HomeMy WebLinkAbout2009-09-08-Meeting Agenda
Engineering Services Committee Meeting Committee Room- 9/8/2009- 1:00 PM
ENGINEERING SERVICES
1. Approve and authorize execution of an agreement between Augusta and
the University of Georgia Research Foundation, Inc. Savannah River
Ecology Laboratory (SREL) for the continuation of research and data
collection related to bird activity around the constructed wetland treatment
system.
Attachments
2. Provide necessary signatures on furnished agreement to include Augusta
Utilities Department water and sanitary sewer main relocations in the
Georgia Department of Transportation contract for Alexander Drive. The
estimated cost of the construction is $298,192.50.
Attachments
3. Approve the adoption of the Flood Insurance Study and the associated
Flood Insurance Rate Maps for Augusta Richmond County.
Attachments
4. Amend agreement with Georgia Power Company for Power Distribution
Termination Services at James B. Messerly WPCP.
Attachments
5. Approve CPB # 323-041110-201823332 Change Number Two and
Supplemental Agreement Number Three in the amount of $65,000.00 on
the Belair Road Improvements project. Funding is available in the project
contingency account to be transferred to the project engineering account
as requested by AED.
Attachments
6. Motion to approve a Deed of Dedication and Maintenance Agreement for
Water and Sanitary Sewer from West Wheeler Townhomes, Phase 8.
Attachments
7. Motion to award bid to Quality Storm Water Solutions (low bidder) in the
amount of $18,354.00 for the repair of the failed outfall structure and 40'
of failed CMP at Belair Road and the Buckhead Subdivision. Approve
under emergency conditions as new homes on Belair Road have the
potential of flooding.
Attachments
8. Motion to approve an Option for the purposes of acquiring a Right-of-
Way between Marvin Griffin Road Investments, LLC, as owner(s), and
Augusta, Georgia, as optionee, in connection with the Marvin Griffin
Road Improvement Project, (2,776 sq. ft.) in fee and (425 sq. ft.) of
permanent easement, more of less; and (7,950 sq. ft.) of temporary
construction easement from property located at: 1401 Marvin Griffin
Attachments
Road, private, at the purchase price of $2,700.00.
9. Motion to approve an Option for the purposes of acquiring a Right-of-
Way between Schwerman Trucking Co., Successor by merger of
Schwerman Real Estate and Development Corp., as owner, and Augusta,
Georgia as optionee, in connection with the Marvin Griffin Road
Improvement Project, (3,275 sq. ft.) in fee and (N/A sq. ft.) of permanent
construction and maintenance easement, and (3,228 sq. ft.) of temporary
construction easement from property located at: 1601 Marvin Griffin
Road, private, at the purchase price of $2,600.00.
Attachments
10. Approve a change in scope to separate Old Savannah Road/Twiggs Street
Improvement Project into two phases for design and construction as
requested by AED.
Attachments
11. Motion to approve an Option for the purposes of acquiring an easement
between Soo H. Yun, as owner, and Augusta, Georgia, as optionee, in
connection with the Marvin Griffin Road Improvements Project, (1,779
sq. ft.) of temporary construction easement from property located at: 1801
Marvin Griffin Road, private, at the purchase price of $125.00.
Attachments
12. Approve award of the contract for construction of a new restroom facility
at Pendleton King Park to the low bidder, Sommers Construction of
Evans, GA, in the amount of $25,740, to be funded from reprogrammed
SPLOST I - GL 271-01-6215/JL 207-27-2007, approved by the
Commission.
Attachments
13. Approve the readoption of the Flood Damage Prevention Ordinance as
amended.
Attachments
14. Approve the recapture and/or reallocation of SPLOST III funds
programmed for the Public Services Department and County Forces into
Phase IV programmed categories.
Attachments
15. Approve a Resolution requesting the Georgia State Properties
Commission grant temporary and permanent construction easements for
the Butler Creek Interceptor Upgrade-East Project.
Attachments
16. Motion to approve the City providing on its website a link to the
website that has been created concerning the mitigation of the Springfield
Historic District, an African-American archaeological site, as part of the
St. Sebastian Street Extension project. The Springfield Historic District
website has been finalized and is available to the public. This
website contains lesson plans at the 8th grade level and this is requesting
that the Augusta-Richmond County Board of Education also be made
aware of this educational opportunity.
Attachments
www.augustaga.gov
17. Approve letter from the Mayor to the Department of Transportation to
transfer TE Grant from 5th Street Depot to James Brown Blvd.
Streetscape Project.
Attachments
18. Approve award of Construction Contract to L-J, Inc. in the amount of
$537,085.00 and Capital Project Budget for the Turknett Springs
Detention Basin Improvements Project, subject to receipt of signed
contracts and proper bonds as requested by AED. Funding in the amount
of $537,085.00 with $268,542.50 from Augusta Utilities and $268,542.50
from SPLOST IV Augusta Public Services for project construction.
Attachments
Engineering Services Committee Meeting
9/8/2009 1:00 PM
2009-2010 Agreement Between Augusta and Savannah River Ecology Laboratory
Department:Utilities
Caption:Approve and authorize execution of an agreement between Augusta and the
University of Georgia Research Foundation, Inc. Savannah River Ecology
Laboratory (SREL) for the continuation of research and data collection
related to bird activity around the constructed wetland treatment system.
Background:In the late 1990's Augusta negotiated an agreement with the Federal
Aviation Administration (FAA) to allow the Utilities Department to
continue to develop the constructed wetland treatment system which follows
the James B. Messerly Water Pollution Control Plant. One of the conditions
of that agreement is that Augusta will monitor the activity of birds in the
vicinity of the constructed wetland and the Augusta Regional Airport in
order to insure there is no adverse impact on airport operations due to the
wetland construction. Augusta has enlisted the services of the Savannah
River Ecology Laboratory to conduct this monitoring as a research program
funded by the Utilities Department. The proposed program for this includes
activities which are designed to study the effects of methods used to reduce
the attractiveness of the wetland system to certain types of birds during the
migratory season. The total cost of the proposed research program for this
year is $98,573.00.
Analysis:The research program to date has yielded important data to support the
development of the constructed wetland system at the current location.
Continued monitoring of the bird activity and development of additional
data will provide valuable information about the effectiveness of wildlife
management activities as well as document the continued beneficial use of
the wetlands as a wildlife habitat. This program should continue for at least
another 3 years to provide this documentation.
Financial Impact:The total cost of the proposed research program for 2009-2010 is
$98,573.00. Three additional years would not exceed $110,000.00 per year.
Alternatives:1) Approve the program for just one year, 2) discontinue the research
program, or 3) negotiate a scaled-back program at a lower cost.
Recommendation:
We recommend that the proposed research program be approved and
executed by the Mayor on behalf of Augusta. We further recommend that
this program be extended for an additional 3 years at a maximum annual
cost of $110,000.00. The cost and scope of the program would be negotiated
annually by the Utilities Department and approved by the Administrator
based on the results of the previous year's research. If the negotiated cost
Cover Memo
exceeds $110,000.00 in any year the agreement would be brought back to
the Commission for approval.
Funds are Available in
the Following
Accounts:
507043420-5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 14
Attachment number 1Page 2 of 14
Attachment number 1Page 3 of 14
4
General Scope of Work
for a Bird Study at Augusta Regional Airport at Bush Field
and Messerly Wastewater Treatment Plant Constructed Wetlands Project
To effectively monitor bird populations that may or may not pose a hazard to air traffic
operations, Savannah River Ecology Laboratory (SREL) proposes to continue aerial survey
coverage of: (1) the artificial wetlands (i.e., Constructed Wetlands Project) constructed to
process effluents from the Messerly Wastewater Treatment Plant, and (2) the Merry Land and
Investment Company Brickyard Ponds. Continuation of minimal aerial bird surveys at only those
two wetlands mentioned above is based upon prior weekly survey results (1998±2001) from a
larger wetland complex indicating that these are the wetlands in the vicinity of Bush Field
Airport that consistently attract the largest numbers of heavily-bodied birds such as geese, other
waterfowl, wading birds, and flocking blackbirds to the vicinity of the airport where such species
are of particular concern from the perspective of a potential aircraft-bird strike hazard. We will
continue the minimal aerial bird surveys by maintaining the reduced frequency of these surveys
at bi-weekly.
While limiting the extent of aerial surveys as described above, we also propose to
continue ground-based bird movement surveys at both the airfield and the adjacent constructed
wetlands. These ground-based surveys are designed to provide time- and location-specific
information regarding the daily patterns of movement, altitude, and behavior of the larger-bodied
bird species including waterfowl, wading birds, and birds of prey, as well as flocking blackbirds.
This specific information will provide the type of detail that will allow airport management and
flight controllers to continue to predict times, locations, and conditions of increased bird-strike
hazard potential that would be of particular consequence to aircraft in the area. Furthermore, with
the habitat alterations now being implemented at the artificial wetlands during fall/winter (i.e.,
airboat crushing of vegetation) and with active bird dispersal activities (e.g., pyrotechnics, or
acoustics) now being used at the airfield and the artificial wetlands, these ground-based bird
movement surveys have the further importance of helping to evaluate the effectiveness of these
techniques and identifying any new problematic bird movement patterns that might be created by
such bird disturbances.
This contract period will also include a series of qualitative assessments of blackbird use
of the entire artificial wetlands and surrounding tree-line that will be used to guide the bird
harassment activities conducted there. Particular areas within the wetlands harboring relatively
large numbers of roosting blackbirds will be identified before, during, and after Augusta Utilities
Department vegetation crushing by airboats. The results from these once-per-week assessments
(conducted from October through March) will be communicated to the bird-harassment team so
that optimizing adjustments can be made quickly to the bird harassment activities. These same
evening visits to the wetlands will also be used to PHHWZLWKWKH6SRQVRU¶V bird-harassment team
members to train and refine their use of all the tools they have to work with, including the Avian
Dissuader laser and various pyrotechnic/launcher devices. These qualitative assessments will
further be used in the decision-making process to determine if and when vegetation crushing by
airboats will need to be carried out.
Attachment number 1Page 4 of 14
5
In addition to bird surveys described above, the SREL co-principal investigators and/or
technical consultants supported under this contract will act as an avian information resource by
providing professional consultation to WKH6SRQVRU¶Vbird-harassment team and Bush Field
Airport personnel with regard to bird issues, including help in identifying the remains and/or
photographs of any birds involved in aircraft strikes in the vicinity of Bush Field or in the
effective use/deployment of bird-harassment techniques (e.g., sound, lasers, pyrotechnics, etc.)
that may be used.
In order to keep the cost of this work as low as possible, we propose to continue to
provide an annual report to AugusWDWKDWLVVLPLODULQGHWDLOWRWKHSUHYLRXV\HDU¶V2009) version
that includes a comprehensive, yet simplified approach of summarizing the results primarily in
tabular and graphical form (excluding detailed statistical analyses), with an accompanying
Executive Summary explaining the meaning and importance of the data that have been collected.
We will be available however to verbally discuss our findings with Augusta Utilities Department
and Bush Field officials, including the Wildlife Control Specialist, as necessary. This approach
will continue to be the most cost-effective in terms of directing a greater proportion of the overall
budget to personnel who are involved directly with the collection and reporting of critical data.
Specific details for carrying-out the research programs of this study ([I] conducting aerial
surveys of bird, [II] conducting ground-based bird-movement surveys, [III] conducting
qualitative assessments of roosting blackbirds in the Constructed Wetlands Project with bird-
harassment techniques refinement) are provided in the three individual scope of work plans that
follow. Separate budgets for each of the three major study components are also provided.
Attachment number 1Page 5 of 14
6
RESEARCH PROGRAM I :
Scope of Work for Aerial Surveys of Birds
at the Constructed Wetlands Project and the Merryland Ponds
(12 months, beginning October 1, 2009)
Wetland vegetation alteration such as the crushing by airboats now being used at the
Constructed Wetlands has the potential to increase the undesired use of the Constructed Wetland
Project by waterfowl and wading birds by reducing vegetation density and placing much of that
vegetation at or below the water surface. Habitually, wading birds and in particular waterfowl,
which may be drawn to the artificial wetland cells as a result of a vegetation crushing program,
often remain at the water surface for much of the day once arriving at these destinations; they
may even spend the night at such destinations with negligible/absent flight activity. Ground-
based bird movement surveys of Research Program II are not designed to detect birds in
wetlands unless they are visible to observers from ground level while actively engaged in flight.
Maintaining a minimal plan for aerial bird surveys of the Constructed Wetlands of the Messerly
Wastewater Treatment Plant and the Merry Land and Investment Company Brickyard Ponds will
assure the detection of such undesired bird use should it occur. SREL personnel will engage the
services of Augusta Aviation, Inc., based at Daniel Field Airport in Augusta, to provide aircraft
and pilots for conducting aerial bird surveys over these study areas. These aerial surveys will be
conducted in close coordination with Bush Field administrative officials and air-traffic
controllers to assure safety of all aircraft operating in the vicinity of the airfield during the
execution of these surveys.
During aerial surveys, SREL observers will reference only species and numbers of
individuals from the following list: waterfowl (ducks, geese, and swans), wading birds (herons,
egrets, ibises, wood storks), other large and/or flocking waterbirds (coots, cormorants, anhingas,
gull spp.), and raptors (hawks, kites, vultures, bald eagles, ospreys). Sightings will be map-
referenced at the time of occurrence. Other data to be included with each aerial survey are: date,
beginning and ending times of the survey, local weather conditions (including temperature, wind
speed, extent of wetland icing in winter, etc.), and sightings (map-referenced) of people,
watercraft, or other disturbance-related activities taking place during the aerial survey. Actual
duration of these aerial surveys will be approximately 45 minutes each, allowing additional flight
time of about 10 minutes for travel time to and from Daniel Field and the possibility of surveys
being interrupted by air-traffic controllers while other aircraft move through the survey area.
Aerial surveys will be conducted from a height of approximately 400±500 ft and at a minimal,
but safe airspeed given the prevailing weather conditions.
This project will include twenty-five (25) flights over a contract period of twelve (12)
months to be executed at approximately bi-weekly intervals (no aerial surveys will be undertaken
during the week of the Masters Golf Tournament). If inclement weather or aircraft unavailability
precludes the completion of more than four (4) flights over the contract period, flights may be
added to the end of the contract period or unused funds may be used for other purposes related to
the study during the contract period, at the discretion of the Sponsor.
Attachment number 1Page 6 of 14
7
For the purposes of electronic data storage and summarization, map-referenced data from
the aerial surveys will include only the Constructed Wetlands Project near the Messerly
Wastewater Treatment Plant and the Merry Land and Investment Company Brickyard Ponds.
Birds will be identifiable to individual wetland cells of the Constructed Wetlands Project. Data
will be stored on a networked PC-workstation operating in a Microsoft-Windows environment.
Upon project completion, all data will be provided to the Sponsor in a mutually agreeable
database format (e.g., Microsoft Excel). Data summaries will be performed using the Statistical
Analysis System (SAS Institute, Inc.). Summaries will include locational (wetland cell)
differences in avian species assemblages and numbers, as well as temporal changes in bird
distributions among wetland cells. Since bird use of the Constructed Wetlands Project will be
specified by individual wetland cells, this aerial survey data will be used in conjunction with the
vegetation alteration (i.e., airboat crushing) program conducted in wetland cells to determine if
such alteration of the vegetation increases undesired use by waterfowl and other wetland bird
species.
Attachment number 1Page 7 of 14
8
RESEARCH PROGRAM II :
Scope of Work for Ground-Based Bird-Movement Surveys
at the Augusta Regional Airport at Bush Field and
the Constructed Wetlands Project
(12 months, beginning October 1, 2009)
Based on previous aerial surveys of bird abundance and distribution in wetlands near the
Augusta Regional Airport at Bush Field, relatively large numbers of large-bodied aquatic birds
are found in the area, particularly during the winter period when migratory waterfowl are most
abundant. In addition to the many waterfowl found in the area, numerous wading birds, divers
including cormorants and anhingas, blackbirds, gulls, and raptors including vultures are known
to frequent the area as well. Wetlands near Bush Field harboring the majority of these birds
include the Merry Land and Investment Company Brickyard Ponds and the Constructed
Wetlands Project of the Messerly Wastewater Treatment Plant. Based on previous ground-based
bird-movement surveys, extremely large numbers (in the millions) of migrant blackbirds move
through airspace in the vicinity of Bush Field and the Constructed Wetlands Project in the
fall/winter period on a twice-daily basis. These blackbirds, in particular, have created an annual
period of high hazardous conditions to aircraft operating in the area.
SREL personnel will continue to collect ground-based bird data to determine daily
behavior and movement patterns (i.e., timing, directions, altitudes) of birds moving through the
airspaces of Bush Field and the Constructed Wetlands Project. Emphasis will be placed on
documentation of movements of flocking bird species such as blackbirds and large-bodied bird
species such as waterfowl that are most likely to produce serious consequences when involved in
collisions with aircraft.
Bird movements will be documented from routinely-monitored ground stations at Bush
Field and the Constructed Wetlands Project. Stations selected at Bush Field (3) and at the
Constructed Wetlands Project (1) in December 2001 will continue to be used to ensure adequate
coverage of the areas of interest. The daylight hours will be divided into four approximately
equal time blocks: (1) 15 minutes before sunrise until 9:00AM, (2) 9:01AM until 12:00PM, (3)
12:01PM until 3:00PM, and (4) 3:01PM until 15 minutes after sunset (Eastern Standard Times;
one hour added when Eastern Daylight Saving Time is in use). Emphasis will be placed on the
time blocks coinciding with sunrise and sunset, because most bird movements occur during these
times of the day. Observations will be made at two different stations within two different time
blocks daily, for two days each week, for four weeks each month of the study. This methodology
allows for all possible combinations of the four locations and the four time blocks to be chosen
monthly in a randomized design. Observations will be made over a 2.5 hr period and will consist
of four 30-minute observation bouts with a 10-minute lapse between each observation period.
Observations will be initiated at the beginning of a time block with the exception of the last time
block, which will be timed so that the final 30-minute observation bout ends approximately 15
minutes after sunset. During the observation bouts, observers will scan the 360o horizon with
binoculars, attempting to collect data on as many flying birds as possible with no upper limit on
distance from the observer. Short movements by birds (<100m) or movements by small
Attachment number 1Page 8 of 14
9
passerine birds in flocks of less than 20 birds will not be recorded. Emphasis will be placed on
movements of waterfowl (ducks and geese), wading birds (herons, egrets, ibises, wood storks),
other large and/or flocking waterbirds (coots, cormorants, anhingas, gull spp., blackbird spp.),
and raptors (hawks, kites, vultures, bald eagles, ospreys). During times of intense movements,
observers will give priority to larger birds and larger flocks. Observations will be conducted
regardless of weather conditions. In addition to meteorological data, the following data will also
be recorded for each observation: time, species, actual or estimated number of individuals,
approximate distance from the observer, approximate direction from observer, estimated altitude
above land or water, approximate direction of bird movement, and flight behavior (e.g., level
flight, soaring, landing, taking-off).
Data will be stored on a networked PC-workstation operating in a Microsoft-Windows
environment. Upon project completion, all data will be provided to the Sponsor in a mutually
agreeable database format (e.g., Microsoft Excel). For the purposes of electronic data storage and
summarization, bird movement data from Bush Field and the Constructed Wetlands Project will
be retained according to each of four observational stations. Data summaries will be performed
using the Statistical Analysis System (SAS Institute, Inc.). Summaries will be made for each
observation station and will be comprised of avian species movement patterns including timing
and direction of flight, flight altitudes, and temporal (annual and seasonal) changes in bird
movement patterns.
As a part of this Research Program, the SREL co-principal investigators and/or technical
consultants will act as an avian information resource by providing professional consultation to
Bush Field Airport personnel with regard to bird-strike issues, including help in identifying the
remains and/or photographs of any birds involved in aircraft strikes in the vicinity of Bush Field
or in the effective use/deployment of bird-harassment techniques (e.g., sound, lasers,
pyrotechnics, etc.) that may be used.
Attachment number 1Page 9 of 14
10
RESEARCH PROGRAM III :
Scope of Work for Conducting Qualitative Assessments
of Roosting Blackbirds in the Constructed Wetlands Project
with Bird-Harassment Techniques Refinement
(12 months, beginning October 1, 2009)
Based on previous ground-based surveys of bird abundance and movements in
and around the Constructed Wetlands Project of the Messerly Wastewater Treatment Plant
(WTP) near the Augusta Regional Airport at Bush Field, blackbirds numbering into the millions
have been shown to roost at night within and adjacent to the Constructed Wetlands where they
use the standing vegetation of the wetland cells as a roosting substrate. This behavior is
particularly notable in the fall/winter months (November±February) when migratory blackbirds
frequent the area. Fall crushing of standing vegetation in the entire Constructed Wetlands was
first used as a successful habitat alteration for dissuading use of the wetlands by roosting
blackbirds in November and December 2008 and will be carried out again as early as mid-
October in 2009 by contractors working for the Augusta Utilities Department. Multiple airboat
crushing events in the same fall/winter will likely be required to maintain the desired vegetation
alteration and thus keep roosting blackbird numbers in check as the season progresses, so insight
as to when vegetation re-crushing is needed will be valuable. In addition to altering habitat as a
bird deterrent, the WTP operators, Operations Management International (OMI), Inc., first
assembled a bird-harassment team in late 2008 to begin actively engaging the roosting blackbirds
with the aid of propane cannons and other pyrotechnic/acoustic devices. In 2009, with a desire to
further develop the activities of the bird-harassment team, SREL personnel will make qualitative
assessments of numbers of roosting blackbirds in all wetland cells and the surrounding tree-line
that will be used to guide and coordinate the activities of the bird-harassment team. These same
qualitative assessments will further be used in the decision-making process to determine if and
when vegetation re-crushing by airboats will need to be carried out. Additionally, SREL
personnel will work with the bird-harassment team to increase basic knowledge of birds and to
provide further training and refinement in their use of bird-harassment tools.
