Loading...
HomeMy WebLinkAbout2010-10-05-Meeting Agenda Commission Meeting Agenda Commission Chamber 10/5/2010 5:00 PM INVOCATION: Dr. Dwayne Carter, Pastor Calvary Baptist Church PLEDGE OF ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA. Five (5) minute time limit per delegation DELEGATIONS A. Dr. Adam Hoover. RE: Public safety and drug dealing on Telfair Street. Attachments B. Mr. Evans Harris. RE: The need to revitalize neighborhoods to help prevent criminal behavior e.g. drug dealers and prostitution. Attachments C. Trustee of Richmond Academy to discuss renovation of Old Academy Building. (Requested by Commissioner Don Grantham) Attachments D. Ms. Sallie Rueggeberg. RE: Damage to property located at 102-104 Third Street. Attachments CONSENT AGENDA (Items 1-14) PUBLIC SERVICES 1. Motion to approve a change order with Alpha Construction in the amount of $178,541.00. (Approved by Public Services Committee September 27, 2010) Attachments 2. Motion to approve Janitorial Contract Services bid for the Augusta Regional Airport. (Approved by Public Services Committee September 27, 2010) Attachments ADMINISTRATIVE SERVICES 3. Motion to approve the filing of three (3) environmentally related grants/services: Brownfield Community-Wide Assessment Grant for Hazardous Substances and Petroleum, EPA Clean Up Grant and the Targeted Brownfield Assessment Program through the Environmental Protection Agency. (Approved by Administrative Services Committee September 27, 2010) Attachments 4. Motion to approve an Ordinance to amend the Augusta, Georgia Code Article Twelve, Sections 3-5-92 through 3-5-95.1 relating to parking violations and enforcement; to add new Sections 3-5-95.2 through 3-5-95.24; to allow the Downtown Development Authority to enforce parking violations and use collected funds for revitalization in Downtown Augusta; to repeal all Ordinances and parts of Ordinances in conflict herewith; to provide an effective date and for other purposes. (Approved by Administrative Services Committee September 13 & 27, 2010) Attachments PUBLIC SAFETY 5. Motion to approve the purchase of NetMotion Software for mobile connectivity. (Approved by Public Safety Committee September 27, 2010) Attachments 6. Motion to approve Contract with New World Systems, Inc. for the New World Field Reporting Software Product. (Approved by Public Safety Committee September 27, 2010) Attachments 7. Motion to approve Purchase of Services Grant #JB-08ST-0002 for Juvenile Offenders. (Approved by Public Safety Committee September 27, 2010) Attachments ENGINEERING SERVICES 8. Motion to approve a resolution creating street lighting districts. (Approved by Engineering Services Committee September 27, 2010) Attachments 9. Motion to approve Indemnity/Hold Harmless Agreement and Mowing and Maintenance Agreement for Doug Barnard Parkway. (Approved by Engineering Services Committee September 27, 2010) Attachments 10. Motion to approve Local Administered Project (Lap) Certification Agreement between Augusta-Richmond County and Georgia Department of Transportation (GDOT) as requested by AED. (Approved by Engineering Services Committee September 27, 2010) Attachments 11. Motion to authorize condemnation to acquire title of property for right of way for the Belair Hills Subdivision Project, (Parcel 134-0-004-00-0) 3968 Scott Street. (Approved by Engineering Services Committee September 27, 2010) Attachments 12. Motion to approve installation of streetlights along Walton Way between 8th Street and 10th Street. Installation will be performed by Georgia Power as requested by Traffic Engineering .(Approved by Engineering Services Committee September 27, 2010) Attachments 13. Motion to approve Capital Project Budget number 324-041110-201824333 and Supplemental Agreement Number One to Cranston Engineering Group, PC, in the amount of $25,345.00 to provide detailed modeling analysis for the Wrightsboro Road Widening, Phase I project. Funding is available in the project engineering account for the Engineering Department. (Approved by Engineering Services Committee September 27, 2010) Attachments PETITIONS AND COMMUNICATIONS 14. Motion to approve the minutes of the regular meeting of the Commission held September 21st, and legal meeting held September 27, 2010. Attachments ****END CONSENT AGENDA**** AUGUSTA COMMISSION 10/5/2010 AUGUSTA COMMISSION REGULAR AGENDA 10/5/2010 (Items 15-23) PLANNING 15. Z-10-50 - A request for concurrence with the Augusta Richmond County Planning Commission to approve a petition by Ramonica M. Luke requesting a Special Exception to establish a Family Personal Care Home per Section 26-1- (H) of the Comprehensive Zoning Ordinance for Augusta-Richmond County affecting property containing .23 acres and known as 1613 Fairwood Drive. (Tax Map 041-4-164-00-0) DISTRICT 3(No action vote by the Augusta Commission September 21, 2010) (Requested by the Augusta Law Departmen) Attachments PUBLIC SERVICES 16. Motion to approve changes to RFP specifications for Augusta Municipal Golf Course. (No recommendation from Public Services Committee September 27, 2010) Attachments 17. Motion to approve amendment to grant award agreement to modify the scope of services of the grant award to include a handicapped accessible parking area. Attachments ADMINISTRATIVE SERVICES 18. Motion to approve the renewal of the lease agreement between Augusta, Ga. and the Department of the Navy (Naval and Marine Corps Reserve Center) for a term July 1, 2010 to June 30, 2011. Attachments FINANCE 19. Approve request from the Augusta Regional Airport at Bush Field to purchase one (1) runway sweeper. Attachments 20. Consider a request from Ms. Carol Nimmons regarding a reduction in the amount of her property taxes for this year. Attachments 21. Motion to approve an ordinance for reallocation of Hotel/Motel tax and car rental fees. (Requested by Commisioner Don Grantham) Attachments 22. Motion to approve an Ordinance to amend the Augusta, Georgia Code Article Twelve, Sections 3-5-92 through 3-5-95.1 relating to parking violations and enforcement; to add new Sections 3-5-95.2 through 3-5-95.24; to allow the Downtown Development Authority to enforce parking violations and use collected funds for revitalization in Augusta; to repeal all Ordinances and parts of Ordinances in conflict herewith; to provide an effective date and for other purposes. (Approved by Administrative Services Committee September 13, 2010) Attachments LEGAL MEETING A. Pending and Potential Litigation. B. Real Estate. C. Personnel. 23. Motion to authorize execution by the Mayor of the affidavit of compliance with Georgia's Open Meeting Act. Upcoming Meetings www.augustaga.gov Commission Meeting Agenda 10/5/2010 5:00 PM Invocation Department:Clerk of Commission Caption:Dr. Dwayne Carter, Pastor Calvary Baptist Church Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Commission Meeting Agenda 10/5/2010 5:00 PM Adam Hoover Department: Caption:Dr. Adam Hoover. RE: Public safety and drug dealing on Telfair Street. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Commission Meeting Agenda 10/5/2010 5:00 PM Evans Harris Department: Caption:Mr. Evans Harris. RE: The need to revitalize neighborhoods to help prevent criminal behavior e.g. drug dealers and prostitution. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Commission Meeting Agenda 10/5/2010 5:00 PM Old Academy Building Department: Caption:Trustee of Richmond Academy to discuss renovation of Old Academy Building. (Requested by Commissioner Don Grantham) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Commission Meeting Agenda 10/5/2010 5:00 PM Sallie Rueggeberg Department: Caption:Ms. Sallie Rueggeberg. RE: Damage to property located at 102-104 Third Street. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Commission Meeting Agenda 10/5/2010 5:00 PM Planning Commission Department:Planning Commission Caption: Z-10-50 - A request for concurrence with the Augusta Richmond County Planning Commission to approve a petition by Ramonica M. Luke requesting a Special Exception to establish a Family Personal Care Home per Section 26-1- (H) of the Comprehensive Zoning Ordinance for Augusta- Richmond County affecting property containing .23 acres and known as 1613 Fairwood Drive. (Tax Map 041-4-164-00-0) DISTRICT 3(No action vote by the Augusta Commission September 21, 2010) (Requested by the Augusta Law Departmen) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Commission Meeting Agenda 10/5/2010 5:00 PM Augusta Municipal Golf Course - RFP Department:Recreation and Parks Caption:Motion to approve changes to RFP specifications for Augusta Municipal Golf Course. (No recommendation from Public Services Committee September 27, 2010) Background:The current language for section 3.3 of the Special Conditions is as follows: Contractor must be licensed in the State of Georgia or by the Governmental entity for which they do the majority of their business. The recommendation is to add ", or must acquire a business license within ten (10) business days after receipt of executed lease of the golf course from Augusta, GA." Also, the current language for section G of specifications regarding term of lease is "The term of the lease will be five years with an option to renew for five years additional years if accepted by both parties". The recommendation is to change this to "The term of the lease will be a minimum of five years, maximum of ten years, with a five year option to renew if accepted by both parties." Analysis:These changes should enhance the chance of the city receiving proposals for the potential operation of the golf course. Financial Impact:N/A Alternatives:Leave the specifications the same. Recommendation:To approve Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Commission Meeting Agenda 10/5/2010 5:00 PM Bob Baurle Boat Ramp Project Department:Tom F. Beck, Director, Recreation and Parks Department Caption:Motion to approve a change order with Alpha Construction in the amount of $178,541.00. (Approved by Public Services Committee September 27, 2010) Background:On May 18, 2010 the Augusta Commission approved a construction contract with Alpha Construction Company for the Bob Baurle Boat Landing Improvement Project, a joint effort between the City of Augusta and the Georgia Department of Natural Resources and is designated as a GO FISH Georgia Tournament Ramp Site. Analysis:The project scheduled at Baurle Boat Ramp is a 50%-50% matching grant. Initially the City obligated in-kind services to provide certain elements of site work required. After further evaluation and concurrence with staff support and the engineers, a consensus was reached that the most efficient and effective manner to address the majority of the major site work required would be to allow the contractor to submit a change to his scope of work that would provide better continuity for the project and to expedite the construction schedule.(See Attached) Financial Impact:Funding is available to cover the amount of the change order requested. Alternatives:1. To approve the change order requested. 2. Move no action thus delaying the work required in order to complete this project in an efficient and timely manner. Recommendation:1. To approve a change oreder to Alpha Construction for $178,541.00 Funds are Available in the Following Accounts:324041110-2010824041 $100,000 272061110 $ 65,541 272061493 $ 13,000 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 3 Attachment number 1Page 2 of 3 Attachment number 1Page 3 of 3 Commission Meeting Agenda 10/5/2010 5:00 PM Butler Creek Nature Corridor Lombard Mill Department: Caption:Motion to approve amendment to grant award agreement to modify the scope of services of the grant award to include a handicapped accessible parking area. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 2 Attachment number 1Page 2 of 2 Commission Meeting Agenda 10/5/2010 5:00 PM Janitorial Contract Services - Augusta Regional Airport Department:Augusta Regional Airport Caption:Motion to approve Janitorial Contract Services bid for the Augusta Regional Airport. (Approved by Public Services Committee September 27, 2010) Background:The Augusta Aviation Commission has agreed to outsource all Custodial/Janitorial Services at the Augusta Regional Airport. The Commission directed a public bid in May 2010, and the Procurement Department opened those bids on June 18, 2010. Analysis:The attached bid tabulation and analysis catalogued 12 submittals with six being certified as responsive. The low bid was submitted by ABM/Southern Management Janitorial of Columbia, SC in the amount of $1,803.78 per week. Financial Impact:Annual cost of services utilizing the low bid will be $93,796.56 per year plus the cost of expendables such as soap, paper towels, etc. Expendables history calls for about $15,000.00 per year and is already contained in the airports budget. Current fiscal year costs for internal Airport Employee labor is $ 233,400 realizing a net savings of $ 139,603 for the Airport Enterprise Fund. Alternatives:Continue service with County Employees. Recommendation:The Augusta Aviation Commission recommends award of contract to the low bid ABM/Southern Management of Columbia, SC in the amount of $93,796.56. Funds are Available in the Following Accounts:551081109/5239110 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo CONTRACT FOR CUSTODIAL SERVICES By and Between AUGUSTA-RICHMOND COUNTY, GEORGIA FOR THE AUGUSTA REGIONAL AIRPORT AND ABM-SOUTHERN MANAGEMENT JANITORIAL SERVICES, INC. Attachment number 1Page 1 of 33 Page 2 of 33 Contract for Custodial Services This Contract for Facilities Services (hereinafter designated as the "Contract") made and entered into as of __________________2010, by and between Augusta-Richmond County, Georgia (hereinafter designated as “the City”) for the AUGUSTA REGIONAL AIRPORT, (hereinafter designated as "ARA”) and ABM-Southern Management Janitorial Services, Inc., (hereinafter designated as “Contractor”). WITNESSETH: WHEREAS, the City is the owner and operator of a full service commercial airport known as the Augusta Regional Airport; WHEREAS, the City has solicited a bid for Contract Custodial Services for the ARA, and Contractor has submitted a Bid for said services which was accepted by the City on behalf of the ARA; NOW, THEREFORE, in consideration of the mutual covenants, promises, and agreements herein contained, the City and Contractor hereby agree as follows: The Services of the Contractor shall be in accordance with the scope of services and all provisions provided herein. SECTION I GENERAL CONDITIONS ARTICLE I DEFINITIONS In addition to the terms that may be defined in the Bid document, the following terms have the following meanings whenever used in the Contract Documents (defined below), or in related documents, the terms or pronouns used in place of them shall be defined as follows: 1. ARA – Augusta Regional Airport 2. Administrator - The person authorized by the ARA to administer the Contract. 3. Aviation Commission- the Commissioners tasked with the overall administration of the Airport. 4. Aviation Director- the person tasked with the day to day operations of the ARA. 5. Augusta-Richmond County or City- the Augusta-Richmond County Commission 6. Change Order - A written order initiated by the Administrator directing the Contractor to perform changes, additions, or deletions in the work. 7. Contract Coordinator - Persons designated by the Administrator who shall coordinate the activities of the Contractor at the facilities 8. Contractor – ABM-Southern Management, Janitorial Services, Inc.; the individual, partnership, or corporation who enters into a Contract with the City for the services as described in the General Conditions and the Performance Work Statement. Attachment number 1Page 2 of 33 Page 3 of 33 Contract for Custodial Services 9. Contract Documents – The Bid, Form of Contract, General Conditions; Special Conditions, Performance Work Statement; Contractor’s Technical and Cost inclusive, together with all addenda, supplemental change orders, required exhibits, and schedules. 10. Contract - The written agreement between the City and the Contractor for the performance of the work in accordance with the requirements of the Contract Documents. 11. General Manager - The person authorized by the Contractor to act fully on behalf of the Contractor in administering this Contract. 12. Performance Work Statement – The documents which describe the manner of performing the work, including detailed technical requirements as to labor, materials, equipment, and methods by which such work is to be performed, and describing the relations between the City and the Contractor. 