Loading...
HomeMy WebLinkAbout2012-08-07-Meeting Agenda Commission Meeting Agenda Commission Chamber 8/7/2012 5:00 PM INVOCATION: Reverend Paul Sherwood, Reid Memorial Presbyterian Church PLEDGE OF ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA. Five (5) minute time limit per delegation DELEGATIONS A. Ms. Jacqueline Kohlenberg. RE: Taxi Cab Inspections. Attachments B. Mr. Phillip T. Barrett RE: Taxi Cab Inspections. Attachments C. Mr. Paul S. Simon RE: Reynolds Street Parking Deck. Attachments CONSENT AGENDA (Items 1-36) PUBLIC SERVICES 1. Motion to approve the Bid Selection of Contract Management Inc. and their contract for the Airport Rescue Fire Fighters Station Renovations as approved by the Aviation Commission at their May 31st and June 28th meetings. (Approved by Public Services Committee July 30, 2012) Attachments 2. Motion to approve New Application: A. N. 12 - 23: request by Daniel Magana for an on premise consumption Beer license to be used in connection with Bambino's Pizza and Things located at 3706 Mike Padgett Hwy Ste B. District 8. Super District 10. (Approved by Public Attachments Services Committee July 30, 2012) 3. Motion to approve New Ownership Application: A. N. 12 - 24: request by Michael Schepis for an on premise consumption Liquor, Beer & Wine license to be used in connection with Oliviana's Pizzeria & Grill located at 399 Highland Ave. There will be Sunday Sales. District 7. Super District 10.(Approved by Public Services Committee July 30, 2012) Attachments 4. Motion to approve New Application: A. N. 12 - 25: request by Krista S. Wight for an on premise consumption Liquor, Beer & Wine license to be used in connection with Southeastern Food Service and Event Consulting, LLC located at 1204 Broad St. District 1. Super District 9. (Approved by Public Services Committee July 30, 2012) Attachments 5. Motion to approve New Application: A. N. 12 - 26: request by Robert Morrison for an on premise consumption Liquor, Beer & Wine license to be used in connection with Whiskey Bar Kitchen located at 1048 Broad St. There will be Sunday Sales. District 1. Super District 9. (Approved by Public Services Committee July 30, 2012) Attachments 6. Motion to approve New Application: A. N. 12 - 27: request by Shailen Patel for an on premise consumption Beer license to be used in connection with Straw Hat Pizza located at 2816 Washington Rd. Ste. 104. District 7. Super District 10. (Approved by Public Services Committee July 30, 2012) Attachments 7. Motion to approve the request to approve APAC Change Order #1, a deductive change order, as approved by the Augusta Aviation Commission at their May 31, 2012 meeting.(Approved by Public Services Committee July 30, 2012) Attachments 8. Motion to approve APAC - Tennessee Change Order #2 - Closeout of RWY 17-35 Rehab Project as approved by the Augusta Aviation Commission at their May 31, 2012 meeting. (Approved by Public Services Committee July 30, 2012) Attachments 9. Motion to approve the Choate Contract Modification #8 - New Fixed Base Operation (FBO) as approved by the Augusta Aviation Commission at their June 28, 2012 Commission meeting. (Approved by Public Services Committee July 30, 2012) Attachments 10. Motion to appoint Mr. Craig Peoples to the Construction Advisory Board for a four-year term to serve as the electrical contractor representative. (Approved by Public Services Committee July 30, 2012) Attachments 11. Motion to approve the Enterprise Leasing Company d/b/a Alamo Rent- A-Car and National Car Rental lease agreement as approved by the Aviation Commission at their June 28, 2012 meeting. (Approved by Public Services Committee July 30, 2012) Attachments 12. Motion to approve a revised land lease for the Georgia State Patrol as approved by the Aviation Commission at their June 28, 2012 meeting. (Approved by Public Services Committee July 30, 2012) Attachments 13. Motion to approve the Bid and Contract with Departure Media, Inc. (DMI) to handle the Airport’s In-Terminal Advertising Concession as approved by the Aviation Commission at their March 31, 2012 and June 28, 2012 meetings. (Approved by Public Services Committee July 30, 2012) Attachments 14. Motion to approve the expenditure of SPLOST funds dedicated to the New TEE Center in the amount of $42,479.15 for the purchase, installation and startup of all scope associated with the new integrated telecommunication system. (Approved by Public Services Committee July 30, 2012) Attachments 15. Motion to approve an agreement with Augusta, Georgia and the Sandridge Community Association (SCA) for Capital Improvement Projects at Jamestown Community Park. (Approved by Public Services Committee July 30, 2012) Attachments 16. Motion to approve Reeves Construction Change Order #5 - Front Door Parking Improvement Project as approved by the Augusta Aviation Commission at their May 31, 2012 meeting.(Approved by Public Services Committee July 30, 2012) Attachments 17. Motion to approve Reeves Contract Modification #6 - Front Door Parking Lot Improvement Project as approved by the Aviation Commission at their June 28, 2012 Meeting. (Approved by Public Services Committee July 30, 2012) Attachments 18. Motion to approve the Southeast Development Area Access Project - Augusta Regional Airport at Bush Field bid awarded to Beam's Contracting, Inc. as approved by the Aviation Commission at their June 28, 2012 meeting. (Approved by Public Services Committee July 30, 2012) Attachments 19. Motion to approve a request from Springfield Baptist Church to hang/install light post banners commemorating the storied legacy of Springfield Baptist Church as a part of the 225th anniversary celebration. (Approved by Public Services Committee July 30, 2012) Attachments 20. Motion to approve the expenditure of SPLOST funds dedicated to the Webster Detention Center Phase II and Renovations, for the purchase, installation, startup and all scope associated in the estimated amounts as follows: 1. Security Electronics Equipment - $790,264.00 2. Detention Door Hardware - $142,733.00 3. Commercial Hardware - $65,120.00 4. Trane HVAC Equipment - $203,500.00 5. Southeast Automated Systems/Reliable Controls - $306,638.00 (Approved by Public Services Committee July 30, 2012) Attachments 21. Motion to approve Campbell & Paris Engineering Work Authorization #21 - Design and Construction Management Services, Airside Pavement Crack Repair and Marking Project as approved by the Aviation Commission at their June 28, 2012 meeting. (Approved by Public Services Committee July 30, 2012) Attachments PUBLIC SAFETY 22. Motion to accept an Agreement between the Administrative Office of the Courts with Siemens Healthcare Diagnostics Inc. to provide drug testing for the Drug Court. (Approved by Public Safety Committee July 30, 2012) Attachments 23. Motion to approve tasking the Law Department to prepare ordinances within 30-days to allow law enforcement officials to gain entry to a vehicle where an animal or child has been left unattended. (Approved by Public Safety Committee July 30, 2012) Attachments 24. Motion to approve an inmate telephone contract with SECURUS Technologies for RCCI for a three-year term with two 1-year options for renewal. (Approved by Public Safety Committee July 30, 2012) Attachments 25. Motion to approve the naming of Fire Station #10 for H. E. (Herb) Beckham and task the Administrator with developing a policy, procedure or ageeement on how future request(s) will be handled. (Approved by Public Safety Committee July 30, 2012) Attachments 26. Motion to approve Amendment to Pictometry Agreement for 4-Inch Mosaic Standard Tiles. (Approved by Public Safety Committee July 30, 2012) Attachments FINANCE 27. Motion to approve request for Augusta Vehicle Maintenance Contract (RFP-09-123) to be extended for Year 2013. (Approved by Finance Committee July 30, 2012) Attachments ENGINEERING SERVICES 28. Motion to award Design Consultant Services Agreement to Cranston Engineering Group, Inc. in the amount of $207,540.00 for 15th Street Bridge over The Augusta Canal, and Broad Street On-Ramp over Lake Olmstead. This Project will be funded through SPLOST PHASE VI for Attachments the Engineering Department. (Approved by Engineering Services Committee July 30, 2012) 29. Motion to approve the deeds of dedication, maintenance agreements and road resolution submitted by the Engineering and Augusta Utilities Departments for Breckenridge Subdivision, Section Four, Phase 2. (Approved by Engineering Services Committee July 30, 2012) Attachments 30. Motion to approve $1,000,000 to fund the current On-Call Concrete and Emergency Services Contract. Funding is available in the Grading & Drainage and Sidewalk Rehab/Replacement Phase VI accounts respectively as requested by AED. (Approved by Engineering Services Committee July 30, 2012) Attachments 31. Motion to approve an Option for the purposes of acquiring an easement between Marcus A. Reid & Katrina Reid, as owner(s), and Augusta, Georgia, as optionee, in connection with the East Augusta Roadway Drainage Improvement Project, said perpetual easement consists of 0.42 acre (18,106.25 sq. ft.) permanent drainage, utility and maintenance easement and (7,710.38 sq. ft.) of temporary construction easement from the property located at 544 Laney Walker Blvd. Ext., private, at the purchase price of $4,913.00. (Approved by Engineering Services Committee July 30, 2012) Attachments 32. Motion to approve an Option for the purposes of acquiring an easement between Marcus A. Reid & Katrina Reid, as owner(s), and Augusta, Georgia, as optionee, in connection with the East Augusta Roadway Drainage Improvement Project, said perpetual easement consists of 0.80 acre (34,780.33 sq. ft.) permanent drainage, utility and maintenance easement and (3,825.53 sq. ft.) of temporary construction easement from the property located at 540 Laney Walker Blvd. Ext., private, at the purchase price of $8,886.00.(Approved by Engineering Services Committee July 30, 2012) Attachments 33. Motion to approve the placement of a monument commemorating the life and achievements of Montgomery Meigs, quartermaster general for the US Army during the Civil War. (Approved by Engineering Services Committee July 30, 2012) Attachments 34. Motion to approve the deeds of dedication, maintenance agreements, and road resolution submitted by the Engineering and Augusta Utilities Departments for Willhaven Subdivision, Phase III, Section I. (Approved by Engineering Services Committee July 30, 2012) Attachments 35. Motion to approve and authorize the Engineering Department (AED) to purchase up to 9,800 stream mitigation credits at a total cost of $563,500 ($57.50 per mitigation credit) from the Bath Branch Augusta, LLC (Bath Branch Mitigation Bank) and up to 14 wetland mitigation credits at a total cost of $210,000 ($15,000 per credit) from the Mitigation Management, LLC, (Brushy Creek Mitigation Bank) to mitigate stream & wetlands impacts as determined necessary by the US Army Corps of Engineers and Georgia Environmental Protection Division in regards to the Wrightsboro Rd. from Jimmie Dyess Pkwy. to I-520 Improvements Project, CPB #323-041110-296823309. Funding is available through Engineering SPLOST III Fund Recapture. (Approved by Engineering Services Committee July 30, 2012) Attachments PETITIONS AND COMMUNICATIONS 36. Motion to approve the minutes of the regular and Special Called meetings of the Commission held July 17, 2012 and the Special Called meeting and Executive Session held July 30, 2012. Attachments ****END CONSENT AGENDA**** AUGUSTA COMMISSION 8/7/2012 AUGUSTA COMMISSION REGULAR AGENDA 8/7/2012 (Items 37-50) ADMINISTRATIVE SERVICES 37. Ratify Amendment No. 3 to the Cooperative Agreement with the Federal Highway Administration for the Augusta Sustainable Development Program. Attachments 38. Presentation by Mr. Andrew Garnett regarding a foreclosed UDAG loan. Attachments 39. Discuss reactivation or reestablishment of a Citizens Advisory Board to provide oversight of the complex activities of the HCD. (Requested by Commissioner Lockett) Attachments 40. Discuss eliminating the requirement for directors to clock in and out each work day. (Requested by Commissioner Lockett) Attachments 41. Adjust Fire Suppression (Fire Department) Personnel Sick Leave from 5.31 hours per pay period to 6.93 hours per pay period for 9 months commencing July 1, 2012 and ending March 31, 2013. On April 1, 2013 sick leave hours will revert back to 5.31 hours per pay period. (Requested by Commissioner Lockett) Attachments 42. Discuss sick leave accrual for Augusta firefighters. (Requested by Commissioner Guilfoyle) Attachments 43. Receive as information an update from the Administrator on the Human Resources Department. Attachments 44. HCD Director will discuss Pine Street Development and other related activities as presented in the June 18 Questionnaire. Director will be prepared to respond to queries presented by the committee. (Requested by Commissioner Lockett) Attachments 45. Update from the Administrator and the Engineering Director on progress made on development of Regency Mall and the status of the 13.5 acre lake that 3.5 million dollars of SPLOST funds were allocated. Provide time frame for action and explain what steps could be taken to expedite this overdue project. (Requested by Commissioner Lockett) Attachments Upcoming Meetings www.augustaga.gov 46. Receive information from the Administrator relative to the SES Pay Disparity. (Requested by Commissioner Lockett) Attachments ENGINEERING SERVICES 47. Motion to approve the 2013 Solid Waste Collections Contracts with Advanced Disposal Services and Inland Services Corporation. (No recommendation from Engineering Services Committee July 30, 2012) Attachments 48. Motion to approve tasking the Administrator to convene a meeting with Mr. Deaton, Mr. Ladson and a representative from the Risk Management Department and report back at the Commission meeting on Tuesday with a path forward to resolve the problem of Kelvin and Julie Deaton regarding the ongoing flooding of their home at 1722 Wrightsboro Road. (Approved by Engineering Services Committee July 30, 2012) Attachments ADMINISTRATOR 49. Motion to approve the Reynolds Street Parking Deck Construction, Operating and Reciprocal Easement Agreement, Reynolds Street Parking Deck Management Agreement, Conference Center Parking Lease and Assignment of Parking Deck Management Agreement, and to authorize the Mayor and Clerk of Commission to execute same. (Deferred from the July 17, 2012 meeting) Attachments LEGAL MEETING A. Pending and Potential Litigation. B. Real Estate. C. Personnel. 50. Motion to authorize execution by the Mayor of the affidavit of compliance with Georgia's Open Meeting Act. Commission Meeting Agenda 8/7/2012 5:00 PM Invocation Department: Caption:Reverend Paul Sherwood, Reid Memorial Presbyterian Church Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 1 Commission Meeting Agenda 8/7/2012 5:00 PM Jacqueline Kohlenberg Department: Caption:Ms. Jacqueline Kohlenberg. RE: Taxi Cab Inspections. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 2 Attachment number 1 \nPage 1 of 1 Item # 2 Commission Meeting Agenda 8/7/2012 5:00 PM Phillip T. Barrett Department: Caption:Mr. Phillip T. Barrett RE: Taxi Cab Inspections. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 3 Attachment number 1 \nPage 1 of 1 Item # 3 Commission Meeting Agenda 8/7/2012 5:00 PM Paul S. Simon Department: Caption:Mr. Paul S. Simon RE: Reynolds Street Parking Deck. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 4 Attachment number 1 \nPage 1 of 1 Item # 4 Commission Meeting Agenda 8/7/2012 5:00 PM Airport Rescue Fire Fighters - Station Renovations Department:Augusta Regional Airport Caption:Motion to approve the Bid Selection of Contract Management Inc. and their contract for the Airport Rescue Fire Fighters Station Renovations as approved by the Aviation Commission at their May 31st and June 28th meetings. (Approved by Public Services Committee July 30, 2012) Background:The Augusta Aviation Commission through the County Procurement Department issued a Bid for a Contractor to perform the tasks required by through contract design documents. As a result, four (4) bids were received. Contract Management - $193,730.06 (Low Bidder) Stewart-Corbitt General Contracting - $242,535.00 SD Clifton Construction - $263,399.50 Courseaull Commercial - $292,551.00 Analysis:As a result to the process of acquiring an additional ARFF Vehicle, it was determined the existing ARFF (Fire Station) Building should be modified to house the new vehicle. This will be accomplished by renovating the existing 3-bay area to include an additional bay, and construct an addition to the building to be used for storage, training and work out areas. In reviewing the bids, it was determined Contract Management from Augusta, GA had the lowest bid. County Procurement has reviewed the information provided at the bid opening and found the information to be complete. Contract Management has successfully performed several projects similar in size in the Augusta area. Financial Impact:A total cost of $193,730.06 for the Airport Rescue Fire Fighting Station Renovations. Alternatives:Deny request. Recommendation: Approve the bid and contract with Contract Management, Inc. for Cover Memo Item # 5 the renovations of the Airport Fire Station Renovations. Funds are Available in the Following Accounts: 551-08-1301/54-13130 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 5 1 AIRCRAFT RESCUE FIRE FIGHTING (ARFF) RENOVATIONS This Contract for (hereinafter designated as the "Contract") made and entered into as of ______________________________, by and between AUGUSTA-RICHMOND COUNTY FOR THE AUGUSTA REGIONAL AIRPORT, (hereinafter designated as "Airport”) and CONTRACT MANAGEMENT, INC (hereinafter designated as “Contractor”), a Georgia corporation. WITNESSETH: WHEREAS, Augusta-Richmond County is the owner and operator of a full service commercial airport known as the Augusta Regional Airport which is managed by the Augusta Aviation Commission; WHEREAS, the Augusta Aviation Commission has solicited a bid for the renovation of the existing Fire Station located at the Airport and the Contractor submitted a Bid for said services which was accepted by the Aviation Commission on behalf of Augusta-Richmond County for the Airport; NOW THEREFORE, in consideration of the mutual covenants, promises, and agreements herein contained, the Airport and the Contractor hereby agree as follows: The Services of the Contractor shall be in accordance with the scope of services and all provisions provided herein. I. SCOPE OF WORK 1.1 The term “Work” means the construction, labor, materials, equipment, tools, machinery, testing, temporary services and utilities, supervision, administration, coordination, planning, insurance, bonds, transportation, security, and all other services and things necessary to provide the Owner with the facilities, improvements, features, and functions described in the Specifications identified in Attachment A, and the Drawings identified in Attachment B. The Specifications and the Plans are hereby incorporated into and made a part of this Contract. The Contractor agrees to complete the Work in a good, firm, substantial and workmanlike manner in strict conformity with this Contract. Attachment number 1 \nPage 1 of 20 Item # 5 2 1.2 Additionally, the following specific items shall be considered a part of the Contract Documents by reference when appropriately executed. 1.2.1 100% Labor and Materials Payment Bond. 1.2.2 100% Performance Bond. 1.2.3 The Certificate of Insurance (as described in Division 0 Section 00810 of the Contract Specifications). 1.2.4 The Contractor's completed Bid Form dated May 23, 2012. 1.3 The Contractor agrees to furnish all of the materials and all of the equipment and labor necessary and to perform all of the work entitled ARFF Renovations (contract, Specifications and Drawings dated March 2012) prepared by Campbell & Paris Engineers, 313 Wingo Way, Mt Pleasant, South Carolina, 29464, in accordance with the requirements and provisions of the Contract Documents. 1.4 Unless otherwise modified, the Contractor shall furnish all of the Work in accordance with the Contract and all incidental work necessary to complete the Project in an acceptable manner, ready for use, occupancy, or operation by the County. The Contractor shall be responsible for the entire project and every part thereof. II. TIME, TERM AND PAYMENT 2.1 Contract Time. The Contractor shall commence the Work under this Contract within ten (10 ) calendar days from the date of receiving the Notice to Proceed, as evidenced by official receipt of certified mail or acknowledgment of personal delivery, and shall fully complete the Work within 180 calendar days from receiving such Notice to Proceed. The Contract Time may be extended only by Change Order approved and executed by the Aviation Commission, the County and the Contractor in accordance with the terms of this Contract. 2.2 Contract Price. As full payment for the faithful performance of this Contract, the County shall pay the Contractor the Contract Price, which is an amount not to exceed of One Hundred Ninety Three Thousand Seven Hundred Thirty Dollars and Six Cents Attachment number 1 \nPage 2 of 20 Item # 5 3 ($193,730.06), unless changed by written Change Order in accordance with the terms of this Contract. Any increase of the Contract Price shall be by Change Order adopted and approved by the Aviation Commission, the County and the Contractor in accordance with the terms of this Contract. 2.3 Subject to satisfactory completion of work performed, payments on account thereof shall be made as follows: 2.3.1 On or about the 15th of each month, 90 percent of the value proportionate to the amount of the contract, of materials on the ground to be incorporated in the work and labor and materials incorporated in the work up to and including the last day of the previous month, as approved by the Engineer, less the aggregate of previous payments. 2.3.3 Upon substantial completion of the entire work, a sum sufficient to increase the total payments to 95 percent of the Contract Price. 2.3.4 Within 30 days after the date of the final acceptance of the work, the balance due under the Contract. 2.4 Contractor and County agree to abide by all applicable provisions of Georgia state law concerning retain age, including but not limited to O.C.G.A. §13-10-80. If the terms of this Contract concerning retainage conflict with state law, state law governs. 2.5 Invoices. Invoice(s) must be submitted as follows: Original invoice(s) must be submitted to: Jack Mayfield Campbell & Paris Engineers 313 Wingo Way Mt Pleasant, South Carolina 29464 III. NOTICE Any notice or consent required to be given by or on behalf of any party hereto to any other party hereto shall be in writing and shall be sent by (a) registered or certified United States Attachment number 1 \nPage 3 of 20 Item # 5 4 mail, return receipt requested, postage prepaid, (b) personal delivery to the County’s Chief Executive Officer and the Executive Assistant, (c) overnight courier service, or (d) delivered in person to the Contractor or his authorized representative on the work site. All notices sent to the addresses listed below shall be binding unless said address is changed in writing no less than two weeks before such notice is sent. Future changes in address shall be effective upon written notice being given by the Contractor to the County’s Executive Assistant or by the County to the Contractor’s authorized representative via certified first class U.S. mail, return receipt requested. Such notices will be addressed as follows: To AUGUSTA-RICHMOND COUNTY: For all notices to Augusta-Richmond County the address will be: Airport Director Augusta Regional Airport 1501 Aviation Way Augusta, Georgia 30906 With a copy to: Augusta General Counsel Augusta Richmond County Department of Law 501 Greene St. Augusta, Georgia 30901 For all notices to CONTRACTOR the address will be: James Williams Contract Management, Inc. 1827 Killingsworth Road Augusta, Georgia 30904 IV. FEDERAL WORK AUTHORIZATION 4.1 Pursuant to O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10- 1-.02, the County cannot enter a contract for the physical performance of services unless the Contractor and its Subcontractors register and participate in the Federal Work Authorization Program to verify specific information on all new employees. Attachment number 1 \nPage 4 of 20 Item # 5 5 4.2 Contractor certifies that it has complied and will continue to comply with O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02. 4.3 Contractor agrees to sign an affidavit evidencing its compliance with O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02. The signed affidavit is attached to this Contract as Attachment C. 4.4 Contractor agrees that in the event that it employs or contracts with any Subcontractor(s) in connection with this Contract, Contractor will secure from each Subcontractor an affidavit that indicates the employee-number category applicable to that Subcontractor and certifies the Subcontractor’s current and continuing compliance with O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02. Any signed Subcontractor affidavit(s) obtained in connection with this Contract shall be attached hereto as Attachment D. V. CORPORATE AUTHORITY Contractor agrees to execute the Certificate of Corporate Authority attached hereto as Attachment E. The officials of the Contractor executing this Contract are duly and properly in office and are fully authorized and empowered to execute the same for and on behalf of the Contractor. Contractor has all requisite power and authority to enter into and perform its obligations under this Contract. The execution and delivery by the Contractor of this Contract and the compliance by the Contractor with all of the provisions of this Contract (i) is within the purposes, powers, and authority of the Contractor; (ii) has been done in full compliance with applicable law and has been approved by the governing body of the Contractor and is legal and will not conflict with or constitute on the part of the Contractor a violation of or a breach of or a default under any indenture, mortgage, security deed, pledge, note, lease, loan, or installment sale agreement, contract, or other agreement or instrument to which the Contractor is a party or by which the Contractor is otherwise subject or bound, or any license, judgment, decree, law, statute, order, writ, injunction, demand, rule, or regulation of any court or governmental agency or body having jurisdiction over the Contractor; and (iii) has been duly authorized by all Attachment number 1 \nPage 5 of 20 Item # 5 6 necessary action on the part of the Contractor. This Contract is the valid, legal, binding and enforceable obligation of the Contractor. VI. PERFORMANCE AND PAYMENT BONDS AND INSURANCE REQUIREMENTS 6.1 Within three (3) days from the date of Notice of Award of this Contract, the Contractor, as principal, and the Gray Casualty & Surety Company, a surety company listed in the Federal Register and licensed to write surety insurance in the State of Georgia, as surety, shall give a Contract performance bond and a payment bond, each in the amount of One Hundred Ninety Three Thousand Seven Hundred Thirty Dollars and Six Cents ($193,730.06), for the use of all persons doing work or furnishing skills, tools, machinery, or materials under or for the purpose of this Contract, in accordance with the applicable provisions of Georgia state law, including but not limited to, O.C.G.A. § 13-10-1 and § 36-91-21 et seq. The life of these bonds shall extend through the life of this Contract including a sixty (60) day maintenance period (where applicable) and a twelve-month guarantee period after the completion of Work performed under this Contract. 6.2 It is further agreed between the parties hereto that if at any time after the execution of this Contract and the surety bonds, the County shall deem the surety or sureties upon such bonds to be unsatisfactory, or if, for any reason, such bonds cease to be adequate to cover the performance of the Work, the Contractor shall, at its sole expense and within five (5) days after the receipt of notice from the County to do so, furnish additional bond or bonds in such form and amount and with such surety or sureties as shall be satisfactory to the County. VII. AUTHORIZED REPRESENTATIVES 7.1 Airport’s Representative. Airport’s Representative shall be Gary LeTellier, Executive Director or his designee. 7.2 Contractor’s Representative(s). Contractor must designate in writing a person(s) acceptable to Airport to serve as its representative ("Contractor’s Representative”) in all dealings with Airport. The initial Contractor’s Representative will be Contractor’s Representative may be changed upon prior written notice delivered to Airport’s Representative. Attachment number 1 \nPage 6 of 20 Item # 5 7 VIII. COMMERCIAL ACTIVITIES Neither Contractor nor its employees may establish any commercial activity or issue concessions or permits of any kind to third parties for establishing activities at the Airport. IX. RECORDS AND AUDIT Contractor and its subcontractors shall maintain records and accounts in connection with all aspects in the performance of this Contract, including those which will accurately document incurred costs, both direct and indirect, of whatever nature, during and for a period of three (3) years from the expiration or other termination of this Contract, unless otherwise specified by applicable law. Augusta-Richmond County may examine and copy, at all reasonable times, with advance notification, those records and accounts. Contractor shall maintain all records in a central location in Augusta-Richmond County. X. CONTINGENT FEES Contractor warrants that it has not employed or retained any company or person, other than a bona fide employee working for Contractor, to solicit or secure this Contract; and that Contractor has not paid or agreed to pay any company, association, corporation, firm or person, other than a bona fide employee working for Contractor, any fee, commission, percentage, gift or any other consideration contingent upon or resulting from the award or making of this Contract. For the breach or violation of this warranty and upon a finding after notice and hearing, the County may terminate the Contract and, at its discretion, may deduct from the Contract Sum, or otherwise recover the full amount of any such fee, commission, percentage, gift or consideration. XI. NON-APPROPRIATIONS Notwithstanding anything contained in this Contract, if sufficient funds have not been appropriated to support continuation of this Contract for an additional calendar year or an additional term of the Contract, this Contract shall terminate absolutely and without further obligation on the part of Augusta-Richmond County at the close of the calendar year of its execution or if Augusta-Richmond County suspends performance pending the appropriation of funds. Attachment number 1 \nPage 7 of 20 Item # 5 8 XII. REPRESENTATIONS AND WARRANTIES 12.1 Contractor’s Representations and Warranties Regarding Capacity to Contract and Perform Work/Services. In order to induce Augusta-Richmond County to enter into this Contract, Contractor hereby represents and warrants to Augusta-Richmond County as of the date above written that: 12.1.1 Contractor is duly organized and validly existing in good standing under the laws of the state of Georgia in which it is organized, is qualified to do business in all jurisdictions in which it is operating, and has the power and authority to execute and deliver and to perform its obligations under this Contract and the documents to which it is signatory; and 12.1.2 The execution, delivery and performance by Contractor and its undersigned representative(s) of this Contract and other documents to which Contractor is a signatory do not require the approval or consent of any other person, entity or government agency and do not result in any breach of any agreement to which Contractor is a party or by which it is bound; and 12.1.3 The execution, delivery and performance by Contractor of this Contract and other documents to which it is a signatory have been duly authorized by all necessary action, and constitute legal, valid and binding obligations of Contractor, enforceable against Contractor in accordance with its terms; 12.1.4 No action, suit or proceeding to which Contractor is a party is pending or threatened that may restrain or question this Contract, or any other document to which it is a signatory, or the enjoyment of rights or benefits contemplated herein; and 12.1.5 Contractor has all State of Georgia Licenses and permits required for the performance of Landscaping and Grounds Maintenance services and shall only use properly licensed and trained persons to perform such services. XIII. NON-DISCRIMINATION The Contractor shall not discriminate against any employee, or applicant for employment, because of race, creed, religion, color, sex or national origin, marital status, Attachment number 1 \nPage 8 of 20 Item # 5 9 physical handicap or sexual orientation. Further, Contractor agrees, for itself, its personal representatives, successors in interest, and assigns, as a part of the consideration hereof, that (1) no person on the grounds of race, color, or national origin shall be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use Airport, (2) in the furnishing of services at Airport, no person on the grounds of race, color, or national origin shall be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination, and (3) Contractor shall use Airport facilities in compliance with all other requirements imposed by or pursuant to 14 CFR Part 152 and Title VI of the Civil Rights Act of 1964 and 49 CFR, Subtitle A, Part 21, Nondiscrimination in Federally Assisted Programs of the Department of Transportation, and as such Title and Regulations may be amended. XIV. AIRPORT SECURITY REQUIREMENTS/SPECIAL IDENTIFICATION DISPLAY AREA (SIDA) BADGES 14.1 Contractor’s employees may be required to operate in Airport secure areas. Contractor shall be required to obtain the Airport’s Special Identification Display Area (SIDA) badges for any employee working in the secured area. Contractor shall comply, at its own expense, with the Transportation Security Authority (TSA) and the Airport’s security requirements for the Airport including, but not limited to employee training and badges. Contractor shall cooperate with the TSA and the Airport on all security matters and shall promptly comply with any project security arrangements established by the Airport. Compliance with such security requirements shall not relieve Contractor of its responsibility for maintaining proper security for the above-noted items, nor shall it be construed as limiting in any manner Contractor’s obligation with respect to all applicable federal, state and local laws and regulations and its duty to undertake reasonable action to establish and maintain secure conditions at and around the Premises and throughout the Airport. All employees shall be properly badged and comply with all Airport safety and security rules. 14.2 To qualify for the badge, individual must be fingerprinted and have a background investigation completed. In addition, the Airport will conduct a background inquiry and require finger printing of all individuals who will be working on the secured side of the Airport screening point. This may also include collection of appropriate criminal history information, Attachment number 1 \nPage 9 of 20 Item # 5 10 contractual and business associations and practices, employment histories, reputation in the business community and credit reports for the Contractor, as well as, its employees. 14.3 Contractor consents to such an inquiry and agrees to make available to the Airport such books and records the Airport deems necessary to conduct the review. 14.4 Contractor shall pay all costs associated with providing SIDA badges. XV. CONTRACTOR’S OBLIGATIONS The Contractor shall, in good workmanlike manner, do and perform, all work and furnish all supplies and materials, machinery, equipment, facilities, and means, except as herein otherwise expressly specified, necessary, or proper to perform and complete all the Work required by this Contract, within the time herein specified, in accordance with the provisions of this Contract and said Specifications and in accordance with the Drawings of the Work covered by this Contract and any and all supplemental drawings of the Work covered by this Contract. Contractor shall furnish, erect, maintain, and remove such construction, plants, and such temporary works as may be required. Contractor alone shall be responsible for the safety, efficiency, and adequacy of his plants, appliances, and methods, and for any damage which may result from their failure or their improper construction, maintenance, or operation. The Contractor shall observe, comply with, and be subject to all terms, conditions, requirements and limitations of the Contract and Specifications, local ordinances, and state and federal laws; and shall do, carry on, and complete the entire Work. XVI. TEMPORARY SUSPENSION OR DELAY OF PERFORMANCE OF CONTRACT To the extent that it does not alter the scope of this Contract, the County may unilaterally order a temporary stopping of the work, or delaying of the work to be performed by Contractor under this Contract. XVII. GEORGIA PROMPT PAY ACT NOT APPLICABLE The terms of this Contract supersede any and all provisions of the Georgia Prompt Pay Act. Attachment number 1 \nPage 10 of 20 Item # 5 11 XVIII. RIGHT TO INSPECT PREMISES. The County may, at reasonable times, inspect the part of the plant, place of business, or work site of Contractor or any of its subcontractor or subunit thereof which is pertinent to the performance of any Contract awarded or to be awarded. XIX. COUNTY’S RIGHT TO SUSPEND OR TERMINATE WORK 19.1 Termination for Convenience. Upon thirty (30) days’ written notice to Contractor, County may, for its own convenience and at its sole option, without cause and without prejudice to any other right or remedy of County, elect to terminate the Contract by delivering to the Contractor, at the address listed in the Notices section of this Contract, a notice of termination specifying the effective date of termination. 19.2 Termination for Default. If the Contractor is adjudged bankrupt or insolvent, or if he makes a general assignment for the benefit of his creditors, or if a trustee or receiver is appointed for the Contractor or for any of his property, or if he files a petition to take advantage of any debtor’s act or to reorganize under the bankruptcy or applicable laws, or if he repeatedly fails to supply sufficient skilled workers or suitable materials or equipment, payments to Subcontractors or for labor, materials or equipment, or if he disregards laws, ordinances, rules, regulations or orders of any public body having jurisdiction of the Work, or if he otherwise violates any provision of the Contract, then the County may, without prejudice to any other right or remedy and after giving the Contractor and his surety a maximum of seven (7) days from delivery of a written notice, declare the Contract in default, and terminate this Contract. In that even, the County may take possession of the Project and of all materials, equipment, tools, construction equipment and machinery thereon owned by the Contractor, and call upon the surety to finish the Work by whatever method deemed expedient. The County also may finish the work by whatever methods the County deems expedient. The Contractor and its surety shall be liable to the County for any and all damages and costs incurred by the County as a result of any default by the Contractor, including without limitation all costs of completion or correction of the Work, liquidated damages, attorneys’ fee, expert fees, and other costs of dispute resolution. Attachment number 1 \nPage 11 of 20 Item # 5 12 19.3 If Contractor’s services are terminated by County pursuant to subparagraph A or B above, the termination will not affect any rights or remedies of County against Contractor then existing or which may therefore accrue. Any retention or payment of moneys due Contractor by County will not release Contractor from liability. If the Contractor can establish or it is otherwise determined that the Contractor was not in default or that the failure to perform is excusable, a termination for default will be considered to have been a termination for the convenience of the County and the rights and obligations of the parties governed accordingly. 19.4 In case of termination of this Contract before completion of the Work, Contractor will be paid only for materials and equipment accepted by the County and the Work satisfactorily performed through the effective date of termination as determined by the County. In no event shall Contractor be entitled to recover, lost profits, special, consequential or punitive damages, attorney’s fees or costs as a result of said termination. XX. INDEPENDENT CONTRACTOR STATUS AND CONTRACTOR’S PERSONNEL 20.1 The Contractor will supervise and direct the Work, including the Work of all Subcontractors. He will be solely responsible for the means, methods, techniques, sequences, and procedures of construction. An experienced Superintendent and necessary assistants competent to supervise the particular types of work involved shall be assigned to the Project by the Contractor, and shall be available at all times when work is in progress. The name of the Superintendent shall be submitted with qualifications of same prior to start of the Work and shall be approved by the County prior to start of the Work. The Superintendent so named by the Contractor shall be employed by the Contractor and shall have served in a supervisory capacity on at least one Project of like description and size performed by the Contractor during the previous twelve months. Under no circumstances shall an employee of any Subcontractor serve as the Superintendent unless approved by the County. The Superintendent shall represent the Contractor, and all directions given to the Superintendent shall be as binding as if given to the Contractor. Important communications shall be confirmed in writing. Other communications shall be similarly confirmed on written request in each case. Attachment number 1 \nPage 12 of 20 Item # 5 13 20.2 The Contractor shall not change key members of its staff without the consent of the County, unless such staff members prove to be unsatisfactory to the Contractor and cease to be in its employ. If the Contractor intends to change a key staff member (defined as certain full- time personnel stationed at the site including Project Manager, Superintendent, Project Engineer, Assistant Project Manager, Assistant Superintendent, or Assistant Project Engineer) it shall give the County written notice at least fifteen (15) days prior to the intended change. The written notice shall include a description of qualifications for the new proposed key staff member. The County shall have the right to approve or disapprove the proposed key staff member. 20.3 Only persons skilled in the type of work which they are to perform shall be employed. The Contractor shall, at all times, maintain discipline and good order among his employees, and shall not employ on the Work any unfit person or persons or anyone unskilled in the work assigned him. 20.4 The relationship between the County and the Contractor shall be that of owner and independent contractor. Other than the consideration set forth herein, the Contractor, its officers, agents, servants, employees and any Subcontractors shall not be entitled to any County employee benefits including, but not limited to social security, insurance, paid annual leave, sick leave, worker's compensation, free parking or retirement benefits. All services provided by Contractor shall be by employees of Contractor and subject to supervision by Contractor and not as officers or employees of the County. Personnel policies, tax responsibilities, social security payments, health insurance, employee benefits and other administrative policies, procedures or requirements applicable to services rendered under this Contract shall be those of the Contractor, not the County. XXI. ASSIGNMENTS The Contractor agrees it shall not sublet, assign, transfer, pledge, convey, sell, or otherwise dispose of the whole or any part of this Contract or his right, title, or interest therein to any person, firm, or corporation without the previous written consent of the County. If such consent is obtained, the County and the Contractor each binds itself and its partners, successors, executors, administrators, and assigns to the other party of this Contract and to the partners, Attachment number 1 \nPage 13 of 20 Item # 5 14 successors, executors, administrators, and assigns of such other party, in respect to all covenants of this Contract. XXII. ROYALTIES AND PATENTS The Contractor shall hold and save the County and its elected officials, officers, agents, servants, and employees, harmless from liability of any nature or kind, including cost and expenses for, or on account of, any patented or unpatented invention, process, article, or appliance manufactured or used in the performance of the Contract, including its use by the County, unless otherwise specifically stipulated in the Contract. XXIII. LAWS AND REGULATIONS 23.1 The Contractor’s attention is directed to the fact that all applicable federal, state, and County laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the Project shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though herein written out in full. The Contractor shall keep himself fully informed of all laws, ordinances, and regulations in any manner affecting those engaged or employed in the Work or the materials used in the Work or in any way affecting the conduct of the Work and of all orders and decrees of bodies or tribunals having any jurisdiction or authority over same. If any discrepancy or inconsistency should be discovered in this Contract, or in the Drawings or Specifications herein referred to, in relation to any such law, regulation, ordinance, order, or decree, he shall herewith report the same, in writing, to the County. He shall at all times himself observe and comply with all such laws, ordinances, and regulations, and shall protect and indemnify the County and its agents against any such law, ordinance, regulation, order, or decree, whether by himself or by his employees. 23.2 Contractor shall not discriminate against any person in its operations, activities or performance of Work under this Contract. Contractor shall affirmatively comply with all applicable provisions of federal, state and local equal employment laws and shall not engage in or commit any discriminatory practice against any person based on race, age, religion, color, gender, national origin, physical or mental disability, or political affiliation. Contractor shall maintain a Drug Free Workplace. Attachment number 1 \nPage 14 of 20 Item # 5 15 XXIV. PERMITS AND INSPECTION FEES 24.1 Permits shall be secured by the Contractor and inspections will be required, but the County will not charge the Contractor for such permits and inspections obtained from the County. The Contractor shall secure and pay for any permits and inspection fees required by any other governmental entity or agency. 24.2 Prior to execution of this Contract, Contractor shall provide the County with copies of all required licenses, certifications and permits for the Contractor and/or all of Contractor’s employees, personnel, agents or subcontractors performing services that require licensure by the federal government, the State of Georgia, or the County. Contractor hereby warrants and represents that at all times during the Contract Term it shall maintain in good standing all required licenses, certifications, and permits required under federal, state and local laws necessary to perform the services required by this Contract. XXV. PROHIBITED INTERESTS No official of the County who is authorized in such capacity and on behalf of the County to negotiate, make, accept, or approve, or to take part in negotiating, making, accepting, or approving any architectural, engineering, inspection, construction, or material supply contract, or any subcontract in connection with the construction of the Project, shall become directly or indirectly interested personally in this Contract or in any part hereof. No officer, employee, architect, attorney, engineer, or inspector of or for the County who is authorized in such capacity and on behalf of the County to exercise any legislative, executive, supervisory, or other similar functions in connection with the construction of the Project, shall become directly or indirectly interested personally in this Contract or in any part thereof, any material supply contract, subcontract, insurance contract, or any other contract pertaining to the Project. XXVI. SEVERABILITY If any provision of this Contract or the application thereof to any person or circumstance shall to any extent be held invalid, then the remainder of this Contract or the application of such provision to persons or circumstances other than those as to which it is held invalid shall not be Attachment number 1 \nPage 15 of 20 Item # 5 16 affected thereby, and each provision of this Contract shall be valid and enforced to the fullest extent permitted by law. XXVII. CONFLICT IN DOCUMENTS AND PRESENT DOCUMENTS The Contractor shall in no case claim a waiver of any specification requirements on the basis of previous approval of material or workmanship on other jobs of like nature or on the basis of what might be considered “standard” for material or workmanship in any particular location. The Contract for this Project shall govern the Work. If any portion of the Contract shall be in conflict with any other portion, the various documents comprising the Contract shall govern in the following order of precedence: Contract, Change Orders or modifications issued after execution of the Contract; the General Requirements of the Contract; the Specifications; the Drawings; as between schedules and information given on the drawings, the schedules shall govern; as between figures given on Drawings and the scaled measurements, the figures shall govern; as between large-scale Drawings and small-scale Drawings, the larger scale shall govern; and detailed drawings shall govern over general drawings; the Bid Document Package. XXVIII. JUDICIAL INTERPRETATION Should any provision of this Contract require judicial interpretation, it is agreed that the court interpreting or construing the same shall not apply a presumption that the terms hereof shall be more strictly construed against one party by reason of the rule of construction that a document is to be construed more strictly against the party who itself or through its agent prepared same, it being agreed that the agents of all parties have participated in the preparation hereof and all parties have had an adequate opportunity to consult with legal counsel. XXIX. USE OF AUGUSTA, GEORGIA LANDFILL All contracts for contractors performing demolition and/or construction projects for Augusta, Georgia shall contain a provision requiring that all debris, trash and rubble from the project be transported to and disposed of at the Augusta, Georgia Solid Waste Landfill in accordance with local and state regulations. The contractor shall provide evidence of proper disposal through manifests, which shall include the types of material disposed of, the name and location of the disposal facility, date of disposal and all related fees. Attachment number 1 \nPage 16 of 20 Item # 5 17 XXX. GOVERNING LAW This Contract will be construed under Georgia law, including the Georgia Uniform Commercial Code; all remedies available under that code are applicable to this Contract. Contractor and Augusta-Richmond County fix jurisdiction and venue for any action brought with respect to this Contract in Augusta-Richmond County, Georgia. Contractor specifically consents to venue in Richmond County and waives any right to contest the venue in the Superior Court of Richmond County, Georgia or the Southern District Court. XXXI. ENTIRE AGREEMENT This Contract constitutes the sole Contract between the County and the Contractor. No representations oral or written not incorporated herein shall be binding on the parties. No Change Order, Field Order, amendment or modification of this Contract shall be enforceable unless approved by official action as provided in this Contract. XXXII. COUNTERPARTS This Contract may be executed in several counterparts, each of which shall be deemed an original, and all such counterparts together shall constitute one and the same Contract. XXXIII. CAPTIONS The section captions contained in this Contract are for convenience only and do not in any way limit or amplify any term or provision hereof. The use of the terms "hereof," "hereunder" and "herein" shall refer to this Contract as a whole, inclusive of the Attachments, except when noted otherwise. The use of the masculine or neuter genders herein shall include the masculine, feminine and neuter genders and the singular form shall include the plural when the context so requires. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed by their appropriate officials, as of the date first written above. SIGNATURES CONTAINED ON FOLLOWING PAGES Attachment number 1 \nPage 17 of 20 Item # 5 18 OWNER: CITY OF AUGUSTA By______________________________ David S. Copenhaver, Mayor Date: Attest: Lena Bonner, Clerk of Commission Date: AUGUSTA AVIATION COMMISSION, AUGUSTA, GEORGIA By______________________________ Mr. Jay Forrester, Chairman Date Witness Printed Name: Date: SIGNATURES CONTINED ON FOLLOWING PAGE Attachment number 1 \nPage 18 of 20 Item # 5 19 CONTRACTOR: By______________________________ Printed Name: Date: Witness Printed Name: Date: Attachment number 1 \nPage 19 of 20 Item # 5 ATTACHMENT F AUGUSTA RICHMOND COUNTY, GEORGIA Contractor acknowledges that this contract and any changes to it by amendment, modification, change order or other similar document may have required or may require the legislative authorization of the Board of Commissioners and approval of the Mayor. Under Georgia law, Contractor is deemed to possess knowledge concerning Augusta, Georgia's ability to assume contractual obligations and the consequences of Contractor's provision of goods or services to Augusta, Georgia under an unauthorized contract, amendment, modification, change order or other similar document, including the possibility that the Contractor may be precluded from recovering payment for such unauthorized goods or services. Accordingly, Contractor agrees that if it provides goods or services to Augusta, Georgia under a contract that has not received proper legislative authorization or if the Contractor provides goods or services to Augusta, Georgia in excess of the any contractually authorized goods or services, as required by Augusta, Georgia's Charter and Code, Augusta, Georgia may withhold payment for any unauthorized goods or services provided by Contractor. Contractor assumes all risk of non- payment for the provision of any unauthorized goods or services to Augusta, Georgia, and it waives all claims to payment or to other remedies for the provision of any unauthorized goods or services to Augusta, Georgia, however characterized, including, without limitation, all remedies at law or equity." This acknowledgement shall be a mandatory provision in all Augusta, Georgia contracts for goods and services, except revenue producing contracts. This _____ day of _______________, 2012. CONTRACTOR: By______________________________ Printed Name: Date: _________________________________ Secretary (Corporate Seal) Attachment number 1 \nPage 20 of 20 Item # 5 Invitation To Bid Sealed bids will be received at this office on Wednesday, May 23, 2012 @ 3:00 p.m. for furnishing: Bid Item 12-153 Southeast Development Area Access Project for Augusta Regional Airport Bid Item 12-154 Aircraft Rescue Fire Fighting Renovations for Augusta Regional Airport Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications for each project which are non-refundable is: Bid Item 12-153 – Southeast Development Area Access Project $175.00 Bid Item 12-154 – Aircraft Rescue Fire Fighting Renovations $100.00 It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706 722-6488) beginning Thursday, April 12, 2012. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Bid Conference will be held for Bid Item 12-153 – Southeast Development Area Access Project on Tuesday, May 8, 2012 @ 11:00 a.m. in the Procurement Department, 530 Greene Street, Room 605. There will be a mandatory site visit at the airport immediately following the 12:00 p.m. mandatory meeting. A Mandatory Pre Bid Conference will be held for Bid Item 12-154 – Aircraft Rescue Fire Fighting Renovations on Tuesday, May 8, 2012 @ 12:00 p.m. in the Procurement Department, 530 Greene Street, Room 605. There will be a mandatory site visit at the airport immediately following the meeting. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, May 11, 2012 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle April 12, 19, 26, May 3, 2012 Metro Courier April 18, 2012 cc: Tameka Allen Deputy Administrator Gary LeTellier Augusta Regional Airport Clarence Fennell Augusta Regional Airport Revised: 8/15/2011 Attachment number 2 \nPage 1 of 1 Item # 5 VENDORS Attachment B E-Verify # Bid Bond Addendum 1 Base Bid Contract Management 1827 Killingsworth Road Augusta, GA 30904 Yes 225306 Yes Yes $194,815.00 Attaway Construction 3810 Oak Drive Martinez, GA 30907 S. D. Clifton Construction 4324 Wheeler Road Martinez, GA 30907 Yes 212153 Yes Yes $263,400.00 RCN Construction 1115 Frankie Place Court Augusta, GA 30909 Stewart-Corbitt P. O. Box 1256 Thomson, GA 30824 Yes 244173 Yes Yes $242,535.00 RW Allen, LLC 1015 Broad Street Augusta, GA 30901 Courseault Commercial Inc. 2015 Montreal Road Suite 200 Tucker, GA 30084 Yes 24794 Yes Yes $292,551.00 Bid Item #12-154 Aircraft Rescue Fire Fighting Renovations for Augusta, Georgia - Augusta Regional Airport Bid Due: Wednesday, May 23, 2012 @ 3:00 p.m. Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 5 CAMPBELL & PARIS ENGINEERS 313 WINGO WAY MT. PLEASANT, SOUTH CAROLINA 29464 WWW.CAMPBELL-PARIS.COM TEL 843.856.9989/FAX 843.856.2829 June 4, 2012 Mr. Gary Le Tellier, AAE Executive Director Augusta Regional Airport 1501 Aviation Way Augusta, Georgia 30906 RE: ARFF Station Renovations Project Augusta Regional Airport at Bush Field Letter of Recommendation and Bid Analysis Dear Mr. Le Tellier: On May 23, 2012, the City of Augusta’s Procurement Department received four (4) bid proposals for consideration associated with the above referenced project. Each proposal was opened by the Procurement Department’s representative and then reviewed to determine if the bid package was a responsive bid. Each bid was deemed “responsive” and the bid amounts were read aloud. The apparent low bidder was Contract Management, Inc. with a bid price of $193,730.06 for the complete project. The remaining bids were as follows: Stewart-Corbitt General Contracting $242,535.00 SD Clifton Construction $263,399.50 Courseault Commercial $292,551.00 Enclosed is the overall bid analysis with results from the four (4) bidders, as well as a general list of projects completed by the low bidding contractor, Contract Management, Inc. Upon a detailed review of the submitted bids, it was determined Contract Management, Inc.’s Schedule of Unit Prices proposal to contain a few mathematical errors. However, in correcting these errors, Contract Management, Inc. remained the low bid. Reeves Construction Company’s bid amount is approximately 3.9% above the Engineer’s estimate and represents the low bid, whereas, the next low bidder, Stewart-Corbitt General Contracting, bid amount is approximately 30% above the Engineer’s estimate. In reviewing the unit prices of the apparent low bidder, it was determined their unit costs are very competitive. In reviewing Contract Management, Inc.’s (CMI) project references, it was determined: - CMI have been in the construction industry since 1995, - CMI have successfully completed numerous projects in Columbia and Richmond Counties, and - CMI is a local company to Augusta, GA. AI R P O R T P L A N N I N G , D E S I G N A N D C O N S T R U C T I O N M A N A G E M E N T F O R T H E 2 1 ST C E N T U R Y ! Attachment number 4 \nPage 1 of 5 Item # 5 Mr. Gary Le Tellier, AAE Contractor Letter of Recommendation for ARFF Station Renovations Project June 4, 2012 Page 2 of 2 As requested, I received references from CMI of similar type projects and have attached them to this letter. Based upon my conversations with the references, I was informed Contract Management, Inc. satisfactorily and successfully completed all the projects listed. I was further informed each reference would not hesitate to use Contract Management, Inc. again for a project they were capable of performing. Based upon my review it is believed Contract Management, Inc. to be qualified and find no reason they would not perform the specified work satisfactorily. Therefore, it is recommended to proceed in contracting Contract Management, Inc. to perform the ARFF Station Renovations Project. Should you have any questions or need any additional information, please do not hesitate to contact me at 843.856.9989. Sincerely, Campbell & Paris Engineers Jack L. Mayfield, P.E. Vice President cc: Julie Orwen/AGS HD Campbell, Jr./CPE File Attachment number 4 \nPage 2 of 5 Item # 5 Contract Management, Inc. Augusta Regional Airport, ARFF Renovation, Augusta, GA C&PE No. 0733-20 **Project Reference** U.S Department of Energy, Savannah River Site, Aiken SC 315-M Curator Facility Modification Project Title 315-M Curator Facility Modification Contract Type Firm Fixed Contract Prime or Subcontractor Prime Name of Contracting office, Address, Phone, Point of Contact Savannah River Nuclear Solutions Pat Elrod (803) 952-9823 Initial Price Final or Current Price $1,362,674.97 Contract Start Date: 5/2010 Actual Completion Date: 9/2011 Project Description: Contract Management Inc. provided renovation services to upgrade this facility to a museum. Scope of work included: new plumbing, HVAC, fire protection, electrical, insulation, painting, roofing, exterior metal panel, metal stud, drywall, and etc. Richmond County Board of Education, Augusta, GA Warren Road Elementary Renovation Project Title Warren Road Elementary Renovation Contract Type Firm Fixed Contract Prime or Subcontractor Prime Name of Contracting office, Address, Phone, Point of Contact Hancomb/GMK Kevin Drayton (803) 446-1512 Initial Price Final or Current Price $406,361.14 Contract Start Date: 4/2008 Actual Completion Date: 8/2008 Project Description: Contract Management Inc. provided renovation services to upgrade the cafeteria, auditorium, and the kitchen facility. Scope of work included: new plumbing, HVAC, fire protection, electrical, insulation, interior wall, painting, roofing, masonry, kitchen equipment and etc. Attachment number 4 \nPage 3 of 5 Item # 5 Contract Management, Inc. Augusta Regional Airport, ARFF Renovation, Augusta, GA C&PE No. 0733-20 **Project Reference** CMI – Cover Sheet 2 U.S. Department of Energy – Legin Group, Inc., Aiken, SC Miscellaneous General Contracting Project Title General Contracting Task Contract Type Task Order Work Prime or Subcontractor Subcontractor Name of Contracting office, Address, Phone, Point of Contact Legin Group, Inc. Thomas Pruitt (301) 590-0303 Contract Value Multi-Year Contract, Worked To-Date has ranged over $5M+ Contract Start Date: 2003 Actual Completion Date: Current Project Description: Responsible for the handling of construction walk-down, estimating, contract administration, construction management of general and mechanical construction projects. We have performed over 50+ different task order for the Legin Group and the Dept. of Energy under this contract. U.S Coast Guard – Civil Engineer Unit, Tybee Island, GA Renovation Engineering Shop Building Project Title Renovation of Engineering Shop Building Contract Type Firm Fixed Contract Prime or Subcontractor Prime Name of Contracting office, Address, Phone, Point of Contact U.S. Coast Guard - CEU Berta Gomez (305) 278-6722 Initial Price Final or Current Price $436,588.57 Contract Start Date: 11/2008 Actual Completion Date: 10/2009 Project Description: Contract Management Inc. provided renovation services to upgrade this shop building. Scope of work included: new plumbing, HVAC, piping, electrical, wall installation, insulation, painting, concrete, and etc. Attachment number 4 \nPage 4 of 5 Item # 5 MAY 2012 ITEM SPEC. SECTION ITEM DESCRIPTION UNIT QUANTITY CONCRETE SECTION UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST 1 02515.4.2.1 Mobilization/Demobilization LS 1 $1,433.34 $1,433.34 $11,360.00 $11,360.00 $1,500.00 $1,500.00 $5,500.00 $5,500.00 $40,000.00 $40,000.00 2 02221.4.2.0 Contractor Quality Control Program LS 1 $1,000.00 $1,000.00 $6,121.00 $6,121.00 $500.00 $500.00 $3,000.00 $3,000.00 $3,600.00 $3,600.00 3 02221.4.2.1 Miscellaneous Demolition and Removal - Site Work LS 1 $2,000.00 $2,000.00 $2,740.00 $2,740.00 $3,000.00 $3,000.00 $2,400.00 $2,400.00 $2,643.00 $2,643.00 4 02221.4.2.2 Full Depth Pavement Demolition and Removal SY 71 $4.00 $284.44 $36.72 $2,607.12 *$40.00 $2,840.00 $56.50 $4,011.50 *$12.00 $852.00 5 02221.4.2.3 Nominal 2" Depth Cold Mill for Pavement Transition SY 88 $3.00 $265.33 $24.48 $2,154.24 *$70.00 $6,160.00 $31.00 $2,728.00 $10.00 $880.00 6 02300.3.21.A Site Grading and Subgrade Preparation LS 1 $2,000.00 $2,000.00 $2,448.00 $2,448.00 $4,000.00 $4,000.00 $6,600.00 $6,600.00 $1,700.00 $1,700.00 7 02310.5.A.1 Graded Aggregate Base Course - In-place - 6" Depth SY 71 $15.00 $1,066.67 $30.60 $2,172.60 *$15.00 $1,065.00 $12.00 $852.00 $16.00 $1,136.00 8 02400.5 Recycled Asph Conc 12.5mm Superpave, GP 2 Only, Incl Polymer-Modified Bitum Material & H Lime TON 34 $90.00 $3,044.70 $214.20 $7,282.80 *$700.00 $23,800.00 $220.00 $7,480.00 $180.00 $6,120.00 9 02520.3.9.B.1 10" Depth Portland Cement Concrete Pavement SY 71 $95.00 $6,755.56 $91.80 $6,517.80 *$70.00 $4,970.00 $155.00 $11,005.00 $120.00 $8,520.00 10 02701.4.2.A.1 Two (2) 8" Dia. Steel Bollards LS 1 $1,500 $1,500.00 $1,085 $1,084.50 *$700 $700.00 $1,500 $1,500.00 $1,400 $1,400.00 11 Building Renovations LS 1 $167,000 $167,000.00 $149,242 $149,242.00 $194,000 $194,000.00 $218,323 $218,323.00 $225,700 $225,700.00 CONSTRUCTION TOTAL:$186,350.04 $193,730.06 *$242,535.00 $263,399.50 *$292,551.00 * Indicate discrepencies with the Contractor's submitted Bid Form due to arthimetic errors. However, the original apparent low bidder is still the low bidder. The order of bidders also remains the same. AUGUSTA REGIONAL AIRPORT ARFF Renovations BID TABULATION Contract Management Inc.Bleccs Inc. DBA Stewart-Corbitt General Contracting S.D. Clifton Construction Courseaull Commercial Inc. ARFF RENOVATIONS ENGINEER'S ESTIMATE At t a c h m e n t n u m b e r 4 \ n P a g e 5 o f 5 It e m # 5 Attachment number 5 \nPage 1 of 2 Item # 5 Attachment number 5 \nPage 2 of 2 Item # 5 Attachment number 6 \nPage 1 of 1 Item # 5 Attachment number 7 \nPage 1 of 2 Item # 5 Attachment number 7 \nPage 2 of 2 Item # 5 Commission Meeting Agenda 8/7/2012 5:00 PM Alcohol Application Department:Planning & Development Caption:Motion to approve New Application: A. N. 12 - 23: request by Daniel Magana for an on premise consumption Beer license to be used in connection with Bambino's Pizza and Things located at 3706 Mike Padgett Hwy Ste B. District 8. Super District 10. (Approved by Public Services Committee July 30, 2012) Background:This location had a license for 2011. Analysis:The applicant meets the requirements of the City of Augusta's Alcohol Ordinance. Financial Impact:The applicant will pay a pro-rated fee of $317.50. Alternatives: Recommendation:Planning & Development recommends approval. The RCSO recommends approval. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 6 Attachment number 1 \nPage 1 of 2 Item # 6 Attachment number 1 \nPage 2 of 2 Item # 6 Commission Meeting Agenda 8/7/2012 5:00 PM Alcohol Application Department:Planning & Development Caption:Motion to approve New Ownership Application: A. N. 12 - 24: request by Michael Schepis for an on premise consumption Liquor, Beer & Wine license to be used in connection with Oliviana's Pizzeria & Grill located at 399 Highland Ave. There will be Sunday Sales. District 7. Super District 10.(Approved by Public Services Committee July 30, 2012) Background:This is a new ownership application. Formerly the Polka Dot Pig. Analysis:The applicant meets the requirements of the City of Augusta's Alcohol Ordinance. Financial Impact:The applicant will pay a pro-rated fee of $3553.50. Alternatives: Recommendation:Planning & Development recommends approval. The RCSO recommends approval. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 7 Attachment number 1 \nPage 1 of 2 Item # 7 Attachment number 1 \nPage 2 of 2 Item # 7 Commission Meeting Agenda 8/7/2012 5:00 PM Alcohol Application Department:Planning & Development Caption:Motion to approve New Application: A. N. 12 - 25: request by Krista S. Wight for an on premise consumption Liquor, Beer & Wine license to be used in connection with Southeastern Food Service and Event Consulting, LLC located at 1204 Broad St. District 1. Super District 9. (Approved by Public Services Committee July 30, 2012) Background:This is a new application. Analysis:The applicant meets the requirements of the City of Augusta's Alcohol Ordinance. Financial Impact:The applicant will pay a pro-rated fee of $2222.50. Alternatives: Recommendation:Planning & Development recommends approval. The RCSO recommends approval. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 8 Attachment number 1 \nPage 1 of 2 Item # 8 Attachment number 1 \nPage 2 of 2 Item # 8 Commission Meeting Agenda 8/7/2012 5:00 PM Alcohol Application Department:Planning & Development Caption:Motion to approve New Application: A. N. 12 - 26: request by Robert Morrison for an on premise consumption Liquor, Beer & Wine license to be used in connection with Whiskey Bar Kitchen located at 1048 Broad St. There will be Sunday Sales. District 1. Super District 9. (Approved by Public Services Committee July 30, 2012) Background:This is a new application. Analysis:The applicant meets the requirements of the City of Augusta's Alcohol Ordinance. Financial Impact:The applicant will pay a pro-rated fee of $3553.50. Alternatives: Recommendation:Planning & Development recommends approval. The RCSO recommends approval. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 9 Attachment number 1 \nPage 1 of 2 Item # 9 Attachment number 1 \nPage 2 of 2 Item # 9 Commission Meeting Agenda 8/7/2012 5:00 PM Alcohol Application Department:Planning & Development Caption:Motion to approve New Application: A. N. 12 - 27: request by Shailen Patel for an on premise consumption Beer license to be used in connection with Straw Hat Pizza located at 2816 Washington Rd. Ste. 104. District 7. Super District 10. (Approved by Public Services Committee July 30, 2012) Background:This is a new application. Analysis:The applicant meets the requirements of the City of Augusta's Alcohol Ordinance. Financial Impact:The applicant will pay a pro-rated fee of $317.50. Alternatives: Recommendation:Planning & Development recommends approval. The RCSO recommends approval. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 10 Attachment number 1 \nPage 1 of 2 Item # 10 Attachment number 1 \nPage 2 of 2 Item # 10 Commission Meeting Agenda 8/7/2012 5:00 PM APAC Change Order #1 - RWY 17/35 Rehab Department:Augusta Regional Airport Caption:Motion to approve the request to approve APAC Change Order #1, a deductive change order, as approved by the Augusta Aviation Commission at their May 31, 2012 meeting.(Approved by Public Services Committee July 30, 2012) Background:The original scope of work provides for the rehabilitation fo Runway 17-35 at Augusta Regional Airport by APAC-Tennessee, Ballenger Paving Division for a contract amount of $14,256,033.97. Analysis:This change modifies the contract as a result of the reduction in materials at a credit of $9.09. No additional time will be added the the original contract duration. Financial Impact:This is a credit in the amount of $9.09 to the original contract. Alternatives:Deny request. Recommendation:Approve the request. Funds are Available in the Following Accounts: 551-08-1301/54-12110 REVIEWED AND APPROVED BY: Finance. Procurement. Augusta Regional Airport Finance. Procurement. Law. Cover Memo Item # 11 Administrator. Clerk of Commission Cover Memo Item # 11 Page 1 of 5 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION AIRPORT IMPROVEMENT PROGRAM CHANGE ORDER NUMER: 1 or SUPPLEMENATAL AGREEMENT NUMBER: N/A AIRPORT: Augusta Regional Airport DATE: 20 November 2011 OWNER: Augusta Regional Airport AIP PROJECT #: 3-13-0011-033 CONTRACTOR: APAC-Tennessee, Ballenger Paving Division You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the engineer: Item No. Description Unit Unit Price Original Quantity Revised Quantity Original Cost Revised Cost 15A Unclassified Excavation CY $20.41 0 1,400 $0.00 $28,574.00 20 Temporary Silt Fence LF $4.00 18,084 19,834 $72,336.00 $79,336.00 22 Rock Check Dams EA $1,400.00 2 3 $2,800.00 $4,200.00 26B Bituminous Repair Under PCC Slabs TON $110.00 3,000 2,687 $330,000.00 $295,570.00 38 30" Class IV RCP LF $200.00 33 0 $6,600.00 $0.00 39A 42" Class IV RCP LF $259.72 0 33 $0.00 $8,570.76 46A Adjustment of Drainage Structure for 42" RCP EA $575.00 0 1 $0.00 $575.00 49A #2 XHHW Wire for MALSR Lights LF $4.52 0 1,795 $0.00 $8,113.40 52A Electrical Duct under PCC 2W-2" LF $15.58 0 210 $0.00 $3,271.80 54A 4" PVC Protection for FAA Cable LS $3,591.11 0 1 $0.00 $3,591.11 56A New Manhole and Connections to Replace Pull Box EA $9,200.00 0 1 $0.00 $9,200.00 64 L-868 Light Base Can for RWCL or TDZ EA $850.00 377 301 $320,450.00 $255,850.00 64A Labor and Materials for Omitted TDZ Cans EA $123.09 0 76 $0.00 $9,354.84 65A Relocate PAPIs Twice - Temporary EA $1,700.00 0 2 $0.00 $3,400.00 67A Relocate TW Edge Light Twice EA $600.00 0 15 $0.00 $9,000.00 70 Permanent Seeding and Mulching MSF $30.00 940 959 $28,200.00 $28,770.00 72 Sodding SY $4.00 22,813 26,063 $91,252.00 $104,252.00 Total Cost: $851,638.00 $851,628.91 *NOTE: Quantity adjustments for existing contract pay items will be made at contract unit prices. All other costs are considered incidental to this contract modification and will not be measured. Total Contract Amount Original contract total: $14,256,033.97 Previous change order(s) total: $0.00 This change order total: - $9.09 Revised contract total: $14,256,024.88 Attachment number 1 \nPage 1 of 5 Item # 11 Page 2 of 5 Total Contract Time Original contract time: 163 days Changes to contract time from previous change order(s): 0 days Changes to contract time from this change order: 0 days Revised contract time total: 163 days This document shall become an amendment to the contract and all provisions of the contract will apply. JUSTIFICATION FOR CHANGE 1. Brief description of the proposed contract change(s) and location(s). • Item 15A: Unclassified excavation. This work is to re-grade the ditch at the outfall of the 48” RCP (station 39+36, east of RW 17-35). • Item 20: Temporary silt fence: This item will be placed around the additional grading work at the 48” pipe outfall (station 39+36, east of RW 17-35). • Item 22: Rock check dams: This item will be placed at the additional grading work at the 48” pipe outfall (station 39+36). • Item 26B: Bituminous repair under PCC slabs: This item was in the contract to repair damaged portions of the milled asphalt prior to PCC paving. • Item 38: 30” class IV RCP pipe: This item was planned to connect structure SD5 to the existing structure north of TW E at station ± 75+00. • Item 39A: 42” class IV RCP: This item was used to connect structure SD5 to the existing structure north of TW E at station ± 75+00. • Item 46A: Adjustment of drainage structure for 42" RCP: This is structure SD5 located at station 74+77. • Item 49A: #2 XHHW wire for MALSR lights: This cable is located at the MALSR system at both thresholds (stations 20+00 and 100+01). • Item 52A: Electrical duct under PCC 2W-2”: This item is located at TW B and TW D. • Item 54A: 4" PVC protection for FAA cable: This protection is located at either side of TWs B and D. • Item 56A: New manhole and connections to replace pull box: This pull-box is located at station 64+63 on the west side of the runway. Attachment number 1 \nPage 2 of 5 Item # 11 Page 3 of 5 • Item 64: L-868 light base can for RWCL or TDZ: The contract is reduced by 76 TDZ cans, located from 20+00 to 40+00 and from 82+00 to 100+01. • Item 64A: Labor and materials for omitted TDZ cans: This item encompasses 76 locations, from 20+00 to 40+00 and from 82+00 to 100+01. • Item 65A: Relocate PAPIs twice – temporary: This item is off RW 8-26, located at baseline B station 22+00 and 58+10. • Item 67A: Relocate TW edge light twice: This item is located at the radii on TWs C, F, and G. • Item 70: Permanent seeding and mulching: This increase in this item is located along the proposed ditch line, station 39+36, east of RW 17-35. • Item 72: Sodding: The increase in this item is located along the proposed ditch line, station 39+36, east of RW 17-35. 2. Reason(s) for the change(s). • Item 15A: Unclassified excavation: This work is necessary to properly drain water from the new 48” RCP. The pipe profile did not change from that of the original; however, the ditch line slowly elevated over the years and needs re-graded. • Item 20: Temporary silt fence: This item is required to provide erosion and sediment protection while excavating for the ditch line. • Item 22: Rock check dams: This item is required to provide erosion and sediment protection while excavating for the ditch line. • Item 26B: Bituminous repair under PCC slabs: This item is being reduced because the total amount was not necessary for the project. • Item 38: 30” class IV RCP pipe: This item had to be changed to 42” RCP because the existing pipe connecting to structure SD5 was 42”. This was a change from the as-builts used to design the system. • Item 38B: 42” class IV RCP pipe: This pipe replaces the deleted 30” RCP. • Item 46A: Adjustment of drainage structure for 42" RCP: The contractor had to modify SD5 to accommodate the existing 42” RCP. • Item 49A: #2 XHHW wire for MALSR lights: This cable was necessary to re-connect the FAA MALSR system that the contractor demolished and replaced in order to elevate the runway thresholds. Attachment number 1 \nPage 3 of 5 Item # 11 Page 4 of 5 • Item 52A: Electrical duct under PCC 2W-2”: The contractor extended the existing duct bank under one taxiway and replaced the duct under another. The replaced duct was unusable because of a bend in the center and because of its condition. • Item 54A: 4" PVC protection for FAA cable: The taxiway shoulders at B and D were extended 15’ in width; as a result, the existing FAA cable beneath the new pavement had to be protected with conduit. • Item 56A: New manhole and connections to replace pull box: The existing pull-box at station 64+63 was not airport-rated; as a result, the contractor replaced it with an airport- rated manhole of the same design as used elsewhere on the project. The extra cost was to demolish the existing pull-box and to make connections to existing circuits. • Item 64: L-868 light base can for RWCL or TDZ: The contract is reduced by 76 TDZ cans due to the proximity of the cans to construction joints. • Item 64A: Labor and materials for omitted TDZ cans: In lieu of TDZ cans, the contractor ran conduit and counterpoise to the location of future cans in the proposed locations. This work required circular saw cuts and installation of extra PVC pipe at each location. • Item 65A: Relocate PAPIs twice – temporary: This item was included to temporarily remove and replace the RW 8-26 PAPIs. • Item 67A: Relocate TW edge light twice: The increased width of RW 8-26 for temporary operations changed the geometry of the TW turnoffs on TWs C, F, and G. This necessitated the temporary movement of some of the MITLs. • Item 70: Permanent seeding and mulching: This item is for erosion control and re- establishment of grass growth along the new proposed ditch at the 48” pipe outfall. • Item 72: Sodding: This item is for erosion control and re-establishment of grass growth along the new proposed ditch at the 48” pipe outfall. 3. The sponsor’s share of this cost is available from: The net change of this contract modification is negative. 4. If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the latest wage rate decision? Yes No Not applicable 5. Has consent of surety been obtained? Yes Not necessary 6. Will this change affect the insurance coverage? Yes No Attachment number 1 \nPage 4 of 5 Item # 11 Attachment number 1 \nPage 5 of 5 Item # 11 Commission Meeting Agenda 8/7/2012 5:00 PM APAC Change Order #2 - RWY 17-35 Closeout Department:Augusta Regional Airport Caption:Motion to approve APAC - Tennessee Change Order #2 - Closeout of RWY 17-35 Rehab Project as approved by the Augusta Aviation Commission at their May 31, 2012 meeting. (Approved by Public Services Committee July 30, 2012) Background:The original scope of work provides for the rehabilitation of Runway 17-35 at the Augusta Regional Airport, and shall be performed by APAC-Tennessee, Ballenger Paving Division for a contract amount of $14,256,033.97. Change Order #1 reduced the contract amount to $14,256,024.88. This change modifies the original construction documents due to a reduction in the amount of materials required for the construction. Analysis:As a result of the reduction in materials, a credit to the contract amount of $3.40 will be made. Financial Impact:The new Contract Amount will be $14,256,021.48. Five (5) days will be added to the original contract duration. Alternatives:Deny request. Recommendation:Approve APAC-Tennessee, Ballenger paving Division Change order #1 for a credit to the original contract of $3.40. Funds are Available in the Following Accounts: 551-08-1301/54-12110 REVIEWED AND APPROVED BY: Finance. Procurement. Cover Memo Item # 12 Augusta Regional Airport Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 12 Attachment number 1 \nPage 1 of 7 Item # 12 Attachment number 1 \nPage 2 of 7 Item # 12 Attachment number 1 \nPage 3 of 7 Item # 12 Attachment number 1 \nPage 4 of 7 Item # 12 Attachment number 1 \nPage 5 of 7 Item # 12 Attachment number 1 \nPage 6 of 7 Item # 12 Attachment number 1 \nPage 7 of 7 Item # 12 Commission Meeting Agenda 8/7/2012 5:00 PM Choate Contract Modification #8 - New Fixed Base Operation Department:Augusta Regional Airport Caption:Motion to approve the Choate Contract Modification #8 - New Fixed Base Operation (FBO) as approved by the Augusta Aviation Commission at their June 28, 2012 Commission meeting. (Approved by Public Services Committee July 30, 2012) Background:The additional cost for the west side of the building and courtyard are $6,267.39 and $6,776.53, respectively. Quotes were obtained from two other landscapers working at the Airport and their proposed costs were $14,000 and $14, 650. The contract length shall increase by two (2) days. Analysis:Contract Modification #8 is a request for Choate Construction Company to install plants that will increase the level of brilliance in the landscaping on the west side of the building and in the courtyard. The change will include variations in color and more flowering plants. Financial Impact:The original project budget included $100,000.00 in owner contingency for a total project budget of $5,145,461.00. Due to the modifications, the project budget is exceeded by $122,748.09 (2.4%). Alternatives:Deny request. Recommendation:Approve the Choate Construction Company Contract Modification #8 in the amount of $13,043.92. Funds are Available in the Following Accounts: 551-08-1206/54-13130 REVIEWED AND APPROVED BY:Cover Memo Item # 13 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 13 Contract Modification #8 Revised Airport: Augusta Regional Airport Date Initiated: 15 June 12 Owner: City of Augusta Project: New FBO Terminal Contractor: Choate Construction Company Project Number: 0733-17 The contractor is requested to perform the following work described upon receipt of an approved copy of this document or as directed by the engineer. Item # Choate Contract Mod # Description Unit Quantity Line Item Price 1 60 Landscaping - Courtyard LS 1 $6,776.53 2 61 Landscaping – West Side of Building LS 1 $6,267.39 $13,043.92 Total Contract Amount Original Contract Total $5,045,461.00 Previous Contract Modification Total (CM #1 - 7) $209,704.17 This Contract Modification Total (CM #8) $13,043.92 Revised Contract Total $5,268,209.09 Total Contract Time Original Contract Time 250 calendar days Changes to Contract Time from Previous Contract Modifications 58 calendar days Changes to Contract Time from This Contract Modification 2 calendar days Revised Contract Time Total 310 calendar days This document shall become an amendment to the contract and all provisions of the contract will apply. Justification for Change Brief description of the proposed contract changes and locations: 1. Landscaping – Courtyard. This COP is associated with the placement of vegetation in the courtyard area, as well as modifying the irrigation system to ensure growth. This COP is an increase to the contract amount by $6,776.53. Refer to Choate Change Order Proposal #60. 