HomeMy WebLinkAbout2006-07-24-Meeting Agenda
Engineering Services Committee
Meeting
Committee Room- 7/24/2006- 1:30 PM
ENGINEERING SERVICES
1. Approve the purchase of two Volvo dump trucks which
are currently being rented from ASC Construction
Equipment, USA, Inc.
Attachments
2. Approve the deeds of dedication, maintenance
agreements, and road resolution submitted by the
Engineering, and Augusta Utilities Departments for
Cambridge Subdivision, Section Eight.
Attachments
3. Approve the deeds of dedication, maintenance
agreements, and road resolution submitted by the
Engineering, and Augusta Utilities Departments for
Cambridge Subdivision, Section 11.
Attachments
4. Approve the deeds of dedication, maintenance
agreements, and road resolutions submitted by the
Engineering, and Augusta Utilities Departments for
Cameron Subdivision, Section I.
Attachments
5. Receive as information a clarification on funding sources
for approved landfill projects.
Attachments
6. Motion to approve and accept the CSX Crossing
Agreement for the Main Interceptor Project.
Attachments
7. Approve proposal from B&E Jackson for $118,000 for
an engineering design of 7,000 feet of sixteen inch (16”)
water main along Jimmy Dyess Parkway as part of the
630 system improvements.
Attachments
8. Approve the deeds of dedication, maintenance
agreements, and road resolutions submitted by the
Engineering, and Augusta Utilities Departments for
Evergreen Subdivision, Section Two.
Attachments
9. Identify and approve funds to cover landfill fees
associated with Georgia Department of Transportation
(GDOT).
Attachments
10. Motion to approve an Option for Right-of-Way between
W. Rodger Giles and W. Rodger Giles, Inc. Profit
Sharing Plan, as owners, and Augusta, Georgia, as
optionee, in connection with the St. Sebastian Way
Project, for 0.29 acres (12,707.72 sq. ft) in fee and 0.113
acres (4,926.73 sq. ft.) of "Temporary Construction
Easement" and also one (1) "Temporary Driveway
Easement" for the following property located at 1399
Walton Way for a purchase price of $255,800.00.
Attachments
11. Motion to approve an Option for Right-of-Way between
W. Rodger Giles, as owner, and Augusta, Georgia, as
optionee, in connection with the St. Sebastian Way
Project, for 0.159 acres (6,915.40 sq. ft) in fee and 0.067
acres (2,920.46 sq. ft.) of Temporary Construction
Easement for the following property located at Young
Street for a purchase price of $191,000.00.
Attachments
12. Presentation by Gwyn Toole regarding regrade/change of
the contour of the easement property to redirect
rainwater away from her residence to prevent further
damage to the home.
Attachments
13. Identify and approve funds to cover collection fees
associated with the Housing Authority.
Attachments
14. Approve the deeds of dedication, maintenance
agreements, and road resolutions submitted by the
Engineering, and Augusta Utilities Departments for
Pinehurst, Section Six, Phase One.
Attachments
www.augustaga.gov
15. Motion to approve and accept the Option Agreement and
Easement Deed from Proctor & Gamble on the Highway
56 24 Inch Water Main Project.
Attachments
16. Identify and approve funds to cover landfill fees and
solid waste collection fees associated with the Salvation
Army.
Attachments
17. Approve the deeds of dedication, maintenance
agreements, and road resolutions submitted by the
Engineering, and Augusta Utilities Departments for
Sanderling Subdivision, Phase Two.
Attachments
18. Discuss possible exemption from garbage pickup for St.
Marks and St. Kitts. (Requested by Commissioner
Bowles)
Attachments
19. Approve the deeds of dedication, maintenance
agreements, and road resolutions submitted by the
Engineering, and Augusta Utilities Departments for
Walton Acres Subdivision, Section IV.
Attachments
20. Approve the deeds of dedication, maintenance
agreements, and road resolutions submitted by the
Engineering, and Augusta Utilities Departments for
Walton Acres Subdivision, Section VII.
Attachments
21. Approve the deeds of dedication, maintenance
agreements, and road resolutions submitted by the
Engineering, and Augusta Utilities Departments for
Walton Hills Subdivision Section VI.
Attachments
22. Identify and approve funds to cover landfill fees
associated with the second level canal improvements.
Attachments
Engineering Services Committee Meeting
7/24/2006 1:30 PM
40 ton articulated dump truck purchase
Department:Solid Waste
Caption:Approve the purchase of two Volvo dump trucks which are
currently being rented from ASC Construction Equipment,
USA, Inc.
Background:Augusta Richmond County currently owns two Moxy 40-ton
dump trucks. We have operated these trucks for 4 years. At
this point, these vehicles have become maintenance intensive
and one of them has been down for more than 2 months. At
any given point one of them is usually non-operational. In
fact, they are both currently inoperable and will require
major, costly repairs to make them fully operational. When
these Moxy trucks had both been down for over 2 weeks we
were beginning to face some environmental compliance
issues because we could not move dirt. Since this condition
was unacceptable we were forced to rent two dump trucks.
