations of parcels as part of
the improvements to Wrightsboro Road from Jimmie Dyess Parkway to I-
520, ARC# 323-041110-296823309. Funds will be transferred from the
project Right of Way Account to the project Engineering Account.
Attachments
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Approve Change Order #1 to the existing construction contract in the amount of $147,964.00 to Blair Construction for
the Water Line Replacements for Fort Gordon Recreation Area at Thurmond Lake . Bid item #09-159.
Department:Augusta Utilities Department
Caption:Motion to approve Change Order # 1 to the existing construction contract in
the amount of $147,964.00 to Blair Construction for the additional work to
complete the Water Line Replacements for Fort Gordon Recreation Area.
Background:The project is located at Fort Gordon Recreation Area at Thurmond Lake in
Columbia County, GA. The project is being constructed to replace the
existing 3" water main with an 8" water main that will allow adequate water
supply to the area. The project will connect the new 8" water main to a
Columbia County owned 12" water main near the intersection of Pike
Avenue and Washington Road, and extend approximately 8,300 linear feet
of 8" water main throughout the recreational area with service connections,
fire hydrants, backflow prevention devices, and an auto flushing device.
The project will also provide approximately 5,000 additional linear feet of
6" water main to serve the housing within the recreation area with water,
and sufficient flow for fire protection. The modification to this contract is
to accommodate new construction at the Fort Gordon Recreation Area. This
modification was requested by Fort Gordon and is beyond the original scope
of work. Augusta will be reimbursed by Fort Gordon for the cost of this
work.
Analysis:AUD has evaluated Blair proposal to Change Order #1 and has considered
the proposal fair and reasonable to accomplish the project.
Financial Impact:The construction proposal submitted for this project is $147,964.00. These
funds are available from account 507043410-5425110 / 88880070-5425110
Alternatives:Rejection of this change order #1 would delay the construction and delay
revenue to Augusta Richmond County.
Recommendation:Recommend Commission approve change order #1 to the existing
construction contract to Blair Construction in the amount of $147,964.00
Funds are Available in
the Following
Accounts:
507043410-5425110 / 88880070-5425110
REVIEWED AND APPROVED BY:
Cover Memo
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 1
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Approve Change Order #2 to the existing Design Contract for Fort Gordon Wastewater Connection (Force Main and
Lift Station)
Department:Augusta Utilities Department
Caption:Motion to approve change order #2 to the existing design contract in the amount of $71,985.45
to ZEL Engineers for additional work to complete the full Supplemental Environmental
Assessment at Fort Gordon.
Background:The Municipal Services Agreement (MSA) contract between the Augusta Richmond County
and Fort Gordon was awarded September 2006. A requirement of the contract is to provide the
wastewater connection from Fort Gordon to Augusta Richmond County wastewater collection
system.
The modification to this contract is to provide a full Supplemental Environment Assessment
requested by Fort Gordon .This Act dictates that all concerned environment and cultural
resource agencies have plenty time and information to review and provide comments on
impacts that may be caused by this action. In order to satisfy that additional scope, ZEL
sought the services of TetraTech NUS to complete the full Supplemental Environment
Assessment in order to satisfy the National Environmental Policy Act (NEPA)
requirements.AUD believe that this scope of work is inclusive and will provide a cost-
effective solution to the connection of the sanitary sewer to the Augusta collection system.
Analysis:AUD evaluated ZEL Engineers Change Order #2 to the existing Design Contract for Fort
Gordon Wastewater Connection (Force Main and Lift Station). This proposal is considered
fair and reasonable to accomplish the project.
Financial Impact:The design proposal submitted for this project was $71,985.45. These funds are available from
the following accounts: 507043420/5212115- 80600040/5212115
Alternatives:1. Rejection of this change order #2 would delay the design and the subsequent construction of
the wastewater connection ( Force Main and Lift Station) delaying revenue for the Augusta
Richmond County.
Recommendation:Recommend Commission approve change order #2 to the existing design contract to ZEL
Engineers in the amount of $71,985.45
Funds are
Available in the
Following
Accounts:
$71,985.45 from account 507043420/5212115- 80600040/5212115
REVIEWED AND APPROVED BY:
Cover Memo
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Municipal Engineering
Water Plants – Distribution
Wastewater Plants – Collection
Investigations – Planning Studies
Recreational Facilities
Industrial Parks – Roadways
Civil – Structural – Mechanical
Electrical & Instrumentation
Joseph J. Tankersley, P. E.
Jorge E. Jiménez, P. E.
Charles D. Drown, P. E.
Stacey W. Gordon, P. E.
Frank W. Byne, P. E.
Kenneth M. Wardenski, EIT, MCSE
Founded 1946
Zimmerman, Evans and Leopold, inc.
(706) 724-5627 – FAX (706) 724-5789
435 Telfair Street
Augusta, Ga. 30901-2494
March 24, 2010
Mr. Jerry Delaughter, P.E.,
Assistant Director, Engineering
Augusta Utilities Department
360 Bay Street, Suite 180
Augusta, GA 30901
Dear Mr. Delaughter:
In May 2009, Zimmerman, Evans, and Leopold, Inc. presented a workplan to satisfy a
request from Fort Gordon for a supplemental Environmental Assessment (SEA) of the
proposed forcemain route. While completing that workplan, the environmental division
requested an additional scope of work to complete the SEA. In order to satisfy that
additional scope, ZEL sought the services of TetraTech NUS. Subsequently the SEA was
revised and published for comments. Only two comments were received, one from the
USACE requesting the wetlands Jurisdictional Determination and Pre-Construction
Notification, and another comment letter from US EPA requesting verification of why certain
activities were presented in the report. The wetlands information was submitted in March
2010 by ZEL. Upon discussion with Fort Gordon personnel, it was determined that a letter
response to US EPA would be sufficient to satisfy the final requirement to the SEA.
Subsequently, TetraTech NUS provided an additional scope of work to provide the response
letter. The original and amended fees requested by Tetratech are presented in Table 1 below.
Finally, the original contract did not include the costs associated with procuring easements.
Because we were able to reuse older easements that were previously executed for the
Jamestown project, the costs were reduced significantly. However the parcels between US-1
and Fort Gordon did not have any recorded information and thus required moderate
fieldwork and research. We have included the fee requested by George Godman, RLS, for
this scope of work.
Attachment number 1Page 1 of 19
Table 1: Fees associated with completing the MSA Contract.
Description Fee Overhead SubTotal
TetraTech NUS SEA WriteUp $49,977.00 $7,496.55 $57,473.55
TetraTech NUS SEA EPA
Response Letter
$9,206.00 $1,380.90 $10,586.90
Easements $3,925.00 $0.00 $3,925.00
Total $71,985.45
The total fee request is $71,985.45. Your consideration of this request for funds required to
complete the project is appreciated.
Attached to this document are TetraTech NUS’s proposal and Mr. Godman’s Invoice.
ZEL looks forward to completing this project for AUD.
Very truly yours,
ZIMMERMAN, EVANS AND LEOPOLD, INC.
Jorge E. Jiménez, P.E.
Principal
JEJ:slv
Attachments
Attachment number 1Page 2 of 19
AIK-09-0320
August 10, 2009
Mr. Jorge E. Jimenez, PE
ZEL Engineers
435 Telfair Street
Augusta, GA 30901
Delivered via electronic mail to J. E. Jimenez on August 10, 2009
Subject: Final Proposal to Provide Support to ZEL Engineers in the preparation of a Supplemental
Environmental Assessment Concerning a Proposed Forcemain on Fort Gordon
Dear Mr. Jimenez:
Based on discussions Ms. Kristi Hagood and Ms. Karen Patterson of our office had with you on July 31,
Tetra Tech is pleased to submit this proposal for preparing a (revised) Supplemental Environmental
Assessment (SEA) for a proposed forcemain to convey wastewater to the Augusta-Richmond County
Wastewater Treatment Plant (WWTP). This letter describes Tetra Tech’s understanding of the project
history and the proposed Scope of Work, briefly discusses Tetra Tech’s qualifications and experience of
key personnel, includes a proposed outline and schedule for revising the SEA, and a Time and Materials
cost estimate. We have also included a copy of a commendation letter we received for a “fast-track”
Environmental Assessment we prepared in May of this year and a copy of our Standard Terms and
Conditions.
The Project
Our understanding of the project is that Fort Gordon privatized its wastewater management system in
2006, consistent with Defense Reform Initiative Directive No. 49. This involved a municipal services
agreement with Augusta-Richmond County to connect the Fort Gordon wastewater system to the
Augusta-Richmond County wastewater system and pump Fort Gordon wastewater to the Augusta-
Richmond County WWTP for treatment. Fort Gordon’s Environmental Division prepared an EA in 2006
that examined potential impacts of privatization, but the EA was in effect a programmatic document
because alternative routes for wastewater pipelines had not been selected. The EA with a Finding of No
Significant Impact (FONSI) was completed and distributed to stakeholders in June 2006. In June 2009,
ZEL Engineers prepared a Supplemental EA that examined several alternative strategies/routes for
conveying wastewater to the municipal treatment facility. Fort Gordon Environmental Division staff
reviewed the draft SEA, provided ZEL Engineers with a number of comments, several of which were
substantive, and recommended that ZEL Engineers engage a full-service National Environmental Policy
Act (NEPA)/natural resources firm, such as Tetra Tech, to revise the document.
Attachment number 1Page 3 of 19
Use or disclosure of data contained in this proposal or quotation shall not be disclosed outside of ZEL Engineers
AIK-09-0320
August 10, 2009
Mr. Jorge E. Jimenez, PE
Page 2 of 12
Tetra Tech NUS, Inc.
900 Trail Ridge Road, Aiken, SC 29803
Tel: 803.649.7963 Fax: 803.642-8454 www.tetratech.com
Our Qualifications
We believe Tetra Tech is uniquely qualified to revise the SEA for ZEL Engineers. Tetra Tech holds one
of the DOE Nationwide NEPA Contracts and has held this contract since 1997, the first year that DOE
awarded this type of contract. We have prepared more than 65 Environmental Impact Statements,
Environmental Assessments, or supplemental analyses for DOE from 2003 through 2007. From 1981 to
2008, the Aiken Office of Tetra Tech prepared dozens of NEPA documents (EAs and EISs) for the DOE-
Savannah River Site (SRS), a facility that shares many characteristics with Fort Gordon. Like Fort
Gordon, SRS is a large federal reservation with limited public access, large forest stands managed for
both wildlife and timber production, and some restricted recreational use (hunting and fishing in portions
of the site at certain times of the year). Moreover, the two sites’ archeological and ecological resources
are very similar, which is not surprising given that they are only 30 (air) miles apart and both lie in the
Savannah River watershed.
The Aiken Office of Tetra Tech has prepared Environmental Reports (specialized NEPA documents
required by the U.S. Nuclear Regulatory Commission) for relicensing of more 25 nuclear power plants
and has prepared Environmental Reports since 2004 for proposed new nuclear generating facilities in
Virginia, South Carolina, Georgia, Florida, and Texas.
In May 2009, we completed an ER for a proposed photovoltaic power generation facility in Chicago for
submittal to the DOE Loan Guarantee Program. This ER had an extremely tight schedule, and Tetra Tech
delivered the Final ER to the client 35 days from contract signature. A letter from the client (attached)
demonstrates his satisfaction with our performance.
Tetra Tech has prepared literally hundreds of Environmental Assessments for Department of Defense
facilities, primarily Air Force facilities, but in recent years has also gotten heavily involved in supporting
various Department of the Army initiatives, including the privatization of military housing on most of its
installations in the Continental US and Hawaii. This action was authorized under the Military Housing
Privatization Initiative (MHPI), enacted by Congress as part of the 1996 Defense Authorization Act, P. L.