13. Project Work - As specified in the Performance Work Statement. 14. Routine Work - As specified in the Performance Work Statement. 15. Subcontractor - Any individual, partnership, or corporation who is contractually bound to the Contractor to perform a specific portion of the total work package under this Contract which is limited to special projects approved by the Administrator. 16. Term - That period of time beginning from the date of execution of the agreement and one year from that date or any extensions thereof. ARTICLE II INDEPENDENT CONTRACTOR/SUBCONTRCTOR Contractor is acting, in performance of this Contract, as an independent contractor. Personnel supplied by the Contractor or its agents or subcontractors hereunder are not ARA’s employees or agents and Contractor assumes full responsibility for their acts. Contractor shall be solely responsible for the payment of compensation to Contractor's employees. Neither the City or ARA shall be responsible for payment of worker's compensation, disability benefits, and unemployment insurance or for withholding and paying employment taxes for any Contractor employee, or Contractor's subcontractors or agent's employees, but such responsibility shall be solely that of Contractor. This clause of the agreement does not prevent ARA from requiring Contractor to have its employees follow normal rules and guidelines for work performance, redirecting the efforts of the employees to meet the needs of the facilities, performing safety or from requiring Contractor to perform the requirements of this Contract satisfactorily, according to the General Conditions and Performance Work Statement. ARTICLE III CONTRACTOR'S PERFORMANCE A. Contractor shall, at its own expense, furnish all necessary management, supervision, labor, technical support and other accessories and services for the cleaning of the facilities and performance of other services as described in the Contract Documents. Such services shall be performed in strict accordance with the terms included herein, including the General Conditions and Performance Work Statement. B. All performance shall be subject to inspection and approval by the Administrator, or its designee, as provided in said Performance Work Statement. If the Contractor's performance is, or becomes Attachment number 1Page 3 of 33 Page 4 of 33 Contract for Custodial Services unsatisfactory, as determined by the Administrator, an appropriate reduction in approved hours or payment due will be made from Contractor's invoice and Contractor will be directed to provide adequate personnel, or otherwise correct the unsatisfactory performance. The correction of unsatisfactory performance shall be at no additional cost to ARA. C. The General Conditions and/or the Performance Work Statement may be amended from time to time, as deemed necessary by the Administrator, by written communication to the Contractor, and shall have the same effect as if fully written herein; such changes may include, but shall not be limited to increases or decreases in labor-hours, changes in work procedures, or changes in shift times. D. In the event an amendment to the General Conditions and/or the Performance Work Statement changes the labor-hours required for Routine Work, the approved Labor Hours shall be increased or decreased as appropriate. Any changes will require the execution of a Change Order by the parties. ARTICLE IV AUTHORIZED REPRESENTATIVES A. CITY/ARA’S REPRESENTATIVE ARA’S Representative shall be Gary LeTellier, Aviation Director or his designee. B. CONTRACTOR’S REPRESENTATIVE(S) Contractor must designate in writing a person(s) acceptable to ARA to serve as its representative ("Contractor’s Representative”) in all dealings with ARA. The Contractor’s Representative will be Milton Smith, Operations Manager. Contractor’s Representative may be changed upon prior written notice delivered to ARA’s Representative. ARTICLE V PATENT INDEMNITY Except as otherwise provided, the Contractor agrees to indemnify the City and its Board of Commissioners, officers, agents and employees against liability, including costs and expenses for infringement upon any letters or patent of the United States arising out of the performance of this Contract or out of the use or disposal by or for the account of the City of supplies furnished or construction work performed hereunder. ARTICLE VI CHANGES The City may, during the Contract period, make changes to the Scope of Work, which may result in changes to the general scope of the Contract and its provisions. Written agreements, changes, or amendments to this Contract shall not be binding upon the City unless signed by the Aviation Commission. Attachment number 1Page 4 of 33 Page 5 of 33 Contract for Custodial Services ARTICLE VII TERM The term of this Contract shall commence on the date on the Notice to Proceed, and shall continue for a period of one (1) year from that date, unless terminated by ARA as provided in paragraph hereof. The Contract may be renewed for one additional year at the sole option of the City. The City shall notify the Contractor at least ninety (90) days prior to the expiration date of its intent to renew this Contract. ARTICLE VIII TERMINATION A. The City may, at its sole option, terminate the Contract with or without cause at any time upon thirty (30) days written notice by certified mail to the Contractor without prejudice to any other right or remedy it may have. B. This Contract shall terminate immediately upon written notice by the City or ARA upon the occurrence of any of the following circumstances: 1. If, with or without the Contractor’s consent, a receiver, liquidator, trustee or similar administrator is appointed to take charge of all, or substantially all, of its assets; 2. If either the Contractor is adjudged, or becomes bankrupt or insolvent, is unable to pay its debts as they become due, or makes an assignment for the benefit of its creditors; 3. Of any judicial proceedings are commenced by or on behalf of the Contractor pursuant to any bankruptcy, insolvency or debtor relief law; 4. If the Contractor voluntarily or involuntarily undertakes to dissolve or wind-up its affairs. C. The City shall be the sole judge of non-performance, which shall include any failure on the part of Contractor to accept the award, to furnish required documents, and/or to fulfill any portion of this Contract within the time stipulated or within thirty (30) days, whichever is earlier. D. Upon failure of Contractor to perform any of its obligations hereunder and its failure to cure the default within ten (10) days after notice thereof, ARA may, at its option, terminate this Agreement and or pursue any other remedy at law or in equity. All such remedies are cumulative and may be exercised concurrently or separately. Contractor shall pay ARA all costs and expenses, including attorney’ s fees, incurred by ARA in exercising any of its rights or remedies hereunder or enforcing any of the terms, conditions, or provisions hereof. E. Notice of elective termination pursuant to sub-sections and of this paragraph shall be deemed effective on the third business day after the postmark date of the certified mail notice. Attachment number 1Page 5 of 33 Page 6 of 33 Contract for Custodial Services F. This Contract shall terminate automatically and immediately upon the closing of ARA by the City, or if the City loses the funding necessary to maintain the Contract. Cancellation will be at no cost to the City, except for services already provided. ARTICLE IX COMMERICAL ACTIVITIES Neither Contractor nor its employees may establish any commercial activity or issue concessions or permits of any kind to third parties for establishing activities at the ARA. ARTICLE X RECORDS AND AUDIT Contractor and its subcontractors shall maintain records and accounts in connection with all aspects in the performance of this Contract, including those which will accurately document incurred costs, both direct and indirect, of whatever nature, during and for a period of three (3) years from the expiration or other termination of this Contract, unless otherwise specified by applicable law. City may examine and copy, at all reasonable times, with advance notification, those records and accounts. Contractor shall maintain all records in a central location in Augusta-Richmond County. ARTICLE XI CONTINGENT FEES Contractor