HomeMy WebLinkAbout2009-08-10-Meeting Agendawww.augustaga.gov Engineering Services Committee Meeting Committee Room- 8/10/2009- 1:00 PM ENGINEERING SERVICES 1. Approve the award of the contract to Thompson Building Wrecking Co., Inc in the amount of $44,400.00 on Capital Project Budget #323-041110- 296823215 Number Ten for the demolition of residential buildings for the Alexander Drive project, subject to receipt of signed contracts and proper bonds for the Engineering Department. Funds are available in the project Right of Way account. Attachments 2. Award contract to Mabus Brothers Construction Company, Inc. in the amount of $ 1,145,728.50. This award will include relocation of existing water mains in conflict with new construction as well as construction of new water and sanitary sewer mains in the area of the Alexander Drive Widening project. . Attachments 3. Approve Change Order to Quality Storm Water Solutions, LLC. in the amount of $16,331.00 for the construction of two new storm boxes and the relocation of an existing power pole. Attachments 4. Motion to approve Georgia Power Governmental Encroachment Agreement # 31166 and Municipal Electric Authority of Georgia Governmental Encroachment Agreement #31167. Attachments 5. Motion to approve emergency award for a contract with Blair Construction, Inc. for services associated with construction of the 6th Street Emergency Sewer Repair Project in the amount of $840,842.78. Bid item #09-138 Attachments 6. Approve Utilities' purchase of Warehouse Pallet Rack Shelving and Furniture for the New Wylds Road Location. Attachments Engineering Services Committee Meeting 8/10/2009 1:00 PM Alexander Drive Department:Abie L. Ladson, PE, CPESC, Director, Engineering Department Caption:Approve the award of the contract to Thompson Building Wrecking Co., Inc in the amount of $44,400.00 on Capital Project Budget #323-041110- 296823215 Number Ten for the demolition of residential buildings for the Alexander Drive project, subject to receipt of signed contracts and proper bonds for the Engineering Department. Funds are available in the project Right of Way account. Background:This is a Georgia Department of Transportation (GDOT) project that will widen and reconstruct Alexander Drive to 4 lanes with a 20’ raised median from Washington Road to Riverwatch Parkway. As part of the Alexander Drive project, the demolition of residential buildings on five parcels of land to clear the right-of-way for the Alexander Drive project must be completed before the construction activities begins. Analysis:Bids were received on July 2, 2009 with Thompson Building Wrecking Co., Inc being the only bidder. Bid results are as follows: CONTRACTORS BID 1. Thompson Building Wrecking $44,400.00 It is the Engineering Department recommendation to award this project to the bidder Thompson Building Wrecking Co., Inc. Financial Impact:Funds are available in the project Right of Way account 323-041110- 5411120/296823215-5411120. Alternatives:1. Approve the award of the contract to Thompson Building Wrecking Co., Inc in the amount of $44,400.00 on Capital Project Budget #323-041110- 296823215 Number Ten for the demolition of residential buildings for the Alexander Drive project, subject to receipt of signed contracts and proper bonds for the Engineering Department. Funds are available in the project Right of Way account. 2. Do not approve and jeopardize the construction of a much needed project. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: 323- 041110-5411120/296823215-5411120 REVIEWED AND APPROVED BY: Cover Memo Item # 1 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project be set up is authorized to CPB#323-041110-296823215. Funding is needed for the demolitionof residential buildings on five parcels of land to clear the Right of Way. Funds in the amount of $44,400.00 are available in the Engineering project Right of Way account. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase II Recapture 500,000$ Special 1% Sales Tax, Phase III Recapture 2,522,795$ Augusta Utilities 24,768$ Special 1% Sales Tax, Phase III Recapture 86,680$ Special 1% Sales, Tax Fund Balance 2,500,000$ Special 1% Sales Tax, Phase III Recapture 117,680$ Augusta Utilities 112,330$ 5,864,253$ CPB#323-041110-296823215 CAPITAL PROJECT BUDGET ALEXANDER DRIVE IMPROVEMENTS CHANGE NUMBER TEN (WASHINGTON ROAD TO RIVERWATCH PARKWAY) Please do not process this document. Once approved by the Commission, the original will be sent to Clerk of Commission for execution. For information reference this request contact Shelette @ ext 5070. Section 3: The following amounts are appropriated for the project: By Basin By District Rock Creek $5,864,253 5,864,253$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor Please do not process this document. Once approved by the Commission, the original will be sent to Clerk of Commission for execution. For information reference this request contact Shelette @ ext 5070. 