2. Landscaping – West Side of Building. This COP is associated with the placement of vegetation along the west side of the building. This COP is an Attachment number 1 \nPage 1 of 2 Item # 13 increase to the contract amount by $6,267.39. Refer to Choate Change Order Proposal #61. C&PE Project #: 0733-18 Contract Modification # 8 Revised Recommended by: ___________________________________ Campbell & Paris Engineers June 15, 2012 Date Accepted by: ___________________________________ Choate Construction Company ____________ Date Approved by: ___________________________________ Augusta Regional Airport ____________ Date Approved by: _____________________________________ City of Augusta _____________ Date Submit 4 original copies to the City of Augusta. Attachment number 1 \nPage 2 of 2 Item # 13 Estimate Description Amount Landscape Project: as specified Irrigation system Plantings per drawing Mulch Labor 2500 5500 1000 5000 Please call Larry Price with any questions. (706) 868-8696 Total 14,000.00 Clarence Fennell Bush Field Pilots Building Augusta Lawn & Turf, Inc. P.O. Box 212162 Augusta, GA 30917 Phone (706) 868 - 8696 Estimate Date 6/19/12 Attachment number 2 \nPage 1 of 1 Item # 13 Attachment number 3 \nPage 1 of 1 Item # 13 Commission Meeting Agenda 8/7/2012 5:00 PM Construction Advisory Board - appointment Department:Planning & Development Caption:Motion to appoint Mr. Craig Peoples to the Construction Advisory Board for a four-year term to serve as the electrical contractor representative. (Approved by Public Services Committee July 30, 2012) Background:Mr. Sean D’Antignac, who served as the electrical contractor representative, resigned from the Board. Mr. Peoples is a state licensed electrical contractor, the owner of P&T Electric and is a resident of Augusta. Analysis:The Construction Advisory Board consists of eleven members and serves in an advisory capacity on matters pertaining to construction. It will conduct mediation hearings to resolve differences of opinions in the interpretation of all construction codes and inspection procedures. The Board will also serve as a liaison between the City of Augusta and builders, developers, design professionals and other disciplines involved in the building industry… The Construction Advisory Board meets bimonthly beginning in January at the Sand Hills Community Center. Financial Impact:N/A Alternatives:Do not make the appointment Recommendation:Approval Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Cover Memo Item # 14 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 14 Commission Meeting Agenda 8/7/2012 5:00 PM Enterprise Leasing Company D/b/a Alamo Rent-A-Car and National Car Rental Lease Agreement Department:Augusta Regional Airport Caption:Motion to approve the Enterprise Leasing Company d/b/a Alamo Rent-A-Car and National Car Rental lease agreement as approved by the Aviation Commission at their June 28, 2012 meeting. (Approved by Public Services Committee July 30, 2012) Background:Since construction of terminal building the airport has been operating under a temporary agreement with current rental car agencies. Staff has consulted with rental car agency representatives regarding updating of rental agreements and Alamo Rent-A-Car and National Car Rental has returned signed agreement for approval. Analysis:Airport staff has updated the rental car agreements which will allow Enterprise Leasing Company D/b/a Alamo Rent-A-Car and National Car Rental to operate on site at the airport. Once the three year agreement expires it is the desire of airport staff to competitively bid the counter and office space, and the ready return spaces. Financial Impact:The three year agreement with Alamo Rent-A-Car and National Car Rental will generate the following revenue streams for the airport: 1. Commission on rental car gross revenue – $5,000 or 10% whichever is greater on a monthly basis 2. Counter Space Terminal Area – $13,300.00/year or $1,108.33/month or $35/sqft on 380 sqft 3. Ready Return Area – $345/mo for 23 spaces or $15/space Alternatives:Deny request. Recommendation:Approve the Enterprise Leasing Company d/b/a Alamo Rent-A- Car and National Car Rental lease agreement. Funds are Available in the Following Accounts: 551-08-1101/34-92403 551-08-1101/34-92404 551-08-1101/34- 92405 551-08-1101/34-92408 Cover Memo Item # 15 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 15 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 4 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 5 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 6 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 7 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 8 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 9 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 0 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 1 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 2 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 3 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 4 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 5 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 6 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 7 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 8 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 1 9 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 0 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 1 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 2 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 3 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 4 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 5 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 6 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 7 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 8 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 2 9 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 0 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 1 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 2 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 3 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 4 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 5 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 6 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 7 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 8 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 3 9 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 4 0 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 4 1 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 4 2 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 4 3 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 4 4 o f 4 5 It e m # 1 5 At t a c h m e n t n u m b e r 1 \ n P a g e 4 5 o f 4 5 It e m # 1 5 Commission Meeting Agenda 8/7/2012 5:00 PM Georgia State Patrol Hangar (GSP) - Revised Plat Department:Augusta Regional Airport Caption:Motion to approve a revised land lease for the Georgia State Patrol as approved by the Aviation Commission at their June 28, 2012 meeting.(Approved by Public Services Committee July 30, 2012) Background:The Augusta Aviation Commission approved a land lease with an attached plat and leasehold description for the Georgia State Patrol on March 29, 2012 for the construction of a hanger at the Augusta Regional Airport. Analysis:The design development and construction management for the Georgia State Patrol hanger was handled by Augusta-Richmond County Engineering Department. After construction was started it was discovered that the north wall of the hanger was 14’ too close to the plat line and would be in violation of the County’s building code without the addition of a fire wall which would have added a considerable amount of expense to the contract for construction. After discussions with the County Engineer, we agreed to administratively adjust the north plat line by 14’ in order to avoid additional County expense for the project that was well under way. Financial Impact:There is no additional cost or burden to the Airport since the original lines were somewhat arbitrary in the beginning and sufficient room was allocated for future growth of the facility. Alternatives:Deny request. Recommendation:Approve request of the revised land plat for the Georgia State Patrol Hangar. Funds are Available in the Following Accounts: N/A Cover Memo Item # 16 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 16 Attachment number 1 \nPage 1 of 1 Item # 16 Commission Meeting Agenda 8/7/2012 5:00 PM In-Terminal Advertising Bid and Contract - Departure Media, Inc. Department:Augusta Regional Airport Caption:Motion to approve the Bid and Contract with Departure Media, Inc. (DMI) to handle the Airport’s In-Terminal Advertising Concession as approved by the Aviation Commission at their March 31, 2012 and June 28, 2012 meetings. (Approved by Public Services Committee July 30, 2012) Background:The Augusta Regional Airport went through the Augusta Procurement Deaprtment and sent out a bid for the In-Terminal Advertising. Only two companies bid, Departure Media, Inc. and Interspace Advertising - Clear Channel, of which DMI was the lowest bidder. Analysis:The contract with DMI is for 3 years with two (2) additional one (1) year extensions. DMI will purchase the electronic equipment the airport needs for digital advertising and will be reimbursed monthly for the costs so when they leave the airport will own the screens, etc. used for advertising. Financial Impact: Alternatives:Deny request. Recommendation:Approve the bid and contract for In-Terminal Advertising with Departure Media, Inc. Funds are Available in the Following Accounts: 551-08-1101/34-92309 REVIEWED AND APPROVED BY: Finance. Cover Memo Item # 17 Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 17 THIS AGREEMENT (Agreement) made this _____day of ___________, 20___, by and between Augusta, Georgia (Augusta) on behalf of the Augusta Aviation Commission (Commission), an agency of Augusta, Georgia and DEPARTURE MEDIA, INC., a corporation existing under the laws of the state of North Carolina (Concessionaire), authorized to do business in the State of Georgia. WITNESSETH: WHEREAS, the Augusta Regional Airport (Airport) is owned by Augusta, Georgia and operated by the Aviation Commission; and WHEREAS, the Aviation Commission has the right to grant the privilege of concession agreements in accordance with applicable Augusta, Georgia ordinances and subject to the terms and conditions hereinafter set forth; and WHEREAS, Concessionaire is a corporation primarily engaged in the business of advertising; and WHEREAS, both Augusta and Concessionaire desire to enter into this Agreement to provide advertising space for persons desiring to place advertising in the Airport terminal; and NOW THEREFORE, in consideration of the mutual covenants and considerations herein contained, Augusta and Concessionaire hereby agree as follows: SECTION 1 DEFINITIONS; CONSTRUCTION Definitions. Certain capitalized words and terms used in this Agreement are defined in the text herein. The following words and terms are defined terms under this Agreement: 1.1 “Advertiser” shall mean any company, corporation or person purchasing advertising space at the Airport. 1.2 “Airport” shall mean the lands and facilities owned by Augusta and operated by the Aviation Commission known collectively as Augusta Regional Airport, as it now exists and as it may change from time to time. Attachment number 1 \nPage 1 of 38 Item # 17 Advertising Concession and Management Agreement Page 1 of 38 1.3 “Airport Concession Disadvantaged Business Enterprise” or “ACDBE” shall mean, a business, whether it is a corporation, sole proprietorship, partnership or joint venture certified as an ACDBE by the Airport, or State of Georgia, of which at least fifty-one percent (51%) of the interest is owned and controlled by one or more socially and economically disadvantaged individuals as defined in the Airport and Airways Safety and Capacity Expansion Act of 1987 and the regulation promulgated pursuant to 49 CFR Part 23. 1.4 “Airport Executive Director” shall mean Gary LeTellier, or any other such person designated by the Aviation Commission to exercise functions with respect to the rights and obligations of the Aviation Commission under this Agreement. 1.5 “Augusta Aviation Commission” or “Commission” shall mean the Commissioners tasked with the overall administration of the Airport. 1.6 “Augusta, Georgia” or “Augusta” shall mean the governing authority of Augusta- Richmond County, Georgia. 1.7 “Best Management Practices” shall include those environmental or operational standards or guidelines specifying common and accepted practices appropriate for the types of businesses Concessionaire, its contractors, agents or vendors engage in on the Airport or such standards or guidelines as have been articulated by pertinent trade associations, professional associations or regulatory agencies, including (but not limited to) Best Management Practices developed by the Airport cooperation with its tenants, including Concessionaire. Best Management Practices shall be subject to approval by the Airport Director. 1.8 “Common Use Area” shall mean and refer to those portions of the Airport shared equally by all tenants. 1.9 “Concessionaire” shall mean and refer to Departure Media, Inc. (“DMI”). 1.10 “FAA” shall mean the Federal Aviation Administration of the U.S. Government or any federal agencies succeeding to its jurisdiction. Attachment number 1 \nPage 2 of 38 Item # 17 Advertising Concession and Management Agreement Page 2 of 38 1.11 “Gross Advertising Sales” shall mean the amount received by Concessionaire from advertisers or their agencies for the use of advertising facilities under this Agreement and as further defined in Section 10.5. 1.12 “Premises” shall mean those areas of the Airport provided to Concessionaire for advertising displays. 1.13 “Public Areas” shall mean those areas of the Airport not leased to any person, company, or corporation that are open to use by the general public. 1.14 “Rules and Regulations” shall mean those rules, regulations, and ordinances promulgated by the Aviation Commission or operating directives issued by the Airport Director, as the same may be amended, modified, or supplemented from time to time to the extent that such rules, regulations, and ordinances are not in conflict with the purposes of this Agreement. 1.15 “TSA” shall mean the Office of Homeland Security and Transportation Security Administration, or their authorized successor(s). 1.16 “Uncollectibles” shall mean any invoice, which, after commercially reasonable efforts on the part of Concessionaire, remains uncollectible one year after delivery of invoice to Advertiser. SECTION 2 REPRESENTATIONS AND UNDERTAKINGS It is understood and agreed under this Agreement that the Aviation Commission is the operator of the Airport for the use and benefit of the public; that Augusta, Georgia is the owner of the Airport and that Concessionaire may use only those portions of the Airport herein described with only the privileges provided for in this Agreement. 2.1 Representations by Augusta. Augusta makes the following representations and warranties as the basis for the undertakings on its part herein contained: 2.1.1 Creation and Authority. Augusta is a public body corporate and politic, duly created and validly existing under the laws of the State of Georgia. Attachment number 1 \nPage 3 of 38 Item # 17 Advertising Concession and Management Agreement Page 3 of 38 2.1.2 Augusta is the owner of the Premises, has all requisite power and authority under the laws of the State of Georgia (i) grant a concession to the Concessionaire, and (ii) to enter into, perform its obligations under this Agreement and (iii) to exercise its rights under this Agreement. 2.2 Representations by the Concessionaire. The Concessionaire makes the following representations and warranties as the basis for the undertakings on its part herein contained: 2.2.1 Organization and Power. The Concessionaire is a corporation duly organized, validly existing, and in good standing under and by virtue of the laws of the State of North Carolina, is authorized to do business in the State of Georgia, and has all requisite power and authority to enter into this Agreement and perform its obligations and exercise its rights under the same. SECTION 3 GENERAL 3.1 That for and in consideration of the payments and agreements hereinafter mentioned to be made by Concessionaire, Augusta does hereby grant to Concessionaire the right to serve as the national, regional and local Sales Representative for all advertising displays within terminal buildings at the Airport and to solicit and make contracts in the Airport for advertising and exhibit material to be displayed therein. 3.2 The approximate number, types and sizes of advertising and exhibit spaces, and their locations, as well as additional locations as may be authorized from time to time by the Aviation Commission as being available to Concessionaire, are at the sole discretion of the Executive Director. 3.3 Concessionaire shall provide a comprehensive, contemporary and innovative advertising program unique to the Airport that utilizes state-of-the art technology and optimizes advertising effectiveness while minimizing visual clutter. To achieve this objective, the Airport requires the Concessionaire to procure, install and maintain a digital program, with accompanying software, to include eight 55” LCD monitors at mutually agreed upon locations Attachment number 1 \nPage 4 of 38 Item # 17 Advertising Concession and Management Agreement Page 4 of 38 throughout the terminal (the “Monitors”). The Monitors are being leased by Concessionaire for a three year term after which time Concessionaire shall purchase the Monitors for $1 plus any taxes to be calculated at the end of lease the lease purchase term. The Monitors shall be deemed to be fixtures and shall become the sole and exclusive property of the Airport after the expiration of the three year lease purchase term and payment of outstanding balances by the Concessionaire. 3.4 The Airport shall have the right to purchase the digital program software should the parties elect not to exercise the contract renewals. 3.5 Concessionaire shall provide advertising that creatively reflects the character of the Airport and the culture and quality of life in Augusta Richmond County and the Central Savannah Region Area (CRSA). 3.6 Concessionaire shall provide displays that are aesthetically consistent with the Airport’s design and architecture and compatible with Airport operational efficiencies. Concessionaire may procure and install static displays in place of digital displays at the approval of the Airport. 3.7 Concessionaire shall provide timely and effective ongoing and emergency maintenance of all displays. 3.8 Concessionaire shall provide a program and hiring policy that provides opportunities for qualified disadvantaged businesses. 3.9 Concessionaire shall provide a business plan that effectively serves advertisers while providing optimum revenues for the Airport. 3.10 Concessionaire shall adhere to the following operational standards: 3.10.1 Make at least 350 sales calls, either by phone or in person, per Agreement year, which shall be documented by Concessionaire. 3.10.2 Shall focus procuring advertising from local and regional advertisers. Attachment number 1 \nPage 5 of 38 Item # 17 Advertising Concession and Management Agreement Page 5 of 38 3.10.3 Provide architect approved engineering drawings for monitor placement. 3.10.4 Provide maintenance staff with on site availability within twenty-four (24) hours upon Airport or Advertiser request. 3.10.4 Provide graphic guidance to advertisers and obtain written approval by Airport for all graphic designs prior to installation. 3.11 Except as otherwise provided herein, all work shall be at Concessionaire’s sole cost and expense and Concessionaire shall provide all necessary labor, supervision, materials, supplies and transportation. 3.12 All improvements and displays installed by the Concessionaire shall be of high quality, safe, fire resistant materials and shall be aesthetically compatible with Airport design. 3.13 Concessionaire shall upload advertisements to monitors and maintain display inventory in a first-class manner during the entire term of the Agreement. 3.14 Concessionaire shall ensure all advertising material is installed in a timely manner to coincide with advertising contract dates. 3.15 Concessionaire shall supervise the installation of all inventory and advertising displays. 3.16 Concessionaire shall supervise repairs of all inventory and advertising displays as required. 3.17 Concessionaire shall hire local maintenance personnel to service the advertising displays and install and remove advertising artwork; provided, however, all communication regarding repairs and requests are to be made directly to Concessionaire Operations Manager not to local maintenance personnel. 3.18 Concessionaire shall continuously promote the concept of Airport advertising and conscientiously solicit and endeavor to sell international, local, national and regional advertisers Attachment number 1 \nPage 6 of 38 Item # 17 Advertising Concession and Management Agreement Page 6 of 38 and advertising agencies on the use of advertising facilities located in the Airport while maintaining and expanding the customer base. 3.19 Concessionaire will act as an advertising consultant to the Aviation Commission, rendering advice and information regarding the management of advertising displays and sales of advertising. If the Aviation Commission is considering additional types of advertising it shall consult with Concessionaire in order to give Concessionaire a reasonable opportunity to determine if direct competition with concession program is forthcoming. 3.20 Concessionaire shall correctly invoice Advertisers in a prompt, conscientious and professional manner. All checks will be made payable to Concessionaire. 3.21 Concessionaire shall follow up with Advertisers to assist with any that are not current on advertising fees owed. 3.22 Concessionaire shall provide Airport with current advertising contracts, monthly statements showing Advertisers and applicable revenues for the previous month. 3.23 The Concessionaire may install and maintain appropriate informational signs in the areas assigned for advertising, provided however, that the design, installation and maintenance of such signs shall be consistent with the graphic standards and policies of the Airport. All such signage shall be subject to written approval of the Airport prior to installation. 3.24 All advertisement, advertising copy, advertising materials and manners of commercial presentation shall be subject to the reasonable approval of the Airport. The Airport should provide written notice to Concessionaire within five (5) days of submission of graphics sample by Concessionaire. Concessionaire shall not display any advertisements reasonably disapproved by the Airport. Concessionaire shall immediately remove from the Airport, upon written demand, any offensive advertisements. 3.25 Concessionaire shall provide a dedicated Sales Representative, Customer Service Manager, Local Maintenance Manager and a qualified Sales Team as part of this Agreement. 3.26 Concessionaire shall conduct regular research studies to define the lifestyles and psychographics of the Airport’s travelers. Attachment number 1 \nPage 7 of 38 Item # 17 Advertising Concession and Management Agreement Page 7 of 38 3.27 Concessionaire shall work closely with the Airport staff and provide: 3.27.1 Monthly sales reports 3.27.2 Records of maintenance requests 3.27.3 Project Management 3.27.4 Equipment Management 3.27.5 Concept Approval 3.27.6 Recommendations on the best use of space 3.27.7 Reports related to construction, relocation and/or expansion projects. 3.28 Concessionaire shall develop relationships with the local Chambers of Commerce, Convention and Visitors’ Bureaus and other community based organizations to increase awareness of advertising opportunities at the Airport. 3.29 Nothing herein contained shall be deemed to grant the Concessionaire any exclusive right or privilege within the meaning of Title 49-40103 of the United States Code. Without derogation to the Act and subject to the terms and provisions hereof, the Concessionaire shall have the sole right to use the assigned areas for advertising purposes under the provisions of this Agreement. SECTION 4 TERM Effective Date; Term. This Agreement shall become effective on ___________, ____, 2012, for a period of three (3) years (the “Agreement Term”). The term of this Agreement may be extended by mutual agreement for two (2) one year periods upon approval of the Aviation Commission. Attachment number 1 \nPage 8 of 38 Item # 17 Advertising Concession and Management Agreement Page 8 of 38 SECTION 5 AIRPORT PREMISES 5.1 Available Advertising Areas. Advertising displays may be located throughout the public areas of the Terminal as the Concessionaire deems effective. 5.2 No advertising shall be displayed on the outside of the Terminal other than specialty displays during the Master’s Golf Tournament. 5.3 All locations and advertising display units are subject to approval by the Executive Director. Concessionaire may modify advertising display types, locations and quantities only with the Executive Director’s written approval. 5.4 Concessionaire shall use the Premises, the areas designated on Exhibit A, for advertising displays. 5.5 Augusta reserves the right to enter upon the Premises at any time for the purpose of further developing and improving said Premises as it sees fit, regardless of the desires of Concessionaire, and without interference or hindrance, and at Augusta’s sole cost and expense. 5.6 Concessionaire shall not attach any additional posters, pictures, advertisement, signs, or the like on the walls or the counters located in the Airport, without the prior written consent of Augusta. SECTION 6 MAINTENANCE AND REPAIR 6.1 Concessionaire accepts the Premises in their present condition and agrees to maintain the displays on the Premises in good state of repair at all times during the life of this Agreement. 6.2 Concessionaire warrants that it has inspected the Premises and accepts possession of the Premises and any improvements thereon “as is” in its present condition, and subject to all limitations imposed upon the use thereof by the rules and regulations of the FAA, TSA, ordinances of Augusta, and the Airport’s Rules and Regulations. Concessionaire agrees that the Premises are suitable and sufficient for the uses permitted hereunder. Except as may otherwise Attachment number 1 \nPage 9 of 38 Item # 17 Advertising Concession and Management Agreement Page 9 of 38 be provided for herein, Augusta shall not be required to maintain nor to make any improvements, repairs restorations upon or to the Premises or to any of the improvements presently located thereon. Augusta shall never have any obligation to repair, maintain or restore, during the term of this Agreement, any improvements placed upon the Premises by Concessionaire, its successors and assigns. 6.3 Concessionaire, without limiting the generality hereof, shall: 6.3.1 Keep at all times, in a clean and orderly condition and appearance, the Premises, all improvements thereon and all of the Concessionaire’s fixtures, equipment and personal property which are located on any part of the Premises; 6.3.2 Repair any damage caused by Concessionaire or its employees and/ or contractors. SECTION 7 APPROVAL OF ADVERTISING MATERIALS; PLACEHOLDERS 7.1 Approval. All advertising material and exhibit material, advertisements, location and manner of presentation shall be subject to approval by the Aviation Commission through the Airport’s Executive Director. 7.2 Concessionaire will immediately remove from the Airport premises, at its sole cost and expense, upon written demand of the Aviation Commission or the Executive Director, advertising material that may be considered offensive to the general public. In the event that such material is not removed immediately upon receipt of written demand, the Executive Director remove said material or display and Concessionaire will pay any warehouse or storage rental incurred by this action. 7.3 Neither Augusta nor its authorized representatives shall be held responsible or liable for any damage to the equipment or materials so removed. Attachment number 1 \nPage 10 of 38 Item # 17 Advertising Concession and Management Agreement Page 10 of 38 SECTION 8 USE OF PREMISES 8.1 Concessionaire shall not use or occupy or permit the Premises or any part thereof to be used or occupied, no do or permit anything to be done in or on the Premises, in whole or in part, in a manner which would in any way (i) violate any then-applicable legal requirements, or (ii) violate any of the covenants, agreements, provisions and conditions of this Agreement (iii) violate the certificate of occupancy then in force with respect thereto, or (iv) may make it difficult for either Augusta to obtain fire or other insurance required hereunder, or (v) as will constitute a public or private nuisance. 8.2 Concessionaire shall not use or occupy or permit the Premises to be used or occupied, in whole or in part, in a manner which, in Augusta’s reasonable judgment, may or tends to, impair or interfere with (i) the character, reputation or appearance of the Premises or the Airport; or (ii) the use of any other Airport property. 8.3 Concessionaire shall not do or permit or suffer any waste, damages, disfigurement or injury to or upon the Premises or any part thereof. 8.4 In connection with the exercise of its rights under this Agreement, Concessionaire shall not: 8.4.1 Do or permit its agents, employees, directors, or officers to do anything on or about the Airport that may interfere with the effectiveness or accessibility of the drainage and sewage system, electrical system, air conditioning system, fire protection system, sprinkler system, alarm system, and fire hydrants and hoses, if any, installed or located on or within the premises of the Airport. 8.4.2 Bring, keep or store, at any time, flammable or combustible liquids on the premises, except in storage containers especially constructed for such purposes in accordance with federal, state, and county laws, including the Uniform Fire Code and the Uniform Building Code. For the purposes of this Agreement, flammable or combustible liquids shall have the same definitions as set forth in the most recent Uniform Fire Code. Attachment number 1 \nPage 11 of 38 Item # 17 Advertising Concession and Management Agreement Page 11 of 38 8.4.3 Do or permit its agents, employees, directors, or officers to do any act or thing upon the Airport that will invalidate or conflict with any fire or other casualty insurance policies covering the Airport or any part thereof. 8.4.4 Do or permit its agents, employees, directors, or officers to do any act or thing upon the Airport that will jeopardize the Airport's Operating Certificate. 8.4.5 Do or permit its agents, employees, directors, or officers to do any act or thing in conflict with the Airport's Security Plan. 8.4.6 Use the Premises for any illegal purposes, or in violation of FAA, TSA and/or the Airport’s Rules or Regulations, as amended from time to time, or any regulation of any other governmental entity having jurisdiction over the Airport. 8.4.7 Use the Premises in any manner that will create any nuisance or trespass with respect to other tenants; constitute any unreasonable annoyances, obstruction or interference with operations; or in any manner interfere with, obstruct, block or violate in any manner, the navigable airspace above the Airport in compliance with 14 C.F.R. § 77.5 and/or other regulations as implemented by the Airport, the FAA or as may be implemented by the TSA. 8.4.8 Cause or permit any hazardous materials to be placed, stored, generated, used, or disposed of in, on, under, about, or transported from any Airport premises by Concessionaire, its agents, employees, contractors, or other person unless it has complied with the following: with respect to hazardous materials other than cleaning products and/or substances reasonably necessary in connection with Concessionaire's advertising activities, the prior written consent of the Airport Executive Director shall be required, which shall not be withheld unreasonably. Augusta may impose, however, as a condition of such consent, such requirements as Augusta in its sole discretion may deem reasonable or desirable, including, without limiting the generality of the foregoing, requirements as to the manner in which, the time at which, and the contractor by whom such work shall be done, and Concessionaire must comply with all environmental laws and regulations (including compliance with all Environmental Protection Agency requirements concerning clean-up) , and with prudent business practices, with respect to such hazardous materials, and the presence of hazardous materials must be reasonably necessary Attachment number 1 \nPage 12 of 38 Item # 17 Advertising Concession and Management Agreement Page 12 of 38 for the operation of Concessionaire’s business. “Hazardous Material” shall mean: (1) any oil petroleum products, flammable substances, explosives, radioactive materials, hazardous wastes or substances, toxic wastes or substances, or any other wastes, materials, or pollutants that pose a hazard to the Airport premises or surrounding property; or to the safety and/or health of persons on or about the Airport and surrounding property and/or cause Concessionaire’s Premises to be in violation of any federal, state, or local laws governing or regulating hazardous materials; (2) asbestos in any form, urea formaldehyde foam insulation, transformers, or other equipment that contains dielectric fluid containing regulated levels of polychlorinated biphenyls, or radon gas; (3) any chemical, material, or substance defined as or included in the definition of “hazardous substances”, “hazardous waste”, “hazardous material”, “extremely hazardous waste”, “restricted hazardous waste”, “toxic substance”, or similar words under any applicable local, state, or federal laws, or any regulations promulgated pursuant thereto, including, but not limited to: the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA), as amended, 42 U.S.C. §§9601, et seq.; the Hazardous Materials Transportation Act, as amended, 49 U.S.C. §§1801, et seq.; the Federal Water Pollution Control Act (Clean Water Act, or CWA), as amended, 33 U.S.C §§1251 et seq.; the Resource Conservation and Recovery Act (RCRA), as amended, 42 U.S.C. §§6901, et seq.; the Toxic Substances Control Act (TSCA), as amended, 15 U.S.C. §§ 2601, et seq.; (4) any other chemical, material, or substance exposure that is prohibited, limited, or regulated by any government authority, and that may or could pose a hazard to the health and safety of occupants of the Airport, or to any person entering upon the Airport or adjacent property; and/or (5) any other chemical, material, or substance that may or could pose a hazard to the environment or a person. 8.5 Concessionaire shall use the Premises of the Airport in accordance with published Airport Rules and Regulations. Concessionaire specifically agrees to comply with all present or future Rules and Regulations of the Airport that are promulgated for the general safety and convenience of the Airport, its various tenants, invitees, licensees and the general public and which do not materially affect the use and enjoyment of the Premises for the purposes for which they are intended under this Agreement. Said Rules and Regulations may be examined by Concessionaire at the offices of the Airport’s Aviation Services. Attachment number 1 \nPage 13 of 38 Item # 17 Advertising Concession and Management Agreement Page 13 of 38 8.6 Concessionaire shall have rights of ingress and egress to and from the assigned areas, included but not limited to common use roadways, subject to any Rules or Regulations which may have been established or shall be established in the future by the Airport. Such rights of ingress and egress shall apply to the Concessionaire’s employees, customers, agents, contractors, suppliers, and other authorized individuals. 8.7 Employees, agents and contractors of Concessionaire shall be permitted to park at the Facility under the same terms and conditions as employees of other concessionaires at the Facility. Visiting service personnel shall be permitted to park in areas designated for temporary vendor parking. SECTION 9 FACILITIES AND SERVICES TO BE PROVIDED BY AUGUSTA Augusta shall, without cost to Concessionaire: 9.1 Furnish all wall spaces and/or other areas in the condition required to accept video monitors and exhibits in the approximate number, type, standard industry sizes and locations, as well as additional locations, as may from time to time be approved by the Executive Director. 9.2 Supply electrical outlets at each approved location and any additional approved locations if equipment type should require electricity and provide CAT 5 cable or wireless access to the Airport’s internet portal for video monitors. 9.3 Provide electrical current in reasonable amounts for the operation of the video monitors. 9.4 Without incurring any liability for property damage, provide normal police surveillance and protection of the displays against vandalism or trespass and will report to Concessionaire the discovery of any damage or unsightly appearance so client(s) may be notified of any interruption in service and repair(s) can begin. Attachment number 1 \nPage 14 of 38 Item # 17 Advertising Concession and Management Agreement Page 14 of 38 SECTION 10 CONCESSION FEES 10.1 For the privileges herein provided, Concessionaire shall pay Augusta a specified percentage of the Gross Advertising Sales Revenue from advertising opportunities sold by Concessionaire for placement at the Airport for each of the years the Agreement is in effect, based upon the total annual passenger enplanements and deplanements as set forth in Section 10.1.1 (the “Percentage Fee”). The Applicable Percentage shall be determined by the total annual passenger enplanements and deplanements during the immediately preceding calendar year (ending December 31). The Percentage Fee due each month shall be calculated by multiplying the Applicable Percentage set forth in Section 10.1.1 by Concessionaire’s Gross Advertising Sales Revenue for the immediately preceding calendar month. 10.1.1 Concessionaire shall pay the Percentage Fee as outlined below: Total Annual Passenger Enplanements and Deplanements Applicable Percentage less than 300,000 20% 300,001-400,000 25% 400,001-500,000 30% over 500,001 35% 10.2 The Percentage Fee shall be subject to proportional percentage reduction equal to the percentage of passenger traffic decline if enplanements and deplanements at the facility during any calendar quarter of the Term shall fall (10%) or more below those recorded during the same quarter of the previous calendar year; and subject to reduction equal to actual and prospective advertising revenues lost and unearnable from removed advertising locations where ten percent (10%) or more (as a percent of potential advertising revenues based on Concessionaire’s current rate card) of the assigned areas are deleted at the request of the Augusta without the option of replacement locations of at least equal passenger exposure and value. Percentage Fee payment to Airport shall be subject to temporary pro rata reduction equal to Advertiser payments refunded to or withheld by affected advertisers where a display case or Attachment number 1 \nPage 15 of 38 Item # 17 Advertising Concession and Management Agreement Page 15 of 38 other display advertisement in an Assigned Area was visually obstructed or subject to electric supply failure for more than three days without default to Concessionaire. 10.3 Transition Period: Commencement of Percentage Payments. Percentage payments to the Airport shall commence once DMI (i) has received copies of existing advertiser’s contracts from previous concessionaire, (ii) new contracts have been executed between DMI and each existing advertiser, and (iii) existing advertiser monies have been collected. 10.4 Capital investment will be determined by (i) the number of approved locations, (ii) Advertisers’ demand for new advertising options pursuant to executed contracts and (iii) the term of the Agreement. 10.5 The term “Gross Advertising Sales” as used herein shall be defined as the amount received by Concessionaire from advertisers or their agencies for the use of advertising facilities under this Agreement. It is further understood that such Gross Advertising Sales receipts (Gross Receipts) shall not include: 10.5.1 Standard (15%) commissions paid to advertisers’ recognized advertising agencies; 10.5.2 Uncollectibles at year-end; 10.5.3 Any taxes imposed by law which are separately stated to and paid by a customer and directly payable to Augusta; 10.5.4 Expensible charges and fees including but not limited to phone charges, rental fees, maintenance fees, brochure stocking fees, credit card fees, technology fees (i.e., content management including programming and maintenance charges for computer-operated, video, interactive or motion displays, equipment repair or replacement, IT support), production, installation and removal charges; or 10.5.6 Commissions received from vendors for production and fabrication work. Attachment number 1 \nPage 16 of 38 Item # 17 Advertising Concession and Management Agreement Page 16 of 38 10.6 In the event Concessionaire is unable to collect amounts due from Advertisers upon which Concessionaire had previously based Percentage Fee payments after diligent efforts, such “uncollectible amounts” shall be deemed uncollectible and an appropriate adjustment shall be made in Concessionaire’s subsequent statements and Percentage Fee submissions. If any “uncollectible amounts” are collected by Concessionaire after adjustment, then appropriate upward adjustment shall be made to a subsequent revenue statement and Percentage Fee submission, excluding collection costs. 10.7 The first thirty-six (36) payments of the Percentage Fee shall be reduced by one- thirty-sixth (1/36) of the actual cost of the acquisition and installation of the Monitors, but in no event more than One Thousand sixty eight Dollars and eighty three cents ($1068.83) per month. In the event the actual costs exceed $38,478.00, Concessionaire shall receive no further credit or reduction. If the actual costs are less than $38,478.00, Concessionaire shall reduce the credits of the Percentage Fee accordingly. Concessionaire shall provide the Airport with a copy of the lease purchase agreement for monitors being acquired and installed. At the time the Concessionaire’s gross advertising revenues exceed $80,000 per year, credits for acquisition and installation shall no longer be issued to Concessionaire. 10.8 All Percentage Fee payments shall be made on or before the twentieth (20th) day of the calendar month following the calendar month during which the Gross Revenue hereinabove described has been realized. Any and all local taxes, including use, receipts, or similar taxes imposed by law and levied and assessed to Concessionaire as a result of its activities hereunder shall be excluded from the Fee. SECTION 11 CONCESSION REQUIREMENTS The granting of the authority to the Concessionaire to operate at the Airport set forth in this Agreement will be on the following terms and conditions: 11.1 Concessionaire shall provide the highest degree and standards of quality advertising services to the passengers and patrons of the Airport. Attachment number 1 \nPage 17 of 38 Item # 17 Advertising Concession and Management Agreement Page 17 of 38 11.2 Concessionaire shall furnish prompt, efficient, first class service that is adequate to meet all responsible demands for advertising services. SECTION 12 EMPLOYEES OF CONCESSIONAIRE 12.1 Concessionaire shall require all of its employees, subcontractors and/or independent contractors hired by Concessionaire working in view of the public, and about the Airport, to wear clean and neat attire and to display appropriate identification. 12.2 Concessionaire’s employees shall obtain identification badges from the Airport. Concessionaire will be responsible for paying for the cost of Transportation Security Administration (TSA) required employee background checks and badging. SECTION 13 INTEREST ON OVERDUE PAYMENTS There shall be added to all unpaid sums due Augusta an interest charge of one and one- half percent (1.5%) per month on the principal sum, computed as simple interest; at no time will the interest actually charged exceed the highest applicable interest rate permitted under Georgia law. Payments not received when due shall accrue interest from the due date until paid in full. SECTION 14 ACCOUNTING PROCEDURES; AUDIT 14.1 Accounting Procedures. Concessionaire covenants and agrees that it will establish and maintain an accounting system (specifically including all books of account and records customarily used in the type of operation permitted by this Agreement) in full and complete accordance with generally accepted accounting principles and otherwise reasonably satisfactory to the Commission for the determination of any revenue computations, which may be necessary or essential in carrying out the terms of this Agreement. Concessionaire shall maintain its records relating to the operation permitted by this Agreement for a period of at least three (3) years after the end of each Agreement year (or until the close of any ongoing audit thereof being conducted by, or on behalf of Augusta); provided, however, that Augusta may Attachment number 1 \nPage 18 of 38 Item # 17 Advertising Concession and Management Agreement Page 18 of 38 (prior to the expiration of the relevant retention period) request that any such records be retained for a longer period of time, in which case Concessionaire, at its option, may deliver such records into the custody of Augusta. 14.2 Audit. Representative(s) designated by the Executive Director shall be allowed to inspect and audit Concessionaire’s books of accounts and records with reference to the determination of any matters relevant to this Agreement at all reasonable times. Augusta’s representative shall specifically be entitled to inspect and audit any records necessary, in the auditor’s professional discretion, to complete the audit consistent in a manner consistent with Generally Accepted Auditing Standards; provided, however, nothing herein shall authorize Augusta to make any investigation into the expenses or expense structure of Concessionaire except to the extent specifically necessary for the verification of any exclusion from Gross Revenues. The costs of such audit shall be borne by Augusta unless the results of such audit reveal a discrepancy of more than three percent (3%) for any other amount for any twelve (12) month audit period. In the event of such discrepancy, the full cost of the audit shall be borne by the Concessionaire, and Concessionaire shall promptly pay all additional fees owing to Augusta together with interest on such sums from the date originally due until the date paid at the Default Rate. 14.3 In the event that Concessionaire’s books or accounts are not maintained in Augusta-Richmond County, they shall be made available for audit digitally within twenty (20) business days of a request by Augusta, or Concessionaire shall pay in full any travel and related expenses of Augusta representative(s) to travel to the location outside Augusta Richmond County. 14.4 In those situations where Concessionaire’s records have been generated from computerized data (whether mainframe, minicomputer, or PC-based computer systems), Concessionaire agrees to provide Augusta’s representative with extracts of data files in a computer readable format on data disks, electronic mail with attached files or suitable alternative computer data exchange formats. Concessionaire agrees to provide appropriate work space to conduct the audit and free access to copiers; number of Concessionaire’s accounting manager or the like who have a thorough knowledge of the accounting system as it pertains to this Attachment number 1 \nPage 19 of 38 Item # 17 Advertising Concession and Management Agreement Page 19 of 38 Agreement and who will assist Augusta with its audit. Concessionaire will also allow interviews of past and present employees who were or are involved in the financial or operational activities of Concessionaire. SECTION 15 RECORDS TO BE MAINTAINED BY CONCESSIONAIRE 15.1 Concessionaire shall maintain a complete and accurate set of books and records on the business conducted on the Airport and same shall be open to inspection by the Aviation Commission or its representative at any reasonable time so as to ascertain the true amount of Concessionaire’s Gross Revenue from its operation on the Airport. 15.2 Concessionaire shall provide a statement verifying monthly Gross Revenues, as previously reported by Concessionaire to Aviation Commission. Said verification is to be compiled by a competent accountant. SECTION 16 COMPLIANCE WITH LAW Concessionaire agrees that its operation at the Airport shall be conducted in conformity with all local, State, and federal laws and all published Airport Rules and Regulations. It is further agreed that the Executive Director, acting on behalf of Augusta, shall be, at all times, in full and complete charge of the Airport in its entirety and his directions as to policy and procedures shall be final and conclusive as regarding Concessionaire. Concessionaire understands that all operations, uses and occupancy of the Premises must be in strict compliance with all TSA, FAA, Airport Rules and Regulations, grant requirements, and related provisions for Airport use and operations without restrictions or limitations. Concessionaire further agrees that, in the event there is a question of interpretation, it will comply with Augusta’s interpretation of such requirements, rules, laws and regulations. This provision supersedes any other provision of this Agreement which may be in conflict therewith. Any default by Concessionaire shall permit Augusta to immediately terminate the Agreement as a non-exclusive remedy. Attachment number 1 \nPage 20 of 38 Item # 17 Advertising Concession and Management Agreement Page 20 of 38 SECTION 17 DEFAULT AND TERMINATION 17.1 Augusta may terminate this Agreement for any Event of Default, for its convenience or as set forth below: 17.2 Events of Default: The following shall be "Events of Default" under this Agreement constituting a material breach of the Agreement and the terms "Events of Default" and "default" shall mean any one of the following events: 17.2.1 If the Premises are vacated, not utilized or abandoned by the Concessionaire for a period of thirty (30) days or more. 17.2.2 If Concessionaire uses the Premises for unlawful or unauthorized purposes and/or fails to comply with or observe any statute, law, ordinance, rule, regulation, standard or requirement of Augusta, any federal, state or local governmental entity with respect to Concessionaire's occupancy and/or use of the Premises. 17.2.3 If Concessionaire fails to obtain, pay for, and maintain in full force and effect at all times during the life of this Agreement, without any lapse in coverage, such insurance as is required of Concessionaire herein. 17.2.4 If Concessionaire fails to make payments when due hereunder, where such failure shall continue for a period of seven (7) days following service of notice thereof upon Concessionaire by Augusta. 17.2.5 If Concessionaire uses, or permits the use of, the Premises at any time for any purpose which at that time is not authorized by this Agreement. Upon the occurrence of any material default and breach of this Agreement by Concessionaire, Augusta may then immediately, or at any time thereafter, terminate this Agreement by service of a ten (10) days advance written notice to such effect upon Concessionaire and this Agreement shall terminate at 11:59:59 p.m. on the termination date specified within such notice. 17.2.6 The failure by Concessionaire to observe or perform any covenant, condition, or agreement to be observed or performed by Concessionaire in this Agreement. Attachment number 1 \nPage 21 of 38 Item # 17 Advertising Concession and Management Agreement Page 21 of 38 17.2.10 The filing by Concessionaire of a petition in bankruptcy, Concessionaire being adjudged bankrupt or insolvent by any court, a receiver of the property of Concessionaire being appointed in any proceeding brought by or against Concessionaire, Concessionaire making an assignment for the benefit of creditors, or any proceeding being commenced to foreclose any mortgage or other lien on Concessionaire’s interest in the Premises or on any personal property kept or maintained on the Premises by Concessionaire. SECTION 18 REMEDIES 18.1 In addition to, and not in lieu or to the exclusion of, any other remedies provided in the Agreement or to any other remedies available to Augusta at law or in equity, whenever any default (other than a default under Section 17 , above, upon which termination of this Agreement shall, at Augusta’s option, be effective immediately without further notice) continues to be un- remedied in whole or in part for thirty (30) days after Notice of Default is provided by Augusta to Concessionaire (or for fifteen (15) days after Notice of Default in the case of default for failure to pay any fees or other required payment under when due). This Agreement and all of Concessionaire’s rights under it will automatically terminate if the Notice of Default so provides. Upon termination, Augusta may reenter the Premises using such force as may be necessary and remove all persons and Property from the Premises. Augusta will be entitled to recover from Concessionaire all Concession fees and other sum or charge otherwise payable by Concessionaire, or any other payments and damages incurred because of Concessionaire’s default. SECTION 19 NON-WAIVER OF RIGHTS Should Concessionaire breach any of its obligations hereunder, Augusta may thereafter accept from Concessionaire any payment or payments due hereunder, and continue this Agreement in effect, without in any way waiving Augusta’s right to exercise its default rights hereunder, or any other remedies provided by law, for said breach. In addition, any waiver by Augusta of any default, breach, or omission of Concessionaire under this Agreement shall not be construed as a Waiver of any subsequent or different default, breach, or omission. Attachment number 1 \nPage 22 of 38 Item # 17 Advertising Concession and Management Agreement Page 22 of 38 SECTION 20 ASSIGNMENT 20.1 Concessionaire may not, without the prior written consent of Augusta endorsed hereon, assign this Agreement. 20.2 Assignees shall become liable directly to Augusta for all obligations of Concessionaire hereunto, without relieving Concessionaire’s liability. 20.3 It is expressly understood that Concessionaire shall not sell or otherwise change ownership of its advertising business or permit representation by any person or persons other than Concessionaire without the prior written approval of Augusta. SECTION 22 DAMAGE OR DESTRUCTION OF DEMISED PREMISES If the Premises are totally destroyed (or so substantially damaged as to be un-tenantable) by storm, fire, earthquake, or other casualty, this Agreement shall terminate as of the date of such destruction or substantial damage, and all concession fees shall be considered accounted for as between the parties hereunto as of that date. SECTION 23 INSURANCE 23.1 Concessionaire agrees to carry and maintain in force at all times during the Term of this Agreement, at Concessionaire’s sole expense, the insurance described in herein below. 23.2 Concessionaire acknowledges that Augusta has and reserves, the right to amend the insurance requirements imposed by this Agreement at any time, provided that any such amendment is not unreasonable. 23.3 Concessionaire understands and agrees that the minimum limits of the insurance required herein may become inadequate during the term of this Agreement and that, if it in any way, directly or indirectly, contingently or otherwise, affects or might affect the Airport or Augusta, as determined in the sole but reasonable discretion of the Airport Director, Attachment number 1 \nPage 23 of 38 Item # 17 Advertising Concession and Management Agreement Page 23 of 38 Concessionaire will increase such minimum limits by reasonable amounts on written request of the Airport Director, with the concurrence of the Augusta-Richmond County Risk Manager. No such amendment shall reduce the coverage amounts lower than as stated in this Agreement. 23.4 Within (30) days of the publication by the Airport of any such modifications to the foregoing insurance requirements, Concessionaire shall deliver to the Airport insurance certificates certifying compliance with such modified coverage(s). 23.5 No written amendment of this Agreement shall be required to effectuate said increases in minimum limits. 23.6 All insurance required hereunder shall be by companies holding a “General Policyholders Rating” of A or better as set forth in the most current issue of “Best’s Insurance Guide” and shall be issued a company licensed, qualified and authorized to transact business in the State of Georgia. 23.7 Any self-insured retention or deductible on any insurance coverage required shall be declared by Concessionaire and approved by the Airport. 23.8 Concessionaire acknowledges that Augusta is not responsible for the costs of its insurance premiums. 23.9 The insurance policies for coverage listed in this Section shall contain a provision that written notice of cancellation or any material change in policy by the insurer shall be delivered to the Airport no less than thirty (30) days prior to cancellation or change. 23.10 Proof of Insurance. Concessionaire shall provide the Airport with an annual Certificate of Insurance on all required insurance prior to Concessionaire’s exercise of any privileges provided by this Agreement and annually upon the effective date thereafter within thirty (30) days of execution of this Agreement. Concessionaire shall furnish additional Certificates of Insurance, from time to time, upon specific request of the Airport. 23.11 The Augusta Richmond County Commissioners, the Augusta Aviation Commission, and their officers, agents, elected and appointed officials, representatives, Attachment number 1 \nPage 24 of 38 Item # 17 Advertising Concession and Management Agreement Page 24 of 38 volunteers, and employees shall be named as “Additional Insureds” on all required coverage and also shown on the certificate as such. 23.12 General Liability Insurance. General liability insurance with a combined single limit of not less than $ 1,000,000 covering Concessionaire’s operations on Airport premises. The foregoing insurance shall be endorsed to state that it will be primary to Airport’s insurance and that the Concessionaire waives its right of subrogation against the Aviation Commission, Augusta-Richmond County, and their officers, agents, elected and appointed officials, representatives, volunteers, and employees. The Aviation Commission, Augusta-Richmond County and their employees, officers, agents, elected and appointed officials shall be added as additional insureds on said policies. Said policy shall contain Severability of Interest Clause and Contractual Liability coverage at least as broad as that given in the most current CG 00 01 ISO form. 23.13 Workers’ Compensation Insurance. Concessionaire shall provide Workers’ Compensation insurance with statutory limits and employers liability with a limit of $1,000,000 for employees and subcontractors with limits of liability of not less than One Million Dollars ($1,000,000.00) for each accident/disease. Such policy (ies) shall be endorsed to state that the Workers’ Compensation carrier waives its right of subrogation against the Aviation Commission, Augusta-Richmond County, and their officers, agents, elected and appointed officials, representatives, volunteers, and employees. 23.15 Worker’s Compensation Insurance. With employer’s liability coverage of at least $1,000,000 each accident, $1,000,000 each employee and a $1,000,000 disease policy limit. The foregoing insurance shall be endorsed to state that that the workers’ compensation carrier waives its right of subrogation against the Augusta, Georgia Board of Commissioners, their officers, agents, elected and appointed officials, representatives, volunteers, and employees, the Aviation Commission and the Airport. 23.16 Property Insurance. To insure Concessionaire against loss or damage to the existing structure and any improvements due to fire, lightning and all other perils included in standard extended coverage policies, plus vandalism and malicious mischief coverage, all in amounts of not less than ninety percent (90%) of replacement value. Upon request by the Attachment number 1 \nPage 25 of 38 Item # 17 Advertising Concession and Management Agreement Page 25 of 38 Aviation Commission, such replacement value shall be determined by a qualified appraiser, a copy of whose findings shall be submitted to the Risk Manager, and thereafter, proper adjustment in the limits of insurance coverage shall be effected. Said property need not be maintained by Concessionaire, if Concessionaire is renting or leasing improvement and Concessionaire’s Concessionaire maintains the required insurance. The foregoing insurance shall be endorsed to state that the carrier waives its right of subrogation against Augusta, Georgia, the Aviation Commission, the Airport, and their officers, agents, elected and appointed officials, representatives, volunteers, and employees. Augusta, GA and the Aviation Commission shall be named as loss payees on any Property coverage. Said policy shall contain a Severability of Interest clause. 23.18 An insurance binder letter or a Certificate of Insurance must be sent to: City of Augusta Risk Manager 530 Greene Street Room 217 Augusta, Ga. 30901 (706) 821-2502 (Fax) 23.19 Loss Control and Safety. Concessionaire shall retain control over its employees, agents, servants and subcontractors, as well as control over its invitees, and its activities on and about the premises and the manner in which such activities shall be undertaken and to that end, Concessionaire shall not be deemed to be an agent of the Aviation Commission or Augusta. Precaution shall be exercised at all times by Concessionaire for the protection of all persons, including employees and property. Concessionaire shall make special effort to detect hazards and shall take prompt action where loss control/safety measure should reasonably be expected. SECTION 24 INDEMNIFICATION AND HOLD HARMLESS 24.1 Concessionaire agrees to indemnify and hold harmless Augusta and the Augusta Aviation Commission, and their members, officers, elected officials, agents, servants, employees and successors in office against all claims, damages, losses and expenses, including but not limited to attorney's fees, and expenses of litigation incurred by Airport in connection therewith Attachment number 1 \nPage 26 of 38 Item # 17 Advertising Concession and Management Agreement Page 26 of 38 related to or arising out of any damage or injury to property or persons, occurring or allegedly occurring in, on or about Airport property caused by any negligent act or omission of Concessionaire or which arise out of any failure of Concessionaire to perform its obligations hereunder during the period from the date of this Agreement to the end of the Agreement Term or Concessionaire’s operations under this Agreement. 24.2 Concessionaire shall keep, defend and hold harmless Augusta and the Augusta Aviation Commission, and their members, officers, elected officials, agents, servants, employees successors in office, guests, licensees and invitees from and against any and all claims, demands, suits, judgments, costs and expenses asserted by any person or persons, including agents or employees of Concessionaire, by reason of death or injury to persons or loss or damage to property, resulting from Concessionaire’s operations or activities on the Airport, or anything done or omitted by Concessionaire under this Agreement except to the extent that such claims, demands, suits, judgment, costs and expenses may be directly attributed to the sole negligence of the Airport or its agents, employees, directors, or officers. 24.3 In the event of a conflict between the provisions of the Augusta Georgia Code and this Agreement the stringent requirements shall govern. SECTION 25 FEDERAL GOVERNMENT’S EMERGENCY CLAUSE It is understood that, during time of war or national emergency, Augusta shall have the right to lease any and all of the herein described Premises to the United States Government for military use, and if any such lease is executed, the provisions of this instrument insofar as they are inconsistent with the lease of the Government shall be suspended. SECTION 26 SECURITY Concessionaire, its officers, employees, agents, and those under its control, shall comply with security measures required of Augusta or the Aviation Commission by the FAA, TSA, or U. S. Department of Transportation, or contained in any Airport Master Security Plan approved by the TSA, to include an Airport Tenant Security Program as outlined in 49 CFR Part 1542 Attachment number 1 \nPage 27 of 38 Item # 17 Advertising Concession and Management Agreement Page 27 of 38 regarding Concessionaire's Agreement. If Concessionaire, its officers, employees, agents, or those under its control shall fail or refuse to comply with said measures and such noncompliance results in a monetary penalty being assessed against Augusta, then Concessionaire shall be responsible and shall reimburse Augusta in the full amount of any such monetary penalty or other damages, including attorney’s fees and other costs to defend Augusta against such claims. SECTION 27 NON-DISCRIMINATION 27.1 Concessionaire shall furnish its services on a fair, equal and not unjustly discriminatory basis to all users thereof and it shall charge fair, reasonable, and non- discriminatory prices for each unit or service, provided that Concessionaire may be allowed to make reasonable and non-discriminatory discounts, rebates, or other similar type of price reductions to volume purchasers. 27.2 Concessionaire shall make its services available to the public on fair and reasonable terms without discrimination on the basis of race, creed, color, sex, sexual orientation, age, national origin, or disability. 27.3 Non-compliance with the above paragraphs, after written findings, shall constitute a material breach thereof and in the event of such non-compliance, Augusta shall have the right to terminate this Agreement or at the election of Augusta and/or the Commission or the United States, either or both said governments shall have the right to judicially enforce the above paragraphs. 27.4 Concessionaire assures that it will undertake an affirmative action program to ensure that no person shall on the grounds of race, creed, color, national origin, sex, or disability be excluded from participating in any employment activities covered in 49 C.F.R. Part 29, Subpart E, and/or 29 C.F.R. Part 21. Concessionaire assures that no person shall be excluded on these grounds from participating in or receiving the services or benefits of any program or activity covered by this subpart. Concessionaire assures that it will require that its covered sub- organization provide assurances to Concessionaire that they similarly will undertake affirmative Attachment number 1 \nPage 28 of 38 Item # 17 Advertising Concession and Management Agreement Page 28 of 38 action programs and that they will require assurances from their sub-organizations, as required by the aforesaid regulations, to the same effect. 27.5 Concessionaire will maintain open hiring and employment practices and will accept applications for employment in all positions from all qualified individuals. 27.6 Concessionaire will provide to Augusta any information needed in the preparation of reports or documents and other data relative to equal employment. 27.7 Concessionaire shall include similar clauses in any subcontracts and shall cause such subcontractors to include these clauses in any contract related to the provision of services. SECTION 28 AIRPORT CONCESSION DISADVANTAGED BUSINESS ENTERPRISES 28.1 Certification Required. Augusta does not operate a DBE, MBE or WBE Program for Augusta funded projects, as a Federal Court has entered an Order enjoining the Race-Based portion of Augusta’s DBE Program. Instead Augusta operates a Local Small Business Opportunity Program. However, for various projects utilizing the expenditure of State or Federal funds, Augusta enforces DBE requirements and/or DBE goals set by the Federal and/or State Agencies in accordance with State and Federal laws. It is the policy of Augusta to support participation in the Airport Concession Disadvantaged Business Enterprises (ACDBE), as defined in 49 CFR Part 23, in concession activities at the Airport. This Agreement is subject to the provisions of 49 CFR Part 23 as applicable. 28.2 Program. The Airport has established an Airport Concession Disadvantaged Business Enterprise (ACDBE) program in accordance with regulations of the U.S. Department of Transportation (DOT), 49 CFR Part 23. The Airport is a primary airport and has received federal funds authorized for airport development after January 1988 (authorized under Title 49 of the United States Code); and has executed airport grant assurances that it will comply with 49 CFR Part 23. It is the policy of the Airport to ensure that ACDBEs as defined in Part 23, have an equal opportunity to receive and participate in concession opportunities. It is also our policy: Attachment number 1 \nPage 29 of 38 Item # 17 Advertising Concession and Management Agreement Page 29 of 38 28.2.1 To ensure nondiscrimination in the award and administration of opportunities for concessions by airports receiving DOT financial assistance; 28.2.2 To create a level playing field on which ACDBEs can compete fairly for opportunities for concessions; 28.2.3 To ensure that our ACDBE program is narrowly tailored in accordance with applicable law; 28.2.4 To ensure that only firms that fully meet this part’s eligibility standards are permitted to participate as ACDBEs at our airport(s); 28.2.5 To help remove barriers to the participation of ACDBEs in opportunities for concessions at the Airport; and 28.2.6 To provide appropriate flexibility to our Airport in establishing and providing opportunities for ACDBEs. 28.3 Contact. Augusta, on behalf of the Airport, has appointed Brenda Brown, Augusta Regional Airport, 1501 Aviation Way, Augusta Georgia 30906 Telephone: (706) 798- 3236; E-mail: bbrown@augustaga.gov as the Airport Concessionaires DBE Liaison Officer (ACDBELO). In that capacity, Ms. Brown is responsible for implementing all aspects of the DBE program. Implementation of the ACDBE program is accorded the same priority as compliance with all other legal obligations incurred by the Airport in its financial assistance agreements with the Department of Transportation. 28.4 Opportunities for Participation. It is the policy of Augusta to ensure that ACDBE, as defined in 49 CFR Part 23 and other small businesses have an equal opportunity to receive and participate in Department of Transportation (DOT) assisted contracts. Augusta encourages the Concessionaire to make every reasonable effort to maximize contracting opportunities for ACDBE and other small businesses in any construction or architectural changes to the premises and in the procurement of goods and services necessary for the operation of the Concession at this Airport. Attachment number 1 \nPage 30 of 38 Item # 17 Advertising Concession and Management Agreement Page 30 of 38 28.5 Reports. Concessionaire shall submit ACDBE participation reports to Augusta as required for the purpose of demonstrating compliance with 49 CFR Part 23. An ACDBE concession specific goal of three percent (3%) of total gross receipts for concessions has been established for this Agreement. Each Concessionaire shall make good faith efforts, as defined in Appendix A, 49 CFR Part 26, to meet the concession specific goal for ACDBE participation in the performance of this Agreement. The Concessionaire will be required to submit the following information: 28.5.1 Names and addresses of ACDBE firms and suppliers that will participate in the concession; 28.5.2 A description of the work that each ACDBE will perform; 28.5.3 The dollar amount of the participation of each ACDBE firm participating; 28.5.4 Written and signed documentation of commitment to use an ACDBE whose participation it submits to meet a contract goal; 28.5.5 Written and signed confirmation from the ACDBE that it is participating in the concession as provided in the prime Concessionaire’s commitment; and 28.5.6 If the concession goal is not met, evidence of good faith efforts. 28.6 Non-Discrimination in Contracts. Augusta encourages Concessionaire to create and maintain a diverse workforce, contractor and supplier base. The Concessionaire shall not create barriers to open and fair opportunities for minority business enterprises (MBE), women’s business enterprises (WBE), small business enterprises (SBE) and disadvantaged business enterprises (DBE) to participate in all contracts at Augusta and to obtain or compete for contracts and subcontracts as sources of supplies, equipment, construction and services. In considering offers from and doing business with contractors and suppliers, the Concessionaire shall not discriminate on the basis of race, color, creed, religion, sex, age, disability, nationality, marital status, sexual orientation or disability. These requirements apply to all concessions firms and Attachment number 1 \nPage 31 of 38 Item # 17 Advertising Concession and Management Agreement Page 31 of 38 suppliers, including those who qualify as an Airport Concessions Disadvantaged Business Enterprise (ACDBE). SECTION 29 DAMAGE TO AIRPORT Concessionaire shall be liable for any damage to the Airport caused by Concessionaire’s officers, agents, employees, contractors, subcontractors, or anyone acting under its direction and control, ordinary wear and tear excepted. All repairs for which Concessionaire is liable shall be made by Augusta at Concessionaire’s expense. SECTION 30 NOTICES All notices by either party to the other shall be made by depositing such notice in the registered or certified mail, of the United States of America, postage prepaid, and such notice shall be deemed to have been delivered and received on the date of such depositing correctly addressed in the registered or certified mail. All notices to Augusta shall be mailed to: Augusta Aviation Commission Attn: Executive Director 1501 Aviation Way Augusta, GA 30906 With a copy to: Augusta Law Department 501 Greene St. Suite 302 Augusta, GA 30901 All notices to Concessionaire shall be mailed to: Leslie Clark Bensen Departure Media, Inc. PO Box 31577 Charleston, SC 29417 (843) 571-2299 Either party may change the address and name of addressee to which subsequent notices are to be sent by notice to the other given as aforesaid. Attachment number 1 \nPage 32 of 38 Item # 17 Advertising Concession and Management Agreement Page 32 of 38 SECTION 31 LIENS Concessionaire shall cause to be removed promptly any and all liens of any nature arising out of or because of any construction performed by Concessionaire or any of its contractors or subcontractors upon the Airport or arising out of or because of the performance of any work or labor by or for it or them at said premises, reserving the right to contest in court the validity of any such liens. Concessionaire shall have the right to post an appropriate bond to cover its obligations pursuant to this Section. If any person or corporation attempts to assert a Mechanic's Lien against Augusta for improvements made by Concessionaire, Concessionaire shall hold Augusta harmless from such claim, including the cost of defense. SECTION 32 RULES AND REGULATIONS 32.1 Concessionaire shall comply with and shall require its officers and employees and any other persons over whom it has direct control to comply with such Rules and Regulations governing the use of Airport facilities and the access to said facilities pursuant to this Agreement and Augusta’s ordinances which may govern said use and access of the Airport facilities, as may be amended from time to time by the Aviation Commission. 32.2 Concessionaire shall not use or permit to be used any Airport facilities for any purposes or uses other than those specifically authorized by this Agreement, and such other purposes or uses as may be mutually agreed upon in writing. 32.3 Concessionaire shall comply with and shall require its officers and employees and any other persons over whom it has control to comply with such reasonable and nondiscriminatory Rules and Regulations governing the use of Airport facilities pursuant to this Agreement as may from time to time be adopted and promulgated by Augusta or the Aviation Commission, including, but not limited to, security, health, safety, environmental concern, sanitation, and good order, and with such amendments, revisions, or extensions thereof as may from time to time be adopted and promulgated by the Aviation Commission. The Airport Attachment number 1 \nPage 33 of 38 Item # 17 Advertising Concession and Management Agreement Page 33 of 38 Director will provide a copy of the initial Rules and Regulations to Concessionaire within thirty (30) days of the date of this Agreement. 32.4 Concessionaire's right of access to the Airport shall be subject to security considerations and all federal, State, and local laws or regulations and all Airport rules, regulations, and ordinances now in effect or hereinafter adopted or promulgated. 32.5 Concessionaire shall, at all times, comply with any and all present and future laws, ordinances, and general rules or regulations of any public or governmental entity pertaining to its operations at the Airport now or at any time during the term that this Agreement is in force. SECTION 33 SURVIVAL Concessionaire’s obligations under this Article shall survive the expiration or earlier termination of this Concession Agreement. No modification, termination or surrender to Augusta of this Agreement or surrender of the Premises or any part thereof, or of any interest therein by Concessionaire, shall be valid or effective unless agreed to and accepted in writing by Augusta, and no act by any representative or agent of Augusta, other than such written agreement and acceptance, shall constitute an acceptance thereof. SECTION 34 ENTIRE AGREEMENT This Agreement contains the entire agreement of the parties and no representation, inducements, promises, or agreement, oral or otherwise, between the parties not embodied herein shall be of any force or effect. No failure of Augusta to exercise any power at variance with the terms hereof shall constitute a waiver of Augusta’s right to demand exact compliance with the terms hereof. SECTION 35 GOVERNING LAW This Agreement and all disputes arising hereunder shall be governed by the laws of the State of Georgia. Attachment number 1 \nPage 34 of 38 Item # 17 Advertising Concession and Management Agreement Page 34 of 38 SECTION 36 VENUE All claims, disputes, and other matters in question between Augusta and Concessionaire arising out of or relating to this Agreement, or the breach hereof, shall be decided in the Superior Court of Richmond County, Georgia. Concessionaire, by executing this Agreement, specifically consents to jurisdiction and venue in Augusta-Richmond County and waives any right to contest jurisdiction and venue in the Superior Court of Richmond County, Georgia or the United States District Court for the Southern District of Georgia, Augusta Division. SECTION 37 ATTORNEY’S FEES If Augusta is reasonably required to obtain counsel to enforce any of its rights under this Agreement or to collect its fees and charges, the Commission shall be entitled to recover from Concessionaire reasonable attorney’s fees incurred by it in connection with such proceedings. SECTION 38 MISCELLANEOUS PROVISIONS 38.1 No purported or alleged waiver of any of the provisions of this Agreement shall be valid or effective unless in writing signed by the party against whom it is sought to be enforced. 38.2 Captions herein are for convenience or reference only and in no way define, limit or expand the scope or intent of this Agreement. Whenever the context hereof shall so require, the singular shall include the plural, the male gender shall include the female, and vice versa. 38.3 Counterparts. This Agreement may be executed in two or more counterparts, all of which together shall constitute but one and the same Agreement. In the event that one or more of the provisions hereof shall be held to be illegal, invalid or enforceable, such provisions shall be deemed severable and the remaining provisions hereof shall continue in full force and effect. 38.4 Nothing contained in this Agreement shall be construed to be a waiver of Augusta’s sovereign immunity. Attachment number 1 \nPage 35 of 38 Item # 17 Advertising Concession and Management Agreement Page 35 of 38 38.5 It is specifically agreed between the parties executing this Agreement that it is not intended by any of the provisions of this Agreement to create in the public or any member thereof, third party beneficiary status in connection with the performance of the obligations herein. 38.6 Nothing contained in this Agreement shall be construed to be a waiver of any individual's qualified good faith immunity. 38.7. Covenants Bind and Benefit Successors and Assigns. The provisions of this Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permitted assigns; provided, however, that no one shall have any benefit or acquire any rights under this Agreement pursuant to any conveyance, transfer, or assignment in violation of any of its provisions. 38.8 Open Records. The Concessionaire acknowledges that all records relating to this Agreement and the services to be provided under this Agreement may be a public record subject to Georgia’s Open Records Act (O.C.G.A. § 50-18-70, et seq.). Concessionaire shall cooperate fully in responding to such request and making all records, not exempt, available for inspection and copying as provided by law. Concessionaire shall notify Augusta immediately of any request made under the Open Records Act and shall furnish Augusta with a copy of the request and the response to such request. IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and year first above written. Augusta, Georgia Augusta Aviation Commission: By: By: Mayor Chairman Date: Date: Attachment number 1 \nPage 36 of 38 Item # 17 Advertising Concession and Management Agreement Page 36 of 38 Attest: Lena Bonner, City Clerk Date: Signed this _____day of _________, 2012 in the presence of: DEPARTURE MEDIA, INC. __________________________________ ________________________________ Witness By: Leslie C. Bensen President Approved as to content: By: Gary LeTellier, Airport Director Approved as to form: By: Andrew Mackenzie, General Counsel Date: ___________________________ Attachment number 1 \nPage 37 of 38 Item # 17 Advertising Concession and Management Agreement Page 37 of 38 ATTACHMENTS Attachment number 1 \nPage 38 of 38 Item # 17 Request for Proposal Request for Proposals will be received at this office until Wednesday, February 29, 2012 @ 3:00 p.m. for furnishing: RFP Item #12-119 Concessions for Advertising for Augusta Regional Airport RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, February 14, 2012 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 90 days after time has been called on the date of opening. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Bidders are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle January 19, 26, February 2, 9, 2012 Metro Courier January 25, 2012 cc: Tameka Allen Deputy Administrator Gary LeTellier Augusta Regional Airport Diane Johnston Augusta Regional Airport Revised: 8/15/2011 Attachment number 2 \nPage 1 of 1 Item # 17 VENDORS Attachment B E-Verify # Addendum 1 Original 6 Copies Fee Proposal Clear Channel Airports 4635 Crackersport Road Allentown, PA 18104 Yes 40635 Yes Yes Yes Yes Departure Media Airport Advertising P.O. Box 31577 Charleston, SC 29417 Yes LBEN8900 Yes Yes Yes Yes Red Wolf, Inc P. O. Box 16554 Augusta, GA 30919 Team 1 Advertising 206 Jackson Avenue North Augusta, SC 29841 B.A.S. Rotary, LLC 346 Handsmill Road, Building 8 Belleplain, NJ 08270 Wierhouse 1124 Broad Street Augusta, GA 30901 Corey Aiport Services 225 Corey Center SE, Suite 1 Atlanta, GA 30312 No Bid Response Hall Marketing, Inc 519 Blackburn Drive Martinez, GA 30907 No Bid Response The Alison Group 2743 Perimeter Parkway Building 200 Suite 200 Augusta, GA 30909 RFP Item #12-119 Concessions for Advertising for Augusta, Georgia - Augusta Regional Airport RFP Due: Wednesday, February 29, 2012 @ 3:00 p.m. Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 17 EVALUATION CRITERIA: Pts. Clear Channel Airports 4635 Crackersport Rd Allentown, PA 18104 Departure Media Airport Advertising 29 Leinbach Drive, Bldg C, Unit 4 Charleston, SC 29407 1) Completeness of the proposal.5 4.7 5.0 2) Proponent's management capabilities and experience in managing the specific type of concession(s). The successful proponent(s) shall have been in business for at least five (5) years with a demonstrated ability to provide service, financing and monetary commitment to successfully operate provide advertising services. 25 16.7 21.7 3) Proponent's financial capability, responsibility and resources. The Proponent should provide such financial data as the Proponent demonstrating the ability to perform the services hereunder and to disclose regarding its current or past business ventures. Such financial data may be in the form of audited or unaudited financial statements, income statements, balance sheets or current Dun & Bradstreet summary. 20 16.7 16.7 4) Proponent's reputation and character. Please provide the names, addresses and telephone numbers for three (3) business references. 10 7.7 10.0 5) Proponent's Concept and Operational plans.30 21.7 25.0 6) Any other factors the Evaluation Committee deems relevant, including, but not limited to: a) The ability, capacity, and skill of the proponent to perform the contract or provide the services required; b) The capability of the proponent to perform the contract or provide the service promptly or within the time specified, without delay or interference; c) The character, integrity, reputation, judgment, experience, and efficiency of the proponent; d) The quality of performance on previous contracts; e) The previous and existing compliance by the proponent with laws and ordinances relating to the contract or services; f) The sufficiency of the financial resources of the proponent relating to his ability to perform the contract; g) The quality, availability, and adaptability of the supplies or services to the particular use required; and 10 6.7 10.0 TOTAL 100 74.0 88.3 Cumulative Evaluation Sheet - RFP Item #12-119 Concessions for Advertising For the City of Augusta - Augusta Regional Airport Friday, March 16,2012 @ 9:30 a.m. Comments: Attachment number 4 \nPage 1 of 1 Item # 17 Attachment number 5 \nPage 1 of 1 Item # 17 The Alison Group Attn: Mark Alison 2743 Perimeter Parkway Building 200 Suite 220 Augusta, GA 30909 Departure Media Attn: Leslie Bensen P. O. Box 31323 Charlotte, NC 28231 Clear Channel Airports Attn: Daniel Soria 4635 Crackersport Road Allentown, PA 18104 Corey Airport Services Attn: Steve Moody 225 Corey Center SE, Suite 1 Atlanta, GA 30312 Team 1 Advertising Attn: Stephen Johnston 206 Jackson Avenue North Augusta, SC 29841 Red Wolf, Inc. Attn: Rhain Swain-Giboney P. O. Box 16554 Augusta, GA 30919 Hall Marketing, Inc. Attn: John Hall 519 Blackburn Dr. Martinez, GA 30907 Wierhouse 1124 Broad Street Augusta, GA 30901 B.A.S. Rotary, LLC Attn: Michael Lagana 346 Handsmill Road, Building 8 Belleplain, NJ 08270 Gary LeTellier Augusta Regional Airport Diane Johnston Augusta Regional Airport Yvonne Gentry Augusta LSBOP Office Freeman Mathis & Gary, LLP Attn: Pamela Everett 661 Forest Parkway Suite E Forest Park, Ga. 30297 RFP #12-119 Concessions for Advertising For Augusta Regional Airport Mailed Out January 19, 2012 RFP #12-119 Concessions for Advertising For Augusta Regional Airport RFP Due: Wed Feb 29 2012 @ 3:00 PM Attachment number 6 \nPage 1 of 1 Item # 17 Attachment number 7 \nPage 1 of 3 Item # 17 Attachment number 7 \nPage 2 of 3 Item # 17 Attachment number 7 \nPage 3 of 3 Item # 17 Commission Meeting Agenda 8/7/2012 5:00 PM Integrated Telecommunication System for Trade, Exhibit and Event Center Department:Recreation, Parks and Facilities Caption:Motion to approve the expenditure of SPLOST funds dedicated to the New TEE Center in the amount of $42,479.15 for the purchase, installation and startup of all scope associated with the new integrated telecommunication system. (Approved by Public Services Committee July 30, 2012) Background:The TEE Center is currently under construction. Sole sourcing of the new telephone system is recommended in order to maintain standardization with existing equipment and systems. Analysis:Approving expenditures for Allied Communications will move the purchase, installation and startup forward with minimal telephone integration issues. Financial Impact:The cost for implementing the telecommunication integration scope is $42,479.15. Present SPLOST funds support the equipment's purchase, installation and startup. Alternatives:1. To Approve the execution of expenditures with Allied Communications from budgeted SPLOST funds in the amount of $42,479.15 for the purchase, installation and startup of the new telephone integration system. The firm was recommended as the sole source supplier in order to maintain standardization with existing systems. 