During this contract period, once-per-week visits to the Constructed Wetlands will be
made from October through March. Since blackbirds roosting in the wetland cells arrive in the
evening and depart at dawn, the assessments will concentrate on the evening arrival period.
Observations will be conducted from 30 minutes before sunset until 30 minutes after sunset
(Eastern Standard Times). Each evening while at the Constructed Wetlands, SREL personnel
will qualitatively examine blackbird use of all wetland cells and the surrounding tree-line while
traversing the site in a vehicle, noting areas of high-density bird-use and prioritizing areas for the
concentration of bird harassment activities. SREL personnel will communicate the findings of
these assessments within 24-hours to designated OMI or Augusta Utilities Department personnel
via e-mail or voice communication. SREL personnel will also coordinate to meet with bird-
harassment team members while at the Constructed Wetlands for the purpose of general
consultation on matters related to wetlands and birds, improving basic knowledge of bird
identification/behavior, and providing training/refinement in the use of such devices as the Avian
Dissuader laser, propane cannons, and various pyrotechnic/launcher devices.
Attachment number 1Page 10 of 14
11
Under this agreement, SREL personnel will only be responsible for conducting the
assessments of bird use of the artificial wetlands and offering refinement of bird-harassment
techniques associated with this scope of work. SREL will not assume responsibility for
conducting the vegetation crushing or any other type of vegetation alteration. Costs and logistics
for conducting the vegetation alteration and costs associated with bird-scaring devices and the
actual bird harassment will be the responsibility of the Sponsor.
Attachment number 1Page 11 of 14
12
RESEARCH PROGRAM I :
Budget for Aerial Surveys of Birds at the
Constructed Wetlands Project and the Merryland Ponds
(12 months, beginning October 1, 2009)
Personnel costs, including benefits
R.A. Kennamer (Co-PI; Research Professional, 7.5% FTE)
Salary: $3,685 Actual Benefits @ 42%: $1,548 $ 5,233.00
A.L. Bryan, Jr. (Research Professional, 3.75% FTE)
Salary: $2,325 Actual Benefits @ 37%: $860 $ 3,185.00
Aircraft and pilot (Augusta Aviation, Daniel Field)
bi-weekly aerial surveys @ approx. 0.75 hr each $ 2,813.00
Vehicle expenses $ 750.00
Expendable supplies $ 150.00
RESEARCH PROGRAM I DIRECT COST $12,131.00
UGA/SREL INDIRECT COST (@ 30%) $ 3,639.00
RESEARCH PROGRAM I : TOTAL COST $15,770.00
Attachment number 1Page 12 of 14
13
RESEARCH PROGRAM II :
Budget for Ground-Based Bird-Movement
Surveys at the Augusta Regional Airport at Bush Field
and the Constructed Wetlands Project
(12 months, beginning October 1, 2009)
Personnel costs, including benefits
I.L. Brisbin, Jr. (Co-Principal Investigator, 4% FTE)
Salary: $4,774 Actual Benefits @ 12%: $573 $ 5,347.00
R.A. Kennamer (Co-PI; Research Professional, 65% FTE)
Salary: $31,935 Actual Benefits @ 42%: $13,413 $45,348.00
Vehicle expenses $ 2,500.00
RESEARCH PROGRAM II DIRECT COSTS $53,195.00
UGA/SREL INDIRECT COSTS (@30%) $15,959.00
RESEARCH PROGRAM II : TOTAL $69,154.00
Attachment number 1Page 13 of 14
14
RESEARCH PROGRAM III :
Budget for Conducting Qualitative Assessments
of Roosting Blackbirds in the Constructed Wetlands Project
with Bird-Harassment Techniques Refinement
(12 months, beginning October 1, 2009)
Personnel costs, including benefits
I.L. Brisbin, Jr. (Co-Principal Investigator, 2% FTE)
Salary: $2,387 Actual Benefits @ 12%: $286 $ 2,673.00
R.A. Kennamer (Co-PI; Research Professional, 10% FTE)
Salary: $4,913 Actual Benefits @ 42%: $2,063 $ 6,976.00
Vehicle expenses $ 750.00
Expendable supplies $ 100.00
RESEARCH PROGRAM III DIRECT COSTS $10,499.00
UGA/SREL INDIRECT COSTS (@30%) $ 3,150.00
RESEARCH PROGRAM III : TOTAL $13,649.00
RESEARCH PROGRAM II : TOTAL (from page 13) $69,154.00
RESEARCH PROGRAM I : TOTAL (from page 12) $15,770.00
GRAND TOTAL: $ 98,573.00
Prepared by: Dr. I. Lehr Brisbin, Jr. and Robert A. Kennamer
The University of Georgia
Savannah River Ecology Laboratory (803) 725-0387
P.O. Drawer E, Aiken, SC 29802 rkennamer@srel.edu
Attachment number 1Page 14 of 14
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Accept terms of contract item agreement with Georgia Department of Transportation concerning installation costs of
water and sanitary sewer mains on GDOT Project # STP-0001-00 (794) Alexander Drive.
Department:Augusta Utilities Department
Caption:Provide necessary signatures on furnished agreement to include Augusta
Utilities Department water and sanitary sewer main relocations in the
Georgia Department of Transportation contract for Alexander Drive. The
estimated cost of the construction is $298,192.50.
Background:The Georgia Department of Transportation project to improve Alexander
Drive will be paid for in part using Federal Stimulus Program dollars. A
recent change to the Federal stimulus program allows GDOT to cover the
costs for replacement of the existing water main, a cost normally borne fully
by Augusta Utilities Department. Augusta Utilities Department will be
solely responsible for the cost of new sanitary sewer installation, which is
the estimated cost reflected in the agreement furnished by GDOT
Analysis:Approving this agreement will allow GDOT to award their contract
including the cost for Augusta Utilities Department sanitary sewer main.
The fee is fair and reasonable. With the completion of this project, the area
of Alexander Drive served by these new mains will enjoy years of trouble
free service
Financial Impact:Funds for this work are available in account number 507043410-
5425110/80800030-5425110
Alternatives:No alternatives are recommended.
Recommendation:We recommend the Commission agree to the terms of the contract item
agreement with Georgia Department of Transportation in the amount of
$298,192.50
Funds are Available in
the Following
Accounts:
507043410-5425110/80800030-5425110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Cover Memo
Law.
Administrator.
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
9/8/2009 1:00 PM
adoption of flood insurance study and flood insurance rate maps
Department:Planning Commission
Caption:Approve the adoption of the Flood Insurance Study and the associated Flood
Insurance Rate Maps for Augusta Richmond County.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Cover Memo
ORDINANCE NO. _____
A resolution by the Augusta-Richmond County Planning Commission recommending that the
Flood Insurance Study and the Flood Insurance Rate Maps for Augusta-Richmond County,
Georgia, both with an effective date of September 25, 2009, be adopted as follows:
AN ORDINANCE TO ADOPT THE FLOOD INSURANCE STUDY (FIS), STUDY
NUMBER 13245CV000A, WITH AN EFFECTIVE DATE OF SEPTEMBER 25, 2009,
AND THE FLOOD INSURANCE RATE MAPS (FIRMs), MAP NUMBERS
13245IND0A, 13245C0015F, 13245C0020F, 13245C0040F, 13245C0070F,
13245C0085F, 13245C0090F, 13245C0095F, 13245C0105F, 13245C0110F,
13245C0115F, 13245C0120F, 13245C0130F, 13245C0135F, 13245C0140F,
13245C0145F, 13245C0175F, 13245C0185F, 13245C0200F, 13245C0205F,
13245C0210F, 13245C0225F, 13245C0230F, 13245C0235F, 13245C0240F,
13245C0245F, 13245C0255F, 13245C0265F, 13245C0300F, 13245C0325F,
13245C0330F, AND 13245C0355F, WITH AN EFFECTIVE DATE OF SEPTEMBER
25, 2009, AS THEY PERTAIN TO AUGUSTA, GEORGIA, IN THEIR ENTIRETY.
THE AUGUSTA COMMISSION HEREBY ORDAINS:
SECTION I. That the Flood Insurance Study (FIS), Study Number 13245CV000A, with an
effective date of September 25, 2009, and the Flood Insurance Rate Maps (FIRMs), Map
Numbers 13245IND0A, 13245C0015F, 13245C0020F, 13245C0040F, 13245C0070F,
13245C0085F, 13245C0090F, 13245C0095F, 13245C0105F, 13245C0110F, 13245C0115F,
13245C0120F, 13245C0130F, 13245C0135F, 13245C0140F, 13245C0145F, 13245C0175F,
13245C0185F, 13245C0200F, 13245C0205F, 13245C0210F, 13245C0225F, 13245C0230F,
13245C0235F, 13245C0240F, 13245C0245F, 13245C0255F, 13245C0265F, 13245C0300F,
13245C0325F, 13245C0330F, and 13245C0355F, with an effective date of September 25, 2009,
as they pertain to regulating Flood Damage Prevention in Augusta, Georgia, be adopted in their
entirety.
Attachment number 1Page 1 of 2
SECTION II. That any and all Flood Insurance Studies (FISs) and Flood Insurance Rate Maps
(FIRMs) with effective dates prior to September 25, 2009, be rendered null and void for
regulating Flood Damage Prevention in Augusta, Georgia.
SECTION III. All Ordinances or parts of Ordinances in conflict with this Ordinance are hereby
repealed.
Done in Open Meeting under the Common Seal thereof this __________ day of
_______________, 2009.
APPROVED THIS __________ day of _______________, 2009.
___________________________________
MAYOR, AUGUSTA COMMISSION
AUGUSTA, GEORGIA
ATTEST:
___________________________________
CLERK OF COMMISSION
Attachment number 1Page 2 of 2
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Amend Agreement with Georgia Power Company for Power Distribution Termination Services at James B. Messerly
WPCP
Department:Utilities
Caption:Amend agreement with Georgia Power Company for Power Distribution
Termination Services at James B. Messerly WPCP.
Background:In February 2008 Augusta entered into an agreement with Georgia Power
Company (GPC) for GPC to provide backup power generation equipment,
high voltage electrical switchgear and termination of some of the high
voltage cables for the James B. Messerly Water Pollution Control Plant
upgrade project. After review of the work being performed on this project
through our Construction Manager at Risk, Parsons Water and
Infrastructure, Inc., it has become evident that GPC should make all of the
high voltage cable terminations on the project to insure propoer coordination
of the work. GPC has provided the attached proposal for increasing the
scope of their work to include all of the high voltage cable terminations.
Their price for this additional work is $206,667.00.
Analysis:The cost for completing this scope of work appears to be reasonable.
Parsons has agreed to compensate for the reduction in their scope of work
by moving funds equal to the cost of this work from their Project
Contingency to the Owner's Allowance portion of the project. Funds in the
Owner's Allowance cannot be used by Parsons to cover the cost of work
within their original scope. The $206,667.00 would be paid to GPC through
an addition to our current billings for power services over a six month
period.
Financial Impact:$206,667.00 from account 506043310-5312310 in equal payments over a
six month period.
Alternatives:No feasable alternatives are available due to complexity of the high voltage
power distribution system.
Recommendation:Approve the proposed additional scope of work to be performed by Georgia
Power Company at a cost of $206,667.00 to be paid through a six-month
additional charge on monthly power bill.
Funds are Available in
the Following
Accounts:
506043310-5312310 Cover Memo
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
City of Augusta – Messerly 8.4.09 Page 1
6711 Londonderry Way
Bin 79510
Union City, GA 30291
770-969-6609
770-969-6615 fax
August 4, 2009
Mr. Allen Saxon
Assistant Director for Wastewater Treatment
Augusta Utilities Department
360 Bay Street, Suite 180
Augusta, GA 30901
Re: Messerly WPCP
Dear Allen:
Georgia Power (“GPC”) is pleased to offer you the following services for additional work in
connection with this distribution system project (the “Project”) at City of Augusta- J. B.
Messerly Water Pollution Control Plant (“Customer”), Augusta, GA.
Scope of work:
GPC will provide labor, material and equipment to complete the below listed.
x Provide and install 2 runs (4 – 750 CMIL, 2 - 4/O GND) from MSG to Pole #1
x Provide and install 2 runs (4 – 750 CMIL, 2 – 4/O GND) from MSG to Pole #2
x Terminate and Hypot all cables from MSG to Poles #1 and #2
x Coordinate all work for connection to utility
x Terminate and Hypot both ends of cables from the load side of LISG to high side of
XFMR-5 (3 - #1/O W #6 GND)
x Run duct bank from the load side of LISG to the existing splice point and provide new
wires and splice to the existing wires
Attachment number 1Page 1 of 3
City of Augusta – Messerly 8.4.09 Page 2
x Terminate and Hypot wire 4(3 - #1/O W #6 GND) between LISG and existing XFMR 1,
2, & 3
x Demo existing LISG Pad and construct new LISG Pad
Contract Price for above scope:_____________________________________$206,667.00
NOTES:
GPC understands that this project to be built in sections at different times and mobilization and
Re-mobilization will be frequent.
All core drilling by others
If there are any delays, or unforeseen problems or complications there will be an extra charge
consisting of labor, equipment and material (+) 20% at owners Approval.
The terms and conditions from our original contract for distribution and generation at the
Messerly site will apply.
Thank you again for allowing us the opportunity to present our proposal. We are very eager to
serve your distribution system needs and look forward to hearing from you soon.
Sincerely,
David Banks
David Banks
Sales & Construction Manager – Power Services
Georgia Power Company
Phone – 770-468-0407
Fax – 770-969-6615
Email – dlbanks@southernco.com
Attachment number 1Page 2 of 3
City of Augusta – Messerly 8.4.09 Page 3
IN WITNESS WHEREOF, Georgia Power and the Customer have caused this Agreement to be
signed by their respective duly authorized officers as of the date below.
AUGUSTA, GEORGIA
By:
The Honorable David S. Copenhaver
Mayor
Date:
ATTEST CLERK:
By: _____________________________________
Lena J. Bonner
Clerk of the Commission
Date: ___________________________________
APPROVED AS TO FORM:
By: _____________________________
Chiquita Johnson
Augusta General Counsel
Date: ____________________________
DEPARTMENT APPROVAL:
By: ____________________________________
Drew Goins
Interim Director, Augusta Utilities Department
Date: ___________________________________
GEORGIA POWER COMPANY
By:
Name:
Title:
Date: ___________________________________
Attachment number 1Page 3 of 3
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Belair Rd Improvements - CPB Chg #2/SA#3
Department:Abie L. Ladson, PE, CPESC, Director of Engineering
Caption:Approve CPB # 323-041110-201823332 Change Number Two and
Supplemental Agreement Number Three in the amount of $65,000.00 on the
Belair Road Improvements project. Funding is available in the project
contingency account to be transferred to the project engineering account as
requested by AED.
Background:The scope of the project is to provide surveying, planning, design and
permitting for operational improvements along Belair Road based on the
recommendations in the Traffic Study prepared by Southeastern
Engineering, Inc.
Analysis:These improvements will include: new left and right turn lanes on Belair
Road on the east and west side of Jimmie Dyess Parkway (SR 383), north
and south left turn lanes on Belair Road on to Bridgeport Drive, a left turn to
Norwood Drive, a right turn off of Belair onto Wrightsboro Road, and a left
turn off of Wrightsboro on to Belair Road. Design services to also include
signalization of the intersection of Belair Road and Wrightsboro Road
Financial Impact:Funds in the amount of $65,000.00 are available in the Project's
Contingency Account 323-041110-201823332/6011110 to be transferred to
the project Engineering Account 323-041110-201823332/52-12115 upon
Commission approval
Alternatives:1) Approve CPB # 323-041110-201823332 Change Number Two and
Supplemental Agreement Number Three in the amount of $65,000.00 on the
Belair Road Improvements project. Funding is available in the project
contingency account to be transferred to the project engineering account as
requested by AED. . 2. Do not approve.
Recommendation:Approve Alternative Number One.
Funds are Available in
the Following
Accounts:
323-041110-201823332/6011110
REVIEWED AND APPROVED BY:Cover Memo
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
(SA01 – For changes more than $20,000) August 2009
AUGUSTA, GEORGIA
ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Project No. 323-041110-201823332
Supplemental Agreement No.2
PO: 71248
WHEREAS, We, “Rochester and Associates” Consultant, entered into a contract with
Augusta-Richmond County on “February 18, 2003”, for engineering design services associated
with the “Belair Road Improvements Project”, Project No. 323-041110-201823332, File
Reference No. 08-014 (A), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not
covered by the scope of the original contract, we desire to submit the following Supplemental
Agreement to-wit:
Assist Augusta-Richmond County with surveying, planning, design and
permitting of three (3) intersections along Belair Road based on the
recommendations in the March 13, 2009 Traffic Study prepared by
Southeastern Engineering, Inc.
It is agreed that as a result of the above described modification the contract amount is
increased by $65,000.00 from $164,578.09 to a new total of $229,578.09.
Any modifications to submittal dates shall be as identified in the attached proposal. This
agreement in no way modifies or changes the original contract of which it becomes a part,
except as specifically stated herein.
NOW, THEREFORE, We, “Rochester and Associates”, Consultant, hereby agree to said
Supplemental Agreement consisting of the above mentioned items and prices, and agree that
this Supplemental Agreement is hereby made a part of the original contract to be performed
under the specifications thereof, and that the original contract is in full force and effect,
except insofar as it might be modified by this Supplemental Agreement.
This day of , 2009.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY
AUGUSTA, GEORGIA
Deke Copenhaver, Mayor
Approved: Date Approved: Date
[ATTACHED CORPORATE SEAL]
ATTEST:
Title:
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission foPlease do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For r execution. For r execution. For r execution. For
information reference this request contact engineering at ext 5070. Thanks information reference this request contact engineering at ext 5070. Thanks information reference this request contact engineering at ext 5070. Thanks information reference this request contact engineering at ext 5070. Thanks
Attachment number 2Page 1 of 1
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Deed of Dedication and Maintenance Agreement for Utilities from West Wheeler Townhomes, Phase 8
Department:Augusta Utilities Department
Caption:Motion to approve a Deed of Dedication and Maintenance Agreement for
Water and Sanitary Sewer from West Wheeler Townhomes, Phase 8.
Background:West Wheeler Townhomes, Phase 8 was developed by ATC Development
Corp., which wishes to dedicate the water and sanitary sewer systems to
Augusta.
Analysis:The Augusta Utilities Department inspected the water and sanitary sewer
systems on April 8, 2009, and found them to be acceptable.
Financial Impact:None
Alternatives:Deny motion to approve a Deed of Dedication and Maintenance Agreement
for Water and Sanitary Sewer from West Wheeler Townhomes, Phase 8.
Recommendation:Approve motion to approve a Deed of Dedication and Maintenance
Agreement for Water and Sanitary Sewer from West Wheeler Townhomes,
Phase 8.
Funds are Available in
the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 5
Attachment number 1Page 2 of 5
Attachment number 1Page 3 of 5
Attachment number 1Page 4 of 5
Attachment number 1Page 5 of 5
Attachment number 2Page 1 of 1
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Detention Pond & Pipe Repair @ Belair Road/Buckhead Subdivision
Department:Public Services Department - Maintenance Division
Caption:Motion to award bid to Quality Storm Water Solutions (low bidder) in the
amount of $18,354.00 for the repair of the failed outfall structure and 40' of
failed CMP at Belair Road and the Buckhead Subdivision. Approve under
emergency conditions as new homes on Belair Road have the potential of
flooding.
Background:The 40' of failed CMP has completely separated from the outfall structure
causing the storm water not to be detained, bypassing the structure and
flooding onto Belair Road. The contractor has been given a "Notice to
Proceed" under an emergency basis.
Analysis:Without immediate attention, the failed structure and pipe will continue to
allow storm water to flood Belair Road causing property damage to adjacent
homes and potential vehicle accidents.
Financial Impact:Funds are availiable in SPLOST IV, Grading and Drainage Account
#324041110/201824021
Alternatives:#1. Motion to award bid to Quality Storm Water Solutions (low bidder) in
the amount of $18,354.00 for the repair of the failed outfall structure and 40'
of failed CMP at Belair Road and the Buckhead Subdivision. Approve under
emergency conditions as new homes on Belair Road have the potential of
flooding.
Recommendation:Alternative #1.
Funds are Available in
the Following
Accounts:
Funds are available in Grading and Drainage Account
#324041110/201824021
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Cover Memo
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Motion to Approve Option for Right-of Way
Department:Engineering Division - Land Acquisition Section
Caption:Motion to approve an Option for the purposes of acquiring a Right-of-Way
between Marvin Griffin Road Investments, LLC, as owner(s), and Augusta,
Georgia, as optionee, in connection with the Marvin Griffin Road
Improvement Project, (2,776 sq. ft.) in fee and (425 sq. ft.) of permanent
easement, more of less; and (7,950 sq. ft.) of temporary construction
easement from property located at: 1401 Marvin Griffin Road, private, at the
purchase price of $2,700.00.