104-106. The MHPI was enacted in response to a growing need for high quality yet affordable housing
for military personnel, and was designed to stimulate private development of housing for military
members.
Tetra Tech was contracted by the Mobile District of the U.S. Army Corps of Engineers to prepare
separate Environmental Assessments (EA), Environmental Baseline Surveys (EBS), Findings of
Suitability to Lease (FOSL), and Findings of Suitability to Transfer (FOST) for each of the Army
facilities included in the MHPI program. Completed projects include: Ft Hood, TX; Fort Bragg, NC; Fort
Campbell, KY; Fort Stewart/Hunter Army Airfield, GA; Fort Polk, LA; Presidio of Monterey, CA;
Moffett Federal Airfield, CA; Parks Reserve Forces Training Area, CA; Fort Irwin, CA; Fort Hamilton,
NY; Fort Drum, NY; Fort Monmouth, NJ; Picatinny Arsenal, NJ; Fort Rucker, AL; Redstone Arsenal,
AL; Fort Benning, GA; Fort Sam Houston, TX; Fort Bliss, TX; Fort Leonard Wood, MO; Fort
Leavenworth, KS; Fort Riley, KS; White Sands Missile Range, NM; Fort Knox, KY; Fort Detrick, MD;
Fort Eustis, VA; Ft Lee, VA; Fort Monroe, VA; Fort Story, VA; Walter Reed Army Medical Center,
Washington DC; and all Army and Coast Guard housing installations (7 areas) in Hawaii. Tetra Tech
also provided support for the privatization of Navy family housing for the Naval Post Graduate School in
Monterey, CA and the Coast Guard in Hawaii.
Attachment number 1Page 4 of 19
Use or disclosure of data contained in this proposal or quotation shall not be disclosed outside of ZEL Engineers
AIK-09-0320
August 10, 2009
Mr. Jorge E. Jimenez, PE
Page 3 of 12
Tetra Tech NUS, Inc.
900 Trail Ridge Road, Aiken, SC 29803
Tel: 803.649.7963 Fax: 803.642-8454 www.tetratech.com
Proposed Project Team
The proposed Project Manager for this project, Ms. Kristi Hagood, has extensive experience preparing
Environmental Assessments and related documents in compliance with NEPA. She came to Tetra Tech
from Fort Gordon, where she was a NEPA Specialist involved in the preparation of Environmental
Assessments and Environmental Baseline Surveys for the Department of the Army. While at Fort
Gordon she co-authored several EAs, including the (2006) Environmental Assessment for the Proposed
Privatization of Wastewater Utilities; US Army Garrison, Fort Gordon and Fort Gordon Recreation
Area, Georgia and the (2007) Environmental Assessment for the Construction and Operation of a
Convoy Live Fire Range; U.S. Army Garrison – Fort Gordon and contributed to several others as a
Senior Reviewer. As a consequence, she is intimately familiar with Fort Gordon’s human and natural
resources and the Army’s policies and procedures for implementing NEPA at 32 CFR Part 651. Mr.
Mathew Neet, who will be the project GIS specialist and Land Use analyst, also came to Tetra Tech from
Fort Gordon, where he was a GIS Analyst with the ITAM (Integrated Training Area Management) and
Sustainable Range Programs. Mr. Derrick Haltiwanger, who is proposed as the Air Resources and
Hazardous Waste analyst, was an Environmental Scientist providing RCRA and Clean Air Act
compliance support to Fort Gordon’s Environmental Division Office from 2003 to 2008.
Ms. Kathy Roxlau, who is proposed as Historic and Cultural Resources lead, has contributed to numerous
Army NEPA documents, including EAs for privatization of housing at Fort Sill (Oklahoma), Fort Lee
(Virginia), and the U.S. Military Academy at West Point. She has also conducted cultural resources
assessments in support of EISs for Defense Base Closure and Realignment Commission (BRAC)-related
expansion of facilities at Fort Belvoir (Virginia), Fort Lee (Virginia) and A.P. Hill (Virginia).
Mr. Mike Whitten, who is proposed as Project Terrestrial Ecologist, has conducted surveys of federally-
listed red-cockaded woodpeckers and state-listed gopher tortoises across the southeast in support of
power plant and transmission line projects. He conducted surveys of endangered species (including red-
cockaded woodpeckers and gopher tortoises) at Georgia Power’s Plant Vogtle and along 360 miles of
associated transmission lines in 2005-2006 in support of an application to NRC for operating license
renewal. He conducted numerous surveys of red-cockaded woodpeckers and gopher tortoises in Florida
in the 1990s for real estate developers and electric utilities, and was authorized by Florida Wildlife
Conservation Commission to relocate gopher tortoises that could be harmed by development activities.
The remainder of the proposed project team is shown in the attached organizational chart.
Proposed Technical Approach
Consistent with (1) our understanding of the Army’s NEPA requirements, (2) our experience preparing
NEPA documentation for actions at other Department of Defense facilities, and (3) comments ZEL
Engineers received on the draft SEA, we propose to do the following:
(1) Reorganize and re-format the document as appropriate
(2) Add new “Geology and Soils” and “Infrastructure & Utilities” sections
(3) Prepare all-new graphics and figures
(4) Stress the connection between the SEA and the original EA, and refer to the original EA as
appropriate, incorporating by reference, material that doesn’t bear directly on the analysis
Attachment number 1Page 5 of 19
Use or disclosure of data contained in this proposal or quotation shall not be disclosed outside of ZEL Engineers
AIK-09-0320
August 10, 2009
Mr. Jorge E. Jimenez, PE
Page 4 of 12
Tetra Tech NUS, Inc.
900 Trail Ridge Road, Aiken, SC 29803
Tel: 803.649.7963 Fax: 803.642-8454 www.tetratech.com
(5) Tie the contents of the document more closely to the Army’s procedures for implementing
NEPA
(6) Expand and refine the discussion of ecological resources, in particular the assessment of
potential impacts to red-cockaded woodpeckers and gopher tortoises
(7) Present a list of special-status species known to occur in the project vicinity and make clearer
the distinction between state-listed, federally-listed species, and species of concern
(8) Add a discussion of the Army’s responsibilities and requirements relative to Section 7 of the
Endangered Species Act
(9) Expand the discussion of cumulative impacts to non-pipeline/non-wastewater projects consistent
with regulations at 32 CFR 651.16 and 40 CFR 1508.7
(10) Add a discussion of potential infrastructure/public utilities impacts, specifically the potential
impact of the additional wastewater volume (up to 6 MGD) on Augusta Utilities (what is the
system’s current treatment capacity? What percent of this capacity is currently being used?)
(11) Expand the discussion of wetlands and wetlands impacts to include state and federal
requirements and the 404 permitting process
(12) Expand the discussion of Historic Properties to include a discussion of the NHPA and the
Army’s responsibilities relative to Section 106 of the NHPA
(13) Ensure that the Fort Gordon Environmental Division comments on ZEL’s draft SEA are
satisfactorily addressed
In addition to revising the SEA as described above, we propose to conduct a focused survey of red-
cockaded woodpecker habitat within a half-mile radius of the project sites, in accordance with the U.S.
Fish and Wildlife Service’s (2003) revised Recovery Plan for the red-cockaded woodpecker. We also
propose to conduct a search for gopher tortoise burrows in the same areas. Note that our cost estimate
assumes that approximately 500 acres will be surveyed. Should it become necessary to expand these
surveys, costs would be revisited.
We also propose to write letters to regulatory agencies and stakeholders seeking information on the
resources of interest and any specific agency concerns, and place these letters and responses in an
appendix to the SEA. The content of these letters would be reviewed by Environmental Division staff
and the letters would go out under Fort Gordon letterhead.
Cost Estimate
The Time and Materials cost estimate for conducting the described scope of work under the proposed
schedule is $49,977. The cost estimate includes the following items:
The items described previously, in the Proposed Technical Approach
Delivery of a Draft SEA for comment
Incorporation of comments on the Draft SEA and delivery of a PDF file of the Final ER.
Our estimate assumes that no face-to-face meetings will be necessary, that any issues that arise can be
dealt with by phone or e-mail. It assumes further that resource reports prepared by Southeastern
Environmental Solutions, Inc. (wetlands), R.S. Webb & Associates (historic and archaeological sites), and
L.L. “Chick” Gaddy (endangered species) are comprehensive and technically sound, and no additional
investigations or surveys will be necessary, other than the red-cockaded woodpecker and gopher tortoise
surveys described in the Proposed Technical Approach section.
Attachment number 1Page 6 of 19
Use or disclosure of data contained in this proposal or quotation shall not be disclosed outside of ZEL Engineers
AIK-09-0320
August 10, 2009
Mr. Jorge E. Jimenez, PE
Page 5 of 12
Tetra Tech NUS, Inc.
900 Trail Ridge Road, Aiken, SC 29803
Tel: 803.649.7963 Fax: 803.642-8454 www.tetratech.com
Proposed Schedule
Tetra Tech is prepared to begin work as shown in the proposed schedule. Any delay in the contract
signature and Notice to Proceed would result in a shifting of the deliverable due dates commensurate with
the change in the start date.
Below is a proposed schedule for the project. Tetra Tech believes this schedule is very aggressive, but
achievable. The draft schedule includes items required from ZEL Engineers in order for us to meet the
schedule for Tetra Tech deliverables. All dates are 2009.
Date Responsibility Item
Aug 17 ZEL Engineers Contract Signed, Notice to Proceed
Provided
Aug 18 Tetra Tech Internal TT Kick-Off Meeting
Aug 19 Tetra Tech TT to Deliver Data Request to Fort Gordon
and ZEL Engineers
Aug 20 Tetra Tech Scoping Letters sent to Fort Gordon for
approval and Signature
Aug 21 Tetra Tech Scoping Letters sent to agencies
Sept 14 Tetra Tech Deliver Draft SEA and draft FONSI to ZEL
Engineers, Augusta Utilities and Fort Gordon
Sept 23 Fort Gordon, ZEL
Engineers, Augusta
Utilities
Deliver comments to TT
Sept 30 Tetra Tech Deliver Final SEA and draft FONSI to
ZEL Engineers, Augusta Utilities, and Fort
Gordon
Oct 1 Tetra Tech Letters sent to Fort Gordon for
approval and Signature to send Final EA to
agencies/Public announcement published in
Augusta Chronicle
Oct 2 Tetra Tech Final SEA and Draft FONSI sent to agencies
for 30-day comment period
Nov 16 Tetra Tech Address any public comments and finalize
FONSI
We look forward to providing environmental support for this interesting project. Should you have any
questions concerning this proposal, please contact Kristi Hagood at 803-641-4959. Should you have any
questions regarding contractual obligations, please contact me at (803) 641-6316 as the authorized
representative for Tetra Tech.
Attachment number 1Page 7 of 19
Use or disclosure of data contained in this proposal or quotation shall not be disclosed outside of ZEL Engineers
AIK-09-0320
August 10, 2009
Mr. Jorge E. Jimenez, PE
Page 6 of 12
Tetra Tech NUS, Inc.
