HomeMy WebLinkAbout2008-05-12-Meeting Agenda
Engineering Services Committee
Meeting
Committee Room- 5/12/2008- 11:35 AM
ENGINEERING SERVICES
1. Approve AUD's use of 2004 Engineering RFQ for New
Projects.
Attachments
2. Approve Change Order #1 to the existing construction
contract with Oscar Renda Contracting to modify the
pavement repair method for New Savannah Road.
Attachments
3. Approve Change Order #2 to the existing construction
contract with Oscar Renda Contracting to provide for
changes to original construction requirements as listed in
the attached change order #2 documentation
Attachments
4. Approve Change Order #3 to the existing construction
contract with W.L. Hailey and Company, Inc. to
construct the Rae’s Creek Sanitary Sewer Improvements
Project.
Attachments
5. Approve concept of a Cost Sharing Agreement between
Automatic Data Processing (ADP) and AUD to share
50% of the construction cost for a sewer line to serve
ADP and surrounding properties on Interstate Parkway.
Attachments
6. Approve final Deductive Change Order for Eagle Utility
Contracting in the amount of ($43,782.60) for the Upper
Butler Creek Sanitary Sewer, Project #50128.
Attachments
7. Motion to approve and accept the AGL Option and Deed
for an easement on AUD Project 10158.
Attachments
8. Motion to approve and accept the Atlanta Gas Light Attachments
Encroachment Agreement for AUD Project 60107.
9. Authorize the Cultural Resources Management services
related to the Archeological Site 9R1158 (aka The Pig
Pen Site) with R. S. Webb & Associates in the amount of
$90,142.00.
Attachments
10. Approve a Memo of Understanding designating the
Augusta Convention and Visitors Bureau as the managing
entity of the wayfinding sign system.
Attachments
11. Approve request to award bid for Ashley Drive Storm
Water Pipe Replacement to low bidder, Beam's
Contracting, in the amount of $104,075.
Attachments
12. Approve Change Order #1 to DS Utilities Company Inc.
to make final quantity adjustments (deductions and
overruns) in accordance with the terms of the unit price
contract as well as add two new unit price line items to
the contract.
Attachments
13. Consider a request from the Brigadier General E. Porter
Alexander Camp #158, Sons of Confederate Veterans, for
permission to perform restoration work on the
Confederate Powder Works Chimney located at Sibley
Mill on Goodrich Street.
Attachments
14. Approve award of Construction Contract to CBH
Construction in the amount of $61,079.00 for the Storm
Pipe Replacement at Good News Baptist Church
(CPB#322-041110-206822001), subject to receipt of
signed contracts and proper bonds. Also approve Change
Number One in the amount of $10,000 to be funded from
One Percent Sales Tax, Phase II Recapture as requested
by the Engineering Department.
Attachments
15. Discuss building location for Juvenile Court.
Attachments
16. Motion to authorize condemnation of a portion of a
property owned by Darnell Warren as Administrator for
Attachments
www.augustaga.gov
the Estate of Mattie of Mattie L. Warren; 9948 square
feet of permanent easement and 9341 square feet of
temporary construction easement, PIN: 099-0-070-00-0,
property address: 2417 Doug Barnard Parkway.
17. Motion to authorize condemnation of a portion of a
property owned by Sheila Ann Mitchell; 1,618 square
feet of permanent access, utility and maintenance
easement and 2,015 square feet of temporary construction
easement. PIN: 132-0-447-00-0, property address: 3490
Monte Carlo Drive.
Attachments
18. Approve the purchase of a KIP 5202 Large Document
Color Scanner/Copier/Printer System and Accessories in
the amount of $35,078.75.
Attachments
19. Ratify Change Order 2 to Daily Rate Construction
Program for Emergency Line Replacement on New
Savannah Rd. for $205,000.00.
Attachments
20. Ratify Emergency Bid to replace Eisenhower Hospital
14” Water Line.
Attachments
21. Approve proposal for the professional services in the
amount of $86,500 to ZEL Engineering for the plan of
study for the Rock Creek basin.
Attachments
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Approve AUD's use of 2004 Engineering RFQ for New Projects
Department:Utilities
Caption:Approve AUD's use of 2004 Engineering RFQ for New
Projects.
Background:In 2004, AUD issued an RFQ for engineering services.
Engineers were selected for projects based on those
responses. AUD would like to continue to use that list for
engineering requirements on Fort Gordon.
Analysis:AUD would like to continue to use the 2004 RFQ list.
Financial Impact:None
Alternatives:Advertise another RFQ for engineering services.
Recommendation:We recommend using the 2004 list.
Funds are
Available in the
Following
Accounts:
None.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 1
Attachment number 1
Page 1 of 1
Item # 1
Attachment number 2
Page 1 of 1
Item # 1
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Approve Change Order #1 to the existing construction contract with Oscar Renda Contracting to
modify the pavement repair method for New Savannah Road.
Department:Utilities
Caption:Approve Change Order #1 to the existing construction
contract with Oscar Renda Contracting to modify the
pavement repair method for New Savannah Road.
Background:Main Interceptor Upgrade Replacement Phase I is a
previously authorized project consisting of a gravity type
sewer pipe installed under , and continuing along Doug
Barnard Parkway to . In addition to the new sewer pipe, a
new water main was installed along a portion of ahead of this
sewer project. The pavement repair method included in the
sewer contract would have been sufficient had the Utilities
Department only installed the sewer line. Due to the width of
the Right of Way on New Savannah Road there were no
options except to install the new water main in the road
alongside the new sewer line. The additional trench width
necessitated a change in the pavement repair detail for and an
update to the bid schedule.
Analysis:Approving this change order will allow the Contractor to
proceed with the repair of New Savannah Road in a timely
manner.
Financial Impact:Funds for this authorization can be charged to the 2004
Series Capital Improvement Program: $187,430.00 funded
by account number: 511043420-5425210/801601115-
5425210
Alternatives:No recommended alternatives.
Recommendation:We recommend the Commission approve Change Order #1
to the existing contract with Oscar Renda Contracting in the
Cover Memo
Item # 2
amount of $187,430.00.
Funds are
Available in the
Following
Accounts:
$187,430.00 from 511043420-5425210/80160115-5425210
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 2
CONSTRUCTION CONTRACT CHANGE ORDER
CO NUMBER 1
BID ITEM 06-171
DATE 03/14/2008
PROJECT TITLE Main Interceptor Upgrade Replacement Phase I
ORIGINAL CONTRACT DATE 01/02/2007 PROJECT NUMBER 60115
OWNER AUGUSTA, GEORGIA PO NUMBER P131205
The following change is hereby made to the contract for the above project:
Description of Change (for a more detailed description see attached proposal):
This is an add type change order intended to adjust the bid amount quantities to the actual quantities utilized
for this project.
PAYEE Oscar Renda Contracting, Inc.
TOTAL AMOUNT OF THIS CHANGE ORDER $ 187,430.00
The contract time will be effected by 60 calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT $ 15,619,620.00
PREVIOUS CHANGE ORDER (INCREASE) $ 0.00
THIS CHANGE ORDER (INCREASE) $ 187,430.00
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 15,807,050.00
FUNDING NUMBER/ACCOUNT NUMBER 511043420 5425210
80160115 5425210
DATE:
PROPOSED BY:
CONTRACTOR
DATE:
REQUESTED BY:
ENGINEER
DATE:
SUBMITTED BY:
DEPARTMENT HEAD
DATE:
FINANCE ENDORSEMENT:
COMPTROLLER
DATE:
RECOMMENDED BY:
ADMINISTRATOR
DATE:
APPROVED BY:
MAYOR
Attachment number 1
Page 1 of 1
Item # 2
522 Benson Lane ~ Roanoke, Texas 76262 ~ 817.491.2703 ~ FAX 817.491.4483
www.oscarrendacontracting.com
March 4, 2008
Mr. Reiny Dahlke, Construction Manager
CH2M Hill
360 Bay St., Suite 100
Augusta, GA 30901
Re: Main Interceptor Upgrade Replacement, Phase 1
Project 60115 – Request for Change #7
Mr. Dahlke,
Pursuant to revised sheets C-28 rev 1, dated February-2008, below are the cost impacts associated with this revision.
The revised detail calls for full width road restoration, in lieu of the trench restoration called for in the plans. The
pricing below takes into account the GABC that has been installed in conjunction with the 63” sewer main, and the
water main which will remain in place. The pricing does include new GABC for the portion of existing roadway that
will have to be removed.
2.5” HMAC Binder Type “B” 10080 SY $ 12.75 $128,520.00
New GABC 3780 SY $ 13.00 $ 49,140.00
Establish Grade on Existing Base 6300 SY $ 3.00 $ 18,900.00
Haul-off excess material 137 LDs $ 110.00 $ 15,070.00
Survey 1 LS $ 6,000.00 $ 6,000.00
Traffic Control 1 LS $ 4,000.00 $ 4,000.00
ORC OH&P @ 10% $ 22,163.00
Bond @ 1% $ 2,437.00
SUB-TOTAL $246,230.00
Credit for HMAC in Bid item P-2 that was not used (4200 SY) ($ 58,800.00)
TOTAL $187,430.00
Please provide the appropriate change order paperwork for execution. Should you have any questions, please feel free
to contact me.
Sincerely,
Dennis Bailey
Regional Project Manager
Oscar Renda Contracting, Inc.
cc: Frank Renda, File
Attachment number 2
Page 1 of 1
Item # 2
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Approve Change Order #2 to the existing construction contract with Oscar Renda Contracting to
provide for changes to original construction requirements as listed in the attached change order
#2 documentation
Department:Utilities
Caption:Approve Change Order #2 to the existing construction
contract with Oscar Renda Contracting to provide for
changes to original construction requirements as listed in the
attached change order #2 documentation
Background:Main Interceptor Upgrade Replacement Phase I is a
previously authorized project consisting of a gravity type
sewer pipe installed under , and continuing along Doug
Barnard Parkway to . Additional construction requirements
unforeseen in the original contract scope of work
necessitated these change requests.
Analysis:Approving this change order will allow the Contractor to
proceed with the installation of the main interceptor sewer in
a timely manner.
Financial Impact:Funds for this authorization can be charged to the 2004
Series Capital Improvement Program: $245,358.00 funded
by account number: 511043420-5425210/801601115-
5425210. This change order represents 1.57% of the total
contract amount of $15,619,620.00
Alternatives:No recommended alternatives.
Recommendation:We recommend the Commission approve Change Order #2
to the existing contract with Oscar Renda Contracting in the
amount of $245,358.00.
Funds are
Available in the
Cover Memo
Item # 3
Following
Accounts:$245,358.00 from 511043420-5425210/80160115-5425210
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 3
Attachment number 1
Page 1 of 12
Item # 3
Attachment number 1
Page 2 of 12
Item # 3
Attachment number 1
Page 3 of 12
Item # 3
Attachment number 1
Page 4 of 12
Item # 3
Attachment number 1
Page 5 of 12
Item # 3
Attachment number 1
Page 6 of 12
Item # 3
Attachment number 1
Page 7 of 12
Item # 3
Attachment number 1
Page 8 of 12
Item # 3
Attachment number 1
Page 9 of 12
Item # 3
Attachment number 1
Page 10 of 12
Item # 3
Attachment number 1
Page 11 of 12
Item # 3
Attachment number 1
Page 12 of 12
Item # 3
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Approve Change Order #3 to the existing construction contract with W.L. Hailey and Company,
Inc. to construct the Rae’s Creek Sanitary Sewer Improvements Project.
Department:Utilities
Caption:Approve Change Order #3 to the existing construction
contract with W.L. Hailey and Company, Inc. to construct
the Rae’s Creek Sanitary Sewer Improvements Project.
Background:W.L. Hailey is currently working on the Rae’s Creek Trunk
Sewer Improvements Project for the Augusta Utilities
Department. While installing the new sewer line in the
contractor exposed a storm sewer that was identified in the
contract documents. Per the contract documents they
removed a section of the storm sewer pipe, installed the new
sewer pipe, and reinstalled a temporary crossing that would
be replaced later with a permanent section. At the time the
storm sewer line was exposed it was noted that the pipe was
in very poor condition and the soil surrounding the pipe was
not adequate for backfill in the pipe zone with evidence of
storm water leakage along the pipe. Blockages were also
identified in the storm sewer line and Augusta Streets and
Drains was contacted. Streets and Drains responded and
removed what they could on such short notice with intentions
of coming back to finish removing the blockages. That
evening we received in excess of an inch of rain. The storm
sewer failed into the open sewer trench due to the blockages
in the pipe. This event caused us to close to through traffic
until repairs could be made. The contractor spent an entire
day cleaning out the new sewer line that was filled with silt
during event. In order to alleviate the problem in the future as
well as getting the road opened back up to traffic the Utilities
Department requested the contractor install new 30-inch
storm pipe and manhole.
