HomeMy WebLinkAbout2007-07-30-Meeting AgendaEngineeringServicesCommittee Meeting CommitteeRoom-7/30/2007-1:30PM ENGINEERINGSERVICES 1.Motion to abandon an alley known as Telfair Lane to Demarcpoint,LLC. Attachments 2.Approve award for Additional Design Services in the amount of $84,775.00 to W.R. Toole Engineers, Inc. (WRTE) in order to incorporate changes in design requirementstoboththeDougBarnardParkway16inc h Water Main and Lumpkin Rd 20inch Water Main Improvementsatthe90%stageofdesign. Attachments 3.Approve award for Additional Design Services in the amount of $42,238.00 to Johnson, Laschober & Associates, P.C. (JLA) in order to incorporate chan ges fromtheoriginalHorsepenPhaseIIdesignrequirem ents whicharecurrentlyat100%stageofdesign. Attachments 4.Approve award of design contract modification in th e amountof$36,742toZELEngineers,Inc.forprovid ing additional engineering services for 3 separate construction contracts in lieu of 2 for Project 108 01- MorganRoadPumpStation/Ft.Gordon20”WaterMain Connection. Attachments 5.Approve the Engineering Department to authorize Supplemental Agreement Number Three and Capital Project Budget Change Number Three (CPB# 324-04- 203824335) authorizing the allocation of funds in t he amountof$29,000.00toW.R.TooleEngineers,Inc.to completethedesignfortheMMScottParkintheBe lair HillsSubdivision. Attachments 6.Motion to approvechanging Benson Drive to Benson Road. Attachments 7.Motion to authorize condemnation of a portion of Property # 052-0-117-00-0 3906 Carolyn Street, which wasownedbythelateJonathanandChristineEdward s, for1,025SquareFeetofPermanentEasementand2,7 93 SquareFeetofTemporaryEasement.PWProject:Bela ir HillsSubdivisionImprovementProject. Attachments 8.Motion to authorize condemnation of a portion of Property#051-0-220-00-01608HildaAvenueand051 - 0-221-00-0 3917 Bolton Street, which are owned by Leonard M. Gaines, for 2,000 Sq. Feet of Temporary Easement. PW Project: Belair Hills Subdivision ImprovementProject. Attachments 9.Motion to authorize condemnation of a portion of Property#065-2-003-00-03912PadrickStreet,whichis ownedbyLonellandCarolY.Spurgeon,for653Squa re Feet of Right of Way and 1,802 Square Feet of Temporary Easement. PW Project: Belair Hills SubdivisionImprovementProject. Attachments 10.Motion to authorize condemnation of a portion of Property#051-0-234-00-03946CarolynStreet,whichis ownedbyRuthN.GrayandThomasD.Gray,for3,805 Sq.FeetofPermanentEasementand3,387Sq.Feeto f Temporary Easement. PW Project: Belair Hills SubdivisionImprovementProject. Attachments 11.Approve of utility items to be constructed by Mabus Brothers Construction, Inc., in the East Boundary Drainage & Improvement Project in the amount of $97,148.67. Attachments 12.ApprovetheFinancialCloseoutsofSPLOSTprojects that wereprogrammedover10yearsagofortheEngineeri ng Department and never designed or constructed.The funding for these projects will be redirected back into theirrespectiveFundRecaptureAccount.(Referred from Attachments www.augustaga.gov July10Commissionmeeting) 13.ApprovethepurchaseofaTrimbleR8GNSSReceiver Kit,DataCollectorandAccessoriesintheamounto f$27, 455.75. Attachments 14.MotiontoapproveanOptionforRight-of-Waybetween Augusta, Georgia, as owner and Augusta, Georgia, as optionee, in connection with the St. Sebastian Way Project,for0.206acre(8,965.86sq.ft.)infeea nd0.032 acre (1,410.21 sq. ft.) of permanent construction a nd maintenanceeasementforthefollowingpropertyloc ated at1522&1547&1548BroadStreetforapurchasep rice of$86,100.00. Attachments 15.Report from the Utilities Department/Administrator regardingtheinstallationofthewatermaininthe areaof theSouthAugustaFleaMarket. Attachments EngineeringServicesCommitteeMeeting 7/30/20071:30PM AbandonmentofanAlleyknownasTelfairLane Department:CountyAttorney-StephenE.Shepard,Attorney caption2:MotiontoabandonanalleyknownasTelfairLaneto Demarcpoint,LLC. Background:TelfairLaneisa0.05acretractofland,measurin g194.39 feetby12feetandislocatedoffof11thStreet.TelfairLane runsparalleltoand160feetsouthofTelfairStre et,asshown ontheattachedplat.Demarcpoint,LLC,isthecur rentowner oftheadjacentparcellocatedbetweenTelfairLane and WalkerStreet.Demarcpoint,LLC,desirestheaband onment ofthispropertysothatitmayuseitinconjuncti onwithits adjoiningproperty. Analysis:Abandonmentofthepropertywillnotblockegresso raccess toanyadjacentpropertyowner. FinancialImpact:Anappraisalvaluedtheproperty'smarketvalueto be $1,500.00. Alternatives:Approveordenythemotiontoabandonthealleykno wna TelfairLane. Recommendation:ApprovethemotiontoabandonthealleyknownaTel fair Lane. Fundsare Availableinthe Following Accounts: N/A REVIEWEDANDAPPROVEDBY : Cover Memo Item # 1 Administrator. ClerkofCommission Cover Memo Item # 1 Attachment number 1 Page 1 of 1 Item # 1 Attachment number 1 Page 1 of 1 Item # 1 Attachment number 1 Page 1 of 1 Item # 1 EngineeringServicesCommitteeMeeting 7/30/20071:30PM AwardChangeOrderforDesignContractforAugusta UtilitiesDepartment Department:AugustaUtilitiesDepartment caption2:ApproveawardforAdditionalDesignServicesinthe amount of$84,775.00toW.R.TooleEngineers,Inc.