HomeMy WebLinkAbout2009-01-12-Meeting Agenda Engineering Services Committee Meeting Committee Room- 1/12/2009- 1:30 PM ENGINEERING SERVICES 1. Motion to award bid to L-J, Inc., (Low Bidder) in the amount of $123,950 for the removal of 520' x 60" failed corrugated metal pipe (CMP). The failed CMP will be replaced with HDPE. Request that this project be approved under emergency conditions due to the enormous cave-in that has occurred. Contractor has been given a "Notice to Proceed" under emergency conditions. Attachments 2. Motion to authorize condemnation to acquire title of a portion of property for a right-of-way consisting of 8312.22 square feet, a permanent construction easement of 14406.26 square feet, site improvements (asphalt, concrete and light pole) and cost to repair landscaping, parking and damages to sign for the Alexander Drive Project. A temporary driveway easement is necessary. The total appraised value is $407,200.00. Project Parcel 1 (Tax Map 013-3, Parcel 011-03), 2745 Washington Road. Attachments 3. Provide authorization to Potts Construction Company to award Bid Package #3, in the amount of $7,102,179.00, which includes Building Foundations and Concrete Frame for the new Judicial Center. Attachments 4. Approve proposal from Graves Engineering, Inc. for Special Inspections and Construction Materials Testing Services in conjunction with the new Judicial Center. Attachments 5. Approve Revised Proposal from ATC Associates, Inc. for Special Inspections and Construction Materials Testing Services in conjunction with the new Judicial Center, reducing their Role and Fee to Provide for Local Participation. Attachments 6. Consider selection of the courtrooms on the second floor of the Municipal Building as a new location for the Commission Chambers. Attachments 7. Motion to approve a Deed of Easement Dedication, from Augusta, Georgia to the Augusta Utilities Department, across eleven properties within the green space corridor of Butler Creek off Phinizy Road and between Mike Padgett Highway and Peach Orchard Road. Attachments 8. Approve design contract to James G. Swift & Associates in the amount of $101,300.00 for the Fort Gordon Replacement of the Water Distribution Attachments System in the vicinity of Eisenhower Hospital. 9. Approve an amount of $30,000.00 to provide construction materials for Eisenhower Emergency Driveway. Funding is available in SPLOST Phase 2 Recapture Account number 326-041110-288811333 as requested by the Engineering Department. Attachments 10. Receive Engineering Department Update Presentation and approve Phase II of the Engineering Department Reorganization to provide a more efficient structure and increase productivity. Attachments 11. Discussion with representatives of CSX Railroad regarding the closing of Foster Lane. (Requested by the Administrator) Attachments 12. Approve relocation of the "Lady Justice" statue behind the Municipal Building to the new Judicial Center. Attachments 13. Approve CPB #323-041110-296823665 Change Number Four in the amount of $4,426,497.96 with funding of $1,190,849.00 from SPLOST Phase III, and $215,649.00 from SPLOST Phase III for Project Construction. Also approve award of Construction Contract to Mabus Brothers Construction, Co., Inc. in the amount of $4,426,497.96 for the Morgan Road Improvement Project, subject to receipt of a detailed project schedule, a contractor’s project team approved by the Engineering Department, a traffic control plan, a staging plan, a detail plan and method approved by the Engineering Department for constructing the proposed Concrete Box Culvert, signed contract(s), and proper bonds. Attachments 14. Motion to approve CSX-617059 Encroachment Agreement between CSX Transportation, Inc. and Augusta, Georgia. Attachments 15. Motion to approve two-year lease (with option to renew two additional years) for 360 Bay Street for continued use of Utilities Operations at this location. Attachments 16. Motion to grant and convey to Georgia Power an easement for installation of an underground electrical distribution line through property owned by the City at Fenwick Street, Tenth Street, Talcot St. and James Brown Blvd. in relation to Augusta’s Judicial Center project for a nominal value of $10.00. Attachments 17. Discuss Regency Mall. (Requested by Commissioner Smith) Attachments 18. Authorize the Engineering Department to approve Supplemental Agreement Number Four and Change Number Five with Jordan, Jones & Goulding (JJG) in the amount of $142,177 which will allow the erosion Attachments www.augustaga.gov control plans to be updated in accordance with the State of Georgia EPD guidelines that became effective August 1, 2008, for adjustments to the bridge foundation investigation schedule and fee, and for the addition of Underground Storage Tank/Hazardous Waste Site investigations for the Windsor Spring Road improvement projects, phase IV & V, CPB #323- 04-299823766 & 323-04-299823786. Funds are available in SPLOST Phase III in the Windsor Spring Road Phase IV project right of way account. Funds from the Phase IV project right of way account will be transferred in the amount of $71,088.50 to each project engineering account 19. Motion to approve a resolution to send to the Georgia Department of Transportation (GDOT) to support the realignment of Barton Chapel Road to the east so that it will be aligned opposite existing Augusta West Parkway and rescinds the resolution adopted June 19, 2001 which opposed the realignment of Augusta West Parkway and Barton Chapel Road as part of the project to improve Wrightsboro Road from Jimmie Dyess Parkway to I-520, project number 323-04-296823309. Attachments Engineering Services Committee Meeting 1/12/2009 1:30 PM 1811 Sibley Road Pipe Replacement Department:Public Services Department-Maintenance Division Caption:Motion to award bid to L-J, Inc., (Low Bidder) in the amount of $123,950 for the removal of 520' x 60" failed corrugated metal pipe (CMP). The failed CMP will be replaced with HDPE. Request that this project be approved under emergency conditions due to the enormous cave-in that has occurred. Contractor has been given a "Notice to Proceed" under emergency conditions. Background:The failed CMP has suffered an enormous cave-in causing a void in the parking area of approximately 15' x 5'x 6'. Analysis:Without immediate attention, the failed 60" pipe will continue to deteriorate causing a larger void in the asphalt and creating further hazards to residents in that area. Financial Impact:Funds are available in SPLOST IV, Grading and Drainage. Alternatives:1. Award bid to L-J, Inc., (Low Bidder) in the amount of $123,950 for the removal of 520' x 60" failed corrugated metal pipe (CMP). The failed CMP will be replaced with HDPE. Request that this project be approved under emergency conditions due to the enormous cave-in that has occurred. Contractor has been given a "Notice to Proceed" under emergency conditions. Recommendation:#1. Award bid to L-J, Inc., (Low Bidder) in the amount of $123,950 for the removal of 520' x 60" failed corrugated metal pipe (CMP). The failed CMP will be replaced with HDPE. Request that this project be approved under emergency conditions due to the enormous cave-in that has occurred. Contractor has been given a "Notice to Proceed" under emergency conditions. Funds are Available in the Following Accounts: Funds are available in Account #324-04-1110/201824021 REVIEWED AND APPROVED BY: Finance. Cover Memo Item # 1 Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 1 Engineering Services Committee Meeting 1/12/2009 1:30 PM Agenda Item Condemnation National Retail Services Department:Attorney Caption:Motion to authorize condemnation to acquire title of a portion of property for a right-of-way consisting of 8312.22 square feet, a permanent construction easement of 14406.26 square feet, site improvements (asphalt, concrete and light pole) and cost to repair landscaping, parking and damages to sign for the Alexander Drive Project. A temporary driveway easement is necessary. The total appraised value is $407,200.00. Project Parcel 1 (Tax Map 013-3, Parcel 011-03), 2745 Washington Road. Background:The City has been unable to reach an agreement with the property owners. In order to proceed and avoid further delays, it is necessary to condemn a portion of subject property as described above. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation Funds are Available in the Following Accounts: 323041110 - 5411120 296823215 - 5411120 REVIEWED AND APPROVED BY: Law. Administrator. Clerk of Commission Cover Memo Item # 2 Engineering Services Committee Meeting 1/12/2009 1:30 PM Approve Bid Package 3 for Judicial Center Department:Public Services Department - Facilities Management Division Caption:Provide authorization to Potts Construction Company to award Bid Package #3, in the amount of $7,102,179.00, which includes Building Foundations and Concrete Frame for the new Judicial Center. Background:Potts Construction was selected under RFQ 07-180 as the Judicial Center Project’s Construction Manager at Risk. The Design Team, led by Turner Associates, completed the concrete frame bid documents in November, and bids were accepted and reviewed by Potts, under the observation of the Procurement Department. Analysis:The following is the lowest responsive, responsible bidder, as determined by Potts Construction to perform the work: Foundations and Concrete Frame Carter Concrete 1960 Parker Court Suite C Stone Mountain, GA 30087 The Scope of Work includes Building Foundations and Concrete Frame, and is within the budgeted amount that was estimated for this phase of the work. Potts Construction, in conjunction with the Design and Program Management Team, will provide oversight during this and subsequent phases of the project. Proceeding with this work now will allow construction to proceed in an expedited fashion, leading to quicker completion of the new Judicial Center. Financial Impact:The amount for Bid Package #3 is a component of the Guaranteed Maximum Price (GMP), which is scheduled to be established and approved in February, 2009. The total GMP is currently budgeted to not exceed $48.5M. Alternatives:1. Provide authorization to Potts Construction Company to award Bid Package #3, in the amount of $7,102,179.00, which includes Building Foundations and Concrete Frame for the Judicial Center, thus facilitating continuation of construction of the new Judicial Center. 2. Wait until the Guaranteed Maximum Price is established in February 2009, and delay the completion of the facility by three (3) months and face potential price increases. Recommendation:#1. Provide authorization to Potts Construction Company to award Bid Package #3, in the amount of $7,102,179.00, which includes Building Foundations and Concrete Frame for the Judicial Center, thus facilitating continuation of construction of the new Judicial Center. Funds are Available in Cover Memo Item # 3 the Following Accounts: FUNDS ARE AVAILABLE IN ACCOUNT: Judicial Center: Account #324-05-1120/201150500 REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 3 Attachment number 1 Page 1 of 28 Item # 3 Augusta Augusta Augusta Augusta Page 1 of 3 AJC - Bid Package 03 12/10/08 9:14 AM Schedule "A" Attachment "A" Augusta-Richmond County Judicial Center - 29 Bid Package 03 - Concrete Super Structure Project name AJC - Bid Package 03 Schedule "A" Attachment "A" Augusta GA Estimator WSS/JGS/JCB/SWH Bid date 12/10/2008 2:00 PM Report format Sorted by 'Group phase/Phase' 'Detail' summary Allocate addons Print item notes Item # 3 Page 2 of 3 AJC - Bid Package 03 12/10/08 9:14 AM Schedule "A" Attachment "A" Item Description Takeoff Qty Labor Unit Cost Amount Material Unit Cost Amount Subcontract Unit Cost Amount Name Total Unit Cost Amount 03000.0 CONCRETE 03310.A Structural Concrete ----Bid Package 03 - Concrete Super Structure Subcontractor 1.00 lsum 6,793,093.00 /lsum 6,793,093 6,793,093.00 /lsum 6,793,093 Structural Concrete 182,668.00 sqft 37.19 /sqft 6,793,093 37.19 /sqft 6,793,093 CONCRETE 182,668.00 sqft 0 0 37.19 /sqft 6,793,093 37.19 /sqft 6,793,093 Item # 3 Page 3 of 3 AJC - Bid Package 03 12/10/08 9:14 AM Schedule "A" Attachment "A" Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Labor Material Subcontract 6,793,093 Equipment Other 6,793,093 6,793,093 Sub Bonds 135,862 2.000 %C 135,862 6,928,955 CM/GC Contingency 173,224 2.500 %T 173,224 7,102,179 Total 7,102,179 Item # 3 Date: 12/10/2008 Sht No.s Drawing Name ISSUE DATE ISSUE DATE Rev 1 Rev 2 TPC Recv'd Stamp Date A0-0 COVER SHEET 11-05-08 Concrete Frame Package Nov 06 2008 A1.1 ARCHITECTURAL SITE PLAN 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 ALS1.1 FIRST FLOOR LIFE SAFETY PLAN 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 ALS1.2 SECOND FLOOR LIFE SAFETY PLAN 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 ALS1.3 THIRD FLOOR LIFE SAFETY PLAN 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 ALS1.4 FOURTH FLOOR LIFE SAFETY PLAN 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 A2.1 OVERALL FIRST FLOOR PLAN 9/29/08 30% PROGRESS SET 11/5/08 50% PROGRESS SET Nov 06 2008 A2.2 OVERALL SECOND FLOOR PLAN 9/29/08 30% PROGRESS SET 11/5/08 50% PROGRESS SET Nov 06 2008 A2.3 OVERALL THIRD FLOOR PLAN 9/29/08 30% PROGRESS SET 11/5/08 50% PROGRESS SET Nov 06 2008 A2.4 OVERALL FOURTH FLOOR PLAN 9/29/08 30% PROGRESS SET 11/5/08 50% PROGRESS SET Nov 06 2008 A2.5 OVERALL ROOF PLAN 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 A4.1 EXTERIOR ELEVATIONS 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 EXHIBIT B-3 - BID PACKAGE THREE - SCHEDULE "A" - ATTACHMENT "B" CONTRACT DOCUMENT LIST Project Name: Augusta-Richmond County Judicial Center A4.1 EXTERIOR ELEVATIONS 9 29 08 CDs For Information Only 11 05 08 CDs For Information Only Nov 06 2008 A4.2 EXTERIOR ELEVATIONS 