Analysis:Approving this change order will allow the Utilities
Department to pay W.L. Hailey for work not covered under
the original contract. In order to avoid excessive delay costs
Cover Memo
Item # 4
associated with contractor downtime the Utilities Department
authorized the contractor to proceed with the storm sewer
replacement. This change order amounts to 1.15% of the total
value of the contract.
Financial Impact:$28,971.95 from the Renewal and Extension Fund and
account number 507043420-5425210/ 80260112-5425210.
Alternatives:None.
Recommendation:We recommend the Commission approve change order #3 to
the existing contract with W.L. Hailey and Company, Inc. in
the amount of $28,971.95.
Funds are
Available in the
Following
Accounts:
$28,971.95 from 507043420-5425210/ 80260112-5425210
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 4
Attachment number 1
Page 1 of 3
Item # 4
Attachment number 1
Page 2 of 3
Item # 4
Attachment number 1
Page 3 of 3
Item # 4
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Approve Cost Sharing Concept with ADP
Department:Utilities
Caption:Approve concept of a Cost Sharing Agreement between
Automatic Data Processing (ADP) and AUD to share 50% of
the construction cost for a sewer line to serve ADP and
surrounding properties on Interstate Parkway.
Background:In Winter 2008, ADP announced plans to expand business
operations in Augusta. At the time, Augusta Utilities
Department (AUD) met with ADP and determined that a
sanitary sewer was in place that would allow service to their
site. Subsequently, ADP and AUD determined that the sewer
would have to be extended to reach ADP’s property.
Therefore, ADP and AUD met and determined that based on
their design, the sewer would have to be extended
approximately 750 feet to ADP’s property. AUD and ADP
determined that a 50% cost-share was appropriate based on
previous cost-sharing agreements and number of property
owners involved. ADP will receive sealed bids for the work.
Analysis:This agreement is a for a 50% cost-share of fees to extend the
sewer along Interstate Parkway to ADP’s site. The
preconstruction estimate is approximately $125,000.00.
Financial Impact:Approximately $62,500.00
Alternatives:None Given.
Recommendation:We recommend approving the Concept of a Cost Sharing
Agreement between Automatic Data Processing (ADP) and
AUD to share 50% of the construction cost for a sewer line
to serve ADP and surrounding properties on Interstate
Parkway.
Cover Memo
Item # 5
Funds are
Available in the
Following
Accounts:
None at Present Time
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 5
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Approve final deductive change order to Upper Butler Creek Sanitary Sewer Extension
Department:Utilities
Caption:Approve final Deductive Change Order for Eagle Utility
Contracting in the amount of ($43,782.60) for the Upper
Butler Creek Sanitary Sewer, Project #50128.
Background:Eagle Utility Contracting was awarded a contract to extend
the sanitary sewer for the Upper Butler Basin in March 06.
The project included the installation of approximately 14,000
L.F. of sanitary sewer and associated components. Eagle
Utility Contracting has met all contract requirements by
successfully installing, testing and performing surface
restoration associated with this project.
Analysis:Revise contract/project to state the final quantities and final
contract amount have been adjusted to match the final
installed quantities and amount.
Financial Impact:Deductive amount of ($43,782.60) to the 2002 Bond Issue,
under account number 507-04-3420-54-25210/80250128-54-
25210.
Alternatives:None
Recommendation:Recommend approving the final deductive change order for
Eagle Utility Contracting, as a deduction of ($43,782.60) in
association with the Upper Butler Creek Sanitary Sewer,
Project #50128.
Funds are
Available in the
Following
Accounts:
Cover Memo
Item # 6
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 6
Item Description Qty Unit Price Scheduled Value Final Qty. Final Value Difference
(Change
S-5C 12” diameter PVC sanitary sewer pipe
SDR 35, Depth 12’ to 14’, including
Type II (No. 67 stone) bedding material
1612 LF $44.00 $70,928.00 3,478.00 $153,032.00 -$82,104.00
S-6C 12” diameter PVC sanitary sewer pipe SDR 35, Depth 14’ to 16’, including
Type II (No. 67 stone) bedding material
800 LF $46.00 $36,800.00 445.00 $20,470.00 $16,330.00
S-7C 12” diameter PVC sanitary sewer pipe
SDR 35, Depth 16’ to 18’, including
Type II (No. 67 stone) bedding material
1297 LF $48.00 $62,256.00 345.00 $16,560.00 $45,696.00
S-8C 12” diameter PVC sanitary sewer pipe
SDR 26, Depth 18’ to 20’, including
Type II (No. 67 stone) bedding material
350 LF $56.00 $19,600.00 400.00 $22,400.00 -$2,800.00
12” diameter PVC sanitary sewer pipe
SDR 26, Depth 20’ to 22’, including Type II (No. 67 stone) bedding material
684 LF $60.00 $41,040.00 150.00 $9,000.00 $32,040.00
S-16C 18” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 18’ to
20’, including Type II (No. 67 stone)
bedding material
243 LF $75.00 $18,225.00 300.00 $22,500.00 -$4,275.00
S-20A Pre-cast sanitary manhole, GA DOT
STD 1011A, Type 1, Depth 0’ to 6’
(48” Diameter)
15 EA $1,750.00 $26,250.00 16.00 $28,000.00 -$1,750.00
S-21A Additional sanitary manhole depth,
Type 1, Depth Class 1 (48” Dia.)
2 VF $175.00 $350.00 - $0.00 $350.00
S-22A Additional sanitary manhole depth,
Type 1, Depth Class 2 (48” Dia.)
115 VF $175.00 $20,125.00 144.60 $25,305.00 -$5,180.00
S-22G Additional sanitary manhole depth,
Type 1, Depth Class3 (48” Dia.)
15 VF $175.00 $2,625.00 $0.00 $0.00
2900 LF $16.45 $47,705.00 2,900.00 $47,705.00 $0.00
1 EA $1,850.00 1850 1.00 1850 0
1 EA $2,200.00 $2,200.00 $0.00
1 EA $12,500.00 $12,500.00 1.00 $12,500.00 $0.00
Install Tracom metering manhole 1 EA $6,550.00 $6,550.00 1.00 $6,550.00 $0.00
S-33 Tie new sanitary sewer to existing
manholes, diameter varies
1 EA $5,500.00 $5,500.00 2.00 $11,000.00 -$5,500.00
$374,504.00 $376,872.00 -$2,368.00
-$9,561.00
-$9,561.00
M-9 Class A Concrete 10 CY $75.00 $750.00 - $0.00 $750.00
M-2 Rock excavation 100 CY $25.00 $2,500.00 - $0.00 $2,500.00
M-3 Foundation backfill, GA DOT Type II,
for additional unclassified excavation
1000 CY $3.50 $3,500.00 578.00
$2,023.00
$1,477.00
M-4 Clearing and Grubbing 6.9 ACRE $6,000.00 $41,400.00 6.90
$41,400.00
$0.00
$48,150.00 $43,423.00 $4,727.00
LS-1 Lump sum construction (includes but
is not limited to the listing continued
below)
1 LS $62,500.00 $62,500.00 1.00 $62,500.00 $0.00
$485,154.00
LUMP SUM
Unit
SANITARY SEWER
MISCELLANEOUS
Attachment number 1
Page 1 of 1
Item # 6
Item Description Qty Unit Price Scheduled Value Final Qty. Final Value Difference
(Change
S-1C 12” diameter PVC sanitary sewer pipe
SDR 35, Depth 0’ to 6’, including Type
II (No. 67 stone) bedding material
130 LF $39.54 $5,140.20 765.00 $30,248.10 -$25,107.90
S-1G 24” diameter PVC sanitary sewer pipe
SDR 26, Depth 0’ to 6’, including Type
II (No. 67 stone) bedding material
370 LF $79.00 $29,230.00 261.00 $20,619.00 $8,611.00
S-2C 12” diameter PVC sanitary sewer pipe SDR 35, Depth 6’ to 8’, including Type
II (No. 67 stone) bedding material
1470 LF $39.00 $57,330.00 1,435.00 $55,965.00 $55,895.00
S-2E 18” diameter PVC sanitary sewer pipe
SDR 26, Depth 6’ to 8’, including Type
II (No. 67 stone) bedding material
440 LF $62.50 $27,500.00 761.00 $47,562.50 -$20,062.50
S-2G 24” diameter PVC sanitary sewer pipe SDR 26, Depth 6’ to 8’, including Type
II (No. 67 stone) bedding material
240 LF $81.00 $19,440.00 821.00 $66,501.00 -$47,061.00
S-3C 12” diameter PVC sanitary sewer pipe
SDR 35, Depth 8’ to 10’, including
Type II (No. 67 stone) bedding material
1900 LF $41.75 $79,325.00 1,342.00 $56,028.50 $23,296.50
S-3E 18” diameter PVC sanitary sewer pipe
SDR 26, Depth 8’ to 10’, including
Type II (No. 67 stone) bedding material
2010 LF $62.50 $125,625.00 1,839.00 $114,937.50 $10,687.50
S-3G 24” diameter PVC sanitary sewer pipe
SDR 26, Depth 8’ to 10’, including
Type II (No. 67 stone) bedding material
1759 LF $81.00 $142,479.00 1,491.00 $120,771.00 $21,708.00
S-4C 12” diameter PVC sanitary sewer pipe
SDR 35, Depth 10’ to 12’, including
Type II (No. 67 stone) bedding material
570 LF $44.00 $25,080.00 620.00 $27,280.00 -$2,200.00
S-4E 18” diameter PVC sanitary sewer pipe
SDR 26, Depth 10’ to 12’, including Type II (No. 67 stone) bedding material
550 LF $66.50 $36,575.00 422.00 $28,063.00 $8,512.00
S-4G 24” diameter PVC sanitary sewer pipe
SDR 26, Depth 10’ to 12’, including
Type II (No. 67 stone) bedding material
838 LF $88.00 $73,744.00 609.00 $53,592.00 $20,152.00
S-5C 12” diameter PVC sanitary sewer pipe SDR 35, Depth 12’ to 14’, including
Type II (No. 67 stone) bedding material
360 LF $44.00 $15,840.00 240.00 $10,560.00 $5,280.00
S-5E 18” diameter PVC sanitary sewer pipe
SDR 26, Depth 12’ to 14’, including
Type II (No. 67 stone) bedding material
60 LF $66.50 $3,990.00 40.00 $2,660.00 $1,330.00
S-5G 24” diameter PVC sanitary sewer pipe SDR 26, Depth 12’ to 14’, including
Type II (No. 67 stone) bedding material
377 LF $88.00 $33,176.00 442.00 $38,896.00 -$5,720.00
S-6C 12” diameter PVC sanitary sewer pipe
SDR 35, Depth 14’ to 16’, including
Type II (No. 67 stone) bedding material
310 LF $46.00 $14,260.00 375.00 $17,250.00 -$2,990.00
S-6G 24” diameter PVC sanitary sewer pipe
SDR 26, Depth 14’ to 16’, including
Type II (No. 67 stone) bedding material
270 LF $90.00 $24,300.00 119.00 $10,710.00 $13,590.00
S-7C 12” diameter PVC sanitary sewer pipe
SDR 35, Depth 16’ to 18’, including Type II (No. 67 stone) bedding material
130 LF $48.00 $6,240.00 100.00 $4,800.00 $1,440.00
S-7G 24” diameter PVC sanitary sewer pipe
SDR 26, Depth 16’ to 18’, including
Type II (No. 67 stone) bedding material
60 LF $92.00 $5,520.00 60.00 $5,520.00 $0.00
S-8G 24” diameter PVC sanitary sewer pipe
SDR 26, Depth 18’ to 20’, including Type II (No. 67 stone) bedding material
20 LF $97.00 $1,940.00 200.00 $19,400.00 -$17,460.00
S-9F 18” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 0’ to 6’,
including Type II (No. 67 stone)
bedding material
30 LF $84.00 $2,520.00 - $0.00 $0.00
S-9H 24” diameter ductile iron sanitary sewer pipe Class XXX, Depth 0’ to 6’,
including Type II (No. 67 stone)
bedding material
475 LF $107.00 $50,825.00 460.00 $49,220.00 $1,605.00
S-10H 24” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 6’ to 8’,
including Type II (No. 67 stone) bedding material
60 LF $107.00 $6,420.00 50.00 $5,350.00 $1,070.00
S-11F 18” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 8’ to 10’,
including Type II (No. 67 stone)
bedding material
426 LF $86.00 $36,636.00 408.00 $35,088.00 $1,548.00
S-11H 24” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 8’ to 10’,
including Type II (No. 67 stone) bedding material
282 LF $109.00 $30,738.00 333.00 $36,297.00 -$5,559.00
S-12F 18” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 10’ to
12’, including Type II (No. 67 stone)
bedding material
130 LF $88.00 $11,440.00 137.00 $12,056.00 -$616.00
S-12H 24” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 10’ to 12’, including Type II (No. 67 stone)
bedding material
153 LF $112.00 $17,136.00 130.00 $14,560.00 $2,576.00
S-13F 18” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 12’ to
14’, including Type II (No. 67 stone)
bedding material
170 LF $90.00 $15,300.00 170.00 $15,300.00 $0.00
S-13H 24” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 12’ to
14’, including Type II (No. 67 stone)
bedding material
93 LF $114.00 $10,602.00 90.00 $10,260.00 $342.00
S-14F 18” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 14’ to
16’, including Type II (No. 67 stone)
bedding material
30 LF $95.00 $2,850.00 50.00 $4,750.00 -$1,900.00
S-14H 24” diameter ductile iron sanitary sewer pipe Class XXX, Depth 14’ to
16’, including Type II (No. 67 stone)
bedding material
10 LF $121.50 $1,215.00 - $0.00 $0.00
S-15F 18” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 16’ to
18’, including Type II (No. 67 stone) bedding material
30 LF $97.00 $2,910.00 $0.00 $0.00
S-15H 24” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 16’ to
18’, including Type II (No. 67 stone)
bedding material
10 LF $126.00 $1,260.00 20.00 $2,520.00 -$1,260.00
Unit
SANITARY SEWER
Attachment number 2
Page 1 of 2
Item # 6
S-16F 18” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 18’ to
20’, including Type II (No. 67 stone)
bedding material
70 LF $96.00 $6,720.00 70.00 $6,720.00 $0.00
S-16F (MOD) 18” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 20’ plus,
including Type II (No. 67 stone)
bedding material
150 LF $101.00 $15,150.00 151.00 $15,251.00 -$101.00
S-16H (Mod) 20” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 20' plus,
including Type II (No. 67 stone) bedding material
420 LF $147.00 $61,740.00 412.00 $60,564.00 $1,176.00
S-16H 24” diameter ductile iron sanitary
sewer pipe Class XXX, Depth 18’ to
20’, including Type II (No. 67 stone)
bedding material
10 LF $136.00 $1,360.00 18.00 $2,448.00 -$1,088.00
S-18 Select backfill, GA DOT Type I, Class I
& II (Sand/Clay) – Measured by in-place volume.
