HomeMy WebLinkAbout2006-10-09-Meeting Agenda
Engineering Services Committee
Meeting
Committee Room- 10/9/2006- 1:30 PM
ENGINEERING SERVICES
1. Motion to abandon alley off of Curran Street to JWS
Properties Investments, LLC (“JWS”).
Attachments
2. Approve a proposal from Johnson Laschober and
Associates, Inc. for the engineering design of the Butler
Interceptor Upgrade - West at a cost of $295,000.
Attachments
3. Approve a proposal from Stevenson and Palmer
Engineering, Inc. for the engineering design of the Main
Interceptor Upgrade Phase 2 at a cost of $530,789.
Attachments
4. Approve Amendment #1 to Zimmerman Evans and
Leopold’s professional services contract for the design of
the Rae’s Creek Trunk Sewer Replacement Phase IV
Project in the amount of $68,537.
Attachments
5. Approve award of construction contract for the Augusta
Utilities Department “Roadway Improvements for
Benson Road” to the lowest responsive bidder in the
amount of $2,339,655.45.
Attachments
6. Motion to authorize condemnation of a portion of
Property #018-0-046-00-0 2842 Pineview Rd, which is
owned by James E. Rowland, III for 3,394 sq. ft. of
temporary easement area and 6,879 sq. ft. of permanent
easement area. Public Works Project: Pointe West
Subdivision Drainage Improvement Project.
Attachments
7. Motion to authorize condemnation of a portion of
Property #018-0-433-00-0 2957 Pointewest Dr, which is
owned by Henry E. Magnusen, Jr. for 1,009 sq. ft. of
Attachments
www.augustaga.gov
permanent easement area. Public Works Project: Pointe
West Subdivision Drainage Improvement Project.
8. Motion to authorize condemnation of a portion of
Property #051-0-208-00-0 3926 Barrett Street, which is
owned by the Alfred and Roberta McKenzie for 3,973
sq. ft. of permanent drainage, utility and maintenance
easement, more or less. Public Works Project: Belair
Hills Subdivision Improvement Project 324-04-
203824335.
Attachments
9. Presentation by David Johnson, Sr. regarding mandatory
trash service.
Attachments
10. Ratify and approve the actions of AUD to repair and
replace the Laney Walker sanitary sewer main between
Laney Walker Court and Lover’s Lane through a change
order to the existing Laney Walker Sewer Emergency
Repair Project in the amount of $330,000 for a total
budget of $465,500.
Attachments
11. Award a contract to Commonwealth Data
Communications, Inc for Landfill and Solid Waste
Collections billing software in an amount not to exceed
$151,530.
Attachments
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Abandonment - Curran Street to JWS Properties Investments, LLC (“JWS”).
Department:County Attorney - Stephen E. Shepard, Attorney
Caption:Motion to abandon alley off of Curran Street to JWS
Properties Investments, LLC (“JWS”).
Background:JWS is the current owner of all of the properties surrounding
the alley located off of Curran Street consists of 0.08 acres,
as shown on the attached plat. This alley has not been used
for access by vehicles in many years and is overgrown with
trees and vegetation. JWS desires the abandonment of this
property so that it may use it in conjunction with its adjoining
property.
Analysis:Because a single owner owns all of the adjacent property,
there is no concern that abandonment will block egress or
access to any property owner.
Financial Impact:An appraisal valued the property’s market value to be $1500.
Alternatives:Either approve or deny the motion to abandon the alley off of
Curran Street.
Recommendation:Approve the motion to abandon the alley off of Curran Street
Funds are
Available in the
Following
Accounts:
JWS to pay.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Approve a proposal from Johnson Laschober and Associates, Inc. for the engineering design of
the Butler Interceptor Upgrade - West.
Department:Utilities
Caption:Approve a proposal from Johnson Laschober and Associates,
Inc. for the engineering design of the Butler Interceptor
Upgrade - West at a cost of $295,000.
Background:The existing Butler Interceptor between Dean’s Bridge Road
and Gordon Highway is currently undersized for the flow
anticipated as west Augusta continues to develop. The
Utilities Department recently completed a project to increase
the line size of a portion of the Butler Interceptor while other
construction projects are underway to expand the sewer
service area towards the western boundary. Upgrades are
needed in the existing sewer system as the customer service
base continues to expand.
Analysis:Accepting this proposal will allow for the design of the
Butler Interceptor Upgrade – West Project that will remove
the existing undersized western section of the Butler
Interceptor from operation. Johnson Laschober and
Associates is a local firm with an established history with the
Augusta Utilities Department.
Financial Impact:Johnson Laschober and Associates, Inc. has proposed a fee of
$295,000 to perform this work. These funds are available
from the 2004 Bond Issue, under account number
511043420/5212115-80360106/5212115.
Alternatives:None recommended.
Recommendation:Approve the proposal from Johnson Laschober and
Associates, Inc. for the engineering design of the Butler
Interceptor Upgrade - West at a cost of $295,000.
Funds are
Available in the
Following
Accounts:
511043420/5212115-80360106/5212115.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Disadvantaged Business Enterprise.
Administrator.
Clerk of Commission
A-1 REVISION DATE: March 2006
ATTACHMENT B – COMPENSATION – FEE PROPOSAL
PROPOSAL #: 042 DATE: 5/22/06
TO: Mr. Wes Byne, Assistant Director BY: PHONE (706) 312-4149
Engineering and Construction FAX (706) 312-4133
Augusta Utilities Dept. EMAIL wbyne@augustaga.gov
Augusta, GA
RE: Project No.: 60106; Project: Butler Creek Interceptor Upgrade – West
SUBMITTED BY: Richard J. Laschober, P.E., Project Manager
PARTICULARS:
I. Project Scope (See Attachment A-Scope of Services with Drawings P-1):
A. PROJECT DESCRIPTION: Butler Creek Interceptor Upgrade – West;
PROJECT NO.: 60106
The project involves the upgrade of an approximate 20,500-foot segment of the existing
Butler Creek Interceptor beginning on the south side of Drayton, on the downstream end,
and ending on the north side of Gordon Highway (US HWY 78/278). The upgrades will
connect to the existing 30-inch diameter interceptor sewer at each end.
Upgrades will involve the following beginning at the downstream end of the project and
commencing upstream:
1. Upgrade of approximately 6,600 feet of existing 15-inch interceptor and 5,800
feet of existing 18-inch interceptor beginning south of Drayton Drive on the
downstream end of the project and ending at the discharge of the existing
force mains. (Note: The exact nature of this upgrade – total replacement with
30-inch DIP replacement or a combination of new force main and gravity
sewer (existing and/or new) will be defined as determined in the Study Phase
of the engineering services);
2. Upgrade of the existing lift station and existing 600-foot segment of parallel 6-
inch and 10-inch force main; and
3. Upgrade of approximately 7,500-feet of 18-inch gravity interceptor with 30-
inch diameter ductile iron pipe beginning at the existing lift station to a point
of tie-in with the 30-inch interceptor sewer located on the north side of
Gordon Highway (US HWY 78/278) at the end of project.
B. DESIGN OBJECTIVES: Implement interceptor upgrades as recommended in previous CITY
studies to eliminate an approximate 20,500-foot segment of hydraulically deficient pipe.
A-2 REVISION DATE: March 2006
The proposed engineering services will be accomplished in two phases as follows:
1. Study Phase - The Study Phase that will develop and evaluate at least two
viable options to upgrade the lower 12,400-foot segment interceptor and make
recommendations for the method of upgrade beginning at the upstream
extent of existing 30-inch diameter interceptor sewer located immediately
south of Drayton Drive and ending at the discharge of the multiple force
mains.
2. Design Phase - The Design Phase Services involves design to implement
upgrade recommendations from the Study Phase and previous studies to the
existing interceptor sewer including upgrading the existing sanitary lift
station.
C. DESIGN CONDITIONS:
1. The CITY will provide the CONSULTANT with projected flow data as is available from
previous studies for design input necessary for the following:
a. Project sanitary flow data from present to end of design period to
include minimum and peak flows tributary to the existing lift station.
The design flow data shall include anticipated sanitary flow from the
City of Grovetown. This information will be used as the design basis
for the lift station upgrade and the development and evaluation of
alternatives during the study phase.
b. Projected sanitary flow data for the design period for the area tributary
to the lower 12,400-foot segment of interceptor excluding the sanitary
flow tributary to the existing lift station. This information will be used
to during the study phase in the development and evaluation of
alternatives.
c. Projected sanitary flow data for the design period for all upstream
areas tributary to the connection to the existing 30” interceptor sewer
located immediately south of Drayton Drive.
2. The CITY will provide the CONSULTANT with available GPS data on the existing
Butler Creek Interceptor within the project area.
3. Proposed Additional Services: Proposed Additional Services: The proposed
environmental service covers impacts that will only require a USACE Nationwide
Permit. If additional impacts are proposed such that the impacts to jurisdictional
waters exceed the maximum requirements of the Nationwide Permit for either USACE
or GA EPD, an individual permit may be required and additional services may be
necessary to complete the individual permit application package. If additional services
are required for an individual permit, the CONSULTANT will notify the CITY
regarding additional fees necessary before proceeding further.
A-3 REVISION DATE: March 2006
II. Basic Professional Services and Compensation:
A. Study Phase – Lump Sum .........................................................................................................$30,000
B. Design Phase:
1. Perform field survey for approximately 20,500 LF.
2. Prepare bid documents (constructions drawings and specifications for
approximately 20,500 LF of interceptor upgrade. Provide between one (1) and
two (2) separate bid tabulations per available funding as determined in later
phases of design.
3. Provide necessary approvals and/or permitting related to GA DOT utility
encroachments, wetlands, GA EPD, GAR 1000002, etc.
4. Provide bid and construction phase services for the initial phase which may
represent all or a portion of the 20,500 LF of interceptor upgrade.
5. Total Fee Engineering Fee - Lump Sum ......................................................................$225,000
C. Total Basic Professional Services and Compensation – Lump Sum .................................$255,000
III. Additional Services:
A. Wetlands and Permitting (by QORE Property Sciences): Work to be performed on a time and
expense basis not to exceed.......................................................................................................$10,000
B. Soil Borings (By QORE Property Sciences): Work to be performed for a Lump Sum of ..$ 9,000
C. Easements (By George L. Godman & Associates, P.C.)
1. Research and prepare up to 98 easement plats for permanent and/or
temporary (construction) easements.
2. Work to be performed on a time and expense basis not to exceed .........................$ 21,000
D. Total Additional Service..........................................................................................................$ 40,000
IV. Total Fee for Basic Professional Services and Additional Services .............................................$295,000
V. Listing of Key Personnel (See appended Attachment C)
VI. Schedule for Performance (See appended Attachment D)
AGENDA.PDFCONVERT.3126.DOC PAGE 1 OF 2
To: Johnson Laschober & Associates
Attn: Richard Laschober
P.O. Box 2103
Augusta, GA 30903
Re: RFQ #05-087
Qualified Engineering Firms on 2004 Bond Issue Projects
From: Geri Sams
Date: February 17, 2006
Project Number: 60106
Project Name: Butler Creek Interceptor Upgrade - West
The Augusta Program Management Team has completed a review of your Statement of
Qualifications submitted in response to RFQ #05-087 issued March 7, 2005 and received April
12, 2005. Based upon a series of criteria involving your preferences, capabilities, past
performance with the Augusta Utilities Department, and the Program needs, your firm has
been selected to complete the engineering design for the Butler Creek Interceptor Upgrade -
West. Included within this memorandum is the preliminary project scope. A meeting will be
set up by the Program Management Team to discuss the project your firm has been assigned
and clarify expectations of the program. Tentatively, these meetings will be scheduled to begin
in late February. Following preparation of your proposal a second meeting will be arranged to
begin contract negotiations. The Augusta Utilities Department looks forward to working with
you on this project. We request that any correspondence regarding this particular project
includes the above noted project number and name.
Preliminary Project Scope
• Design a pipeline to replace the western section of the Butler Creek Trunk Line. Refer to the
attached location figure for a general overview of the project area. One option for the
proposed project is a gravity sewer that will consist of approximately 20,500 feet of 30-inch
diameter ductile iron pipe that will begin where the previous upgrade project ended. Other
options for this project can be discussed at the initial scoping meeting alluded to below.
AGENDA.PDFCONVERT.3126.DOC PAGE 2 OF 2
During the first meeting be prepared to discuss the cost of route analysis, surveying, easement
plat preparation, design standards, bid package preparation, bid phase support, construction
phase support and optional services during construction/resident observation for this project.
Should you have any questions prior to the first meeting please contact the Augusta Program
Management Office at 706-303-2426 or submit questions to the Program Manager at
larry.scott@ch2m.com.
Sincerely,
Geri Sams
Director Procurement
COPIES: Max Hicks/Utilities Dept. Director
Wes Byne/Utilities Dept. Assistant Director
Clifford Goins/Utilities Dept. Assistant Director
Allen Saxon/Utilities Dept. Assistant Director
Russell Thies/Utilities Dept. Assistant Director
Larry Scott/Program Manager
Bob Davis/Program Construction Manager
James Rush/Program Project Engineer
Vendor Original
Five
Copies Vendor Original
Five
Copies
EMC Engineering Yes Yes Cheatham, Fletcher, Scott & Sears
Black & Veatch Yes Yes Lowe & Associates
Prad Group Yes Yes Nicholas Dickinson & Assoc
MacTec Engineering & Consulting Yes Yes The Woodhurst Partnership
Jordan Jones & Goulding Yes Yes URS Greiner Woodward Clyde
Gannett Fleming Yes Yes The LPA Group
Stantec Consulting Yes Yes KBJ Architects, Inc.
Arcadis Yes Yes Phillips & Jordan, Inc.
W. R. Toole Engineering, Inc. Yes Yes Goldie & Associates, Inc.
HDR Yes Yes H. Lawson Graham
James G. Swift & Associates Yes Yes Kimley-Horn & Assoc
Cranston, Robertson & Whitehurst Yes Yes QK4
W. K. Dickson Yes Yes R. W. Armstrong & Assoc
Johnson, Laschober & Assoc Yes Yes Scott Godefroy & Assoc
Stevenson & Palmer Yes Yes Stevens & Wilkinson
Williams-Russell & Johnson Yes Yes T3 Design Associates, Inc.
Zimmerman, Evans & Leopold Yes Yes Hobbs, Upchurch & Assoc.
RTW Yes Yes Grice & Associates
Environmental Services Group Yes Yes Pharr Engineering
B & E Jackson Yes Yes Heath & Lineback Engineers
Malcolm Pirnie Gresham Smith & partners
Southern Partners USInfrastructure, Inc.
Montgomery, Watson, Harza Volkert & Associates
Greenhorne & O'Mara Rochester & Associates
Clark Patterson Virgo Gambill Architects
Camp Dresser & McKee Parson Engineering
PM & A Consulting
RFQ #05-087 Qualified Engineering Firms on 2004 Bond Issue Projects
Augusta Utilities
RFQ Due: Tuesday, April 12, 2005 @ 3:00 p.m.
Request for Qualifications
RFQ’s will be received at this office until 3:00 p.m., Tuesday, April 12, 2005
RFQ #05-087 Qualified Engineering Firms on 2004 Bond Issue Projects for Augusta Utilities
RFQ’s will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30911
706-821-2422
RFQ documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street
– Room 605, Augusta, GA 30911.
All questions must be submitted in writing to the office of the Procurement Department by fax at 706-821-
2811 or by mail. No RFQ will be accepted by fax, all must be received by mail or hand delivered.
Bidders are cautioned that sequestration of documents through any other source is not advisable. Acquisition
of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate
information upon which to base his qualifications.
It is the wish of the Owner that minority businesses are given the opportunity to submit on the various parts of
the work. This desire on the part of the Owner is not intended to restrict or limit competitive bidding or to
increase the cost of the work. The Owner supports a healthy free market system that seeks to include
responsible businesses and provide ample opportunity for business growth and development.
No RFQ may be withdrawn for a period of 60 days after time has been called on the date of opening.
Bidders will please note that the number of copies requested; all supporting documents including financial
statements and references and such other attachments that may be required by the Request of Qualification are
material conditions of the package. Any package found incomplete or submitted late shall be rejected by the
Procurement Office. Any bidder allegedly contending that he/she has been improperly disqualified from
bidding due to an incomplete bid submission shall have the right to appeal to the appropriate committee of the
Augusta Commission. Please mark RFQ number on the outside of the envelope.
Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places
the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Augusta has a Link Deposit program designed to provide loans to eligible local Small, Minority and Women
Owned Businesses. For more information about this program contact the Human Resources Department at
706-821-2303.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle March 10, 17, 24, 31, 2005
Augusta Focus March 17, 2005
cc: Tameka Allen Interim Deputy Administrator
Yvonne Gentry DBE Coordinator
Max Hicks Utilities Department
Jim Rush CH2M Hill
FAX TRANSMISSION
AUGUSTA-RICHMOND COUNTY CONSOLIDATED GOVERNMENT
530 Greene Street - Room 605
Augusta, Georgia 30911
706 821-2422
Fax: 706 821-2811
To:
Southeastern Newspaper
Date: March 3, 2005
Fax #:
706 823-3588
Pages:
From:
Geri A. Sams
2, including this cover sheet.
Subject:
LEGAL NOTICES FOR RFQ ITEM: #05-087
COMMENTS:
Please print the above RFQ Item(s) on the following dates:
March 10, 17, 24, 31, 2005
REQUISITION #47297A
Please send an affidavit of publication.
FAX TRANSMISSION
AUGUSTA-RICHMOND COUNTY CONSOLIDATED GOVERNMENT
530 Greene Street - Room 605
Augusta, Georgia 30911
706 821-2422
Fax: 706 821-2811
To:
Augusta Focus
Date: March 3, 2005
Fax #:
706 724-8432
Pages:
From:
Geri A. Sams
2, including this cover sheet.
Subject:
LEGAL NOTICES FOR RFQ ITEM: #05-087
COMMENTS:
Please print the above RFQ Item(s) on the following dates:
March 17, 2005
REQUISITION #47297B
Please send an affidavit of publication.
Disadvantaged Business Enterprise
Yvonne Gentry
DBE Coordinator
Disadvantaged Business Enterprise Department
501 Greene Street – Suite 304 - Augusta, GA 30901
(706) 821-4206 – Fax (706) 821-4228
WWW.AUGUSTAGA.GOV
TO: Geri Sams
Director, Procurement Department
Max Hicks
Director, Utilities Department
FROM: Yvonne Gentry, Coordinator
Disadvantaged Business Enterprise Department
SUBJECT: DBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOAL
BBBButler Creek Inteutler Creek Inteutler Creek Inteutler Creek Interceptor Upgrade rceptor Upgrade rceptor Upgrade rceptor Upgrade ---- West West West West
DATE: September 22, 2006
This memo is to transmit the review and concurrence of the recommended DBE
Utilization goal of zero (0%) for the above referenced project. The goal-setting
methodology considered the following factors based on good faith efforts of the
contractor:
• The project’s total estimated cost is $$$$295,000295,000295,000295,000.