Background:The property owner has agreed to convey a certain Right-of-Way and
Easement to Augusta, Georgia, for the Marvin Griffin Road Improvement
Project.
Analysis:The purchase of the referenced property is necessary for the project.
Financial Impact:The costs necessary for this purchase will be covered under the project
budget.
Alternatives:Deny the Motion
Recommendation:Approve the Motion
Funds are Available in
the Following
Accounts:
323041110 - 5411120 296823215 - 5411120
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 2
Attachment number 1Page 2 of 2
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Motion to Approve Option for Right-of-Way
Department:Engineering Division - Land Acquisition Section
Caption:Motion to approve an Option for the purposes of acquiring a Right-of-Way
between Schwerman Trucking Co., Successor by merger of Schwerman
Real Estate and Development Corp., as owner, and Augusta, Georgia as
optionee, in connection with the Marvin Griffin Road Improvement Project,
(3,275 sq. ft.) in fee and (N/A sq. ft.) of permanent construction and
maintenance easement, and (3,228 sq. ft.) of temporary construction
easement from property located at: 1601 Marvin Griffin Road, private, at the
purchase price of $2,600.00.
Background:The property owner has agreed to convey a certain Right-of-Way and
easement to Augusta, Georgia, for the Marvin Griffin Road Improvement
Project.
Analysis:The purchase of the referenced property is necessary for the project.
Financial Impact:The costs necessary for this purchase will be covered under the project
budget.
Alternatives:Deny the Motion
Recommendation:Approve the Motion
Funds are Available in
the Following
Accounts:
323041110 - 5411120 2968236303 - 5411120
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 2
Attachment number 1Page 2 of 2
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Old Savannah Rd/Twiggs St Improvements (Change in Scope)
Department:Abie L. Ladson, PE, CPESC, Director of Engineering
Caption:Approve a change in scope to separate Old Savannah Road/Twiggs Street
Improvement Project into two phases for design and construction as
requested by AED.
Background:The Old Savannah Road/Twiggs Improvement project is a project that was
approved in October 2001. The original scope of the project proposes to
construct minor widening including turn lanes at intersections and to
consider adding curb and gutter, and sidewalks from 6th Avenue to Nicholas
Street.
Analysis:The Old Savannah Road/Twiggs Improvement project is currently in the
design stage, and is contracted to design consultants, Clark Patterson
Associates. The design consultants expressed concerns to replace the
existing enclosed storm drainage system, curb and gutter, sidewalks,
landscaping, and street lighting. In a letter dated March 18, 2009, the
consultant stated the implementation of street lighting, sidewalks, and
landscaping would increase the need for additional rights-of-way and
permanent easements. A total of 154 properties will be affected, and
approximately 52 properties would be displaced with the current plans. The
time that it will take to acquire properties with the current plans would be
three to four years. The existing Old Savannah Road/Twiggs Street surface
is currently in poor condition and requires immediate repair. It is the
recommendation of the Augusta-Richmond County Engineering Department
to separate this project into two phases, and move forward with Phase I
immediately. The phases are as follow: PHASE I: Phase I consists of
milling, resurfacing, pavement stripping, and conducting repair and
maintenance on selected storm drainage systems, and curb and gutter. Phase
I will address the immediate needs along the corridor. NOTE: No land
acquisitions and project funds are required in this phase. ESTIMATED
CONSTRUCTION START DATE: November 2009 PHASE II: Phase II
consists of sidewalks, street lighting, and landscaping. Phase II will require
an additional 3 to 4 years to complete the land acquisition process.
Additional funds will be required for design, land acquisition, and
construction. An estimated cost is not yet available. ESTIMATED
CONSTRUCTION START DATE: 2015
Financial Impact:No additional funds are required for Phase I. A required fund for Phase II
has not been determined.
Alternatives:1)Approve a change in scope to separate Old Savannah Road/Twiggs Street
Improvement Project into two phases for design and construction as
Cover Memo
requested by AED. 2) Do not approve, and delay the much needed repair
along the corridor.
Recommendation:Approve Alternative Number One.
Funds are Available in
the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Option for Easement
Department:Engineering Division - Land Acquisition Section
Caption:Motion to approve an Option for the purposes of acquiring an easement
between Soo H. Yun, as owner, and Augusta, Georgia, as optionee, in
connection with the Marvin Griffin Road Improvements Project, (1,779 sq.
ft.) of temporary construction easement from property located at: 1801
Marvin Griffin Road, private, at the purchase price of $125.00.
Background:The property owner has agreed to convey a certain option for easement to
Augusta, Georgia, for the Marvin Griffin Road Improvement Project.
Analysis:The purchase of the referenced property is necessary for the project.
Financial Impact:The costs necessary for this purchase will be covered under the project
budget.
Alternatives:Deny the Motion
Recommendation:Approve the Motion
Funds are Available in
the Following
Accounts:
323041110 - 5411120 2968236303 - 5411120
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 2
Attachment number 1Page 2 of 2
Engineering Services Committee Meeting
9/8/2009 1:00 PM
PKP Restroom
Department:Public Services Department - Facilities Management Division
Caption:Approve award of the contract for construction of a new restroom facility at
Pendleton King Park to the low bidder, Sommers Construction of Evans, GA, in the
amount of $25,740, to be funded from reprogrammed SPLOST I - GL 271-01-
6215/JL 207-27-2007, approved by the Commission.
Background:The Commission reallocated $50,000 of recaptured SPLOST I funds for upgrades to
Pendleton King Park. A new restroom was one of the projects included in this
reallocation. This new facility is also part of the PKP Master Plan approved by the
Commission.
Analysis:A Request for Bids (RFB), Bid Item 09-131, was issued for this scope of work.
Specifications were sent out and three responsive bids were received. Sommers
Construction was the low bid. Staff has reviewed the numbers, confirmed with the
contractor that they are comfortable with the price as submitted, and verified that the
price is within budget.
Financial Impact:The cost of the contract is $25,740 which is to be funded from SPLOST Phase I
recapture.
Alternatives:1. Approve award of the contract for construction of a new restroom facility at
Pendleton King Park to the low bidder, Sommers Construction of Evans, GA, in the
amount of $25,740 to be funded from reprogrammed SPLOST I - GL 271-01-
6215/JL 207-27-2007, approved by the Commission. 2. Do not approve the award.
Recommendation:Alternative #1
Funds are Available in the
Following Accounts:FUNDS ARE AVAILABLE IN ACCOUNT: GL 271-01-6215/JL 207-27-2007
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
1
EXHIBIT II
Pendleton King Park Restroom
Bid Item #
INDEX TO CONTRACT
Section Title Page
NA Notice of Award 2
A Agreement 3-4
PB Performance Bond 5-6
LMPB Labor & Material Payment Bond 7-8
COA Certificate of Owner's Attorney 9
NP Notice to Proceed 10
GC General Conditions 11-25
SGC Supplemental General Conditions 26-28
SC Special Conditions 28
Attachment number 1Page 1 of 28
2
SECTION NA
NOTICE OF AWARD
TO:
PROJECT DESCRIPTION: Pendleton King Park Restroom
The Owner has considered the BID submitted by you for the PROJECT named above in response to its Bid Item
# due on .
You are hereby notified that your BID (Including Alternates ) has been accepted in the
amount of .
You are to execute the AGREEMENT (Section A) within Ten (10) calendar days from the date of this Notice to
you. Furthermore, the Owner has elected to require a Contractor's Performance Bond (Section PB) and a Labor
and Materials Payment Bond (Section LMPB). The price of said bonds is included in the contract amount stated
above.
If you fail to execute said Agreement and to furnish said Bonds within Ten (10) working days from the date of this
Notice, said OWNER will be entitled to consider all your rights arising out of the OWNER'S acceptance of your
PROPOSAL as abandoned and as a forfeiture of your Bid Bond. The OWNER will be entitled to such other rights
as may be granted by law.
Shop drawings and other submittals are due within fifteen (15) calendar days of the issuance of this Notice of
Award.
You are required to return an acknowledged copy of this NOTICE OF AWARD to the OWNER.
Dated this day of , .
BY:
Richard M. Acree, Jr., Assistant Director
Augusta Public Services Department
Facilities Management Division
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE OF AWARD is hereby acknowledged on this day of , .
BY:
TITLE:
Attachment number 1Page 2 of 28
3
SECTION A
AGREEMENT
THIS AGREEMENT, made this day of , . by and between
Augusta Georgia, a political subdivision of the State of Georgia, hereinafter called "Owner"
and doing business as a corporation hereinafter
called "Contractor."
WITNESSETH: That for and in consideration of the payments and agreements as hereinafter
mentioned the sufficiency which is hereby acknowledged, the parties agree to as follows:
1. The Contractor will commence construction of the Pendleton King Park Restroom. All
work is to be in accordance with plans prepared by the owner as included in Bid Item#
and related documents as listed in item 5 below.
2. The Contractor shall provide all labor, material, parts, engineering, licensing and
certifications required by any applicable regulation. Furthermore, the Contractor will
furnish all drawings, product data, material, supplies, tools, equipment, labor, traffic
control and other services necessary for the construction and completion of the project
described herein.
3. The Contractor will commence the work required by the Contract Documents within
Thirty (30) calendar days after the date of the Notice of Award and will complete the
work not later than 90 days after notice to proceed, unless the period of completion is
extended otherwise in accordance with the terms of this agreement.
4. The Contractor agrees to perform all the work described in the Contract Documents for
the sum of ($ ).
5. The term "Contract Documents" means and includes the following:
Advertisement for Bids Request for Bids # Bid
Bid Bond Notice of Award Agreement
Performance/Payment Bonds Certificate of Owner's Attorney Notice to Proceed
Change Order General Conditions Plans
Supplemental General Conditions Special Conditions Technical Specifications
Addendum No. , dated .
Addendum No. , dated .
6. The Owner will pay to the Contractor in the manner and at such times as set forth in
the General Conditions such amounts as required by the Contract Documents.
7. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors and assigns.
Attachment number 1Page 3 of 28
4
IN WITNESS WHEREOF, the parties hereto have executed or caused to be executed by their
duly authorized officials, this Agreement in Five (5) counterparts, each of which shall be
deemed an original on the date first above written.
OWNER: AUGUSTA, GEORGIA ATTEST:
BY: NAME:
Deke Copenhaver (Mayor) Lena Bonner (Clerk)
CONTRACTOR: ATTEST:
BY: (SEAL)
NAME: NAME:
(Type or Print) (Type or Print)
TITLE: TITLE:
ADDRESS:
Attachment number 1Page 4 of 28
5
SECTION PB
PERFORMANCE BOND
(NOTE: THIS BOND IS ISSUED SIMULTANEOUSLY WITH PAYMENT BOND ON PAGES 7-8, IN
FAVOR OF THE OWNER CONDITIONED FOR THE PAYMENT OF LABOR AND MATERIAL.)
KNOW ALL MEN BY THESE PRESENTS:
That , as Principal, hereinafter called Contractor, and
, a corporation organized and existing under the laws of the State of
, with its principal office in the City of , State of , as Surety,
hereinafter called Surety, are held and firmly bound unto Augusta, Georgia, as Obligee, hereinafter
called the Owner, in the penal amount of Dollars ($ )
for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators,
successors, and assigns, jointly and severally, firmly by these presents for the faithful performance of a
certain written agreement.
WHEREAS, Contractor has by said written agreement dated entered into a contract
with Owner for the construction of Pendleton King Park Restroom, Augusta, Georgia, in accordance
with the specifications issued by the Richmond County Public Services Department, which contract is
by reference made a part hereof, and is hereinafter referred to as the CONTRACT.
NOW, THEREFORE, the condition of this obligation is such that, if Contractor shall promptly and
faithfully perform said CONTRACT, then this obligation shall be null and void; otherwise it shall remain
in full force and effect.
The Surety hereby waives notice of any alteration or extension of time made by the Owner.
Whenever Contractor shall be, and declared by Owner to be in default under the CONTRACT, the
Owner having performed Owner's obligations thereunder, the Surety may promptly remedy the default,
or shall promptly
(1) Complete the CONTRACT in accordance with its terms and conditions, or,
(2) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and
upon determination by Surety of the lowest responsible bidder, or, if the Owner elects, upon
determination by the Owner and the Surety jointly of the lowest responsible bidder, arrange for a
contract between such bidder and Owner, and make available as Work progresses (even though
there should be a default or a succession of defaults under the contract or contracts of completion
arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of
the contract price; but not exceeding, including other costs and damages for which the Surety may
be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the
contract price," as used in this paragraph, shall mean the total amount payable by Owner to
Contractor under the Contract and any amendments thereto, less the amount properly paid by
Owner to Contractor.
Any suit under this bond must be instituted before the expiration of two (2) years from the date on which
final payment under the CONTRACT falls due.
Attachment number 1Page 5 of 28
6
No right of action shall accrue on this bond to or for the use of any person or corporation other than the
Owner named herein or the heirs, executors, administrators or successors of the Owner.
Signed and sealed this day of , .
Witness (Seal)
(Contractor)
Attest By (Seal)
(Title)
Witness (Seal)
(Surety)
Attest By (Seal)
(Title)
Note: Date of Bond must be prior to date of Contract. If Contractor is Partnership, all partners should
execute Bond.
Attachment number 1Page 6 of 28
7
SECTION LMPB
LABOR AND MATERIAL PAYMENT BOND
(NOTE: THIS BOND IS ISSUED SIMULTANEOUSLY WITH PERFORMANCE BOND ON PAGES 5-6,
IN FAVOR OF THE OWNER CONDITIONED FOR THE PERFORMANCE OF THE CONTRACT.)
KNOW ALL MEN BY THESE PRESENTS:
That , as Principal, hereinafter called Contractor, and , a
corporation organized and existing under the laws of the State of , with its principal office in the
City of , State of , as Surety, hereinafter called Surety, are held and firmly
bound unto Augusta, Georgia, as Obligee, hereinafter called the Owner, for the use and benefit of
claimants as hereinbelow defined in the amount of Dollars ($ )
for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators,
successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, Contractor has, by written agreement dated ,entered into a contract with
Owner for the construction of Pendleton King Park Restroom, in accordance with specifications
issued by the Richmond County Public Services Department, which contract is by reference made a
part hereof, and is hereinafter referred to as the CONTRACT.
NOW, THEREFORE, the condition of this obligation is such that, if the Contractor shall promptly make
payment to all claimants as hereinafter defined, for all labor and material used or reasonably required to
use in the performance of the CONTRACT, then this obligation shall be void; otherwise it shall remain
in full force and effect, subject, however, to the following conditions:
(1.) A claimant is defined as one having a direct contract with the Contractor or with a subcontractor
of the Contractor for labor, material, or both, used or reasonably required for use in the
performance of the contract, labor and material being construed as to include that part of water,
gas, power, light, heat, oil, gasoline, telephone service or rental of equipment directly applicable
to the CONTRACT.
(2) The above named Contractor and Surety hereby jointly and severally agree with the Owner that
every claimant as herein defined, who has not been paid in full before the expiration of a period
of ninety (90) days after the date on which the last of such claimant's work or labor was done or
performed, or materials were furnished by such claimant, may sue on this bond for the use of
such claimant, prosecute the suit to final judgement for such sum or sums as may be justly due
claimant, and have execution thereon. The Owner shall not be liable for the payment of any
costs or expenses of any such suit.
(3) No suit or action shall be commenced hereunder by any claimant,
(a) Unless claimant, other than one having a direct contract with the Contractor, shall have
given written notice to any two of the following: The Contractor, the Owner, or the Surety
above named, within ninety (90) days after such claimant did or performed the last of
the work or labor, or furnished the last of the materials for which said claim is made,
stating with substantial accuracy the amount claimed and the name of the party to
whom the materials were furnished, or for whom the work or labor was done or
performed. Such notice shall be served by mailing the same by registered mail or
certified mail, postage prepaid, in an envelope addressed to the Contractor, Owner or
Surety, at any place where an office regularly maintained for the transaction of
Attachment number 1Page 7 of 28
8
business, or served in any manner in which legal process may be served in the state in
which the aforesaid project is located, save that such service need not be made by a
public officer.
(b) After the expiration of one (1) year following the date on which Contractor ceased work
on said CONTRACT, it being understood, however, that if any limitation embodied in
this bond is prohibited by any law controlling the construction hereof, such limitation
shall be deemed to be amended so as to be equal to the minimum period of limitation
permitted by such law.
(c) Other than in a state court of competent jurisdiction in and for the county or other
political subdivision of the state in which the project, or any part thereof, is situated, or in
the United States District Court for the district in which the project, or any part thereof, is
situated, and not elsewhere.
(4) The amount of this bond shall be reduced by and to the extent of any payment or payments
made in good faith hereunder, inclusive of the payment by Surety of mechanics' liens which
may be filed of record against said improvement, whether or not claim for the amount of such
lien be presented under and against this bond.
Signed and sealed this day of , .
Witness (Seal)
(Contractor)
Attest By (Seal)
(Title)
Witness (Seal)
(Surety)
Attest By (Seal)
(Title)
Note: Date of Bond must be prior to date of Contract. If Contractor is Partnership, all partners should
execute Bond.
Attachment number 1Page 8 of 28
9
CERTIFICATE OF OWNER'S ATTORNEY
I, the undersigned ,
the authorized and acting legal representative of Augusta, Georgia, do hereby certify as
follows:
I have examined the attached Contract(s) and Surety Bonds, and the manner of execution
thereof, and I am of the opinion that each of the aforesaid agreements has been duly
executed by the proper parties thereto acting through their duly authorized representatives;
that said representatives have full power and authority to execute said agreements on behalf
of the respective parties named thereon; and that the foregoing agreements constitute valid
and legally binding obligations upon the parties executing the same in accordance with the
terms, conditions and provisions thereof.
____________________________________________
Chiquita Johnson, Attorney
Augusta, Georgia
DATE:_____________________
Attachment number 1Page 9 of 28
10
SECTION NP
NOTICE TO PROCEED
TO: DATE:
PROJECT: Pendleton King Park Restroom
You are hereby notified to commence work in accordance with the Agreement dated
,
This Notice accompanies the accepted Shop Drawings. You are to complete the work not
later than 90 days following the issuance of this Notice to Proceed.
BY:
Richard M. Acree, Jr., Assistant Director
Augusta Public Services Department
Facilities Management Division
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE TO PROCEED is hereby acknowledged on this day of , .
BY:
TITLE:
Attachment number 1Page 10 of 28
11
SECTION GC
GENERAL CONDITIONS
INDEX TO ARTICLES OF GENERAL CONDITIONS
Section Page
GC-01 Definitions 12
GC-02 Additional Instructions and Detail Drawings 14
GC-03 Schedules, Reports and Records 14
GC-04 Drawings and Specifications 14
GC-05 Shop Drawings 15
GC-06 Materials, Services and Facilities 15
GC-07 Inspection and Testing 15
GC-08 Substitutions 16
GC-09 Patents 16
GC-10 Surveys, Permits and Regulations 16
GC-11 Protection of Work, Property and Persons 17
GC-12 Supervision by Contractor 17
GC-13 Changes in the Work 18
GC-14 Changes in Contract Price 18
GC-15 Time for Completion 18
GC-16 Correction of Work 18
GC-17 Subsurface Conditions 19
GC-18 Suspension of Work, Termination and Delay 19
GC-19 Payments to Contractor 21
GC-20 Acceptance of Final Payment as Release 21
GC-21 Insurance 21
GC-22 Contract Security 22
GC-23 Assignments 23
GC-24 Indemnification 23
GC-25 Separate Contracts 23
GC-26 Subcontracting 24
GC-27 Engineer's Authority 24
GC-28 Land and Rights-of-Way 24
GC-29 Guarantee 24
GC-30 Taxes 25
GC-31 Work Adjacent to Railway or Other Property 25
GC-32 Order and Discipline 25
GC-33 Warning Devices and Signs 25
GC-34 Special Restrictions 25
GC-35 As-Built Drawings 25
GC-36 Allowances 25
Attachment number 1Page 11 of 28
12
GC-01. DEFINITIONS:
Wherever used in the Contract Documents, the following terms shall have the meanings indicated which shall be
applicable to both the singular and plural thereof.
1. ADDENDA: Written or graphic instruments issued prior to the execution of the Agreement which
modify or interpret the Contract Documents, Drawings and Specifications, by addition,
deletion, clarifications or corrections.
2. BID: The offer or proposal of the Bidder submitted on the prescribed form setting forth the
prices for the work to be performed.
3. BIDDER: Any person, firm or corporation submitting a bid or proposal for the work.
4. BONDS: Bid, Performance and Payment Bonds and other instruments of security furnished by
the Contractor and his Surety in accordance with the Contract Documents.
5. CHANGE ORDER: A written order to the Contractor authorizing an addition, deletion or revision in
the work within the general scope of the Contract Documents or authorizing an
adjustment in the contract price or contract time.
6. CONTRACT DOCUMENTS: The contract including, but not limited to, Request for Proposals,
Advertisement for Bids, Information for Bidders, Proposal, Bid Bond, Notice of award,
Agreement, Performance Bond, Payment Bond, Notice to Proceed, Change Order,
General Conditions, Supplemental General Conditions, Special Conditions, Technical
Specifications, Drawings and Addenda.