12000 CY $3.50 $42,000.00 12,100.00 $42,350.00 -$350.00
S-20A Pre-cast sanitary manhole, GA DOT STD 1011A, Type 1, Depth 0’ to 6’
(48” Diameter)
48 EA $1,750.00 $84,000.00 48.00 $84,000.00 $0.00
S-21A Additional sanitary manhole depth,
Type 1, Depth Class 1 (48” Dia.)
26 VF $175.00 $4,550.00 5.00 $875.00 $3,675.00
S-22A Additional sanitary manhole depth,
Type 1, Depth Class 2 (48” Dia.)
390 VF $175.00 $68,250.00 322.60 $56,455.00 $11,795.00
S-22G Additional sanitary manhole depth,
Type 1, Depth Class3 (48” Dia.)
20 VF $175.00 $3,500.00 $0.00 $0.00
S-33 Tie new sanitary sewer to existing manholes, diameter varies 1 EA $5,500.00 $5,500.00 1.00 $5,500.00 $0.00
$1,209,356.20 $1,190,927.60 $18,428.60
$81,242.20
M-7 Arial Creek Crossing 1 EA $28,000.00 $28,000.00 1.00 $28,000.00 $0.00
M-9 Class A Concrete 300 CY $75.00 $22,500.00 12.00 $900.00 $21,600.00
M-2 Rock excavation 150 CY $25.00 $3,750.00 381.00 $9,525.00 -$5,775.00
M-3 Foundation backfill, GA DOT Type II,
for additional unclassified excavation
4000 CY $3.50 $14,000.00 3,900.00
$13,650.00
$350.00
M-4 Clearing and Grubbing 13.3 ACRE $6,000.00 $79,800.00 13.30
$79,800.00
$0.00
M-6 Anchor Collars for crossing 4 EA $1,850.00 $7,400.00 4.00 $7,400.00 $0.00
$155,450.00 $139,275.00 $16,175.00
LS-1 Lump sum construction (includes but
is not limited to the listing continued below)
1 LS $135,000.00 $135,000.00 1.00 $135,000.00 $0.00
$1,499,806.20 $1,465,202.60
C.O. #1 Soil Removal 1 EA 16429 $9,609.00 $6,820.00
LUMP SUM
MISCELLANEOUS
Attachment number 2
Page 2 of 2
Item # 6
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Atlanta Gas Light Easement Option and Deed for AUD Project 10158
Department:Augusta Utilities Department
Caption:Motion to approve and accept the AGL Option and Deed for
an easement on AUD Project 10158.
Background:The construction of AUD Project 10158, the Doug Barnard
Parkway Water Main, requires acquisition of an easement
from AGL.
Analysis:AGL owns the property in question and has agreed to sell
AUD an easement for the appraised value.
Financial Impact:$512.00
Alternatives:
Recommendation:Approve motion to approve and accept the AGL Option and
Deed for an easement on AUD Project 10158.
Funds are
Available in the
Following
Accounts:
G/L 510043410-5411120 J/L 80210158-5411120
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 7
Cover Memo
Item # 7
Attachment number 1
Page 1 of 6
Item # 7
Attachment number 1
Page 2 of 6
Item # 7
Attachment number 1
Page 3 of 6
Item # 7
Attachment number 1
Page 4 of 6
Item # 7
Attachment number 1
Page 5 of 6
Item # 7
Attachment number 1
Page 6 of 6
Item # 7
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Atlanta Gas Light Encroachment Agreement for AUD Project 60107
Department:Augusta Utilities Department
Caption:Motion to approve and accept the Atlanta Gas Light
Encroachment Agreement for AUD Project 60107.
Background:AUD will be crossing an existing AGL easement, during the
construction of AUD Project 60107.
Analysis:An encroachment agreement is needed, between AGL and
AUD, defining the rights and obligations of each party.
Financial Impact:None
Alternatives:
Recommendation:Approve the motion to approve and accept the Atlanta Gas
Light Encroachment Agreement for AUD Project 60107.
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 8
Attachment number 1
Page 1 of 5
Item # 8
Attachment number 1
Page 2 of 5
Item # 8
Attachment number 1
Page 3 of 5
Item # 8
Attachment number 1
Page 4 of 5
Item # 8
Attachment number 1
Page 5 of 5
Item # 8
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Augusta Canal FERC Licensing Process - SHPO Agreement
Department:Utilities
Caption:Authorize the Cultural Resources Management services
related to the Archeological Site 9R1158 (aka The Pig Pen
Site) with R. S. Webb & Associates in the amount of
$90,142.00.
Background:Augusta is in the process on having the Augusta Canal
licensed through the Federal Energy Regulatory Commission
(FERC). Recently, Augusta entered into an agreement with
FERC, Georgia State Historic Preservation Office, and the
South Carolina Historic Preservation Office which included
principles and procedures of treatment of historic properties.
The Augusta Canal is listed on the National Registrar as a
Historic Landmark District. The Augusta Canal FERC
License 11810 project area is within the Historic Landmark
District and the recent agreements with SHPO included
principles and procedures for treatment of historic properties.
One of these archeologically significant sites is partially
located within the Augusta Canal Historic Landmark District.
Archeological Site 9R1158 (aka The Pig Pen Site) is
recognized as being an important archeological site that was
occupied during prehistoric and historic times.
Analysis:Attached to the agenda item as backup is the agreement
between Augusta and R. S. Webb & Associates which
includes the scope of the services by task and the costs
associated with the work for the archeological recovery of
the site.
Financial Impact:Funds for the project requested to come from the 2002 Bond
Capital Improvements Program account number: 510043410-
5213119/80110250-5213119
Alternatives:No alternatives are recommended.
Cover Memo
Item # 9
Recommendation:We recommend the Commission authorize the execution of
the agreement between Augusta and R. S. Webb for Cultural
Resources Management Services for Archeological Site
9R1158 in the amount of $90,142.00.
Funds are
Available in the
Following
Accounts:
510043410-5213119/80110250-5213119
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 9
R.S. Webb & Associates
Cultural Resource Management Consultants
2800 Holly Springs Parkway, Suite 200 • P.O. Drawer 1319
Holly Springs, Georgia 30142
Phone: 770-345-0706 • Fax: 770-345-0707
February 11, 2008
Mr. Doug Mooneyhan
ENTRIX, Inc.
500 Glenlake Parkway, Suite 600
Atlanta, Georgia 30328
Subject:Proposal to Conduct Phase III Cultural Resources Management Services
Archeological Site 9RI158 (aka The Pig Pen Site)
Augusta Canal Industrial District
Augusta-Richmond County, Georgia
R.S. Webb & Associates No. 08-198-006p
Dear Mr. Mooneyhan:
BACKGROUND
R.S. Webb & Associates (RSWA) is pleased to present this proposal to ENTRIX, ZEL Engineers
(ZEL), and the City of Augusta-Richmond County (CITY) for Phase III cultural resources
management services related to the treatment of Archeological Site 9RI158 (aka The Pig Pen Site).
This site is recognized as being an important archeological site that was occupied during prehistoric
and historic times. The site is partially located within the Augusta Canal Industrial District in
Augusta, Georgia.
A review of ZEL’s most recent yard piping plan, indicates that approximately 31,663 square feet
(0.73 acre) of Site 9RI158 will be impacted by the excavation of two waterline corridors
(approximately 725 linear feet of pipe; two partially overlapping 60-foot wide corridors). Several
smaller utility lines will be installed as well, but only small portions of these (approximately 120
linear feet; 6-foot wide corridors) will be outside the larger 60-foot wide corridors. The primary goal
of the current project is to document portions of Site 9RI158 (through Phase III excavations) that will
be affected by waterline construction. Another goal is to provide the CITY with recommendations
for the management and/or preservation of the remaining portions of Site 9RI158.
Based on recent conversations with ZEL, we assume that the proposed Phase III archeological work
is a private undertaking on private property. Because of this, RSWA further assumes there is no
requirement for Section 106 consultation, and/or consultation with the Georgia Historic Preservation
Office, the National Park Service, or the Augusta Canal Authority. If a need for such consultation
arises, RSWA will need to re-evaluate the Scope-Of-Services described in this proposal and
determine if changes in the scope are required. If changes are necessary, the project budget and
schedule may require adjustment.
SCOPE OF SERVICES
Task 1 - Treatment Plan for Site 9RI158
Prior to initiating fieldwork, a treatment plan will be developed for Site 9RI158 and submitted to
ENTRIX and ZEL/CITY for review and approval. This plan will provide recommendations on how
Attachment number 1
Page 1 of 6
Item # 9
Proposal - Phase III Cultural Resources Management Services, Site 9RI158 (The Pig Pen Site) Page 2
February 11, 2008
the site will be managed before, during, and after excavations. The plan will address tree/debris/
surface vegetation removal, delineation of work areas, site security, and preservation of the
remainder of the site once excavations are completed.
Task 2 - Archeological Data Recovery Excavations
Site Preparation: It is understood that the CITY or its representatives will remove trees, debris and
surface vegetation from the impact area (and perhaps other clearing zones), per the treatment plan.
The limits of the impact area will be defined and marked with silt fencing; work areas will be
defined and marked within the impact area. If sediment/erosion control measures are required for
the overall undertaking, it is assumed that the CITY will provide the appropriate sediment/silt
fencing.
A transit-based grid will be set up within the impact area to facilitate the mapping of shovel tests,
excavation units, strip blocks, and archeological features, and to prepare a site-specific topographic
map (if one is not available). Once the grid is in place, shovel tests will be excavated at 5.0 m
(meter) intervals to determine the depths of plowzone/subplowzone deposits and artifact density/
diversity within the impact area. Each shovel test will be 50-centimeters (cm) square and be
excavated to sterile subsoil. Shovel test soils will be passed through 0.64 cm hardware cloth to
enhance the recovery of artifacts. Artifacts will be bagged by individual shovel test location and
information on soil color/textures and depths of deposits/artifacts will be recorded. Artifact density/
diversity and soil color/texture data will be used to develop artifact density maps and to determine
the locations of excavation units and mechanical strip blocks.