The Landfill Operations Manager called three vendors,
Yancey, Metrac, and ASC Construction Equipment, USA,
Inc. The first two vendors stated that they did not have any
dump trucks, which met our size request, available to rent.
ASC did have some and were able to deliver a pair of Volvo
dump trucks within 3 days. After coordination with the
Administrator’s Office and the Procurement Department we
were able to rent the Volvo trucks. We are finding that the
Volvo trucks are significantly better quality and extremely
more reliable than the Moxy trucks which have become a
financial and operational burden to us. We are very pleased
with the performance of the Volvo trucks and the timely
responsiveness and outstanding customer service provided by
the vendor.
Analysis:ASC is offering us a valuable opportunity to purchase the
rented Volvo trucks. The actual purchase price of these
trucks is $446,704 each. This price includes all additional
features such as tailgate, added sideboards, as well as a “full
equipment” warranty for 5 years. The vendor is willing to
offer us $100,000 per truck for our used Moxy trucks. This
would bring the purchase price down to $346,704 each.
Furthermore, the vendor is willing to apply our accrued
rental fees towards the purchase price of the trucks. We have
now been renting the units for four months and have paid a
total rental fee of $52,000 per truck. This amount can be
subtracted from the purchase price. Then, the actual out of
pocket funds would only be $294,704 for each truck. We
would like to work with the Procurement Department to
procure these assets from ASC. By not purchasing these
units, it would be wasting in excess of $100,000 in rent
payments.
Financial Impact:Taking into account all of ASC’s proposed discounts
outlined above, we could save at least $152,000 per truck
(total savings of $304,000 for both trucks). Since the Moxys
are chronically inoperable and could cause us to be out of
environmental compliance, they are a financial drain and an
operational hazard. It is reasonable to replace them. The offer
we have from ASC makes the purchase of the Volvo trucks a
significant value for Augusta. The cost of each truck would
be $294,704. The Solid Waste Department would
recommend funding this purchase with a GMA lease over 5
years.
Alternatives:1. Approve the purchase two Volvo dump trucks which are
currently being rented from ASC Construction Equipment,
USA, Inc. 2. Continue renting the trucks while we spend
extra money and time to fix the Moxys. 3. Return the Volvos
after the six month rent whether the Moxys are fixed or not.
Recommendation:Approve Alternative 1.
Funds are
Available in the
Following
Accounts:
541-10-1110/6011110
REVIEWED AND APPROVED BY:
Finance.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Cambridge, Section Eight
Department:Engineering Department- Abie L. Ladson, P.E., Interim
Director
Caption:Approve the deeds of dedication, maintenance agreements,
and road resolution submitted by the Engineering, and
Augusta Utilities Departments for Cambridge Subdivision,
Section Eight.
Background:The final plat was approved by the Commission on
December 21, 2004 . The subdivision design and plat,
including the storm drain system, have been reviewed and
accepted by our engineering staff and the construction has
been reviewed by our inspectors. The Utilities Department
has inspected and reviewed the water and sanitary sewer
installations, and hereby requests acceptance of the utility
deed and maintenance agreement of same.
Analysis:This section meets all codes, ordinances and standards. There
are no wetlands or 100-year flood plain boundaries involved
in this section. Acceptance of said utility deed shall dedicate,
as required, the water and sanitary sewer mains along with
the applicable easements to Augusta, Georgia, for operation
and maintenance.
Financial Impact:By accepting this road, water and sanitary sewer installations
into the County system and after the 18-month maintenance
warranty by the developer/contractor has expired, all future
maintenance and associated costs will be borne by Augusta,
Georgia. By acceptance of the utility deed and maintenance
agreement, positive revenue will be generated from the sale
of water and sanitary sewer taps and monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements,
and road resolution submitted by the Engineering, and
Augusta Utilities Departments for Cambridge Subdivision,
Section Eight. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Cambridge, Section Eleven
Department:Engineering Department-Abie L. Ladson, P.E., Interim
Director
Caption:Approve the deeds of dedication, maintenance agreements,
and road resolution submitted by the Engineering, and
Augusta Utilities Departments for Cambridge Subdivision,
Section 11.
Background:The final plat was approved by the Commission on August
16, 2005 . The subdivision design and plat, including the
storm drain system, have been reviewed and accepted by our
engineering staff and the construction has been reviewed by
our inspectors. The Utilities Department has inspected and
reviewed the water and sanitary sewer installations, and
hereby requests acceptance of the utility deed and
maintenance agreement of same.
Analysis:This section meets all codes, ordinances and standards. There
are no wetlands or 100-year flood plain boundaries involved
in this section. Acceptance of said utility deed shall dedicate,
as required, the water and sanitary sewer mains along with
the applicable easements to Augusta, Georgia, for operation
and maintenance.