(WRTE)in ordertoincorporatechangesindesignrequirements toboth theDougBarnardParkway16inchWaterMainandLump kin Rd20inchWaterMainImprovementsatthe90%stage of design. Background:TheLumpkinRd20-inchWaterMainImprovementsproj ect involvesthedesignof5,650linearfeetof20-inch diameter ductileironpipefromtheHWY56andLumpkinRd intersectiontoDougBarnardintersection.DougBa rnard Parkway16-inchImprovementsprojectinvolvesthed esign of12,860LFof16-inchdiameterductileironpipe along DougBarnardParkway,startingNorthofI-520toth e intersectionofGordonHWY.Thedesignofbothprop osed 20-inchand16-inchwaterlineisatransmissionmai nthat willallowtheAugustaUtilitiesDepartmenttosupp lysurface waterfromthenewN.MaxHicksTobaccoRoadWater TreatmentPlantintoareasprimarilyservedbythee xisting groundwatersystem. Analysis:BasedonAUD'sHydraulicModelanalysis,itwas determinedthatthecurrentdesignpipesizeof20-inch waterlineonLumpkinRdand16inchwaterlineonDo ug BarnardParkwaydoesnotmeetupcomingprojectedwa ter demands.Inaddition,AUDisunabletoobtainthen ecessary easementforthelastsectionof3,000LFofwaterm ainon DougBarnardParkwaytoGordonHWY.Thereforethis last sectionofpipehastoberedesignedfromtheorigi nally proposedrouteoftheeastsidetothemorefeasibl erouteon thewestsideofDougBarnard.W.R.TooleEngineers ,Inc. submittedanacceptableproposalforadditionaldes ignfees tomodifybothplanswhicharecurrentlyatthe90%design phase.Thestaffoftheutilitiesdepartmenthasre viewedthe Cover Memo Item # 2 proposalandrecommendawardoftheadditionaldesi gnfees. FinancialImpact:Thechangeorderforthisproject$84,775.00.These funds areavailablefromthefollowingaccounts:510043410 - 5212115/80210168-5212115 Alternatives:1.RejectWRTEProposal,whichwoulddelaythedesi gnof theprojectandtheconstructionofthewatermain extension. 2.ApproveWRTEProposalforAdditionalEngineering DesignFeetocompletethedesignofthetwowaterl ine projects. Recommendation:ItisrecommendedtoawardtheAdditionalDesignFe eto W.R.TooleEngineers,Inc.intheamountof$84,775 .00 Fundsare Availableinthe Following Accounts: 510043410-5212115/80210168-5212115 REVIEWEDANDAPPROVEDBY : ClerkofCommission Cover Memo Item # 2 Lumpkin Road Water Main Project Plan Revisions Project Limits (Update Existing Design): Professional services will be provided to revise the existing Lumpkin Road Water Main Plans and specifications to reflect changes in the pipe diameter size as requested by AUD. Anticipated Services and Design Issues: The following services will be provided in addition to the original scope of work outlined for the Lumpkin Road Water Main Project: • Update plan/profiles/easement maps and resubmit 90% Preliminary Plans and attend 90% Review Meeting. • Review/update permits as necessary. • Update restrained joint calculations. • Prepare 100% Final Plans and Specifications. • Draft digital “red-line” construction plans. Field notes to be provided by Contractor. Deliverables: The following deliverables were considered for calculation of direct costs and fee estimates: • 90% Preliminary Plans – 8 Sets (Including revised easement maps) • 100% Contract Documents Including Soil Erosion, Sedimentation and Pollution Control Plans– 5 Sets • One hardcopy and one digital copy of “red-lined” construction plans. NOTE: 1 set of Contract Documents will be provided to the Purchasing Department. NOTE: WRTE does not anticipate a 30% or 60% Plan Submittal. Doug Barnard Parkway Water Main Project – Phase I Plan Revisions: Project Limits (Update Existing Design): Professional services will be provided to revise the existing Doug Barnard Parkway Phase I Water Main Plans and specifications to reflect changes in the route and change the pipe diameter size as requested by AUD. The changes in alignment are due to conflicts with a parallel access road located along the east side of Doug Barnard Parkway. Services will include the redesign of approximately 3,000 linear feet of the project beginning near Gordon Highway and continuing south toward Dan Bowles Road. Anticipated Services and Design Issues: The following services will be provided in addition to the original scope of work outlined for the Doug Barnard Parkway Water Main Project: Attachment number 1 Page 1 of 7 Item # 2 • Coordinate with Atlanta Gas Light Company for crossing of gas mains. • Coordinate with Atlanta Gas Light Company for determination of anode beds and potential conflicts with ductile iron water mains. • Assess options for PVC water mains in areas in conflict with anode beds. • Coordinate with Georgia Power Transmission Department for permitting around transmission poles located along Doug Barnard Parkway. • Investigate options for wrapped piped in areas conflicting with anode beds or in areas with corrosive soils. • Develop new field survey required along west side of Doug Barnard Parkway to update existing basemap. • Coordinate with Georgia Department of Transportation for utility permitting in R/W. • Coordinate with Army Corp of Engineers for wetland impacts. • Construction could potentially impact 6 property owners on west side of Doug Barnard Parkway. Additional easement maps will be prepared. • A sub-surface investigation will be prepared. Soil tests will be completed at 500 foot intervals at depths up to 6 