• There is 0% value of the scope of work where minority/women minority/women minority/women minority/women
businesses businesses businesses businesses availability exists.
• There is 0% value of the scope of work where small businesses small businesses small businesses small businesses
availability exists.
• There is 100% value of the scope where local businesses local businesses local businesses local businesses availability
exists.
The contractor must prepare their proposed DBE Utilization Form submittal based on
the total dollar value of their base bid. No further adjustments should be made.
The above recommendation is based on information provided at the time of review.
If you have any questions, please feel free to contact me at (706) 821-2406.
YG:glw
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Approve a proposal from Stevenson and Palmer Engineering, Inc. for the engineering design of
the Main Interceptor Upgrade Phase 2.
Department:Utilities
Caption:Approve a proposal from Stevenson and Palmer Engineering,
Inc. for the engineering design of the Main Interceptor
Upgrade Phase 2 at a cost of $530,789.
Background:The existing Main Interceptor Sanitary Sewer is a 50 year old
reinforced concrete pipe that runs from Walton Way in
downtown Augusta to the James B. Messerly Water Pollution
Control Plant (WPCP) on Doug Barnard Parkway. The
existing pipe is undersized and beginning to deteriorate is
several locations. Phase 1 of the Main Interceptor Upgrade is
currently advertised for construction and will replace the
existing pipe from Laney Walker Boulevard to Dan Bowles
Road. Phase 2 of the Main Interceptor Upgrade will replace
the existing pipe from Dan Bowles Road to the James B.
Messerly WPCP.
Analysis:Accepting this proposal will allow for the design of Phase 2
of the Main Interceptor Upgrade Project that will remove the
existing aging and undersized Main Interceptor from
operation. Stevenson and Palmer Engineering is a local firm
with an established history with the Augusta Utilities
Department. Stevenson and Palmer Engineering also
proposes to utilize 11% local DBE participation on this
project as well.
Financial Impact:Stevenson and Palmer Engineering, Inc. has proposed a fee
of $530,789 to perform this work. These funds are available
from the 2004 Bond Issue, under account number
511043420/5212115-80300007/5212115.
Alternatives:None recommended.
Recommendation:Approve the proposal from Stevenson and Palmer
Engineering, Inc. for the engineering design of the Main
Interceptor Upgrade Phase 2 at a cost of $530,789.
Funds are
Available in the
Following
Accounts:
511043420/5212115-80300007/5212115.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Disadvantaged Business Enterprise.
Administrator.
Clerk of Commission
Main Interceptor Upgrade Phase II
Preliminary Opinion of Probably Cost
Key Description Quantity Unit Unit Price Total
1 72" Sanitary Sewer 5335 LF $530 $2,827,550
2 84" Sanitary Sewer 8535 LF $721 $6,153,735
3 Jack and Bore (add) 300 LF $500 $150,000
4 Manholes 35 EA $13,000 $455,000
5 Special Structures 3 EA $20,000 $60,000
6 Pavement 1 LS $100,000 $100,000
7 Miscellaneous Construction 1 LS $1,719,485 $1,719,485
8 Contingency 20.00% $2,293,154
$13,758,924
9 Engineering 3.31% $530,789
$14,289,713
Subtotal
Preliminary Opinion of Probably Cost
06 09 13 00007 Probable Cost.xls
AGENDA.PDFCONVERT.3129.DOC PAGE 1 OF 2
To: Stevenson & Palmer Engineering, Inc.
Attn: Tom Wiedmeier
Suite 400, 360 Bay Street
Augusta, GA 30901
Re: RFQ #05-087
Qualified Engineering Firms on 2004 Bond Issue Projects
From: Geri Sams
Date: February 17, 2006
Project Number: 00007
Project Name: Main Interceptor Upgrade Phase II
The Augusta Program Management Team has completed a review of your Statement of
Qualifications submitted in response to RFQ #05-087 issued March 7, 2005 and received April
12, 2005. Based upon a series of criteria involving your preferences, capabilities, past
performance with the Augusta Utilities Department, and the Program needs, your firm has
been selected to complete the engineering design for the Main Interceptor Upgrade Phase II.
Included within this memorandum is the preliminary project scope. A meeting will be set up
by the Program Management Team to discuss the project your firm has been assigned and
clarify expectations of the program. Tentatively, these meetings will be scheduled to begin in
late February. Following preparation of your proposal a second meeting will be arranged to
begin contract negotiations. The Augusta Utilities Department looks forward to working with
you on this project. We request that any correspondence regarding this particular project
includes the above noted project number and name.
Preliminary Project Scope
• Design a pipeline to replace the lower section of the Main Interceptor in Augusta, Georgia.
Refer to the attached location figure for a general overview of the project area. The project
should extend from the James B. Messerly WPCP to Dan Bowles Road where it should tie
into the current project to upgrade the upstream section of the Main Interceptor.
AGENDA.PDFCONVERT.3129.DOC PAGE 2 OF 2
During the first meeting be prepared to discuss the cost of route analysis, surveying, easement
plat preparation, design standards, bid package preparation, bid phase support, construction
phase support and optional services during construction/resident observation for this project.
Should you have any questions prior to the first meeting please contact the Augusta Program
Management Office at 706-303-2426 or submit questions to the Program Manager at
larry.scott@ch2m.com.
Sincerely,
Geri Sams
Director Procurement
COPIES: Max Hicks/Utilities Dept. Director
Wes Byne/Utilities Dept. Assistant Director
Clifford Goins/Utilities Dept. Assistant Director
Allen Saxon/Utilities Dept. Assistant Director
Russell Thies/Utilities Dept. Assistant Director
Larry Scott/Program Manager
Bob Davis/Program Construction Manager
James Rush/Program Project Engineer
Vendor Original
Five
Copies Vendor Original
Five
Copies
EMC Engineering Yes Yes Cheatham, Fletcher, Scott & Sears
Black & Veatch Yes Yes Lowe & Associates
Prad Group Yes Yes Nicholas Dickinson & Assoc
MacTec Engineering & Consulting Yes Yes The Woodhurst Partnership
Jordan Jones & Goulding Yes Yes URS Greiner Woodward Clyde
Gannett Fleming Yes Yes The LPA Group
Stantec Consulting Yes Yes KBJ Architects, Inc.
Arcadis Yes Yes Phillips & Jordan, Inc.
W. R. Toole Engineering, Inc. Yes Yes Goldie & Associates, Inc.
HDR Yes Yes H. Lawson Graham
James G. Swift & Associates Yes Yes Kimley-Horn & Assoc
Cranston, Robertson & Whitehurst Yes Yes QK4
W. K. Dickson Yes Yes R. W. Armstrong & Assoc
Johnson, Laschober & Assoc Yes Yes Scott Godefroy & Assoc
Stevenson & Palmer Yes Yes Stevens & Wilkinson
Williams-Russell & Johnson Yes Yes T3 Design Associates, Inc.
Zimmerman, Evans & Leopold Yes Yes Hobbs, Upchurch & Assoc.
RTW Yes Yes Grice & Associates
Environmental Services Group Yes Yes Pharr Engineering
B & E Jackson Yes Yes Heath & Lineback Engineers
Malcolm Pirnie Gresham Smith & partners
Southern Partners USInfrastructure, Inc.
Montgomery, Watson, Harza Volkert & Associates
Greenhorne & O'Mara Rochester & Associates
Clark Patterson Virgo Gambill Architects
Camp Dresser & McKee Parson Engineering
PM & A Consulting
RFQ #05-087 Qualified Engineering Firms on 2004 Bond Issue Projects
Augusta Utilities
RFQ Due: Tuesday, April 12, 2005 @ 3:00 p.m.
Request for Qualifications
RFQ’s will be received at this office until 3:00 p.m., Tuesday, April 12, 2005
RFQ #05-087 Qualified Engineering Firms on 2004 Bond Issue Projects for Augusta Utilities
RFQ’s will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30911
706-821-2422
RFQ documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street
– Room 605, Augusta, GA 30911.
All questions must be submitted in writing to the office of the Procurement Department by fax at 706-821-
2811 or by mail. No RFQ will be accepted by fax, all must be received by mail or hand delivered.
Bidders are cautioned that sequestration of documents through any other source is not advisable. Acquisition
of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate
information upon which to base his qualifications.
It is the wish of the Owner that minority businesses are given the opportunity to submit on the various parts of
the work. This desire on the part of the Owner is not intended to restrict or limit competitive bidding or to
increase the cost of the work. The Owner supports a healthy free market system that seeks to include
responsible businesses and provide ample opportunity for business growth and development.
No RFQ may be withdrawn for a period of 60 days after time has been called on the date of opening.
Bidders will please note that the number of copies requested; all supporting documents including financial
statements and references and such other attachments that may be required by the Request of Qualification are
material conditions of the package. Any package found incomplete or submitted late shall be rejected by the
Procurement Office. Any bidder allegedly contending that he/she has been improperly disqualified from
bidding due to an incomplete bid submission shall have the right to appeal to the appropriate committee of the
Augusta Commission. Please mark RFQ number on the outside of the envelope.
Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places
the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Augusta has a Link Deposit program designed to provide loans to eligible local Small, Minority and Women
Owned Businesses. For more information about this program contact the Human Resources Department at
706-821-2303.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle March 10, 17, 24, 31, 2005
Augusta Focus March 17, 2005
cc: Tameka Allen Interim Deputy Administrator
Yvonne Gentry DBE Coordinator
Max Hicks Utilities Department
Jim Rush CH2M Hill
FAX TRANSMISSION
AUGUSTA-RICHMOND COUNTY CONSOLIDATED GOVERNMENT
530 Greene Street - Room 605
Augusta, Georgia 30911
706 821-2422
Fax: 706 821-2811
To:
Southeastern Newspaper
Date: March 3, 2005
Fax #:
706 823-3588
Pages:
From:
Geri A. Sams
2, including this cover sheet.
Subject:
LEGAL NOTICES FOR RFQ ITEM: #05-087
COMMENTS:
Please print the above RFQ Item(s) on the following dates:
March 10, 17, 24, 31, 2005
REQUISITION #47297A
Please send an affidavit of publication.
FAX TRANSMISSION
AUGUSTA-RICHMOND COUNTY CONSOLIDATED GOVERNMENT
530 Greene Street - Room 605
Augusta, Georgia 30911
706 821-2422
Fax: 706 821-2811
To:
Augusta Focus
Date: March 3, 2005
Fax #:
706 724-8432
Pages:
From:
Geri A. Sams
2, including this cover sheet.
Subject:
LEGAL NOTICES FOR RFQ ITEM: #05-087
COMMENTS:
Please print the above RFQ Item(s) on the following dates:
March 17, 2005
REQUISITION #47297B
Please send an affidavit of publication.
Disadvantaged Business Enterprise
Yvonne Gentry
DBE Coordinator
Disadvantaged Business Enterprise Department
501 Greene Street – Suite 304 - Augusta, GA 30901
(706) 821-4206 – Fax (706) 821-4228
WWW.AUGUSTAGA.GOV
TO: Geri Sams
Director, Procurement Department
Max Hicks
Director, Utilities Department
FROM: Yvonne Gentry, Coordinator
Disadvantaged Business Enterprise Department
SUBJECT: DBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOAL
Bid Item #05Bid Item #05Bid Item #05Bid Item #05----087 087 087 087 Proposal from Stevenson and Palmer EngineeringProposal from Stevenson and Palmer EngineeringProposal from Stevenson and Palmer EngineeringProposal from Stevenson and Palmer Engineering
DATE: September 26, 2006
This memo is to transmit the review and concurrence of the recommended DBE
Utilization goal of eleven (11%) for the above referenced project. The goal-setting
methodology considered the following factors based on good faith efforts of the
contractor:
• The project’s total estimated cost is $$$$530,789530,789530,789530,789.
• There is 11% value of the scope of work where minority/women minority/women minority/women minority/women
businesses businesses businesses businesses availability exists.
• There is 0% value of the scope of work where small businesses small businesses small businesses small businesses
availability exists.
• There is 11% value of the scope where local businesses local businesses local businesses local businesses availability
exists.
The contractor must prepare their proposed DBE Utilization Form submittal based on
the total dollar value of their base bid. No further adjustments should be made.
The above recommendation is based on information provided at the time of review.
If you have any questions, please feel free to contact me at (706) 821-2406.
YG:glw
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Approve an Amendment to the Professional Services Contract for the Rae’s Creek Trunk Sewer
Replacement Phase IV Project.
Department:Utilities
Caption:Approve Amendment #1 to Zimmerman Evans and
Leopold’s professional services contract for the design of the
Rae’s Creek Trunk Sewer Replacement Phase IV Project in
the amount of $68,537.
Background:The existing professional services contract with Zimmerman
Evans and Leopold is for the engineering design associated
with replacement of the final section of the Rae’s Creek
Trunk Sewer that has not been replaced. During the easement
negotiations with one of the property owners an issue was
brought up with the route that could have made it very
difficult to proceed. The Utilities Department and
Zimmerman Evans and Leopold worked with the property
owner to develop a route that was beneficial to both parties.
Analysis:Accepting this proposal will allow for the expedited
engineering design to proceed so construction can begin as
soon as possible. Zimmerman Evans and Leopold, Inc. is a
local firm with an established history with the Augusta
Utilities Department. Stevenson Zimmerman Evans and
Leopold also proposes to utilize approximately 19% MBE
participation on the work associated with this amendment.
Financial Impact:Zimmerman Evans and Leopold, Inc. has proposed a fee of
$68,537 to expedite the design this alternate route. These
funds are available from the 2002 Bond Issue, under account
number 510043420/5212115-80260112/5212115.
Alternatives:None recommended.
Recommendation:
Approve Amendment #1 to Zimmerman Evans and
Leopold’s professional services contract for the design of the
Rae’s Creek Trunk Sewer Replacement Phase IV Project in
the amount of $68,537.01.
Funds are
Available in the
Following
Accounts:
510043420/5212115-80260112/5212115.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Disadvantaged Business Enterprise.
Administrator.
Clerk of Commission
Disadvantaged Business Enterprise
Yvonne Gentry
DBE Coordinator
Disadvantaged Business Enterprise Department
501 Greene Street – Suite 304 - Augusta, GA 30901
(706) 821-4206 – Fax (706) 821-4228
WWW.AUGUSTAGA.GOV
TO: Geri Sams
Director, Procurement Department
Max Hicks
Director, Utilities Department
FROM: Yvonne Gentry, Coordinator
Disadvantaged Business Enterprise Department
SUBJECT: DBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOAL
Amendment #1 to ZAmendment #1 to ZAmendment #1 to ZAmendment #1 to Zimmerman Evans and Leopold’s Professionalimmerman Evans and Leopold’s Professionalimmerman Evans and Leopold’s Professionalimmerman Evans and Leopold’s Professional
ServicesServicesServicesServices
DATE: September 26, 2006
This memo is to transmit the review and concurrence of the recommended DBE
Utilization goal of 100% for the above referenced project. The goal-setting methodology
considered the following factors based on good faith efforts of the contractor:
• The project’s total estimated cost is $$$$68,53768,53768,53768,537.
• There is 100% value of the scope of work where minority/women minority/women minority/women minority/women
businesses businesses businesses businesses availability exists.
• There is 0% value of the scope of work where small businesses small businesses small businesses small businesses
availability exists.
• There is 100% value of the scope where local businesses local businesses local businesses local businesses availability
exists.
The contractor must prepare their proposed DBE Utilization Form submittal based on
the total dollar value of their base bid. No further adjustments should be made.
The above recommendation is based on information provided at the time of review.
If you have any questions, please feel free to contact me at (706) 821-2406.
YG:glw
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Award Benson Road Contract
Department:Utilities
Caption:Approve award of construction contract for the Augusta
Utilities Department “Roadway Improvements for Benson
Road” to the lowest responsive bidder in the amount of
$2,339,655.45.
Background:The new Benson Road will provide access to the proposed
site of an Augusta Utilities Department Complex intended to
consolidate customer service, administration, operations, and
maintenance functions at a central Augusta location.
Consolidation of AUD facilities will reduce current operating
costs with elimination of office leasing and allow improved
resource management of employees, equipment and material.
This new roadway and water main, along with planned sewer
improvements, will also allow future economic development
of the surrounding area.
Analysis:Blair Construction Company submitted an acceptable bid
package and was the lowest qualified bidder for this project.
Financial Impact:The current bid amount of $2,339,655.45 is budgeted from
account numbers 507043410-5425110/80190110-5425110.
Alternatives:Reject the contract bid. Return to design firms for project
redesign to reduce costs. Issue new contract bid package of
new project design.
Recommendation:We recommend approval of the contract award to Blair
Construction Company. Proceeding now will guarantee
current price quotes and avoid future inflationary costs that
would be incurred during a redesign and new bidding phase.
Funds are
Available in the
Following
Accounts:
507043410-5425110/80190110-5425110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Disadvantaged Business Enterprise.
Administrator.
Clerk of Commission
Vendor Bid Bond
Addendum
1 - 4 Bid Total
Vastec Group
701 Greene Street
Suite 100
Augusta, GA 30901
Mabus Brothers
920 Molly Pond Road
Augusta, GA 30901 Yes Yes 2,699,966.00$
APAC
P. O. Box 1129
Augusta, GA 30903 Yes Yes 3,108,150.70$
Construction Perfected
587 Cherry Avenue
North Augusta, SC 29841 Yes Yes 2,815,048.94$
Blair Construction
4308 Evans to Lock Rd.
Evans, GA 30809 Yes Yes 2,339,655.45$
Beam's Construction
2335 Atomic Road
Beech Island, SC 29842 Yes Yes 2,906,202.95$
Reeves Construction Co.
167 Knox-Rivers Rd. NW
Thomson, GA 30824 Yes Yes 2,746,720.50$
Bid Item #06-145
Roadway Improvements for Benson Road
Augusta Utilities
Bid Due: Thursday, August 31, 2006 @ 3:00 p.m.
Invitation To Bid
Bids will be received at this office until 3:00 p.m., Tuesday, August 8, 2006.
Bid Item #06-145 Roadway Improvements for Benson Road for Augusta Utilities Department
Bid’s will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30911
706-821-2422
Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta,
GA 30911. Plans and specifications for the project can be made available upon request to Digital Blue Print. The fees for the
plans and specifications which are non-refundable is $150.00.
Scope: This project consist of construction of approximately 5000 LF of two lanes asphalt roadway extending from Richmond Hill
Road to the proposed Augusta Utilities Department Complex site. Also includes the widening and restriping of approximately 1000
LF of Richmond Hill Road. The project will include construction of a regional stormwater detention basin, a new water main, and
storm drainage.
Documents may also be examined during regular business hours at the Augusta Builders Exchange, 1262 Merry Street, Augusta, GA
30904; F. W. Dodge Plan Room, 1281 Broad Street, Augusta, GA 30904. It is the wish of the Owner that all businesses are given the
opportunity to submit on this project. To facilitate this policy, the Owner is providing the opportunity to view plans online
(www.digblueprint.com) at no charge through Digital Blueprint (706-821-0405) beginning Thursday, June 22, 2006. Bidders are
cautioned that submitting a package without review or Procurement of a complete set are likely to overlook issues of construction
phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project.