warrants that it has not employed or retained any company or person, other than a bona fide employee working for Contractor, to solicit or secure this Contract; and that Contractor has not paid or agreed to pay any company, association, corporation, firm or person, other than a bona fide employee working for Contractor, any fee, commission, percentage, gift or any other consideration contingent upon or resulting from the award or making of this Contract. For the breach or violation of this warranty and upon a finding after notice and hearing, City may terminate the Contract and, at its discretion, may deduct from the Contract Sum, or otherwise recover the full amount of any such fee, commission, percentage, gift or consideration. ARTICLE XII RIGHTS AND REMEDIES The rights and remedies of City provided in this paragraph are not exclusive and are in addition to any other rights and remedies provided by law or under this Contract. ARTICLE XIII NON-APPROPRIATIONS Notwithstanding anything contained in this Contract, if sufficient funds have not been appropriated to support continuation of this Contract for an additional calendar year or an additional term of the Contract, this Contract shall terminate absolutely and without further obligation on the part of the City at the close of the calendar year of its execution or if the City suspends performance pending the appropriation of funds. ARTICLE XIV REPRESENTATIONS AND WARRANTIES Attachment number 1Page 6 of 33 Page 7 of 33 Contract for Custodial Services Contractor’s Representations and Warranties Regarding Capacity to Contract and Perform Work/Services. In order to induce the City to enter into this Contract, Contractor hereby represents and warrants to the City as of the date above written that: A. Contractor is duly organized and validly existing in good standing under the laws of the state(s) in which it is organized, is qualified to do business in all jurisdictions in which it is operating, and has the power and authority to execute and deliver and to perform its obligations under this Contract and the documents to which it is signatory; and B. The execution, delivery and performance by Contractor and its undersigned representative(s) of this Contract and other documents to which Contractor is a signatory do not require the approval or consent of any other person, entity or government agency and do not result in any breach of any agreement to which CONTRACTOR is a party or by which it is bound; and C. The execution, delivery and performance by Contractor of this Contract and other documents to which it is a signatory have been duly authorized by all necessary action, and constitute legal, valid and binding obligations of Contractor, enforceable against Contractor in accordance with its terms; and D. No action, suit or proceeding to which Contractor is a party is pending or threatened that may restrain or question this Contract, or any other document to which it is a signatory, or the enjoyment of rights or benefits contemplated herein. ARTICLE XV ASSIGNMENT Without the prior written consent of City, Contractor may not assign, transfer or convey any of its interests under this Contract, nor delegate any of its obligations or duties under this Contract except as provided herein. A. Consent of CITY Required. Any assignment of this Contract or rights under this Contract, in whole or part, without the prior written consent of City will be void, except that, upon ten (10) calendar days prior written notice to City, Contractor may assign monies due or to become due under this Contract. Any assignment of monies will be subject to proper setoffs in favor of City and to any deductions provided for in this Contract. B. No Relief of Responsibilities. No assignment will be approved which would relieve Contractor of its responsibilities under this Contract. C. No Partnership or Joint Venture; Independent Contractor. Nothing contained in this Contract will be deemed to create a partnership or joint venture between City and Contractor or cause City to be responsible for the debts or obligations of Contractor or any other party. Contractor must not represent to anyone that its relationship to City is other than as City’s Contractor. Contractor must act as an independent agent and not as the agent of City in performing this Contract, maintaining complete control over its employees and all of its lower-tier suppliers and subcontractors. Nothing contained in this Contract or any lower tier purchase order or subcontract awarded by Contractor will create any contractual relationship between any lower-tier supplier or subcontractor and City. No act or direction of the City shall be deemed to be the exercise of supervision or control of the Contractor’s performance hereunder. D. Parties Bound. This Contract will be binding upon and inure to the benefit of CITY and CONTRACTOR and their respective successors and assigns. ARTICLE XVI Attachment number 1Page 7 of 33 Page 8 of 33 Contract for Custodial Services NOTICES A. Delivery. All notices given by either party to the other under this Contract must be in writing and may be delivered by: (i) regular mail, postage prepaid; (ii) certified or registered mail; (iii) facsimile; or (iv) hand-delivery, to the parties at the addresses and facsimile numbers set forth in the Clause titled “Addresses”. B. Receipt. Notices sent by mail will be deemed to be received upon deposit in the mail, properly addressed. Notices sent by certified or registered mail will be deemed to be received upon the date of the acknowledgment. Notices sent by facsimile will be deemed to be received upon successful transmission to the proper facsimile number. Notices delivered by hand-delivery will be deemed to be received upon acceptance by the respective party or its agent. C. Change of Address or Facsimile Number. Either party may, at any time, change its respective address or facsimile number by sending written notice to the other party of the change. D. Addresses. To CITY: For all notices to CITY the address will be: Augusta Regional Airport 1501 Aviation Way Augusta, Georgia 30906 Fax: (706) 798-1551 With a copy to: City of Augusta 501 Greene St. Ste. 302 Augusta, Georgia 30901 Attn: General Counsel Fax: (706) 842-5556 To CONTRACTOR: For all notices to CONTRACTOR the address will be: Milton Smith, Operations Manager ABM-Southern Management 489 Columbia Industrial Blvd. Evans, Ga. 30809 Phone: (706) 210-4635 Fax: (706) 210-4142 ARTICLE XVII WAIVER The failure of CITY to seek redress for any violation of or to insist upon the strict performance of, any term of this Contract will not prevent a subsequent violation of this Contract from being actionable by CITY. The provision in this Contract of any particular remedy will not preclude CITY from any other remedy. ARTICLE XVIII COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS Attachment number 1Page 8 of 33 Page 9 of 33 Contract for Custodial Services Contractor covenants and agrees that it, its agents and employees will comply with all Georgia, county, state, and federal laws, rules, regulations, and ordinances applicable to the work to be performed under this Contract, and that it shall obtain all necessary permits, pay all license fees and taxes to comply therewith. Further, Contractor agrees that it, its agents, and employees will abide by all rules, regulations, and policies of ARA during the term of this Contract, including any renewal periods. In the event that any governmental authority imposes new or materially increased taxes upon the Contractor’s operations, the parties agree to negotiate changes in billing reflecting such increased tax costs. ARTICLE XIX INSURANCE A. During the term of this Contract, Contractor shall provide, pay for, and maintain with companies reasonably satisfactory to the City and the Aviation Commission, the types of insurance as set forth in the Augusta-Richmond County Code, and Georgia law as the same may be amended from time to time, and as described herein. All insurance shall be issued by insurance companies eligible to do business in the State of Georgia and Best Rated A- or equivalent. In the event of a conflict between the provisions of the Augusta-Richmond County Code and this Contract, the more stringent requirement shall govern. In no event shall Airline maintain any insurance less than the requirements set forth in the Augusta-Richmond County Code, as amended. B. All liability policies of Contractor and its subcontractors shall provide coverage that includes, or has the same substantive effect as the following: 1. Augusta-Richmond County and each of its Commissioners, officers, agents, elected representatives, Aviation Commission, volunteers, and employees, in their respective capacities as such, shall be additional insureds hereunder with respect to the products, premises, and operations of the named insured. 