feet. Soil PH will be addressed to identify corrosive soils. Additionally, soil borings will be taken in areas proposed for jack and bore construction to determine presence of rock and ground water. • Evaluate wetlands on west side of Doug Barnard Parkway. • Update plan/profiles/easement maps and resubmit 30% Preliminary Plans and attend 30% Review Meeting. • Review/update permits as necessary. • Update restrained joint calculations. • Prepare 90% Preliminary Plans, Final Easement Maps, and attend 90% Review Meeting. • Prepare 100% Final Plans and Specifications. • Draft digital “red-line” construction plans. Field notes to be provided by Contractor. • WRTE anticipates utilizing DIPRA for field testing services. Should design services be necessary then WRTE will utilize CORRPRO Deliverables: The following deliverables were considered for calculation of direct costs and fee estimates: • 30% Preliminary Plans – 8 Sets (Including preliminary easement maps) • Sub-surface investigation report. • 90% Preliminary Plans – 6 Sets (Including final easement maps) • 100% Contract Documents Including Soil Erosion, Sedimentation and Pollution Control Plans– 5 Sets • One hardcopy and one digital copy of “red-lined” construction plans. Attachment number 1 Page 2 of 7 Item # 2 NOTE: 1 set of Contract Documents will be provided to the Purchasing Department. NOTE: WRTE does not anticipate a 60% Preliminary Plan Submittal. Anticipated Permits: The following permits are anticipated for construction: • Approval of Plans by GDOT - Utility Permit • Approval of Plans by Georgia Power – Encroachment Permit • Approval of Plans by Atlanta Gas Light – Encroachment Permit • Approval of Plans by ACOE – Wetlands Nationwide Permit or Individual Permit Professional Services: WRTE will provide all engineering services for this project with in-house personnel. Probable sub-consultant services will include surveying/base mapping, wetland delineation, environmental permitting and soil testing. WRTE has successfully coordinated the professional services noted above with the following professionals: o Surveying/Base mapping: Toole Surveying Company, Inc. (Augusta, GA) o Wetland Delineation/Environmental Permitting: Graves Engineering Services (Augusta, GA) and Sligh Environmental Consultants (Savannah, GA) o Geotechnical Evaluation: Graves Engineering Services (Augusta, GA) Unforeseen Environmental Conditions (Corrosion Engineering) WRTE will coordinate with DIPRA for field testing to determine the need for corrosion testing/protection. Currently, these services are free for ductile iron pipe diameters less than 30”. However, should DIPRA policy change or should there be a need for specialty engineering services, then WRTE will utilize the services of CORRPRO. A lump sum fee has been included for these services. WRTE will not utilize these fees without submitting a separate fee proposal and receiving written authorization from AUD. Attachment number 1 Page 3 of 7 Item # 2 Prime Consultant: Client: Pr i n c i p a l - i n - C h a r g e Pr o j e c t M a n a g e r Se n i o r E n g i n e e r St a f f E n g i n e e r En g i n e e r i n g T e c h Ca d d O p e r a t o r Ad m i n i s t r a t i v e A s s i s t To t a l Phase I - Concept Validation 0 0 0 0 0 0 0 0 Phase II - Database Preparation 0 0 0 0 0 0 0 0 Phase III - Sub-Consultant Services 0 0 0 0 0 0 0 0 Phase IV - 30% Plans 0 8 28 0 30 60 0 126 Phase V - Easement Maps 0 0 0 0 0 0 0 0 Phase VI - 60% Plans 0 0 0 0 0 0 0 0 Phase VII - 90% Plans 0 12 40 0 38 52 0 142 Phase VIII - Final Plans 0 12 40 0 38 52 0 142 Phase IX - Construction 0 0 0 0 0 0 0 0 Totals 0 32 108 0 106 164 0 410 Phase I - Concept Validation Engineering = $32,235.00 Phase II - Database Preparation Surveying = $15,840.00 Phase III - Sub-Consultant Services Environmental = $3,500.00 Phase IV - 30% Plans Geotechnical = $5,500.00 Phase V - Easement Maps Easement Maps = $2,700.00 Phase VI - 60% Plans Corrosion Engineering = $25,000.00 Phase VII - 90% Plans Total = $84,775.00 Phase VIII - Final Plans Phase IX - Construction Doug Barnard /Lumpkin Road Richmond Total Phase Cost Augusta Utilities 2/13/2007 P-06001A W.R. Toole Engineers, Inc. Proposal Number: Project Name: County: Date: Ph a s e D e s c r i p t i o n Ph a s e D e s c r i p t i o n Man-Hour Summary Total Estimated Cost =$84,775.00 Cost Summary By Phase $34,000.00 Total Labor $0.00 Total Direct Cost (Sub-Consultants & Reproduction Costs) $0.00 $0.00 $15,840.00 $2,700.00$0.00 $330.00 $2,700.00 $9,160.00 $9,490.00 $495.00 $0.00 $15,840.00 $0.00 $34,000.00 $0.00 $330.00 Cost Summary By Service $0.00 $0.00 $0.00 $0.00 $11,290.00 $11,455.00 $0.00 $10,960.00 $10,960.00 Percentage of Cost By Service 38.02% 18.68% 4.13% 100.00% 6.49% 3.18% 29.49% Attachment number 1 Page 4 of 7 Item # 2 Task Item/ Task Description Pr i n c i p a l - I n - C h a r g e Pr o j e c t M a n a g e r Se n i o r E n g i n e e r En g i n e e r En g i n e e r i n g T e c h n i c i a n CA D O p e r a t o r Ad m i n i s t r a t o r To t a l % o f T o t a l 1 Water Main Alignments 0 0 2 0 8 16 0 26 20.63% 2 Water Main Profiles 0 0 2 0 8 16 0 26 20.63% 3 Water Main Details 0 0 2 