900 Trail Ridge Road, Aiken, SC 29803
Tel: 803.649.7963 Fax: 803.642-8454 www.tetratech.com
Sincerely,
James L. Oliver
Aiken Operations Manager
Attachments:
Proposed Outline for the Environmental Report
Commendation Letter from Client for Chicago Solar Facility ER
Tetra Tech Project Organizational Chart
Tetra Tech NUS Inc. Standard Conditions
cc: PNUS-019952
Attachment number 1Page 8 of 19
PROPOSED OUTLINE FOR THE ENVIRONMENTAL ASSESSMENT
EXECUTIVE SUMMARY
TABLE OF CONTENTS
ACRONYMS AND ABBREVIATIONS
1. PURPOSE, NEED AND SCOPE
1.1. BACKGROUND
1.2. PURPOSE AND NEED FOR THE PROPOSED ACTION
1.3. DECISION TO BE MADE
1.4. PROJECT SCOPING AND PUBLIC INVOLVEMENT
1.4.1. PROJECT PLANNING MEETINGS
1.4.2. SCOPING LETTER
1.4.3. PUBLIC PARTICIPATION PROCESS
1.4.4. KEY ISSUES TO ADDRES IN THIS EA
1.5. SCOPE OF THIS EA
1.6. SUMMARY OF ENVIRONMENTAL COMPLIANCE REQUIREMENTS
2. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES
2.1. DESCRIPTION OF THE PROPOSED ACTION
2.2. ALTERNATIVES CONSIDERED IN THIS EA
2.3. ALTERNATIVES SCREENING PROCESS
2.4. PREFERRED ALTERNATIVE
3. AFFECTED ENVIRONMENT & CONSEQUENCES
3.1. ASSESSING IMPACTS
3.1.1. GENERAL INFORMATION
3.1.2. TYPES OF IMPACTS
3.1.3. INTENSITY OF IMPACT (Significance Thresholds)
3.1.4. SOURCES OF INFORMATION AND ANALYSIS
3.1.5. LIMITING THE IMPACT ANALYSIS (some of the following categories could be moved
under “Limiting the Impact Analysis” if full discussions are not warranted)
3.2. NOISE EFFECTS
3.3. LAND USE & VISUAL RESOURCES
3.4. AIR QUALITY
3.5. GEOLOGY & SOILS
3.6. WETLANDS RESOURCES
3.7. WATER QUALITY
3.8. BIOLOGICAL RESOURCES
3.9. CULTURAL RESOURCES
3.10. SOCIOECONOMICS & ENVIRONMENTAL JUSTICE
3.11. INFRASTRUCTURE & UTILITIES
3.12. HAZARDOUS SUBSTANCES
4. CUMULATIVE IMPACTS
Attachment number 1Page 9 of 19
5. SUMMARY AND RECOMMENDATIONS
5.1. FINDINGS AND RECOMMENDATIONS
5.2. SELECTED ALTERNATIVE
5.3. IMPACT REDUCTION MEASURES FOR THE SELECTED ALTERNATIVE
5.4. BEST MANAGEMENT PRACTICES
6. REFERENCES
7. LIST OF PREPARERS
8. LIST OF AGENCIES CONTACTED
APPENDIX A AGENCY/STAKEHOLDER CORRESPONDENCE
(additional appendices as required)
Attachment number 1Page 10 of 19
Commendation letter from Client for Chicago Solar Facility ER
Attachment number 1Page 11 of 19
TETRA TECH PROJECT ORGANIZATIONAL CHART
Proposed Action and
Alternatives
• Kristi Hagood
Cumulative Impacts
• Kristi Hagood
Noise Effects
• Kristi Hagood
Air Quality
• Derrick Haltiwanger
Cultural Resources
• Kathy Roxlau
Water Quality
• Philip Moore
Biological Resources
• Philip Moore
• Mike Whitten
Wetlands Resources
• Kristi Hagood
Socioeconomics &
Environmental Justice
•Emily McRee
Infrastructure & Utilities
• Mary Hoganson
Geology & Soils
• David Watkins
Land Use/Visual
Resources
•Emily McRee
• Matthew Neet
Hazardous
Substances
• Derrick Haltiwanger
GIS
• Matthew Neet
Technical Leads
Tetra Tech
Project Manager
Kristi Hagood
Line Manager
James L. Oliver
ZEL Engineers/
Augusta Utilities/
Fort Gordon
Proposed Action and
Alternatives
• Kristi Hagood
Cumulative Impacts
• Kristi Hagood
Noise Effects
• Kristi Hagood
Air Quality
• Derrick Haltiwanger
Cultural Resources
• Kathy Roxlau
Water Quality
• Philip Moore
Biological Resources
• Philip Moore
• Mike Whitten
Wetlands Resources
• Kristi Hagood
Socioeconomics &
Environmental Justice
•Emily McRee
Infrastructure & Utilities
• Mary Hoganson
Geology & Soils
• David Watkins
Land Use/Visual
Resources
•Emily McRee
• Matthew Neet
Hazardous
Substances
• Derrick Haltiwanger
GIS
• Matthew Neet
Technical Leads
Tetra Tech
Project Manager
Kristi Hagood
Line Manager
James L. Oliver
ZEL Engineers/
Augusta Utilities/
Fort Gordon
Attachment number 1Page 12 of 19
TETRA TECH NUS, INC. STANDARD CONDITIONS
1. SERVICES. TETRA TECH NUS, INC. shall provide professional
services in accordance with the agreed upon scope of work.
2. EXECUTION. This Agreement becomes effective upon signatures by
authorized representatives of the Client and TETRA TECH NUS, INC. and
upon receipt by TETRA TECH NUS, INC. of a signed original or facsimile
transmittal. If facsimile transmittal is initially sent to TETRA TECH NUS,
INC., Client will provide TETRA TECH NUS, INC. with a signed original for
record as soon as practicable.
3. INITIATION. TETRA TECH NUS, INC. is authorized to proceed with
services upon receipt of an executed Agreement or written Notice to
Proceed.
4. COMPLETION/TERMINATION. This Agreement shall remain in
force until completion and acceptance of the services or until terminated
by mutual agreement. This contract may be terminated by the Client
and/or TETRA TECH NUS, INC. upon 10 days written notice. In the event
of such termination, TETRA TECH NUS, INC. will be paid the portion of
the compensation (and fixed fee, if applicable) for services performed in
accordance with the scope of services under the terms of this Agreement to
the date of termination together with all costs arising out of such
termination.
Continuing Service Agreements shall be reviewed annually for rates and
shall remain in force until terminated in writing by either party, or
otherwise stipulated contractually.
5. STANDARD OF CARE. Services provided by TETRA TECH NUS,
INC. under this Agreement will be performed in a manner consistent with
that degree of care and skill ordinarily exercised by members of the same
profession currently practicing under similar circumstances. TETRA
TECH NUS, INC. makes no warranty or guaranty, either express or
implied.
6. INDEPENDENT CONSULTANT. TETRA TECH NUS, INC. is and
shall be at all times during the term of this Agreement an independent
consultant and not an employee or agent of the Client.
7. COMPLIANCE WITH LAWS. TETRA TECH NUS, INC. will endeavor
to comply with Federal, State, and local laws and ordinances applicable to
the services to be provided under this Agreement.
8. PAYMENT TERMS / COLLECTION COSTS. TT NUS shall be
compensated in accordance with TT NUS’ Proposal and the terms of this Article.
TT NUS’ invoices are rendered monthly and are payable upon receipt. Payment
shall be made to the following address: Tetra Tech NUS, Inc., Department
1624, Denver, CO 80291-1624. Interest shall accrue at the rate of two percent
(2%) over prevailing prime rate shall be charged on a monthly basis (or the
maximum percentage allowed by law, whichever is less) on any amounts not
paid within thirty (30) days of invoice submittal. In the event legal action is
necessary to enforce the payment provisions of this Agreement if Client
fails to make payment within sixty (60) days of the invoice date, TETRA
TECH NUS, INC. shall be entitled to collect from the Client any judgment
or settlement sums due, reasonable attorneys' fees, court costs and
expenses incurred by TETRA TECH NUS, INC. in connection therewith
and, in addition, the reasonable value of TETRA TECH NUS, INC.'s time
and expenses spent in connection with such collection action, computed
at TETRA TECH NUS, INC.'s prevailing fee schedule and expense policies.
9. OWNERSHIP OF DOCUMENTS. Drawings, specifications, reports,
programs, manuals, or other documents, including all documents on
electronic media, prepared under this Agreement are instruments of
service and are, and shall remain, the property of TETRA TECH NUS, INC..
TETRA TECH NUS, INC. will retain all common law, statutory, and other
reserved rights, including the copyright thereto. TETRA TECH NUS, INC.
shall not be held liable for reuse of documents or modifications thereof by
the Client or its representatives for any purpose other than the original
intent of this Agreement, without written authorization of and appropriate
compensation to TETRA TECH NUS, INC..
10. SITE VISITS/OBSERVATION. If included in the Scope of Work,
TETRA TECH NUS, INC. shall visit the project and/or construction site at
appropriate intervals to become generally familiar with the progress,
quality of work (contractors' work), and to determine if the work is
proceeding in general accordance with the Contract Documents. Visits to
the project site and observations made by TETRA TECH NUS, INC. as part
of services during construction under Agreement shall not make TETRA
TECH NUS, INC. responsible for, nor relieve the construction contractor(s)
of the obligation to conduct comprehensive monitoring of the work
sufficient to ensure conformance with the intent of the Contract
Documents, and shall not make TETRA TECH NUS, INC. responsible for,
nor relieve the construction contractor(s) of the full responsibility for all
construction means, methods, techniques, sequences, and procedures
necessary for coordinating and completing all portions of the work under
the construction contract(s) and for all safety precautions incidental
thereto.
11. EQUAL OPPORTUNITY EMPLOYMENT. TETRA TECH NUS, INC.
will comply with federal regulations pertaining to Equal Opportunity
Employment. TETRA TECH NUS, INC. is in compliance with applicable
local, state, and federal regulations concerning minority hiring. It is
TETRA TECH NUS, INC.'s policy to ensure that applicants and employees
are treated equally without regard to race, creed, sex, age, color, religion,
veteran status, ancestry, citizenship status, national origin, marital status,
sexual orientation, or disability. TETRA TECH NUS, INC. expressly
assures all employees, applicants for employment, and the community of
its continuous commitment to equal opportunity and fair employment
practices.
TETRA TECH NUS, INC.'s equal opportunity employment policy applies to
all phases of employment, including recruiting, hiring, job assignment,
supervision, training, upgrading, transfer, compensation, benefits,
promotion, education, recreation, layoff and termination.
12. INSURANCE. TETRA TECH NUS, INC. will maintain the following
levels of insurance during the term of this Agreement. The Client will be
named as an additional insured on the Commercial General Liability and
Automobile Liability insurance policies.
a. Worker's Compensation (and Employer's Liability Insurance) —
as required by applicable state statute.
b. Commercial General Liability — $1,000,000 per occurrence for
bodily injury, including death and property damage, and
$2,000,000 in the aggregate.
c. Automobile Liability — minimum of $1,000,000 combined
single limit for bodily injury and property damage.
d. Professional Liability (E&O) and Professional Pollution Liability
and Contractors’ Pollution Liability — $1,000,000 each claim
and in the aggregate.
13. INDEMNIFICATION/HOLD HARMLESS. TETRA TECH NUS, INC.
shall indemnify and hold harmless the Client and its employees from any
liability, settlements, loss, or costs (including reasonable attorneys’ fees
and costs of defense) to the extent caused by TETRA TECH NUS, INC.’s
negligent acts, errors, or omissions in services provided pursuant to this
Agreement. Provided, however, that if any such liability, settlements, loss,
or costs result from the concurrent negligence of TETRA TECH NUS, INC.
and the Client, this indemnification applies only to the extent of the
negligence of TETRA TECH NUS, INC..