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 A4.5 BUILDING SECTIONS 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 A4.6 BUILDING SECTIONS 9-29-08 CDs For Information Only 11-05-08 CDs For Information Only Nov 06 2008 S0.0 STRUCTURAL NOTES 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.1 STRUCTURAL NOTES & LEGEND 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.2 FIRST LEVEL LOADING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.3 SECOND LEVEL LOADING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.4 THIRD LEVEL LOADING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.5 FOURTH LEVEL LOADING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.6 FIRST LEVEL EDGE OF SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.7 SECOND LEVEL EDGE OF SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.8 THIRD LEVEL EDGE OF SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.9 FOURTH LEVEL EDGE OF SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S0.10 FIFTH LEVEL EDGE OF SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S1.0 PILE CAP LAYOUT PLAN OVERALL 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S1.1 PILE CAP LAYOUT PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S1.2 PILE CAP LAYOUT PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S1.3 PILE CAP LAYOUT PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S1.4 FIRST LEVEL SLAB & GRADE BEAM LAYOUT PLAN OVERALL 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S1.5 FIRST LEVEL SLAB & GRADE BEAM LAYOUT PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S1.6 FIRST LEVEL SLAB & GRADE BEAM LAYOUT PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 Page 1 of 4 Item # 3 Date: 12/10/2008 EXHIBIT B-3 - BID PACKAGE THREE - SCHEDULE "A" - ATTACHMENT "B" CONTRACT DOCUMENT LIST Project Name: Augusta-Richmond County Judicial Center S1.7 FIRST LEVEL SLAB & GRADE BEAM LAYOUT PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S2.0 SECOND LEVEL FRAMING PLAN OVERALL 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S2.1 SECOND LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S2.2 SECOND LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S2.3 SECOND LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S2.4 SECOND LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S2.5 SECOND LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S2.6 SECOND LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S2.7 SECOND LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S3.0 THIRD LEVEL FRAMING PLAN OVERALL 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S3.1 THIRD LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S3.2 THIRD LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S3.3 THIRD LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S3.4 THIRD LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008S3.4 THIRD LEVEL SLAB PLAN 11 05 2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S3.5 THIRD LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S3.6 THIRD LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S3.7 THIRD LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S4.0 FOURTH LEVEL FRAMING PLAN OVERALL 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S4.1 FOURTH LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S4.2 FOURTH LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S4.3 FOURTH LEVEL SLAB PLAN OVERALL 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S4.4 FOURTH LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S4.5 FOURTH LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S5.0 FIFTH LEVEL FRAMING PLAN OVERALL 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S5.1 FIFTH LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S5.2 FIFTH LEVEL FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S5.3 FIFTH LEVEL SLAB PLAN OVERALL 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S5.4 FIFTH LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S5.5 FIFTH LEVEL SLAB PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S6.0 TOWER FRAMING PLAN 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S7.0 BEAM SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S7.1 BEAM SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S7.2 BEAM SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S7.3 BEAM SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S7.4 BEAM SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 Page 2 of 4 Item # 3 Date: 12/10/2008 EXHIBIT B-3 - BID PACKAGE THREE - SCHEDULE "A" - ATTACHMENT "B" CONTRACT DOCUMENT LIST Project Name: Augusta-Richmond County Judicial Center S7.5 BEAM SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S7.6 BEAM SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S7.7 BEAM SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S7.8 COLUMN SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 07 2008 S7.9 COLUMN SCHEDULE AND DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 07 2008 S8.0 FOUNDATION DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S8.1 FOUNDATION DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S9.0 MASONRY SECTIONS & DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S10.0 STEEL SECTIONS & DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S11.0 CONCRETE FRAME SECTIONS & DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S11.1 CONCRETE FRAME SECTIONS & DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S11.2 CONCRETE FRAME SECTIONS & DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S11.3 CONCRETE FRAME SECTIONS & DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S11.4 CONCRETE FRAME SECTIONS & DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008S11.4 CONCRETE FRAME SECTIONS & DETAILS 11 05 2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S11.5 CONCRETE FRAME SECTIONS & DETAILS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S12.0 ELEVATOR PLANS, DETAILS, & SECTIONS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 S13.0 STAIR PLANS, DETAILS & SECTIONS 11-05-2008 Concrete Frame Bid & Permit Docs.Nov 06 2008 End of Drawings Spec.Specification Name Original Rev 1 Rev 2 Rev 3 TPC Recv'd Section Date Stamp Date COVER Concrete Frame Bid Package - November 5, 2008 Nov 07 2008 00 01 05 CERTIFICATIONS PAGE 05 Nov 2008 Nov 07 2008 00 01 10 TABLE OF CONTENTS issued - November 5, 2008 Nov 07 2008 00 72 00 GENERAL CONDITIONS issued - September 15, 2008 Nov 07 2008 01 00 10 PROJECT DIRECTORY issued - September 15, 2008 Nov 07 2008 01 22 00 UNIT PRICES issued - September 15, 2008 Nov 07 2008 01 25 13 PRODUCT SUBSTITUTION PROCEDURES issued - September 15, 2008 Nov 07 2008 01 29 00 PAYMENT PROCEDURES issued - September 15, 2008 Nov 07 2008 01 29 73 SCHEDULE OF VALUES issued - September 15, 2008 Nov 07 2008 01 31 13 PROJECT COORDINATION issued - September 15, 2008 Nov 07 2008 01 31 19 PROJECT MEETINGS issued - September 15, 2008 Nov 07 2008 01 32 16 CONSTRUCTION PROGRESS SCHEDULES issued - September 15, 2008 Nov 07 2008 01 32 33 PHOTOGRAPHIC DOCUMENTATION July 8, 2008 Nov 07 2008 01 33 00 SUBMITTAL PROCEDURES issued - September 15, 2008 Nov 07 2008 01 41 14 SPECIAL INSPECTIONS issued - September 15, 2008 Nov 07 2008 01 45 29 TESTING LABORATORY SERVICES issued - September 15, 2008 Nov 07 2008 01 50 00 TEMPORARY FACILITIES AND CONTROLS issued - September 15, 2008 Nov 07 2008 Page 3 of 4 Item # 3 Date: 12/10/2008 EXHIBIT B-3 - BID PACKAGE THREE - SCHEDULE "A" - ATTACHMENT "B" CONTRACT DOCUMENT LIST Project Name: Augusta-Richmond County Judicial Center 01 65 00 PRODUCT DELIVERY, STORAGE, AND HANDLING issued - September 15, 2008 Nov 07 2008 01 73 29 CUTTING AND PATCHING issued - November 5, 2008 Nov 07 2008 01 74 00 CLEANING AND WASTE MANAGEMENT issued - September 15, 2008 Nov 07 2008 01 78 00 CLOSEOUT SUBMITTALS issued - September 15, 2008 Nov 07 2008 01 78 23.16 MAINTENANCE DATA issued - September 15, 2008 Nov 07 2008 01 78 34 WARRANTIES AND BONDS issued - November 5, 2008 Nov 07 2008 01 78 39 PROJECT RECORD DOCUMENTS issued - September 15, 2008 Nov 07 2008 02 30 00 SUBSURFACE INVESTIGATION issued - September 15, 2008 Nov 07 2008 03 06 30 SCHEDULES FOR CAST-IN-PLACE CONCRETE issued - November 5, 2008 Nov 07 2008 03 30 00 CAST-IN-PLACE CONCRETE November 5, 2008 Nov 07 2008 03 35 00 CONCRETE FINISHING issued - November 5, 2008 Nov 07 2008 03 38 16 UNBONDED POST TENSIONED CONCRETE November 5, 2008 Nov 07 2008 07 16 16 CRYSTALLINE WATERPROOFING issued - November 5, 2008 Nov 07 2008 07 26 00.13 VAPOR RETARDERS issued - November 5, 2008 Nov 07 2008 07 26 00.16 VAPOR BARRIERS issued - November 5, 2008 Nov 07 2008 End of SpecificationsEnd of Specifications Page 4 of 4 Item # 3  EXHIBITB  EXHIBITB  EXHIBITB  EXHIBITB  EXHIBITB  EXHIBITB  EXHIBITB Page 1 of 6 AJC - Tracking Budget Est 12/10/08 8:32 AM B-3 Schedule "A" Attachment"D" Augusta Richmond County Judicial Center - 30 Tracking Budget Estimate at Bid Package 03 - Concrete Superstructure Exhibit B-3 Schedule "A" Attachment "D" Project name AJC - Tracking Budget Est B-3 Schedule "A" Attachment"D" Augusta GA Estimator WSS/JGS/JCB/SWH Bid date 12/10/2008 2:00 PM Report format Sorted by 'Group phase/Phase' 'Phase' summary Allocate addons Item # 3 Page 2 of 6 AJC - Tracking Budget Est 12/10/08 8:32 AM B-3 Schedule "A" Attachment"D" Description Quantity Labor Unit Cost Amount Material Unit Cost Amount Subcontract Unit Cost Amount Total Unit Cost Amount 02000.0 SITE CONSTRUCTION 02060.0 Site Demolition 182,668.00 sqft 02080.0 Hazardous Material Abate 182,668.00 sqft 02105.0 Site Engineering 182,668.00 sqft 0.092/sqft 16,720 0.092/sqft 16,720 02210.0 Site Grading 182,668.00 sqft 3.86 /sqft 704,621 3.86 /sqft 704,621 02211.0 Finish Site Grading/Bobca 182,668.00 sqft 0.103/sqft 18,875 0.103/sqft 18,875 02215.0 Erosion Control 182,668.00 sqft 02280.0 Soil Treatment 182,668.00 sqft 0.031/sqft 5,580 0.031/sqft 5,580 02370.0 Bored/Augered Piles 182,668.00 sqft 4.68 /sqft 854,842 4.68 /sqft 854,842 02510.0 Asphaltic Concrete Paving 182,668.00 sqft 3.05 /sqft 556,414 3.05 /sqft 556,414 02515.0 Unit Pavers 182,668.00 sqft 0.50 /sqft 90,381 0.50 /sqft 90,381 02521.0 Concrete Curb & Gutter 182,668.00 sqft 0.74 /sqft 135,166 0.74 /sqft 135,166 02522.0 Walks & Pads 182,668.00 sqft 0.22 /sqft 39,909 0.384/sqft 70,075 0.602/sqft 109,984 02580.0 Pavement Marking 182,668.00 sqft 0.06 /sqft 10,719 0.06 /sqft 10,719 02660.0 Water Distribution 182,668.00 sqft 02685.0 Gas Distribution Systems 182,668.00 sqft 02710.0 Subdrainage Systems 182,668.00 sqft 02720.0 Storm Sewerage 182,668.00 sqft 02730.0 Sanitary Sewer 182,668.00 sqft 02785.0 Electrical Power Transmis 182,668.00 sqft 02790.0 Site Commun. Conduits 182,668.00 sqft 0.093/sqft 16,936 0.093/sqft 16,936 02801.0 Modular Retaining Walls 182,668.00 sqft 02830.0 Fences 182,668.00 sqft 0.19 /sqft 34,330 0.19 /sqft 34,330 02870.0 Site & Street Furnishings 182,668.00 sqft 0.304/sqft 55,496 0.14 /sqft 25,000 0.441/sqft 80,496 02900.0 Landscaping 182,668.00 sqft 1.06 /sqft 193,418 1.06 /sqft 193,418 SITE CONSTRUCTION 182,668.00 sqft 0.63 /sqft 114,279 14.86 /sqft 2,714,202 15.484/sqft 2,828,481 03000.0 CONCRETE 03210.0 Reinforcing Steel 182,668.00 sqft 0.59 /sqft 106,929 0.59 /sqft 106,929 03300.0 Cast in Place Concrete 182,668.00 sqft 0.04 /sqft 7,348 0.06 /sqft 10,605 0.10 /sqft 17,953 03305.0 Concrete Pumping 182,668.00 sqft 0.01 /sqft 905 0.01 /sqft 905 03310.A Structural Concrete 182,668.00 sqft 37.19 /sqft 6,793,093 37.19 /sqft 6,793,093 CONCRETE 182,668.00 sqft 0.63 /sqft 114,277 37.251/sqft 6,804,603 37.88 /sqft 6,918,880 04000.0 MASONRY 04200.0 Unit Masonry 182,668.00 sqft 3.20 /sqft 584,335 6.632/sqft 1,211,409 9.831/sqft 1,795,744 04200.2 Unit Masonry - CMU Walls 182,668.00 sqft 1.07 /sqft 195,076 0.944/sqft 172,461 2.012/sqft 367,537 04400.0 Stone 182,668.00 sqft 0.922/sqft 168,492 0.922/sqft 168,492 MASONRY 182,668.00 sqft 4.27 /sqft 779,411 8.50 /sqft 1,552,362 12.77 /sqft 2,331,774 05000.0 METALS 05120.0 Structural Steel 182,668.00 sqft 0.92 /sqft 168,000 0.92 /sqft 168,000 05160.0 Framing System/Pre-Engine 182,668.00 sqft 05720.0 Ornamental Handrails Rail 182,668.00 sqft 0.67 /sqft 122,400 0.67 /sqft 122,400 METALS 182,668.00 sqft 1.59 /sqft 290,400 1.59 /sqft 290,400 06000.0 WOOD AND PLASTICS 06050.0 Fasteners & Adhesives 182,668.00 sqft 0.091/sqft 16,614 0.091/sqft 16,614 06100.0 Rough Carpentry 182,668.00 sqft 0.52 /sqft 94,457 0.193/sqft 35,182 0.71 /sqft 129,639 Item # 3 Page 3 of 6 AJC - Tracking Budget Est 12/10/08 8:32 AM B-3 Schedule "A" Attachment"D" Description Quantity Labor Unit Cost Amount Material Unit Cost Amount Subcontract Unit Cost Amount Total Unit Cost Amount 06220.0 Millwork 182,668.00 sqft 16.38 /sqft 2,991,265 16.38 /sqft 2,991,265 06240.0 Laminates 182,668.00 sqft 1.27 /sqft 231,629 1.27 /sqft 231,629 06450.0 Standing & Running Trim 182,668.00 sqft 0.39 /sqft 70,648 0.39 /sqft 70,648 06600.0 GFRC Fabrications 182,668.00 sqft 0.894/sqft 163,255 1.74 /sqft 317,080 2.63 /sqft 480,335 WOOD AND PLASTICS 182,668.00 sqft 0.52 /sqft 94,457 1.18 /sqft 215,051 19.77 /sqft 3,610,622 21.46 /sqft 3,920,130 4,160.00 Labor hours 07000.0 THERMAL AND MOISTURE PROT 07100.0 Waterproofing 182,668.00 sqft 0.073/sqft 13,389 0.073/sqft 13,389 07150.0 Dampproofing 182,668.00 sqft 0.044/sqft 8,077 0.044/sqft 8,077 07240.0 Stucco Soffits 182,668.00 sqft 0.182/sqft 33,162 0.182/sqft 33,162 07250.0 Fireproofing 182,668.00 sqft 0.192/sqft 35,037 0.192/sqft 35,037 07510.0 Modified Bitumen Roofing 182,668.00 sqft 7.02 /sqft 1,282,213 7.02 /sqft 1,282,213 07610.0 Metal Roofing 182,668.00 sqft 2.013/sqft 367,797 2.013/sqft 367,797 07920.0 Sealants & Caulking 182,668.00 sqft 0.52 /sqft 94,853 0.52 /sqft 94,853 THERMAL AND MOISTURE PROT 182,668.00 sqft 10.043/sqft 1,834,527 10.043/sqft 1,834,527 08000.0 DOORS AND WINDOWS 08001.0 Doors, Frames, & Hardware 182,668.00 sqft 4.422/sqft 807,668 0.824/sqft 150,580 5.25 /sqft 958,248 08360.0 Overhead