Loading...
HomeMy WebLinkAbout2009-01-27-Meeting Agenda Engineering Services Committee Meeting Committee Room- 1/27/2009- 1:05 PM ENGINEERING SERVICES 1. Approve Clarification of Monthly Residential Sewer Rate. Attachments 2. Approve Clarification of Multi-family Dwelling Water & Sewer Rates. Attachments 3. Motion to approve and accept an Easement Deed from Boral Bricks, Inc. for the Doug Barnard Water Main Project. Attachments 4. Approve payment to Tampa Armature Works in the amount of $23,392.81 for repairs to the Chafee Lift Station Pump. Attachments 5. Approve Change Order #1 to Blair Construction Company Inc. for $88,757.88 for additional asphalt over lay over the roads, replacing raised edge asphalt and improving the storm structures throughout the area. Attachments 6. Motion to approve condemnation of a portion of property at 2803 Washington Road for the purpose of acquiring a Right-of-Way in connection with the Alexander Drive Project of 0.043 acre (1,869.98 sq. ft.) in fee and 0.311 acre (13,551.70 sq. ft.) of permanent construction & maintenance easement. The appraised value is $59,770.00. Attachments 7. Approve additional engineering services in the amount of $26,826.00 to James G. Swift & Associates to incorporate changes in design requirements for the Gordon Hwy 24-inch Water Main Extension Project. Attachments 8. Approve $250,000 to Mainline Homeland Security for the continued work of installing protection devices in the city’s fire hydrants. Attachments 9. Presentation by Mr. Ike Williams regarding the closing of Foster Lane. Attachments 10. Presentation by Mr. Ming F. Lin regarding sewer backup problems at his property located at 3008 Mistletoe Ave. Attachments 11. Approve the lease of an additional 653 square feet of office space for the Utility Systems Program Section of the Augusta Utilities Engineering Department on the first floor of The New South Building, 360 Bay Street. Attachments 12. Approve Proposal from Graves Engineering, Inc. for NPDES Services in Attachments www.augustaga.gov conjunction with the new Judicial Center, in the not to exceed amount of $23,200. 13. Approve the deed of dedication, maintenance agreement and road resolution submitted by the Engineering Department for Pinnacle Place, Phase 6, Section IV. Attachments Engineering Services Committee Meeting 1/27/2009 1:05 PM Approve Clarification of Monthly Residential Sewer Rate Department:Utilities, Drew Goins, Interim Director Caption:Approve Clarification of Monthly Residential Sewer Rate. Background:Per City Code, residential sewer rates for accounts more than one year old are set at the same rate for the entire year based on the average consumption for that address from the previous December, January and February billing cycles. Analysis:Historically, the residential sewer rate has been literally interpreted and billed exactly as noted above. However, it has come to our attention that the literal interpretation of the Code creates some billing situations that vary from the intent of this billing policy. The intent of this policy is to cap the sewer charges at the amount of water that is normally used by a household during the time of year when outside watering is at a minimum. By doing this, we charge for the amount of water we estimate actually is processed through the sewer system, assuming any excess water usage over this amount is outside watering usage and does not actually flow through the sewer and hence should not be considered when billing for sewer. Normally this policy works fine, however, there are some circumstances where this billing methodology actually charges the customer more than common sense would dictate. For instance, if the customer has a higher than normal usage during the winter months used to calculate the average consumption, due to abnormal circumstances or some type of plumbing problem, the winter average could be higher than the amount of normal consumption that could take place during the rest of the year. Using the current policy, this would result in an unfairly high sewer bill, possibly all year. For example, if the average consumption for the three winter months at a residence is 10,000 gallons, the sewer bill will be calculated at the rate for 10,000 gallons of consumption, even if actual water consumption for the month was only 3,000 gallons. This scenario doesn’t make sense since you can’t send 10,000 gallons into the sewer system when you have only consumed 3,000 gallons of water. However, this is currently how the policy is written. In order to clarify the intent of the policy and to allow us to make the necessary changes to our billing software to fix this problem without going against the letter of the Code, AUD recommends changing the following clause to the City Code: Sec. 5-2-43.