Bidders are cautioned that sequestration of documents through any other source is not advisable. Acquisition of documents from
unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his
qualifications.
A Mandatory pre bid conference will be held on Tuesday, July 18, 2006 @ 10:00 a.m. in the conference room of the
Procurement Department. All questions must be submitted in writing to the office of the Procurement Department by fax at
706-821-2811 or by mail. The last day to submit questions is Friday, July 21, 2006 by 4:00 p.m. No bid will be accepted by fax,
all must be received by mail or hand delivered.
The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference
on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the
Procurement Department with your bonafide bid package.
It is the wish of the Owner that minority businesses are given the opportunity to submit on the various parts of the work. This desire
on the part of the Owner is not intended to restrict or limit competitive bidding or to increase the cost of the work. The Owner
supports a healthy free market system that seeks to include responsible businesses and provide ample opportunity for business growth
and development.
No BID may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid bond is required to
be submitted in a separate envelope so marked along with the bidders’ qualifications; a 100% performance bond and a 100%
payment bond will be required for award.
Bidders will please note that the number of copies requested; all supporting documents including financial statements and references
and such other attachments that may be required by the bid are material conditions of the package. Any package found incomplete or
submitted late shall be rejected by the Procurement Office. Any bidder allegedly contending that he/she has been improperly
disqualified from bidding due to an incomplete bid submission shall have the right to appeal to the appropriate committee of the
Augusta Commission. Please mark bid number on the outside of the envelope.
Augusta has a Link Deposit program designed to provide loans to eligible local Small, Minority and Women Owned Businesses. For
more information about this program contact the Office of the Disadvantage Business Enterprise at 706-821-2406
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle June 22, 29, July 6, 13, 2006
Metro Courier June 28, 2006
cc: Tameka Allen Interim Deputy Administrator
Max Hicks Utilities Department
Wes Byne Utilities Department
Clifford Carey CH2M Hill
Yvonne Gentry DBE
My DemandStar
Buyers
Account Info
Log Bid [View Bids] View Quotes Supplier Search Build Broadcast List Reports
Planholders List
5 Planholder(s) found.
Add Planholder
DemandStar is a product of Onvia, Inc. (c) 1997-2006. All rights reserved. | Terms of Use | Privacy
User: Carerra, Betty Organization: City of Augusta, GA Logout | Help
Onvia DemandStar
Member Name City of Augusta, GA
Bid Number ITB-06-145-0-2006/PJM
Bid Name Roadway Improvements for Benson Road
Number of Documents
for this bid 1
Supplier Name Phone Fax Doc Count Attributes Programs Actions
Construction
Journal, Ltd. 8007855165 8005817204 1 Documents
Delta Milling
Company 3523268689 3527873476 1 Documents
ECOSCAPE
CREATING
LANDSCAPE
SOLUTIONS
8136334300 8136330170 1 1. Small
Business Documents
Reed Construction
Data 8009018687 8775633534 1 Documents
Total Traffic Inc. 7278489757 7274997951 1 Documents
Page 1 of 1
Format for Printing No
Search << Return
Disadvantaged Business Enterprise
Yvonne Gentry
DBE Coordinator
Disadvantaged Business Enterprise Department
501 Greene Street – Suite 304 - Augusta, GA 30901
(706) 821-4206 – Fax (706) 821-4228
WWW.AUGUSTAGA.GOV
TO: Geri Sams
Director, Procurement Department
Max Hicks
Director, Utilities Department
FROM: Yvonne Gentry, Coordinator
Disadvantaged Business Enterprise Department
SUBJECT: DBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOAL
Bid Item #06Bid Item #06Bid Item #06Bid Item #06----145 145 145 145 –––– Roadway Improvements for Benson Road Roadway Improvements for Benson Road Roadway Improvements for Benson Road Roadway Improvements for Benson Road
DATE: September 26, 2006
This memo is to transmit the review and concurrence of the recommended DBE
Utilization goal of 4.3% for the above referenced project. The goal-setting methodology
considered the following factors based on good faith efforts of the contractor:
• The project’s total estimated cost is $$$$2,339,655.452,339,655.452,339,655.452,339,655.45.
• There is 4.3% value of the scope of work where minority/women minority/women minority/women minority/women
businesses businesses businesses businesses availability exists.
• There is 0% value of the scope of work where smallsmallsmallsmall businesses businesses businesses businesses
availability exists.
• There is 95.7% value of the scope where local businesses local businesses local businesses local businesses availability
exists.
The contractor must prepare their proposed DBE Utilization Form submittal based on
the total dollar value of their base bid. No further adjustments should be made.
The above recommendation is based on information provided at the time of review.
If you have any questions, please feel free to contact me at (706) 821-2406.
YG:glw
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Condemnation - James E. Rowland III
Department:County Attorney - Stephen E. Shepard, Attorney
Caption:Motion to authorize condemnation of a portion of Property
#018-0-046-00-0 2842 Pineview Rd, which is owned by
James E. Rowland, III for 3,394 sq. ft. of temporary
easement area and 6,879 sq. ft. of permanent easement area.
Public Works Project: Pointe West Subdivision Drainage
Improvement Project.
Background:The appraised value of the temporary and permanent
easement is $3,024.00. The subject property owner is not
willing or interested in participating in this project. In order
to timely acquire access, condemnation will be necessary.
Analysis:Condemnation is required in order to acquire the easement
area.
Financial Impact:The necessary costs will be covered by project budget.
Alternatives:Deny the authorization to condemn.
Recommendation:Approve the authorization to condemn.
Funds are
Available in the
Following
Accounts:
G/L - 324041110-5411120 J/L - 203823372-5411120
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Condemnation - Magnusen, Henry E. Jr.
Department:County Attorney - Stephen E. Shepard, Attorney
Caption:Motion to authorize condemnation of a portion of Property
#018-0-433-00-0 2957 Pointewest Dr, which is owned by
Henry E. Magnusen, Jr. for 1,009 sq. ft. of permanent
easement area. Public Works Project: Pointe West
Subdivision Drainage Improvement Project.
Background:The appraised value of the permanent easement is $2,018.00.
The subject property owner is not willing or interested in
participating in this project. In order to timely acquire access,
condemnation will be necessary.
Analysis:Condemnation is required in order to acquire the easement
area.
Financial Impact:The necessary costs will be covered by project budget.
Alternatives:Deny the authorization to condemn.
Recommendation:Approve the authorization to condemn.
Funds are
Available in the
Following
Accounts:
G/L - 324041110-5411120 J/L - 203823372-5411120
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Condemnation - McKenzie, Alfred and Reoberta
Department:County Attorney - Stephen E. Shepard, Attorney
Caption:Motion to authorize condemnation of a portion of Property
#051-0-208-00-0 3926 Barrett Street, which is owned by the
Alfred and Roberta McKenzie for 3,973 sq. ft. of permanent
drainage, utility and maintenance easement, more or less.
Public Works Project: Belair Hills Subdivision Improvement
Project 324-04-203824335.
Background:The appraised value for the temporary and permanent
easement is $2,582.00. The subject property owner made a
counteroffer of $7,000.00, which is $4,418.00 above the
appraised value. In order to timely acquire access,
condemnation will be necessary.
Analysis:Condemnation is required in order to acquire the easement.
Financial Impact:The necessary costs will be covered by project budget.
Alternatives:Deny the authorization to condemn.
Recommendation:Approve the authorization to condemn.
Funds are
Available in the
Following
Accounts:
G/L 324-04-1110-52.12122 J/L 201824117-52.121222
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
10/9/2006 1:30 PM
David Johnson
Department:Clerk of Commission
Caption:Presentation by David Johnson, Sr. regarding mandatory
trash service.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Laney Walker Emergency Repair and Sewer Replacement
Department:Utilities
Caption:Ratify and approve the actions of AUD to repair and replace
the Laney Walker sanitary sewer main between Laney
Walker Court and Lover’s Lane through a change order to
the existing Laney Walker Sewer Emergency Repair Project
in the amount of $330,000 for a total budget of $465,500.
Background:
The Laney Walker sewer line is an 18” concrete sewer line
that was installed approximately forty years ago. This sewer
line is located at a depth of 14 to 18 feet, and is parallel to the
storm ditch which runs in the median of Laney Walker. This
sanitary sewer line carries all of the industrial waste from
Columbia Nitrogen Drive to the Second Street lift station.
The industrial waste is such that it reacts in a negative
manner with the concrete pipe causing the top portion to
erode and fail. The sewer line failures ultimately manifest
themselves into large holes from the pipe to the ground
surface. AUD has a sewer project that is in the process of
being advertised called the Industrial Force-Main. This
project entails running a pressurized sewer line from
Columbia Nitrogen Drive to the Messerly Wastewater
Treatment Plant. It was the plan of AUD to get this sewer
force-main in service to remove the industrial waste from the
Laney Walker sewer line. After the industrial waste was
removed the sewer line in Laney Walker was to be evaluated,
repaired, and replaced with a much reduced sewer flow. The
Laney Walker sewer line has begun failing sooner than was
anticipated. Over the past year several point repairs have
been performed to patch the failing line. Most recently a
1,900 foot section of the sewer line had four failures to
become evident after a large rain event. Two of these failures
are right against the roadway and undermining the concrete
culvert and guardrail along Laney Walker. It was this latest
set of failures that led AUD to begin emergency replacement
of this 1,900 foot section of the sewer line. This work is in
progress. We anticipate completion by the end of October.
The first emergency action was to setup bypass pumping
around the 1,900 foot section of sewer line so that the
contractor could begin his emergency repair work. AUD
requested that Godwin Pumps mobilize and setup the bypass
pumping so as to prevent potential groundwater
contamination from the sanitary sewer as well as a possible
sanitary sewer overflow.
Analysis:On June 7, 2005 the Commission approved a budget of
$250,000 for emergency repairs to the Laney Walker Sewer
line. $135,500 of this was for Blair Construction for various
point repairs to the sewer line. This request seeks ratification
for the current ongoing emergency repairs and to increase the
budget for emergency repairs by Blair Construction in the
amount of $270,000 for a total to Blair Construction of
$405,500, and to create a budget for Godwin pumps in the
amount of $60,000 for two months of sanitary sewer bypass
pumping for a total of $465,500.
Financial Impact:Funds are available in the renewal extension fund
507043420-5425210 / 80500020-5425210 for a total budget
increase of $330,000.
Alternatives:None recommended.
Recommendation:It is recommended to Ratify and approve the actions of AUD
to repair and replace the Laney Walker sanitary sewer main
between Laney Walker Court and Lover’s Lane through a
change order to the existing Laney Walker Sewer Emergency
Repair Project in the amount of $330,000 for a total budget
of $465,500.
Funds are
Available in the
Following
Accounts:
507043420-5425210 80500020-5425210
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Disadvantaged Business Enterprise.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
10/9/2006 1:30 PM
Solid Waste Collections Software
Department:Solid Waste
Caption:Award a contract to Commonwealth Data Communications,
Inc for Landfill and Solid Waste Collections billing software
in an amount not to exceed $151,530.
Background:The Solid Waste Department worked closely with the
Commission to determine a defined path forward from the
previous Solid Waste Collections contract. One item of
contention was how to effectively perform billing functions
for solid waste services. We evaluated using the water billing
system, the tax collections, and independent billing. Due to a
series of complications with the tax system as well as the
water bill, it was agreed that direct billing would meet the
needs for all involved.
Analysis:The Solid Waste Department has worked with IT, the DBE
Department and the Procurement Department through an
RFP process in which multiple bidders were evaluated.
Commonwealth was the bidder that best met the Solid Waste
Department’s requirements for scale, customer management,
and billing software. This new system offers a variety of
benefits to both the Landfill and Solid Waste Collections.
First, let’s address the benefits of the Landfill. It will allow
us to integrate scale automation. This allows us to reduce
human errors, as well as reduce line wait times for our
customers. Second, it will improve our billing process by
allowing us to automatically charge for volume based
customers. Next, it allows us to track our “special waste” and
automate the manifest tracking process. Fourth, it will allow
us to run multiple sites, should the county ever have a second
disposal site. Finally, it offers real time data and reporting on
a significantly larger amount of data. The system will also
allow a variety of options and functions for the Solid Waste
Collections. It will allow the Solid Waste Department to
internalize our services at a point in the future if so desired.
This system allows for the general billing functions in a
variety of formats. It allows us to route customers via route
sheets (if we want to internalize). Further, it allows us to log
all customer issues by customer, as well as dispatch
complaints to the appropriate company and/or persons. This
creates a real time data base of contract performance. It
allows Augusta to track its container inventory as well as
track how much to pay each contractor, based on the
contract. Additionally, it can be modified to achieve a pay as
you go through program. In summary, this program allows
both the Landfill and Solid Waste Collections to have a new
and improved program offering enhanced functionality to
what is currently offered. It provides long term flexibility for
our ever improving programs.
Financial Impact:This contract has been broken down into two distinct phases.
Phase one has a cost of $81,530. It is for the billing software
and getting us operational. Phase two is for additional
functions that will improve production, functionality and
customer service. It has an estimated cost of $55,000. This
will leave us $15,000 for contingency in this project.
Alternatives:1. Award a contract to Commonwealth Data
Communications, Inc for Landfill and Solid Waste
Collections billing software in an amount not to exceed
$151,530. 2. Change billing methodology and provide
commission recommendation.
Recommendation:Alternative 1.
Funds are
Available in the
Following
Accounts:
541-04-4210/54.24220
REVIEWED AND APPROVED BY:
Procurement.
Disadvantaged Business Enterprise.
Information Technology.
Finance.
Administrator.
Clerk of Commission
Augusta, GA Solid Waste Software Contract
SOFTWARE LICENSE, IMPLEMENTATION, AND SUPPORT
AGREEMENT FOR INSIGHT SOFTWARE
Augusta, GA Solid Waste Software Contract 2
SOFTWARE LICENSE, IMPLEMENTATION AND SUPPORT
AGREEMENT FOR INSIGHT SOFTWARE SYSTEM
THIS AGREEMENT is entered into this ____ day of _____, 2006 (“Effective Date”),
between AUGUSTA, GA, a political subdivision of the state of Georgia, having offices at 530
Greene St, Augusta, GA 30911 (the “Customer”), and COMMONWEALTH DATA
COMMUNICATIONS, INC. (d/b/a COMMONWEALTH SOLUTIONS), a Michigan
corporation, having offices at 15447 Middlebelt, Livonia, Michigan, 48154.(the
“Commonwealth”).
I. GENERAL SCOPE/DEFINITIONS
Section 1.01. General Scope and Definition of the System. The principal subject matter of this
Agreement relates to “Licensed Software” directed to administrative and general business
functions for solid waste scale house operations and residential waste collection account
management, including billing. The Licensed Software comprises part of a computer system
configuration (the “System”), which includes the System Hardware (comprising, in part, the
System Software) as defined in Section 1.03 of this Article I. Commonwealth will license the
Licensed Software to the Customer. In accordance with the terms and conditions of this
Agreement, Commonwealth shall also provide data conversion, training,
installation/implementation and software support, in addition to other services as may be
described elsewhere herein.
Section 1.02. Definition of User Documentation. “User Documentation” as used herein means
all descriptive materials (whether in written, graphic or electronic format) identified under the
corresponding heading in Schedule E, and all other user’s manuals, system operation materials
and similar documents provided by Commonwealth to the Customer with respect to the Licensed
Software. The term “User Documentation” refers to descriptive materials, manuals and other
materials and documents that exist separately from the Licensed Software and does not include
help screens, on-screen instructions, and other such functions that are incorporated in and operate
as part of the Licensed Software.
Section 1.03. Definition of Custom Programming. "Custom Programming" as used herein
means the software customizations generally described in Schedule D, and which are required
for modifying the Licensed Software so as to meet all functional descriptions and performance
specifications set forth in this Agreement, as modified.
Section 1.04. Definition of Licensed Software. "Licensed Software” as used herein means the
application software resulting from incorporating the Custom Programming with the Licensed
Software as reflected in the Functional Specification, as modified. Individual components of the
Licensed Software are referred to herein as “Modules” as listed in Schedule C.
Section 1.05. Definition of Enhancements. “Enhancements” as used herein means any
additions, modifications, corrections, upgrades, new versions/releases or any other changes made
to the Licensed Software by Commonwealth, or at the request of the Customer, (such as a
correction for which Commonwealth provides materials to the Customer for installation of the
correction by City personnel), during any period of this Agreement when Commonwealth is
Augusta, GA Solid Waste Software Contract 3
providing software support services to the Customer under a valid Software Support Services
Agreement between the Parties. The term “Software Changes” as defined in Section 6.02 shall
be interpreted to include any Enhancements.
Section 1.06. Definition of System Acceptance Date. “System Acceptance Date” as used herein
means the date of successful completion of the acceptance tests, as described in Article VIII.
Section 1.07. Definition of the Customer. The “Customer” as used herein means AUGUSTA, in
addition to other entities which may be serviced in the future by AUGUSTA through use of the
Licensed Software.
Section 1.08. Definitions of System Documents and Documentation. “System Documents” as
used herein means the Functional Specification, as modified. System Documents include
operating system manuals and other documentation of the Licensed Software provided by
Commonwealth. “Documentation” as used herein means, collectively, the User Documentation
and the System Documents.
Section 1.09. Definition of Go-Live. “Go-Live” shall be the date on which the software is
expected to be first placed into operational use by the Customer. On this date, software is
expected to operate per the system requirements in Schedule C. This date is also the beginning
of the System Acceptance Testing period as described in Section VIII.
Section 1.10. Definition of Work. The “Work” as used herein means all activities, which are the
responsibilities of Commonwealth and are associated with implementation of the Licensed
Software, including development of Custom Programming, delivery, installation, data
conversion, training and testing for the Licensed Software.
Section 1.11. Precedence of Written Materials. For purposes of interpreting the scope and
meaning of any terms and conditions among the parties, the following documents may be
considered, in descending order of precedence:
(1) This Agreement;
(2) The User Documentation.
Further, to the extent of any conflicts or inconsistencies between the main body of this
Agreement and the attached Schedules, the main body of this Agreement shall be controlling.
II. SYSTEM HARDWARE
Section 2.01. General. The Customer shall acquire the requisite System Hardware from third
parties, or the Customer may currently have components of the System Hardware in place at City
facilities. Commonwealth shall have no responsibilities or liability whatsoever for purchase,
license, installation, implementation, operation or ongoing maintenance for the System
Hardware.
Section 2.02. Failure of City to Perform. Should the Customer fail to provide the requisite
System Hardware, System software, Servers, Back-up Software or network hardware and
Augusta, GA Solid Waste Software Contract 4
software that is necessary to support scheduled installation, training or “go-live” operations,
Commonwealth shall not be required to perform any affected services until such items become
available.
III. THE LICENSED SOFTWARE
Section 3.01. Grant of License. Commonwealth grants to the Customer a license of the
Licensed Software that shall become effective upon delivery of the Licensed Software and shall
continue unless terminated as provided herein. The Customer shall obtain this license of the
Licensed Software and right to use the Licensed Software only after City acceptance of and full
payment for the installed Licensed Software. The Customer shall install the Licensed Software
in the following locations: Augusta Solid Waste Facility, 4330 Deans Bridge Rd, Augusta, GA.