Doors 182,668.00 sqft 0.771/sqft 140,882 0.771/sqft 140,882 08410.0 Aluminum Entrances & Stor 182,668.00 sqft 5.46 /sqft 996,481 5.46 /sqft 996,481 DOORS AND WINDOWS 182,668.00 sqft 4.422/sqft 807,668 7.051/sqft 1,287,943 11.472/sqft 2,095,611 09000.0 FINISHES 09250.0 Gypsum Wallboard 182,668.00 sqft 16.883/sqft 3,083,909 16.883/sqft 3,083,909 09300.0 Tile 182,668.00 sqft 0.70 /sqft 127,759 0.70 /sqft 127,759 09380.0 Terrazzo 182,668.00 sqft 2.644/sqft 482,901 2.644/sqft 482,901 09525.0 Resilient Flooring 182,668.00 sqft 0.40 /sqft 72,351 0.40 /sqft 72,351 09680.0 Carpet 182,668.00 sqft 2.772/sqft 506,309 2.772/sqft 506,309 09780.0 Floor Treatment 182,668.00 sqft 0.04 /sqft 7,173 0.071/sqft 13,000 0.11 /sqft 20,173 09800.0 Special Coatings 182,668.00 sqft 1.174/sqft 214,375 1.174/sqft 214,375 09900.0 Painting 182,668.00 sqft 1.494/sqft 272,906 1.494/sqft 272,906 09950.0 Wallcovering 182,668.00 sqft 0.43 /sqft 78,280 0.43 /sqft 78,280 FINISHES 182,668.00 sqft 0.04 /sqft 7,173 26.561/sqft 4,851,791 26.60 /sqft 4,858,964 10000.0 SPECIALTIES 10115.0 Marker Boards 182,668.00 sqft 0.02 /sqft 3,427 0.02 /sqft 3,427 10165.0 Toilet Partitions & Acces 182,668.00 sqft 0.67 /sqft 122,385 0.67 /sqft 122,385 10200.0 Louvers & Vents 182,668.00 sqft 10260.0 Wall & Corner Guards 182,668.00 sqft 0.03 /sqft 5,350 0.03 /sqft 5,350 10270.0 Access Flooring 182,668.00 sqft 10350.0 Flagpoles 182,668.00 sqft 0.08 /sqft 13,950 0.08 /sqft 13,950 10440.0 Signage 182,668.00 sqft 0.821/sqft 150,000 0.821/sqft 150,000 10500.0 Lockers 182,668.00 sqft 10520.0 Fire Ext. Cabinets, Acces 182,668.00 sqft 0.03 /sqft 4,711 0.03 /sqft 4,711 10650.0 Operable Partitions 182,668.00 sqft 10850.0 Miscellaneous Specialties 182,668.00 sqft SPECIALTIES 182,668.00 sqft 0.06 /sqft 10,061 1.59 /sqft 289,762 1.641/sqft 299,823Item # 3 Page 4 of 6 AJC - Tracking Budget Est 12/10/08 8:32 AM B-3 Schedule "A" Attachment"D" Description Quantity Labor Unit Cost Amount Material Unit Cost Amount Subcontract Unit Cost Amount Total Unit Cost Amount 11000.0 EQUIPMENT 11020.0 Security & Vault Equipmen 182,668.00 sqft 11130.0 Audio Visual Equipment 182,668.00 sqft 0.10 /sqft 18,000 0.10 /sqft 18,000 11190.0 Security and Detention Eq 182,668.00 sqft 6.85 /sqft 1,250,830 6.85 /sqft 1,250,830 11452.0 Residential Appliance 182,668.00 sqft 11900.0 Acoustical Wall Treatment 182,668.00 sqft 0.471/sqft 85,998 0.471/sqft 85,998 EQUIPMENT 182,668.00 sqft 7.42 /sqft 1,354,828 7.42 /sqft 1,354,828 12000.0 FURNISHINGS 12500.0 Window Treatments 182,668.00 sqft 0.09 /sqft 16,485 0.09 /sqft 16,485 12690.0 Entry Mats 182,668.00 sqft 0.023/sqft 4,271 0.022/sqft 3,992 0.05 /sqft 8,263 12700.0 Multiple Seating 182,668.00 sqft 0.692/sqft 126,447 0.692/sqft 126,447 FURNISHINGS 182,668.00 sqft 0.023/sqft 4,271 0.804/sqft 146,924 0.83 /sqft 151,195 13000.0 SPECIAL CONSTRUCTION 13120.0 Division 13 Subcontractor 182,668.00 sqft 0.552/sqft 100,770 0.552/sqft 100,770 SPECIAL CONSTRUCTION 182,668.00 sqft 0.552/sqft 100,770 0.552/sqft 100,770 14000.0 CONVEYING SYSTEMS 14200.0 Elevators 182,668.00 sqft 4.281/sqft 782,000 4.281/sqft 782,000 14400.0 Lifts 182,668.00 sqft CONVEYING SYSTEMS 182,668.00 sqft 4.281/sqft 782,000 4.281/sqft 782,000 15000.0 MECHANICAL 15300.0 Fire Protection 182,668.00 sqft 3.19 /sqft 582,470 3.19 /sqft 582,470 15400.0 Plumbing 182,668.00 sqft 8.97 /sqft 1,638,219 8.97 /sqft 1,638,219 15500.0 HVAC 182,668.00 sqft 25.02 /sqft 4,569,631 25.02 /sqft 4,569,631 MECHANICAL 182,668.00 sqft 37.173/sqft 6,790,321 37.173/sqft 6,790,321 16000.0 ELECTRICAL 16010.0 Electrical Subcontractor 182,668.00 sqft 18.42 /sqft 3,364,175 18.42 /sqft 3,364,175 16600.0 Special Systems 182,668.00 sqft 1.114/sqft 203,547 1.114/sqft 203,547 16610.0 Fire Alarm System 182,668.00 sqft 1.35 /sqft 246,602 1.35 /sqft 246,602 16700.0 Communication Systems/Aud 182,668.00 sqft 1.97 /sqft 359,074 1.97 /sqft 359,074 ELECTRICAL 182,668.00 sqft 22.85 /sqft 4,173,398 22.85 /sqft 4,173,398 17000.0 MISCELLANEOUS 17100.0 Miscellaneous 182,668.00 sqft Item # 3 Page 5 of 6 AJC - Tracking Budget Est 12/10/08 8:32 AM B-3 Schedule "A" Attachment"D" Description Quantity Labor Unit Cost Amount Material Unit Cost Amount Subcontract Unit Cost Amount Total Unit Cost Amount Item # 3 Page 6 of 6 AJC - Tracking Budget Est 12/10/08 8:32 AM B-3 Schedule "A" Attachment"D" Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Labor 94,457 4,160.000 hrs Material 2,052,192 Subcontract 36,584,453 Equipment Other 38,731,102 38,731,102 Sub Bonds 731,689 2.000 %C 731,689 39,462,791 Dtl Design/Market Ctngy 1,309,129 L 1,309,129 40,771,920 Escalation 1,672,362 4.102 %T 1,672,362 42,444,282 CM/GC Contingency 1,061,107 2.500 %T 1,061,107 43,505,389 Lump Sum GC/Fee/Precon 4,994,611 L 4,994,611 48,500,000 Total 48,500,000 Item # 3 AJC Exhibit B-3 - Bid Package Three Page 1 of 3 Schedule "A" Attachment "E"12/10/2008 8:28 AM Item Description Total Amount AJC-30 AJC-27 Variance 02000.0 SITE CONSTRUCTION 02060.0 Site Demolition 02080.0 Hazardous Material Abate 02105.0 Site Engineering 16,720 16,720 0 02210.0 Site Grading 704,621 704,621 0 02211.0 Finish Site Grading/Bobca 17,640 17,640 0 02215.0 Erosion Control 02280.0 Soil Treatment 5,580 5,580 0 02370.0 Bored/Augered Piles 854,842 854,842 0 02510.0 Asphaltic Concrete Paving 556,414 556,414 0 02515.0 Unit Pavers 90,381 90,381 0 02521.0 Concrete Curb & Gutter 135,166 135,166 0 02522.0 Walks & Pads 107,373 107,373 0 02580.0 Pavement Marking 10,719 10,719 0 02660.0 Water Distribution 02685.0 Gas Distribution Systems 02710.0 Subdrainage Systems 02720.0 Storm Sewerage 02730.0 Sanitary Sewer 02785.0 Electrical Power Transmis 02790.0 Site Commun. Conduits 16,936 16,936 0 02801.0 Modular Retaining Walls 02830.0 Fences 34,330 34,330 0 02870.0 Site & Street Furnishings 76,865 76,865 0 02900.0 Landscaping 193,418 193,418 0 SITE CONSTRUCTION 2,821,005 2,821,005 0 03000.0 CONCRETE 03055.0 S.O.G. Pourous Fill 26,975 (26,975) 03210.0 Reinforcing Steel 99,934 201,969 (102,035) 03250.0 Concrete Accessories 27,565 (27,565) 03300.0 Cast in Place Concrete 17,472 505,823 (488,351) 03305.0 Concrete Pumping 905 38,272 (37,366) 03310.A Structural Concrete 6,793,093 5,931,766 861,327 CONCRETE 6,911,404 6,732,369 179,035 04000.0 MASONRY 04200.0 Unit Masonry 1,757,517 1,757,517 0 04200.2 Unit Masonry - CMU Walls 354,775 379,882 (25,107) 04400.0 Stone 168,492 168,492 0 MASONRY 2,280,784 2,305,891 (25,107) 05000.0 METALS 05120.0 Structural Steel 168,000 206,000 (38,000) 05160.0 Framing System/Pre-Engine 05720.0 Ornamental Handrails Rail 122,400 122,400 0 METALS 290,400 328,400 (38,000) 06000.0 WOOD AND PLASTICS 06050.0 Fasteners & Adhesives 15,527 15,527 0 06100.0 Rough Carpentry 127,337 127,337 0 06220.0 Millwork 2,991,265 2,991,265 0 06240.0 Laminates 231,629 231,629 0 06450.0 Standing & Running Trim 70,648 70,648 0 06600.0 GFRC Fabrications 469,655 469,655 0 WOOD AND PLASTICS 3,906,061 3,906,061 0 07000.0 THERMAL AND MOISTURE PROT 07100.0 Waterproofing 13,389 13,389 0 07150.0 Dampproofing 8,077 8,077 0 AJC - 30 TRACKING BUDGET @ BID PACKAGE THREE AJC - 27 TRACKING BUDGET @ BID PACKAGE TWO Attachment number 1 Page 26 of 28 Item # 3 AJC Exhibit B-3 - Bid Package Three Page 2 of 3 Schedule "A" Attachment "E"12/10/2008 8:28 AM Item Description Total Amount AJC-30 AJC-27 Variance 07240.0 Stucco Soffits 33,162 33,162 0 07250.0 Fireproofing 35,037 35,037 0 07510.0 Modified Bitumen Roofing 1,282,213 1,282,213 0 07610.0 Metal Roofing 367,797 367,797 0 07920.0 Sealants & Caulking 94,853 94,853 0 THERMAL AND MOISTURE PROT 1,834,527 1,834,527 0 08000.0 DOORS AND WINDOWS 08001.0 Doors, Frames, & Hardware 905,410 905,410 0 08360.0 Overhead Doors 140,882 140,882 0 08410.0 Aluminum Entrances & Stor 996,481 996,481 0 DOORS AND WINDOWS 2,042,773 2,042,773 0 09000.0 FINISHES 09250.0 Gypsum Wallboard 3,083,909 3,083,909 0 09300.0 Tile 127,759 127,759 0 09380.0 Terrazzo 482,901 482,901 0 09525.0 Resilient Flooring 72,351 72,351 0 09680.0 Carpet 506,309 506,309 0 09780.0 Floor Treatment 19,704 19,704 0 09800.0 Special Coatings 214,375 214,375 0 09900.0 Painting 272,906 272,906 0 09950.0 Wallcovering 78,280 78,280 0 FINISHES 4,858,494 4,858,494 0 10000.0 SPECIALTIES 10115.0 Marker Boards 3,427 3,427 0 10165.0 Toilet Partitions & Acces 122,385 122,385 0 10200.0 Louvers & Vents 10260.0 Wall & Corner Guards 5,000 5,000 0 10270.0 Access Flooring 10350.0 Flagpoles 13,950 13,950 0 10440.0 Signage 150,000 150,000 0 10500.0 Lockers 10520.0 Fire Ext. Cabinets, Acces 4,403 4,403 0 10650.0 Operable Partitions 10850.0 Miscellaneous Specialties SPECIALTIES 299,165 299,165 0 11000.0 EQUIPMENT 11020.0 Security & Vault Equipmen 11130.0 Audio Visual Equipment 18,000 18,000 0 11190.0 Security and Detention Eq 1,250,830 1,250,830 0 11452.0 Residential Appliance 11900.0 Acoustical Wall Treatment 85,998 85,998 0 EQUIPMENT 1,354,828 1,354,828 0 12000.0 FURNISHINGS 12500.0 Window Treatments 16,485 16,485 0 12690.0 Entry Mats 7,984 7,984 0 12700.0 Multiple Seating 126,447 126,447 0 FURNISHINGS 150,916 150,916 0 13000.0 SPECIAL CONSTRUCTION 13120.0 Division 13 Subcontractor 100,770 100,770 0 SPECIAL CONSTRUCTION 100,770 100,770 0 14000.0 CONVEYING SYSTEMS 14200.0 Elevators 782,000 782,000 0 14400.0 Lifts Attachment number 1 Page 27 of 28 Item # 3 AJC Exhibit B-3 - Bid Package Three Page 3 of 3 Schedule "A" Attachment "E"12/10/2008 8:28 AM Item Description Total Amount AJC-30 AJC-27 Variance CONVEYING SYSTEMS 782,000 782,000 0 15000.0 MECHANICAL 15300.0 Fire Protection 582,470 582,470 0 15400.0 Plumbing 1,638,219 1,638,219 0 15500.0 HVAC 4,569,631 4,569,631 0 MECHANICAL 6,790,321 6,790,321 0 16000.0 ELECTRICAL 16010.0 Electrical Subcontractor 3,364,175 3,364,175 0 16600.0 Special Systems 203,547 203,547 0 16610.0 Fire Alarm System 246,602 246,602 0 16700.0 Communication Systems/Aud 359,074 359,074 0 ELECTRICAL 4,173,398 4,173,398 0 17000.0 MISCELLANEOUS 17100.0 Miscellaneous Total 38,596,846 38,480,919 115,928 Estimate Totals Labor 94,457 94,457 0 Material 1,917,936 2,369,479 (451,543) Subcontract 36,584,453 36,016,983 567,470 Equipment 0 0 0 Other 0 0 0 38,596,846 38,480,919 115,927 Sales Tax 134,256 165,864 (31,608) 38,731,102 38,646,783 84,319 Sub Bonds 731,689 720,340 11,349 39,462,791 39,367,123 95,668 Dtl Design/Market Ctngy 1,309,129 1,309,129 0 40,771,920 40,676,252 95,668 Escalation 1,672,362 1,768,030 (95,668) 42,444,282 42,444,282 0 CM/GC Contingency 1,061,107 1,061,107 0 43,505,389 43,505,389 0 Lump Sum GC/Fee/Precon 4,994,611 4,994,611 0 48,500,000 48,500,000 0 Total 48,500,000 48,500,000 0 Attachment number 1 Page 28 of 28 Item # 3 Engineering Services Committee Meeting 1/12/2009 1:30 PM Approve Proposal from Graves Engineering for Special Inspections and Construction Materials Testing Services for the New Judicial Center Department:Public Services Department - Facilities Management Division Caption:Approve proposal from Graves Engineering, Inc. for Special Inspections and Construction Materials Testing Services in conjunction with the new Judicial Center. Background:Graves Engineering has performed geotechnical engineering services on the Judicial Center project since 2003. This proposal will formalize the agreement with Graves and clarify the scope of work, as well as delineate the division of work responsibilities between Graves and ATC Associates. The Judicial Center is scheduled to commence structural fill and foundation work in January, 2009. As the project’s geotechnical engineer, Graves is well-positioned to perform the site work and foundations portion of the work. ATC will retain a leadership role for the special inspections. Analysis:The quality control enhancements that these “on call” services bring to the project is required by the jurisdictional Building Code. Graves Engineering will provide the site work testing and foundations evaluations under a stand- alone contract, with ATC Associates performing special inspections and testing on the remaining construction with Graves Engineering acting as their sub-consultant. Financial Impact:The contract will establish “not to exceed” amounts based upon the stated assumptions described in the attached proposal. Actual fees will be determined by actual quantities of tests/inspections, as determined by field conditions. The "not to exceed" contract amount for Graves Engineering is $122,000.00. Alternatives:1. Approve Proposal from Graves Engineering, Inc. for Special Inspections and Construction Materials Testing Services in conjunction with the new Judicial Center. 