2. Move No Action thus delaying the installation of the telecommunication system by approximately 12 weeks. Recommendation:1. To Approve the expenditure of SPLOST funds in the amount of $42,479.15 and execute an agreement with Allied Commuunications for the TEE Center. It is recommended that this scope be sole sourced in order to maintain standardization with existing systems at the site. Funds are Available in the Following 325051120 - 206351102 Cover Memo Item # 18 Accounts: REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 18 Attachment number 1 \nPage 1 of 5 Item # 18 Attachment number 1 \nPage 2 of 5 Item # 18 Attachment number 1 \nPage 3 of 5 Item # 18 Attachment number 1 \nPage 4 of 5 Item # 18 Attachment number 1 \nPage 5 of 5 Item # 18 Commission Meeting Agenda 8/7/2012 5:00 PM Jamestown Community Park Improvements Department:Recreation, Parks and Facilities Caption:Motion to approve an agreement with Augusta, Georgia and the Sandridge Community Association (SCA) for Capital Improvement Projects at Jamestown Community Park. (Approved by Public Services Committee July 30, 2012) Background:The SCA has maintained an operational agreement with Augusta, Georgia since 1998. The SCA and Augusta, Georgia have previously entered into a mutual agreement in 2007 to work jointly to make needed capital improvements to this facility. Analysis:The SCA is contemplating making capital improvements to the Jamestown Community Park, as per the attached list of projects and estimated costs associated with this work, at a not to exceed cost of $32,260.00. Funding will be made available as outlined in the attached agreement and follows the established guidelines for dispersal of SPLOST funds, also attached. Financial Impact:The cost of these improvements is set at a not to exceed cost of $32,260.00 and is currently available as part of SPLOST VI funded projects administered through the Department of Recreation, Parks and Facilities. Alternatives:1. To Approve the agreement between the Sandridge Community Association and Augusta, Georgia. 2. Move No Action. Recommendation:1. To Approve. Funds are Available in the Following Accounts: 328061110 - 211066801 REVIEWED AND APPROVED BY:Cover Memo Item # 19 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 19 Attachment number 1 \nPage 1 of 7 Item # 19 Attachment number 1 \nPage 2 of 7 Item # 19 Attachment number 1 \nPage 3 of 7 Item # 19 Attachment number 1 \nPage 4 of 7 Item # 19 Attachment number 1 \nPage 5 of 7 Item # 19 Attachment number 1 \nPage 6 of 7 Item # 19 Attachment number 1 \nPage 7 of 7 Item # 19 Commission Meeting Agenda 8/7/2012 5:00 PM Reeves Construction Change Order #5 - Front Door Parking Lot Improvement Department:Augusta Regional Airport Caption:Motion to approve Reeves Construction Change Order #5 - Front Door Parking Improvement Project as approved by the Augusta Aviation Commission at their May 31, 2012 meeting.(Approved by Public Services Committee July 30, 2012) Background:The original scope of wok provides for the construction of the Front Door Parking Lot Improvements at Auusta Regiona Airport and shall be performed by Reeves Construction for a contract amount of $4,310,823.10. This contract modification modifies the original construction documents due to a design modification associated with the consversion of the current valet parking lot. Analysis:This contract modification modifies the original construction documents due to a design modification associated with the consversion of the current valet parking lot. Financial Impact:As a result to this design modification, an additional $18,343.00 will be made to the contract. contract time will increas by 3 calendar days. Alternatives:Deny request Recommendation:Approve Reeves Construction Change Order #5 in the amount of $18,343.00 which increases the original contract amount and timeline. Funds are Available in the Following Accounts: 551-08-1201/54-12110 REVIEWED AND APPROVED BY: Cover Memo Item # 20 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 20 Attachment number 1 \nPage 1 of 2 Item # 20 Attachment number 1 \nPage 2 of 2 Item # 20 Commission Meeting Agenda 8/7/2012 5:00 PM Reeves Contract Modification #6 – Front Door Parking Lot Improvement Project Department:Augusta Regional Airport Caption:Motion to approve Reeves Contract Modification #6 - Front Door Parking Lot Improvement Project as approved by the Aviation Commission at their June 28, 2012 Meeting. (Approved by Public Services Committee July 30, 2012) Background:The original scope of work provides for the construction of the Front Door Parking Lot Improvements at the Augusta Regional Airport, and shall be performed by Reeves Construction for a contract amount of $4,310,823.10. This contract modification modifies the original construction documents to include the relocation of mature oak trees from the construction area to other areas on the airport. Analysis:Because of the uncertainty of survival, the original intent was to cut these trees and use younger trees along the west side of Aviation Way. The relocated trees are of sufficient size to match the size of the existing trees. Financial Impact:The additional cost of this modification is $8,800.00. The contract time will not increase. Alternatives:Deny request. Recommendation:Approve Reeves Construction Contract Modification #6 - Front Door Parking Lot Improvement Project in the amount of $8,800.00. Funds are Available in the Following Accounts: 551-08-1201/54-12110 REVIEWED AND APPROVED BY:Cover Memo Item # 21 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 21 Attachment number 1 \nPage 1 of 2 Item # 21 Attachment number 1 \nPage 2 of 2 Item # 21 Commission Meeting Agenda 8/7/2012 5:00 PM Southeast Development Area Access Project – Augusta Regional Airport at Bush Field Department:Augusta Regional Airport Caption:Motion to approve the Southeast Development Area Access Project - Augusta Regional Airport at Bush Field bid awarded to Beam's Contracting, Inc. as approved by the Aviation Commission at their June 28, 2012 meeting. (Approved by Public Services Committee July 30, 2012) Background:The project consists of constructing a new roadway and utility corridor in order to access a portion of the Airport which is currently undeveloped. A portion of this roadway includes General Perry Smith Parkway. Analysis:On May 30, 2012, Augusta-Richmond County Procurement received three (3) responsive bid proposals. The apparent low bidder was Beam’s Contracting, Inc. with a bid price of $4,035,194.91 for the complete project. Upon reviewing Beam’s Contracting, Inc’s, detailed bid and references, they are believed to be qualified and find no reason why they would not perform the specified work satisfactorily. The overall bid analysis is attached. Financial Impact:A not to exceed bid price of $4,035,194.91. Alternatives:Deny request. Recommendation:Approve Beam’s Contracting, Inc. for the Southeast Development Area Access Project at a cost not to exceed $4,035,194.91. Funds are Available in the Following Accounts: 328-08-1130/54-12110-210351001 REVIEWED AND APPROVED BY: Cover Memo Item # 22 Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 22 MAY 2012 Bid Tab from May 30, 2012 Bid Opening ITEM SPEC. SECTION ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST 1 MD-3.1 Mobilization/Demobilization LS 1 $406,835.53 $406,835.53 $108,271.00 $108,271.00 $283,000.00 $283,000.00 $201,362.00 $201,362.00 2 MD-3.2 Performace Bonds and Labor & Materials Payment Bonds LS 1 $30,000.00 $30,000.00 $43,067.00 $43,067.00 $135,000.00 $135,000.00 $50,000.00 $50,000.00 3 MD-3.3 Project Insurance LS 1 $20,000.00 $20,000.00 $7,465.00 $7,465.00 $100.00 $100.00 $50,000.00 $50,000.00 4 MD-3.4 Engineer and Contractor Offices and Staging Area LS 1 $50,000.00 $50,000.00 $65,909.00 $65,909.00 $30,000.00 $30,000.00 $50,000.00 $50,000.00 5 MD-3.5 Maintenance of Traffic LS 1 $50,000.00 $50,000.00 $100,041.00 $100,041.00 $35,000.00 $35,000.00 $100,000.00 $100,000.00 6 MD-3.6 Construction and Maintenance of Haul Routes LS 1 $20,000.00 $20,000.00 $7,500.00 $7,500.00 $35,000.00 $35,000.00 $20,000.00 $20,000.00 7 02221.4.2.1 Miscelaneous Demolition/Removal LS 1 $15,000.00 $15,000.00 $5,063.00 $5,063.00 $10,000.00 $10,000.00 $30,000.00 $30,000.00 8 02221.4.2.2 Full Depth Pavement Demolition/Removal SY 207 $5.00 $1,035.00 $8.58 $1,776.06 $6.00 $1,242.00 $25.00 $5,175.00 9 02221.4.2.3 Variable Depth Cold Mill SY 2,102 $2.50 $5,255.00 $2.33 $4,897.66 $4.65 $9,774.30 $5.00 $10,510.00 10 02221.4.2.4 Demolish/Remove Existing AOA Fence LF 2,120 $10.00 $21,200.00 $2.81 $5,957.20 $5.75 $12,190.00 $6.00 $12,720.00 11 02221.4.2.5 Demolish/Remove Existing Guardrail LF 496 $25.00 $12,400.00 $5.32 $2,638.72 $2.80 $1,388.80 $5.00 $2,480.00 12 02221.4.2.6 Demolish/Remove Existing 24" to 36" Pipe LF 206 $50.00 $10,300.00 $3.25 $669.50 $20.65 $4,253.90 $15.00 $3,090.00 13 02221.4.2.7 Demolish/Remove Existing 60" CMP Pipe LF 145 $75.00 $10,875.00 $3.56 $516.20 $31.00 $4,495.00 $25.00 $3,625.00 14 02230-4.2.1 Clear/Grubb AC 30 $7,500.00 $225,000.00 $3,628.00 $108,840.00 $3,600.00 $108,000.00 $2,000.00 $60,000.00 15 02230-4.2.2 Clear Existing Drainage Ditch AC 1 $9,000.00 $9,000.00 $3,628.00 $3,628.00 $17,000.00 $17,000.00 $15,000.00 $15,000.00 16 02230.3.21.A Unclassified Excavation CY 94,250 $8.00 $754,000.00 $3.97 $374,172.50 $2.90 $273,325.00 $10.00 $942,500.00 17 02230.3.21.C Subgrade Preparation SY 29,661 $2.00 $59,322.00 $1.00 $29,661.00 $0.90 $26,694.90 $3.00 $88,983.00 18 02304-9.1 Cement Treated Base - 8" depth SY 18,491 $14.00 $258,874.00 $12.34 $228,178.94 $11.35 $209,872.85 $13.00 $240,383.00 19 02304-9.2 Cement Treated Base - 6" depth SY 4,978 $12.00 $59,736.00 $13.85 $68,945.30 $13.00 $64,714.00 $12.00 $59,736.00 20 02304-9.3 Portland Cement for Cement Treated Base TON 884 $150.00 $132,600.00 $126.00 $111,384.00 $112.00 $99,008.00 $110.00 $97,240.00 21 02400.1 Asph Conc 12.5mm SuperPave, GP 2 Only, Incl. Polymer-Modified Bitum Material & H Lime TON 6,504 $105.00 $682,920.00 $87.69 $570,335.76 $79.00 $513,816.00 $85.00 $552,840.00 22 02400.2 Asph Conc 19mm SuperPave, GP 2 Only, Incl. Bitum Material & H Lime TON 6,941 $100.00 $694,100.00 $80.18 $556,529.38 $66.50 $461,576.50 $70.00 $485,870.00 23 02413-1 Bituminous Tack Coat GAL 4,438 $8.00 $35,504.00 $3.75 $16,642.50 $3.65 $16,198.70 $4.00 $17,752.00 24 02310.5.A.1 6" Depth Graded Aggregate - incl material SY 1,802 $12.00 $21,624.00 $6.13 $11,046.26 $7.25 $13,064.50 $12.00 $21,624.00 25 02630.4.2.A.1 18" Reinforced Concrete Pipe, Class III LF 1,051 $35.00 $36,785.00 $33.25 $34,945.75 $43.55 $45,771.05 $56.00 $58,856.00 26 02630.4.2.A.2 30" Reinforced Concrete Pipe, Class III LF 50 $50.00 $2,500.00 $54.98 $2,749.00 $69.25 $3,462.50 $76.00 $3,800.00 27 02630.4.2.A.3 36" Reinforced Concrete Pipe, Class III LF 2,710 $63.00 $170,730.00 $62.49 $169,347.90 $71.25 $193,087.50 $88.00 $238,480.00 28 02630.4.2.A.4 42" Reinforced Concrete Pipe, Class III LF 108 $100.00 $10,800.00 $82.97 $8,960.76 $99.55 $10,751.40 $155.00 $16,740.00 29 02630.4.2.A.5 60" Reinforced Concrete Pipe, Class III LF 103 $180.00 $18,540.00 $132.54 $13,651.62 $178.75 $18,411.25 $200.00 $20,600.00 30 02630.4.2.A.6 84" Reinfoced Concrete Pipe, Class IV LF 1,300 $375.00 $487,500.00 $260.24 $338,312.00 $305.00 $396,500.00 $350.00 $455,000.00 31 02630.4.2.A.7 Type I Trapezoidal Concrete Paved Ditch LF 1,581 $90.00 $142,290.00 $95.53 $151,032.93 $90.00 $142,290.00 $100.00 $158,100.00 32 02630.4.2.A.8 Concrete Paved Low-flow Channel LF 260 $50.00 $13,000.00 $29.92 $7,779.20 $53.00 $13,780.00 $60.00 $15,600.00 32A 02630.4.2.A.9 24" Reinforced Concrete Pipe, Class III LF 29 $51.00 $1,479.00 $37.56 $1,089.24 $60.00 $1,740.00 $72.00 $2,088.00 33 02630.4.2.B.1 Precast Storm Sewer Manhole Structure - STD 1011A VF 18 $300.00 $5,400.00 $337.06 $6,067.08 $475.00 $8,550.00 $560.00 $10,080.00 34 02630.4.2.B.2 Ditch Drop Inlet Structure VF 105 $325.00 $34,125.00 $345.09 $36,234.45 $415.00 $43,575.00 $550.00 $57,750.00 35 02630.4.2.B.3 Curb Inlet VF 10 $500.00 $5,000.00 $484.69 $4,846.90 $488.00 $4,880.00 $520.00 $5,200.00 36 02630.4.2.B.4 Special Design Drainage Structure EA 3 $25,000.00 $75,000.00 $12,255.00 $36,765.00 $17,200.00 $51,600.00 $15,000.00 $45,000.00 37 02630.4.2.C.1 Tapered Headwall - 18" dia. EA 2 $1,500.00 $3,000.00 $832.75 $1,665.50 $620.00 $1,240.00 $675.00 $1,350.00 38 02630.4.2.C.2 Tapered Headwall - 18" dia. - Modified with Trash Rack EA 1 $3,500.00 $3,500.00 $2,098.00 $2,098.00 $1,245.00 $1,245.00 $1,200.00 $1,200.00 39 02630.4.2.C.3 Tapered Headwall - 36" dia. EA 5 $2,500.00 $12,500.00 $2,113.00 $10,565.00 $1,060.00 $5,300.00 $1,400.00 $7,000.00 40 02630.4.2.C.4 Tapered Outlet Headwall - 42" dia. EA 1 $3,500.00 $3,500.00 $2,447.00 $2,447.00 $4,125.00 $4,125.00 $1,700.00 $1,700.00 41 02630.4.2.C.5 Tapered Outlet Headwall - 60" dia. EA 1 $5,000.00 $5,000.00 $6,121.00 $6,121.00 $7,300.00 $7,300.00 $2,800.00 $2,800.00 BEAM'S CONTRACTING REEVES CONSTRUCTION MASASANNA CONSTRUCTION ROADWAY DEVELOPMENT AUGUSTA REGIONAL AIRPORT Southeast Development Area Access Project SCHEDULE OF UNIT PRICES ENGINEER'S ESTIMATE At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 2 It e m # 2 2 42 02630.4.2.C.6 Tapered Headwall - 84" dia. EA 1 $7,000.00 $7,000.00 $12,063.00 $12,063.00 $16,200.00 $16,200.00 $4,000.00 $4,000.00 43 02630.4.2.C.7 Pond Outlet Control Structure EA 1 $3,500.00 $3,500.00 $5,275.00 $5,275.00 $9,945.00 $9,945.00 $10,000.00 $10,000.00 44 02630.4.2.C.8 Standard Frame and Cover EA 2 $1,250.00 $2,500.00 $281.44 $562.88 $325.00 $650.00 $600.00 $1,200.00 45 02630.4.2.C.9 Fabricated Safety Grate for Ditch Drop Inlets EA 18 $750.00 $13,500.00 $2,463.43 $44,341.74 $1,065.00 $19,170.00 $1,200.00 $21,600.00 45A 02630.4.2.C.10 Safety End Section - Concrete - 24" Dia. EA 2 $751.00 $1,502.00 $924.00 $1,848.00 $1,275.00 $2,550.00 $1,800.00 $3,600.00 46 02162-5.1 7' High Security Fence w/ Barbed Wire and Mow Guard LF 1,605 $40.00 $64,200.00 $45.81 $73,525.05 $41.00 $65,805.00 $20.00 $32,100.00 47 02162-5.2 12' Manual Swing Gate EA 1 $2,000.00 $2,000.00 $1,153.10 $1,153.10 $1,325.00 $1,325.00 $1,500.00 $1,500.00 48 02162-5.3 24' Manual Swing Gate EA 1 $2,500.00 $2,500.00 $2,194.00 $2,194.00 $2,600.00 $2,600.00 $2,500.00 $2,500.00 49 02635.5.1 Permanent Timber Barricade LF 87 $150.00 $13,050.00 $35.00 $3,045.00 $45.00 $3,915.00 $20.00 $1,740.00 50 03300.4.2.A.1 30" Type 7 Curb and Gutter LF 2,530 $25.00 $63,250.00 $17.02 $43,060.60 $24.35 $61,605.50 $14.00 $35,420.00 51 03300.4.2.B.1 Type 7 Integral Reinforced Concrete Median Islands SY 49 $100.00 $4,900.00 $64.27 $3,149.23 $83.00 $4,067.00 $30.00 $1,470.00 52 03300.4.2.B.2 4" Concrete Pavement, incl. base SY 130 $50.00 $6,500.00 $50.76 $6,598.80 $47.00 $6,110.00 $50.00 $6,500.00 53 03300.4.2.B.3 5" Reinforced Concrete Apron for Headwalls, incl. base SY 31 $75.00 $2,325.00 $59.25 $1,836.75 $150.00 $4,650.00 $200.00 $6,200.00 54 03300.4.2.C.1 Reinforced Concrete Pipe Collar EA 2 $1,000.00 $2,000.00 $2,444.00 $4,888.00 $3,500.00 $7,000.00 $5,000.00 $10,000.00 55 16123.4.2.A.1 4W-6" Concrete Encased Conduit LF 470 $25.00 $11,750.00 $20.25 $9,517.50 $86.00 $40,420.00 $54.00 $25,380.00 56 16123.4.2.A.2 1W-4" Concrete Encased Conduit LF 1,105 $12.00 $13,260.00 $15.25 $16,851.25 $8.25 $9,116.25 $18.00 $19,890.00 57 02510-5.2.1 Encasement Pipe - 12" LF 225 $50.00 $11,250.00 $109.83 $24,711.75 $48.75 $10,968.75 $125.00 $28,125.00 58 02510-5.2.2 Connection to 16" Existing Waterline - Tapping Sleeve and Valve EA 2 $5,500.00 $11,000.00 $13,293.00 $26,586.00 $15,200.00 $30,400.00 $10,000.00 $20,000.00 59 02510-5.2.3 8" Water Line - DIP LF 3,978 $40.00 $159,120.00 $25.62 $101,916.36 $27.65 $109,991.70 $28.00 $111,384.00 60 02510-5.2.4 Fire Hydrant Assembly EA 5 $5,000.00 $25,000.00 $3,503.05 $17,515.25 $4,800.00 $24,000.00 $3,000.00 $15,000.00 61 02510-5.2.5 8" Gate Valve EA 7 $1,300.00 $9,100.00 $988.67 $6,920.69 $1,715.00 $12,005.00 $2,800.00 $19,600.00 61A 02510-5.2.6 16" Water Line - DIP LF 860 $75.00 $64,500.00 $58.95 $50,697.00 $66.40 $57,104.00 $55.00 $47,300.00 61B 02510-5.2.7 16" Gate Valve EA 1 $8,000.00 $8,000.00 $5,305.00 $5,305.00 $7,445.00 $7,445.00 $3,500.00 $3,500.00 62 02530-4.2.A.1 Connection to Existing Sanitary Sewer MH EA 1 $5,000.00 $5,000.00 $1,199.70 $1,199.70 $3,235.00 $3,235.00 $7,500.00 $7,500.00 63 02530-4.2.B.1 8" PVC Sanitary Sewer Pipe LF 800 $55.00 $44,000.00 $28.88 $23,104.00 $24.90 $19,920.00 $44.00 $35,200.00 64 02530-4.2.A.2 Sanitary Sewer Manholes EA 3 $2,200.00 $6,600.00 $1,800.00 $5,400.00 $1,255.00 $3,765.00 $3,800.00 $11,400.00 65 10425.4.2.A.1 Monument Sign M.1, complete and in-place LS 1 $35,000.00 $35,000.00 $42,000.00 $42,000.00 $20,900.00 $20,900.00 $7,500.00 $7,500.00 66 02701.4.2.A.1 Highway signs, type 1 material, reflective sheeting type III SF 55 $31.00 $1,705.00 $20.25 $1,113.75 $14.00 $770.00 $14.00 $770.00 67 02701.4.2.A.2 Highway signs, type 1 material, reflective sheeting type IV SF 162 $35.00 $5,670.00 $24.75 $4,009.50 $16.00 $2,592.00 $18.00 $2,916.00 68 02701.4.2.B.1 Galvanized steel posts, type 7 LF 235 $17.00 $3,995.00 $10.15 $2,385.25 $6.00 $1,410.00 $7.00 $1,645.00 69 02701.4.2.B.2 Galvanized steel posts, type 8 LF 205 $20.00 $4,100.00 $12.40 $2,542.00 $8.00 $1,640.00 $8.00 $1,640.00 70 02580-3.3.A.1 Thermoplastic Traffic Stripe SY 1,370 $25.00 $34,250.00 $30.37 $41,606.90 $27.00 $36,990.00 $27.00 $36,990.00 71 02580-3.3.B.1 Thermoplastic Pavement Marking, Words, and Symbols - Type I EA 4 $250.00 $1,000.00 $112.50 $450.00 $100.00 $400.00 $100.00 $400.00 72 02580-3.3.B.2 Thermoplastic Pavement Marking, Words, and Symbols - Type II EA 14 $250.00 $3,500.00 $73.15 $1,024.10 $65.00 $910.00 $65.00 $910.00 73 02580-3.3.B.3 Raised Reflective Markers EA 200 $5.00 $1,000.00 $4.50 $900.00 $4.00 $800.00 $4.00 $800.00 74 02456.5.1 Indentation Rumble Strips - ground in place (skip) GLM 1.25 $2.50 $3.13 $1,688.00 $2,110.00 $2,985.00 $3,731.25 $2,500.00 $3,125.00 75 02935.3.3 Stormwater Pollution Prevention Plan LS 1 $9,000.00 $9,000.00 $10,000.00 $10,000.00 $10,100.00 $10,100.00 $10,000.00 $10,000.00 76 02161-5.1 Silt Fence LF 12,400 $6.00 $74,400.00 $2.76 $34,224.00 $3.25 $40,300.00 $2.50 $31,000.00 77 02161-5.2 Construction Entrance EA 1 $2,500.00 $2,500.00 $1,415.00 $1,415.00 $1,800.00 $1,800.00 $1,500.00 $1,500.00 78 02161-5.3 Check Dam EA 5 $1,500.00 $7,500.00 $377.45 $1,887.25 $495.00 $2,475.00 $280.00 $1,400.00 79 02161-5.4 Outlet Protection SY 547 $100.00 $54,700.00 $35.28 $19,298.16 $52.00 $28,444.00 $75.00 $41,025.00 80 02920.4.2.1.A.1 Permanent Seeding and Mulching AC 30 $2,500.00 $75,000.00 $1,856.00 $55,680.00 $1,500.00 $45,000.00 $800.00 $24,000.00 81 02920.4.2.1.A.2 Temporary Seeding and Mulching AC 30 $11.00 $330.00 $1,688.00 $50,640.00 $200.00 $6,000.00 $600.00 $18,000.00 82 02920.4.2.1.B.1 Sodding SY 509 $10.00 $5,090.00 $5.56 $2,830.04 $6.00 $3,054.00 $4.00 $2,036.00 ENGINEER'S ESTIMATE $5,492,279.66 BEAM'S CONTRACTING TOTAL $4,035,194.91 REEVES CONSTRUCTION TOTAL $4,059,602.60 MASASANNA CONSTRUCTION TOTAL $4,890,000.00 It should be noted the total amount for Beam's Contracting was in error. The actual amount is $300.30 less than the amount shown in the bid tab. The amount shown on this page has been corrected. At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 2 It e m # 2 2 Invitation To Bid Sealed bids will be received at this office on Wednesday, May 23, 2012 @ 3:00 p.m. for furnishing: Bid Item 12-153 Southeast Development Area Access Project for Augusta Regional Airport Bid Item 12-154 Aircraft Rescue Fire Fighting Renovations for Augusta Regional Airport Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications for each project which are non-refundable is: Bid Item 12-153 – Southeast Development Area Access Project $175.00 Bid Item 12-154 – Aircraft Rescue Fire Fighting Renovations $100.00 It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706 722-6488) beginning Thursday, April 12, 2012. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Bid Conference will be held for Bid Item 12-153 – Southeast Development Area Access Project on Tuesday, May 8, 2012 @ 11:00 a.m. in the Procurement Department, 530 Greene Street, Room 605. There will be a mandatory site visit at the airport immediately following the 12:00 p.m. mandatory meeting. A Mandatory Pre Bid Conference will be held for Bid Item 12-154 – Aircraft Rescue Fire Fighting Renovations on Tuesday, May 8, 2012 @ 12:00 p.m. in the Procurement Department, 530 Greene Street, Room 605. There will be a mandatory site visit at the airport immediately following the meeting. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, May 11, 2012 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No Bid may be withdrawn for a period of 60 days after time has been called on the date of opening. A 10% Bid bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle April 12, 19, 26, May 3, 2012 Metro Courier April 18, 2012 cc: Tameka Allen Deputy Administrator Gary LeTellier Augusta Regional Airport Clarence Fennell Augusta Regional Airport Revised: 8/15/2011 Attachment number 2 \nPage 1 of 1 Item # 22 VENDORS Attachment B E-Verify # Bid Bond Addendum 1 Base Bid Reeves Construction 1 APAC Industrial Way Augusta, GA 30907 Yes 48048 Yes Yes $4,059,602.60 Masasanna Construction 135 Celtic Blvd Tyrone, GA 30290 Yes 139279 Yes Yes $4,890,000.00 Beam's Contracting 1530 Atomic Road Beech Island, SC 29842 Yes 167300 Yes Yes $4,035,495.21 Bid Item #12-153 Southeast Development Area Access Project for Augusta, Georgia - Augusta Regional Airport Bid Due: Wednesday, May 30, 2012 @ 3:00 p.m. The following vendor did not respond: RW Allen, LLC / 1015 Broad Street / Augusta, GA 30901 Page 1 of 1 Attachment number 3 \nPage 1 of 1 Item # 22 Attachment number 4 \nPage 1 of 2 Item # 22 Attachment number 4 \nPage 2 of 2 Item # 22 Attachment number 5 \nPage 1 of 2 Item # 22 Attachment number 5 \nPage 2 of 2 Item # 22 C A M P B E L L & P A R I S E N G I N E E R S 313 WINGO WAY MT. PLEASANT, SOUTH CAROLINA 29464 WWW.CAMPBELL-PARIS.COM TEL 843.856.9989/FAX 843.856.2829 June 15, 2012 Mr. Gary Le Tellier, AAEExecutive Director Augusta Regional Airport 1501 Aviation WayAugusta, Georgia 30906 RE:Southeast Development Area Access Project Augusta Regional Airport at Bush FieldLetter of Recommendation and Bid Analysis Dear Mr. Le Tellier: On May 30,2012,the City of Augusta’s Procurement Department received three (3) bid proposals for consideration associated with the above referenced project. Each proposal was opened by the Procurement Department’s representative and then reviewed to determine if thebid package was a responsive bid.Each bid was deemed “responsive” and the bid amounts were read aloud. The apparent low bidder was Beam’s Contracting, Inc.with a bid price of$4,035,194.91 for the complete project.The second low bidder,Reeves ConstructionCompany’s bid price was $4,059,602.60, and the third low bidder, Masasanna Construction’s bid price was $4,890,000.00. Enclosed is the overall bid analysis with results from the three (3) bidders, as well as a general list of projects completed by the low bidding contractor,Beam’s Contracting, Inc. Upon adetailed review of the submitted bids,it was determined all of the Bidder’s Schedule of Unit Prices proposals to be mathematically correct and was prepared in accordance with the contract documents. Beam’s Contracting, Inc’s bid amount is approximately 26.5% below the Engineer’s estimate and represents the low bid, whereas,the next low bidder, Reeves Construction Company’s bidamount is approximately 26%below the Engineer’s estimate.In reviewing the unit prices of the apparent low bidder,it was determined their unit costs are very competitive. In reviewing Beam’s Contracting, Inc’s (BCI)project references, it was determined: -BCI have been in the construction industry since 1978,-BCI have successfully completed numerous projects in the CSRA, including the City of Augusta-Richmond County, Fort Gordon, City of North Augusta and the Georgia Department of Transportation, and-BCI has over 125 employees. A I R P O R T P L A N N I N G , D E S I G N A N D C O N S T R U C T I O N M A N A G E M E N T F O R T H E 2 1 S T C E N T U R Y ! Attachment number 6 \nPage 1 of 4 Item # 22 Mr. Gary Le Tellier, AAE Contractor Letter of Recommendation forSoutheast Development Area Access Project June 15, 2012 Page 2 of 2 Therefore, based upon my review it is believed Beam’s Contracting, Inc.to be qualified and findno reason they would not perform the specified work satisfactorily. Should you have any questions or need any additional information, please do not hesitate tocontact me at 843.856.9989. Sincerely,Campbell & Paris Engineers Jack L. Mayfield, P.E. Vice President cc:Julie Orwen/AGS Clarence Fennell/AGS HD Campbell, Jr./CPEFile Attachment number 6 \nPage 2 of 4 Item # 22 MAY 2012 Bid Tab from May 30, 2012 Bid Opening ITEM SPEC. SECTION ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST 1 MD-3.1 Mobilization/Demobilization LS 1 $406,835.53 $406,835.53 $108,271.00 $108,271.00 $283,000.00 $283,000.00 $201,362.00 $201,362.00 2 MD-3.2 Performace Bonds and Labor & Materials Payment Bonds LS 1 $30,000.00 $30,000.00 $43,067.00 $43,067.00 $135,000.00 $135,000.00 $50,000.00 $50,000.00 3 MD-3.3 Project Insurance LS 1 $20,000.00 $20,000.00 $7,465.00 $7,465.00 $100.00 $100.00 $50,000.00 $50,000.00 4 MD-3.4 Engineer and Contractor Offices and Staging Area LS 1 $50,000.00 $50,000.00 $65,909.00 $65,909.00 $30,000.00 $30,000.00 $50,000.00 $50,000.00 5 MD-3.5 Maintenance of Traffic LS 1 $50,000.00 $50,000.00 $100,041.00 $100,041.00 $35,000.00 $35,000.00 $100,000.00 $100,000.00 6 MD-3.6 Construction and Maintenance of Haul Routes LS 1 $20,000.00 $20,000.00 $7,500.00 $7,500.00 $35,000.00 $35,000.00 $20,000.00 $20,000.00 7 02221.4.2.1 Miscelaneous Demolition/Removal LS 1 $15,000.00 $15,000.00 $5,063.00 $5,063.00 $10,000.00 $10,000.00 $30,000.00 $30,000.00 8 02221.4.2.2 Full Depth Pavement Demolition/Removal SY 207 $5.00 $1,035.00 $8.58 $1,776.06 $6.00 $1,242.00 $25.00 $5,175.00 9 02221.4.2.3 Variable Depth Cold Mill SY 2,102 $2.50 $5,255.00 $2.33 $4,897.66 $4.65 $9,774.30 $5.00 $10,510.00 10 02221.4.2.4 Demolish/Remove Existing AOA Fence LF 2,120 $10.00 $21,200.00 $2.81 $5,957.20 $5.75 $12,190.00 $6.00 $12,720.00 11 02221.4.2.5 Demolish/Remove Existing Guardrail LF 496 $25.00 $12,400.00 $5.32 $2,638.72 $2.80 $1,388.80 $5.00 $2,480.00 12 02221.4.2.6 Demolish/Remove Existing 24" to 36" Pipe LF 206 $50.00 $10,300.00 $3.25 $669.50 $20.65 $4,253.90 $15.00 $3,090.00 13 02221.4.2.7 Demolish/Remove Existing 60" CMP Pipe LF 145 $75.00 $10,875.00 $3.56 $516.20 $31.00 $4,495.00 $25.00 $3,625.00 14 02230-4.2.1 Clear/Grubb AC 30 $7,500.00 $225,000.00 $3,628.00 $108,840.00 $3,600.00 $108,000.00 $2,000.00 $60,000.00 15 02230-4.2.2 Clear Existing Drainage Ditch AC 1 $9,000.00 $9,000.00 $3,628.00 $3,628.00 $17,000.00 $17,000.00 $15,000.00 $15,000.00 16 02230.3.21.A Unclassified Excavation CY 94,250 $8.00 $754,000.00 $3.97 $374,172.50 $2.90 $273,325.00 $10.00 $942,500.00 17 02230.3.21.C Subgrade Preparation SY 29,661 $2.00 $59,322.00 $1.00 $29,661.00 $0.90 $26,694.90 $3.00 $88,983.00 18 02304-9.1 Cement Treated Base - 8" depth SY 18,491 $14.00 $258,874.00 $12.34 $228,178.94 $11.35 $209,872.85 $13.00 $240,383.00 19 02304-9.2 Cement Treated Base - 6" depth SY 4,978 $12.00 $59,736.00 $13.85 $68,945.30 $13.00 $64,714.00 $12.00 $59,736.00 20 02304-9.3 Portland Cement for Cement Treated Base TON 884 $150.00 $132,600.00 $126.00 $111,384.00 $112.00 $99,008.00 $110.00 $97,240.00 21 02400.1 Asph Conc 12.5mm SuperPave, GP 2 Only, Incl. Polymer-Modified Bitum Material & H Lime TON 6,504 $105.00 $682,920.00 $87.69 $570,335.76 $79.00 $513,816.00 $85.00 $552,840.00 22 02400.2 Asph Conc 19mm SuperPave, GP 2 Only, Incl. Bitum Material & H Lime TON 6,941 $100.00 $694,100.00 $80.18 $556,529.38 $66.50 $461,576.50 $70.00 $485,870.00 23 02413-1 Bituminous Tack Coat GAL 4,438 $8.00 $35,504.00 $3.75 $16,642.50 $3.65 $16,198.70 $4.00 $17,752.00 24 02310.5.A.1 6" Depth Graded Aggregate - incl material SY 1,802 $12.00 $21,624.00 $6.13 $11,046.26 $7.25 $13,064.50 $12.00 $21,624.00 25 02630.4.2.A.1 18" Reinforced Concrete Pipe, Class III LF 1,051 $35.00 $36,785.00 $33.25 $34,945.75 $43.55 $45,771.05 $56.00 $58,856.00 26 02630.4.2.A.2 30" Reinforced Concrete Pipe, Class III LF 50 $50.00 $2,500.00 $54.98 $2,749.00 $69.25 $3,462.50 $76.00 $3,800.00 27 02630.4.2.A.3 36" Reinforced Concrete Pipe, Class III LF 2,710 $63.00 $170,730.00 $62.49 $169,347.90 $71.25 $193,087.50 $88.00 $238,480.00 28 02630.4.2.A.4 42" Reinforced Concrete Pipe, Class III LF 108 $100.00 $10,800.00 $82.97 $8,960.76 $99.55 $10,751.40 $155.00 $16,740.00 29 02630.4.2.A.5 60" Reinforced Concrete Pipe, Class III LF 103 $180.00 $18,540.00 $132.54 $13,651.62 $178.75 $18,411.25 $200.00 $20,600.00 30 02630.4.2.A.6 84" Reinfoced Concrete Pipe, Class IV LF 1,300 $375.00 $487,500.00 $260.24 $338,312.00 $305.00 $396,500.00 $350.00 $455,000.00 31 02630.4.2.A.7 Type I Trapezoidal Concrete Paved Ditch LF 1,581 $90.00 $142,290.00 $95.53 $151,032.93 $90.00 $142,290.00 $100.00 $158,100.00 32 02630.4.2.A.8 Concrete Paved Low-flow Channel LF 260 $50.00 $13,000.00 $29.92 $7,779.20 $53.00 $13,780.00 $60.00 $15,600.00 32A 02630.4.2.A.9 24" Reinforced Concrete Pipe, Class III LF 29 $51.00 $1,479.00 $37.56 $1,089.24 $60.00 $1,740.00 $72.00 $2,088.00 33 02630.4.2.B.1 Precast Storm Sewer Manhole Structure - STD 1011A VF 18 $300.00 $5,400.00 $337.06 $6,067.08 $475.00 $8,550.00 $560.00 $10,080.00 34 02630.4.2.B.2 Ditch Drop Inlet Structure VF 105 $325.00 $34,125.00 $345.09 $36,234.45 $415.00 $43,575.00 $550.00 $57,750.00 35 02630.4.2.B.3 Curb Inlet VF 10 $500.00 $5,000.00 $484.69 $4,846.90 $488.00 $4,880.00 $520.00 $5,200.00 36 02630.4.2.B.4 Special Design Drainage Structure EA 3 $25,000.00 $75,000.00 $12,255.00 $36,765.00 $17,200.00 $51,600.00 $15,000.00 $45,000.00 37 02630.4.2.C.1 Tapered Headwall - 18" dia. EA 2 $1,500.00 $3,000.00 $832.75 $1,665.50 $620.00 $1,240.00 $675.00 $1,350.00 38 02630.4.2.C.2 Tapered Headwall - 18" dia. - Modified with Trash Rack EA 1 $3,500.00 $3,500.00 $2,098.00 $2,098.00 $1,245.00 $1,245.00 $1,200.00 $1,200.00 39 02630.4.2.C.3 Tapered Headwall - 36" dia. EA 5 $2,500.00 $12,500.00 $2,113.00 $10,565.00 $1,060.00 $5,300.00 $1,400.00 $7,000.00 40 02630.4.2.C.4 Tapered Outlet Headwall - 42" dia. EA 1 $3,500.00 $3,500.00 $2,447.00 $2,447.00 $4,125.00 $4,125.00 $1,700.00 $1,700.00 41 02630.4.2.C.5 Tapered Outlet Headwall - 60" dia. EA 1 $5,000.00 $5,000.00 $6,121.00 $6,121.00 $7,300.00 $7,300.00 $2,800.00 $2,800.00 BEAM'S CONTRACTING REEVES CONSTRUCTION MASASANNA CONSTRUCTION ROADWAY DEVELOPMENT AUGUSTA REGIONAL AIRPORT Southeast Development Area Access Project SCHEDULE OF UNIT PRICES ENGINEER'S ESTIMATE At t a c h m e n t n u m b e r 6 \ n P a g e 3 o f 4 It e m # 2 2 42 02630.4.2.C.6 Tapered Headwall - 84" dia. EA 1 $7,000.00 $7,000.00 $12,063.00 $12,063.00 $16,200.00 $16,200.00 $4,000.00 $4,000.00 43 02630.4.2.C.7 Pond Outlet Control Structure EA 1 $3,500.00 $3,500.00 $5,275.00 $5,275.00 $9,945.00 $9,945.00 $10,000.00 $10,000.00 44 02630.4.2.C.8 Standard Frame and Cover EA 2 $1,250.00 $2,500.00 $281.44 $562.88 $325.00 $650.00 $600.00 $1,200.00 45 02630.4.2.C.9 Fabricated Safety Grate for Ditch Drop Inlets EA 18 $750.00 $13,500.00 $2,463.43 $44,341.74 $1,065.00 $19,170.00 $1,200.00 $21,600.00 45A 02630.4.2.C.10 Safety End Section - Concrete - 24" Dia. EA 2 $751.00 $1,502.00 $924.00 $1,848.00 $1,275.00 $2,550.00 $1,800.00 $3,600.00 46 02162-5.1 7' High Security Fence w/ Barbed Wire and Mow Guard LF 1,605 $40.00 $64,200.00 $45.81 $73,525.05 $41.00 $65,805.00 $20.00 $32,100.00 47 02162-5.2 12' Manual Swing Gate EA 1 $2,000.00 $2,000.00 $1,153.10 $1,153.10 $1,325.00 $1,325.00 $1,500.00 $1,500.00 48 02162-5.3 24' Manual Swing Gate EA 1 $2,500.00 $2,500.00 $2,194.00 $2,194.00 $2,600.00 $2,600.00 $2,500.00 $2,500.00 49 02635.5.1 Permanent Timber Barricade LF 87 $150.00 $13,050.00 $35.00 $3,045.00 $45.00 $3,915.00 $20.00 $1,740.00 50 03300.4.2.A.1 30" Type 7 Curb and Gutter LF 2,530 $25.00 $63,250.00 $17.02 $43,060.60 $24.35 $61,605.50 $14.00 $35,420.00 51 03300.4.2.B.1 Type 7 Integral Reinforced Concrete Median Islands SY 49 $100.00 $4,900.00 $64.27 $3,149.23 $83.00 $4,067.00 $30.00 $1,470.00 52 03300.4.2.B.2 4" Concrete Pavement, incl. base SY 130 $50.00 $6,500.00 $50.76 $6,598.80 $47.00 $6,110.00 $50.00 $6,500.00 53 03300.4.2.B.3 5" Reinforced Concrete Apron for Headwalls, incl. base SY 31 $75.00 $2,325.00 $59.25 $1,836.75 $150.00 $4,650.00 $200.00 $6,200.00 54 03300.4.2.C.1 Reinforced Concrete Pipe Collar EA 2 $1,000.00 $2,000.00 $2,444.00 $4,888.00 $3,500.00 $7,000.00 $5,000.00 $10,000.00 55 16123.4.2.A.1 4W-6" Concrete Encased Conduit LF 470 $25.00 $11,750.00 $20.25 $9,517.50 $86.00 $40,420.00 $54.00 $25,380.00 56 16123.4.2.A.2 1W-4" Concrete Encased Conduit LF 1,105 $12.00 $13,260.00 $15.25 $16,851.25 $8.25 $9,116.25 $18.00 $19,890.00 57 02510-5.2.1 Encasement Pipe - 12" LF 225 $50.00 $11,250.00 $109.83 $24,711.75 $48.75 $10,968.75 $125.00 $28,125.00 58 02510-5.2.2 Connection to 16" Existing Waterline - Tapping Sleeve and Valve EA 2 $5,500.00 $11,000.00 $13,293.00 $26,586.00 $15,200.00 $30,400.00 $10,000.00 $20,000.00 59 02510-5.2.3 8" Water Line - DIP LF 3,978 $40.00 $159,120.00 $25.62 $101,916.36 $27.65 $109,991.70 $28.00 $111,384.00 60 02510-5.2.4 Fire Hydrant Assembly EA 5 $5,000.00 $25,000.00 $3,503.05 $17,515.25 $4,800.00 $24,000.00 $3,000.00 $15,000.00 61 02510-5.2.5 8" Gate Valve EA 7 $1,300.00 $9,100.00 $988.67 $6,920.69 $1,715.00 $12,005.00 $2,800.00 $19,600.00 61A 02510-5.2.6 16" Water Line - DIP LF 860 $75.00 $64,500.00 $58.95 $50,697.00 $66.40 $57,104.00 $55.00 $47,300.00 61B 02510-5.2.7 16" Gate Valve EA 1 $8,000.00 $8,000.00 $5,305.00 $5,305.00 $7,445.00 $7,445.00 $3,500.00 $3,500.00 62 02530-4.2.A.1 Connection to Existing Sanitary Sewer MH EA 1 $5,000.00 $5,000.00 $1,199.70 $1,199.70 $3,235.00 $3,235.00 $7,500.00 $7,500.00 63 02530-4.2.B.1 8" PVC Sanitary Sewer Pipe LF 800 $55.00 $44,000.00 $28.88 $23,104.00 $24.90 $19,920.00 $44.00 $35,200.00 64 02530-4.2.A.2 Sanitary Sewer Manholes EA 3 $2,200.00 $6,600.00 $1,800.00 $5,400.00 $1,255.00 $3,765.00 $3,800.00 $11,400.00 65 10425.4.2.A.1 Monument Sign M.1, complete and in-place LS 1 $35,000.00 $35,000.00 $42,000.00 $42,000.00 $20,900.00 $20,900.00 $7,500.00 $7,500.00 66 02701.4.2.A.1 Highway signs, type 1 material, reflective sheeting type III SF 55 $31.00 $1,705.00 $20.25 $1,113.75 $14.00 $770.00 $14.00 $770.00 67 02701.4.2.A.2 Highway signs, type 1 material, reflective sheeting type IV SF 162 $35.00 $5,670.00 $24.75 $4,009.50 $16.00 $2,592.00 $18.00 $2,916.00 68 02701.4.2.B.1 Galvanized steel posts, type 7 LF 235 $17.00 $3,995.00 $10.15 $2,385.25 $6.00 $1,410.00 $7.00 $1,645.00 69 02701.4.2.B.2 Galvanized steel posts, type 8 LF 205 $20.00 $4,100.00 $12.40 $2,542.00 $8.00 $1,640.00 $8.00 $1,640.00 70 02580-3.3.A.1 Thermoplastic Traffic Stripe SY 1,370 $25.00 $34,250.00 $30.37 $41,606.90 $27.00 $36,990.00 $27.00 $36,990.00 71 02580-3.3.B.1 Thermoplastic Pavement Marking, Words, and Symbols - Type I EA 4 $250.00 $1,000.00 $112.50 $450.00 $100.00 $400.00 $100.00 $400.00 72 02580-3.3.B.2 Thermoplastic Pavement Marking, Words, and Symbols - Type II EA 14 $250.00 $3,500.00 $73.15 $1,024.10 $65.00 $910.00 $65.00 $910.00 73 02580-3.3.B.3 Raised Reflective Markers EA 200 $5.00 $1,000.00 $4.50 $900.00 $4.00 $800.00 $4.00 $800.00 74 02456.5.1 Indentation Rumble Strips - ground in place (skip) GLM 1.25 $2.50 $3.13 $1,688.00 $2,110.00 $2,985.00 $3,731.25 $2,500.00 $3,125.00 75 02935.3.3 Stormwater Pollution Prevention Plan LS 1 $9,000.00 $9,000.00 $10,000.00 $10,000.00 $10,100.00 $10,100.00 $10,000.00 $10,000.00 76 02161-5.1 Silt Fence LF 12,400 $6.00 $74,400.00 $2.76 $34,224.00 $3.25 $40,300.00 $2.50 $31,000.00 77 02161-5.2 Construction Entrance EA 1 $2,500.00 $2,500.00 $1,415.00 $1,415.00 $1,800.00 $1,800.00 $1,500.00 $1,500.00 78 02161-5.3 Check Dam EA 5 $1,500.00 $7,500.00 $377.45 $1,887.25 $495.00 $2,475.00 $280.00 $1,400.00 79 02161-5.4 Outlet Protection SY 547 $100.00 $54,700.00 $35.28 $19,298.16 $52.00 $28,444.00 $75.00 $41,025.00 80 02920.4.2.1.A.1 Permanent Seeding and Mulching AC 30 $2,500.00 $75,000.00 $1,856.00 $55,680.00 $1,500.00 $45,000.00 $800.00 $24,000.00 81 02920.4.2.1.A.2 Temporary Seeding and Mulching AC 30 $11.00 $330.00 $1,688.00 $50,640.00 $200.00 $6,000.00 $600.00 $18,000.00 82 02920.4.2.1.B.1 Sodding SY 509 $10.00 $5,090.00 $5.56 $2,830.04 $6.00 $3,054.00 $4.00 $2,036.00 ENGINEER'S ESTIMATE $5,492,279.66 BEAM'S CONTRACTING TOTAL $4,035,194.91 REEVES CONSTRUCTION TOTAL $4,059,602.60 MASASANNA CONSTRUCTION TOTAL $4,890,000.00 It should be noted the total amount for Beam's Contracting was in error. The actual amount is $300.30 less than the amount shown in the bid tab. The amount shown on this page has been corrected. At t a c h m e n t n u m b e r 6 \ n P a g e 4 o f 4 It e m # 2 2 Attachment number 7 \nPage 1 of 2 Item # 22 Attachment number 7 \nPage 2 of 2 Item # 22 Attachment number 8 \nPage 1 of 5 Item # 22 Attachment number 8 \nPage 2 of 5 Item # 22 Attachment number 8 \nPage 3 of 5 Item # 22 Attachment number 8 \nPage 4 of 5 Item # 22 Attachment number 8 \nPage 5 of 5 Item # 22 Commission Meeting Agenda 8/7/2012 5:00 PM Springfield Baptist Church Department:Clerk of Commission Caption:Motion to approve a request from Springfield Baptist Church to hang/install light post banners commemorating the storied legacy of Springfield Baptist Church as a part of the 225th anniversary celebration. (Approved by Public Services Committee July 30, 2012) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 23 Attachment number 1 \nPage 1 of 1 Item # 23 Commission Meeting Agenda 8/7/2012 5:00 PM Webster Detention Center Phase II Improvements Department:Recreation, Parks and Facilities Caption:Motion to approve the expenditure of SPLOST funds dedicated to the Webster Detention Center Phase II and Renovations, for the purchase, installation, startup and all scope associated in the estimated amounts as follows: 1. Security Electronics Equipment - $790,264.00 2. Detention Door Hardware - $142,733.00 3. Commercial Hardware - $65,120.00 4. Trane HVAC Equipment - $203,500.00 5. Southeast Automated Systems/Reliable Controls - $306,638.00 (Approved by Public Services Committee July 30, 2012) Background:Sole sourcing of the above equipment has been requested by the Sheriff’s Office to maintain standardization with existing equipment and systems; and has been approved by Col. Gary Powell, on behalf of the sheriff, and by Geri Sams of the Procurement Department. Analysis:Approving the sole sourcing expenditures will move the bidding process along with no delays and provide the equipment requested by the Sheriff’s Office.(See attached correspondence from the RCSO) Financial Impact:The total cost for implementing the sole source for the 5 items is estimated at $1,508,255.00 and will be included in the Construction Manager’s GMP that will be submitted for Commission approval at a later date. Alternatives:1. Approve the sole sourcing expenditures from budgeted SPLOST funds in the estimated amount of $1,508,255.00, for purchase, installation and startup of Security Electronics Equipment, Detention Door Hardware, Commercial Hardware, Trane HVAC Equipment and Southeast Automated Systems/Reliable Controls to maintain standardization with the existing equipment and systems at the Webster Detention Center. 2. Open the bidding up to other equipment manufacturers, also acceptable to the Architect and Engineers, and risk the possibility Cover Memo Item # 24 of having non-compatible equipment. Recommendation:Approve the expenditure of SPLOST funds in the estimated amount of $1,508,255.00 to sole source the above listed items in order to maintain standardization with the existing equipment and systems at the existing Webster Detention Center. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN ACCOUNT: GL – 328-03-1130; JL – 210356004 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 24 Attachment number 1 \nPage 1 of 8 Item # 24 Attachment number 1 \nPage 2 of 8 Item # 24 Attachment number 1 \nPage 3 of 8 Item # 24 Attachment number 1 \nPage 4 of 8 Item # 24 Attachment number 1 \nPage 5 of 8 Item # 24 Attachment number 1 \nPage 6 of 8 Item # 24 Attachment number 1 \nPage 7 of 8 Item # 24 Attachment number 1 \nPage 8 of 8 Item # 24 Commission Meeting Agenda 8/7/2012 5:00 PM Work Authorization #21 – Design & CM Services, Airside Pavement Crack Repair and Marking Project Department:Augusta Regional Airport Caption:Motion to approve Campbell & Paris Engineering Work Authorization #21 - Design and Construction Management Services, Airside Pavement Crack Repair and Marking Project as approved by the Aviation Commission at their June 28, 2012 meeting. (Approved by Public Services Committee July 30, 2012) Background:Runway 8-26 and all of the taxiways are in serious need of repairs. The most cost-effective approach is to perform a crack- seal and extend the life of the pavements another 3-4 years. After that time, a new master plan should have been completed with more guidance on when to perform any major pavement rehabilitation. Analysis:This Work Authorization provides for the Design and Construction Management Services to be performed by Campbell & Paris Engineers for the Airside Pavement Crack Repair and Marking Project. In addition to preparing construction documents, Campbell & Paris Engineers will ensure: - The project is performed in accordance with the contract documents (plans and specifications), as well as FAA and GDOT guidelines; - All questions raised by the Contractor are answered; - All necessary paperwork/correspondence is provided to FAA/GDOT; and The project is completed on time and on budget. Financial Impact:Not to exceed $63,282.55. Alternatives:Deny request. Recommendation:Approve Campbell & Paris Engineering Work Authorization #21 - Design and Construction Management Services, Airside Pavement Crack Repair and Marking Project in the amount not to exceed $63,282.55. Cover Memo Item # 25 Funds are Available in the Following Accounts: 551-08-1201/54-12110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 25 CPE Project Number 0733-21 June 19, 2012 Page 1 of 4 ATTACHMENT “A” Augusta Regional Airport at Bush Field NARRATIVE SCOPE OF WORKFOR DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES WORK AUTHORIZATION NUMBER 21 AIRSIDE PAVEMENT CRACK REPAIR AND MARKING PROJECT PROJECT TITLE:DESIGN AND CONSTRUCTION MANAGEMENT SERVICES FOR AIRSIDE PAVEMENT CRACK REPAIR AND MARKING PROJECT WORK AUTHORIZATION:Twenty One (21) It is agreed to undertake the following work in accordance with the provision of the Prime Agreement for Professional Services dated October 2, 2007. INTRODUCTION This Scope of Work provides for the Design and Construction Management Services for the Airside Pavement Crack Repair and Marking project at the Augusta Regional Airport at Bush Field.It is anticipated the project construction duration will take a total of 54 calendar daysto complete. This project consists of preparing a CATEX and FAA Form 7460 for the tasks listed below;performing a crack seal application to the pavements noted in the project documents; and performing a pavement remarking application to the pavements noted in the project documents. The staffing and organization for the Program/Construction Management Services for this project is commensurate with the scope and period of service required for this element of work. The proposed budget for the core staffing provides one on-site Resident Engineer who will beavailable on an as needed basis and is supported by and reports directly to the Construction Manager. The Construction Manager will coordinate all construction efforts with the Airport and provide supplemental RE coverage to cover construction schedules involving extended shifts or extended work weeks. The estimated hours for each position required to provide these services are detailed in the attached man-hour proposal. TASK 1 -CONTRACT ADMINISTRATION (Estimated 8 week period total) A.CONTRACTOR PAYMENT REQUESTS (Estimated 3 Requests)-The Engineer will evaluate, coordinate, prepare, review and recommend payment requests to the Airport approximately every thirty days during construction. Attachment number 1 \nPage 1 of 9 Item # 25 CPE Project Number 0733-21 June 19, 2012 Page 2 of 4 B.SHOP DRAWINGS AND SUBMITTAL REVIEW -The Engineer will review and approve shop drawings/submittals, proposed by the contractor, for materials and products to be used on the project. C.PRE-CONSTRUCTION CONFERENCES -The Engineer will conduct a formal pre- construction conference. The conference will be scheduled to permit Airport Staff, contractor representatives and other associated agencies to attend. The agenda and format will be in accordance with local agency guidelines and recommendations. D.PERIODIC SITE VISITS -The Project Manager will visit the construction site periodicallyduring construction to review the progress on the project and report progress to the Airport based on the Contractor’s monthly revised construction CPM schedule. E.ROUTINE CONSTRUCTION MANAGEMENT –The Senior Project Engineer will be designated as the Project Manager and will be assigned for the duration of the project. The Project Manager and Senior Project Manager will respond to project requirements throughout construction including contractor questions, problems, claims andinterpretations of contract documents. TASK 2 -RESIDENT ENGINEERING (Estimated 8 week period total) A.ON-SITE INSPECTION -The Engineer will provide an on-site representative on an as needed basis to inspect the work during construction.The Resident Engineer (RE) willmonitor and document construction progress, confirm conformance with schedules, plans and specifications, measure and document construction pay quantities, document significant conversations, situations and visits/inspections by authorities and prepare the necessary field construction compliance reports for payment. The proposed man-hour budget assumes that one on-site Resident Engineer and one Construction Manager will be assigned to the project for the duration of this contract and be used on an as needed basis. During periods when construction activity on the site is minimal or none (e.g.weather prohibitive construction days, curing times,etc.) the RE will be assigned for partial duty to continue to coordinate construction efforts, make periodic updates and site inspections. B.FINAL INSPECTION AND PUNCH LIST COORDINATION -The Engineer will coordinate for final inspection and assist with the preparation of the final "PUNCH LIST" and document the accomplishment of the "PUNCH LIST" items to facilitate final projectacceptance.Upon the contractor’s successful completion of remedial work, the Engineer will recommend acceptance by the Owner. TASK 3 -FINAL PROJECT CLOSE OUT A.CONTRACT CLOSE OUT-FINAL ENGINEER’S REPORT –FINAL RECORD DRAWINGS TheEngineer will assist the Airport with those requirements necessary to formally close-out the project at the conclusion of construction.The Engineer will coordinate and schedule a final inspection of the work with the Airport,local agencies and contractors. Attachment number 1 \nPage 2 of 9 Item # 25 CPE Project Number 0733-21 June 19, 2012 Page 3 of 4 The Engineer will coordinate the preparation of a set of final "Record Drawings" from the contractor’s red-lined markup set and a final Engineer's Report documenting the project construction. SCHEDULE: The work shall begin as soon as the Notice to Proceed is given. BASIS OF COMPENSATION: The SPONSOR will compensate Campbell & Paris Engineers the following for the DESIGN AND CONSTRUCTION MANAGEMENT SERVICES FOR AIRSIDE PAVEMENT CRACK REPAIR AND MARKING PROJECT in accordance with Exhibit C, which is attached and made part of thisAgreement. TASK CONTRACT AMOUNT Design $40,382.12 (Lump Sum) Contraction Administration and Project Closeout Services $10,475.54 (Lump Sum) Resident Engineering $12,214.39 (Cost Plus) TOTAL $61,975.04 (Not-To-Exceed) Attachment number 1 \nPage 3 of 9 Item # 25 CPE Project Number 0733-21 June 19, 2012 Page 4 of 4 NOWTHEREFORE, This Work Authorization is agreed upon for the scope of services, period of services and basis of compensation. The budget will not be exceeded without an Amendment to this Work Authorization. SPONSOR: Augusta Aviation Commission Augusta, Georgia Jay Forrester,Chairman Augusta Aviation Commission DATE: Gary W.Le Tellier, AAE, Executive Director Jack Mayfield, P.E., Senior Vice President Augusta Regional Airport at Bush Field Campbell &Paris Engineers, P.C. DATE:DATE:June 19, 2012 Attachment number 1 \nPage 4 of 9 Item # 25 CAMPBELL & PARIS ENGINEERS, 313 WINGO WAY, MT PLEASANT, SC 29464 DATE 0733-20 19-Jun-12 I. DIRECT COSTS No. Hrs. Rate/Hr.Total No. Hrs. Rate/Hr. Total No. Hrs. Rate/Hr.Total No. Hrs. Rate/Hr. Total 1. Senior Project Manager/Principle-in-Charge 0 $79.33 $0.00 7 $79.33 $555.31 0 $79.33 $0.00 0 $79.33 $0.00 2. Senior Project Engineer 24 $51.68 $1,240.32 52 $51.68 $2,687.36 24 $51.68 $1,240.32 60 $51.68 $3,100.80 3. Project Engineer 6 $33.03 $198.18 16 $33.03 $528.48 0 $33.03 $0.00 8 $33.03 $264.24 4. Senior Electrical Engineer 0 $49.12 $0.00 4 $49.12 $196.48 0 $49.12 $0.00 0 $49.12 $0.00 5. Engineer 8 $24.67 $197.36 188 $24.67 $4,637.96 0 $24.67 $0.00 26 $24.67 $641.42 6. Construction Specialist 0 $34.38 $0.00 12 $34.38 $412.56 0 $34.38 $0.00 0 $34.38 $0.00 7. Administrative Assistant 2 $19.23 $38.46 18 $19.23 $346.14 0 $19.23 $0.00 0 $19.23 $0.00 8. Other 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 Task Total Hours 40 297 24 94 $1,674.32 $9,364.29 $1,240.32 $4,006.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1. Overhead on Direct Labor -- Percentage 175.00%$2,930.06 $16,387.51 $2,170.56 $7,011.31 2. General and Administrative Costsl (% Direct Labor)0%$0.00 $0.00 $0.00 $0.00 Profit -- % of All above Direct and Indirect Costs 15.00%$690.66 $3,862.77 $511.63 $1,652.66 $3,620.72 $20,250.28 $2,682.19 $8,663.97 $5,295.04 $29,614.57 $3,922.51 $12,670.43 1. Reproduction and Mailing Costs $50.00 $250.00 $25.00 $150.00 2. Travel Expenses $220.00 $440.00 $440.00 $880.00 3. Meal Expenses $25.00 $50.00 $50.00 $100.00 4. Subconsultant - Resident Inspector $0.00 $0.00 $0.00 $9,100.00 5. Subconsultant - N/A $0.00 $0.00 $0.00 $0.00 6. Subcontractor - N/A $0.00 $0.00 $0.00 $0.00 7.$0.00 $0.00 $0.00 $0.00 8.$0.00 $0.00 $0.00 $0.00 $295.00 $740.00 $515.00 $10,230.00 $5,590.04 $30,354.57 $4,437.51 $22,900.43 GRAND TOTAL $63,282.55 NAME AND ADDRESS OF FIRM TASK 4. CONSTRUCTION PHASE SERVICES TOTAL OF TASK 4 TOTAL OF SECTION VI V. TOTAL OF SECTIONS I, II, III, AND IV VI. REIMBURSABLE ITEMS (Give Details) VII. PROPOSAL (TOTAL OF SECTIONS V AND VI) TOTAL OF SECTION IV TOTAL OF TASK 2 TOTAL OF TASK 3 Work Classification II. IN-HOUSE REPRODUCTION COSTS III. MATERIAL AND SUPPLIES (Not included in G&A Costs) IV. INDIRECT COSTS (Furnish Details) TOTAL OF TASK I TASK 1. PREPARATION OF CATEX AND 7460 TASK 2. CONTRACT DOCUMENTS TASK 3. BID AND AWARD PHASE EXHIBIT "C" Campbell & Paris Engineers CONSTRUCTION MANAGEMENT SERVICES COST BREAKDOWN PROJECT NUMBER(S) AND DESCRIPTION AUGUSTA REGIONAL AIRPORT - AIRSIDE PAVEMENT CRACK REPAIR AND MARKING PROJECT At t a c h m e n t n u m b e r 1 \ n P a g e 5 o f 9 It e m # 2 5 Labor Category Sr. Proj. Manager Sr. Prof. Engineer Project Engineer Sr. Electrical Engineer Engineer Construction Specialist Admin. Assistant Sub- Consultant Contract Direct Labor Rate 79.33$ 51.68$ 33.03$ 49.12$ 24.67$ 34.38$ 19.23$ 1A.CATEX Preparation 12 6 4 2 24 955.48$ 1B.7460 Preparation 12 4 16 718.84$ 0 24 6 0 8 0 2 n/a 0 -$ 1,240.32$ 198.18$ -$ 197.36$ -$ 38.46$ -$ 1,674.32$ Total Salary Costs Labor and G/A Overhead @ 175.00% Subtotal Salary and OH Fixed Payment @ 15.00% Subtotal Salary, OH & Fixed Payment Other Non-Salary Expenses: Reproduction and Mailing Costs Travel: 1 trip @ 400 miles per trip @ 0.55 per mile Meals: 1 trip @ $25 per trip Subcontracts TASK 1. CATEX AND 7460 PREPARATION $25.00 $50.00 $220.00 $0.00 $5,590.04 $4,604.38 $690.66 $5,295.04 SUBTOTAL DESIGN PHASE SERVICES - MH'S DIRECT LABOR COSTS CRACK SEAL AND PAVEMENT MARKING AUGUSTA REGIONAL AIRPORT TASK 1. CATEX AND 7460 PREPARATION TOTAL ALL MH'S TOTAL DIRECT LABOR COST $1,674.32 $2,930.06 At t a c h m e n t n u m b e r 1 \ n P a g e 6 o f 9 It e m # 2 5 Labor Category Sr. Proj. Manager Sr. Prof. Engineer Project Engineer Sr. Electrical Engineer Engineer Construction Specialist Admin. Assistant Sub- Consultant Contract Direct Labor Rate 79.33$ 51.68$ 33.03$ 49.12$ 24.67$ 34.38$ 19.23$ 2A.Contract Documents (See Detail Below)7 52 16 4 188 12 18 Tentative Sheet List 1 Cover Sheet 1 6 2 Legends, Abbreviations and Work Quantities 2 12 3 Site Access, Safety, and Staging Plan 2 14 4 Construction Phasing Plan 16 5 General Safety Notes and Details 1 8 6-10 Demolition Plans 2 24 11-15 Layout Plans 2 4 24 16 Misellaneous Details 2 12 17-20 Cross Sections 2 24 Engineer's Report and Construction Estimate 1 12 4 16 4 Contract Documents and Technical Specifications 1 16 24 12 4 Quality Control Review 2 8 4 Coordination Review and Address Comments 1 8 8 8 6 and Modifications to Plans per Comments 7 52 16 4 188 12 18 n/a 0 555.31$ 2,687.36$ 528.48$ 196.48$ 4,637.96$ 412.56$ 346.14$ -$ 9,364.29$ Total Salary Costs Labor and G/A Overhead @ 175.00% Subtotal Salary and OH Fixed Payment @ 15.00% Subtotal Salary, OH & Fixed Payment Other Non-Salary Expenses: Reproduction and Mailing Costs Travel: 2 trips @ 400 miles per trip @ 0.55 per mile Meals: 2 trips @ $25 per trip Subcontracts TASK 2. DESIGN PHASE SERVICES $30,354.57 $440.00 $50.00 $0.00 $29,614.57 SUBTOTAL DESIGN PHASE SERVICES - MH'S DIRECT LABOR COSTS $9,364.29 $250.00 $16,387.51 $25,751.80 $3,862.77 AUGUSTA REGIONAL AIRPORT TASK 2. DESIGN PHASE SERVICES TOTAL ALL MH'S TOTAL DIRECT LABOR COST CRACK SEAL AND PAVEMENT MARKING At t a c h m e n t n u m b e r 1 \ n P a g e 7 o f 9 It e m # 2 5 Labor Category Sr. Proj. Manager Sr. Prof. Engineer Project Engineer Sr. Electrical Engineer Engineer Construction Specialist Admin. Assistant Sub- Consultant Contract Direct Labor Rate 79.33$ 51.68$ 33.03$ 49.12$ 24.67$ 31.25$ 19.23$ 3A.Bidding 16 16 826.88$ Pre-Bid Conference, Bid Opening 3B.Award 8 8 413.44$ Bid Tabulation, Review, Award Recommndation 0 24 0 0 0 0 0 24 -$ 1,240.32$ -$ -$ -$ -$ -$ -$ 1,240.32$ Total Salary Costs Labor and G/A Overhead @ 175.00% Subtotal Salary and OH Fixed Payment @ 15.00% Subtotal Salary, OH & Fixed Payment Other Non-Salary Expenses: Reproduction and Mailing Costs Travel: 2 trips @ 400 miles per trip @ 0.55 per mile Meals: 2 trips @ $25 per trip Subcontracts TASK 3. BIDDING AND AWARD PHASE SERVICES $440.00 DIRECT LABOR COSTS $2,170.56 CRACK SEAL AND PAVEMENT MARKING AUGUSTA REGIONAL AIRPORT SUBTOTAL DESIGN PHASE SERVICES - MH'S $1,240.32 TASK 3. BIDDING AND AWARD PHASE SERVICES TOTAL ALL MH'S TOTAL DIRECT LABOR COST $0.00 $4,437.51 $3,922.51 $25.00 $50.00 $3,410.88 $511.63 At t a c h m e n t n u m b e r 1 \ n P a g e 8 o f 9 It e m # 2 5 Labor Category Sr. Proj. Manager Sr. Prof. Engineer Project Engineer Sr. Electrical Engineer Engineer Construction Specialist Admin. Assistant Sub- Consultant Contract Direct Labor Rate 79.33$ 51.68$ 33.03$ 49.12$ 24.67$ 34.38$ 19.23$ 35.00$ 4A.Pre Construction Conference 8 10 4 18 660.14$ 4B.Submittal Review/RFI 4 8 12 470.96$ 4C.Administration 16 8 16 826.88$ Assume 2 Pay Requests plus Final Retianage Release 4D.Resident Inspection 16 8 240 24 1,024.24$ 4E.Project Closeout 16 8 8 24 1,024.24$ Punchlist, Construction Reports, Grant Closeout 0 60 8 0 26 0 0 260 94 -$ 3,100.80$ 264.24$ -$ 641.42$ -$ -$ 9,100.00$ 4,006.46$ Total Salary Costs Labor and G/A Overhead @ 175.00% Subtotal Salary and OH Fixed Payment @ 15.00% Subtotal Salary, OH & Fixed Payment Other Non-Salary Expenses: Reproduction and Mailing Costs Travel: 4 trips @ 400 miles per trip @ 0.55 per mile Meals: 4 trips @ $25 per trip Subcontracts: Jimmy Hendrix TASK 4. CONSTRUCTION PHASE SERVICES $22,900.43 $100.00 $9,100.00 $150.00 $880.00 $11,017.77 $1,652.66 $12,670.43 SUBTOTAL DESIGN PHASE SERVICES - MH'S DIRECT LABOR COSTS $4,006.46 $7,011.31 CRACK SEAL AND PAVEMENT MARKING AUGUSTA REGIONAL AIRPORT TASK 4. CONSTRUCTION PHASE SERVICES TOTAL ALL MH'S TOTAL DIRECT LABOR COST At t a c h m e n t n u m b e r 1 \ n P a g e 9 o f 9 It e m # 2 5 Commission Meeting Agenda 8/7/2012 5:00 PM Amendment to Cooperative Agreement Augusta Sustainable Development Implementation Program Department:Planning and Development Caption:Ratify Amendment No. 3 to the Cooperative Agreement with the Federal Highway Administration for the Augusta Sustainable Development Program. Background:The amendment involves a change in scope of the transportation element of the Sustainable Development planning project. As spelled out in the original agreement, the transportation element was to involve an extensive redesign of the 15th Street widening project. Unfortunately, GDOT’s pre-construction activities on the road widening project have advanced to the point where wholesale changes in the design and engineering of the project would be costly, time-consuming and result in additional environmental impacts. The amendment limits the scope of the transportation element to the following two tasks: 1) working with GDOT to add landscape and hardscape features to the 15th Street widening project, and 2) creating concept-level design plans for the section of the Deans Bridge Road between Milledgeville Road and Gordon Highway. The design plan for Deans Bridge Road would be coordinated with the plans for the 15th Street widening project. Analysis:The amendment affects only the transportation element of the Sustainable Development planning project. It does not change any of the other elements of the project. The scope change is in keeping with the overall objective to create a multimodal transportation corridor along 15th Street, MLK, Jr. Blvd. and Deans Bridge Road. The scope change was proposed by city staff several months ago, but the amendment was not finalized by FHWA until mid-June. FHWA then requested that the city return the signed amendment as soon as possible. Note that the scope change was included in the procurement process and in the consultant contract with Tunnell-Spangler-Walsh and Associates that was approved on June 5, 2012. Financial Impact:The amendment does not change the amount of the FHWA TIGER II grant award for the project or the project budget.Cover Memo Item # 26 Alternatives:None recommended Recommendation:Ratify Amendment No. 3 to the Cooperative Agreement with the Federal Highway Administration for the Augusta Sustainable Development Program. Funds are Available in the Following Accounts: No funds are required. REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 26 DowntownAugustaMedicalComplex &GHSUPaineCollege SouthgateShoppingCenter Turpin HillNeighborhood RegencyMallVacant Railroad Overpass M L K , J r. B lv d .15TH ST WALTON WAY GORDON HWY WRIGHTSBORO RD BROAD ST CENTRAL AVE OL IVE RD GREENE ST 7TH ST MILLEDGEVILLE RD HIGHLAND AVE 3RD ST 13TH ST LANEY-WALKER BLVD WHEELER RD 5TH ST H E A R D A V E W H E E L E S S R D D E A N S B R I D G E R D OLD SAVANNAH RD JOHN C CALHOUN EXWY MILLEDGE RD G O L D E N C A M P R D KISSINGBOWER RDDAMASCUS RD T W I G G S S T RIVERWATCH PKWY Augusta Sustainable Implementation Program 15th_St_Pedestrian SR4_15th_Widening Deans_Bridge_Rd_Segment Priority_District_ASDA Railroad Roads Rivers & Streams ® Attachment number 1 \nPage 1 of 1 Item # 26 Attachment number 2 \nPage 1 of 23 Item # 26 Attachment number 2 \nPage 2 of 23 Item # 26 Attachment number 2 \nPage 3 of 23 Item # 26 Attachment number 2 \nPage 4 of 23 Item # 26 Attachment number 2 \nPage 5 of 23 Item # 26 Attachment number 2 \nPage 6 of 23 Item # 26 Attachment number 2 \nPage 7 of 23 Item # 26 Attachment number 2 \nPage 8 of 23 Item # 26 Attachment number 2 \nPage 9 of 23 Item # 26 Attachment number 2 \nPage 10 of 23 Item # 26 Attachment number 2 \nPage 11 of 23 Item # 26 Attachment number 2 \nPage 12 of 23 Item # 26 Attachment number 2 \nPage 13 of 23 Item # 26 Attachment number 2 \nPage 14 of 23 Item # 26 Attachment number 2 \nPage 15 of 23 Item # 26 Attachment number 2 \nPage 16 of 23 Item # 26 Attachment number 2 \nPage 17 of 23 Item # 26 Attachment number 2 \nPage 18 of 23 Item # 26 Attachment number 2 \nPage 19 of 23 Item # 26 Attachment number 2 \nPage 20 of 23 Item # 26 Attachment number 2 \nPage 21 of 23 Item # 26 Attachment number 2 \nPage 22 of 23 Item # 26 Attachment number 2 \nPage 23 of 23 Item # 26 Commission Meeting Agenda 8/7/2012 5:00 PM Andrew Garnett Department:Clerk of Commission Caption:Presentation by Mr. Andrew Garnett regarding a foreclosed UDAG loan. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 27 Attachment number 1 \nPage 1 of 1 Item # 27 Commission Meeting Agenda 8/7/2012 5:00 PM Citizens Advisory Board Department:Clerk of Commission Caption:Discuss reactivation or reestablishment of a Citizens Advisory Board to provide oversight of the complex activities of the HCD. (Requested by Commissioner Lockett) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 28 Attachment number 1 \nPage 1 of 1 Item # 28 Commission Meeting Agenda 8/7/2012 5:00 PM Directors clocking in and out Department:Clerk of Commission Caption:Discuss eliminating the requirement for directors to clock in and out each work day. (Requested by Commissioner Lockett) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 29 Attachment number 1 \nPage 1 of 1 Item # 29 Commission Meeting Agenda 8/7/2012 5:00 PM Fire Department Personnel Sick Leave Department:Clerk of Commission Caption:Adjust Fire Suppression (Fire Department) Personnel Sick Leave from 5.31 hours per pay period to 6.93 hours per pay period for 9 months commencing July 1, 2012 and ending March 31, 2013. On April 1, 2013 sick leave hours will revert back to 5.31 hours per pay period. (Requested by Commissioner Lockett) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 30 Attachment number 1 \nPage 1 of 1 Item # 30 Commission Meeting Agenda 8/7/2012 5:00 PM Firefighters Sick Leave Accrual Department:Clerk of Commission Caption:Discuss sick leave accrual for Augusta firefighters. (Requested by Commissioner Guilfoyle) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 31 Commission Meeting Agenda 8/7/2012 5:00 PM Human Resources Department Update Department:Administrator Caption:Receive as information an update from the Administrator on the Human Resources Department. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 32 Commission Meeting Agenda 8/7/2012 5:00 PM Pine Street Development Department:Clerk of Commission Caption:HCD Director will discuss Pine Street Development and other related activities as presented in the June 18 Questionnaire. Director will be prepared to respond to queries presented by the committee. (Requested by Commissioner Lockett) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 33 Attachment number 1 \nPage 1 of 1 Item # 33 Attachment number 2 \nPage 1 of 1 Item # 33 Commission Meeting Agenda 8/7/2012 5:00 PM Regency Mall Department:Clerk of Commission Caption:Update from the Administrator and the Engineering Director on progress made on development of Regency Mall and the status of the 13.5 acre lake that 3.5 million dollars of SPLOST funds were allocated. Provide time frame for action and explain what steps could be taken to expedite this overdue project. (Requested by Commissioner Lockett) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 34 Attachment number 1 \nPage 1 of 1 Item # 34 Commission Meeting Agenda 8/7/2012 5:00 PM SES Pay Disparity Department:Clerk of Commission Caption:Receive information from the Administrator relative to the SES Pay Disparity. (Requested by Commissioner Lockett) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 35 Attachment number 1 \nPage 1 of 1 Item # 35 Commission Meeting Agenda 8/7/2012 5:00 PM Administrative Office of the Courts Agreement with Siemens Healthcare Diagnostics Inc. Department:Administrator's Office Caption:Motion to accept an Agreement between the Administrative Office of the Courts with Siemens Healthcare Diagnostics Inc. to provide drug testing for the Drug Court. (Approved by Public Safety Committee July 30, 2012) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: Grant funding. REVIEWED AND APPROVED BY: Cover Memo Item # 36 Attachment number 1 \nPage 1 of 1 Item # 36 Commission Meeting Agenda 8/7/2012 5:00 PM Animal Rescues from Vehicles Department:Clerk of Commission Caption:Motion to approve tasking the Law Department to prepare ordinances within 30-days to allow law enforcement officials to gain entry to a vehicle where an animal or child has been left unattended. (Approved by Public Safety Committee July 30, 2012) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 37 Attachment number 1 \nPage 1 of 1 Item # 37 Commission Meeting Agenda 8/7/2012 5:00 PM Inmate Telephone Contract Department:Richmond County Correctional Institution Caption:Motion to approve an inmate telephone contract with SECURUS Technologies for RCCI for a three-year term with two 1-year options for renewal. (Approved by Public Safety Committee July 30, 2012) Background:The installation of collect only telephones in the inmate dormitories allows inmates to communicate with their family and allows staff to perform other duties. A request for proposal (RFP Item #12-033) was completed in June 2012 and four (4) companies responded. Analysis:A committee was formed to select a contractor to provide Inmate Telephone Service for RCCI. SECURUS Technologies was selected. Financial Impact:SECURUS Technologies will pay Richmond County sixty-four (64%) percent commission on all revenues generated from the inmate telephones. Alternatives:None Recommendation:Request approval of three (3) years with two 1-year option contract with SECURUS Technologies. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Procurement. Cover Memo Item # 38 Law. Administrator. Clerk of Commission Cover Memo Item # 38 Attachment number 1 \nPage 1 of 1 Item # 38 Attachment number 2 \nPage 1 of 1 Item # 38 Attachment number 3 \nPage 1 of 1 Item # 38 Attachment number 4 \nPage 1 of 3 Item # 38 Attachment number 4 \nPage 2 of 3 Item # 38 Attachment number 4 \nPage 3 of 3 Item # 38 Attachment number 5 \nPage 1 of 1 Item # 38 Attachment number 6 \nPage 1 of 4 Item # 38 Attachment number 6 \nPage 2 of 4 Item # 38 Attachment number 6 \nPage 3 of 4 Item # 38 Attachment number 6 \nPage 4 of 4 Item # 38 Commission Meeting Agenda 8/7/2012 5:00 PM Naming of Fire Station #10 Department:Clerk of Commission Caption:Motion to approve the naming of Fire Station #10 for H. E. (Herb) Beckham and task the Administrator with developing a policy, procedure or ageeement on how future request(s) will be handled. (Approved by Public Safety Committee July 30, 2012) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 39 Attachment number 1 \nPage 1 of 1 Item # 39 Commission Meeting Agenda 8/7/2012 5:00 PM Pictometry Amendment for 4-inch tiles Department:Information Technology Caption:Motion to approve Amendment to Pictometry Agreement for 4- Inch Mosaic Standard Tiles. (Approved by Public Safety Committee July 30, 2012) Background:Augusta currently uses oblique imagery with our Geographic Information System (GIS) maps. An oblique image is a digital aerial photo that is registered to the earth’s surface, taken at an angle in order to permit the viewing of a building (or property) from 5 viewpoints: directly above, north, south, east, and west. Oblique Imagery is useful in that it provides a 360-degree view of a building from 45 degree elevation. Augusta has previously purchased imagery and analysis tools from Pictometry, with flights in 2008, 2010, and 2011. This contract amendment is requested to obtain higher-accuracy tiles (4-inch instead of 12- inch) from our 2011 flight. Analysis:The 2011 Pictometry imagery that was purchased is in 12" tiles. This means that the images are made up of 12" blocks (or pixels). 4" mosaic tiles enable the user to have clearer and sharper imagery to work with. Using the smaller tiles provides a higher-resolution image with less pixelation and the user can zoom in closer to the ground and still see details. The cost of the enhanced orthophotography is $3,170. The contract for these services was originally approved by commission. Per the Law Department, amendments to the contract should be approved by the commission as well. Financial Impact:The cost of the 4-inch orthophotography tiles is a one-time cost of $3,170. There is no future ongoing maintenance cost associated with this purchase. Alternatives:N/A Recommendation:Approve Amendment to Pictometry Agreement for 4-Inch Mosaic Standard Tiles Cover Memo Item # 40 Funds are Available in the Following Accounts: Funding will be obtained from IT's remaining GIS Orthophotography Funds from SPLOST V. REVIEWED AND APPROVED BY: Procurement. Information Technology. Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 40 Page 1 of 3 Augusta-Richmond County, GA – C116749 20120530 CMT-00005-20120514 AMENDMENT TO AGREEMENT DATED 3/26/2010 BETWEEN PICTOMETRY INTERNATIONAL CORP. AND AUGUSTA-RICHMOND COUNTY, GA THIS AMENDMENT (“Amendment”), which includes this cover sheet and the Sections referenced herein is entered into by and between Pictometry International Corp. (“Pictometry”) and the customer named above (“Licensee”), and shall supplement and modify the terms of the Agreement dated 3/26/2010, in addition to any and all related addenda, or amendments (collectively, the “Agreement”). To the extent that there is any inconsistency between the terms set forth in this Amendment and those set forth in the Agreement, the terms set forth in this Amendment shall prevail. DESCRIPTION OF PRODUCTS (the “Products”): Section A: Licensed Products Section B: Product Terms, Conditions, and Specifications, as applicable MODIFICATION TO AGREEMENT: This License Agreement Amendment shall terminate absolutely and without further obligation on the part of the Augusta, Georgia at the close of the calendar year in which it was executed and at the close of each succeeding calendar year for which it may be renewed. FEES AND PAYMENT TERMS (the “License Fees”): Any fees referred to in this Amendment are in United States dollars and do not include any duties, taxes (including, without limitation, any sales, use, ad valorem or withholding, value added or other taxes) or handling fees, all of which are exclusive of other fees to be paid by Licensee to Pictometry and which duties, taxes and fees will be paid by Licensee without reducing any amount owed to Pictometry unless documentation of tax exemption is provided to Pictometry prior to billing. Any amount payable by Licensee that is not paid within 30 days after its invoice date will accrue interest at the rate of 1.5% per month or at the maximum lesser rate allowed by law. In addition to any applicable interest, Licensee will pay Pictometry all costs it incurs to collect any amount due under this Amendment and any other Amendment(s) or Addenda to the Agreement described above, including but not limited to, attorneys' fees and court costs. LICENSEE NOTICE ADDRESS PICTOMETRY NOTICE ADDRESS 530 Greene Street A-101 | 100 Town Centre Drive, Suite A Augusta, GA 30901 Rochester, NY 14623 Attn: Michele Pearman, GIS Analyst Attn: Director, Contract Administration Phone: (706) 821-2843 Fax: Phone: (585) 486-0093 Fax: (585) 486-0098 Any modifications of this Amendment must be in writing and duly executed by an authorized representative of each Party hereto. Any purchase order or similar document that Licensee may issue in connection with this Amendment will be for ordering purposes only and that any terms and conditions on such purchase order will be of no force or effect. IN WITNESS WHEREOF, this Amendment is hereby duly executed by an authorized representative of each Party hereto and shall not become effective until execution by both Parties. PARTIES: “LICENSEE” “PICTOMETRY” NAME: PICTOMETRY INTERNATIONAL CORP. (entity type) a Delaware Corporation SIGNATURE: SIGNATURE: NAME: NAME: TITLE: TITLE: DATE: DATE: Attachment number 1 \nPage 1 of 3 Item # 40 Page 2 of 3 Augusta-Richmond County, GA – C116749 20120530 CMT-00005-20120514 SECTION A LICENSED PRODUCTS Pictometry International Corp. ORDER # 100 Town Centre Drive, Suite A C116749 Rochester, NY 14623 BILL TO SHIP TO Augusta-Richmond County, GA Augusta-Richmond County, GA Michele Pearman Michele Pearman 530 Greene Street A-101 | 530 Greene Street A-101 | Augusta, GA 30901 Augusta, GA 30901 (706) 821-2843 (706) 821-2843 pearman@augustaga.gov pearman@augustaga.gov CUSTOMER ID SALES REP TERM OF CONTRACT NUMBER OF FLIGHTS A116945 RRoth 1 year 0 QTY PRODUCT NAME PRODUCT DESCRIPTION LIST PRICE DISCOUNT PRICE/TYPE AMOUNT 317 Mosaic Standard Tiles (4in) Per Sector (GeoTIFF) 4-inch GSD Mosaic Tiles in GeoTIFF Format $40.00 $10.00 LTI Grant-Tiles $3,170.00 Thank you for choosing Pictometry as your service provider. TOTAL $3,170.00 PAYMENT TERMS Due at Shipment of Tiles $3,170.00 Total Payments $3,170.00 Attachment number 1 \nPage 2 of 3 Item # 40 Page 3 of 3 Augusta-Richmond County, GA – C116749 20120530 CMT-00005-20120514 SECTION B PRODUCT TERMS, CONDITIONS, AND SPECIFICATIONS The following are the terms, conditions, and specifications related to the products offered under the attached License Agreement. PRODUCT PARAMETERS MOSAIC TILES Product: Mosaic Standard Tiles (4in) Per Sector (GeoTIFF) Ortho Tile Projection: State Plane, NAD83 Ortho Tile Format: Units: Feet Elevation Source: Customer Provided Leaf: Less than 30% leaf cover (Off) Special Instructions: STANDARD TERMS AND CONDITIONS STANDARD ORTHO MOSAIC PRODUCTS Pictometry Standard Ortho Mosaic Products: Pictometry ortho mosaic products are the result of high definition, full color aerial images and automated mosaicking processes that incorporate digital elevation data to create large-area mosaic ortho images from the individual Pictometry ortho frames. Pictometry's process includes quality control, programmatic error correction, and data integrity checks into the planning, capture, and processing of the images. Certain artifacts may remain evident in the ortho mosaic tiles, including, but not limited to: disconnects in non-elevated surfaces , disconnects in elevated surfaces (roadways, bridges, etc.), building intersect and clipping, seasonal cutlines, ground illumination cutlines, color variations (illumination differences and multiple-aircraft/camera captures), color variations (mixed GSD), color variations (e.g. water) and lack of edges of coverage (the border of a county, for example). Note: If mathematical operations will be performed on the Mosaic Tiles (such as automated feature extraction), that would be compromised by compression artifacts, Ortho Mosaic Tiles may be created from non-compressed TIFF imagery and delivered in TIFF format with world files and separate trailers, minimal overlap, projected in State Plane, NAD 83, feet unless the projection is stated otherwise. Custom Ortho-Mosaics: It is important to note that while the custom ortho-mosaic can generally be created at any pixel resolution, up or down, creating an ortho-mosaic with a pixel size smaller than the ground sample distance of the input imagery will not contain any more information than the resolution of the input imagery. For example, if you create a six-inch ortho-mosaic from one-foot imagery, even though the pixels will be six-inch, the overall image data resolution will still only be one-foot. For this reason, it is important to ensure the base imagery purchased meets or exceeds the resolution requirements of any ortho-mosaics you need. Under-sampling, for instance creating a one-foot ortho-mosaic from six-inch resolution imagery, is not a problem and generally produces very good results. In general, ortho-mosaics from Pictometry’s neighborhood orthogonal imagery can meet NMAS 1:1200 (1.0-meter RMS error at 95% confidence interval) in relatively flat terrains or areas with good elevation data. For areas with highly variable terrain or areas with poor elevation data, this number generally drops to NMAS 1:2400 (2.0-meter RMS error at 95% confidence interval). Certified ortho-mosaics can be created from Pictometry’s community orthogonal imagery, but only under certain capture parameters. As such, it is important to include any custom ortho-mosaic requirement with the image capture requirements such that the community orthogonal imagery can be captured in a way consistent with certification requirements. Attachment number 1 \nPage 3 of 3 Item # 40 Attachment number 2 \nPage 1 of 9 Item # 40 Attachment number 2 \nPage 2 of 9 Item # 40 Attachment number 2 \nPage 3 of 9 Item # 40 Attachment number 2 \nPage 4 of 9 Item # 40 Attachment number 2 \nPage 5 of 9 Item # 40 Attachment number 2 \nPage 6 of 9 Item # 40 Attachment number 2 \nPage 7 of 9 Item # 40 Attachment number 2 \nPage 8 of 9 Item # 40 Attachment number 2 \nPage 9 of 9 Item # 40 Commission Meeting Agenda 8/7/2012 5:00 PM Vehicle Maintenance Contract Extension Department:Fleet/Finance Caption:Motion to approve request for Augusta Vehicle Maintenance Contract (RFP-09-123) to be extended for Year 2013. (Approved by Finance Committee July 30, 2012) Background:The current fleet maintenance 2010 agreement with First Vehicle Services, RFP-09-123, expires on December 31, 2012. The original contract included the option to (1) renew the contract at the end of the 36 month term; or (2) Extend the current contract on a year-to year basis. Fleet Management has requested that the contractor (First Vehicle Services) provide a history of previous activity with Augusta and a cost proposal for the extension of the existing contract for review. The final analysis will be presented to the commission for approval. Please see the attachment for a breakout of the proposal. Analysis:The total of the cost proposal for 2013, which includes labor, parts and supplies, other direct costs, and management fees, is $3,695,238.44. The contract cost for 2012 is $3,640,629.00. This is an increase of $54,609.40 or 1.5% over the current year. The maintenance contract covers over 2500 pieces of equipment & vehicles to include approximately: 513 automobiles, 382 light trucks, 44 heavy trucks, 37 agriculture tractors (for mowing), 702 pieces of landscaping equipment (including riding mowers), 37 fire machines, 177 trailers of all types, 692 pieces of small equipment, and other specialty items. Per the attached information, the existing contract one year extension would incur a minimal 1.5 percent increase over the current yearly cost. Financial Impact:Funding for fleet maintenance will be included in the 2013 budget as appropriate. Alternatives:(1) Approve the extension with First Vehicle Services from 1 January 2013 to 31 December 2013; (2) Direct a new Request for Proposal (RFP) to be published. Cover Memo Item # 41 Recommendation:Approve the one year contract extension proposal Funds are Available in the Following Accounts: To be included in Departmental and Fund level budgets during the 2013 budget process REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 41 Attachment number 1 \nPage 1 of 40 Item # 41 Attachment number 1 \nPage 2 of 40 Item # 41 Attachment number 1 \nPage 3 of 40 Item # 41 Attachment number 1 \nPage 4 of 40 Item # 41 Attachment number 1 \nPage 5 of 40 Item # 41 Attachment number 1 \nPage 6 of 40 Item # 41 Attachment number 1 \nPage 7 of 40 Item # 41 Attachment number 1 \nPage 8 of 40 Item # 41 Attachment number 1 \nPage 9 of 40 Item # 41 Attachment number 1 \nPage 10 of 40 Item # 41 Attachment number 1 \nPage 11 of 40 Item # 41 Attachment number 1 \nPage 12 of 40 Item # 41 Attachment number 1 \nPage 13 of 40 Item # 41 Attachment number 1 \nPage 14 of 40 Item # 41 Attachment number 1 \nPage 15 of 40 Item # 41 Attachment number 1 \nPage 16 of 40 Item # 41 Attachment number 1 \nPage 17 of 40 Item # 41 Attachment number 1 \nPage 18 of 40 Item # 41 Attachment number 1 \nPage 19 of 40 Item # 41 Attachment number 1 \nPage 20 of 40 Item # 41 Attachment number 1 \nPage 21 of 40 Item # 41 Attachment number 1 \nPage 22 of 40 Item # 41 Attachment number 1 \nPage 23 of 40 Item # 41 Attachment number 1 \nPage 24 of 40 Item # 41 Attachment number 1 \nPage 25 of 40 Item # 41 Attachment number 1 \nPage 26 of 40 Item # 41 Attachment number 1 \nPage 27 of 40 Item # 41 Attachment number 1 \nPage 28 of 40 Item # 41 Attachment number 1 \nPage 29 of 40 Item # 41 Attachment number 1 \nPage 30 of 40 Item # 41 Attachment number 1 \nPage 31 of 40 Item # 41 Attachment number 1 \nPage 32 of 40 Item # 41 Attachment number 1 \nPage 33 of 40 Item # 41 Attachment number 1 \nPage 34 of 40 Item # 41 Attachment number 1 \nPage 35 of 40 Item # 41 Attachment number 1 \nPage 36 of 40 Item # 41 Attachment number 1 \nPage 37 of 40 Item # 41 Attachment number 1 \nPage 38 of 40 Item # 41 Attachment number 1 \nPage 39 of 40 Item # 41 Attachment number 1 \nPage 40 of 40 Item # 41 Commission Meeting Agenda 8/7/2012 5:00 PM 15th Street Bridge over the Augusta Canal, and Broad Street On-Ramp overLake Olmstead (Bid Item#11-134) Department:Abie L. Ladson, PE, CPESC, Director Caption:Motion to award Design Consultant Services Agreement to Cranston Engineering Group, Inc. in the amount of $207,540.00 for 15th Street Bridge over The Augusta Canal, and Broad Street On-Ramp over Lake Olmstead. This Project will be funded through SPLOST PHASE VI for the Engineering Department. (Approved by Engineering Services Committee July 30, 2012) Background:The 15th Street Bridge over The Augusta Canal, and Broad Street On-Ramp over Lake Olmstead structures are in need of major repair and maintenance. It requires painting, sidewalk repairs, expansion joint repairs, lighting repairs, sub-structure and super- structure repairs, barrier repairs, and restoring the historical significance and aesthetics of the structure. Services will consist of bridge studies/reports, preliminary and final construction plans, construction contract documents, construction cost and schedules, life cycle cost analyses, field surveys, and construction observations. Analysis:On July 12, 2011, the following firms submitted RFPs and were evaluated based on qualifications, project approach, experience, and schedule: 1. Civil Services, Inc. 2. Cranston Engineering 3. Moreland Altobelli Associates, Inc. 4. R S & H 5. T.Y. Lin International Once the RFPs were evaluated, the three highest scored firms were scheduled for interviews on Augusta 22, 2011. Cranston Engineering Group, Inc. was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in SPLOST PHASE VI account number 328- 041110-5212115/211828012-5212115 upon Commission approval. Alternatives:1) Award Design Consultant Services Agreement to Cranston Engineering Group, Inc. in the amount of $207,540.00 for 15th Street Bridge over The Augusta Canal, and Broad Street On-Ramp over Lake Olmstead. This Project will be funded through SPLOST Cover Memo Item # 42 PHASE VI for the Engineering Department. 2) Do not approve and cancel project. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 328-041110-5212115/211828012-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 42 Attachment number 1 \nPage 1 of 6 Item # 42 Attachment number 1 \nPage 2 of 6 Item # 42 Attachment number 1 \nPage 3 of 6 Item # 42 Attachment number 1 \nPage 4 of 6 Item # 42 Attachment number 1 \nPage 5 of 6 Item # 42 Attachment number 1 \nPage 6 of 6 Item # 42 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project change is authorized to CPB# 328-041110-211828012 15th St. Bridge over the Augusta Canal & the Broad Street On-Ramp over Lake Olmstead to award the Design Consultant Agreement to Cranston Engineering, Group in the amount of $207,540.00 to be funded from SPLOST PHASE VI. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase VI 207,540$ 207,540$ Section 3: The following amounts are appropriated for the project: By Basin By District Raes Creek 3rd 207,540$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Deke Copenhaver, Mayor CAPITAL PROJECT BUDGET BRIDGE REHABILATION & REPAIRS Bid Item 11-134 CPB#328-041110-211828012 ( 15th St Bridge over the Augusta Canal, & Broad St On-Ramp over Lake Olmstead ) Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 5.24.2012 Attachment number 2 \nPage 1 of 2 Item # 42 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET BRIDGE REHABILATION & REPAIRS Bid Item 11-134 CPB#328-041110-211828012 ( 15th St Bridge over the Augusta Canal, & Broad St On-Ramp over Lake Olmstead ) CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPECIAL 1% SALES TAX, PHASE VI 328-041110-6011110-211828012 ($207,540)($207,540) TOTAL SOURCES: ($207,540)($207,540) USE OF FUNDS ENGINEERING 328-041110-5212115-211828012 $207,540 $207,540 TOTAL USES: $207,540 $207,540 5.24.2012 Attachment number 2 \nPage 2 of 2 Item # 42 Attachment number 3 \nPage 1 of 1 Item # 42 Attachment number 4 \nPage 1 of 5 Item # 42 Attachment number 4 \nPage 2 of 5 Item # 42 Attachment number 4 \nPage 3 of 5 Item # 42 Attachment number 4 \nPage 4 of 5 Item # 42 Attachment number 4 \nPage 5 of 5 Item # 42 TVS DESIGN 2700 PROMEANADE TWO 1230 PEACHTREE ST., NE ATLANTA, GA 30309 ATTN: MARK VIDEKOVICH BRPH, INC. 2000 POWERS FERRY RD., SUITE 600 MARIETTA, GA 30067 ATTN: MICHAEL A. CLIFFORD LINDSAY, POPE, BRAYFIELD, CLIFFORD & ASSOCIATES, INC. 344 WEST PIKE STREET LAWRENCEVILLE, GA 30046 ATTN: DOUG STRAUGHAN HUSSEY, GAY, BELL & DEYOUNG INT. 625 GREEN STREET, NE GAINESVILLE, GA 30501 ATTN: KYLE F. EPSTEIN WARREN EPSTEIN & ASSOCIATES 1785 CHESIRE BRIDGE RD., NE ATLANTA, GA 30324 ATTN: SCOTT WILLIAMS CRANSTON ENGINEERING OLD ENGINE CO. NO. 1 BLDG 452 ELLIS STREET AUGUSTA, GA 30901 THE POLOTE CO. 1810 MILL B LANE SAVANNAH, GA 31405 ATTN: TREY WINGATE W. K. DICKSON 1450 GREENE ST. SUITE 225 AUGUSTA, GA 30901 T Y LIN INTERNATIONAL 260 PEACHTREE STREET SUITE 900 ATLANTA, GA 30303 ATTN: TONY JOHNSON AECOM 1360 PEACHTREE ST NE STE 500 ATLANTA GA 30309 P M & A CONSULTING ENGINEERS 609 BROAD STREET AUGUSTA, GA 30901 RETURNED MAIL ATTN: PHILLIP GREENE SOUTHERN PARTNERS 1233 AUGUSTA WEST PARKWAY AUGUSTA, GA 30909 ATTN: BOB MUNGER MUNGER ASSOCIATES CONSULTING 596 LINKS LANE MARTINEZ, GA 30907 ATTN: TONY AECK LORD, AECK & SARGENT 1201 PEACHTREE ST, NE STE 300 ATLANTA, GA 30361 PBS & J 5665 NEW NORTHSIDE DR. SUITE 400 ATLANTA, GA 30328 ATTN: RICHARD LASCHOBER JOHNSON LASCHOBER & ASSOCIATES 1296 BROAD STREET AUGUSTA, GA 30901 EMC ENGINEERING SERVICES 4106 COLBERN BLVD, SUITE 105 EVANS, GA 30809 WR TOOLE ENGINEERS 1005 BROAD STREET AUGUSTA, GA 30901 ATTN: TONY PARKER POND & COMPANY 3500 PARKWAY LANE SUITE 600 NORCROSS, GA 30092 KRAFRA 418 8TH STREET AUGUSTA, GA 30901 ATTN: EDWARD LEHMAN ARCHETYPE DESIGN 4860 LEISURE DRIVE DUNWOODY, GA 30338 ATTN: JOANNA HENDERSON STEWART-COOPER-NEWELL 719 E. SECOND AVENUE GASTONIA, NC 28504 ATTN: JETAYA MCGHEE ROSSER INTERNATIONAL 524 W PEACHTREE ST. NW ATLANTA, AG 30308 ATTN: TERESA C. SMITH A & S ENGINEERING P. O. BOX 2413 EVANS, GA 30809 ATTN: JOSEPH PORTER, JR S. L. KING TECHNOLOGIES 270 PEACHTREE ST, NW. STUITE 1600 ATLANTA, GA 30303 ATTN: JOHN EISENLAU HO & K 191 PEACHTREE ST. NE SUITE 4100 ATLANTA, GA 30303 YVONNE GENTRY 500/HATCHER BUILDING ATTN: SANDIE VANVALKENBURG ZEL ENGINEERS 435 TELFAIR STREET AUGUSTA GA 30901 ABIE LADSON ENGINEERING ADMIN HAMEED MALIK ENGINEERING ADMIN RFQ ITEM #11-134 MAILED 5/27/11 RFP Item #11-134 Design & Field Engineering Services for Bridge Rehabilitation & Repairs For Engineering Department RFP Due: Tue 7/12/11 @ 3:00 p.m. Attachment number 5 \nPage 1 of 1 Item # 42 VENDORS Attachment B Addendum Original 9 Copies Fee Proposal Civil Services Inc 2394 St Johns Bluff Rd South Jacksonville, FL 32246 Yes Yes Yes Yes Yes Cranston Engineering Old Engine Co. No. 1 Bldg 452 Ellis Street Augusta, GA 30901 Yes Yes Yes Yes Yes Moreland Altobelli Associates, Inc 2211 Beaver Ruin Road, Suite 100 Norcross, GA 30071 Yes Yes Yes Yes Yes RS&H 730 Peachtree Street, Suite 430 Atlanta, GA 30308 Yes Yes Yes Yes Yes T Y Lin International 260 Peachtree Street, Suite 900 Atlanta, GA 30303 Yes Yes Yes Yes Yes Heath & Lineback Engineering Inc 209 Corporate Dr. Suite 300 Carollton, GA 30117 ZEL Engineers 435 Telfair Street Augusta, GA 30901 A & S Engineering P. O. Box 2413 Evans, GA 30809 AECOM 1360 Peachtree St Ne Ste 500 Atlanta, GA 30309 Archetype Design 4860 Leisure Drive Dunwoody, GA 30338 Atkins Global 1600 River Edge Parkway Atlanta, GA 30328 BRPH, Inc. 2000 Powers Ferry Rd., Suite 600 Marietta, GA 30067 EMC Engineering Services 4106 Colbern Blvd, Suite 105 Evans, GA 30809 Enercon 500 Townpark Lane, Suite 275 Kennesaw, GA 30144 HO & K 191 Peachtree St. NE, Suite 4100 Atlanta, GA 30303 Hussey, Gay, Bell & Deyoung Int. 625 Green Street, Ne Gainesville, GA 30501 Johnson Laschober & Associates 1296 Broad Street Augusta, GA 30901 RFP Item #11-134 Design & Field Engineering Services for Bridge Rehabilitation & Repairs for the City of Augusta - Engineering Department RFP Due: Tuesday, July 12, 2011 @ 3:00 P.M. Submitted No Bid Response Non-Compliant Missing E-Verify Number Page 1 of 2 Attachment number 6 \nPage 1 of 2 Item # 42 VENDORS Attachment B Addendum Original 9 Copies Fee Proposal RFP Item #11-134 Design & Field Engineering Services for Bridge Rehabilitation & Repairs for the City of Augusta - Engineering Department RFP Due: Tuesday, July 12, 2011 @ 3:00 P.M. Krafra 418 8th Street Augusta, GA 30901 Lindsay, Pope, Brayfield, Clifford & Associates, Inc. 344 West Pike Street Lawrenceville, GA 30046 Lord, Aeck & Sargent 1201 Peachtree St, Ne Ste 300 Atlanta, GA 30361 Munger Associates Consulting 596 Links Lane Martinez, GA 30907 Parsons Brinckerhff 3340 Peach Tree Road NE Ste 2400 Tower Place 100 Atlanta GA 30326 PBS & J 5665 New Northside Dr. Suite 400 Atlanta, GA 30328 Pond & Company 3500 Parkway Lane, Suite 600 Norcross, GA 30092 Rosser International 524 W Peachtree St. NW Atlanta, GA 30308 S. L. King Technologies 270 Peachtree St, NW, Suite 1600 Atlanta, GA 30303 Southern Partners 1233 Augusta West Parkway Augusta, GA 30909 Stewart-Cooper-Newell 719 E. Second Avenue Gastonia, NC 28504 The Polote Co. 1810 Mill B Lane Savannah, GA 31405TVS Design 2700 Promeanade Two 1230 Peachtree St., NE Atlanta, GA 30309W. K. Dickson 1450 Greene St. Suite 225 Augusta, GA 30901 Warren Epstein & Associates 1785 Chesire Bridge Rd., Ne Atlanta, GA 30324 Wilbur Smith Associates 2835 Brandywine Rd Ste 400 Atlanta GA 30341 WR Toole Engineers 1005 Broad Street Augusta, GA 30901 Page 2 of 2 Attachment number 6 \nPage 2 of 2 Item # 42 Attachment number 7 \nPage 1 of 1 Item # 42 Commission Meeting Agenda 8/7/2012 5:00 PM Approve the 2013 Solid Waste Collections Contract Department:Environmental Services Caption:Motion to approve the 2013 Solid Waste Collections Contracts with Advanced Disposal Services and Inland Services Corporation. (No recommendation from Engineering Services Committee July 30, 2012) Background:In the early 2000’s Augusta chose to implement mandatory trash collection service to residents in Augusta. As the years progressed, and contracts were continued, the service levels changed and the area that received serviced expanded. We are currently in the final extension period of the current contract – and that has been extended on a purely month-to-month basis with our current service providers. In 2011, Augusta released RFP 11-112 – Solid Waste and Recyclables Collection Services, to which there were four (4) compliant respondents. Analysis:The four compliant respondents were scored and based upon that scoring; contract negotiations were entered. During those negotiations, it became apparent that Augusta had two basic options for service – one company performing collection services for the entire county, or dividing the service area into two areas and allow two companies to provide services. At the recent Commission meetings, it was the will of the body that the service area be awarded to two companies and one-time-per-week trash services be offered. In addition, an incentive-based recycling program was included as well. At this time, and per the body’s instruction, the Department is providing and requesting approval of the Solid Waste Collections Contract for 2013. The Contract provides for very detailed daily service-level data to be provided electronically by each provider which will allow the Department to know and verify whether service was provided at a specific address. In addition, all the trash collection vehicles will operate on compressed natural gas, and have increased safety devices such as backup alarms which adjust to be louder than the surrounding background noise. The Contract also provides for the incentive- based recycling program (Recycle Perks) as requested by the Commission; and one-time per week trash collection services with variable cart sizes, and a comprehensive marketing and Cover Memo Item # 43 communication campaign to allow the Department to communicate and notify our customers of changes to their services. Financial Impact:Our budgeted rate for 2012 is $320 per year and we believe that rate should be appropriate for the new contract starting in 2013. Alternatives:1. Approve the Contract. 2. Do not approve the Contract. Recommendation:Alternative 1. Funds are Available in the Following Accounts: 542-04-4110/5222110 REVIEWED AND APPROVED BY: Cover Memo Item # 43 REQUEST FOR PROPOSALS Request for Proposals will be received at this office until Wednesday, April 27, 2011 @ 3:00 p.m. for furnishing: RFP Item #11-112 Solid Waste & Recyclable Collection Services for Solid Waste Department RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Richmond County web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. A Mandatory Pre-Proposal Meeting will be held on Friday, April 1, 2011 @ 11:00 a.m. in the Procurement Department 530 Greene Street, Room 605. All questions must be submitted by fax at 706 821-2811 or by email to procbidandcontract@augustaga.gov by Monday, April 11, 2011 @ 5:00 p.m. No RFP will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the Procurement Department with your bonafide bid package. No RFP may be withdrawn for a period of 120 days after time has been called on the date of opening. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark RFP number on the outside of the envelope. Bidders are cautioned that sequestration of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Funding for this project may include federal funds provided by the U. S. Department of Transportation (DOT) and/or other federal agencies. All DOT funded projects are subject to the requirements of 49 CFR Part 26. These requirements are mandatory and non-negotiable. Augusta enforces Disadvantage Business Enterprise (DBE) requirements and/or DBE goals set by Federal and/or State Agencies in accordance with State and Federal laws. Please be advised that the U. S. District Court for the Southern District of Georgia has entered on Order enjoining the Race-Based portion of Augusta, Georgia’s DBE Program. Thus, Augusta, Georgia does not have or operate a DBE, MBE or WBE Program for projects (or portions of projects) having Augusta, Georgia s the source of funding. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle March 10, 17, 24, 31, 2011 Metro Courier March 16, 2011 cc: Tameka Allen Interim Deputy Administrator Mark Johnson Solid Waste Lori Videtto Solid Waste Attachment number 1 \nPage 1 of 1 Item # 43 RFP Item #11-112 Solid Waste Recyclables Collection Services for the City of Augusta - Solid Waste Department RFP Due: Thursday, June 23, 2011 @ 3:00 p.m. VENDORS Attachment B Bidders Form Bid Bond Addendums 1 - 6 Original 6 Copies Fee Proposal Advanced Disposal 5734 Columbia Road Grovetown GA 30813 YES YES YES YES YES YES YES Inland Service Corp 1561 Doug Barnard Pkwy Augusta GA 30906 YES YES YES YES YES YES YES Waste Management 208 Prep Phillips Drive Augusta GA 30901 YES YES YES YES YES YES YES Waste Pro 1405 Danielsville Road Athens GA 30601 YES YES YES YES YES YES YES Berry Smith Sanitation 1308 New Savannah Road Augusta GA 30901 A-1 Sanitation Service 3452-B Peach Orchard Road Augusta GA 30906 Metro-Waste 1824 Wylds Road Suite A5 Augusta GA 30909 Republic Services, Inc. 84 Clifton Blvd Savannah GA 31408 Veolia ES Solid Waste 1101 Hawkins Street Valdosta GA 31601 Augusta Disposal Po Box 334 Evans GA 30809 Choice Environmental 2860 State Road 84 Fort Lauderdale, FL 33312 Clean Energy 3988 Shadow Loch Drive Suwanee GA 30024 Coleman Sanitation 3010 Georgia Road Augusta GA 30906 Columbia Waste 1064 Franke Industrial Boulevard Augusta GA 30901 Dorado Services Inc 195 W Seminole Boulevard Sanford FL 32771 Gallop & Associates 2911 Point West Drive Augusta GA 30909 Inland Service Corp 1561 Doug Barnard Pkwy Augusta GA 30906 Precision Waste Services Po Box 446 Thomson GA 30824 Richmond Waste Inc Po Box 6887 Augusta GA 30916 Submitted No Bid Response Submitted No Bid Response Submitted No Bid Response Submitted No Bid Response Non-Compliant Attachment B missing E-Verify Number Page 1 of 2 Attachment number 2 \nPage 1 of 2 Item # 43 RFP Item #11-112 Solid Waste Recyclables Collection Services for the City of Augusta - Solid Waste Department RFP Due: Thursday, June 23, 2011 @ 3:00 p.m. VENDORS Attachment B Bidders Form Bid Bond Addendums 1 - 6 Original 6 Copies Fee Proposal Schaefer Systems 4235 Marsh Landing Blvd Apt 432 Jacksonville Beach FL 32250 Spartan Waste 3668 Sterling Ridge Way Decatur GA 30032 Unity Disposal & Recycling Llc 14862 Old Gunpowder Road Laurel MD 20707 Waste Industries 2699 Cochran Industrial Blvd Douglasville GA 30134 World Waste Recycling Inc 3547 Nw 49th Street Miami FL 33142 Page 2 of 2 Attachment number 2 \nPage 2 of 2 Item # 43 Evaluation Criteria PTS Advanced Disposal 5734 Columbia Road Grovetown GA 30813 Inland Service Corp 1561 Doug Barnard Pkwy Augusta GA 30906 Waste Management 208 Prep Phillips Drive Augusta GA 30901 Waste Pro 1405 Danielsville Road Athens GA 30601 1. Staffing 10 6 6 9 7 2. Experience 20 14 17 17 14 3. Available Resources 10 8 8 8 8 4. Financial Stability &Financial Statement 10 6 4 9 7 5. Implementation Plan 5 3 3 5 4 6. Customer Service Procedures 5 2 3 5 4 8. Litigation History 5 4 4 5 4 9. Criminal Convictions / Environmental iolations 5 5 5 5 5 10. Cost for Service 10 10 8 4 6 11. Other Benefits to the County 15 3 7 5 0 11. Proximity to Area Within Augusta 5 pts Within the CSRA 4 pts Within Georgia 3 pts Within Southeast US 2 pts All Others 1 pt 5 4 5 5 3 TOTAL 100 64 71 77 62 Cumulative Evaluation Sheet - RFP Item #11-112 Solid Waste & Recyclables Collection Services For The City of Augusta – Solid Waste Department Comments: Attachment number 3 \nPage 1 of 1 Item # 43 Attachment number 4 \nPage 1 of 5 Item # 43 Attachment number 4 \nPage 2 of 5 Item # 43 Attachment number 4 \nPage 3 of 5 Item # 43 Attachment number 4 \nPage 4 of 5 Item # 43 Attachment number 4 \nPage 5 of 5 Item # 43 Attachment number 5 \nPage 1 of 4 Item # 43 Attachment number 5 \nPage 2 of 4 Item # 43 Attachment number 5 \nPage 3 of 4 Item # 43 Attachment number 5 \nPage 4 of 4 Item # 43 Attachment number 6 \nPage 1 of 3 Item # 43 Attachment number 6 \nPage 2 of 3 Item # 43 Attachment number 6 \nPage 3 of 3 Item # 43 Attachment number 7 \nPage 1 of 1 Item # 43 AUGUSTA, GEORGIA SOLID WASTE AD 1 RECYCLABLES COLLECTIO AGREEMET 2 3 THIS AGREEMENT (the "Agreement") is effective as of the day of ____________ ___, 2012 (the 4 "Effective Date"), with the first day of service being April 1, 2013 (the “Starting Date”) by and between 5 Augusta, Georgia, a political subdivision of the state of Georgia (hereinafter referred to as the "Augusta"), 6 and ______________, a _________ corporation doing business as _________________ (hereinafter 7 referred to as "Contractor"). 8 9 WHEREAS, Augusta, Georgia owns and operates a Subtitle D and inert landfill known as Deans Bridge 10 Road Landfill; and 11 12 WHEREAS, the Deans Bridge Road Landfill is the destination for the solid waste to be collected under 13 this Agreement; and 14 15 WHEREAS, Augusta desires the Contractor to provide Residential Units with Residential Garbage, 16 Recyclables, Yard Waste and Bulky Waste collection to its citizens; and 17 18 WHEREAS, Augusta desires the Contractor to provide Designated Non-Residential Locations with 19 Residential Garbage and Recyclables, collection to its citizens; and 20 21 WHEREAS, Augusta desires the Contractor to provide Unoccupied Locations with Yard Waste and 22 Bulky Waste collection to its citizens; and 23 24 WHEREAS, the Contractor desires to provide such solid waste and recyclables collection services; and 25 26 WHEREAS, Augusta desires the Contractor to provide vehicles that operate solely on compressed natural 27 gas (hereinafter referred to as “CNG”); and 28 29 WHEREAS, Augusta desires to provide the Contractor with CNG; and 30 31 WHEREAS, the Contractor agrees to purchase CNG from Augusta; and” 32 33 WHEREAS, all parties hereto desire to set forth the rights and obligations of the parties in this 34 Agreement. 35 36 NOW, THEREFORE, in consideration of the promises, the mutual premises and the compensation as 37 defined below and other good and valuable consideration, the parties hereto hereby agree as follows: 38 39 40 SECTIO 1 - DEFIITIOS 41 42 For the purpose of this collection services contract, hereinafter referred to as "Contract", the definitions 43 contained in this Section shall apply unless otherwise specifically stated. When not inconsistent with the 44 context, words used in the present tense include the future, words in the plural include the singular, and 45 words in the singular include the plural. To the extent the definitions contained herein conflict with 46 similar definitions in any federal, state or local law, the definition in the Contract shall prevail. Use of the 47 masculine gender shall include the feminine gender. The word "shall" is always mandatory and not 48 merely discretionary. 49 50 Attachment number 8 \nPage 1 of 73 Item # 43 Page 2 of 73 Solid Waste & Recyclables Collection Augusta, GA Area Miss means missed collection involving one hundred (100) or more Residential Units, Designated 51 Non-Residential Locations, and Unoccupied Locations in the Designated Collection Area on one 52 collection day. 53 54 Appliances see White Goods. 55 56 Building Material see Construction Debris. 57 58 Bulky Waste means large items of solid waste such as furniture, mattresses, and other items too large for 59 the Roll-Out Cart, including any oversized wastes whose large size precludes or complicates their 60 handling by normal solid waste collection. Bulky Waste as defined here shall include property owner or 61 tenant generated building materials. Bulky Waste is divided into two (2) distinct categories; a) piles less 62 than 10 cubic yards; and b) piles 10 cubic yards or greater. 63 64 Carry-Out Collection means special handling service provided to those individuals unable to place their 65 Residential Garbage or Recyclables curbside for collection due to Physical Impairment and where no 66 person(s) capable of placing the Residential Garbage or Recyclables curbside resides at the dwelling. 67 Carry-Out Collection services are not available for Yard Waste or Bulk Waste. In no event will the 68 quantity of persons receiving Carry-Out Collection services exceed three percent (3%) of the total 69 Residential Units located within the Designated Collection Area. Carry-Out Collections shall be limited 70 to a maximum of 200 feet from the public right of way. 71 72 Collection Schedule means the days of collection authorized by the Contract. 73 74 Collection Services means Residential Garbage, Recyclables, Yard Waste and Bulky Waste collection, as 75 described herein. 76 77 Construction Debris means waste building materials resulting from construction, remodeling, repair, or 78 demolition operations. 79 80 Contract means this Agreement as executed for the provision of solid waste collection services in 81 Augusta, including all of the provisions, responsibilities, procedures, remedies, and attachments without 82 exception. 83 84 Contract Administrator means Augusta’s Environmental Services Director, or designee, assigned to 85 administer this Contract on behalf of Augusta. 86 87 Contract Term means the duration of the Contract, measured from the Starting Date as set forth in this 88 Agreement. 89 90 Courtesy Collections means special collection requests by Augusta that the Contractor shall be 91 responsible for providing within the same time period as regularly scheduled collections. 92 93 Customer means the recipient of collection services within Augusta, provided through this Contract, and 94 includes Residential Units, Designated Non-Residential Locations, and Unoccupied Locations. 95 96 Damages means agreed to, actual, compensatory, consequential, continuing, direct, irreparable, punitive, 97 presumptive, proximate and/or recissory damages incurred by Augusta, the payment of which shall not be 98 an exclusive remedy. 99 100 Attachment number 8 \nPage 2 of 73 Item # 43 Page 3 of 73 Solid Waste & Recyclables Collection Augusta, GA Dead Animals means animals or portions thereof equal to or less than 100 pounds in weight, which have 101 expired. 102 103 Designated Collection Area means the geographic area of which the Contractor will provide collection 104 and other services pursuant to the Contract. Collection points will be at the curb or other Augusta 105 determined locations for Customers receiving Carry-Out Collection service. 106 107 Designated Disposal Facility means a facility to which Garbage, Yard Waste and Bulky Waste collected 108 under the Contract must be delivered. The disposal facility for Residential Garbage, Yard Waste and 109 Bulky Waste collected as part of this Contract will be the Deans Bridge Road Landfill located in Augusta, 110 Georgia. 111 112 Designated on-Residential Location means a non-residential location in the Service Area that receives 113 collection and other solid waste services from the Contractor. An example would be public facilities or 114 small businesses serviced by Roll-Out Carts. 115 116 Designated Recycling Facility means a Materials Recovery Facility or transfer station selected by 117 Augusta for delivery of Recyclables and/or White Goods collected under this Contract. 118 119 District Manager means the employee designated by the Contractor as the Contractor's primary 120 representative with regard to matters involving this Contract. 121 122 Fiscal Year means Augusta’s fiscal year that runs from January 1 through December 31. 123 124 Garbage, Residential See Residential Garbage 125 126 Hazardous Waste means waste, in any amount, which is defined, characterized, or designated as 127 hazardous by the United States Environmental Protection Agency or appropriate State agency by or 128 pursuant to federal or state law, or waste, in any amount, which is regulated under federal or state law; as 129 well as all waste defined as "Hazardous Waste" in this Agreement. For the purposes of this Agreement, 130 the term Hazardous Waste shall also include, but is not limited to, motor oil, gasoline, and liquid paint. 131 132 Hot Load means any vehicle carrying solid waste observed to be smoldering, smoking, on fire, giving off 133 odors, or leaking a caustic or corrosive substance. 134 135 Implementation Plan means a document describing in detail the activities that will be undertaken and 136 the schedule that will be followed to successfully implement the Contractor’s collection services under 137 this Contract on the Start Date. The Implementation Plan shall include a description of how the 138 Contractor will evaluate routing and determine routes. 139 140 Littering means allowing spilled or wind-blown materials to come from the vicinity of the Contractor's 141 truck hopper or to fall to the ground as the Roll-Out Carts are emptied. 142 143 Maintenance Director means the person the Contractor has assigned to Augusta, and shall be a qualified 144 person to be in charge of maintenance associated with providing Collection Services within the Service 145 Area. The Maintenance Director shall be physically stationed in the Service Area and available to 146 Augusta through the use of telecommunications equipment at all times that the Contractor is providing 147 Collection Services. 148 149 Material Recovery Facility or MRF means a site used for the collection, storage, and processing of 150 Recyclables. 151 Attachment number 8 \nPage 3 of 73 Item # 43 Page 4 of 73 Solid Waste & Recyclables Collection Augusta, GA 152 Miss means any Request for Service of a missed collection reported to Augusta. 153 154 Physical Impairment means a condition that renders an individual physically unable to bring a Roll-Out 155 Cart either to the curb or for whom the undertaking of such an act would clearly and seriously threaten 156 that person's health. 157 158 Putrescible means wastes that will decay or become rotten such as meats, dairy products, vegetables, 159 fruits, etc. that are normally the source of odors and are attractive to insects. 160 161 Producer means a property owner or tenant of a Residential Unit, Designated Non-Residential Location 162 and Unoccupied Location who generates solid waste. 163 164 Recyclables means solid waste including but not limited to newsprint and inserts; junk mail, cardboard, 165 books and phone books, food packaging (not contaminated by food), magazines, paper bags and boxes; 166 plastic bottles and containers to include items labeled #1 and #2, plastic milk containers, detergent bottles 167 and plastic soft drink and liquor bottles; aluminum, steel, or tin cans; and other items determined to be 168 recyclable by Augusta. Augusta may amend this list from time to time. 169 170 Recyclables Cart means the container designated and authorized by Augusta based upon the container's 171 depth, size, and material and identified solely for Recyclables. It shall be subject to the collection 172 regulations pertaining to Recyclables. 173 174 Refuse means all nonputrescible material discarded for disposal as Residential Garbage. 175 176 Repeat Collection Miss means two or more collection misses at any one Residential Unit, Designated 177 Non-Residential Location, Unoccupied Location, or other designated collection point during any thirty 178 (30) day period or four (4) or more collection misses in a ninety (90) day period. 179 180 Request for Service means reported customer service requests or discovered missed collection of 181 Residential Garbage, Recyclables, Yard Waste or Bulky Waste from any one Residential Unit, 182 Designated Carry-out Collection Locations, Designated Non-Residential Locations, Unoccupied Location 183 or Courtesy Collections on the form used by Augusta to document customer service requests. Usually this 184 request is transmitted electronically to the Contractor and can also be referred to as an "Insight" or "GBA" 185 work order. 186 187 Residential Garbage means residential waste including but not limited to animal and vegetable matter; 188 non-hazardous residential waste materials; properly contained medical waste; discarded food or beverage 189 containers; discarded toys, clothing and other residential items; but excluding liquids of any kind. For the 190 purpose of this Contract, Residential Garbage also includes garbage generated by Designated Non-191 Residential Locations. 192 193 Residential Unit means any single-family dwelling, condominium, or rental unit with four (4) or fewer 194 dwelling units at one location. Each dwelling unit contained in a condominium and each dwelling unit in 195 apartment complexes with four (4) or fewer rental units will be counted as separate collection points. 196 197 Roll-Out Cart means the gray (or any other color) plastic Roll-Out Cart supplied by Augusta to 198 Customers or other designated Producers for the collection of Residential Garbage or Recyclables. 199 200 Service Area means the area(s) within Augusta limits served by the Contractor(s) and any annexations, if 201 granted. 202 Attachment number 8 \nPage 4 of 73 Item # 43 Page 5 of 73 Solid Waste & Recyclables Collection Augusta, GA 203 Supervisor means the person the Contractor has assigned to Augusta, and shall be a qualified supervisor 204 to be in charge of the operations within the Service Area. The supervisor shall be physically stationed in 205 the Service Area and available to Augusta through the use of telecommunications equipment at all times 206 that the Contractor is providing Collection Services. 207 208 Valid Miss means any missed Request for Service or solid waste collection determined by Augusta to 209 result from Contractor negligence or omission. 210 211 Vehicle Leaks and Spills means leaks consisting of a constant drip of fluids or fluid spills that leave 212 visible puddles or "staining" upon the pavement. These fluids can be any of the motor fluids, hydraulic 213 fluids, or waste liquids from the compactor unit. 214 215 White Goods includes refrigerators, ranges, water heaters, freezers, unit air conditioners, washing 216 machines, dishwashers, clothes dryers, any others similar domestic appliances that are collected by the 217 Contractor for recycling. 218 219 Yard Waste means grass, leaves, limbs, trimmings, or other plant or vegetative material generated by the 220 Customer and separated and placed at curbside for collection. Yard Waste is divided into two (2) distinct 221 categories; a) quantities less than 10 cubic yards; and b) quantities 10 cubic yards or greater. 222 223 Unoccupied Locations means a vacant or unoccupied Residential Unit, unimproved property or vacant 224 lot. 225 226 SECTIO 2 - COTRACT TERM AD COMMECEMET 227 228 2.1 Performance Commencement 229 The term of this Agreement shall commence on April 1, 2013, and terminate on December 31, 2021 (the 230 “Initial Term”) unless this Agreement is terminated earlier by Augusta as herein provided. This 231 Agreement may be renewed for two (2) or more successive two (2) year terms (the “Renewal Terms”) 232 upon mutual agreement of the parties at the rates herein (as may be adjusted as provided herein) no less 233 than sixty (60) days prior to the expiration of the Initial Term or the then current Renewal Term. 234 235 2.2 Transition prior to Commencement Date of this Contract. 236 Contractor understands and agrees that the time between the formal Contract signing and April 1, 2013 is 237 intended to provide the Contractor with sufficient time to, among other things, order equipment, prepare 238 necessary routing changes, and prepare to start services. Contractor shall be responsible for the provision 239 of all collection services beginning April 1, 2013. Accordingly, Contractor shall provide collection 240 services as set forth in this Contract no later than April 1, 2013. 241 242 2.3 Deadlines for the Contractor's Implementation Planning. 243 At a minimum, the Contractor must address the following specific performance requirements in the 244 Implementation Plan and accomplish them according to the following deadlines. Dates may be modified 245 by mutual agreement. 246 By June 29, 2012 Contractor shall hire the District Manager, who shall attend the Implementation 247 Plan discussion meeting. 248 By July 13, 2012 Contractor shall provide Augusta’s Contract Administrator with a collection and 249 maintenance plan, which shall be subject to the approval of Augusta’s Contract Administrator. 250 The maintenance plan shall include a description of how emergency maintenance issues will be 251 handled. Ten days after receiving Augusta Contract Administrator’s comments, the Contractor 252 Attachment number 8 \nPage 5 of 73 Item # 43 Page 6 of 73 Solid Waste & Recyclables Collection Augusta, GA shall provide Augusta Contract Administrator with a revised collection and maintenance plan, if 253 necessary. 254 By July 13, 2012 Contractor shall submit to Augusta’s Contract Administrator documentation 255 demonstrating that: (a) all necessary vehicles, equipment, and containers have been ordered and 256 will be delivered to Contractor's equipment yard no later than January 11, 2013. 257 By July 13, 2012 Contractor and Augusta shall meet and discuss the Contractor’s Implementation 258 Plan. 259 By July 13, 2012 Contractor shall request a detailed customer list from Augusta to show all 260 Residential Garbage, Designated Non-Residential, and Unoccupied Locations. The Contractor 261 shall also request other information that the Contractor may reasonably need for an effective 262 implementation. This may include lists of Carry-Out Collection locations, exempt locations from 263 services, and locations with multiple Roll-Out Carts. 264 By Augusta 10, 2012 Contractor and Augusta shall meet and discuss the Contractor’s 265 Implementation Plan. 266 By September 7, 2012 Contractor and Augusta shall meet and discuss the Contractor’s 267 Implementation Plan. 268 By September 14, 2012 the Contractor shall have audited the detailed customer list from Augusta 269 to show all Residential Garbage, Designated Non-Residential, and Unoccupied Locations and 270 provide discrepancies back to Augusta in a format acceptable to Augusta. 271 By October 5, 2012 Contractor and Augusta shall meet and discuss the Contractor’s 272 Implementation Plan. 273 By November 9, 2012 Contractor and Augusta shall meet and discuss the Contractor’s 274 Implementation Plan. 275 By December 7, 2012 Contractor and Augusta shall meet and discuss the status of the 276 Contractor’s Implementation Plan and its completion. 277 By January 11, 2013 Contractor and Augusta shall meet and discuss the status of the Contractors 278 Implementation Plan and its completion. 279 By January 11, 2013 Contractor shall confirm in writing to Augusta Contract Administrator that 280 all of the vehicles and equipment necessary to provide Collection Services have been delivered to 281 the Contractor's equipment yard. 282 By January 18, 2013 Contractor shall confirm in writing to Augusta Contract Administrator that 283 all of the vehicles necessary to provide collection services have been registered, licensed, tagged, 284 and equipped, and are ready to perform in compliance with the requirements of this Contract. 285 By January 18, 2013 Contractor shall provide Augusta Contract Administrator with a vehicle and 286 equipment list, which shall identify the make, type, year, license number, and identification 287 number for each Collection vehicle. 288 By January 25, 2013, Contractor shall ensure that all collection vehicles have been properly 289 permitted, inspected, and have an established tare weight with the Designated Disposal Facility. 290 By January 25, 2013 Contractor shall confirm in writing to Augusta Contract Administrator that: 291 (a) Contractor has hired and trained all of the employees needed to provide Collection Service in 292 compliance with the requirements in this Contract; (b) all of the Contractor's drivers have 293 inspected their collection routes and confirmed their ability to complete their routes on the 294 scheduled collection work day; (c) drivers have been made aware of all Carry-Out Collection 295 locations; (d) provide a certification that all employees working under this contract have passed 296 the Contractors background check; (e) provide a certification that all employees working under 297 this contract have passed a pre-employment drug test; and (f) provide a certification that all 298 employees working under this contract have agreed to abide the operating rules of the Designated 299 Disposal Facility and Designated Recycling Facility. 300 301 2.3.1 CG Station Implementation Planning 302 Attachment number 8 \nPage 6 of 73 Item # 43 Page 7 of 73 Solid Waste & Recyclables Collection Augusta, GA At a minimum, the Contractor must address the following specific performance requirements in 303 the Implementation Plan and accomplish them according to the following deadlines. Dates may 304 be modified by mutual agreement. 305 306 Within one week of Contract award, Contractor shall meet with Augusta to discuss the 307 implementation of the CNG stations. 308 By June 29, 2012, Contractors and Augusta shall meet and discuss locations as well as site 309 design, specifications and the companies who will construct the stations. 310 By July 20, 2012, Contractors shall finalize design of the station and an Agreement shall be 311 entered into with a development partner. 312 By August 13, 2012, Construction commencement. 313 By January 18, 2013, Construction completion and facility operational.” 314 By April 1, 2013, title of said property, equipment and the station shall be turned over to Augusta. 315 316 2.4 Transition upon Expiration of this Contract 317 318 2.4.1 Continuation of Contractor’s Service 319 If Augusta does not exercise its right to renew this Contract or if there are no renewal options 320 remaining, Augusta will attempt to award a new agreement at least six (6) months prior to the 321 expiration of this Contract. In the event a new agreement has not been awarded within such time 322 frame, Contractor shall provide Collection Services to Augusta on a month-to-month basis after 323 the expiration of this Contract, at the then established rates, if Augusta requests this service with 324 at least thirty (30) days notice to the Contractor. 325 326 2.4.2 Schedule for Termination of Contractor’s Service 327 Prior to the termination of this Contract, Contractor shall work with Augusta to ensure that there 328 is no interruption or reduction of service when the Contractor ends its services to Augusta. If a 329 new contract is awarded to a hauler other than the Contractor, the Contractor shall coordinate and 330 cooperate with the newly selected hauler, as well as Augusta, to minimize any disruptions in the 331 service provided to the public. 332 333 334 SECTIO 3 - GEERAL COLLECTIO REQUIREMETS 335 336 3.1 Scope of Service 337 Commencing on the Starting Date, the Contractor shall collect and transfer, in a workmanlike manner, 338 according to the Collection Service Frequency in Section 3.5; the following: 339 340 3.1.1 Residential Garbage 341 Residential Garbage and Recyclables in Augusta-provided Roll-Out Carts placed at curbside, 342 Yard Waste placed at curbside, and Bulky Waste placed at curbside at each Residential Unit. 343 344 3.1.2 Designated on-Residential Location 345 Residential Garbage and Recyclables in Augusta-provided Roll-Out Carts placed at curbside, at 346 each Designated Non-Residential Location. 347 348 3.1.3 Unoccupied Locations 349 Yard Waste placed at curbside, and Bulky Waste placed at curbside at each Unoccupied 350 Location. 351 352 Attachment number 8 \nPage 7 of 73 Item # 43 Page 8 of 73 Solid Waste & Recyclables Collection Augusta, GA 3.1.4 Roll-out Carts 353 Approved Roll-Out Carts have been or shall be provided by Augusta to each Residential Unit 354 and Designated Non-Residential Location. Additionally, the Contractor shall provide Carry-Out 355 Collection for those residents qualifying for this special service and all Courtesy Collections 356 when requested by Augusta. The Contractor shall furnish all labor, equipment materials, tools, 357 storage, insurance, supervision, and all other items incidental thereto and to perform all work 358 necessary and specified in the prescribed manner and time, to provide Collection Services, in the 359 Designated Collection Area, as described herein. 360 a. Residential and Designated on-Residential Location Roll-Out Carts – Garbage: 361 Each Residential Unit and Designated Non-Residential Locations is initially authorized 362 one (1) gray topped Roll-Out Cart with an Augusta, Georgia logo, should the volume 363 needs for Residential Garbage increase for a specific Residential Unit or Designated 364 Non-Residential Locations, Augusta may authorize additional Roll-Out Cart(s) for that 365 location. Augusta will then pay for the additional Roll-Out Cart(s) at the rates specified. 366 Multiple Augusta, Georgia Roll-Out Carts beyond those authorized at each location, 367 personal carts or cans, and Roll-Out Carts from other hauling services containing 368 Residential Garbage shall not be emptied, and the Contractor shall report these 369 unauthorized carts immediately to Augusta for investigation. 370 371 b. Residential and Designated on-Residential Location Roll-Out Carts – Recyclables: 372 Each Residential Unit and Designated Non-Residential Locations are authorized one (1) 373 blue topped Roll-Out Cart with an Augusta, Georgia logo, should the volume needs for 374 Recyclables increase for a specific location, Augusta may authorize additional Roll-Out 375 Cart(s). 376 377 3.1.5 Extra Residential Garbage Collection 378 Residential Garbage placed outside the Roll-Out Cart on a regular basis shall not be collected, 379 and the Contractor shall report the address to Augusta for investigation. A maximum of five (5) 380 bags of Residential Garbage placed outside the Roll-Out Cart no more than once per quarter will 381 be allowed to accommodate special occasions, but the Contractor shall report the address for 382 entry into the Insight Work Order System for monitoring purposes. Residential Garbage shall 383 not be collected as Bulky Waste except as otherwise allowed by the Agreement. 384 3.1.6 Bulky Waste Collection 385 The Contractor shall collect Category One (1) Bulky Waste once per week from Residential Units 386 and Unoccupied Locations. Contractor shall strictly follow established process as written herein 387 or as later modified in writing. Bulky Waste is divided into two distinct categories as described 388 below: 389 a. Category One (1): Bulky piles less than 10 cubic yards that do not require scheduling, qualify 390 for curb-side collection, and are collected by the Contractor as part of the residential route 391 collection process; and 392 393 b. Category Two (2): Bulk Waste piles 10 cubic yards or greater that do not qualify for curbside 394 collection, must be placed for Augusta grapple truck collection. When the Contractor 395 encounters a Bulk Waste pile 10 cubic yards or greater the Contractor shall NOT collect any 396 portion of this Bulk Waste pile and report the location immediately to Augusta for 397 investigation. 398 399 c. Reporting of Category Two bulky waste shall be either through an automated on-board 400 software solution or via email from the Contractor. 401 402 Attachment number 8 \nPage 8 of 73 Item # 43 Page 9 of 73 Solid Waste & Recyclables Collection Augusta, GA 3.1.7 Yard Waste Collection 403 The Contractor shall collect Category One (1) Yard Waste from Residential Units and 404 Unoccupied Locations according to Section 3.5. Yard Waste shall be placed in Kraft paper bags, 405 in Customer provided cans, clearly identifiable as Yard Waste, or in piles. Contractor shall 406 strictly follow established process as written herein or as modified later in writing. Yard Waste is 407 divided into two distinct categories as described below: 408 a. Category One (1): Yard Waste Piles less than 10 cubic yards that do not require scheduling, 409 qualify for curb-side collection, and are collected by the contractor as part of the residential 410 route collection process, provided that any material shall be no longer than 5 feet in length 411 and be reasonably accessible by manpower. Christmas trees will be eligible for collection as 412 Yard Waste and are not required to meet the stated standards, so long as lights and 413 decorations have been removed; and 414 415 b. Category Two (2): Yard Waste piles 10 cubic yards or greater that do not qualify for curbside 416 collection must be placed for Augusta grapple truck collection. When the Contractor 417 encounters a Yard Waste pile 10 cubic yards or greater Contractor shall NOT collect any 418 portion of this Yard Waste pile and report the location immediately to Augusta for 419 investigation. 420 421 c. Reporting of Category Two yard waste shall be either through an automated on-board 422 software solution of via email from the Contractor. 423 424 3.1.8 Residential Recyclables Collection 425 The Contractor shall collect Recyclables from Residential Units, and Designated Non-Residential 426 Locations. Operation and expansion of the residential recycling program is a high priority for 427 Augusta. 428 a. The Contractor shall provide an incentive based recycling program offered by Recycling 429 Perks. The Recycling Perks scope of services is listed as Appendix D and shall be 430 considered a material requirement of this Contract. 431 432 b. The Contractor shall exercise due care not to contaminate the Recyclables. 433 c. The Contractor shall ensure that its provision of the services does not in any manner 434 contribute to contamination levels and shall adhere to the collection vehicle cleaning 435 requirements described herein. 436 437 3.1.9 Roll-Out Cart and Recyclable Cart Placement 438 Contractor shall return Roll-Out Carts and Recyclable Carts to their original position, as provided 439 by Section 5.4; taking care not to block access to driveways or mailboxes after it has been 440 emptied. Contractor shall reasonably attempt to close Roll-Out Cart and Recyclable Cart lids. 441 442 3.2 Designated Collection Area 443 Augusta hereby gives, grants, and awards to the Contractor the exclusive right to pickup, collect, and 444 transport for disposal or processing Residential Garbage, Recyclables, Yard Waste and Bulky Waste from 445 all Residential Unit, Designated Non-Residential Location and Unoccupied Location collection points 446 within the Designated Collection Area, as described herein. For this Agreement, Advanced Disposal 447 Services Augusta, LLC, shall provide service to Designated Collection Area 1 (DCA 1) and Inland 448 Services Corporation shall provide service to Designated Collection Areas 2 and 3 (DCA 2 and DCA 3). 449 A map of the Designated Collection Areas is presented in Appendix A. 450 3.3 Monthly Performance Summary 451 Attachment number 8 \nPage 9 of 73 Item # 43 Page 10 of 73 Solid Waste & Recyclables Collection Augusta, GA A monthly performance summary form ("Monthly Performance Summary") has been established to assist 452 Augusta in evaluating Contractor performance under this Agreement. The Monthly Performance 453 Summary consists of the following two elements, which are further described in Appendix B: 454 455 3.3.1 The Monthly Performance Summary 456 The Summary will include a listing of key performance measures profiling the Contractor's 457 service level. These measures may be reviewed with the Contractor throughout the month in an 458 effort to identify potential service issues and to work proactively toward a resolution of any 459 deficiencies. 460 461 3.3.2 Annual Customer Satisfaction Survey 462 An annual customer satisfaction survey that will be administered by a professional survey 463 company selected by Augusta and paid for by the Contractor. This survey will target areas where 464 service problems or poor participation are observed. 465 Augusta will evaluate the results of the survey in conjunction with the profile of the key 466 performance measures to determine the overall performance of the Contractor. Augusta will 467 review the results of the Monthly Performance Summary with the Contractor on at least a 468 quarterly basis and the Contractor agrees to implement measures as necessary to improve areas 469 identified as requiring improvement. The Contractor recognizes that these results will be 470 compiled by Augusta and may be presented internally or publically. 471 472 Contractor acknowledges that its performance relative to the Monthly Performance Summary 473 shall not be construed to mean that the Contractor is meeting its performance obligations as 474 required by this Agreement. Should the Contractor not comply with any other material provision 475 of this Agreement, Augusta may declare the Contractor in default notwithstanding its 476 performance levels relative to the Monthly Performance Summary. 477 478 3.4 Materials to be Collected 479 480 The Contractor shall provide alley collection and curbside collection of Residential Garbage, Yard Waste, 481 Recyclables and Bulky Waste placed for collection in accordance with the Collection Schedule in the 482 Designated Collection Area, and as further described in this document. 483 484 3.4.1 Mixing 485 The Contractor shall not mix Garbage and Bulky Waste with any Yard Waste or Recyclables. 486 Further, the Contractor shall not mix any Yard Waste and Recyclables. The Contractor shall 487 not collect material in the same truckload from both Recyclables Carts and Roll-Out Carts, 488 unless Augusta has identified the Recyclables Carts as containing an excess of non-recyclable 489 material. 490 491 3.4.2 Damages 492 If the Contractor's equipment operator collects one or more commodities in the same 493 truckload without permission, or as otherwise allowed by this Agreement, from Augusta, the 494 Contractor shall be assessed Damages in the amount of one thousand dollars ($1,000) per 495 incident and Augusta may declare it an event of default. 496 3.5 Collection Service Frequency 497 The Contractor shall collect Residential Garbage, Recyclables in Augusta-provided Roll-Out Carts placed 498 at curbside, Yard Waste placed at curbside, and Bulky Waste placed at curbside at each Residential Unit 499 and Designated Non-Residential Location. Yard Waste placed at curbside, and Bulky Waste placed at 500 Attachment number 8 \nPage 10 of 73 Item # 43 Page 11 of 73 Solid Waste & Recyclables Collection Augusta, GA curbside at each Unoccupied Location shall also be collected. Each Customer's Residential Garbage, 501 Recyclables, Yard Waste and Bulky Waste must be collected on the same day of the week (i.e., the 502 collection of Residential Garbage, Recyclables, Yard Waste and Bulky Waste for a single Customer shall 503 be coordinated so that the designated collection day of each type of material occurs on the same day of 504 the week at the Customer's collection point). The Customers' collection day shall be in accordance with 505 the approved Collection Schedule. Augusta expects Roll-Out Carts, Recyclables Carts, Yard Waste and 506 Bulky Waste to be placed at curbside by 7:00 a.m. on the designated collection day. Table 1, below, 507 describes the service frequencies. 508 Table 1: Service Levels 509 510 Service Levels Residential Unit Designated on-Residential Locatio n Unoccupied Location Garbage - Once per week Garbage - Once per week Yard Waste - Once per week Recyclables - Once per week Recyclables - Once per week Bulky Waste - Once per week Yard Waste - Once per week Bulky Waste - Once per week 511 512 3.6 Collection Days 513 Routes for Residential Garbage, Recyclables, Yard Waste and Bulky Waste must be spread out evenly 514 over five (5) collection days, Monday through Friday. For each Residential Unit, Designated Non-515 Residential Location, and Unoccupied Location, all services will be performed on the same day as 516 Residential Garbage. 517 518 3.7 Hours of Collection 519 No Residential Garbage, Recyclables, Yard Waste or Bulky Waste collection shall commence prior to 520 7:00 a.m., and the Contractor must request permission to continue collection after 8:00 p.m. 521 3.8 Holiday Collection 522 Attachment number 8 \nPage 11 of 73 Item # 43 Page 12 of 73 Solid Waste & Recyclables Collection Augusta, GA The Contractor shall provide Collection Services on all legal holidays except New Years Day, Memorial 523 Day, Fourth of July, Labor Day, Thanksgiving and Christmas. Collection services shall be delayed one 524 (1) day for each observed holiday. For example, if Friday is a holiday then collections normally scheduled 525 on Friday will be collected on Saturday. 526 527 3.8.1 Extra Holiday Collections 528 Contractor shall provide adequate resources to collect the increased holiday waste loads during 529 the five (5) work day(s) following the holiday, as listed in Section 3.8. Extra bags of Refuse and 530 Residential Garbage placed outside the Roll-Out Carts shall be collected, and may be collected as 531 Bulky Waste. 532 533 3.9 Extra Masters Collections 534 Contractor shall provide adequate resources to collect the increased waste loads during the week prior to, 535 the week of, and the week after the Masters Golf Tournament. Extra bags of Refuse and Residential 536 Garbage placed outside the Roll-Out Carts during that period shall be collected, and may be collected as 537 Bulky Waste. 538 539 3.10 Dead Animals 540 Augusta personnel will pick up Dead Animals within Augusta limits. Augusta reserves the right to 541 transfer these Dead Animals to any of the Contractor's solid waste trucks operating in the vicinity when 542 Dead Animals are collected by Augusta crews. Contractor’s Supervisor shall provide immediate direction 543 and/or location of nearest Contractor solid waste collection truck upon request. Dead Animals shall not be 544 placed in a Collection Vehicle collecting Yard Waste or Recyclables. 545 3.11 Requests for Service 546 Once any route has been completed, or is scheduled to have been completed, any Customer missed will 547 be designated as a Request for Service, regardless of the time of day. 548 549 3.11.1 Communication of Requests for Service and Completion 550 a. Upon the receipt of a Request for Service, Augusta will notify the Contractor immediately, 551 through the issuance of a Request for Service, with the date and address where the Request 552 for Service occurred. 553 554 b. If Augusta sends a Request for Service, or provides verbal notification of a Request for 555 Service to the Contractor between the hours of 7:00 a.m. to 5:30 p.m. on any given collection 556 day, the Contractor shall provide collection by 8 p.m. on the same day. The Contractor shall 557 collect any Request for Service received after 5:30 p.m. by noon of the following scheduled 558 collection day. Once Augusta has sent a Request for Service, it shall be considered received 559 by the Contractor, in accordance with Section 10.1. 560 561 c. When Contractor's equipment operators are collecting material based on Requests for 562 Service, they shall be responsible for checking other Residential Units, Designated Carry-out 563 Collection Locations, Designated Non-Residential Locations and Unoccupied Locations in 564 the same vicinity for other possible misses in order to prevent additional calls from other 565 Customers reporting collection misses. 566 567 d. Requests for Service and other emergency calls received by Augusta on non-collection days 568 and evenings will be conveyed to the Contractor's representative, as designated in Section 569 10.1. The Contractor shall respond to such requests in the same timeframe and manner as 570 Attachment number 8 \nPage 12 of 73 Item # 43 Page 13 of 73 Solid Waste & Recyclables Collection Augusta, GA specified in Section 3.11 for Requests for Service, or as specified in other sections of this 571 Agreement for other requests. 572 573 e. The Contractor shall collect solid waste based on Requests for Service and shall transport the 574 materials to the appropriate and approved Designated Disposal Facility or Designated 575 Recycling Facility, as appropriate, during normal business hours. 576 577 f. The Contractor shall notify Augusta, through its response to the Request for Service, of the 578 date and time that collection was completed. 579 580 3.11.2 Route Status 581 Communication from the Contractor on the status of each day's route completion is vital so that 582 Augusta can adequately respond to Customer complaints as they are received. If the Contractor 583 does not keep Augusta so informed, any reported or discovered collection misses for routes, 584 which should have been completed for that collection day, will be designated as Valid Collection 585 Misses. Therefore, the Contractor shall notify Augusta immediately of the following: 586 a. The status of Contractor collection service. 587 b. Unresolved Requests for Service from the previous day and plans to resolve these 588 outstanding requests. 589 c. Any changes or delays in route completion. 590 d. Any open routes not covered in the morning. 591 e. Equipment breakdowns. 592 f. Any other event, which could affect the normal time of completion of any route. 593 594 3.11.3 Missed Collections 595 Augusta employees will investigate Request for Service(s), and classify it as a "Valid Miss" if, in 596 their opinion, the reported miss is due to Contractor negligence or omission. Otherwise, it will 597 remain classified as a Request for Service. 598 599 The Contractor is responsible for avoiding Repeat Collection Misses. 600 601 Requests for Service result in additional work for Augusta, requiring customer service staff to 602 handle customer service requests, and field and office staff to provide follow-up to ensure 603 completion. Therefore, the Contractor shall use its best efforts to minimize the number of Missed 604 Collections. 605 606 3.11.4 Damages 607 If the Contractor fails to provide collection of a Request for Service by the times specified in 608 Section 3.11, the Contractor shall pay Augusta Damages in the following amounts: 609 610 a. One hundred dollars ($100) for each violation of Section 3.11.1.b during any one 611 (1) calendar month; 612 613 b. The Contractor shall also pay Augusta additional Damages of five thousand dollars 614 ($5,000) per month for any month in which there are two hundred (200) or more 615 violations of Section 3.11.1.b 616 617 c. The Contractor shall remain responsible for providing collection. However, if the 618 Contractor fails to pick up the Request for Service by the times specified in Section 619 3.11.1.b Augusta may elect to provide the service and charge the Contractor Damages in 620 Attachment number 8 \nPage 13 of 73 Item # 43 Page 14 of 73 Solid Waste & Recyclables Collection Augusta, GA the amount of $500 per missed collection to cover crew mobilization, collection, 621 transport for disposal, and staff costs. The intent is to ensure that quality customer service 622 is provided to each Customer. 623 624 d. Repeat Collection Miss: Should Contractor fail to provide immediate collection of a 625 Repeat Collection Miss, Augusta may, in its sole discretion, provide the collection 626 service and charge the Contractor Damages of $500 for each collection point serviced by 627 Augusta. The Contractor shall also pay Augusta Damages as follows for Repeat 628 Collection Misses: 629 630 (i) Five hundred dollars ($500.00) for the second and third Collection Miss of 631 any one (1) Residential Unit, Designated Non-Residential Location, or 632 Unoccupied Locations location during any thirty (30) day period. 633 634 (ii) One thousand dollars ($1,000.00) for each Collection Miss for four or more 635 Collection Misses of any one (1) Residential Unit, Designated Non-Residential 636 Location, or Unoccupied Locations location during any ninety-(90) day period. 637 638 e. Route Changes: When approved route changes are implemented, the Contractor will 639 be given a four week grace period beginning with the Contractor's first collection day 640 under the approved transition schedule during which misses will be noted but no 641 Damages will be assessed. The grace period is intended solely for one (1) to five (5) 642 Residential Units, Designated Non-Residential Locations, and Unoccupied Locations 643 missed on any one (1) route due to driver unfamiliarity with new routes, therefore any 644 misses of six (6) or more Residential Units, Designated Non-Residential Locations, and 645 Unoccupied Locations on any one (1) route will not be covered by the grace period. Any 646 such misses shall be designated as Valid Misses and shall be subject to Damages. The 647 Contractor shall use its best efforts to limit the number of collection misses, and shall 648 remain responsible for the timely collection of any collection misses during the grace 649 period. 650 651 f. Area Misses: The Contractor shall respond to Area Misses in the same timeframe 652 and manner as specified above. The Contractor shall pay Augusta Damages in the amount 653 of: 654 655 (i) Two thousand dollars ($2,000) for the first one hundred (100) 656 Residential Units, Designated Non-Residential Locations and 657 Unoccupied Locations missed, and 658 (ii) Twenty dollars ($20) for each Residential Unit, Designated Non-659 Residential Location or Unoccupied Location missed over the first one 660 hundred (100) Residential Units, Designated Non-Residential Locations 661 and Unoccupied Locations. 662 (iii) In addition, if the Contractor fails to provide collection by the times 663 specified in Section 3.11.1 (b), Augusta may elect to provide the service 664 and charge the Contractor Augusta's fee for such service as specified in 665 Section 3.11.4 (c). 666 667 3.11.5 Courtesy Collections 668 The Contractor shall be responsible for providing Courtesy Collections, upon request by Augusta. 669 Contractor shall limit Courtesy Collections to a number not to exceed the number of Residential 670 Attachment number 8 \nPage 14 of 73 Item # 43 Page 15 of 73 Solid Waste & Recyclables Collection Augusta, GA Units times 0.15% percent in any calendar week. This service consists of collections of 671 Residential Garbage, Recyclables, Yard Waste and Bulky Waste from specific Residential Units, 672 Designated Non-Residential Locations and Unoccupied Locations. 673 674 The Contractor shall respond to Courtesy Collection requests from Augusta in the same 675 timeframe and manner as specified in Section 3.11.1.b. Augusta shall designate Courtesy 676 Collection requests that are not collected in the specified timeframe to be a Valid Miss, which 677 shall be subject to the Damages specified in Section 3.11.4 678 679 3.11.6 Review of Damages Assessed 680 If Augusta assesses damages that the Contractor believes are not justified by the facts, the 681 Contractor will provide its evidence and schedule a meeting with the Contract Administrator to 682 review. If the matter is not resolved at the review meeting the Contractor may ask the Contract 683 Administrator (or his designee) in writing to review the record and make a determination as to the 684 amount of damages assessed. The Contract Administrator's review shall be made and a written 685 answer provided to the Contractor no later than ten (10) Augusta working days following the 686 receipt of the request for review by the Contract Administrator. Upon receipt of any decision 687 finding liability following the review, the amount of the damages for which liability is found may 688 be withheld by Augusta from the next payment due to Contractor without such withholding being 689 considered a breach of this Agreement. 690 3.12 Designated on-Residential Location Collection 691 The Contractor shall provide collection service to Designated Non-Residential Locations identified and 692 designated by Augusta, which may include facilities such as fire stations, schools, churches, non-profit 693 agencies, businesses, and public buildings. Each Designated Non-Residential Location shall be counted as 694 one stop. Payment for collection at Designated Non-Residential Locations will be based on the actual 695 number of Roll-Out Carts at each location. Each Designated Non-Residential Location is required to be 696 served by a Grey, Augusta, Georgia Roll-Out Cart. Any Roll-Out Carts without the Augusta, Georgia hot-697 stamp on the cart shall not be emptied, but shall be reported immediately to Augusta for investigation. 698 3.13 Unoccupied Location Collection 699 The Contractor shall provide collection service to Unoccupied Locations identified and designated by 700 Augusta. Each Unoccupied Location shall be counted as one stop, and therefore the Contractor shall be 701 paid for one stop for each Yard Waste pick up and each Bulky Waste pickup. Unoccupied Locations will 702 not be issued Roll-Out carts, and any Roll-Out carts at these locations shall not be emptied but shall be 703 reported to Augusta for investigation. 704 3.14 Carry-Out Collection 705 The Contractor shall provide Carry-Out Collection for those individuals who are unable to place their 706 solid waste for collection in the usual manner due to severe physical disability. The Contractor shall not 707 receive special payment for this service. 708 709 Augusta will investigate new requests for Carry-Out Collection. If approved, Augusta will notify the 710 Contractor to start the service on the next regularly scheduled collection day. 711 712 At its discretion, Augusta will re-confirm the need for Carry-Out Collection. However, if the Contractor 713 has reason to believe that Carry-Out Collection is no longer required at any Residential Unit, the 714 Contractor shall notify Augusta. Augusta will investigate and confirm the need for Carry-Out Collection 715 and notify the Contractor of the result of the investigation and whether the service is to be continued or 716 discontinued. 717 Attachment number 8 \nPage 15 of 73 Item # 43 Page 16 of 73 Solid Waste & Recyclables Collection Augusta, GA 718 3.15 Service Verification and Documentation 719 The Contractor shall purchase, install, and utilize on-board technologies on each of the collection vehicles 720 and supervisor vehicles. This technology will be used to perform a variety of tasks which will provide 721 necessary data and service validation both for Augusta and for our customers. All data should be 722 available to Augusta on a real-time basis. This technology shall, at a minimum: 723 724 3.15.1 Fully Automated Service Verification 725 The RFID technology shall be capable of reading Augusta’s RFID tags in each Roll-Out 726 Cart and shall verify the accuracy of containers being serviced, including positively 727 identifying which Customers were not serviced and why; identify which containers were 728 not out for collection; and which customers had extra materials for collection. It should 729 also identify containers that have been moved, stolen, or relocated. All such actions 730 should be captured by photograph attached to the customer and/or container. 731 732 3.15.2 Provide Detailed Route Sheets 733 Driving directions to the next stop based on the route sheets, also allow the driver to 734 choose the next stop manually when running the route out of sequence. When this 735 occurs, the system shall recalculate the route. 736 737 3.15.3 On-Board Scale Technology 738 Automatically record lift events and lift weights for Roll-Out carts and Recyclables Roll-739 Out carts for each Customer. 740 741 3.15.4 Roll-Out Carts 742 Capable of automating the delivery, damage, exchanges, returns, and removals of Roll-743 Out Carts for each Customer. This will be performed by Augusta, but the software 744 should be capable of supporting cart data. 745 746 3.15.5 Hand-Held Devices 747 A hand-held device which integrates with the on-board computer that will allow the 748 driver and/or supervisor to collect information while outside of the vehicle. The hand-749 held device shall have at least signature verification and RFID reader capabilities. 750 751 3.15.6 Global Positioning System 752 All data gathering and tracking shall be geo-coded and provide real-time vehicle location 753 (within 2 minutes), route driven, and stops made. 754 755 3.15.7 Messaging 756 Wireless communication to each vehicle while in the yard, en-route, or at the Designated 757 Disposal facility, and real-time messaging between the driver and the back-office 758 software. 759 760 3.15.8 Reporting 761 A report center that allows the logging of time for breaks, customer stops, refueling, 762 landfill, and others. This should also provide the recording of detailed events during 763 accident situations, and the exact route each vehicle took any day. Reports should be 764 customizable. 765 766 SECTIO 4 - ROUTIG AD COLLECTIO SCHEDULES 767 768 Attachment number 8 \nPage 16 of 73 Item # 43 Page 17 of 73 Solid Waste & Recyclables Collection Augusta, GA 4.1 Route Maps 769 The Contractor shall annually review the existing collection maps and evaluate workloads and service 770 areas for effectiveness and efficiency in light of changed population density and/or distribution. Augusta 771 will review the Contractor's route maps to ensure that all areas to be collected are included, and that 772 routing does not result in dangerous collection practices. 773 774 4.1.1 Route Details 775 Each set of detailed route maps must show, for each collection day, the areas to be collected, the 776 starting point for collection, and the exact direction and sequence of travel of the streets and 777 alleys for each route to be collected. The Contractor shall use its best efforts to minimize the 778 number of Residential Units, Designated Non-Residential Locations and Unoccupied Locations 779 that are affected by collection day changes as a result of its initial routing plans. 780 781 The Contractor is responsible for ensuring that all routes are accurately populated in the on-board 782 vehicle technology. 783 784 4.1.2 Route Summary Information 785 The Contractor shall include a summary of the route maps, indicating the number of Residential 786 Units, Designated Non-Residential Locations and Unoccupied Locations to be collected each 787 collection day, and the number of Residential Units, Designated Non-Residential Locations and 788 Unoccupied Locations per route, for Residential Garbage, Recyclables, Yard Waste and Bulky 789 Waste collection. The summary shall also show the number of Residential Units, Designated 790 Non-Residential Locations and Unoccupied Locations, which would be affected by any changes 791 in their current collection days, and an explanation of those changes. 792 793 4.1.3 Route Boundaries 794 Routes shall be bounded by natural boundaries, such as bodies of water, major highways or 795 arterials. Any boundaries that are on secondary or residential roads shall be divided on the back 796 of property lines to ensure both sides of the street are collected on the same day and route. 797 798 4.1.4 Route Map Format 799 Route maps shall be submitted in reproducible, approved GIS format. All street names must be 800 legible. The Contractor may request current street maps showing parcel information from 801 Augusta's GIS manager. Once a format is agreed upon, all future route maps shall be prepared 802 using the same format. 803 804 4.2 Routing and Collection Day Changes 805 When adjustments are warranted, the Contractor shall submit detailed route maps, one (1) set each for 806 Residential Garbage, Recyclables, Yard Waste and Bulky Waste collection, to Augusta for Augusta's 807 review. Any routing change, which results in a change of collection days for any Residential Units, 808 Designated Non-Residential Locations and Unoccupied Locations, requires compliance with the 809 notification process described in Section 4.3. Augusta may require the Contractor to phase in collection 810 day changes and any changes affecting more than five (5) routes. 811 812 4.2.1 Route Change Requests 813 In the event collection days or routes become unbalanced due to population changes or other 814 reason, Augusta may allow the Contractor to make revisions to its initial approved route maps. 815 The Contractor shall submit any requests for changes in routing or collection schedules to 816 Augusta for Augusta's review and approval as follows: 817 Attachment number 8 \nPage 17 of 73 Item # 43 Page 18 of 73 Solid Waste & Recyclables Collection Augusta, GA a. Not less than six (6) weeks prior to the week proposed for a routing change for five 818 (5) routes or less to become effective. Augusta will approve or disapprove the request 819 within three (3) week of receipt. 820 b. Not less than twelve (12) weeks prior to the week proposed for a routing change for 821 more than five (5) routes or a collection day change to become effective. Augusta 822 will approve or disapprove the request within six (6) weeks of receipt. 823 824 4.2.2 Route Change Documentation 825 All such changed routes must be documented in the same detail as the original route maps 826 supplied by the Contractor, as described in Section 4.1, and must include the reasons for the 827 requested change and the number of Residential Units, Designated Non-Residential Locations 828 and Unoccupied Locations affected in each route. Changes shall involve easily identifiable route 829 and area boundaries for ease in communicating the change to Customers. 830 831 4.2.3 Route Change Justification 832 The Contractor shall not request any routing or collection day changes without a valid reason 833 because of the resulting confusion to Customers and increases in the number of customer service 834 calls which must be handled by Augusta staff. In addition to the Courtesy Collections provided by 835 the Contractor in accordance with Section 3.11.5, the Contractor shall provide Courtesy 836 Collection to any Residential Units, Designated Non-Residential Locations and Unoccupied 837 Locations affected by a routing or collection day change, upon request from Augusta, for a two-838 week period following implementation of the change. 839 840 4.3 Collection Day Change otification Process 841 The Contractor shall be responsible for the full cost and provision of notification to all Residential Units, 842 Designated Non-Residential Locations and Unoccupied Locations affected by any change in routes or 843 collection schedules, which has been approved by Augusta, which alters the day of collection. The 844 Contractor shall submit a notification plan for Augusta's review and approval, at the time of submittal of 845 any request for collection day changes. The notification plan shall outline the process recommended by 846 the Contractor. 847 848 Notification must be received by each affected Residential Unit, Designated Non-Residential Location or 849 Unoccupied Location not less than one (1) week or more than two (2) weeks prior to the starting date of 850 such change. Notice shall be made in writing to each individual Customer. Such notice shall include the 851 reason for the change and a Augusta telephone number and e-mail address to contact if further 852 information is desired. The method of notification may be a letter sent through the U.S. Postal Service to 853 every affected Customer of record, or the same letter or a door hanger hand-delivered door-to-door (either 854 handed to the Customer or left at each service address). Notification to Unoccupied Locations shall be a 855 letter sent through the U.S. Postal Service. Notification by notice attached to Roll-Out Carts is not 856 permitted. The method and date of notification and the proposed content of the notice letter or door 857 hanger must be reviewed and approved by Augusta. Augusta may conduct random inspections to ensure 858 notification procedures are being followed. 859 860 The Contractor is also responsible for ensuring that its equipment operators are fully informed of any 861 approved change, and that the change is accomplished with a minimum of disruption to Customers and 862 daily operations. 863 864 4.4 Route Order 865 866 The Contractor shall always collect each route in the order approved by Augusta. Route maps are used by 867 Augusta to document and monitor areas to be collected in order to provide good customer service to the 868 Attachment number 8 \nPage 18 of 73 Item # 43 Page 19 of 73 Solid Waste & Recyclables Collection Augusta, GA public and to respond to Customer complaints and reported collection misses. Should there be an 869 equipment failure reported to Augusta, the Contractor may request authorization from Augusta for a 870 temporary route change. 871 872 4.4.1 Damages 873 Should the Contractor collect Residential Garbage, Recyclables, Yard Waste and Bulky 874 Waste in any other order without obtaining approval of Augusta in accordance with Section 875 4.4 and 4.2, and without providing notification to affected residents before the change, the 876 Contractor shall pay Augusta Damages of five hundred dollars ($500) per route for each 877 daily occurrence. 878 879 4.4.2 Route Audits 880 Augusta shall have the right to be a passenger in the collection vehicles for the purposes of 881 auditing routes and services. Augusta shall request such activity at least 48-hours in 882 advance. 883 884 4.5 Collection Impediments 885 A number of collection impediments may require special effort by the Contractor to provide collection 886 service. Collection impediments of any type, in any portion of the Service Area including streets and 887 alleys, shall not result in disruption of collection service. When conditions require special efforts to 888 complete collection service, the Contractor shall make these additional efforts at no additional cost to 889 Augusta. 890 891 4.5.1 Adverse Weather 892 If the impassability of the street or alley due to extreme weather conditions is anticipated to last 893 for only one or two scheduled collection days, Augusta may elect to delay collection services until 894 conditions improve. When this occurs, the Contractor shall resume collection services on the next 895 scheduled collection day. 896 897 4.5.2 Infrastructure Construction 898 Periodically major renovation is necessary to maintain the infrastructure of Augusta. This 899 renovation includes such activities as replacing gas, water, and sewer lines, surfacing or 900 resurfacing streets, and replacing wiring for telephone, electricity, or cable television. If the 901 Contract Administrator is notified in advance of these activities, the Department will notify the 902 Contractor. However, it is not uncommon for work to be initiated without prior notification. 903 Alternate collection service must be provided during this period of disruption. Each circumstance 904 must be evaluated individually to determine the appropriate alternative. The Contractor shall 905 notify Augusta of the nature of the disruption, its location, and the Contractor's recommended 906 alternative to provide service. Augusta will either approve the alternative method or require the 907 Contractor to use a different collection method. 908 909 4.5.3 Materials Blocking the Street or Alley 910 When materials of any kind are placed in the street or alley in such a way that the collection 911 vehicle cannot proceed down the street or alley, the Contractor shall immediately notify Augusta. 912 Augusta will attempt to locate the individual responsible for the material and have them remove it. 913 However, if the responsible party cannot be located immediately and Augusta determines that the 914 amount of material is too large for the Contractor to move or to collect, Augusta will remove the 915 material blocking the street or alley and the Contractor shall provide collection service as 916 scheduled at no extra charge to Augusta. If Augusta determines that the Contractor should collect 917 Attachment number 8 \nPage 19 of 73 Item # 43 Page 20 of 73 Solid Waste & Recyclables Collection Augusta, GA the material, the Contractor shall remove the material and provide collection service as scheduled 918 at no extra charge to Augusta. 919 920 4.5.4 Illegally Parked Vehicles 921 If an illegally parked vehicle blocks a street or alley, the Contractor must inform Augusta of the 922 situation and request removal of the vehicle. Removal of the vehicle usually occurs in a matter of 923 hours, thus collection must be provided on the scheduled day. If the vehicle is not removed by the 924 end of the collection day and there is no other access to the Roll-Out Carts, the Contractor shall, 925 upon notification to and approval by Augusta, provide collection at start of shift on the following 926 day. The Contractor is responsible for follow-up with Augusta until the vehicle is removed and 927 shall inform Augusta when the vehicle is removed. 928 929 SECTIO 5 - ROLL-OUT CARTS AD RECYCLABLES CARTS 930 5.1 Provision & Maintenance of Roll-Out and Recyclables Carts 931 Except as otherwise provided for in this Agreement, Augusta will be responsible for providing and 932 delivering Roll-Out and Recyclables Carts to Customers, and delivering replacement Roll-Out and 933 Recyclables Carts for those which are lost, stolen, damaged or worn beyond their useful life. Augusta will 934 also be responsible to repair or replace all Roll-Out and Recyclables Carts as needed. 935 5.2 Roll-Out and Recyclables Cart Size & Types 936 Roll-Out and Recyclables Carts provided to Customers by Augusta include 35-gallon, 64-gallon and 95-937 gallon nominal capacity carts. Augusta may distribute Roll-Out and Recyclables Carts of other sizes; 938 however, all such Roll-Out and Recyclables Carts will be compatible with the approved collection 939 equipment. The number of Roll-Out and Recyclables Carts distributed will be at the sole discretion of 940 Augusta. 941 5.3 Roll-Out and Recyclables Cart Loss & Damage 942 943 The Contractor shall exercise all reasonable care and diligence to ensure that Roll-Out and Recyclables 944 Carts are not damaged by its collection vehicles while providing collection service. 945 946 When Contractor's equipment operators observe any damaged Roll-Out Cart or Recyclables Cart, the 947 Contractor shall report the address and description of the damaged Roll-Out Cart or Recyclables Cart to 948 Augusta through the onboard computer. If, in Augusta's judgment following inspection, the Contractor is 949 responsible for damaging a Roll-Out Cart or Recyclables Cart, the Contractor shall pay Augusta's fee to 950 cover the costs to repair or replace the damaged Roll-Out Cart or Recyclables Cart. Augusta will adjust 951 the payment of the Contractor's next monthly invoice in an amount equal to the cost of these repairs or 952 replacements. 953 954 From the Start Date, the Contractor will be given a waiver on Roll-Out Cart and Recyclables Cart 955 damages for a period of ninety (90) days. This time shall be used by the Contractor to identify any 956 current damages to Roll-Out and Recyclables Carts and afford Augusta time to make such repairs or 957 replacements. 958 959 5.4 Roll-Out and Recyclables Cart Placement 960 Contractor shall return Roll-Out and Recyclables Carts to their original location, or to a safe location, 961 taking special care not to create a hazard to the traveling public, not to block access to driveways or 962 mailboxes. The Roll-Out and Recyclables Carts shall be located a safe distance from either side of the 963 driveway to assure Customers are not impeded in entering their driveway. Roll-Out Carts and Recycling 964 Attachment number 8 \nPage 20 of 73 Item # 43 Page 21 of 73 Solid Waste & Recyclables Collection Augusta, GA Carts shall not be left in the gutter line of the street, but shall be placed behind the curb where curb and 965 gutter exist and off the road, on public right-of-way when no curb and gutter exist. When the Contractor 966 shall fail to meet these performance standards, the Contractor shall pay Augusta damages described 967 herein. 968 969 5.4.1 Due Care 970 The Contractor shall exercise all reasonable care and diligence to ensure that Roll-Out and 971 Recyclables Carts are not damaged by its collection vehicles while providing collection service. 972 973 5.4.2 Damages by Collection Vehicles, Actions, or eglect 974 The Contractor shall be responsible for any damage to or loss of Roll-Out or Recyclables Carts 975 resulting from misplacement (if hit by vehicle because they are placed too near to the travel lane), 976 mishandled (damaged by or falls into the Contractor's collection truck), abuse (slinging or 977 throwing) or crushed (either by the packing blade or automated arm). The Contractor shall 978 immediately notify Augusta of any damaged Roll-Out or Recyclables Carts caused by 979 Contractor's collection vehicles, action or neglect. 980 981 a. One hundred dollars ($100) for each offense starting at the eleventh (11) violation of 982 Sections 5.4, 5.4.1, and 5.4.2 during any one (1) calendar month; 983 984 b. An additional five thousand dollars ($5,000) for each month in which there are two 985 hundred (200) or more violations of Sections 5.4, 5.4.1, and 5.4.2 in any one (1) 986 calendar month. 987 988 5.4.3 Damages - Wheels 989 The Contractor shall be responsible for any damage to or loss of Roll-Out or Recyclables Carts 990 wheels. If, in Augusta's judgment, following inspection, the Contractor is responsible for 991 damaging a Roll-Out Cart or Recyclables Cart, the Contractor shall pay Augusta's fee to cover the 992 costs to repair or replace the damaged Roll-Out Cart or Recyclables Cart. 993 994 a. Twenty-five ($25) for each offense starting at the eleventh (11) violation of Sections 995 5.4.3. during any one (1) calendar month; 996 997 b. An additional five thousand dollars ($5,000) for each month in which there are two 998 hundred (200) or more violations of Sections 5.4.3 in any one (1) calendar month. 999 1000 1001 SECTIO 6 – EQUIPMET/FACILITIES 1002 6.1 Collection Vehicles 1003 1004 The Contractor shall provide and maintain during the Contract a fleet of collection vehicles sufficient in 1005 number and capacity to perform the services described in this Agreement. All vehicles shall be 1006 appropriately licensed with the State of Georgia in Richmond County and comply with all applicable 1007 federal, state, and local laws and regulations. 1008 1009 The Contractor shall provide and use only such equipment, material, and facilities as are capable of 1010 performing quality and timely services required by this Agreement. The fleet shall be sufficient to handle 1011 the special requirements of adverse weather, holiday and Masters overloads. The Contractor's collection 1012 vehicles shall be maintained by the Contractor, kept clean, neat, kept in good repair and working order. 1013 The Contractor shall furnish, at its sole expense, whatever backup or substitute equipment may be 1014 required to continue performance of the services. 1015 Attachment number 8 \nPage 21 of 73 Item # 43 Page 22 of 73 Solid Waste & Recyclables Collection Augusta, GA 1016 6.1.1 Vehicle Specifications 1017 a. All collection vehicles shall have enclosed bodies. 1018 1019 b. The Contractor may use new or used equipment so long as the equipment is capable 1020 of performing the required services in accordance with this Agreement. Collection 1021 equipment utilized in this Agreement shall not be more than three (3) years old at the 1022 Starting Date of this Agreement. In no event shall a vehicle operating under this 1023 Agreement exceed a maximum age of ten (10) years. 1024 1025 c. The noise level for collection vehicles during the stationary compaction process shall 1026 not exceed seventy-five (75) decibels at a distance of twenty-five (25) feet from the 1027 collection vehicle and at an elevation of five (5) feet from the ground elevation of 1028 such vehicle. 1029 1030 d. Prior to the Starting Date and then quarterly thereafter, the Contractor shall supply 1031 Augusta with a list of all equipment to be used in providing services and shall notify 1032 Augusta of additions or deletions as they occur. 1033 1034 e. The Contractor shall maintain a dedicated fleet solely for use to provide Augusta, 1035 Georgia collection services included in this Contract. With Augusta approval, and at 1036 the sole discretion of Augusta, vehicles used in the provision of services under this 1037 Agreement may be used for other purposes, provided that the Contractor has made a 1038 request in writing, and such request was approved by Augusta in writing. Any such 1039 use shall not interfere in any way with the Contractor's provision of services under 1040 this Agreement. Augusta reserves its right to revoke such authorization at any time 1041 for any reason. 1042 1043 f. The Contractor shall be responsible for arranging for tare weights with the 1044 Designated Disposal Facility and the Designated Recycling Facility for all collection 1045 vehicles prior to the Starting Date, and shall periodically, upon request from Augusta, 1046 arrange for updating tare weights. 1047 g. All vehicles collecting Roll-Out or Recyclables Carts shall have cart tippers/dumpers 1048 on the collection vehicles which are operational. All such tipper/dumpers shall be 1049 designed to empty carts pursuant to ANSI Z245.30-2008 and ANSI Z245.60-2008. 1050 Cart tippers/dumpers shall be operated at the original equipment manufacturers 1051 specifications. Cart tippers/dumpers which do not meet this requirement shall not be 1052 used. Augusta has the right to inspect and test cart tipper/dumpers. Should a cart 1053 tipper/dumper not pass inspection, the collection vehicle shall be removed from 1054 service until such time as the deficiency has been remedied. 1055 1056 If a cart tipper/dumper is used that does not meet the above specifications, the 1057 Contractor risks being responsible for additional damages to Roll-Out Carts and 1058 Recyclables Carts to include the cost of repair or replacement under Section 5.4. 1059 1060 h. All collections vehicles used to perform functions under this Contract shall be 1061 equipped with the following in complete and sound working order: 1062 1063 1. Progressive ambient noise back-up alarm. 1064 Attachment number 8 \nPage 22 of 73 Item # 43 Page 23 of 73 Solid Waste & Recyclables Collection Augusta, GA 2. Back-up camera with monitor visible from any driving position. 1065 3. A 10 pound fire extinguisher. 1066 4. A 25 person first aid kit. 1067 5. Minimum of three safety marking devices (flares, or reflective triangles). 1068 6. Rear-mounted strobe light(s) activated while collecting materials. 1069 7. A spill kit with a minimum size of 10 gallons to handle operational spills. 1070 8. Onboard computer hereinafter defined. 1071 i. All supervisors vehicles used to perform functions under the Contract shall be 1072 equipped with the following in complete and sound working order: 1073 1074 1. A 10 pound fire extinguisher. 