Unit Excavations at Site 9RI158: Based on shovel testing data, the equivalent of up to 25 square
meters will be excavated in one more areas were midden deposits are present beneath the plowzone.
This will be done to collect samples of artifacts and other anthropogenic materials (floral/faunal
remains) from prehistoric living zones/surfaces. Each unit excavation will be partitioned into 1.0
by 1.0 m lots, the plowzone removed in bulk, and the midden excavated in 10-cm arbitrary levels
unless natural stratigraphy offers finer resolution within a level. Soils from each level will be
described and recorded using USDA-SCS soils texture classes and Munsell soil color charts. Matrix
soils will be screened through 0.64-cm hardware cloth to enhance artifact recovery. Artifacts will
be bagged by provenience. Block profiles will be mapped and photo-documented. Excavation will
be terminated when undisturbed clay subsoil/substrate is encountered.
Mechanical Stripping: Depending on what is found during the shovel testing and unit excavations,
one or more blocks will mechanically stripped by a backhoe with a smooth bucket. The purpose of
stripping is to search for and expose features and patterns of features that document the various
occupations at 9RI158. Backhoe stripping will be monitored by the Principal Archeologist or the
Field Director. The blocks will be stripped down to midden deposits or to subsoil clay so that
midden deposits can be sampled and/or archeological features can be clearly defined. As soon as
features are observed they will be shovel-shaved and/or troweled, and marked with numbered pin
flags. Features will be treated as described below.
The cost of the backhoe and operator is included in the budget. The exact sizes/configurations of
the strip blocks are not known and will be determined by the spatial extent of midden deposits and/or
archeological features; however, the total amount of stripping is not expected to exceed the
equivalent of 10 by 70 m.
Attachment number 1
Page 2 of 6
Item # 9
Proposal - Phase III Cultural Resources Management Services, Site 9RI158 (The Pig Pen Site) Page 3
February 11, 2008
Treatment of Diagnostic Artifacts, Features and Samples: When detected during excavation or
stripping, prehistoric diagnostic artifacts will be piece-plotted and mapped before removal. Features
(e.g., posts, pits, hearths, artifact clusters, etc.) will be plotted on the site plan, individually mapped,
and photographed in plan view. Features will then be half-sectioned, drawn, photographed in profile
view, then the other half of the feature excavated. Depending on the volume, fill from excavated
features will be set aside for flotation, pollen analysis and/or fine screening. For large features, a 20-
liter flotation sample will be collected and the remainder screened through 0.64-cm hardware cloth.
Soils from small features such a post holes will set aside for flotation.
Radiometric dating samples will be collected (and piece-plotted) as available from prehistoric
features and secured buried contexts. Macrobotanical, pollen, and zooarcheological samples will
be collected from half-sectioned feature profiles. As considered necessary, samples will be taken
from midden deposits encountered during unit excavations and/or stripping.
Site Plan: A site plan will be drawn, showing stripped areas, archeological features, and surface
features (e.g., trees, roads, disturbances, etc.). If a detailed topographic base map of the site is not
available, then one will be prepared based on recorded surface elevations.
Task 3 - Data Analysis and Curation
Artifact and Data Treatment: Data analysis will include the processing and identification of artifacts,
tabulation of artifact data, transcription of field data to graphic media, special analyses (i.e.,
radiometric dating, faunal/floral analyses, etc.), artifact photography, and preparation of an updated
Georgia archeological site form. Artifacts will be identified using published typologies and
technological paradigms.
Sample Processing and Special Analyses: Flotation samples from midden deposits and/or features
will be volumetrically measured and processed at RSWA using a high-volume, water-flow system
with tap-water pressure for agitation. The floral and faunal remains will be sorted and bagged
appropriately for analysis.
Preservation of faunal remains appears to range from poor to good, based on work conducted in
other areas of 9RI158 in the 1980s; however, many of the faunal remains are historic. Most of the
prehistoric remains are small, burned and/or fragmentary. As detected, faunal remains will be
collected from the flotation samples and studied by the Project Zooarcheologist. Zooarcheological
materials will be analyzed to the extent possible based on size and state of preservation. At
minimum these remains will be counted, weighed and subjected to a general analysis (i.e., mammal,
bird, fish; long bone versus cranial; unmodified versus burned; etc.).
Previous work suggests poor to fair preservation of ethnobotanical remains. It appears likely that
plant remains will be comprised mostly of the more resistant elements such as nut shells and dense
pits/seeds. The heavy and light fraction materials from block samples and feature fill flotation
analyzed by the Project Paleobotanist along with other botanical remains collected.
Radiometric samples will be packaged and shipped to Beta Analytical for dating. Radiometric
samples will be selected based on their association with diagnostic artifact types, food remains,
structural remains, and other entities that are likely to assist in further definition of archeological
phase characteristics.
Attachment number 1
Page 3 of 6
Item # 9
Proposal - Phase III Cultural Resources Management Services, Site 9RI158 (The Pig Pen Site) Page 4
February 11, 2008
If promising samples for pollen analysis are recovered, pollen samples will be submitted to the UGA
Palynology Laboratory for quick-scan analysis. If these samples produce viable results, up to four
additional samples will be processed for pollen; otherwise, no additional pollen analysis will be
conducted.
Curation Arrangements: Artifacts and project documentation will be prepared for curation. For this
proposal RSWA assumes that 15 boxes (1.0 cubic feet/box) of project artifacts and documentation
will be produced by data recovery activities. Once the project is complete, the materials will be
shipped to ENTRIX or the CITY for permanent storage, to the Riverbend Research Laboratory
(RRL), University of Georgia, Athens, or to a facility selected by ENTRIX or the CITY. If the
materials are shipped to the RRL or other curation facility, then there will be an institutional curation
fee. The RRL charges $220/box. Curation fee are not included in RSWA’s project budget.
Task 4 - Reporting
Completion of Fieldwork Report: When fieldwork and basic data analysis is completed, a
“completion of fieldwork letter report” will be submitted to ENTRIX and ZEL/CITY for review.
The purpose of this report is to inform ZEL/CITY that the proposed fieldwork have been completed
and to satisfy the CITY that the fieldwork was conducted following the methods described under
Task 2. The completion report also provides notification that no further archeological work is
needed in the impact area and the CITY can proceed with waterline construction in this area. RSWA
will proceed with the preparation of the draft data recovery report
Data Recovery Reporting: Information collected and compiled during excavation and analysis will
be included in the data recovery report. The draft report will discuss methodology, appropriate
environmental and cultural contexts, results and interpretations. Copies of the draft report will be
forwarded to ENTRIX and ZEL/CITY for review. RSWA will respond to one set of review
comments from ENTRIX and ZEL/CITY. Upon receipt of review comments, RSWA address the
review comments and prepare a final report under this task.
Task 5 - Interpretive Display (Optional)
Depending on what is recovered during excavations at 9RI158, the CITY may determine that the
preparation of an interpretive display is appropriate. If determined appropriate, preparation of the
display would include securing a display case, preparing verbiage, and preparing the layout for the
display. The CITY would be responsible for securing/constructing the display case(s) and providing
a secure environment for the display case(s). The need for Task 5 will be determined after reporting
is complete.
Task 6 - Additional Services
RSWA personnel will provide additional services as authorized by ENTRIX or ZEL/CITY.
Additional Services typically include but are not limited to, off-site or out-of-office meetings (at your
request) to discuss project issues. At present, it is not possible to determine if Additional Services
will be required; therefore, no budget has been prepared. The costs of professional services and
expenses associated with this task will be determined if the need for such services arises.
Attachment number 1
Page 4 of 6
Item # 9
Proposal - Phase III Cultural Resources Management Services, Site 9RI158 (The Pig Pen Site) Page 5
February 11, 2008
COST
The not-to-exceed cost for completing the work described in Tasks 1 through 4 is $90,141. The
CITY will only be billed for work conducted. The budget outlined below includes the labor and
expenses required to complete Tasks 1 through 4. This cost estimate is valid until August 11, 2008.
The cost of artifact curation at a recognized facility is not in the budget. Likewise, the costs of
preparing an interpretive display (Task 5) and Additional Services (Task 6) are not included.
Project Budget
Task 1 - Preparation of Treatment Plan
Labor (14 hrs) $ 978
Expenses $ 65
Subtotal $ 1,043
Task 2 - Archeological Data Recovery Excavations
Labor (904 hrs) $ 34,291
Expenses $ 20,650
Subtotal $ 54,941
Task 3 - Data Analysis
Labor (420 hrs) $ 17,240
Expenses $ 2,800
Subtotal $ 20,040
Task 4 - Reporting
Labor (304 hrs) $ 13,168
Supplies/Copies $ 950
Subtotal $ 14,118
Total $ 90,142
SCHEDULE
Task 1 will begin within three working days after receipt of notice to proceed from ENTRIX/ZEL/
CITY. Task 2 will begin within five working days after the impact area has been cleared of trees,
debris, and surface vegetation. It is anticipated that Task 2 will be completed with approximately
30 working days; however, this schedule is contingent upon weather, soil conditions, and the number
of archeological features encountered. The completion of fieldwork report will be submitted to
ENTRIX/ZEL within 20 working days after completion of fieldwork. It is estimated that the full
draft report will be completed within 45 to 55 working days after completion of fieldwork. We will
address comments within 15 working days after receipt of review comments and submit the final
report. After approval of the final report, the artifacts and project documentation will be shipped to
the selected repository (e.g., the CITY or a selected curation facility).
DELIVERABLES
The deliverables for the project include:
• Communications with ENTRIX and ZEL/CITY throughout the project
• An estimated 15 boxes of project artifacts and documentation, shipped to the selected
curation facility (Task 3)
• Submission of a completion of fieldwork report (five copies) (Task 4)
• Submission of a data recovery report for Site 9RI158 (four draft copies; eight final
copies) (Task 4)
Attachment number 1
Page 5 of 6
Item # 9
Proposal - Phase III Cultural Resources Management Services, Site 9RI158 (The Pig Pen Site) Page 6
February 11, 2008
• Preparation of an interpretive display, if requested by you or your representative
(Task 5)
• Additional services by RSWA personnel, as requested by you or your representative
(Task 6)
PERSONNEL
Mr. Steve Webb will serve as the Principal Investigator for the data recovery project. Mr. Webb will
be assisted by supervisory and technical staff members as need to complete project tasks.
PAYMENT
You will be invoiced once a month during active periods of the project. Payment for services should
be made to R.S. Webb & Associates and is due within 30 days.
PROJECT AUTHORIZATION
If the terms of our proposal are acceptable, please sign in the space provided below and return a
completed original to us. If you wish begin the project immediately you may fax the executed
proposal to us at 770-345-0707, or e-mail it to Mr. Webb at rswebb@alltel.net.
CLOSING COMMENTS
Mr. Mooneyhan, we appreciate the opportunity to provide you with this proposal and look forward
to performing these cultural resources services for ENTRIX, ZEL Engineers, and the City of
Augusta-Richmond County. Please contact Mr. Steve Webb 770-345-0706 if you have any
questions concerning our proposal.
Sincerely,
R.S. WEBB & ASSOCIATES
Robert S. (Steve) Webb
President and Senior Principal Archeologist
ACCEPTED AND AGREED TO:
ENTITY (Print Name):
BY (Print Name):
AS ITS (Print Title):
SIGNATURE:
DATE:
Robert
S. Webb
Digitally signed by Robert S. Webb DN: cn=Robert S. Webb, o=R.S. Webb
Associates,
c=US
Date:
2008.02.11
13:50:13 -05'00'
Signature
Not
Verified
Attachment number 1
Page 6 of 6
Item # 9
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Augusta Convention and Visitors Bureau
Department:Clerk of Commission
Caption:Approve a Memo of Understanding designating the Augusta
Convention and Visitors Bureau as the managing entity of
the wayfinding sign system.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Cover Memo
Item # 10
Attachment number 1
Page 1 of 1
Item # 10
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Award bid for Ashley Drive Storm Water Pipe Replacement
Department:Public Services Department Maintenance Division
Caption:Approve request to award bid for Ashley Drive Storm Water
Pipe Replacement to low bidder, Beam's Contracting, in the
amount of $104,075.
Background:There were three companies that showed an interest in this
project, however two of the bidders were non-compliant.
Analysis:This 300 foot corrugated metal pipe has completely failed,
creating further sinkholes and potential safety hazards to
residents.