14. LIMITATION OF LIABILITY. In recognition of the relative risks and
benefits of the project to both the Client and TETRA TECH NUS, INC., the
risks have been allocated such that the Client agrees, to the fullest extent
permitted by law, to limit the liability of TETRA TECH NUS, INC. and its
subconsultants to the Client and to all construction contractors and
subcontractors on the project for any and all claims, losses, costs,
damages of any nature whatsoever or claims expenses from any cause or
causes, so that the total aggregate liability of TETRA TECH NUS, INC. and
its subconsultants to all those named shall not exceed $250,000 or the
amount of TETRA TECH NUS’ total fee paid by the Client for services
under this Agreement, whichever is the greater. Such claims and causes
include, but are not limited to negligence, professional errors or omissions,
strict liability, breach of contract or warranty.
15. SPECIAL, INDIRECT or CONSEQUENTIAL DAMAGES. Tetra Tech
NUS and its employees shall in no event be liable for any special, indirect
or consequential damages, including specifically but without limitation, any
based on loss of profits or revenue, loss of or interference, whether or not by
third parties, with full or partial use of any equipment, facility or property,
including real property, cost of replacement power, energy or product, delay
in or failure to perform or to obtain permits or approvals, cost of capital, loss
of goodwill, claims of customers, fines or penalties assessed against client or
similar damages. These terms provide allocations of risk and reward
consistent with the nature and extent of the Services and to that end include
(i) protections against, and limitations on, liability of Tetra Tech NUS and (ii)
specific remedies of Client which shall be its sole and exclusive remedies.
The allocations, shall survive this contract and apply to the fullest extent
allowed by law irrespective of whether liability of Tetra Tech NUS is claimed,
or found, to be based in contract, tort or otherwise (including negligence,
warranty, indemnity and strict liability) and Client hereby waives all rights of
recovery and assumes all risks beyond those explicitly allocated to Tetra
Tech NUS herein.
16. FORCE MAJEURE. Neither party shall be considered in default in
the performance of its obligations hereunder to the extent that the
performance of such obligations is prevented or delayed by any cause
which is beyond the reasonable control of the affected party, and the time
for performance of either party hereunder shall in such event be extended
Attachment number 1Page 13 of 19
for a period equal to any time lost as a result thereof, and an equitable
adjustment shall be made to Tetra Tech NUS’ compensation.
17. DISPUTES. Any action for claims arising out of or relating to this
Agreement and/or respective services shall be governed by the laws of the
State of CA. Venue shall be in Los Angeles County Superior Court.
Mediation is an express condition precedent to the filing of any legal
action. Unless the parties agree otherwise, the mediation shall be
conducted pursuant to the Construction Mediation Rules of the American
Arbitration Association.
18. ATTORNEY FEES. Should there be any suit or action instituted to
enforce any right granted in this contract, the substantially prevailing
party shall be entitled to recover its costs, disbursements and reasonable
attorney fees from the other party. The party who is awarded a net
recovery against the other shall be deemed the substantially prevailing
party unless such other party has previously made a bona fide offer of
payment in settlement and the amount of recovery is the same or less than
the amount offered in settlement. Reasonable attorney fees may be
recovered regardless of the forum in which the dispute is heard, including
an appeal.
Attachment number 1Page 14 of 19
Attachment number 1Page 15 of 19
Use or disclosure of data contained in this proposal or quotation shall not be disclosed outside of ZEL Engineers
AIK-10-0072
February 26, 2010
Mr. Wes Byne, PE
Page 2 of 4
Tetra Tech NUS, Inc.
900 Trail Ridge Road, Aiken, SC 29803
Tel: 803.649.7963 Fax: 803.642-8454 www.tetratech.com
The Time and Materials cost estimate for conducting the described scope of work under the proposed
schedule is $9,206. The cost estimate assumes that no revisions to the SEA will be necessary.
Below is a proposed schedule for the project. Tetra Tech believes this schedule is very aggressive, but
achievable. The draft schedule includes items required from ZEL Engineers in order for us to meet the
schedule for Tetra Tech deliverables. All dates are 2009.
Date Responsibility
March 3
Item
ZEL Engineers Contract Signed, Notice to Proceed
Provided
March 15 Tetra Tech Draft response submitted to ZEL Engineers and
Fort Gordon
March 17 ZEL Engineers and
Fort Gordon
Submit comments to Tetra Tech for incorporation
into response
March 22 Tetra Tech Deliver final response to ZEL Engineer and Fort
Gordon
We look forward to providing environmental support for this project. Should you have any questions
concerning this proposal, please contact Kristi Hagood at 803-641-4959. Should you have any questions
regarding contractual obligations, please contact me at (803) 641-6316 as the authorized representative
for Tetra Tech.
Sincerely,
James L. Oliver
Aiken Operations Manager
Attachments:
Tetra Tech NUS Inc. Standard Conditions
cc: 112C02377
Attachment number 1Page 16 of 19
TETRA TECH NUS, INC. STANDARD CONDITIONS
1. SERVICES. TETRA TECH NUS, INC. shall provide professional
services in accordance with the agreed upon scope of work.
2. EXECUTION. This Agreement becomes effective upon signatures by
authorized representatives of the Client and TETRA TECH NUS, INC. and
upon receipt by TETRA TECH NUS, INC. of a signed original or facsimile
transmittal. If facsimile transmittal is initially sent to TETRA TECH NUS,
INC., Client will provide TETRA TECH NUS, INC. with a signed original for
record as soon as practicable.
3. INITIATION. TETRA TECH NUS, INC. is authorized to proceed with
services upon receipt of an executed Agreement or written Notice to
Proceed.
4. COMPLETION/TERMINATION. This Agreement shall remain in
force until completion and acceptance of the services or until terminated
by mutual agreement. This contract may be terminated by the Client
and/or TETRA TECH NUS, INC. upon 10 days written notice. In the event
of such termination, TETRA TECH NUS, INC. will be paid the portion of
the compensation (and fixed fee, if applicable) for services performed in
accordance with the scope of services under the terms of this Agreement to
the date of termination together with all costs arising out of such
termination.
Continuing Service Agreements shall be reviewed annually for rates and
shall remain in force until terminated in writing by either party, or
otherwise stipulated contractually.
5. STANDARD OF CARE. Services provided by TETRA TECH NUS,
INC. under this Agreement will be performed in a manner consistent with
that degree of care and skill ordinarily exercised by members of the same
profession currently practicing under similar circumstances. TETRA
TECH NUS, INC. makes no warranty or guaranty, either express or
implied.
6. INDEPENDENT CONSULTANT. TETRA TECH NUS, INC. is and
shall be at all times during the term of this Agreement an independent
consultant and not an employee or agent of the Client.
7. COMPLIANCE WITH LAWS. TETRA TECH NUS, INC. will endeavor
to comply with Federal, State, and local laws and ordinances applicable to
the services to be provided under this Agreement.
8. PAYMENT TERMS / COLLECTION COSTS. TT NUS shall be
compensated in accordance with TT NUS’ Proposal and the terms of this
Article. TT NUS’ invoices are rendered monthly and are payable upon
receipt.
- Interest shall accrue at
the rate of two percent (2%) over prevailing prime rate shall be charged on a
monthly basis (or the maximum percentage allowed by law, whichever is less)
on any amounts not paid within thirty (30) days of invoice submittal. In the
event legal action is necessary to enforce the payment provisions of this
Agreement if Client fails to make payment within sixty (60) days of the
invoice date, TETRA TECH NUS, INC. shall be entitled to collect from the
Client any judgment or settlement sums due, reasonable attorneys' fees,
court costs and expenses incurred by TETRA TECH NUS, INC. in
connection therewith and, in addition, the reasonable value of TETRA
TECH NUS, INC.'s time and expenses spent in connection with such
collection action, computed at TETRA TECH NUS, INC.'s prevailing fee
schedule and expense policies.
9. OWNERSHIP OF DOCUMENTS. Drawings, specifications, reports,
programs, manuals, or other documents, including all documents on
electronic media, prepared under this Agreement are instruments of
service and are, and shall remain, the property of TETRA TECH NUS, INC..
TETRA TECH NUS, INC. will retain all common law, statutory, and other
reserved rights, including the copyright thereto. TETRA TECH NUS, INC.
shall not be held liable for reuse of documents or modifications thereof by
the Client or its representatives for any purpose other than the original
intent of this Agreement, without written authorization of and appropriate
compensation to TETRA TECH NUS, INC..
10. SITE VISITS/OBSERVATION. If included in the Scope of Work,
TETRA TECH NUS, INC. shall visit the project and/or construction site at
appropriate intervals to become generally familiar with the progress,
quality of work (contractors' work), and to determine if the work is
proceeding in general accordance with the Contract Documents. Visits to
the project site and observations made by TETRA TECH NUS, INC. as part
of services during construction under Agreement shall not make TETRA
TECH NUS, INC. responsible for, nor relieve the construction contractor(s)
of the obligation to conduct comprehensive monitoring of the work
sufficient to ensure conformance with the intent of the Contract
Documents, and shall not make TETRA TECH NUS, INC. responsible for,
nor relieve the construction contractor(s) of the full responsibility for all
construction means, methods, techniques, sequences, and procedures
necessary for coordinating and completing all portions of the work under
the construction contract(s) and for all safety precautions incidental
thereto.
11. EQUAL OPPORTUNITY EMPLOYMENT. TETRA TECH NUS, INC.
will comply with federal regulations pertaining to Equal Opportunity
Employment. TETRA TECH NUS, INC. is in compliance with applicable
local, state, and federal regulations concerning minority hiring. It is
TETRA TECH NUS, INC.'s policy to ensure that applicants and employees
are treated equally without regard to race, creed, sex, age, color, religion,
veteran status, ancestry, citizenship status, national origin, marital status,
sexual orientation, or disability. TETRA TECH NUS, INC. expressly
assures all employees, applicants for employment, and the community of
its continuous commitment to equal opportunity and fair employment
practices.
TETRA TECH NUS, INC.'s equal opportunity employment policy applies to
all phases of employment, including recruiting, hiring, job assignment,
supervision, training, upgrading, transfer, compensation, benefits,
promotion, education, recreation, layoff and termination.
12. INSURANCE. TETRA TECH NUS, INC. will maintain the following
levels of insurance during the term of this Agreement. The Client will be
named as an additional insured on the Commercial General Liability and
Automobile Liability insurance policies.
a. Worker's Compensation (and Employer's Liability Insurance) —
as required by applicable state statute.
b. Commercial General Liability — $1,000,000 per occurrence for
bodily injury, including death and property damage, and
$2,000,000 in the aggregate.
c. Automobile Liability — minimum of $1,000,000 combined
single limit for bodily injury and property damage.
d. Professional Liability (E&O) and Professional Pollution Liability
and Contractors’ Pollution Liability — $1,000,000 each claim
and in the aggregate.
13. INDEMNIFICATION/HOLD HARMLESS. TETRA TECH NUS, INC.
shall indemnify and hold harmless the Client and its employees from any
liability, settlements, loss, or costs (including reasonable attorneys’ fees
and costs of defense) to the extent caused by TETRA TECH NUS, INC.’s
negligent acts, errors, or omissions in services provided pursuant to this
Agreement. Provided, however, that if any such liability, settlements, loss,
or costs result from the concurrent negligence of TETRA TECH NUS, INC.
and the Client, this indemnification applies only to the extent of the
negligence of TETRA TECH NUS, INC..
