Loading...
HomeMy WebLinkAbout2008-08-11-Meeting Agenda Engineering Services Committee Meeting Committee Room- 8/11/2008- 1:00 PM ENGINEERING SERVICES 1. Approve the attached list of streets proposed for submittal to the Georgia Department of Transportation for inclusion in the 2009 LARP. Attachments 2. Motion to approve an Option for the purpose of acquiring a Right-of-Way between Norman C. Skalicky, as owner, and Augusta, Georgia, as optionee, in connection with the Alexander Drive Project, GDOT Project No. STP-0001- 00(794), ARC Project No.: 323-04-296823215; 0.011 acre (490.32 sq. ft.) in fee and 0.005 acre (209.97 sq. ft.) of permanent construction and maintenance easement from the property located at 2819 Brickrun Way, Project Parcel 49 (Tax map 013-1, Parcel 254) at a purchase price of $35,000.00. Attachments 3. Approve execution of Project Framework Agreement with Georgia Department of Transportation which will require Augusta Richmond County to cover the relocation cost for the City's existing water and sewer lines affected in the GDOT widening of State Route 56 from Bennock Mill Road to Old Waynesboro Road. Attachments 4. Approve (CPB #324-04110-203824335) Change Number Four in the amount of $6,549,090.64 with funding of $56,642.00 from SPLOST Phase IV Recapture, $1,600,000.00 from (Augusta Utilities Department), and $87,000.00 from (Augusta Recreation Department) for Project Engineering and Construction. Also approve award of Construction Contract to Blair Construction, Inc. in the amount of $6,549,090.64 for the Belair Hills Subdivision Improvements Project, subject to receipt of a detailed project schedule, a contractor’s project team Attachments approved by the Engineering Department, a traffic control plan, a staging plan, signed contract(S) and proper bonds. Also approve Supplemental Agreement Number Four to W.R. Toole Engineers, Inc. in the amount of $174,000.00 for additional services that include construction observation and field engineering. 5. A report from staff regarding the burial plot records at Cedar Grove Cemetery. Attachments 6. Approve Supplemental Agreement Number Two to Cranston Engineering Group, P.C. for additional Professional Design Services of the D’Antignac Street Drainage Improvements Project in the amount of $166,130.00 for the Engineering Department. Attachments 7. Motion to grant and convey to Georgia Power an easement for installation of an underground electrical distribution line through property owned by the City located on Highway U.S.1 for the Augusta Waste Management Plant for a nominal value of $10.00. Attachments 8. Motion to grant and convey to Georgia Power an easement for installation of an underground electrical distribution line through property owned by the City located on Highway U.S.1 for Augusta Fire Department Training Tower for a nominal value of $10.00. Attachments 9. Approve award of contract to Hardy Appraisal Services in the amount of $14,500.00 for preparing appraisals on the Marvin Griffin Road Project (CPB 323-041110- 296823603), subject to receipt of a detailed work schedule and a signed contract to be funded from the project Right-of-Way account for the Engineering Department. Attachments 10. Consider a request from Mr. Frank Carl of Savannah Riverkeeper to provide half of the Augusta Canal flow to the Savannah River for 12 hours immediately prior to the canoe and kayak race to be held on August 30, 2008. Attachments www.augustaga.gov 11. Discuss/approve concept from G-DOT regarding beautification plan for Skinner Mill Road behind sound barriers with participation from local government, neighborhoods and G-DOT. (Requested by Commissioner Grantham) Attachments 12. Motion to approve an architectural services contract with Thompson, Ventulett, Stainback and Associates, Inc. for the Augusta TEE Center. Attachments 13. Authorize the Engineering Department to approve Supplemental Agreement Seven (7) with PBS & J in the amount of $68,358 to update the traffic counts and cover additional costs associated with the extended project schedule as part of the improvements to Wrightsboro Road from Jimmie Dyess Parkway to I-520, ARC# 323- 04-296823309. Funds will be transferred from the project Right of Way Account to the project Engineering Account. Attachments 14. Motion to authorize the Engineering Department to cancel the existing contract with US Infrastructure, Inc. for design services associated with Phase I of the Wrightsboro Road Widening Project and advertise a Requests For Proposals for Engineering Services to complete the design of this project. Attachments Engineering Services Committee Meeting 8/11/2008 1:00 PM 2009 