Financial Impact:Further delay in removing/replacing this pipe could result in
further damage to private property.
Alternatives:1. Approve request to award bid for Ashley Drive Storm
Water Pipe Replacement to low bidder, Beam's Contracting,
in the amount of $104,075. 2. Do not replace pipe, but
continue attempting to repair deteriorated pipe.
Recommendation:#1. Approve request to award bid for Ashley Drive Storm
Water Pipe Replacement to low bidder, Beam's Contracting,
in the amount of $104,075.
Funds are
Available in the
Following
Accounts:
Funds are available in in account #324-04-1110/201-82-
4021.
REVIEWED AND APPROVED BY:
Cover Memo
Item # 11
Finance.
Administrator.
Clerk of Commission
Cover Memo
Item # 11
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Change Order #1 for the 630 36” Water Main Phase I Project (10150)
Department:Utilities
Caption:Approve Change Order #1 to DS Utilities Company Inc. to
make final quantity adjustments (deductions and overruns) in
accordance with the terms of the unit price contract as well as
add two new unit price line items to the contract.
Background:After construction was completed there were line items that
were not utilized or fully billed and were removed from the
contract. There were also some line items that did exceed the
contract quantities but ultimately did not cause the project to
exceed the original budget. These items will serve to improve
the water systems and roadways in the area.
Analysis:Approving this change order will adjust the final contract
quantities to match the actual final quantities in accordance
with the provisions of the unit price contract.
Financial Impact:($365,322.93) credited to the 2000 Bond Issue, under
account number 511043410-5425110/ 80310150-5425110
Alternatives:Disapprove this change order and risk delays in contract
close out and potential claim from the Contractor.
Recommendation:Approve Change Order #1 in the deductive amount of
($365,322.93) to DS Utilities Company Inc. on the 630 36”
Water Main Phase I Project.
Funds are
Available in the
Following
Accounts:
Funds are available in the following accounts: 511043410-
5425110/ 80310150-5425110
Cover Memo
Item # 12
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 12
1
3
6
"
C
l
a
s
s
2
0
0
D
I
P
S
t
a
n
d
a
r
d
J
o
i
n
t
P
i
p
e
53
0
0
L
.
F
.
$
1
5
6
.
0
0
$
8
2
6
,
8
0
0
.
0
0
4
8
0
3
$
7
4
9
,
2
6
8
.
0
0
-
$
7
7
,
5
3
2
.
0
0
2
1
8
"
C
l
a
s
s
2
5
0
D
I
P
R
e
s
t
r
a
i
n
e
d
J
o
i
n
t
P
i
p
e
20
L
.
F
.
$
1
2
0
.
5
0
$
2
,
4
1
0
.
0
0
1
2
$
1
,
4
4
6
.
0
0
-
$
9
6
4
.
0
0
3
3
6
"
C
l
a
s
s
2
0
0
D
I
P
R
e
s
t
r
a
i
n
e
d
J
o
i
n
t
P
i
p
e
29
0
0
L
.
F
.
$
2
0
4
.
0
0
$
5
9
1
,
6
0
0
.
0
0
2
3
9
5
$
4
8
8
,
5
8
0
.
0
0
-
$
1
0
3
,
0
2
0
.
0
0
4
J
a
c
k
a
n
d
B
o
r
e
5
0
"
C
a
s
i
n
g
,
I
n
c
l
.
3
6
"
R
J
D
I
P
a
n
d
e
n
d
s
e
a
l
s
1
0
0
L
.
F
.
$8
6
0
.
0
0
$
8
6
,
0
0
0
.
0
0
1
0
0
$
8
6
,
0
0
0
.
0
0
$
0
.
0
0
5
S
e
l
e
c
t
B
a
c
k
f
i
l
l
-
S
a
n
d
/
C
l
a
y
10
0
0
0
C
.
Y
.
$
0
.
0
1
$
1
0
0
.
0
0
0
$
0
.
0
0
-
$
1
0
0
.
0
0
6
M
i
s
c
e
l
l
a
n
e
o
u
s
D
u
c
t
i
l
e
I
r
o
n
F
i
t
t
i
n
g
s
45
0
0
0
L
.
B
.
$
0
.
0
1
$
4
5
0
.
0
0
4
5
0
0
0
$
4
5
0
.
0
0
$
0
.
0
0
7
A
i
r
R
e
l
e
a
s
e
F
i
r
e
H
y
d
r
a
n
t
5
E
A
$
1
,
5
0
0
.
0
0
$
7
,
5
0
0
.
0
0
4
$
6
,
0
0
0
.
0
0
-
$
1
,
5
0
0
.
0
0
8
F
l
u
s
h
i
n
g
F
i
r
e
H
y
d
r
a
n
t
2
E
A
$
1
,
5
0
0
.
0
0
$
3
,
0
0
0
.
0
0
1
$
1
,
5
0
0
.
0
0
-
$
1
,
5
0
0
.
0
0
9
3
6
"
B
F
V
,
I
n
c
l
u
d
i
n
g
8
4
"
M
a
n
h
o
l
e
3
E
A
$
3
0
,
8
6
0
.
0
0
$
9
2
,
5
8
0
.
0
0
3
$
9
2
,
5
8
0
.
0
0
$
0
.
0
0
10
1
8
x
1
8
T
a
p
p
i
n
g
S
l
e
e
v
e
&
V
a
l
v
e
1
E
A
$
2
2
,
1
6
0
.
0
0
$
2
2
,
1
6
0
.
0
0
1
$
2
2
,
1
6
0
.
0
0
$
0
.
0
0
11
1
"
A
i
r
R
e
l
e
a
s
e
V
a
l
v
e
,
I
n
c
l
.
M
a
n
h
o
l
e
5
E
A
$
1
,
0
0
0
.
0
0
$
5
,
0
0
0
.
0
0
0
$
0
.
0
0
-
$
5
,
0
0
0
.
0
0
11
P
o
l
y
e
t
h
e
l
e
n
e
W
r
a
p
o
f
3
6
"
D
I
P
25
0
0
L
.
F
.
$
1
.
6
7
$
4
,
1
7
5
.
0
0
6
3
1
$
1
,
0
5
3
.
7
7
-
$
3
,
1
2
1
.
2
3
12
T
i
e
i
n
t
o
e
x
i
s
t
i
n
g
l
i
n
e
1
E
A
$
2
,
8
9
0
.
0
0
$
2
,
8
9
0
.
0
0
1
$
2
,
8
9
0
.
0
0
$
0
.
0
0
14
M
i
s
c
e
l
l
a
n
e
o
u
s
C
l
a
s
s
A
C
o
n
c
r
e
t
e
75
C
.
Y
.
$
7
5
.
0
0
$
5
,
6
2
5
.
0
0
0
$
0
.
0
0
-
$
5
,
6
2
5
.
0
0
15
A
s
b
e
s
t
o
s
C
e
m
e
n
t
o
r
C
a
s
t
I
r
o
n
W
a
t
e
r
M
a
i
n
C
r
o
s
s
i
n
g
s
2
E
A
$
9
,
4
0
0
.
0
0
$
1
8
,
8
0
0
.
0
0
0
$
0
.
0
0
-
$
1
8
,
8
0
0
.
0
0
16
C
l
a
y
P
i
p
e
S
e
w
e
r
C
r
o
s
s
i
n
g
s
2
E
A
$
1
,
2
8
5
.
0
0
$
2
,
5
7
0
.
0
0
0
$
0
.
0
0
-
$
2
,
5
7
0
.
0
0
17
As
p
h
a
l
t
O
v
e
r
l
a
y
,
T
y
p
e
F
,
1
.
5
"
T
h
i
c
k
15
8
0
0
S
Y
$
7
.
5
0
$
1
1
8
,
5
0
0
.
0
0
2
9
3
3
$
2
1
,
9
9
7
.
5
0
-
$
9
6
,
5
0
2
.
5
0
18
P
a
v
e
m
e
n
t
P
a
t
c
h
,
I
n
c
l
u
d
i
n
g
s
t
o
n
e
b
a
s
e
a
n
d
a
s
p
h
a
l
t
23
0
0
S
Y
$
4
5
.
5
0
$
1
0
4
,
6
5
0
.
0
0
2
1
2
0
$
9
6
,
4
6
0
.
0
0
-
$
8
,
1
9
0
.
0
0
19
A
s
p
h
a
l
t
L
e
v
e
l
i
n
g
10
0
T
N
$
9
3
.
1
0
$
9
,
3
1
0
.
0
0
0
$
0
.
0
0
-
$
9
,
3
1
0
.
0
0
13
Mi
l
l
i
n
g
0
"
-
1
.
5
"
32
0
0
S
Y
$
9
.
1
0
$
2
9
,
1
2
0
.
0
0
0
$
0
.
0
0
-
$
2
9
,
1
2
0
.
0
0
20
6"
T
h
i
c
k
C
o
n
c
r
e
t
e
D
r
i
v
e
w
a
y
,
3
0
0
0
P
S
I
M
i
x
50
S
Y
$
1
1
4
.
5
0
$
5
,
7
2
5
.
0
0
0
$
0
.
0
0
-
$
5
,
7
2
5
.
0
0
23
2"
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
R
e
p
l
a
c
e
m
e
n
t
,
I
n
c
l
u
d
i
n
g
6
"
S
t
o
n
e
B
a
s
e
11
5
0
S
Y
$
1
6
.
6
0
$
1
9
,
0
9
0
.
0
0
3
8
0
0
$
6
3
,
0
8
0
.
0
0
$
4
3
,
9
9
0
.
0
0
21
24
"
C
o
n
c
r
e
t
e
C
u
r
b
a
n
d
G
u
t
t
e
r
,
R
e
m
o
v
e
a
n
d
R
e
p
l
a
c
e
25
0
L
.
F
.
$
2
2
.
5
0
$
5
,
6
2
5
.
0
0
7
1
$
1
,
5
9
7
.
5
0
-
$
4
,
0
2
7
.
5
0
32
As
p
h
a
l
t
R
a
i
s
e
d
E
d
g
e
80
0
L
.
F
.
$
5
.
3
5
$
4
,
2
8
0
.
0
0
2
0
0
$
1
,
0
7
0
.
0
0
-
$
3
,
2
1
0
.
0
0
34
4"
A
g
g
r
e
g
r
a
t
e
B
a
s
e
C
o
u
r
s
e
,
6
'
W
i
d
e
(
A
S
U
)
16
7
5
S
Y
$
2
.
7
0
$
4
,
5
2
2
.
5
0
0
$
0
.
0
0
-
$
4
,
5
2
2
.
5
0
22
1.5
"
A
s
p
h
a
l
t
P
a
t
h
,
6
'
W
i
d
e
(
A
S
U
)
16
7
5
S
Y
$
1
1
.
8
0
$
1
9
,
7
6
5
.
0
0
1
4
8
6
$
1
7
,
5
3
4
.
8
0
-
$
2
,
2
3
0
.
2
0
Un
i
t
Un
i
t
P
r
i
c
e
Or
i
g
i
n
a
l
S
c
h
e
d
u
l
e
d
V
a
l
u
e
Fi
n
a
l
Q
t
y
Fi
n
a
l
V
a
l
u
e
Au
g
u
s
t
a
U
t
i
l
i
t
i
e
s
D
e
p
a
r
t
m
e
n
t
63
0
3
6
"
W
a
t
e
r
M
a
i
n
E
x
t
e
n
s
i
o
n
P
r
o
j
e
c
t
(
1
0
1
5
0
)
Ch
a
n
g
e
O
r
d
e
r
N
o
.
1
(
F
i
n
a
l
)
S
u
m
m
a
r
y
Dif
f
e
r
e
n
c
e
(
C
O
V
a
l
u
e
)
It
e
m
N
o
.
De
s
c
r
i
p
t
i
o
n
o
f
W
o
r
k
Or
i
g
i
n
a
l
Q
t
y
5/
8
/
2
0
0
8
1
o
f
2
P
D
F
C
o
n
v
e
r
t
.
6
8
1
7
.
1
.
1
0
1
5
0
_
6
3
0
_
3
6
W
M
P
H
_
I
_
C
O
_
1
_
F
i
n
a
l
_
1
02
3
0
7
_
D
S
U
t
i
l
i
t
i
e
s
.
x
l
s
,
F
i
n
a
l
C
O
1
Attachment number 1
Page 1 of 2
Item # 12
Un
i
t
Un
i
t
P
r
i
c
e
Or
i
g
i
n
a
l
S
c
h
e
d
u
l
e
d
V
a
l
u
e
Fi
n
a
l
Q
t
y
Fi
n
a
l
V
a
l
u
e
Au
g
u
s
t
a
U
t
i
l
i
t
i
e
s
D
e
p
a
r
t
m
e
n
t
63
0
3
6
"
W
a
t
e
r
M
a
i
n
E
x
t
e
n
s
i
o
n
P
r
o
j
e
c
t
(
1
0
1
5
0
)
Ch
a
n
g
e
O
r
d
e
r
N
o
.