Financial Impact:By accepting this road, water and sanitary sewer installations
into the County system and after the 18-month maintenance
warranty by the developer/contractor has expired, all future
maintenance and associated costs will be borne by Augusta,
Georgia. By acceptance of the utility deed and maintenance
agreement, positive revenue will be generated from the sale
of water and sanitary sewer taps and monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements,
and road resolution submitted by the Engineering, and
Augusta Utilities Departments for Cambridge Subdivision,
Section 11. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Cameron, Section I
Department:Engineering Department-Abie L. Ladson, P.E., Interim
Director
Caption:Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Cameron Subdivision,
Section I.
Background:The final plat was approved by the Commission on April 19,
2005 . The subdivision design and plat, including the storm
drain system, have been reviewed and accepted by our
engineering staff and the construction has been reviewed by
our inspectors. The Utilities Department has inspected and
reviewed the water and sanitary sewer installations, and
hereby requests acceptance of the utility deed and
maintenance agreement of same.
Analysis:This section meets all codes, ordinances and standards. There
are no wetlands or 100-year flood plain boundaries involved
in this section. Acceptance of said utility deed shall dedicate,
as required, the water and sanitary sewer mains along with
the applicable easements to Augusta, Georgia, for operation
and maintenance.
Financial Impact:By accepting these roads, water and sanitary sewer
installations into the County system and after the 18-month
maintenance warranty by the developer/contractor has
expired, all future maintenance and associated costs will be
borne by Augusta, Georgia. By acceptance of the utility deed
and maintenance agreement, positive revenue will be
generated from the sale of water and sanitary sewer taps and
monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Cameron Subdivision,
Section I. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Clarification on funding sources
Department:Solid Waste
Caption:Receive as information a clarification on funding sources for
approved landfill projects.
Background:Change orders were approved for four contractors back in
November of 2005. The Solid Waste Department made a
procedural error when creating the agenda item. All the
approved captions stated “Approve a change order…”, and
then listed the funds where to take the monies from in the
analysis and/or financial impact section of the agenda. This
action created conflict when it came time to generate
purchase orders from the other funds. A change order, by
definition is a change to an existing purchase order, which
already has a defined funding source. When the Solid Waste
Department identified funding sources which were not
included on the original purchase order it became impossible
to generate the new purchase order.
Analysis:The Solid Waste Department needs to generate new purchase
orders in order to use approved funding sources as identified
in the analysis and/or financial impact portions of the
approved agenda in December 2005. The monies are still
available in those accounts. By not utilizing the intent of the
agenda, it will short the bond account which must be used to
construct our new facilities.
Financial Impact:By not utilizing the intent of the agenda, it will short the
bond account which must be used to construct our new
facilities.
Alternatives:Receive as information, a clarification on funding sources for
Landfill projects.
Recommendation:Receive as information
Funds are
Available in the
Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
CSX Crossing Agreement - Main Interceptor
Department:Augusta Utilities Department, Max Hicks Director
Caption:Motion to approve and accept the CSX Crossing Agreement
for the Main Interceptor Project.
Background:AUD will be upgrading the Main Interceptor Sanitary Sewer,
which requires that the pipeline cross under a railroad track
owned by CSX.
Analysis:AUD and CSX negotiated terms, conditions and
renumeration, as set forth in the agreement.
Financial Impact:$4750.00 ($4,000 for the crossing and $750.00 for Railroad
Protective Liability Insurance)
Alternatives:None.
Recommendation:Approve and accept the agreement.
Funds are
Available in the
Following
Accounts:
G/L 510043420-5411120 J/L 80360115-5411120
REVIEWED AND APPROVED BY:
Finance.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Engineering Fee Proposal for Jimmy Dyess Pkwy Water Line
Department:Utilities
Caption:Approve proposal from B&E Jackson for $118,000 for an
engineering design of 7,000 feet of sixteen inch (16”) water
main along Jimmy Dyess Parkway as part of the 630 system
improvements.
Background:The Master Plan identified areas that require infrastructure
for water and sewer in western Augusta, along Gordon
Highway. This project is part of an extensive capital
improvements phase to bring water to the undeveloped areas
of Augusta. This water line will be installed along Jimmy
Dyess Parkway from Gordon Highway to Belair Rd. This
line will reinforce the infrastructure along the Belair Rd
corridor.
Analysis:Accepting this proposal will allow for the design of water
main to provide redundancy to the residents of western
Augusta. This line will reinforce the infrastructure along the
Belair Rd corridor and loop the system in that location. This
line consists of approximately 7,000 feet of 16” DIP water
main.
Financial Impact:B&E Jackson has proposed a base fee of $99,000.00 to
perform this work, along with additional professional
services not to exceed $19,000.00. The estimated
construction cost is $525,000, and this fee represents
approximately 22.4% of the project’s estimated construction
cost. These funds are available from the 2004 Bond Issue,
under account number 510043410/5212115-
80310157/5212115.
Alternatives:Do not approve the proposal and delay infrastructure
development in western Augusta.
Recommendation:It is recommended to approve the proposal from B&E
Jackson for $118,000 for an engineering design of 7,000 feet
of sixteen inch (16”) water main along Jimmy Dyess
Parkway as part of the 630 system improvements.