In support of the Customer’s use of the Licensed Software, the Customer can store the licensed
Software’s machine readable instructions or data in, transmit it through and display it on
machines associated with the sites and make one copy of the Software in machine-readable,
object code form for nonproductive backup purposes only, provided that the media is identified
as Commonwealth’s property.
IV. DOCUMENTATION
Section 4.01. Initial User Documentation. Commonwealth will promptly provide the Customer
with the current version of the User Documentation. The parties understand that this version of
the User Documentation will not include descriptions relating to the Custom Programming to be
provided by Commonwealth in development of the Licensed Software. Thereafter,
Commonwealth agrees to provide the Customer with User Documentation reflecting the Custom
Programming no later than the delivery dates of related portions of the Licensed Software being
provided by Commonwealth.
V. TRAINING
Section 5.01. Initial Training and Schedule. Commonwealth shall provide the Customer with
instruction and training in the use and operation of the Licensed Software. Details relating to the
training are set forth in Schedule G.
VI. HARDWARE MAINTENANCE/SOFTWARE SUPPORT
Section 6.01. Hardware Maintenance. The Customer shall be responsible for obtaining all
requisite System Hardware maintenance, and Commonwealth shall have no responsibility
whatsoever for any such maintenance.
Section 6.02. Definition of Software Changes. “Software Changes” as used herein mean any
additions, modifications, corrections, upgrades, new Releases or any other changes made to the
Licensed Software, by Commonwealth or at the request of the Customer, (such as a correction
for which Commonwealth provides materials to the Customer for installation of the correction by
City personnel). “Software Changes” shall include “Enhancements” as defined in Section 1.05.
Augusta, GA Solid Waste Software Contract 5
Section 6.03. Definition of Principal Period of Support. The term “Principal Period of Support” as
used herein shall mean the hours of 8:00 a.m. to 6:00 p.m. Eastern Time, Monday through Friday,
excluding holidays observed by Commonwealth as determined annually, during which emergency
support shall be available via pager.
Section 6.04. Services. Commonwealth shall provide the Customer with the “Software Support
Services” described in Schedule A of this Agreement, for all Licensed Software commencing
upon installation of the Software. Commonwealth shall provide the Software Support Services
for the first year, beginning on the day of installation of the software.
Section 6.05. Support Fees. The “Annual Software Support Fees” are set forth in Schedule I.
VII. SCHEDULE OF EVENTS AND IMPLEMENTATION
Section 7.01. Schedule of Events. Commonwealth and the Customer shall implement the
Licensed Software in accordance with the "Project/Implementation Plan” set forth in Schedule B,
as may be modified by agreement between the parties.
Section 7.02. Scope of Services. As a general statement, Commonwealth shall develop and
provide the Customer with Licensed Software which comprises the Licensed Software modified
by the Custom Programming, so as to meet the requirements and specifications stated in this
Agreement and the Functional Specifications (as described in Schedule C) and to function and
operate in compliance with the specific requirements of all relevant statutes, regulations and
rules of the State of Georgia and the Customer.
Section 7.03. Maintenance of Records. All records of Commonwealth or any subvendor or
subcontractor relating to this Agreement and implementation of the Licensed Software shall be
retained for three (3) years following the date of final payment or completion of any requisite
audit, whichever is earlier.
Section 7.04. Delivery and Installation of Licensed Software. Commonwealth shall deliver,
install and implement all Licensed Software as provided in this Agreement at the Customer’s
facilities. Commonwealth shall be exclusively responsible for the safety of its employees and
those of its subvendors and subcontractors, and for compliance with federal, state, City and
municipal safety requirements.
Section 7.05. Remedy for Breach of Obligations Regarding Implementation. In the event that
Commonwealth fails to timely or properly maintain or perform its obligations with regard to the
Project/Implementation Plan set forth in Schedule B, Commonwealth shall use their best efforts
to return to conformance to the Project/Implementation Plan. In the event the cumulative total of
delays in implementation, which need not be consecutive, exceeds sixty (60) days,
Commonwealth shall be considered in material breach of this Agreement, and the Customer shall
have a right to terminate this Agreement for cause, in whole or in part, in accordance with the
terms and conditions of Article XII, or to exercise any other of its rights and remedies. The
Customer’s exercise of its option to designate the party required to perform certain tasks shall
not affect or impair any of its other rights and remedies. Commonwealth shall have a right to
terminate this Agreement for cause, in whole or in part, in accordance with the terms and
Augusta, GA Solid Waste Software Contract 6
conditions of Article XII; namely non payment of fees according to fee schedule and distribution
of Licensed Software or user documentation beyond the licensed users, installation on additional
workstations without the express written permission of Commonwealth.
Commonwealth is contractually obligated to provide software and implementation support for
this project and to satisfy the requirements found in Schedule C. Customer and Commonwealth
consent to work conscientiously and cooperatively in order to achieve implementation by the
established “Go Live” date as set forth in the Project Schedule attached as Schedule B. For each
workday that implementation is delayed beyond the agreed-upon “Go-Live” date,
Commonwealth agrees to pay Customer liquidated damages of $100 per day provided that the
delay in “Go Live” was not attributable any of the conditions described in Items A-C of this
section. Customer agrees to submit to Commonwealth, in writing, any issues that may impact
the “Go Live” that are believed to be Commonwealth’s responsibility and may therefore increase
the likelihood of a penalty being invoked. Customer shall identify these issues as soon as
possible so that corrective action can be taken by Commonwealth. The penalty shall not apply
under the following circumstances:
A. The Go-Live date was extended or moved by mutual consent of Customer and
Commonwealth. If the Go-Live date is extended or moved by written mutual consent
of both parties, then penalties will accrue beginning on the new Go-Live date.
B. Customer did not meet requirements or objectives required in order to facilitate Go-
Live as scheduled (including failure to order equipment that was the Customer’s
responsibility to order, or failure to set up said equipment). Such failure by the
Customer must be documented in writing by Commonwealth as soon as possible so
that corrective action can be taken.
C. Customer failed to notify Commonwealth of additional requirements which, when
identified, impacted the Go Live date of the project. Such failure by the Customer
must be documented in writing by Commonwealth by Commonwealth as soon as
possible so that corrective action can be taken.
If said penalties are enacted, all penalties will become due and payable upon failure to meet the
Go-Live date and shall accrue until paid in full. Additional services and/or licenses may be
accepted as payment provided that this type of restitution is acceptable to the Customer.
Section 7.06. Custom Programming. Commonwealth agrees to undertake all of the duties and
obligations set forth in Schedule D with respect to development of Custom Programming, subject
to scheduling and administrative and/or commission approval as sought by Customer. These
activities shall be undertaken in accordance with the time frames also set forth in Schedule B
where applicable.
VIII. ACCEPTANCE TESTING PROCEDURES
Section 8.01. General Scope. Commonwealth shall perform the Work in accordance with the
scheduled dates set forth in the Project/Implementation Plan (Schedule B).
Section 8.02. System Acceptance Test. Following successful completion of installation, a
“System Acceptance Test” shall be performed with respect to the entirety of the Licensed
Augusta, GA Solid Waste Software Contract 7
Software. The System Acceptance Test shall be performed so as to determine that all of the
Licensed Software operating as an integral system performs in accordance with all detailed
specifications and functional descriptions set forth in this Agreement and the Functional
Specifications. During the System Acceptance Test, the Customer shall have the right to use the
Licensed Software with live data. The System Acceptance Test shall be completed within an
initial period of 60 days following initiation of the same, which will commence in not more than
sixty (60) days following the successful installation of Licensed Software. If more than 60 days
elapses after Commonwealth installs and there are no written notification of errors or failures the
software will be deemed accepted. This sixty (60) day clock would pause as Commonwealth is
informed of errors or failures and while Commonwealth staff work to correct them.
Section 8.03. Acceptance Testing. The Customer recognizes that during System Acceptance
Testing, there will be errors, which will be discovered and corrected by Commonwealth. This
process of identification of issues and the request by the Customer for modifications to existing
formats or layouts is a natural process during the installation, testing, training, “go-live”,
acceptance and post-implementation support phases. Commonwealth is required to provide the
Licensed Software, as agreed to be modified, in operational condition and ready for recordations.
Should a situation occur wherein the modifications are incomplete or that other operational
features of the Licensed Software preclude the Customer from performing the complete
recordation process, including the performance of every software module, the Customer may
suspend the testing. If such suspension occurs, the Customer shall provide Commonwealth with
written notice and physical evidence of the errors or operational failures, which must be
corrected before the system can be accepted. Commonwealth shall thereafter undertake its best
efforts to correct such errors and failures as soon as possible. Upon correction of the same,
Commonwealth shall immediately notify the Customer of completion of corrections, and a
second System Acceptance Testing shall occur, with a completion date for such test period
extended by the period of time required for corrections. However, if the period of time required
for corrections of errors or failures identified by the Customer in a single notice exceeds fourteen
(14) days, or if the total period of time required for interim correction of all errors or failures
occurring during the test period exceeds sixty (60) days, the Customer may terminate all or a
portion of this Agreement for cause in accordance with the terms of this Agreement, except that
Commonwealth shall not be entitled to any additional time to correct or cure any errors or
failures as may be provided by other sections. Notwithstanding any of the foregoing, in no event
shall the Customer have less than sixty (60) days following completion of any corrections by
Commonwealth to test any such corrections.
Section 8.04. Nonacceptance. Failure of the Licensed Software to successfully complete the
System Acceptance Testing described in 8.03 without the occurrence of errors or failures
reported in writing to Commonwealth by City shall entitle the Customer, at its option, to
terminate all or a portion of this Agreement for cause in accordance with the terms of this
Agreement, except that Commonwealth shall not be entitled to any additional time to correct or
cure any errors or failures as may be provided by other sections. Failure of the Customer to
notify Commonwealth of nonacceptance within ten (10) days following completion of the second
System Acceptance Test period shall be deemed a successful completion of the System
Acceptance Test. In the event that the Customer exercises its option to terminate this Agreement
under this Section and upon payment of the refund by Commonwealth, the Customer shall
return, purge or permanently destroy all Licensed Software Modules (and Copies thereof) within
Augusta, GA Solid Waste Software Contract 8
twenty (20) days following payment of the refund, except for backup copies which shall be
returned, purged or permanently destroyed within ninety (90) days.
IX. PAYMENTS/SCHEDULE
Section 9.01. System Prices. In consideration for the licensing and implementation of the
Licensed Software, and other duties and obligations of Commonwealth as set forth herein, the
Customer agrees to pay to Commonwealth the amounts set forth in Schedule J, in accordance
with the payment schedules also set forth in Schedule H.
X. COVENANTS, REPRESENTATIONS AND
WARRANTIES OF COMMONWEALTH
Section 10.01. Warranty of Rights. Commonwealth warrants that it is a corporation in good
standing under the laws of the state of Michigan, that it is authorized to enter into this Agreement
under the terms and conditions hereof and neither this Agreement nor the performance thereof is,
or will be, in violation of any agreement to which Commonwealth is a party or by which it is
bound.
Commonwealth warrants that it has the legal right to grant the license and perform the services
required by this Agreement. Commonwealth further warrants that the Licensed Software and
User Documentation shall be free and clear of any and all liens and encumbrances, except those
normally incurred during the normal course of business (securing standard business lines of
credit, etc.) which do not impair the Customer’s right to exercise its license and use the Licensed
Software and User Documentation. During the time when the Customer shall have the right to
use the Licensed Software and User Documentation under this Agreement, Commonwealth
warrants that any such licenses and rights in the Licensed Software and User Documentation
which may be necessary shall be maintained in full effect or that any such licenses or rights will
be obtained from any other party as may be necessary. Commonwealth agrees to indemnify and
hold the Customer including, but not limited to, its elected and appointed public officials, and
City employees, harmless from and against any loss, cost, liability and expense (including
reasonable counsel fees and expenses) arising out of any breach or claimed breach of these
warranties, in addition to the indemnification provided in Section 10.06 and 10.07.
Section 10.02. Software Warranty. Commonwealth hereby warrants that the Licensed Software
shall perform in accordance with the performance specifications and functional specifications set
forth in this Agreement. Commonwealth warrants that the Licensed Software shall function and
operate in compliance with all Georgia state statutes and regulations affecting operations of the
Customer at the time of Installation and during the term of any Software Support Services
Agreement.
Section 10.03. Compliance with Laws. Commonwealth shall comply with all local, state and
federal laws, ordinances, codes and regulations. Commonwealth shall be responsible for all
reports, payments and withholdings required by federal, state, municipal and City law with
respect to social security, worker's compensation, employee income and other taxes.
Commonwealth shall indemnify, defend and hold the Customer and its elected and appointed
Augusta, GA Solid Waste Software Contract 9
officers, employees and agents harmless from any liability that they may incur as a result of any
failure of Commonwealth to comply with this Section 10.03.
Section 10.04. General Indemnification. Commonwealth shall, at its own expense, indemnify,
defend and hold harmless the Customer, and its elected and appointed officers, employees and
agents against any liability, claims, causes of action for injury or death for persons or damage to
property that they may incur as a result of any negligent acts, errors or omissions, or intentional
or willful misconduct on the part of Commonwealth, its subvendors or subcontractors, or any of
Commonwealth’s or its subvendors’ or subcontractors’ officers, employees, or agents which may
arise out of the performance of any of this Agreement. Nothing contained in this Agreement shall
create a contractual relationship with or cause of action in favor of a third party against either the
Customer or Commonwealth.
Commonwealth’s indemnification responsibility shall include the sum of damages, costs,
attorney’s fees and expenses which are in excess of the sum paid out on behalf of or reimbursed
to the Customer or its elected and appointed officers, employees or agents by the insurance
coverage obtained and/or maintained by Commonwealth pursuant to the requirements of this
Agreement.
Section 10.05. Proprietary Rights Indemnification. At its own expense, Commonwealth shall
indemnify, defend and hold harmless the Customer, including, but not limited to its elected and
appointed public officials, and City employees, against any claim or alleged claim that the
Licensed Software, the User Documentation or any part thereof furnished under this Agreement
infringes a United States patent or copyright, constitutes misuse or misappropriation of a trade
secret, or otherwise violates any ownership, proprietary, contractual or legal rights of a third
party; provided, however, that Commonwealth is given notice in writing of the claim or alleged
claim, and is given authority and information required for the defense of the same. The costs of
any suit or damages for which the Customer is liable that are attributable to the claim shall be
borne by Commonwealth, and Commonwealth shall have the right to manage the defense of such
suits as it sees fit.
Section 10.06. Remedies for Proprietary Rights Infringement. If the Licensed Software, the
User Documentation or any part of the software or documentation furnished under this
Agreement is likely to or does become the subject of a claim of infringement of a United States
patent or copyright, misuse or misappropriation of a trade secret, or any other violation of any
ownership, proprietary, contractual or legal rights of a third party, Commonwealth shall, at its
own expense, undertake one of the following:
(1) Obtain the right for the Customer to continue use of the Licensed Software
or User Documentation;
(2) Modify or furnish a substitute for the alleged infringing Licensed Software
or User Documentation;
Any replacement Licensed Software or User Documentation substituted under the second option
set forth in subparagraph (b) shall be acceptable to the Customer (acceptance shall not be
unreasonably withheld). All options are subject to prior written approval by the Customer;
provided, however, that no prior approval or concurrence by the Customer shall be required if
Augusta, GA Solid Waste Software Contract 10
use or possession of the Licensed Software or User Documentation has been permanently
enjoined by a court of competent jurisdiction in Michigan. In the event that Commonwealth is
not able or willing to obtain the necessary rights for use of the Licensed Software or User
Documentation or to provide acceptable substitute Licensed Software or User Documentation,
Commonwealth shall be required to refund the license fees paid by the Customer. In addition to
receiving any refund of fees, the Customer shall be entitled to exercise any other of its rights or
remedies.
Commonwealth shall not have any liability to the Customer for any claim that is caused
by use of the Licensed Software or part thereof in any manner for which it was not designed, or
by modifications to the Licensed Software by the Customer, without Commonwealth’s prior
approval. Nothing in this Section shall relieve Commonwealth of any of its duties to indemnify
the Customer as provided in this Agreement.
Section 10.07. Georgia Open Records Act. Licensee acknowledges that this Agreement and
certain documentation may be subject to the Georgia Open Records Act (O.C.G.A. § 50-18-70,
et seq.) Commonwealth shall cooperate fully in responding to such request and shall make all
records, not exempt, available for inspection and copying as required by law. Commonwealth
shall clearly mark any information provided to Licensee which Commonwealth contends is
Proprietary Information. Commonwealth shall notify Licensee immediately of any Open
Records request arising out of this contract and shall provide to Licensee a copy of any response
to the same.
XI. TERM/TERMINATION
Section 11.01. Term. The term of this Agreement shall commence upon the Effective Date and
shall continue until terminated in accordance with the provisions set forth in this Agreement.
Commonwealth shall have sole and exclusive ownership of all rights, title and interest in the
Licensed Software and all modifications and enhancements thereof(including ownership of all
trade secrets and copyrights pertaining thereto), subject only to the rights and privileges expressly
granted to City herein by Commonwealth. This Agreement does not provide the Customer with
title or ownership of the Licensed Software, but only a right of limited use. City must keep the
Licensed Software free and clear of all claims, liens, and encumbrances. City may not use, copy,
modify, or distribute the Licensed Software (electronically or otherwise), or any copy, adaptation,
transcription, or merged portion thereof, except as expressly authorized by Commonwealth. City
may not reverse assemble, reverse compile, or otherwise translate the Licensed Software. City’s
rights may not be transferred, leased, assigned, or sublicensed except for a transfer of the Licensed
Software in its entirety to (1) a successor in interest of City’s entire business who assumes the
obligations of this Agreement or (2) any other party who is reasonably acceptable to
Commonwealth, enters into a substitute version of this Agreement, and pays an administrative fee
intended to cover attendant costs. No service bureau work, multiple-user license, or time-sharing
arrangement is permitted, except as expressly authorized by Commonwealth. The Customer may
not install the Licensed Software on any other computer system or use it at any other location
without Commonwealth's express authorization obtained in advance (which will not be
unreasonably withheld); provided that City may transfer the Licensed Software to another
computer if the computer using the Software is inoperable. If City uses, copies, or modifies the
Augusta, GA Solid Waste Software Contract 11
Licensed Software or if the Customer transfers possession of any copy, adaptation, transcription, or
merged portion of the Licensed Software to any other party in any way not expressly authorized by
Commonwealth, City’s license is automatically terminated. Upon termination of this Agreement all
rights granted to City will terminate and revert to Commonwealth. Promptly upon termination of
this Agreement for any reason or upon discontinuance or abandonment of City’s possession or use
of the Licensed Software, the Customer must return or destroy as requested by Commonwealth all
copies of the Licensed Software in City’s possession (whether modified or unmodified), and all
other materials pertaining to the Licensed Software (including all copies thereof). The Customer
agrees to certify compliance with such restrictions upon Commonwealth’s request.