1 of 2 7.31.09 Attachment number 1 Page 1 of 2 Item # 1 Augusta-Richmond County, Georgia CPB#323-041110-296823215 CAPITAL PROJECT BUDGET ALEXANDER DRIVE IMPROVEMENTS CHANGE NUMBER TEN (WASHINGTON ROAD TO RIVERWATCH PARKWAY) CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPLOST, PHASE II 322-04-1110-6011110-292822333 ($500,000) ($500,000) SPLOST, PHASE III 323-04-1110-000000-000000000 ($2,522,795) ($2,522,795) AUGUSTA UTILITIES 507043420-5212115/89800510-5212115 ($24,768) ($24,768) SPLOST PHASE III 323-04-1110-6011111-296823333 ($86,680) ($86,680) SPLOST, FUND BALANCE 322-000-000000/39-52110 ($2,500,000) ($2,500,000) SPLOST PHASE III 323-04-1110-6011110-296823333 ($117,680) ($117,680) AUGUSTA UTILITIES ($105,850) ($105,850) 507043410-5212115-80800030 ($6,480) ($6,480) TOTAL SOURCES: ($5,864,253) ($5,864,253) USE OF FUNDSUSE OF FUNDS ENGINEERING 323-04-1110-5212115-296823215 $729,287 $729,287 RIGHT OF WAY 323-04-1110-5411120-296823215 $5,103,752 $5,103,752 (Demolition $44,400 Thompson ) UTILITIES 323-04-1110-5414510-296823215 $24,734 $24,734 UTILITIES 507043410-5212115-80800030 $6,480 $6,480 TOTAL USES: $5,864,253 $5,864,253 2 of 2 7.31.09 Attachment number 1 Page 2 of 2 Item # 1 Engineering Services Committee Meeting 8/10/2009 1:00 PM Approve construction award associated with relocation of Augusta Utilities Department facilities located in the right-of way of Alexander Drive as related to Georgia Department of Transportation project #STP-0001-00 (794) Department:Utilities Caption:Award contract to Mabus Brothers Construction Company, Inc. in the amount of $ 1,145,728.50. This award will include relocation of existing water mains in conflict with new construction as well as construction of new water and sanitary sewer mains in the area of the Alexander Drive Widening project. . Background:The Georgia Department of Transportation project to widen and realign Alexander Drive will require Augusta Utilities Department to relocate existing water mains in the area. This project will also offer an opportunity for Augusta Utilities Department to extend sanitary sewer service to customers previously not served. Analysis:Approving this contract will allow the contractor, Mabus Brothers Construction Company, Inc. to complete construction of the Alexander Drive water and sanitary sewer mains. The construction fee is fair and reasonable. With the completion of this construction, the area of Alexander Drive served by these new mains will enjoy years of trouble free service. Financial Impact:Funds for this work are available in account number 507043410-5425110 / 80800030-5425110 Alternatives:No alternatives are recommended. Recommendation:We recommend the Commission award the construction contract to Mabus Brothers Construction in the amount of $1,145,728.50. Funds are Available in the Following Accounts:507043410-5425110 / 80800030-5425110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 2 Attachment number 1 Page 1 of 1 Item # 2 Attachment number 2 Page 1 of 3 Item # 2 Attachment number 2 Page 2 of 3 Item # 2 Attachment number 2 Page 3 of 3 Item # 2 Invitation To Bid Sealed bids will be received at this office until 3:00 p.m., Thursday, July 16, 2009 for furnishing: Bid Item #09-127 Alexander Drive Project for Utilities Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from Imaging Technology. The fees for the plans and specifications which are non-refundable is $200.00 Documents may also be examined during regular business hours at the Augusta Builders Exchange, 1262 Merry Street, Augusta, GA 30904; F. W. Dodge Plan Room, 1281 Broad Street, Augusta, GA 30901. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.itrepro.com) at no charge through Imaging Technology (706 724-7924) beginning Thursday, June 4, 2009. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that sequestration of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre-Bid Conference will be held on Friday, June 26, 2009 @ 11:00 a.m. in the Procurement Department – Room 605. All questions must be submitted in writing to the office of the Procurement Department by fax at 706-821-2811 or by mail. No bid will be accepted by fax, all must be received by mail or hand delivered. All questions are to be submitted in writing by Wednesday, July 1, 2009 by 3:00 p.m. No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid bond is required to be submitted in a separate envelope so marked along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark BID number on the outside of the envelope. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle June 4, 11, 18, 25, 2009 Metro Courier June 10, 2009 cc: Tameka Allen Interim Deputy Administrator Drew Goins Utilities Department Jerry Delaughter Utilities Department Sean Barr Utilities Department Justo Chacon Utilities Department Attachment number 3 Page 1 of 1 Item # 2 Ve n d o r s : Bl a i r C o n s t r u c t i o n P. O . B o x 7 7 0 Ev a n s , G A 3 0 8 0 9 Be a m ' s C o n t r a c t i n g 23 3 5 A t o m i c R o a d Be e c h I s l a n d , S C 2 9 8 4 2 Ma b u s B r o t h e r s C o n s C o . 92 0 M o l l y P o n d R o a d Au g u s t a , G A 3 0 9 0 1 Tr a n C o n s t r u c t i o n 38 5 5 R e d O a k C o u r t Ma r t i n e z , G A 3 0 9 0 7 Bi d F o r m YE S Y E S Y E S St a t e m e n t o f N o n - Di s c r i m i n a t i o n YE S Y E S Y E S Co n f l i c t o f I n t e r e s t YE S Y E S Y E S Co n t r a c t o r A f f i d a v i t & Ag r e e m e n t YE S Y E S Y E S Su b c o n t r a c t o r A f f i d a v i t & A g r e e m e n t YE S Y E S Y E S No n - C o l l u s i o n A f f i d a v i t of B i d d e r NO N - C O M P L I A N T MI S S I N G C O R P O R A T E S E A L YE S Y E S No n - C o l l u s i o n A f f i d a v i t Su b c o n t r a c t o r YE S Y E S Y E S Lo c a l S m a l l B u s i n e s s Go o d F a i t h E f f o r t s YE S Y E S Y E S Lo c a l S m a l l B u s i n e s s Su b c o n t r a c t o r / S u p p l i e r Ut i l i z a t i o n P l a n YE S Y E S Y E S Ad d e n d u m YE S Y E S Y E S Bi d B o n d YE S Y E S Y E S Bi d A m o u n t NO N - C O M P L I A N T $1 , 1 4 5 , 7 2 8 . 5 0 $ 1 , 1 9 6 , 3 0 7 . 4 0 Bi d I t e m # 0 9 - 1 2 7 Al e x a n d e r D r i v e P r o j e c t Fo r t h e C i t y o f A u g u s t a - U t i l i t i e s D e p a r t m e n t Bi d O p e n i n g D a t e : T h u r s d a y , J u l y 1 6 , 2 0 0 9 a t 3 : 0 0 p . m . Attachment number 4 Page 1 of 1 Item # 2 Attachment number 5 Page 1 of 2 Item # 2 Attachment number 5 Page 2 of 2 Item # 2 Attachment number 6 Page 1 of 4 Item # 2 Attachment number 6 Page 2 of 4 Item # 2 Attachment number 6 Page 3 of 4 Item # 2 Attachment number 6 Page 4 of 4 Item # 2 Engineering Services Committee Meeting 8/10/2009 1:00 PM Change Order: Meadowbrook Drive Storm Pipe Replacement Department:Public Services Caption:Approve Change Order to Quality Storm Water Solutions, LLC. in the amount of $16,331.00 for the construction of two new storm boxes and the relocation of an existing power pole. Background:The two new boxes were not a part of the original scope of work, as the need was not detected until the original pipe was exposed. It is imperative that the boxes be installed to accommodate six existing storm lines that had been bored into the original pipe. Analysis:Without the installation of the additional boxes to accommodate six additional storm lines that were discovered, there would be no way to channel the water through the storm pipe. Financial Impact:Funds are available in SPLOST IV, Grading and Drainage Account #324041110/201824021 Alternatives:1. Approve Change Order to Quality Storm Water Solutions, LLC. in the amount of $16,331.00 for the construction of two new storm boxes and the relocation of an existing power pole. 2. None Recommendation:#1. Approve Change Order to Quality Storm Water Solutions, LLC. in the amount of $16,331.00 for the construction of two new storm boxes and the relocation of an existing power pole. Funds are Available in the Following Accounts: Funds are available in Account #324041110/201824021 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 3 Engineering Services Committee Meeting 8/10/2009 1:00 PM Georgia Power Co Gov Encroachment Agreement #31166 & Municipal Electric Auth GEA #31167 Department:Augusta Utilities Department Caption:Motion to approve Georgia Power Governmental Encroachment Agreement # 31166 and Municipal Electric Authority of Georgia Governmental Encroachment Agreement #31167. Background:The Augusta Utilities Department will be constructing a water main to Fort Gordon and will be crossing an