(b) – “The monthly residential sewer rate shall be charged based on the (lesser of the actual water usage for the month or) average water usage for that address from the previous December, January and February billing cycles.” Changes are in parenthesis above. Since this policy has been in place for many years without being specifically defined in the Code, AUD requests that this issue be considered as being grandfathered into our rate structure so that no retroactive adjustments would be considered in relation to this policy. Cover Memo Financial Impact:There may be nominal cost to AUD for implementation of billing software changes for this policy and revenue may decrease slightly as a result of the change, however AUD feels it is more important to make the billing policies fair to all customers. Alternatives:1. Approve clarification of monthly residential sewer rate 2. Do not approve the agenda item and allow the current policy to continue as is stated in the Code. This will cause some of AUD’s customers to pay larger sewer bills than the AUD policy was intended to dictate. Recommendation:Approve clarification of monthly residential sewer rate by inserting the wording into the Code as noted above. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Engineering Services Committee Meeting 1/27/2009 1:05 PM Approve Clarification of Multi-family Dwelling Water & Sewer Rates Department:Utilities, Clifford A. Goins, Interim Director Caption:Approve Clarification of Multi-family Dwelling Water & Sewer Rates. Background:Since consolidation, Augusta Utilities internal policy has been that all multi- family dwellings supplied water by a single meter, such as apartments, condominiums, townhouses, etc. were all considered commercial properties for billing purposes. However, the Code does not address this policy and there have been several questions regarding the handling of this policy. Analysis:Water and sewer bills include two separate parts each month, a base charge and a rate per thousand gallons for consumption. Commercial rates are basically different from residential rates in two main ways. The base rate varies by the size of the meter for commercial rates and residential does not (since meter sizes and water line sizes for residential structures generally do not vary), and sewer rates for commercial accounts are based on actual water usage throughout the year, while residential accounts pay sewer all year based on the average consumption for the three winter months of December through February. The intent of the base charge portion of a water and sewer bill is to recapture some of the costs of the water meter and the water and sewer lines required to service that structure. Because larger meters and therefore, larger water lines, are more costly to maintain and replace, the base rate for commercial accounts increase with the size of the meter. Since multi-family dwellings generally use much larger meters and water lines than single family dwellings, they have always been treated as commercial accounts for billing purposes when one meter supplies the structure. Recently, we have had several homeowner’s associations contacting us to request that they be billed at residential rates. After performing an analysis comparing their account using commercial rates versus a hypothetical case where the structure was billed as if each unit was separately metered and charged residential rates with one base charge for each unit, we found that the charges were very similar, in fact the commercial rate was actually slightly less. In practice, this is the intent of the rate structure, so that each situation should be about the same. However, if we were to charge a homeowner’s association on our current residential rate structure with only one base charge (since the base charge for residential does not vary with the size of the meter), these accounts would be charged significantly less than their neighbors who may have each unit separately metered. This would create an unfair rate difference for two structures of the exact same size. AUD recommends adding the following clause to the City Code to define multi-family dwellings as commercial accounts in order to clarify this issue and to officially define these rates to be fair to all customers. Sec. 5-2-45.