2. “It is agreed that this insurance policy shall apply as primary, and any insurance and/or self-insurance as may be maintained by the City or its Commissioners, officers, agents, elected representatives, volunteers, and employees shall apply in excess of, and shall not contribute with insurance provided by this policy.” 3. This insurance shall not be materially changed, altered, canceled, or non- renewed until after thirty (30) days advanced written notice has been given to the City except that only ten (10) days notice shall be required in the event of cancellation due to non-payment of premium.” C. All such evidence of insurance shall be in the form of certificates of insurance satisfactory to the City and its Risk Manager, accompanied by a certified true copy of an endorsement to each policy containing the above language. The insurance coverage and limits required shall be evidenced by properly executed certificates of insurance. These certificates shall be signed by the authorized representative of the insurance company shown on the certificate. The required policies of insurance shall be in compliance with the laws of the State of Georgia. D. If at any time the Aviation Director requests a written statement from the insurance company as to any impairment to the aggregate limit, Airline shall promptly authorize and have delivered such statement to the Aviation Commission. Contractor authorizes the Aviation Commission and/or the City’s Risk Manager to confirm with Contractor’s insurance agents, brokers, and insurance companies all information furnished. Attachment number 1Page 9 of 33 Page 10 of 33 Contract for Custodial Services E. The acceptance of delivery to the City and the Aviation Commission of any certificate of insurance evidencing the insurance coverages and limits required under this Contract does not constitute approval or acceptance by the City or the Aviation Commission that the insurance requirements in this Agreement have been met. No operations shall commence at the ARA unless and until the required certificates of insurance are in effect and approved by the City. F. The Contractor and the City understand and agree that the minimum limits of the insurance herein required may, from time to time, become inadequate, and Airline agrees that it will increase such minimum limits upon receipt of written notice defining the basis of the increase. The Contractor shall furnish the City, within sixty (60) days of the effective date thereof, a certificate of insurance evidencing that such insurance is in force. G. Contractor’s insurance companies or its authorized representative shall give the City and the Aviation Commission thirty (30) days prior written notice of any cancellation, intent not to renew, or material reduction in any policy's coverage, except in the application of the Aggregate Limit Provisions. In the event of a reduction to the Aggregate Limit, it is agreed that immediate steps will be taken to have the prior Aggregate Limit reinstated. H. If at any time the Airport Director requests a written statement from the insurance companies as to any impairments to the Aggregate Limit, prompt authorization and delivery of all requested information will be given to the Aviation Commission. Renewal Certificates of Insurance must be provided to the City and Aviation Commission as soon as practical but in every instance prior to expiration of current coverages. I. The amounts and types of insurance shall conform to the following minimum requirements with the use of Insurance Service Office policies, forms, and endorsements or broader, where applicable. Notwithstanding the foregoing, the wording of all policies, forms, and endorsements must be reasonably acceptable to the City and Aviation Commission. J. Workers Compensation and Employer's Liability Insurance shall be maintained in force by Airline during the term of this Agreement for all employees engaged in the operations under this Agreement. The limits of coverage shall not be less than: Workers' Compensation Georgia Statutory Employer's Liability $1,000,000 Limit Each Accident $1,000,000 Limit Disease Aggregate $1,000,000 Limit Disease Each Employee K. Property Damage. Property damage liability insurance including coverage of motor vehicles with limits not less than $5,000,000, naming as an additional insured. L. Automobile Liability Insurance - Covering all owned, non-owned and hired vehicles, used in connection with the work, in amounts as indicated in (10.A.(2)) above. This policy must be endorsed to indicate that any premium, whether deposit or final, will be the sole obligation of the Contractor. M. Contractual Liability Insurance - Covering all liability arising out of the terms of the Contract Documents, in amount as indicated above. Attachment number 1Page 10 of 33 Page 11 of 33 Contract for Custodial Services N. The Commercial General Liability Insurance coverage as required in paragraph (10.A. (2)) above shall include those classifications, as listed in Standard Liability Insurance Manuals, which are applicable to the operations of the Contractor in the performance of this Contract. O. An insurance binder letter or a Certificate of Insurance must be sent to: City of Augusta 530 Greene St. Room 217 Augusta, Ga. 30901 Attn: Sandy Wright, Risk Manager P. All insurance policies above shall be issued by companies authorized to do business under the laws of the State of Georgia with the following qualifications as to management and financial strength: The Company must be rated no less than "A" as to management, and no less than "AAA” as to strength, by the latest edition of Best's Insurance Guide, published by Alfred M. Best Co., Inc., 75 Fulton Street, New York, New York 10038. ARTICLE XX INDEMNIFICATION AND HOLD HARMLESS Except where, and to the extent caused by the gross negligence of the City, its agents, employees, contractors, officers or the Board of the Aviation Commission, Contractor shall protect, defend, reimburse, indemnify, and hold Augusta-Richmond County, the Aviation Commission, its members, agents, employees, and elected officers and each of them, free and harmless at all times as set forth in the Augusta-Richmond County Code, and particularly Article 1, Chapter 3, Division 1, Section 1-3-8.5, Indemnity and Insurance, as the same may be amended from time to time, and described herein. In the event of a conflict between the provisions of the Augusta-Richmond County Code and this Contract, the broader requirement shall govern. ARTICLE XXI DISASTERS Contractor shall make his entire work force assigned to the ARA and materials to secure the Facilities available for protection of life and property in the event of a disaster such as, but not limited to, tornadoes, floods and fires. The Contractor shall do such work as directed by the Administrator and shall keep pertinent records of all work performed. The Contractor shall be separately reimbursed by Change Order for all such work performed which is beyond the scope of this Contract. ARTICLE XXII FORCE MAJEURE A. Neither party hereto shall be considered in default in the performance of its obligations hereunder to the extent that the performance of any such obligation, except the payment of money, is prevented or delayed by any cause, existing or future, which is beyond the reasonable control of Attachment number 1Page 11 of 33 Page 12 of 33 Contract for Custodial Services the affected party, or by a strike, lockout or other labor difficulty, the settlement of which shall be within the sole discretion of the party involved. B. Each party hereto shall give notice promptly to the other of the nature and extent of any Force Majeure claimed to delay, hinder or prevent performance of the services under this Contract. In the event either party is prevented or delayed in the performance