2. Retain ATC as the sole Materials Testing and Special Inspections firm, at a cost of $240,257.50. Recommendation:#1. Approve Proposal from Graves Engineering, Inc. for Special Inspections and Construction Materials Testing Services in conjunction with the new Judicial Center. Funds are Available in the Following Accounts: Funds are Available in Account: #324-05-1120/201150500 Cover Memo Item # 4 REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 4 Attachment number 1 Page 1 of 4 Item # 4 Attachment number 1 Page 2 of 4 Item # 4 Attachment number 1 Page 3 of 4 Item # 4 Attachment number 1 Page 4 of 4 Item # 4 Attachment number 2Page 1 of 22 Item # 4 Attachment number 2 Page 2 of 22 Item # 4 Attachment number 2 Page 3 of 22 Item # 4 Attachment number 2 Page 4 of 22 Item # 4 Attachment number 2Page 5 of 22 Item # 4 Attachment number 2 Page 6 of 22 Item # 4 Attachment number 2 Page 7 of 22 Item # 4 Attachment number 2 Page 8 of 22 Item # 4 Attachment number 2 Page 9 of 22 Item # 4 Attachment number 2 Page 10 of 22 Item # 4 Attachment number 2 Page 11 of 22 Item # 4 Attachment number 2 Page 12 of 22 Item # 4 Attachment number 2 Page 13 of 22 Item # 4 Attachment number 2 Page 14 of 22 Item # 4 Attachment number 2 Page 15 of 22 Item # 4 Attachment number 2 Page 16 of 22 Item # 4 Attachment number 2 Page 17 of 22 Item # 4 Attachment number 2 Page 18 of 22 Item # 4 Attachment number 2 Page 19 of 22 Item # 4 Attachment number 2 Page 20 of 22 Item # 4 Attachment number 2 Page 21 of 22 Item # 4 Attachment number 2 Page 22 of 22 Item # 4 Attachment number 3 Page 1 of 21 Item # 4 Attachment number 3 Page 2 of 21 Item # 4 Attachment number 3 Page 3 of 21 Item # 4 Attachment number 3 Page 4 of 21 Item # 4 Attachment number 3 Page 5 of 21 Item # 4 Attachment number 3 Page 6 of 21 Item # 4 Attachment number 3 Page 7 of 21 Item # 4 Attachment number 3 Page 8 of 21 Item # 4 Attachment number 3 Page 9 of 21 Item # 4 Attachment number 3 Page 10 of 21 Item # 4 Attachment number 3 Page 11 of 21 Item # 4 Attachment number 3 Page 12 of 21 Item # 4 Attachment number 3 Page 13 of 21 Item # 4 Attachment number 3 Page 14 of 21 Item # 4 Attachment number 3 Page 15 of 21 Item # 4 Attachment number 3 Page 16 of 21 Item # 4 Attachment number 3 Page 17 of 21 Item # 4 Attachment number 3 Page 18 of 21 Item # 4 Attachment number 3 Page 19 of 21 Item # 4 Attachment number 3 Page 20 of 21 Item # 4 Attachment number 3 Page 21 of 21 Item # 4 Attachment number 4 Page 1 of 15 Item # 4 Attachment number 4 Page 2 of 15 Item # 4 Attachment number 4 Page 3 of 15 Item # 4 Attachment number 4 Page 4 of 15 Item # 4 Attachment number 4 Page 5 of 15 Item # 4 Attachment number 4 Page 6 of 15 Item # 4 Attachment number 4 Page 7 of 15 Item # 4 Attachment number 4 Page 8 of 15 Item # 4 Attachment number 4 Page 9 of 15 Item # 4 Attachment number 4 Page 10 of 15 Item # 4 Attachment number 4 Page 11 of 15 Item # 4 Attachment number 4 Page 12 of 15 Item # 4 Attachment number 4 Page 13 of 15 Item # 4 Attachment number 4 Page 14 of 15 Item # 4 Attachment number 4 Page 15 of 15 Item # 4 Attachment number 5 Page 1 of 9 Item # 4 Attachment number 5 Page 2 of 9 Item # 4 Attachment number 5 Page 3 of 9 Item # 4 Attachment number 5 Page 4 of 9 Item # 4 Attachment number 5 Page 5 of 9 Item # 4 Attachment number 5 Page 6 of 9 Item # 4 Attachment number 5 Page 7 of 9 Item # 4 Attachment number 5 Page 8 of 9 Item # 4 Attachment number 5 Page 9 of 9 Item # 4 Attachment number 6 Page 1 of 35 Item # 4 Attachment number 6 Page 2 of 35 Item # 4 Attachment number 6 Page 3 of 35 Item # 4 Attachment number 6 Page 4 of 35 Item # 4 Attachment number 6 Page 5 of 35 Item # 4 Attachment number 6 Page 6 of 35 Item # 4 Attachment number 6 Page 7 of 35 Item # 4 Attachment number 6 Page 8 of 35 Item # 4 Attachment number 6 Page 9 of 35 Item # 4 Attachment number 6 Page 10 of 35 Item # 4 Attachment number 6 Page 11 of 35 Item # 4 Attachment number 6 Page 12 of 35 Item # 4 Attachment number 6 Page 13 of 35 Item # 4 Attachment number 6 Page 14 of 35 Item # 4 Attachment number 6 Page 15 of 35 Item # 4 Attachment number 6 Page 16 of 35 Item # 4 Attachment number 6 Page 17 of 35 Item # 4 Attachment number 6 Page 18 of 35 Item # 4 Attachment number 6 Page 19 of 35 Item # 4 Attachment number 6 Page 20 of 35 Item # 4 Attachment number 6 Page 21 of 35 Item # 4 Attachment number 6 Page 22 of 35 Item # 4 Attachment number 6 Page 23 of 35 Item # 4 Attachment number 6 Page 24 of 35 Item # 4 Attachment number 6 Page 25 of 35 Item # 4 Attachment number 6 Page 26 of 35 Item # 4 Attachment number 6 Page 27 of 35 Item # 4 Attachment number 6 Page 28 of 35 Item # 4 Attachment number 6 Page 29 of 35 Item # 4 Attachment number 6 Page 30 of 35 Item # 4 Attachment number 6 Page 31 of 35 Item # 4 Attachment number 6 Page 32 of 35 Item # 4 Attachment number 6 Page 33 of 35 Item # 4 Attachment number 6 Page 34 of 35 Item # 4 Attachment number 6 Page 35 of 35 Item # 4 Engineering Services Committee Meeting 1/12/2009 1:30 PM Approve Revised Proposal from ATC Associates for Special Inspections and Construction Materials Testing Services for the New Judicial Center Department:Public Services Department - Facilities Management Division Caption:Approve Revised Proposal from ATC Associates, Inc. for Special Inspections and Construction Materials Testing Services in conjunction with the new Judicial Center, reducing their Role and Fee to Provide for Local Participation. Background:At the July 10, 2008 Commission Meeting, ATC Associates was approved as the Special Inspections and Construction Materials Testing firm for the Webster Detention Center, Main Library and the Judicial Center. ATC has now agreed to a reduction of their fee and work scope for the Judicial Center Project, thus allowing for participation of a local engineering firm. Analysis:The project will benefit from the quality control enhancements that these “on call” services bring to the projects. Financial Impact:The contract will establish “not to exceed” amounts based upon the stated assumptions described in the attached proposal. Actual fees will be determined by actual quantities of tests/inspections, as determined by field conditions. The "not to exceed" amount of ATC’s Contract will be $130,697.50. Alternatives:1. Approve Revised Proposal from ATC Associates, Inc. for Special Inspections and Construction Materials Testing Services in conjunction with the new Judicial Center, reducing their Role and Fee to Provide for Local Participation. 2. Retain ATC as the sole materials testing and special inspection firm, at a cost of $240,257.50. Recommendation:#1. Approve Revised Proposal from ATC Associates, Inc. for Special Inspections and Construction Materials Testing Services in conjunction with the new Judicial Center, reducing their Role and Fee to Provide for Local Participation. Funds are Available in the Following Accounts: Funds are Available in Account: #324-05-1120/201150500 REVIEWED AND APPROVED BY: Cover Memo Item # 5 Clerk of Commission Cover Memo Item # 5 1841 West Oak Parkway, Suite F Marietta, Georgia 30062 www.atcassociates.com 770.427.9456 Fax 770.427.1907 November 18, 2008 Augusta-Richmond County c/o Heery International 501 Greene Street, Suite 313 Augusta, GA 30901 Attention: Mr. Bob Munger Re: Budget Estimate to Provide Special Inspection Services and Construction Materials Testing Augusta Richmond County Judicial Center Augusta, GA ATC Proposal Number 27105B Dear Mr. Munger: ATC Associates is pleased to submit this budget estimate to provide special inspection and construction materials testing services for this project. We understand that another firm will provide the soils and earthwork, pile evaluation and concrete testing for this project. ATC will provide the special inspections for concrete, reinforcing steel, masonry, structural steel & bolt evaluation, fireproofing and asphalt pavement. Our cost estimate was developed based upon our review of preliminary project plans, specifications and the Master Schedule dated November 7, 2008. We have estimated a total cost of $130,697.50 for performing special inspection services and construction materials testing services. Please note that this is a cost estimate and the cost for our services will be dependent upon the actual quantity of services scheduled by the General Contractor. Services performed beyond the scope of work listed will result in additional costs for our services. The actual cost of ATC’s testing services will be based on the attached unit fee schedule. If you find this budget estimate acceptable please issue a purchase order so that we may complete our files. We would request receiving one copy of the project plans and specifications prior to the start of work. Attachment number 1 Page 1 of 7 Item # 5 Attachment number 1 Page 2 of 7 Item # 5 ATC Proposal Number 27105B1 Page 1 AUGUSTA RICHMOND COUNTY JUDICIAL CENTER Augusta, Georgia Scope of Work and Cost Budget 1.0 SPECIAL INSPECTIONS AND CONSTRUCTION MATERIALS TESTING SERVICES: (Concrete, reinforcing steel, masonry, structural steel weld & bolt evaluation, fireproofing and asphalt pavement testing) 1.1 Estimate 35 weeks x 40 hours per week x $55.00 per hour...................................................................................................$77,000.00 1.2 Estimate 35 weeks x 5 hours per week overtime average x $55.00 per hour x 1.5.......................................................$14,437.50 1.3 Structural Steel Weld & Bolt Evaluation, estimate 4 weeks x 25 hours per week x $70.00 per hour ...............................$7,000.00 1.4 Materials Engineer for field data review, estimate 35 weeks x 3 hours per week x $75.00 per hour ....................................$7,875.00 1.5 Project Management, field data review, meetings and consultation, estimate 35 weeks x 1 hour per week x $135.00 per hour ................................................................................$4,725.00 1.6 Trip Charge, estimate 180 trips x $100.00 per trip...........................$18,000.00 1.7 Laboratory Services 1.7.1. Modified GAB Proctor, estimate 1 x $135.00 per each............................................................................................$135.00 1.7.2. Mortar Cubes, estimate 15 sets x 3 per set x $10.00 per each .........................................................................$450.00 1.7.3. Grout Prisms, estimate 15 sets x 3 per set x $15.00 per each .........................................................................$675.00 1.7.4. Asphalt Marshalls, estimate 1 x $125.00 per each............................................................................................$125.00 Attachment number 1 Page 3 of 7 Item # 5 ATC Proposal Number 27105B1 Page 2 1.7.5. Asphalt Extraction/Gradation, estimate 1 x $125.00 per each .......................................................................$125.00 1.7.6. Asphalt Cores, estimate 3 x $25.00 per each..............................$75.00 1.7.7. Asphalt Density Tests, estimate 3 x $25.00 per each..............................................................................................$75.00 Subtotal ..............................................................................$130,697.50 Attachment number 1 Page 4 of 7 Item # 5 ATC Proposal Number 27105B1 Page 3 SUMMARY 1.0 SPECIAL INSPECTIONS AND CONSTRUCTION MATERIALS TESTING SERVICES.........................................................$130,672.50 TOTAL......................................................................................................$130,672.50 NOTE: The above budget estimate was prepared based upon the best available preliminary information. Services required beyond the Scope of Work listed will result in additional costs for our services. We have assumed a 5 day per week work schedule with no overtime. The actual cost for our services will be based on the enclosed unit fee schedule. The attached scope of services does not include re-tests. The hourly rates are portal to portal. Overtime rates will be applicable for services performed outside normal working hours, over 8 hours per day within this period, and on Saturdays, Sundays and holidays at 1.5 times the standard hourly rate for technicians. There will be a minimum charge of two (2) hours per visit for our services. Attachment number 1 Page 5 of 7 Item # 5 2008 Unit Fee Schedule CONSTRUCTION MATERIALS TESTING SERVICES 1. Senior Engineering Technician for soil density, trench backfill, concrete, asphalt and pavement evaluation in accordance with ASTM standards and Project Specifications.............................................$45.00/hour 2. Engineering Aide for concrete, reinforcing steel placement observation and masonry inspections in accordance with Project Specifications.............................................................................................$55.00/hour 3. Project Geotechnical and Materials Engineer for foundation, and subgrade evaluation and other geotechnical related issues and report review ..............................................................................................$75.00/hour 4. Senior Registered Engineer for field data review, meetings and consultation as needed............................................................................$135.00/hour 5. Senior Structural Steel Technician, N.D.E. for non-destructive structural steel evaluation utilizing ultrasonic, magnetic particle, dye penetrant, visual and bolt torque testing services in accordance with project specifications ......................................................$70.00/hour 6. Floor flatness (FF) and levelness (FL) of concrete floors utilizing an Auto Floor Profiler (DIPSTICK)..................................................................$55.00/hour 7. Senior Roofing Technician, to monitor roofing membrane installation according to the contract documents and latest industry standards (If requested) ...........................................................................$55.00/hour 8. Compressive strength testing of concrete cylinders (Plastic molds)...........$8.00/each 9. Compressive strength testing of mortar cubes..........................................$10.00/each 10. Compressive strength testing of grout prisms...........................................$20.00/each 11. Standard soils Proctor (ASTM D698).....................................................$135.00/each 12. Modified soils Proctor (ASTM D1557).................................................... $135.00/each Attachment number 1 Page 6 of 7 Item # 5 13. Natural Moisture Content (ASTM D2216).................................................$10.00/each 14. Atterberg Limits (ASTM D4318)................................................................$75.00/each 15. Sieve and Hydrometer Analysis (ASTM D422).........................................$75.00/each 16. Asphalt Marshall test ..............................................................................$125.00/each 17. Asphalt extraction / gradation test.......................................................... $125.00/each 18. Asphalt density test....................................................................................$25.00/each 19. Mileage for ATC personnel to and from site...............................................