LARP Department:Public Services Department-Maintenance Division Caption:Approve the attached list of streets proposed for submittal to the Georgia Department of Transportation for inclusion in the 2009 LARP. Background:In accordance with the Georgia Department of Transportation requirements, we have prepared a list of streets as candidates for the 2009 LARP. The list is being sent to the Augusta Utilities and Engineering Departments for review, and is subject to minor revision based on their input on ongoing and future projects. Analysis:The Georgia Department of Transportation will review these streets and make a final determination as to which streets will be resurfaced, based on needs and funding availability. Financial Impact:The resurfacing will be let for bid by GDOT. Any required patching will the responsibility of Augusta-Richmond County, and will be performed by the Maintenance Division. The resurfacing costs will be borne by GDOT. Alternatives:1. Approve the attached list of streets proposed for submittal to the Georgia Department of Transportation for inclusion in the 2009 LARP. 2. Do not approve. Recommendation:#1. Approve the attached list of streets proposed for submittal to the Georgia Department of Transportation for inclusion in the 2009 LARP. Funds are Available in the Following Accounts: N/A Cover Memo Item # 1 REVIEWED AND APPROVED BY: Finance. Administrator. Clerk of Commission Cover Memo Item # 1 RESURFACING WORKSHEET LARP 2009 SHEET# STREET NAME TERMINI CONDITION DISTRICT WIDTH LENGTH (FEET) 1801 GORDON PARK RD NEW SAVANNAH RD - SKYVIEW DR 16 1 30 1790 1857 TAYLOR ST EAST BOUNDARY TO 2ND ST 20 1 26 1141 1869 2ND ST LANEY-WALKER BLVD - REYNOLDS ST 19 1 25 4969 1539 BERCKMAN RD WASHINGTON RD - WHEELER RD 17 1 & 7 var 9525 209 COLEMAN AVE/DANIEL AVE LUMPKIN RD - SCOTT RD 18 2 23 5576 1500 CHESTNUT ST WRIGHTSBORO RD - M.L.K. BLVD 17 2 26 2670 1400 MONROE ST ANDERSON AVE - DEAD ENT 16 2 27 650 1400 LEE BEARD WAY SWANEE QUINTET BLVD - POPLAR ST 17 2 27 2000 1124 EIDSON DR BARTON CHAPEL RD - DEAD END 21 3 17 1558 1178 BELAIR RD WRIGHTSBORO RD - POWELL RD 22 3 21 13945 1500 FORT VIEW CT BELAIR RD - CUL DE SAC 17 3 27 450 3200 KINGS VIEW CT KINGSVIEW DR - CUL DE SAC 17 3 27 600 2900 KINGS VIEW DR BELAIR RD - 2832 17 3 27 1430 389 STONEY BROOK RD PEPPERIDGE DR TO RAMBLEWOOD DR 16 4 27 4156 3500 WOODLAKE RD CROSSCREEK RD - DEAD END 18 4 40 1140 3500 WALSHAM CT WOODLAKE RD - CUL DE SAC 17 4 27 180 2400 LENNOX RD WINDSOR SPRING RD - DEAD END 19 4 27 1050 767 DAVIS DR MEADOWBROOK DR - NEWMAN DR 16 5 20 1822 806 BLACKSTONE ST CHADBOURNE ST - CUL-DE- SAC 15 5 27 2477 3400 TOMS DRIVE GLENN HILS DR - DEAD END 19 5 27 3170 3000 BREEZE HILL DR TOMS DR - GLENN HILLS DR 18 5 27 2115 3100 KEESHA CT BREEZE HILL DR - CUL DE SAC 18 5 27 190 3700 BEACON PLACE ENGLE RD. TO CUL-DE-SAC 20 6 27 866 3300 FASHION DR MORNING DR-DEAD END 19 6 27 1885 28 DENMARK DR PEACH ORCHARD - TOBIN ST 20 6 26 813 91 DEERFIELD LN OLD TRAIL RD - CUL-DE-SAC 16 7 27 1474 3300 CRANE FERRY RD PLEASANT HOME RD - WARREN RD 18 7 30 4493 1238 AVONDALE DR GARDNER MILL RD - WASHINGTON RD 21 7 27 3253 3300 QUAKER SPRING RD PLEASANT HOME RD - DEAD END 18 7 27 2320 3300 DAVANT ST PLEASANT HOME RD - DEAD END 17 7 27 910 2700 WEST TERRACE DR WICKLOW DR - CUL DE SAC 17 7 27 710 1273 COUNTRY PLACE DR MIKE PADGETT HWY-DEAD END 20 8 26 2065 Attachment number 1 Page 1 of 4 Item # 1 RESURFACING WORKSHEET LARP 2009 1283 GOSHEN LANE N & S GOSHEN CIRCLE TO CUL-DE- SAC 19 8 27 1204 20 NEW KARLEEN RD TOBACCO RD - OLD KARLEEN RD 27 8 24 3084 35 OLD WAYNESBORO RD HEPH-MCBEAN RD - MCBEAN CREEK 17 8 22 9853 562 KEYSVILLE ROAD HWY 88 - COUNTY LINE 16 8 21 16370 2580 STOREY MILL RD HEPH-MCBEAN RD - NEW PAVING 18 8 21 4750 4600 STOREY MILL RD FULCHER RD - COUNTY LINE 21 8 21 6340 1300 WALKER ST GORDON HWY TO SIBLEY ST 20 8 38 2675 2400 SUMAC CT SUMAC DR - CUL DE SAC 19 8 27 650 2800 CLIFFWOOD ST NORTON DR - LESLIE CIR 27 8 26 1050 3400 JONATHAN CT JONATHAN CIR-CUL DE SAC 27 528 TOTAL 61729 Attachment number 1 Page 2 of 4 Item # 1 RESURFACING WORKSHEET LARP 2009 TONNAGE 504 279 1165 2411 1203 676 165 506 394 2746 114 152 362 1052 428 46 266 342 627 803 534 48 220 478 200 373 1264 824 587 231 180 504 Attachment number 1 Page 3 of 4 Item # 1 RESURFACING WORKSHEET LARP 2009 305 694 2032 3223 935 1248 953 165 256 134 29629 Attachment number 1 Page 4 of 4 Item # 1 Engineering Services Committee Meeting 8/11/2008 1:00 PM Acquisition of Right-of-Way Norman C. Skalicky Department:Attorney Caption:Motion to approve an Option for the purpose of acquiring a Right-of-Way between Norman C. Skalicky, as owner, and Augusta, Georgia, as optionee, in