(f) – “Multi-family dwellings with a meter size of 1” or greater are considered commercial accounts for billing Cover Memo purposes, regardless of the type of entity that is being billed.” Since this policy has been in place for many years without being specifically defined in the Code, AUD requests that this issue be considered as being grandfathered into our rate structure so that no retroactive adjustments be considered in relation to this policy. Financial Impact:There will be no additional cost to AUD for implementation of this policy, but there will be a considerable amount of administrative time saved in dealing with this issue in the future and current levels of revenue will be maintained. Alternatives:1. Approve Clarification of Multi-family Dwelling Water & Sewer Rates 2. Do not approve the agenda item and allow the current informal policy to continue with no official documentation of the policy in the Code. This will leave the City without clearly defined rates for multi-family dwellings and could leave us open to arguments relating to the legality of our rates. Recommendation:Approve clarification of multi-family dwelling water & sewer rates by inserting the wording into the Code as noted above. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Engineering Services Committee Meeting 1/27/2009 1:05 PM Boral Bricks, Inc. Easement Deed Department:Augusta Utilities Department Caption:Motion to approve and accept an Easement Deed from Boral Bricks, Inc. for the Doug Barnard Water Main Project. Background:The Augusta Utilities Department is in the process of obtaining easements for the new 24" water main that will run from the Barnyard Flea Market to Gordon Highway. Analysis:To complete construction of the Doug Barnard Water Main Project (AUD- 10158), an easement is needed from Boral Bricks, Inc. In lieu of monetary payment, Boral Bricks has agreed that a tee and stub-out will be placed at the edge of the easement that runs across their private entrance. Financial Impact:None Alternatives:Disapprove motion to approve and accept an Easement Deed from Boral Bricks, Inc. for the Doug Barnard Water Main Project and redesign the project. Recommendation:Approve and accept the Easement Deed from Boral Bricks, Inc. for the Doug Barnard Water Main Project. Funds are Available in the Following Accounts: G/L 510043410-5411120 J/L 80210158-5411120 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 13 Attachment number 1Page 2 of 13 Attachment number 1Page 3 of 13 Attachment number 1Page 4 of 13 Attachment number 1Page 5 of 13 Attachment number 1Page 6 of 13 Attachment number 1Page 7 of 13 Attachment number 1Page 8 of 13 Attachment number 1Page 9 of 13 Attachment number 1Page 10 of 13 Attachment number 1Page 11 of 13 Attachment number 1Page 12 of 13 Attachment number 1Page 13 of 13 Engineering Services Committee Meeting 1/27/2009 1:05 PM Chafee Lift Station Pump Repair Department:Utilities Caption:Approve payment to Tampa Armature Works in the amount of $23,392.81 for repairs to the Chafee Lift Station Pump. Background:The Chafee Lift Pump #1 is a pump manufactured by KSP pumps of Germany and is in need of quick repair. KSP will only provide parts to authorized repair facilities. Tampa Armature Works is an authorized facility and is therefore the company of choice for the repairs. Analysis:The repairs to the pump need to be completed as soon as possible to minimize the time where the additional (back up) pump is not available. Financial Impact:Funds are available in the renewal extension fund Alternatives:None Recommended Recommendation:It is recommended to approve payment to Tampa Armature Works in the amount of $23,392.81 for repairs to the Chafee Lift Station Pump. Funds are Available in the Following Accounts: 506043410-5425210 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 3 Attachment number 1Page 2 of 3 Attachment number 1Page 3 of 3 Engineering Services Committee Meeting 1/27/2009 1:05 PM Change Order #1 for The Meadowbrook Area Utility Improvements Department:Augusta Utilities Department Caption:Approve Change Order #1 to Blair Construction Company Inc. for $88,757.88 for additional asphalt over lay over the roads, replacing raised edge asphalt and improving the storm structures throughout the area. Background:A contract was approved and awarded to Blair Construction in the amount of $2,537,304.91 on September 24, 2007. There are two parts of this project: A) Installation of Sewer and Water lines in the Meadowbrook Drive Sewer Pocket, and B) Trunk Line Sewer Extension to the properties on Benson Road. The major portion of this project is scheduled to provide new sewer and improved water service to the Meadowbrook Drive Sewer Area. During the design phase of this project the Utilities Department identified the need for larger water distribution lines in this area. The water system improvements will supply customers with water through a new network of 6-inch diameter water mains. The second portion of this project extends a sewer trunk line north from the Butler Creek Trunk Sewer to the properties along Benson Road. The sewer line extension should assist with the development along Benson Road. While in the first phase of construction there was a conflict between the existing water line and proposed sewer line route. To resolve the problem, the