of this obligation by reason of such Force Majeure, there shall be an equitable adjustment of the schedule. C. Contractor will not be liable for failure to perform or for delay in performance as a result of Force Majeure, including the following: 1. Any cause beyond its reasonable control; 2. Any act of God; 3. Inclement weather; 4. Earthquake; 5. Fire; 6. Explosion; 7. Flood; 8. Strike or other labor dispute; 9. Any shortage or disruption of or inability to obtain labor, material, manufacturing facilities, power, fuel or transportation from unusual sources, or any other transportation facility; 10. Delay or failure to act of any governmental or military authority; 11. Any war, hostility or invasion; 12. Any embargo, sabotage, civil disturbance, riot or insurrection; 13. Any legal proceedings; or 14. Failure to act by Contractor’s suppliers due to any cause which Contractor is not responsible, in whole or in part. ARTICLE XXIII PERMITS Contractor will obtain all necessary licenses, permits and certifications to perform the work described in the Contract. Contractor will furnish copies of all licenses, permits, and certifications to the Administrator. ARTICLE XXIV WORK PERMITS REQUIRED Contractor agrees and acknowledges that its employees and agent's employees, as well as any subcontractors or subcontractors' personnel, working on the Contract must be United States citizens, or must be lawfully admitted for residence and be permitted to work in the United States under the Immigration and Naturalization Act, 8 U.S.C. 1101, et seq. Attachment number 1Page 12 of 33 Page 13 of 33 Contract for Custodial Services ARTICLE XXV NON DISCRIMINATION The Contractor shall not discriminate against any employee, or applicant for employment, because of race, creed, religion, color, sex or national origin, marital status, physical handicap or sexual orientation. Further, Contractor agrees, for itself, its personal representatives, successors in interest, and assigns, as a part of the consideration hereof, that (1) no person on the grounds of race, color, or national origin shall be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use ARA, (2) in the furnishing of services at ARA, no person on the grounds of race, color, or national origin shall be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination, and (3) Contractor shall use ARA facilities in compliance with all other requirements imposed by or pursuant to 14 CFR Part 152 and Title VI of the Civil Rights Act of 1964 and 49 CFR, Subtitle A, Part 21, Nondiscrimination in Federally Assisted Programs of the Department of Transportation, and as such Title and Regulations may be amended. SECTION II ARTICLE XXVI SCOPE OF SERVICES A. The Contractor is to provide all necessary management, supervision, and labor to complete the following services at the facilities of the ARA: 1. All assigned custodial services, including routine and project work; 2. Other related custodial activities as requested. B. The services described above and in the Performance Work Statement are to be provided in the following facilities: MAIN TERMINAL NET CLEANABLE S.F. RESTROOMS FIXTURES PASSENGER GATES 15,352 6 26 PASSENGER TICKETING 7,300 3 16 MID-TERMINAL 11,318 2 4 PASSENGER BAGGAGE CLAIIM 9,969 2 14 ADMINISTRATION 9,048 3 13 TOTAL PASSENGER TERMINAL 52,987 16 73 FIXED BASE OPERATIONS 4,400 3 12 COMMAND CENTER 3,000 1 2 CONTRACT OPERATIONS 807 2 4 HANGAR 1 700 1 10 HANGAR 2 500 2 4 TOTAL ALL FACILITIES 62,394 25 105 C. The Contractor is responsible for the Monday – Friday complete routine cleaning of the main passenger terminal and assigned areas in the FBO and outlying areas, as shown in the chart above. The Contractor is not routinely responsible for custodial services for: Attachment number 1Page 13 of 33 Page 14 of 33 Contract for Custodial Services 1. The Lost Bags office and bag storage area; 2. Tug Drive area behind Baggage Claim; 3. Airline areas behind the ticket counters; 4. The Marshal’s Offices, except for the restroom; 5. Food Prep and Staging area in the Mid-Terminal; 6. Passenger screening area “between the steel security gates”; and 7. The two (2) Concession areas and the Frequent Flier Room in the passenger gate area. D. Contractor’s custodial responsibilities include, but are not limited to: 1. Daily cleaning of administrative areas; 2. Daily vacuuming (trafficked areas) of gate, ticketing, waiting, pre- and post-security areas, and baggage claim areas; 3. Daily cleaning of all restrooms; 4. Daily cleaning of the FBO, Command Center, Contract Operations, Hanger 1 and Hanger 2; 5. Daily cleaning of exterior areas; 6. Daily dust-mopping and auto-scrubbing of terrazzo concourses, weekly burnishing of terrazzo concourses; 7. Weekly dusting and spot-cleaning of furniture, glass and fixtures in all areas; 8. Policing of all areas, including restrooms and exterior areas; and 9. Assistance with baggage handling and other similar duties as requested. ARTICLE XXVII DUTIES OF THE ADMINISTRATOR AND CONTRACT COORDINATOR A. The person responsible for the performance of this Contract on behalf of ARA is the Administrator. The instructions of the Administrator will be strictly and promptly followed in every case. The Administrator shall have free access to the materials and the work at all times for measuring and inspecting the work. The Contractor is to afford the Administrator all necessary facilities and assistance for so doing. B. The Administrator will decide any and all questions that may arise as to the quality and acceptability of work performed, and as to the manner of performance and rate of progress of the work. The Administrator will decide all questions that may arise as to the interpretation of the Performance Work Statement, and plans relating to the work and to the fulfillment of the Contract on part of the Contractor. The Administrator will determine the amount and quality of the various kinds of work performed and materials furnished which are to be paid for under the Contract. The Administrator's or his designee's decisions upon all claims, questions, and disputes will be final and conclusive upon the parties to this Contract. Attachment number 1Page 14 of 33 Page 15 of 33 Contract for Custodial Services C. The Administrator or designee may make temporary changes in the routine assignments, tasks, or task frequencies if such changes do not require additional labor hours. If the Administrator directs the Contractor to assist in the performance of non-custodial duties such as baggage handling then the Contractor will not be responsible for any reductions in cleaning due to the performance on non-custodial duties. Such changes shall not be considered modifications of the Contract and shall not affect the amount or method of payment to the Contractor. ARTICLE XXVIII TYPE OF WORK SUPERVISION The Contractor will provide direct supervision to its own employees as well as subcontractor employees of subcontractors hired by the Contractor. On-site supervision will be provided by a working supervisor who also has specific cleaning duties. ARTCLE XXIX LABOR REQUIREMENTS A. The Contractor shall provide the following labor hours on the days and shifts shown in the table below: Position Shift Hours Shift Days Work Hours/Day Hrs/Week Working Supervisor S-1 10pm-7am Sun - Thurs 8.00 40.00 Custodian N-1 10pm-7am Sun - Thurs 8.00 40.00 Custodian N-2 10pm-7am Sun - Thurs 8.00 40.00 Custodian W-1 7am-4pm Sat-Sun 8.00 16.00 Custodian W-2 1pm-10pm Sat-Sun 8.00 16.00 B. The Contractor’s employees assigned to the 10pm-7am shift will be responsible for the complete routine cleaning of the Passenger Terminal, FBO, Command Center, Contract Operations, Hanger 1 and Hanger 2. A detailed description of duties for this shift is contained in the Performance Work Statement. C. The Contractor’s employees assigned to the Saturday/Sunday shift will be responsible for policing the Passenger Terminal and FBO, as well as fully cleaning the public restrooms once each shift. A detailed description of duties for this shift is contained in the Performance Work Statement. D. Contractor shall provide trained, qualified personnel to perform the duties required in accordance with the Performance Work Statement. Each Contractor employee assigned to work in the secured areas of the ARA facilities shall undergo a background check to receive