1
(
F
i
n
a
l
)
S
u
m
m
a
r
y
Dif
f
e
r
e
n
c
e
(
C
O
V
a
l
u
e
)
It
e
m
N
o
.
De
s
c
r
i
p
t
i
o
n
o
f
W
o
r
k
Or
i
g
i
n
a
l
Q
t
y
25
Flo
w
a
b
l
e
F
i
l
l
10
0
C
.
Y
.
$
9
5
.
0
0
$
9
,
5
0
0
.
0
0
0
$
0
.
0
0
-
$
9
,
5
0
0
.
0
0
24
Ro
c
k
E
x
c
a
v
a
t
i
o
n
,
T
r
e
n
c
h
o
r
M
a
s
s
10
0
C
.
Y
.
$
7
0
.
0
0
$
7
,
0
0
0
.
0
0
0
$
0
.
0
0
-
$
7
,
0
0
0
.
0
0
26
Fo
u
n
d
a
t
i
o
n
B
a
c
k
f
i
l
l
,
G
A
T
y
p
e
I
I
18
0
0
C
.
Y
.
$
0
.
0
1
$
1
8
.
0
0
0
$
0
.
0
0
-
$
1
8
.
0
0
27
Cle
a
r
i
n
g
a
n
d
G
r
u
b
b
i
n
g
1
L
.
S
.
$
1
8
,
7
2
5
.
0
0
$
1
8
,
7
2
5
.
0
0
1
$
1
8
,
7
2
5
.
0
0
$
0
.
0
0
28
6'
W
o
o
d
e
n
P
r
i
v
a
c
y
F
e
n
c
e
,
C
o
m
p
l
e
t
e
(
A
S
U
)
13
0
0
L
.
F
.
$
1
0
.
0
0
$
1
3
,
0
0
0
.
0
0
0
$
0
.
0
0
-
$
1
3
,
0
0
0
.
0
0
29
So
d
d
i
n
g
30
0
S
Y
$
8
.
0
0
$
2
,
4
0
0
.
0
0
0
$
0
.
0
0
-
$
2
,
4
0
0
.
0
0
30
St
o
n
e
D
u
m
p
e
d
R
i
p
-
R
a
p
,
T
y
p
e
I
I
I
,
1
2
"
50
S
Y
$
5
9
.
0
0
$
2
,
9
5
0
.
0
0
0
$
0
.
0
0
-
$
2
,
9
5
0
.
0
0
31
Si
l
t
F
e
n
c
e
,
A
d
d
i
t
i
o
n
a
l
50
0
L
.
F
.
$
3
.
2
5
$
1
,
6
2
5
.
0
0
0
$
0
.
0
0
-
$
1
,
6
2
5
.
0
0
Se
l
e
c
t
C
l
e
a
r
i
n
g
a
n
d
G
r
u
b
b
i
n
g
(
A
S
U
)
4
A
.
C
.
$
2
,
1
4
0
.
0
0
$
8
,
5
6
0
.
0
0
4
$
8
,
5
6
0
.
0
0
$
0
.
0
0
Sa
l
e
o
f
4
0
'
o
f
F
l
e
x
R
i
n
g
D
I
P
3
6
"
P
i
p
e
40
L
.
F
.
$
1
2
6
.
8
4
$
5
,
0
7
3
.
6
0
4
0
$
5
,
0
7
3
.
6
0
$
0
.
0
0
33
Lu
m
p
S
u
m
C
o
n
s
t
r
u
c
t
i
o
n
1
L
.
S
.
$
9
9
,
6
0
0
.
0
0
$
9
9
,
6
0
0
.
0
0
1
$
9
9
,
6
0
0
.
0
0
$
0
.
0
0
Su
b
t
o
t
a
l
-
O
r
i
g
i
n
a
l
C
o
n
t
r
a
c
t
$2
,
1
6
0
,
6
9
9
.
1
0
$
1
,
7
8
5
,
6
2
6
.
1
7
-
$
3
7
5
,
0
7
2
.
9
3
Li
n
e
I
t
e
m
C
h
a
n
g
e
s
t
o
B
i
d
S
c
h
e
d
u
l
e
Sl
a
t
I
n
s
e
r
t
s
f
o
r
F
e
n
c
e
(
R
e
v
i
s
e
d
p
r
i
c
e
p
e
r
l
e
t
t
e
r
t
o
A
U
D
)
0
L
.
F
.
$
7
.
5
0
$
1
3
,
0
0
0
.
0
0
1
3
0
0
$
9
,
7
5
0
.
0
0
-
$
3
,
2
5
0
.
0
0
Su
b
t
o
t
a
l
-
L
i
n
e
I
t
e
m
C
h
a
g
e
s
t
o
B
i
d
S
c
h
e
d
u
l
e
$1
3
,
0
0
0
.
0
0
$
9
,
7
5
0
.
0
0
-
$
3
,
2
5
0
.
0
0
Or
i
g
i
n
a
l
S
c
h
e
d
u
l
e
d
V
a
l
u
e
F
i
n
a
l
V
a
l
u
e
C
O
1
T
o
t
a
l
GR
A
N
D
T
O
T
A
L
S
$2
,
1
6
0
,
6
9
9
.
1
0
$
1
,
7
9
5
,
3
7
6
.
1
7
-
$
3
6
5
,
3
2
2
.
9
3
5/
8
/
2
0
0
8
2
o
f
2
P
D
F
C
o
n
v
e
r
t
.
6
8
1
7
.
1
.
1
0
1
5
0
_
6
3
0
_
3
6
W
M
P
H
_
I
_
C
O
_
1
_
F
i
n
a
l
_
1
02
3
0
7
_
D
S
U
t
i
l
i
t
i
e
s
.
x
l
s
,
F
i
n
a
l
C
O
1
Attachment number 1
Page 2 of 2
Item # 12
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Confederate Powder Works Chimney
Department:Clerk of Commission
Caption:Consider a request from the Brigadier General E. Porter
Alexander Camp #158, Sons of Confederate Veterans, for
permission to perform restoration work on the Confederate
Powder Works Chimney located at Sibley Mill on Goodrich
Street.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Cover Memo
Item # 13
Attachment number 1
Page 1 of 1
Item # 13
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Good News Church Storm Replacement Contract Award
Department:Abie L. Ladson, P.E., Director
Caption:Approve award of Construction Contract to CBH
Construction in the amount of $61,079.00 for the Storm Pipe
Replacement at Good News Baptist Church (CPB#322-
041110-206822001), subject to receipt of signed contracts
and proper bonds. Also approve Change Number One in the
amount of $10,000 to be funded from One Percent Sales Tax,
Phase II Recapture as requested by the Engineering
Department.
Background:Currently, there is an existing 30” corrugated metal pipe that
extends from the Warren Road right-of-way through the
parking lot of GoodNewsBaptistChurch and terminates at the
Georgia Department of Transportation (GDOT) right-of-
way. The existing pipe and subgrade is currently failing and
causing the church parking lot to sink and fail. The existing
30” pipe is currently receiving at least 75% of the stormwater
from Augusta-RichmondCounty’s stormwater facilities. The
proposed improvements will alleviate the drainage and
subgrade problem.
Analysis:Bids were received on March 4, 2008 with CBH
Construction being the low bidder. Bid results are as follow:
CONTRACTORS BID 1. CBH Construction $61,079.00 2.
Blair Construction $94,664.79 3. Mabus Brothers
Construction $99,986.00 4. Payne Construction Commercial
$134,121.00 5. Beam’s Construction $196,290.16 It is the
Engineering Department recommendation to award this
project to the Low bidder CBH Construction.
Financial Impact:Upon Commission approval, Funds will be available in the
project construction budget.
Alternatives:1) Approve award of Construction Contract to CBH
Cover Memo
Item # 14
Construction in the amount of $61,079.00 for the Storm Pipe
Replacement at Good News Baptist Church (CPB#322-
041110-206822001), subject to receipt of signed contracts
and proper bonds. Also approve Change Number One in the
amount of $10,000 to be funded from One Percent Sales Tax,
Phase II Recapture as requested by the Engineering
Department. 2) Do not approve and deny completion of a
funded project.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
322-041110-6011110/292822333-6011110
REVIEWED AND APPROVED BY:
Finance.
Administrator.
Clerk of Commission
Cover Memo
Item # 14
Augusta-Richmond County, Georgia CPB#322-04-206822001
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following
Capital Project Budget is hereby authorized.
Section 1: The project is authorized to CPB# 322-04-206822001. Funding of the proposes to replace the
existing pipe and subgrade which is currently failing and causing the church parking lot
to sink and fail. The proposed improvements will alleviate the drainage and subgrade problem.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase II Recapture $56,872
$56,872
Section 3: The following amounts are appropriated for the project:
By Basin By District
Varies $56,872 $56,872
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Honorable Deke Copenhaver, Mayor
CAPITAL PROJECT BUDGET
STORM PIPE REPLACEMENT AT GOOD NEWS BAPTIST CHURCH
1 of 9 5/8/2008
Attachment number 1
Page 1 of 9
Item # 14
Augusta-Richmond County, Georgia CPB#322-04-206822001
CAPITAL PROJECT BUDGET
STORM PIPE REPLACEMENT AT GOOD NEWS BAPTIST CHURCH
Copy-Procurement Department
2 of 9 5/8/2008
Attachment number 1
Page 2 of 9
Item # 14
Augusta-Richmond County, Georgia CPB#322-04-206822001
CAPITAL PROJECT BUDGET
STORM PIPE REPLACEMENT AT GOOD NEWS BAPTIST CHURCH
CPB AMOUNT CPB
SOURCE OF FUNDS CPB CHANGE
SALES TAX PHASE II RECAPTURE
322-041110-6011110-292822333 ($56,872)
SPECIAL 1% SALES TAX, PHASE II
322-041110-6011110-292822333
TOTAL SOURCES: ($56,872) $0
USE OF FUNDS
CONSTRUCTION
322-04-1110-5414110-206822001 $54,164
CONTINGENCY
322-04-1110-6011110-206822001 $2,708
$56,872 $0
TOTAL USES:
3 of 9 5/8/2008
Attachment number 1
Page 3 of 9
Item # 14
Section 1: The project is authorized to CPB# 322-04-206822001. Funding of the proposes to replace the
to sink and fail. The proposed improvements will alleviate the drainage and subgrade problem.
4 of 9 5/8/2008
Attachment number 1
Page 4 of 9
Item # 14
5 of 9 5/8/2008
Attachment number 1
Page 5 of 9
Item # 14
NEW
CPB
$0
$0
6 of 9 5/8/2008
Attachment number 1
Page 6 of 9
Item # 14
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
STORM PIPE REPLACEMENT AT GOOD NEWS BAPTIST CHURCH
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following
Capital Project Budget is hereby authorized.
Section 1: The project is authorized to CPB# 322-041110-206822001. Funding of the proposes to replace the
existing pipe and subgrade which is currently failing and causing the church parking lot
to sink and fail. The proposed improvements will alleviate the drainage and subgrade problem.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase II Recapture $56,872
Special 1% Sales Tax, Phase II Recapture $10,000
$66,872
Section 3: The following amounts are appropriated for the project:
By Basin By District
Varies $66,872 $66,872
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
Honorable Deke Copenhaver, Mayor
CHANGE NUMBER ONE
CPB#322-041110-206822001
7 of 9 5/8/2008
Attachment number 1
Page 7 of 9
Item # 14
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
STORM PIPE REPLACEMENT AT GOOD NEWS BAPTIST CHURCH
CHANGE NUMBER ONE
CPB#322-041110-206822001
8 of 9 5/8/2008
Attachment number 1
Page 8 of 9
Item # 14
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
STORM PIPE REPLACEMENT AT GOOD NEWS BAPTIST CHURCH
CHANGE NUMBER ONE
CPB#322-041110-206822001
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB CHANGE CPB
SALES TAX PHASE II RECAPTURE
322-041110-6011110-292822333 ($56,872)($56,872)
SPECIAL 1% SALES TAX, PHASE II
322-041110-6011110-292822333 ($10,000) ($10,000)
TOTAL SOURCES: ($56,872) ($10,000) ($66,872)
USE OF FUNDS
CONSTRUCTION $54,164 $10,000 $64,164
322-04-1110-5414110-206822001
CONTINGENCY
322-04-1110-6011110-206822001 $2,708 $2,708
TOTAL USES:$56,872 $10,000 $66,872
9 of 9 5/8/2008
Attachment number 1
Page 9 of 9
Item # 14
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Juvenile Court Building Location
Department:Administrator
Caption:Discuss building location for Juvenile Court.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Cover Memo
Item # 15
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Property Condemnation - Easements - Darnell Warren as Administrator for the Estate of Mattie
L. Warren
Department:Attorneys
Caption:Motion to authorize condemnation of a portion of a property
owned by Darnell Warren as Administrator for the Estate of
Mattie of Mattie L. Warren; 9948 square feet of permanent
easement and 9341 square feet of temporary construction
easement, PIN: 099-0-070-00-0, property address: 2417
Doug Barnard Parkway.