design was revised to relocate the proposed sewer line to the center of the roadway, which caused additional over laying of the roads, replacing raised edge asphalt and improving the storm structures through out the area. These items will serve to improve the sewer, water systems and roadways in the area. Analysis:Blair Construction, Inc. submitted a proposal to execute this work for $88,757.88. AUD evaluated the proposal to be based on existing contract unit prices and considered it reasonable. Approving this change order will allow Blair Construction to finish the project on time and improve the sewer, water systems and roadways in the area. Financial Impact:The change order submitted for this project is $88,757.88. These funds are available from the following accounts: 507043420/5425210 80250134/5425210 Alternatives:Disapproved this change order and risk delays in the contract completion. Recommendation:Approve Change Order #1 in the amount of $88,757.88 to Blair Construction Company Inc.contract for The Meadowbrook Area Utility Improvements. Cover Memo Funds are Available in the Following Accounts: $88,757.88 from account 507043420/5425210 80250134/5425210 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Engineering Services Committee Meeting 1/27/2009 1:05 PM Condemnation - Alexander Drive Project Parcel 2 Department:Attorney Caption:Motion to approve condemnation of a portion of property at 2803 Washington Road for the purpose of acquiring a Right-of-Way in connection with the Alexander Drive Project of 0.043 acre (1,869.98 sq. ft.) in fee and 0.311 acre (13,551.70 sq. ft.) of permanent construction & maintenance easement. The appraised value is $59,770.00. Background:The City has been unable to reach an agreement with the property owners and condemnation is necessary to avoid further delays in the project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the motion. Recommendation:Approve the motion to condemn a portion of referenced property. Funds are Available in the Following Accounts: 323041110 -5411120 296823215 – 5411120 REVIEWED AND APPROVED BY: Law. Administrator. Clerk of Commission Cover Memo Engineering Services Committee Meeting 1/27/2009 1:05 PM Design Contract Modification for Gordon Hwy 24 - inch Water Main Department:Augusta Utilities Department Caption:Approve additional engineering services in the amount of $26,826.00 to James G. Swift & Associates to incorporate changes in design requirements for the Gordon Hwy 24-inch Water Main Extension Project. Background:The design contract was awarded to James G. Swift & Associates in the amount of $135,260.00 on August 08, 2006.The Gordon Highway 24-inch Transmission Water Main project involves the design of 6,900 linear feet of 24-inch diameter ductile iron pipe and 700LF of 18-inch DIP along Gordon Highway. The 24-inch line will connect to the proposed 30-inch water main (which will run along the north side of Gordon HWY) and end at the proposed 16-inch Water Main. The design of this transmission main will allow the Augusta Utilities Department to supply surface water from the Highland Avenue Water Treatment Plant into Fort Gordon and the west area of Richmond County. Due to conflicts with GA PWR’s proposed high- powered transmission line and the existing wetlands, the proposed 18in line to serve the Fort Gordon area has to be rerouted. Therefore, Swift was tasked to perform additional survey work and redesign of the Fort Gordon 18-inch water main connection. These items will serve to improve the construction efforts and help the City of Augusta save money in construction cost. Analysis:AUD evaluated James G. Swift & Associates proposal for engineering services to redesign the Gordon Hwy 24-inch Water Main Extension Project This proposal is considered fair and reasonable to accomplish the project. Financial Impact:The re-design proposal submitted for this project was $26,826.00. These funds are available from the following accounts: 511043410/5212115 - 80310153/5212115 Alternatives:1. Rejection of this approval would delay the design and the subsequent construction of the Gordon Hwy 24-inch Water Main 2. Approve the re- design proposal to James G. Swift & Associates Recommendation:Recommend approval of contract design change to James G. Swift & Associates in the amount of $ 26,826.00. Funds are Available in the Following Accounts: $26,826.00 from account 511043410/5212115 - 80310153/5212115Cover Memo REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 3 Attachment number 1Page 2 of 3 Attachment number 1Page 3 of 3 Attachment number 2Page 1 of 2 Attachment number 2Page 2 of 2 Attachment number 3Page 1 of 1 Attachment number 4Page 1 of 1 Engineering Services Committee Meeting 1/27/2009 1:05 PM Fire Hydrant Protection Project Department:Utilities Caption:Approve $250,000 to Mainline Homeland Security for the continued work of installing protection devices in the city’s fire hydrants. Background:Over the past few years there has been considerable focus placed on municipal water systems and their vulnerability to attack from terrorism. Municipalities have been directed to perform vulnerability assessments regarding ways in which their water systems may be compromised. One area of vulnerability surrounds the fire hydrant. The Davidson Anti Terrorism Valve (ATV) device is the first of its kind to protect the water system at the point of the hydrant. The installation of this device makes it extremely difficult for a person to compromise the water system through the openings in the fire hydrant. The Davidson ATV staff have held training sessions with AUD staff regarding the installation of these devices. The AUD crew is skilled in the installation process and is now in a position to begin retrofitting our existing hydrants. Analysis:There are approximately 5,500 fire hydrants in Augusta’s water system. Approximately 900 of these hydrants have already been retrofitted. The current cost to retrofit each hydrant with ATV device is approximately $600.00. This represents a total long-term cost of approximately 3.3 million dollars. AUD proposes this year’s budget to be $250,000 and will increase the protected hydrants by 400 to 1300, or 24% of the system. Financial Impact:Funds are available in the renewal extension fund Alternatives:None recommended Recommendation:It is recommended to approve $250,000 to Mainline Homeland Security for the continued work of installing protection devices in the city’s fire hydrants. Funds are Available in the Following Accounts: 507043410-5425110 / 80700020-5425110 REVIEWED AND APPROVED BY:Cover Memo Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 2 Attachment number 1Page 2 of 2 Engineering Services Committee Meeting 1/27/2009 1:05 PM Ike Williams Department: Caption:Presentation by Mr. Ike Williams regarding the closing of Foster Lane. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Engineering Services Committee Meeting 1/27/2009 1:05 PM Ming F. Lin Department:Clerk of Commission Caption:Presentation by Mr. Ming F. Lin regarding sewer backup problems at his property located at 3008 Mistletoe Ave. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 2 Attachment number 1Page 2 of 2 Engineering Services Committee Meeting 1/27/2009 1:05 PM Modification of Lease Space at Utilities Bay St Location Department:Utilities Caption:Approve the lease of an additional 653 square feet of office space for the Utility Systems Program Section of the Augusta Utilities Engineering Department on the first floor of The New South Building, 360 Bay Street. Background:The Utilities Systems Program Branch of the Engineering Division, AUD has steadily grown in the last couple of years. With the addition of Fort Gordon the Engineering Department’s GBA workload alone has increased by 50% in 2008 and continues to grow. Also, other project requirements for GIS/CMMS have resulted in manpower increases. The10 required Branch employees are scattered thru- out several locations at the Bay St. facility. In order to provide a more centrally located staff and a more efficient work center, we are proposing to consolidate most of the Systems Section personnel into one larger office location at the New South Building on Bay St. Analysis:The new 1,123 Sq. Ft. space will accommodate 8 of the 10 Systems Section personnel and their associated support equipment. This proposal includes giving up 470 square feet of existing leased space, resulting in a net increase of 653 Sq. Ft. Financial Impact:The Rex Group has quoted the cost for the 1,123 square feet at $1,321.41 per month. The 470 Sq. Ft. to be relinquished would save $504.73 per month. Therefore, the net increase would be $ 816.41 per month. Alternatives:None recommended. Recommendation:Approve the net increase of 653 Sq. Ft. of leased office space at 360 Bay Street. Funds are Available in the Following Accounts: 506043110-5224111 REVIEWED AND APPROVED BY: Finance. Procurement. Cover Memo Law. Administrator. Clerk of Commission Cover Memo Engineering Services Committee Meeting 1/27/2009 1:05 PM Motion to Approve Proposal from Graves Engineering for NPDES Services Associated with the New Judicial Center Department:Public Services Department - Facilities Management Division Caption:Approve Proposal from Graves Engineering, Inc. for NPDES Services in conjunction with the new Judicial Center, in the not to exceed amount of $23,200. Background:Heery/CIPM has reviewed three proposals received in response to Bid No. 08-213, for National Pollutant Discharge Elimination Systems services, in accordance with EPD regulations and Erosion Sedimentation and