1075 2. A 25 person first aid kit. 1076 3. Minimum of three safety marking devices (flares, or reflective triangles). 1077 4. A spill kit with a minimum size of 10 gallons to handle operational spills. 1078 5. Onboard computer hereinafter defined. 1079 j. All collection vehicles or personnel must be equipped with a communication device 1080 (i.e. cell phone or radio) which allows for immediate communication between the 1081 collection vehicle and a supervisor, and/or the Contractor’s office. 1082 k. All vehicles operated under the authority of this Contract shall be driven in 1083 compliance with Uniform Rules of the Road and Georgia State traffic laws and, 1084 where applicable, Augusta’s codes, ordinances, and rules. 1085 l. The Contractor shall make a reasonable effort to empty each collection vehicle at the 1086 end of each day. 1087 m. The Contractor is responsible for any and all fees associated with disposal permits, 1088 inspection fees, IFTA stickers, etc. These permits shall be timely obtained. 1089 n. Prior to the Starting Date, and annually thereafter, the Contractor shall have a D.O.T. 1090 inspection performed on all vehicles operating under this Contract by a competent 1091 third party firm to perform such inspections. Copies of said inspection shall be 1092 supplied to Augusta within 30 days of the inspection taking place. Should a vehicle 1093 not pass inspection, it shall be removed from service until such time as the deficiency 1094 has been remedied. 1095 o. Augusta shall have the right to inspect all vehicles used in performing this Contract. 1096 Augusta shall have the right to do random spot inspections as it deems reasonably 1097 necessary. Should a vehicle not pass inspection, it shall be removed from service 1098 until such time as the deficiency has been remedied. 1099 p. All vehicles operated under this Agreement, to include collection vehicles and 1100 supervisor’s vehicles, shall operate solely on Compressed Natural Gas (CNG). 1101 1. Vehicles operating on CNG shall be able to be filled at a minimum 1102 flow rate of six (6) diesel gallon equivalents (DGE) per minute. 1103 2. All vehicles operating on CNG shall be equipped with a 1000 scfm 1104 fill port for fast filling and it is recommended that they also have a 1105 5000 scfm fast fill port. 1106 3. All vehicles shall be equipped with Syntech-Fuelmaster Systems, 1107 AIMS II product which will communicate directly with the fueling 1108 island. 1109 6.2 Smart Vehicle Onboard Technology 1110 Attachment number 8 \nPage 23 of 73 Item # 43 Page 24 of 73 Solid Waste & Recyclables Collection Augusta, GA The Contractor shall purchase, install, and utilize on-board technologies on each of the collection vehicles 1111 and supervisor vehicles. This technology will be used to perform a variety of tasks which will provide 1112 necessary data and service validation both for Augusta and for our customers. 1113 1114 6.2.1 Fully Automated Service Verification 1115 The RFID technology shall be capable of reading Augusta’s RFID tags in each Roll-Out 1116 Cart and shall verify the accuracy of containers being serviced, including positively 1117 identifying which customers were not serviced and why; identify which containers were 1118 not out for collection; and which customers had extra materials for collection. It should 1119 also identify containers that have been moved, stolen, or relocated. All such actions 1120 should be captured by photograph attached to the customer and/or container. 1121 1122 6.2.2 Provide Detailed Route Sheets 1123 Driving directions to the next stop based on the route sheets, also allow the driver to 1124 choose the next stop manually when running the route out of sequence. When this 1125 occurs, the system shall recalculate the route. 1126 1127 6.2.3 On-Board Scale Technology 1128 Automatically record lift events and lift weights for Roll-Out carts and Recyclables Roll-1129 Out carts for each customer. 1130 1131 6.2.4 Roll-Out Carts 1132 Automate the delivery, damage, exchanges, returns, and removals of Roll-Out Carts for 1133 each customer. This function will be performed by Augusta, but the software should be 1134 capable of supporting cart data. 1135 1136 6.2.5 Hand-Held Devices 1137 A hand-held device which integrates with the on-board computer that will allow the 1138 driver and/or supervisor to collect information while outside of the vehicle. The hand-1139 held device shall have signature verification and RFID reader capabilities. 1140 1141 6.2.6 Global Positioning System 1142 All data gathering and tracking shall be geo-coded and provide real-time vehicle 1143 locations (within 2 minutes), route driver, and stops made. 1144 1145 6.2.7 Messaging 1146 Wireless communication to each vehicle while in the yard, en-route, or at the Designated 1147 Disposal facility, and real-time messaging between the driver and the back-office 1148 software. 1149 1150 6.2.8 Reporting 1151 A report center that allows the logging of time for breaks, customer stops, refueling, 1152 landfill, and others. This should also provide the recording of detailed events during 1153 accident situations, and the exact route each vehicle took any day. Reports should be 1154 customizable. 1155 6.3 Collection Vehicle Cleaning 1156 All collection vehicles must be kept clean, in sanitary condition, and good repair at all times. The 1157 Contractor shall ensure that all collection vehicles are washed as required to reduce possible odor, reduce 1158 vector problems and provide a positive image. 1159 1160 Attachment number 8 \nPage 24 of 73 Item # 43 Page 25 of 73 Solid Waste & Recyclables Collection Augusta, GA 6.4 Emergency Unloading 1161 1162 While Augusta recognizes that an occasional emergency such as a Hot Load may require unloading a 1163 collection vehicle in the field, the Contractor shall recollect this material within two (2) hours of the 1164 unloading. The Contractor shall notify Augusta immediately of such an event and shall take whatever 1165 measures are necessary to ensure that no fire danger exists. The area must be litter free after the re-1166 collection. The Contractor shall notify Augusta when the material has been collected; at which time 1167 Augusta may conduct a follow-up inspection to ensure that the cleanup has been completed to the 1168 satisfaction of Augusta. 1169 1170 6.4.1 Damages 1171 If the Contractor fails to collect the load and notify Augusta of such collection within two 1172 (2) hours, the Contractor shall pay Augusta in Damages one hundred dollars ($100) for 1173 each two- (2) hour period such load is not collected. If the material is not collected in a 1174 timely manner, Augusta may, in addition to assessing Damages for time delays, assess 1175 Damages of $2,000 to collect the load, and will invoice the Contractor the cost to repair 1176 any damage to Augusta's streets, sidewalks or other infrastructure as soon as Augusta can 1177 assess the costs of such damages to infrastructure. All repairs to Augusta property shall 1178 be completed by a licensed professional and in a means and matter approved by Augusta. 1179 1180 Augusta shall not be liable to Contractor for any damage to Contractor's collection 1181 vehicles or injury to Contractor's personnel, or any other damage or injury, as a result of a 1182 Hot Load. 1183 6.5 Vehicle Leaks & Spills 1184 Minimizing hydraulic fluid, oil leaks and spills on public or private streets and parking lots is a high 1185 priority for Augusta, Georgia. The Contractor shall maintain equipment in top mechanical condition, and 1186 the operator shall exercise vigilance in observing for leaks and spills that may develop during the 1187 collection day and take immediate corrective action to stop the leak or spill and call for cleanup of 1188 hydraulic fluid, oil, other vehicle fluids or other leaks or spills present upon the public or private streets or 1189 parking lots in accordance to the following standards. 1190 1191 6.5.1 Removal from Service/Spill Cleanup 1192 The Contractor’s vehicles shall be repaired or removed from service immediately if any spill or 1193 leak is a result of a mechanical problem, or poor seal(s). The Contractor shall be responsible for 1194 applying absorbent materials, clean up, and disposal in a manner which complies with all federal, 1195 state, and local laws and regulations, of all oil spills, hydraulic fluid or other leaks or spills 1196 associated with its provision of services. In the event of a spill or leak, the Contractor shall 1197 immediately notify Augusta and shall send a representative to the location of the incident. If the 1198 spill or leak is in a street location and/or is a public safety hazard, the Contractor shall also 1199 immediately request traffic control and any other required public safety personnel. Augusta and 1200 the Contractor will evaluate the spill or leak to determine proper handling. Augusta must approve 1201 the Contractor's recommended clean-up plan, which may require steam cleaning. The clean up 1202 must commence as soon as possible but no later than two (2) hours following the spill or leak. 1203 After application of absorbent materials is complete, the Contractor is responsible for removal of 1204 the absorbent material and/or cleaning of the street, if necessary. The Contractor shall notify 1205 Augusta when the cleanup is completed so that a follow-up inspection can be conducted to ensure 1206 that the cleanup has been completed to the satisfaction of Augusta. Any fluids associated with the 1207 spill or the cleanup shall be recovered for proper disposal and shall OT be released into the 1208 storm water system. 1209 1210 Attachment number 8 \nPage 25 of 73 Item # 43 Page 26 of 73 Solid Waste & Recyclables Collection Augusta, GA 6.5.2 Damages 1211 In the event the vehicle operator fails to remove the leaking vehicle from service or call for the 1212 on-call mechanic to make field repairs, and continues collecting the route spreading puddles of 1213 hydraulic fluid, oil, other vehicle fluids or other leaks or spills throughout the road system, the 1214 Contractor shall be subject to Damages in the amount of $3,000, plus the damages described 1215 below. 1216 a. In the event that Contractor does not clean up any spill or leak within the time 1217 specified above, the Contractor shall be subject to Damages in the amount of one 1218 thousand five hundred dollars ($1,500) for each such occurrence. The Contractor 1219 shall endeavor to prevent such occurrences by whatever means possible. 1220 1221 b. If the Contractor fails to initiate proactive measures necessary to reduce the 1222 frequency and severity of vehicle leaks or spills the Contractor shall, in addition to 1223 the Damages described above, be subject to the following Damages: 1224 (i) One thousand dollars ($1,000.00) for each leak or spill during any 1225 one- (1) month period in which there were three (3) or more leaks or 1226 spills; 1227 1228 6.6 Vehicle Identification and Presentation 1229 Each Contractor vehicle will be clearly identified with the Contractor name, a vehicle number, and a local 1230 telephone number that can be clearly read from a distance of 100 feet. 1231 1232 6.6.1 Marketing Campaign – Vehicles 1233 The Contractor shall provide trucks that have been wrapped in a marketing campaign that address 1234 the following issues. At a minimum, it shall include Augusta phone number and Augusta email 1235 and/or web site information. Wraps may need to be replaced from time to time, to ensure that 1236 their appearance is acceptable to Augusta. 1237 a. Recycling awareness and participation 1238 b. Waste reduction strategies 1239 c. Eco friendly solutions 1240 d. Composting 1241 e. CNG Benefits 1242 f. Others as approved 1243 1244 6.7 Facilities 1245 The Contractor shall operate a facility within Augusta, Georgia, and will license/tag all vehicles utilized 1246 by the Contractor in the performance of this Contract in Augusta. 1247 1248 SECTIO 7 - DISPOSAL AD PROCESSIG SITES 1249 7.1 Ownership of Solid Waste Materials 1250 The Contractor shall have ownership of solid waste from the time of collection until the materials are 1251 deposited at the Designated Disposal Facility or the Designated Recycling Facility. 1252 7.2 Designated Disposal and Recycling Facilities 1253 The Contractor shall be responsible for abiding by all rules and policies pertaining to the delivery of 1254 Residential Garbage, Yard Waste and Bulky Waste as directed by the Designated Disposal Facility, and 1255 delivery of Recyclables as directed by the Designated Recycling Facility. A copy of the current policies 1256 Attachment number 8 \nPage 26 of 73 Item # 43 Page 27 of 73 Solid Waste & Recyclables Collection Augusta, GA and procedures for the Designated Disposal Facility and Designated Recycling Facility will be provided 1257 to the Contractor by Augusta, and are subject to modification from time to time. 1258 1259 7.2.1 Designated Disposal Facility 1260 All Residential Garbage, Yard Waste and Bulky Waste shall be delivered to the Deans Bridge 1261 Road Landfill, located at 4330 Deans Bridge Road, Blythe, Georgia 30805. 1262 1263 Disposal of Residential Garbage, Yard Waste and Bulky Waste will be provided by Augusta at no 1264 charge to the Contractor for all materials delivered to the Designated Disposal Facility. 1265 1266 Mixing of non-contract solid waste is strictly prohibited, and will be considered a breach of 1267 contract. 1268 1269 7.2.2 Designated Recycling Facility 1270 All Recyclables shall be delivered to the transfer station located at 3946 Goshen Industrial Blvd, 1271 Augusta, Georgia, 30906 or other location as may be determined by Augusta from time to time. 1272 1273 Disposal of Recyclables will be provided by Augusta at no charge to the Contractor for all 1274 materials delivered to the Designated Recycling Facility. 1275 1276 7.2.3 Damages 1277 If the Contractor delivers Recyclables to the landfill, Damages in the amount of five hundred 1278 dollars ($500.00) per incident will be assessed. 1279 1280 7.3 on-Contract Waste 1281 1282 Beginning on the Effective Date, the Contractor servicing Designated Collection Area 1 has the right to 1283 bring Augusta non-contract waste collected, or under its control, where economically feasible, in the areas 1284 surrounding Richmond County. The Contractor shall pay Augusta the standard volume based disposal 1285 rates from 0-5000 tons per month. The Contractor shall pay Augusta $17.00 dollars per ton on the 5001-1286 10,000 tons per month. After that the standard volume based disposal rates shall apply. 1287 1288 a. The tons being charged at the reduced rate will factor into the standard volume based rates 1289 tonnages. 1290 1291 b. Augusta shall be entitled to the same CPI Adjustment as afforded the Contractor in Section 12.3. 1292 All the same general conditions of adjustment shall apply with the exception that Augusta does 1293 not have to provide notice as required under Section 12.3.1 (b). 1294 1295 7.4 Additional on-Contract Waste 1296 The Contractor, with Augusta’s prior approval, may market Augusta’s landfill in an effort to generate 1297 additional revenues for both the Contractor and Augusta. Negotiated disposal pricing must be approved 1298 by the Environmental Services Director and Augusta’s Administrator. 1299 1300 SECTIO 8 – MEDIA AD CAPITAL COSTS 1301 1302 8.1 Media Design and Distribution 1303 Between the Effective Date and the Start Date, the Contractor shall provide a Media Design and 1304 Distribution firm capable of designing, distributing, and producing the following items. The estimated 1305 expense per Designated Collection Area awarded is $75,000.00. The schedule of such services shall be 1306 coordinated with Augusta to insure a timely implementation. 1307 Attachment number 8 \nPage 27 of 73 Item # 43 Page 28 of 73 Solid Waste & Recyclables Collection Augusta, GA 1308 8.1.1 Internet Site 1309 This shall include the acquiring and hosting of the domain name “augustasolidwaste.com”. The 1310 website shall be interactive and capable of providing fill-able forms, customer service 1311 information, and educational items, at a minimum. The content will be coordinated, specified, 1312 and approved by Augusta. Said domain name will be transferred to free and clear to Augusta at 1313 the termination of this Agreement. 1314 1315 8.1.2 Truck Media 1316 The Media firm will design, produce, and install various vehicle media and wraps as approved by 1317 Augusta. The Contractor shall bear all costs for the production and installation of media items on 1318 their collection vehicles. All vehicles shall state that they are fueled by CNG”. See Section 6.6.1 1319 for details. 1320 1321 8.1.3 Pamphlets, Handouts, Advertising, Public Service Announcements 1322 The Media firm will be capable of designing pamphlets, handouts, large advertising pieces (such 1323 as newspaper advertisements and billboards), as well as Public Service Announcements at the 1324 direction and approval of Augusta. 1325 1326 8.1.4 Other Media 1327 Augusta may utilize the funds for other media which may include newspaper advertisement, 1328 billboards, or other forms of advertisement or public relations as Augusta deems appropriate. 1329 1330 8.1.5 Annual Media 1331 The Contractor will provide additional funds in the amount of $50,000 per year per Designated 1332 Collection Area for updates to the media items, as well as additional media items as Augusta 1333 deems appropriate. 1334 1335 8.2 Capital Costs 1336 Between the Effective Date and the Start Date, the Contractor shall provide the following items per 1337 Designated Collection Area awarded. 1338 1339 8.2.1 Roll-Out Carts 1340 The Contractor awarded Designated Collection Area One (1) and Designated Collection Area 1341 Two (2) shall each provide: 1342 1. 8,000 96-gallon Cascade Engineering Roll-Out Carts to Augusta. Such Roll-Out Carts 1343 will be the same specification as Augusta currently owns. These Roll-Out Carts shall 1344 include in their cost, the RFID Chip, and Assembly and Delivery. These shall be 1345 provided prior to the Start Date. 1346 2. 1,000 96-gallon Cascade Engineering Recyclables Carts. Such Recyclables Carts will be 1347 the same specification as Augusta currently owns. Those Recyclables Carts shall include 1348 in their cost, the RFID Chip, In-mold recycling label and delivery to Augusta’s Solid 1349 Waste Facility. These shall be provided prior to the Start Date. 1350 3. At a mutually agreeable time, 2,000 96-gallon Cascade Engineering Roll-Out Carts to 1351 Augusta. Such Roll-Out Carts will be the same specification as Augusta currently owns. 1352 These Roll-Out Carts shall include in their cost, the RFID Chip and delivery to Augusta’s 1353 Solid Waste facility. 1354 4. At a mutually agreeable time, 2,500 96-gallon Cascade Engineering Recyclables Carts. 1355 Such Recyclables Carts will be the same specification as Augusta currently owns. Those 1356 Attachment number 8 \nPage 28 of 73 Item # 43 Page 29 of 73 Solid Waste & Recyclables Collection Augusta, GA Recyclables Carts shall include in their cost, the RFID Chip, In-mold recycling label and 1357 delivery to Augusta’s Solid Waste Facility. 1358 1359 The Contractor awarded Designated Collection Area Three (3) shall provide, prior to the Start 1360 Date, spare parts from Cascade Engineering. This shall include 30 pallets of wheels and axles, as 1361 well as 200 bars, and 200 Recyclables Cart lids. All items will be of a size and type to match the 1362 existing Augusta inventory. 1363 1364 8.2.2 Management Software 1365 A one-time fee of $100,000 for software licensing, set up, and integration will be provided at the 1366 inception of the contract per Designated Collection Area. Each contract year thereafter, $50,000 1367 will be provided for ongoing licenses, technology support, and programming per Designated 1368 Collection Area. 1369 1370 8.2.3 Hand-Held Solutions 1371 Three portable Windows CE-based hand-held devices will be provided to Augusta for their use in 1372 support and management of this Contract per Designated Collection Area. The devices will be 1373 capable of integrating with the on-board vehicle units and will be equipped with RFID readers, 1374 signature capture, and the ability to enter data. This shall include the cost of any monthly access 1375 or service fees. 1376 1377 8.2.4 CG Station 1378 The Contractor awarded Designated Collection Area One (1) and Designated Collection Area 1379 Two (2) shall design and build a CNG station for the use under this Agreement. Such station 1380 shall be designed with Augusta’s input. For Designated Collection Area One (1), a one-time fee 1381 of $2,650,000.00, for Designated Collection Area Two (2), a one-time fee of $2,650,000.00, for 1382 the development of CNG and LFG infrastructure, at an Augusta identified location and 1383 constructed by a mutually-agreed upon contractor. The CNG stations shall be operational by 1384 January 18, 2013, and on or before that date, the title to such property, equipment and 1385 improvements shall be transferred to Augusta, free and clear. Specifications for the construction 1386 of the station shall be provided once the Contract is awarded. 1387 1388 8.2.5 Additional CG Infrastructure 1389 The Contractor awarded Designated Collection Area Two (2) and Designated Collection Area 1390 Three (3) shall provide an additional $2,650,000.00 for Augusta’s use. Such funds shall be paid 1391 in the fifty fourth (54) month of the Agreement. 1392 8.3 Annual Survey 1393 An annual customer satisfaction survey that will be administered by a professional survey company 1394 selected by Augusta and paid for by the Contractor. This survey will target areas where service problems 1395 or poor participation are observed, and for the purpose of this Contract is valued at $15,000.00 per 1396 Designated Collection Area. 1397 Augusta will evaluate the results of the survey in conjunction with the profile of the key performance 1398 measures to determine the overall performance of the Contractor. Augusta will review the results of the 1399 Monthly Performance Summary with the Contractor on at least a quarterly basis and the Contractor 1400 agrees to implement measures as necessary to improve areas identified as requiring improvement. The 1401 Contractor recognizes that these results will be compiled by Augusta and may be presented internally or 1402 publically. 1403 1404 Attachment number 8 \nPage 29 of 73 Item # 43 Page 30 of 73 Solid Waste & Recyclables Collection Augusta, GA Contractor acknowledges that its performance relative to the Monthly Performance Summary shall not be 1405 construed to mean that the Contractor is meeting its performance obligations as required by this 1406 Agreement. Should the Contractor not comply with any other material provision of this Agreement, 1407 Augusta may declare the Contractor in default notwithstanding its performance levels relative to the 1408 Monthly Performance Summary. 1409 1410 8.4 Unused Funds 1411 Any unused funds from the activities in this Section shall be credited to Augusta on the final statement of 1412 each year. 1413 1414 SECTIO 9 - CUSTOMER SERVICE 1415 1416 9.1 Requests for Service 1417 Augusta's Customer Care Center is responsible for receiving Customer inquiries, Requests for Service, 1418 and complaints related to service in the Service Area. Upon receipt of a call requiring follow-up by the 1419 Contractor, the Customer Care Center will prepare a Request for Service form and send such forms 1420 electronically to both the Contractor and the Environmental Services Department representative 1421 responsible for monitoring the Contractor's services under this Contract. The Contractor shall provide a 1422 computer system that is in compliance with Section 9.3 below. In the event that the Contractor receives 1423 any telephone calls from Customers, other than in response to follow-up property damage calls as 1424 described in Section 10.3, the Contractor shall refer such calls to Augusta. 1425 1426 9.1.1 Receipt of Requests for Service 1427 Once a Request for Service has been sent by Augusta, it shall be considered as received by the 1428 Contractor, therefore the Contractor shall ensure that its system for receipt of Requests for 1429 Service is operational at all times and monitored, at a minimum, at all times during the office 1430 hours set forth in Section 10.1 and any other time as necessary for the Contractor to comply with 1431 the requirements of this Agreement. 1432 1433 9.1.2 Completion of Service Request 1434 The Contractor shall notify Augusta, through its response to the Request for Service, of the 1435 Contractor's actions taken in response to the Request for Service including the date and time the 1436 request was completed. 1437 1438 9.1.3 Monthly Reports 1439 Augusta shall keep a record of the total number of Requests for Service received related to the 1440 Service Area by the Contractor under this Agreement. These records will be transmitted to the 1441 Contractor monthly. 1442 9.2 Customer Service 1443 The Contractor shall be responsible for responding to Customer requests for information that may be 1444 received by its employees in the course of providing services. To assist the Contractor in providing such 1445 information, Augusta will supply the Contractor with literature regarding Augusta services and the 1446 Contractor shall ensure that such literature is available at all times in all collection vehicles for use by its 1447 equipment operators. All literature used by the Contractor for this purpose must either be supplied by or 1448 approved by Augusta prior to use. 1449 9.3 Computer Hardware and Software Requirements 1450 The Contractor shall provide network access with sufficient bandwidth and speed to transfer data in a 1451 timely manner between the Customer Care Center and the Contractor's operation center in a manner 1452 Attachment number 8 \nPage 30 of 73 Item # 43 Page 31 of 73 Solid Waste & Recyclables Collection Augusta, GA acceptable to Augusta. The Contractor's computer system shall be capable of running in a Windows 1453 environment and at an appropriate version of Windows to be compatible with Augusta’s software. 1454 1455 9.3.1 Software Requirements 1456 The Contractor shall acquire and operate at least one stand-alone license for Insight of the 1457 appropriate release to support the customer service software. The customer service software 1458 (Insight) and data shall remain the sole property of Augusta. 1459 1460 Augusta shall provide a customer service software capable of tracking complaints by street 1461 address. The data collected shall include route number, scheduled day of pickup, type of 1462 complaint, date, time, method of resolution, and related comments such as special conditions or 1463 services provided at the location. The ability to maintain a historical record of complaints and 1464 activities at this address, to transmit work orders, and to prepare daily or monthly reports sorted 1465 by day of week, address, street or neighborhood, and the ability to transmit data to remote 1466 locations are also required. 1467 1468 Augusta shall be responsible for all data integrity including routine system maintenance, backups, 1469 and data recovery. The Contractor shall be responsible for system maintenance includes 1470 troubleshooting at the Contractor's facility. 1471 1472 System availability will be a minimum of 12 hours per day, 5 days per week as defined by 1473 Augusta. 1474 1475 The Contractor shall provide a firewall between their facilities and Augusta facilities acceptable 1476 to Augusta for the protection and integrity of Augusta's network. 1477 1478 SECTIO 10 - PERSOEL AD SAFETY 1479 10.1 Contact with Contractor 1480 1481 10.1.1 Contractor Facility 1482 Throughout the Contract Term, the Contractor shall establish and maintain a local facility 1483 capable of receiving Requests for Service electronically and by telephone, and to dispatch 1484 appropriate trucks and personnel to respond to Request for Service or to respond to service 1485 complaints such as Littering, property damage, or Vehicle Leaks and Spills within the time 1486 limits established in this Agreement. 1487 1488 The contractor facility should be of sufficient size and type to house all vehicles used under 1489 this contract, maintenance and cleaning for all vehicles operated under this contract, an office 1490 of sufficient size for contractor staff, and storage space for equipment as needed. 1491 1492 10.1.2 District Manager 1493 All Contractor personnel shall be directed by a District Manager permanently stationed 1494 within Augusta. The Contractor shall furnish Augusta the name of the District Manager prior 1495 to the Starting Date and shall notify Augusta immediately if the District Manager is changed 1496 at any time. The Contractor's District Manager shall serve as the contact person for dealings 1497 and communications with the Contractor. A request to the Contractor's representative shall 1498 always constitute a request to the Contractor. 1499 1500 10.1.3 Office Hours and Contact Personnel 1501 Attachment number 8 \nPage 31 of 73 Item # 43 Page 32 of 73 Solid Waste & Recyclables Collection Augusta, GA A responsible person in charge shall be present at the Contractor's local office during the 1502 time period of 8:00 a.m. to 5:15 p.m. Monday through Friday, and on Saturday when 1503 collection is scheduled, with the authority to make decisions relevant to operations under this 1504 Agreement. 1505 1506 Route supervisors will be accessible by telephone between the hours from 6:30 a.m. to 8:00 1507 p.m. on all days when collection operations are in progress. The names and phone numbers 1508 of emergency representatives shall be given to Augusta prior to the Starting Date, and shall 1509 be updated as soon as any changes are made. Contractor's emergency representative shall be 1510 responsible for responding to any Requests for Service from Augusta on non-collection days 1511 and evenings, as described in this Agreement. If Friday is a scheduled collection day, misses 1512 will be collected on Saturday. 1513 1514 10.1.4 Augusta Contact Persons 1515 Augusta will designate a contact person for operational issues and a contact person for 1516 Agreement administration issues. It is, however, recognized that daily operational 1517 communications will occur at all levels of staff. To the extent that these communications 1518 facilitate job performance, they are encouraged. 1519 1520 10.1.5 Communication Devices 1521 The Contractor shall provide, at the Contractor's cost, sufficient communicating devices to 1522 facilitate good two-way communication between Contractor personnel, Augusta Customer 1523 Care Center, and Augusta Environmental Services Department supervisory staff and support 1524 personnel. 1525 10.2 Employees: Character of Workers 1526 All employees, subcontractors, superintendents, foremen, and workers employed by the Contractor shall 1527 be competent and careful workers, skilled in their respective trades. The Contractor shall not employ any 1528 person who repeatedly engages in misconduct or is incompetent or negligent in the due and proper 1529 performance of his or her duties under this Agreement. The Contractor shall furnish such supervision, 1530 labor, and equipment as is considered necessary for the fulfillment of the services in an acceptable 1531 manner at a satisfactory rate of progress. 1532 1533 10.2.1 Drug-Free Work Place 1534 The Contractor shall prohibit the use of intoxicating and/or illegal substances by its employees, 1535 subcontractors, superintendents, foremen, and workers while on duty or in the course of 1536 performing their duties under this Agreement. Records of any such substance testing will be 1537 provided to Augusta upon written request. 1538 1539 10.2.2 Uniforms 1540 The Contractor's employees, subcontractors, superintendents, foremen, and workers shall be 1541 required to wear a clean uniform bearing the Contractor's name. The uniform shall meet an ANSI 1542 class II standard for reflectivity and visibility. Employees, who normally and regularly come into 1543 direct contact with the public, including drivers, shall bear some means of individual 1544 identification such as a nametag or identification card. 1545 1546 10.2.3 Driver Credentials 1547 Employees driving the Contractor's vehicles shall at all times possess and carry a valid 1548 Commercial Driver's License issued by the State of Georgia or South Carolina for the class 1549 appropriate to the weight of the vehicle being driven. Augusta reserves the right to require the 1550 Attachment number 8 \nPage 32 of 73 Item # 43 Page 33 of 73 Solid Waste & Recyclables Collection Augusta, GA Contractor to provide proof of compliance with federal laws regarding Commercial Driver's 1551 Licenses, specifically information regarding drug testing. 1552 1553 10.2.4 Contract Employees 1554 The Contractor's employees, officers, agents, and subcontractors shall, at no time, be allowed to 1555 identify themselves or in any way represent themselves as being employees of Augusta. 1556 1557 10.2.5 Removal of Contractor Employee 1558 Augusta shall have the sole right to require the removal and replacement of a Contractor’s or 1559 subcontractor’s employee working under this Contract. Augusta shall exercise such a right by 1560 providing written notice to the Contractor. 1561 1562 Contractor will replace any personnel who separate from the Contractors employment with equivalently 1563 qualified persons. The Contractor will replace such personnel as soon as reasonably possible. 1564 10.3 Property Damage/Accidents 1565 10.3.1 Property Damage 1566 As between Augusta and the Contractor, the Contractor shall retain full responsibility for all 1567 claims of damage to private property caused by the negligence or willful misconduct of the 1568 Contractor. In the event of any property damage caused by the Contractor, the Contractor shall: 1569 a. Immediately notify Augusta Customer Care Center and Environmental Services 1570 Department by telephone. 1571 b. Leave a notice at the time of the damage at the Residential Unit, Designated Non-1572 Residential Location, Unoccupied Location or the location where the damage occurred, 1573 informing the Customer of the damage and the telephone number of the Contractor to call for 1574 follow-up. 1575 c. Provide a written explanation to Augusta of the circumstances, results of any 1576 investigation, and disposition of the claim. 1577 d. Notify the Customer within ten (10) working days in writing of the disposition of the 1578 claim and provide a copy to Augusta. If the Contractor assumes responsibility for the 1579 damages, the notification shall include a date by which remedial action will be completed. 1580 e. The Contractor shall refer all calls regarding reporting of property damage to Augusta 1581 and Augusta will forward such claims to the Contractor in the form of a Request for Service. 1582 f. Should repair be required, the Contractor shall provide appropriately licensed personnel 1583 to complete the repair. 1584 1585 10.3.2 Claims Resolution 1586 The Contractor shall use its best efforts to promptly and expeditiously resolve claims. In the 1587 event that the Contractor denies responsibility for damages and the Customer pursues a remedy, 1588 Augusta may investigate. If Augusta believes that the Contractor is responsible and the 1589 Contractor continues to deny responsibility, Augusta may pursue, and the Contractor shall be 1590 obligated to the dispute settlement procedures as described in Section 20.16. 1591 1592 10.3.3 Damages 1593 If the Contractor does not notify Augusta of damages, the Contractor shall pay damages in the 1594 amount of $2,000.00 for each occurrence. 1595 1596 10.3.4 Accidents 1597 The Contractor shall immediately notify by telephone Augusta Customer Care Center and the 1598 Environmental Services Department of all vehicular accidents in which there is serious personal 1599 Attachment number 8 \nPage 33 of 73 Item # 43 Page 34 of 73 Solid Waste & Recyclables Collection Augusta, GA injury or a fatality. The Contractor shall notify Augusta Customer Care Center and the 1600 Environmental Services Department of all other accidents in a timely manner. 1601 1602 10.4 Care and Diligence/Littering 1603 1604 The Contractor shall exercise all reasonable care and diligence in collecting Residential Garbage, 1605 Recyclables, Yard Waste and Bulky Waste. Collection service shall be accomplished in a manner, which 1606 contributes to a litter-free environment. Every effort must be made to prevent spilling, scattering, 1607 dropping, or littering of Residential Garbage, Recyclables, Yard Waste and Bulky Waste during the 1608 collection process and during transit to and from the Designated Disposal Facility, or Designated 1609 Recycling Facility. However, in the event that Residential Garbage, Recyclables, Yard Waste, or Bulky 1610 Waste are spilled, scattered, dropped, or littered, the Contractor's equipment operator shall immediately 1611 clean up the material, place it in the Roll-Out or Recyclables Cart, and collect the Cart contents. If any 1612 litter escapes from Contractor's collection vehicles on any roadways, the Contractor's equipment operator 1613 must immediately collect such litter. In the event that Contractor does not immediately collect such litter, 1614 the Contractor shall be subject to Damages in the amount of two hundred and fifty dollars ($250.00) for 1615 each such occurrence. The Contractor shall endeavor to prevent such occurrences by whatever means 1616 possible. 1617 1618 The Contractor acknowledges that streets and alleys frequently include multiple utility features. 1619 Therefore, particular attention shall be given to the location of water meters, transformers, guy wires, 1620 utility poles, irrigation sprinkler heads and other private property features. Authorization to use the street 1621 or alley does not abrogate the Contractor's responsibility to exercise caution in relationship to the property 1622 of other authorized users. 1623 1624 10.4.1 Damages 1625 As stated above, in the event that Contractor does not immediately collect such litter, the 1626 Contractor shall be subject to Damages in the amount of two hundred and fifty dollars 1627 ($250.00) for each such occurrence. 1628 1629 10.5 Operator Awareness Training 1630 The Contractor shall be responsible for maintaining levels of operator participation regarding correct 1631 collection of Residential Garbage, Recyclables, Yard Waste and Bulky Waste; additional Carts; holiday 1632 collection, safe driving and operations, as well as all other contract provisions. 1633 1634 The Contractor shall be responsible for ongoing training of existing and new employees. 1635 1636 10.6 Communication Plan 1637 Within 30-days of approval of this Contract and by January 1 and July 1 of each year the Contract 1638 remains in effect, the Contractor shall submit a written Communication Plan to Augusta for review and 1639 approval. The Communication Plan shall identify key operations and administrative personnel and 1640 include the contacts’ name, title, primary area of responsibility, immediate supervisor including his/her 1641 office, home and cellular telephone number, pager number and email addresses for work day and after 1642 hour contact. The Communication Plan and/or contact names shall be updated as changes are made, but in 1643 no event less than semi-annually. The Communication Plan shall be included as an Appendix to this 1644 Contract once completed and approved by Augusta. 1645 1646 SECTIO 11 - REPORTIG REQUIREMETS 1647 1648 11.1 Daily Communication/Reports 1649 Attachment number 8 \nPage 34 of 73 Item # 43 Page 35 of 73 Solid Waste & Recyclables Collection Augusta, GA In addition to communications requirements described throughout this Contract, the Contractor shall be 1650 responsible for providing, at a minimum, the following information and reports to Augusta on a daily 1651 basis: 1652 1653 1. Listing of missed collections, or other problems remaining unresolved from the previous 1654 day and how they will effect today's operations. 1655 2. Listing of all confirmed, collected locations. 1656 3. Listing of all locations which were not collected which could include locations which 1657 were not out or available for service, services which were blocked, routes which did not get 1658 completed, or non-collected Solid Waste due to contract limits being exceeded. 1659 4. Responses to Requests for Service. 1660 5. Production data to include fuel usage, hours, and mileage. 1661 6. Roll-Out and Recyclables Cart repair needs identified by the Contractor. 1662 7. Street or alley repair needs identified by the Contractor. 1663 8. Other information as requested by Augusta. 1664 1665 The information listed above shall be submitted in a format approved by Augusta. 1666 1667 Augusta and the Contractor shall meet on a monthly basis, or as often as deemed necessary by Augusta, to 1668 review and discuss any operational issues, Contractor's performance, and any other issues pertaining to 1669 services provided under this Agreement. 1670 1671 11.2 Monthly Reports 1672 The Contractor shall submit monthly reports via an electronic format acceptable to Augusta during the 1673 Contract Term commencing one (1) month after Contractor commences services. These reports shall be 1674 due by the 20th day of the month following the month for which the services were performed. Augusta 1675 may withhold up to twenty-five percent (25%) of the latest monthly invoice until all items required in the 1676 report are submitted to Augusta. Augusta will pay the balance of the invoice after the required items are 1677 provided. At a minimum, the monthly report shall include: 1678 1. Deliver a trends report on the utilization and weights of the Recyclables collection 1679 program. 1680 2. Deliver a trends report on the utilization and weights of the Yard Waste collection 1681 program. 1682 3. Summary description of any property damage, including status and/or final 1683 disposition. 1684 4. A narrative description of any significant operational issues during the month. 1685 5. Required forms relating to section 11.6 of the Agreement. 1686 6. Other information as requested by Augusta. 1687 1688 11.3 Record Keeping, Accounting, and Auditing 1689 The Contractor shall keep and maintain complete and detailed records including, but not limited to the 1690 following: 1691 1. Records that provide the basis for the reports required under Section 12 including all matters 1692 affecting amounts payable by or to Augusta or the Contractor, 1693 2. Policies for required insurance, policy amendments, and all other related insurance 1694 documents, 1695 3. Accounting records and vouchers evidencing all costs, receipts, payments, and any other 1696 matter of accounting associated with the Contractor's performance in accordance with generally 1697 accepted accounting principles and 1698 Attachment number 8 \nPage 35 of 73 Item # 43 Page 36 of 73 Solid Waste & Recyclables Collection Augusta, GA 4. Copies of bond documents for both payment and performance bonds. 1699 1700 11.3.1 Auditing 1701 The Contractor's books, records, and accounts shall accurately, fairly, and in reasonable detail 1702 reflect all Contractor's dealings and transactions, and shall contain sufficient data to enable those 1703 dealings and transactions to be audited in accordance with generally accepted governmental 1704 accounting and auditing standards. 1705 1706 Augusta, or its audit representative, shall have the right at any reasonable time to inspect, copy, 1707 and audit records relating to the services accounting records, vouchers, and their source 1708 documents which serve as the basis for costs, receipts, and payments. The said records shall be 1709 available for Augusta's inspection and audit for a period of three (3) years following the 1710 termination of this Agreement, and any extension of this Agreement and for such further periods 1711 as may be necessary to resolve any matters which may be pending at that time or any longer 1712 period required by applicable law. The Contractor shall make available at Contractor's Augusta 1713 offices any such records to Augusta upon request. 1714 1715 11.3.2 Financial Condition 1716 The Contractor shall immediately notify Augusta should it become apparent that the Contractor 1717 is unable to pay its debts as they become due and payable or if there is an adverse change in the 1718 Contractor's financial condition. The Contractor shall, upon Augusta's request, provide to 1719 Augusta the Contractor's most recent audited financial statements or un-audited statements if the 1720 audited statements are not then available. 1721 11.4 Reliability of Reports 1722 The Contractor represents that all information the Contractor has provided or will provide to Augusta is 1723 true and correct and can be relied upon by Augusta. Any material false or misleading information or 1724 omission shall be just cause for Augusta to terminate this Agreement and/or pursue any other appropriate 1725 remedy. 1726 11.5 Observation and Inspection 1727 1728 Augusta, its representatives, and invitees shall have the right to observe and inspect operations at all 1729 times, provided it is conducted in such a manner so as to minimize interference with the Contractor's 1730 performance and operations. The inspection may review operating records for the current and previous 1731 contract years, and may consist of an inspection of the physical areas of operations and equipment with 1732 emphasis on contract compliance, safety and hazard mitigation. 1733 1734 Augusta, at its own expense, may at any commercially reasonable time inspect any and all records 1735 relating to the services performed to verify that the services are being performed in accordance with this 1736 Agreement. 1737 1738 Augusta's inspections shall not relieve the Contractor of any of its obligations herein or impose any 1739 liability upon Augusta. 1740 11.6 Local Small Business Language 1741 In accordance with Chapter 10B of the AUGUSTA, GA. CODE, Contractor expressly agrees to collect and 1742 maintain all records necessary to for Augusta, Georgia to evaluate the effectiveness of its Local Small 1743 Business Opportunity Program and to make such records available to Augusta, Georgia. The requirements 1744 of the Local Small Business Opportunity Program can be found at www.augustaga.gov. In accordance 1745 with AUGUSTA, GA. CODE § 1-10-129(d)(7), for all contracts where a local small business goal has been 1746 Attachment number 8 \nPage 36 of 73 Item # 43 Page 37 of 73 Solid Waste & Recyclables Collection Augusta, GA established, the contractor is required to provide local small business utilization reports. Contractor shall 1747 report to Augusta, Georgia the total dollars paid to each local small business on each contract, and shall 1748 provide such payment affidavits, regarding payment to subcontractors as may be requested by Augusta, 1749 Georgia. Such documents shall be in the format specified by the Director of minority and small business 1750 opportunities, and shall be submitted at such times as required by Augusta, Georgia. Failure to provide 1751 such reports within the time period specified by Augusta, Georgia shall entitle Augusta, Georgia to 1752 exercise any of the remedies set forth, including but not limited to, withholding payment from the 1753 contractor and/or collecting liquidated damages. 1754 1755 Contractor has agreed to a Local Small Business goal of twenty-five percent (25%). In accordance with 1756 Augusta, GA. Code § 1-10-129(d)(7), Contractor will submit local small business utilization reports and 1757 any additionally required information as provided for in Appendix F 1758 1759 SECTIO 12 - COMPESATIO 1760 1761 12.1 Basis and Method of Payment 1762 The Contractor shall offer the services described herein at the following rates beginning at the 1763 commencement of the Contract Term: 1764 1765 Advanced Disposal Inland Services Residential Unit Residential Unit Garbage - Once per week Garbage - Once per week Recyclables - Once per week Recyclables - Once per week Yard Waste - Once per week Yard Waste - Once per week Bulky Waste - Once per week Bulky Waste - Once per week Rate per unit per month: Rate per unit per month: DCA 1: $ 13.68 DCA 2/3 $ 13.75 Recycling Perks $ 0.35 Recycling Perks $ 0.35 Designated on-Residential Location Designated on-Residential Location Garbage - Once per week Garbage - Once per week Recyclables - Once per week Recyclables - Once per week Rate per unit per month: Rate per unit per month: DCA 1: $ 9.00 DCA 2/3 $ 9.74 Recycling Perks $ 0.35 Recycling Perks $ 0.35 Unoccupied Location Unoccupied Location Yard Waste - Once per week Yard Waste - Once per week Bulky Waste - Once per week Bulky Waste - Once per week Rate per unit per month: Rate per unit per month: DCA 1: $ 0.00 DCA 2/3 $ 4.54 Extra Cart Fee: $ 8.50 Extra Cart Fee: $ 6.31 1766 1767 The listed unit price shall be adjusted annually for inflation beginning January 2015 in accordance with 1768 Section 12.3. 1769 1770 Attachment number 8 \nPage 37 of 73 Item # 43 Page 38 of 73 Solid Waste & Recyclables Collection Augusta, GA 12.2 umber of Collection Points 1771 Augusta shall pay the Contractor monthly for all services rendered as defined by this Contract. Payment 1772 shall be based on the actual number of Residential Units, Designated Non-Residential Location(s) and 1773 Unoccupied Locations serviced as well as additional services as allowed by this Contract. Adjustments in 1774 the Residential Unit count, Designated Non-Residential Location count and Unoccupied Location(s) 1775 count shall be made each month. A unit shall be considered billable if the Residential Unit, Designated 1776 Non-Residential Location or Unoccupied Location had been receiving services for the majority of the 1777 month. After services have been rendered, a Residential Unit, Designated Non-Residential Location or 1778 Unoccupied Location will be removed from billing if services were not rendered for the majority of the 1779 month. 1780 1781 12.3 Inflation Factor - CPI Adjustment 1782 The Contractor shall be entitled to seventy percent (70%) of the actual percentage change in the CPI (as 1783 hereinafter defined). 1784 1785 The “CPI”. Means the Consumer Price Index for All Urban Consumers (“CPI-U”), Atlanta, Georgia – 1786 Atlanta, Georgia, All Items, 1982-1984 equals 100, published by the United States Department of Labor, 1787 Bureau of Labor Statistics (“BLS”), or its successor. If BLS designates an index with a nes title or code 1788 number or table number as being the continuation of the index cited above, the new index will be used, or 1789 if no new index is designated, the most nearly compatible index shall be used. 1790 1791 12.3.1 General Conditions for Adjustments 1792 1793 a. The CPI Index percentage change will be determined from January 1st to December 31st 1794 of the previous year, with an implementation of any adjustment being made on January 1795 1st, and every January 1st thereafter with the first adjustment starting in January of 2015. 1796 1797 b. The Contractor must notify Augusta in writing by April 30th of each year beginning in 1798 April of 2014, of the percentage of any rate adjustment as well as the new rates to be 1799 implemented as allowed under this section. If timely notice is not received by Augusta, 1800 no increase will be allowed for that year. 1801 1802 c. Should the CPI Index show a decrease, Augusta will automatically be entitled to a 1803 reduced cost up to the allowable limits as defined hereinafter. 1804 1805 d. In any event, the adjustment will be limited to a maximum increase or decrease of four 1806 percent (4%) annually. 1807 12.4 Payment Reduction for Damages 1808 1809 Damage charges will be monitored monthly and reviewed with the Contractor each month. Augusta will 1810 deduct any damages owed Augusta from the next payment owed to the Contractor. If the contract is not 1811 extended or renewed in accordance with the contract conditions, Augusta will deduct any remaining 1812 damages owed Augusta from the last payment. However, in no event is Augusta prohibited from taking 1813 actions to collect any unpaid amount owed to Augusta. 1814 1815 12.5 Fuel 1816 Augusta shall provide CNG for use by the Contractors performing under this Agreement. The 1817 Contractors shall pay Augusta $4.00 per Diesel Gallon Equivalent (DGE) for vehicles operated under this 1818 Agreement. Augusta will provide monthly fuel usage to the Contractor and the cost of fuel will be 1819 Attachment number 8 \nPage 38 of 73 Item # 43 Page 39 of 73 Solid Waste & Recyclables Collection Augusta, GA credited to Augusta on the Contractor’s monthly invoice. For non-contract vehicles operating on CNG 1820 (those not operating under this Agreement), Augusta may negotiate a CNG fuel price separate from this 1821 Agreement. 1822 12.5.1 Augusta shall be entitled to the same CPI adjustment as afforded the Contractor in 12.3. 1823 All of the same general conditions of adjustments shall apply with the exception that 1824 Augusta does not have to provide notice as required under 12.3.1 (b). 1825 12.5.2 The first price adjustment shall not go into effect until January 2015. 1826 12.5.3 In any event, the adjustment will be limited to a maximum increase or decrease of four 1827 percent (4%) annually. 1828 12.5.4 Should the Contractor not receive an Adjustment, Augusta reserves the right to adjust the 1829 price of fuel. 1830 1831 1832 1833 SECTIO 13 - ISURACE AD PERFORMACE SURETY 1834 13.1 Coverages 1835 The Contractor shall at all times during the Agreement maintain in full force and effect General Liability 1836 and Workmen's Compensation Insurance. All insurance shall be by insurers reasonably acceptable to 1837 Augusta and be in full force and effect before commencement of work. 1838 13.2 Insurance Limits 1839 For the purpose of the Agreement, the Contractor shall carry the following types of insurance in at least 1840 the limits specified below: 1841 1842 Coverages Limits of Liability Workers’ Compensation Statutory Employer’s Liability $500,000 each accident limit $500,000 Disease Policy Limit $500,000 Each Employee Limit Contractors and lessees shall be responsible for workers’ compensation insurance for subcontractors or sub lessees who directly or indirectly provide services or lease premise under the Augusta, Georgia’s contract. General Liability $2,000,000 per accident $2,000,000 aggregate Excess Umbrella Policy $2,000,000 per accident Pollution Liability Insurance Automobile Bodily Injury and Property Damage Liability $1,000,000 per claims made basis. The Contractor needs to warrant any retroactive date applicable to coverage under the policy precedes the effective date of the contract. $1,000,000 per accident 1843 Attachment number 8 \nPage 39 of 73 Item # 43 Page 40 of 73 Solid Waste & Recyclables Collection Augusta, GA As an alternative to the above, the Contractor may insure the above public liability and property 1844 coverages under a plan of self-insurance. The Contractor’s parent corporation may provide the required 1845 coverages to certify that their program is funded to actuarial projected losses. 1846 13.3 Certificate of Insurance 1847 a. The Contractor agrees to furnish Augusta certificates of insurance or other evidence 1848 satisfactory to Augusta to the effect that such insurance has been procured and is in force. 1849 The certificates shall contain the following express obligations: 1850 1851 "This is to certify that the policies of insurance described herein have 1852 been issued to the named insured for which this certificate is executed 1853 and are in force at this time. In the event of cancellation of a policy 1854 affecting the certificate holder, thirty (30) days prior written notice will 1855 be given to the certificate holder." 1856 1857 b. It is agreed that the Contractor will be responsible for notifying Augusta of any material 1858 change in a policy. 1859 1860 c. The certificates shall also include Augusta as an additional insured. 1861 13.4 Special Requirements 1862 The following special conditions shall apply to the insurance coverage: 1863 a. Augusta is to be included as an additional insured on both the commercial general liability 1864 and business auto liability policies. The Contractor providing the automobile liability coverage 1865 must include all vehicles owned, leased, hired, non-owned, and the employee non-owned 1866 vehicles Personal Injury Protection (when applicable). 1867 b. Commercial General Liability. The Commercial General Liability required coverage is 1868 ISO CG0001 or a substitute form providing equivalent coverage. Coverage must include: 1869 · Premises and Operations 1870 · Personal Injury/Advertising Liability 1871 · Products/ Completed Operations 1872 · Liability assumed under an Insured Contract (including tort liability of another assumed 1873 in a business contract) 1874 · Independent Contractors 1875 c. Pollution Liability. Contractors shall provide pollution liability coverage to cover bodily 1876 injury; property damage, (including natural resource damage), cleanup costs, removal, storage, 1877 disposal, and or use of the pollutant; and defense, including costs and expenses incurred in the 1878 investigation, defense, or settlement of claims. Coverage shall apply to the sudden and gradual 1879 pollution conditions resulting from the escape of smoke vapors, fumes, acids, alkalis, toxic 1880 chemicals, liquids, or gases, natural gases, waste materials, or other irritants, contaminants or 1881 pollutants (including asbestos). The Contractor needs to warrant any retroactive date applicable 1882 to coverage under the policy precedes the effective date of the contract 1883 1884 d. Current, valid insurance policies meeting the requirements herein identified shall be 1885 maintained during the Contract Term. Renewal certificates shall be sent to Augusta 30 days prior 1886 to an expiration date. There shall also be a 30-day notification to Augusta in the event of 1887 cancellation, modification of coverage, or reduction of aggregate limits below those required in 1888 Attachment number 8 \nPage 40 of 73 Item # 43 Page 41 of 73 Solid Waste & Recyclables Collection Augusta, GA Section 13.2. Certificates of insurance meeting the required insurance provisions shall be 1889 forwarded to Augusta. Wording on the certificate that states that no liability shall be 1890 imposed upon the company for failure to provide such notice is not acceptable. 1891 1892 e. It is agreed that the Contractor will be responsible for notifying Augusta of any material 1893 changes in a policy. 1894 1895 f. It shall be the Contractor's responsibility to ensure that all subcontractors comply with the 1896 same insurance requirements that the Contractor is required to meet. 1897 1898 g. All Certificates of Insurances shall be furnished on an ACORD form or equivalent as require 1899 by this contract. The certificates for each insurance policy are to be signed by a person 1900 authorized by that insurer to bind coverage on its behalf. 1901 13.5 Surety 1902 1903 13.5.1 Performance Bond 1904 A performance bond and payment bond will be provided to Augusta prior of the execution of this 1905 Contract, the Contractor shall provide Augusta with a surety bond from a company rated A or better 1906 by A.M Best's Rating Service in an amount equal to 100% of the Contract’s value. With each 1907 submittal of a bond, the Contractor shall furnish a current copy of the A.M Best’s rating for the 1908 surety company providing the bonds. 1909 1910 For the first year, assume that Designated Collection Area 1 has 30,701, Designated Collection Area 1911 2 has 24,056 and Designated Collection Area 3 has 13,007 Residential Units. For each awarded 1912 Designated Collection area, take the number of assumed Residential Units and multiply by the 1913 Residential Unit rate in this Contract. 1914 1915 For each subsequent year, use the amount of the prior year’s actual payments received from January 1916 1st through December 31st to establish the surety amount, in a form acceptable to Augusta, to ensure 1917 the performance of the Contractor. Updated bonds shall be received by Augusta no later than January 1918 31, for each subsequent year of the contract. The form and amount of this surety bond shall be 1919 reviewed annually and updated as may be required by Augusta upon 30 days written notice to the 1920 Contractor. 1921 1922 1923 1924 SECTIO 14 - REPRESETATIOS AD WARRATIES 1925 1926 14.1 Representations and Warranties 1927 The Contractor represents and warranties satisfactory performance in accordance with this Contract as 1928 well as: 1929 a. Organization and Qualification. The Contractor is duly incorporated or otherwise legally 1930 organized and, validly existing and in good standing under the laws of the State of Georgia, 1931 and has all requisite power and authority to enter into and perform its obligations under this 1932 Contract. 1933 1934 b. Authority. 1935 1936 Attachment number 8 \nPage 41 of 73 Item # 43 Page 42 of 73 Solid Waste & Recyclables Collection Augusta, GA 1. The Contractor has the authority to execute this Contract, to make the representations and 1937 warranties set forth in it and is appropriately skilled, organized and financially able to 1938 perform the obligations of Contractor under this Contract in accordance with its terms. 1939 1940 2. This Contract has been validly executed by the authorized representatives of the Contractor 1941 and constitutes a legally binding, enforceable obligation of Contractor. 1942 1943 c. Government Authorizations and Consents. The Contractor has or will obtain prior to the 1944 Effective Date such licenses, permits, and other authorizations from federal, state, and other 1945 governmental authorities, as are necessary for the performance of its obligations under this 1946 Contract. 1947 1948 d. Compliance with Laws. The Contractor is not in violation of any applicable law, ordinance 1949 or regulation, the consequence of which will or may materially affect Contractor’s ability to 1950 perform its obligations under this Contract. The Contractor is not subject to any order or 1951 judgment of any court, tribunal, or governmental agency which could materially and 1952 adversely affects its operations or assets in the State of Georgia, or its ability to perform its 1953 obligations under this Contract. 1954 1955 e. Accuracy of Information. None of the representations or warranties in this Contract and none 1956 of the documents, statements, certificates or schedules furnished or to be furnished by 1957 Contractor pursuant hereto or in connection with the performance of the obligations 1958 contemplated under this Contract, contains or will contain any untrue statement of a material 1959 fact or omits or will omit to state a material fact necessary to make the statements of fact 1960 contained therein not misleading. 1961 1962 f. Independent Examination. In accepting these responsibilities, the Contractor represents and 1963 affirms that it has made its own examination of all conditions, facilities, and properties 1964 affecting the performance of this Contract and of the quantity and expense of labor, 1965 equipment, materials needed, and of applicable taxes permits and laws. The Contractor 1966 affirms that within the Designated Collection Area, it is aware of the present placement of 1967 Roll-Out Carts and Recyclables Carts at the curb, alley, or Carry-Out Collection locations, 1968 and the present location of Carry-Out Collection customers. The Contractor represents and 1969 warranties that it is capable of continuing to collect Roll-Out Carts and Recyclable Carts from 1970 their present locations. 1971 1972 SECTIO 15 - IDEMITY 1973 1974 15.1 Indemnity 1975 The Contractor(s) shall defend, indemnify and save harmless Augusta and Augusta’s officers, employees 1976 and agents from any and every claim and risk, and from all losses, damages, demands, suits, judgments 1977 and attorney fees, and other expenses of any kind (collectively “losses”) arising out of this Contract or the 1978 performance thereof; including but not limited to any personal injury, or death of any and all persons 1979 (including but not limited to the Contractor, its agents, employees, subcontractors and their successors 1980 and assignees, as well as Augusta or Augusta’s agents and all third parties); and including any property 1981 damage of any kind, whether tangible or intangible, including loss of use resulting there from, in 1982 connection with or related to the negligent or willful act(s) or omissions of the Contractor or its 1983 subcontractor which were caused in whole or in part by the Contractor or its subcontractor while 1984 performing work under this Contract, or in connection with or related to (in whole or in part by reason of) 1985 the presence of the Contractor or its subcontractors or their property, employees or agents, upon or in 1986 Attachment number 8 \nPage 42 of 73 Item # 43 Page 43 of 73 Solid Waste & Recyclables Collection Augusta, GA proximity to the property of Augusta or any other property (upon which the Contractor is performing any 1987 work called for), except only those losses resulting solely from the negligence of Augusta. 1988 1989 SECTIO 16 - DEFAULT AD TERMIATIO 1990 1991 16.1 Default and Termination 1992 This section is independent, notwithstanding any other provisions of this Contract. The Contractor may 1993 be held in default of the Contract in the event the Contractor: 1994 1995 a. Fails to perform ninety percent (90%) of the collections required by this Contract and 1996 appears, to Augusta, to have abandoned the work, or to be unable to resume collections 1997 within forty-eight (48) hours. 1998 1999 b. Has failed on any occasion of two (2) consecutive working days, in any year, or ten (10) 2000 days in a calendar year to perform the collections required by the Contract. 2001 2002 c. Mixes Contract materials with materials collected from outside this Contract. 2003 2004 d. Fails to furnish and maintain a Performance and/or Payment Bond per Section 13. 2005 2006 e. Fails to furnish and maintain the Insurance requirements per Section 13. 2007 2008 f. Fails to be granted and/or receive prior written approval of a change of control or other 2009 provision as defined in Sections 20.3 and 20.4. 2010 2011 g. Fails to perform any material obligation of the Contractor under the terms of this 2012 Contract, and continuance of such failure after receiving written notice by Augusta 2013 specifying such failure, and Contractor’s failure to cure the default or immediately 2014 initiate and diligently pursue reasonable action to cure such non-performance within the 2015 thirty (30) day period. 2016 2017 To initiate proceedings under this Section, Augusta shall give notice to the Contractor and its 2018 surety. Within 7 days, Contractor may demand a hearing at which the Contractor may show 2019 cause as to why it should not be declared in default or why it should be given the opportunity 2020 to cure said default. In the event the Contractor fails to show cause, to the reasonable 2021 satisfaction of Augusta, why the Contractor should not be declared to be in default of this 2022 Contract, Augusta may make a declaration of default. In evaluating whether to make such a 2023 declaration of default, Augusta may, in its sole discretion, consider the severity of the alleged 2024 violations, and the overall performance of the Contractor under the Contract. 2025 2026 In declaring the Contractor to have defaulted on the Contract, Augusta also may order the 2027 Contractor to discontinue further performance of work under the Contract and transfer the 2028 obligation to perform such work from the Contractor to the surety on the Contractor’s 2029 performance bond and take any other action it deems advisable. 2030 2031 Under receipt of a notice that the work has been transferred to the surety without termination 2032 of the Contract, the surety shall take possession of all materials and equipment described in 2033 the most recent inventory submitted to Augusta, for the purpose of completing the work 2034 under the Contract, employ, by the Contract or otherwise, any person and/or all persons 2035 needed to perform the work; and provide materials and equipment required therefore. Such 2036 Attachment number 8 \nPage 43 of 73 Item # 43 Page 44 of 73 Solid Waste & Recyclables Collection Augusta, GA employment shall not relieve the surety of its obligations under the Contract of bond. If there 2037 is a transfer to the surety, payments shall be made to the surety or its agent for all work 2038 performed under the Contract subsequent to such transfer, in amounts equal to those that 2039 would have been made to the Contractor had it performed in the manner and to the extent of 2040 the surety’s performance, and the Contractor shall have no claim upon the same. 2041 2042 In the event the surety on the Contractor’s performance bond fails to assume or continue 2043 performance within two (2) days after its receipt of notice that the work has been transferred 2044 to such surety, the Contractor shall be deemed to have leased, subleased, or otherwise license 2045 Augusta to use all, or whatever portion is desired by Augusta, of the materials and equipment 2046 described on the most recent inventory submitted to Augusta pursuant to Section 6 hereof, for 2047 collection (and processing) purposes for a period of up to one (1) year following the date of 2048 the declaration of default by Augusta without requiring Augusta to execute any other 2049 document whatsoever to accomplish such lease, sublease, or license and without requiring 2050 Augusta to post any bond, pledge, deposit or other security for such equipment and materials, 2051 but upon the condition that Augusta pay for the equipment and materials actually used for 2052 such collection, a market rental that is no greater than (i) the monthly lease, in the event such 2053 property is leased by the Contractor, (ii) the periodic installment, in the event such property is 2054 being acquired under a purchase Contract, (iii) the periodic financing interest and principal, in 2055 the event such property is being acquired under a purchase Contract, or (iv) the financing 2056 arrangement; provided, that under no circumstances shall Augusta be liable during its use of 2057 such property for any arrearages, balloon payment, accrued interest, accelerated charges in 2058 the event of a default, or other extraordinary payment; nor shall the satisfaction thereof be a 2059 condition of Augusta’s interim use of such property; provided, further, that such lease, sub-2060 lease, or license shall be suspended the date the surety on the Contractor’s bond or its agent 2061 accepts the transfer of work under the Contract. 2062 2063 In the event Augusta secures the performance of work under the Contract at a lesser cost than 2064 would have been payable to the Contractor had the Contractor performed the same, then 2065 Augusta shall retain such difference; but in the event such cost to Augusta is greater, the 2066 Contractor and its surety shall be liable for and pay the amount of such excess to Augusta. 2067 2068 All payments due the Contractor at the time of default, less amounts due Augusta from the 2069 Contractor, shall be applied by Augusta against damages suffered and expense incurred by 2070 Augusta to reason of such default, any excess shall be paid to the Contractor unless otherwise 2071 provided herein. 2072 2073 Notwithstanding the provisions of this Section, a delay or interruption in the performance of 2074 all or any part of the Contract resulting from causes beyond the Contractor’s control, as 2075 defined in section 20.28, shall not be deemed to be a default and the rights and remedies of 2076 Augusta provided for herein shall be inapplicable; provided that all labor disputes as defined 2077 in section 20.28 hereof shall not be considered a cause beyond the Contractor’s control as 2078 defined in section 20.28. 2079 2080 Augusta shall have the unilateral right to order in writing a temporary stopping of the work, 2081 or delaying performance that does not alter the scope, of the contract. 2082 2083 Augusta shall have the unilateral right to terminate this Contract in whole or in part for the 2084 convenience of Augusta, Georgia; provided however, 2085 2086 a. For the Contractor servicing Designated Collection Area 1, in the event that Augusta 2087 Attachment number 8 \nPage 44 of 73 Item # 43 Page 45 of 73 Solid Waste & Recyclables Collection Augusta, GA elects to terminate this Agreement, Augusta agrees to pay all costs associated with the 2088 CNG infrastructure at one hundred and five percent (105%) of the then outstanding 2089 amount owed on the CNG infrastructure. The amount shall be calculated by dividing the 2090 total amount of money spent on the CNG infrastructure pursuant to Section 8.2.4, divided 2091 by 107 (months of the agreement) and multiplied by the remaining full months of the 2092 then terminated agreement. 2093 2094 b. For the Contractor servicing Designated Collection Area Two (2) and Designated 2095 Collection Area Three (3), in the event that Augusta elects to terminate the Agreement in 2096 the first 53 months of the agreement, Augusta agrees to pay all costs associated with the 2097 initial CNG infrastructure expense at one hundred and five percent (105%) of the then 2098 outstanding amount owed on the CNG infrastructure. The amount shall be calculated by 2099 dividing the total amount of money spent on the CNG infrastructure pursuant to Section 2100 8.2.4, divided by 53 and multiplied by the remaining full months through the 53 month. 2101 2102 c. For the Contractor servicing Designated Collection Area Two (2) and Designated 2103 Collection Area Three (3), in the event that Augusta elects to terminate the Agreement in 2104 the last 54 months of the agreement, Augusta agrees to pay all costs associated with the 2105 second CNG expense at one hundred and five percent (105%) of the then outstanding 2106 amount owed on the CNG infrastructure. The amount shall be calculated by dividing the 2107 total amount of money spent on the CNG infrastructure pursuant to Section 8.2.5, divided 2108 by 54 and multiplied by the remaining full months of the then terminated agreement. 2109 2110 d. In the event that Augusta terminates this contract for convenience, Augusta shall pay 2111 Contractor three months straight line depreciation on the collection vehicles operated 2112 under this agreement. A month of straight line depreciation shall be defined as the 2113 amount of money paid for the collection vehicles operating under this Agreement divided 2114 by 107 months. 2115 2116 SECTIO 17 – COMMITMET OF EQUIPMET 2117 2118 1. Unless a replacement or substitute is provided, all vehicles, facilities, equipment and property 2119 identified in the Contractor’s inventory under Section 6 for use in the performance of this 2120 Contract (called “such property”) shall be available for use in collecting Refuse, Garbage, 2121 Yard Waste, Recyclables, White Goods, and Bulky Waste. When provided, this Section 2122 applies to the replacement and substitute. 2123 2124 2. For the duration of this Contract, any document (including a lease to or by the Contractor, 2125 financing Contract, acquisition over time, mortgage, or other instrument establishing a 2126 security interest) that encumbers or limits the Contractor’s interest in such property shall: 2127 2128 a. Allow the surety on the Contractor’s performance bond to take over the Contractor’s 2129 obligations and to continue the use of the equipment in service for performance of the 2130 Contract; 2131 2132 b. Allow Augusta to take over the Contractor’s obligations and to continue the use of the 2133 equipment in service for performance of the Contract; 2134 2135 c. Exempt Augusta from liability during its usage of such property for arrearages, balloon 2136 payments, accrued interest, accelerated charges on account of a default, or other 2137 Attachment number 8 \nPage 45 of 73 Item # 43 Page 46 of 73 Solid Waste & Recyclables Collection Augusta, GA extraordinary payments, and not make satisfaction thereof a condition of Augusta’s 2138 interim usage; and 2139 2140 d. Forbare any foreclosure, trustee’s sale or other dispossession of the Contractor’s interest 2141 in such property without giving both Augusta and surety on the Contractor’s performance 2142 bond sixty (60) days prior notice, and then make any termination of the Contractor’s 2143 interest in such property pursuant to such action or the enforcement thereof subject to the 2144 requirement of Subsections a, b, and c of this section. 2145 2146 3. To assure compliance with this Section, the Contractor shall submit to Augusta for review 2147 and approval or disapproval prior to execution all contracts, leases, or other documents for 2148 acquisition of, or encumbering or limiting the Contractor’s interest in, such property or for 2149 replacements thereof and any proposed agreement that would encumber or transfer any 2150 interest of the Contractor in such property before the Contractor’s execution of such 2151 agreement. Augusta’s approval shall not be unreasonably withheld. 2152 2153 SECTIO 18 - AFFIRMATIVE ACTIO AD O-DISCRIMIAT IO SERVICE 2154 2155 The Contractor shall not discriminate against any employee or applicant for employment because of race, 2156 religion, creed, color, sex, marital status, sexual orientation, political ideology, ancestry, national origin, 2157 or the presence of any sensory, mental, or physical handicap, unless based upon a bonafide occupational 2158 qualification. The Contractor will take affirmative action to ensure that applicants are employed, and that 2159 employees are treated during employment, without regard to their of race, religion, creed, color, sex, 2160 marital status, sexual orientation, political ideology, ancestry, national origin, or the presence of any 2161 sensory, mental, or physical handicap. Such action shall include, but not be limited to the following: 2162 employment, upgrading, promotion, demotion, transfer, recruitment or recruitment advertising, layoff or 2163 termination, rates of pay or other forms of compensation, and selection for training, including 2164 apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and 2165 applicants for employment, notices are provided, setting forth the provisions of this non-discrimination 2166 clause. 2167 2168 The Contractor will not discriminate against any Customer or Augusta resident in the provision of service 2169 or quality of service on account of race, religion, creed, color, sex, marital status, sexual orientation, 2170 political ideology, ancestry, national origin, or the presence of any sensory, mental, or physical handicap, 2171 unless based upon a bona fide qualification to or for service. The Contractor shall provide the same good 2172 quality service throughout Augusta without regard to racial, ethnic, or cultural characteristics or relative 2173 standard of living of the neighborhood. 2174 2175 SECTIO 19 – DRUG AD ALCOHOL FREE WORKPLACE 2176 2177 19.1 Drug and Alcohol Free Workplace 2178 Augusta is a drug-free workplace employer. The Contractor hereby certifies that it has or it will within 2179 thirty (30) days prior to the Start Date of the Contract: 2180 2181 a. Notify employees that the unlawful manufacture, distribution, dispensation, possession, or 2182 use of alcohol or a controlled substance is prohibited in the workplace and specifying actions 2183 that will be taken for violations of such prohibition; 2184 2185 b. Establish an alcohol and drug-free awareness program to inform employees about (i) the 2186 dangers of alcohol and drug abuse in the workplace, (ii) the Contractor’s policy of 2187 maintaining an alcohol and drug-free workplace, (iii) any available alcohol and drug 2188 Attachment number 8 \nPage 46 of 73 Item # 43 Page 47 of 73 Solid Waste & Recyclables Collection Augusta, GA counseling, rehabilitation, and employee assistance programs, and (iv) the penalties that may 2189 be imposed upon employees for alcohol and drug abuse violations; 2190 2191 c. Notify each employee that as a condition of employment, the employee will (i) abide by the 2192 terms of the prohibition outlined above, and (ii) notify the Contractor of any alcohol or drug 2193 statute conviction for a violation occurring in the workplace, or that could affect the 2194 employees ability to perform their job, not later that five (5) days after such conviction; 2195 2196 d. Impose a sanction on, or requiring the satisfactory participation in an alcohol or drug 2197 counseling, rehabilitation or abuse program by, an employee convicted of an alcohol or drug 2198 crime; 2199 2200 e. Make a good faith effort to continue to maintain an alcohol and drug-free workplace for 2201 employees; and require any party to which it subcontracts any portion of the work under the 2202 Contract to comply with the above provisions. 2203 2204 f. A false certification or the failure to comply with the above alcohol and drug-free workplace 2205 requirements during the performance of the Contract shall be grounds for suspension, 2206 termination or debarment. 2207 2208 g. The foregoing provisions will be inserted in all subcontracts for work covered by this 2209 Contract. 2210 2211 SECTIO 20 - GEERAL PROVISIOS 2212 20.1 Taxes 2213 The Contractor shall promptly pay all taxes and license fees required by Augusta and by the State of 2214 Georgia. 2215 20.2 Permits 2216 The Contractor shall obtain all licenses and permits (other than the license and permit granted by the 2217 Agreement) required by Augusta, by the State of Georgia, or by the federal government. 2218 20.3 on-Assignment; Subcontracting; Delegation of Dutie s 2219 Except for the subcontracting identified in the Contractor’s proposal, the Contractor shall not assign or 2220 subcontract or transfer any of the work or delegate any of its duties under the Contract without the prior 2221 written approval of Augusta, which approval may be withheld in Augusta’s sole discretion. 2222 Notwithstanding the foregoing, Augusta’s approval shall not unreasonably be withheld if the Contractor 2223 proposes to assign or transfer this Contract to an affiliate of the Contractor or to Contractor’s parent 2224 corporation, provided that Contractor can establish to the reasonable satisfaction of Augusta that (i) the 2225 assignee or transferee will operate the Contract in substantially the same manner as the Contractor, will 2226 use substantially the same management and collection personnel as Contractor, and possesses 2227 substantially the same financial capabilities as Contractor and (ii) the assignee or transferee is not 2228 affiliated in any way with the company that has a Contract for collection with Augusta for any portion of 2229 Augusta outside the Contractors current Designated Collection Area. 2230 2231 In the event of an assignment, subcontract, or delegation of duties, the Contractor shall remain responsible 2232 for the full and faithful performance of the Contract and the assignee, subcontractor, or other obligor shall 2233 also become responsible to Augusta for the satisfactory performance of the work assumed. Augusta may 2234 Attachment number 8 \nPage 47 of 73 Item # 43 Page 48 of 73 Solid Waste & Recyclables Collection Augusta, GA condition its approval upon the delivery by the assignee, subcontractor or other obligor of its covenant to 2235 Augusta to fully and faithfully complete the work or responsibility undertaken. 2236 2237 During the term of this Contract, the Contractor shall not have an ownership interest in any other 2238 company that has a Contract for residential collection with Augusta. 2239 2240 Should a Contractor sub-contract work under this contract, a sub-contract contract/agreement shall be 2241 generated in writing. This agreement shall at a minimum include the area to be serviced, the price that the 2242 sub-contractor shall be paid, and the required sections under this contract that flow through to a sub-2243 contractor. A copy of said agreement(s) shall be provided to Augusta within fourteen (14) days of 2244 execution. 2245 2246 20.4 Change in Control 2247 In the event of a change in “Control” of the Contractor (as defined below), Augusta shall terminate the 2248 Contract for default unless Augusta has granted prior written approval. Such approval shall be at the sole 2249 discretion of Augusta. Any approval by Augusta for transfer of ownership or control shall be contingent 2250 upon the perspective controlling party becoming a signatory to the Contract and otherwise complying 2251 with the terms of the Contract. The Contractor shall notify Augusta within ten (10) days after it becomes 2252 aware that a change in Control will occur. As used in the Contract, the term “Control” shall mean the 2253 possession, direct or indirect of either; 2254 2255 a. The ownership of or ability to direct the voting of, as the case may be fifty one (51%) or 2256 more of the equity interest, value or voting power of the Contractor; or 2257 2258 b. The power to direct or cause the direction of the management and policies of the 2259 Contractor whether through the ownership of voting securities, by Contract or otherwise. 2260 20.5 Laws and Regulations 2261 The Contractor shall conduct operations under this Agreement in compliance with all applicable laws, 2262 rules or standards. These shall include OSHA, EPA, EPD, Federal Highway Safety, as well as state and 2263 local rules, regulations, and practices. 2264 20.6 Governing Law; Forum; Venue 2265 The terms, conditions and provisions in the Request for Proposal may supplement the Contract between 2266 Augusta and the Contractor. The order of precedence will be the Contract, the RFP, the winning 2267 proposer’s response and general law. This Agreement shall be governed under the laws of the State of 2268 Georgia. The appropriate forum for judicial interpretation of this Agreement and the sole venue for legal 2269 actions concerning this Contract shall be the Superior Courts of Richmond County Georgia. 2270 20.7 o Other Parties to Benefit 2271 This Agreement is for the benefit of the parties hereto and does not enlarge any party's liability to any 2272 third party. The provisions of this Agreement shall not be construed to create a higher standard of safety 2273 or care in any evidentiary sense with respect to third party claims. 2274 20.8 Appropriation of Funds 2275 This Agreement, and Augusta’s payment obligation for succeeding fiscal periods shall be subject to the 2276 budget process, availability and appropriation of funds. In the event that Augusta does not appropriate 2277 funds, said agreement shall terminate as required by statute. 2278 20.9 Headings 2279 Attachment number 8 \nPage 48 of 73 Item # 43 Page 49 of 73 Solid Waste & Recyclables Collection Augusta, GA The headings of the paragraphs and subparagraphs shall not be interpreted as a limitation upon the 2280 language contained therein. 