0 2 4 0 8 6.35% 4 Soil Erosion Control Plans 0 0 2 0 4 8 0 14 11.11% 5 Utility Coordinations 0 2 4 0 4 8 0 18 14.29% 6 GDOT Permitting 0 2 4 0 4 8 0 18 14.29% 7 Specifications 0 0 0 0 0 0 0 0 0.00% 8 Site Visits 0 0 0 0 0 0 0 0 0.00% 9 Meetings 0 4 4 0 0 0 0 8 6.35% 10 QA/QC 0 0 8 0 0 0 0 8 6.35% 11 Task 0 0 0 0 0 0 0 0 0.00% 12 Task 0 0 0 0 0 0 0 0 0.00% 13 Task 0 0 0 0 0 0 0 0 0.00% 14 Task 0 0 0 0 0 0 0 0 0.00% 15 Task 0 0 0 0 0 0 0 0 0.00% 16 Task 0 0 0 0 0 0 0 0 0.00% 17 Task 0 0 0 0 0 0 0 0 0.00% 18 Task 0 0 0 0 0 0 0 0 0.00% 19 Task 0 0 0 0 0 0 0 0 0.00% 20 Task 0 0 0 0 0 0 0 0 0.00% 0 0.00% Totals 0 8 28 0 30 60 0 126 100.00% RichmondCounty: Phase IV: 30% Plan Man-Hour Estimates Project Name:Doug Barnard /Lumpkin Road Date:2/13/2007 Project:P-06001A Item # 2 Task Item/ Task Description Pr i n c i p a l - I n - C h a r g e Pr o j e c t M a n a g e r Se n i o r E n g i n e e r En g i n e e r En g i n e e r i n g T e c h n i c i a n CA D O p e r a t o r Ad m i n i s t r a t o r To t a l % o f T o t a l 1 Water Main Alignments 0 0 2 0 8 12 0 22 15.49% 2 Water Main Profiles 0 0 2 0 8 12 0 22 15.49% 3 Water Main Details 0 0 2 0 2 4 0 8 5.63% 4 Soil Erosion Control Plans 0 0 2 0 8 8 0 18 12.68% 5 Utility Coordinations 0 2 8 0 4 8 0 22 15.49% 6 GDOT Permitting 0 2 8 0 4 8 0 22 15.49% 7 Specifications 0 0 2 0 4 0 0 6 4.23% 8 Site Visits 0 0 0 0 0 0 0 0 0.00% 9 Meetings 0 6 6 0 0 0 0 12 8.45% 10 QA/QC 0 2 8 0 0 0 0 10 7.04% 11 Task 0 0 0 0 0 0 0 0 0.00% 12 Task 0 0 0 0 0 0 0 0 0.00% 13 Task 0 0 0 0 0 0 0 0 0.00% 14 Task 0 0 0 0 0 0 0 0 0.00% 15 Task 0 0 0 0 0 0 0 0 0.00% 16 Task 0 0 0 0 0 0 0 0 0.00% 17 Task 0 0 0 0 0 0 0 0 0.00% 18 Task 0 0 0 0 0 0 0 0 0.00% 19 Task 0 0 0 0 0 0 0 0 0.00% 20 Task 0 0 0 0 0 0 0 0 0.00% 0 0.00% Totals 0 12 40 0 38 52 0 142 100.00% Date:2/13/2007 Project:P-06001A Phase VII: 90% Plan Man-Hour Estimates Project Name:Doug Barnard /Lumpkin Road RichmondCounty: Item # 2 Task Item/ Task Description Pr i n c i p a l - I n - C h a r g e Pr o j e c t M a n a g e r Se n i o r E n g i n e e r En g i n e e r En g i n e e r i n g T e c h n i c i a n CA D O p e r a t o r Ad m i n i s t r a t o r To t a l % o f T o t a l 1 Water Main Alignments 0 0 2 0 8 12 0 0 22 15.49% 2 Water Main Profiles 0 0 2 0 8 12 0 0 22 15.49% 3 Water Main Details 0 0 2 0 2 4 0 0 8 5.63% 4 Soil Erosion Control Plans 0 0 2 0 8 8 0 0 18 12.68% 5 Utility Coordinations 0 2 8 0 4 8 0 0 22 15.49% 6 GDOT Permitting 0 2 8 0 4 8 0 0 22 15.49% 7 Specifications 0 0 2 0 4 0 0 0 6 4.23% 8 Site Visits 0 0 0 0 0 0 0 0 0 0.00% 9 Meetings 0 6 6 0 0 0 0 0 12 8.45% 10 QA/QC 0 2 8 0 0 0 0 0 10 7.04% 11 Task 0 0 0 0 0 0 0 0 0 0.00% 12 Task 0 0 0 0 0 0 0 0 0 0.00% 13 Task 0 0 0 0 0 0 0 0 0 0.00% 14 Task 0 0 0 0 0 0 0 0 0 0.00% 15 Task 0 0 0 0 0 0 0 0 0 0.00% 16 Task 0 0 0 0 0 0 0 0 0 0.00% 17 Task 0 0 0 0 0 0 0 0 0 0.00% 18 Task 0 0 0 0 0 0 0 0 0 0.00% 19 Task 0 0 0 0 0 0 0 0 0 0.00% 20 Task 0 0 0 0 0 0 0 0 0 0.00% Totals 0 12 40 0 38 52 0 0 142 100.00% Phase VIII: Final Plan Man-Hour Estimates County: Project Name: Date: Project: 2/13/2007 P-06001A Doug Barnard /Lumpkin Road Richmond Item # 2 EngineeringServicesCommitteeMeeting 7/30/20071:30PM AwardChangeOrdertotheDesignContractforAugus taUtilitiesDepartment Department:AugustaUtilitiesDepartment caption2:ApproveawardforAdditionalDesignServicesinthe amount of$42,238.00toJohnson,Laschober&Associates,P .C. (JLA)inordertoincorporatechangesfromtheorig inal HorsepenPhaseIIdesignrequirementswhicharecur rentlyat 100%stageofdesign. Background:TheHorsepenSanitaryImprovementsprojectinvolved the designofsanitarysewerlinestoservicetheSandR idgeArea ofTobaccoRoad.Theseimprovementsprojectisfur ther subdividedintotwoseparatedesignprojects,Phase Iand PhaseII.ThePhaseIIdesigninvolves36,652line arfeetof 8-inchsanitarysewerlinetoservetheSandrigesu bdivision area. Analysis:TheconstructioneffortfortheHorsepenPhaseIde signwas notabletocaptureseveralpropertiesalongCrestD riveand PinnaclePlace.Inaddition,duringthePhaseIIde signeffort to100%stage,alargetractofpropertywassubdiv idedinto5 separateparcels,andtheroutethroughacouplepr operties hadtoberedesignedinordertomeetcurrentstrea mbuffer requirements.AUDhasrequestedJLAtoperformaddi tional designworktomodifycurrentPhaseII100%planst o capturethechangesduetoenvironmentalpermitting andthe threelineextensionstoservetheadditionalprope rties previouslyidentified.JLAsubmittedanacceptable proposal foradditionaldesignfeestomodifythePhaseIId esignplans whichincludesengineeringworkfordesignofaddit ional 3,755LFandpreparationof48additionaleasementp lats.The staffoftheAugustaUtilitiesDepartmenthasrevie wedthe proposalandrecommendawardoftheadditionaldesi gnfees. FinancialImpact: Thechangeorderforthisproject$42,238.00.These funds areavailablefromthefollowingaccounts:510043420 - Cover Memo Item # 3 5212115/80250202-5212115 Alternatives:1.RejectJLAProposal,whichwoulddelaythedesig nofthe projectandtheconstructionofthewatermainexte nsion.2. ApproveJLAProposalforAdditionalEngineeringDes ign Feetocompletethedesignofthetwowaterlinepro jects. Recommendation:ItisrecommendedtoawardtheAdditionalDesignFe eto JLAintheamountof$42,238.00 Fundsare Availableinthe