Funds are
Available in the
Following
Accounts:
510043410/5212115-80310157/5212115
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Disadvantaged Business Enterprise.
Administrator.
Clerk of Commission
Disadvantaged Business Enterprise
Yvonne Gentry
DBE Coordinator
Disadvantaged Business Enterprise Department
501 Greene Street – Suite 304 - Augusta, GA 30901
(706) 821-4206 – Fax (706) 821-4228
WWW.AUGUSTAGA.GOV
TO: Geri Sams
Director, Procurement Department
Max Hicks
Director, Utilities Department
FROM: Yvonne Gentry, Coordinator
Disadvantaged Business Enterprise Department
SUBJECT: DBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOALDBE REVIEW AND APPROVAL OF RECOMMENDED DBE GOAL
Engineering Fee PEngineering Fee PEngineering Fee PEngineering Fee Proposal for Jimmy Dyess Parkwayroposal for Jimmy Dyess Parkwayroposal for Jimmy Dyess Parkwayroposal for Jimmy Dyess Parkway
DATE: July 7, 2006
This memo is to transmit the review and concurrence of the recommended DBE
Utilization goal of 100% for the above referenced project. The goal-setting methodology
considered the following factors based on good faith efforts of the contractor:
• The project’s total estimated cost is $$$$118,000118,000118,000118,000.
• There is 100% value of the scope of work where minority/women minority/women minority/women minority/women
businesses businesses businesses businesses availability exists.
• There is 0% value of the scope of work where small businesses small businesses small businesses small businesses
availability exists.
• There is 0% value of the scope where local businesses local businesses local businesses local businesses availability
exists.
The contractor must prepare their proposed DBE Utilization Form submittal based on
the total dollar value of their base bid. No further adjustments should be made.
The above recommendation is based on information provided at the time of review.
If you have any questions, please feel free to contact me at (706) 821-2406.
YG:glw
AGENDA.PDFCONVERT.2342.DOC PAGE 1 OF 2
To: B&E Jackson & Associates, Inc.
Attn: Birdel F. Jackson
International Tower, Suite 300
229 Peachtree Street
Atlanta, GA 30303
Re: RFQ #05-087
Qualified Engineering Firms on 2004 Bond Issue Projects
From: Geri Sams
Date: February 17, 2006
Project Number: 10157
Project Name: Jimmy Dyess Parkway 16-inch Water Main
The Augusta Program Management Team has completed a review of your Statement of
Qualifications submitted in response to RFQ #05-087 issued March 7, 2005 and received April
12, 2005. Based upon a series of criteria involving your preferences, capabilities, past
performance with the Augusta Utilities Department, and the Program needs, your firm has
been selected to complete the engineering design for the Jimmy Dyess Parkway 16-inch Water
Main. Included within this memorandum is the preliminary project scope. A meeting will be
set up by the Program Management Team to discuss the project your firm has been assigned
and clarify expectations of the program. Tentatively, these meetings will be scheduled to begin
in late February. Following preparation of your proposal a second meeting will be arranged to
begin contract negotiations. The Augusta Utilities Department looks forward to working with
you on this project. We request that any correspondence regarding this particular project
includes the above noted project number and name.
Preliminary Project Scope
• Design a pipeline extension along Jimmy Dyess Parkway for the Augusta water distribution
system that will extend from Gordon Highway to the existing water main on Belair Road.
Refer to the attached location figure for a general overview of the project area. The proposed
water main project will consist of approximately 7,000 feet of 16-inch diameter ductile iron
pipe that will connect the new 24-inch water main on Gordon Highway to an existing
pipeline on Belair Road.
AGENDA.PDFCONVERT.2342.DOC PAGE 2 OF 2
During the first meeting be prepared to discuss the cost of route analysis, surveying, easement
plat preparation, design standards, bid package preparation, bid phase support, construction
phase support and optional services during construction/resident observation for this project.
Should you have any questions prior to the first meeting please contact the Augusta Program
Management Office at 706-303-2426 or submit questions to the Program Manager at
larry.scott@ch2m.com.
Sincerely,
Geri Sams
Director Procurement
COPIES: Max Hicks/Utilities Dept. Director
Wes Byne/Utilities Dept. Assistant Director
Clifford Goins/Utilities Dept. Assistant Director
Allen Saxon/Utilities Dept. Assistant Director
Russell Thies/Utilities Dept. Assistant Director
Larry Scott/Program Manager
Bob Davis/Program Construction Manager
James Rush/Program Project Engineer
Vendor Original
Five
Copies Vendor Original
Five
Copies
EMC Engineering Yes Yes Cheatham, Fletcher, Scott & Sears
Black & Veatch Yes Yes Lowe & Associates
Prad Group Yes Yes Nicholas Dickinson & Assoc
MacTec Engineering & Consulting Yes Yes The Woodhurst Partnership
Jordan Jones & Goulding Yes Yes URS Greiner Woodward Clyde
Gannett Fleming Yes Yes The LPA Group
Stantec Consulting Yes Yes KBJ Architects, Inc.