2281 20.10 Severability 2282 Should any term, provision, condition, or other portion of this Contract or its application be held to be 2283 inoperative, invalid, or unenforceable, and the remainder of the Contract still fulfills its purposes, the 2284 remainder of this Contract or its application in other circumstances shall not be affected thereby and shall 2285 continue in force and effect. 2286 20.11 Indulgences ot Waivers 2287 A waiver of any breach of any provision of the Agreement shall not constitute or operate as a waiver of 2288 any breach of such provision or any other provision, nor shall any failure to enforce any provision hereof 2289 operate as a waiver of such provision. 2290 20.12 Modifications and Waiver 2291 The parties must mutually agree upon any changes in the Agreement and must be incorporated by written 2292 amendments to the Agreement. The Augusta Administrator or their designee shall have the authority to 2293 amend the Agreement on behalf of Augusta. 2294 2295 This Agreement constitutes the entire agreement of the parties regarding the subject matter hereof and 2296 may be amended or modified only by a written agreement signed by both parties. 2297 20.13 Independent Contractor 2298 The Contractor and Augusta agree that the Contractor is an independent contractor and not an employee 2299 nor agent of Augusta. The Contractor shall have exclusive control of and the exclusive right to control the 2300 details of the services and work performed, and such action does not create a partnership, agency, joint 2301 venture or other similar relationship between Augusta and the Contractor. 2302 2303 The Contractor agrees that it will not represent to anyone that its relationship with Augusta is other than 2304 that of an independent contractor, and Augusta and the Contractor may so inform any parties with whom 2305 they deal and may take any other responsible steps to carry out the intent of this section. The Contractor 2306 shall be fully and solely responsible for its own acts and omissions and those of its employees, officers, 2307 agents, and subcontractors. 2308 2309 20.14 otices 2310 Any notice required herein shall be given by certified mail to: 2311 2312 For Augusta: 2313 2314 Fred Russell 2315 Administrator 2316 530 Greene Street, Room 802 2317 Augusta, Georgia 30901 2318 2319 2320 Mark Johnson 2321 Director of Solid Waste 2322 Augusta, Georgia 2323 4330 Deans Bridge Road 2324 Blythe, GA 30805 2325 Attachment number 8 \nPage 49 of 73 Item # 43 Page 50 of 73 Solid Waste & Recyclables Collection Augusta, GA Telephone: 706-592-3201 2326 2327 2328 Lori Videtto 2329 Deputy Director of Solid Waste 2330 Augusta, Georgia 2331 4330 Deans Bridge Road 2332 Blythe, GA 30805 2333 Telephone: 706-592-3206 2334 2335 For the Contractor: 2336 Name 2337 Title 2338 Address 2339 County, State Zip 2340 Telephone: 2341 Fax: 2342 2343 20.15 Exclusive Agreement 2344 The Contractor is granted an exclusive Agreement to provide Garbage, Recyclables, Yard Waste and 2345 Bulky Waste collection services, as described herein, within the Designated Service Area. Augusta 2346 intends to Contract ONLY with the Contractor for routine collection services as described herein. In the 2347 event of an emergency declared by the appropriate governmental authorities, an event of Force Majeure 2348 or breach of this Agreement by the Contractor, Augusta may provide alternative collection services. 2349 20.16 Dispute Settlement 2350 Any claim, dispute, or other matter concerning the performance of the Contractor shall initially be 2351 referred to the Environmental Services Director in writing, for a decision. Such decision shall be 2352 rendered within thirty (30) days in writing, following the final presentation by the Contractor of evidence 2353 or argument relative to such claim, dispute, or matter. The decision of the Director may be appealed to 2354 Augusta’s Administrator or his designee, in writing, within fifteen (15) days from the date of the 2355 Director's decision. Augusta’s Administrator must render a written decision to the Contractor within thirty 2356 (30) days from the date of the appeal. The decision of the Administrator shall be subject to formal 2357 mediation between the parties. The cost of mediation shall be shared equally by the parties. If mediation 2358 is not successful, either party may bring an action in a court of appropriate venue. In the event of any 2359 litigation between the parties, each party shall pay their own attorney fees and despite who is the 2360 prevailing party, neither party shall be entitled to reimbursement of attorney's fees in any litigation 2361 between the parties. 2362 20.17 Augusta ot Liable for Delays 2363 It is further expressly agreed that in no event shall Augusta be liable for or responsible to the Contractor 2364 for or because of any stoppages or delay in the work herein provided for by injunction or other legal or 2365 equitable proceedings or due to any delay for any cause over which Augusta has insufficient control to 2366 cause a different result. 2367 2368 20.18 Contractor Will ot Sell or Disclose Data 2369 The Contractor will treat as confidential information, all data in connection with the Contract. Augusta 2370 data processed by the Contractor shall remain the exclusive property of Augusta. The Contractor will not 2371 Attachment number 8 \nPage 50 of 73 Item # 43 Page 51 of 73 Solid Waste & Recyclables Collection Augusta, GA reproduce, copy, duplicate, disclose or in any way treat the data supplied by Augusta in any manner 2372 except as contemplated by this Contract. 2373 2374 20.19 o Publicity 2375 No advertising, sales promotion or other materials of the Contractor or its agents or representatives may 2376 be distributed to Customers without prior written approval of Augusta. The Contractor, its agents or 2377 representatives shall not reference this Contract or Augusta in any manner without the prior written 2378 consent of Augusta. 2379 2380 20.20 Contract Rights 2381 2382 1. The parties reserve the right to amend this Contract from time to time by mutual agreement in 2383 writing. 2384 2385 2. Rights under this contract are cumulative, and in addition to rights existing at common law. 2386 2387 3. Payment by Augusta and performance by the contractor do not waive their Contractual rights. 2388 2389 4. Failure by either party on any occasion to exercise a Contractual right shall not forfeit or 2390 waive the right to exercise the right of another occasion. The use of one remedy does not 2391 exclude or waive the right to use another. 2392 2393 20.21 Open Records Act 2394 2395 Contractor acknowledges that Augusta records including this Contract are subject to Georgia’s Open 2396 Records Act. 2397 2398 20.22 Interpretation 2399 2400 1. This Contract shall be interpreted as a whole and to carry out its purpose. This Contract is an 2401 integrated document and contains all the promises of the parties; no earlier oral 2402 understandings modify its provisions. 2403 2404 2. Captions are for convenient reference only. A caption does not limit the scope or add 2405 commentary to the text. 2406 2407 20.23 Law; Venue 2408 2409 The laws of the State of Georgia shall govern the validity, construction and effect of this Contract. The 2410 venue for any claims, litigation or causes of action between the parties shall be in the Superior Court of 2411 Richmond County, Georgia. 2412 2413 20.24 Discretionary Waiver of Right to a Jury Trial 2414 2415 The Contractor and Augusta may waive all rights to have a trial by jury in any action, proceeding, claim, 2416 or counterclaim brought by either of them against the other on any matter whatsoever arising out of or in 2417 any way related to or connected with the Contract. 2418 2419 20.25 Specific Performance and Injunctive Relief 2420 2421 Attachment number 8 \nPage 51 of 73 Item # 43 Page 52 of 73 Solid Waste & Recyclables Collection Augusta, GA The Contractor agrees that the services are critical to Augusta’s operation and that monetary damages are 2422 not an adequate remedy for the Contractors failure to provide services as required by the Contract, nor 2423 could damages be the equivalent of the performance of such obligation. Accordingly, the Contractor 2424 hereby consents to an order granting specific performance of such obligations of the Contractor in a court 2425 of competent jurisdiction within the State of Georgia. The Contractor further agrees that a failure by it to 2426 perform the services in the manner required by the Contract will entitle Augusta to injunctive relief. 2427 2428 20.26 Severability 2429 2430 Should any term, provision, condition, or other portion of this Contract or its application be held to be 2431 inoperative, invalid, or unenforceable, and the remainder of the Contract still fulfills its purposes, the 2432 remainder of this Contract or its application in other circumstances shall not be affected thereby and shall 2433 continue in force and effect. 2434 2435 20.27 Interest of the Parties 2436 2437 The Contractor covenants that its officers, employees and shareholders have no interest and shall not 2438 acquire any interest, direct or indirect, which would conflict in any manner of degree with the 2439 performance of services required under the Contract. 2440 2441 2442 20.28 Force Majeure 2443 2444 1. The Contractor shall not be liable for any failure or delay in the performance of its 2445 obligations pursuant to this Contract (and such failure or delay shall not be deemed a default 2446 of this Contract or grounds for termination hereunder if all of the following conditions are 2447 satisfied: 2448 2449 a. If such failure or delay 2450 2451 i. could not have been prevented by reasonable precaution, and 2452 2453 ii. cannot reasonably be circumvented by the non-performing party through the use of 2454 alternate sources, work around plans, or other means, and 2455 2456 b. If and to the extent such failure or delay is caused, directly or indirectly by fire, flood, 2457 hurricanes, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance, 2458 sabotage, and governmental actions. 2459 2460 2. Upon the occurrence of an event which satisfies all of the conditions set forth above, the 2461 Contractor shall be excused from any further performance of those obligations pursuant to 2462 this Contract affected by the Force Majeure for as long as; 2463 2464 a. Such Force Majeure event continues and, 2465 2466 b. The Contractor continues to use commercially reasonable efforts to recommence 2467 performance whenever and to whatever extent possible without delay. 2468 2469 3. Upon the occurrence of a Force Majeure event, the Contractor shall immediately notify 2470 Augusta by telephone and confirmed in writing within two (2) days of the occurrence of a 2471 Force Majeure and shall describe in reasonable detail the nature of the Force Majeure. If any 2472 Attachment number 8 \nPage 52 of 73 Item # 43 Page 53 of 73 Solid Waste & Recyclables Collection Augusta, GA Force Majeure prevents the Contractor from performing its obligations for more than five (5) 2473 days, Augusta may terminate this Contract. 2474 2475 4. Strikes, slow-downs, walkouts, lockouts and individual disputes are not excused under this 2476 provision. 2477 2478 5. Augusta may grant variances in routes, schedules and materials collected as are reasonably 2479 required and in the best interest of Augusta. 2480 2481 6. Augusta may negotiate with the Contractor fees for any additional work which the Contractor 2482 may agree to perform in the event of a disaster. 2483 2484 20.29 E-Verify 2485 2486 All contractors and subcontractors entering into contracts with Augusta, Georgia for the physical 2487 performance of services shall be required to execute an Affidavit verifying its compliance with O.C.G.A. 2488 § 13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with 2489 Augusta, Georgia has registered with and is participating in a federal work authorization program. All 2490 contractors and subcontractors must provide their E-Verify number and must be in compliance with the 2491 electronic verification of work authorized programs operated by the United States Department of 2492 Homeland Security or any equivalent federal work authorization program operated by the United States 2493 Department of Homeland Security to verify information of newly hired employees, pursuant to the 2494 Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603, in accordance with the applicability 2495 provisions and deadlines established in O.C.G.A. § 13-10-91 and shall continue to use the federal 2496 authorization program throughout the contract term. All contractors shall further agree that, should it 2497 employ or contract with any subcontractor(s) in connection with the physical performance of services 2498 pursuant to its contract with Augusta, Georgia the contractor will secure from such subcontractor(s) each 2499 subcontractor’s E-Verify number as evidence of verification of compliance with O.C.G.A. § 13-10-91 on 2500 the subcontractor affidavit provided in Rule 300-10-01-.08 or a substantially similar form. All contractors 2501 shall further agree to maintain records of such compliance and provide a copy of each such verification to 2502 Augusta, Georgia at the time the subcontractor(s) is retained to perform such physical services 2503 2504 2505 “Contractor acknowledges that this contract and any changes to it by amendment, modification, 2506 change order or other similar document may have required or may require the legislative 2507 authorization of the Board of Commissioners and approval of the Mayor. Under Georgia law, 2508 Contractor is deemed to possess knowledge concerning Augusta, Georgia's ability to assume 2509 contractual obligations and the consequences of Contractor's provision of goods or services to 2510 Augusta, Georgia under an unauthorized contract, amendment, modification, change order or 2511 other similar document, including the possibility that the Contractor may be precluded from 2512 recovering payment for such unauthorized goods or services. Accordingly, Contractor agrees 2513 that if it provides goods or services to Augusta, Georgia under a contract that has not received 2514 proper legislative authorization or if the Contractor provides goods or services to Augusta, 2515 Georgia in excess of the any contractually authorized goods or services, as required by Augusta, 2516 Georgia's Charter and Code, Augusta, Georgia may withhold payment for any unauthorized 2517 goods or services provided by Contractor. Contractor assumes all risk of non-payment for the 2518 provision of any unauthorized goods or services to Augusta, Georgia, and it waives all claims to 2519 payment or to other remedies for the provision of any unauthorized goods or services to 2520 Augusta, Georgia, however characterized, including, without limitation, all remedies at law or 2521 equity." This acknowledgement shall be a mandatory provision in all Augusta, Georgia contracts 2522 for goods and services, except revenue producing contracts 2523 2524 Attachment number 8 \nPage 53 of 73 Item # 43 Page 54 of 73 Solid Waste & Recyclables Collection Augusta, GA SIGATURES O FOLLOWIG PAGE 2525 2526 Attachment number 8 \nPage 54 of 73 Item # 43 Page 55 of 73 Solid Waste & Recyclables Collection Augusta, GA I WITESS HEREOF, the parties hereto have caused this Agreement to be executed by 2527 duly authorized officers on this the ___day of ___________________, 20____. 2528 2529 2530 BY: 2531 2532 Augusta, Georgia 2533 2534 2535 _______________________ 2536 As its Mayor 2537 2538 2539 Attest: 2540 2541 ________________________ 2542 Clerk of Commission 2543 2544 2545 The foregoing contract is hereby executed by the below-listed parties: 2546 2547 Contractor: ____________________________________ 2548 2549 By: __________________________________________ 2550 2551 As its: ________________________________________ 2552 2553 2554 2555 Sworn to and subscribed before me on this _____ day of _________________, 20___. 2556 2557 ______________________ 2558 Notary Public 2559 2560 My Commission Expires: _____________________ 2561 2562 2563 Attachment number 8 \nPage 55 of 73 Item # 43 Page 56 of 73 Solid Waste & Recyclables Collection Augusta, GA 2564 2565 2566 2567 2568 2569 APPEDIX A 2570 2571 Designated Collection Area Map(s) 2572 2573 2574 2575 2576 2577 2578 Attachment number 8 \nPage 56 of 73 Item # 43 Page 57 of 73 Solid Waste & Recyclables Collection Augusta, GA 2579 2580 2581 2582 APPEDIX B 2583 2584 Monthly Performance Summary 2585 Attachment number 8 \nPage 57 of 73 Item # 43 Page 58 of 73 Solid Waste & Recyclables Collection Augusta, GA MONTHLY PERFORMANCE SUMMARY UNITS UNITS KEY PERFORMANCE AREAS OBSERVED PENALIZED Number of Requests for Services Number of Valid Misses Number of Requests for Services not collected within specific timeframe Number of Courtesy Collections Number of Service Complaints Number of Repeat Collection Misses Number of Area Misses Property Damage/Claims Container (Damage/Loss) Roll Out Container/Bin Placement Leaks & Spills Littering Mixed Loads Emergency Unload Cleanup Deliver Recycling to Landfill 2586 Attachment number 8 \nPage 58 of 73 Item # 43 Page 59 of 73 Solid Waste & Recyclables Collection Augusta, GA Liquidated Damages: $ Attachment number 8 \nPage 59 of 73 Item # 43 Summary of Damages for Performance Criteria List of Damages Units Collection Contract Damages Damage TOTAL Request for Service [3.11.4] each $100 Per Month When Misses >200 Lump Sum $5,000 Repeat Collection Miss [3.11.4.d] 2nd and 3rd Miss each $500 4 or more Misses each $1,000 Area Misses [3.11.4.f] 1 – 100 Misses Lump Sum $2,000 >100 Misses each $20 Augusta clean-up Service Lump Sum $500 Property Damage/Accidents [10.3.3] Failure to notify Augusta of Damages each $2,000 Rollout Container Loss or Damage [5.3] each TBD Rollout Container Damage – Wheels 11+ each [5.4.3] $25 Rollout Container Placement [5.4.2] 11+ each $100 Per Month When Misses >200 Lump Sum $5,000 Vehicle Leaks & Spills [6.5.2] Failure to remove from service each $3,000 Failure to cleanup spill each $1,500 1 to 3 leaks or spills per month each $1,000 Care & Diligence/Littering [10.4.1] Failure to clean up litter each $500 Mixed Loads [Garbage/Recycling] [7.2.3] Per Incident Lump Sum $500 Collecting Route Out of Order [4.4.1] Per Route per Daily Occurrence Lump Sum $500 Emergency Unload Cleanup [6.4.1] For each 2-hr delay in clean-up each $100 Augusta provided clean-up each $2,000 Deliver Recycling to Landfill [7.2.3] For each incident each $500 Augusta Provided Collection [3.11.4] each $500 TOTAL Attachment number 8 \nPage 60 of 73 Item # 43 Attachment number 8 \nPage 61 of 73 Item # 43 APPEDIX D Proposal for Incentive Based Rewards Program for Advanced Disposal for the city of Augusta, Georgia. Waste Diversion through Incentivized Recycling April 25, 2012 Overview Recycling Perks partners with municipalities, haulers and local businesses to improve and enhance residential curbside recycling while supporting the local economy. Recycling Perks provides residents and cities with a unique incentive based recycling rewards program that includes reward program management, community outreach and marketing, as well as measurement and performance tracking. The Recycling Perks program will be heavily weighted towards local businesses to help drive local revenue and increase program participation. City of Augusta Recycling Perks will work with the city and hauler to implement an Incentive based Recycling Rewards program. The incentive based recycling program will be implemented city wide and participating residents will be rewarded for their recycling efforts. Participation will be tracked using Radio Frequency Identification (RFID) tags which will be provided by the city. Recycling will be collected from a residents recycling container and will be dumped into the collection vehicle. Each container will have a RFID tag affixed, allowing us to compile data on which home’s recycling containers have been collected. Technical Plan Recycling Perks will work with Hauler to establish RFID technology data capturing. The RFID data will be delivered to Recycling Perks through an active data feed containing collection records and addresses within the program. The Recycling Perks system records participation and awards points for each collection. Each collection period, participating households will receive points for their participation. Attachment number 8 \nPage 62 of 73 Item # 43 Recycling Perks Program utilizes an exclusive website area for each city. The Recycling Perks platform allows residents to view content that is specifically for Augusta residents. Customer Service and Reward Fulfillment Recycling Perks points are used to claim Rewards offered by Local Reward Partners. Residents can obtain their rewards online, print immediately and redeem the rewards with the local business offering a reward. Recycling Perks will consult with local businesses to offer free reward content on Recycling Perks and will procure all reward offerings. Recycling Perks will maintain a Customer Service Department to answer resident’s questions relating to the incentive program by phone or email. The privacy of all residents will be protected and managed in accordance with State and Federal regulations. Costs · $0.35 per household/month for length of contract. · A one month activation fee is required prior to contract launch. Contractor will provide the following: · RFID technology on all Collection Vehicles and Containers. · Maintain RFID Software to provide collection data reports in real time through a data feed directly to Recycling Perks. · Provide a list of container deliveries identifying residential address, container serial number, RFID number, route, zip code and ongoing updates relating to new, moved or replaced containers within the program. · A willingness to participate in community events that will promote the Perks program. · Introduction Letter to all residents announcing the program. Recycling Perks to provide the following: · Timely awarding of Recycling Perks points for all approved containers collected by hauler. · Pricing is not affected by the size or type of container collected. · Participation is recorded automatically and the Recycling Perks Program awards points automatically upon the collection of each container. · RFID technology is used to automatically identify each resident’s participation, each day. · Recycling Perks points will be calculated and distributed based on the participation of the household. Weight per individual household will not be used in determining points. · Businesses in Augusta will be offered the opportunity to be a Reward Partner free of charge. · Recycling Perks points do not expire. · Recycling Perks will be available for all residents prior to the first collection day. · Recycling Perks provides a dedicated, toll free number and customer service team specific for each municipality offering incentives through Recycling Perks. · Pricing for Recycling Perks is unaffected by the contractors choice of container. Attachment number 8 \nPage 63 of 73 Item # 43 · Recycling Perks will hire and manage a Municipal Market Manger as the single point of contact for all aspects of the incentive program in Augusta. · Recycling Perks will also initiate a local charity campaign designed to give back to the community based on the success and viability of our rewards program. Attachment number 8 \nPage 64 of 73 Item # 43 Attachment number 8 \nPage 65 of 73 Item # 43 APPEDIX E Communications Plan The communication plan shall consist of the following Contractor contract information for Contractor staff. These staff shall be available as per the provisions above. For the Contractor: Title: District Manager Office Phone: Cellular Phone: Email: Title: Emergency Contact Office Phone: Cellular Phone: Email: Title: Operations Manager Office Phone: Cellular Phone: Email: Title: Customer Service/Dispatch Office Phone: Cellular Phone: Email: Attachment number 8 \nPage 66 of 73 Item # 43 APPEDIX F AUGUSTA-RICHMOND COUNTY - LOCAL SMALL BUSINESS OPPORTUNITY PROGRAM MONTHLY SUBCONTRACTOR/SUPPLIER UTILIZATION REPORT List all subcontractors/suppliers, including lower tiers, to be used on this project. PROJECT AME __________________________________________________________ PROJECT O. ________________ BASE BID $___________________ REPORT PERIOD FROM _____________ TO ______________, 20____ PAY REQUEST AMOUT_______________ PROPOSED LSB UTILIZATIO _______% AME OF SUB-COTRACTOR/ SUPPLIER COMPAY AME, ADDRESS, AD PHOE # COTRACT AMOUT TYPE OF WORK PERFORMED LSB BUSIESS YES/O TOTALS Total LSB%___________________ COTRACTOR : AUTHORIZED SIGATURE ________________ ________________________ PAY REQUEST O. ____________________________________ PERCETAGE OF TOTAL COTRACT COMPLETED TO DATE ____________% DATE ___________________ This form is to be submitted MOTHLY by the success ful vendor only –after the bid is awarded. Questions: Contact Ms. Yvonne Gentry – Office: (706) 821-2406 or Fax: (706) 821-4228 Attachment number 8 \nPage 67 of 73 Item # 43 START DATE: ______________________________________________________ COMPLETIO DATE: ________________________________________________ Complete the Following Information for Each Contract/Purchase Order Identified Business Name: __________________________________________________________ Business Contact Person Information: Name: ___________________________________________________________ Title: _____________________________ Telephone: (____)_______________ E-mail: __________________________________________________________ Business Address: _____________________________________________________ _______________________________________________________________________ City, State, Zip: _____________________________________________________ Total Award Amount (including all Change Orders): $______________________ Total Amount Paid: $______________________ Brief Description of Work Performed by Prime Contractor: _______________________ _______________________________________________________________________ _______________________________________________________________________ Business Owner(s) Primary Race/Ethnicity (White, Black, Hispanic, Asian, Native American, or Other): _____________________________________________________ Business Owner(s) Primary Gender (Male or Female):____________________________ Total No. of First-Tier Subcontractors/Sub-consultants/Suppliers on this Contract: ______ (This number should match the number of entries on Attachment B) Attachment number 8 \nPage 68 of 73 Item # 43 ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________ PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________ START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________ Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS AD/OR PERFORMED SERVICES O THIS COTRACT OR PURCHASE ORD ER. umber of subcontractor lines must match the to tal number of first-tier subcontractors indicated in the last line of Attachment A (include Additional Pages if ecessary) PAGE ___ OF ___ Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in dollars) Total Amount Paid (in dollars) Owner(s) Race/Ethnicity Owner(s) Gender Brief Description of Work Performed Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in dollars) Total Amount Paid (in dollars) Owner(s) Race/Ethnicity Owner(s) Gender Brief Description of Work Performed Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in Total Amount Paid (in Owner(s) Race/Ethnicity Owner(s) Brief Description of Work Performed At t a c h m e n t n u m b e r 8 \ n P a g e 6 9 o f 7 3 It e m # 4 3 ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form (Continued) PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________ PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________ START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________ Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS AD/OR PERFORMED SERVICES O THIS COTRACT OR PURCHASE ORD ER. umber of subcontractor lines must match the to tal number of first-tier subcontractors indicated in the last line of Attachment A (include Additional Pages if ecessary) PAGE ___ OF ___ dollars) dollars) Gender Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in dollars) Total Amount Paid (in dollars) Owner(s) Race/Ethnicity Owner(s) Gender Brief Description of Work Performed Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in dollars) Total Amount Paid (in dollars) Owner(s) Race/Ethnicity Owner(s) Gender Brief Description of Work Performed At t a c h m e n t n u m b e r 8 \ n P a g e 7 0 o f 7 3 It e m # 4 3 ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form (Continued) PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________ PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________ START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________ Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS AD/OR PERFORMED SERVICES O THIS COTRACT OR PURCHASE ORD ER. umber of subcontractor lines must match the to tal number of first-tier subcontractors indicated in the last line of Attachment A (include Additional Pages if ecessary) PAGE ___ OF ___ Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in dollars) Total Amount Paid (in dollars) Owner(s) Race/Ethnicity Owner(s) Gender Brief Description of Work Performed Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in dollars) Total Amount Paid (in dollars) Owner(s) Race/Ethnicity Owner(s) Gender Brief Description of Work Performed Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in Total Amount Paid (in Owner(s) Race/Ethnicity Owner(s) Brief Description of Work Performed At t a c h m e n t n u m b e r 8 \ n P a g e 7 1 o f 7 3 It e m # 4 3 ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form (Continued) PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________ PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________ START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________ Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS AD/OR PERFORMED SERVICES O THIS COTRACT OR PURCHASE ORD ER. umber of subcontractor lines must match the to tal number of first-tier subcontractors indicated in the last line of Attachment A (include Additional Pages if ecessary) PAGE ___ OF ___ dollars) dollars) Gender Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in dollars) Total Amount Paid (in dollars) Owner(s) Race/Ethnicity Owner(s) Gender Brief Description of Work Performed Line o. Business ame Address City State Zip Telephone Cont act Person/Title Total Award Amount (in dollars) Total Amount Paid (in dollars) Owner(s) Race/Ethnicity Owner(s) Gender Brief Description of Work Performed At t a c h m e n t n u m b e r 8 \ n P a g e 7 2 o f 7 3 It e m # 4 3 ATTACHMENT B: First-Tier Subcontractor, Sub-Consultant, Supplier Information Form (Continued) PRIME COTRACT/PURCHASE ORDER TITLE (IF AY): _____________________________________________________________________________________ PRIME COTRACT/PURCHASE ORDER UMBER (OR ITEM #): ______________________________________________________________________________ START DATE: _______________________________________ APPROXIMATE COMPLETIO DATE: _________________________________________ Please provide the following information for EACH FIRST-TIER SUBCOTRACTOR, SUB-COSULTAT, OR SUPPLIE R THAT PROVIDED GOODS AD/OR PERFORMED SERVICES O THIS COTRACT OR PURCH ASE ORDER. umber of subcontractor lines must match the total number of first- tier subcontractors indicated in the last line of Attachment A (include Additional Pages if ecessary) PAGE ___ OF ___ I attest, to the best of my knowledge and belief, that the information furnished in Attachment A and Attachment B is correct and accurate. By: ____________________________________________ Name and Title of Company Officer ____________________________________________ PRINTED NAME AND TITLE Company: ____________________________________________ Name of Company Phone Number: ____________________________________________ Date: ____________________________________________ At t a c h m e n t n u m b e r 8 \ n P a g e 7 3 o f 7 3 It e m # 4 3 Commission Meeting Agenda 8/7/2012 5:00 PM Breckenridge, Section Four, Phase 2 Department:Engineering Department-Abie L. Ladson, P.E., CPESC, Director Caption:Motion to approve the deeds of dedication, maintenance agreements and road resolution submitted by the Engineering and Augusta Utilities Departments for Breckenridge Subdivision, Section Four, Phase 2. (Approved by Engineering Services Committee July 30, 2012) Background:The final plat for Breckenridge Subdivision, Section Four, Phase 2, was approved by the Commission on December 21, 2010. The subdivision design and plat for this section have been reviewed and accepted by our engineering staff and the construction has been reviewed by our inspectors. The Utilities Department has inspected and reviewed the water and sanitary sewer installations, and hereby requests acceptance of the utility deed. Analysis:This section meets all codes, ordinances and standards. There are no wetlands or 100-year flood plain boundaries involved in this section. Acceptance of said utility deed shall dedicate, as required, the water and sanitary sewer mains along with the applicable easements to Augusta, Georgia for operation and maintenance. Financial Impact:By accepting this road into the County system and after the 18- month maintenance warranty by the developer/contractor for the road has expired, all future maintenance and associated costs will be borne by Augusta, Georgia. By acceptance of the utility deeds and maintenance agreements, all future maintenance and associated costs for water and sanitary sewer installations will be borne by Augusta, Georgia, and positive revenue will be generated from the sale of water and sanitary sewer taps and monthly billing of same. Alternatives:1. Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering and Augusta Utilities Departments for Breckenridge Subdivision, Section Four, Phase 2. 2. Do not approve and risk litigation. Cover Memo Item # 44 Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 44 Attachment number 1 \nPage 1 of 1 Item # 44 Attachment number 2 \nPage 1 of 1 Item # 44 Attachment number 3 \nPage 1 of 2 Item # 44 Attachment number 3 \nPage 2 of 2 Item # 44 Attachment number 4 \nPage 1 of 2 Item # 44 Attachment number 4 \nPage 2 of 2 Item # 44 Attachment number 5 \nPage 1 of 1 Item # 44 Attachment number 6 \nPage 1 of 4 Item # 44 Attachment number 6 \nPage 2 of 4 Item # 44 Attachment number 6 \nPage 3 of 4 Item # 44 Attachment number 6 \nPage 4 of 4 Item # 44 Item # 44 Item # 44 Commission Meeting Agenda 8/7/2012 5:00 PM Kelvin and Julie Deaton Department:Clerk of Commission Caption:Motion to approve tasking the Administrator to convene a meeting with Mr. Deaton, Mr. Ladson and a representative from the Risk Management Department and report back at the Commission meeting on Tuesday with a path forward to resolve the problem of Kelvin and Julie Deaton regarding the ongoing flooding of their home at 1722 Wrightsboro Road. (Approved by Engineering Services Committee July 30, 2012) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 45 Attachment number 1 \nPage 1 of 1 Item # 45 Commission Meeting Agenda 8/7/2012 5:00 PM On-Call Concrete and Emergency Services Contract Department:Abie L. Ladson, PE, CPESC, Director Caption:Motion to approve $1,000,000 to fund the current On-Call Concrete and Emergency Services Contract. Funding is available in the Grading & Drainage and Sidewalk Rehab/Replacement Phase VI accounts respectively as requested by AED. (Approved by Engineering Services Committee July 30, 2012) Background:Due to the increase in maintenance and emergency repairs to aging infrastructures and sidewalks within the county, AED has determined that supplementing engineering maintenance resources with the existing contract will be a practical approach to sustain much needed repairs, it will also allow AED to complete critical repairs in a timely manner to minimize public safety risks, damaged property and any associated potential hazard liabilities. Analysis:On February 7, 2012, the Augusta Commission approved the On- Call Concrete Repair, Concrete Construction & Emergency Repair Contract to Horizon Construction, Larry McCord LLC, and SITEC LLC. Additional funds allocation to this contract is needed to help improve the current level of services. Financial Impact:Funds are available in the amount of $800,000 in Grading & Drainage, and $200,000 in Sidewalk Rehab/Replacement, respectively to be transferred to the On-Call Concrete Construction Services Contract upon Commission approval. Alternatives:1) Approve $1,000,000 to fund the current On-Call Concrete and Emergency Services Contact. Funding is available in the Grading & Drainage, and Sidewalk Rehab/Replacement Phase VI accounts respectively as requested by AED. 2) Do not approve requested fund allocation and accept extended delay in completion maintenance work and increase liability risk. Recommendation:Approve Alternative Number One. Cover Memo Item # 46 Funds are Available in the Following Accounts: Phase VI Grading & Drainage and Sidewalk Rehab/Replacement REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Item # 46 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project change is authorized to CPB#N/A. This request is to continue to fund the current contract services that include concrete repair, concrete construction, and emergency repair services. Funding is available in the Grading & Drainage ($800,000) and Sidewalk Rehab/Replacement ($200,000) Phase VI accounts respectively. Contract services to Horizon Construction, Larry McCord, LLC and Sitec, LLC. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Grading and Drainage 150,000$ Sidewalks-Rehab-Replacement 150,000$ Suburbah Forces-Resurfacing 150,000$ Grading and Drainage 800,000$ Sidewalks-Rehab-Replacement 200,000$ 1,450,000$ Section 3: The following amounts are appropriated for the project: By Basin By District Varies Varies Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor CAPITAL PROJECT BUDGET CPB#N/A On-Call Concrete Repair, Concrete Construction, and Emergency Repair (Bid 11-159) 1.13.2012 Attachment number 1 \nPage 1 of 3 Item # 46 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#N/A On-Call Concrete Repair, Concrete Construction, and Emergency Repair (Bid 11-159) 1.13.2012 Attachment number 1 \nPage 2 of 3 Item # 46 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#N/A On-Call Concrete Repair, Concrete Construction, and Emergency Repair (Bid 11-159) CPB AMOUNT CHANGE CPB AMOUNT SOURCE OF FUNDS CPB GRADING & DRAINAGE PHASE VI ($150,000) ($800,000) ($950,000) SUBURBAN FORCES RESURFACING PHASE VI ($150,000)($150,000) SIDEWALKS-REHAB-REPLACEMENT ($150,000) ($200,000) ($350,000) TOTAL SOURCES: ($450,000) ($1,000,000) ($1,450,000) USE OF FUNDS CONTINGENCY PHASE VI $450,000 $1,000,000 $1,450,000 TOTAL USES: $450,000 $1,000,000 $1,450,000 1.13.2012 Attachment number 1 \nPage 3 of 3 Item # 46 Attachment number 2 \nPage 1 of 2 Item # 46 Attachment number 2 \nPage 2 of 2 Item # 46 Commission Meeting Agenda 8/7/2012 5:00 PM Option for Easement Department:Law Department Caption:Motion to approve an Option for the purposes of acquiring an easement between Marcus A. Reid & Katrina Reid, as owner(s), and Augusta, Georgia, as optionee, in connection with the East Augusta Roadway Drainage Improvement Project, said perpetual easement consists of 0.42 acre (18,106.25 sq. ft.) permanent drainage, utility and maintenance easement and (7,710.38 sq. ft.) of temporary construction easement from the property located at 544 Laney Walker Blvd. Ext., private, at the purchase price of $4,913.00. (Approved by Engineering Services Committee July 30, 2012) Background:The property owner has agreed to convey a certain option for easement to Augusta, Georgia, for the East Augusta Roadway & Drainage Improvement Project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the Motion Recommendation:Approve the Motion Funds are Available in the Following Accounts: 327041110-5411120 209812101-5411120 REVIEWED AND APPROVED BY: Finance. Cover Memo Item # 47 Law. Administrator. Clerk of Commission Cover Memo Item # 47 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 2 It e m # 4 7 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 2 It e m # 4 7 Commission Meeting Agenda 8/7/2012 5:00 PM Option for Easement Department:Law Caption:Motion to approve an Option for the purposes of acquiring an easement between Marcus A. Reid & Katrina Reid, as owner(s), and Augusta, Georgia, as optionee, in connection with the East Augusta Roadway Drainage Improvement Project, said perpetual easement consists of 0.80 acre (34,780.33 sq. ft.) permanent drainage, utility and maintenance easement and (3,825.53 sq. ft.) of temporary construction easement from the property located at 540 Laney Walker Blvd. Ext., private, at the purchase price of $8,886.00.(Approved by Engineering Services Committee July 30, 2012) Background:The property owner has agreed to convey a certain option for easement to Augusta, Georgia, for the East Augusta Roadway & Drainage Improvement Project. Analysis:The purchase of the referenced property is necessary for the project. Financial Impact:The costs necessary for this purchase will be covered under the project budget. Alternatives:Deny the Motion Recommendation:Approve the Motion Funds are Available in the Following Accounts: 327041110-5411120 209812101-5411120 REVIEWED AND APPROVED BY: Finance. Cover Memo Item # 48 Law. Administrator. Clerk of Commission Cover Memo Item # 48 At t a c h m e n t n u m b e r 1 \ n P a g e 1 o f 2 It e m # 4 8 At t a c h m e n t n u m b e r 1 \ n P a g e 2 o f 2 It e m # 4 8 Commission Meeting Agenda 8/7/2012 5:00 PM Request for Marker Monument Department:Planning and Development Caption:Motion to approve the placement of a monument commemorating the life and achievements of Montgomery Meigs, quartermaster general for the US Army during the Civil War. (Approved by Engineering Services Committee July 30, 2012) Background:Place a monument in the median at approximately at 658 Broad Street (his birthplace) In front of either the Commerce Building or the old Chateau Restaurant building. To commemorate the life and achievements of Montgomery Meigs, quartermaster general for the US Army during the Civil War, an engineer and architect contributing to the expansion of the US Capital building, the Washington Aqueduct, the Cabin John Bridge and the Old Pension Office Building, both also located in Washington D.C. Meigs is also credited as the creator of Arlington National Cemetery. It was Meigs who suggested to Abraham Lincoln that Arlington would be an appropriate site for a national cemetery. He is buried there. Analysis:The marker will be the standard double sided cast aluminum plaque, approximately 42” by 42” with the GA Historical Seal and commemorative language placed on an aluminum post. Financial Impact:no cost to City Alternatives:Allow placement or deny placement Recommendation:Allow placement Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 49 Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 49 Attachment number 1 \nPage 1 of 10 Item # 49 Attachment number 1 \nPage 2 of 10 Item # 49 Attachment number 1 \nPage 3 of 10 Item # 49 Attachment number 1 \nPage 4 of 10 Item # 49 Attachment number 1 \nPage 5 of 10 Item # 49 Attachment number 1 \nPage 6 of 10 Item # 49 Attachment number 1 \nPage 7 of 10 Item # 49 Attachment number 1 \nPage 8 of 10 Item # 49 Attachment number 1 \nPage 9 of 10 Item # 49 Attachment number 1 \nPage 10 of 10 Item # 49 Birthplace of Montgomery C. Meigs One of two native Georgians who served as generals in the U.S. Army during the Civil War, Montgomery C. Meigs was born here on May 3, 1816, grandson of a University of Georgia president. After graduating from West Point, he oversaw construction of some of Washington D.C.’s greatest engineering feats, including the U.S. Capitol dome. Meigs became Quartermaster General of the U.S. Army in 1861, coordinating the massive supply effort throughout the Civil War, and continuing in that position until he retired in 1882. His organizational genius created an efficient war machine that helped destroy the Confederacy. In 1864, Meigs ordered that Arlington, the confiscated plantation of Robert E. Lee’s wife, be used for military burials, creating the nation’s premier national cemetery. Meigs was buried there when he died Jan. 2, 1892. Erected for the Civil War 150 commemoration by the Georgia Historical Society, the Georgia Department of Economic Development, and the Georgia Battlefields Association Item # 49 Commission Meeting Agenda 8/7/2012 5:00 PM Willhaven Subdivision, Phase III, Section I Department:Engineering-Abie L. Ladson, P.E., CPESC, Director Caption:Motion to approve the deeds of dedication, maintenance agreements, and road resolution submitted by the Engineering and Augusta Utilities Departments for Willhaven Subdivision, Phase III, Section I. (Approved by Engineering Services Committee July 30, 2012) Background:The final plat for Willhaven Subdivision, Phase III, Section I was approved by the Commission on September 20, 2011. The subdivision design and plat for this section, including the storm drain system, have been reviewed and accepted by our engineering staff and the construction has been reviewed by our inspectors. The Utilities Department has inspected and reviewed the water and sanitary sewer installations, and hereby requests acceptance of the utility deed. Analysis:This section meets all codes, ordinances and standards. There are no wetlands or 100-year flood plain boundaries involved in this section. Acceptance of said utility deed shall dedicate, as required, the water and sanitary sewer mains along with the applicable easements to Augusta, Georgia for operation and maintenance. Financial Impact:By accepting these roads and storm drainage installations into the County system and after the 18-month maintenance warranty by the developer/contractor for the roads and storm drainage has expired, all future maintenance and associated costs will be borne by Augusta, Georgia. By acceptance of the utility deeds and maintenance agreements, all future maintenance and associated costs for water and sanitary sewer installations will be borne by Augusta, Georgia, and positive revenue will be generated from the sale of water and sanitary sewer taps and monthly billing of same. Alternatives:1. Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering and Augusta Utilities Departments for Willhaven Subdivision, Phase III, Section I. 2. Do not approve and risk litigation. Cover Memo Item # 50 Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 50 Attachment number 1 \nPage 1 of 1 Item # 50 Attachment number 2 \nPage 1 of 1 Item # 50 Attachment number 3 \nPage 1 of 2 Item # 50 Attachment number 3 \nPage 2 of 2 Item # 50 Attachment number 4 \nPage 1 of 2 Item # 50 Attachment number 4 \nPage 2 of 2 Item # 50 Attachment number 5 \nPage 1 of 3 Item # 50 Attachment number 5 \nPage 2 of 3 Item # 50 Attachment number 5 \nPage 3 of 3 Item # 50 Attachment number 6 \nPage 1 of 5 Item # 50 Attachment number 6 \nPage 2 of 5 Item # 50 Attachment number 6 \nPage 3 of 5 Item # 50 Attachment number 6 \nPage 4 of 5 Item # 50 Attachment number 6 \nPage 5 of 5 Item # 50 Attachment number 7 \nPage 1 of 2 Item # 50 Attachment number 7 \nPage 2 of 2 Item # 50 Commission Meeting Agenda 8/7/2012 5:00 PM Wrightsboro Road Improvements-Stream Mitigation Credits Department:Abie L. Ladson, PE, CPESC, Director Caption:Motion to approve and authorize the Engineering Department (AED) to purchase up to 9,800 stream mitigation credits at a total cost of $563,500 ($57.50 per mitigation credit) from the Bath Branch Augusta, LLC (Bath Branch Mitigation Bank) and up to 14 wetland mitigation credits at a total cost of $210,000 ($15,000 per credit) from the Mitigation Management, LLC, (Brushy Creek Mitigation Bank) to mitigate stream & wetlands impacts as determined necessary by the US Army Corps of Engineers and Georgia Environmental Protection Division in regards to the Wrightsboro Rd. from Jimmie Dyess Pkwy. to I-520 Improvements Project, CPB #323-041110-296823309. Funding is available through Engineering SPLOST III Fund Recapture. (Approved by Engineering Services Committee July 30, 2012) Background:This is a Georgia Department of Transportation (GDOT) managed project that will widen & reconstruct Wrightsboro Road from Jimmie Dyess Parkway to I-520. AED is responsible for funding engineering activities, road design, right-of-way plans, construction plans and environmental permitting. GDOT is funding the right of way acquisition ($11.9 million) and the construction ($23 million). Project construction tentative let date is in September 2012. It has been determined by the US Corps of Engineers (USACE) and Georgia Department of Environmental Protection (GAEPD) that 9766.30 stream mitigation credits and 13.97 wetland mitigation credits will have to be purchased to mitigate the impacts to Rae’s Creek, its associated tributaries and wetlands. The stream mitigation credits will be purchased from Bath Branch Augusta LLC (a local credit bank) at a cost of $57.5 per stream credit. The wetland mitigation credit will be purchased from Mitigation Management, LLC (Brushy Creek wetland bank) at a cost of $15,000 per wetland credit. Analysis:Purchase of Mitigation Credit is pre-requisite of Environmental Permits and GDOT to commence construction activities at this project. A timely purchase of required credits is critical to maintain project letting schedule and project construction funds as allocated. Cover Memo Item # 51 Financial Impact:Funding in amount of $773,500 is available through Engineering SPLOST III Fund Recapture to be transferred to the Wrightsboro Road Improvements Project upon Commission approval. Alternatives:1) Approve and authorize the Engineering Department (AED) to purchase up to 9,800 stream mitigation credits at a total cost of $563,500 ($57.50 per mitigation credit) from the Bath Branch Augusta, LLC (Bath Branch Mitigation Bank) and up to 14 wetland mitigation credits at a total cost of $210,000 ($15,000 per credit) from the Mitigation Management, LLC, (Brushy Creek Mitigation Bank) to mitigate stream & wetlands impacts as determined necessary by the US Army Corps of Engineers and Georgia Environmental Protection Division in regards to the Wrightsboro Rd from Jimmie Dyess Pkwy to I-520 Improvements Project, CPB #323-041110-296823309. Funding is available through Engineering SPLOST III Fund Recapture. 2) Do not approve purchase of mitigation credit as requested and lose designated State & Federal funding, and identify alternate ways to complete the project. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: Phase III Recapture REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Item # 51 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project change is authorized to CPB# 323-041110-296823309 Change Number Eighteen. This is to purchase stream and wetland mitigation credits at a cost of $773,500 as determined necessary by the US Army Corps of Engineers. Funding is available in SPLOST III Fund Recapture accounts. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase III 1,984,000$ SPLOST III Recapture 773,500$ 2,757,500$ Section 3: The following amounts are appropriated for the project: By Basin By District Raes Creek 3rd 2,757,500$ Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Deke Copenhaven, Mayor CAPITAL PROJECT BUDGET WRIGHTSBORO ROAD IMPROVEMENTS CHANGE NUMBER EIGHTEEEN CPB#323-041110-296823309 Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks 7.12.2012 Attachment number 1 \nPage 1 of 2 Item # 51 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET WRIGHTSBORO ROAD IMPROVEMENTS CHANGE NUMBER EIGHTEEEN CPB#323-041110-296823309 Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPECIAL 1% SALES TAX, PHASE III 323-04-1110-6011110-296823309 ($1,984,000) $0 ($1,984,000) SPECIAL 1% SALES TAX, PHASE III 323-04-1110-6011110-296823333 ($773,500) ($773,500) TOTAL SOURCES: ($1,984,000) ($773,500) ($2,757,500) USE OF FUNDS ENGINEERING 323-04-1110-5212115-296823309 $1,676,006 $773,500 $2,449,506 ADVERTISING 323-04-1110-5233119-296823309 $1,000 $1,000 RIGHT-OF-WAY 323-04-1110-5411120/296823309 $43,894 $43,894 CONTINGENCY 323-04-1110-6011110/296823309 $23,100 $23,100 TRAFFIC SIGNAL 323-04-1110-5414610/296823309 $40,000 $40,000 UTILITY RELOCATION 323-04-1110-5414510/296823309 $200,000 $200,000 TOTAL USES: $1,984,000 $773,500 $2,757,500 7.12.2012 Attachment number 1 \nPage 2 of 2 Item # 51 Commission Meeting Agenda 8/7/2012 5:00 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the regular and Special Called meetings of the Commission held July 17, 2012 and the Special Called meeting and Executive Session held July 30, 2012. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 52 Commission Meeting Agenda 8/7/2012 5:00 PM Approve agreements for Parking Decks Department:Administrator / Finance Caption:Motion to approve the Reynolds Street Parking Deck Construction, Operating and Reciprocal Easement Agreement, Reynolds Street Parking Deck Management Agreement, Conference Center Parking Lease and Assignment of Parking Deck Management Agreement, and to authorize the Mayor and Clerk of Commission to execute same. (Deferred from the July 17, 2012 meeting) Background:The approval of the Reynolds Street Parking Deck Construction, Operating and Reciprocal Easement Agreement, Reynolds Street Parking Deck Management Agreement and Conference Center Parking Lease were approved by the Commission on February 7, 2012. Analysis:The approval of the Reynolds Street Parking Deck Construction, Operating and Reciprocal Easement Agreement, Reynolds Street Parking Deck Management Agreement and Conference Center Parking Lease were approved by the Commission on February 7, 2012, subject to a change in the term of the Management Agreement and the conveyance by 933 Broad, LLC of its surface rights beneath the parking deck to the Augusta, Georgia Land Bank Authority. 933 Broad, LLC’s lender has requested slight modifications and for Augusta to consent to an Assignment of Parking Deck Management Agreement. Attached are copies of the Deed to Augusta, Deed to the Augusta, Georgia Land Bank Authority and the Quitclaim Deed and Partial Release that will be executed and recorded upon finalization of these documents Financial Impact:No funding is necessary Alternatives:N/A Recommendation:Approve the execution of the documents Cover Memo Item # 53 Funds are Available in the Following Accounts: n/a REVIEWED AND APPROVED BY: Cover Memo Item # 53 1 00455906-10 Seyfarth Shaw Revisions 5/4/12 Version 10 _____________________________________________________________________________________ Space above this line for recorder’s use REYNOLDS STREET PARKING DECK CONSTRUCTION, OPERATING AND RECIPROCAL EASEMENT AGREEMENT THIS REYNOLDS STREET PARKING DECK CONSTRUCTION, OPERATING AND RECIPROCAL EASEMENT AGREEMENT (this “Agreement”) is made this ___ day of _________, 2012, by and between AUGUSTA, GEORGIA (“City”) and 933 BROAD INVESTMENT CO., LLC, a Georgia limited liability company (“Developer”). RECITALS A. Developer is the owner of that certain improved parcels of land described on Exhibit “A” attached hereto and by this reference made a part hereof, together with all improvements located thereon (the “Developer Property”). B. City is the owner of (i) that certain tract of land described on Exhibit “B” attached hereto and by this reference made a part hereof together with all improvements located thereon (the “WAGT Tract”); (ii) that certain tract of land described on Exhibit “C” attached hereto and by this reference made a part hereof, together with all improvements located thereon (the “Jackson Tract”); and (iii) that certain improved parcel of property described on Exhibit “D” attached hereto and by this reference made a part hereof, together with all improvements located thereon (the “Air Rights Parcel” and together with the WAGT Tract and the Jackson Tract, referred to as the “City Property”) . The Air Rights Parcel is generally the block of space occupied by the Parking Deck, extending vertically from the roof of the first floor of the Parking Deck to eight feet above the finished floor elevation of the six (6th) floor of the Parking Deck. C. City has constructed on the Air Rights Parcel and the portion of the Developer Property located directly underneath the Air Rights Parcel a six (6) story parking deck (the “Parking Deck”). The Developer Property contains additional surface parking (the “Developer Surface Parking Areas”) not located within the Parking Deck. D. In connection with transactions related to the Augusta Convention Center, but for no monetary consideration, Developer conveyed the Air Rights Parcel to City. Both before and after the construction of the Parking Deck, the general functionality and utility to Developer of the Attachment number 1 \nPage 1 of 21 Item # 53 2 00455906-10 Developer Property are for surface parking for its tenants. The Parking Deck was constructed by City for the benefit of City, and the benefits of the Parking Deck to Developer are small and incidental (i.e., additional security, covered parking, and better aesthetics). Automated gates and a staffed toll booth are solely for the benefit of City in the management of its portion of the Parking Deck and provide only an incidental benefit to Developer. In connection with the Management Agreement, Developer’s affiliate has agreed to certain cost sharing and has agreed that City may use parking spaces located on the Developer Property without charge after business hours. Such agreements are part of a bargained for exchange made in connection with the Management Agreement but have no applicability outside of the Management Agreement. Accordingly, the Parties acknowledge that Developer should have no responsibility for maintaining the Parking Deck structure or sharing of costs for operation of the Parking Deck and should have no obligation to allow City to use the parking spaces located on Developer Property after hours, unless provision for the same is made in the Management Agreement. E. City and Developer desire to set forth their respective obligations and rights with respect to the Developer Property, the City Property, and the Parking Deck, including but not limited to those rights and obligations related to operation, maintenance, support, access, and insurance as set forth in this Agreement. AGREEMENT In consideration of the premises and the mutual agreements and covenants contained herein, and for other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, City and Developer, intending to be legally bound, agree as follows. ARTICLE I DEFINITIONS Section 1.1. Definitions. As used in this Agreement, the following terms shall have the following meanings. “Access Easement Areas” shall mean those areas located on the City Property and the Developer Property shown as cross-hatched on Exhibit “E” attached to this Agreement. “Air Rights Parcel” shall have the meaning set forth in the recitals of this Agreement. “Agreement” shall have the meaning set forth in the opening paragraph of this Agreement. “City” shall have the meaning set forth in the opening paragraph of this Agreement and its successors in title to the City Property. “City Property” shall have the meaning set forth in the recitals of this Agreement. “Developer” shall have the meaning set forth in the opening paragraph of this Agreement, and its successors in title to the Developer Property or any part thereof. “Developer Property” shall have the meaning set forth in the recitals of this Agreement. Attachment number 1 \nPage 2 of 21 Item # 53 3 00455906-10 “Developer Surface Parking Areas” shall have the meaning set forth in the recitals of this Agreement. “Ground Floor Ramp” shall mean that ramp connecting the ground floor of the Parking Deck to the second floor of the Parking Deck and labeled as such on the schematic Plans and Specification attached as Exhibit “H” to this Agreement. The Ground Floor Ramp is also shown on the Plat of the Reynolds Street Parking Deck referenced on Exhibit “A” to this Agreement and is depicted as the area on the “ramp” where the parking spaces are portrayed with dashed lines. “Jackson Tract” shall have the meaning set forth in the recitals of this Agreement. “Landscape Areas” shall mean those areas located on the Developer Property upon which City has landscaped and shown as cross-hatched on Exhibit “G” attached to this Agreement. “Manager” shall mean any person or entity managing the City Property. “Management Agreement” shall mean the agreement whereby a Developer, its affiliate, or a third party manages the portion of the Parking Deck located on the City Property. “Parking Deck” shall have the meaning set forth in the recitals of this Agreement and shall include all structural portions thereof and the surfaces of the ground floor and all floors thereof. “Party” shall mean City or Developer individually, and “Parties” shall mean City and Developer collectively. “Plans and Specifications” shall mean the final plans and specification for the Parking Deck, full copies of which are on file with City and Developer. Schematics of the Plans and Specifications are attached as Exhibit “H” to this Agreement. In the event reconstruction is necessary and the original full Plans and Specifications cannot be located, the Parties shall work together in good faith to engage an engineering firm to produce a new set of Plans and Specifications for re-construction of the Parking Deck in a first-class manner, in compliance with all applicable building codes and standards, in substantial accordance with the schematic plans and specifications attached to this Agreement, whereupon such plans and specifications shall become the Plans and Specifications. “Property” or “Properties” shall mean the Developer Property and the City Property, combined. “Security Deed” shall mean, collectively, that Deed to Secure Debt, Assignment of Rents and Leases, and Security Agreement from Developer to Wachovia Bank, N.A. (n/k/a Wells Fargo Bank, National Association) recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia on October 14, 2005, in Book 1019, page 1326, and the related Assignments of Leases and Rents, all related UCC financing statements, and all amendments and modifications thereto. “Standard” shall mean the first-class standards of construction, operation, maintenance and repair of Marriott Corporation, reasonably interpreted to take into account differences between a hotel and a Parking Deck. “Term of this Agreement” shall mean the period of time commencing on the date of this Agreement and continuing in perpetuity for so long as the Parking Deck is in existence and shall include the period of time following any casualty with respect to the Parking Deck for so long as either Party has Attachment number 1 \nPage 3 of 21 Item # 53 4 00455906-10 the right to rebuild the Parking Deck or the right to require the other Party or any person or entity to re- build the Parking Deck. “Traffic Control Areas” shall mean those areas located on the Developer Property shown as cross-hatched on Exhibit “F” attached to this Agreement. “WAGT Tract” shall have the meaning set forth in the recitals of this Agreement. “Wells Fargo” shall mean Wells Fargo Bank, National Association, successor to Wachovia Bank, National Association, the holder of the Security Deed and the loans secured thereby. ARTICLE II EASEMENTS Section 2.1. Access Easements. Developer hereby grants to City non-exclusive easements in perpetuity over the Access Easement Areas located on the Developer Property for vehicular and pedestrian ingress and egress to and from the public streets and sidewalks to the City Property. Developer retains the right to relocate or modify the Access Easement Areas existing on the Surface Parking Areas so long as such relocation or modification does not unreasonably hinder City’s access to the City Property and Parking Deck. City hereby grants to Developer non-exclusive easements in perpetuity over the Access Easement Areas located on the City Property for vehicular and pedestrian ingress and egress to and from the public streets and sidewalks to the Developer Property. City retains the right to relocate or modify the Access Easement Areas existing on the City Property so long as such relocation or modification does not unreasonably hinder Developer’s access to the Developer Property. Section 2.2. Landscaping Easements. Developer hereby grants to City non-exclusive easements in perpetuity over the Landscape Areas located on the Developer Property for the installation, use, replacement, and maintenance of grass, shrubs, flowers, trees, and other landscaping material, together with a non-exclusive easement in perpetuity over the driveways on the Developer Property for vehicular and pedestrian access to the Landscaping Areas. With the prior written approval of City, which shall not be unreasonably withheld or conditioned, Developer retains the right to relocate or modify the Landscape Areas in the modification or development of the Developer Property so long as such modification or development does not materially decrease the general aesthetics of the site. Section 2.3. Support and Utility Easements. The Parties acknowledge that the improvements on the Developer Property and the Air Rights Parcel share common footings and supports and that utility lines serving the Property may cross the City Property and the Developer Property. Each of the Parties hereby grants to the other Party a non-exclusive and perpetual easement over and under its respective Property for the construction, use, repair, and maintenance of supports and utility lines (electric, communication, water, sewer, storm water, and gas, to the extent now or hereafter desirable in connection the use of the respective Properties) in accordance with the Plans and Specifications, provided that the manner of construction, use, repair, and maintenance of such supports and utilities shall be in accordance with generally accepted engineering and construction practice for improvements of such type and so as not to impair the structural integrity of the other Party’s improvements. The exercise of easement rights under this section by either Party shall be conducted in such a manner as will minimize interference with the conduct of business by the other Party. In the event either Party shall in the future desire to install additional utilities for the benefit of its Property and such installation impacts the other Party’s Property, Attachment number 1 \nPage 4 of 21 Item # 53 5 00455906-10 the Party desiring to install said utilities shall install the same at its sole cost with the advance written approval and cooperation of the other Party, such cooperation and approval not to be unreasonably withheld or delayed, and the requesting Party shall return all disturbed Property to its substantially pre- disturbed condition promptly in a first-class manner. Section 2.4. Easements in favor of City for Toll Booth and Traffic Control Equipment. Developer hereby grants to City non-exclusive easements in perpetuity over the Traffic Control Areas for occupancy, use, maintenance, and repair of a toll booth and traffic control equipment in order to control access to the Parking Deck. The use of the toll booth and traffic control equipment is subject to other provisions of this Agreement and the Management Agreement. Section 2.5. Easements in favor of Developer for Parking. City hereby grants to Developer an exclusive easement in perpetuity over the WAGT Tract for parking of passenger and commercial vehicles and a non-exclusive easement in perpetuity over the WAGT Tract for pedestrian and vehicular ingress and egress to and from the public streets and sidewalks to the Developer Property. Developer shall have the right to maintain, repair, and upgrade the WAGT Tract for the parking and access purposes set forth in this section. City acknowledges and agrees that its obligation to provide WAGT Television, Inc. with a permanent easement for parking pursuant to that Parking Easement Agreement dated November 15, 2010, and recorded with the Office of the Clerk of Superior Court for Augusta Richmond County, Georgia on May 18, 2011, in Book 1301, page 2188, shall be met by the use of parking spaces in the Parking Deck located on the City Property and not on the WAGT Tract or any Developer Property. Section 2.6. Easements in favor of Developer for Parking on Ground Floor Ramp. City and Developer intend that Developer have fee simple title to and exclusive use of the parking spaces located on the Ground Floor Ramp. Because City owns the structure of the Parking Deck and because a portion of the Ground Floor Ramp is situated above the earth and is considered part of the structure, City hereby grants to Developer an exclusive easement in perpetuity over any portion of the Ground Floor Ramp outside of the Access Easement Areas for parking of passenger and commercial vehicles. Because of the configuration of the Parking Deck, it is possible that a portion of the Ground Floor Ramp may extend into the Air Rights Parcel owned by City. Accordingly, City hereby grants to Developer an exclusive easement in perpetuity over any portion of the Ground Floor Ramp consisting of parking spaces and extending into the Air Rights Parcel for parking of passenger and commercial vehicles. City hereby grants to Developer a non-exclusive easement in perpetuity over the access drive located on Ground Floor Ramp for pedestrian and vehicular ingress and egress to and from the Developer Property and said parking spaces located on the Ground Floor Ramp. City hereby grants to Developer non-exclusive easements in perpetuity over all ramps and drives within the City Property necessary to allow ingress and egress to and from the parking spaces on the Ground Floor Ramp pursuant to the designed traffic flow patterns within the Parking Deck. Section 2.7. Binding Effect; Extension of Easements to Invitees. The Parties shall have the right to extend to their tenants, customers, business guests and invitees the benefit of the rights and easements established in this Agreement, but no such tenant, customer, business guest or invitee shall by virtue thereof be deemed to have acquired any interest whatsoever in the City Property or the Developer Property or any part thereof. The benefits and burdens of the easements and restrictions created in this Agreement shall run with the land and shall be binding upon and inure to the benefit of the owners of the City Property and the Developer Property (and all subdivided portions thereof) and their respective heirs, executors, successors-in-title, tenants, and assigns, and all those holding under any of them. The easements, restrictions and obligations contained in this Agreement shall be unaffected by any change in the ownership of any property covered by this Agreement or by any change of use, demolition, Attachment number 1 \nPage 5 of 21 Item # 53 6 00455906-10 reconstruction, expansion or other circumstances, except as specified herein. Each of the rights created hereunder may be enforceable in a court of equity by the owner of any property covered by this Agreement or by Developer pursuant to retained rights and obligations under this Agreement in the event of a conveyance of all or any part of the Developer Property as contemplated in Section 6.10 below. All easements and other rights conveyed by City to Developer within this Agreement shall be for the benefit of the Developer Property. It is the express intent of the parties hereto that the easements granted herein shall not, at any time, merge by operation of law into any owner’s title or interest in any parcel, but that the easements granted herein shall remain separate and distinct rights and estates in land unless the owner(s) of all affected parcels specifically evidence their intent by mutual agreement in writing to extinguish any such easement. It is further expressly provided that the acquisition hereafter by any other party (including, without limitation, a present or future mortgagee of any parcel or any portion thereof) of an ownership interest (in fee, leasehold, or otherwise) shall not operate, by merger or otherwise, to extinguish, diminish, impair, or otherwise affect any easement granted herein, which easements shall remain separate and distinct and estates in land. Section 2.8. Perpetual Easements. The easements granted under this Section shall continue so long as the Parking Deck continues to exist or is rebuilt following a casualty. The Parties expressly acknowledge and agree that the purpose of this Agreement is the grant, conveyance and establishment of the easements, rights and privileges set forth herein, and none of the terms or provisions of this Agreement shall be or be deemed to be “covenants restricting land to certain uses” for purposes of O.C.G.A. §44-5-60, or any similar law or statute, and each Party (knowingly, willingly and upon the advice of legal counsel) expressly forever waives, releases and discharges any right that either Party now has or ever may have to claim or assert in any legal or other circumstances that any of the easements or other terms or provisions of this Agreement are in any way covered or limited by said section or any similar law or statute. Section 2.9. Reservation of Rights. Developer, as the owner of the Developer Property, hereby expressly reserves for itself, its successors and assigns, all rights and privileges incident to the ownership of the fee simple estate of the Developer Property which are not inconsistent with the rights and privileges herein granted. Specifically, Developer shall have the right to make non-structural alterations or modifications to the portion of the Parking Deck located on the Developer Property, including its façade (e.g., attaching signage, painting, or striping of the floor); provided, however, Developer shall not materially alter or modify the exterior of the Parking Deck without the prior written approval by City of the plans for such alteration or modification, which approval shall not be unreasonably withheld. Notwithstanding the preceding provision, Developer may develop the first floor of the Parking Deck into retail spaces without the approval of City, so long as the modifications do not materially impede traffic flow to the City Property or affect the structural integrity of the Parking Deck. In the event that Developer’s alterations or modifications to the Parking Deck cause damage to the Parking Deck, Developer shall be responsible to repair the same to the substantially pre-damaged condition. Furthermore, Developer retains the right to develop or modify the Developer Property (and to modify the location of the Access Easement Areas, the Traffic Control Areas, and the Landscape Areas), subject to the prior written approval of City, which approval shall not be withheld so long as such development or modification does not materially decrease the general aesthetics of the site, does not unreasonably hinder City’s access to the City Property and Parking Deck, and does not impair the structural integrity of the Parking Deck. Attachment number 1 \nPage 6 of 21 Item # 53 7 00455906-10 ARTICLE III CONSTRUCTION AND TITLE Section 3.1. Construction of the Parking Deck. Pursuant to prior agreements, City has constructed the Parking Deck in substantial accordance with the Plans and Specifications. The Parking Deck is acceptable to City and Developer in all respects. Section 3.2. Title to the Parking Deck. The structure of the Parking Deck shall be owned by City. Section 3.3. Expansion of the Parking Deck. Developer and City have agreed that City may expand the Parking Deck to the south of the existing Parking Deck (i.e., between the existing Parking Deck and Jones Street). In the event City so desires to expand the Parking Deck, Developer shall convey to City property necessary for expansion of the Parking Deck (or shall modify its easements under this Agreement with respect to the WAGT Tract) and shall amend this Agreement to provide for necessary support, access, operation and maintenance of the expanded parking deck, subject to the following conditions: (i) Developer shall retain title to the surface parking underneath of the expanded parking deck and shall only convey “air rights” in a similar manner to the rights existing under the current property ownership and this Agreement, (ii) the construction shall be of equal quality and aesthetics to the current Parking Deck, and the plans and specifications therefor shall be acceptable to Developer and any mortgagee, in their reasonable discretion, (iii) construction shall be made under the joint supervision of City and Developer in a manner similar to the management of construction of the existing Parking Deck (i.e., Developer shall have the right to inspect and review and object to draw requests prior to payment of the same), (iv) access to and functionality of Developer’s remaining property or easement rights shall not be unreasonably impaired, and agreements with respect to the expanded parking deck shall be substantially similar to the agreements in this Agreement, and (v) Developer shall retain sufficient property or easements, whether on the ground or upper levels of the expanded parking deck, so that Developer shall not suffer reduction in the number of parking spaces owned, or to which Developer has rights via easements, by Developer. Attachment number 1 \nPage 7 of 21 Item # 53 8 00455906-10 ARTICLE IV OPERATION AND MAINTENANCE OF PARKING DECK Section 4.1. Maintenance and Repair of the Property. City shall, at its sole cost and expense, repair, maintain, and clean the structure of the Parking Deck (including all parking surfaces located within the Parking Deck) and the Landscape Areas to the Standard. Otherwise, each Party shall, at its sole cost and expense, maintain its respective Property to the Standard. Notwithstanding the foregoing, during any period when both Developer and City consent to a different cost sharing arrangement pursuant to a Management Agreement, the maintenance and repair of the Parking Deck shall be made in accordance with the Management Agreement. Given that each Party has a significant investment in the Parking Deck and the property upon which the Parking Deck is located, the Parties acknowledge that each Party has an important interest in insuring that the Parking Deck is maintained in accordance with the Standard in perpetuity. Accordingly, this Agreement, and particularly this section of this Agreement, may be enforced by either Party by specific performance or otherwise. Section 4.2. Operation of Parking Deck. No barricades, curbs, gates, or other obstacles shall be erected which block or prohibit the free flow of traffic through the entrances, exits, ramps and driveways within the Property. However, City, in its sole discretion and for its benefit, may staff and operate a toll booth and/or automated traffic control devices in connection with the operation of its portion of the Parking Deck (either directly or through a Management Agreement). In the absence of a Management Agreement approved by Developer providing for a contrary agreement, Developer shall have no obligation to share in the costs of operating the Parking Deck, and Developer shall have the right to prohibit the unauthorized parking of vehicles on its Property, and the easement areas granted hereunder, and the WAGT Tract by all means allowed by law (including towing of unauthorized vehicles). In the event Developer or its affiliate manages the Parking Deck pursuant to a Management Agreement, the manager under the Management Agreement shall be responsible for all vehicle towing. In the event City elects to control access to the Parking Deck, City shall provide Developer with key cards or other acceptable devices to allow Developer’s tenants, licensees and invitees efficient access to the Developer Property, and the easement areas granted hereunder, and shall provide a reasonable and efficient method for Developer’s tenants, licensees and invitees to access the Developer Property, and the easement areas granted hereunder, through the toll booth system, all at no cost to Developer. Nothing herein shall prohibit temporary closing of the Parking Deck or Property as may be necessary for the cleaning, repair and maintenance of the same as required from time to time, so long as such activities are conducted at reasonable times and in a reasonable manner with prior coordination with the other Party. Each Party shall have the exclusive right to set or cause to be set the rents for use of the parking spaces within its respective Property. Each Party shall operate its respective improvements in compliance with the Standard and with all applicable governmental requirements, laws, statutes, regulations and/or ordinances and shall keep in full force and effect at all times all governmental permits and licenses required for the use and operation of such improvements. Section 4.3. Taxes. Developer shall be responsible for all ad-valorem taxes levied against the Developer Property. City shall be responsible for all ad-valorem taxes levied against the City Property. Section 4.4. Insurance by City. City shall either self-insure, self-fund or provide the following insurance meeting the following requirements: Attachment number 1 \nPage 8 of 21 Item # 53 9 00455906-10 General Liability Insurance. During the Term of this Agreement, City shall, at its sole cost and expense, carry comprehensive general liability property insurance, including contractual liability, personal and bodily injury, and property damage insurance, covering activities relating to the Parking Deck, with a combined single limit in an amount sufficient to protect City and Developer, but in no event will such insurance be in an amount less than a combined single limit of $3,000,000 per occurrence. Such insurance may contain a loss deductible provision of not more than $100,000.00, which loss deductible amount may be adjusted upward annually by the percentage increase in the Consumer Price Index for all urban consumers (CPI-U) (All Items 1982-84=100) for the preceding calendar year. Developer and, if requested, Developer’s mortgage lender, shall be named as an additional insured under such insurance. City shall provide Developer with a certificate of insurance evidencing such coverage no later than thirty days prior to the commencement of operation of the Parking Deck. City’s insurance shall contain a clause stating that there shall be no reduction, cancellation, or non-renewal of coverage without giving Developer and Developer’s mortgage lender thirty (30) days prior written notice. Such insurance shall also be endorsed to provide that the insurance shall be primary to and not contributory to any similar insurance carried by Developer, and shall contain a severability of interest clause. Property Insurance. During the Term of this Agreement, City shall, at its sole cost and expense, procure and keep in effect fire and extended coverage for the Parking Deck and all personal property located thereon, including rent loss or business interruption coverage for periods of no less than twelve (12) months, written on an All-Risk Endorsement and Replacement Cost basis, in amounts at no time less than the total replacement cost therefor. Such policy referred to above shall name City and Developer as loss payee and additional insureds, as their interest may appear. During any period of construction, such property insurance shall be provided, at City’s sole cost and expense, through a builder’s risk policy. City shall provide Developer with a certificate of insurance evidencing such coverage no later than thirty days prior to the commencement of the Term of this Agreement. Upon completion of construction, City shall provide Developer with such a certificate of permanent fire and extended property insurance. Section 4.5. Insurance by Developer. Developer shall either self-insure, self-fund or provide the following insurance meeting the following requirements: General Liability Insurance. During the Term of this Agreement, Developer shall, at its sole cost and expense, carry comprehensive general liability property insurance, including contractual liability, personal and bodily injury, and property damage insurance, covering activities relating to the Parking Deck, with a combined single limit in an amount sufficient to protect Developer and City, but in no event will such insurance be in an amount less than a combined single limit of $3,000,000 per occurrence. City shall be named as an additional insured under such insurance. Developer shall provide City with a certificate of insurance evidencing such coverage no later than thirty days prior to the commencement of operation of the Parking Deck. Developer’s insurance shall contain a clause stating that there shall be no reduction, cancellation, or non-renewal of coverage without giving City thirty (30) days prior written notice. Such insurance shall also be endorsed to provide that the insurance shall be primary to and not contributory to any similar insurance carried by City, and shall contain a severability of interest clause. Property Insurance. In recognition of the fact that the Parking Deck structure was built for the sole purpose of supporting and housing the upper decks for the benefit of City and that Developer’s interest in the Developer Property is merely a surface parking lot requiring no vertical improvements, Developer shall be under no obligation to insure any portion of the Parking Deck for casualty. Section 4.6. Policies and Endorsements. All insurance described in this Article may be obtained by endorsement or equivalent means under blanket insurance policies, provided that such Attachment number 1 \nPage 9 of 21 Item # 53 10 00455906-10 blanket policies substantially fulfill the requirements specified herein. Where permitted, all insurance provided under this Article shall be carried in the name of Developer, City, the owner of any fee or leasehold interest in the Parking Deck or any portion thereof, and the holder of any security deeds covering the Parking Deck or any portion thereof, if any; and any losses thereunder shall be payable to the parties as their respective interests may appear. The party procuring such insurance shall deliver to the other party certificates of insurance with respect to all policies so procured, including existing, additional and renewal policies and, in the case of insurance about to expire, shall deliver certificates of insurance with respect to the renewal policies not less than ten (10) days prior to the respective dates of expiration. All policies of insurance provided under this Article shall, to the extent obtainable, have attached thereto an endorsement that such policy shall not be canceled or materially changed without at least thirty (30) days prior notice to Developer, City, any other fee or leasehold owner of any portion of the Parking Deck, and any holder of indebtedness secured by any portion the Parking Deck. Section 4.7. Waiver of Subrogation. City and Developer agree that with respect to any loss or claim which is covered by insurance then being carried or required to be carried by them under this Agreement, the party suffering such loss or claim and carrying or required to carry such insurance releases the other of and from any and all claims, defense