14. LIMITATION OF LIABILITY. In recognition of the relative risks and
benefits of the project to both the Client and TETRA TECH NUS, INC., the
risks have been allocated such that the Client agrees, to the fullest extent
permitted by law, to limit the liability of TETRA TECH NUS, INC. and its
subconsultants to the Client and to all construction contractors and
subcontractors on the project for any and all claims, losses, costs,
damages of any nature whatsoever or claims expenses from any cause or
causes, so that the total aggregate liability of TETRA TECH NUS, INC. and
its subconsultants to all those named shall not exceed $250,000 or the
amount of TETRA TECH NUS’ total fee paid by the Client for services
under this Agreement, whichever is the greater. Such claims and causes
include, but are not limited to negligence, professional errors or omissions,
strict liability, breach of contract or warranty.
15. SPECIAL, INDIRECT or CONSEQUENTIAL DAMAGES. Tetra Tech
NUS and its employees shall in no event be liable for any special, indirect
or consequential damages, including specifically but without limitation, any
based on loss of profits or revenue, loss of or interference, whether or not by
third parties, with full or partial use of any equipment, facility or property,
including real property, cost of replacement power, energy or product, delay
in or failure to perform or to obtain permits or approvals, cost of capital, loss
of goodwill, claims of customers, fines or penalties assessed against client or
similar damages. These terms provide allocations of risk and reward
consistent with the nature and extent of the Services and to that end include
(i) protections against, and limitations on, liability of Tetra Tech NUS and (ii)
specific remedies of Client which shall be its sole and exclusive remedies.
The allocations, shall survive this contract and apply to the fullest extent
allowed by law irrespective of whether liability of Tetra Tech NUS is claimed,
or found, to be based in contract, tort or otherwise (including negligence,
warranty, indemnity and strict liability) and Client hereby waives all rights of
recovery and assumes all risks beyond those explicitly allocated to Tetra
Tech NUS herein.
16. FORCE MAJEURE. Neither party shall be considered in default in
the performance of its obligations hereunder to the extent that the
performance of such obligations is prevented or delayed by any cause
which is beyond the reasonable control of the affected party, and the time
for performance of either party hereunder shall in such event be extended
Attachment number 1Page 17 of 19
Use or disclosure of data contained in this proposal or quotation shall not be disclosed outside of ZEL Engineers
Tetra Tech NUS, Inc.
900 Trail Ridge Road, Aiken, SC 29803
Tel: 803.649.7963 Fax: 803.642-8454 www.tetratech.com
for a period equal to any time lost as a result thereof, and an equitable
adjustment shall be made to Tetra Tech NUS’ compensation.
17. DISPUTES. Any action for claims arising out of or relating to this
Agreement and/or respective services shall be governed by the laws of the
State of CA. Venue shall be in Los Angeles County Superior Court.
Mediation is an express condition precedent to the filing of any legal
action. Unless the parties agree otherwise, the mediation shall be
conducted pursuant to the Construction Mediation Rules of the American
Arbitration Association.
18. ATTORNEY FEES. Should there be any suit or action instituted to
enforce any right granted in this contract, the substantially prevailing
party shall be entitled to recover its costs, disbursements and reasonable
attorney fees from the other party. The party who is awarded a net
recovery against the other shall be deemed the substantially prevailing
party unless such other party has previously made a bona fide offer of
payment in settlement and the amount of recovery is the same or less than
the amount offered in settlement. Reasonable attorney fees may be
recovered regardless of the forum in which the dispute is heard, including
an appeal.
Attachment number 1Page 18 of 19
Attachment number 1Page 19 of 19
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Approve Change Order #21 CBWDC
Department:Public Services Department - Facilities Management Division
Caption:Approve Change Order No. 21 in the amount of $90,794.00 to the
Construction Contract for the Webster Detention Center (WDC) Expansion.
This Change Order also includes a contract time extension of 62 days for
increase in scope of work with no extended overhead charges. The revised
contract amount is $33,814,805.03.
Background:The current $33.5M Contract with McKnight Construction to construct
additions to the Detention Center was approved by the Commission on
November 5, 2008, and significantly altered by the addition of the Female
Pod (Change Order No. 1) shortly thereafter. Subsequent, additional
Change Orders have been approved since that time necessary for on-going
construction and enhanced functionality of the Webster Detention Center.
This Change Order enhances the project as follows: 1. Installs polished
concrete flooring in F Pod Dayrooms, in lieu of VCT; 2. Adds sealer to the
concrete floors in all of the cells in F Pod; 3. Changes the finish material
from plastic laminate to stainless steel on the video visitation stations in all
of the pods.; 4. Gives a credit for deleting the painting in the chase areas of
Buildings F and G TOTAL OF CHANGE ORDER #21 IS $90,794.00
Upon approval of this change order, total spending on project change orders
would be at 31% of the contingency budget or 2% of the initial, total
construction budget, which is well within budget and industry standards for
a detention center of this complexity. The revised contract amount is
$33,814,805.03.
Analysis:This Change Order consists of five major items, each recommended as
noted: 1. Replace VCT with polished and sealed concrete: ($29,416.59)
Replace the VCT floor finish in 5 day rooms with polished concrete. 2.
Replace exposed concrete with sealed concrete ($45,457.41) Replace
exposed concrete with sealed concrete in the cells on the first floor of the
Female Pod and on the second floor of the Female, Male and MMH Pods. 3.
Changes the finish material from plastic laminate to stainless steel
($40,120.00) Changes the finish material from plastic laminate to stainless
steel on the video visitation stations in all of the pods. 4. Gives a credit back
to the Owner (-$24,200). Gives a credit back to the Owner for deleting the
painting in the chase areas of Buildings F and G 5. Increased scope of work
days: (62 days). This item adds 62 days to the Construction Contract
schedule as allowed per Contract Documents because of increase of scope of
work as required by the above items.
Financial Impact:
This Change Order will increase McKnight’s Construction Contract amount
by $90,794.00. The Change Order will be funded by the project’s
Cover Memo
construction change order contingency, which retains ample funds for
future, unforeseen changes.
Alternatives:1. Approve Change Order No. 21 in the amount of $90,794.00 to the
Construction Contract for the Webster Detention Center (WDC) Expansion.
This Change Order also includes a contract time extension of 62 days for
increase in scope of work with no extended overhead charges. The revised
contract amount is $33,814,805.03. 2. Do not approve the Change Order.
Recommendation:#1. Approve Change Order No. 21 in the amount of $90,794.00 to the
Construction Contract for the Webster Detention Center (WDC) Expansion.
This Change Order also includes a contract time extension of 62 days for
increase in scope of work with no extended overhead charges. The revised
contract amount is $33,814,805.03.
Funds are Available in
the Following
Accounts:
FUNDS ARE AVAILABLE IN ACCOUNT: Jail Expansion: GL – 325-05-
1130/206351101 GL - 325-05-1120/208251101
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 1
Attachment number 2Page 1 of 1
Attachment number 3Page 1 of 40
Attachment number 3Page 2 of 40
Attachment number 3Page 3 of 40
Attachment number 3Page 4 of 40
Attachment number 3Page 5 of 40
Attachment number 3Page 6 of 40
Attachment number 3Page 7 of 40
Attachment number 3Page 8 of 40
Attachment number 3Page 9 of 40
Attachment number 3Page 10 of 40
Attachment number 3Page 11 of 40
Attachment number 3Page 12 of 40
Attachment number 3Page 13 of 40
Attachment number 3Page 14 of 40
Attachment number 3Page 15 of 40
Attachment number 3Page 16 of 40
Attachment number 3Page 17 of 40
Attachment number 3Page 18 of 40
Attachment number 3Page 19 of 40
Attachment number 3Page 20 of 40
Attachment number 3Page 21 of 40
Attachment number 3Page 22 of 40
Attachment number 3Page 23 of 40
Attachment number 3Page 24 of 40
Attachment number 3Page 25 of 40
Attachment number 3Page 26 of 40
Attachment number 3Page 27 of 40
Attachment number 3Page 28 of 40
Attachment number 3Page 29 of 40
Attachment number 3Page 30 of 40
Attachment number 3Page 31 of 40
Attachment number 3Page 32 of 40
Attachment number 3Page 33 of 40
Attachment number 3Page 34 of 40
Attachment number 3Page 35 of 40
Attachment number 3Page 36 of 40
Attachment number 3Page 37 of 40
Attachment number 3Page 38 of 40
Attachment number 3Page 39 of 40
Attachment number 3Page 40 of 40
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Approve Judicial Center Change Order #15
Department:Public Services Department - Facilities Management Division
Caption:Approve Change Order #15 on the Augusta Judicial Center and John H.
Ruffin Courthouse in the amount of $66,588.00 for unforeseen undercut
work on sub-surface conditions on the west side of the Augusta Judicial
Center site along 10th Street between Talcot & Fenwick Streets.
Background:Graves Engineering services required removal of unsuitable materials from
the parking & roadway area parallel to 10th Street. Area was undercut down
to suitable soils and backfilled with select imported fill. Removal and
backfill of soils was observed and documented by Graves Engineering as the
Owner’s Geotechnical Engineer. Construction of the new Judicial Center
Facility is located in an urban setting in an older city, thus knowledge of
existing underground conditions was not possible to ascertain before actual
construction activity on the site.
Analysis:The proposed Change Order #15 and associated costs have been reviewed,
recommended and signed off by Turner Associates Architects and Potts
Construction per the contract requirements for acceptance by the Augusta
Richmond County Commission. The items contained in the change order are
all related to unknown and unforeseen underground conditions which have
occurred at below grade conditions discovered during site grading and
underground work.
Financial Impact:The Change Order number total is $66,588.00 Revised contract amount to
date will be $47,517,534.00
Alternatives:1. Approve Change Order #15 on the Augusta Judicial Center and John H
Ruffin Courthouse in the amount of $66,588.00 for unforeseen undercut
work on sub-surface conditions on the West side of the Augusta Judicial
Center site along 10th Street between Talcot & Fenwick Streets . 2. Do not
approve Change Order 15.
Recommendation:Approve Change Order #15 on the Augusta Judicial Center and John H
Ruffin Courthouse in the amount of $66,588.00 for unforeseen undercut
work on sub-surface conditions on the West side of the Augusta Judicial
Center site along 10th Street between Talcot & Fenwick Streets .
Funds are Available in
the Following
Accounts:
FUNDS ARE AVAILABLE IN ACCOUNT: GL –325-05-1120; JL –
209251104 Object Code 5413130.
Cover Memo
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Approve or deny the use of Compressed Natural Gas as the required fuel source for the Solid Waste Collections
Contract.
Department:Solid Waste
Caption:Motion to approve or deny the use of Compressed Natural Gas as the
required fuel source for the Solid Waste Collections Contract. (Referred
from April 1 Commission meeting)
Background:The Augusta Solid Waste Collection Contract expires at the end of 2010. As
such, the Commission is first being asked to decide on a fueling option for
the trash collection vehicles. The landfill currently produces methane gas
which is being sold to an end user in Hephzibah; however the landfill
produces more gas than the current customer can use; and therefore is
exploring a second option for the remaining landfill gas. This gas could be
converted into Compressed Natural Gas (CNG) and used to fuel both fleet
and contract vehicles.
Analysis:This is the first critical decision to be made as it will allow the Solid Waste
Department to move forward with either a Request for Proposals and a new
contract or to exercise the two one-year options on the existing contract. As
the current Solid Waste Collection Contract nears the end of the initial term,
the first option to consider is the fuel source for the trash collection vehicles.
Since the Solid Waste Department could convert the landfill gas into CNG –
this CNG could be required to be used to fuel trash collection vehicles.