Following Accounts: 510043420-5212115/80250202-5212115 REVIEWEDANDAPPROVEDBY : ClerkofCommission Cover Memo Item # 3 Item # 3 Item # 3 Item # 3 Item # 3 Attachment number 1 Page 5 of 8 Item # 3 Attachment number 1 Page 6 of 8 Item # 3 Attachment number 1 Page 7 of 8 Item # 3 Attachment number 1 Page 8 of 8 Item # 3 EngineeringServicesCommitteeMeeting 7/30/20071:30PM AwarddesignmodificationforMorganRoadpumpStat ionImprovementsandFt.GordonWater MainConnectionprojects Department:UtilitiesEngineering caption2:Approveawardofdesigncontractmodificationinth e amountof$36,742toZELEngineers,Inc.forprovid ing additionalengineeringservicesfor3separatecons truction contractsinlieuof2forProject10801-MorganRoa dPump Station/Ft.Gordon20”WaterMainConnection. Background:Anengineeringcontractintheamountof$247,000w as awardedtoZELEngineersJune6,2006todesignan upgrade totheMorganRoadpumpstationandtodesigna20”water maintoserviceTobaccoRoadandFt.Gordon.Thepr oject designincludedproviding2.5MGDofwatertoFt.G ordon sourcedfromtheTobaccoRoadelevatedTankandupg raded MorganRoadPumpStationandstoragefacilityviaa 20” diameterpipeline.Duringthecourseofthedesign AUD determinedtheprojectshouldbeexecutedby3cons truction contractsinlieuof2.Threecontractswillprovid emore certaintythatAUDwillmeetthescheduledrequired inthe Ft.Gordon/CityofAugustacontractforwater/sanita rysewer services.Also,duetothenatureoftheworkinvol ved,3 constructioncontractsareconsideredmorepractica lto execute.ThereisspecializedworkattheMorganRo adPump Station,specialentryandclearancerequirementsi nstalling thepipelineontheFt.GordonArmyinstallation,a nd considerableconstructionconcernsworkingontheb usy TobaccoRoadcorridor. Analysis:ZELEngineerssubmittedaproposalof$36,742topr epared 3setsofconstructionsplansandspecificationsas directed. Theproposalalsoincludesadditionalnormalengine ering servicesduringthebiddingandconstructionphases ofthe3 contracts.TheAUDstaffevaluatedtheproposaland considersitfairandreasonableandinlinewithp riordesign costsforsimilarservices. Cover Memo Item # 4 FinancialImpact:Theproposalsubmittedforthisprojectchangewas $36,742. Thesefundsareavailablefromaccounts #511043410/5212115and80310810/5212115. Alternatives:None Recommendation:Itisrecommendedtoawardthedesignchangeorder toZEL Engineers,Inc. Fundsare Availableinthe Following Accounts: 511043410/5212115and80310810/5212115 REVIEWEDANDAPPROVEDBY : Finance. Procurement. Administrator. ClerkofCommission Cover Memo Item # 4 Attachment number 1 Page 1 of 1 Item # 4 Attachment number 2 Page 1 of 1 Item # 4 EngineeringServicesCommitteeMeeting 7/30/20071:30PM BelairHillsSubdivisionChangeNumberThree Department:EngineeringDepartment,AbieL.LadsonDirector caption2:ApprovetheEngineeringDepartmenttoauthorize SupplementalAgreementNumberThreeandCapitalPro ject BudgetChangeNumberThree(CPB#324-04-203824335) authorizingtheallocationoffundsintheamounto f $29,000.00toW.R.TooleEngineers,Inc.tocomplet ethe designfortheMMScottParkintheBelairHillsSu bdivision. Background:Thisprojectproposestoconsolidatethedirtroads inthe BelairHillsSubdivisionandallowthemtobeconst ructed underoneconstructioncontract.Thisprojectalso fundedby theUtilityDepartment,andtheMMScottPark ImprovementsfundedbytheRecreationDepartment. Analysis:Currently,thedesigntoimprovethestormdrainage anddirt roadsinBelairHillsSubdivisioniscompleted.Al arge portionoftheCity’spropertywhereMMScottislo catedhas beensurveyedanddesignedtoaccommodateanyaddit ional drainage.Foranadditional$29,000,W.R.Toolecan completethesurveyanddesignfortheMMScottwal king trail.Thedesigncompletionisscheduledfor1-1/2 monthsto 2months.TheconstructionofMMScottParkImprove ments willbeincludedintheconstructionbidfortheBe lairHills Subdivisionproject,butfundedthroughtheRecreat ion Department. FinancialImpact:FundsareavailablethroughtheRecreationDepartme ntin account(325061110-5212115/206065006-5212115) Alternatives:1)ApprovetheEngineeringDepartmenttoauthorize SupplementalAgreementNumberThreeandCapitalPro ject BudgetChangeNumberThree(CPB#324-04-203824335) authorizingtheallocationoffundsintheamounto f $29,000.00toW.R.TooleEngineers,Inc.tocomplet ethe Cover Memo Item # 5 designfortheMMScottParkintheBelairHillsSu bdivision. 2)Donotapproveandriskdelayingtheproject. Recommendation:ApproveAlternativeNumberOne. Fundsare Availableinthe Following Accounts: 325061110-5212115/206065006-5212115 REVIEWEDANDAPPROVEDBY : Finance. Administrator. ClerkofCommission Cover Memo Item # 5 Attachment number 1 Page 1 of 7 Item # 5 Attachment number 1 Page 2 of 7 Item # 5 Attachment number 1 Page 3 of 7 Item # 5 Attachment number 1 Page 4 of 7 Item # 5 Attachment number 1 Page 5 of 7 Item # 5 Attachment number 1 Page 6 of 7 Item # 5 Attachment number 1 Page 7 of 7 Item # 5 (SA02 – For changes greater than $20,000) April 2005 AUGUSTA, GEORGIA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT Project No.: 324-04-203824335 SUPPLEMENTAL AGREEMENT NO.: 3 P.O.: 78600 WHEREAS, We, WR Toole Engineers, Inc. Consultant, entered into a contract with Augusta- Richmond County on April 15, 2003, for engineering design services associated with the Belair Hill Subdivision Improvements, Project No. 324-04-203824335, File Reference No. 06-014 (A), and WHEREAS, certain revisions to the design requested by Augusta, Georgia are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to- wit: Additional engineering services to the proposed detention pond located In the center MM Scott Park. It is agreed that as a result of the above modification the contract amount is increased by $28,750.00 from $383,085.74 to a new total of $411,835.74. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, WR Toole Engineers, Inc., Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This 10th day of May, 2007. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA, GEORGIA Fred Russell, Administrator Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Attachment number 2 Page 1 of 1 Item # 5 EngineeringServicesCommitteeMeeting 7/30/20071:30PM BensonRoad Department:AugustaUtilitiesDepartment caption2:MotiontoapprovechangingBensonDrivetoBensonR oad. Background:OnSeptember2,2003,theAugustaCommissionapprov ed thenameBensonDriveforthenewroadway,located offof RichmondHillRoad,totheproposedPublicWorksan d Utilitiesbuildings.Inadvertently,theroadwayna mewas pickedupasBensonRoadandallplans,plats,cont ractsand otherdocumentsrefertoBensonRoad. Analysis:Forfutureprojects,maintenanceandreference,the reneeds tobeaclearpapertrailonthisroadway.Changing thename onalloftherecordsanddocumentationwouldbea major monetaryexpense,whereasrenamingBensonDriveto BensonRoadwouldbeachangemadeinthemapping system. FinancialImpact: Alternatives:DonotapproverenamingBensonDriveBensonRoadan d reviseallrecordsanddocumentation. Recommendation:ApprovethenamechangefromBensonDrivetoBenson Road. Fundsare Availableinthe Following Accounts: N/A REVIEWEDANDAPPROVEDBY : Cover Memo Item # 6 Finance. Procurement. Administrator. ClerkofCommission Cover Memo Item # 6 EngineeringServicesCommitteeMeeting 7/30/20071:30PM Condemnation-JonathanandChristineEdwards Department:CountyAttorney-StevenE.Shepard,Attorney caption2:MotiontoauthorizecondemnationofaportionofPr operty# 052-0-117-00-03906CarolynStreet,whichwasowned by thelateJonathanandChristineEdwards,for1,025 Square FeetofPermanentEasementand2,793SquareFeetof TemporaryEasement.PWProject:BelairHillsSubdiv ision ImprovementProject. Background:Theappraisedvalueoftheeasementis$633.00.Du eto inabilitytoverifythatMs.JoyceI.Chandlerist hetrusteeof Mr.JonathanEdwardsandMrs.ChristineEdwardsEst ate. Therefore,itisnecessarytopursuecondemnation. Analysis:Condemnationisrequiredinordertoacquireeaseme nt. FinancialImpact:Thenecessarycostswillbecoveredbytheprojectb udget. Alternatives:Denytheauthorizationtocondemn. Recommendation:Approvetheauthorizationtocondemn. Fundsare Availableinthe Following Accounts: G/L324-04-1110-54.11120J/L203824335-54.11120 REVIEWEDANDAPPROVEDBY : Administrator. ClerkofCommission Cover Memo Item # 7 Cover Memo Item # 7 Attachment number 1 Page 1 of 1 Item # 7 EngineeringServicesCommitteeMeeting 7/30/20071:30PM Condemnation-LeonardM.Gaines Department:CountyAttorney-StephenE.Shepard,Attorney caption2:MotiontoauthorizecondemnationofaportionofPr operty# 051-0-220-00-01608HildaAvenueand051-0-221-00-0 3917BoltonStreet,whichareownedbyLeonardM.G aines, for2,000Sq.FeetofTemporaryEasement.PWProje ct: BelairHillsSubdivisionImprovementProject. Background:Theappraisedvalueofthiseasementis$160.00.D ueto numerousunsuccessfulattemptstocontacttheowner ,itis necessarytopursuecondemnation. Analysis:Condemnationisrequiredinordertoacquiretheea sement. FinancialImpact:Thenecessarycostswillbecoveredbytheprojectb udget. Alternatives:Denytheauthorizationtocondemn. Recommendation:Approvetheauthorizationtocondemn. Fundsare Availableinthe Following Accounts: G/L324-04-1110-54.11120J/L203824335-54.11120 REVIEWEDANDAPPROVEDBY : Administrator. ClerkofCommission Cover Memo Item # 8 Attachment number 1 Page 1 of 1 Item # 8 EngineeringServicesCommitteeMeeting 7/30/20071:30PM Condemnation-LonellandCarolY.Spurgeon Department:CountyAttorney-StephenE.Shepard,Attorney caption2:MotiontoauthorizecondemnationofaportionofPr operty #065-2-003-00-03912PadrickStreet,whichisowned by LonellandCarolY.Spurgeon,for653SquareFeeto fRight ofWayand1,802SquareFeetofTemporaryEasement.PW Project:BelairHillsSubdivisionImprovementProje ct. Background:Theappraisedvalueoftheeasementis$666.00.Du eto unsuccessfulattemptstoobtainthenecessaryparti alreleases fromtwobanksforthepurchaseoftherightofway ,itis necessarytopursuecondemnation. Analysis:Condemnationisrequiredinordertoacquireright ofway andtemporaryeasement. FinancialImpact:Thenecessarycostswillbecoveredbytheprojectb udget. Alternatives:Denytheauthorizationtocondemn. Recommendation:Approvetheauthorizationtocondemn. Fundsare Availableinthe Following Accounts: G/L324-04-1110-54.11120J/L203824335-54.11120 REVIEWEDANDAPPROVEDBY : Administrator. ClerkofCommission Cover Memo Item # 9 Cover Memo Item # 9 Attachment number 1 Page 1 of 1 Item # 9 EngineeringServicesCommitteeMeeting 7/30/20071:30PM Condemnation-RuthN.andThomasD.Gray Department:CountyAtotrney-StephenE.Shepard,Attorney caption2:MotiontoauthorizecondemnationofaportionofPr operty# 051-0-234-00-03946CarolynStreet,whichisowned by