$0.585/mile 20. Trip Charge................................................................................................ $100.00/trip 21. Clerical Services........................................................................................$45.00/hour 22. CADD Services..........................................................................................$35.00/hour 23. Nextel/Radio ........................................................................................... $60.00/month 24. Non-destructive testing equipment rental....................................................$50.00/day NOTES: 1. Engineering Charges are applicable for time spent in initiating, supervising, coordinating, closing out projects, evaluating field and laboratory data, report preparation and review, consultation and site observations. 2. The hourly rates are portal to portal. Overtime rates will be applicable for services performed outside normal working hours, over 8 hours per day within this period, and on Saturdays, Sundays and holidays at 1.5 times the standard hourly rate for technicians. 3. A minimum charge of two hours per visit will be charged for field personnel. 4. The attached unit rate fee schedule is valid through December 31, 2009. There will be a price escalation of 5% if this project goes past this date. Attachment number 1 Page 7 of 7 Item # 5 Engineering Services Committee Meeting 1/12/2009 1:30 PM Consider location of Commission Chambers Department:Public Services Department - Facilities Management Division Caption:Consider selection of the courtrooms on the second floor of the Municipal Building as a new location for the Commission Chambers. Background:Groundbreaking for the new Judicial Center was held on December 17, 2008 with anticipated completion in roughly two years. When the Judges move, a significant amount of space in the existing Municipal Building will be available to relieve overcrowding for the governmental operations that remain. One of those operations is the Commission Meetings and the need for increased space to accommodate the public. Analysis:Attendance at Commission Committee and full Commission Meetings has increased over the years to the point where both the Committee Room and Commission Chambers are often overcrowded. This results, not only in an inconvenience to the citizens, but possible safety issues as well. Conversion of one of the courtrooms on the second floor of the building to Commission Chambers would alleviate much of the overcrowding. Furthermore, the second floor location has a much larger public space outside the room that would also help reduce the crowding currently experienced. The process of planning for the Municipal Building after the departure of the Judges is beginning. This is one of many decisions that will need to be made as this process progresses. Financial Impact:The cost would be determined by the amount of work desired. Alternatives:1. Consider selection of the courtrooms on the second floor of the Municipal Building as a new location for the Commission Chambers. 2. Select another location. 3. Stay in the current location Recommendation:#1. Consider selection of the courtrooms on the second floor of the Municipal Building as a new location for the Commission Chambers. Funds are Available in the Following Accounts: None required at this time. REVIEWED AND APPROVED BY:Cover Memo Item # 6 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 6 Engineering Services Committee Meeting 1/12/2009 1:30 PM Deed of Easement Dedication from Augusta, Georgia to the Augusta Utilities Department Department:Augusta Utilities Department Caption:Motion to approve a Deed of Easement Dedication, from Augusta, Georgia to the Augusta Utilities Department, across eleven properties within the green space corridor of Butler Creek off Phinizy Road and between Mike Padgett Highway and Peach Orchard Road. Background:The Augusta Utilities Department is in the process of acquiring easements for the Butler Creek Interceptor Upgrade - East, Project #60107. This project will replace the sanitary sewer pipeline, from Plant Messerly to Lexington Drive. In order to construct the sanitary sewer pipeline, AUD will need to cross eleven properties owned by Augusta, Georgia. These properties are part of what will become the trail system between Meadowbrook Elementary School and Phinizy Swamp Nature Park. They are managed, under a Conservation Easement, by the Central Savannah River Land Trust. Analysis:The eleven properties are owned by Augusta, Georgia, and managed by the Central Savannah River Land Trust. Construction of the pipeline has been discussed with the CSRLT, which is joining in the granting of the Deed of Easement Dedication. Augusta's approval of the Deed of Easement Dedication is being sought so that the Deed may be recorded in realty records, thereby creating a record, and history, of the pipeline that is more easily accessible to the public. Also, since CSRLT has an interest in the properties, by virtue of the Conservation Easement, it will need to sign a Deed agreeing to the easements. Financial Impact:None Alternatives:Do not approve the Deed of Easement Dedication. Since the properties are owned by Augusta, Georgia, it is not mandatory that a Deed be recorded. Information on the sanitary sewer pipeline may be obtained by viewing the design/as built plans located in the Augusta Utilities Department office. In this case, a separate Deed of Easement Dedication may be prepared for the signature of the Central Savannah River Land Trust. Recommendation:Approve the Deed of Easement Dedication, from Augusta, Georgia, to the Augusta Utilities Department, across eleven properties within the green space corridor of Butler Creek off Phinizy Road and between Mike Padgett Highway and Peach Orchard Road. Funds are Available in Cover Memo Item # 7 the Following Accounts:511043420-5411120 80360107-5411120 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 7 Engineering Services Committee Meeting 1/12/2009 1:30 PM Design Contract for Augusta Utilities Department Project Fort Gordon Replacement of the Water Distribution System in the vicinity of Eisenhower Hospital Department:Utilities Caption:Approve design contract to James G. Swift & Associates in the amount of $101,300.00 for the Fort Gordon Replacement of the Water Distribution System in the vicinity of Eisenhower Hospital. Background:The Privatization of Water/Wastewater Utilities contract between Fort Gordon and Augusta Richmond County was awarded September 2007. The requirements of the contract include executing Initial Capital Upgrades (ICU) and Renewal and Replacement (R&R) projects for the water and wastewater systems throughout the installation of Fort Gordon. One of the Renewal & Replacement projects is to provide a design to replace 5,700 L.F. of existing asbestos cement (AC) water main and replace it with 10” ductile iron pipe (DIP), while maintaining water service to the hospital at all time. Analysis:Augusta Utilities Department evaluated James G Swift & Associates proposal for engineering services to design the water main in the vicinity of Fort Gordon Eisenhower Hospital. The proposal is considered fair and reasonable to accomplish the project. Financial Impact:The amount submitted for the design of this project is $101,300.00.These funds are available from account 507043410-5425110 / 88880102-5425110 Alternatives:1. Reject the award of the engineering contract, which would delay the design of the project and the installation of the Fort Gordon Replacement to the Water Distribution System in the vicinity of Eisenhower Hospital. 2. Award the engineering contract to James G Swift & Associates to design the Fort Gordon Replacement of the Water Distribution System in the vicinity of Eisenhower Hospital . Recommendation:Recommend award of the design contract for Fort Gordon Replacement to the Water Distribution System in the vicinity of Eisenhower Hospital to James G Swift & Associates at $101,300.00 Funds are Available in the Following Accounts: 507043410-5425110 / 88880102-5425110 from account $101,300.00 Cover Memo Item # 8 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 8 Attachment number 1 Page 1 of 7 Item # 8 Attachment number 1 Page 2 of 7 Item # 8 Attachment number 1 Page 3 of 7 Item # 8 Attachment number 1 Page 4 of 7 Item # 8 Attachment number 1 Page 5 of 7 Item # 8 Attachment number 1 Page 6 of 7 Item # 8 Attachment number 1 Page 7 of 7 Item # 8 Attachment number 2 Page 1 of 1 Item # 8 Engineering Services Committee Meeting 1/12/2009 1:30 PM Eisenhower Emergency Driveway Department:Abie L. Ladson, PE, Director Caption:Approve an amount of $30,000.00 to provide construction materials for Eisenhower Emergency Driveway. Funding is available in SPLOST Phase 2 Recapture Account number 326-041110-288811333 as requested by the Engineering Department. Background:Eisenhower Drive extends from Washington Road and ends at both Lynndale School, and Parks and Recreation ball fields. A proposed driveway will be constructed northwest of Lynndale School and intersect with Riverwatch Parkway. The proposed driveway will provide emergency vehicle access for emergencies at both Lynndale School and the ball parks. On occasions Eisenhower Drive is blocked by trains, providing no access to the school and the ball parks in case of an emergency. The gated emergency driveway will be used by emergency officials for emergency purposes only. The Engineering Department designed the driveway, and the Georgia Department of Transportation (GDOT) has signed a contract with the County to provide $9,000.00 in State-Aid. This project was bid twice, and the results were $82,000.00 and $72,000.00. To prevent major cost overruns, the Public Services Department was asked to provide the construction services for this project. The only cost the County would incur is $30,000.00 for construction materials. Analysis:The cost for construction material is estimated at $30,000.00. Financial Impact:Funds are available in 326-041110-288811333 Alternatives:1) Approve an amount of $30,000.00 to provide construction materials for Eisenhower Emergency Driveway. 2) Do not approve, and risk loosing $9,000.00 of State-Aid funds. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 326-041110-288811333 REVIEWED AND APPROVED BY:Cover Memo Item # 9 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 9 Engineering Services Committee Meeting 1/12/2009 1:30 PM Engineering ReOrg Chart Phase II Department:Abie L. Ladson, PE, Director Caption:Receive Engineering Department Update Presentation and approve Phase II of the Engineering Department Reorganization to provide a more efficient structure and increase productivity. Background:The financial impact associated with the revised organizationof the Engineering Department will result in a savings of $87,463.15 a year. Analysis:n/a Financial Impact:n/a Alternatives:1) Officially approve the Reorganization. 2) Do not approve Reorganization. Recommendation:Approve Department Reorganization. Funds are Available in the Following Accounts: No additional funds are required. REVIEWED AND APPROVED BY: Finance. Human Resources. Law. Administrator. Clerk of Commission Cover Memo Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Item # 10 Engineering Services Committee Meeting 1/12/2009 1:30 PM Foster Lane Closing Department:Clerk of Commission Caption:Discussion with representatives of CSX Railroad regarding the closing of Foster Lane. (Requested by the Administrator) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 11 Engineering Services Committee Meeting 1/12/2009 1:30 PM Lady Justice Department:Public Services Department - Facilities Management Division Caption:Approve relocation of the "Lady Justice" statue behind the Municipal Building to the new Judicial Center. Background:The statue of "Lady Justice", currently on a pedestal at the rear of the Municipal Building, has historically been associated with the courts. The statue originally was located on top of the previous courthouse. The plans for the new Judicial Center show the statue as a focal point for the entrance. Analysis:Because of the historic association of this statue with the courts, relocation should be considered. Financial Impact:No funding is being requested at this time. Alternatives:1. Approve relocation of the "Lady Justice" statue behind the Municipal Building to the new Judicial Center. 