costs and expenses with respect to such loss or claim, to the extent of available insurance proceeds. City and Developer further agree that each of their insurance policies shall provide for an appropriate waiver of subrogation reflecting this release. Section 4.8. Indemnification. Subject to the waiver of subrogation provisions in this Agreement, each Party shall indemnify and hold harmless the other Party, its subsidiaries, its affiliates, and their respective officers, directors, agents, and employees from and against any and all claims, liabilities, losses, damages to persons or property, costs, and expenses of any kind or character, including without limitation reimbursement of court costs, reasonable attorneys’ fees, interest, fees, and penalties, to the extent such liabilities are finally determined by a court of competent jurisdiction to have been the result of the acts, omissions, negligence, or misconduct of such indemnifying Party or its employees, contractors, agents, lessees, or invitees, in the use, operation, or maintenance of the Property. This section shall survive termination of this Agreement. ARTICLE V DAMAGE AND DESTRUCTION Section 5.1. Damage or Destruction of Parking Deck. In the event of damage to or destruction of all or any part of the Parking Deck, City shall, at its election, either (i) rebuild, replace and repair such damaged or destroyed improvements to the same condition and usefulness and to the same general appearance as existed immediately prior to such damage or destruction, or (ii) clear debris and raze the improvements as outlined below. Upon such damage or destruction, City shall notify Developer of its election within ninety (90) days. In the event City elects to rebuild, replace, or repair the Parking Deck, such reconstruction shall be completed as expeditiously as reasonably possible but no later than twelve (12) months following such damage and shall be performed in compliance with the requirements set forth with respect to the initial construction of such improvements. In the event City elects to clear the debris and raze the improvements, such work shall be completed as expeditiously as reasonably possible but no later than three (3) months following such damage and shall be performed in a first-class and workmanlike manner. Section 5.2. Clearing Debris from Razed Improvements. To the extent City does not elect to restore the Parking Deck destroyed or damaged by casualty, City shall promptly raze the entirety of the Attachment number 1 \nPage 10 of 21 Item # 53 11 00455906-10 Parking Deck, clear away all debris and take all other action (including repaving) required by good constructions practice so that the area which had been occupied by the razed improvements will be compatible with the surrounding property and shall be aesthetically appropriate in accordance with the Standard. Section 5.3. Termination of this Agreement; Option to Re-Acquire the City Property. In the event City fails to rebuild after damage to the Parking Deck, this Agreement shall terminate upon the completion by City of its obligation to clear debris and raze the improvements as outline above. Upon such termination, Developer may develop the Developer Property in accordance with applicable laws. In such event, Developer shall have a perpetual option to acquire the City Property for its fair market value, as determined by an appraisal complying with the laws of Georgia with respect to the sale of government owned property. City shall reasonably cooperate with Developer in obtaining such appraisal and all necessary approvals for such conveyance of the City Property. ARTICLE VI MISCELLANEOUS Section 6.1. Breach. In the event of a breach or threatened breach of this Agreement, the parties shall be entitled to institute proceedings for full and adequate relief from the consequences of said breach or threatened breach (including, without limitation, the right to obtain injunctive relief or specific performance). In the event such proceedings are instituted, the non-prevailing litigant shall pay the reasonable attorney’s fees of the prevailing litigant. It is expressly agreed that no breach of this Agreement shall result in a cancellation, rescission or termination of this Agreement or the easements and other rights and obligations created hereby. Section 6.2. Amendments. The terms, covenants, conditions, and provisions of this Agreement cannot be modified or added to except in writing signed by all Parties. Section 6.3. Time of Essence. Time is of the essence. Section 6.4. Notices. All notices hereunder or required by law will be sent (a) via US Mail, postage prepaid, certified or registered mail, return receipt requested; or (b) via any nationally recognized commercial overnight carrier with provisions for a receipt, in either case addressed to the parties hereto at their respective addresses or numbers set forth below or as they will have theretofore specified by notice delivered in accordance herewith: Attachment number 1 \nPage 11 of 21 Item # 53 12 00455906-10 In case of the City to: Augusta, Georgia City County Municipal Building 530 Greene Street Augusta, Georgia 30901 Attn: City Administrator With a copy to: Augusta, Georgia Legal Department 530 Greene Street Augusta, Georgia 30901 Attn: General Counsel In the case of Developer to: 933 Broad Investment Co., LLC One 10th Street, Riverfront Center Suite 340 Augusta, Georgia 30901 Attn: Mr. Paul S. Simon With a copy to: Hull Barrett, PC 801 Broad Street, 7th Floor Augusta, Georgia 30901 Attn: Rand Hanna Section 6.5. Entire Agreement. This Agreement is the entire agreement between the parties with respect to the subject matter hereof and no alteration, modification or interpretation hereof shall be binding unless in writing and signed by the parties hereto. Section 6.6. Severability. If any provision of this Agreement or its application to any party or circumstances will be determined by any court of competent jurisdiction to be invalid and unenforceable to any extent, the remainder of this Agreement or the application of such provision to such person or circumstances, other than those as to which it is so determined invalid or unenforceable, will not be affected thereby, and each provision hereof will be valid and will be enforced to the fullest extent permitted by law. Section 6.7. Computation of Time. The time in which any act under this Agreement is to be done shall be computed by excluding the first day and including the last day. If the last day of any time period stated herein shall fall on a Saturday, Sunday or legal holiday, then the duration of such time period shall be extended so that it shall end on the next succeeding day which is not a Saturday, Sunday or legal holiday. Unless preceded by the word “business”, the word “day” shall mean a calendar day. The phrase “business day” or “business days” shall mean those days on which the Superior Court of Augusta-Richmond County, Georgia is located is open for business. Section 6.8. Applicable Law. This Agreement shall be construed and enforced in accordance with the laws of the State of Georgia. Section 6.9. Waiver. The failure of either party to insist upon a strict performance of any of the terms or provisions of this Agreement or to exercise any option, right or remedy herein contained, shall not be construed as a waiver or as a relinquishment for the future of such term, provision, option, right or remedy, but the same shall continue and remain in full force and effect. No waiver by either party of any term or provision hereof shall be deemed to have been made unless expressed in writing and signed by such party. Section 6.10. Successors and Assigns. The provisions of this Agreement shall apply to, inure to the benefit of and bind the Parties and the respective successors and assigns thereof, including, without Attachment number 1 \nPage 12 of 21 Item # 53 13 00455906-10 limitation, any mortgagee acquiring an interest in any portion of the Developer Property or the City Property or any improvements thereon by reason of foreclosure, deed or assignment in lieu of foreclosure or purchase at foreclosure sale; but any such mortgagee shall not incur or be required to assume any obligation under this Agreement unless and until such mortgagee has so acquired an interest in any portion of the Developer Property or the City Property or any improvements thereon, and then only such as may arise by operation of law by reason or privity of estate as limited by the provisions of this Agreement. Subject to the above, whenever in this Agreement a reference to any Party is made, such reference shall be deemed to include a reference to the heirs, executors, legal representatives, successors and assigns of such Party. It is expressly acknowledged and agreed by the Parties hereto that Developer may convey all or any portion of the Developer Property and retain from such conveyance the rights and obligations of Developer under this Agreement. Such retained rights and obligations of Developer may be further transferred, assigned or conveyed by Developer or financed and assigned by Developer as set forth in Section 6.16 below. Section 6.11. Force Majeure. Any party’s performance under this Agreement shall be suspended to the extent such party’s performance shall be delayed or hindered in or prevented from the performance of any act required by reason of strikes, lockouts, labor troubles, inability to procure materials, failure of power, riots, terrorism, insurrection, war or other reason of a like nature not the fault of such party. Section 6.12. Third Party Beneficiaries. This Agreement shall not inure to the benefit of any third party except that this Agreement may be enforced by Wells Fargo as holder of the Security Deed. Section 6.13. Relationship of the Parties. Nothing contained herein shall be construed or interpreted as creating a partnership, joint enterprise or joint venture between or among the Parties. It is understood that the relationship between the parties is an arms-length one that shall at all times be and remain separate with respect to their interests in each tract. No Party shall have the right to act for or on behalf of another Party, as agent or otherwise, unless expressly authorized to do so by separate written instrument signed by the Party to be charged or bound. Section 6.14. Interpretation. No provision of this Agreement shall be construed against or interpreted to the disadvantage of any Party by any court or other governmental or judicial authority by reason of such Party having or being deemed to have structured or dictated such provision. All personal pronouns used in this Agreement, whether used in the masculine, feminine or neuter gender, shall include all other genders; the singular shall include the plural; and the plural shall include the singular. Titles of Articles and Sections of this Agreement are for convenience only, and neither limit nor amplify the provisions of this Agreement, and all references in this Agreement to Articles, Sections or Subsections thereof shall refer to the corresponding Article, Section or Subsection of this Agreement unless specific reference is made to the articles, sections or subdivisions of another document or instrument. Section 6.15. Management Agreement. The Parties acknowledge that the Management Agreement in effect on the date of this Agreement may shift responsibility for costs, operation, insurance, etc. between Developer (or its affiliate) and City. In the event the Parties agree to the terms of a Management Agreement with respect to the management of the Parking Deck (and such agreement shall be assumed if the Parties or their affiliates are parties to the Management Agreement), any conflicting terms of the Management Agreement shall control over this Agreement. Section 6.16. Financing - Limitations of Mortgagee Liability. Any Party may finance its Property subject to this Agreement, and, in conjunction therewith, may convey and/or assign (either absolutely or conditionally) all of its rights and interests under this Agreement to any mortgagee or lessee. This Agreement and the rights, interests and easements created hereunder shall be prior and superior to Attachment number 1 \nPage 13 of 21 Item # 53 14 00455906-10 any such mortgage or lease of any portion of the Property. Any such mortgagee or lessee shall be liable for the performance of the mortgagor’s or lessee’s covenants and obligations hereunder only if and for so long as such mortgagee or lessee comes into and holds possession (or has a right to possession) of such mortgagee’s or lessee’s property, but upon any such transfer or further lease the transferee shall be subject to the terms of this Agreement. Except as specifically provided in this Agreement, no mortgagee shall have any personal or corporate liability with regard to any provision of this Agreement during the period of such mortgagee’s ownership or possession of any property encumbered hereby, any such mortgagee’s liability hereunder being limited to its interest in the property covered by such mortgage, any improvements erected thereon, and the rents and other income derived therefrom. Section 6.17. Status Reports. Recognizing that any Party may find it necessary from time to time to establish to third parties such as accountants, banks, mortgagees or the like, the then current status of performance hereunder, the Parties each agree, upon the written request of the other Party, made from time to time by notice as provided in this Agreement, to furnish promptly a written statement (in recordable form, if requested) on the status of any matter pertaining to this Agreement to the best of the knowledge and belief of the Party making such statement. [EXECUTION ON FOLLOWING PAGE] Attachment number 1 \nPage 14 of 21 Item # 53 15 00455906-10 IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed under seal effective the date and year first above written. Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) Augusta, Georgia By:________________________ Its Mayor Attest:______________________ Its Clerk of Commission (Seal) Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) 933 Broad Investment Co., LLC, a Georgia limited liability company By:________________________ Paul S. Simon As its President (Seal) Attachment number 1 \nPage 15 of 21 Item # 53 16 00455906-10 CONSENT AND SUBORDINATION Wells Fargo Bank, National Association (“Wells Fargo”), the holder of the Security Deed and the indebtedness secured thereby, hereby consents to the foregoing Agreement and subordinates the Security Deed to the foregoing Agreement. Otherwise, the Security Deed shall remain in full force and effect. Executed under seal this ____ day of ___________, 2012. Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) Wells Fargo Bank, National Association (Seal) By:__________________________ Print Name: ___________________ Title: ________________________ Attachment number 1 \nPage 16 of 21 Item # 53 17 00455906-10 Schedule of Exhibits Exhibit “A” – Developer Property Exhibit “B” – WAGT Tract Exhibit “C” – Jackson Tract Exhibit “D” – Air Rights Parcel Exhibit “E” – Access Easement Areas Exhibit “F” –Traffic Control Areas Exhibit “G” –Landscape Areas Exhibit “H” – Schematic Plans and Specifications Attachment number 1 \nPage 17 of 21 Item # 53 18 00455906-10 Exhibit “A” Developer Property All that lot, tract or parcel of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 3” containing 0.83 acre, more or less, on that certain Plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. AND All those lots, tracts, or parcels of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 4” containing 0.41 acre, more or less, and “Tract 4A” containing 0.01 acre, more or less, on that certain Plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. LESS AND EXCEPT the Air Rights Parcel, as defined on Exhibit “D” of this Agreement. Attachment number 1 \nPage 18 of 21 Item # 53 19 00455906-10 Exhibit “B” WAGT Tract All that lot, tract or parcel of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 1” containing 0.32 acre, more or less, on that certain Plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. Attachment number 1 \nPage 19 of 21 Item # 53 20 00455906-10 Exhibit “C” Jackson Tract All that lot, tract or parcel of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 2” containing 0.07 acre, more or less, on that certain Plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. Attachment number 1 \nPage 20 of 21 Item # 53 21 00455906-10 Exhibit “D” Air Rights Parcel The exclusive and perpetual right of possession and occupancy of, the exclusive and perpetual right to floor and to cover over and to build and construct over, in or upon the entire space or area situate at a height above a horizontal plane of 151.05 feet above mean sea level and below a horizontal plane of 216.10 feet above mean sea level as determined by reference to the United States Coast and Geodetic Survey Benchmark Elevation of 134.948 feet above mean sea level located at the Georgia Geodetic Monument #14-R-3 north 1,262,402.48, east 563,401.17 in the parkway on Greene Street between Fourth and Fifth Streets in the City of Augusta, Richmond County, Georgia, directly over and above the land described as follows: All that lot, tract or parcel of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 3” containing 0.83 acre, more or less, on that certain Plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. Attachment number 1 \nPage 21 of 21 Item # 53 00412263-14 Hull Barrett 5/16/12 Version 14 REYNOLDS STREET PARKING DECK MANAGEMENT AGREEMENT THIS REYNOLDS STREET PARKING DECK MANAGEMENT AGREEMENT (“Agreement”) is made effective the ___ day of ________, 2012, by and between AUGUSTA, GEORGIA (“Owner”) and AUGUSTA RIVERFRONT, LLC, a Georgia limited liability company (“Manager”). RECITALS A. Owner is a political subdivision of the State of Georgia and a consolidated city-county government pursuant to the laws of the State of Georgia. B. Owner intends to construct and own the Reynolds Street Parking Deck (the “RSPD”) which is generally defined as all elevated parking areas and specifically excluding the ground level or surface parking areas owned by Augusta, Georgia Land Bank Authority, on which easements for parking and other rights are held by 933 Broad, LLC. The RSPD is to be located at the northwestern intersection of Reynolds Street and James Brown Boulevard in Augusta, Georgia, and Owner intends to acquire certain air rights relating to, or fee simple and/or leasehold title, to the land upon which such building is located, and the furniture, fixtures, equipment, and supplies located therein. C. Owner has determined that significant public benefits will ensue to the citizens of Owner when the RSPD is continuously operated at a high standard of quality, in order to positively affect the quality of life on the City of Augusta and its environs, and in such a way so as to maximize its long-term utilization at rates at or above the non- fixed costs of operation. D. Owner has further determined that the RSPD be made available to all persons and groups on such basis, without any preference for business entities or associations, and that Owner’s objectives may best be achieved through a management agreement with a private company with expertise in such matters. E. Through its prior and current operation of the Conference Center, the Augusta Marriott and the Augusta Marriott Suites (the “Hotels”), which are situated adjacent to the Conference Center, Manager has sufficient knowledge as to local conditions and possesses the resources to efficiently operate facilities of a character and location comparable to the RSPD, and agrees to provide such time, expertise, and knowledge to Manager as necessary to operate the facilities as required under this Agreement. Attachment number 2 \nPage 1 of 22 Item # 53 00412263-14 F. Owner desires to have Manager manage and operate the RSPD, and Manager is willing to perform such services for the account of Owner on the terms and conditions set forth herein. NOW, THEREFORE, in consideration of the premises and the mutual covenants contained herein, the parties hereto agree as follows: ARTICLE I DEFINITIONS 1.1 Defined Terms. All capital terms herein and not otherwise defined shall have the meaning as defined in the CORE Agreement or TEE Center CORE Agreement or the RSPD CORE Agreement, as the context requires. In addition to the terms defined elsewhere in this Agreement, the following terms shall have the meanings assigned to them herein, unless the context otherwise indicates: “Annual Plan” shall have the meaning set forth in Section 7.1. “Approving Tax Opinion” shall mean the opinion of tax counsel experienced in federal income tax matters related to state and local bonds, within the meaning of Section 103 of the Internal Revenue Code of 1986, as amended (the “Code”), and qualified bonds, within the meaning of Section 141 of the Code, to the effect that a proposed action or amendment will not, without more, impair any exclusion of the interest on any outstanding issues of obligations that were issued to finance the RSPD, or result in the disallowance of any credit against federal income tax or payable to the issuer of such obligations by the U.S. Treasury Department. “Capital Account” shall have the meaning set forth in Section 6.1. “Capital Expenses” shall mean all expenditures for Capital Improvements. “Capital Improvements” shall mean one or more items or project(s) - i) the cost of each of which totals $5,000.00 or more, ii) that becomes part of the RSPD, and iii) the cost of which is required or allowed to be capitalized under the accounting guidelines of Augusta, Georgia and GAAP. Examples of Capital Improvements include but are not limited to, traffic/parking/access control equipment, furniture, fixtures, roofing, and striping, including the cost of repair or replacement thereof. “Conference Center” shall mean the Expanded Conference Center, as defined in the CORE Agreement. “Convention Center” shall mean the Conference Center, the TEE Center, the RSPD and the existing parking deck associated with the Conference Center. “CORE Agreement” shall mean that Amended and Restated Construction, Operating and Reciprocal Easement Agreement dated June 1, 1999, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia at Realty Reel 648, Attachment number 2 \nPage 2 of 22 Item # 53 00412263-14 page 45, and all amendments thereto, including an amendment on or about the date of this Agreement whereby the Conference Center is expanded to include Conference Center Annex. “Effective Date” shall mean the date on which construction of the RSPD has been completed, a certificate of occupancy for the RSPD has been issued, and the RSPD has been fully furnished and delivered to Manager for operation. “Financial Statement” shall have the meaning set forth in Section 7.6. “Fiscal Year” shall mean the twelve (12) month period ending December 31 of each year during the Operating Term of this Agreement. The first Fiscal Year shall be the period commencing on the Effective Date and ending on December 31 of the same year. A partial Fiscal Year after the end of the last full Fiscal Year and ending with the expiration or earlier termination of the Operating Term shall constitute a Fiscal Year. “GAAP” shall mean Generally Accepted Accounting Principles based on the accrual method of accounting. “Management Fee” shall have the meaning set forth in Section 3.1. “Manager’s Other Businesses” shall have the meaning set forth in Section 5.1. “Net Operating Revenues” shall mean for any period the excess, if any, of Operating Revenues over Operating Expenses, as determined using GAAP. “Operating Account” shall have the meaning set forth in Section 6.1. “Operating Expenses” shall mean all expenses required to be incurred in order to operate and manage the RSPD to the extent the same are authorized under the applicable Annual Plan, including, but not limited to the following: (a) Salary Costs of RSPD Employees and Shared Employees; (b) operating supplies; (c) utility and telephone charges; (d) repair and maintenance costs; (e) equipment rental costs; (f) insurance costs related to RSPD operations, including insurance premiums paid by Manager on behalf of the Owner (but not performance or fidelity bonds); (g) security costs; (h) cleaning expenses; (i) cost of reimbursable event expenses; (j) the cost of obtaining an audited financial statement of Manager; (k) pre- and post-opening marketing, promotional and advertising expenses; (l) sales commissions; (m) maintenance agreements; and (n) any other expenses incurred in the operation of the RSPD that would be considered operating expenses under GAAP. Operating Expenses shall not include debt service on any borrowing to finance the acquisition, construction, installation, and equipping of the RSPD. “Operating Revenues” shall mean the gross revenues generated from the operation of the RSPD including, but not limited to, the following: (a) sums collected by the Operator from the rental of space for the parking and storage of motor vehicles whether on an hourly, daily, weekly, or monthly basis, less all refunds, credit card fee discounts, and other discounts as authorized by Owner (sales tax, use tax, excise tax, Attachment number 2 \nPage 3 of 22 Item # 53 00412263-14 occupancy tax, gross receipts tax, or other taxes assessed upon or attributable to said receipts shall be held by the Operator and paid directly to the taxing entity involved); (c) on-site advertising revenues; (d) interest income, if any, from the Operating Account; (e) reimbursable event expenses; (f) all other RSPD miscellaneous revenue; (g) any and all revenues generated by or associated with RSPD marquee advertising; and (h) revenue derived from naming rights. “Operating Term” shall have the meaning set forth in Section 2.4. “RSPD CORE Agreement” shall mean the agreement executed in connection with this Agreement which provides for the construction and operation of the RSPD and provides any necessary easements with respect construction or operation of the RSPD. “Salary Costs” shall mean the gross amount payable by an employer to secure the services of an employee including, without limitation, employees’ accrued and vested wages, salaries, employee medical/disability/life insurance and other health benefits incurred by Manager, vacation pay and sick leave, severance costs, 401(k), profit sharing, pension or similar retirement benefits or other accrued and vested fringe benefits, business travel expenses, and other compensation of whatever nature, including any applicable federal, state and local taxes. For the avoidance of doubt, Salary Costs may also include bonuses for employees or commissions for sales staff. “Shared Employees” shall have the meaning ascribed thereto by Section 5.3(f) and may include officers, managers or members of Manager. “Standard” shall mean the first-class standard of operation, maintenance and repair of the TEE Center, adjusted to take into account the differences between a parking deck and a trade, exhibit, and event center. “TEE Center” shall mean the trade, event and exhibit hall to be constructed adjacent to the existing Conference Center. TEE Center CORE Agreement” shall mean the agreement executed in connection with this Agreement, which provides for the construction and operation of the TEE Center and provides any necessary easements with respect construction or operation of the TEE Center. “RSPD Employees” shall have the meaning set forth in Section 5.3(a) but shall not include any officer or member of Manager or any person who, directly or indirectly, otherwise owns an interest in Manger or any affiliate thereof. ARTICLE II APPOINTMENT OF MANAGER AND OPERATING TERM 2.1 Appointment of Manager; Powers and Duties Generally. Subject to Manager’s covenants set forth in § 5.1, Owner hereby appoints, authorizes, and engages Manager, and Manager hereby accepts appointment on the terms and conditions Attachment number 2 \nPage 4 of 22 Item # 53 00412263-14 hereinafter provided as agent to: (a) manage, operate, control, license, and rent the RSPD on Owner’s behalf during the Operating Term; (b) collect all fees, pay all expenses, and pay or cause to be paid all Capital Expenses with respect to the RSPD in accordance with the Annual Plan; (c) render Financial Statements to Owner as set forth in this Agreement; (d) remit to the Owner on a quarterly basis Net Operating Revenues for the immediately preceding quarter, less permitted reserves as authorized by § 6.2 of this Agreement; (e) execute, renew and cancel rental and license agreements for the RSPD or any part thereof at rates and on such terms as may be approved by Owner in accordance with the Annual Plan; and (f) sue and recover for rent and for loss of or damage to any part of the RSPD and, when expedient, compromise, settle and release any such legal proceedings or lawsuits; provided, however, that Manager shall not settle any lawsuit or other claim relating to the RSPD without the prior consent of Owner. Concerning the RSPD, Manager shall have the exclusive right to enter into any lease, license or other agreement granting any party the right to use any portion of the RSPD except as provided in the Annual Plan. RSPD operations shall be under the exclusive supervision and control of Manager subject to the terms of this Agreement. Manager shall have discretion and control, free from interference, interruption or disturbance, in all matters relating to management and operation of the RSPD, including, without limitation, charges for license and rental, other RSPD services, employment policies, granting of concessions or renting of space within the RSPD, receipt, holding and disbursement of funds, maintenance of bank accounts, procurement of supplies and services, promotion and publicity and, in general, all activities necessary for operation of the RSPD. 2.2 Restriction on RSPD Licenses and Rentals. Except as otherwise additionally limited hereby, Manager shall have the discretion to prescribe the terms of the rental or licensing of space at the RSPD based on generally applicable and uniformly applied rates or that are negotiated with the user in arms-length bargaining, in either case, that is consistent with the applicable Annual Plan. Notwithstanding the foregoing, Manager shall not be prohibited by this Section 2.2 from entering into a lease or licensing of space at the RSPD if Manager and Owner have received an Approving Tax Opinion. 2.3 Relationship of Parties. Neither this Agreement nor any agreements, instruments, documents or transactions contemplated hereby shall in any respect be interpreted, deemed or construed as making Manager a partner or joint venturer with Owner or as creating any similar relationship or entity, and Owner and Manager agree that they will not make any contrary assertion, contention, claim or counterclaim in any action, suit or other legal proceeding. 2.4 Operating Term. Subject to Article IV, the initial Operating Term of this Agreement shall be for a period commencing on the Effective Date and terminating on the fifth (5) year anniversary of the Effective Date. The initial Operating Term may be renewed or extended as provided in Section 2.5, 2.6, and 2.7. Notwithstanding the foregoing, this Agreement shall be binding on the date it is signed by Owner and Manager and provisions of this Agreement shall survive the Operating Term to the extent specifically set forth in this Agreement. During the term of this Agreement and any extension thereof, Owner shall have the right to use the parking spaces located on Developer’s Property and the WAGT Tract after normal business hours and all hourly Attachment number 2 \nPage 5 of 22 Item # 53 00412263-14 parking revenues generated or collected from the use of such parking spaces shall be the property of Owner. 2.5 First Option of Owner to Extend Operating Term. Owner, in its sole discretion, may elect, by written notice to Manager, within 60 days from the expiration of the initial Operating Term of this Agreement, to renew the initial Operating Term of this Agreement, for a period equal to the remaining term of the bond financing used for construction of the RSPD or any refinancing with respect thereto, but in no event for a term exceeding the lesser of 5 years or 80% of the remaining useful life of the RSPD (the “First Renewal Option”). In the event Owner so elects to extend the Operating Term of this Agreement, all of the other terms and conditions of this Agreement shall remain unchanged during such extended Operating Term. In the event Owner elects not to renew this Agreement, Owner shall not be liable for any penalties or other costs of any kind whatsoever by reason of such non-renewal. 2.6 Second Option of Owner to Extend Operating Term. In the event Owner exercises the First Renewal Option, Owner, in its sole discretion, may elect, by written notice to Manager within 60 days from the expiration of the extended Operating Term of this Agreement, to renew the Operating Term of this Agreement for a period equal to the remaining term of the bond financing used for construction of the RSPD or any refinancing with respect thereto, but in no event for a term exceeding the lesser of 5 years or 80% of the remaining useful life of the RSPD (the “Second Renewal Option”). In the event Owner so elects to extend the Operating Term of this Agreement, all of the other terms and conditions of this Agreement shall remain unchanged during such extended Operating Term. In the event Owner elects not to renew this Agreement, Owner shall not be liable for any penalties or other costs of any kind whatsoever by reason of such non-renewal. 2.7 Right of First Refusal. In the event that Owner does not elect to exercise its first or second option to extend, and solicits requests for proposals (“RFP”) for the operation of the RSPD, then in such event Manager shall have the right to meet the terms and conditions of the RFP of the entity that is deemed to be most qualified to operate the RSPD. If Manager agrees to the terms and conditions contained in such RFP, then this Agreement shall be renewed, subject to modification to incorporate any terms and conditions consistent with accepted RFP, and right of first refusal shall be continue in effect, provided however, that the total length of the primary term and all extensions shall not exceed fifteen (15) years. Should Manager not elect to operate the RSPD pursuant to the terms and conditions of the accepted RFP, then in such event Manager shall have no further right to operate the RSPD, notwithstanding any prior vote of the Augusta, Georgia Commission to designate Augusta Riverfront, LLC as the operator of the RSPD. ARTICLE III COMPENSATION OF MANAGER 3.1 RSPD Management Fee. Commencing on the Effective Date, Owner shall, pay to Manager a Management Fee in the amount of $25,000.00 per year, payable Attachment number 2 \nPage 6 of 22 Item # 53 00412263-14 in equal monthly installments, adjusted upward annually, but not downward, by the percentage increase in the Consumer Price Index for all urban consumers (CPI-U) (All Items 1982-84=100) for the preceding calendar year for performing its services under this Agreement in managing the RSPD. The parties acknowledge that certain property and services paid for by Owner and required for the operation of the RSPD will also benefit Manager’s easement for ground level parking facilities located underneath and adjacent to the RSPD. Such property and services include, but are not limited to, traffic control gates and related equipment, sweepers, lighting, and services of a toll both operator (the “Incidental Services”). The Incidental Services would be required for the operation of the RSPD whether or not Manager maintained easements for the ground level parking facilities, and allowing Manager to benefit from these Incidental Services does not materially increase the costs to Owner. Accordingly, in further consideration of the granting of air rights and easements to Owner for the construction and operation of the RSPD, Manager shall have the right to utilize the Incidental Services for Manager’s ground level parking facilities (whether held in fee simple or easement) located underneath and adjacent to the RSPD, so long as such use does not materially increase the cost to Owner. 3.2 Payment of Fee. The Management Fees shall be due and payable no later than the fifteenth (15th) day after the end of the month for which the Management Fee is owed and may be remitted by Manager directly to Manager from the Operating Account. 3.3 Survival. The provisions of this Article shall survive termination of this Agreement. ARTICLE IV TERMINATION 4.1 Termination. Should either party materially fail to comply with any of the terms of this Agreement, the non-defaulting party may cancel this Agreement upon ninety (90) days’ written notice to the other party of the alleged breach and failure by such other party to cure such breach within such ninety (90) day period; provided, however, that in the event the default is not curable within such ninety (90) day period, but the defaulting party has commenced within the ninety (90) day period efforts to cure the default, the time to cure the default shall be extended for a reasonable period of time in order to allow such cure. In the event the party alleged to be in material default of this Agreement disputes the existence of such material default, this Agreement shall continue in full force until a court of competent jurisdiction finds such party to be in material default, after written notice and expiration of the applicable cure period, and all time periods for appeal of such finding have expired. 4.2 Rights and Obligations Following Termination. In addition to the rights and remedies otherwise available to the parties at law or in equity, the following provisions will apply following termination pursuant to this Article or the expiration of the Operating Term. Attachment number 2 \nPage 7 of 22 Item # 53 00412263-14 (a) Manager shall quit, vacate, surrender, and deliver to Owner peacefully and promptly the RSPD, together with all books, records, accounts, contracts, keys, all cash in the Operating Account, less any fees due Manager, and in the Capital Account, and all other pertinent and necessary documents and records pertaining to the RSPD and the operation thereof. After termination of this Agreement, Owner shall, without right of offset against Manager, timely pay all unpaid Operating Expenses incurred by Manager prior to the date of such termination, including without limitation, Salary Costs; (b) Manager shall do all acts and execute and deliver all documents reasonably requested by Owner and otherwise reasonably cooperate with Owner and any successor manager to insure or facilitate orderly continuation of the business of the RSPD. Manager shall take such actions at Owner’s cost, in which case the costs of such action shall be an Operating Expense; (c) The rights and liabilities of the parties having accrued prior to termination shall continue; and (d) All provisions hereof identified herein as surviving termination of this Agreement shall survive. ARTICLE V SERVICES OF MANAGER 5.1 Manager’s General Covenants. (a) Manager shall use commercially reasonable efforts to manage and operate the RSPD in accordance with industry standards for first class parking decks affiliated with trade, exhibit, and event centers of similar size and quality. (b) Manager acknowledges that a conflict of interest could arise between Manager’s duties hereunder with respect to the RSPD and the interests of Manager in the Hotel, the Conference Center and the RSPD and any other businesses owned or operated (directly or through one or more affiliates) by Manager (“Manager’s Other Businesses”). Manager covenants to use its best efforts to cause the RSPD to be operated to fulfill Owner’s objectives. Without limiting the generality of the foregoing, Manager shall never reduce or discount fees or charges for the license or rental of the RSPD or for goods or services provided at the RSPD, which comprise part of Operating Revenues, from the fees or charges authorized to be charged in such circumstances pursuant to the applicable Annual Plan, in consideration for the use, or promise to use, goods or services provided by Manager’s Other Businesses. The parties recognize and acknowledge that an affiliated business of Manager maintains easement rights for the surface parking below the RSPD, said affiliated business operates and leases the same for profit, and that such activity is not deemed to be a conflict of interest for purposes of this paragraph. Attachment number 2 \nPage 8 of 22 Item # 53 00412263-14 (c) Manager shall maintain a separate set of books and records and prepare financial statements reflecting its activities hereunder that are sufficient to enable an auditor to audit the same on the same basis as if such activities were conducted by a separate accounting unit or single purpose entity. 5.2 Policies and Practices. Manager shall adopt and implement administrative, accounting, budgeting, marketing, personnel, and operational policies and practices consistent with industry standards for trade, exhibit, and event centers of similar size and quality. 5.3 Personnel. (a) Employment. Subject to the terms of this Agreement, Manager shall select, employ, promote, terminate where appropriate, supervise, direct, train, and assign the duties of all personnel which Manager reasonably determines to be necessary or appropriate for the operation of the RSPD (collectively, the “RSPD Employees”). All RSPD Employees shall be employed by Manager. Owner may at any time consult or communicate with Manager regarding any of the RSPD Employees, but Owner shall not give orders to or otherwise interfere in the day-to-day activities of RSPD Employees including for this purpose Shared Employees. (b) Selection. Manager agrees to use reasonable and prudent judgment in the training and supervision of RSPD employees to ensure that they are courteous and efficient, and do not use improper language or act in a loud or boisterous manner while performing duties at the RSPD. Manager agrees that it will not discriminate against any RSPD Employee or applicant for employment for work under this Agreement because of race, religion, color, sex, disability, national origin, ancestry, physical handicap, or age. (c) Appearance and Training. Manager shall ensure that non- management RSPD Employees performing the duties at the RSPD shall be neatly attired in clean, commercially attractive uniforms. Manager shall train all such employees that they are aware of the high standards for cleanliness, courtesy and service required. (d) Compensation. Manager shall set the salaries and fringe benefits of all RSPD Employees consistent with industry standards and the Annual Plan. Cost-of- living increases shall not exceed those given by Owner to its employees. Unless otherwise provided in the Annual Plan, no bonuses or merit raises shall be given without the approval of Owner. (e) Salary Costs for Full Time RSPD Employees. Although all RSPD Employees shall be employed by Manager, Owner shall be responsible for all Salary Costs of RSPD Employees. (f) Salary Costs of Shared Employees. In order to provide the most cost-effective services, the parties specifically contemplate that Manager may provide certain of the services under this Agreement through employees and agents of Manager’s Other Businesses (“Shared Employees”). To the extent Manager (a) incurs Salary Costs of its Shared Employees that are allocable to operation of the RSPD and (b) Manager Attachment number 2 \nPage 9 of 22 Item # 53 00412263-14 shall not “mark-up” or otherwise add any profit or administrative charge to such Salary Costs, then, such Salary Costs shall be deemed to be Operating Expenses and shall be remitted to Manager from the Operating Account the same as any other Operating Expense. Salary Costs of a Shared Employee shall be deemed to have been fairly allocable to RSPD operations if the proportion of the Shared Employee’s aggregate Salary Costs for the period in question so allocated is the same the proportion of the amount of time the Shared Employee exclusively devoted to operation of the RSPD in relation to the total amount of time worked for the period in question. (g) Recordkeeping. The books and records required to be maintained by Manager pursuant to Section 7.5 hereof shall be sufficient to establish the amount of time that any RSPD Employee spends providing services to Manager’s Other Businesses, and the amount of time any Shared Employee expends providing services for the RSPD, in each case as a percentage of their periodic work schedules. 5.4 Maintenance. (a) RSPD. Manager shall (i) maintain the RSPD in good condition and repair, and (ii) maintain, repair, and replace when necessary, furniture, fixtures and equipment for the RSPD. Subject to the limitation of § 5.4(b), if applicable, Manager may withdraw funds from the Capital Account to pay for Capital Expenses. Manager shall obtain Owner’s approval prior to making any non-emergency expenditure of more than $10,000.00 on a single maintenance item or category of Capital Expenses not otherwise authorized by the Annual Plan. (b) General Limitation. Except as otherwise expressly authorized herein, any Capital Expense exceeding the budgeted amount(s) set forth in the Annual Plan for such category of expenditure by more than 15% or the payment of which would cause the amount then held in the Capital Account to be reduced by more than 95% of the amount held therein as of the beginning of the Fiscal Year shall require Owner’s prior approval. 5.5 Marketing. Marketing of the RSPD shall be the obligation of the Manager, subject to the terms of the Annual Plan. 5.6 Legal Services. Manager is authorized to engage such legal counsel as Manager deems reasonably necessary for the ordinary operational legal matters for the RSPD, the reasonable costs and expenses of which shall be an Operating Expense. With the advice and consent of Owner, Manager shall institute any necessary or desirable legal actions or proceedings to collect charges or other income of the RSPD or to enforce the right to cancel or terminate or sue for damages under any agreement relating to the operation of the RSPD. 5.7 Compliance with Government Rules and Regulations. Manager shall operate the RSPD in compliance with all applicable federal, state and local laws and insure that no activity or condition occurs on or about the RSPD in violation of any laws; provided, however, that Manager shall have no liability nor be subject to any allegation of default with respect to non-compliance by the RSPD with any applicable federal, state Attachment number 2 \nPage 10 of 22 Item # 53 00412263-14 and local laws regarding the condition or use of the RSPD and the surrounding property, including without limitation, the Americans with Disabilities Act, zoning regulations and hazardous waste laws. 5.8 Limitation Upon Obligations. In the event that the performance of any of Manager’s duties requiring expenditure of Owner’s funds shall be impeded by reason of unavailability of such funds, then, Manager’s performance of such obligations shall be excused to the extent so impeded and until such funds become available. Manager shall be under no obligation to provide such funds from any source other than amounts then held in the Operating Account or the Capital Account. Manager’s obligations also shall be excused to the extent performance would be contrary to express written instructions of Owner. Owner shall indemnify, defend, and hold Manager harmless from and against any and all liabilities, claims, suits, fines, penalties, damages, judgments, fees, costs and expenses (including, but not limited to attorneys’ fees and disbursements) related to the performance of any of Manager’s duties requiring expenditure of Owner’s funds, if and when such funds are not available to Manager. 5.9 Contracts. (a) In General. Manager is hereby authorized, without Owner’s prior approval, to enter into contracts, in its own name or as Owner’s agent, with vendors or service providers of its choice, provided, in addition, that the contract in question: (i) does not have a term exceeding the lesser of one year and the then remaining Operating Term, (ii) the aggregate annual Operating Expense attributable to the contract does not exceed $5,000, (iii) does not authorize the vendor or service provider to use any portion of the RSPD unless the compensation therefor is not based on the net profits arising from such service or activity, and (iv) is not inconsistent with the applicable Annual Plan. Manager shall promptly notify Owner of the execution of such contracts. (b) Special Indemnity. In the event Manager, in its own name or as agent of Owner, enters into a contract for or related to the RSPD, Owner shall indemnify, defend, and hold Manager harmless from and against any and all liabilities, claims, suits, fines, penalties, damages, judgments, fees, costs and expenses (including, but not limited to attorneys’ fees and disbursements) related to the payment of, or obligations related to such contract. This right of indemnification shall survive termination of this Agreement. 5.10 Costs of Compliance. Unless otherwise set forth in this Agreement to the contrary, any costs related to duties imposed on Manager shall, except to the extent incurred as a result of Manager’s gross negligence, willful misconduct or breach of this Agreement, be at Owner’s cost, in which case the costs of such action shall be an Operating Expense and may be paid from the Operating Account. ARTICLE VI BANK ACCOUNTS, PAYMENTS AND DISTRIBUTIONS 6.1 Bank Accounts. Manager shall open, at one or more banks in Augusta, Georgia selected by Manager, a bank account for the benefit of Owner, which will serve as an operating account for the RSPD (the “Operating Account”). and (b) a bank Attachment number 2 \nPage 11 of 22 Item # 53 00412263-14 account for the benefit of Owner, which shall serve as a capital account for the RSPD (the “Capital Account”), as the source of funds for Capital Expenses. 6.2 Operating Account; Payment to Owner. Manager shall deposit all Operating Revenues into the Operating Account. All Operating Revenues, whether or not deposited into such account, shall be solely the property of Owner. All Operating Expenses shall be borne exclusively by Owner. Manager shall have authority to execute checks, drafts and other items on the Operating Account to pay the Operating Expenses, including the Management Fee. In the event the amount held in Operating Account at the end of any quarter exceeds the amount reasonably anticipated to be necessary for the operation of the RSPD for the succeeding quater, Manager shall distribute such excess amount to Owner not later than fifteen days of the close of the quarter.. If at any time the Operating Account contains less than the reasonably anticipated Operating Expenses for a period of time not longer than the ensuing 90 days, Manager shall so advise Owner in writing, accompanied by an (pro-forma) operating budget, that was submitted as part of the Annual Plan or, if the Annual Plan has not yet been adopted, in Manager’s proposed budget for the Annual Plan, and Owner shall cause such amount to be deposited into the Operating Account within ten (10) business days of receipt of such notice. The intent of this section is that the Operating Account shall, at all times, contain a permitted reserve sufficient to cover Operating Expenses for the next 90 days, without regard to the future receipt of any Operating Revenues. In the event of a deficiency in the Operating Account, Manager may, but shall not be required to, in its sole discretion, advance funds to meet Operating Expenses and such advances shall become immediately due from Owner. Manager may, but shall not be required to, in its sole discretion, advance funds for pre-opening expenses approved by Owner. Such advances shall be reimbursed to Manager from the first receipts from the operation of the RSPD. 6.3 Capital Improvements and Capital Account. Owner agrees to provide all necessary funding for Capital Expenses that are reasonably necessary to maintain the RSPD to the Standard in accordance with the Annual Plan. Fifteen percent of all net operating revenues shall be earmarked annually by Owner for Captial Expenses until the balance of earmarked funds is the lesser of $250,000.00 and the capital reserve approved in the Annual Plan. Upon Manager notifying Owner in writing that a portion of such earmarked funds are needed for payment of Capital Expenses, then Owner will within fifteen (15) day deliver funds to Manager as necessary for the payment of Capital Expenses and Manager will deposit such funds into the Captial Account. Such funds shall be used for Capital Improvements for any parking decks associated or located in the immediate proximity of the Convention Center. In the event that funds in the Capital Account are used for capital expenditures, then in such event Manager shall resume depositing fifteen (15%) percent of Net Operating Revenues, if any, into the Capital Account until such time as the balance in such account is restored. Manager shall have the right to execute checks, drafts, and other items on the Capital Account to pay Capital Expenses in accordance with Section 5.4 of this Agreement. To the extent funds are not available in the Capital Account which are reasonably necessary to maintain the RSPD, Manager shall so notify Owner in writing and within thirty (30) days of such notification, Attachment number 2 \nPage 12 of 22 Item # 53 00412263-14 Owner shall cause to be deposited into the Capital Account a sufficient amount to fund Capital Improvements in accordance with the Standard and the Annual Plan. In the event that performance of any of Manager's obligations requiring expenditure of Owner's funds related to the Capital Expenses shall be impeded by reason of unavailability of such funds, then, Manager's performance of such obligations shall be excused to the extent so impeded and until such funds become available. Manager shall be under no obligation to provide such funds from any source other than Net Operating Revenue or other sources of funds provided by Owner. Manager's obligations shall also be excused to the extent performance would be contrary to express written instructions of Owner. In the event Owner fails to make such money available to Manager, Owner shall indemnify, defend, and hold Manager harmless from and against any and all liabilities, claims, suits, fines, penalties, damages, judgments, fees, costs and expenses (including, but not limited to attorneys' fees and disbursements) related to the performance of any of Manager's duties hereunder requiring expenditure of funds for Capital Improvements. In the event of a deficiency in the Capital Account necessary to maintain the RSPD to the Standard and in accordance with the Annual Plan, Manager may, but shall not be required to, in its sole discretion, to advance funds to maintain the RSPD to the Standard and such advance shall be immediately due and payable from Owner. 6.4 Indemnity. Debts, obligations, and other liabilities incurred by Manager that are part of the Annual Plan or are otherwise authorized hereunder and are incurred in the performance of its duties under this Agreement shall be deemed to be incurred on behalf of Owner. Owner shall indemnify, defend, and hold Manager harmless from and against any and all liabilities, claims, suits, fines, penalties, damages, judgments, fees, costs and expenses (including, but not limited to attorneys’ fees and disbursements) related to the payment of, or obligations related to, the Management Fee, other Operating Expenses, and Capital Expenses. Expenses arising from the fraud or gross negligence of Manager’s corporate office senior management personnel in the management, operation, or maintenance of the RSPD shall not be authorized expenditures and shall not be subject to indemnification from the Owner. 6.5 Tax Authority Audits. If, during the Operating Term or thereafter, any applicable taxing authority assesses additional taxes of any kind with respect to the RSPD, such additional taxes or assessments, together with any interest, penalties, fees, or other amounts assessed related thereto, shall be Operating Expenses, together with all costs, accounting fees, and legal fees incurred by Manager on behalf of the RSPD in reviewing and, if necessary, challenging or negotiating such determinations. Manager shall be authorized to pay from the Operating Account all such costs, fees, and tax amounts determined to be due but shall otherwise have no liability therefor. This provision shall survive any termination of this Agreement. ARTICLE VII BUDGETS AND ACCOUNTING 7.1 Annual Plan. Manager shall submit to Owner, for Owner's approval as a part of Owner’s budget process, not later than ninety (90) days subsequent to the Attachment number 2 \nPage 13 of 22 Item # 53 00412263-14 Effective Date, and at least ninety (90) days prior to the beginning of each Fiscal Year thereafter, an annual plan for the RSPD (the “Annual Plan”), which shall include for the ensuing Fiscal Year, the following proposed budgets and programs setting forth: (a) Manager’s best estimate of Operating Revenues and Operating Expenses; (b) Manager's best estimate of Capital Expenses for RSPD; (c) a proposed schedule of rental rates for the use of the RSPD (including hourly, daily and monthly fee rates), and objective criteria for deviating from such rates and fees; (d) marketing expenses; and (e) a summary of the prior year’s operations and such other information Manager deems beneficial to Owner. Following adoption of the Annual Plan, Manager covenants not to make RSPD available for rates and fees that differ from the approved schedule of rates and fees without prior consent of Owner. The Annual Plan attached to this Agreement covers Fiscal Year 2012. Operating Expenses set forth in said Annual Plan shall constitute the approved Operating Expenses, on a pro-rata basis, for the period from the date of this Agreement through December 31, 2011. The parties acknowledge that the first Annual Plan is based on estimates made without the benefit of operating experience. Manager may submit a revised first Annual Plan if operating experience from the opening of the RSPD through December 31, 2011, indicates that the first Annual Plan does not accurately reflect anticipated revenues and expenses. 7.2 Information Sharing. [intentionally deleted]. 7.3 Approval of Annual Plan. Owner shall notify Manager within thirty (30) days of its receipt of the proposed Annual Plan if Owner has any objections to the Annual Plan. Otherwise, the Annual Plan shall be deemed approved. If the Annual Plan is disapproved by Owner, Manager and Owner shall enter into discussions in an attempt to determine mutually satisfactory budgets and programs. Until the Annual Plan is approved or deemed approved by Owner, the parties agree that Manager shall operate the RSPD in accordance with the last previously approved or deemed approved Annual Plan. Manager shall operate the RSPD in substantial accordance with the Annual Plan; provided, however, Owner acknowledges and agrees with Manager that during the first three Fiscal Years of the Operating Term, when Net Operating Revenues will be especially difficult to predict, the Annual Plan will be only a planning tool. Furthermore, expenses related to the RSPD vary in proportion to business volume, making budgeting imprecise and unpredictable. During the initial three Fiscal Years, Owner authorizes Manager to deviate from the Operating Expenses or Capital Expenses as set forth in the Annual Plan, following notice to Owner and without any prior approval of Owner if, in the reasonable judgment of Manager, such deviation is necessary to achieve Owner’s objectives to operate RSPD in accordance with the Standard, but only if such change Attachment number 2 \nPage 14 of 22 Item # 53 00412263-14 does not result in the expenditure of funds in excess of the lesser of: (i) fifteen percent (15%) of the budgeted amount of Operating Expenses or Capital Expenses, as the case may be in the Annual Plan and (ii) ninety-five percent (95%) of the amount then held in the Capital Account or the Operating Account as the case may be. 7.4 Amendments of Annual Plan. Manager may notify Owner of a proposed change to the Annual Plan. Owner shall notify Manager within thirty (30) days of its receipt of the requested modification of any objections to the modified Annual Plan. Otherwise, the modified Annual Plan shall be deemed approved. Owner agrees to consider, in its reasonable judgment, modification of the Annual Plan to enable the RSPD to be operated in accordance with the Standard. 7.5 Obligation to Provide Funding to Operate and Maintain the RSPD to the Standard. Notwithstanding anything in this Agreement to the contrary, Owner agrees to provide funding to Manager, whether through approval and funding of the Annual Plan or through approval and funding of amendments to the Annual Plan, in an amount sufficient to operate and maintain (whether such maintenance be categorized as Capital Expenses or Operating Expenses) the RSPD. In the event Owner fails to provide funding as required in this Section, Manager’s sole remedy shall be to terminate this Agreement whereupon Manager shall have the rights and obligations set forth in Section 4.2 of this Agreement. After such termination, neither Manager nor Owner shall have any further obligations to the others under this Agreement. 7.6 Books and Records. Manager shall establish and maintain for the benefit of Owner complete, current, and accurate records and books of account reflecting all transactions of the RSPD and of Manager with respect to the RSPD that are separate from Manager’s Other Businesses. Manager shall make such books and records available during normal business hours and at all other reasonable hours at the RSPD for inspection, copying, and audit upon reasonable notice by Owner and its agents. 7.7 Financial Statements. (a) Annual Statements. Manager shall prepare and deliver to Owner by the 90th day after the end of each Fiscal Year the following financial statements and reports (the “Financial Statements”) using GAAP, which are in reasonable detail covering RSPD operations for such previous Fiscal Year: (i) balance sheet as of the last day of such Fiscal Year, which shall reflect the balances of the Operating Account and Capital Account as of the last day of such Fiscal Year, (ii) cash flow statement, and (iii) profit and loss statement. The profit and loss statement will include a comparison of the budgeted and actual revenues and expenses as well as a comparison to the prior Fiscal Year. (b) Quarterly Statements. On or before 30 days after the end of each calendar quarter, Manager shall prepare and deliver to Owner a statement showing Operating Revenue and Operating Expenses for the previous calendar quarter and Statement of Capital Expenditures. Attachment number 2 \nPage 15 of 22 Item # 53 00412263-14 7.8 Annual Audit. On or prior to 120 days after the end of each Fiscal Year, Manager shall provide, at Owner’s cost and expense, a financial audit with respect to RSPD operations to be made by an independent certified accounting firm selected by Manager and designated in the Annual Plan. 7.9 Survival Following End of Term. Manager’s obligations under this Article shall continue as to all Fiscal Years occurring within the Operating Term notwithstanding that such performance may be due following the end of such term. ARTICLE VIII ASSIGNMENT 8.1 Assignment by Manager. (a) Manager shall have the right, without the prior written consent of Owner (but only upon not less than five (5) business days’ prior notice to Owner), to assign this Agreement or any duties arising hereunder to any entity controlled by, or under common control with, Manager, provided that (i) such case such transferee shall have, in the reasonable judgment of Owner, expertise, personnel and other resources sufficient to discharge its duties hereunder no less favorably than Manager has performed the same, (ii) the assignee or transferee agrees directly with Owner to be bound by all of Manager’s obligations under this Agreement, and (iii) Owner shall have received an Approving Tax Opinion. (b) In the event Manager, including for this purpose any affiliate thereof, sells the Hotels to a third party, Owner shall elect one of the following: (i) allow transferee to assume this Agreement and release Manager from its obligations under this Agreement but only if Owner shall have received an Approving Tax Opinion, or (ii) allow Manager to terminate this Agreement, without penalty. 8.2 Assignment by Owner. Owner’s obligations under this Agreement shall not be assigned, and any purported assignment shall be void, without the prior written consent of Manager, which consent shall not be unreasonably withheld. ARTICLE IX INSURANCE Owner shall either self-insure or self-fund or provide insurance equal or greater the following insurance requirements 9.1 General Liability Insurance. Owner shall carry comprehensive general liability insurance, including contractual liability, personal and bodily injury, and property damage insurance, on the RSPD, with a combined single limit in an amount sufficient to protect Owner and Manager, but in no event will such insurance be in an amount less than a combined single limit of $3,000,000 per occurrence. Manager shall be named as an additional insured under such insurance. Owner shall provide Manager Attachment number 2 \nPage 16 of 22 Item # 53 00412263-14 with a certificate of insurance evidencing such coverage no later than thirty days prior to the commencement of the Operating Term. Owner’s insurance shall contain a clause stating that there shall be no reduction, cancellation, or non-renewal of coverage without giving Manager thirty (30) days prior written notice. Such insurance shall also be endorsed to provide that the insurance shall be primary to and not contributory to any similar insurance carried by Manager, and shall contain a severability of interest clause. 9.2 Property Insurance. Owner shall procure and keep in effect during the Operating Term fire and extended coverage for the RSPD and all personal property in the RSPD, including rent loss or business interruption coverage for periods of no less than twelve (12) months, written on an All-Risk Endorsement and Replacement Cost basis, with the replacement cost value reasonably acceptable to Manager. Such policy shall name Owner and Manager as loss payee, mortgagee, as their interest may appear. Owner shall provide Manager with a certificate of insurance evidencing such coverage no later than thirty days prior to the commencement of the Operating Term. 9.3 Operational Insurance. Manager shall procure and maintain the following insurance: (a) Workers’ Compensation and employer’s liability insurance as may be required under applicable laws covering all RSPD Employees, including Shared Employees, with such deductible limits as determined by Manager; (b) Garage Keeper’s legal liability insurance to insure against theft, loss and damage to patron’s vehicles. (c) Such other insurance and/or additional coverage in amounts as Manager in its reasonable judgment deems advisable for its protection against claims, liabilities and losses arising out of or connected with its performance under this Agreement. 9.4 Cost and Expense. Except with respect to insurance premiums that are paid by Owner other than with funds held in the Operating Account, insurance premiums and any costs or expenses with respect to the insurance described in this Article shall be an Operating Expense of the RSPD. Any reserves, losses, costs, damages or expenses which are uninsured, or fall within deductible limits or self-insured retentions, shall be treated as a cost of insurance and shall be an Operating Expense. 9.5 Coverage. All insurance described in this Article may be obtained by endorsement or equivalent means under Manager’s or Owner’s blanket insurance policies, provided that such blanket policies substantially fulfill the requirements specified herein. 9.6 Policies and Endorsements. (a) Where permitted, all insurance provided under this Article shall be carried in the name of Owner, with additional insureds being Manager, the owner of any fee or leasehold interest in the RSPD other than Owner, and the holder of the security Attachment number 2 \nPage 17 of 22 Item # 53 00412263-14 deeds covering the RSPD, if any; any losses thereunder shall be payable to the parties as their respective interests may appear. The party procuring such insurance shall deliver to the other party certificates of insurance with respect to all policies so procured, including existing, additional and renewal policies and, in the case of insurance about to expire, shall deliver certificates of insurance with respect to the renewal policies not less than ten (10) days prior to the respective dates of expiration. (b) All policies of insurance provided under this Article shall, to the extent obtainable, have attached thereto an endorsement that such policy shall not be canceled without at least ten (10) days prior notice to Owner, Manager, any other fee or leasehold owner of any portion of the RSPD, and any holder of indebtedness secured by the RSPD. (c) Owner and Manager agree that with respect to any loss or claim which is covered by insurance then being carried or required to be carried by them under this Agreement, the party suffering such loss or claim and carrying or required to carry such insurance releases the other of and from any and all claims, defense costs and expenses with respect to such loss or claim. Owner and Manager further agree that each of their insurance policies shall provide for an appropriate waiver of subrogation reflecting this release. 9.7 Indemnification. (a) Indemnification by Owner. Owner shall indemnify, defend, and hold harmless Manager, its parent, its subsidiaries, and its affiliates and their respective officers, directors, agents, and employees, from and against any and all claims, liabilities, losses, damages, costs, and expenses of any kind or character, including without limitation indemnity claims , court costs, reasonable attorneys’ fees, interest, fees, and penalties, arising from or related to the management, operation, or maintenance of the RSPD, in all cases to the fullest extent permitted by law, except to the extent such liabilities are finally determined by a court of competent jurisdiction to have been the result of the fraud or gross negligence of Manager’s corporate office senior management personnel in the management, operation, or maintenance of the RSPD. (b) Indemnification by Manager. Manager shall indemnify and hold harmless Owner, its subsidiaries, and its affiliates, and their respective officers, directors, agents, and employees from and against any and all claims, liabilities, losses, damages, costs, and expenses of any kind or character, including without limitation reimbursement of court costs, reasonable attorneys’ fees, interest, fees, and penalties charged to the RSPD, to the extent such liabilities are finally determined by a court of competent jurisdiction to have been the result of the fraud or gross negligence of Manager’s corporate office personnel in the management, operation, or maintenance of the RSPD. (c) Defense Costs. All costs and expenses, including without limitation reasonable attorneys’ fees, of any legal proceeding that is instituted against the RSPD, Manager, or both related to the operation, management, or maintenance of the RSPD, including without limitation any employment-related claims of any nature, shall Attachment number 2 \nPage 18 of 22 Item # 53 00412263-14 be charged as Operating Expenses or paid directly by Owner; provided, however, that Manager shall reimburse Owner on demand to the extent the fraud or gross negligence of the Manager’s corporate office senior management personnel in the management, operation, or maintenance of the RSPD is established in such proceeding. Owner specifically acknowledges and agrees that any party’s mere allegation or claim of a negligent or intentional act by Manager or any officer, director, agent, or employee thereof does not trigger any obligation of Manager under this Section and that, pending the determination of any question as to whether Manager or any of its officers, directors, agents, or employees are entitled to indemnification under this Section, Manager shall be entitled to charge as Operating Expenses and pay from Operating Account all expenses of defending or otherwise handling any claim or litigation under this Agreement. (d) Good-faith Judgment. Notwithstanding any other provision of this Agreement, Owner shall not make any claim against Manager based on any alleged error of judgment if such judgment was made by Manager in good faith or based on any action taken by Manager at the express direction of Owner. (e) Survival. This Section shall survive Termination. ARTICLE X GENERAL PROVISIONS 10.1 Actions of a Party. Except for any amendment of this Agreement or approval of an Annual Plan pursuant to Article VII hereof, each the Owner and the Manager shall designate an individual in the Annual Plan to serve as the authorized designee of a party, with respect to all other matters hereunder, who is authorized to take any other actions for that party, as may be required from time to time hereunder; provided, however, that a party may change its designee at any time by a written notice to the other party. Unless the authorization conferred by a designation is expressly limited by its terms, such authorization may be presumed to authorize designee to act in behalf of a party for all other purposes of this Agreement. 10.2 Inspection of RSPD. Owner and its agents, employees, and designees may go anywhere in the RSPD upon reasonable advance written notice to the Manager for the purposes of inspecting the RSPD and inspecting the performance by Manager of the terms and conditions hereof. Manager shall facilitate the access permitted under this Section upon request. 10.3 Amendments. The terms, covenants, conditions, and provisions of this Agreement may be modified or added to only in a writing signed by the parties hereto provided, in addition, there shall have been delivered to Owner an Approving Tax Opinion. 10.4 Time of the Essence. Time is of the essence. 10.5 Notices. All notices hereunder or required by law shall be sent (a) via US Mail, postage prepaid, certified or registered mail, return receipt requested; or (b) via any Attachment number 2 \nPage 19 of 22 Item # 53 00412263-14 nationally recognized commercial overnight carrier with provisions for a receipt, in either case addressed to the parties hereto at their respective addresses or numbers set forth below or as they will have theretofore specified by notice delivered in accordance herewith: In case of the City to: Augusta-Richmond County City County Municipal Building 530 Greene Street Augusta, Georgia 30901 Attn: City Administrator With a copy to: Augusta-Richmond County Legal Department 530 Greene Street Augusta, Georgia 30901 Attn: General Counsel In the case of Manager to: Augusta Riverfront, LLC One 10th Street, Riverfront Center Suite 340 Augusta, Georgia 30901 Attn: Mr. Paul S. Simon With a copy to: Hull Barrett, PC 801 Broad Street, 7th Floor Augusta, Georgia 30901 Attn: Rand Hanna 10.6 Entire Agreement. This Agreement is the entire agreement between the parties with respect to the subject matter hereof and no alteration, modification or interpretation hereof shall be binding unless in writing and signed by the parties hereto. In the event of a conflict between any provision in this Agreement and in the TEE Center RSPD CORE Agreement, this Agreement shall control. 10.7 Severability. If any provision of this Agreement or its application to any party or circumstances will be determined by any court of competent jurisdiction to be invalid and unenforceable to any extent, the remainder of this Agreement or the application of such provision to such person or circumstances, other than those as to which it is so determined invalid or unenforceable, will not be affected thereby, and each provision hereof will be valid and will be enforced to the fullest extent permitted by law. 10.8 Computation of Time. The time in which any act under this Agreement is to be done shall be computed by excluding the first day and including the last day. If the last day of any time period stated herein shall fall on a Saturday, Sunday or legal holiday, then the duration of such time period shall be extended so that it shall end on the next succeeding day which is not a Saturday, Sunday or legal holiday. Unless preceded by the word “business”, the word “day” shall mean a calendar day. The phrase “business day” or “business days” shall mean those days on which the Superior Court of Augusta- Richmond County, Georgia is located is open for business. 10.9 Applicable Law. This Agreement shall be construed and enforced in accordance with the laws of the State of Georgia. 10.10 Waiver. The failure of either party to insist upon a strict performance of any of the terms or provisions of this Agreement or to exercise any option, right or Attachment number 2 \nPage 20 of 22 Item # 53 00412263-14 remedy herein contained, shall not be construed as a waiver or as a relinquishment for the future of such term, provision, option, right or remedy, but the same shall continue and remain in full force and effect. No waiver by either party of any term or provision hereof shall be deemed to have been made unless expressed in writing and signed by such party and an Approving Tax Opinion shall have been delivered to Owner. 10.11 Force Majeure. At Manager’s option, Manager’s performance under this Agreement shall be suspended to the extent Manager shall be delayed or hindered in or prevented from the performance of any act required by reason of strikes, lockouts, labor troubles, inability to procure materials, failure of power, restrictive governmental laws or regulations, riots, terrorism, insurrection, war or other reason of a like nature not the fault of Manager. 10.12 Headings. Headings of Articles and Sections are inserted only for convenience and are in no way to be construed as a limitation on the scope of the particular Articles or Sections to which they refer. 10.13 Third Party Beneficiaries. Except with respect to Caterer, this Agreement shall not inure to the benefit of any third parties. [EXECUTION ON FOLLOWING PAGE] Attachment number 2 \nPage 21 of 22 Item # 53 00412263-14 IN WITNESS WHEREOF, the parties hereto have executed this Agreement under seal on the day and year first above written. Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) Augusta, Georgia By:________________________ Its Mayor Attest:______________________ Its Clerk of Commission (Seal) Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) Augusta Riverfront, LLC, a Georgia limited liability company By:________________________ Paul S. Simon As its President (Seal) Attachment number 2 \nPage 22 of 22 Item # 53 1 Augusta Riverfront, LLC Assignment of Parking Deck Management Agreement 00495403-3 ASSIGNMENT OF PARKING DECK MANAGEMENT AGREEMENT THIS ASSIGNMENT OF PARKING DECK MANAGEMENT AGREEMENT (this “Assignment”) is made as of the __ day of ______________________, 2012, by AUGUSTA RIVERFRONT, LLC, a Georgia limited liability company (“Borrower”), to and for the benefit of WELLS FARGO BANK, N.A., a national banking association (“Lender”), and consented and agreed to by THE CITY OF AUGUSTA, GEORGIA (“City”). RECITALS: A. Lender (as successor-by-merger to Wachovia Bank, National Association, a national banking association) has heretofore made certain loans (collectively referred to herein as the “Loans”) to Borrower, which Loans are governed by, among other things, that certain Loan Agreement dated September 27, 2005 entered into by and among Lender, Borrower and Guarantor (as defined in the Loan Agreement [defined below]), as said Loan Agreement has been amended by that certain First Modification of Loan Agreement by and among Lender, Borrower and Guarantor dated February 17, 2006, and as said Loan Agreement has been further amended by that certain Second Modification of Loan Agreement by and among Lender, Borrower and Guarantors dated August 23, 2007 (said Loan Agreement, as so amended, is hereinafter referred to as the “Loan Agreement”). B. The Loans are evidenced by (i) that certain Promissory Note dated September 27, 2005 made by Borrower payable to the order of Lender in the original principal amount of $78,500,000.00 and (ii) that certain Promissory Note dated February 17, 2006 made by Borrower payable to the order of Lender in the original principal amount of $13,500,000.00 (collectively, the “Note”). The Loans previously included a revolving loan evidenced by a Second Amended and Restated Promissory Note from Borrower payable to the order of Lender dated August 23, 2007 in the maximum principal amount of $7,000,000.00, which revolving loan has since matured and has been satisfied and cancelled, with Borrower having no further right to reborrow thereunder. C. The Note and Borrower’s obligations under the Loans are secured, in part, by that certain Deed to Secure Debt, Assignment of Rents and Leases, and Security Agreement dated September 27, 2005 made by Borrower to Lender, recorded in the real estate records of Richmond County, Georgia (the “Official Records”), at Book 01019, Page 1272, as the same has been amended by that certain First Modification of Deed to Secure Debt, Security Agreement, Financing Statement and Fixture Filing, and First Modification of Assignment of Rents and Leases dated February 17, 2006 between Borrower and Lender and recorded in the Official Records at Book 01041, Page 2150, and as further amended by that certain Second Modification of Deed to Secure Debt, Security Agreement, Financing Statement and Fixture Filing, and Second Modification of Assignment of Rents and Leases dated August 23, 2007 between Borrower and Lender and recorded in the Official Records at Book 01141, Page 2129 (said Deed to Secure Debt, Assignment of Rents and Leases, and Security Agreement, as so amended, and as the same may hereafter be amended, hereinafter collectively referred to as the “Borrower Security Instrument”), which Borrower Security Instrument encumbers certain real and personal property owned by Borrower as more particularly described therein, including, but not limited to, the Augusta Mariott and the Augusta Marriott Suites hotels (the “Hotels”) (such real and personal property owned by Borrower hereinafter referred to collectively as the “Borrower’s Property”). D. Borrower’s obligations under the Loans are also secured by, among other things, a Guaranty Agreement from 933 Broad Investment Co, LLC, a Georgia limited liability company (“933 Broad Guarantor”), which is an affiliate of Borrower. The Guaranty Agreement from 933 Broad is secured by Attachment number 3 \nPage 1 of 8 Item # 53 2 Augusta Riverfront, LLC Assignment of Parking Deck Management Agreement 00495403-3 that certain Deed to Secure Debt, Security Agreement, Financing Statement and Fixture Filing dated as of September 27, 2005, made by 933 Broad Guarantor for the benefit of Lender (as successor-by-merger to Wachovia Bank, National Association, a national banking association) and recorded October 14, 2005 in the Official Records in Book 01019, Page 1326, as modified and amended by that certain First Modification of Deed to Secure Debt, Security Agreement, Financing Statement and Fixture Filing, and First Modification of Assignment of Rents and Leases dated February 17, 2006 and recorded in the Official Records on March 2, 2006 in Book 0104, Page 2155, as modified and amended by that certain Second Modification of Deed to Secure Debt, Security Agreement, Financing Statement and Fixture Filing, and Second Modification of Assignment of Rents and Leases dated August 23, 2007 and recorded in the Official Records on September 7, 2007 in Book 01141, Page 2119 (Deed to Secure Debt, Security Agreement, Financing Statement and Fixture Filing, as so amended, and as the same may hereafter be amended, hereinafter collectively referred to as the “933 Broad Security Deed”). E. The 933 Broad Security Deed encumbers certain real and personal property owned by 933 Broad Guarantor (the “933 Broad Property”) which is in the vicinity of the Hotels, including, but not limited to, an office building and certain adjacent property, on some of which adjacent property a parking garage commonly referred to as the Reynolds Street Parking Deck (the “RSPD”) is now located. F. Contemporaneously with the execution and delivery of this Assignment, Borrower and 933 Broad Guarantor are entering into certain transactions and agreements relating to the RSPD (collectively, the “Parking Garage Transactions”), and in connection therewith, Borrower and Guarantor have requested that Lender (i) release certain of the 933 Broad Property from the encumbrances of the Loan in return for appurtenant easement rights with respect to the RSPD and (ii) make certain other modifications and amendments to the terms of the Loans (collectively, the “Loan Modification”), such Parking Garage Transactions and Loan Modification being more particularly described in and evidenced by that certain Omnibus Agreement (933 Broad Parking Lot Matters) of even date herewith entered into by and among Borrower, Guarantor and Lender. G. As a part of the Parking Garage Transactions, Borrower, as manager, and City, as owner, are entering into that certain Reynolds Street Parking Deck Management Agreement of even date herewith (the “Management Agreement”), pursuant to which the City has engaged Borrower to manage the RSPD pursuant to the terms and conditions of the Management Agreement. H. As one of the conditions to Lender’s consent to the Loan Modification, Lender has required that Borrower enter into this Assignment with respect to the Management Agreement, with the consent and agreement of the City. I. Borrower desires to enter into this Assigment for the purpose of inducing Lender to consent to the Loan Modification, and the City has executed this Assigment for the purpose of (i) evidencing its consent to the assignment by Borrower to Lender of the Management Agreement pursuant to the terms of this Assignment and (ii) agreeing to be bound by the terms and provisions of Section 10 of this Assignment. AGREEMENT NOW, THEREFORE, in consideration of the Loan and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Borrower agrees as follows: 1. Definitions. Capitalized terms used but not defined in this Assignment are defined in the Loan Agreement. Attachment number 3 \nPage 2 of 8 Item # 53 3 Augusta Riverfront, LLC Assignment of Parking Deck Management Agreement 00495403-3 2. Assignment. As security for the Note and all other obligations and agreements of Borrower with respect to the Loans (the “Obligations”), Borrower assigns to Lender and grants Lender a security interest in and to all of Borrower’s right, title and interest in and to the Management Agreement, including the right to collect and retain all sums that may become payable to Borrower under the Management Agreement. 