Background:The project has to proceed according to schedule and it is
necessary to condemn a portion of subject property to clear
the title. The appraised value of the easements is $2,658.00.
Analysis:Condemnation is required in order to acquire the easements.
Financial Impact:The necessary costs will be covered by the project budget.
Alternatives:None, action is necessary to avoid delays in the project and
associated costs.
Recommendation:Approve the authorization to condemn
Funds are
Available in the
Following
Accounts:
510043420-5411120 80200007-5411120
REVIEWED AND APPROVED BY:
Administrator.
Cover Memo
Item # 16
Clerk of Commission
Cover Memo
Item # 16
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Property Condemnation–Permanent and Temporary Construction Easements Sheila Ann
Mitchell
Department:Attorneys
Caption:Motion to authorize condemnation of a portion of a property
owned by Sheila Ann Mitchell; 1,618 square feet of
permanent access, utility and maintenance easement and
2,015 square feet of temporary construction easement. PIN:
132-0-447-00-0, property address: 3490 Monte Carlo Drive.
Background:The project has to proceed according to schedule and the
City has been unable to purchase the required easements due
to title issues. In order to proceed and avoid the resulting
delays and costs, it is necessary to condemn a portion of
subject property. The appraised value of the easements is
$600.00.
Analysis:Condemnation is required in order to acquire the easements.
Financial Impact:The necessary costs will be covered by the project budget.
Alternatives:None, action is necessary to avoid delays in the project and
the associated costs.
Recommendation:Approve the authorization to condemn
Funds are
Available in the
Following
Accounts:
510043420-5411120 80260107-5411120
REVIEWED AND APPROVED BY:
Cover Memo
Item # 17
Administrator.
Clerk of Commission
Cover Memo
Item # 17
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Purchase of Wide Format Printer / Copier / Scanner for Augusta Utilities
Department:Utilities
Caption:Approve the purchase of a KIP 5202 Large Document Color
Scanner/Copier/Printer System and Accessories in the
amount of $35,078.75.
Background:
Analysis:AUD's current Large Document Scanner/Copier/Printer
system is outdated obsolete and unsupported. Our efforts to
generate the digital/electronic database and provide a faster
and more efficient Archive Retrieval System cannot be
accomplished with our current equipment.
Financial Impact:$35,078.75 from account 506043110-5424510
Alternatives:None
Recommendation:Augusta Utitlties recommends the purchase of the KIP 5202
Large Document Color Scanner/Copier/Printer System and
Accessories in the amount of $35,078.75 from Imaging
Technologies of Augusta GA. This recommendation is based
upon the competitive bid results from BID Item 08-061 and
evaluation of initial equipment purchase plus subsequent
monthly maintenance costs for a period of one year following
warranty expiration.
Funds are
Available in the
Following
Accounts:
$35,078.75 from account 506043110-5424510
Cover Memo
Item # 18
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 18
N. Max Hicks, P.E., RLS, Director Engineering and Construction Division
Wes Byne, P.E., Assistant Director 360 Bay Street, Suite 180 – Augusta, GA 30901
Office (706) 312-4132 – Fax (706) 312-4133
www.augustaga.gov
March 14, 2008
Geri Sams, Director
Procurement Department
Ref: Bid Item #08-061 Wide Format Printer / Copier / Scanner for Augusta Utilities
Ms. Sams:
After thorough review of the bids received in the above referenced bid item 08-061,
Augusta Utilities recommends the bid to be awarded to Imaging Technologies.
Our criteria for selecting a vendor is based on a combination of the price of the equipment and accompanying
maintenance costs for one year following the expiration of the warranty.
Please see the table below:
Vendor Model Equipment Price Maintenance (1 Yr) Total
Pollock Company KIP 5202 $32,734.00 $180 per mo base
Plus .06 per sq ft
@4,500 sq ft per
month ($5,400.00)
$38, 134.00
Imaging
Technologies
KIP 5202 $33,058.75 $165 per mo @
4,500 sq ft
($1,980.00)
$35, 038.75
Digital Blueprint KIP 5202 $33,995.00 $210 per mo @
4,500 sq ft
($2,520.00)
$36,515.00
Although Pollock Company’s bid for the KIP 5202 was the lowest, they are actually highest in total cost over
a 1 year period when you add monthly maintenance fees. Their “base” rate is $180.00 per month but their sq ft
usage is $.06 per sq ft (this equals $2,160 for the base rate plus $3,240 for 4,500 sq ft of usage for a total of
$5,400). Digital Blueprint is 2nd lowest overall within $450.00 of Imaging Technologies. ACME and IKON
were not considered based on their exceptions and of not bidding an acceptable equivalent.
Thank you for your attention to this matter. Please contact me if there are any questions regarding this bid
item.
Sincerely,
Jerry Philpot, Systems Program Manager
Augusta Utilities Department
cc: N. Max Hicks, P.E., RLS, Director
Wes Byne, P.E., Assistant Director
Reggie Horne, Information Technology
UTILITIES DEPARTMENT
Attachment number 1
Page 1 of 2
Item # 18
Attachment number 1
Page 2 of 2
Item # 18
Attachment number 2
Page 1 of 1
Item # 18
Attachment number 3
Page 1 of 2
Item # 18
Attachment number 3
Page 2 of 2
Item # 18
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Ratify Change Order #2 to New Savannah Rd Water Main
Department:Utilities
Caption:Ratify Change Order 2 to Daily Rate Construction Program
for Emergency Line Replacement on New Savannah Rd. for
$205,000.00.
Background:During the construction of the Main Interceptor, the water
line on was not redesigned, and was in conflict with the new
sewer. Because of this, water service to a significant service
area would be impacted. The extent of this impact was not
immediately clear during design. Because AUD is planning
to replace this section of line, it was determined to move
ahead with an emergency replacement of the existing line.
Blair was selected because of the daily rate program. They
were tasked with replacing the 12” line with a 16” line on a
daily contracted rate based on the bid of that service. In
addition, Blair secured materials at a lesser rate than AUD
could procure. This was determined to be an emergency due
to the number of residents and businesses affected by the
outage. The contractor on the Main Interceptor offered a
competitive price approximately 1.5 times this fee.
Analysis:This was deemed an emergency line replacement.
Procurement was notified because of the emergency nature.
Replacing this line saves money in the long run because
overlay costs are not spread across two contracts. In addition,
service is improved for residents and businesses in South
Augusta. The first change order did not include enough
funding to adequately address the issues that occurred with
replacing the line while another construction contract was
occurring. Due to logistical delays, additional expenses were
incurred. No engineering fees nor right of way fees were
incurred in the design of this line, a savings of approximately
$80,000.00.
Cover Memo
Item # 19
Financial Impact:$200,000.00 from account 50704340-5425110/80600040-
5425110
Alternatives:None.
Recommendation:Ratify Change Order to Daily Rate Construction Program for
Emergency Line Replacement on New Savannah Rd for
$205,000.00
Funds are
Available in the
Following
Accounts:
$200,000.00 from account 50704340-5425110/80600040-
5425110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 19
Attachment number 1
Page 1 of 1
Item # 19
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Ratify Emergency Bid for Eisenhower 14" Waterline Replacement
Department:Utilities
Caption:Ratify Emergency Bid to replace Eisenhower Hospital 14”
Water Line.
Background:Fort Gordon contacted AUD to obtain pricing for
replacement of a section of 14” water main that is in conflict
with current construction on base. AUD contacted
Procurement and obtained an emergency bid on the project.
Three bidders were contacted. The low bidder was Beams
Construction. AUD was asked to hold the award pending
review by the Contracting Officer at the Defense Energy
Services Center. That review has been completed, and the
Army is prepared to proceed. By the time this agenda item is
on Committee, the work should have been completed.
Analysis:This was deemed an emergency line replacement.
Procurement was notified because of the emergency nature.
Fort Gordon and DESC were made aware of the emergency
requirements and agreed to notify AUD upon completion of
review. AUD received notification on March 13, that the
notice to proceed should be issued in the next week. AUD
submitted this agenda item assuming that work would be
complete by the time the agenda item is reviewed.
Financial Impact:$ 112,373.23 from account 507043410-5425110/80800005-
5425110
Alternatives:None.
Recommendation:Ratify Emergency Bid to Replace Eisenhower Hospital 14”
Water Line for $112,373.23
Funds are
Cover Memo
Item # 20
Available in the
Following
Accounts:
$ 112,373.23 from account 507043410-5425110/80800005-
5425110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 20
Augusta Utilities Proposal to Install a 14" line replacement at the
Intersection of Chamberlain and East Hospital Rd
7 Mar 2008
Attachment number 1
Page 1 of 4
Item # 20
New 14" Line
(Light Blue)
Old Line (Red),
Abandon In Place
C H A M B ER L AI N AVE N U E
EAST
HOSPITAL
ROAD
CENTRAL HOSPITALROAD
Item # 20
Vendors Price Bid Bond G&A Final R & R
Beam's Construction
2355 Atomic Rd
Beech Island, SC
29842
83,493 X 34.59% 112373.2287
Blair Construction PO
Box 770 Evans, GA
30809 152,617.30
X 34.59% 205407.6241
Eagle Construction
4005 Braswell Rd
Blythe, GA 30805 107,122.00
X 34.59% 144175.4998
Emergency Bid 08-087
Eisenhower Emergency Waterline Replacement
For Augusta Utilities Dept
Emergency Bid Opening Date Wednesday, February 27, 2008 @ 3:00 PM
Attachment number 1
Page 3 of 4
Item # 20
Attachment number 1
Page 4 of 4
Item # 20
Attachment number 2
Page 1 of 1
Item # 20
Engineering Services Committee Meeting
5/12/2008 11:35 AM
Rock Creek Improvements
Department:Augusta Utilities Department
Caption:Approve proposal for the professional services in the amount
of $86,500 to ZEL Engineering for the plan of study for the
Rock Creek basin.
Background:The Rock Creek Sanitary Improvements project involves
Infiltration and/or Inflow (I/I) that may exist in the Rock
Creek collection system. There is evidence that either the
sewer is near its capacity or that excessive infiltration exists
that warrant evaluation and correction. The sewer trunk line
starts at Lake Olmstead and ends near Stevens Creek Rd.
Analysis:The price for the scope of work listed is $86,500. Based on
projects of similar scope, AUD has reviewed the cost and
determine this fee to be fair and reasonable.
Financial Impact:The cost for services from ZEL is $86,500.00. These funds
are available from the following accounts:507043420-
5425210/80800010-5425210
Alternatives:Reject ZEL Proposal, which would delay the design of the
project and the construction of the sanitary sewer
improvements.
Recommendation:It is recommended to award ZEL in the amount of
$86,500.00
Funds are
Available in the
Following
Accounts:
507043420-5425210/80800010-5425210
Cover Memo
Item # 21
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Administrator.