7. CONTRACT PRICE: The total monies payable to the Contractor under the terms and conditions of
the Contract Documents.
8. CONTRACT TIME: The number of calendar days, or defined completion date stated in the Contract
Documents for the completion of the work.
9. LIFE OF THE CONTRACT: The total duration of the Contract from Notice to Proceed to completion
of all the work.
10. CONTRACTOR: The person, firm or corporation with whom the Owner has executed the
Agreement.
11. DRAWINGS: The part of the Contract Documents which show the characteristics and scope of the
work to be performed and which have been prepared or approved by the Engineer.
12. ENGINEER: The person, firm or corporation named as such in the Contract Documents. For
purposes of this contract, the Assistant Director of Public Services Department,
Facilities Management Division or his designated representative shall act as the
Engineer.
13. FIELD ORDER: A written order effecting a change in the work not involving an adjustment in the contract
price or an extension of the contract time issued by the Engineer to the Contractor
during construction.
14. NOTICE OF AWARD: The written notice of the acceptance of the Bid from the Owner to the
successful Bidder.
15. NOTICE TO PROCEED: Written communication issued by the Owner to the Contractor
authorizing him to proceed with the work and establishing the date of commencement of
the work.
Attachment number 1Page 12 of 28
13
16. OWNER: For purposes of this Request for Bids, the Owner is Augusta, Georgia.
17. PROJECT: The undertaking to be performed as provided in the Contract Documents.
18. RESIDENT PROJECT REPRESENTATIVE: The authorized representative of the Owner who is
assigned to the project or any part thereof.
19. SHOP DRAWINGS: All drawings, diagrams, illustrations, brochures, schedules, and other data
which are prepared by the Contractor, a Subcontractor, Manufacturer, Supplier or
Distributor, which illustrate how specific portions of the work shall be fabricated or
installed.
20. SPECIFICATIONS: A part of the Contract Documents consisting of written descriptions of a
technical nature or materials, equipment, construction systems, standards and
workmanship.
21. SUBCONTRACTOR: An individual, firm or corporation having a direct contract with the Contractor or
any other Subcontractor for the performance of a part of the work at the site.
22. SUBSTANTIAL COMPLETION: That date as certified by the Engineer when the construction of the
project or a specified part can be utilized for the purposes for which it is intended.
23. SUPPLEMENTAL GENERAL CONDITIONS: Modifications and/or additions to the General
Conditions of a specific nature generally aimed at the specific contract of which it is a
part.
24. SUPPLIERS: Any person, supplier or organization who supplies materials or equipment for the work,
including that fabricated to a special design, but who does not perform labor at the site.
25. WORK: All labor necessary to produce the construction required by the Contract Documents and
all materials and equipment incorporated or to be incorporated in the project.
26. WRITTEN NOTICE: Written notice to any party of the Agreement relative to any part of this
Agreement. Said Notice is considered delivered and the service thereof completed,
when posted by certified or registered mail to the said party at his last given address or
delivered in person to said party or his authorized representative on the work.
Attachment number 1Page 13 of 28
14
GC-02. ADDITIONAL INSTRUCTIONS AND DETAIL DRAWINGS:
1. The Contractor may be furnished additional instructions or detail drawings, by the Engineer, as necessary
to carry out the work required by the Contract Documents.
2. Any additional drawings and instructions thus supplied will become a part of the Contract Documents.
The Contractor shall carry out the work in accordance with the additional detail drawings and instructions.
GC-03. SCHEDULES, REPORTS AND RECORDS:
1. The Contractor shall submit to the Owner such schedule of quantities and costs, progress schedules,
payrolls, reports, estimates, records and other data as the Owner may request concerning the work
performed or to be performed.
2. Prior to the first partial payment estimate, the Contractor shall submit schedules showing the order in
which he proposes to carry on the work, including dates at which he will start the various parts of the
work, estimated date of completion of each part and as applicable:
2.1 the dates at which special detail drawings will be required; and
2.2 respective dates for submission of shop drawings, the beginning of manufacture, the testing and
the installation of materials, supplies and equipment.
3. The Contractor shall also submit a schedule of payments that he anticipates he will earn during the
course of the work.
GC-04. DRAWINGS AND SPECIFICATIONS;
1. The intent of the Contract Documents is to describe the scope of work for which the Contractor shall
furnish all design, labor, materials, tools, equipment and transportation necessary for the proper
execution. All work is to be in accordance with the Contract Documents and all incidental work necessary
to complete the project in an acceptable manner, ready for use, occupancy or operation by the Owner is
to be included.
2. In case of conflict between any drawings and specifications, the specifications shall govern. Figure
dimensions on drawings shall govern over general drawings.
3. Any discrepancies, inconsistencies, or ambiguities found between the Contract Documents and site
conditions shall be immediately reported to the Engineer, in writing, who shall promptly correct such
inconsistencies or ambiguities in writing. Work done by the Contractor after his discovery of such
discrepancies, inconsistencies or ambiguities shall be done at the Contractor's risk.
4. All work that may be called for in the specifications and not shown on the drawings, or shown and not
called for in the specifications, shall be executed and furnished by the Contractor as if described in both
these ways. Should any work or material be required which is not detailed in the specifications or
drawings, either directly or indirectly, but which is nevertheless necessary for the proper carrying out of
the intent thereof, the Contractor is to understand the same to be implied and required and shall perform
all such work and furnish any such material as fully as if they were particularly delineated or described.
5. It is understood and agreed that the Contractor, by careful examination, has satisfied himself as to the
nature and location of the work, the conformation of the ground, the character, quality and quantity of the
materials to be encountered, the character of equipment and facilities needed preliminary to and during
the prosecution of the work, the general and local conditions and all other matters which can in any way
affect the work under this contract. No verbal agreement or conversation with any officer, agent or
employee of the Owner, either before or after the execution of this contract, shall affect or modify any of
the terms or obligations herein contained.
Attachment number 1Page 14 of 28
15
GC-05. SHOP DRAWINGS:
1. The Contractor shall provide design drawings, shop drawings and product data for all components as
may be necessary for the prosecution of the work as required by the Contract Documents. The Engineer
shall promptly review all shop drawings. The Engineer's approval of any shop drawings shall not release
the Contractor from responsibility for deviations from the Contract Documents. The approval of any shop
drawing that deviates substantially from the requirement of the Contract Documents shall be evidenced
by a Change Order.
2. When submitted for the Engineer's review, shop drawings shall bear the Contractor's certification that he
has reviewed, checked and approved the shop drawings and that they are in conformance with the
requirements of the Contract Documents.
3. Portions of the work that require shop drawings or sample submission shall not commence until the shop
drawings or submissions have been approved by the Engineer. A copy of each approved shop drawing
and each approved sample shall be kept in good order by the Contractor at the site and shall be available
to the Engineer.
GC-06. MATERIALS, SERVICES AND FACILITIES:
1. It is understood that, except as otherwise specifically stated in the Contract Documents, the Contractor
shall provide and pay for all materials, labor, tools, equipment, transportation, supervision, temporary
construction of any nature and all other services and facilities of any nature necessary to execute,
complete and deliver the work within the specified time.
2. Materials and equipment shall be stored so as to insure the preservation of their quality and fitness for
the work. Stored materials and equipment to be incorporated in the work shall be located so as to
facilitate prompt inspection.
3. Manufactured articles, materials and equipment shall be applied, installed, connected, erected, used,
cleaned and conditioned as directed by the manufacturer.
4. Materials, supplies or equipment shall be in accordance with samples submitted by the Contractor and
approved by the Engineer.
5. Materials, supplies or equipment to be incorporated into the work and purchased by the Contractor or the
Subcontractor will be subject to a chattel mortgage or under a conditional sale contract or other
agreement by which an interest is retained by the seller.
GC-07. INSPECTION AND TESTING:
1. All materials and equipment used in the construction of the project shall be subject to adequate
inspection and testing in accordance with generally accepted standards.
2. The Contractor shall provide, at his expense, the necessary testing, inspection and certification services
required by the Contract Documents, unless otherwise provided.
3. The Owner shall provide all other inspection and testing services required by the Contract Documents.
4. If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having
jurisdiction require any work to specifically be inspected, tested or approved by someone other that the
Contractor, the Contractor will give the Engineer timely notice of readiness. The Contractor will then
furnish the Engineer the required certificates of inspection, testing or approval.
Attachment number 1Page 15 of 28
16
5. Neither observation by the Engineer nor inspections, tests or approvals by persons other than the
Contractor shall relieve the Contractor from his obligations to perform the work in accordance with the
requirements of the Contract Documents.
6. The Engineer and his representatives will at all times have access to the work. In addition, authorized
representatives and agents of any participating Federal or State Agency shall be permitted to inspect all
work, materials, payrolls, records of personnel, invoices of materials and other relevant data and records.
The Contractor will provide proper facilities for such access and observation of the work and also for any
inspection or testing thereof.
7. If any work is covered contrary to the written request of the Engineer, it must, if requested by the
Engineer, be uncovered for his observation and replaced at the Contractor's expense.
8. If any work has been covered which the Engineer has not specifically requested to observe prior to its
being covered or if the Engineer considers it necessary or advisable that covered work be inspected or
tested by others, the Contractor at the Engineer's request, will uncover, expose or otherwise make
available for observation, inspection or testing as the Engineer may require, that portion of the work in
question, furnishing all necessary labor, materials, tools and equipment. If it is found that such work is
defective, the Contractor will bear all the expenses of such uncovering, exposure, observation, inspection
and testing and of satisfactory reconstruction. If, however, such work is not found to be defective, the
Contractor will be allowed an increase in the contract price or an extension of the contract time, or both,
directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction and
an appropriate change order shall be issued.
9. The Contractor shall give the Engineer 24 hours notice of starting any new work. No work shall be done
or materials used without suitable supervision and inspection by the Engineer. The Contractor shall
furnish the Engineer with necessary samples of material for testing purposes.
GC-08. SUBSTITUTIONS:
1. When a material, article or piece of equipment is identified on the drawings or specifications by reference
to brand name or catalogue number, the performance or other salient requirements and that other
products of equal capacities, quality and function shall be considered. The Contractor may recommend
the substitution of a material, article or piece of equipment of equal substance and function for those
referred to in the Contract Documents by reference to brand name or catalogue number and if, in the
opinion of the Engineer, such material, article or piece of equipment is of equal substance and function to
that specified, the Engineer may approve its substitution and use by the Contractor. Any cost differential
shall be deducted from the contract price and the Contract Documents shall be appropriately modified by
change order. The Contractor warrants that if substitutes are approved, no major changes in the function
or general design of the project will result. Incidental changes or extra component parts required to
accommodate the substitute will be made by the Contractor without a change in the contract price or
contract time.
GC-09. PATENTS:
1. The Contractor shall pay all applicable royalties and license fees. He shall defend all suits or claims for
infringement of any patent rights and save the Owner harmless from loss on account thereof except that
the Owner shall be responsible for any such loss when a particular process, design or the product of a
manufacturer or manufacturers is specified, but if the Contractor has reason to believe that the design,
process or product specified is an infringement of a patent, he shall be responsible for such loss unless
he promptly gives such information to the Engineer.
GC-10. SURVEYS, PERMITS AND REGULATIONS:
1. The Owner shall furnish all land surveys and establish all base lines for locating the principal component
parts of the work together with a suitable number of benchmarks adjacent to the work as shown in the
Attachment number 1Page 16 of 28
17
Contract Documents. From the information provided by the Owner, unless otherwise specified in the
Contract Documents, the Contractor shall develop and make all detail surveys needed for construction
such as slope stakes, batter boards, stakes for pile locations and other working points, lines, elevations
and cut sheets.
2. The Contractor shall carefully preserve benchmarks, reference points and stakes and in case of willful or
careless destruction, he shall be charged with the resulting expense and shall be responsible for any
mistakes that may be caused by their unnecessary loss or disturbance.
3. Permits and licenses necessary for the prosecution of the work shall be secured and paid for by the
Contractor. The Contractor shall give all notices and comply with all laws, ordinances, rules and
regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that
the Contract Documents are at variance therewith, he shall promptly notify the Engineer in writing and
any necessary changes shall be adjusted as provided in Section GC-13, Changes in the Work.
GC-11. PROTECTION OF WORK, PROPERTY AND PERSONS:
1. The Contractor will be responsible for initiating, maintaining and supervising all safety precautions and
programs in connection with the work. He will take all necessary precautions for the safety of and will
provide the necessary protection to prevent damage, injury or loss to all employees on the work and
other persons who may be affected thereby, all the work and all materials or equipment to be
incorporated therein, whether in storage on or off the site or other property at the site or adjacent thereto,
including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for
removal, relocation or replacement in the course of construction.
2. The Contractor will comply with all applicable laws, ordinances, rules, regulations and orders of any
public body having jurisdiction. He will erect and maintain, as required by the conditions and progress of
the work, all necessary safeguards for safety and protection. He will notify the owners of adjacent
properties when prosecution of the work may affect them. The Contractor will remedy all damage, injury
or loss to any property caused, directly or indirectly, in whole or in part, by the Contractor, and
subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of
them are liable, except damage or loss attributable to the fault of the Contract Documents or to the acts
or omissions of the Owner or the Engineer or anyone employed by either of them or anyone for whose
acts either of them may be liable and not attributable, directly or indirectly, in whole or in part, to the fault
or negligence of the Contractor.
3. In emergencies affecting the safety of persons or the work or property at the site or adjacent thereto, the
Contractor, without special instructions or authorization from the Engineer or Owner, shall act to prevent
threatened damage, injury or loss. He will give the Engineer prompt written notice of any significant
changes in the work or deviations from the Contract Documents caused thereby and a Change Order
shall be issued covering the changes and deviations involved.
4. The work under this Contract in every respect shall be at the risk of the Contractor until finished and
accepted, except to damage or injury caused directly by the Owner's agents or employees.
GC-12. SUPERVISION BY CONTRACTOR:
1. The Contractor will supervise and direct the work. He will be solely responsible for the means, methods,
techniques, sequences and procedures of construction. The Contractor will employ and maintain on the
work a qualified supervisor or superintendent who shall have been designated in writing by the Contractor
as the Contractor's representative at the site. The supervisor shall have full authority to act on the behalf
of the Contractor and all communications given to the supervisor shall be as binding as if given to the
Contractor. The supervisor shall be present on the site at all times as required to perform adequate
supervision and coordination of the work.
Attachment number 1Page 17 of 28
18
GC-13. CHANGES IN THE WORK:
1. The Owner may at any time as the need arises, order changes within the scope of the work without
invalidating the Agreement. If such changes increase or decrease the amount due under the Contract
Documents or in the time required for performance of the work, an equitable adjustment shall be
authorized by Change Order.
2. The Engineer, also, may at any time, by issuing a field order, make changes in the details of the work.
The Contractor shall proceed with the performance of any changes in the work so ordered by the
Engineer unless the Contractor believes that such field order entitles him to a change in the contract
price or time or both, in which event he shall give the Engineer written notice thereof within ten (10) days
after the receipt of the ordered change pending the receipt of an executed change order or further
instruction from the Owner.
GC-14. CHANGES IN CONTRACT PRICE:
1. The contract price may be changed only by a change order. The value of any work covered by a change
order or of any claim for increase or decrease in the contract price shall be determined by one or more of
the following methods in the order of precedence listed below:
1.1 Unit prices previously approved.
1.2 An agreed lump sum.
1.3 The actual cost for labor, direct overhead, materials, supplies, equipment and other services
necessary to complete the work. In addition there shall be added an amount to be agreed upon
but not to exceed fifteen (15) percent of the actual cost of the work to cover the cost of general
overhead and profit.
GC-15. TIME FOR COMPLETION:
1. The date of beginning and the time for completion of the work are essential conditions of the Contract
Documents and the work embraced shall be commenced on the date specified in the Notice to Proceed.
2. The Contractor will proceed with the work at such rate of progress to insure full completion within the
contract time. It is expressly understood and agreed, by and between the Contractor and the Owner, that
the contract time for the completion of the work described herein is a reasonable time, taking into
consideration the average climatic and economic conditions and other factors prevailing in the locality of
the work.
GC-16. CORRECTION OF WORK:
1. The Contractor shall promptly remove from the premises all work rejected by the Engineer for failure to
comply with the Contract Documents, whether incorporated in the construction or not and the Contractor
shall promptly replace and re-execute the work in accordance with the Contract Documents and without
expense to the Owner and shall bear the expense of making good all work of other Contractors
destroyed or damaged by such removal or replacement.
2. All removal and replacement work shall be done at the Contractor's expense. If the Contractor does not
take action to remove such rejected work within ten (10) days after receipt of written notice, the Owner
may remove such work and store the materials at the expense of the Contractor.
3. Any omissions or failure on the part of the Engineer to disapprove or reject any work or material shall not
be construed to be an acceptance of any defective work or material. The Contractor shall remove, at his
own expense and shall rebuild and replace same without extra charge and in default thereof the same
may be done by the Owner at the Contractor's expense or in case the Engineer shall not consider the
defect of sufficient importance to require the Contractor to rebuild or replace any imperfect work or
Attachment number 1Page 18 of 28
19
material, he shall have the power and is hereby authorized to make an equitable deduction from the
stipulated price.
GC-17. SUBSURFACE CONDITIONS:
1. The Contractor shall promptly and before such conditions are disturbed, except in the event of an
emergency, notify the Owner by written notice of:
1.1 Subsurface or latent physical conditions at the site differing materially from those indicated in the
Contract Documents.
1.2 Unknown physical conditions at the site, of an unusual nature, differing materially from those
ordinarily encountered and generally recognized as inherent in work of the character provided for
in the Contract Documents.
2. The Owner shall promptly investigate the conditions and if he finds that such conditions do so materially
differ and cause an increase or decrease in the cost of, or in the time required, for performance of the
work, an equitable adjustment shall be made and the Contract Documents shall be modified by a Change
Order. Any claim of the Contractor for adjustment hereunder shall not be allowed unless he has given the
required written notice; provided that the Owner may, if he determines the facts so justify, consider and
adjust any such claims asserted before the date of final payment.
GC-18. SUSPENSION OF THE WORK, TERMINATION AND DELAY:
1. The Owner may, at any time and without cause, suspend the work or any portion thereof for a period of
not more than ninety days or such further time as agreed upon by the Contractor, by written notice to the
Contractor. The Engineer shall fix the date on which work shall be resumed. The Contractor will resume
that work on the date so fixed. The Contractor will be allowed an increase in the contract price, an
extension of the contract time, or both, directly attributable to any suspension.
2. If the Contractor is adjudged bankrupt or insolvent, or if he makes a general assignment for the benefit of
his creditors or if a trustee or receiver is appointed for the Contractor or for any of his property or if he
files a petition to take advantage of any debtor's act to reorganize under the bankruptcy or applicable
laws or if he repeatedly fails to supply sufficient skilled workmen or suitable materials or equipment, or if
he repeatedly fails to make prompt payments to subcontractors or for labor, materials or equipment or if
he disregards laws, ordinances, rules, regulations or orders of any public body having jurisdiction of the
work or if he disregards the authority of the Engineer, or if, in the opinion of the Engineer, the Contractor
fails to make satisfactory progress in prosecuting the work, or if he otherwise violates any provision of the
Contract Documents, then the Owner may, without prejudice to any other right or remedy and after giving
the Contractor and his Surety a minimum of ten (10) days from delivery of a written notice, terminate the
services of the Contractor and take possession of the Project and of all materials, equipment, tools,
construction equipment and machinery thereon owned by the Contractor and finish the work by whatever
method he may deem expedient. In such case, the Contractor shall not be entitled to receive any further
payment until the work is finished. If the unpaid balance of the Contract Price exceeds the direct and
indirect costs of completing the Project, including compensation for additional professional services, such
excess shall be paid to the Contractor. If such costs exceed such unpaid balance, the Contractor will pay
the difference to the Owner. Such costs incurred by the Owner will be determined by the Engineer and
incorporated in a Change Order.
3. The Contractor must obtain permission from the Engineer before any equipment can be removed from
the job site. In the event such equipment is removed without the Engineer's approval, the job will be
terminated until such time as the equipment is returned to the project and any time and money lost by the
Contractor as a result of moving the equipment shall be absorbed by the Contractor.
4. Where the Contractor's services have been so terminate by the Owner, said termination shall not affect
any right of the Owner against the Contractor then existing or which may thereafter accrue. Any retention
or payment of monies by the Owner due the Contractor will not release the Contractor from compliance
with the Contract Documents.
Attachment number 1Page 19 of 28
20
5. After ten (10) days from delivery of a written notice to the Contractor and the Engineer, the Owner, may,
without cause and without prejudice to any other right or remedy, elect to abandon the Project and
terminate the Contract. In such case, the Contractor shall be paid for all work executed and any expense
sustained plus reasonable profit.