3. Performance by Borrower. Notwithstanding such assignment, Borrower shall continue to be obligated to perform its obligations under the Management Agreement to the same extent as though this Assignment had not been made. By acceptance of this Assignment, Lender is not assuming any obligation of Borrower under the Management Agreement. 4. Authority of Lender. Upon the occurrence of an Event of Default under the Loan Documents, Borrower does hereby authorize and empower Lender to enforce the Management Agreement, to exercise any and all rights of Borrower thereunder, and to collect and retain all sums that may become payable to Borrower under the Management Agreement and Borrower does hereby direct and authorize each and all of the contractual obligors of Borrower under the Management Agreement to (i) pay to Lender all amounts that may become payable under the Management Agreement and (ii) to perform any obligations on its or their part to be performed under the Managmeent Agreement, upon demand for performance thereof by Lender. Borrower shall have no claim against the City for any amounts paid by the City to Lender following demand by Lender. 5. Power. The sole signature of Lender shall be sufficient for the exercise of any rights under this Assignment. 6. Representations. Borrower hereby covenants and warrants that it has not executed any prior assignment or pledge of the Management Agreement, nor performed any act or executed any other instrument which might prevent Lender from operating under any of the terms and conditions of this Assignment, or which would limit Lender in such operation. 7. Restrictions. Borrower hereby agrees that so long as any of the Obligations remain outstanding, without the prior written consent and approval of Lender in each instance, Borrower will not assign, pledge, hypothecate or otherwise encumber any of its rights under the Management Agreement. 8. Other Obligations. Borrower agrees that at its sole cost and expense it (i) will duly and punctually perform and comply in all material respects with any and all representations, warranties, covenants, terms and provisions to be performed or complied with by it under the Management Agreement; (ii) will not terminate or amend any material terms or provisions of the Management Agreement without the prior written consent of Lender; (iii) will give notice to Lender of any notice received by Borrower of any default by Borrower under the terms of the Management Agreement or which indicates that the City is terminating the Management Agreement. 9. No Obligation of Lender; Liability of Lender; Indemnification. Lender shall not, by reason of this Assignment or the exercise of its rights or remedies hereunder, (a) be obligated to perform or discharge, or be liable or responsible for, any obligation, duty or liability of Borrower under the Management Agreement; or (b) be liable to governmental authorities, contractors or any parties under the Management Agreement by reason of any default by any party under the Management Agreement; or (c) be obligated to take any action under or with respect to the Management Agreement or to incur any expense with respect to the Management Agreement or the RSPD; or (d) be obligated to appear in or defend any action or proceeding relating to the Management Agreement or the RSPD; or (e) be, or be construed to be, a mortgagee in possession of the RSPD or any part thereof; or (f) be liable in any way for Attachment number 3 \nPage 3 of 8 Item # 53 4 Augusta Riverfront, LLC Assignment of Parking Deck Management Agreement 00495403-3 any injury or damage to person or property sustained by any person in or about the RSPD; or (g) be responsible or liable for the control, care, management or repair of the RSPD or any waste committed on the RPSD by contractors or any other parties under the Management Agreement or any other parties or for any dangerous or defective condition of the RSPD, or for any negligence in the management, upkeep, repair or control of the RSPD resulting in loss, injury or death to any party under the Management Agreement or any tenant, licensee, employee, or stranger with respect to the RSPD. Except to the extent of any Claims (defined below) directly resulting from Lender's gross negligence or willful misconduct, Borrower hereby agrees to indemnify and hold Lender harmless from and against, and reimburse Lender for, all claims, demands, liabilities, losses, damages, causes of action, judgments, penalties, costs, and expenses (including without limitation, reasonable attorney’s fees) ("Claims") which may be imposed upon, asserted against or incurred or paid by Lender by reason of this Assignment or the exercise of its rights or remedies hereunder. For purposes of this Section, the term “Lender” shall include the directors, officers, partners, employees and agents of Lender and any persons or entities owned or controlled by, owning or controlling, or under common control or affiliated with Lender. The foregoing releases and indemnities shall not terminate upon release or other termination of this Assignment. Any amount to be paid under this Section by Borrower to Lender shall be a demand obligation owing by Borrower to Lender, shall bear interest from the date such amount becomes due until paid at the Default Rate (as defined in the Note) and shall be secured by the Borrower Security Instrument, the 933 Broad Security Instrument and by any other instrument securing the Note. 10. Agreement of Borrower and the City Regarding the RSPD. Borrower and the City agree that, in the event, for any reason, Lender or any other party acquires the Borrower’s Property and/or the 933 Broad Property pursuant to a foreclosure of any or all of the Borrower’s Property and/or the 933 Broad Property, either judicially or by power of sale or by deed-in-lieu of foreclosure or by any other means (any of the foregoing hereinafter referred to as a “Succession”; and Lender or any other party succeeding to the interest of Borrower or 933 Broad Guarantor (or either of them) pursuant to a Succession being hereinafter referred to as a “Successor”), all of the easements, rights and obligations of Borrower created pursuant to the Management Agreement (collectively, the “Management Rights”) shall, if foreclosed by Lender and elected by Successor (it being understood that Successor shall have no obligation to so elect) as evidenced by written notice from Successor to the City of such election delivered within ten (10) business days following such Succession, be binding upon and shall inure to the benefit of Successor; provided, however, that the consent of the City shall be required prior to Successor’s succession to the Management Rights, which consent shall not be withheld, conditioned or delayed so long as such Successor, or its designee, shall have, in the reasonable discretion of the City, expertise, personnel and other resources sufficient to discharge the Management Rights no less favorably than Borrower has performed same. Borrower, and the City further agree that in the event that the City does not consent to Successor’s succession to the Management Rights within fifteen (15) Business Days (defined below) following receipt by the City of Successor’s election to assume the Management Rights (the “Outside Date”), then, effective as of the Outside Date, the Management Agreement and the Management Rights created pursuant to the Management Agreement shall terminate and be of no further force and effect, and the City and Borrower agree that neither Borrower nor any affiliate of Borrower will thereafter be engaged to manage or otherwise operate or control the RSPD until all Obligations under the Loans have been paid and satisfied in full. 11. Further Assurances. Borrower agrees from time to time to execute, acknowledge and deliver all such instruments and to take all such action for the purpose of further effectuating this Assignment and the carrying out of the terms hereof as may be requested by Lender. 12. No Release. Neither the execution of this Assignment nor any action or inaction on the part of Lender under this Assignment shall release Borrower from any of its obligations under the Attachment number 3 \nPage 4 of 8 Item # 53 5 Augusta Riverfront, LLC Assignment of Parking Deck Management Agreement 00495403-3 Management Agreement or constitute an assumption of any such obligations on the part of the Lender. No action or failure to act on the part of Borrower shall adversely affect or limit, in any way, the rights of Lender under this Assignment or, through this Assignment, under the Management Agreement. Neither the existence of this Assignment nor the exercise of Lender’s privilege to collect or enforce the Management Agreement hereunder shall be construed as a waiver by Lender or its successors and assigns of the right to enforce payment of the Obligations in strict accordance with the terms and provisions of the Note and other Loan Documents. 13. Notices. All notices or other written communications hereunder shall be deemed to have been properly given (i) upon delivery, if delivered in person or by facsimile transmission with receipt acknowledged by the recipient thereof, (ii) one (1) Business Day (hereinafter defined) after having been deposited for overnight delivery with any reputable overnight courier service, or (iii) three (3) Business Days after having been deposited in any post office or mail depository regularly maintained by the U.S. Postal Service and sent by registered or certified mail, postage prepaid, return receipt requested, addressed as follows: In case of the City to: Augusta-Richmond County City County Municipal Building 530 Greene Street Augusta, Georgia 30901 Attn: City Administrator With a copy to: Augusta-Richmond County Legal Department 530 Greene Street Augusta, Georgia 30901 Attn: General Counsel In the case of Borrower to: Augusta Riverfront, LLC One 10th Street, Riverfront Center Suite 340 Augusta, Georgia 30901 Attn: Mr. Paul S. Simon With a copy to: Hull Barrett, PC 801 Broad Street, 7th Floor Augusta, Georgia 30901 Attn: Rand Hanna In the case of Lender to: Wells Fargo, Bank, N.A. 2030 Main Street, Suite 800 Irvine, California 92614 Attention: Kim Taylor, Loan Administrator With a copy to: Seyfarth Shaw LLP 1075 Peachtree Street, N.E. Suite 2500 Atlanta, Georgia 30309 Attention: Paul M. Baisier, Esq. or addressed as such party may from time to time designate by written notice to the other parties. For purposes of this Assignment, the term “Business Day” shall mean a day on which commercial banks are not authorized or required by law to close in New York, New York. Any party by notice to the others may designate additional or different addresses for subsequent notices or communications. 14. General Provisions. Attachment number 3 \nPage 5 of 8 Item # 53 6 Augusta Riverfront, LLC Assignment of Parking Deck Management Agreement 00495403-3 (a) This Assignment shall be binding upon and shall inure to the benefit of the successors and assigns of the parties hereto. (b) This Assignment is a Loan Document as defined in the Loan Agreement. (c) This Assignment shall be deemed to be a contract entered into pursuant to the laws of the State of Georgia and shall in all respects be governed, construed, applied and enforced in accordance with the laws of the State of Georgia. 15. WAIVER OF JURY TRIAL. BORROWER HEREBY WAIVES, TO THE FULLEST EXTENT PERMITTED BY LAW, THE RIGHT TO TRIAL BY JURY IN ANY ACTION, PROCEEDING OR COUNTERCLAIM FILED BY BORROWER OR LENDER, WHETHER IN CONTRACT, TORT OR OTHERWISE, RELATING DIRECTLY OR INDIRECTLY TO THIS ASSIGNMENT, THE LOAN EVIDENCED BY THE NOTE, THE LOAN DOCUMENTS OR ANY ACTS OR OMISSIONS OF LENDER IN CONNECTION THEREWITH. [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK] [SIGNATURES ON FOLLOWING PAGE] Attachment number 3 \nPage 6 of 8 Item # 53 Borrower Signature Page Augusta Riverfront, LLC Assignment of Parking Deck Management Agreement 00495403-3 IN WITNESS WHEREOF, Borrower caused this Assignment to be executed as of the day and year first above written. BORROWER: AUGUSTA RIVERFRONT, LLC, a Georgia limited liability company By: ______________________________ Name: ______________________________ Title: ______________________________ [CONSENT AND AGREEMENT OF CITY SIGNATURE PAGE FOLLOWS] Attachment number 3 \nPage 7 of 8 Item # 53 City Signature Page Augusta Riverfront, LLC Assignment of Parking Deck Management Agreement 00495403-3 CONSENT AND AGREEMENT OF CITY By its execution below, the City of Augusta, Georgia joins in the execution of this Assignment for the purpose of evidencing its consent to the foregoing Assignment of Parking Deck Management Agreement (“Assignment”) by Augusta Riverfront, LLC to and for the benefit of Wells Fargo Bank, N.A., and to evidence its agreement to be bound by the the provisions of Section 10 of the foregoing Assignment. CITY: AUGUSTA, GEORGIA By: Its Mayor Attest: Its Clerk of Commission [SEAL] Attachment number 3 \nPage 8 of 8 Item # 53 1 00437404-4 Hull Barrett Draft 5/16/12 Version 4 ___________________________________________________________________________________ Space above this line for recorder’s use DEED TO AIR RIGHTS PARCEL THIS INDENTURE, made this ___ day of ____________, 2012, by and between 933 BROAD INVESTMENT CO., LLC, a Georgia limited liability company, as party of the first part (herein called “Grantor”), and AUGUSTA, GEORGIA, a public body corporate and politic of the State of Georgia, as party of the second part (herein called “Grantee”) (the words “Grantor” and “Grantee” shall include their respective heirs, successors and assigns where the context requires or permits); W I T N E S S E T H: GRANTOR, for and in consideration of the sum of Ten and No/100 Dollars ($10.00) in hand paid at and before the sealing and delivery of these presents, the receipt whereof is hereby acknowledged, has granted, bargained, sold, aliened, conveyed and confirmed and by these presents does grant, bargain, sell, alien, convey and confirm unto said Grantee, all those property rights lying and being in Augusta, Richmond County, Georgia, and being more particularly described on Exhibit “A” attached hereto and by this reference made a part hereof, together with any and all improvements, and fixtures located thereon or attached thereto, and all rights, easements and benefits appurtenant thereto (hereinafter referred to as the “Property”), subject to current taxes and assessments not yet due and payable, all easements, rights of way, covenants, conditions, restrictions, and other matters of record, zoning ordinances, rights of tenants and parties in possession and any state of facts that would be disclosed by a current accurate survey of the Property ("Permitted Encumbrances"). TO HAVE AND TO HOLD the Property to the same being, belonging, or in anywise appertaining, to the only proper use, benefit and behoof of Grantee forever in FEE SIMPLE. Attachment number 4 \nPage 1 of 3 Item # 53 2 00437404-4 EXECUTED under seal the day and year first above written. Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) 933 BROAD INVESTMENT CO., LLC, a Georgia limited liability company By:________________________ Paul S. Simon As its President (Seal) Attachment number 4 \nPage 2 of 3 Item # 53 3 00437404-4 Exhibit “A” The exclusive and perpetual right of possession and occupancy of, the exclusive and perpetual right to floor and to cover over and to build and construct over, in or upon the entire space or area situate at a height above a horizontal plane of 151.05 feet above mean sea level and below a horizontal plane of 216.10 feet above mean sea level as determined by reference to the United States Coast and Geodetic Survey Benchmark Elevation of 134.948 feet above mean sea level located at the Georgia Geodetic Monument #14-R-3 north 1,262,402.48, east 563,401.17 in the parkway on Greene Street between Fourth and Fifth Streets in the City of Augusta, Richmond County, Georgia, directly over and above the land described as follows: All that lot, tract or parcel of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 3” containing 0.83 acre, more or less, on that certain Plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. Grantor reserves title to all portions of said Tract 3 not contained within the air space described above. Portion of TMP Nos. 037-3-066-01-0; 037-3-066-00-0; 037-3-177-00-0; 037-3-069-00-0; and 037-3- 070-00-0. Attachment number 4 \nPage 3 of 3 Item # 53 00428222-10 Version 10 – Hull Barrett Comments 1-6-12 CONFERENCE CENTER PARKING LEASE BETWEEN AUGUSTA, GEORGIA a political subdivision of Georgia, AS LANDLORD AND AUGUSTA RIVERFRONT, LLC a Georgia limited liability company, AS TENANT DATED AS OF _________________, 2012 Attachment number 5 \nPage 1 of 15 Item # 53 00428222-10 CONFERENCE CENTER PARKING LEASE THIS CONFERENCE CENTER PARKING LEASE (this “Lease”) is entered into as of the ____ day of ____________, ___________ (the “Effective Date”), by and between Augusta, Georgia, a political subdivision of Georgia, as landlord (“Landlord”), and Augusta Riverfront, LLC, a Georgia limited liability company, as tenant (“Tenant”). 1. LEASE OF PREMISES. Landlord hereby leases to Tenant and Tenant hereby takes from Landlord in consideration of the covenants and agreements in this Lease, the premises (the “Demised Premises”) located north of Reynolds Street, between 9th and 10th Streets in Augusta, Georgia, and consisting of (i) the surface parking lot located on Parcel “N” containing 1.89 acres, more or less, on that Compiled Map for Augusta Riverfront Limited Partnership by John Thomas Attaway, Georgia RLS No. 2512, dated January 19, 1999, revised June 1, 1999, and recorded in the Office of the Clerk of Superior Court of Augusta-Richmond County, Georgia on June 22, 1999, in Reel 648, pages 39-44, and (ii) that parking deck containing approximately _____ parking spaces and being located on a portion of Parcels “P” and “P-1” on said Compiled Map, together with all improvements located thereon. 2. OPERATING TERM AND USE. The initial term of this Agreement (the “Operating Term”) shall be for a period commencing on the Effective Date and terminating on the five (5) year anniversary of the Effective Date. Notwithstanding the foregoing, this Agreement shall be binding on the date it is signed by Landlord and Tenant and provisions of this Agreement shall survive the Operating Term to the extent specifically set forth in this Agreement. Landlord, in its sole discretion, may elect, by written notice to Tenant, within 60 days from the expiration of the initial Operating Term of this Agreement, to renew the initial Operating Term of this Agreement, for an additional term of five (5) years. In the event that Landlord does not elect to renew the term of this Agreement and solicits requests for proposals (“RFP”) for the operation of the Demised Premises, then in such event Tenant has have the right to meet the terms and conditions of the RFP of the entity that is deemed to be most qualified to operate the Demised Premises, If Tenant agrees to the terms and conditions contained in such RFP, then this Agreement shall be renewed, subject to modification to incorporate any terms and conditions consistent with accepted RFP, and right of first refusal shall be continue in effect. Should Tenant not elect to operate the Demised Premises pursuant to the terms and conditions of the accepted RFP, then in such event Tenant shall have no further right to operate the Demised Premises or the parking deck owned by Landlord and located at the northwestern intersection of Reynolds Street and James Brown Boulevard in Augusta, Georgia (the “RSPD”) [upon expiration of the Reynolds Street Parking Deck Management Agreement of even date entered into by and between Landlord and Augusta Riverfront, LLC (the “RSPD Agreement”)], notwithstanding any prior vote of the Augusta, Georgia Commission to designate Augusta Riverfront, LLC as the operator of the Demised Premises or the RSPD. Tenant may use the Demised Premises as parking deck open to the public and/or exclusively for the use of Convention Center guests and its hotel patrons, and no other (the “Permitted Uses”). Attachment number 5 \nPage 2 of 15 Item # 53 00428222-10 3. RENT AND ACCEPTANCE OF DEMISED PREMISES. For purposes of this section “Operating Income” shall mean the gross revenues generated from the operation of the Demised Premises including, but not limited to, the following: (a) sums collected by the Tenant from the rental of space for the parking and storage of motor vehicles whether on an hourly, daily, weekly, or monthly basis, less all refunds, and credit card fee discounts (sales tax, use tax, excise tax, occupancy tax, gross receipts tax, or other taxes assessed upon or attributable to said receipts shall be paid directly to the taxing entity involved and are not be included in the definition of gross revenues); (b) on-site advertising revenues; (c) reimbursable event expenses; (d) all other miscellaneous revenue from the operation of the Demised Premises; and (e) any and all revenues generated by or associated with any marquee advertising (if such advertising is permitted by Landlord). For purposes of this section “Operating Expenses” shall mean all expenses required to be incurred in order to operate and manage the Demised Premises, including, but not limited to the following: (a) salary costs of employees of Tenant (so long as such salary costs are commensurate with the salary costs (as such term as defined in that certain RSPD Agreement) associated with the operation of the RSPD and Shared Employees (as such term is defined in the RSPD Agreement); (b) operating supplies; (c) utility and telephone charges; (d) repair and maintenance costs; (e) equipment rental costs; (f) insurance costs related to the operation of the Demised Premises (but not performance or fidelity bonds); (g) security costs; (h) cleaning expenses; (i) cost of reimbursable event expenses; (j) the cost of obtaining an audited financial statements required hereunder; (k) maintenance agreements; and (l) any other expenses incurred in the operation of the Demised Premises that would be considered operating expenses under GAAP. Operating Expenses shall not include debt service on any borrowing. For purposes of this section “Net Income” shall be calculated as Operating Income less Operating Expenses. A. Base Rent. During the term of this Agreement and any extensions, Tenant shall pay to Landlord an annual rental of $50,000.00, payable in equal monthly installments the first of such installments being due and payable on the Effective Date. Such annual rent shall be adjusted annually on the anniversary of the Effective Date, upward but not downward, by the lesser of (i) one half (1/2) of the cumulative percentage increase in the Consumer Price Index for all urban consumers (CPI-U) (All Items 1982-84=100) since the last rate increase at the RSPD, or (ii) the percentage increase in maximum daily parking rates during such year for parking spaces in the RSPD. B. Tenant Income. After payment of Base Rent and Operating Expenses, Tenant shall be entitled to receive the lesser of all of the Net Income from the operation of the Demised Premises or $25,000.00. C. Additional Rent. In addition to the Base Rent and after payment of the Operating Expenses and the Tenant Income, Tenant shall pay to Landlord as additional rent an amount equal to the lesser of (i) the operating loss from the operation of the RSPD, if any, or (ii) Net Income in excess of Base Rent and Tenant Income. Attachment number 5 \nPage 3 of 15 Item # 53 00428222-10 D. Surplus Income. In the event that there remains Net Income after payment of the Base Rent, Operating Expenses, Tenant Income, and Additional Rent, such remaining Net Income will be divided equally between Landlord and Tenant. E. Financial Statements. (a) In order to determine Net Income, Tenant shall prepare and deliver to Landlord by the 90th day after the end of each calendar year during the term of this Agreement the following financial statements and reports for the operation of the Demised Premises for the previous calendar year, which shall be in reasonable detail and shall be prepared in accordance with GAAP: (i) balance sheet as of the last day of such calendar year (ii) cash flow statement, and (iii) profit and loss statement. The profit and loss statement will include a comparison to the prior calendar year and a comparison to the budgeted amounts for the prior calendar year. (b) On or prior to 120 days after the end of each calendar year, Tenant shall provide, at Tenant’s cost and expense, a financial audit with respect to the operations of the Demised Premises for the previous calendar year to be made by an independent certified accounting firm selected by Tenant and approved by Landlord, with such approval not to be unreasonably withheld. 4. DEMISED PREMISES REPAIRS AND MAINTENANCE. A. Landlord represents and warrants that during the Term, Landlord shall maintain the structure of the Demised Premises, at its sole cost and expense, in good condition and shall perform all necessary maintenance, repair, and replacement to the Demised Premises including, but not limited to: (i) maintaining the integrity of the structure and surface of all paved areas such that there are no pot holes or other conditions that may compromise its utility or safety of the Demised Premises; (ii) maintaining the foundation, floors, walls, all exterior utility lines and pipes to the point of entry into the Demised Premises; (iii) maintaining all other structural portions of the Demised Premises; and (iv) making any other repair or replacement that is considered to be capital in nature under Generally Accepted Accounting Principles. All repairs, restorations, or payments which are obligations of Landlord, shall be completed or made within a reasonable time. Landlord has the right but not responsibility to enter the Demised Premises periodically, at any reasonable time during Tenant’s normal business hours, and upon reasonable advance notice to Tenant, to inspect the condition of the Demised Premises and to make repairs. Any repairs or other work done by Landlord shall be performed so as to cause the least interference possible with Tenant’s operation. B. Tenant shall be responsible for re-striping of the deck and surface parking areas, maintenance and repair of traffic control devices, cleaning of the parking areas, landscaping of grassed and unpaved areas, and routine maintenance and repair of a non-capital nature under Generally Accepted Accounting Principles. All repairs, restorations, maintenance or payments which are obligations of Tenant shall be completed or made within a reasonable time. For purposes of this paragraph, “pro-rata share” means the proportion of (i) the number of parking spaces in the parking deck on Demised Premises to (ii) the total number of parking spaces in the RSPD plus the number of parking spaces in the parking deck on the Demised Attachment number 5 \nPage 4 of 15 Item # 53 00428222-10 Premises combined. With respect to software costs for traffic control devices, Landlord shall pay the same in connection with the RSPD, and Tenant shall reimburse the pro-rata share of such costs. With respect to any leased equipment used for the Demised Premises and the RSPD, Tenant shall pay the pro-rata share of such lease payments. With respect to any equipment owned by Landlord but used for both the RSPD and the Demised Premises, Tenant shall pay a fair rental rate for the use of said equipment, as set forth in the Annual Plan in effect for the RSPD Management Agreement. 5. FIXTURES AND EQUIPMENT. Landlord shall deliver the Demised Premises with lighting, electrical and traffic control equipment in good working condition. 6. INSURANCE AND INDEMNIFICATION 6.1 General Liability Insurance. Tenant shall carry comprehensive general liability insurance, including contractual liability, personal and bodily injury, and property damage insurance, on the Demised Premises, with a combined single limit in an amount sufficient to protect Landlord and Tenant, but in no event will such insurance be in an amount less than a combined single limit of $3,000,000 per occurrence. Landlord shall be named as an additional insured under such insurance. Tenant shall provide Landlord with a certificate of insurance evidencing such coverage no later than 10 days prior to the commencement of the Operating Term. Tenant’s insurance shall contain a clause stating that there shall be no reduction, cancellation, or non-renewal of coverage without giving Landlord thirty (30) days prior written notice. Such insurance shall also be endorsed to provide that the insurance shall be primary to and not contributory to any similar insurance carried by Landlord, and shall contain a severability of interest clause. 6.2 Property Insurance. Landlord shall maintain property insurance with respect to the Demised Premises in accordance with Section 4.5 of the Amended and Restated Construction, Operating and Reciprocal Easement Agreement dated June 1, 1999, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia at Realty Reel 648, page 45, as amended by that First Amendment to Amended and Restated Construction, Operating and Reciprocal Easement Agreement dated December 20, 1999, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia at Book 673, page 711 (the “CORE Agreement”) . 6.3 Operational Insurance. Tenant shall procure and maintain the following insurance: 6.3.1 Workers’ Compensation and employer’s liability insurance as may be required under applicable laws covering all Tenant’s Employees, including Shared Employees, with such deductible limits as allowed by law; 6.3.2 Garage keeper’s legal liability insurance to insure against theft, loss and damage to patron’s vehicles. 6.3.3 Such other insurance and/or additional coverage in amounts as Tenant in its reasonable judgment deems advisable for its protection against Attachment number 5 \nPage 5 of 15 Item # 53 00428222-10 claims, liabilities and losses arising out of or connected with its performance under this Agreement. 6.3.4 Tenant, at Tenant’s sole cost and expense, may, but shall not be obligated to, carry insurance insuring its trade fixtures, equipment, inventory and such other items as Tenant, from time to time, deems necessary or appropriate. 6.4 Cost and Expense. Each party will be responsible for the payment of insurance premiums it is required to obtain under the terms of the this agreement. In addition, Landlord shall have the right to self-insure or self-fund for any requirements provided herein. 6.5 Coverage. All insurance described in this Article may be obtained by endorsement or equivalent means under Landlord’s or Tenant’s blanket insurance policies, provided that such blanket policies substantially fulfill the requirements specified herein. 6.6 Policies and Endorsements. 6.6.1 Where permitted, all general liability and operational insurance provided under this Article shall be carried in the name of Tenant, with additional insureds being Landlord, the owner of any fee or leasehold interest in the Demised Premises other than Landlord, and the holder of the security deeds covering the Demised Premises, if any; any losses thereunder shall be payable to the parties as their respective interests may appear. The party procuring such insurance shall deliver to the other party certificates of insurance with respect to all policies so procured, including existing, additional and renewal policies and, in the case of insurance about to expire, shall deliver certificates of insurance with respect to the renewal policies not less than ten (10) days prior to the respective dates of expiration. 6.6.2 All policies of insurance provided under this Article shall, to the extent obtainable, have attached thereto an endorsement that such policy shall not be canceled without at least ten (10) days prior notice to Landlord, Tenant, any other fee or leasehold owner of any portion of the Demised Premises, and any holder of indebtedness secured by the Demised Premises. 6.6.3 Landlord and Tenant further agree that each of their insurance policies shall provide for an appropriate waiver of subrogation reflecting the mutual waiver of subrogation rights set forth in Section 20 of this Lease. 6.7 Indemnification. 6.7.1 Indemnification by Tenant. Tenant shall indemnify, defend, and hold harmless Landlord, its Mayor, Commissioners, administrators, agents, and employees, and successors from and against any and all claims, liabilities, losses, damages, costs, and expenses of any kind or character, including without limitation indemnity claims, court costs, reasonable attorneys’ fees, interest, fees, Attachment number 5 \nPage 6 of 15 Item # 53 00428222-10 and penalties, arising from or related to the management, operation, or maintenance of the Demised Premises, in all cases to the fullest extent permitted by law, except to the extent such liabilities are finally determined by a court of competent jurisdiction to have been the result of the fraud or gross negligence of Landlord’s Mayor, Commissioners, or senior management personnel in the management, operation, or maintenance of the Demised Premises. 6.7.2 Indemnification by Landlord. Landlord shall indemnify and hold harmless Tenant, its subsidiaries, and its affiliates, and their respective officers, directors, agents, and employees from and against any and all claims, liabilities, losses, damages, costs, and expenses of any kind or character, including without limitation reimbursement of court costs, reasonable attorneys’ fees, interest, fees, and penalties charged to the Demised Premises, to the extent such liabilities are finally determined by a court of competent jurisdiction to have been the result of the failure of Landlord to fulfill its obligations under this Lease or the fraud or gross negligence of Landlord’s Mayor, Commissioners or senior management personnel in the management, operation, or maintenance of the Demised Premises. 6.7.3 Defense Costs. All costs and expenses, including without limitation reasonable attorneys’ fees, of any legal proceeding that is instituted against the Demised Premises, Landlord, or both related to the operation, management, or maintenance of the Demised Premises, including without limitation any employment-related claims of any nature, shall be paid directly by Tenant; provided, however, that Landlord shall reimburse Tenant on demand to the extent the fraud or gross negligence of the Landlord’s Mayor, Commissioners or senior management personnel in the management, operation, or maintenance of the Demised Premises is established in such proceeding. Tenant specifically acknowledges and agrees that any party’s mere allegation or claim of a negligent or intentional act by Landlord or any officer, director, agent, or employee thereof does not trigger any obligation of Landlord. 6.7.4 Good-faith Judgment. Notwithstanding any other provision of this Agreement, Landlord shall not make any claim against Tenant based on any alleged error of judgment if such judgment was made by Tenant in good faith or based on any action taken by Tenant at the express direction of Landlord. 6.7.5 Survival. This Section shall survive Termination. 7. ENTRANCES. Tenant shall have unrestricted use and access to all entrances, passageways, and access lanes to the Demised Premises and easements adjacent thereto. Landlord shall not permit or allow any changes to easements, the entrances, passageways, curb cuts and delivery lanes on or benefiting the Demised Premises without the prior written consent of Tenant. Attachment number 5 \nPage 7 of 15 Item # 53 00428222-10 8. UTILITIES. Tenant shall pay for all utilities used by it in the Demised Premises during the Term of this Lease. 9. TAXES. The parties anticipate that ad-valorem property taxes will not be assessed with respect to the Demised Premises. In the event of such assessment, Tenant shall be responsible for payment of the same. Tenant shall be responsible for all taxes arising from Tenant’s use of the Demised Premises. 10. ASSIGNMENT AND SUBLETTING. This Agreement is not assignable by Tenant without the prior written consent of Landlord, except that Tenant shall have the right, without any prior written consent (but only upon not less than five (5) business days’ prior notice to Landlord), to assign this Agreement or any duties arising hereunder to any entity controlled by, or under common control with, Tenant, provided that in such case such transferee shall have, in the reasonable judgment of Landlord, expertise, personnel and other resources sufficient to discharge its duties hereunder no less favorably than Tenant has performed the same. Such assignment shall be effective only if the assignee or transferee agrees to be bound by all of Tenant’s obligations under this Agreement. In the event Tenant, including for this purpose any affiliate thereof, sells the hotels located adjacent to the Demised Premises to a third party, Landlord shall either (a) allow transferee to assume this Agreement and release Landlord from its obligations under this Agreement, or (b) terminate this Agreement. 11. SIGNS. No signs (other than directional or parking related signs) shall be affixed to the Demised Premises without the prior written consent of Landlord. 12. CONDITION OF PREMISES: COMPLIANCE WITH LAWS. A. Tenant shall comply in all material respects with all Laws, as such term is defined below, related to Tenant’s particular use of the Demised Premises and with which only the occupant can comply, such as laws governing maximum occupancy, workplace smoking, and illegal business operations; the obligation to comply in every other case and also those cases where such Laws require repairs, alterations, changes or additions to the Demised Premises, or any part thereof, not caused by Tenant’s particular use thereof, is expressly assumed by Landlord. Notwithstanding anything to the contrary set forth in this Lease, Tenant shall not be required to construct or pay the cost of complying with any requirements resulting from Laws requiring construction of improvements in the Demised Premises which are properly capitalized under general accounting principles, unless such compliance is necessitated solely because of Tenant’s particular use of the Demised Premises. The term “Laws” shall mean all laws, statutes, governmental ordinances, rules and regulations and orders with respect to the use and occupancy of the Demised Premises of any municipal, county, state, federal, or other government agency or authority have jurisdiction over the parties to this Lease or the Demised Premises, or both, in effect either at the Effective Date of this Lease or any time during the Term. B. Landlord represents and warrants that at the commencement of the Term, the Demised Premises shall conform to all requirements of encumbrances to Landlord’s title, and all Laws applicable thereto. Attachment number 5 \nPage 8 of 15 Item # 53 00428222-10 13. DAMAGE TO DEMISED PREMISES. Section 8.2 of the CORE Agreement is incorporated in this Lease by reference and shall govern issues of damage to the Demised Premises. 14. ALTERATIONS. Tenant agrees not to make any structural alterations or additions to the Demised Premises without first obtaining the Landlord’s written consent, which consent shall not be unreasonably withheld. 15. MECHANICS LIENS. Tenant shall not allow, and Landlord shall not be responsible for, any mechanics liens filed against the Demised Premises arising from work performed, or materials supplied to the Demised Premises by Tenant or Tenant’s agents, employees, contractors, subcontractors or materialmen. 16. COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT. Tenant covenants that the Demised Premises will at all times, at Tenant’s sole cost and expense, conform to the applicable provisions of the Americans with Disabilities Act of 1990 (“ADA”) (Pub. L 101-36), and the ADA Accessibility Guidelines for Buildings and facilities as issued and amended by the U.S. Architectural and Transportation Barriers Compliance Board (56 F.R. 35455 et. seq.). Provided however, that changes, improvements or installations that would be considered capital in nature and not operational shall be paid by Landlord. By way of example, a change in the width of parking spaces or the number of handicap accessible spaces would be operational and the responsibility of Tenant, but the addition of ramps or changes in the width of doorways would be capital in nature and the responsibility of Landlord. 17. CONDEMNATION. In the event the Demised Premises are taken in Condemnation Proceedings, Tenant may cancel the Lease without further liability to Landlord. In the event any part of the Demised Premises, including all or part of rights-of-way adjoining the Demised Premises, or approaches to the Demised Premises, are taken in Condemnation Proceedings so that in the reasonable business judgment of Tenant the Demised Premises remaining would be unsatisfactory for Tenant’s business operation, Tenant may cancel this Lease or, at its option, retain that portion of the Demised Premises not taken. In the event Tenant retains the Demised Premises, Landlord will promptly and with due diligence restore the remaining premises to proper tenantable condition. Until the Demised Premises are restored to proper tenantable condition rent shall abate. Thereafter, rent shall be reduced in proportion to the amount of land and building area lost, or, if Tenant shall elect, in proportion to the effect of the loss of such area on Tenant’s business. In the event that the laws governing the Condemnation Proceedings provide separate compensation/benefits for lessees, Tenant shall be entitled to such compensation and/or benefits provided that it does not diminish any award or right to which Landlord is entitled. For purposes of this Lease, the term “Condemnation Proceedings” shall mean a governmental taking of all or any part of the Demised Premises, and shall include conveyances and grants made in anticipation of or in lieu of Condemnation Proceedings. 18. TENANT’S DEFAULT. If Tenant defaults in the performance of any obligation under this Lease, Landlord shall give notice to Tenant specifying the nature of the default. Attachment number 5 \nPage 9 of 15 Item # 53 00428222-10 A. If Tenant does not, within thirty (30) days after receipt of the notice, cure the default, or, if the default is of a nature that it cannot reasonably be cured within a period of thirty (30) days, and Tenant does not commence the cure within the thirty (30) day period and proceed thereafter with reasonable diligence and in good faith to cure the default, then after the expiration of the thirty (30) day period Landlord shall have the right to pursue its legal remedies. B. If Tenant does not, within fifteen (15) days after receipt of the notice, cure a default in the payment of rent or other charges properly due to Landlord, then after the expiration of the fifteen (15) day period Landlord shall give a second notice to Tenant, and if Tenant does not, within five (5) days after receipt of the second notice, cure the default, then after the expiration of the second five (5) day period Landlord shall have the right to pursue its legal remedies. 19. LANDLORD’S DEFAULT. If Landlord shall be in default hereunder, Tenant, after thirty (30) days notice that Tenant intends to cure the default (or without notice if in Tenant’s reasonable judgment an emergency shall exist), Tenant shall have the right, but not the obligation, to cure the default, and Landlord shall pay to Tenant upon demand the cost thereof within ten (10) days. If Landlord does not make such payments to Tenant within ten (10) days, Tenant may offset the amount due from Landlord against any payments for rent or other payments due Landlord, if any, and pursue its legal remedies. Except when in Tenant’s reasonable judgment an emergency shall exist, Tenant shall not commence to cure any default of a nature that could not reasonably be cured within a period of thirty (30) days, provided Landlord shall have commenced to cure the default within the cure period and so long as Landlord proceeds with reasonable diligence and in good faith to cure the default. 20. MUTUAL WAIVER OF SUBROGATION RIGHTS. Landlord and Tenant and all parties claiming under them mutually waive, release and discharge each other from all rights of recovery, causes of action, claims and liabilities arising from or caused by any cause, casualty or hazard covered or required hereunder to be covered in whole or in part by insurance on the Demised Premises and waive any right of subrogation which might otherwise exist in or accrue to any person on account thereof. The foregoing waiver shall apply regardless of the cause or origin of the claim, including but not limited to, the negligence of a party or that party’s agents, officers, employees or contractors. Each party to the extent possible shall obtain, for each policy of insurance, provisions permitting waiver of any claim against the other party for loss or damage within the scope of the insurance and each party to the extent permitted, for itself and its insurer, waives all such insured claims against the other party. 21. QUIET POSSESSION. Landlord covenants that it will put Tenant into complete and exclusive possession of the Demised Premises, free from all orders, restrictions and notices of any public or quasi-public authority, and that if Tenant shall pay the rental and perform all the covenants and provisions of this Lease to be performed by Tenant, the Tenant shall, during the Term, freely, peaceably and quietly occupy and enjoy the full possession of the Demised Premises, and the tenements and appurtenances thereto belonging, and the rights and privileges granted without hindrance. In addition, Landlord agrees to indemnify, defend, and hold Tenant harmless from any and all claims seeking to prevent Tenant from quiet and complete possession of the Demised Premises. If at any time during the term demised the title of the Landlord shall Attachment number 5 \nPage 10 of 15 Item # 53 00428222-10 fail or for any reason it shall appear that Landlord is unable to make this Lease for the term on the conditions set forth, the Tenant shall, in addition to all remedies available at law or in equity, have the right at Landlord’s expense to correct any default and offset such amount against rent, or terminate this Lease. 22. RENT PAYMENT. Tenant shall make rent checks payable to Augusta, Georgia, and mail them to the address set forth in paragraph 31 or as otherwise directed by Landlord. 23. TENANT’S BUSINESS OPERATION. Landlord and Tenant agree that nothing in this Lease shall be construed to imply that Tenant is required to conduct its business in any particular manner or for any specified number of hours per day or week, or to limit the number of hours per day or week that Tenant may operate in the Demised Premises, or as creating an implied or expressed obligation upon Tenant to continuously occupy or operate a business in the Demised Premises. 24. SURRENDER OF DEMISED PREMISES. Upon the expiration of this Lease, Tenant shall peaceably surrender the Demised Premises to Landlord in the same condition in which they were received from Landlord at the commencement of this Lease, except: (i) as altered as permitted or required by this Lease; (ii) for repairs, replacements and maintenance required to be performed by Landlord; (iii) for items covered by Landlord’s insurance; and (iv) except for ordinary wear and tear. This Section 24 shall not apply to cancellation or termination of this Lease pursuant to Section 13, DAMAGE TO DEMISED PREMISES, or pursuant to Section 18, CONDEMNATION, pursuant to which Tenant shall have no obligation or liability to Landlord. Tenant shall remove its property from the Premises within a reasonable time after the Lease expiration (not to exceed thirty (30) days), without additional rent obligation. 25. LANDLORD’S CONSENTS AND APPROVALS. Whenever it is stated in this Lease that Landlord’s consent or approval is required, Landlord agrees that such consent or approval will not be unreasonably withheld or delayed. If, in any instance, Landlord refuses to grant its consent or approval, Landlord agrees to simultaneously give Tenant written notice of the reason(s) for such refusal. If Landlord’s consent or approval is not given or refused within ten (10) days after Tenant’s written request therefore, such consent or approval shall be deemed automatically granted. 26. ATTORNEYS’ FEES. If either party commences an action against the other party arising out of or in connection with this Lease, the prevailing party shall be entitled to have and recover from the losing party reasonable attorneys’ fees and costs of suit, including, but not limited to, fees and costs of appeal. 27. RECORDING. In the event either party desires to record the existence of this Lease, the parties agree to execute a Memorandum of Lease setting forth the Operating Term, number of renewal option periods and length, if any, the description of the Demised Premises, and any other terms and conditions of the Lease the parties wish to make of public record. 28. NO WAIVER. The failure of the Landlord or Tenant to insist upon the strict performance of this Lease, or the failure of Landlord or Tenant to exercise any right, option or remedy contained in this Lease shall not be construed as a waiver for the future of any such Attachment number 5 \nPage 11 of 15 Item # 53 00428222-10 provision, right, option, or remedy, or as a waiver of any subsequent breach. No provision of this Lease shall be deemed to have been waived unless such waiver shall be in writing signed by the party to be charged. 29. TRUE LEASE. This Lease is intended as, and shall constitute, an agreement of lease, and nothing herein shall be construed as conveying to the Tenant any right, title or interest in or to the Demised Premises nor to any remainder or reversionary estates in the Demised Premises held by any person, except, in each instance, as a Tenant. Under no circumstances shall this Lease be regarded as an assignment of all of Landlord’s interests in and to the Demised Premises. Instead Landlord and Tenant shall have the relationship between them of Landlord and Tenant, pursuant to the provisions of this Lease. 30. HOLD OVER. Any holding over by Tenant beyond the original term of this Lease shall be on the same terms and conditions as contained herein, and shall be a periodic tenancy terminable by either party upon thirty (30) days prior written notice to the other party. 31. NOTICES. All notices required under this Lease shall be given and deemed to have been properly served if delivered in writing personally, by certified mail, or by a nationally recognized overnight carrier with signed proof of delivery to: In case of the Landlord to: Augusta-Richmond County City County Municipal Building 530 Greene Street Augusta, Georgia 30901 Attn: City Administrator With a copy to: Augusta-Richmond County Legal Department 530 Greene Street Augusta, Georgia 30901 Attn: General Counsel In the case of Tenant to: Augusta Riverfront, LLC One 10th Street, Riverfront Center Suite 340 Augusta, Georgia 30901 Attn: Mr. Paul S. Simon With a copy to: Hull Barrett, PC 801 Broad Street, 7th Floor Augusta, Georgia 30901 Attn: Rand Hanna or such other place or places as either of them may designate in writing to the other from time to time in accordance with the provisions of this Section. Date of service of a notice served by mail shall be the date on which such notice is received by the addressee. Date of service by any other method shall be the date of receipt. 32. ESTOPPEL CERTIFICATES. Upon the reasonable request of either party, Landlord and Tenant agree to execute and deliver to the other within ten (10) business days after receipt of the request, a written instrument, (a) certifying that this Lease has not been modified and is in full force and effect or, if there has been a modification of this Lease, that this Lease is in full force and effect as modified, stating such modifications; (b) stating that the fixed monthly rent has not been paid more than thirty (30) days in advance, or if so, the date to which it has been paid; (c) stating whether or not, to the knowledge of the party executing the instrument, the Attachment number 5 \nPage 12 of 15 Item # 53 00428222-10 other party hereto is in default and, if the party is in default, stating the nature of the default; and (d) stating the date of this Lease. 33. SUBORDINATION, NON-DISTURBANCE AND ATTORNMENT. Tenant agrees that this Lease shall, at Landlord’s request, be subject and subordinate to any first mortgage or deed of trust hereafter placed upon the Demised Premises upon the condition that the mortgagee or holder of a deed of trust enter into a Subordination, Non-Disturbance and Attornment Agreement in a form mutually acceptable to Landlord, Tenant and the mortgagee or holder. 34. TENANT PROPERTY. All Tenant’s personal property, furniture, furnishings, signs, equipment, machinery, trade fixtures and trade uses located at the Demised Premises shall remain the property of Tenant and may be removed from the Demised Premises at any time. Landlord shall have no lien or other interest whatsoever in any such items and within ten (10) days following Tenant’s request, Landlord shall execute documents in reasonable form to evidence Landlord’s waiver of any right, title, lien, or interest in or to same. 35. INVALIDITY OF CERTAIN PROVISIONS. If any provisions of this Lease shall be invalid or unenforceable, the remainder of the provisions of this Lease shall not be affected and every other provision of this Lease shall be enforceable to the fullest extent permitted by law. 36. FORCE MAJEURE. If either party shall be prevented or delayed from punctually performing any obligation or satisfying any condition under this Lease by: (a) any strike, lockout, or labor dispute not caused by the negligence non-performing party or breach of a labor contract by the non-performing party; (b) the inability to obtain labor or materials not resulting in any way from the negligence or any act or omission of the non-performing party; (c) and Act of God; (d) governmental restrictions; regulations or controls not existing as of the date of this Lease; (e), enemy or hostile governmental action; (f) civil commotion, insurrection, sabotage, fire or other casualty not resulting from the non-performing party’s negligence or other actions; or, (g) any other condition beyond the reasonable control of the responsible party, then the time to perform the obligation or satisfy the condition shall be extended for a period of time equal in length to the length of the event. 37. GOVERNING LAW. This Lease shall be construed in accordance with the laws of the state Georgia, with venue being in Augusta-Richmond County, Georgia without giving regard to its conflict of laws. 38. SUBMISSION TO VENUE AND JURISDICTION. Any legal action or proceeding with respect to this Lease shall be brought in the appropriate federal or state court located in the state where the Demised Premises are located. By execution and delivery each party hereto accepts for itself and in respect of its property, generally and the jurisdiction of the above-reference courts. 39. CAPTIONS. All captions and headings are for convenience of reference only and in no way shall be used to construe or modify the provisions set forth in this Lease. Attachment number 5 \nPage 13 of 15 Item # 53 00428222-10 40. ENTIRE AGREEMENT. This Lease, its attachments, any duly executed amendments, the documents incorporated into the Lease by reference, any written agreements which are duly executed pursuant to the terms and provisions of this Lease, if any, and the CORE Agreement contain the entire agreement between the parties and there are no covenants, express or implied except as contained herein. No statement, promise or inducement made by either party or agent of either party that is not contained in this written agreement shall be valid or binding. No waiver of any condition or covenant of this Lease by either party shall be deemed to imply or constitute a further waiver of the same or any other condition or covenant of the Lease. During the term of this Lease, Article VI of the CORE Agreement shall be suspended, but said Article VI shall revive and remain in full force and effect upon any expiration of this Lease. 41. BINDING EFFECT. This Lease, as of the Effective Date, shall bind and inure to the benefit of the parties hereto, their heirs, successors, executors, administrators, and assigns. [EXECUTION ON FOLLOWING PAGE] Attachment number 5 \nPage 14 of 15 Item # 53 00428222-10 IN WITNESS WHEREOF, the parties hereto have executed this Lease under seal in multiple counterparts, each of original document, on the day and year first above written. Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) Augusta, Georgia By:________________________ Its Mayor Attest:______________________ Its Clerk of Commission (Seal) Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) Augusta Riverfront, LLC, a Georgia limited liability company By:________________________ Paul S. Simon As its President (Seal) Attachment number 5 \nPage 15 of 15 Item # 53 1 STATE OF GEORGIA COUNTY OF RICHMOND LIMITED WARRANTY DEED THIS INDENTURE, made this ___ day of ____________, 2011, by and between 933 BROAD INVESTMENT CO., LLC, a Georgia limited liability company, as party of the first part (herein called “Grantor”), and AUGUSTA, GEORGIA, a public body corporate and politic of the State of Georgia, as party of the second part (herein called “Grantee”) (the words “Grantor” and “Grantee” shall include their respective heirs, successors and assigns where the context requires or permits); W I T N E S S E T H: GRANTOR, for and in consideration of the sum of Ten and No/100 Dollars ($10.00) in hand paid at and before the sealing and delivery of these presents, the receipt whereof is hereby acknowledged, has granted, bargained, sold, aliened, conveyed and confirmed and by these presents does grant, bargain, sell, alien, convey and confirm unto said Grantee, all those property rights lying and being in Augusta, Richmond County, Georgia, and being more particularly described on Exhibit “A” attached hereto and by this reference made a part hereof, together with any and all improvements, and fixtures located thereon or attached thereto, and all rights, easements and benefits appurtenant thereto (hereinafter referred to as the “Property”), subject to current taxes and assessments not yet due and payable, all easements, rights of way, covenants, conditions, restrictions, and other matters of record, zoning ordinances, rights of tenants and parties in possession and any state of facts that would be disclosed by a current accurate survey of the Property ("Permitted Encumbrances"). TO HAVE AND TO HOLD the Property to the same being, belonging, or in anywise appertaining, to the only proper use, benefit and behoof of Grantee forever in FEE SIMPLE. AND Grantor shall and will warrant and forever defend by virtue of these presents, the Property unto Grantee against Grantor and all persons owning, holding or claiming by, through or under Grantor, except for claims arising under or by virtue of the Permitted Encumbrances. Attachment number 6 \nPage 1 of 3 Item # 53 2 EXECUTED under seal the day and year first above written. Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) 933 BROAD INVESTMENT CO., LLC, a Georgia limited liability company By:________________________ Paul S. Simon As its President (Seal) Attachment number 6 \nPage 2 of 3 Item # 53 3 Exhibit “A” The exclusive and perpetual right of possession and occupancy of, the exclusive and perpetual right to floor and to cover over and to build and construct over, in or upon the entire space or area situate at a height above a horizontal plane of 149.25 feet above mean sea level and below a horizontal plane of 199.25 feet above mean sea level as determined by reference to the United States Coast and Geodetic Survey Benchmark Elevation of 135.748 feet above mean sea level located at the Georgia Geodetic Monument #14-R-3 north 1,262,402.48, east 563,401.17 in the parkway on Greene Street between Fourth and Fifth Streets in the City of Augusta, Richmond County, Georgia, directly over and above the land described as follows: All that lot, tract or parcel of land situate, lying and being in Richmond County, Georgia, being depicted as “N/F 933 Broad Investment Co. LLC” containing 1.25 acres, more or less (the “Land”), on that certain Compiled Map of Proposed Reynolds Street Parking Deck for Augusta, Georgia by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated November 1, 2010, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____ (“Plat”). Reference is hereby made to said Plat for a more complete and accurate description as to the metes, bounds, courses, distances and location of said property. The above described air rights parcel is less and except and subject to the rights of others to the exclusive and perpetual possession and occupancy of, and the exclusive and perpetual right to, floor and cover over and build and construct over, in or upon the entire space or area situate at a height above a horizontal plane of 199.25 feet above mean sea level as determined by reference to the United States Coast and Geodetic Survey Benchmark Elevation of 135.748 feet above mean sea level located at the Georgia Geodetic Monument #14-R-3 north 1,262,402.48, east 563,401.17 in the parkway on Greene Street between Fourth and Fifth Streets in the City of Augusta, Richmond County, Georgia, directly over and above the land described above. The above described air rights parcel is less and except and subject to the rights of others to the exclusive and perpetual possession and occupancy of, and the exclusive and perpetual right to, floor and cover over and build and construct over, in or upon the entire space or area situate at a height below a horizontal plane of 149.25 feet above mean sea level as determined by reference to the United States Coast and Geodetic Survey Benchmark Elevation of 135.748 feet above mean sea level located at the Georgia Geodetic Monument #14-R-3 north 1,262,402.48, east 563,401.17 in the parkway on Greene Street between Fourth and Fifth Streets in the City of Augusta, Richmond County, Georgia, directly over and above the land described above. TOGETHER WITH a perpetual, non-exclusive access easement for vehicular and pedestrian access to the Property over all entrance driveway(s) and access ramp(s) currently existing on the Land, as such may be relocated from time to time. The easement granted herein shall continue so long as the parking facilities continue to exist. TOGETHER WITH a non-exclusive, perpetual easement for support for all columns, walls and other support structures located on the Land. The easement granted herein shall continue so long as the parking facilities continue to exist. Attachment number 6 \nPage 3 of 3 Item # 53 00468294-3 1 Prepared by and after recording, please return to: Seyfarth Shaw LLP 1075 Peachtree Street, N.E., Suite 2500 Atlanta, Georgia 30309 Attn: Lori H. Whitfield, Esq. Cross Reference to instruments recorded at: Deed Book 01019, Page 1326 Deed Book 01019, Page 1367 Deed Book 01041, Page 2155 Deed Book 01141, Page 2119 Deed Book 01019, Page 1440 Deed Book 01264, Page 1045 Richmond County, Georgia records STATE OF GEORGIA COUNTY OF RICHMOND QUITCLAIM DEED AND PARTIAL RELEASE THIS QUITCLAIM DEED AND PARTIAL RELEASE (this “Partial Release”) is effective as of this ___ day of _______________, 2012, between WELLS FARGO BANK, N.A., a national banking association, successor by merger to WACHOVIA BANK, NATIONAL ASSOCIATION (“Lender”), having a mailing address of 2030 Main Street, Suite 800, Irvine, California 92614, Attention: Kim Taylor, Loan Administrator, and 933 BROAD INVESTMENT CO, LLC, a Georgia limited liability company (“Guarantor”), with the mailing address of c/o Azalea Development, LLC, 725 Broad Street, Augusta, Georgia 30901, Attention: William S. Morris IV (“Lender” and “Guarantor” to include the plural as well as the singular, and heirs, legal representatives, successors and assigns, where the context so requires or admits). W I T N E S S E T H WHEREAS, Lender has made certain loans (the “Loans”) to Augusta Riverfront, LLC (“Borrower”), which Loans are unpaid and are currently evidenced by (i) that certain Promissory Note made by Borrower in the original principal amount of $78,500,000 dated September 27, 2005 and (ii) that certain Promissory Note made by Borrower in the original principal amount of $13,500,000 dated February 17, 2006 (collectively, the “Notes”). WHEREAS, Guarantor has guaranteed Borrower’s indebtedness and obligations under the Notes and the Loans pursuant to that certain Guaranty Agreement dated September 27, 2005 (as the same has been heretofore amended and reaffirmed, the “Guaranty”). WHEREAS, Guarantor has secured its obligations under the Guaranty with the following instruments: Attachment number 7 \nPage 1 of 4 Item # 53 00468294-3 2 (i) that Deed to Secure Debt, Assignment of Rents and Leases, and Security Agreement dated as of September 27, 2005 made by Guarantor for the benefit of Lender and recorded October 14, 2005 in Office of the Clerk of the Superior Court, Richmond County, Georgia (the “Official Records”) in Deed Book 01019, Page 1326, as the same has been modified and amended by that certain First Modification of Deed to Secure Debt, Security Agreement, Financing Statement and Fixture Filing, and First Modification of Assignment of Rents and Leases dated February 17, 2006 and recorded in the Official Records on March 2, 2006 in Deed Book 01041, Page 2155 (the “First Modification”), as further modified and amended by that certain Second Modification of Deed to Secure Debt, Security Agreement, Financing Statement and Fixture Filing, and Second Modification of Assignment of Rents and Leases dated August 23, 2007 and recorded in the Official Records on September 7, 2007 in Deed Book 01141, Page 2119 (the “Second Modification”; said deed to secure debt, as modified by the First Modification and the Second Modification is hereinafter collectively referred to as the “Security Deed”); (ii) that certain Assignment of Rents and Leases dated as of September 27, 2005 made by Guarantor for the benefit of Lender and recorded in the Official Records on October 14, 2005 in Deed Book 01019, Page 1367, as the same has been modified by the First Modification and Second Modification (said assignment of rents and leases as modified by the First Modification and the Second Modification is hereinafter collectively referred to as the “ALR”); and (iii) that UCC Financing Statement recorded in the Official Records on September 27, 2005, in Deed Book 01019, Page 1440, as continued by that UCC Financing Statement Amendment recorded in the Official Records on June 22, 2010, in Deed Book 01264, Page 1045 (as continued, the “UCC”). The foregoing documents, instruments and agreements, together will all other documents, instruments and agreements evidencing, securing or otherwise relating to the Loans, as any of same may have been amended, modified, supplemented, restated, extended, spread, renewed and/or consolidated, are hereinafter collectively referred to as the “Loan Documents”. WHEREAS, Lender is the current holder of the Loan Documents and all indebtedness secured thereby. WHEREAS, at Guarantor’s request, Lender has agreed to release the Release Parcel (as defined hereinbelow), BUT ONLY THE RELEASE PARCEL, from the lien, security interests, operation and effect created under and by virtue of the Loan Documents, and desires to evidence and confirm said agreement by executing and delivering this Partial Release. WHEREAS, except for the Release Parcel (which is being released from the lien of the Loan Documents), the Loans are outstanding and unpaid, the Loan Documents remain in full force and effect, with all property, land, easements, improvements, fixtures and personal property described in the Loan Documents (collectively, the “Mortgaged Property”) continuing to secure the Guaranty and the Loans and subject to the lien(s) of the Loan Documents. THIS IS ONLY A PARTIAL RELEASE OF LIEN AND RELEASES ONLY PART OF THE MORTGAGED PROPERTY COVERED BY THE LOAN DOCUMENTS. NOW THEREFORE, in consideration of the premises and TEN DOLLARS in-hand paid to Lender, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, Lender does hereby remise, release, quitclaim and set over unto Guarantor and its heirs, successors and assigns forever the following property (the “Release Parcel”): Attachment number 7 \nPage 2 of 4 Item # 53 00468294-3 3 The exclusive and perpetual possession and occupancy of, and the exclusive and perpetual right to, floor and cover over and build and construct over, in or upon the entire space or area situate at a height above a horizontal plane of 151.05 feet above mean sea level and below a horizontal plane of 216.10 feet above mean sea level as determined by reference to the United States Coast and Geodetic Survey Benchmark Elevation of 134.948 feet above mean sea level located at the Georgia Geodetic Monument #14-R-3 north 1,262,402.48, east 563,401.17 in the parkway on Greene Street between Fourth and Fifth Streets in the City of Augusta, Richmond County, Georgia, directly over and above the land described as follows: All that lot, tract or parcel of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 3” containing 0.83 acre, more or less, on that certain plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. Portion of TMP Nos. 037-3-066-01-0; 037-3-066-00-0; 037-3-177-00-0; 037-3-069-00-0; and 037-3- 070-00-0. but only the Release Parcel, together with all hereditaments and appurtenances thereunto belonging, and all right, title and interest of Lender in and to the same, BUT WITHOUT, HOWEVER, in any manner releasing or relinquishing the lien, security interests, operation or effect of the Loan Documents on the Mortgaged Property (other than the Release Parcel) and all other property, land, easements, improvements, fixtures and personal property described therein. THIS IS A PARTIAL RELEASE OF LIEN, and except for the Release Parcel, the liens and obligations of the Loan Documents continue in full force and effect on the Mortgaged Property as described in the Loan Documents. Lender reaffirms, and by its acceptance hereof Guarantor reaffirms, that the indebtedness under the Loan Documents has not been paid and remains outstanding and ratify and affirm the liens held by Lender under the Loan Documents (other than for the Release Parcel, which is released by this Partial Release). All terms covenants, conditions and provisions of the Partial Release are binding upon Lender and its heirs, legal representatives, successors and assigns, and all other parties in interest. This Partial Release is governed by, and shall be construed and enforced in accordance with, the laws of the State of Georgia. TO HAVE AND TO HOLD the Release Parcel to Guarantor, so that neither Lender nor any person or persons claiming under Lender, shall at any time, by any means or ways, have, claim or demand any right to title to the Property or its appurtenances. [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK; SIGNATURE PAGE FOLLOWS] Attachment number 7 \nPage 3 of 4 Item # 53 00468294-3 4 IN WITNESS WHEREOF, Lender has executed this instrument the day and year first above written. Signed, sealed and delivered in the presence of: Unofficial Witness Notary Public My Commission Expires: [Notarial Seal] Lender: WELLS FARGO BANK, N.A., a national banking association, successor by merger to WACHOVIA BANK, NATIONAL ASSOCIATION By: ______________________________ Name: Brandon Cox Title: Senior Vice President [BANK SEAL] Attachment number 7 \nPage 4 of 4 Item # 53 1 00467896-6 Seyfarth Shaw Revision 6/3/12 Version 6 ___________________________________________________________________________________ Space above this line for recorder’s use DEED WITH RESERVATION OF EASEMENTS AND OTHER RIGHTS THIS INDENTURE (this “Deed”), made this ___ day of ____________, 2012, by and between 933 BROAD INVESTMENT CO, LLC, a Georgia limited liability company, as party of the first part (herein called “Developer”), and AUGUSTA, GEORGIA LAND BANK AUTHORITY, as party of the second part (herein called the “Authority”) (the words “Developer” and “Authority” shall include their respective heirs, successors and assigns where the context requires or permits); W I T N E S S E T H: DEVELOPER, for and in consideration of the sum of Ten and No/100 Dollars ($10.00) in hand paid at and before the sealing and delivery of these presents, the receipt whereof is hereby acknowledged, has granted, bargained, sold, aliened, conveyed and confirmed and by these presents does grant, bargain, sell, alien, convey and confirm unto the Authority, all that tract and parcel of land being in Augusta, Richmond County, Georgia, and being more particularly described on Exhibit “A” attached hereto and by this reference made a part hereof (hereinafter referred to as the “Property”), subject to current taxes and assessments not yet due and payable, that certain Deed to Secure Debt, Assignment of Rents and Leases, and Security Agreement from Developer to Wachovia Bank, N.A., dated September 27, 2005 and recorded in the real estate records of Richmond County, Georgia at Book 01019, Page 1326, as the same has been amended, and that certain Assignment of Rents and Leases from Developer to Wachovia Bank, N.A. dated September 27, 2005 and recorded in the real estate records of Richmond County, Georgia at Book 01019, Page 1367, as the same has been amended, all easements, rights of way, covenants, conditions, restrictions, and other matters of record, zoning ordinances, rights of tenants and parties in possession, that certain Reynolds Street Parking Deck Construction, Operating, and Reciprocal Easement Agreement (the “CORE Agreement”) of even date, the easements and rights reserved herein, and any state of facts that would be disclosed by a current accurate survey of the Property (“Permitted Encumbrances”). TO HAVE AND TO HOLD the Property to the same being, belonging, or in anywise appertaining, to the only proper use, benefit and behoof of the Authority forever in FEE SIMPLE. Attachment number 8 \nPage 1 of 7 Item # 53 2 00467896-6 EXECUTED under seal the day and year first above written. Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) 933 BROAD INVESTMENT CO, LLC, a Georgia limited liability company By:________________________ Paul S. Simon As its President (Seal) Attachment number 8 \nPage 2 of 7 Item # 53 3 00467896-6 The Authority accepts this Deed and agrees to the easements, rights, terms and conditions contained in this Deed under seal the day and year first above written. Signed, sealed and delivered in the presence of: ________________________ Unofficial Witness ________________________ Notary Public (Notary Seal) Augusta, Georgia Land Bank Authority By:________________________ As its Chairman Attest:______________________ As its Land Bank Coordinator (Seal) Attachment number 8 \nPage 3 of 7 Item # 53 4 00467896-6 Exhibit “A” All that lot, tract or parcel of land (the “Land”) situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 3” containing 0.83 acre, more or less, on that certain plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____ (“Plat”). LESS AND EXCEPT and subject to the rights of others to exclusive and perpetual right of possession and occupancy of, the exclusive and perpetual right to floor and to cover over and to build and construct over, in or upon the entire space or area situate at a height above a horizontal plane of 151.05 feet above mean sea level and below a horizontal plane of 216.10 feet above mean sea level as determined by reference to the United States Coast and Geodetic Survey Benchmark Elevation of 134.948 feet above mean sea level located at the Georgia Geodetic Monument #14-R-3 north 1,262,402.48, east 563,401.17 in the parkway on Greene Street between Fourth and Fifth Streets in the City of Augusta, Richmond County, Georgia, directly over and above the Land. Said air rights parcel was conveyed to Augusta, Georgia by deed of Grantor of even date and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia, prior to the recordation of this Deed (the “City Air Rights Property”). LESS AND EXCEPT and subject to the rights of others to the exclusive and perpetual possession and occupancy of, and the exclusive and perpetual right to, floor and cover over and build and construct over, in or upon the entire space or area situate at a height above a horizontal plane of 216.10 feet above mean sea level as determined by reference to the United States Coast and Geodetic Survey Benchmark Elevation of 134.948 feet above mean sea level located at the Georgia Geodetic Monument #14-R-3 north 1,262,402.48, east 563,401.17 in the parkway on Greene Street between Fourth and Fifth Streets in the City of Augusta, Richmond County, Georgia, directly over and above the Land. Title to said air rights parcel is hereby reserved to Grantor. Portion of TMP Nos. 037-3-066-01-0; 037-3-066-00-0; 037-3-177-00-0; 037-3-069-00-0; and 037-3- 070-00-0. SUBJECT TO AND RESERVING THEREFROM THE FOLLOWING EASEMENTS AND RIGHTS: Easements Reserved in Favor of Developer. The parties intend that Developer, as the owner of the land described in Exhibit “B” hereto (the “Developer Property”), retains, at no rental or other charge, the perpetual right of possession, use and occupancy of the Property in the broadest sense for parking, access, commercial and residential use and occupancy, and all other lawful purposes, subject only to the agreements and restrictions set forth in the CORE Agreement. Accordingly, Developer reserves easements in perpetuity for the use and benefit of the owner of the Developer Property over all portions of the Property, subject to the CORE Agreement, for (i) the parking of passenger and commercial vehicles on all parking spaces now or hereafter located on the Property, on an exclusive basis; (ii) pedestrian and vehicular ingress and egress to and from the public streets and sidewalks over all portions of the Property; (iii) the possession, use, and occupancy of the Property; (iv) the re-configuration, demolition of improvements, erection of new improvements, modification, construction, use, occupancy, leasing, operation, and maintenance of retail or office space or any other type of commercial or residential use not prohibited by law; (v) the construction, use, repair, and Attachment number 8 \nPage 4 of 7 Item # 53 5 00467896-6 maintenance of footings, supports and utility lines (electric, communication, water, sewer, storm water, and gas, to the extent now or hereafter desirable by Developer); (vi) all other uses of the Property not prohibited by law; and (vii) all rights, benefits and easements of Developer under the CORE Agreement. Neither the Authority nor any person or entity acting through the Authority shall enter into or make any use of the Property or any portion thereof in a manner that would impact or interfere with Developer’s, or any successor owner of the Developer Property, exercise of its rights and easements reserved in this Deed, without the express and prior written consent of Developer. Developer shall not be required to obtain any consent of the Authority or provide any notice to the Authority prior to the exercise of its rights reserved in this Deed. The foregoing rights and easements shall run with the land for the benefit of the owner of the Developer Property and burden the Property, such being intended to be rights and easements appurtenant to the Developer Property and not in gross. Binding Effect; Etc. Developer, or any successor owner of the Developer Property, shall have the right to extend to its tenants, customers, business guests and invitees the benefit of the rights and easements established in this Deed, but no such tenant, customer, business guest or invitee shall by virtue thereof be deemed to have acquired any interest whatsoever in the Property or any part thereof. The benefits and burdens of the easements and restrictions created in this Deed shall run with the land and shall be binding upon and inure to the benefit of the owners of all interests in the Property (and all subdivided portions thereof) and the Developer Property and their respective heirs, executors, successors-in-title, tenants, and assigns, and all those holding under any of them. The easements, restrictions and obligations contained in this Deed shall be unaffected by any change in the ownership of any property covered by this Deed or the Developer Property or by any change of use, demolition, reconstruction, expansion or other circumstances, except as specified in this Deed. Each of the rights created hereunder may be enforceable in a court of equity by the owner of any property covered by this Deed. It is the express intent of the parties hereto that the easements reserved in this Deed shall not, at any time, merge by operation of law into any owner’s title or interest in any parcel, but that the easements reserved in this Deed shall remain separate and distinct rights and estates in land unless the owner(s) of all affected parcels specifically evidence their intent by mutual agreement in writing to extinguish any such easement. It is further expressly provided that the acquisition hereafter by any other party (including, without limitation, a present or future mortgagee of any parcel or any portion thereof) of an ownership interest (in fee, leasehold, or otherwise) shall not operate, by merger or otherwise, to extinguish, diminish, impair, or otherwise affect any easement granted herein, which easements shall remain separate and distinct estates in land. Developer shall have the right to encumber, pledge, mortgage, grant security title to, grant a security interest in, convey, transfer, assign, and subdivide and convey to one or multiple parties, all or any portion of the easements and rights reserved in this Deed. Perpetual Easements. The easements reserved in this Deed shall continue in perpetuity. The parties expressly acknowledge and agree that the purpose of this Deed is the reservation and establishment of the easements, rights and privileges set forth herein, and none of the terms or provisions of this Deed shall be or be deemed to be “covenants restricting land to certain uses” for purposes of O.C.G.A. § 44-5-60, or any similar law or statute, and each party (knowingly, willingly and upon the advice of legal counsel) expressly forever waives, releases and discharges any right that either party now has or ever may have to claim or assert in any legal or other circumstances that any of the easements or other terms or provisions of this Deed are in any way covered or limited by said section or any similar law or statute. Option to Re-Acquire the Property. In the event Augusta, Georgia fails to rebuild after damage to the parking deck located on the City Air Rights Property, above the Property and the CORE Agreement terminates pursuant to Section 5.3 thereof, Developer, together with its successors and assigns as owners of the Developer Property, shall have a perpetual option to acquire fee simple title to the Property for its fair market value, as Attachment number 8 \nPage 5 of 7 Item # 53 6 00467896-6 determined by an appraisal complying with the laws of Georgia with respect to the sale of government owned property and taking into account the diminution in value of the Property on account of the easements reserved by Developer in this Deed. In the event Developer exercises its option to acquire the Property, the Authority shall reasonably cooperate with Developer in obtaining such appraisal and all necessary approvals for such conveyance of the Property to Developer. Furthermore, Developer, for itself and its successors and assigns as owners of the Developer Property, reserves for itself and its successors and assigns, and expressly does not transfer to the Authority, the option to acquire the City Air Rights Property after a casualty pursuant to Section 5.3 of the CORE Agreement. Amendment and Waiver. No amendment of any provision of this Deed shall be valid unless the same shall be in writing and signed by Developer and the Authority (or their successors in title to the Property) and duly indexed and recorded in the Office of the Clerk of Superior Court of Augusta, Richmond County, Georgia. No waiver by any party of any provision of this Deed, whether intentional or not, shall be valid unless the same shall be in writing and signed by the party making such waiver nor shall such waiver be deemed to extend to any subsequent default, misrepresentation, or breach of warranty or covenant under this Deed or affect in any way any rights arising by virtue of any prior or subsequent such occurrence. Attachment number 8 \nPage 6 of 7 Item # 53 7 00467896-6 Exhibit “B” “Developer Property” All that lot, tract or parcel of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 3” containing 0.83 acre, more or less, on that certain Plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. AND All those lots, tracts, or parcels of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 4” containing 0.41 acre, more or less, and “Tract 4A” containing 0.01 acre, more or less, on that certain Plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. LESS AND EXCEPT: The exclusive and perpetual right of possession and occupancy of, the exclusive and perpetual right to floor and to cover over and to build and construct over, in or upon the entire space or area situate at a height above a horizontal plane of 151.05 feet above mean sea level and below a horizontal plane of 216.10 feet above mean sea level as determined by reference to the United States Coast and Geodetic Survey Benchmark Elevation of 134.948 feet above mean sea level located at the Georgia Geodetic Monument #14-R-3 north 1,262,402.48, east 563,401.17 in the parkway on Greene Street between Fourth and Fifth Streets in the City of Augusta, Richmond County, Georgia, directly over and above the land described as follows: All that lot, tract or parcel of land situate, lying and being in the 87th G.M.D, Augusta, Richmond County, Georgia, being depicted as “Tract 3” containing 0.83 acre, more or less, on that certain Plat of the Reynolds Street Parking Deck for Augusta, Georgia; 933 Broad Investment Co., LLC; and Augusta, Georgia Land Bank Authority by John Thomas Attaway, GA RLS No. 2512, of Cranston Engineering Group, P.C., dated February 2, 2012, and recorded in the Office of the Clerk of Superior Court of Richmond County, Georgia in Plat Cabinet ___, Slide _____ # ____. Attachment number 8 \nPage 7 of 7 Item # 53 Attachment number 9 \nPage 1 of 6 Item # 53 Attachment number 9 \nPage 2 of 6 Item # 53 Attachment number 9 \nPage 3 of 6 Item # 53 Attachment number 9 \nPage 4 of 6 Item # 53 Attachment number 9 \nPage 5 of 6 Item # 53 Attachment number 9 \nPage 6 of 6 Item # 53 Commission Meeting Agenda 8/7/2012 5:00 PM Affidavit Department:Clerk of Commission Caption:Motion to authorize execution by the Mayor of the affidavit of compliance with Georgia's Open Meeting Act. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Cover Memo Item # 54