the clearance necessary for the employee to work in “Secure Areas” without an escort. The Contractor will bear the cost for background checks. The Contractor shall not permit any personnel not having undergone such security background check to work in secured areas of the ARA. E. Subject to controlling law, the Administrator will refuse to permit the Contractor to use any employee on this job if the Administrator reasonably deems that individual to be unfit to work at the ARA Facilities in any respect. F. Contractor shall keep on file and furnish the Administrator each day a report which lists the names of all personnel present for work that day, showing the positions filled by each person to accomplish the specified work. G. Contractor shall instruct its employees that no gratuities shall be solicited for any reason whatsoever from occupants or other persons using the ARA Facilities or any other person. Contractor employees will not remove any property from the ARA grounds or facilities without receiving advance approval from the Administrator. H. Contractor’s employees must be able to read, write, speak, and understand English. Attachment number 1Page 15 of 33 Page 16 of 33 Contract for Custodial Services I. All Contractor employees shall strictly adhere to ARA regulations while on the ARA premises, including but not limited to City, FAA, and TSA regulations governing access to buildings, personal conduct, and possession of prescribed substances, parking, and traffic. The ARA reserves the right to require the removal of Contractor employees from assignment to its facility. ARTICLE XXX RELIEF FOR ABSENTEEISM AND VACATION A. The Contractor shall provide relief personnel to perform routine work as necessary and/or to work overtime at no additional cost to the ARA to insure that each routine cleaning assignment is performed as required, and that the requirements for Labor Hours are met each day. B. If the on-site Working Supervisor is absent, the Contractor shall provide a replacement that is competent, has the necessary security clearances and has been given the authority to carry out the duties of the Supervisor, if authorized by the Administrator. ARTICLE XXXI CONTRACTOR'S EMPLOYEE UNIFORMS AND IDENTIFICATION Contractor shall insure that all employees assigned to the ARA are dressed in clean, neat-appearing uniforms and are wearing appropriate footwear. Cotton or synthetic smocks (approximately mid-thigh length) will be acceptable. Uniforms must not interfere with the safety of the employee. The Administrator must approve the style and color of Contractor uniforms. The City will not provide the uniforms. ARTICLE XXXII CONTRACTOR TRAINING Individual training for employees is to be done with materials supplied by the Contractor. At any time that a worker is new to the ARA facilities, Contractor shall provide immediate training as necessary, covering types of tasks performed in the assignment by the new worker. ARTICLE XXXIII MAINTENANCE OF EQUIPMENT AND CARTS A. Contractor shall require each employee to maintain the cleanliness of their assigned equipment. This shall include custodial carts, all tools, and powered equipment. B. At the end of each shift, all equipment must be returned to the Contractor's storage area and must be wiped off with a sponge and neutral detergent before returning it to the storage area. Cleaned equipment, including electrical cords, shall be free of all removable soil. ARTICLE XXXIV MATERIALS, SUPPLIES, TOOLS, AND EQUIPMENT MANAGEMENT A. Contractor shall supply all equipment, materials and supplies necessary to allow it to perform the work described in the General Conditions and Performance Work Statement of this Contract. Attachment number 1Page 16 of 33 Page 17 of 33 Contract for Custodial Services B. The Contractor will submit monthly requirements for needed items to the Administrator for approval. C. Contractor will provide a method to electronically account for all materials and supplies expended to perform the work required in this Contract and will provide monthly summaries of materials and supplier usage and purchases to the Administrator. D. The Contractor is solely responsible for the maintenance, upkeep, and inventory of materials, tools and equipment. Thirty days prior to beginning work on this Contract the Contractor will submit to the Administrator a complete list of supplies needed. ARTICLE XXXV KEY SECURITY A. ARA keys used by the Contractor will not be taken from the facilities. Keys must be stored in a secure lock box when not being used. In the event of lost or misplaced keys the Contractor will bear the cost of any necessary re-keying. B. Contractor employees will keep ARA keys on their person at all times while working in the facilities, securely attached to the body or to the clothing. C. Contractor employees may not leave a work area when the doors are unlocked. Unlocked doors must have a Contractor employee present at all times in the immediate area. D. Schedules for Deductions for Non-performance for Routine Work: Area Type Penalty Vestibule $25.00/vistibule Terrazzo concourse $5.00/square foot Office/Administrative Work Space $1.25/square foot Gate Area $1.00/square foot Ticketing Area $1.00/square foot Baggage Claim Area $1.00/square foot Restroom $100.00/restroom Exterior Area $1.50/square foot Waste Containers (Exterior/interior) $5.00/container FBO/Outlying Spaces $1.00/square foot E. Penalties will be deducted from the Contractor’s invoice. ARTICLE XXXVI CONTRACTOR'S COMPENSATION FOR ROUTINE WORK A. Contractor shall be compensated monthly for routine cleaning work, after approval of invoice, for the approved actual weekday and weekend hours provided multiplied by the appropriate Loaded Hourly Rate, as shown on the Contractor’s Cost Bid, Cost Schedules C, which are attached and incorporated by reference as if fully set forth herein. The total bi-weekly hours shall be a total of Attachment number 1Page 17 of 33 Page 18 of 33 Contract for Custodial Services the M-F hours provided each weekday, and the total of the Weekend hours provided each weekend, not to exceed two-hundred forty (240) M-F hours and sixty-four (64) weekend hours. The Contractor will not be given credit daily for approved work hours in excess of the daily work hours shown in the Contractor’s Cost Bid, Cost Schedules 1.0 and 3.0. B. Approved Labor Hours are defined as the total hours spent each day by the Contractor in the performance of the custodial work as defined in the Performance Work Statement. C. ARA will make every effort to insure the Contractor’s invoice is paid within fifteen (15) working days after receipt of the invoice. D. ARA or its accountants may, during regular business hours, inspect as much of the Contractor’s books and records as pertain to the cost incurred in furnishing the services described in the Contract as deemed necessary by ARA. ARTICLE XXXVII CONTRACTOR’S COMPENSATION FOR EXTRA SERVICES WORK Extra Services (project cleaning) will only be performed with prior notice to and approval by ARA. The Contractor shall use the employees normally assigned to routine cleaning for project cleaning and miscellaneous work. The Contractor will be compensated for Extra Services Work in the manner described above. ARTICLE XXXVIII NON-PERFORMANCE OF ROUTINE WORK A. Routine Work will be considered not to have been performed (non-performed) when any one of the following conditions exists: 1. The appearance of the area does not comply with the Quality Standards. 2. The required work tasks were not completed. 