Section 11.02. Termination by the Customer Without Cause. Notwithstanding any of the
provisions of this Agreement to the contrary, the Customer may terminate this Agreement,
without cause, at any time upon at least thirty (30) days prior written notice to Commonwealth.
Upon receipt of such notice of termination without cause, Commonwealth will cease all work
activities as soon as reasonably feasible or as directed by the Customer. Further, Commonwealth
shall receive payment for all services rendered by Commonwealth up to date of Commonwealth
ceasing work activities; subject, however, to the condition that Commonwealth provides
reasonable documentation (in writing) describing the services rendered, including such itemized
billing setting forth time, materials, labor, subcontractor and other invoices, and any other
documentation necessary for the Customer to identify the extent and progress of services and
expenses attributable to specific tasks and deliverables required. Commonwealth shall receive
payment for such services in accordance with the rates set forth in Schedule J for time and
materials activities, except that Commonwealth shall not receive payment on a time and
materials basis for any services that were previously paid on a fixed fee basis, and, in no event,
shall the total payments to Commonwealth exceed the amounts stated in Schedule H.
Section 11.03. Termination for Cause. In the event Commonwealth does not satisfactorily
deliver or complete the installation and implementation of the Licensed Software or provide
training or support services in accordance with the terms of this Agreement and the
specifications set forth herein and in the Documentation, or if Commonwealth materially
breaches any terms, conditions, warranties or representations set forth in this Agreement or the
Documentation, the Customer may, at its option, notify Commonwealth of the Customer's
intention to terminate this Agreement. The written notice shall inform Commonwealth of the
reasons for the proposed termination and describe the problems or deficiencies that must be
corrected. Except as provided elsewhere in this Agreement, Commonwealth shall thereafter
have thirty (30) days from receipt of the notice to take such action as is necessary to fully comply
with its duties and obligations which the Customer has notified them that they are in breach of
under this Agreement. In the event Commonwealth does not fully comply with all of its duties
and obligations under the Agreement as notified by the Customer by the end of the thirty (30)
day period, the Customer may, without further notice, terminate this Agreement.
Section 11.04. Optional Remedy Upon Termination Prior to Complete Acceptance. If the
Customer terminates the Agreement for cause prior to the System Acceptance Date, based upon
Commonwealth's failure to deliver the Licensed Software or otherwise meet the scheduled
delivery, installation or implementation dates, the failure of the Licensed Software to pass
acceptance tests, or for any other material breach of this Agreement by Commonwealth prior to
the System Acceptance Date, the Customer may, at its sole option and discretion, elect to
terminate this Agreement with respect to the entirety of the Licensed Software and to receive a
Augusta, GA Solid Waste Software Contract 12
refund from Commonwealth of all License Fees monies theretofore paid to Commonwealth by
the Customer in accordance with the terms and conditions of this Agreement. In the event that
the Customer exercises its option to terminate this Agreement under this Section and upon
payment of the refund by Commonwealth, the Customer shall return, purge or permanently
destroy all Licensed Software (and copies thereof) within twenty (20) days following payment of
the refund, except for backup copies which shall be returned, purged or permanently destroyed
within 90 days. The Customer may retain all data files.
Section 11.05. Rights Upon Termination After Acceptance. In the event of termination of this
Agreement by the Customer after Acceptance and without cause under Section 11.02 or
termination by the Customer with cause under Section 11.03 (except if the Customer exercises
its optional remedy under Section 11.04), termination by the Customer under Section 11.06, or
termination as permitted under any other provision of this Agreement or as permitted by law, the
Customer shall have the right to continue use of the Licensed Software and User Documentation
as authorized by the license granted to it by Commonwealth in Section 3.01. All license rights
subsequent to termination after acceptance revert to Commonwealth.
In the event of a termination of this Agreement by the Customer for any reason, whether with or
without cause, the Customer shall have the right, by itself or by contracting with any other
persons or entities, to complete the development, implementation and installation of the Licensed
Software, to provide training and support services, and to perform any of the activities, services
or operations that may have performed under this Agreement if it had not been terminated. In no
event shall the Customer or any other persons or entities use or modify the source code or
reverse engineer object code for the Licensed Software.
Section 11.06. Termination Relating to Labor-Related Activities. The Customer may terminate
this Agreement upon fifteen (15) days notice, if Commonwealth or a contractor, manufacturer or
supplier of Commonwealth subsequently appears in the register compiled pursuant to Section 2
of Public Act 278 of 1980, which prohibits the Customer from entering into contracts with
certain employers who engage in unfair labor practices; to prohibit those employers from
entering into certain contracts with others; to provide for the compilation and distribution of a
register of those employers; and to provide for voiding of certain contracts. This right of the
Customer to terminate this Agreement in its entirety under this Section 11.06, and notice
provisions herein, shall apply notwithstanding any other terms and conditions in this Agreement
to the contrary.
XII. MISCELLANEOUS PROVISIONS
Section 12.01. Civil Rights Compliance. As required by the Elliott-Larsen Civil Rights Act,
Commonwealth and its subcontractors shall not discriminate against an employee or applicant
for employment with respect to hire, tenure, terms, conditions, or privileges of employment, or a
matter directly or indirectly related to employment because of race, color, religion, national
origin, age, sex, height, weight or marital status. Breach of this covenant shall be regarded as a
material breach of this Agreement, and this Agreement may be terminated upon notification from
the Michigan Civil Rights Commission as provided by Section 605(4) of the Elliott-Larsen Civil
Rights Act.
Augusta, GA Solid Waste Software Contract 13
Section 12.02. Source Code Protection. Commonwealth is the owner of proprietary software.
For all Licensed Software provided by Commonwealth as the owner of such proprietary
software, Commonwealth shall have available its most current recent release of the source code
and related User Documentation. Commonwealth will agree that should any action occur that
prevents them from providing service or maintenance on the Licensed Software, they will
immediately deliver to the Customer a copy of all Source Code.
Events Entitling City to Source Code: In no event shall City be entitled to the delivery of any
materials being held by Commonwealth for the Source Code until after City shall have paid to
Commonwealth the entire license fee specified in the License Agreement. After City has paid
the entire license fee specified in the License Agreement, City shall be entitled to the delivery of
all materials being held by Commonwealth for the Source Code and shall acquire a non-
exclusive right thereto for the purposes hereinafter set forth upon the occurrence of one or more
of the following events:
A. Upon filing of a petition in bankruptcy or insolvency by or against Commonwealth,
which if filed against Commonwealth shall not have been dismissed within 60 days
thereafter, or upon the institution of any proceedings for the liquidation or winding
up of Commonwealth’s business without a successor to the business, or
B. In the event of Commonwealth’s failure or refusal to provide maintenance service
for the Software to City in a reasonably timely basis in breach of a contractual or
warranty obligation to City.
Upon delivery of the information and documentation to City in accordance with this Agreement,
City shall have the irrevocable right to use such information and documentation for any purpose
reasonably necessary to provide for the continued maintenance and enhancement of the software
furnished by Commonwealth solely for use by City and otherwise subject to all the terms and
provisions of the License Agreement.
Section 12.03. Applicable Laws and Jurisdiction. This Agreement shall be governed by and
construed in accordance with the laws of the State of Georgia. All claims, disputes and other
matters in question between Licensee and Hansen arising out of, or relating to, this Agreement,
or the breach thereof, shall be decided in the Superior Court of Richmond County, Georgia.
Hansen, by executing this Agreement, specifically consents to venue and jurisdiction in
Richmond County, Georgia and waives any right to contest jurisdiction and venue in said Court.
Section 12.04. Severability. In the event any one or more of the provisions contained in this
Agreement or any application thereof shall be deemed invalid, illegal or unenforceable in any
respect, the offending portions of such provisions, construed as narrowly as possible, shall be
deemed stricken here from and the validity, legality and enforceability of the remaining
provisions contained herein and any other applications thereof shall not in any way be affected or
impaired thereby.
Section 12.05. Force Majeure. No party shall incur any liability to the other parties on account
of any loss or damage resulting from any delay or failure to perform all or any part of this
Agreement, where such delay or failure is caused, in whole or in part, by events, occurrences or
causes beyond the reasonable control of the parties.
Augusta, GA Solid Waste Software Contract 14
Section 12.06. Assignment. Neither this Agreement, nor any rights hereunder may be assigned
or otherwise transferred by Commonwealth, in whole or in part, whether voluntary or by
operation of law, including any merger or consolidation, without the prior written consent of the
Customer, which consent shall not be unreasonably withheld.
Section 12.07. Notices. All notices required by the terms and conditions of this Agreement shall
be in writing, addressed as follows:
Augusta
Tameka Allen, IT Director
530 Greene Street, A-101
Augusta, GA 30911
T: 706.821.2522
F: 706.821.2530
Copies to:
Fred Russell, City Administrator
530 Greene Street, Room 801
Augusta, GA 30911
T: 706.821.2400
Mark Johnson, Solid Waste Director
4339 Deans Bridge Rd
Augusta, GA 30906
T: 706.592.3200
F: 706.592.1658
Commonwealth
COMMONWEALTH
15447 Middlebelt
Livonia, Michigan 48154
Any notice required or permitted under this Agreement may be transmitted by facsimile, hand
delivery or mailed to the parties at their respective addresses set forth in this Section 12.07, or to
such other addresses as a party may substitute by written notice. Any such notice transmitted by
facsimile or hand delivery shall be deemed to have been given one (1) day following transmittal,
and any mailed notice shall be deemed to have been given three (3) days following the date of
posting by Certified Mail, Return Receipt Requested.
Section 12.08. Waiver. No term or provision of this Agreement shall be deemed waived, and no
breach excused, unless such waiver or consent shall be in writing and signed by the party
claimed to have waived or consented. Any consent by any party to, or waiver of, a breach by
another party, whether express or implied, shall not constitute a consent to or waiver of any
different or subsequent breach.
Augusta, GA Solid Waste Software Contract 15
Section 12.09. Entire Agreement. This Agreement contains the entire agreement of the parties
with respect to its subject matter, and there are no promises, conditions or representations made
by any party, except as expressly set forth therein, and in the Documentation. This Agreement
may be modified or amended only by written instrument executed by authorized representatives
of the Customer and Commonwealth. No term, provision or condition of any purchase order or
invoice which the Customer or Commonwealth may use in connection with the Licensed
Software or any related matters shall have any effect on the rights, duties or obligations of the
Customer or Commonwealth in accordance with this Agreement.
Section 12.10. Successors Bound. The terms and conditions of this Agreement shall extend to
and inure to the benefit of and be binding on the respective successors and permitted assigns of
the Customer and Commonwealth.
Section 12.11. Assignment. Commonwealth shall not assign its duties or obligations under this
Agreement without the prior written consent of the Customer.
Section 12.12. Performance Bond. Prior to the making of this contract, Commonwealth shall
have obtained a performance bond in the amount of $82,000 (Eighty-Two Thousand Dollars).
Proof of the acquisition of the bond shall be provided to the Licensee and attached to the contract
as Schedule L.
Augusta, GA Solid Waste Software Contract 16
IN WITNESS WHEREOF, the parties have caused their duly authorized representatives to
execute this Agreement as of the Effective Date set forth at the outset hereof.
AUGUSTA
Date: By: __________________________________
Its: Mayor, City of Augusta
Attest:_________________________________
COMMONWEALTH
Date: By: __________________________________
Its: _________________________________
Augusta, GA Solid Waste Software Contract 17
SCHEDULE A
SOFTWARE SUPPORT SERVICES
Section A1: General Services. Commonwealth shall furnish the Customer with the following
Software Support Services, provided the programs must be used with the version or release of
the operating system recommended by Commonwealth; and Commonwealth will supply
telephone assistance to the Customer representatives; the Customer Systems Administrator, the
Customer Financial Analyst, and or other party(ies) designated by the Customer; during City’s
normal business working hours, from Commonwealth’s designated office location, during
Commonwealth’s “Principal Period of Support”, meaning the hours of 8:00 a.m. to 6:00 p.m.
Eastern Time, Monday through Friday, excluding holidays observed by Commonwealth as
determined annually, and communicated to the Customer at the beginning of each year. This
telephone assistance will consist of the Commonwealth using its best effort to provide:
1. Explanation of functions and features of the Software;
2. Clarification of documentation pertaining to the Software
3. Guidance in the operation of the Software; and
4. Error analysis and correction in accordance with paragraph A4.1, if correction can be
made by telephone.
Section A2: Software Updates.
1. Commonwealth shall, if and when it deems necessary, provide the Customer with updates for
the Software reflecting improvements made to the Software.
2. Commonwealth shall make available to the Customer all releases developed by
Commonwealth for the Licensed Software as well as updates to the User Documentation
reflecting such new releases, provided Customer is a client in good standing, having paid
current year’s annual support fees.
3. For all new releases acquired by the Customer as described herein, and for any other of the
Software Changes made by Commonwealth, the same shall be made available to the
Customer in a timely manner as developed and debugged by Commonwealth. However, the
same shall be provided to the Customer no later than ninety (90) days following completion
of debugging. Commonwealth shall simultaneously provide updates to the User
Documentation reflecting any such Software Changes. Should the Customer desire to
implement the Software Changes, Commonwealth shall provide instructions, media,
telephone support, and conversion utilities for installation and implementation of the
Software Changes. However, if the Customer requests installation assistance at the
Customer's facilities, Commonwealth shall provide such assistance on a time and materials
basis, in addition to reasonable travel and living expenses (in accordance with the Customer's
then current policies). Such installation fees and expenses shall be in addition to the Annual
Software Support Fees, but shall be in accordance with the rates set forth in this Agreement.
Augusta, GA Solid Waste Software Contract 18
Section A3: Services Beyond Standard Support. The Commonwealth help desk shall be the
primary means of communication between the Customer and Commonwealth regarding the
Licensed Software. Necessary resources shall be allocated to resolve each reported issue.
Commonwealth shall have a comprehensive escalation procedure in place to ensure that all calls
are handled in an expeditious manner.
1. After the documentation described in Schedule E is provided to the Customer, the telephone
service described above is not to be used for educational purposes. If Commonwealth
determines that the telephone assistance is being used for educational purposes, the Customer
shall pay to Commonwealth the then current standard charges for educational services.
2. As and when reasonably requested by the Customer, Commonwealth may provide additional
technical support (beyond the Software Support Services described in this Agreement),
additional modifications to the Licensed Software and other related services. Examples of
additional technical support may include, but not be limited to, setting up user accounts,
setting up printer queues, performing file conversions, system maintenance (defragmenting
the disk, system fine-tuning, etc.) and operating system training. Additional services
associated with modification of the Licensed Software may include, but not be limited to
requirements analysis, preparation of functional and programming specifications, software
development, testing, documentation, installation and training (beyond the implementation
services with Commonwealth will be required to perform pursuant to the terms and
conditions of this Agreement). Commonwealth shall provide an estimate of costs prior to
performing any of the requested services. To the extent that any of the foregoing services are
requested by the Customer, Commonwealth agrees to enter into good faith negotiations
directed to performance of such services, in accordance with the service fee rates set forth in
this Agreement.
Section A4: Software Errors and Defects.
1. If the Customer suspects that a defect exists in the Software, the Customer shall notify
Commonwealth in writing of its suspicions. This notification shall comprehensively describe
the nature of the suspected defect and provide details of the circumstances of its occurrence.
Upon receipt of the Customer’s notice, Commonwealth shall use its best efforts to confirm
the existence of the defect. If the Commonwealth confirms the existence of the defect,
Commonwealth shall correct it as part of its obligations under this Agreement.
2. To the extent required for Commonwealth to timely correct Licensed Software errors or
defects, Commonwealth support personnel shall be available for on-site visitations, as
required. On-site visits are subject to the following parameters:
A. Provided that the error or defect is inherent to the software and is not the fault of the
Customer, any such on-site visitations to correct Licensed Software errors or defects shall
be undertaken by Commonwealth at no additional cost to the Customer.
B. Provided that the error or defect is not inherent to the software and is the fault of the
Customer, any such on-site visitations to correct Licensed Software errors or defects shall
be undertaken by Commonwealth at no additional cost to the Customer, beyond the
Travel/Mileage, Daily Food Per Diem, Reasonable-Lodging charges described in
Schedule J.
Augusta, GA Solid Waste Software Contract 19
Section A5: Commonwealth Support Process and Conditions.
1. The following is the process that is required in order to initiate Support:
A. Calls, email, or fax goes to the Support Center in Livonia, Michigan where they are
logged and prioritized with the following priorities:
1) Priority 1: Mission critical/System down
2) Priority 2: Urgent fix needed/workaround in place
3) Priority 3: Desire for report or additional functionality
2. Commonwealth team will respond within four (4) hours to a Priority 1 during normal
business hours 8am – 6pm Monday-Friday, excluding holidays. After the question is
answered or the problem resolved, a support analyst will call the Customer back to determine
if the problem is solved. Commonwealth connectivity to Augusta servers will be governed
according to Schedule K: Augusta Information Technology Third-Party Vendor Access
Agreement.
3. A phone number will be provided by Commonwealth to provide for emergency services
during the normal business hours of our operation Monday – Saturday 8:00am – 6:00pm
(Eastern time).
4. Following notification by the Customer to Commonwealth of any software problems
associated with the Licensed Software, Commonwealth shall promptly undertake those
efforts necessary to correct the problem. Commonwealth shall provide the Customer with a
way to work around the problem, which is acceptable to the Customer, until such time as a
correction can be reasonably implemented.
5. During the Principal Period of Support, as described in Section 6.03 of this Agreement, and
as and when requested by the Customer, Commonwealth shall provide verbal telephone
consultation with City personnel (via the help desk), on-line remote diagnostics and on-site
visitations for isolating, identifying, and resolving problems associated with the Licensed
Software. Commonwealth shall provide the Customer with corrections of errors and logic,
instructions, or functional performance of the Licensed Software, so as to ensure that the
Licensed Software meets the warranties set forth in the main body of this Agreement.
6. For purposes of consultation and assistance, Commonwealth shall provide qualified technical
contact personnel (or have timely access to such qualified personnel) during the Principal
Period of Support. With respect to requests for assistance by the Customer, the Customer
shall limit such requests to no more than a reasonable number of City personnel.
7. In accordance with the terms and conditions set forth herein, Commonwealth shall be
available for the Software Support Services during the Principal Period of Support. Further,
the Software Support Services as described herein with respect to verbal telephone
consultation, on-line remote diagnostics and on-site visitations shall also be available outside
of the Principal Period of Support, subject to the Customer paying for such off-hour services
on a time and materials basis, in accordance with the service fee rates set forth in this
Agreement.
Augusta, GA Solid Waste Software Contract 20
SCHEDULE B
Insight Environmental Software Implementation Plan For City of Augusta
Section B1: Tentative Implementation Plan. The plan below describes the general steps of the
implementation process, and is to be used as a guideline for detailed planning that will take place
during the project. The steps below may be rescheduled, expanded, or otherwise changed with
the written approval of Augusta’s Project Manager and Commonwealth.