6. If, through no act or fault of the Contractor, the work is suspended for a period of more than ninety (90)
days by the Owner or under an order of court or other public authority of the Engineer fails to act on any
request for payment within thirty (30) days after it is submitted or the Owner fails to pay the Contractor
substantially the sum approved by the Engineer within thirty (30) days of its approval and presentation,
then the Contractor may after ten (10) days from delivery of a written notice to the Owner and the
Engineer, terminate the Contract and recover from the Owner payment for all work executed and all
expenses sustained. In addition, and in lieu of terminating the Contract, if the Engineer has failed to act
on a request for payment or if the Owner has failed to make any payment as aforesaid, the Contractor
may, upon ten (10) days notice to the Owner and the Engineer, stop the work until he has been paid all
amounts then due, in which event and upon resumption of the work, Change Orders shall be issued for
adjusting the contract price or extending the contract time or both to compensate for the costs and delays
attributable to the stoppage of the work.
7. If the performance of all or any portion of the work is suspended, delayed, or interrupted as a result of a
failure of the Owner or the Engineer to act within the time specified in the Contract Documents, or if no
time is specified, within reasonable time, an adjustment in the contract price or an extension of the
contract time or both, shall be made by Change Order to compensate the Contractor for the costs and
delays necessarily caused by the failure of the Owner or the Engineer.
GC-19. PAYMENTS TO THE CONTRACTOR:
1. Between the first (1st) and the fifth (5th) of each month, the Contractor will submit to the Engineer a
partial payment estimate filled out and signed by the Contractor on an approved form covering the work
performed during the period covered by the partial payment estimate and supported by such data as the
Engineer may reasonably require. If payment is requested on the basis of materials and equipment not
incorporated in the work but delivered and suitably stored at or near the site, the partial payment estimate
shall also be accompanied by such supporting data, satisfactory to the Owner, as will establish the
Owner's title to the material and equipment and protect his interest therein, including applicable
insurance. The Engineer will, within ten days after receipt of each partial payment estimate, either
indicate in writing his approval of payment and present the partial payment estimate to the Owner, or
return the partial payment estimate to the Contractor indicating in writing his reasons for refusing to
approve payment. In the latter case, the Contractor may make the necessary corrections and resubmit
the partial payment estimate. The Owner will, within ten days of presentation to him of an approved
partial payment estimate, pay the Contractor a progress payment on the basis of the approved partial
payment estimate. The Owner shall retain ten (10%) percent of the amount of each payment until final
completion and acceptance of all work covered by the Contract Documents. The Owner at any time,
however, after fifty (50%) percent of the work has been completed, if he finds that satisfactory progress is
being made, may reduce the retained percentage to five (5%) percent on the current and remaining
estimates. On completion and acceptance of a part of the work on which the price is stated separately in
the Contract Documents, payment may be made in full, including retained percentages, less authorized
deductions.
2. The request for payment may also include an allowance for the cost of such major materials and
equipment which are suitably stored and insured either at or near the site.
3. All work covered by partial payment shall thereupon become the sole property of the Owner, but this
provision shall not be construed as relieving the Contractor of the sole responsibility for the care and
protection of the work, material and equipment upon which payments have been made or the restoration
of any damaged work, or as a waiver of the right of the Owner to require the fulfillment of all terms of the
Contract Documents.
Attachment number 1Page 20 of 28
21
4. Upon completion and acceptance of the work, the Engineer shall issue a certificate attached to the final
payment request that the work has been accepted by him under the conditions of the Contract
Documents. The entire balance found to be due the Contractor, including the retained percentages shall
be paid to the Contractor, except such sums as may be lawfully retained by the Owner for saving the
Owner or the Owner's agents harmless from all claims growing out of the lawful demands of
Subcontractors, laborers, workmen, mechanics, materialmen and furnishers of machinery and parts
thereof, equipment, tools and supplies, incurred in the furtherance of the performance of the work. The
Contractor shall, at the Owner's request, furnish satisfactory evidence that all obligations of the nature
designated above have been paid, discharged, or waived. If the Contractor fails to do so, the Owner may,
after having notified the Contractor, either pay unpaid bills or withhold from the Contractor's unpaid
compensation a sum of money deemed reasonably sufficient to pay any and all such lawful claims until
satisfactory evidence is furnished that all liabilities have been fully discharged whereupon payment to the
Contractor shall be resumed, in accordance with the terms of the Contract Documents, but in no event
shall the provisions of this sentence be construed to impose any obligations upon the Owner to either the
Contractor, his Surety, or any third party. In paying any unpaid bills of the Contractor, any payment so
made by the Owner shall be considered as a payment made under the Contract Documents by the
Owner to the Contractor and the Owner shall not be liable to the Contractor for any such payments made
in good faith.
5. If the Owner fails to make payment 30 days after approval by the Engineer, in addition to other remedies
available to the Contractor, there may be added to each such payment, interest at a maximum rate of 1%
per month commencing on the first day after said payment is due and continuing until the payment is
received by the Contractor.
GC-20. ACCEPTANCE OF FINAL PAYMENT AS RELEASE:
1. The acceptance by the Contractor of final payment shall be and shall operate as a release to the Owner
of all claims and all liability to the Contractor other than claims in stated amounts as may be specifically
excepted by the Contractor for all things done or furnished in connection with this work and for every act
and neglect of the Owner and other relating to or arising out of this work. Any payment, however, final or
otherwise, shall not release the Contractor or his Sureties from any obligations under the Contract
Documents or the Performance Bond and Payment Bonds.
GC-21. INSURANCE:
1. The Contractor shall purchase and maintain during the life of this Contract such insurance as will protect
him from claims set forth below which may arise out of or result from the Contractor's execution of the
work, whether such execution by himself or by any Subcontractor or by anyone directly or indirectly
employed by any of them or by anyone for whose acts any of them may be liable.
1.1 Claims under Workman's Compensation, disability benefit and other similar employee benefit
acts,
1.2 Claims for damages because of bodily injury, occupational sickness or disease or death of his
employees,
1.3 Claims for damages because of bodily injury, sickness or disease or death of any person other
than his employees,
1.4 Claims for damages insured by usual personal injury liability coverage which are sustained (1) by
any person as a result of an offense directly or indirectly related to the employment of such
person by the Contractor or (2) by any other person; and
1.5 Claims for damages because of injury to or destruction of tangible property, including loss of use
resulting therefrom.
Attachment number 1Page 21 of 28
22
2. Certificates of Insurance acceptable to the Owner shall be filed with the Owner prior to commencement
of the work. These Certificates shall contain a provision that coverage afforded under the policies will not
be cancelled unless at least fifteen (15) days prior written notice has been given to the Owner.
3. The Contractor shall procure and maintain, at his own expense, during the life of the Contract, liability
insurance as hereinafter specified.
3.1 Contractor's General Public liability and Property Damage insurance including vehicle coverage
issued to the Contractor and protecting him from all claims for personal injury, including death,
and all claims for destruction of or damage to property, arising out of or in connection with any
operations under the Contract Documents, whether such operations be by himself or by any
Subcontractor under him or anyone directly or indirectly employed by the Contractor or by a
Subcontractor under him. Insurance shall be written with a limit of liability of not less than
$500,000 for all damages arising out of bodily injury, including death, at any time resulting
therefrom, sustained by any one person in any one accident; and a limit of liability of not less
than $500,000 for any such damages sustained by two or more persons in any one accident.
Insurance shall be written with a limit of liability of not less than $500,000 for all property damage
sustained by any one person in any one accident; and a limit of liability of not less than $500,000
for any such damage sustained by two or more persons in any one accident.
3.2 The Contractor shall acquire and maintain, if applicable, Fire and Extended Coverage insurance
upon the Project to the full insurable value thereof for the benefit of the Owner, the Contractor
and Subcontractor as their interest may appear. This provision shall in no way release the
Contractor or Contractor's Surety from obligations under the Contract Documents to fully
complete the Project.
4. The Contractor shall procure and maintain, at his own expense, during the life of the Contract, in
accordance with the provisions of the laws of the state in which the work is performed, Workman's
Compensation Insurance, including occupational disease provisions, for all of his employees at the site of
the project and in case any work is sublet, the Contractor shall require such Subcontractor similarly to
provide Workman's Compensation Insurance, including occupational disease provision for all of the
latter's employees unless such employees are covered by the protection afforded by the Contractor. In
case any class of employees engaged in hazardous work under this Contract at the site of the Project is
not protected under Workman's Compensation statute, the Contractor shall provide and shall cause each
Subcontractor to provide adequate and suitable insurance for the protection of his employees not
otherwise protected.
5. The Contractor shall secure, if applicable, "All Risk" type Builder's Risk Insurance for work to be
performed. Unless specifically authorized by the Owner, the amount of such insurance shall not be less
than One Million Dollars ($1,000,000.00). The policy shall cover not less than the losses due to fire,
explosion, hail, lightening, vandalism, malicious mischief, wind, collapse, riot, aircraft and smoke during
the contract time and until the work is accepted by the Owner. The policy shall name as the insured the
Contractor, the Engineer and the Owner.
GC-22. CONTRACT SECURITY:
1. The Contractor shall, within ten (10) days after the receipt of the Notice of Award, furnish the Owner with
a Performance Bond and a Payment Bond in penal sums equal to the amount of the contract price,
conditioned upon the performance by the Contractor of all undertakings, covenants, terms, conditions
and agreements of the Contract Documents and upon the prompt payment by the Contractor to all
persons supplying labor and materials in the prosecution of the work provided by the Contract
Documents. Such bonds shall be executed by the Contractor and a corporate bonding company licensed
to transact business in the state in which the work is to be performed and named on the current list of
"Surety Companies Acceptable on Federal Bonds" as published in the Treasury Department Circular
Number 570. The expense of these bonds shall be borne by the Contractor. If at any time a Surety on
any such bond is declared a bankrupt or loses its right to do business in the state in which the work is to
be performed or is removed from the list of Surety Companies accepted on Federal Bonds, Contractor
Attachment number 1Page 22 of 28
23
shall within ten (10) days after notice from the Owner to do so, substitute an acceptable bond (or bonds)
in such form and sum and signed by such other Surety or Sureties as may be satisfactory to the Owner.
The premiums on such bonds shall be paid by the Contractor. No further payments shall be deemed due
nor shall be made until the new Surety or Sureties shall have furnished an acceptable bond to the Owner.
GC-23. ASSIGNMENTS:
1. Neither the Contractor nor the Owner shall sell, transfer, assign or otherwise dispose of the Contract or
any portion thereof, or his right, title or interest therein, or his obligations thereunder, without written
consent of the other party.
GC-24. INDEMNIFICATION:
1. The Contractor will indemnify and hold harmless the Owner and the Engineer and their agents and
employees from and against all claims, damages, losses and expenses including attorney's fees arising
out of or resulting from the performance of the work, provided that any such claim, damage, loss or
expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible
property, including the loss of use resulting therefrom; and is caused in whole or in part by any negligent
or willful act or omission of the Contractor and Subcontractor, anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable.
2. In any and all claims against the Owner or the Engineer or any of their agents or employees, by an
employee of the Contractor, Subcontractor, anyone directly or indirectly employed by any of them, or
anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any
way by any limitation on the amount or type of damages, compensation or benefits payable by or for the
Contractor or any Subcontractor under Workman's Compensation acts, disability benefit acts or other
employee benefits acts.
3. The obligation of the Contractor under this paragraph shall not extend to the liability of the Engineer, his
agents or employees arising out of the preparation or approval of maps, drawings, opinions, reports,
surveys, change orders, design or specifications.
GC-25. SEPARATE CONTRACTS:
1. The Owner reserves the right to let other contracts in connection with this Project. The Contractor shall
afford other contractors reasonable opportunity for the introduction and storage of their materials and the
execution of their work and shall properly connect and coordinate his work with theirs. If the proper
execution or results of any part of the Contractor's work depends upon the work of any other Contractor,
the Contractor shall inspect and promptly report to the Engineer any defects in such work that render it
unsuitable for such proper execution and results.
2. The Owner may perform additional work related to the Project by himself or he may let other contracts
containing provisions similar to these. The Contractor will afford the other Contractors who are parties to
such contracts (or the Owner, if he is performing the additional work himself), reasonable opportunity for
the introduction and storage of materials and equipment and the execution of the work and shall properly
connect and coordinate his work with theirs.
3. If the performance of additional work by other Contractors or the Owner is not noted in the Contract
Documents prior to the execution of the Contract, written notice thereof shall be given to the Contractor
prior to starting any such additional work. If the Contractor believes that the performance of such
additional work by the Owner or others involves him in additional expense or entitles him to an extension
of the contract time, he may make a claim therefor as provided in Sections GC-13 and GC-14.
Attachment number 1Page 23 of 28
24
GC-26. SUBCONTRACTING:
1. The Contractor may utilize the services of specialty Subcontractors on those parts of the work which,
under normal contracting practices, are performed by specialty Subcontractors.
2. The Contractor shall not award work to Subcontractor(s), in excess of fifty (50%) percent of the Contract
Price, without prior written approval of the Owner.
3. The Contractor shall be fully responsible to the Owner for the acts and omissions of his Subcontractors,
and of persons either directly or indirectly employed by them, as he is for the acts and omissions of
person directly employed by him.
4. The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to
bind the Subcontractors to the Contractor by the terms of the Contract Documents insofar as applicable
to the work of Subcontractors and to give the Contractor the same power as regards terminating any
subcontract that the Owner may exercise over the Contractor under any provision of the Contract
Documents.
5. Nothing contained in this Contract shall create any contractual relation between any Subcontractor and
the Owner.
GC-27. ENGINEER'S AUTHORITY:
1. The Engineer shall act as the Owner's representative during the construction period. He shall decide
questions which may arise as to quality and acceptability of materials furnished and work performed. He
shall interpret the intent of the Contract Documents in a fair and unbiased manner. The Engineer will
make visits to the site and determine if the work is proceeding in accordance with the Contract
Documents.
2. The Contractor will be held strictly to the intent of the Contract Documents in regard to the quality of
materials, workmanship and execution of the work. Inspections may be made at the factory or fabrication
plant or the source of material supply.
3. The Engineer will not be responsible for the construction means, controls, techniques, sequences,
procedures, or construction safety.
4. The Engineer shall promptly make decisions relative to interpretation of the Contract Documents.
GC-28. LAND AND RIGHTS-OF-WAY:
1. The Owner shall provide the Contractor information which delineates and describes the land owned and
right-of-way acquired.
2. The Contractor shall provide at his own expense and without liability to the Owner any additional land or
building and access thereto that the Contractor may desire for temporary construction facilities, or for
storage of materials.
GC-29. GUARANTEE:
1. The contractor shall provide a warranty on all work, materials and equipment incorporated into this
project. The warranty period shall not be less than one (1) year from the date of completion and shall
cover parts and labor.
GC-30. TAXES:
1. The Contractor will pay all sales, consumer, use and other similar taxes required by the law of the place
where the work is performed.
Attachment number 1Page 24 of 28
25
GC-31. WORK ADJACENT TO RAILWAY OR OTHER PROPERTY:
1. Whenever the work embraced in this Contract is near the tracks, structures or buildings of the Owner or
of other railways, persons, or property, the work shall be so conducted as not to interfere with the
movement of trains or other operations of the railway, or, if in any case such interference be necessary,
the Contractor shall not proceed until he has first obtained specific authority and directions therefor from
the proper designated officer of the Owner and has the approval of the Engineer.
GC-32. ORDER AND DISCIPLINE:
1. The Contractor shall at all times enforce strict discipline and good order among his employees and any
employee of the Contractor who shall appear to be incompetent, disorderly or intemperate or in any other
way disqualified for or unfaithful to the work entrusted to him, shall be discharged immediately on the
request of the Engineer and he shall not again be employed on the workout with the Engineer's written
consent.
GC-33. WARNING DEVICES AND SIGNS:
1. The Contractor shall furnish, erect, paint and maintain appropriate warning devices in and around the
construction area.
GC-34. SPECIAL RESTRICTIONS: Not Used for this Project
GC-35. AS-BUILT DRAWINGS: Not Used for this Project
GC-36. ALLOWANCES: - Not Used for this Project
Attachment number 1Page 25 of 28
26
SECTION SGC
INDEX TO SUPPLEMENTAL GENERAL CONDITIONS
SECTION TITLE
SGC-01. Contractor's Breakdown of Lump Sum Payment Items
SGC-02. Prior Use By Owner
SGC-03. Cleaning Up
SGC-04. Maintenance of Traffic
SGC-05. Maintenance of Access
SGC-06. Erosion Control and Restoration of Property
SGC-07. Safety and Health Regulations
SGC-08. Pre-Construction Conference
SGC-09. Settlement of Disputes
SGC-10. Open Records Act
Attachment number 1Page 26 of 28
27
SECTION SGC
SUPPLEMENTAL GENERAL CONDITIONS
SGC-01. CONTRACTOR'S BREAKDOWN OF LUMP SUM PAYMENT ITEMS:
The Contractor shall, immediately after the contract has been awarded, submit to the Engineer for his approval, a
breakdown showing estimates of all costs apportioned to the major elements of design, equipment, material and
labor comprising the total work included under any of the lump sum items shown in the proposal. These estimates
as approved will serve as the basis for estimating of payments due on all progress estimates.
SGC-02. PRIOR USE BY OWNER:
Prior to completion of all the work, the Owner may take over the operation and/or use of the incomplete project or
portions thereof. Such prior use of the facilities by the Owner shall not be deemed as final acceptance of any
work or relieve the Contractor from any of the requirements of the Contract Documents.
SGC-03. CLEAN-UP:
The Contractor shall keep the premises free from the accumulation of waste material and rubbish and upon
completion of the work, prior to final acceptance of the completed project by the Owner, he shall remove from the
premises all rubbish, surplus materials, implements, tools, etc., and leave his work in a clean condition,
satisfactory to the Engineer. Periodic cleaning will be scheduled by a representative of the owner.
SGC-04. MAINTENANCE OF TRAFFIC AND OPERATIONS:
The Contractor shall provide adequate warning and protection for pedestrian and vehicular traffic from any hazard
arising out of the Contractor's operations and will be held responsible for any damage caused by negligence on
his part or by the improper placing of or failure to display danger signs and road lanterns. All traffic lanes,
sidewalks and driveways will be kept open and clear at all times except as provided below. The Contractor shall
not block traffic on any street more than 30 minutes or without written permission from such agency. Before
leaving the work each night, it shall be placed in such condition as to cause the least possible hazard therefrom.
Should the Contractor fail to comply with the provisions of this paragraph, the Owner may, with his own forces,
provide signs, flagmen, barricades and/or passageways or clear the pavement and deduct the cost thereof from
sums due to the Contractor. Detours and traffic controls are to be reviewed by Traffic Engineering before
implementation.
SGC-05. MAINTENANCE OF ACCESS:
The Contractor will be required to maintain access to the establishment during all times it is normally open for
business. Bridges across open trenches and work areas will be required to provide vehicular and pedestrian
access. Bridges with handrail protection will be required for crosswalks at street intersections. It is recognized that
it will be necessary to remove bridges and to block cross traffic while equipment is in operation. The Contractor
shall, however, plan and pursue his operations so as to minimize the time that direct entrance is blocked.
SGC-06. EROSION CONTROL AND RESTORATION OF PROPERTY:
The Contractor will be required to schedule his work and perform operations in such a manner that siltation and
bank erosion will be minimized during all phases of construction. This work should included protective measures
in places before land disturbing activities begin in accordance with Federal, State and Local Ordinances covering
soil erosion and siltation prevention. Any areas disturbed during the course of construction shall be restored to a
condition equal or better than the original condition.
Attachment number 1Page 27 of 28
28
SGC-07. SAFETY AND HEALTH REGULATIONS:
The Contractor shall comply with the Department of Labor Safety and Health Regulations for construction
promulgated under the Occupational, Health and Safety Act of 1970 (PL31-596) and under Section 107 of the
Contract Work Hours and Safety Standards Act (PL91-54).
SGC-08. PRE-CONSTRUCTION CONFERENCE:
A pre-construction conference may be held at an acceptable time to the Owner and the Contractor prior to the
"Notice to Proceed" to coordinate the work and satisfy all requirements of the Contract Documents.
SGC-09. SETTLEMENT OF DISPUTES:
This Agreement shall be governed by and construed in accordance with the laws of the State of Georgia, U.S.A.
All claims, disputes and other matters in question between Licensee and Icon Software Corporation arising out of,
or relating to, this Agreement, or the breach thereof, shall be decided in the Superior Court of Richmond County,
Georgia. Contractor, by executing this Agreement, specifically consents to venue and jurisdiction in Richmond
County, Georgia and waives any right to contest jurisdiction and venue in said Court
SGC-10. OPEN RECORDS ACT:
Contractor acknowledges that this Agreement and certain documentation may be subject to the Georgia Open
Records Act (O.C.G.A. § 50-18-70, et seq. Contractor shall cooperate fully in responding to such request and
shall make all records, not exempt, available for inspection and copying as required by law.
.
SPECIAL CONDITIONS
SC-01. LICENSE:
The successful bidder shall have a current Business license during the term of this contract. The license shall be
purchased form the Business License and Enforcement Department.
SC-02. COORDINATION OF WORK:
The Contractor shall coordinate his work with the Landscape Section of the Facilities Management Division of
Augusta Public Services Department as required for traffic control and access. All construction shall be in
accordance with the contract documents and applicable codes and regulations.
SC-03. OPERATION AND STORAGE AREAS:
The owner will not be responsible for providing security for any stored materials, on site or off.
SC-04. PRESERVATION OF EXISTING VEGETATION:
The Contractor will preserve and protect existing vegetation such as trees, shrubs and grass on or adjacent to the
site which do not unreasonably interfere with the construction as may be determined by the Engineer.