easement owned by Georgia Power Company (GPC) and the Municipal Electric Authority of Georgia (MEAG). Analysis:The GPC/MEAG easement is in the pathway of the most direct route for the pipeline. The project has been discussed and GPC has submitted the usual Governmental Encroachment Agreements for signature. Financial Impact:None Alternatives:Deny motion to approve Georgia Power Governmental Encroachment Agreement # 31166 and Municipal Electric Authority of Georgia Governmental Encroachment Agreement #31167. Recommendation:Approve motion to approve Georgia Power Governmental Encroachment Agreement # 31166 and Municipal Electric Authority of Georgia Governmental Encroachment Agreement #31167. Funds are Available in the Following Accounts: 507043410-5212115 88880068-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 4 Attachment number 1 Page 1 of 3 Item # 4 Attachment number 1 Page 2 of 3 Item # 4 Attachment number 1 Page 3 of 3 Item # 4 Attachment number 2 Page 1 of 4 Item # 4 Attachment number 2 Page 2 of 4 Item # 4 Attachment number 2 Page 3 of 4 Item # 4 Attachment number 2 Page 4 of 4 Item # 4 Engineering Services Committee Meeting 8/10/2009 1:00 PM Notification of award for a construction contract to Blair Construction, Inc. for construction of the 6th Street Emergency Sewer Repair Project Department:Augusta Utilities Department Caption:Motion to approve emergency award for a contract with Blair Construction, Inc. for services associated with construction of the 6th Street Emergency Sewer Repair Project in the amount of $840,842.78. Bid item #09-138 Background:The Utilities Department has identified a major problem to an existing 36" brick sewer main in the downtown area of Richmond County. In recent months there have been several failures that have occurred. These failures and the potential of future failures are affecting the safe operation of the railroad system. The needed repairs include installing 1500 linear feet of new sewer main and sealing the existing main to ensure no future failures to the existing pipe. This project is needed to provide a more reliable and safe operation and eliminate the current dilapidated pipe that is in close proximity to the Norfolk Southern train track that installed in 6th Street in the downtown area of Richmond County. Analysis:Blair Construction, Inc submitted an acceptable bid package and was the lowest responsive bidder. The Utilities Department desires to inform commission of the award of this contract to construct the 6th Street Emergency Sewer Repair Project to Blair Construction, Inc. Financial Impact:$840,842.78, under account number 507043420-5425210 / 80900035- 5425210 Alternatives:No alternatives due to the contract being awarded under emergency conditions Recommendation:We are informing commission of the department's emergency award of the contract with Blair Construction, Inc. in the amount of $840,842.78 for the construction of the 6th Street Emergency Sewer Repair Project. Funds are Available in the Following Accounts: $840,842.78 from account 507043420-5425210 / 80900035-5425210 REVIEWED AND APPROVED BY:Cover Memo Item # 5 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 5 Attachment number 1 Page 1 of 27 Item # 5 Item # 5 Attachment number 1 Page 3 of 27 Item # 5 Attachment number 1 Page 4 of 27 Item # 5 Attachment number 1 Page 5 of 27 Item # 5 Attachment number 1 Page 6 of 27 Item # 5 Attachment number 1 Page 7 of 27 Item # 5 Attachment number 1 Page 8 of 27 Item # 5 Attachment number 1 Page 9 of 27 Item # 5 Attachment number 1 Page 10 of 27 Item # 5 Attachment number 1 Page 11 of 27 Item # 5 Attachment number 1 Page 12 of 27 Item # 5 Attachment number 1 Page 13 of 27 Item # 5 Attachment number 1 Page 14 of 27 Item # 5 Attachment number 1 Page 15 of 27 Item # 5 Attachment number 1 Page 16 of 27 Item # 5 Attachment number 1 Page 17 of 27 Item # 5 Attachment number 1 Page 18 of 27 Item # 5 Attachment number 1 Page 19 of 27 Item # 5 Attachment number 1 Page 20 of 27 Item # 5 Attachment number 1 Page 21 of 27 Item # 5 Attachment number 1 Page 22 of 27 Item # 5 Attachment number 1 Page 23 of 27 Item # 5 Attachment number 1 Page 24 of 27 Item # 5 Attachment number 1 Page 25 of 27 Item # 5 Attachment number 1 Page 26 of 27 Item # 5 Attachment number 1 Page 27 of 27 Item # 5 Attachment number 2 Page 1 of 1 Item # 5 1450 Greene Street Suite 225 Augusta, GA 30901 Tel. 706.722.3479 Fax 706.722.6773 www.wkdickson.com Transportation x Water Resources x Urban Development x