2. Do not approve relocation of the statue. Recommendation:#1. Approve relocation of the "Lady Justice" statue behind the Municipal Building to the new Judicial Center. Funds are Available in the Following Accounts: No funding is being requested at this time. REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 12 Engineering Services Committee Meeting 1/12/2009 1:30 PM Morgan Rd CPB #4 & Contract Award 1208 Department:Abie L. Ladson, PE, Director Caption:Approve CPB #323-041110-296823665 Change Number Four in the amount of $4,426,497.96 with funding of $1,190,849.00 from SPLOST Phase III, and $215,649.00 from SPLOST Phase III for Project Construction. Also approve award of Construction Contract to Mabus Brothers Construction, Co., Inc. in the amount of $4,426,497.96 for the Morgan Road Improvement Project, subject to receipt of a detailed project schedule, a contractor’s project team approved by the Engineering Department, a traffic control plan, a staging plan, a detail plan and method approved by the Engineering Department for constructing the proposed Concrete Box Culvert, signed contract(s), and proper bonds. Background:On February 16, 1999, the Commission authorized the Morgan Road Improvement Project. This project consists of constructing a three lane roadway with curb and gutter, enclosed storm drainage, and sidewalks. Improvements will extend from Deans Bridge Road (US 1) to Tobacco Road. Analysis:Bids were received on October 9, 2008 with Mabus Brothers Construction Co., Inc. being the low bidder. Bid results are as follow: CONTRACTORS BID 1. Mabus Brothers Construction Co., Inc. $4,426,497.96 2. Beam’s Contracting $4,657,863.69 3. Reeves Construction $4,722,757.75 4. Blair Construction $4,857,790.33 5. Construction Perfected, Inc. $5,378,047.00 It is the Engineering Department recommendation to award this project to the low bidder, subject to receipt of the following items: 1. Detailed Project Schedule 2. Contractor’s Project Team Approval by AED 3. Traffic Control Plan 4. Staging Plan 5. A detail plan and method approved by the Engineering Department for constructing the proposed Concrete Box Culvert 6. Signed Contracts and Proper Bonds Financial Impact:Funds are available in SPLOST Phase III 323-000000-3921000 & SPLOST Phase III 323-041110-6011110/296823333 to be transferred to the project account upon Commission approval. Alternatives:1)Approve CPB # 323-041110-296823665Change Four in the amount of $4,426,497.96 with funding of $1,190,849 from SPLOST Phase II, and $215,498.00 from SPLOST Phase III for Project Construction. Also approve award of Construction Contract to Mabus Brothers Construction, Co., Inc. in the amount of $4,426,497.96 for the Morgan Road Improvement Project, subject to receipt of a detailed project schedule, a contractor’s project team approved by the Engineering Department, a traffic control plan, a staging plan, a detail plan and method approved by the Engineering Department for Cover Memo Item # 13 constructing the proposed Concrete Box Culvert, signed contract(s), and proper bonds. 2)Do not approve and eliminate project. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 323-00-0000-3952110 323-04-1110-6011110/296823333-6011110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 13 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: The project is authorized to CPB#323-041110-296823665. This project consist of constructing a three lane roadway with curb and gutter, enclosed storm drainage, and sidewalks. This change request additional funding of $1,190,849 from SPLOST Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase III 2,641,900$ Special 1% Sales Tax, Phase I 698,100$ Special 1% Sales Tax, Phase I Recapture 549,193$ Special 1% Sales Tax, Phase II 1,190,849$ Special 1% Sales Tax, Phase III 215,649$ 5,295,691$ Section 3: The following amounts are appropriated for the project: By Basin By District Phinizy Swamp $5,295,691 1st 5,295,691$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor CPB#323-041110-296823665 CAPITAL PROJECT BUDGET MORGAN ROAD CHANGE NUMBER FOUR Phase II and $215,649 from SPLOST Phase III. 1 of 2 11-4-2008 Attachment number 1 Page 1 of 2 Item # 13 Augusta-Richmond County, Georgia CPB#323-041110-296823665 CAPITAL PROJECT BUDGET MORGAN ROAD CHANGE NUMBER FOUR CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPECIAL 1% SALES TAX, PHASE III 323-04-1110-6011110-296823333 ($1,641,900) ($215,649)($1,857,549) SPECIAL 1% SALES TAX, PHASE II 322-04-1110-6011110-292822333 ($1,190,849) ($1,190,849) SPECIAL 1% SALES TAX, PHASE I 321-04-1110-6011110-288821333 ($698,100) ($698,100) SPECIAL 1% SALES TAX, PHASE I ($549,193) ($549,193) 321-04-1110-6011110-288821333 SPECIAL 1% SALES TAX, PHASE III ($1,000,000) ($1,000,000) 323-00-0000-000000000 TOTAL SOURCES: ($3,889,193) ($1,406,498) ($5,295,691) USE OF FUNDS ENGINEERING 323-04-1110-5212115-296823665 $169,000 $0 $169,000 ADVERTISING 323-04-1110-5233119-296823665 $1,000 $0 $1,000 RIGHT OF WAY 323-04-1110-5411120-296823665 $100,000 $0 $100,000 CONSTRUCTION 323-04-1110-5414310-296823665 $2,700,000 $1,726,498 $4,426,498 UTILITIES 323-04-1110-5414510-296823665 $599,193 $0 $599,193 CONTINGENCY 323-04-1110-6011110-296823665 $320,000 ($320,000) $0 TOTAL USES: $3,889,193 $1,406,498 $5,295,691 2 of 2 11-4-2008 Attachment number 1 Page 2 of 2 Item # 13 Attachment number 2 Page 1 of 1 Item # 13 Attachment number 3 Page 1 of 1 Item # 13 Attachment number 4 Page 1 of 1 Item # 13 Attachment number 5 Page 1 of 2 Item # 13 Attachment number 5 Page 2 of 2 Item # 13 Item # 13 Item # 13 Item # 13 Item # 13 Attachment number 7 Page 1 of 2 Item # 13 Attachment number 7 Page 2 of 2 Item # 13 Attachment number 8 Page 1 of 1 Item # 13 Engineering Services Committee Meeting 1/12/2009 1:30 PM Motion to Approve CSX-617059 Facility Encroachment Agreement Department: Caption:Motion to approve CSX-617059 Encroachment Agreement between CSX Transportation, Inc. and Augusta, Georgia. Background:The Augusta Utilities Department is constructing a sanitary sewer pipeline for the Goodrich Street Raw Water Pump Station. The path of the pipeline calls for it to travel under a railroad track owned by CSX Transportation. Analysis:CSX has agreed to the sanitary sewer pipeline crossing under their tracks. To this end, they have submitted their encroachment agreement for signature. Financial Impact:$4,000.00 Alternatives:Do not approve the motion to approve the encroachment agreement. Recommendation:Approve the motion to approve the encroachment agreement with CSX Transportation. Funds are Available in the Following Accounts: 507043410-5425110 80110250-5425110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 14 Attachment number 1 Page 1 of 20 Item # 14 Attachment number 1 Page 2 of 20 Item # 14 Attachment number 1 Page 3 of 20 Item # 14 Attachment number 1 Page 4 of 20 Item # 14 Attachment number 1 Page 5 of 20 Item # 14 Attachment number 1 Page 6 of 20 Item # 14 Attachment number 1 Page 7 of 20 Item # 14 Attachment number 1 Page 8 of 20 Item # 14 Attachment number 1 Page 9 of 20 Item # 14 Attachment number 1 Page 10 of 20 Item # 14 Attachment number 1 Page 11 of 20 Item # 14 Attachment number 1 Page 12 of 20 Item # 14 Attachment number 1 Page 13 of 20 Item # 14 Attachment number 1 Page 14 of 20 Item # 14 Attachment number 1 Page 15 of 20 Item # 14 Attachment number 1 Page 16 of 20 Item # 14 Attachment number 1 Page 17 of 20 Item # 14 Attachment number 1 Page 18 of 20 Item # 14 Attachment number 1 Page 19 of 20 Item # 14 Attachment number 1 Page 20 of 20 Item # 14 Engineering Services Committee Meeting 1/12/2009 1:30 PM Motion to Approve Two -Year Lease of 360 Bay Street for Utilities Department Department:Utilities Department Caption:Motion to approve two-year lease (with option to renew two additional years) for 360 Bay Street for continued use of Utilities Operations at this location. Background:The Utilities Department is currently leasing space at this location and has expanded the amount of leased space at this location over the years. There is currently no lease agreement in place. Analysis:It is in the best interest of both Augusta, Georgia and the landlord of 360 Bay Street to formalize the terms of the space being leased at 360 Bay Street. Financial Impact:The schedule or rent payments is included as part of the lease attached hereto as Exhibit "A". Payment for the space is included in the Utilities Department Budget. Alternatives:Alternatives would include continuing to lease the space without a lease, or changing the terms of the lease. Recommendation:Approval of lease. Funds are Available in the Following Accounts: In Utilities Department Budget. REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 15 360 Bay Street Lease Page 1 RICHMOND COUNTY GEORGIA MASTER LEASE AGREEMENT FOR 360 BAY STREET AUGUSTA, GEORGIA 7KLV/HDVH$JUHHPHQW ³/HDVH´ PDGHDQGHQWHUHGLQWRWKLVBBBBBB day of January, 2009, by and between Hutch Holdings, a Georgia corporation with its principle address at P.O. Box 13310, Savannah, Georgia 31416 (hereinafter referred WR DV ³/HVVRU´  and Augusta-Richmond County, a political sub-division of the State of Georgia, whose address is 501 Greene Street, Suite 301, Augusta, Georgia 30901 KHUHLQDIWHUUHIHUUHGWRDV³/HVVHH´ IRU the Augusta-Richmond County Utilities Department. 1. LESSOR ±Landlord Hutch Holdings P.O. Box 13310 Savannah, Georgia 31416 Phone 912-236-7575 Fax 912-495-9605 Attn: 2. LESSEE ±Tenant Augusta-Richmond County Georgia 501 Greene Street, Suite 301 Augusta, Georgia 30901 Phone 706-821-2426 Fax 706-821-2484 Attn: Mr. Rick Acree 3. AGREEMENT. Lessor hereby leases to Tenant and Tenant hereby leases from Lessor the following property known as 360 Bay Street Augusta, Georgia. The leased space consists of approximately 11,389 square feet of total usable space as well as the common use of other common areas of the building as needed for reasonable use. The leased space includes 304 square feet known as suite 101; 470 square feet known as suite 110; 334 square feet known as suite 150; 6459 square feet known as suite 180; 1981 square feet known as suite 200; 1841 square feet known as suite 210. 4. TERM. The term of this lease shall initially be for approximately two (2) years starting the date when this agreement is executed and ending, December 31, 2010. Lessee shall have an option to renew this lease for two (2) additional years. Attachment number 1 Page 1 of 9 Item # 15 360 Bay Street Lease Page 2 5. RENT. Tenant agrees to pay Landlord at the address shown above, or as amended, rent for the lease premises, on a monthly basis as follows: Year 1 $12,658.67 per month for Year 2009 Year 2 $13,101.72 per month for year 2010 Year 3 $13,560.28 per month for year 2011 Year 4 $14,034.89 per month for year 2012 6. RENT DUE DATES. Rent is due in advance on the 1st day of each month. 7. LANDLORD SERVICES. Subject to other express terms and provisions of this agreement, Landlord will provide the following services: A. For all public areas and special service areas to the building: 1) Electric current for lighting and for nominal building maintenance and operations usage, and 2) Electric lighting and gas service, and 3) Heating, ventilating and/or air conditioning as required on a seasonal basis, and 4) Routine maintenance, painting, and decorating, and 5) Janitorial service on a five (5) day per week basis. 6) Water and plumbing service (from the public water supply) for domestic use in restrooms and drinking fountains for general use of all tenants in the building, and 7) Elevator service where applicable. 8) Snow removal after at least two (2) inches of accumulation where applicable. 9) Parking lot maintenance, lighting & cleaning. B. For all Tenant areas in the Building: 1) (OHFWULFFXUUHQWIRUOLJKWLQJDQGIRU7HQDQW¶V incidental uses consistent with the operations of business offices, provided that the electricity so furnished will be at a nominal 120 volts and such electricity will be used only for equipment and accessories normal to office usage, and 2) Electric lighting service for Building standard Attachment number 1 Page 2 of 9 Item # 15 360 Bay Street Lease Page 3 lighting fixtures, and gas service. 3) Heating, ventilating, and/or air conditioning 8:00 A.M. to 7:00 P.M. Monday thru Friday and after hours or on weekends upon reasonable notice by Tenant to Landlord. 4) Routine maintenance, and 5) Janitorial service on a five (5) day per week basis, and 6) Water and plumbing service for restrooms. 8. COMMON AREAS. The 360 Bay Street Building contains Common Area space consisting of lobby areas, hallways and other space not within a specific suite, parking lot, outdoor landscaping, elevator, stairs, building safety alarm systems, etc. 9. REPAIRS AND MAINTENANCE. A. 7HQDQW ZLOO DW 7HQDQW¶V H[SHQVH NHHS WKH OHDVHG premises in good order, repair and condition at all times during the Term, and Tenant shall promptly and DGHTXDWHO\ UHSDLU DOO GDPDJH RFFDVLRQHG E\ 7HQDQW¶V negligence to the leased premises and replace or repair all damaged or broken fixtures and appurtenances, under the supervision and subject to the reasonable approval of the Landlord, and within any reasonable period of time specified by the Landlord. If the Tenant does not do so, Landlord may but need not, make such repairs and replacements, and, if such damage was caused by Tenant, Tenant shall pay Landlord the cost thereof. Landlord may, upon written notice to Tenant, enter the leased premises at all reasonable times to make such repairs, alterations, improvements and additions to the leased premises or to the Building or to any equipment located in the Building as Landlord shall desire or deem necessary or as Landlord may be required to do by governmental authority or court order or decree. B. Tenant shall not commit or allow any unreasonable waste or damage to be committed on any portion of the leased premises, and at the termination of this Lease, by lapse of time or otherwise, Tenant shall deliver said leased premises to Landlord in as good condition Attachment number 1 Page 3 of 9 Item # 15 360 Bay Street Lease Page 4 as of the date of initial possession by Tenant, ordinary wear and tear excepted, and upon such ter- mination of this lease, Landlord shall have the right to re-enter and resume possession of the leased premises. The cost and expense of any repair necessary to restore the condition of the leased premises to said condition in which they are to be delivered to Landlord shall be borne by Tenant. C. Tenant may, at its expense, install security fencing and lighting to the parking lot; however, tenant shall, if requested by Landlord, remove all lighting and fencing at the termination of this lease by elapse of time or otherwise. 