Arcadis Yes Yes Phillips & Jordan, Inc.
W. R. Toole Engineering, Inc. Yes Yes Goldie & Associates, Inc.
HDR Yes Yes H. Lawson Graham
James G. Swift & Associates Yes Yes Kimley-Horn & Assoc
Cranston, Robertson & Whitehurst Yes Yes QK4
W. K. Dickson Yes Yes R. W. Armstrong & Assoc
Johnson, Laschober & Assoc Yes Yes Scott Godefroy & Assoc
Stevenson & Palmer Yes Yes Stevens & Wilkinson
Williams-Russell & Johnson Yes Yes T3 Design Associates, Inc.
Zimmerman, Evans & Leopold Yes Yes Hobbs, Upchurch & Assoc.
RTW Yes Yes Grice & Associates
Environmental Services Group Yes Yes Pharr Engineering
B & E Jackson Yes Yes Heath & Lineback Engineers
Malcolm Pirnie Gresham Smith & partners
Southern Partners USInfrastructure, Inc.
Montgomery, Watson, Harza Volkert & Associates
Greenhorne & O'Mara Rochester & Associates
Clark Patterson Virgo Gambill Architects
Camp Dresser & McKee Parson Engineering
PM & A Consulting
RFQ #05-087 Qualified Engineering Firms on 2004 Bond Issue Projects
Augusta Utilities
RFQ Due: Tuesday, April 12, 2005 @ 3:00 p.m.
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Evergreen Section Two Dedication
Department:Engineering Department-Abie L. Ladson, P.E., Interim
Director
Caption:Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Evergreen Subdivision,
Section Two.
Background:The final plat was approved by the Commission on August
17, 2004 . The subdivision design and plat, including the
storm drain system, have been reviewed and accepted by our
engineering staff and the construction has been reviewed by
our inspectors. The Utilities Department has inspected and
reviewed the water and sanitary sewer installations, and
hereby requests acceptance of the utility deed and
maintenance agreement of same.
Analysis:This section meets all codes, ordinances and standards.
Portions of this subdivision lie within the jurisdiction
boundaries of the Corps of Engineers wetlands, which are
noted on the final plat. Acceptance of said utility deed shall
dedicate, as required, the water and sanitary sewer mains
along with the applicable easements to Augusta, Georgia, for
operation and maintenance.
Financial Impact:By accepting these roads, water and sanitary sewer
installations into the County system and after the 18-month
maintenance warranty by the developer/contractor has
expired, all future maintenance and associated costs will be
borne by Augusta, Georgia. By acceptance of the utility deed
and maintenance agreement, positive revenue will be
generated from the sale of water and sanitary sewer taps and
monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Evergreen Subdivision,
Section Two. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
GDOT funding
Department:Solid Waste
Caption:Identify and approve funds to cover landfill fees associated
with Georgia Department of Transportation (GDOT).
Background:Augusta and GDOT have a long standing relationship which
intertwines state functions and county functions. Augusta’s
general fund has typically budgeted funds to cover GDOT
expenses associated with litter collection along the roadways,
dead animal removal, etc. Traditionally, the Solid Waste
Department would request an intergovernmental transfer of
funds to cover the cost of fees incurred by GDOT. However,
since the 2006 budget does not include an appropriation for
GDOT fees, the Solid Waste Department’s
intergovernmental transfer requests regarding these fees are
consistently being denied due to the unavailability of the
needed funds.
Analysis:Over the last 5 months, GDOT has spent in excess of $4,739
dollars disposing of more than 174 tons of litter and waste at
the landfill. This averages out to about $950 per month. At
current spending and providing for the same rate of service
on our part, GDOT will owe the landfill approximately
$11,400 by years end. When usage of GDOT’s vehicles and
labor are factored into the equation, it is clear that the true
value of GDOT’s roadway litter collection and animal
removal efforts actually exceeds the cost of fees incurred.
Furthermore, in helping to keep Augusta area roadways clean
and litter free, GDOT is not only providing a valuable service
to all of our citizens, but is actively supporting our goal of a
“Beautiful” Augusta.
Financial Impact:
By not funding the program, Augusta is shorting the Solid
Waste Department an estimated $11,400 per year while
jeopardizing an established, valuable intergovernmental
relationship.
Alternatives:1. Identify and approve funds to cover landfill fees incurred
by Georgia Department of Transportation (GDOT) roadway
litter pickup and dead animal removal services. 2. Coordinate
in kind services with GDOT that would benefit the Solid
Waste Department and alleviate the financial burden of not
securing associated fees.
Recommendation:Option 1
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Giles, Rodger - Parcel 5
Department:County Attorney - Stephen E. Shepard, Attorney
Caption:Motion to approve an Option for Right-of-Way between W.