Geomatics June 25, 2009 Mr. Jerry Delaughter Augusta Utilities Department 360 Bay Street, Suite 180 Augusta, Georgia 30901 RE: 6th Street Emergency Sewer Replacement Dear Jerry: Currently W.K. Dickson & Co., Inc. is under contract with Augusta Utilities Department (AUD) to provide professional services for the design of the 6th Street Sanitary Sewer Repairs. We have completed the design and suggest the County consider waiving the competitive bid process due to the recent settlements adjacent to the 6th Street railroad tracks. REASON FOR THE EMERGENCY The Utility Department is experiencing pipe failures of a 36-inch brick arch sewer pipe in the downtown area along 6th Street which may impact the structural integrity of the foundation for the adjacent railroad track. A failure occurred five feet off the main train track just north of Fenwick Street in July 2008 and a few months earlier a failure occurred north of Walker Street. Both repairs were made by your department. As of today, I have observed other depressions beginning to form which may lead to a collapse of the pipe. It appears that the existing 36-inch brick arch pipe will loosen a brick causing the soil and pavement from above to seep through creating a small crater. To further aggravate the situation, the vibration from a moving train will exacerbate the small opening thus eventually causing another brick to fall creating a large crater. When a few bricks are dislodged, the structural integrity of the arch pipe is compromised. RECOMMENDATIONS Due to a possible development of a dangerous condition that may create an immediate threat to public health, welfare or safety or an interruption of service along the existing railroad tracks, WD Dickson feels that procurement shall be made as quickly as possible with such competition as is practicable using the plans that have been completed by our firm. If you should have any questions, please give me a call at (706) 722-3479 or on my mobile at (706) 825-8153. Sincerely, Gordon Smith, PE Project Manager Cc: Sean Barr, Civil Engineer Attachment number 3 Page 1 of 1 Item # 5 Attachment number 4 Page 1 of 2 Item # 5 Attachment number 4 Page 2 of 2 Item # 5 Attachment number 5 Page 1 of 1 Item # 5 Engineering Services Committee Meeting 8/10/2009 1:00 PM Utilities Purchase of Warehouse Shelving and Furniture Department:Utilities, Clifford A. Goins, Interim Director Caption:Approve Utilities' purchase of Warehouse Pallet Rack Shelving and Furniture for the New Wylds Road Location. Background:The Utilities Department is consolidating two existing warehouse locations (one at 2760 Peach Orchard Rd. and the other at 2822 Central Ave.) into one larger location. The new location will be on Wylds Road and will also house the entire Construction & Maintenance Division for the Utilities Department. Analysis:The new Wylds Road location has several existing shelf units already in place in the warehouse. We will need additional shelving for our existing inventory supplies as well as furniture to provide working space for our combined staff. We will need to purchase additional shelving of the same quality and type as those that are already at the facility to house our supplies and parts. Financial Impact:We would like to purchase additional shelving to complete the warehouse space and furniture for the employees at a cost of $59,287.66. This amount has been quoted by Modern Business Supplies per the Georgia State Contract No. SWC060748. The funds for these purchases have been budgeted and are available within Account No. 50604-3110 / 5423110. Alternatives:1) Approve this item and provide for efficient, increased warehouse storage space for our new consolidated warehouse and for safer material handling practices. 2) Do not approve this item which will require us to move our makeshift shelving from the two existing locations. Much of the existing shelving was handmade of wood and is very old and dilapidated. It is also difficult to store all of the parts, as well as maneuver or transfer the parts utilizing the existing shelves. Recommendation:We recommend the Commission approve the purchase of warehouse pallet rack shelving and furniture for the new Wyld’s Road location. Funds are Available in the Following Accounts: 506043110/5423110 REVIEWED AND APPROVED BY: Cover Memo Item # 6 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 6 Attachment number 1 Page 1 of 3 Item # 6 Attachment number 1 Page 2 of 3 Item # 6 Attachment number 1 Page 3 of 3 Item # 6