10. ASSIGNMENT OR SUBLEASE. Tenant shall not assign or, in any manner, transfer this Lease or any estate or interest herein, or sublet the leased premises or any part thereof; or grant any license, concession or other right of occupancy of any portion of the leased premises, or use or permit same to be used for any other purpose than stated in the use clause hereof without the prior written consent of Landlord, which consent shall not be unreasonably withheld. Consent by Landlord to one or more assignments, subletting or uses shall QRW RSHUDWH DV D ZDLYHU RI /DQGORUG¶V ULJKWV DV WRDQ\ subsequent assignment, subletting, or uses. Notwithstanding any assignments or subletting, Tenant and any guarantor of 7HQDQW¶V REOLJDWLRQV XQGHU WKLV OHDVH VKDOO DW DOOWLPHV remain fully responsible and liable for the payment of the rent herein specified and for the compliance with all of the 7HQDQW¶VRWKHUREOLJDWLRQVXQGHUWKLV/HDVHDQGLWVKDOOQRW be necessary for Landlord to join any such sublessee or assignee hereof in any action of Landlord against Tenant resulting from default by such sublessee or assignee under WKHWHUPVRIWKH/HDVH8SRQWKHRFFXUUHQFHRIDQ³HYHQWRIGHIDXOW´ DV KHUHLQDIWHU GHILQHG LI the leased premises or any part thereof are or have been assigned and/or sublet, Landlord, in addition to any other remedies herein provided by law, may, at its option, collect directly from such assignee or sublessee all rents becoming due to Tenant under such assignment or sublease and apply such rent against any sum due to it by Tenant hereunder, and no such collection shall be construed to constitute a novation or a release of Tenant from the further performance of its obligations hereunder. Attachment number 1 Page 4 of 9 Item # 15 360 Bay Street Lease Page 5 11. ADDITIONS AND ALTERATIONS. A. Except as otherwise indicated in this Lease, Tenant shall not, without the prior written consent of Landlord, make any alterations, improvements or additions to the leased premises. If Landlord consents to said alterations, improvements or additions, it may impose such conditions with respect thereto as Landlord deems appropriate, including, without limitation, requiring Tenant to furnish Landlord with security for the payment of all costs to be incurred in connection with such work, insurance against liabilities which may arise out of such work, and plans and specifications plus permits necessary for such work. The work necessary to make any alterations, improvements or additions to the leased premises shall EHGRQHDW7HQDQW¶VH[SHQVH$OOZRUNGRQHE\7HQDQW or its contractors pursuant to this Lease shall be done in a first-class workmanlike manner using only good grades of materials and shall comply with all insurance requirements and all applicable laws and ordinances and rules and regulations of governmental departments or agencies. B. Except as otherwise indicated in this Lease or other agreement, all permanent alterations, improvements and additions to the leased premises whether temporary or permanent in character, made or paid for by Landlord or Tenant, shall without compensation to Tenant become /DQGORUG¶VSURSHUW\DWWKHWHUPLQDWLRQRIWKLV/HDVH by lapse of time or otherwise and shall, unless Landlord requests their removal, be relinquished to Landlord in good condition, ordinary wear excepted. It is understood and agreed between the parties that technological improvements (i.e., computer, phone, communications and other system wiring and implements) are specifically excluded from this provision. 12. TAXES. To be paid by the Lessor. 13. LESSOR INSURANCE. Landlord shall provide fire, casualty and commercial liability insurance on the building itself but not the Lessee nor their equipment and possessions. Attachment number 1 Page 5 of 9 Item # 15 360 Bay Street Lease Page 6 14. LESSEE INSURANCE. Lessee shall provide- or be self-insured for- all fire, casualty and liability insurance for all its business operations on the leased premises. Lessor shall be specifically included as an additional named insured on any policy of insurance that Lessee has or obtains as related to fire, casualty and liability insurance. 15. USE. The space shall be used for General Office Space, Meeting Rooms, Hearing Rooms, etc. 16. SIGNS. Tenant shall not post or paint any signs at, on or about the leased premises or paint the exterior walls of the building without the prior written consent of the Lessor. 17. COMPLIANCE WITH LAWS AND REGULATIONS. Tenant shall, at its own expense, comply with all laws, orders and requirements of all government entities with reference to the use and occupancy of the leased premises. 18. COMPLIANCE WITH BUILDING RULES AND REGULATIONS. Tenant agrees to abide by all reasonable Building Rules and Regulations of Landlord. 19. NOTICES. Notices to Lessor and Lessee shall be sent by certified mail to the attention of the parties (and their successors by amendment) as listed below: 20. LESSOR Hutch Holdings c/o Rex Property & Construction Management Company P.O. Box 1302 Augusta, Georgia 30903 Phone 706-722-4962 Fax 706-722-0982 Attn: Mr. David Moretz LESSEE Augusta-Richmond County Georgia 501 Greene Street, Suite 301 Augusta, Georgia 30901 Phone 706-821-2426 Fax 706-821-2484 Attn: Mr. Rick Acree Attachment number 1 Page 6 of 9 Item # 15 360 Bay Street Lease Page 7 21. WAIVER OF BREACH. Except as otherwise provided by law, the waiver by Lessor or Lessee of any breach of any provision of this lease shall not constitute a continuing waiver of any subsequent breach or a different provision of this lease. 22. INTERUPTION OF UTILITIES. If any utility services furnished by Lessor are interrupted despite the good faith effort of Lessor to remedy same, Lessor shall not be liable in any respect for damages to the person or property of Lessee or the property of Lessee¶VHPSOR\HHVDJHQWVRUJXHVWV/HVVRU shall use reasonable diligence to repair and remedy such interruption promptly. 23. DESTRUCTION. In the event the lease premises is partly damaged or destroyed or rendered partially unfit for occupancy by fire or other casualty, Lessor may repair the damage and restore the leased premises to substantially the same condition as immediate1y prior to the occurrence of the casualty. If the leased premises are totally destroyed or deemed by the Lessor to be rendered unfit for occupancy by fire or other casualty, or if Lessor shall decide not to repair or rebuild, this lease shall terminate and the rent shall be paid to the time of such loss. 24. SUBORDINATION. Lessor may subordinate this lease to any mortgage, Deed of Trust, or other lien hereafter placed on the premises. Lessee agrees to execute such further instruments subordinating this lease as Lessor may request. Such subordination shall be recognized by the mortgagee, and the rights of Lessee shall remain in full force and effect during the term of this lease so long as Lessee shall continue to perform all of the covenants and conditions of this lease. 25. ESTOPPEL CERTIFICATE. The Tenant agrees that, upon written request by Landlord, the Tenant will, within a reasonable time, deliver to Landlord a statement in writing certifying: A. that this Lease is unmodified and in full force and effect (or if there have been modifications that the Lease as modified is in full force and effect); B. the dates to which rent and other charges have been paid; and Attachment number 1 Page 7 of 9 Item # 15 360 Bay Street Lease Page 8 26. LIABILITY. Lessor and its employees and agents shall not be liable to Lessee or to Lessee's employees, patrons, visitors, invites, or any other persons for any injury to any such persons or for damage to personal property caused by any, omission or neglect of Lessee or Lessee's agents or of any other tenant of the space leased by Lessee. Lessor shall be liable for maintaining common areas of 360 Bay Street. 27. RIGHT OF ENTRY. Lessor, with prior notice and mutual agreement with Lessee, shall have the right during normal business hours to enter the premises: a) to inspect the general condition and state of repair thereof and, b) to make repairs required or permitted under this lease, or c) for any other reasonable purpose. 28. CHOICE OF LAW TO APPLY. This agreement shall be construed under and in accordance with the laws of the state of Georgia. 29. PRIOR AGREEMENTS SUPERSEDED. This agreement constitutes the sole and only agreement of the parties to this lease and supersedes any prior understandings or written or oral agreements between the parties of this lease. 30. RIGHTS AND REMEDIES. The use of anyone right or remedy by either party shall not preclude or waive its right to use any or all other remedies. Said rights and remedies are given in addition to any other rights the parties may have by law, statute, ordinance, or otherwise. 31. LEGAL CONSTRUCTION. In case any one or more of the provisions contained in this agreement shall for any reason be held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provision hereof and this agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. 32. AMENDMENT. No amendment, modification, or alteration of the terms hereof shall be binding unless it is in writing, dated subsequent to the date hereof, and duly executed by the parties. Attachment number 1 Page 8 of 9 Item # 15 360 Bay Street Lease Page 9 33. PARKING. Tenant and their employees have the right to park in the parking lot of the premises at no charge and on a first-come first-serve basis. Hutch Holdings Augusta-Richmond County By _____________________ By _______________________ Mayor Deke Copenhaver Date ___________________ Date _____________________ Attachment number 1 Page 9 of 9 Item # 15 Engineering Services Committee Meeting 1/12/2009 1:30 PM Option to grant to GA Power an underground easement for the Judicial Center distribution line Department:Attorney Caption:Motion to grant and convey to Georgia Power an easement for installation of an underground electrical distribution line through property owned by the City at Fenwick Street, Tenth Street, Talcot St. and James Brown Blvd. in relation to Augusta’s Judicial Center project for a nominal value of $10.00. Background:Georgia Power is requesting an option to acquire an underground easement for an electrical distribution line known as the “JudicialCenter (RichmondCounty) underground distribution line” to service property owned by the City where the Judicial Center is being constructed. The rights include the right to clear and keep clear all trees and other obstructions within 10 feet of the underground distribution line. Analysis:See background. Financial Impact:Georgia Power will cover the costs necessary for the construction of the underground distribution line. Alternatives:Decline the requested option. Recommendation:Grant the option to convey to Georgia Power the underground easement and authorize the Mayor or Mayor Pro Tem to sign and execute all necessary documents to close the transaction. Funds are Available in the Following Accounts: n/a REVIEWED AND APPROVED BY: Law. Administrator. Clerk of Commission Cover Memo Item # 16 Attachment number 1 Page 1 of 3 Item # 16 Attachment number 1 Page 2 of 3 Item # 16 Attachment number 1 Page 3 of 3 Item # 16 Engineering Services Committee Meeting 1/12/2009 1:30 PM Regency Mall Department:Clerk of Commission Caption:Discuss Regency Mall. (Requested by Commissioner Smith) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 17 Engineering Services Committee Meeting 1/12/2009 1:30 PM Windsor Spring Road Improvements Ph 4 & %, SA4/Chg5 Department:Abie L. Ladson, PE, Director Caption:Authorize the Engineering Department to approve Supplemental Agreement Number Four and Change Number Five with Jordan, Jones & Goulding (JJG) in the amount of $142,177 which will allow the erosion control plans to be updated in accordance with the State of Georgia EPD guidelines that became effective August 1, 2008, for adjustments to the bridge foundation investigation schedule and fee, and for the addition of Underground Storage Tank/Hazardous Waste Site investigations for the Windsor Spring Road improvement projects, phase IV & V, CPB #323-04- 299823766 & 323-04-299823786. Funds are available in SPLOST Phase III in the Windsor Spring Road Phase IV project right of way account. Funds from the Phase IV project right of way account will be transferred in the amount of $71,088.50 to each project engineering account Background:This is a Georgia Department of Transportation (GDOT) project that will widen and reconstruct Windsor Spring Road to 4 lanes with a 19’ raised median from State Route 88 in Hephzibah to Tobacco Road and replace the bridges over Norfolk Southern Railroad and Spirit Creek. Augusta Engineering Department is responsible for development of the Preliminary Engineering activities and hired JJG to accomplish these activities. The estimated construction cost for Phase IV is $29.2 million and $16.6 million for Phase V. Analysis:JJG entered into an agreement with Augusta-Richmond County on June 27, 2001 to provide engineering and design services for the Windsor Spring Road corridor from State Route 88 in Hephzibah to Tobacco Road. The erosion control plans for Phase IV and Phase V had been prepared in accordance with the current state EPD and GDOT guidelines. However, on August 1, 2008 the State EPD Office made significant changes concerning sediment storage, potential impacts to biota impaired stream and the installation phasing of erosion control measures. GDOT adopted these regulations and advised that the erosion control plans on all projects should reflect the August 1, 2008 State EPD guidelines. There are two bridges within the limits of the Windsor Spring Road corridor that will be reconstructed. One bridge is located in Phase IV (bridge over Spirit Creek) and one is located within Phase V (bridge over Norfolk Southern Railroad). In January, 2005 JJG entered into an agreement with Willmer Engineering for the preparation of soil surveys and the bridge foundation investigations (BFIs) for the Phase IV and Phase V projects. However, shortly after that, the GDOT plan development process changed such that BFIs could not be conducted until after the Preliminary Field Plan Review (PFPR) has occurred. The BFIs were to be done at the same time as the soil surveys but Cover Memo Item # 18 the change in the GDOT plan development process did not allow that to happen as originally scheduled. Due to delays in approval of the environmental document and the addition of the Value Engineering Study, the PFPR for Phase IV could not be held until May, 2008. The PFPR for Phase V is currently scheduled to be held in December, 2008. Since there has been a time lapse of over three and a half years of the original agreement between JJG and Willmer Engineer, labor rates have increased. In addition, remobilization is required since the BFIs could not be accomplished when the soil surveys were done. The original agreement did not address the responsibility of conducting the underground storage tank/hazardous waste site investigations. GDOT has advised this is the responsibility of the local government. Financial Impact:JJG has proposed a total cost of $142,177 to accomplish this and funds are available in SPLOST Phase IV Windsor Spring Road Phase IV project right of way account. GDOT has agreed to fund and acquire the right of way on Phase IV so the $956,140 already identified for this work can be redirected to other places. Alternatives:1) Authorize the Engineering Department to approve Supplemental Agreement Number Four and Change Number Five with Jordan, Jones & Goulding (JJG) in the amount of $142,177 which will allow the erosion control plans to be updated in accordance with the State of Georgia EPD guidelines that became effective August 1, 2008, for adjustments to the bridge foundation investigation schedule and fee, and for the addition of Underground Storage Tank/Hazardous Waste Site investigations for the Windsor Spring Road improvement projects, phase IV & V, CPB #323-04- 299823766 & 323-04-299823786. Funds are available in SPLOST Phase III in the Windsor Spring Road Phase IV project right of way account. Funds from the Phase IV project right of way account will be transferred in the amount of $71,088.50 to each project engineering account. 