Should be Commission choose to produce CNG and use the CNG to fuel the
trash collection vehicles, the Solid Waste Department would need to
exercise the two one-year options on the existing contract. This would allow
for the needed upgrades and installation of the equipment and facility to
produce the gas. Since this is not a simple “off the shelf” purchase and
installation of equipment, the Solid Waste Department would need the
additional time that the options could provide in order to complete the
design and installation of the CNG station. In addition to the design and
installation of the CNG station, the Solid Waste Department would use the
additional two years to develop and evaluate the RFP and negotiate the
contract with the collection company(ies). Should the Commission choose to
not produce CNG and use the gas to fuel the trash collection vehicles; the
Solid Waste Department is poised to discuss with the Commission the
additional details of the upcoming Solid Waste Collection services. These
discussions would include a systematic series of meetings to make decisions
on such things as the expansion of the service area and the level of service
provided to each customer (including the discussions on yard waste and
bulky item services). Addressing the items above and having these
discussions now will allow the solid waste department and the commission
the time necessary to carefully consider each decision and the impact to the
residents/customers.
Cover Memo
Financial Impact:None at this time.
Alternatives:1. Authorize the production and use of CNG at the Solid Waste Facility and
exercise the existing options on the contract. 2. Choose to not produce CNG
and therefore continue discussions about the details of the upcoming Solid
Waste Collections contract.
Recommendation:
Funds are Available in
the Following
Accounts:
None needed at this time.
REVIEWED AND APPROVED BY:
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Award an emergency contract to Atlantic Coast Consulting for the repair and upgrade to the gas collection and control
system.
Department:Solid Waste
Caption:Award an emergency contract to Atlantic Coast Consulting for the repair
and upgrade to the gas collection and control system.
Background:
The Solid Waste Facility currently operates a Gas Collection and Control
System (GCCS) in accordance with requirements set forth by the Georgia
EPD, and the EPA. The GCCS was first installed in 1996 when Augusta was
having issues with methane gas migration on the landfill property. Because
of the amount of trash that was in place at the facility, Augusta reached what
is called “Title V status” and was required to install some sort of collection
system for the landfill gas. Landfill gas is comprised mostly of methane, but
it also contains carbon dioxide – both of which are greenhouse gases and are
harmful to the environment and dangerous if not collected and controlled
appropriately. As Augusta was not well suited to deal with gas, it
contracted out the gas system to a company named, LandGas of Georgia. In
that deal, Augusta gave away the rights to the gas, and LandGas was to
provide environmental compliance for Augusta. In 2005, Augusta initiated
proceedings to get LandGas to perform its services in compliance with Title
V standards. To no avail, Augusta purchased the GCCS system and all gas
rights back from LandGas in January of 2008. Augusta has been working
with the EPD on the environmental issues since 2004. The GCCS is
comprised of three basic components – the extraction points or “wells”; the
gas compression station, and the flare. Between 1996 and 2009, 87 landfill
gas extraction points have been installed in five landfill cells. The wells are
of varying depths depending on the depth of the trash in that particular area
of the landfill. The wells are all linked together by underground piping and
connected to the gas compression station. The compression station has two
large compressors and one small blower. These components provide
constant vacuum on the wells which removes the gas from the landfill and
pushes it either through a pipeline to the Unimin Corporation for use in their
processes or to the flare where it is burned. In order to maintain compliance
with the permit issued by EPD, the system must operate constantly. Since
Augusta purchased the GCCS in 2008, it has taken steps to improve
environmental compliance. Augusta has installed 49 extraction points, 4
condensate sumps, and over 14,000 feet of piping. Augusta worked to
contract CH2M Hill to perform engineering services on the system to
provide a plan for additional corrections. Due to contract negotiations, this
work never occurred. Augusta entered into a consent order with the EPD
on February 15, 2010. Within that order, compliance actions and a timeline
were established. Under item 2 of the order, Augusta must install a new
blower, flare and flow meter to be considered in compliance with the New
Source Performance Standards (NSPS) of the Clean Air Act by September
Cover Memo
14, 2010. Should Augusta not meet the specified timeline, additional fines
and penalties will be assessed.
Analysis:Atlantic Coast Consulting (ACC) currently has a Stand-by Engineering
contract with Augusta. The firm has a vast knowledge of the existing
infrastructure at the landfill; plus, ACC designed the gas system expansion
and provided construction quality assurance on all of the gas system
improvements made since Augusta took over the system in 2005. Further,
under the Stand-by Engineering contract, ACC has initiated key tasks
involved in the design of the new gas collection and control system.
Therefore, to eliminate the learning curve of another firm, and knowing that
ACC has the expertise to provide the design and construction quality
assurance services; it is recommended that ACC provide those services.
Financial Impact:Augusta estimates that this piece of the project will cost $1,250,000. This
money must be bonded to cover the costs of the project.
Alternatives:1. Award an emergency contract to Atlantic Coast Consulting for the repair
and upgrade to the gas collection and control system. 2. Do not award the
contract and jeopardize Augusta's ability to meet the deadlines designated in
the consent order.
Recommendation:Alternative 1.
Funds are Available in
the Following
Accounts:
We are requesting approval to bond the project under a separate agenda
item. That agenda item must be approved, or an alternate source of funding
identified.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Award an emergency contract to Dabbs-Williams General Contractors for the construction/construction management
of the gas collection and control system.
Department:Solid Waste
Caption:Award an emergency contract to Dabbs-Williams General Contractors for
the construction/construction management of the gas collection and control
system.
Background:
The Solid Waste Facility currently operates a Gas Collection and Control
System (GCCS) in accordance with requirements set forth by the Georgia
EPD, and the EPA. The GCCS was first installed in 1996 when Augusta was
having issues with methane gas migration on the landfill property. Because
of the amount of trash that was in place at the facility, Augusta reached what
is called “Title V status” and was required to install some sort of collection
system for the landfill gas. Landfill gas is comprised mostly of methane, but
it also contains carbon dioxide – both of which are greenhouse gases and are
harmful to the environment and dangerous if not collected and controlled
appropriately. As Augusta was not well suited to deal with gas, it
contracted out the gas system to a company named, LandGas of Georgia. In
that deal, Augusta gave away the rights to the gas, and LandGas was to
provide environmental compliance for Augusta. In 2005, Augusta initiated
proceedings to get LandGas to perform its services in compliance with Title
V standards. To no avail, Augusta purchased the GCCS system and all gas
rights back from LandGas in January of 2008. Augusta has been working
with the EPD on the environmental issues since 2004. The GCCS is
comprised of three basic components – the extraction points or “wells”; the
gas compression station, and the flare. Between 1996 and 2009, 87 landfill
gas extraction points have been installed in five landfill cells. The wells are
of varying depths depending on the depth of the trash in that particular area
of the landfill. The wells are all linked together by underground piping and
connected to the gas compression station. The compression station has two
large compressors and one small blower. These components provide
constant vacuum on the wells which removes the gas from the landfill and
pushes it either through a pipeline to the Unimin Corporation for use in their
processes or to the flare where it is burned. In order to maintain compliance
with the permit issued by EPD, the system must operate constantly. Since
Augusta purchased the GCCS in 2008, it has taken steps to improve
environmental compliance. Augusta has installed 49 extraction points, 4
condensate sumps, and over 14,000 feet of piping. Augusta worked to
contract CH2M Hill to perform engineering services on the system to
provide a plan for additional corrections. Due to contract negotiations, this
work never occurred. Augusta entered into a consent order with the EPD
on Febuary 15, 2010. Within that order, compliance actions and timeline
were established. Under item 2 of the order, Augusta must install a new
blower, flare and flow meter so that it complies with NSPS by September
Cover Memo
14, 2010. Should Augusta not meet its timeline, additional fines and
penalties will be assessed.
Analysis:Dabbs-Williams General Contractors is currently under contract with the
Solid Waste Department to construct its maintenance facility. Dabbs-
Williams has provided construction management services and construction
activities of the highest quality. Given the short time allowed to complete
the project, we believe that a construction management approach with a true
general contractor is the best approach in order to receive the best product
and the most efficient use of dollars. The general contractor acting as a
construction manager will be able to bid work to multiple companies to
insure that Augusta is getting a competitive price for the services performed.
The solid waste department is recommending installing some additional
equipment is addition to the blower, flare and flow meter. These additional
items all work to improve our environmental impact at the landfill. The
additional items fix current issues and eliminate potential future problems
that Augusta has with its GCCS. Therefore, we recommend installing new
compressor systems with dehydration, a power generator, well field
isolation piping, additional gas wells, system automation, and some repairs
to the pipeline that feeds the mine.
Financial Impact:Augusta estimates that this piece of the project will cost $7,750,000.
Alternatives:1. Award an emergency contract to Dabbs-Williams for the
construction/construction management of the gas collection and control
system. 2. Do not award the contract
Recommendation:Alternative 1.
Funds are Available in
the Following
Accounts:
Augusta estimates that this piece of the project will cost $7,750,000. This
money must be bonded to cover the costs of the project. We are requesting
approval to bond the project under a separate agenda item. That agenda item
must be approved, or an alternate source of funding identified.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Elderberry, Section III Subdivision Dedication
Department:Engineering-Abie L. Ladson, PE, CPESC
Caption:Approve the deed of dedication, maintenance agreement, and road
resolutions submitted by the Engineering Department for Elderberry,
Section III.
Background:The final plat was approved by the Commission on November 8, 2007 . The
subdivision design and plat, including the storm drain system, have been
reviewed and accepted by our engineering staff and the construction has
been reviewed by our inspectors.
Analysis:This section meets all codes, ordinances and standards. There are no
wetlands or 100-year flood plain boundaries involved in this section.
Financial Impact:By accepting these roads into the County system and after the 18-month
maintenance warranty by the developer/contractor has expired, all future
maintenance and associated costs will be borne by Augusta, Georgia.
Alternatives:1. Approve the deed of dedication, maintenance agreement, and road
resolutions submitted by the Engineering Department for Elderberry,
Section III. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are Available in
the Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 1
Attachment number 2Page 1 of 1
Attachment number 3Page 1 of 3
Attachment number 3Page 2 of 3
Attachment number 3Page 3 of 3
Attachment number 4Page 1 of 2
Attachment number 4Page 2 of 2
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Georgia Power Easement for New Judicial Center
Department:Engineering-Abie L. Ladson, PE, CPESC
Caption:Approve granting Georgia Power an easement for their underground utilities
to provide electrical service to the new Judicial Center and have the
agreement executed by the appropriate City of Augusta official(s).
Background:The Judicial Center is a new facility that is being built and electrical service
will be necessary to operate this facility. Georgia Power has requested an
easement for the underground utilities to service this facility.
Analysis:This easement will allow Georgia Power to provide electrical service to the
new Judicial Center and also allow Georgia Power Company to be able to
maintain this service.
Financial Impact:There will be no financial impact to Augusta Richmond County.
Alternatives:1) Approve granting Georgia Power an easement for their underground
utilities to provide electrical service to the new Judicial Center and have the
agreement executed by the appropriate City of Augusta official(s). 2) Do not
approve and deny electrical service to the new Judicial Center.
Recommendation:Approve Alternative Number One
Funds are Available in
the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 3
Attachment number 1Page 2 of 3
Attachment number 1Page 3 of 3
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Goodrich St. Raw Water Pumping Station
Department:Utilities
Caption:Authorize execution of Change Order # 1 in an amount not to exceed
$127,000.00 to Hagler Systems for additional work on the Goodrich Street
Raw Water Pumping Station contract.
Background:The Augusta Commission authorized Hagler Systems to provide services on
the Goodrich St. Raw Water Pumping Station Improvements Project as the
Mechanical Equipment Integrator on the project. The project includes
adding two large diesel driven pumps and a future electric pump at the Raw
Water Pumping Station. These diesel and electric pumps will have the
capability of pumping raw water from either the Augusta Canal or the
Savannah River. Due to the specialized nature of the work required and the
critical nature of equipment, the mechanical equipment integrator was
necessary for this project.