Task
ID Project Phase/Step Status Notes/Comments Start
Date
Sched
End
Date
End
Date
1 Contract Signing
1.1 Contracts signed and exchanged 9/15/06 9/22/06
1.2 50% of License Fee 9/22/06 9/22/06
2 Kickoff Meeting
2.1 Review system and report changes 10/2/06 10/4/06
2.2 Develop detailed project plan 10/2/06 10/4/06
3 Hardware Acquire and Install
3.1 Acquire and Install Hardware 9/22/06 10/21/06
3.2 Place Hardware on Network 10/23/06 10/27/06
4 Install Base System (Licensed Software
from Schedule C)
4.1 Software Installation 10/30/06 11/3/06
4.2 25% of License Fee (at installation) 11/3/06 11/3/06
5 Customization Tasks
5.1 Set up staging lab at Commonwealth 10/9/06 10/20/06
5.2 Develop data migration 10/9/06 11/3/06
5.3 Develop system and report changes 10/9/06 12/22/06
6 Training and Testing
6.1
Test completed program changes and
data migration in staging area (Augusta
and Commonwealth)
11/6/06 12/22/06
6.2 Create training schedule 11/6/06 11/06/06
6.3 City of Augusta staff training 11/13/06 12/22/06
7 Conversion
7.1 Create installation plan accounting for
probability of co-existence of 2 systems 11/06/06 1/5/06
7.2 Conversion Testing 12/11/06 1/5/06
7.3 Final Data Conversion 1/6/06 1/7/06
8 Go Live 1/8/06 1/12/06
9 Acceptance Testing and Project Close-
Out
9.1 Testing Period
30 days
after go
live
9.2 25% of License Fee (at end of period) -
9.3
Final Billing Assistance (tentative
onsite technical assistance only 3-
days)*
3 days
* Vendor will be onsite for three days to assist in Augusta’s first major billing.
Augusta, GA Solid Waste Software Contract 21
Section B2: System Enhancements Scheduling.
Create design specifications for billable and non-billable system changes and reports
RFP ID Description Days to
Develop Cost
Enhancements (billable)
SB-20, CB-2 Bar Code Invoices 4 days $ 2720.00
SC-2 Labor Costs 10 days $ 6800.00
CC-5 Finish vendor contracts and vendor
inventory assign 5.5 days $ 3740.00
NEW-4
Cart/inventory integration – tracking
automation of asset placement to a
customer.
10 days
$ 6,800.00
NEW-6 Scale automation 1 day $ 680.00
Enhancements (no charge)
NEW-5, SAR-21
Financial assurance for the landfill –
report all landfills must create each
year. It ties directly to remaining
capacity and lifespan of a landfill.
4 days
SG-15 Random load inspections to be
scheduled based tons or commodity. 4 days
SG-24 Generate close to "credit limit" letter. 5 days
SB-21 Show aging on invoices on a customer
by customer basis. 1 day
CS-4 Generate a "new service" letter. 5 days
CR-5 Optimize routes, allow prototype
optimize before post to production 15 days
CAP-1 Finish A/P 23 days
Section B3: Project Task Definitions.
Create training schedule
Each City of Augusta staffer will have unique elements of Insight that they will be interested in learning. We will create
a curriculum and schedule. You may then select the areas that interest you most and participate in those areas of
training exclusively. This maximizes the focus of the training where needed and minimizes regular workload
disruptions.
Create system and report changes
The developers will create all the additional reports, process and screen changes. These will be verified during the
construction by the appropriate City of Augusta authority for the specific function.
Create data Migration
The data from legacy system will be migrated to the Insight database. We must determine which data and how much of
it is supposed to come over. This temporary tool will be used to refresh the data a number of times during this project
until the final migration during the go live event.
Residential data from route audit (approx. 60,000 residents) 10 days
Landfill customer from Wasteworks (approx. 300 customers) 5 days
Commercial customers to be keyed in manually (approx. 100 customers) 2 days
Augusta, GA Solid Waste Software Contract 22
Set up staging lab at Commonwealth
This is a set of computers that contain a simulation of the City of Augusta environment and data. The code changes will
be tested here. The training and the overall system testing will be done here also.
Test completed program changes and data migration in staging area
This is the process where City of Augusta personnel sign off on the completion of the code changes that need to be
done in advance of go live. This involves testing all reports and screen or process changes.
Begin City of Augusta staff training
Near the end of the implementation plan, the training of the City of Augusta staff will begin. It is our desire to schedule
these events as close to go-live date as possible. These events will be grouped around areas of expertise. We will
attempt to make the training 3 – 4 hour blocks at a time over the course of a few weeks. The data used during the
training will be the migrated data.
Create final installation plan accounting for probability of co-existence of 2 systems
Here we want to explore the possibility of an install to the live systems ahead of time. If Insight is allowed to co-exist
with the legacy system, then we can install Insight before the go live date and do a system wide infrastructure walk
through.
Go Live
Mission Critical cut-over. This means that we do not run parallel. The users stop using the old and start using the new.
Section B4: Development Methodology.
This describes how we do what we do. The Commonwealth Development Methodology begins with a requirements
definition and user feedback loop. This produces agreed upon specifications. From this document the detail design
specifications are produced. These are programmer specifications that provide directions of the technical nature
required by good programmers. The programmers construct and test their objects and modules. These are then
integrated into the existing product framework and system and integration tested in preparation for beta and ultimate
pilot testing. The new features are then documented and the support staff is trained on their nature and use. Finally, the
pilot is complete and the work is ready for general release.
• Requirements Definition Loop (Senior Analyst)
• Detail Design (Senior Analyst)
• Construction and Unit Test (Programmer/Report Writer)
• System and Integration Test (Quality Assurance staff)
• Pilot and Release (large projects, Quality Assurance staff)
Augusta, GA Solid Waste Software Contract 23
SCHEDULE C
LICENSED SOFTWARE
Section C1: Licensed Software. Commonwealth shall furnish the Customer with the following
Software:
The entire suite of Insight Environmental Software. Including Landmark, HaulMark and the
Multi-Site Enterprise Solution.
LandMark (Landfill, Transfer Station)
Scale House Ticketing
Scale Interface
Reporting
Cash Applications
Billing
Customer/Business Inquiry
Master Files
HaulMark (Roll Off, Residential, Commercial)
Routing
Dispatching
Reporting
Cash Applications
Billing
Customer/Business Inquiry
Master Files
Multi-Site Enterprise Solution
Replication
Section C2: Software Functional Requirements. The Software shall have the following
functionality as identified in the original RFP #05-162 section entitled Software and System
Requirements. Since the original RFP was released, these items have been identified for
completion in either Phase I or Phase II of this project. Items in Schedule C are part of the Phase
I Implementation, and items that have been moved to Phase II (which are indicated under
Schedule D) are indicated as such following the Vendor Response, since the response to the RFP
question was a key guiding factor in phase assignment. Phase II requirements will be addressed
under a Statement of Work separate from this contract. Additionally, several items have been
classified as “Phase III” items that are not to be included as part of the vendor’s contract
obligations for this project. These exist here simply for information items in order to guide
future development.
For all of the requirements listed on the following pages, the vendor is expected to respond in the
column on the right according to the following parameters:
Augusta, GA Solid Waste Software Contract 24
Y Vendor is fully compliant with the requirement. If the vendor is partially
compliant, they should indicate “N” rather than “Y”, and include an
explanation.
N Vendor is not currently compliant with the requirement and does not plan
to be compliant for the foreseeable future. Please note that a response of
“N” will generally not disqualify a vendor from this competitive process.
M Software currently does not meet the requirement but this can be done as a
modification at no cost.
M$xxx Software currently does not meet the requirement but this can be done as a
modification for an additional cost. The vendor should indicate in the
“xxx” what the estimated cost will be.
F The software does not meet the requirement but the feature is under
development and will be provided at a future date at no additional cost. If
this code is used, a date should be supplied as well (e.g. F 8/6/2006).
N/A Does not Apply (Based on the vendor’s specific solution, this is not
applicable). For example, questions referring to data being hosted offsite
would not apply to vendors offering a solution to be served from the
Augusta IT computer room.
Please note: Augusta reserves the right to automatically disqualify for consideration any vendor
that is found to have answered these questions falsely with the intent to deceive in order to
artificially enhance their chances of becoming the vendor of choice for this project.
This list may be amended as needed during the implementation, allowing Augusta to request
additional modifications. Modifications requested by Augusta that are not included below, and
are not considered by Commonwealth to be needed by future Software Licensees will be done
for an additional fee based on Augusta acceptance of a quote provided by Commonwealth for
such modification.
A. Augusta Software Technology Contract Requirements
Item ID Item Description Vendor Response
1. Database Type and Schema
IT-1-1 The database must be either SQL Server, Oracle, or an IBM-server/database configuration. Y
IT-1-2
The vendor must provide an updated copy of the production database schemas for the
purpose of understanding the system and generating reports. The vendor must provide
current updates if/when the schemas change. This includes a data dictionary that explains
table and field names.
No. The database is
not encrypted and the
naming conventions
are not ambiguous.
Clarification is
available through
customer support.
2. Database features for Archiving, Testing, Restore, and Data Integrity
Augusta, GA Solid Waste Software Contract 25
Item ID Item Description Vendor Response
IT-2-1 It must be possible to restore a historical backup of the database and do a forward recovery
using a transaction log.
Y. Handled at SQL
Administration level.
IT-2-2
Editing Controls should be in place to protect data integrity by ensuring that incomplete or
incorrect data cannot be entered or processed and that entries cannot be processed in the
wrong sequence.
Y
IT-2-3 Software should able to archive and purge selected information in order to remove
historical records that are not required to be retained permanently. Y
IT-2-4
Vendor should provide for a solution that permits a production environment and a test
environment to reside on the same server so that upgrades and service packs can be tested
prior to being implemented in production.
Y
3. System Security
IT-3-1 The system must include security that logs all database transactions, recording operator,
date and time. N
IT-3-2 Access to the system must be protected by unique user identification codes and passwords. Y
IT-3-3 Software must allow assignment of access privileges by user for each system module. Y
IT-3-4 User characteristics for on user may be copied to a new user so that similar characteristics
for multiple personnel need not be entered multiple times. Y
IT-3-5 Database security must have the ability to control access at the database level. Y
4. Internet Interaction
IT-4-1 There must be an interface for the World Wide Web available to enable the public to have
inquiry-only access to the data stored in the vendor’s system.
M $6000
Phase II Item
IT-4-2 Vendor should have the capability for program modules to be accessed via a web browser
rather than a traditional client installation. N
5. Graphical User Interface (GUI)
IT-5-1 The software must have a GUI interface that provides a flexible, menu-driven environment
for the user to invoke system functions from. Y
IT-5-2 Menus in the GUI should have a consistent “look and feel”, meaning a common
arrangement of menus, buttons, boxes, etc. that are the same from one menu to another. Y
IT-5-3
The software operates from a standard Internet browser (preferably Microsoft Internet
Explorer) such that, in most cases, no software is required on the users’ desktop. It is
permissible for hardware (digital cameras, PDAs, other handheld devices) to require
software installations on the client workstations.
N
6. Performance Bond
IT-6-1
Prior to the making of any contract with Augusta, vendor shall agree to obtain a
performance bond in the amount of the licenses, services, and other fees provided to
Augusta in the execution of the project. For example, if the vendor software solution
(including proprietary hardware) is $150,000, then the vendor shall obtain the bond in the
amount of $150,000. Augusta’s cost of obtaining servers, etc. which may be used with
other vendor solutions is not to be included in the bond amount, subject to review by
Augusta IT during the contract negotiation process.
Y
7. Presentation
IT-7-1
If selected to present their product to the selection committee, the vendor should be
prepared to have all of their software modules ready for presentation. A vendor may be
disqualified if modules / products that are “in development” or otherwise not ready to
present or implement are represented as being complete in this RFP.
Y
8. Maintenance
IT-8-1 Augusta does not expect to pay maintenance on any product in the 1st year. Maintenance
will begin on the anniversary of the "live date". Y
9. Vendor Security Practices
Augusta, GA Solid Waste Software Contract 26
Item ID Item Description Vendor Response
IT-9-1
If the vendor desires to connect to Augusta’s network through remote electronic means or
through on-site activity, then the vendor shall sign the Augusta Information Technology
Third-Party Vendor Access Agreement. This document shall be made part of any licensing,
services, or maintenance contract(s)) between Augusta and the vendor. The agreement is
attached to this document as Exhibit A. A response to this RFP/RFQ indicates that the
vendor will sign the agreement, thereby agreeing to the stipulations and consequences
therein. Vendors that will not sign the agreement should not reply to this RFP/RFQ, and
will be summarily disqualified if they later refuse to sign. The current methodology for
connection to Augusta’s network is VPN, and the standard software package for connection
to Augusta’s Microsoft Windows-based servers is pcAnywhere.
Y
B. General Software Requirements / Scale Application
Item ID Item Description Vendor Response
General
SG-1 Generate tickets by yards and/or tons. Y
SG-2 Able to enter Manual tickets. Y
SG-3 Able to generate tickets with sequential ticket numbers. Y
SG-4 Ability to split loads by commodity or volume and weight and track the load segments to
individual origins and counties. Y
SG-5 Ability to charge minimum rates per customer and or per commodity. As well as defining a
minimum load charge. Y
SG-6 Automatic Rate Adjustments for premium or off hours Y
SG-7 Interface with a cash drawer providing secured access to cash drawer with the drawer
access restricted to the appropriate payment type(s)). Y
SG-8 Automatic vehicle interface. Each truck can be read as it approaches the scales Y
SG-9
Interfaces with a variety of scale automation controls. This could include card readers, key
pads, RF ID tags, etc. Automation should include the ability to open gates, change traffic
signals and other auxiliary items.
M $3750
Phase II I
SG-10 Must be able to operate multiple scales at multiple sites. Must be able to accommodate a
variety of scale manufacturers. Y
SG-11 Should interface with surveillance cameras to capture multiple images viable and printable
on tickets. Y
SG-12 Tare averaging using vehicle history, or like vehicle type Y
SG-13 Capture the vehicle weight by truck and box combinations or by individual components,
with the truck weights stored separately from the box weights. Y
SG-14 Scheduled required weigh outs / re-tares. Shows the last tare weight date for reference. Y
SG-15
Program indicates when a random load inspection is to be done. Must be able to set the
parameters by commodity type, load count, tons, etc. Must be able to provide a detailed
report of load inspections.
M
SG-16 Customer specific pricing or standard company pricing or standard pricing for different
types of customers and commodities. Y
SG-17 Configurable fees, surcharges, discounts for all or a portion of the customers and all or a
portion of any commodity price, this should specifically include volume based discounts. Y
SG-18 We have the option to print surcharges and fees separately or include them in the rate. Y
SG-19 Configurable access to functions based on security levels/tasks assigned Y
SG-20 Tracking and restrictions for bad checks Y
SG-21
Must be able to hold a check, and generate one invoice for all daily activities against that
check within the system. The customer must be able to leave a blank check also and have
the system tabulate the balance of all tickets paid using the blank check.
Y
SG-22 Option for required deposit on weigh in - based on a customer Y
Augusta, GA Solid Waste Software Contract 27
Item ID Item Description Vendor Response
SG-23 Optional forced drivers license and/or vehicle tag number for all cash or check
customers. Y
SG-24
Credit limit checks/limitations based on accounts receivables. Automatic "close to
limit" letters can be generated to notify the customer they are close to their credit
limit.
M
SG-25 Tracks and reports on origin of waste received for each material. Y
SG-26
Tracks waste placement through a 3 dimensional grid system. Would like it to
communicate with a GPS data collector to get exact Latitude, Longitude, and
elevation.
M$4000
Phase II Item
SG-27 Able to track both incoming and outgoing loads, volume and tons. Y
SG-28 POS reconciliation by cash/checks/charges/and temp accounts Y
SG-29 Ability to balance cash and batch within the system. Y
SG-30 Generates a detailed audit trail by user and actions. F 3/31/2006
SG-31 Able to have more than one customer tied to a specific truck. Y
SG-32 In-Process ticket (vehicle in facility or unclosed ticket) tracking/report Y
SG-33 Able to electronically save tickets/batches/invoices in a format that can be easily
e-mailed or stored by date, customer, etc. Y
Pricing
SP-1 Rates must modifiable dynamically from ticketing or billing using fixed rate or
percentage fees or discounts Y
SP-2 Rates must modifiable dynamically from ticketing or billing using quantity based
or time based rate tables using fixed rate or percentage fees or discounts Y
SP-3 Rates must be modifiable using formulas that allow for the creation of any rate
modifier based on volumes, time, unit of measure and any combinations. Y
SP-4
Scheduled price changes by customer, contract, charge type and charge categories must be
provided for. The price change must be able to be modeled against historical data and be
applicable on demand as well as automatically when scheduled.
Y
SP-5
Price adjustments must have the ability to be reviewed prior to implementation, generating
a price adjustment model that can be evaluated and manipulated prior to implementation.
Reports on such must be available.
Y
Special Waste Approvals
SS-1 Individual waste profiles for waste streams tied to a customer or master approvals
for multiple haulers. Y
SS-2
Approvals can be tracked/limited to a specific waste stream and specific jobs.
Automated "close to limit" letters can be generated to notify the customer their
profile is about to expire.
M
SS-3
Volume or tons tracking of limits based on a profile. The approvals must track and
enforce the volume limits by tons, yards and any other unit of measure. Ticketing
must warn the operators of the load becoming close to the limits of the approval at
a predefined threshold.
Y
SS-4
Time tracking and limits based on a profile. The approvals must track and enforce
the expiration date of the approval and warn the customer in advance of the
violating load.
Y
SS-5 Individualized load authorization security. Waste approvals can require up to 3
password secured authorizations Y
Municipal
SM-1 Must be able to identify a vehicle by a county supplied unique truck number Y
SM-2 Vehicle insurance expiration tracking Y
SM-3 Vehicle or company expirations Y
Billing
Augusta, GA Solid Waste Software Contract 28
Item ID Item Description Vendor Response
SB-1 Deferred Quantity Billing - volume based billing Y
SB-2 Can bill Cash, charge or intercompany Y
SB-3 Print separate invoices for each pricing contract that a customer has negotiated. Y
SB-4 Must be able to bill finance charges. Y
SB-5 Must be able to print invoices summarized by vehicle ID, charge type, material, or
by date Y
SB-6 Option to print aged account summary on the invoices. Y
SB-7 Optional overdue messages on invoices based on age of balance. Y
SB-8 Able to suspend a customer to a "cash only" customer. Y
SB-9 Automatic generation of cut off letters based on aging, with the ability to preview
and make adjustments prior to printing. Y
SB-10 Option to automatically suspend customers if their account balance reaches
unacceptable limits. Y
SB-11 Auto-pay by credit card on file during billing. Y
SB-12 Generate General Ledger posting reports. Y
SB-13 Able to edit the batch prior to close or billing. Y
SB-14 Able to re-print a given ticket with or without the captured customer signature. Y
SB-15 Able to re-print a given invoice after the invoice is posted. Y
SB-16 A ticket can never be deleted, it may be voided or a line item may be reversed. Y
SB-17
If the total invoice amount for a customer is below a predefined minimum billing,
then an optional administration fee can be assessed to bring the invoice to an
acceptable minimum.