connection with the Alexander Drive Project, GDOT Project No. STP-0001-00 (794), ARC Project No.: 323-04-296823215; 0.011 acre (490.32 sq. ft.) in fee and 0.005 acre (209.97 sq. ft.) of permanent construction and maintenance easement from the property located at 2819 Brickrun Way, Project Parcel 49 (Tax map 013-1, Parcel 254) at a purchase price of $35,000.00. Background:The property owner has agreed to convey a certain right-of- way and easement to Augusta, Georgia, for the Alexander Drive project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the motion to approve the purchase of the referenced property. Recommendation:Approve the motion to purchase the referenced property. Funds are Available in the Following Accounts: Funds available in the following account(s): 323041110- 5411120 29682315-5411120 Cover Memo Item # 2 REVIEWED AND APPROVED BY: Administrator. Clerk of Commission Cover Memo Item # 2 Item # 2 Item # 2 Item # 2 Item # 2 Engineering Services Committee Meeting 8/11/2008 1:00 PM Approve execution of Frame Work Agreement with Georgia Department of Transportation for GDOT Project No: CSSTP-0006-00 (431) Department:Utilities Caption:Approve execution of Project Framework Agreement with Georgia Department of Transportation which will require Augusta Richmond County to cover the relocation cost for the City's existing water and sewer lines affected in the GDOT widening of State Route 56 from Bennock Mill Road to Old Waynesboro Road. Background:This GDOT project is in the conceptual stage. AUD is awaiting conceptual plans from GDOT in order to work with GDOT on probable construction cost estimate. The widening project requires the relocation and upgrade of more than 15,000 linear feet of water lines on GDOT ROW. GDOT Project Frame work Agreement requires Augusta-Richmond County to agree on payment of relocation cost for the water and sewer lines on GDOT ROW that will be in conflict with the widening project. Analysis:Based on preliminary plans proposed by GDOT, the lines must be moved in order to gain access for future development and to replace with higher quality materials than were available when some of the lines were originally instal Financial Impact:To be confirmed once conceptual planes received. Alternatives:1. Reject execution of GDOT Framework Agreement which might delay the construction of the widening of SR56 2. Approve execution of GDOT Framework Agreement to fund the relocation of lines that will be affected by the widening project Cover Memo Item # 3 Recommendation:It is recommended to approved the execution of the GDOT Framework Agreement Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Procurement. Administrator. Clerk of Commission Cover Memo Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Engineering Services Committee Meeting 8/11/2008 1:00 PM Belair Hills Subdivision Improvements Change #4, Contract Award, SA#4 Department:Abie L. Ladson, Director Caption:Approve (CPB #324-04110-203824335) Change Number Four in the amount of $6,549,090.64 with funding of $56,642.00 from SPLOST Phase IV Recapture, $1,600,000.00 from (Augusta Utilities Department), and $87,000.00 from (Augusta Recreation Department) for Project Engineering and Construction. Also approve award of Construction Contract to Blair Construction, Inc. in the amount of $6,549,090.64 for the Belair Hills Subdivision Improvements Project, subject to receipt of a detailed project schedule, a contractor’s project team approved by the Engineering Department, a traffic control plan, a staging plan, signed contract(S) and proper bonds. Also approve Supplemental Agreement Number Four to W.R. Toole Engineers, Inc. in the amount of $174,000.00 for additional services that include construction observation and field engineering. Background:In February 2003, the Commission authorized the use of Paving Dirt Roads funds for the Belair Hills Estates Improvement project. This project consolidates the “paper” streets in the Belair Hills Subdivision and allows them to be constructed in one construction contract. The project will also includes water and sewer installation and park improvements to be funded by Augusta Utilities Department and Augusta Parks and Recreation Department. Analysis:Bids were received on July 1, 2008 with Blair Construction, Inc. being the low bidder. Bid results are as follow: CONTRACTOR BID 1.Blair Construction, Inc. $6,549,090.64 2.Beam’s Contracting, Co. $7,000,655.39 It is the Engineering Department recommendation to award this project to the low bidder, subject to receipt of the following items: 1. Detailed Project Schedule 2. Contractor’s Project Team Approval by AED 3. Traffic