Analysis:The additional work required included specialized sole plates for the pump
connection to withstand pressures when pumping from the Augusta Canal.
Also the heat exchangers for the cooling system for the diesel engines had to
be installed to meet temperature requirements.
Financial Impact:Funds for the project are included in the 2002 Bond Issue, under account
number 510043410-5425110/80110250-5425110.
Alternatives:No alternatives are recommended.
Recommendation:We recommend the Commission authorize execution of Change Order #1
with Hagler Systems for additional work as the Mechanical Equipment
Integrator for the Goodrich St. Raw Water Pumping Station Improvements
in the amount not to exceed $127,000.00.
Funds are Available in
the Following
Accounts:
510043410-5425110 80110250-5425110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Cover Memo
Law.
Administrator.
Clerk of Commission
Cover Memo
Change Order Number: 1 Date: March 8, 2010
Project Title:
Original Contract Date: Nov. 27, 2008 Project Number:
Owner: P.O. Number: P157539
Contractor: Hagler Systems
The following change order is hereby made to the proposal for the above project:
This change includes modifications to cooling systems for diesel engines and specialized sole
plates for pumps. (See attachment for detailed description.)
TOTAL AMOUNT OF THIS CHANGE ORDER $127,000.00
The Contract time will be Increased/Decreased by 0 calendar days as a result of
this change. The date of completion including this change order is .
Original Contract Amount $410,809.00
Previous Change Order
(Increased / Decreased) $ -0-
This Change Order
(Increased / Decreased) $ 127,000.00
TOTAL CONTRACT WITH CHANGE ORDER(S) $537,809.00
* * * * * * * * * * * * *
Funding Source/Account Number: 510043410-5425110/80110250-5425110
Requested By: Date:
Engineer
Submitted By: Date:
Department Head
Finance Endorsement: Date:
Comptroller
Recommended By: Date:
Administrator
Approved By: Date:
Mayor
Accepted By: Date:
Contractor
Attachment number 1Page 1 of 1
REVISION
REV. DESCRIPTION DATE APPROVED
RELEASED: 10-OCT-2008
LID PROVIDED FOR SPARE PUMP
A
26"
2"
1"
31 1/2"
CLEARANCE FOR PUMP
37.020
6"
0702045-273 ---
3
BLH
UNLESS OTHERWISE SPECIFIED:
9-OCT-2008DRAWN
---REF:
Friday, October 10, 2008 10:29:08 AM
CHECKED
DOCUMENT VERSION DATE:PO BOX 7007
Fax: 803.278.2729
9-OCT-2008
D
C
B
AA
B
C
D
12
DETAIL
BREAK ALL SHARP EDGES .062
THIS DRAWING IS THE SOLE PROPERTY
North Augusta, SC 29860
SCALE: 1:8
THE INFORMATION CONTAINED IN
WHOLE WITHOUT THE WRITTEN
IS PROHIBITED.
PROPRIETARY AND CONFIDENTIAL
DATE NAME
SHEET SIZE
B
DWG NO.
Document File Name:
BLH
REV
SHEET 1 OF 1PERMISSION OF HAGLER SYSTEMS, INC
www.haglersystems.com
7 4
OF HAGLER SYSTEMS, INC. ANY
PROPOSED SOLE PLATE ARRANGMENT
SURFACE FINISH 250
6 3
REPRODUCTION IN PART OR AS A
5
12
8
46857
ALL DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL 1/32"
ANGULAR: MACH 1/2
BEND RADII 0.062"
DECIMALS .X 0.031
.XX 0.010
.XXX 0.002
FILLETS & ROUNDS .062
Phone: 803.278.2728
0702045-273 Sole Plate Gland Assy
2" OF COMPRESSION
36" PIPE 3/4" Wall
GLAND
36" ID X 1" WITH 3/8" HOLE
NEOPRENE 65 DUROMETER
CUSTOM WASHER
COTTER PIN ZINC
COUPLING NUT & THREADED ROD WELDED TO PIPE
ZINC
3/4" NUT ZINC
SCALE 1 : 4
DETAIL A
3/4" JAM NUT ZINC
O-RING GROOVE
O-RING
125
2"
Attachment number 2Page 1 of 1
DATE
C
D
12
B
35786
8 6 5 4 3 27
THE INFORMATION CONTAINED IN
Document File Name:
REV
REPRODUCTION IN PART OR AS A
SCALE: 1:12BREAK ALL SHARP EDGES .062
---
A
C
SURFACE FINISH 250
THIS DRAWING IS THE SOLE PROPERTY
A
B
IS PROHIBITED.
PROPRIETARY AND CONFIDENTIAL
SHEET SIZE
B
DRAWN
Fax: 803.278.2729
DWG NO.
SHEET 1 OF 1
Engine Cooling Water Flow Control
www.haglersystems.com
WHOLE WITHOUT THE WRITTEN
1
PERMISSION OF HAGLER SYSTEMS, INC
4
BLH
0702045-508OF HAGLER SYSTEMS, INC. ANY
BLH
North Augusta, SC 29860
27-FEB-09
Overview
D
UNLESS OTHERWISE SPECIFIED:
27-FEB-09
---REF:
PO BOX 7007DOCUMENT VERSION DATE:
NAME
CHECKED
Friday, February 27, 2009 2:34:51 PM
ALL DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL 1/32"
ANGULAR: MACH 1/2
BEND RADII 0.062"
DECIMALS .X 0.031
.XX 0.010
.XXX 0.002
FILLETS & ROUNDS .062
Phone: 803.278.2728
0702045-508 Extras Heat Exchanger Flow Control
REVISION
REV. DESCRIPTION DATE APPROVED
RELEASED: 27-FEB-09
Total Price Per Unit
$35,371
Total Price (2) Units
$70,742
6" Strainer
$3,291
$5,369
Pressure Switch
$527
Mounting Frame
Clay Valve 10 gpm
Flow Control
$2,263
$1,894
$3,577
Pressure Transducer for Strainer
Shop Assembly
Clay Valve 80 gpm
$1,800
60 $/hr @ 123hrs = $7,380
Flow Control
Clay Valve 285 gpm
Flow Control
Engineering Design
98 hrs @ $125 /2 = $ 6,125
Pipe Fittings & Hardware
$3,145
Attachment number 3Page 1 of 1
8 7 6
1
4 3 2 1
THE INFORMATION CONTAINED IN
REPRODUCTION IN PART OR AS A
BREAK ALL SHARP EDGES .062
Overview
0702045-509 ---
BLH
BLH
UNLESS OTHERWISE SPECIFIED:
27-FEB-09
27-FEB-09DRAWN
REF:---
Friday, February 27, 2009 3:20:30 PM
CHECKED
DOCUMENT VERSION DATE:
8 7
North Augusta, SC 29860
SURFACE FINISH 250
5 2
WHOLE WITHOUT THE WRITTEN
IS PROHIBITED.
PROPRIETARY AND CONFIDENTIAL
DATE NAME
SHEET SIZE
B
DWG NO.REV
SHEET 1 OF 1
Reconfiguring Heat Exchangers - Lower Flow
B
PERMISSION OF HAGLER SYSTEMS, INC SCALE: 1:16
AFax: 803.278.2729
OF HAGLER SYSTEMS, INC. ANY
C
THIS DRAWING IS THE SOLE PROPERTY
D
PO BOX 7007
4
Document File Name:
36
A
C
D
B
www.haglersystems.com
5
ALL DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL 1/32"
ANGULAR: MACH 1/2
BEND RADII 0.062"
DECIMALS .X 0.031
.XX 0.010
.XXX 0.002
FILLETS & ROUNDS .062
Phone: 803.278.2728
0702045-509 Extras Heat Exchanger Rack
Mounting Frame
$1,638
Assembly
48hrs @ 60 $/hr = $2,880
Pressure Transducers (4)
$3,580
Engineering - Reconfiguring For Lower Flow Rate
60 hrs @ 125 $/hr / 2 = $3,750 each
Pipe, Fittings & Hardware
$3,467
RELEASED: 27-FEB-09
REVISION
REV. DESCRIPTION DATE APPROVED
Total Price Per Unit
$15,315
Total Price (2) Untis
$30,630
Attachment number 4Page 1 of 1
Engineering Services Committee Meeting
4/12/2010 12:55 PM
GPC GEA 31201 and MEAG GEA 31202
Department:Augusta Utilities Department
Caption:Motion to approve Georgia Power Company Governmental Encroachment
Agreement 31201 and Municipal Electric Authority of Georgia
Governmental Encroachment Agreement 31202.
Background:The Augusta Utilities Department is planning construction of a wastewater
force main to Fort Gordon. The pipeline route will cross a right-of-way
belonging to the Georgia Power Company and the Municipal Electric
Authority of Georgia.
Analysis:GEA 31201 and GEA 31202 are the normal and usual agreements signed,
when crossing GPC and MEAG rights-of-way.
Financial Impact:None
Alternatives:Dissaprove motion to approve Georgia Power Company Governmental
Encroachment Agreement 31201 and Muncipal Electric Authority of
Georgia Governmental Encroachment Agreement 31202.
Recommendation:Approve motion to approve Georgia Power Company Governmental
Encroachment Agreement 31201 and Muncipal Electric Authority of
Georgia Governmental Encroachment Agreement 31202.
Funds are Available in
the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 6
Attachment number 1Page 2 of 6
Attachment number 1Page 3 of 6
Attachment number 1Page 4 of 6
Attachment number 1Page 5 of 6
Attachment number 1Page 6 of 6
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Motion to authorize condemnation to acquire 7,531 sq. ft. of permanent easement and 3,796 square feet of temporary
easement of 4112 Deans Bridge Road - PIN: 150-0-001-07-0.
Department:Law
Caption:Motion to authorize condemnation to acquire 7,531 sq. ft. of permanent
easement and 3,796 square feet of temporary easement of 4112 Deans
Bridge Road - PIN: 150-0-001-07-0.
Background:The City has been unable to reach an agreement with the property owner. In
order to proceed and avoid further delays, it is necessary to condemn the
subject property and purchase the real properties. The appraised value for
the properties is $1,078.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available in
the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNT:_______
G/L 507043410-5212115 J/L 88880068-5212115
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 2
Attachment number 1Page 2 of 2
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Newman Tennis Center Georgia Power Easement
Department:Engineering-Abie L. Ladson, PE, CPESC, Director
Caption:Approve granting Georgia Power an easement for their underground utilities
to provide electrical service to the Newman Tennis Center and have the
agreement executed by the appropriate City of Augusta official(s).
Background:This easement is for new lighting on tennis courts at the Newman Tennis
Center, and electrical service will be necessary to operate this
facility. Georgia Power has requested an easement for the underground
utilities to service this facility.
Analysis:This easement will allow Georgia Power to provide electrical service to the
Newman Tennis Center and also allow Georgia Power Company to be able
to maintain this service.
Financial Impact:There will be no financial impact to Augusta Richmond County.
Alternatives:1) Approve granting Georgia Power an easement for their underground
utilities to provide electrical service to the Newman Tennis Center and have
the agreement executed by the appropriate City of Augusta official(s). 2) Do
not approve and deny electrical service to the Newman Tennis Center.
Recommendation:Approve Alternative Number One
Funds are Available in
the Following
Accounts:
No funds necessary
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 3
Attachment number 1Page 2 of 3
Attachment number 1Page 3 of 3
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Property Condemnation –Permanent and Temporary Easements
Department:Law
Caption:Motion to authorize condemnation to acquire title of a portion of the
properties for permanent and temporary easements for the 10156 Gordon
Highway 16 Inch Water Main Project, PIN: 080-0-001-12-0 & 080-0-001-
13-0.