SC-05. CLEAN-UP:
The Contractor shall keep the premises free from the accumulation of waste material and rubbish. Upon
completion of the work, prior to final acceptance of the completed project by the Owner, he shall remove from the
premises all rubbish and surplus materials to the satisfaction of the Engineer.
Attachment number 1Page 28 of 28
Attachment number 2Page 1 of 3
Attachment number 2Page 2 of 3
Attachment number 2Page 3 of 3
Invitation to Bid
Sealed bids will be received at this office until Tuesday, July 28, 2009 at 3:00 P.M. for
furnishing:
Bid Item 09-131 New Restroom Facility Pendleton King Park for Public Service
Bids’ will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the
offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
706-821-2422
BID documents may be obtained at the office of Augusta, GA Procurement Department, 530
Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular
business hours at the offices of Augusta, GA Procurement Department. A Mandatory Pre-Bid
Conference will be held on Wednesday, July 8, 2009 @ 10:00 a.m. in the Procurement
Department Room 605. All questions must be submitted in writing to the office of the
Procurement Department by Friday, July 10, 2009 @ 3:00 p.m. by fax at 706-821-2811 or
by mail. .No bid will be accepted by fax, all must be received by mail or hand delivered.
No Bid may be withdrawn for a period of 90 days after time has been called on the date of
opening. A 10% Bid bond is required to be submitted in a separate envelope so marked
along with the bidders’ qualifications; a 100% performance bond and a 100% payment
bond will be required for award.
An invitation for bids shall be issued by the Procurement Office and shall include specifications
prepared in accordance with Article 4 (Product Specifications), and all contractual terms and
conditions, applicable to the procurement. All specific requirements contained in the invitation
to bid including, but not limited to, the number of copies needed, the timing of the submission,
the required financial data, and any other requirements designated by the Procurement
Department are considered material conditions of the bid which are not waiveable or modifiable
by the Procurement Director. Please mark BID number on the outside of the envelope.
Bidders are cautioned that sequestration of BID documents through any source other than the
office of the Procurement Department is not advisable. Acquisition of BID documents from
unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate
information upon which to base his qualifications.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle June 11, 18, 25, July 2, 2009
Metro Courier June 17, 2009
cc: Tameka Allen Interim Deputy Administrator
Mike Greene Public Service
Rick Acree Public Service
Attachment number 3Page 1 of 1
Attachment number 5Page 1 of 3
Attachment number 5Page 2 of 3
Attachment number 5Page 3 of 3
Attachment number 6Page 1 of 1
Engineering Services Committee Meeting
9/8/2009 1:00 PM
readoption of flood damage prevention ordinance
Department:Planning Commission
Caption:Approve the readoption of the Flood Damage Prevention Ordinance as
amended.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Cover Memo
1
TITLE EIGHT
PLANNING & ZONING
CHAPTER 1
FLOOD DAMAGE PREVENTION
ARTICLE 1
STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES
§ 8-1-1. STATUTORY AUTHORIZATION.
Article IX, Section II of the Constitution of the State of Georgia and Section 36-1-20(a) of the
Official Code of Georgia Annotated have delegated the responsibility to local governmental units
to adopt regulations designed to promote the public health, safety, and general welfare of its
citizenry. Therefore, the Augusta Commission of Augusta, Georgia does ordain the provisions of
this Chapter:
§ 8-1-2. FINDINGS OF FACT.
(a) The flood hazard areas of Augusta, Georgia are subject to periodic inundation which
results in loss of life and property, health and safety hazards, disruption of commerce and
governmental services, extraordinary public expenditures for flood relief and protection,
and impairment of the tax base, all of which adversely affect the public health, safety and
general welfare.
(b) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable
to floods, which are inadequately elevated, flood-proofed, or otherwise unprotected from
flood damages, and by the cumulative effect of obstructions in floodplains causing
increases in flood heights and velocities.
§ 8-1-3. STATEMENT OF PURPOSE.
It is the purpose of this Chapter to promote the public health, safety and general welfare and to
minimize public and private losses due to flood conditions in specific areas by provisions designed
to:
(a) restrict or prohibit uses which are dangerous to health, safety and property due to water or
erosion hazards, or which increase flood heights, velocities, or erosion;
(b) require that uses vulnerable to floods, including facilities which serve such uses, be
protected against flood damage at the time of initial construction;
(c) control the alteration of natural floodplains, stream channels, and natural protective
barriers which are involved in the accommodation of flood waters;
Attachment number 1Page 1 of 23
2
(d) control filling, grading, dredging and other development which may increase flood
damage or erosion, and;
(e) prevent or regulate the construction of flood barriers which will unnaturally divert flood
waters or which may increase flood hazards to other lands.
§ 8-1-4. OBJECTIVES.
The objectives of this Chapter are:
(a) to protect human life and health;
(b) to minimize expenditure of public money for costly flood control projects;
(c) to minimize the need for rescue and relief efforts associated with flooding and generally
undertaken at the expense of the general public;
(d) to minimize prolonged business interruptions;
(e) to minimize damage to public facilities and utilities such as water and gas mains, electric,
telephone and sewer lines, streets and bridges located in floodplains;
(f) to help maintain a stable tax base by providing for the sound use and development of
flood prone areas in such a manner as to minimize flood blight areas; and
(g) to insure that potential home buyers are notified that property is in a flood area.
§ 8-1-5. - - 8-1-9. RESERVED.
Attachment number 1Page 2 of 23
3
ARTICLE 2
DEFINITIONS
§ 8-1-10. SPECIFIC DEFINITIONS.
Unless specifically defined below, words or phrases used in this Chapter shall be interpreted so as
to give them the meaning they have in common usage and to give this Chapter its most reasonable
application:
(a) Addition (to an existing building). Any walled and roofed expansion to the perimeter
of a building in which the addition is connected by a common load-bearing wall other
than a fire wall. Any walled and roofed addition which is connected by a fire wall or is
separated by an independent perimeter load-bearing wall shall be considered "New
Construction".
(b) Appeal. A request for a review of the Executive Director's interpretation of any provision
of this Chapter or a request for a variance.
(c) Area of shallow flooding. A designated AO or AH Zone on a community's Flood
Insurance Rate Map (FIRM) with base flood depths from one (1) to three (3) feet, and/or
where a clearly defined channel does not exist, where the path of flooding is
unpredictable and indeterminate, and where velocity flow may be evident.
(d) Area of Special Flood Hazard. The land in the floodplain within a community subject
to a one (1) percent or greater chance of flooding in any given year. In the absence of
official designation by the Federal Emergency Management Agency, Areas of Special
Flood Hazard shall be those designated by the local community and referenced in Article
3, Section 8-1-17.
(e) Base flood. The flood having a one (1) percent chance of being equaled or exceeded in
any given year.
(f) Base Flood Elevation (BFE). The elevation shown on the Flood Insurance Rate Map
(FIRM) for Zones AE, AH, A1-A30, AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO,
V1-V30, and VE that indicates the water surface elevation resulting from a flood that has
a one percent change of equaling or exceeding that level in any given year.
(f) Basement. That portion of a building having its floor subgrade (below ground level) on
all sides.
(g) Building. Any structure built for support, shelter, or enclosure for any occupancy or
storage.
(h) City Engineer. The City Engineer for Augusta, GA.
(i) Commission. The Augusta Commission
(j) Critical Facilities. Any public or private facility, which, if flooded, would create an
added dimension to the disaster or would increase the hazard to life and health. Critical
facilities include:
Attachment number 1Page 3 of 23
4
(1) structures or facilities that produce, use, or store highly volatile, flammable,
explosive, toxic, or water-reactive materials;
(2) hospitals and nursing homes, and housing for the elderly, which are likely to
contain occupants who may not be sufficiently mobile to avoid the loss of life or
injury during flood and storm events;
(3) emergency operation centers or data storage center which contain records or
services that may become lost or inoperative during flood and storm events; and
(4) generating plants, and other principal points of utility lines.
(k) Development. Any man-made change to improved or unimproved real estate, including,
but not limited to, buildings or other structures, mining, dredging, filling, grading, paving,
excavating, drilling operations, and permanent storage of materials or equipment.
(l) Elevated building. A non-basement building built to have the lowest floor of the lowest
enclosed area elevated above the ground level by means of fill, solid foundation perimeter
walls, pilings, columns, piers, or shear walls adequately anchored so as not to impair the
structural integrity of the building during a base flood event.
(m) Executive Director. The Executive Director of the Augusta-Richmond County Planning
Commission.
(m) Existing Construction. Any structure for which the "start of construction" commenced
before February 15, 1978 for the City of Augusta prior to consolidation and March 4,
1980 for the unincorporated areas of Richmond County prior to consolidation - the
effective date of the FIRST Floodplain Management Ordinance adopted by Augusta, GA
as a basis for Augusta's participation in the National Flood Insurance Program (NFIP).
(n) Existing manufactured home park or subdivision. A manufactured home park or
subdivision for which the construction of facilities for servicing the lots on which the
manufactured homes are to be affixed (including at a minimum the installation of utilities,
the construction of streets, and final site grading or the pouring of concrete pads) is
completed before February 15, 1978 for the City of Augusta prior to consolidation and
March 4, 1980 for the unincorporated areas of Richmond County prior to consolidation -
the effective date of the FIRST Floodplain Management Ordinance adopted by Augusta
as a basis for Augusta's participation in the National Flood Insurance Program (NFIP).
(o) Expansion to an existing manufactured home park or subdivision. The preparation of
additional sites by the construction of facilities for servicing the lots on which the
manufactured homes are to be affixed, including the installation of utilities, the
construction of streets, and either final site grading or the pouring of concrete pads.
(p) Flood or flooding. A general and temporary condition of partial or complete inundation
of normally dry land areas from:
(1) the overflow of inland or tidal waters; or
(2) the unusual and rapid accumulation or runoff of surface waters from any source.
(q) Flood Hazard Boundary Map (FHBM). An official map of a community, issued by
the Federal Insurance Administration, where the boundaries of areas of Special Flood
Hazard have been defined as Zone A.
Attachment number 1Page 4 of 23
5
(r) Flood Insurance Rate Map (FIRM). An official map of a community, issued by the
Federal Insurance Administration, delineating the areas of Special Flood Hazard and/or
risk premium zones applicable to the community.
(s) Flood Insurance Study. The official report by the Federal Insurance Administration
evaluating flood hazards and containing flood profiles and water surface elevations of the
base flood.
(t) Floodplain. Any land area susceptible to flooding.
(u) Floodproofing. Any combination of structural and non-structural additions, changes, or
adjustments to structures, which reduce or eliminate flood damage to real estate or
improved real property, water and sanitary facilities, structures and their contents.
(v) Floodway. The channel of a river or other watercourse and the adjacent land areas that
must be reserved in order to discharge the base flood without cumulatively increasing the
water surface elevation more than a designated height.
(w) Floodway fringe, lower. The portion of the area of Special Flood Hazard that is located
between the limit of the floodway and a line connecting all points half the distance
between the floodway and the limit of the area of Special Flood Hazard.
(x) Floodway fringe, upper. The portion of the area of Special Flood Hazard that is located
between the lower floodway fringe and the boundary of the area of Special Flood Hazard.
(y) Floor. The top surface of an enclosed area in a building (including basement), i.e. top of
slab in concrete slab construction or top of wood flooring in wood frame construction.
The term does not include the floor of a garage used solely for parking vehicles.
(z) Functionally dependent facility. A facility which cannot be used for its intended
purpose unless it is located or carried out in close proximity to water, such as a docking or
port facility necessary for the loading and unloading of cargo or passengers, shipbuilding,
ship repair, or seafood processing facilities. The term does not include long-term storage,
manufacturing, sales or service facilities.
(aa) Highest adjacent grade. The highest natural elevation of the ground surface, prior to
construction, adjacent to the proposed foundation of a building.
(bb) Historic Structure. Any structure that is:
(1) listed individually in the National Register of Historic Places (a listing
maintained by the U.S. Department of Interior) or preliminarily determined by
the Secretary of the Interior as meeting the requirements for individual listing on
the National Register;
(2) certified or preliminarily determined by the Secretary of the Interior as
contributing to the historical significance of a registered historic district or a
district preliminarily determined by the Secretary to qualify as a registered
historic district;
(3) individually listed on a state inventory of historic places and determined as
eligible by states with historic preservation programs which have been approved
by the Secretary of the Interior; or
Attachment number 1Page 5 of 23
6
(4) individually listed on a local inventory of historic places and determined as
eligible by communities with historic preservation programs that have been
certified either:
a) By an approved state program as determined by the Secretary of the
Interior; or
b) directly by the Secretary of the Interior in states without approved
programs.
(cc) Lowest floor. The lowest floor of the lowest enclosed area, including basement. An
unfinished or flood resistant enclosure, used solely for parking of vehicles, building
access, or storage, in an area other than a basement, is not considered a building's lowest
floor, provided that such enclosure is not built so as to render the structure in violation of
other provisions of this Code.
(dd) Manufactured home. A building, transportable in one or more sections, built on a
permanent chassis and designed to be used with or without a permanent foundation when
connected to the required utilities. The term also includes park trailers, travel trailers, and
similar transportable structures placed on a site for one hundred and eighty (180)
consecutive days or longer and intended to be improved property.
(ee) Mean Sea Level. The average height of the sea for all stages of the tide. It is used as a
reference for establishing various elevations within the floodplain. For purposes of this
Chapter, the term is synonymous with National Geodetic Vertical Datum (NGVD).
(ff) National Geodetic Vertical Datum (NGVD). As corrected in 1929, is a vertical control
used as a reference for establishing varying elevations within the floodplain.
(gg) New construction. (for purposes of determining insurance rates and for floodplain
management purposes) ANY structure (see definition) for which the "start of
construction" commenced after February 15, 1978 for the City of Augusta prior to
consolidation and March 4, 1980 for the unincorporated areas of Richmond County prior
to consolidation - the effective date of the FIRST Floodplain Management Ordinance
adopted by Augusta, GA as a basis for Augusta's participation in the National Flood
Insurance Program (NFIP) - and includes any subsequent improvements to such
structure.
(hh) New manufactured home park or subdivision. A manufactured home park or
subdivision for which the construction of facilities for servicing the lots on which the
manufactured homes are to be affixed (including at a minimum, the installation of
utilities, the construction of streets, and either final site grading or the pouring of concrete
pads) is completed on or after February 15, 1978 for the City of Augusta prior to
consolidation and March 4, 1980 for the unincorporated areas of Richmond County prior
to consolidation - the effective date of the FIRST Floodplain Management Ordinance
adopted by Augusta, GA as a basis for Augusta's participation in the National Flood
Insurance Program (NFIP).
(ii) Recreational vehicle means a vehicle which is:
(1) built on a single chassis;
(2) 400 square feet or less when measured at the largest horizontal projection;
(3) designed to be self-propelled or permanently towable by a light duty truck; and
Attachment number 1Page 6 of 23
7
(4) designed primarily not for use as a permanent dwelling but as temporary living
quarters for recreational, camping, travel, or seasonal use.
(jj) Start of construction. The date the Development Permit was issued, provided the actual
start of construction, repair, reconstruction, or improvement was within one hundred and
eighty (180) days of the permit date. The actual start means the first placement of
permanent construction of the structure such as the pouring of slabs or footings,
installation of piles, construction of columns, or any work beyond the stage of excavation,
and includes the placement of a manufactured home on a foundation. (Permanent
construction does not include initial land preparation, such as clearing, grading and
filling; nor does it include the installation of streets and/or walkways; nor does it include
excavation for a basement, footings, piers or foundations or the erection of temporary
forms; nor does it include the installation on the property of buildings appurtenant to the
permitted structure, such as garages or sheds not occupied as dwelling units or part of the
main structure. (NOTE: Accessory structures are NOT exempt from any ordinance
requirements) For a substantial improvement, the actual start of construction means the
first alteration of any wall, ceiling, floor, or other structural part of a building, whether or
not that alteration affects the external dimensions of the building.
(kk) Structure. A walled and roofed building that is principally above ground, a
manufactured home, a gas or liquid storage tank.
(ll) Substantial damage. Damage of any origin sustained by a structure whereby the cost of
restoring the structure to its before damaged condition would equal or exceed fifty (50)
percent of the market value of the structure before the damage occurred.
(mm) Substantial improvement. Any combination of repairs, reconstruction, alteration, or
improvements to a building, taking place during a five (5) year period, in which the
cumulative cost equals or exceeds fifty percent of the market value of the structure prior
to the improvement. The market value of the building should be:
(1) the appraised value of the structure prior to the start of the initial repair or
improvement; or
(2) in the case of damage, the value of the structure prior to the damage occurring. This
term includes structures which have incurred "substantial damage", regardless of the
actual amount of repair work performed.
For the purposes of this definition, "substantial improvement" is considered to occur
when the first alteration of any wall, ceiling, floor, or other structural part of the building
commences, whether or not that alteration affects the external dimensions of the building.
The term does not, however, include those improvements of a building required to
comply with existing health, sanitary, or safety code specifications which are solely
necessary to assure safe living conditions, which have been pre-identified by the Code
Enforcement Official, and not solely triggered by an improvement or repair project.
(nn) Substantially improved existing manufactured home parks or subdivisions. Where
the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads
equals or exceeds fifty (50) percent of the value of the streets, utilities and pads before the
repair, reconstruction or improvement commenced.
(oo) Variance. A grant of relief from the requirements of this Chapter which permits
construction in a manner otherwise prohibited by this Chapter.
Attachment number 1Page 7 of 23
8
(pp) Violation. The failure of a structure or other development to be fully compliant with the
community’s floodplain management regulations. A structure or other development
without the elevation certificate, or other certifications, or other evidence of compliance
required by this ordinance is presumed to be in violation until such time as that
documentation is provided.
§ 8-1-11. - - 8-1-15. RESERVED.
Attachment number 1Page 8 of 23
9
ARTICLE 3
GENERAL PROVISIONS
§ 8-1-16. LANDS TO WHICH THIS CHAPTER APPLIES.
This Chapter shall apply to all areas of Special Flood Hazard within the jurisdiction of Augusta,
Georgia.
§ 8-1-17. BASIS FOR ESTABLISHING THE AREAS OF SPECIAL FLOOD HAZARD.
The areas of Special Flood Hazard, identified by the Federal Emergency Management Agency in
its Flood Insurance Study (FIS), dated February 15, 1978 for the City of Augusta prior to
consolidation and March 4, 1980 for the unincorporated areas of Richmond County prior to
consolidation, with accompanying maps and other supporting data and any revision thereto, the
most recent revision being September 25, 2009, are adopted by reference and declared a part of
this Chapter.
Areas of Special Flood Hazard may also include those areas known to have flooded historically or
defined through standard engineering analysis by governmental agencies or private parties but not
yet incorporated in a FIS.
The Repository for public inspection of the Flood Insurance Study (FIS), accompanying maps and
other supporting data is located at 525 Telfair Street, Augusta, GA.
§ 8-1-18. ESTABLISHMENT OF DEVELOPMENT PERMIT
A Development Permit shall be required, in conformance with the provisions of this Chapter,
PRIOR to the commencement of any development activities.
§ 8-1-19. COMPLIANCE.
No structure or land shall hereafter be located, extended, converted or altered without full
compliance with the terms of this Chapter and other applicable regulations.
§ 8-1-20. ABROGATION AND GREATER RESTRICTIONS.
This Chapter is not intended to repeal, abrogate, or impair any existing ordinance, easements,
covenants, or deed restrictions. However, where this Chapter and another conflict or overlap,
whichever imposes the more stringent restrictions shall prevail.
§ 8-1-21. INTERPRETATION.
In the interpretation and application of this Chapter all provisions shall be:
(a) considered as minimum requirements;
(b) liberally construed in favor of the Governing Body, and;
Attachment number 1Page 9 of 23
10
(c) deemed neither to limit nor repeal any other powers granted under state statutes.
§ 8-1-22. WARNING AND DISCLAIMER OF LIABILITY.
The degree of flood protection required by this Chapter is considered reasonable for regulatory
purposes and is based on scientific and engineering considerations. Larger floods can and will
occur; flood heights may be increased by man-made or natural causes. This Chapter does not
imply that land outside the areas of Special Flood Hazard or uses permitted within such areas will
be free from flooding or flood damages. This Chapter shall not create liability on the part of
Augusta, GA, the Commission, and/or the Augusta-Richmond County Planning Commission or by
any officer or employee thereof for any flood damages that result from reliance on this Chapter or
any administrative decision lawfully made thereunder.
§ 8-1-23. ENFORCEMENT AND PENALTIES FOR VIOLATION
Violation of the provisions of this Chapter or failure to comply with any of its requirements,
including violation of conditions and safeguards established in connection with grants of variance
or special exceptions shall be reported to the City Engineer. Once a violation is evident, the City
Engineer, acting on behalf of the Commission, shall be empowered to notify the owner in writing
of the apparent violation of this Chapter. The written notice shall direct the owner to cease the
development activity until such time as the requirements and procedures of this Chapter have been
met. Upon failure of the owner to comply with this notice, the City Engineer shall notify the City
Attorney of the violation; and the City Attorney shall immediately begin legal procedures in the
Superior Court of Richmond County to prevent, enjoin, abate or remove such violations in addition
to injunctive relief. All persons, firms or corporations failing to comply with the mandatory
provisions hereof or doing any act prohibited hereby shall be guilty of an offense and, upon
conviction thereof, be fined not more than one thousand dollars ($1,000.00) or imprisoned for not
more than sixty (60) days, or both, and, in addition, shall pay all costs and expenses involved in the
case. Each day such violation continues shall be considered a separate offense. Nothing contained
herein shall prevent the Commission from taking such other lawful action as is necessary to
prevent or remedy any violation.