Clerk of Commission
Cover Memo
Item # 21
ENGINEERING SCOPE DOCUMENT
THE CITY OF
AUGUSTA, GEORGIA
UTILITIES DEPARTMENT
SEWER
IMPROVEMENTS
ROCK CREEK
BASIN
PLAN OF STUDY
January 14, 2008
PROJECT 2007-P24
E N G I N E E R S
Attachment number 1
Page 1 of 11
Item # 21
E N G I N E E R S
Page 1 of 8
Table of Contents
Table of Contents................................................................................................................ 1
Rock Creek Sewer Collection Basin................................................................................... 2
I. Identify Collection System Problems.......................................................................... 2
II. Define Infiltration/Inflow (I/I) Problem..................................................................... 3
A. Physical Inspection ................................................................................................ 3
B. Collection of Rainfall Data .................................................................................... 3
C. Rainfall Simulation ................................................................................................ 4
III. Prepare Map and Field Report.................................................................................. 4
IV. Conduct a Cost-Effectiveness Analysis.................................................................... 4
Attachment number 1
Page 2 of 11
Item # 21
E N G I N E E R S
Page 2 of 8
Rock Creek Sewer Collection Basin
Infiltration and/or Inflow (I/I) may exist in the Rock Creek collection system. There is
evidence that either the sewers are near their capacities or excessive Infiltration/Inflow
(I/I) flow exists that warrant evaluation and correction. Augusta Utilities Department
(AUD) may perform an sewer system evaluation survey (SSES) to identify the sources of
I/I and determine at what level it is cost effective to treat and/or remove the I/I. AUD
should also evaluate the design capacity of the existing system and evaluate the full basin
development flow rates.
1. Evaluation of the existing capacity is a desktop evaluation based on the known
features of the collection system. Evaluation of the full basin development flow rates
is a planning evaluation based on standard planning type land use estimates from
local planning agencies and correlated to regional and state planning projections for a
date in the future. Since the trunk sewers in Rock Creek were constructed in the
1960’s and 1970’s (extended to serve the I-20 welcome station), planning should look
at the available land and apply the density for the anticipated land use to arrive at a
design flow at various points in the basin.
2. If there is evidence that the present flows are greatly influenced by I/I, Then a SSES
should be undertaken for sections of the trunk mains that do not warrant replacement
based on the full basin projections. Because the lower end of the basin is fully
developed, it is most likely that these sections of the trunk lines may need relief.
The following steps should be taken to complete the study:
I. Identify Collection System Problems
1. Describe the existing system and discuss its history;
2. Review and analyze existing flow records such as plant influent data, pump
stations data, overflow locations and estimated amounts, etc;
3. Divide the collection system into subsystems and identify the key manholes
Attachment number 1
Page 3 of 11
Item # 21
E N G I N E E R S
Page 3 of 8
which are located at the outlet of each subsystem;
4. Monitor flows to key manholes and compare them to the expected sewer flows
from the subsystems. Identify problem subsystems and determine if further study
is needed. Discuss and explain the basis for the decision; and
5. Determine if the excessive flow problem is due to infiltration or inflow (or both)
and decide the appropriate time period of the year to monitor the problem
subsystems.
II. Define Infiltration/Inflow (I/I) Problem
Once problem subsystems are identified, a physical inspection, rainfall data, and rainfall
simulation may be used to further define the I/I problem.
A. Physical Inspection
Conduct a physical inspection of the subsystem area that includes the following:
1. Inspect all manholes within the identified area. Descend manholes using a lamp
system and inspect the manhole walls and floor for weeping water, mineral
deposits, and sand/silt deposits. Inspect all construction and pipe materials for
misalignment, structural deformities, etc.
2. Prepare a manhole inspection report. A manhole inspection report should contain
the manhole number, size, type of pipe, structural condition, amount of deposit,
root growth, and other miscellaneous information. The report should also contain
a recommendation for the preferred cleaning method for each sewer section.
3. If groundwater infiltration is suspected to be a problem, groundwater gauges
should be installed at manholes or at other sites to evaluate the groundwater
conditions.
4. Measure early morning flows (between 2 a.m. to 5 a.m.) at key manholes and at
upstream manholes to identify infiltration. The domestic flows will be minimal
during these hours. Subtract approximated domestic flow from the actual flow
measurements to determine infiltration.
B. Collection of Rainfall Data
Rain gauges should be installed at selected sites, (Augusta RWPS, Welcome Station, or
mid-basin @ Rock Creek) either to provide raw data or to establish the basis for a
Attachment number 1
Page 4 of 11
Item # 21
E N G I N E E R S
Page 4 of 8
correlating analysis of various adjacent areas that have available rainfall data.
C. Rainfall Simulation
1. Perform rainfall simulation to identify sewer sections with I/I problems. The use
of the following techniques is suggested:
2. Smoke test--A smoke test should be used to identify inflow sources such as catch
basins, roof and other drains, crossing connections, manhole covers, and bad
joints and leaks.
3. Dye test--A dye test should be used on ditches, streams, or storm sewers located
above or crossing the sanitary sewer system.
III. Prepare Map and Field Report
1. After all the fieldwork is complete, locate and present all identified problem
sewers and manholes on a map. The map should be color coded to identify pipe
sizes, joint materials, and estimated quantity of I/I. The direction of sewer flow
should also be indicated on the map.
2. Prepare a field inspection report. The inspection report should compile and
analyze all data and information collected in the field. Include all backup
information, such as field notes and measurements, a summary of defective
manholes and pipes, an estimate of rehabilitation cost, and an estimate of I/I
reduction.
3. Show sections of existing trunk main found deficient for full basin development
needs. Rank the sections by their level of deficiency.
IV. Conduct a Cost-Effectiveness Analysis
After all data and results have been analyzed and summarized, a cost-effective analysis
must be conducted to determine the cost of eliminating I/I at various levels. The costs of
I/I reduction should then be compared to the total cost of transportation and treatment of
I/I flows at the treatment facilities. The total present worth or annual worth analysis shall
be used to perform the cost comparison. For various levels of I/I removal, determine the:
1. Cost of transporting and treating existing I/I. Include capital costs (modifying
transportation system, constructing treatment plant, replacing units, engineering,
legal, administration, and contingency costs), operation and maintenance costs;
Attachment number 1
Page 5 of 11
Item # 21
E N G I N E E R S
Page 5 of 8
2. Cost of I/I reduction. Include rehabilitation, repair, replacement, and engineering
costs; and
3. Total cost of transporting, treating, and reduction I/I. Plot the total costs
associated with the various percentages of I/I reduction and determine the cost-
effective cutoff point, the lowest cost point for I/I reduction (see attached Cost
Effective Analysis Curve).
V. Prepare Survey Recommendations
1. Propose a rehabilitation program to deal with the cost effective reduction of I/I.
Explain the basis for recommendations and include a short term and long term
action plan and schedule.
2. Present a recommended sequence of upgrade to the trunk main based on the
deficiency rank and present the limits of each section and the design criteria (pipe
size and available slope for gravity relief, or for each section, the pipe size and
available head for low pressure transport.
Attachment number 1
Page 6 of 11
Item # 21
E N G I N E E R S
Page 6 of 8
Attachment number 1
Page 7 of 11
Item # 21
E N G I N E E R S
Page 7 of 8
Figure 1 Rock Creek Basin and Trunk Sewer
Attachment number 1
Page 8 of 11
Item # 21
E N G I N E E R S
Page 8 of 8
Figure 2 Estimate of Effort
AUGUSTA UTILITIES DEPARTMENT
Engineering Scope Docum ent
ZEL Engineers
January 14, 2008
Description Total H ours
BASE DATA
Task M anagem ent Hours 8
1 Existing capacity from records 18
2 Collect Land U se Plan 10
3 Identify developable tracts 14
4 Separate Basin into gravity Sub Basins 6
5 Obtain digital GIS inform ation on the sewer system 22
Sub Totals 78
EVALUATIONS
M anagem ent Hours 16
6 Determ ine proper density for future use 20
7 Determ ine design flow rates for contributing areas 16
8 Identify change of size locations 12
9 Identify changes in available slope 16
10 Cum ulative design flows 12
11 Review and analyze existing flow records 16
12 C orrelate rain gauge to available rainfall data 12
13 Conduct a Cost-Effectiveness Analysis 28
14 Identify problem subsystem s 16
15 Determ ine if further study is needed. 12
16 Explain the basis for the decision 8
Sub Totals 184
FIELD W ORK
M anagem ent Hours 8
17 Flow M onitoring, key m anholes 70
18 Prepare a m anhole inspection report 20
19 Recom m endation for the preferred cleaning m ethod 12
20 Install groundwater gauges at m anholes 28
21 Install Rain gauges 10
22 Sm oke test 60
23 Dye test 60
Sub Totals 268
REPORT PHASE
M anagem ent Hours 16
24 Describe the existing system and discuss its history 8
25 Prepare M ap 46
26 Prepare Field Report 8
27 Describe short and long term goals 12
28 Propose Correction Program 20
29 Determ ine the sequence of upgrade 34
30 Prepare Basin Report 38
Sub Totals 182
CLIENT COMMUNICATION
M anagem ent Hours 12
31 Progress Reports 20
32 Field visits 12
33 Questions and Answers 20
34 Project M anagem ent 16
S ub T otals 80
TOTALS 792
Reimbursable Costs
Attachment number 1
Page 9 of 11
Item # 21
March 26, 2008
Mr. N. Max Hicks, P.E., Director
Augusta-Richmond Co. Utilities Dept.
360 Bay Street, Suite 180
Augusta, GA 30901
RE: Rock Creek Basin Study
Professional Services Proposal
Dear Mr. Hicks:
We are pleased to offer this proposal for professional services for the referenced project as
requested by the Mr. Byne. We propose to execute the Plan of Study presented to AUD on
January 14, 2008. The attached Professional Services Worksheet presents our estimates of
manpower requirements and the costs of services, including:
xCompile and review all available Base Data
xEngineering and Economic Evaluations
xField Monitoring and Inspections
xReport Presenting the Priorities and Recommendations
xClient Communications and Presentations
xAll reimbursable expenses.
We propose to render the normal services listed for a lump sum fee of $86,500. If you have any
questions in this regard, please let us know.
Yours truly,
ZIMMERMAN, EVANS AND LEOPOLD, INC.
Jorge E. Jiménez, P. E.
Principal
JEJ:st
cc: Mr. Wes Byne, P. E., Assistant Director AUD, Engineering
Enclosure
Attachment number 1
Page 10 of 11
Item # 21
AUGUSTA UTILITIES DEPARTMENT
ROCK CREEK BASIN
Engineering Scope Document
ZEL Engineers
March 26, 2008
Description Total Hours Task Cost
BASE DATA
Task Management Hours 8 1,043.69$
1 Existing capacity from records 18 1,474.22$
2 Collect Land Use Plan 10 848.00$
3 Identify developable tracts 14 1,487.26$
4 Separate Basin into gravity Sub Basins 6 534.89$
5 Review digital GIS information on the sewer system 22 1,616.16$
Sub Totals 78 7,004.22$
EVALUATIONS
Management Hours 16 2,087.38$
6 Determine proper density for future use 20 2,044.59$
7 Determine design flow rates for contributing areas 16 1,601.02$
8 Identify change of size locations 12 1,157.45$
9 Identify changes in available slope 16 1,601.02$
10 Cumulative design flows 12 961.76$
11 Review and analyze existing flow records 16 1,601.02$
12 Correlate rain gauge to available rainfall data 12 961.76$
13 Conduct a Cost-Effectiveness Analysis 28 2,931.73$
14 Identify problem subsystems 16 1,601.02$
15 Determine if further study is needed. 12 1,157.45$
16 Explain the basis for the decision 8 713.89$
Sub Totals 184 18,420.13$
FIELD WORK
Management Hours 8 1,043.69$
17 Flow Monitoring, key manholes 70 7,651.10$
18 Prepare a manhole inspection report 20 1,587.98$
19 Recommendation for the preferred cleaning method 12 1,157.45$
20 Install groundwater gauges at manholes 28 2,995.71$
21 Install Rain gauges 10 1,065.71$
22 Smoke test 60 7,324.11$
23 Dye test 60 7,324.11$
Sub Totals 268 30,149.87$
REPORT PHASE
Management Hours 16 2,087.38$
24 Describe the existing system and discuss its history 8 713.89$
25 Prepare Map 46 2,810.14$
26 Prepare Field Report 8 713.89$
27 Describe short and long term goals 12 1,157.45$
28 Propose Correction Program 20 2,044.59$
29 Determine the sequence of upgrade 34 2,624.89$
30 Prepare Basin Report 38 3,068.46$
Sub Totals 182 15,220.69$
CLIENT COMMUNICATION
Management Hours 12 1,565.54$
31 Progress Reports 20 2,044.59$
32 Field visits 12 1,157.45$
33 Questions and Answers 20 2,044.59$
34 Project Management 16 1,601.02$
Sub Totals 80 8,413.20$
TOTALS 792 79,208.11$
Reimbursable Costs
Travel, 1000 miles @ $0.42 420.00$
Equipment charges, 4@300*4 months 4,800.00$
Miscellaneous out of pocket 1,000.00$
Printing Costs 1,000.00$
7,220.00$
Program Total 86,428.11$
Attachment number 1
Page 11 of 11
Item # 21