2) Do not approve the request and jeopardize the progress of these important projects to south Augusta. Recommendation:approve alternative #1 Funds are Available in the Following Accounts: 323-041110-5411120/299823766-5411120 323-041110- 5411120/299823786-5411120 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 Item # 18 (SA02 – For changes greater than $20,000) April 2005 AUGUSTA, GA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT PROJECT NUMBERS: STP-7007 (6) & STP-1105 (4) PI 250610 & 254320 SUPPLEMENTAL AGREEMENT NUMBER : 4 P.O: 53296 WHEREAS, We, Jordan, Jones & Goulding, Consultant, entered into a contract with Augusta- Richmond County on June 27, 2001, for engineering design services associated with the improvements to Windsor Spring Road from State Route 88 in Hephzibah to Tobacco Road, projects STP-7007 (6) & STP-1105 (4), File Reference No. 08-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Revisions to the state of Georgia and GDOT erosion control guidelines effective Augusta 1, 2008, adjustments to the Bridge Foundation Investigation schedule and fee, and investigations for Underground Storage Tanks/Hazardous Waste Sites It is agreed that as a result of the above described modification the contract amount is increased by $142,177 from $2,152,914.71 to a new total of $2,295,091.71. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Jordan, Jones & Goulding, Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This day of , 2008. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY AUGUSTA, GEORGIA Mayor Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Please do not process this document. Once approved by the Commission, the original will be sent to Clerk of Commission for execution. For information reference this request contact Shelette @ ext 5070. Attachment number 2 Page 1 of 1 Item # 18 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project be set up is authorized to CPB#323-04-299823766. The funding for this project is needed for Engineering. We propose to realign Travis Road with Spirit Creek Road and perform investigations for Underground Storage Tanks/Hazardous Waste Sites. Funding will come from the project Right of Way account Special 1% Sales Tax, Phase III Funds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase III 1,560,500$ Special 1% Sales Tax, Phase IV 600,000$ 2,160,500$ Section 3: The following amounts are appropriated for the project: CPB#323-04-299823766 CAPITAL PROJECT BUDGET WINDSOR SPRING ROAD IMPROVEMENTS, SECTION IV CHANGE NUMBER FIVE (WILLIS FOREMAN RD TO TOBACCO RD) Please do not process this document. Once approved by Commission, original will be sent to the Clerk of Commission for execution. For information reference this note contact Shelette @ ext 5070. Thanks 1 of 5 9/29/08 Section 3: The following amounts are appropriated for the project: By Basin By District 4th, 6th, & 8th $2,160,500 2,160,500$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department McBean & Spirit Creek Honorable Deke Copenhaver, Mayor 1 of 5 9/29/08 Attachment number 3 Page 1 of 5 Item # 18 Copy-Procurement Department 2 of 5 9/29/082 of 5 9/29/08 Attachment number 3 Page 2 of 5 Item # 18 Augusta-Richmond County, Georgia CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SALES TAX, PHASE III 323041110-000000-299823766 ($1,000) ($1,000) SALES TAX, PHASE III 323041110-000000-299823766 ($1,559,500) ($1,559,500) SPECIAL 1% SALES TAX, PHASE IV 324041110-000000-202824766 ($600,000) ($600,000) TOTAL SOURCES: ($2,160,500) ($2,160,500) USE OF FUNDS CPB#323-04-299823766 CAPITAL PROJECT BUDGET WINDSOR SPRING ROAD IMPROVEMENTS, SECTION IV (WILLIS FOREMAN RD TO TOBACCO RD) CHANGE NUMBER FIVE 3 of 5 9/29/08 USE OF FUNDS ADVERTISING 323041110-5233119-299823766 $1,000 $1,000 ENGINEERING Section IV 323041110-5212115-299823766 $1,136,559 $71,089 $1,207,648 RIGHT OF WAY Section IV 323041110-5411120-299823766 $963,441 ($71,089) $892,352 UTILITIES 323041110-5414510-299823766 $50,000 $50,000 SIGNAL 323041110-5414610-299823766 $5,000 $5,000 CONTINGENCY 323041110-6011110-299823766 $4,500 $4,500 TOTAL USES:$2,160,500 $0.00 $2,160,500 3 of 5 9/29/08 Attachment number 3 Page 3 of 5 Item # 18 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project be set up is authorized to CPB#323-04-299823786. The funding for this project is needed for Engineering. We propose to realign Travis Road with Spirit Creek Road and perform investigations for Underground Storage Tanks/Hazardous Waste Sites. Funding will come from the Project Right Away account Special 1% Sales Tax, Phase III Funds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase III 1,560,500$ Special 1% Sales Tax, Phase IV 600,000$ 2,160,500$ Section 3: The following amounts are appropriated for the project: By Basin By District 4th, 6th, & 8th $2,160,500 2,160,500$ (WILLIS FOREMAN RD TO TOBACCO RD) CHANGE NUMBER FIVE McBean & Spirit Creek CAPITAL PROJECT BUDGET WINDSOR SPRING ROAD IMPROVEMENTS, SECTION V CPB#323-04-299823786 4 of 5 9/29/08 Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor 4 of 5 9/29/08 Attachment number 3 Page 4 of 5 Item # 18 Augusta-Richmond County, Georgia CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SALES TAX, PHASE III 323041110-000000-299823786 ($1,000) ($1,000) SALES TAX, PHASE III 323041110-000000-299823786 ($1,559,500) ($1,559,500) SPECIAL 1% SALES TAX, PHASE IV 324041110-000000-203824768 ($600,000) ($600,000) TOTAL SOURCES: ($2,160,500) ($2,160,500) USE OF FUNDS ADVERTISING 323041110-5233119-299823786 $1,000 $1,000 CHANGE NUMBER FIVE CPB#323-04-299823786 CAPITAL PROJECT BUDGET WINDSOR SPRING ROAD IMPROVEMENTS, SECTION V (WILLIS FOREMAN RD TO TOBACCO RD) 5 of 5 9/29/08 ENGINEERING Section IV 323041110-5212115-299823786 $1,136,559 $71,088 $1,207,647 RIGHT OF WAY 323041110-5411120-299823786 $963,441 ($71,088) $892,353 UTILITIES323041110-5414510-299823786 $50,000 $50,000 SIGNAL 323041110-5414610-299823786 $5,000 $5,000 CONTINGENCY 323041110-6011110-299823786 $4,500 $4,500 TOTAL USES:$2,160,500 $0.00 $2,160,500 5 of 5 9/29/08 Attachment number 3 Page 5 of 5 Item # 18 Engineering Services Committee Meeting 1/12/2009 1:30 PM Wrightsboro Rd Improvements (Resolution) Department:Abie L. Ladson, PE , Director Caption:Motion to approve a resolution to send to the Georgia Department of Transportation (GDOT) to support the realignment of Barton Chapel Road to the east so that it will be aligned opposite existing Augusta West Parkway and rescinds the resolution adopted June 19, 2001 which opposed the realignment of Augusta West Parkway and Barton Chapel Road as part of the project to improve Wrightsboro Road from Jimmie Dyess Parkway to I- 520, project number 323-04-296823309. Background:This is a GDOT project that will widen & reconstruct Wrightsboro Road from Jimmie Dyess Parkway to I-520. The Engineering Department is responsible for the development of the preliminary engineering activities. GDOT is funding the right of way acquisition ($8,906,000) and the construction ($16,100,000). Analysis:During the early development stages of this project GDOT proposed the concept of aligning Augusta West Parkway and Barton Chapel Road by shifting Augusta West Parkway to the west and Barton Chapel Road to the east. This concept was not supported by some members of the business community in this area. On June 19, 2001 the City adopted a resolution which stated that they did not support this concept either and submitted the resolution to GDOT. GDOT agreed to move forward with a different concept for this area which has the intersections of Barton Chapel Road, Crescent Drive and Augusta West Parkway operating independently of each other. In the past few years much has changed in this area concerning the ownership of properties. Frank Lawrence, owner of Bobby Jones Ford, has acquired all of the properties except two (2) between the east side of Barton Chapel Road and his Ford dealership. Mr. Lawrence has hired a consultant and is in the planning stages of redeveloping this property. Mr. Lawrence has indicated that several commercial retail tenants will be part of his redevelopment plans. There are concerns that the intersections of Barton Chapel Road, Crescent Drive and Augusta West Parkway would be negatively impacted as currently design within the GDOT Wrightsboro Road widening project. Shifting Barton Chapel road to the east so that it aligns opposite existing Augusta West Parkway will provide a more operationally efficient corridor. Financial Impact:There is no financial impact associated with the passing of this resolution. However, if the resolution is passed by the City and approved by GDOT, this area of Wrightsboro Road will have to be redesigned. The design consultant has indicated that the estimated cost to redesign this would be $120,000 and the City will be responsible for this. Cover Memo Item # 19 Alternatives:The Engineering Department requests approval of a resolution to send to the Georgia Department of Transportation (GDOT) to support the realignment of Barton Chapel Road to the east so that it will be aligned opposite existing Augusta West Parkway and rescinds the resolution adopted June 19, 2001 which opposed the realignment of Augusta West Parkway and Barton Chapel Road as part of the project to improve Wrightsboro Road from Jimmie Dyess Parkway to I-520, project number 323-04-296823309. 2) Do not approve and jeopardize the operational efficiency of this area of the Wrightsboro Road corridor. Recommendation:approve alternative #1 Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 19 A RESOLUTION BY THE HONORABLE DON GRANTHAM COMMISSIONER; AUGUSTA-RICHMOND COUNTY, GEORGIA A RESOLUTION SUPPORTING THE REALIGNMENT OF BARTON CHAPEL ROAD OPPOSITE EXISTING AUGUSTA WEST PARKWAY BY THE GEORGIA DEPARTMENT OF TRANSPORTATION; AND OTHER PURPOSES. WHEREAS, the Georgia Department of Transportation is planning for road improvements on Wrightsboro Road in Augusta-Richmond County, Georgia; and WHEREAS, Augusta-Richmond County, Georgia, by and through Augusta-Richmond County Commission Resolution, dated June 19, 2001, opposed the previous proposal by the Georgia Department of Transportation to shift Augusta West Parkway to the west and Barton Chapel Road to the east; and WHEREAS, as a part of the Georgia Department of Transportation’s “Wrightsboro Road Improvements Project,” Georgia Department of Transportation is giving consideration to a proposal that “Augusta West Parkway” and “Barton Chapel Road” instead be realigned so that Barton Chapel Road is oriented to the east so that it aligns opposite of the existing Augusta West Parkway; and WHEREAS, the proposed realignment of “Barton Chapel Road” opposite existing “Augusta West Parkway” by the Georgia Department of Transportation will increase and support commercial development and have a significant and positive impact upon businesses located in that area; and WHEREAS, the proposed realignment of “Barton Chapel Road” opposite existing “Augusta West Parkway” will improve the efficiency of traffic operations in the “Wrightsboro Road Project” area; THE COMMISSION OF AUGUSTA-RICHMOND COUNTY, GEORGIA HEREBY RESOLVES AS FOLLOWS: SECTION 1. The Augusta-Richmond County Commission supports and requests that “Barton Chapel Road” be realigned so that Barton Chapel Road orients to the east and that it aligns opposite of the existing Augusta West Parkway. Attachment number 1 Page 1 of 2 Item # 19 SECTION 2. The “Resolution Opposing Realignment of Augusta West Parkway and Barton Chapel Road,” dated June 19, 2001, the Augusta-Richmond County Commission hereby rescinds. SECTION 3. Augusta-Richmond County Commission resolves that a copy of this Resolution be forwarded to the Commissioner of Georgia Department of Transportation, forthwith. Duly adopted this day of , 2009. AUGUSTA-RICHMOND COUNTY, GEORGIA By: ______________________________________ Deke S. Copenhaver As its Mayor ATTEST: _____________________________ Lena Bonner, Clerk of Commission Attachment number 1 Page 2 of 2 Item # 19