§ 8-1-24 - - 8-1-28. RESERVED.
Attachment number 1Page 10 of 23
11
ARTICLE 4
ADMINISTRATION
§ 8-1-29. DESIGNATION OF EXECUTIVE DIRECTOR.
The Executive Director of the Augusta-Richmond County Planning Commission is hereby
appointed to administer and implement the provisions of this Chapter.
§ 8-1-30. PERMIT PROCEDURES.
Application for a Development Permit shall be made to the Executive Director on forms furnished
by the community PRIOR to any development activities, and may include, but not be limited to the
following: plans in duplicate drawn to scale showing the elevations of the area in question and the
nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of
materials or equipment, and drainage facilities.
Specifically, the following information is required:
(a) Application Stage -
(1) Elevation in relation to mean sea level (or highest adjacent grade) of the lowest
floor, including basement, of all proposed structures;
(2) Elevation in relation to mean sea level to which any non-residential structure will
be flood-proofed;
(3) Design certification from a registered professional engineer or architect that any
proposed non-residential flood-proofed structure will meet the flood-proofing
criteria of Article 5, Section 8-1-44(b);
(4) Description of the extent to which any watercourse will be altered or relocated as
a result of a proposed development, and;
(b) Construction Stage -
For all new construction and substantial improvements, the permit holder shall provide to
the Administrator an as-built certification of the regulatory floor elevation or flood-
proofing level immediately after the lowest floor or flood-proofing is completed. Any
lowest floor certification made relative to mean sea level shall be prepared by or under
the direct supervision of a registered land surveyor or professional engineer and certified
by same. When flood-proofing is utilized for non-residential structures, said certification
shall be prepared by or under the direct supervision of a professional engineer or architect
and certified by same.
Any work undertaken prior to submission of these certifications shall be at the permit
holder's risk.
The Executive Director shall review the above referenced certification data submitted.
Deficiencies detected by such review shall be corrected by the permit holder immediately
and prior to further progressive work being allowed to proceed. Failure to submit
Attachment number 1Page 11 of 23
12
certification or failure to make said corrections required hereby, shall be cause to issue a
Stop-Work Order for the project.
§ 8-1-31. DUTIES AND RESPONSIBILITIES OF THE EXECUTIVE DIRECTOR
Duties of the Executive Director shall include, but shall not be limited to:
(a) Review all Development Permits to assure that the permit requirements of this Chapter
have been satisfied;
(b) Review proposed development to assure that all necessary permits have been received
from governmental agencies from which approval is required by Federal or State law,
including Section 404 of the Federal Water Pollution Control Act Amendments of 1972,
33 U.S.C. 1334. Require that copies of such permits be provided and maintained on file.
(c) Review all permit applications to determine whether proposed building sites will be
reasonably safe from flooding.
(d) When Base Flood Elevation data or floodway data have not been provided in accordance
with Article 3, Section 8-1-17, then the Executive Director shall obtain, review and
reasonably utilize any base flood elevation and floodway data available from a Federal,
State or other sources in order to administer the provisions of Article 5.
(e) Review and record the actual elevation in relation to mean sea level (or highest adjacent
grade) of the lowest floor, including basement, of all new or substantially improved
structures in accordance with Article 4, Section 8-1-30(b).
(f) Review and record the actual elevation, in relation to mean sea level to which any new or
substantially improved structures have been flood-proofed, in accordance with Article 4,
Section 8-1-30(b).
(g) When flood-proofing is utilized for a structure, the Executive Director shall obtain
certification of design criteria from a registered professional engineer or architect in
accordance with Article 4, Section 8-1-30(a)(3) and Article 5, Section 8-1-44(b) or
Article 5, Section 8-1-48(b).
(h) Make substantial damage determinations following a flood event or any other event that
causes damage to structures in flood hazard areas.
(i) Notify adjacent communities and the Georgia Department of Natural Resources prior to
any alteration or relocation of a watercourse and submit evidence of such notification to
the Federal Emergency Management Agency (FEMA).
(j) For any altered or relocated watercourse, submit engineering data/analysis within six (6)
months to the FEMA to ensure accuracy of community flood maps through the Letter of
Map Revision process. Assure flood carrying capacity of any altered or relocated
watercourse is maintained.
(k) Where interpretation is needed as to the exact location of boundaries of the Areas of
Special Flood Hazard (for example, where there appears to be a conflict between a
mapped boundary and actual field conditions) the Executive Director shall make the
necessary interpretation. Any person contesting the location of the boundary shall be
given a reasonable opportunity to appeal the interpretation as provided in this Chapter.
Attachment number 1Page 12 of 23
13
(l) All records pertaining to the provisions of this Chapter shall be maintained in the office of
the Executive Director and shall be open for public inspection.
§ 8-1-32. VARIANCE PROCEDURES
(a) The Zoning Board of Appeals as established by the Commission shall hear and decide
requests for appeals or variance from the requirements of this Chapter.
(b) The Zoning Board of Appeals shall hear and decide appeals when it is alleged an error in
any requirement, decision, or determination is made by the Executive Director in the
enforcement or administration of this Chapter.
(c) Any person aggrieved by the decision of the Zoning Board of Appeals may appeal such
decision to the Superior Court of Richmond County, Georgia, as provided in O.C.G.A.
Sec. 5-4-1; however all appeals shall be on record and shall not be de novo.
(d) Variances may be issued for the repair or rehabilitation of Historic Structures upon a
determination that the proposed repair or rehabilitation will not preclude the structure's
continued designation as a Historic Structure and the variance is the minimum to preserve
the historic character and design of the structure.
(e) In reviewing such requests, the Zoning Board of Appeals shall consider all technical
evaluations, relevant factors, and all standards specified in this and other sections of this
Chapter, and:
(1) The danger that materials may be swept onto other lands to the injury of others;
(2) The danger to life and property due to flooding or erosion damage;
(3) The susceptibility of the proposed facility and its contents to flood damage and
the effect of such damage on the individual owner;
(4) The importance of the services provided by the proposed facility to the
community;
(5) The necessity to the facility of a waterfront location, in the case of a functionally
dependent facility;
(6) The availability of alternative locations, not subject to flooding or erosion
damage, for the proposed use;
(7) The compatibility of the proposed use with existing and anticipated
development;
(8) The relationship of the proposed use to the Comprehensive Plan and Floodplain
Management Program for that area;
(9) The safety of access to the property in times of flood for ordinary and emergency
vehicles;
(10) The expected heights, velocity, duration, rate of rise and sediment transport of
floodwaters and the effects of wave action, if applicable, expected at the site; and
Attachment number 1Page 13 of 23
14
(11) The costs of providing governmental services during and after flood conditions,
including maintenance and repair of public utilities and facilities such as sewer,
gas, electrical, and water systems, and streets and bridges.
(f) Upon consideration of the factors listed above and the purposes of this Chapter, the
Zoning Board of Appeals may attach such conditions to the granting of variances as it
deems necessary to further the purposes of this Chapter.
(g) Variances shall not be issued within any designated floodway, or lower floodway fringe,
if ANY increase in flood levels during the base flood discharge would result.
(h) Conditions for Variances:
(1) The provisions of this Chapter are minimum standards for flood loss reduction,
therefore any deviation from the standards must be weighed carefully. Variances
shall only be issued upon a determination that the variance is the minimum
necessary, considering the flood hazard, to afford relief; and, in the instance of
an Historic Structure, a determination that the variance is the minimum necessary
so as not to destroy the historic character and design of the building.
(2) A variance shall be issued ONLY when there is:
(a) a finding of good and sufficient cause,
(b) a determination that failure to grant the variance would result in
exceptional hardship, and;
(c) a determination that the granting of a variance will not result in
increased flood heights, additional threats to public safety,
extraordinary public expense, create nuisance, cause fraud on or
victimization of the public, or conflict with existing local laws or
ordinances.
(3) Any applicant to whom a variance is granted shall be given written notice
specifying the difference between the base flood elevation and the elevation of
the proposed lowest floor and stating that the cost of flood insurance will be
commensurate with the increased risk to life and property resulting from the
reduced lowest floor elevation.
(i) The Executive Director shall maintain the records of all appeal actions and report any
variances to the Federal Emergency Management Agency upon request.
(j) Variances may be issued for development necessary for the conduct of a functionally
dependent use, provided the criteria of this Article are met, no reasonable alternative
exists, and the development is protected by methods that minimize flood damage during
the base flood and create no additional threats to public safety.
§ 8-1-33 - - 8-1-42. RESERVED.
Attachment number 1Page 14 of 23
15
ARTICLE 5
PROVISIONS FOR FLOOD HAZARD REDUCTION
§ 8-1-43. GENERAL STANDARDS
In ALL Areas of Special Flood Hazard the following provisions are required:
(a) New construction and substantial improvements of existing structures shall be anchored to
prevent flotation, collapse or lateral movement of the structure;
(b) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral
movement. Methods of anchoring may include, but are not limited to, use of over-the-top
or frame ties to ground anchors. This standard shall be in addition to and consistent with
applicable State requirements for resisting wind forces;
(c) New construction and substantial improvements of existing structures shall be constructed
with materials and utility equipment resistant to flood damage;
(d) New construction or substantial improvements of existing structures shall be constructed
by methods and practices that minimize flood damage;
(e) All heating and air conditioning equipment and components, all electrical, ventilation,
plumbing, and other service facilities shall be designed and/or located so as to prevent
water from entering or accumulating within the components during conditions of
flooding;
(f) New and replacement water supply systems shall be designed to minimize or eliminate
infiltration of flood waters into the system;
(g) Replacement sanitary sewage systems shall be designed to minimize or eliminate
infiltration of flood waters into the systems and discharges from the systems into flood
waters;
(h) New on-site waste disposal systems shall be located within the Special Flood Hazard Area
per the provisions of the Georgia Onsite Wastewater Regulations;
(i) Any alteration, repair, reconstruction or improvement to a structure which is not
compliant with the provisions of this Chapter, shall be undertaken only if the non-
conformity is not furthered, extended or replaced; and
(j) Elevated Buildings - All new construction or substantial improvements of existing
structures that include ANY fully enclosed area located below the lowest floor formed by
foundation and other exterior walls shall be designed so as to be an unfinished or a flood
resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces
on exterior walls by allowing for the automatic entry and exit of floodwater.
(1) A minimum of two (2) openings that are installed no more than twelve (12)
inches above the higher of the final interior or exterior grade, and that are
installed in at least two different sides (preferably the sides in the direction of the
flow of floodwater) of each enclosed area, must be provided, where the
openings:
Attachment number 1Page 15 of 23
16
(a) Have a total open net area of not less than one square inch for every square
foot of enclosed area Openings may be equipped with screens, louvers,
valves or other coverings or devices provided they are disabled in the open
position and also permit the automatic flow of floodwater in both
directions.; or
(b) Are individually certified by a design professional licensed to do design
work in the State of Georgia stating that the openings are designed to
automatically equalize hydrostatic flood loads on exterior walls by allowing
the automatic entry and exit of floodwaters in accordance with the American
Society of Civil Engineers – Flood Resistant Design and Construction
(ASCE 24) and that an appropriate number of vents are provided. A copy
of the Engineer’s Certification (signed and sealed) along with the applicable
section from the Flood Ordinance (this section) allowing for the use of these
engineered openings must be attached to the Elevation Certificate; or
(c) Are ICC-ES accepted engineered flood vents, and the appropriate number of
such vents are provided and installed in accordance with the manufacturer’s
specifications. A copy of the ICC-ES Evaluation Report along with the
applicable section from the Flood Ordinance (this section) allowing for the
use of these engineered flood vents must be attached to the Elevation
Certificate.
(2) So as not to violate the "Lowest Floor" criteria of this Chapter, the unfinished or
flood resistant enclosure shall only be used for parking of vehicles, limited
storage of maintenance equipment used in connection with the premises, or entry
to the elevated area; and
(3) The interior portion of such enclosed area shall not be partitioned or finished
into separate rooms.
(4) An attached garage may have its flood below the BFE provided the garage meets
all of the requirements for an enclosed area below the BFE, including, but not
limited to, the installation of openings that meet Section 8-1-43-(j)-(1) above.
Opens may be installed in garage doors; however, garage doors do not meet the
requirement for openings. The use of the garage space must be limited to parking
of vehicles, building access and storage. Section 8-1-43-(j)-(3), above, must be
strictly adhered to. Flood damage-resistant materials must be used below the
BFE and all utilities must be elevated to be three (3) feet above the BFE.
(5) Crawlspaces that are below-grade on all sides (basements) are not allowed.
(6) Detached garages and detached storage building are allowed, without the
requirement to elevate to three (3) feet above the BFE in AE zones, or three (3)
feet above the highest adjacent grade in A zones, if they comply with all of the
requirements for enclosures:
(a) must be used for parking of vehicles and storage only;
(b) must be constructed of flood damage-resistant materials below the area
that is three (3)feet above the BFE;
(c) all utilities must be elevated to be three (3) feet above the BFE;
(d) the requirements for flood openings that meet Section 8-1-43-(j)-(1)
above must be satisfied;
(e) must be anchored to resist floatation, collapse or lateral movement
under flood conditions.
Attachment number 1Page 16 of 23
17
§ 8-1-44. SPECIFIC STANDARDS
In ALL areas of Special Flood Hazard the following provisions are required:
(a) New construction and substantial improvements. Where base flood elevation data are
available, new construction or substantial improvement of any structure or manufactured
home shall have the lowest floor, including basement, elevated no lower than three (3)
feet above the base flood elevation. Should solid foundation perimeter walls be used to
elevate a structure, openings sufficient to facilitate the unimpeded movements of flood
waters shall be provided in accordance with standards of Article 5, Section 8-1-43(j),
"Elevated Buildings".
(1) All heating and air conditioning equipment and components (including
ductwork), all electrical, ventilation, plumbing, and other service facilities shall
be elevated at or above three (3) feet above the base flood elevation.
(b) Non-Residential Construction. New construction or the substantial improvement of any
structure located in A1-30, AE, or AH zones, may be flood-proofed in lieu of elevation.
The structure, together with attendant utility and sanitary facilities, must be designed to be
water tight to three (3) feet above the base flood elevation, with walls substantially
impermeable to the passage of water, and structural components having the capability of
resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered
professional engineer or architect shall certify that the design and methods of construction
are in accordance with accepted standards of practice for meeting the provisions above,
and shall provide such certification to the official as set forth above and in Article 4,
Section 8-1-31(g).
(c) Standards for Manufactured Homes and Recreational Vehicles. Where base flood
elevation data are available:
(1) All manufactured homes placed or substantially improved on: (1) individual lots
or parcels, (2) in new or substantially improved manufactured home parks or
subdivisions, (3) in expansions to existing manufactured home parks or
subdivisions, or (4) on a site in an existing manufactured home park or
subdivision where a manufactured home has incurred "substantial damage" as
the result of a flood, must have the lowest floor including basement, elevated no
lower than three (3) feet above the base flood elevation.
(2) Manufactured homes placed or substantially improved in an existing
manufactured home park or subdivision may be elevated so that either:
(a) The lowest floor of the manufactured home is elevated no lower than
three (3) feet above the level of the base flood elevation, or
(b) The manufactured home chassis is elevated and supported by reinforced
piers (or other foundation elements of at least an equivalent strength) of
no less than 36 inches in height above grade.
(3) All manufactured homes must be securely anchored to an adequately anchored
foundation system to resist flotation, collapse and lateral movement. (ref. Article
5, Section 8-1-43(b) ).
(4) All recreational vehicles placed on sites must either:
Attachment number 1Page 17 of 23
18
(a) Be on the site for fewer than 180 consecutive days.
(b) Be fully licensed and ready for highway use, (a recreational vehicle is
ready for highway use if it is licensed, on its wheels or jacking system,
attached to the site only by quick disconnect type utilities and security
devices, and has no permanently attached structures or additions), or
(c) The recreational vehicle must meet all the requirements for "New
Construction", including the anchoring and elevation requirements of
Article 5, Section 8-1-44(c)(1) and (3).
(d) Floodway. Located within areas of Special Flood Hazard established in Article 3,
Section 8-1-17, are areas designated as floodway. A floodway may be an extremely
hazardous area due to velocity flood waters, debris or erosion potential. In addition, the
area must remain free of encroachment in order to allow for the discharge of the base
flood without increased flood heights. Therefore, the following provisions shall apply:
(1) Encroachments are prohibited, including earthen fill, new construction, substantial
improvements or other development within the regulatory floodway. Development
may be permitted however, provided it is demonstrated through hydrologic and
hydraulic analyses performed in accordance with standard engineering practice that
the encroachment shall not result in any increase in flood levels or floodway widths
during a base flood discharge. A registered professional engineer must provide
supporting technical data and certification thereof.
(2) ONLY if Article 5, Section 8-1-44(d)(1) above is satisfied, then any new construction
or substantial improvement shall comply with all other applicable flood hazard
reduction provisions of Article 5.
(3) The placement of manufactured homes, except in an existing manufactured home
park or subdivision, shall be prohibited. A replacement manufactured home may be
placed on a lot in an existing manufactured home park or subdivision provided the
anchoring standards of § 8-1-43 (b) are met, and the elevation standards of § 8-1-44
(a) and the encroachments standards of subsection (1) of this Section are met.
(4) Removal of trees and other vegetation may not be a consideration in calculating the
effect of proposed encroachments on flood levels during the occurrence of the base
flood discharge.
(e) Floodway fringe, lower. Within the lower floodway fringe is the area between the
floodway and the upper floodway fringe that is lower than a lines one-half (1/2) the
distance between the floodway and the boundary of the area of Special Flood Hazard.
The lower floodway fringe is a transitional area that is hazardous due to its proximity to
the floodway and encroachment by fill or development within this area could have serious
impact on the entire floodplain. The following provisions shall apply with the lower
floodway fringe:
(1) Encroachments, including fill, new construction, substantial improvements and
other developments shall be prohibited unless certification by a registered
professional engineer, with supporting technical data, is provided to the
Executive Director demonstrating that encroachments shall not result in any
increase in flood levels during occurrence of base flood discharge;
Attachment number 1Page 18 of 23
19
(2) If Article 5, Section 8-1-44(d)(1) is satisfied, all new construction and
substantial improvements shall comply with all applicable flood hazard
reduction provisions of Article 5.
(3) The placements of manufactured homes, except in an existing manufactured
home park or subdivision, shall be prohibited. A replacement manufactured
home may be placed on a lot in an existing manufactured home park or
subdivision provided the anchoring standards of Article 5, Section 8-1-43(b),
and the elevation standards of Article 5, Section 8-1-44(a), and the
encroachment standards of Article 5, Section 8-1-44(d)(1) are met.
(4) Removal of trees and other vegetation may not be a consideration in calculating
the effect of proposed encroachments on flood levels during the occurrence of
the base flood discharge.
(k) Large Tracts. If a tract contains over one (1) acre located within the area of Special Flood
Hazard, then development or land disturbance on that portion of the tract located within
the Special Flood Hazard area shall comply with the standards for lower floodway fringe
set forth in § 8-1-44 (e).
(l) Other area unsuitable for development. Land subject to flooding that is not located within
a mapped area of Special Flood Hazard may, at the discretion of the Executive Director
or City Engineer, be required to comply with any or all standards set forth in this Chapter.
(m) Grading in the area of the Special Flood Hazard. Grading (including excavating, filling,
or any culmination thereof) shall be prohibited in the area of the Special Flood Hazard
except for the following:
(1) Minimum land disturbing activities such as home gardens and individual home
landscaping, repairs, maintenance work and other related activities;
(2) Agricultural practices involving the establishment, cultivation or harvesting or
products of the field or orchard, preparing and planting of pasture land, forestry
land management practices including harvesting (where stumps are not
removed), farm ponds, dairy operations, livestock and poultry management
practices and the construction of farm buildings.
(3) Projects permitted by or carried out under the technical supervision of the U.S.
Department of Agriculture, U.S. Army Corps of Engineers, or any other agency
of the U.S. Government;
(4) Cemetery graves;
(5) Excavation for wells or tunnels or utilities;
(6) Approved mining, quarrying, stockpiling of rock, sand, gravel aggergrates or
clay where established and provided for by law;
(7) Exploratory excavations under the direction of soils engineers or engineering
geologists;
(8) Where consistent with other provisions of this Chapter, minimum grading for
land development or construction which does not result in topographic changes
greater than two (2) feet at any location and which is not for the sole purpose of
elevating structures pursuant to Article 5, Section 8-1-44(a) and Article 5,
Attachment number 1Page 19 of 23
20
Section 8-1-44(b) of this Chapter. In no case, shall fill be transported into the
area of Special Flood Hazard.
(a) Detention ponds and retention ponds are exempt from the provisions 8-
1-44-(m)-(8), provided it is demonstrated through hydrologic and
hydraulic analyses performed in accordance with standard engineering
practice that the encroachment by the detention pond or retention pond
shall not result in any increase in flood levels or floodway widths
during a base flood discharge. A registered professional engineer must
provide supporting technical data and certification thereof.