RuthN.GrayandThomasD.Gray,for3,805Sq.Feet of PermanentEasementand3,387Sq.FeetofTemporary Easement.PWProject:BelairHillsSubdivision ImprovementProject. Background:Theappraisedvalueoftheeasementis$1,793.00.After numerousunsuccessfulattemptstoreachMr.McMulle nof McMullenandAssociates,whorepresentsthepropert y owners,itisinourbestinteresttopursuecondem nation. Analysis:Condemnationisrequiredinordertoacquiretothe easement. FinancialImpact:Thenecessarycostswillbecoveredbytheprojectb udget. Alternatives:Denytheauthorizationtocondemn. Recommendation:Approvetheauthorizationtocondemn. Fundsare Availableinthe Following Accounts: G/L324-04-1110-54.11120J/L203824335-54.11120 REVIEWEDANDAPPROVEDBY : Administrator. Cover Memo Item # 10 ClerkofCommission Cover Memo Item # 10 Attachment number 1 Page 1 of 1 Item # 10 EngineeringServicesCommitteeMeeting 7/30/20071:30PM EastBoundaryWater&SewerConstruction Department:Utilities caption2:ApproveofutilityitemstobeconstructedbyMabus Brothers Construction,Inc.,intheEastBoundaryDrainage& ImprovementProjectintheamountof$97,148.67. Background:TheEastBoundaryDrainageImprovementProjectis currentlyunderconstructionunderthedirectionof thePublic WorksDepartment.TheprojectlimitsrunsalongEas t BoundaryfromBroadStreettoLaneyWalkerBlvd.During constructionofthenewstormlines,MabusBrothers Constructionfoundthatthereweresanitarysewer connectionstotheoldstormlines.Theflowneeds tobe removedassoonaspossible.Fromthisdiscoveryi thasbeen determinedthatthereisanareaalongEastBoundar ythat currentlyhasnosanitarysewerpipinginplace.Ap provalof thisitemwillallowfortheconstructionof640li nearfeetof sewermain,alongwiththeadditionalservicesthat willtieto thenewmain.Ithasalsobeendeterminedthatther eis approximately525linearfeetofoldACwaterlinea longEast Boundary.ItisthedesireofAUDtoreplacethiso ldline whilethedrainageimprovementprojectisunder construction. Analysis:Theconstructionof640linearfeetofsanitarysew ermain andappurtenanceswillallowforthesanitarysewer flowto beremovedfromthenewstormlinesandwillprovid eforthe neededsewerservicealongEastBoundary.Theconst ruction of525linearfeetofnewwaterlinewillreplaceth eoldAC waterlinewithanewerandmorereliablewaterline. FinancialImpact:Fundsareavailableintherenewal&extensionbudg et 507043420-5425210/80700050-5425210intheamoount of $97,148.67. Cover Memo Item # 11 Alternatives:1)LeavetheexistingwaterlineinplaceandtaskM abus Brotherswiththenewsewerlineonly.2)Obtainpr icing fromothercontractorsfortheconstructionofthe new waterlineand/orthenewsewerline Recommendation:Itisrecommendedto:Approveofutilityitemstob e constructedbyMabusBrothersConstruction,Inc.,i ntheEast BoundaryDrainage&ImprovementProjectintheamou ntof $97,148.67. Fundsare Availableinthe Following Accounts: $97,148.67 REVIEWEDANDAPPROVEDBY : Finance. Procurement. Administrator. ClerkofCommission Cover Memo Item # 11 EngineeringServicesCommitteeMeeting 7/30/20071:30PM FinancialCloseoutsofSplostProjects Department:AbieL.Ladson,P.E.,DirectorEngineeringDrpartme nt caption2:ApprovetheFinancialCloseoutsofSPLOSTprojects that wereprogrammedover10yearsagofortheEngineeri ng Departmentandneverdesignedorconstructed.Thef unding fortheseprojectswillberedirectedbackintothe irrespective FundRecaptureAccount.(ReferredfromJuly10 Commissionmeeting) Background:Belowisalistofprojectsbudgetedover10years ago.No documentationtoinitiateanyactivitytostartthe processof anyoftheseprojectscanbefoundinTheEngineeri ng DepartmentorTheFinanceDepartment.Therefore,in an efforttocontinuetheprogressoffundingcurrent projectsand withthecostsofconstructionrising,weareaskin gtoredirect fundingfromtheseprojectstotheirrespectiveFun d RecapturePhase.YearBudgetedProjectProject#Amount Budgeted1996CraneCreek296812303$150 ,000 1996LaneyWalker@EastBN/A$15,0001 996 MartinL.KingDrImp296812010$273,794 1996 NewSavannahRoad296823120$1,431,0001996 RaesCreekPhII296812305$257,0001996 Third LevelCleaning296812014$491,5061996W illow CreekN/A$40,0001999FuryFerryRoad 296823205$22,0001999WaltonWayExt 299822370$1,385,0001999WashingtonSidewa lkN/A $176,0002000PhinizySwampDrainage2008 23170 $273,8842002RifleRange202824830$ 55,000$4,570,184 Analysis:Whiletheseprojectsarestilldeemedimportant,it willbe beneficialandinthebestinterestofAugusta-Rich mond Countytocontinuewiththeprogressofcurrentpro jects. FinancialImpact: FundswillbetransferredtotherespectiveRecaptu rePhase Cover Memo Item # 12 Accounts. Alternatives:1)ApprovetheFinancialCloseoutsofSPLOSTprojec tsthat wereprogrammedover10yearsagoforTheEngineeri ng Departmentandneverdesignedorconstructed.Thef unding fortheseprojectswillberedirectedbackintothe irrespective FundRecaptureAccount.2)Donotapproveanddisco ntinue projectsduetofundingthatarecurrentlyinprogr ess. Recommendation:ApproveAlternativeNumberOne Fundsare Availableinthe Following Accounts: N/A REVIEWEDANDAPPROVEDBY : ClerkofCommission Cover Memo Item # 12 EngineeringServicesCommitteeMeeting 7/30/20071:30PM GPS/GlonassReceiverandBaseStation Department:Utilities caption2:ApprovethepurchaseofaTrimbleR8GNSSReceiver Kit, DataCollectorandAccessoriesintheamountof$27 ,455.75. Background:TheAugustaUtilitiesDepartmentmaintainscritical