Control Plan 4. Staging Cover Memo Item # 4 Plan 5. Signed Contracts and Proper Bonds It is also essential that the Design Engineer of this project “W.R. Toole Engineers, Inc.” is involved in the day-to-day construction activities (construction inspection and field engineering) to help address the Engineering Department extensive work load. It is also the Engineering Department recommendation to approve the supplemental agreement for additional engineering services for this project. Financial Impact:Funds are available in SPLOST Phase IV Recapture account #324-041110-6011110/207824999-6011110 in the amount of $56,642.00, Augusta Utilities account #507-043420- 5425210/80800020-5425210 in the amount of $1,600,000.00 and Augusta Recreation account #325-061110- 6011110/206065006-6011110 in the amount of $87,000.00 upon Commission approval. Alternatives:1) Approve (CPB #324-04110-203824335) Change Number Four in the amount of $6,549,090.64 with funding of $56,642.00 from SPLOST Phase IV Recapture, $1,600,000.00 from (Augusta Utilities Department), and $87,000.00 from (Augusta Recreation Department) for Project Engineering and Construction. Also approve award of Construction Contract to Blair Construction, Inc. in the amount of $6,549,090.64 for the Belair Hills Subdivision Improvements Project, subject to receipt of a detailed project schedule, a contractor’s project team approved by the Engineering Department, a traffic control plan, a staging plan, signed contract(S) and proper bonds. Also approve Supplemental Agreement Number Four to W.R. Toole Engineers, Inc. in the amount of $174,000 for additional services that include construction observation and field engineering. 2) Do not approve and eliminate project. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: Ph IV 324-041110-6011110/207824999-6011110 AU 507- 043420-5425210/80800020-5425210 AR 325-061110- 6011110/206065006-6011110 REVIEWED AND APPROVED BY: Cover Memo Item # 4 Finance. Administrator. Clerk of Commission Cover Memo Item # 4 Attachment number 1 Page 1 of 7 Item # 4 Attachment number 1 Page 2 of 7 Item # 4 Attachment number 1 Page 3 of 7 Item # 4 Attachment number 1 Page 4 of 7 Item # 4 Attachment number 1 Page 5 of 7 Item # 4 Attachment number 1 Page 6 of 7 Item # 4 Attachment number 1 Page 7 of 7 Item # 4 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project change is authorized to CPB# 324-04-203824335. Change number Four consildates the "paper" streets in the Belair Hills Subdivision and allows them to be constructed in one construction contract. The project will also include water and sewer installation and park improvements to be funded by Augusta Utilities Department and Augusta Parks and Recreation Department in the total amout of $6,549,090.64. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales %Sales Tax, Phase IV 3,801,130$ CF Grading & Drainage , Phase IV 500,000$ CF Resurfacing, Phase IV 1,101,000$ Special 1% Sales Tax, Phase IV Recapture 56,642$ Augusta Utilities Department 1,600,000$ Augusta Recreation and Parks Department 87,000$ 7,145,772$ Section 3: The following amounts are appropriated for the project: By Basin By District Varies $7,145,772 Varies 7,145,772$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor CPB#324-041110-203824335 CAPITAL PROJECT BUDGET BELAIR HILLS IMPROVEMENT PROJECT CHANGE NUMBER FOUR DO NOT PROCESS THIS DOCUMENT. (once approved by the Commission Engineering will send the original document(s) for execution to the Clerk of Commission Office. For questions please contact Engineering at ext Attachment number 2 Page 1 of 2 Item # 4 Augusta-Richmond County, Georgia CPB#324-041110-203824335 CAPITAL PROJECT BUDGET BELAIR HILLS IMPROVEMENT PROJECT CHANGE NUMBER FOUR CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPECIAL 1% SALES TAX, PHASE I 324-04-1110/201824055 ($3,801,130) $0 ($3,801,130) CF GRADING & DRAINAGE PHASE IV 324-041110/201824021 ($500,000) $0 ($500,000) CF RESURFACING PHASE IV 324-04-1110/201824041 ($1,101,000)($1,101,000) Special 1% SALES TAX, PHASE IV RECPATURE 324-04-1110-6011110/207824999 ($56,642) ($56,642) AUGUSTA UTILITIES DEPARTMENT 507043420-5425210/80800020-5425210 ($1,600,000) ($1,600,000) AUGUSTA RECREATION AND PARKS DEPARTMENT 325-06-1110/206065006 ($87,000) ($87,000) TOTAL SOURCES: ($5,402,130) ($1,743,642) ($7,145,772) USE OF FUNDS ENGINEERING 324-04-1110-5212115/203824335 $273,755 $56,642 $330,397 RIGHT-OF-WAY 324-04-1110-5411120/203824335 $200,000 ($200,000)$0 ADVERTISING 324-04-1110-5233119/203824335 $1,000 $1,000 UTILITIES (RELOC) 324-04-1110-5414510/203824335 $100,000 ($100,000)$0 CONSTRUCTION 324-04-1110-5414110/203824335 $4,350,000 $1,687,000 $6,814,375 $200,000 $100,000 $477,375 CONTINGENCY 324-04-1110-6011110/203824335 $477,375 ($477,375) $0 TOTAL USES: $5,402,130 $1,743,642 $7,145,772 Attachment number 2 Page 2 of 2 Item # 4 (SA02 – For changes greater than $20,000) July 2008 AUGUSTA, GEORGIA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT PROJECT NUMBER: 324-04-203824335 SUPPLEMENTAL AGREEMENT NO.: 4 P.O.: 78600 WHEREAS, We, WR Toole Engineers, Inc. Consultant, entered into a contract with Augusta- Richmond County on April 15, 2003, for engineering design services associated with the Belair Hill Subdivision Improvements, Project No. 324-04-203824335, File Reference No. 06-014 (A), and WHEREAS, certain revisions to the design requested by Augusta, Georgia are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to- wit: Additional engineering services that required to include construction observation and field engineering. It is agreed that as a result of the above modification the contract amount is increased by $174,000.00 from $412,085.74 to a new total of $586,085.74 This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, WR Toole Engineers, Inc., Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This 18th day of July, 2008. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA, GEORGIA Deke Copenhaver, Administrator Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: DO NOT PROCESS THIS DOCUMENT. (once approved by the Commission Engineering will send the original document(s) for execution to the Clerk of Commission Office. For questions please contact Engineering at ext 5070. ) Attachment number 3 Page 1 of 1 Item # 4 Engineering Services Committee Meeting 8/11/2008 1:00 PM Cedar Grove Cemetery Burial Plot Records Department:Clerk of Commission Caption:A report from staff regarding the burial plot records at Cedar Grove Cemetery. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 5 Engineering Services Committee Meeting 8/11/2008 1:00 PM D'Antignac St Drainage Impvts - SA#2 Department:Abie L. Ladson, Director Engineering Caption:Approve Supplemental Agreement Number Two to Cranston Engineering Group, P.C. for additional Professional Design Services of the D’Antignac Street Drainage Improvements Project in the amount of $166,130.00 for the Engineering Department. Background:The D’Antignac Street Drainage Improvements project was approved by the Augusta-Richmond County Commission on March 28, 2007. D’Antignac Street has a low point in front of University Hospital which is drained through a series of pipes to the Third Level Canal below 8th Street. During periods of heavy rain, this area ponds and the rising water has put surrounding structures at risk. The City currently has a contract with Cranston Engineering Group, PC to provide a drainage study and a design to improve the area. The original study was to analyze the existing drainage system and provide design alternatives based on the required county standards and specifications, and most feasible cost. The study was completed in March of 2008, and it was determined that the original design plan to place an additional 60” pipe along D’antignac Street from 13th Street to Bennet Street would not provide necessary capacity to drain the problem area. Analysis:The drainage study has also recommended a different alignment that will require additional surveying, property research and base maps, geotechnical services, NPDES monitoring, preliminary design, final design, permitting, and field engineering/construction observation. The propose stormwater will discharge into the Third Level Canal. The additional is $166,130.00. Financial Impact: Funds are available in SPLOST PHASE V (325-04-1120) Cover Memo Item # 6 and as agreed upon in the Amended Intergovernmental Agreement for the D’Antignac Street Drainage Improvement project. Alternatives:1) Approve Supplemental Agreement Number Two to Cranston Engineering Group, P.C. for additional Professional Design Services of the D’Antignac Street Drainage Improvements Project in the amount of $166,130.00 for the Engineering Department. 