Rodger Giles and W. Rodger Giles, Inc. Profit Sharing Plan,
as owners, and Augusta, Georgia, as optionee, in connection
with the St. Sebastian Way Project, for 0.29 acres (12,707.72
sq. ft) in fee and 0.113 acres (4,926.73 sq. ft.) of "Temporary
Construction Easement" and also one (1) "Temporary
Driveway Easement" for the following property located at
1399 Walton Way for a purchase price of $255,800.00.
Background:The property owners have agreed to convey a certain right-
of-way and easements to Augusta, Georgia, for the St.
Sebastian project.
Analysis:The purchase of the referenced property is necessary for the
improvements.
Financial Impact:The costs necessary for this purchase will be covered under
the project budget. The County will advance the necessary
funds for the purchase and the Georgia Department of
Transportation will reimburse the funds advanced by
Augusta, Georgia after acquisition of the property.
Alternatives:Deny the motion to approve the purchase of the referenced
property.
Recommendation:Approve the motion to purchase the referenced property.
Funds are
Available in the
Following
Accounts:
Will be reimbursed by Georgia DOT
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Giles, Rodger - Parcel 6
Department:County Attorney - Stephen E. Shepard, Attorney
Caption:Motion to approve an Option for Right-of-Way between W.
Rodger Giles, as owner, and Augusta, Georgia, as optionee,
in connection with the St. Sebastian Way Project, for 0.159
acres (6,915.40 sq. ft) in fee and 0.067 acres (2,920.46 sq. ft.)
of Temporary Construction Easement for the following
property located at Young Street for a purchase price of
$191,000.00.
Background:The property owner has agreed to convey a certain right-of-
way and easements to Augusta, Georgia, for the St. Sebastian
project.
Analysis:The purchase of the referenced property is necessary for the
improvements.
Financial Impact:The costs necessary for this purchase will be covered under
the project budget. The County will advance the necessary
funds for the purchase and the Georgia Department of
Transportation will reimburse the funds advanced by
Augusta, Georgia after acquisition of the property.
Alternatives:Deny the motion to approve the purchase of the referenced
property.
Recommendation:Approve the motion to purchase the referenced property.
Funds are
Available in the
Following
Accounts:
Will be reimbursed by Georgia DOT
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Gwyn Toole - Easement
Department:Clerk of Commission
Caption:Presentation by Gwyn Toole regarding regrade/change of the
contour of the easement property to redirect rainwater away
from her residence to prevent further damage to the home.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Housing Authority Funding
Department:Solid Waste
Caption:Identify and approve funds to cover collection fees
associated with the Housing Authority.
Background:Augusta and the Housing Authority have a long standing
relationship. Augusta has typically budgeted and
appropriated a portion of the Urban Services Fund to cover
expenses associated with solid waste collection and disposal
from the Housing Authority areas. Previously, this
appropriation has been $106,920 per year, even though the
actual cost of the service was not accurately determined..
Last year, in a streamlining effort, the Solid Waste
Department requested permission to separate the dumpster
contract portion of the solid waste collection program and
combine it with the dumpster contract for all other county
services. This enabled the Solid Waste Department to award
a single contract for all commercial dumpster services. The
contract was awarded to Advanced Disposal. Currently, by
contract, the Solid Waste Department gets billed by
Advanced Disposal for dumpster collection services for all
local government agencies, including the Housing Authority.
The Solid Waste Department then back charges the
appropriate departments, via intergovernmental funds
transfer action, for the services they use. When the Solid
Waste Department went to back charge the Housing
Authority, there was not an established intergovernmental
account. When we called the Housing Authority to identify
how they wanted billed, they provided us with a copy of a
contract exempting them from paying for waste services.
Analysis:It costs Augusta approximately $19,286 per month ($231,432
annually) to provide the current level of solid waste
collection services to the Housing Authority. Because no
funds are currently being transferred to the Solid Waste
Department to offset these contractually obligated fees, the
Solid Waste Department is being forced to secure funding for
an obligation which it did not incur. Without a funding
source, the Solid Waste Department has no way to pay these
fees. Since, in this case, the Solid Waste Department is
simply a conduit to ensure the garbage is collected and
disposed of properly, appropriations should be applied from
the Urban Services Fund or the General Fund to cover the
cost of this program.
Financial Impact:The Solid Waste Department faces a shortfall estimated at
$231,432 per year if this program is not funded properly.
Alternatives:1. Identify and approve funds to cover collection fees
associated with the Housing Authority. 2. Pay for services
from the Urban Services Fund 3. Renegotiate the contract
with the Housing Authority.
Recommendation:Option 1
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Pinehurst, Section Six, Phase One
Department:Engineering Department- Abie L. Ladson, P.E., Interim
Director
Caption:Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Pinehurst, Section Six,
Phase One.
Background:The final plat was approved by the Commission on April 19,
2005 . The subdivision design and plat, including the storm
drain system, have been reviewed and accepted by our
engineering staff and the construction has been reviewed by
our inspectors. The Utilities Department has inspected and
reviewed the water and sanitary sewer installations, and
hereby requests acceptance of the utility deed and
maintenance agreement of same.