(1) Under no circumstances shall a detention pond or a retention
pond be located in the area of Special Flood Hazard.
(9) Construction activities at existing Industrial Sites which were developed before
the effective date of the FIRST Floodplain Management Ordinance adopted by
Augusta, GA as a basis for Augusta's participation in the National Flood
Insurance Program (NFIP), such as dikes, ditches and ponds.
(n) As-built Drawings and Certification. Within the area of the Special Flood Hazard, as-
built drawings and certifications shall be provided by a registered professional engineer
and/or a registered land surveyor pursuant to 8-1-30(b) and 8-1-44(b) of this Ordinance
and also when required by the Site Plan Regulations or the Subdivision Regulations. As-
built drawings and certifications may be required in other situations at the discretion of
the Executive Director.
§ 8-1-45. BUILDING STANDARDS FOR STREAMS WITHOUT ESTABLISHED BASE
FLOOD ELEVATIONS AND/OR FLOODWAYS (A-ZONES).
Located within the Areas of Special Flood Hazard established in Article 3, Section 8-1-17, where
streams exist but no base flood data have been provided (A-Zones), OR where base flood data
have been provided but a Floodway has not been delineated, the following provisions apply:
(a) No encroachments, including structures or fill material, shall be located within an area
equal to five (5) times the width of the stream or twenty (20) feet, whichever is greater,
measured from the top of the stream bank, unless certification by a registered professional
engineer is provided demonstrating that such encroachment shall not result in any
increase in flood levels during the occurrence of the base flood discharge.
(b) In Special Flood Hazard Areas without base flood elevation data, new construction and
substantial improvements of existing structures shall have the lowest floor of the lowest
enclosed area (including basement) elevated no less than three (3) feet above the highest
adjacent grade at the building site. Openings sufficient to facilitate the unimpeded
movements of flood waters shall be provided in accordance with standards of Article 5,
Section 8-1-43(j), "Elevated Buildings".
(1) All heating and air conditionaing equipment and components (including
ductwork), all electrical, ventilation, plumbing, and other service facilities shall
be elevated no less than three (3) feet above the highest adjacent grade at the
building site.
The Executive Director shall certify the lowest floor elevation level and the record shall
become a permanent part of the permit file.
Attachment number 1Page 20 of 23
21
(c) When base flood elevation data or floodway data have not been provided in accordance
with Article 3, Section 8-1-17, then the Executive Director shall obtain, review, and
reasonably utilize any scientific or historic base flood elevation and floodway data
available from a Federal, State, or other source, in order to administer the provisions of
Article 5. ONLY if data are not available from these sources, then the provisions of (a)
and (b) of this Section shall apply.
§ 8-1-46. STANDARDS FOR SUBDIVISIONS.
(a) All subdivision and/or development proposals shall be consistent with the need to
minimize flood damage;
(b) All subdivision and/or development proposals shall have public utilities and facilities
such as sewer, gas, electrical and water systems located and constructed to minimize flood
damage;
(c) All subdivision and/or development proposals shall have adequate drainage provided to
reduce exposure to flood hazards, and;
(d) For subdivisions and/or developments greater than fifty lots of five acres, whichever is
less, base flood elevation data shall be provided for subdivision proposals and all other
proposed development, including manufactured home parks and subdivisions. Any
changes or revisions to the flood data adopted herein and shown on the FIRM shall be
submitted to FEMA for review as a Conditional Letter of Map Revision (CLMOR) or
Conditional Letter of Map Amendment (CLOMA), whichever is applicable. Upon
completion of the project, the developer is responsible for submitting the “as-built” data
to FEMA in order to obtain the final Letter of Map Revision (LOMR).
§ 8-1-47. STANDARDS FOR AREAS OF SHALLOW FLOODING (AO ZONES).
Areas of Special Flood Hazard established in Article 3, Section 8-1-17, may include designated
"AO" shallow flooding areas. These areas have base flood depths of one to three feet (1'-3') above
ground, with no clearly defined channel. The following provisions apply:
(a) All new construction and substantial improvements of residential and non-residential
structures shall have the lowest floor, including basement, elevated to the flood depth
number specified on the Flood Insurance Rate Map (FIRM), above the highest adjacent
grade. If no flood depth number is specified, the lowest floor, including basement, shall
be elevated at least three feet (3) above the highest adjacent grade. Openings sufficient to
facilitate the unimpeded movements of flood waters shall be provided in accordance with
standards of Article 5, Section 8-1-43(j), "Elevated Buildings".
The Executive Director shall certify the lowest floor elevation level and the record shall
become a permanent part of the permit file.
(b) New construction or the substantial improvement of a non-residential structure:
(1) Shall have the lowest floor, including basement, elevated to the flood depth
number specified on the Flood Insurance Rate Map (FIRM), above the highest
adjacent grade. If no flood depth number is specified, the lowest floor, including
basement, shall be elevated at least three feet (3) above the highest adjacent
grade.
Attachment number 1Page 21 of 23
22
(2) May be flood-proofed in lieu of elevation. The structure, together with attendant
utility and sanitary facilities, must be designed to be water tight to the specified
FIRM flood level plus one (1) foot, above highest adjacent grade, with walls
substantially impermeable to the passage of water, and structural components
having the capability of resisting hydrostatic and hydrodynamic loads and the
effect of buoyancy. A registered professional engineer or architect shall certify
that the design and methods of construction are in accordance with accepted
standards of practice for meeting the provisions above, and shall provide such
certification to the official as set forth above and as required in Articles 4,
Section 8-1-30(a)(3) and Article 4, Section 8-1-30(b).
(c) Drainage paths shall be provided to guide floodwater around and away from any proposed
structure.
§ 8-1-48 STANDARDS FOR AREAS OF SPECIAL FLOOD HAZARD (ZONES AE) WITH
ESTABLISHED BASE FLOOD ELEVATIONS WITHOUT DESIGNATED
FLOODWAYS
Located within the Areas of Special Flood Hazard established in Article 3, Section 8-1-17, where
streams with base flood elevations are provided but no floodways have been designated, (Zone
AE) the following provisions apply:
(a) No encroachments, including fill material, new structures or substantial improvements
shall be located within Special Flood Hazard Areas, unless certification by a registered
professional engineer is provided deomonstrating that the cumulative effect of the
proposed development, when combined with all other existing and anticipated
development, will not increase the water surface elevation of the base flood more than
one foot at any point within the community. The engineering certification should be
supported by technical data that conforms to standard hydraulic engineering principles.
(b) New construction or substantial improvements of buildings shall be elevated or flood-
proofed to elevations established in accordance with Article 5, Section 8-1-44.
§ 8-1-49 STANDARDS FOR CRITICAL FACILITIES
(a) Critical facilities shall not be located in the 100 year floodplain or the 500 year
floodplain.
(b) All ingress and egress from any critical facility must be protected to the 500 year flood
elevation.
§ 8-1-50. RESERVED.
Attachment number 1Page 22 of 23
23
§ 8-1-51. SEVERABILITY
If any Section, clause, sentence, or phrase of this Chapter is held to be invalid or unconstitutional
by any court of competent jurisdiction, then said holding shall in no way effect the validity of the remaining
portions of this Chapter.
Section 2. This Chapter shall become effective upon adoption.
Section 3. All Ordinances or parts of Ordinances in conflict with this Chapter are hereby repealed.
Duly adopted by the Augusta Commission this __________ day of ____________________, 2009.
AUGUSTA COMMISSION
___________________________________
Mayor
ATTEST:
__________________________________
Clerk of Commission
Attachment number 1Page 23 of 23
ORDINANCE NO. _____
A resolution by the Augusta-Richmond County Planning Commission recommending that the
Flood Damage Prevention Ordinance be readopted and amended as follows:
AN ORDINANCE TO READOPT THE FLOOD DAMAGE PREVENTION
ORDINANCE OF AUGUSTA, GEORGIA, INITIALLY ADOPTED ON FEBRUARY
15, 1978 AND MARCH 4, 1980, AMENDED BY THE AUGUSTA COMMISSION
AFTER CONSOLIDATION ON MARCH 18, 1997, AND LAST AMENDED BY THE
AUGUSTA COMMISSION ON OCTOBER 17, 2000, IN ITS ENTIRETY, AND TO
ADD LANGUAGE FROM GEORGIA’S MODEL ORDINANCE AS REQUIRED BY
AUGUSTA’S PARTICIPATION IN THE NATION FLOOD INSURANCE PROGRAM
(NFIP), AND TO AMEND AND ADD LANGUAGE FROM FEMA’S TECHNICAL
BULLETIN 1 TO SECTION 8-1-43-(j).
THE AUGUSTA COMMISSION HEREBY ORDAINS:
SECTION I. That the Ordinance regulating Flood Damage Prevention in Augusta, Georgia, is
amended by deleting the following:
• TITLE EIGHT PLANNING & ZONING Chapter 1 Flood Damage Prevention
SECTION II. That the Ordinance regulating Flood Damage Prevention in Augusta, Georgia, is
amended by adding the following:
• TITLE EIGHT PLANNING & ZONING Chapter 1 Flood Damage Prevention
SECTION III. All Ordinances or parts of Ordinances in conflict with this Ordinance are hereby
repealed.
Attachment number 2Page 1 of 2
Done in Open Meeting under the Common Seal thereof this __________ day of
_______________, 2009.
APPROVED THIS __________ day of _______________, 2009.
___________________________________
MAYOR, AUGUSTA COMMISSION
AUGUSTA, GEORGIA
ATTEST:
___________________________________
CLERK OF COMMISSION
Attachment number 2Page 2 of 2
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Recapture & Reallocation of SPLOST III Funds into Phase IV Programmed
Department:Public Services Department
Caption:Approve the recapture and/or reallocation of SPLOST III funds programmed
for the Public Services Department and County Forces into Phase IV
programmed categories.
Background:SPLOST Funds were programmed for Public Services in general categories
and were/are not project specific. In an effort to close out Phase III, funds
will be recaptured and reprogrammed to Phase IV. (See attached table.)
Analysis:With the re-programming of these funds, we effectively close out Phase III
project categories for Public Services and consolidate these to Phase IV, in
like categories.
Financial Impact:Funds will be transferred to the designated accounts, as listed, upon
Commission approval.
Alternatives:1. Approve the recapture and/or reallocation of SPLOST III funds
programmed for the Public Services Department and County Forces, into
Phase IV programmed categories. 2. Do not approve.
Recommendation:Approve Alternative #1.
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Resolution for Easements from Ga. State Properties Commission
Department:Clerk of Commission
Caption:Approve a Resolution requesting the Georgia State Properties Commission
grant temporary and permanent construction easements for the Butler Creek
Interceptor Upgrade-East Project.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Cover Memo
Attachment number 1Page 1 of 7
Attachment number 1Page 2 of 7
Attachment number 1Page 3 of 7
Attachment number 1Page 4 of 7
Attachment number 1Page 5 of 7
Attachment number 1Page 6 of 7
Attachment number 1Page 7 of 7
Engineering Services Committee Meeting
9/8/2009 1:00 PM
St. Sebastian Way/Greene Street/15th Street- Archaeological Website
Department:Abie L. Ladson, PE, CPESC, Director of Engineering
Caption:Motion to approve the City providing on its website a link to the
website that has been created concerning the mitigation of the Springfield
Historic District, an African-American archaeological site, as part of the St.
Sebastian Street Extension project. The Springfield Historic District
website has been finalized and is available to the public. This
website contains lesson plans at the 8th grade level and this is requesting
that the Augusta-Richmond County Board of Education also be made aware
of this educational opportunity.
Background:This is a Georgia Department of Transportation (GDOT) project that will
extend St. Sebastian Street on new location from Walton Way to
Riverwatch Parkway and provide connectivity to Broad Street. The
Engineering Department was responsible for development of the
Preliminary Engineering activities. The project was awarded to Sunbelt
Structures, Inc. on April 9, 2008 at the low bid of $30,306,988.7 with a
completion date of July 31, 2010. Construction is approximately 50%
complete.
Analysis:The alignment on the connector segment from Greene Street to Broad Street
and Reynolds Street encroached on the Springfield Historic District. The
Springfield Community was established in the late 1700’s and has long been
an important location for African-American culture and history in Augusta.
The Federal Highway Administration, National Historic Preservation Office,
State Historic Preservation Office and GDOT deemed this site to be eligible
for inclusion on the National Register of Historic Places. Mitigation of the
archaeological site has been completed and the findings of the artifacts and
other historical information have been documented on the websites listed
below. http://georgiainfo.galileo.usg.edu/blackga.htm
http://africanamericanspringfield.org
http://www.nps.gov/nr//travel/Augusta/springfieldbaptists.html
http://www.diaspora.uiuc.edu/bookmark3.html#1e
http://thesga.org/2009/07/road-trip-augustas-springfield-community/
http://gashpo.org/content/displaycontent.asp?txtDocument=50
Financial Impact:N/A
Alternatives:1 Request approval for the City to provide on its website a link to the
website that has been created concerning the mitigation of the Springfield
Historic District, an African-American archaeological site, as part of the St.
Sebastian Street Extension project. The Springfield Historic District website
has been finalized and is available to the public. This website contains
Cover Memo
lesson plans at the 8th grade level and this is requesting that the Augusta-
Richmond County Board of Education also be made aware of this
educational opportunity. 2) N/A
Recommendation:Approve Alternative Number One
Funds are Available in
the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
9/8/2009 1:00 PM
TE Grant
Department:Clerk of Commission
Caption:Approve letter from the Mayor to the Department of Transportation to
transfer TE Grant from 5th Street Depot to James Brown Blvd. Streetscape
Project.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
9/8/2009 1:00 PM
Turknett Springs Detention Basin Improvements -Contract/CPB
Department:Abie L. Ladson, PE, CPESC, Director of Engineering
Caption:Approve award of Construction Contract to L-J, Inc. in the amount of
$537,085.00 and Capital Project Budget for the Turknett Springs Detention
Basin Improvements Project, subject to receipt of signed contracts and
proper bonds as requested by AED. Funding in the amount of $537,085.00
with $268,542.50 from Augusta Utilities and $268,542.50 from SPLOST IV
Augusta Public Services for project construction.
Background:The Turknett Springs Sediment Basin is a regionalfacility that receives
stormwater flow from surrounding areas to include the backwashing of
water treatment filters at the Higland Avenue plant. Over time, sediments
from both sources have accumulated in the pond - thereby diminishing the
ponds capacity. Very soon no additional sediments storage capacity will be
left. The requested periodic maintenance work will remove accumulated
sediment deposits and restore the pond’s capacity nearer to its design level.
This project will also provide needed capacity for sedimentation from the
water treatment plant and surface runoff.
Analysis:Bids were received on August 14, 2009 with L-J, Inc. being the low bidder.
The bid results are as follow: CONTRACTORS BID 1. L-J, Inc.
$537,085.00 2. Mabus Brothers $633,500.00 3. Bio-Nomic Services
$649,900.00 4. Beam’s $652,062.85 It is AED's recommendation to award
this project to the low bidder, L-J, Inc. subject to receipt of proper bonds.
Financial Impact:Funding in the amount of $537,085.00 with $268,542.50 from Augusta
Utilities and $268,542.50 from SPLOST IV Augusta Public Services for
project construction.
Alternatives:1) Approve award of Construction Contract to L-J, Inc. in the amount of
$537,085.00 and Capital Project Budget for the Turknett Springs Detention
Basin Improvements Project, subject to receipt of signed contracts and
proper bonds as requested by AED. Funding in the amount of $537,085.00
with $268,542.50 from Augusta Utilities and $268,542.50 from SPLOST IV
Augusta Public Services for project construction. 2) Do not approve project
Recommendation:Approve Alternative Number One.
Funds are Available in
the Following
Accounts:
507043410-5425110/8090040-5425110 AUD 324-041110-
6011110/201824021-6011110 APS
Cover Memo
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Invitation To Re-Bid
Sealed re-bids will be received at this office until 11:00 a.m., Friday, August 7, 2009 for furnishing:
Re-Bid Item #09-125A Turknett Springs Detention Basin Improvements for
Engineering Department
Re-Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the
offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
706-821-2422
Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530
Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall
be obtained by all prime, subcontractors and suppliers exclusively from Digital Blue Print.
The fees for the plans and specifications which are non-refundable is $50.00
Documents may also be examined during regular business hours at the Augusta Builders
Exchange, 1262 Merry Street, Augusta, GA 30904; F. W. Dodge Plan Room, 1281 Broad Street,
Augusta, GA 30901. It is the wish of the Owner that all businesses are given the opportunity to
submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans
online (www.digblueprint.com) at no charge through Digital Blue Print (706 821-0405) beginning
Wednesday, July 22, 2009. Bidders are cautioned that submitting a package without Procurement
of a complete set are likely to overlook issues of construction phasing, delivery of goods or services,
or coordination with other work that is material to the successful completion of the project. Bidders
are cautioned that sequestration of documents through any other source is not advisable.
Acquisition of documents from unauthorized sources places the bidder at the risk of receiving
incomplete or inaccurate information upon which to base his qualifications.
A Mandatory Pre-Bid Conference will be held on Tuesday, July 28, 2009 @ 10:00 a.m. in the
Procurement Department – Room 605. All questions must be submitted in writing to the
office of the Procurement Department by fax at 706-821-2811 or by mail. No bid will be
accepted by fax, all must be received by mail or hand delivered.
No re-Bid may be withdrawn for a period of 60 days after time has been called on the date of
opening. A 10% Bid bond is required to be submitted in a separate envelope so marked along
with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be
required for award.
An invitation for bids shall be issued by the Procurement Office and shall include specifications
prepared in accordance with Article 4 (Product Specifications), and all contractual terms and
conditions, applicable to the procurement. All specific requirements contained in the invitation to bid
including, but not limited to, the number of copies needed, the timing of the submission, the required
financial data, and any other requirements designated by the Procurement Department are
considered material conditions of the bid which are not waiveable or modifiable by the Procurement
Director. Please mark RE-BID number on the outside of the envelope.
GERI A. SAMS, Procurement Director
cc: Tameka Allen Interim Deputy Administrator
Abie Ladson Engineering
Hameed Malik Engineering
Attachment number 2Page 1 of 1
Attachment number 5Page 1 of 2
Attachment number 5Page 2 of 2
BILL HEAD
DS UTILITIES, INC
1644 HOLY TRINITY CHURCH ROAD
LITTLE MOUNTAIN SC 29075
TONY AMMAR
AMMAR CONSTSRUCTION
PO BOX 1877
EVANS GA 30809
THOMAS SLADE
MIDDLE GA ROAD BUILDING
155 CENTRAL DRIVE
DUBLIN GA 31027
MCCLAM & ASSOCIATES
ATTN SAMMY DOMINICK
1642 HOLY TRINITY CHURCH ROAD
LITTLE MOUNTAIN SC 29075
L-J INC
ATTN RANDALL MCCLAIN
603 PINE LOG ROAD
BEECH ISLAND SC 29842
BNS/VIS
ATTN PET FLEETWOOD
516 ROUNTREE ROAD
CHARLOTTE NC 28217
JIMMY BLOUNT
BLOUNTS COMPLETE HOME SRVC
2907C TOBACCO ROAD
HEPHZIBAH GA 30815
PATRICK DILLARD
BLAIR CONSTRUCTION
PO BOX 770
EVANS GA 30809
BO DOUGLAS
DREDGE AMERICA
9555 NW HIGHWAY N
KANSAS CITY MO 64153
SCOTT STEPHENS
BEAMS CONTRACTING
2335 ATOMIC ROAD
BEECH ISLAND SC 29842
LARRY GOOLSBY
MABUS BROS CONSTRUCTION
920 MOLLY POND ROAD
AUGUSTA GA 30901
TIM NORTH
GRANTO & GEARIG BROS.
PO BOX 2684
EVANS GA 30809
DAVID CARTER
CARTER DREDGING
3845 SAVANNAH HIGHWAY
JESUP GA 31555
JERRY DAVIS
HOLLAND PUMP
836 JONES SWAMP ROAD
WALTERBORO SC 29488
TONY HIGHFIELD
EAGLE UTILITY
1350 BRANCH ROAD
BISHOP GA 30627
BOB BARKER
HARRIS CONSTRUCTION
1736 BARTON CHAPEL ROAD
AUGUSTA GA 30909
CHARLES LANCE
PO BOX 398
BUTLER GA 31006
DAREN SCHATX
ROWBOAT DOCK & DREDGE
858 WILLIAMSON ROAD
MOORESVILLE NC 28117
ABIE LADSON
ENGINEERING ADMIN.
HAMEED MALIK
ENGINEERING ADMIN.
YVONNE GENTRY
DBE
HATCHER BUILDING
DIGITAL BLUE PRINT
ATTN: CHAD CARROLL
1281 BROAD STREET
AUGUSTA GA 30901
Re-Bid 09-125A
ADDENDUM 1
MAILED MON JUL 27 2009
Re-Bid 09-125A Turknett Springs
Detention Basin Improvements
Engineering Department
Re-Bid Due: Fri. 8/7/09 @ 11:00 a.m.
Attachment number 6Page 1 of 1
Attachment number 7Page 1 of 2
Attachment number 7Page 2 of 2