2) Do not approve. Recommendation:Approve alternative one. Funds are Available in the Following Accounts: SPLOST PHASE V 325-04-1120 REVIEWED AND APPROVED BY: Finance. Administrator. Clerk of Commission Cover Memo Item # 6 Attachment number 1 Page 1 of 8 Item # 6 Attachment number 1 Page 2 of 8 Item # 6 Attachment number 1 Page 3 of 8 Item # 6 Attachment number 1 Page 4 of 8 Item # 6 Attachment number 1 Page 5 of 8 Item # 6 Attachment number 1 Page 6 of 8 Item # 6 Attachment number 1 Page 7 of 8 Item # 6 Attachment number 1 Page 8 of 8 Item # 6 Engineering Services Committee Meeting 8/11/2008 1:00 PM Georgia Power Company an Easement to serve Augusta Waste Management Plant Department:Attorney Caption:Motion to grant and convey to Georgia Power an easement for installation of an underground electrical distribution line through property owned by the City located on Highway U.S.1 for the Augusta Waste Management Plant for a nominal value of $10.00. Background:Georgia Power is requesting an option to acquire an underground easement for an electrical distribution line known as the Richmond County Landfill “(Richmond County) Distribution Line”, to service property owned by the City where the Waste Management Plant is located at 4330 Deans Bridge Road, Blythe, Georgia, 30805. The rights include the right to clear and keep clear all trees and other obstructions within 10 feet of the underground distribution pole line and the right to install and maintain anchors and guy wires as needed in the construction and maintenance of the distribution line. Analysis:See background. Financial Impact:N/A Alternatives:Decline the requested option. Recommendation:Grant the option to convey to Georgia Power the underground easement and authorize the Mayor or Mayor Pro Tem to sign and execute all necessary documents to close the transaction. Funds are Available in the Following N/A Cover Memo Item # 7 Accounts: REVIEWED AND APPROVED BY: Administrator. Clerk of Commission Cover Memo Item # 7 Attachment number 1 Page 1 of 3 Item # 7 Attachment number 1 Page 2 of 3 Item # 7 Attachment number 1 Page 3 of 3 Item # 7 Engineering Services Committee Meeting 8/11/2008 1:00 PM Georgia Power electrical distribution easement for Augusta Fire Department Training Tower Department:Attorney Caption:Motion to grant and convey to Georgia Power an easement for installation of an underground electrical distribution line through property owned by the City located on Highway U.S.1 for Augusta Fire Department Training Tower for a nominal value of $10.00. Background:Georgia Power is requesting an option to acquire an underground easement for an electrical distribution line known as the “Augusta Fire Department Training Tower (Richmond County)”, to service property owned by the City where the Augusta Fire Department Training Tower is located at 3125 Deans Bridge Road, Augusta, Georgia, 30909. The rights include the right to clear and keep clear all trees and other obstructions within 10 feet of the underground distribution line. Analysis:See background. Financial Impact:Georgia Power will cover the costs necessary for the construction of the underground distribution line. Alternatives:Decline the requested option. Recommendation:Grant the option to convey to Georgia Power the underground easement and authorize the Mayor or Mayor Pro Tem to sign and execute all necessary documents to close the transaction. Funds are Available in the Following Accounts: N/A Cover Memo Item # 8 REVIEWED AND APPROVED BY: Administrator. Clerk of Commission Cover Memo Item # 8 Attachment number 1 Page 1 of 3 Item # 8 Attachment number 1 Page 2 of 3 Item # 8 Attachment number 1 Page 3 of 3 Item # 8 Engineering Services Committee Meeting 8/11/2008 1:00 PM Marvin Griffin Road Appraiser Award Department:Engineering - Abie L. Ladson, P.E., Director Caption:Approve award of contract to Hardy Appraisal Services in the amount of $14,500.00 for preparing appraisals on the Marvin Griffin Road Project (CPB 323-041110-296823603), subject to receipt of a detailed work schedule and a signed contract to be funded from the project Right-of-Way account for the Engineering Department. Background:This project proposes to widen Marvin Griffin Road to four (4) lanes, two east bound and two west bound. Analysis:Bids were received on June 27, 2008 with Hardy Appraisal Services being the low bidder. Bid results are as follow: CONTRACTORS BID 1. Hardy Appraisal Services $14,500.00 2. Jack L. Minor Realty $24,700.00 3. Coldwell Banker Commercial $27,550.00 d/b/a Sherman & Hemstreet It is the Engineering Department recommendation to award this project to the low bidder, subject to receipt of the following items: 1. Detailed Work Schedule 2. Signed Contracts Financial Impact:Funds are available in the project Right of Way account 323- 041110-5411120/296823603-5411120 upon Commission approval. Alternatives:1) Approve award of Contract to Hardy Appraisal Services in the amount of $14,500.00 for preparing appraisals on the Marvin Griffin Road Project (CPB 323-041110-296823603), subject to receipt of a detailed work schedule and a signed contract to be funded from the project Right-of-Way account for the Engineering Department. 