Analysis:This section meets all codes, ordinances and standards. There
are no wetlands or 100-year flood plain boundaries involved
in this section. Acceptance of said utility deed shall dedicate,
as required, the water and sanitary sewer mains along with
the applicable easements to Augusta, Georgia, for operation
and maintenance.
Financial Impact:By accepting these roads, water and sanitary sewer
installations into the County system and after the 18-month
maintenance warranty by the developer/contractor has
expired, all future maintenance and associated costs will be
borne by Augusta, Georgia. By acceptance of the utility deed
and maintenance agreement, positive revenue will be
generated from the sale of water and sanitary sewer taps and
monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Pinehurst, Section Six,
Phase One. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Proctor & Gamble Easement
Department:Augusta Utilities Department, Max Hicks Director
Caption:Motion to approve and accept the Option Agreement and
Easement Deed from Proctor & Gamble on the Highway 56
24 Inch Water Main Project.
Background:AUD will be constructing a 24 inch water main along
Highway 56, from Tobacco Road to Marvin Griffin Road.
This entails securing an easement along the front of P&G,
running the full length of the plant. P&G has requested that
they be able to have the restoration work done, instead of
AUD's contractor.
Analysis:The estimate of the restoration work is $11,340.00. The area
covered is completely landscaped. In addition to the sod
within the easement areas, the construction will require that
some trees and shrubs be cut down. AUD will pay this sum
by separate check to P&G. This will be a one time only
payment and will allow P&G to control the performance of
the landscaper to its satisfaction.
Financial Impact:$20,566 (Easement Area = $9,226 Restoration = $11,340)
Alternatives:Reject motion to approve and accept the Option Agreement
and Easement Deed and disallow P&G the money to have
their own landscaper perform the restoration. This would
result in requiring the winning contractor to subcontract the
landscaping work and thereby make Augusta responsible for
the restoration work, and P&G's satisfaction with it.
Recommendation:Approve and accept the Option Agreement and Easement
Deed from Proctor & Gamble.
Funds are
Available in the
Following
Accounts:
G/L 510043410-5411120 J/L 80210120-5411120
REVIEWED AND APPROVED BY:
Finance.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Salvation Army Funding
Department:Solid Waste
Caption:Identify and approve funds to cover landfill fees and solid
waste collection fees associated with the Salvation Army.
Background:Augusta and Salvation Army entered an agreement where in
exchange for placing a shelter at a particular location, the city
would exempt the Salvation Army for its waste. This was
included in a contract. To cover the fees, Augusta treated this
as an intergovernmental charge. Augusta budgeted monies
for the Salvation Army and the general fund picked up the
expense. In the 2006 budget, monies were not appropriated
for the Salvation Army.
Analysis:Over the last 5 months the Salvation Army has spent in
excess of $3,309 dollars at the landfill. This averages out to
about $661 per month. At current spending, the Salvation
Army will owe the landfill approximately $7,930 by the end
of the year. This is provided service stays about the same.
Further, the Salvation Army has an 8 yard dumpster which is
paid for by the general fund. No funds were appropriated for
this expense as well. Their current cost is $150.67 per month
or $1808.04 per year.
Financial Impact:By not funding the program, shorts the Solid Waste
Department an estimated $9,738 per year.
Alternatives:1. Identify and approve funds to cover Solid Waste fees
associated with Salvation Army. 2. Do not renew the contract
with the Salvation Army for the Shelter.
Recommendation:Option 1
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Sanderling, Phase Two, Dedication
Department:Engineering Department- Abie L. Ladson, P.E., Interim
Director
Caption:Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Sanderling Subdivision,
Phase Two.
Background:The final plat was approved by the Commission on Oct. 19,
2004 . The subdivision design and plat, including the storm
drain system, have been reviewed and accepted by our
engineering staff and the construction has been reviewed by
our inspectors. The Utilities Department has inspected and
reviewed the water and sanitary sewer installations, and
hereby requests acceptance of the utility deed and
maintenance agreement of same.
Analysis:This section meets all codes, ordinances and standards. There
are no wetlands or 100-year flood plain boundaries involved
in this section. Acceptance of said utility deed shall dedicate,
as required, the water and sanitary sewer mains along with
the applicable easements to Augusta, Georgia, for operation
and maintenance.
Financial Impact:By accepting these roads, water and sanitary sewer
installations into the County system and after the 18-month
maintenance warranty by the developer/contractor has
expired, all future maintenance and associated costs will be
borne by Augusta, Georgia. By acceptance of the utility deed
and maintenance agreement, positive revenue will be
generated from the sale of water and sanitary sewer taps and
monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Sanderling Subdivision,
Phase Two. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
St. Marks and St. Kitts Garbage Pickup
Department:Clerk of Commission
Caption:Discuss possible exemption from garbage pickup for St.
Marks and St. Kitts. (Requested by Commissioner Bowles)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Walton Acres, Section IV Dedication
Department:Engineering Department- Abie L. Ladson, P.E., Interim
Director
Caption:Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Walton Acres Subdivision,
Section IV.