Pollution Control documents produced by the project’s Engineer of Record. The Judicial Center site work has now commenced and erosion control systems have been installed. Weekly inspection and post-storm monitoring are now required. Analysis:After review of the three submitted proposals by Heery/CIPM, Graves Engineering was found to have submitted the lowest fees(bid), and they are deemed to be fully qualified. Financial Impact:Lump sum fees are based on a project of 21-month duration for weekly inspections, with additional unit costs incurred following qualifying rain events. These qualifying rain events trigger a need for supplemental inspections and turbidity tests. The final fee amount will depend on the quantity of qualifying rain events. Based upon historical weather data, it is estimated that the total fee will not exceed $23,200.00. Alternatives:1. Approve Proposal from Graves Engineering, Inc. for NPDES Services in conjunction with the new Judicial Center, in the Not to Exceed amount of $23,200. 2. Select another proposal. Recommendation:#1. Approve Proposal from Graves Engineering, Inc. for NPDES Services in conjunction with the new Judicial Center, in the Not to Exceed amount of $23,200. Funds are Available in the Following Accounts: Funds are Available in Account: #324-05-1120/201150500 REVIEWED AND APPROVED BY:Cover Memo Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 19 Attachment number 1Page 2 of 19 Attachment number 1Page 3 of 19 Attachment number 1Page 4 of 19 Attachment number 1Page 5 of 19 Attachment number 1Page 6 of 19 Attachment number 1Page 7 of 19 Attachment number 1Page 8 of 19 Attachment number 1Page 9 of 19 Attachment number 1Page 10 of 19 Attachment number 1Page 11 of 19 Attachment number 1Page 12 of 19 Attachment number 1Page 13 of 19 Attachment number 1Page 14 of 19 Attachment number 1Page 15 of 19 Attachment number 1Page 16 of 19 Attachment number 1Page 17 of 19 Attachment number 1Page 18 of 19 Attachment number 1Page 19 of 19 Ve n d o r s : Or i g i n a l 2 C o p i e s F e e P r o p o s a l Gr a v e s E n g i n e e r i n g S e r v i c e s 12 2 0 W . W h e e l e r P a r k w a y , S t e F Au g u s t a , G A 3 0 9 0 9 Ye s Y e s Y e s CS R A T e s t i n g a n d E n g i n e e r i n g C o . 10 0 5 E m m e t t S t r e e t , S t e A Au g u s t a , G A 3 0 9 0 4 Y e s Y e s Y e s QO R E P r o p e r t y S c i e n c e s 17 3 2 W y l d s R o a d Au g u s t a , G A 3 0 9 0 9 Y e s Y e s Y e s In v i t a t i o n f o r Q u o t a t i o n s # 0 8 - 2 1 3 Pr o f e s s i o n a l S e r v i c e s - N P D E S S e r v i c e s f o r t h e J u d i c i a l C e n t e r fo r T h e C i t y o f A u g u s t a - A d m i n i s t r a t i o n RF Q O p e n i n g D a t e : W e d n e s d a y , D e c e m b e r 1 7 , 2 0 0 8 a t 3 : 0 0 P . M . Attachment number 2Page 1 of 1 Attachment number 3Page 1 of 4 Attachment number 3Page 2 of 4 Attachment number 3Page 3 of 4 Attachment number 3Page 4 of 4 Graves Engineering Services Attn: Rick Swanson 1220 W. Wheeler Parkway, Ste F Augusta, GA 30909 CSRA Testing and Engineering Co Attn: James Pope 1005 Emmett Street, Ste A Augusta, GA 30904 QORE Attn: Robert Williamson 1732 Wylds Road Augusta, GA 30909 Bob Munger Heery Int’l Hatcher Building Yvonne Gentry DBE Bid Item #08-214 Professional Services for NPDES Services For the Judicial Center Bid Due: Thurs. 12/17/08 @ 3:00 p.m. Attachment number 4Page 1 of 1 Engineering Services Committee Meeting 1/27/2009 1:05 PM Pinnacle Place, Ph 6, Section IV Department:Engineering-Abie L. Ladson, P.E., Director Caption:Approve the deed of dedication, maintenance agreement and road resolution submitted by the Engineering Department for Pinnacle Place, Phase 6, Section IV. Background:The final plat was approved by the Commission on August 21, 2007. The subdivision design and plat, including the storm drain system, have been reviewed and accepted by our engineering staff and the construction has been reviewed by our inspectors. Analysis:This section meets all codes, ordinances and standards. There are no wetlands or 100-year flood plain boundaries involved in this section. Financial Impact:By accepting this road into the County system, all future maintenance and associated costs will be borne by Augusta, Georgia. Alternatives:1. Approve the deed of dedication, maintenance agreement and road resolution submitted by the Engineering Department for Pinnacle Place, Phase 6, Section IV. 2. Do not approve and risk litigation. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: Not required at this time. REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Attachment number 2Page 1 of 1 Attachment number 3Page 1 of 3 Attachment number 3Page 2 of 3 Attachment number 3Page 3 of 3 Attachment number 4Page 1 of 2 Attachment number 4Page 2 of 2 Attachment number 5Page 1 of 1