Y
SB-18 Ability to configure the contents of an invoice on a customer by customer basis.
This includes sorting, filtering subtotals and formatting. Y
SB-19 Provision must be made for Invoices to be distributed online.. Y
Phase II Item
SB-20 Bar coded information on invoice to facilitate payment scanning M $2750
SB-21 Invoices can be printed as a statement showing the aged account balance on the invoice -
optionally on a customer by customer basis M
SB-22 Finance charges calculated on a customer by customer basis with the inclusion on finance
charge calculation optional during a billing. Y
SB-23 The finance charge period and the aging days are configurable on a customer by customer
basis Y
SB-24 Allow for consolidated billings across lines of business so all billings for a customer appear
on one invoice if desired Y
SB-25 Allow for the invoice to be paid automatically by credit card on file. Y
SB-26 Provision to accept payment over the phone and perform instantaneous transactions of
payments. Y
Accounts Receivable
SR-1 Automated Past Due Letters and envelopes. Integrated with Microsoft Word. Must
allow selection of letters by aging category, balance and customer. Y
SR-2
Payment terms include all standard payment terms, user defined terms and
discounts automatically offered in the payment entry if payment is made within a
specific number of days.
Y
SR-3 Generate statements. Statements must be a running balance statement that shows
current month payments and adjustments in detail. Y
SR-4
Aging Analysis must provide summary, invoice summary and detail aging. They
must be able to be filtered by balance, aging category and allow override the aging
period days from a typical 30, 60, 90 etc.. days to any number of days per aging
category like 45, 60,75 etc.
Y
Augusta, GA Solid Waste Software Contract 29
Item ID Item Description Vendor Response
SR-5 Cash Receipts entry, providing helpful mechanism for paying multiple invoices
with a single payment. Y
SR-6 Ability to balance cash within the software. Y
SR-7 Cash receipts reporting by batch or customer number Y
SR-8 Tracking of check numbers Y
SR-9 Able to split payment amount between credit card, cash, checks, and charge
account. Y
SR-10 Ability to offer prepayment or early payment discounts such as 2% net 10 days. Y
Multiple sites
SMS-1 Real time data updates at the HQ from all sites. Y
SMS-2 Instant updates at sites of all transactions and activity of all sites including remote
sites. Y
SMS-3 Configurable synchronization frequency of all information edited at remote sites. Y
SMS-4 The remote sites must be able to function in the software even in the event of the
communication lines being down. Y
Analysis and Reporting
SAR-1 All reports must be exportable to an ODBC data source such as MS EXCEL Y
SAR-2 Must be able to report Volumes of tons, yards, loads , revenue; Y
SAR-3 For any time range selected by date; Y
SAR-4 Presented in summary or detail; Y
SAR-5 For Divisions, Customers, Materials, Generators, Customer vehicle, Hauler,
Contract, Approval, county, state. Y
SAR-6 Must report assessment fees and surcharges for reporting to the governing
authorities. Y
SAR-7 Must generate general ledger detail and summary ledgers for any accounting
period Y
SAR-8 Must report operational reports showing volumes by time of day, days of week,
trucks per hour and cumulative truck count throughout the day. Y
SAR-9 Must report customer ranking reporting by sales for a given time frame Y
SAR-10 Must provide deposit slips at the scale house for the daily deposits and deposit
slips for the payments made against AR Y
SAR-11 Must provide simple one line detail ticket ledgers as well as comprehensive ticket
lists showing the charge details Y
SAR-12 Provide reporting for outbound loads in volumes a revenues, filtering and sorting
the same as is required for inbound loads. Y
SAR-13 Provide a detailed customer ledger report detailing account transactions, profile
details and sales statistics Y
SAR-14 Provide a detailed contract report showing the negotiated price structures for the
customer Y
SAR-15 Standard label and envelope Y
SAR-16 Customer contact logs detailing phone calls and other communication events Y
SAR-17 Provide vehicle listings showing key information such as the tare and size for a
selected customers vehicles. Y
SAR-18 Reports must be easily found with documentation and search capabilities by
helpful descriptive phrases and keywords. Y
SAR-19 Report access must be subject to security restrictions based on user security level. Y
SAR-20 Must be able to organize the reports by user defined groupings and hide unused reports. Y
Augusta, GA Solid Waste Software Contract 30
Item ID Item Description Vendor Response
SAR-21
Must be able to generate a snapshot "remaining capacity" report. This report will reflect the
airspace used by waste factored by a density, adding in cover soils, etc. To generate an
anticipated fill date.
M
Cost Tracking
SC-1 Fuel costs must be tracked. Automated fuel surcharges must be easily deployed to billing.
Fuel costs should be able to be uploaded from a fuel card system.
M $4500
Phase III Item.
SC-2 Labor costs must be tracked. A cost per hour per employee must be stored and be able to
be allocated to workflows accurately.
M $6800
Phase I Item
SC-3 Cover dirt utilization must be tracked, by volume, load, and density with the ability to run
reports on such. Y
SC-4
Asset Utilization must be tracked. This should include the hours the equipment operated.
A cost per hour per piece of equipment must be stored and be able to be allocated to
workflows accurately.
Y
SC-5 Costs should be able to be allocated and identified as capital projects, tracked by project
number, name, etc.
M $3500
Phase III Item.
C. General Software Requirements / Solid Waste Collections
Item ID Item Description Vendor Response
Customer Service
CS-1 Customer Quick set up - set up the customers contract, location, charges, initial payment,
container, routing, and sequencing from one screen. Y
CS-2 Provide a detailed customer contact log, which allows for scheduled feedback to the
customer. Must show who and when talked to the customer. Y
CS-3 Able to e-mail/fax customers information such as invoices, tickets and reports. Y
CS-4 Once a new customer is generated, the system should generate a letter/new service
information letter automatically. M
Routing
CR-1 Must be able to sequence a customer to a route. Y
CR-2 Computer shall have the ability to automatically select the route to place it on. Y
CR-3 There must be a way to identify changes/new items/exceptions on a route. Y
CR-4 Must be able to track additional items such as fuel costs, disposal costs, disposal trip times,
down time and reason. Y
CR-5
Must be able to review routes on maps, optimize routes on maps and save to a trial area
before implementing into the routes. Must further be able to bring driving directions into
the system so they can be added to a work order.
F 6/30/2006
CR-6 Must be able to print a map to a customer. Y
CR-7 Must be able to integrate with onboard computers, onboard scales, and GPS. This could
include computerized route sheets, route audits, etc.
M $17,500.
Phase III Item.
CR-8 Must be able to mass re-sequence based on manual choices. Y
CR-9 Must automatically re-sequence the route when an additional item is inserted or deleted. Y
CR-10
Service must be tied to the customers account balance in such as way as to allow suspension
of the service automatically from the routes based on a configurable violation of the account
balance.
Y
CR-11 Recording of route exceptions and missed pickups must be provided. The credits to billing
that may be necessary should be generated F 3/31/2006
CR-12 Route sheets in simple one line formats and multiple line versions allowing comments, street
directions and physical location descriptions to be printed Y
CR-13 Route Audit lists showing all stops on all routes Y
Augusta, GA Solid Waste Software Contract 31
Item ID Item Description Vendor Response
Dispatch and Contractor Functionality
CD-1 Missed pickups must be scheduled as work orders for the contractors to remedy. Y
CD-2 The work orders must be managed through a dispatch board and work order function. Work
orders must be e-mailable to the contractor. Y
CD-3 The work orders must be able to bill directly through to the customer and/or the contractor. Y
CD-4 The work orders must be able to be billed to the customer with vendor costs also being
recorded. F 6/30/2006
CD-5 The work orders must also be able to record just a straight billing to the Contractor. Y
CD-6 Work orders must be printed and also be able to faxed or emailed to the Contractor. Y
CD-7 Each Contractor must able have its own pricing contract and configuration. Y
CD-8 The dispatch board must easily organize the jobs by date and time as well as sort and filter
them by vendor, location, and status of the job. Y
CD-9
The board must record the awareness of the Contractor relative to the job. Have they
received it yet or not. Has the job been completed, tracking what time was the job
completed.
Y
CD-10 Must be able to track and charge against contract performance based issues such as
liquidated damages to each contractor separately. Y
CD-11 Work orders must be easily billed allowing filters by date, customer, division, charge type. Y
CD-12 The billing system must be the same one used in the landfill billing. Y
CD-13 Extra pulls and special pickups are handled through the work order system. Y
Container Management
CC-1 Containers must be tracked by SKU or unique number. These must have the capability of
being tracked with RF tags or similar technology Y
CC-2 The work order system must have the capability to move and track inventory intuitively and
with as little possibility for operator error as possible. Y
CC-3 Work order reporting must provide for daily summaries of work orders including snapshot
key indicators like numbers of open jobs, closed, dollar volumes of each etc. Y
CC-4 Container reports must identify the location of inventory whether in the yards, at a customer
site, at a contractors yard or en route. Y
CC-5
Must be able to track when containers were delivered to contractor and have contract
specific affects on the amounts payable to the contractor based on contract specific
parameters.
Y
CC-6 Must be able to report on the number of containers a given contractor has at a given time. Y
CC-7 Reports must detail the location, routing and billing details for each service site. This
includes the container SKU ID Y
CC-8 Customers must be able to define multiple service locations under the same service
agreement. There can be no limit on the number of service locations per customer. Y
CC-9 Invoices must be able to be printed with each service agreement on its own invoice or
consolidated under one customer invoice. Y
Cost Tracking
CT-1 Fuel costs must be tracked. Automated fuel surcharges must be easily deployed to billing.
Fuel costs should be able to be uploaded from a fuel card system.
M $2500
Phase III Item.
CT-2 Disposal Costs must be tracked. A function must be provided to reconcile tracked disposal
costs with the disposal site invoice. Y
CT-3 Labor costs must be tracked. A cost per hour per employee must be stored and be able to be
allocated to workflows accurately. Y
Pricing
CP-1 Rates must modifiable dynamically from ticketing or billing using fixed rate or
percentage fees or discounts Y
Augusta, GA Solid Waste Software Contract 32
Item ID Item Description Vendor Response
CP-2 Rates must modifiable dynamically from ticketing or billing using quantity based
or time based rate tables using fixed rate or percentage fees or discounts Y
CP-3 Rates must be modifiable using formulas that allow for the creation of any rate
modifier based on volumes, time, unit of measure and any combinations. Y
CP-4
Scheduled price changes by customer, contract, charge type and charge categories must be
provided for. The price change must be able to be modeled against historical data and be
applicable on demand as well as automatically when scheduled.
Y
CP-5
Price adjustments must have the ability to be reviewed prior to implementation, generating a
price adjustment model that can be evaluated and manipulated prior to implementation.
Reports on such must be available.
Y
Accounts Payable/Contracts
CAP-1 Must be able to track the amount to be paid to contractor. This would factor in contract
deductions, units serviced by rate, and reporting on such. F 6/30/2006
Billing
CB-1 Provision must be made for Invoices to be distributed online Y
Phase II Item
CB-2 Bar coded information on invoice to facilitate payment scanning M
CB-3 Provide for advance or recurring billing set up by customer Y
CB-4 Invoices can be printed as a statement showing the aged account balance on the invoice -
optionally on a customer by customer basis Y
CB-5 Finance charges calculated on a customer by customer basis with the inclusion on finance
charge calculation optional during a billing. Y
CB-6 The finance charge period and the aging days are configurable on a customer by customer
basis Y
CB-7 Allow for consolidated billings across lines of business so all billings for a customer appear
on one invoice if desired Y
CB-8 Allow for the invoice to be paid automatically by credit card on file. Y
CB-9 Provision to accept payment over the phone and perform instantaneous transactions of
payments. Y
Cash Management
CM-1 Provision for online bill paying M $4000
Phase II Item
CM-2 Provide for OCR scanning of payments M $800
Phase II Item
CM-3 Provide for automatic bill payments via EFT M $4000
Phase II Item
CM-4 Provide web based customer account interface for customer statistics, reporting work orders,
service, billings and payment activity
M
Phase II Item
CM-5 Automatically pay invoices by credit card. Y
D. Additional Items
Item ID Item Description Vendor Response
NEW-4 Cart/inventory integration – tracking automation of asset placement to a customer. M $6800
Phase I Item
NEW-5 Financial assurance for the landfill – report all landfills must create each year. It
ties directly to remaining capacity and lifespan of a landfill.
M $2200
Phase I Item
NEW-6 Scale automation. M $680
Phase I Item
Augusta, GA Solid Waste Software Contract 33
SCHEDULE D
SOFTWARE CUSTOMIZATION
Section D2: Contract Obligations:
The items listed on Schedule D will be addressed following the initial software implementation
project. They are subject to the same support and maintenance requirements as the items in
Schedule C, which are to be implemented as part of the initial implementation. These items are
to be implemented under a Statement of Work, separate from this Contract, following
implementation of the items in Schedule C.
Items in Section D2 are potential Phase III items that are included here for reference and the
vendor is NOT under any obligation to provide these products/services under this contract or any
future contract. Additionally, there is no guarantee that a Phase III will be required or necessary,
and these items are included simply for information purposes.
Section D1: Customization.
This list may be amended as needed during the implementation, allowing City to request
additional modifications. Modifications requested by the Customer that are not considered by
Commonwealth to be needed by future Software Licensees will be done for an additional fee
based on City acceptance of a quote provided by Commonwealth for such modification.
Section D1.1: RFP Responses requiring modification:
A. Augusta Software Technology Contract Requirements
Item ID Item Description Vendor Response
IT-4-1 There must be an interface for the World Wide Web available to enable the public to have
inquiry-only access to the data stored in the vendor’s system. M $6000
B. General Software Requirements / Scale Application
Item ID Item Description Vendor Response
SG-9
Interfaces with a variety of scale automation controls. This could include card readers, key
pads, RF ID tags, etc. Automation should include the ability to open gates, change traffic
signals and other auxiliary items.
M $3750
SG-26
Tracks waste placement through a 3 dimensional grid system. Would like it to
communicate with a GPS data collector to get exact Latitude, Longitude, and
elevation.
M$4000
SC-2 Labor costs must be tracked. A cost per hour per employee must be stored and be able to
be allocated to workflows accurately. M $1000
C. General Software Requirements / Solid Waste Collections
Item ID Item Description Vendor Response
Augusta, GA Solid Waste Software Contract 34
Item ID Item Description Vendor Response
CS-4 Once a new customer is generated, the system should generate a letter/new service
information letter automatically. M
CM-1 Provision for online bill paying M $4000
CM-2 Provide for OCR scanning of payments M $800
CM-3 Provide for automatic bill payments via EFT M $4000
CM-4 Provide web based customer account interface for customer statistics, reporting work orders,
service, billings and payment activity M
NEW-1 Automated reports by time/date for day end, month end, etc. M $4760
NEW-2 Follow-up calls assigned to specific staff by date/time.
M $2720
NEW-3
Promise to pay date for collections of funds with flags/triggers based on those
dates.
M $2720
Augusta, GA Solid Waste Software Contract 35
Section D2: Potential Future (Phase III) Applications:
The following items may be considered at a later date, and are recorded here to indicate the Solid
Waste Department’s interest in exploring these in the future. These are not to be considered as a
part of the vendor’s contract obligation and are included here for information purposes only:
Item ID Item Description Vendor Response
CR-7 Must be able to integrate with onboard computers, onboard scales, and GPS. This could
include computerized route sheets, route audits, etc. M $17,500
SC-1 Fuel costs must be tracked. Automated fuel surcharges must be easily deployed to billing.
Fuel costs should be able to be uploaded from a fuel card system. M $4500
SC-5 Costs should be able to be allocated and identified as capital projects, tracked by project
number, name, etc. M $3500
CT-1 Fuel costs must be tracked. Automated fuel surcharges must be easily deployed to billing.
Fuel costs should be able to be uploaded from a fuel card system. M $2500
FUT-1
"Real time" check verification. There is commercially available technology (used
by retail stores), that scans a check and informs the cashier if funds are available.
Could this be integrated?
FUT-2 Scheduled reports to print.
FUT-3 Inter-company work order/project numbers keyed into scale tickets to track by
project or job.
FUT-4 Lost business report tracking price and service.
FUT-5 Phone system integration – as the customer calls, the software goes to that account
based on phone number. Additionally, have look-up by phone number.
FUT-6
Suggested the use of a "debit card" which would allow customers to pre-pay for a
few months of service, with a 5% discount. Customer would swipe card when they
came in, and Insight would keep a running total of their account balance. This
way, Augusta gets a cash flow boost, the customer gets 1.00 of service for 95
cents, etc.
Augusta, GA Solid Waste Software Contract 36
SCHEDULE E
USER DOCUMENTATION
Section E1: User Documentation. Commonwealth shall furnish the Customer with a user
manual that defines standard functionality of the delivered software.
Augusta, GA Solid Waste Software Contract 37
SCHEDULE F
MINIMUM CONFIGURATION
Section F1: Minimum Configuration. Minimum computer system specifications upon which
licensed software will execute:
Server Minimum Requirements
Computer and processor: Pentium 4 or higher processor. 2GB Memory.
Data Storage: 100 GB Hard drive, with at least 20 GB available, for database
backups
Memory: 2 GB of RAM or greater
Hard drive: Server: 80 GB hard drive, with at least 20 GB Free. You need to
have at least 1 GB free on your main partition for Installation.
Optical Drive: CD-ROM or DVD drive. One PC should have a CD-RW (CD-
ROM Burner drive) or DVD+/-R (DVD Burner drive) for sending
backup files to Insight.
Display (Monitor): 17" Monitor or larger with 1024x768 resolution.
OS/Software:
Windows 2000 Server or later with matching number of client
licenses (CALs) for each client machine
Microsoft SQL Server 2000 with matching number of client
licenses (CALs) for each Client machine.
Crystal Reports 9 or greater
VNC software for remote support access.
* NOTE: If you are using a PC that will act as the Insight Server, the PC must meet the Server
hardware requirements.
Augusta, GA Solid Waste Software Contract 38
Client / PC Minimum Requirement
Computer and processor: Intel Pentium 4 equivalent or AMD 2.0 GHz or faster processor
Memory: 1 GB of RAM or greater
Hard drive: 60 GB hard drive, with at least 5 GB Free.
Display (Monitor): 17" Monitor or larger with 1024x768 resolution.
OS/Software:
Microsoft Windows® 2000 with Service Pack 4 (SP4)
Windows XP PROFESSIONAL**, or later
Office 2000 or later.
Microsoft Word and Microsoft Excel
Microsoft .NET 1.1 Framework
VNC (Remote desktop software)
**NOTE: We cannot support Insight Environmental Software running on Windows XP Home
edition, or Windows XP Media Center Edition**
Internet Connection:
Internet functionality requires dial-up or broadband Internet access (provided separately); Due to
the increasing sizes of databases, we HIGHLY RECOMMEND a Broadband Internet
connection. Local or long-distance charges may apply.