Background:The final plat was approved by the Commission on Sept. 17,
2002 . The subdivision design and plat, including the storm
drain system, have been reviewed and accepted by our
engineering staff and the construction has been reviewed by
our inspectors. The Utilities Department has inspected and
reviewed the water and sanitary sewer installations, and
hereby requests acceptance of the utility deed and
maintenance agreement of same.
Analysis:This section meets all codes, ordinances and standards. There
are no wetlands or 100-year flood plain boundaries involved
in this section. Acceptance of said utility deed shall dedicate,
as required, the water and sanitary sewer mains along with
the applicable easements to Augusta, Georgia, for operation
and maintenance. Acceptance of said utility deed shall
dedicate, as required, the water and sanitary sewer mains
along with the applicable easements to Augusta, Georgia, for
operation and maintenance.
Financial Impact:By accepting these roads, water and sanitary sewer
installations into the County system and after the 18-month
maintenance warranty by the developer/contractor has
expired, all future maintenance and associated costs will be
borne by Augusta, Georgia. By acceptance of the utility deed
and maintenance agreement, positive revenue will be
generated from the sale of water and sanitary sewer taps and
monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Walton Acres Subdivision,
Section IV. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Walton Acres, Section VII
Department:Engineering Department-Abie L. Ladson, P.E., Interim
Director
Caption:Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Walton Acres Subdivision,
Section VII.
Background:The final plat was approved by the Commission on
November 16, 2004 . The subdivision design and plat,
including the storm drain system, have been reviewed and
accepted by our engineering staff and the construction has
been reviewed by our inspectors. The Utilities Department
has inspected and reviewed the water and sanitary sewer
installations, and hereby requests acceptance of the utility
deed and maintenance agreement of same.
Analysis:This section meets all codes, ordinances and standards. There
are no wetlands or 100-year flood plain boundaries involved
in this section. Acceptance of said utility deed shall dedicate,
as required, the water and sanitary sewer mains along with
the applicable easements to Augusta, Georgia, for operation
and maintenance.
Financial Impact:By accepting this road, water and sanitary sewer installations
into the County system and after the 18-month maintenance
warranty by the developer/contractor has expired, all future
maintenance and associated costs will be borne by Augusta,
Georgia. By acceptance of the utility deed and maintenance
agreement, positive revenue will be generated from the sale
of water and sanitary sewer taps and monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Walton Acres Subdivision,
Section VII. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Walton Hills, Section VI, Dedication
Department:Engineering - Abie L. Ladson, P.E., Interim Director
Caption:Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Walton Hills Subdivision
Section VI.
Background:The final plat was approved by the Commission on
November 16, 2004 . The subdivision design and plat,
including the storm drain system, have been reviewed and
accepted by our engineering staff and the construction has
been reviewed by our inspectors. The Utilities Department
has inspected and reviewed the water and sanitary sewer
installations, and hereby requests acceptance of the utility
deed and maintenance agreement of same.
Analysis:This section meets all codes, ordinances and standards. There
are no wetlands or 100-year flood plain boundaries involved
in this section. Acceptance of said utility deed shall dedicate,
as required, the water and sanitary sewer mains along with
the applicable easements to Augusta, Georgia, for operation
and maintenance.
Financial Impact:By accepting these roads, water and sanitary sewer
installations into the County system and after the 18-month
maintenance warranty by the developer/contractor has
expired, all future maintenance and associated costs will be
borne by Augusta, Georgia. By acceptance of the utility deed
and maintenance agreement, positive revenue will be
generated from the sale of water and sanitary sewer taps and
monthly billing of same.
Alternatives:1. Approve the deeds of dedication, maintenance agreements,
and road resolutions submitted by the Engineering, and
Augusta Utilities Departments for Walton Hills Subdivision,
Section VI. 2. Do not approve and risk litigation.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
Following
Accounts:
Not required at this time.
REVIEWED AND APPROVED BY:
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
7/24/2006 1:30 PM
Walton Way/Canal level two funding
Department:Solid Waste
Caption:Identify and approve funds to cover landfill fees associated
with the second level canal improvements.
Background:In the negotiations leading to the contract involving the 2nd
level canal improvements to alleviate downtown flooding, it
was recognized that the bridges at 8th and 9th streets and the
culvert at 9th and Fenwick would have to be replaced. As
part of the agreed upon cost sharing for the civil work,
Augusta agreed not to charge tipping fees on the debris
resulting from the demolition of the existing bridges and
culverts.
Analysis:The balance owed as of May 31, 2006 was $149,814.15. This
amount includes $139,910.97 of actual disposal and
$9,903.18 of finance charge.
Financial Impact:By not funding this contractually agreed-upon program, the
Solid Waste Department is shorted an estimated $149,814.15
thus far.
Alternatives:1. Identify and approve funds to cover landfill fees associated
with the second level canal improvements. 2. Make a
financial adjustment to the Landfills “in lieu of tax” line item
in the budget, reducing the amount by at least $149,814.15.
Recommendation:Option 1
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Administrator.
Clerk of Commission