2) Do not approve and eliminate project. Cover Memo Item # 9 Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 323-041110-5411120/296823603-5411120 REVIEWED AND APPROVED BY: Finance. Administrator. Clerk of Commission Cover Memo Item # 9 Attachment number 1 Page 1 of 1 Item # 9 Attachment number 2 Page 1 of 2 Item # 9 Attachment number 2 Page 2 of 2 Item # 9 Engineering Services Committee Meeting 8/11/2008 1:00 PM Savannah Riverkeeper Department:Clerk of Commission Caption:Consider a request from Mr. Frank Carl of Savannah Riverkeeper to provide half of the Augusta Canal flow to the Savannah River for 12 hours immediately prior to the canoe and kayak race to be held on August 30, 2008. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 10 Attachment number 1 Page 1 of 2 Item # 10 Attachment number 1 Page 2 of 2 Item # 10 Engineering Services Committee Meeting 8/11/2008 1:00 PM Skinner Mill Road Beautification Department:Clerk of Commission Caption:Discuss/approve concept from G-DOT regarding beautification plan for Skinner Mill Road behind sound barriers with participation from local government, neighborhoods and G-DOT. (Requested by Commissioner Grantham) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 11 Engineering Services Committee Meeting 8/11/2008 1:00 PM TEE Center Architectural Contract Department:Clerk of Commission Caption:Motion to approve an architectural services contract with Thompson, Ventulett, Stainback and Associates, Inc. for the Augusta TEE Center. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Item # 12 Attachment number 1 Page 1 of 47 Item # 12 Attachment number 1 Page 2 of 47 Item # 12 Attachment number 1 Page 3 of 47 Item # 12 Attachment number 1 Page 4 of 47 Item # 12 Attachment number 1 Page 5 of 47 Item # 12 Attachment number 1 Page 6 of 47 Item # 12 Attachment number 1 Page 7 of 47 Item # 12 Attachment number 1 Page 8 of 47 Item # 12 Attachment number 1 Page 9 of 47 Item # 12 Attachment number 1 Page 10 of 47 Item # 12 Attachment number 1 Page 11 of 47 Item # 12 Attachment number 1 Page 12 of 47 Item # 12 Attachment number 1 Page 13 of 47 Item # 12 Attachment number 1 Page 14 of 47 Item # 12 Attachment number 1 Page 15 of 47 Item # 12 Attachment number 1 Page 16 of 47 Item # 12 Attachment number 1 Page 17 of 47 Item # 12 Attachment number 1 Page 18 of 47 Item # 12 Attachment number 1 Page 19 of 47 Item # 12 Attachment number 1 Page 20 of 47 Item # 12 Attachment number 1 Page 21 of 47 Item # 12 Attachment number 1 Page 22 of 47 Item # 12 Attachment number 1 Page 23 of 47 Item # 12 Attachment number 1 Page 24 of 47 Item # 12 Attachment number 1 Page 25 of 47 Item # 12 Attachment number 1 Page 26 of 47 Item # 12 Attachment number 1 Page 27 of 47 Item # 12 Attachment number 1 Page 28 of 47 Item # 12 Attachment number 1 Page 29 of 47 Item # 12 Attachment number 1 Page 30 of 47 Item # 12 Attachment number 1 Page 31 of 47 Item # 12 Attachment number 1 Page 32 of 47 Item # 12 Attachment number 1 Page 33 of 47 Item # 12 Attachment number 1 Page 34 of 47 Item # 12 Attachment number 1 Page 35 of 47 Item # 12 Attachment number 1 Page 36 of 47 Item # 12 Attachment number 1 Page 37 of 47 Item # 12 Attachment number 1 Page 38 of 47 Item # 12 Attachment number 1 Page 39 of 47 Item # 12 Attachment number 1 Page 40 of 47 Item # 12 Attachment number 1 Page 41 of 47 Item # 12 Attachment number 1 Page 42 of 47 Item # 12 Attachment number 1 Page 43 of 47 Item # 12 Attachment number 1 Page 44 of 47 Item # 12 Attachment number 1 Page 45 of 47 Item # 12 Attachment number 1 Page 46 of 47 Item # 12 Attachment number 1 Page 47 of 47 Item # 12 Engineering Services Committee Meeting 8/11/2008 1:00 PM Wrightsboro Rd Improvements Supplemental Agreement #7 Department:Abie L. Ladson, Director Caption:Authorize the Engineering Department to approve Supplemental Agreement Seven (7) with PBS & J in the amount of $68,358 to update the traffic counts and cover additional costs associated with the extended project schedule as part of the improvements to Wrightsboro Road from Jimmie Dyess Parkway to I-520, ARC# 323-04- 296823309. Funds will be transferred from the project Right of Way Account to the project Engineering Account. Background:This is a Georgia Department of Transportation (GDOT) project that will widen & reconstruct Wrightsboro Road from Jimmie Dyess Parkway to I-520. The Engineering Department is responsible for the development of the preliminary engineering activities and hired PBS & J to accomplish these activities. GDOT is funding the right of way acquisition ($8,906,000) and the construction ($16,100,000). Analysis:PBS & J entered into an agreement with Augusta-Richmond County