Background:The City has been unable to reach an agreement with the owners. In order to
proceed and avoid further delays, it is necessary to condemn a portion of
subject properties. The required properties consisting of a permanent
easement of 987 sq. ft. for 080-0-001-12-0 and a permanent easement of
1429 sq. ft. and temporary easement of 494 sq. ft. for 080-0-001-13-0. The
appraised value for both properties is $1,131.00.
Analysis:Condemnation is necessary in order to acquire the required properties.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available in
the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNT:_______
G/L 510043410-5411120 J/L 80310156-5411120
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 2
Attachment number 1Page 2 of 2
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Proposed Riverfront Development
Department:Planning Commission
Caption:Presentation regarding proposed development on the Savannah River
upstream from the Lock and Dam.
Background:Janksowski Properties LLC is in the process of completing a master plan for
a 306 acre tract on the Savannah River just upstream from the Lock and
Dam. The plan includes a marina, some commercial development and
potentially 500 residential units. The project could evolve into a new
community with very positive impact, but it also has some possible
detrimental attributes that need to be carefully considered. The purpose of
placing this on the agenda is to advise the committee of the project and
provide for a dialog between the developer and commissioners. The plan is
not at a stage where any specific action is being sought.
Analysis:This is being presented for discussion only.
Financial Impact:N/A at this time
Alternatives:N/A at this time
Recommendation:N/A at this time
Funds are Available in
the Following
Accounts:
N/A at this time
REVIEWED AND APPROVED BY:
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Street Lighting Resolution
Department:Abie Ladson, Director
Caption:Motion to approve a resolution creating street lighting districts.
Background:The Engineering Department has been petitioned by the citizens requesting
street lighting in their neighborhood pursuant to a 1971 Commission
Resolution authorizing the creating of Street Lighting Districts. The
petitioners agree to pay for all costs associated with the installation, ongoing
maintenance and energy.
Analysis:Currently, street lighting is non-existing in these areas. Street lighting has
been an effective measure to increase pedestrian and vehicular safety, assist
in crime prevention, and to promote businesses and community pride.
Financial Impact:Street Lighting Districts are funded by a self supporting fund. Street
Lighting charges vary based on the type lighting requested or required,
billable front footage, and light wattage and spacing. Costs for the subject
districts follow: 335 Southhampton $0.95/Ft
Alternatives:Recommend approval of resolution creating street lighting districts.
Recommendation:Recommed approval
Funds are Available in
the Following
Accounts:
2760416105233111/Legal Advertising
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
4/12/2010 12:55 PM
Wrightsboro Road Improvements-CPB Number Twelve and Supplemental Agreement Eleven
Department:Engineering
Caption:Authorize the Engineering Department to approve CPB Number Twelve
andSupplemental Agreement Eleven with PBS & J in the amount of
$116,907 to finalize the design of the Barton Chapel Road realignment;
update the plans in accordance with revised guidelines from GDOT, US
Army Corps of Engineers, and EPD; database revisions to incorporate the
changes to 14 parcels that have redeveloped; andextensive coordination with
the GDOT R/W Office during the negotiations of parcels as part of the
improvements to Wrightsboro Road from Jimmie Dyess Parkway to I-
520, ARC# 323-041110-296823309. Funds will be transferred from the
project Right of Way Account to the project Engineering Account.
Background:This is a Georgia Department of Transportation (GDOT) project that will
widen & reconstruct Wrightsboro Road from Jimmie Dyess Parkway to I-
520. The Engineering Department is responsible for the development of the
preliminaryengineering activities and hired PBS & J to accomplish these
activities. GDOT is funding the right of way acquisition ($8.9 million) and
the construction ($17.6 million).
Analysis:PBS & J entered into an agreement with Augusta-Richmond County on
October 19, 1999 for engineering and design services on the Wrightsboro
Road project. GDOT approved for Barton Chapel Road to be realigned to
create a 4-legged intersection at Augusta West Parkway and instructed PBS
& J to revise the plans up to the level of preliminary field plan review status.
The Value Engineering process and the Public Information Open House
meeting have been completed. PBS & J was given the Notice to Proceed on
February 19, 2010 to finalize the design of this 4-legged intersection. The
cost of this effort is $63,402. In 2007 the US Army Corps of Engineers
revised the conditions for the Nationwide Permit. Drainage calculations will
have to be revised on three (3) box culverts and the design will have to be
revised to comply with the updated regulations. The cost of this effort is
$5,183. In 2008 the Georgia NPDES Permit was revised which changed the
design criteria for NPDES plans. In 2009 regulations to certain impaired
streams went into effect which added even more requirements to the NPDES
plans. The cost to incorporate these revisions is $8,844. Fourteen (14)
parcels have been redeveloped or have experienced extensive changes since
the original database was completed. The cost to gather the additional
survey information and update the database is $21,591. The final traffic
signal, signing and marking plans will have to be updated in accordance
with the MUTCD, 2009 edition, revised GDOT guidelines and ADA
requirements. This includes changes for pedestrian signals, additional signal
heads, changes to guidelines for street signs and wheel chair ramp design.
The cost of this effort is $6,907. Coordination with the GDOT R/W Office
Cover Memo
to settle two (2) parcels has been more extensive than anticipated. One
parcel was allowed to develop without coordination with the design of this
project. An oversized U-turn has been designed to accommodate truck
turning movements for another parcel to minimize damages this parcel is
incurring. Both of these efforts have required extensive coordination with
the R/W Cost to Cure expert and redesign work. The cost of this effort is
$3,980. Street lighting will be included as part of the safety features for this
corridor and the photometric analysis for the lighting design was approved.
GDOT is now requiring additional veiling luminance calculations which
were not included in the original scope of work for street lighting design.
The cost of this effort is $7,000.
Financial Impact:PBS & J has proposed a cost of $116,907.
Alternatives:1) Authorize the Engineering Department to approve CPB Change Number
Twelve and Supplemental Agreement Eleven with PBS & J in the amount of
$116,907 to finalize the design of the Barton Chapel Road realignment;
update the plans in accordance with revised guidelines from GDOT, US
Army Corps of Engineers, and EPD; database revisions to incorporate the
changes to 14 parcels that have redeveloped; and extensive coordination
with the GDOT R/W Office during the negotiations of parcels as part of the
improvements to Wrightsboro Road from Jimmie Dyess Parkway to I-520,
ARC# 323-041110-296823309. Funds will be transferred from the project
Right of Way Account to the project Engineering Account. 2) Do not
approve and delay the construction and improvements on a major
transportation corridor that is vital to the city.
Recommendation:Approve Alternative Number One.
Funds are Available in
the Following
Accounts:
323-041110-5411120 & 296823309-5411120
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project change is authorized to CPB# 323-04-296823309 Supplemental.
Agreement Number Eleven. This change is to finalize the design of Barton Chapel
Road realigment; update the plans in accordance with the revised guidelines from
from GDOT, US Army Corps of Engineers, and EPD; database revisions to incorporate
the changes to 14 parcels that have redeveloped; and extensive coordination with the
GDOT R/W office during negotiations of parcels as part of the improvements to
Wrightsboro Road from Jimmie Dyess Parkway to I-520 in the total amount of
$116,907 to be funded by the project Right-of-Way account within the SPLOST,
Phase Three Fund.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase III 1,984,000$
1,984,000$
Section 3: The following amounts are appropriated for the project:
By Basin By District
Raes Creek $1,984,000 3rd 1,984,000$
CAPITAL PROJECT BUDGET
WRIGHTSBORO ROAD IMPROVEMENTS
CHANGE NUMBER TWELVE
CPB#323-041110-296823309
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for er er er execution. For information reference this request contact xecution. For information reference this request contact xecution. For information reference this request contact xecution. For information reference this request contact
engineering at ext 5070. Thanks engineering at ext 5070. Thanks engineering at ext 5070. Thanks engineering at ext 5070. Thanks
Raes Creek $1,984,000 3rd 1,984,000$
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
Honorable Deke Copenhaver, Mayor
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for er er er execution. For information reference this request contact xecution. For information reference this request contact xecution. For information reference this request contact xecution. For information reference this request contact
engineering at ext 5070. Thanks engineering at ext 5070. Thanks engineering at ext 5070. Thanks engineering at ext 5070. Thanks
3.13.09
Attachment number 1Page 1 of 2
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
WRIGHTSBORO ROAD IMPROVEMENTS
CHANGE NUMBER TWELVE
CPB#323-041110-296823309
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB CHANGE CPB
SPECIAL 1% SALES TAX, PHASE III
323-04-1110-6011110-296823309 ($1,984,000) $0 ($1,984,000)
TOTAL SOURCES: ($1,984,000) $0 ($1,984,000)
USE OF FUNDS
ENGINEERING
323-04-1110-5212115-296823309 $1,337,074 $116,907 $1,453,981
ADVERTISING
323-04-1110-5233119-296823309 $1,000 $0 $1,000
RIGHT-OF-WAY
323-04-1110-5411120/296823309 $162,926 ($116,907)$46,019
CONTINGENCY
323-04-1110-6011110/296823309 $43,000 $0 $43,000
TRAFFIC SIGNALTRAFFIC SIGNAL
323-04-1110-5414610/296823309 $40,000 $0 $40,000
UTILITY RELOCATION
323-04-1110-5414510/296823309 $400,000 $0 $400,000
TOTAL USES: $1,984,000 $0 $1,984,000
3.13.09
Attachment number 1Page 2 of 2
(SA11 – For changes greater than $20,000) March 2010
AUGUSTA-RICHMOND COUNTY
AUGUSTA, GA ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Augusta Richmond County Project
Number(s): 323-04-296823309
GDOT Number: PI 250510
Supplemental Agreement Number: 11
Purchase Order Number: 04471
WHEREAS, We, PBS & J, Consultant, entered into a contract with Augusta-Richmond County on
October 19, 1999, for engineering design services associated with the Wrightsboro Road
Improvements from Jimmie Dyess Parkway to I-520, GDOT Project No. STP-7001 (9), File Reference
No. 08-014 (A), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by
the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit:
Finalize the design of Barton Chapel Road realignment; update the plans
in accordance with the revised guidelines from GDOT, US Army Corps of
Engineers, and EPD; database revisions to incorporate the changes to 14
parcels that have redeveloped; and extensive coordination with the GDOT
R/W office during the negotiations of parcels as part of the improvements
to Wrightsboro Road from Jimmie Dyess Parkway to I-520.
It is agreed that as a result of the above described modification the contract amount is increased by
$116,907 from $1,336,914.37 to a new total of $1,453,821.37.
Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no
way modifies or changes the original contract of which it becomes a part, except as specifically stated
herein.
NOW, THEREFORE, We, PBS & J, Consultant, hereby agree to said Supplemental Agreement
consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is
hereby made a part of the original contract to be performed under the specifications thereof, and that the
original contract is in full force and effect, except insofar as it might be modified by this Supplemental
Agreement.
This day of , 2010.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY
AUGUSTA, GEORGIA
Honorable Deke Copenhaver, Mayor
Approved: Date Approved: Date
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title: Title:
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For r execution. For r execution. For r execution. For
information reference this request contact engineeinformation reference this request contact engineeinformation reference this request contact engineeinformation reference this request contact engineering at ext 5070. Thanks ring at ext 5070. Thanks ring at ext 5070. Thanks ring at ext 5070. Thanks
Attachment number 2Page 1 of 1