Augusta, GA Solid Waste Software Contract 39
SCHEDULE G
SOFTWARE TRAINING SERVICES
Section G: Services. Commonwealth shall furnish the Customer with the following Training
Services:
Commonwealth will provide training for the number of City staff equal to the number of user
licenses purchased. Training shall occur in two blocks:
Go-Live: Commonwealth will provide five days of on-site staff training configured to
Augusta’s specific needs and conducted in a facility the Customer provides. The nature of
the Licensed Software is such that there are multiple types of work that require training,
i.e., Scale house, Billing, Administrative, and one function does not overlap to the other.
Training software functions are job-specific and the five days of training should be
structured so as to separate the functions into appropriate time segments.
Commonwealth shall provide on-site assistance (and training as needed) during a
residential customer billing cycle, which shall be identified by the customer, for a
minimum of three days, subsequent to the Go-Live date of the software. This training
shall be scheduled within three months of the scheduled Go-Live date.
Any subsequent training, requested by the Customer, where Commonwealth will be providing
training, will be done for a fee as defined in Schedule J, it being acceptable at the Customer’s
choice to train or retrain using City personnel.
Augusta, GA Solid Waste Software Contract 40
SCHEDULE H
SOFTWARE PAYMENT
Section H1: Payment. The Customer will exercise the following payment plan:
Milestone Payment Required
Contract Signing 50% of the license fees
(Throughout project) Itemized Weekly invoices for custom work
net 30 days.
Start of Acceptance Testing 25% of the license fees
Acceptance of Licensed Software Final 25% of license fees and any balance
Section H2: Price of Software and Services.
Quant Item Description Unit Price Extension Notes
Software Licenses
2 I-Server Insight Enterprise Servers End User License
Agreement (EULA). $ 5,000.00 $ 10,000.00 1
20 I-Client Insight Client End User License Agreement (EULA) $ 1,250.00 $ 25,000.00
-0.667 Discount Co-development Program Contribution (66.7% off of
the license fees) $ 30,000.00 $ (20,010.00) 2
Complete Turn-Key Insight Software and Installation Subtotal $ 14,990.00
Co-Development (Phase I only. Additional Items are found under
Phase II.)
1 SB-20, CB-
2 Bar Code Invoices $ 2,720.00 $ 2,720.00
1 SC-2 Labor Costs $ 6,800.00 $ 6,800.00
1 CC-5 Finish vendor contracts and vendor inventory assign $ 3,740.00 $ 3,740.00
1 NEW-4 Cart/Inventory integration-tracking automation of
asset placement to a customer $ 6,800.00 $ 6,800.00
1 NEW-6 Scale automation $ 680.00 $ 680.00
Management / Implementation Costs $ 20,740.00
Travel and Implementation Costs
Travel Expenses: Over a 30 day period weekends off.
8 trips Airfare: 4 trips 2 consultants $ 450.00 $ 3,600.00
40 days Lodging: 20 days, 2 consultants $ 80.00 $ 3,200.00
40 days
Per Diem: (Whatever your standard is x 20 days, we
will use $30/day as an example) $ 30.00 $ 1,200.00
20 days
Rental Car: 20 days x $45/day or less if it is less,
again we will conform to your requirements $ 45.00 $ 900.00
160 Hours Management and Implementation $ 75.00 $ 12,000.00
Augusta, GA Solid Waste Software Contract 41
Management / Implementation Costs $ 20,900.00
Training Section
13 Days Insight Training $ 500.00 $ 6,500.00 3
Training Section $ 6,500.00
Conversion of Existing Data
120 hours
Convert 300 landfill customers and current
account balances, 52000 solid waste
customer records and their balances
$ 75.00 $ 9,000.00
Conversion of Existing Data $ 9,000.00
Annual Support Starting Second Year
1
17% of retail software license fees. $35000 x
17% $ 5,950.00 $ 5,950.00
Annual Support Starting Second Year $ 5,950.00
Optional Hardware Costs
1
2 Digital Video Cameras and Sharkseye
software interface $ 7,200.00 $ 7,200.00
1 Scale Interface Configuration $ 200.00 $ 200.00
1 1 Wireless Signature Pad $ 1,350.00 $ 1,350.00
1 1 Cash Drawer $ 650.00 $ 650.00
Optional Hardware Costs $ 9,400.00
Project Total Cost (Software Solution and Vendor
Hardware) $ 81,530.00
Notes
1 Two servers and databases are needed to facilitate the synchronization of information between the landfill and the
Solid Waste offices. This price includes unlimited support and all upgrades for 1 year from installation.
2 This number represents the amount of the license fees that Insight is prepared to invest in the customizations for the
City of Augusta that improve the core Insight products.
3 If you need less, you will only be billed for the training time you actually needed.
Augusta, GA Solid Waste Software Contract 42
Section H3: Explanation of Pricing and Estimates.
Software Cost Section
The costs for the customized programming defined in this section represent a very gross estimate. As
described in our explanation of the Standard Software Development Process, exact costs cannot be known
until a proper Proposed Business Model is constructed. Or in other words, detail design specifications are
done. We feel that it is impossible for anyone to do it correctly any other way. Any estimate presented as an
accurate quote without that detail design work done is highly suspect at least and probably very misleading.
We are putting these numbers forward as a ‘ballpark’ guess based on the gross assumptions we have had to
make. Even if we spent all of the time between receiving the RFP on October 24th and the November 9th
question deadline sending written communications back and forth to the procurement office trying to create
detailed specifications, we would not have been able to create them in that short of time using that manner
of communication. It requires face to face, ‘in the trenches’ tedious, hard work to interrogate all the
necessary users, vendors and other contributing parties to do the job correctly and accurately. We know that
a ‘final number’ stipulation was described as a criteria for the nature of the estimates. We cannot warrant
that on these estimates. If that disqualifies us, well then that would be regrettable. But we would know we
did due diligence and gave the truest and best numbers we could. Anything else would have been
disingenuous and misleading.
So we based the estimates on the assumption that we were building these features for our core product. The
goal there is to have the richest functionality on the market and the highest quality product. Basically, it is a
high standard and one we could be proud of. However, you may have requirements unique to Augusta that
will alter the estimates up or down by significant amounts.
Therefore, the estimates are subject to change by you the customer based on the details you will ultimately
provide during the inevitable detail design phase of the project.
Management / Implementation Cost Section
The above stipulation carries over into this section. Changes may occur to estimates of the volume of time
spent on your site, the travel expenses and the hours spent managing the project. Also, if there is the
possibility of an Augusta IT staff member managing all or segments of the project, then that could reduce
costs.
Training Costs
Training costs will be based on actual hours used. If students are quick studies the costs will be less. If we
train a super user who trains others, the costs will also be less.
Conversion of Existing Data Section
The conversion makes the following assumptions: The goal is to migrate the landfill customer names and
addresses. There are no special pricing contracts to be migrated. The open AR balances will be migrated in
detail open item records. As for the solid waste records, the goal is to migrate the customer name, address,
a service location and one container activity record per customer and any AR balance if that is applicable.
Annual Support Costs Section (Starting 2nd year)
The support costs are based on the rate of the license fee before Cooperative Development Program
discount. They are included for the first year so no support costs are incurred until the second year.
Augusta, GA Solid Waste Software Contract 43
Hardware Costs Section
We have included hardware cost estimates for the elements of our software that have these interfaces up
and running now. Hardware for items to be created in the future have not been included since the detail
requirements are not known. We felt that absent these details the inaccuracy of the hardware costs might
skew the accuracy of the estimate too much.
Augusta, GA Solid Waste Software Contract 44
SCHEDULE I
ANNUAL SOFTWARE SUPPORT
Section I1: Annual Fee. Commonwealth shall furnish the Customer with annual support, which
will include upgrades and staff support to answer questions and resolve problems.
Section I2: Fee Amount. The Annual Commonwealth (Insight) Maintenance Fee is seventeen
percent (17%) of the Total Licensed Software Cost, which is stated in Schedule J. This fee is
due annually, and will be billed by Commonwealth. It entitles the Customer to Software support
and periodic updates. Commonwealth reserves the right to change its support and maintenance
fees, with the following conditions:
Changes to the Annual Commonwealth (Insight) Maintenance Fee are to be announced
prior to June 1 of the year previous to the changes taking effect in order to provide the
customer with sufficient time to budget for the changes.
Increases to the support and maintenance fees shall exceed no more than 3% of the cost
of the previous year, provided that the number and type of licenses purchased by the
customer shall not have changed.
Additional licenses purchases by the Customer shall be billed at the then-current
Commonwealth rate and the maintenance amount for the new license(s) shall be added to
the existing annual maintenance fee. Said fees shall be prorated for the year in which
they are purchased and shall be billed in full with the next Annual Billing.
This maintenance agreement applies to licensed software, to include customizations that
will be incorporated into the Commonwealth suite of software (HaulMark, LandMark,
and derivatives/sub-programs thereof). Augusta-specific customizations that are not
incorporated into the Commonwealth suite of software and will not be marketed or
supplied to other customers shall be subject to maintenance on a time-and-materials
basis. This provision applies to the customizations described in Schedule D, and is
subject to change if/when the customizations are incorporated into the Commonwealth
suite of software.
Section I3: Fees beyond Annual Support.
All travel expenses and data transmission-related telephone expenses related to installation,
service or support of the Licensed Software are the responsibility of the Customer, subject to
written approval from the Customer prior to the beginning of any billable activity. If the
Customer provides Commonwealth with VPN access for services or support, there shall be no
charge for data transmission-related expenses.
All fees are payable at the beginning of each month or upon invoice. Payment Terms for
invoices of this nature shall be: Net 30 days.
Other activities not related to Annual Software Support are subject to the charges as described in
Schedule J.
Augusta, GA Solid Waste Software Contract 45
SCHEDULE J
CHARGES
Section J1: System. Commonwealth will charge the Customer the following Charges:
All reasonable Mileage, Daily Food Per Diem, and reasonable Lodging charges will be
billed weekly. Food Per Diem shall not exceed the U.S. Internal Revenue Service
schedule for Augusta, GA.
Training requiring additional time will be charged at $500/day.
Customization of Invoice, Tickets, and Statements is at $75/hour.
Commonwealth reserves the right to change the fees described in this Schedule J on ninety (90)
days advance notice.
Augusta, GA Solid Waste Software Contract 46
SCHEDULE K
Augusta Information Technology Third-Party Vendor Access Agreement
This is an excerpt of relevant material from the Augusta Information Technology Standard
Operating Procedures, 2005 Edition.
5.6.4.1 Purpose
The purpose of this policy is to provide guidelines for Remote Access Virtual Private Network
(VPN) connections to the Augusta Richmond County network.
5.6.4.2 Scope
This policy applies to all Augusta Richmond County employees, contractors, consultants,
temporaries, and other workers including all personnel affiliated with third parties utilizing
VPNs to access the Augusta Richmond County network. This policy applies to implementations
of VPN that are directed through an Augusta Richmond County VPN Concentrator.
5.6.4.3 Policy
Approved Augusta Richmond County employees and authorized third parties (customers,
vendors, etc.) may utilize the benefits of VPNs, which are a "user managed" service. This means
that the user is responsible for selecting an Internet Service Provider (ISP), coordinating
installation, installing any required software, and paying associated fees.
Any employee wishing to access the internal Augusta-Richmond County network remotely from
any location other than a branch office shall through a VPN via the internet. They will have to
authenticate themselves using a uniquely assigned password. All sensitive data will be encrypted
in transit over all networks.
A user with Internet access from home may request access to the network via the Internet using
VPN access. The user must make the request through their project leader and provide their
username. The username will be the same one used when using a computer on the network.
Passwords must meet the requirements of the Password Policy (See Passwords for IT
Resources). Once approved the user must install the VPN client on their computer to be able to
access the network through the Internet.
All vendors will be required to use VPN to connect to any resource on the Augusta-Richmond
County network. Vendors needing access to the Augusta-Richmond County network will need
to be requested through the appropriate Project Leader only. The Project Leader will then need
to email firewall administrators the request with day and time the vendor needs access. If this is
a new vendor access, then the Project Leader will need to make the request with the security
administrator to setup the appropriate access needed.
Additionally,
1. VPN access is provided through the Augusta Information Technology Department. No
other department may implement VPN services.
2. It is the responsibility of employees with VPN privileges to ensure that unauthorized
users are not allowed access to Augusta Richmond County internal networks.
Augusta, GA Solid Waste Software Contract 47
3. The VPN software can only be installed on the computer listed on the access request
form.
4. VPN use is to be controlled using either a one-time password authentication such as a
token device or a public/private key system with a strong passphrase.
5. When actively connected to the corporate network, VPNs will force all traffic to and
from the PC over the VPN tunnel: all other traffic will be dropped.
6. Dual (split) tunneling is NOT permitted; only one network connection is allowed.
7. VPN gateways will be set up and managed by Augusta Richmond County network
operational groups.
8. All network activity during a VPN session is subject to ARC policies and may be
monitored for compliance.
9. All computers connected to Augusta Richmond County internal networks via VPN or any
other technology must use the most up-to-date anti-virus software that is the county
standard (provide URL to this software); this includes personal computers. All
computers are also required to be up to date on all OS patches for security. Proof of
compliance is required prior to the assignment of a VPN account to ensure network
health.
10. VPN users will be automatically disconnected from Augusta Richmond County's network
after thirty minutes of inactivity. The user must then logon again to reconnect to the
network.
Augusta, GA Solid Waste Software Contract 48
SCHEDULE L
Performance Bond
Or
i
g
i
n
a
l
S
i
x
(
6
)
C
o
p
i
e
s
P
r
i
c
e
P
r
o
p
o
s
a
l
A
d
d
e
n
d
u
m
1
&
2
So
f
t
P
a
k
Ye
s
Y
e
s
Y
e
s
Y
e
s
In
s
i
g
h
t
E
n
v
i
r
o
n
m
e
n
t
a
l
Ye
s
Y
e
s
Y
e
s
Y
e
s
De
s
e
r
t
M
i
c
r
o
Ye
s
Y
e
s
Y
e
s
Y
e
s
Co
m
p
u
t
e
r
B
u
s
i
n
e
s
s
S
e
r
v
i
c
e
No
n
-
C
o
m
p
l
i
a
n
t
RF
P
#
0
5
-
1
6
2
So
l
i
d
W
a
s
t
e
M
a
n
a
g
e
m
e
n
t
S
o
f
t
w
a
r
e
C
o
n
s
u
l
t
i
n
g
,
I
m
p
l
e
m
e
n
t
a
t
i
o
n
&
T
e
c
h
n
i
c
a
l
S
e
r
v
i
c
e
In
f
o
r
m
a
t
i
o
n
T
e
c
h
n
o
l
o
g
y
RF
P
D
u
e
:
T
u
e
s
d
a
y
,
N
o
v
e
m
b
e
r
2
9
,
2
0
0
5
@
3
:
0
0
p
.
m
.
Request for Proposal
Sealed RFP’s will be received at this office until Tuesday, November 29, 2005 @ 3:00 p.m.
RFP #05-162 Solid Waste Management Software Consulting, Implementation, and Technical
Services for Information Technology
RFP’s will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30911
706-821-2422
RFP documents may be obtained at the office of Augusta, GA Procurement Department, 530 Greene Street – Room
605, Augusta, GA 30911. Documents may be examined during regular business hours at the offices of Augusta, GA
Procurement Department. All questions must be submitted in writing to the office of the Procurement Department by
Fax at 706-821-2811 or by mail. No bid will be accepted by fax, all must be received by mail or hand delivered.
The last day to submit questions is Tuesday, November 8, 2005 by 4:00 p.m.
It is the wish of the Owner that minority businesses are given the opportunity to BID on the various parts of the work.
This desire on the part of the Owner is not intended to restrict or limit competitive bidding or to increase the cost of the
work. The Owner supports a healthy free market system that seeks to include responsible businesses and provide ample
opportunity for business growth and development.
No RFP may be withdrawn for a period of 120 days after time has been called on the date of opening.
Bidders will please note that the number of copies requested; all supporting documents including financial statements
and references and such other attachments that may be required by the bid invitation are material conditions of the RFP.
Any package found incomplete or submitted late shall be rejected by the Procurement Office. Any bidder allegedly
contending that he/she has been improperly disqualified from bidding due to an incomplete bid submission shall have
the right to appeal to the appropriate committee of the Augusta Commission. Please mark RFP number on the outside
of the envelope.
Bidders are cautioned that sequestration of RFP documents through any source other than the office of the Procurement
Department is not advisable. Acquisition of RFP documents from unauthorized sources placed the bidder at the risk of
receiving incomplete or inaccurate information upon which to base his qualifications.
Augusta has a Link Deposit program designed to provide loans to eligible local Small, Minority and Women Owned
Businesses. For more information about this program contact the Office of Disadvantage Business Enterprise at 706-
821-2406.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle October 13, 20, 27, November 3, 2005
Metro Courier October 19, 2005
cc: Tameka Allen Interim Deputy Administrator
Michael Blanchard Information Technology
Yvonne Gentry DBE Coordinator
Mark Johnson Solid Waste
FAX TRANSMISSION
AUGUSTA-RICHMOND COUNTY CONSOLIDATED GOVERNMENT
530 Greene Street - Room 605
Augusta, Georgia 30911
706 821-2422
Fax: 706 821-2811
To: Metro Courier
Date: October 5 , 2005
Fax #:
(706) 722-7104
Pages:
From:
Geri A. Sams
2, including this cover sheet.
Subject:
LEGAL NOTICES FOR RFP #05-162
COMMENTS:
Please print the above Bid Item(s) on the following dates:
October 19, 2005
REQUISITION #43723B
Please send an affidavit of publication.
Disadvantaged Business Enterprise
Yvonne Gentry
DBE Coordinator
Disadvantaged Business Enterprise Department
501 Greene Street – Suite 304 - Augusta, GA 30901
(706) 821-4206 – Fax (706) 821-4228
WWW.AUGUSTAGA.GOV
TO: Geri Sams
Director, Procurement Department
Mark Johnson
Solid Waste Department
FROM: Yvonne Gentry, Coordinator
Disadvantaged Business Enterprise Department
SUBJECT: DBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOAL
Bid Item Bid Item Bid Item Bid Item ####05050505----162 162 162 162 –––– Solid Solid Solid Solid Waste Management Software ConsultingWaste Management Software ConsultingWaste Management Software ConsultingWaste Management Software Consulting
and Implementationand Implementationand Implementationand Implementation
DATE: October 5, 2006
This memo is to transmit the review and concurrence of the recommended DBE
Utilization goal of five (5%) for the above referenced project. The goal-setting
methodology considered the following factors based on good faith efforts of the
contractor:
• The project’s total estimated cost is $$$$170,000170,000170,000170,000.
• There is 5% value of the scope of work where minority/women minority/women minority/women minority/women
businesses businesses businesses businesses availability exists.
• There is 0% value of the scope of work where small businesses small businesses small businesses small businesses
availability exists.
• There is 0% value of the scope where local businesses local businesses local businesses local businesses availability
exists.
The contractor must prepare their proposed DBE Utilization Form submittal based on
the total dollar value of their base bid. No further adjustments should be made.
The above recommendation is based on information provided at the time of review.
If you have any questions, please feel free to contact me at (706) 821-2406.
YG:glw