on October 19, 1999 for engineering and design services on the Wrightsboro Road project. The original construction let date for this project was spring, 2001. The project has been delayed because of major alignment revisions; changes in federal and state laws concerning the environmental issues and erosion control; much longer than anticipated reviews of the environmental document by the state and federal resource agencies that are required to receive approval of the environmental document; and additional scope of work items from the Engineering Department which included the design of street lighting for the roadway corridor and the I-520 interchange. The Average Daily Traffic (ADT) information used to design this project was gathered in 1999. Because the above mentioned schedule delays have lengthened the project schedule, and to meet the Cover Memo Item # 13 GDOT guidelines, it is necessary to gather traffic count data that is more reflective of the year that construction should be completed (2012) and the 20 year design projection (2032). Financial Impact:PBS & J has proposed a cost of $68,358 to update the traffic data and to cover the additional costs associated with the extension of the project schedule. Alternatives:1) Authorize the Engineering Department to approve Supplemental Agreement Seven (7) with PBS & J in the amount of $68,358 to update the traffic counts and cover additional costs associated with the extended project schedule as part of the improvements to Wrightsboro Road from Jimmie Dyess Parkway to I-520, ARC# 323-04- 296823309. Funds will be transferred from the project Right of Way Account to the project Engineering Account. 2) Do not approve and risk delaying the construction and improvements on a major transportation corridor that is vital to the city. Recommendation:Approve alternative number one. Funds are Available in the Following Accounts: 323-041110-5411120 & 296823309-5411120 REVIEWED AND APPROVED BY: Finance. Administrator. Clerk of Commission Cover Memo Item # 13 Attachment number 1 Page 1 of 6 Item # 13 Attachment number 1 Page 2 of 6 Item # 13 Attachment number 1 Page 3 of 6 Item # 13 Attachment number 1 Page 4 of 6 Item # 13 Attachment number 1 Page 5 of 6 Item # 13 Attachment number 1 Page 6 of 6 Item # 13 Engineering Services Committee Meeting 8/11/2008 1:00 PM Wrightsboro Road Widening, Phase I Re-bid Department:Abie L. Ladson, Director Caption:Motion to authorize the Engineering Department to cancel the existing contract with US Infrastructure, Inc. for design services associated with Phase I of the Wrightsboro Road Widening Project and advertise a Requests For Proposals for Engineering Services to complete the design of this project. Background: Phase I of the Wrightsboro Road Widening Project was part of SPLOST Phase IV and called for traffic operational improvements along Wrightsboro Road between Augusta West Parkway and Marks Church Road. Original contract was awarded to US Infrastructure in 2002 to develop the concept report and perform design services. The concept report was completed in 2003 but, design work was never completed. Moreover, due to staff turnover, US Infrastructure no longer maintains the staff nor the expertise to complete the original contract. Therefore, the Engineering Department is requesting authorization to cancel the existing contract with US Infrastructure and advertise a request for proposals to update the original concept report and provide design services for recommended improvements. Analysis:The area covered by this project is adjacent to Augusta Mall, which has undergone expansion since the original concept report. Therefore, recommendations in the original concept report will need to be updated to reflect current conditions. Moreover, Phase II of the Wrightsboro Road widening project, which proposes widening between Augusta West Parkway and Jimmy Dyess Parkway is currently in ROW purchase and should be let within the next year. The completion of Phase II could have a significant impact on signal coordination and communications along the corridor. Financial Impact:No funding is required at this time. Cover Memo Item # 14 Alternatives:Motion to authorize the Engineering Department to cancel the existing contract with US Infrastructure, Inc. for design services associated with Phase I of the Wrightsboro Road Widening Project and advertise a Requests For Proposals for Engineering Services to complete the design of this project. 2) Do not approve. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: No funding required. REVIEWED AND APPROVED BY: Finance. Administrator. Clerk of Commission Cover Memo Item # 14