infrastructuretosupportit'sWaterProductionand WastewaterCollectionandDistributionOperations.The EngineeringDepartmenthasdevelopedGIStoolsand utilizes GPSTechnologytoaccuratelylocate,measureandin ventory WaterandSewerassets.Additionally,AUDisconst ructing modificationstothewaterplantatHighlandAvenue andthe JBMesserlyWastewaterPlant.Theexistingroverw illbe assignedtothoseprojectstocapturelocationsof pipingand valvesduringconstruction. Analysis:ThepurchaseoftheR8GNSSUnitwillgreatlyenhan cethe capabilitesofourdatacollectionprocess.Itisa fully integrated,lightweightreceiver,antennaanddatal inkradio thatprovidessubmeteraccuracyandsupportsModern ized GPSL2CandL5signalsaswellasGLONASSL1/L2 signals.TheR8unitiscapableofswitchingfromb aseto roverfunctionstoprovidegreaterflexibilityint hefield. FinancialImpact:$27,455.75fromaccount506043110-5213119 Alternatives:NoAlternatives Recommendation:WerecommendthepurchaseoftheTrimbleR8GNSS GPS/GLONASSunitandenhancedwarrantiesintheamo unt of$27,455.75tosupportourexpandinginfrastructu re, includingFortGordon. Fundsare Cover Memo Item # 13 Availableinthe Following Accounts: 506043110-5213119 REVIEWEDANDAPPROVEDBY : Finance. Procurement. Administrator. ClerkofCommission Cover Memo Item # 13 Quotation R8 GNSS GPS/Glonass eRTK Rover 6/22/07 Bill to: City of Augusta Tom Carpenter tcarpenter@augustaga.gov 360 Bay St Augusta, GA. 30901 Ship to: City of Augusta Tom Carpenter Augusta, GA. 30901 Tel 706-312-4150 Fax 706-312-4129 Qty Catalog #Description Price Total 1 R8200-91-66 Trimble R8 GNSS Receiver Kit with base accessories, Internal UHF Receive Radio $22,258.50 $22,258.50 1 TSC216 TSC2 w/Survey Controller and integrated bluetooth, 802.11b wireless, and 512Mb memory $5,315.25 $5,315.25 1 56044-00 TSC2 GPS Accessory Kit - Pole bracket, cabling $304.00 $304.00 1 48237-00 Discount - R8 GNSS Receiver with Data Collector -$2,500.00 -$2,500.00 1 5129-50 2M Composite Prism Pole Lightweight, mobile, collapsible with fixed height pin $245.00 $245.00 1 5217-04 SECO Bipod Use for control points and site calibration $139.00 $139.00 1 47926-00 Pouch for Cell Phone $29.00 $29.00 Shipping $55.00 Subtotal $25,845.75 1 Year software and firmware updates included with Sales Tax $0.00 purchase. Additional 1 yr update agreements available.Total $25,845.75 1 48811-00 Trade in credit for New Trimble GPS base or rover. 10" or better digital theodolite or 7" or better electronic total station or old survey grade GPS - Offer Valid through Jun 30 2007 -$2,500.00 -$2,500.00 1 48814-50 Trade In of Old Datalogger against new datalogger - Offer Valid through Jun 30 2007 -$1,000.00 -$1,000.00 Additional Warranties 1 EWR8 TRIMBLE R8 Extended Warranty - Covers hardware and firmware $1,030.00 $1,030.00 1 EWTSC2-SC TSC2 w/ Trimble Survey Controller Extended Warranty Extended warranty includes hardware, application software, firmware, and the Windows® CE operating system where applicable. $580.00 $580.00 Quoted prices are valid for 30 days. Thank you for the opportunity to submit this quotation. Signed: Signed: Signed: Signed: Chuck DrouillardChuck DrouillardChuck DrouillardChuck Drouillard Chuck Drouillard Duncan-Parnell 3150 West Montague Ave North Charleston, SC 29418 800-849-7710 Mobile: 843-709-3784 Fax 843-744-8073 chuckd@duncan-parnell.com Attachment number 1 Page 1 of 1 Item # 13 EngineeringServicesCommitteeMeeting 7/30/20071:30PM Parcel31AcquisitionofRight-of-Way,TaxMap:036-1-140-00-0;036-1-141-00-0;036-1-142-00-0; St.SebastianWay/GreeneSt./15thSt.,GDOTProject No.DE-00MS(389),P.I.26750,ARC ProjectNo.327-04-296812003 Department:CountyAttorney-StephenE.Shepard,Attorney caption2:MotiontoapproveanOptionforRight-of-Waybetwee n Augusta,Georgia,asownerandAugusta,Georgia,as optionee,inconnectionwiththeSt.SebastianWay Project, for0.206acre(8,965.86sq.ft.)infeeand0.032 acre (1,410.21sq.ft.)ofpermanentconstructionandma intenance easementforthefollowingpropertylocatedat1522 &1547 &1548BroadStreetforapurchasepriceof$86,100 .00. Background:Thepropertyownerhasagreedtoconveyaright-of-wayfor theSt.SebastianWayProject. Analysis:Thepurchaseofthereferencedpropertyisnecessar yforthe improvements. FinancialImpact:Thecostsnecessaryforthispurchasewillbecover edunder theprojectbudget.TheCountywilladvancethenec essary fundsforthepurchaseandtheGeorgiaDepartmento f Transportationwillreimbursethefundsadvancedby Augusta,Georgiaafteracquisitionoftheproperty. Alternatives:Denythemotiontoapprovethepurchaseoftherefe renced property. Recommendation:Approvethemotiontopurchasethereferencedprope rty. Fundsare Availableinthe Following Accounts: WillbereimbursedbyGeorgiaDOT. Cover Memo Item # 14 REVIEWEDANDAPPROVEDBY : Administrator. ClerkofCommission Cover Memo Item # 14 Item # 14 Item # 14 Item # 14 Item # 14 EngineeringServicesCommitteeMeeting 7/30/20071:30PM SouthAugustaFleaMarketWaterMain Department:ClerkofCommission caption2:ReportfromtheUtilitiesDepartment/Administrator regardingtheinstallationofthewatermaininthe areaofthe SouthAugustaFleaMarket. Background: Analysis: FinancialImpact: Alternatives: Recommendation: Fundsare Availableinthe Following Accounts: REVIEWEDANDAPPROVEDBY : ClerkofCommission Cover Memo Item # 15