3. The correct number of work hours was not applied to the work. 4. The proper materials, tools, or equipment were not used. 5. The above list of conditions which determine non-performance of work is not exhaustive. B. All Routine Work tasks required by the Performance Work Statement must be performed in an area before that area is considered acceptable. If all tasks have not been properly completed as required by the Quality Standard, including leaving doors open in an area then the entire area will be considered unacceptable. The Contractor may be penalized for non-performance. SECTION III ARTICLE XXXVIX Attachment number 1Page 18 of 33 Page 19 of 33 Contract for Custodial Services PERFORMANCE WORK STATEMENT A. The intent of this Performance Work Statement is to describe the work that the Contractor shall do in full compliance with the provisions contained herein. The Contractor shall do all the work provided in this Performance Work Statement and shall do additional work and incidental work as may be considered necessary by the City from time to time to comply with the Performance Work Statement in a satisfactory manner. B. The apparent silence on any specification, detail or the omissions of any detailed description concerning any service or point whatsoever shall be regarded as meaning that only the best commercial practices are to prevail and that only materials of first quality are to be used. All workmanship is to be of first quality. All interpretations of this specification will be made upon the basis of this statement. C. The Performance Standards are intended to provide the Contractor a platform for the conformance to the Quality Standards. The Contractor may utilize methods and techniques that differ from those shown in the Performance Standards, provided that the different methods and techniques do not reduce the quality level, damage the ARA facilities and grounds, create unsafe working conditions for the Contractor’s employees, or require additional time or materials. D. The conformance to the requirements of the Performance Work Statement will be measured by the conformance of the Contractor to the Quality Standards. That is, the result carries more weight than the method used to achieve the result. The desired results can only be achieved if the tasks and frequencies for the work are adhered to by the Contractor. Adherence to these tasks and frequencies by the Contractor will also be used to measure the conformance to the requirements of the Performance Work Statement. E. The Contractor shall provide, for the approval of the Administrator, recommendations for procedures, products, and materials that are considered “Green” from an environmental standpoint. The use of micro-fiber products is encouraged, as is the use of “Green” cleaning chemicals which are not considered hazardous materials by the Federal or State Environmental Protection Agencies. F. Any procedure, product, or material that is approved by the Administrator as “Green” shall at least match, if possible, the cleaning abilities of the more traditional cleaning agents, shall not cause the expenditure of additional Contractor labor, and shall not add to the cost of products and supplies. Cleaning and other products approved by the Administrator for use in this Contract will be hereinafter referred to in the Performance Work Statement as ACP (Approved Cleaning Product). ARTICLE XL WEEKEND POLICING A. Police Exterior Areas, Including Curbside and Verandas Collect and dispose of trash in waste receptacles; replace trash liners as needed; empty and clean ash receptacles, collect surface litter with small broom and dustpan, powered blower or “Billy Goat” vacuum. Spot clean entrance door glass and frames; clean trash containers and lids. Mop/pressure wash verandas as needed to remove obvious soil. B. Police and Restock Restrooms Place “Closed for Cleaning” signs at entrances, pick up and dispose of trash and litter, empty trash receptacles and replace liners as needed; restock paper goods, soap and sanitary napkins; damp mop floors under urinals and other areas as needed, clean plumbing fixtures and mirrors as needed and report malfunctioning automatic valves. Attachment number 1Page 19 of 33 Page 20 of 33 Contract for Custodial Services C. Police Terminal and Other Areas Clean glass doors at entrances, collect and dispose of trash and replace liners as needed; spot vacuum or dust mop as needed; spot clean interior glass; remove any gross soil or stains from furniture and building surfaces. D. Deep-Clean Restrooms Place “Closed for Cleaning” signs at entrances, pick up and dispose of trash and litter, empty trash receptacles and replace liners as needed. Clean the restrooms according to the Performance Work Statement. E. CUSTODIAN W-1: SHORT INTERVAL SCHEDULE Activity Start Police Gate area, including restrooms 7:00 AM Police Ticketing area, including restrooms 7:45 AM Police Mid-terminal area, including TSA 8:10 AM Police Bag claim area, including restrooms 8:40 AM Police exterior 9:30 AM Police FBO & outlying areas 10:00 AM Clean Gate area restrooms 10:30 AM Lunch Break 12:00 PM Police Administration area 1:00 PM Clean Ticketing area restrooms 1:15 PM Clean Bag claim area restrooms 2:15 PM Clean exterior 3:00 PM End of Shift 4:00 PM Total Work Hours: 8.00/Day F. CUSTODIAN W-2: SHORT INTERVAL SCHEDULE Activity Start Police Gate area, including restrooms 1:00 PM Police Ticketing area, including restrooms 1:45 PM Police Mid-terminal area, including TSA 2:10 PM Police Bag claim area, including restrooms 2:40 PM Police exterior 3:30 PM Police FBO & outlying areas 4:00 PM Clean Gate area restrooms 4:30 PM Attachment number 1Page 20 of 33 Page 21 of 33 Contract for Custodial Services Lunch Break 6:00 PM Clean Ticketing area restrooms 7:00 PM Clean Bag claim area restrooms 8:00 PM Clean exterior 9:00 PM End of Shift 10:00 PM Total Work Hours: 8.00/Day G. WORKING SUPERVISOR S-1 SHORT INTERVAL SCHEDULE Activity Start Clean the Mid-Terminal Area 10:00 PM Clean the Baggage Claim Area 11:45 PM Lunch Break 1:30 AM Clean all Vestibules & Terrazzo Concourses 2:30 AM Supervisory Duties 5:30 AM End of Shift 7:00 AM Total Work Hours: 8.00/Day H. CUSTODIAN N-1: SHORT INTERVAL SCHEDULE Activity Start Clean the Gate Area, except for Terrazzo Concourse 10:00 PM Lunch Break 2:15 AM Continue Cleaning the Gate Area 3:15 AM Clean the Ticketing Area, except for Terrazzo Concourse 4:45 AM End of Shift 7:00 AM Total Work Hours: 8.00/Day I. CUSTODIAN N-2: SHORT INTERVAL SCHEDULE Activity Start Clean the Administrative Wing (2nd floor) 10:00 PM Lunch Break 1:30 AM Clean the FBO and other Outlying Facilities 2:30 AM Clean the Exterior and Curbside Walk Areas 5:30 AM End of Shift 7:00 AM Total Work Hours: 8.00/Day The schedules shown above are to be used as guidelines only, although they can be used to depict the expected actions of the custodial staff. The Contractor may substitute its own short Attachment number 1Page 21 of 33 Page 22 of 33 Contract for Custodial Services interval work schedules as long as the emphasis is placed on performing the assigned cleaning work effectively and efficiently, not necessarily in the right place at the right time. J. ROUTINE CUSTODIAL TASKS/FREQUENCY MATRIX Cleaning Task Re s t r o o m s Pa s s e n g e r Ar e a s & Ra m p s Of f i c e s / Ad m i n Ar e a s Ve s t i b u l e s / Co n c o u r s e Ar e a s Ex t e r i o r & Cu r b s i d e Remove Trash, Replace Liners D D D D D Vacuum Walk-off Mats D Clean Entrance Glass D Dust Horizontal Surfaces W D D Damp Clean Surfaces W W D Dust Mop/Sweep D D D D Spot Mop - W D Damp Mop D M Wet Mop D AR Scrub with Auto-Scrubber D Restore Finish W Spray-buff/Burnish W W Vacuum Complete D W W D Spot Carpets D D D D Disinfect Drinking Fountains D - D D Clean Interior Glass D D D D Vacuum/Damp Clean Furniture W W Report items needing repair D D D D D Clean Glass and Mirrors D Clean and Disinfect Fixtures D Damp Wipe All Surfaces D Replace Paper/Soap D De-scale Urinals/Commodes W Scrub/Pressure Wash Floor M Power blow/vacuum Exterior Area D Pressure Wash Verandas W W 5/D=Five (5) times/day; 3/D=Three (3) times/day; D=Daily; W=Once/Week; M=Monthly ARTICLE XLI PERFORMANCE STANDARDS FOR ROUTINE CUSTODIAL WORK A. The Performance Standards for Routine Custodial Work are intended to provide a platform for the routine cleaning tasks and frequencies for the most common housekeeping tasks that will be performed on a frequent basis. The basic task category and frequency for the performance of the tasks is shown on the preceding Task Frequency Matrices. Attachment number 1Page 22 of 33 Page 23 of 33 Contract for Custodial Services B. If the facilities are properly cleaned following these performance standards and on the frequencies stated earlier then the cleanliness of the facilities will meet or surpass the expectations of ARA management. ACP will be used in these standards to represent “Approved Cleaning Product” for the job as described. C. REMOVE TRASH, REPLACE LINERS 1. All waste receptacles and other trash containers within the area should be emptied and returned to their initial location. Boxes, cans, papers, etc. placed near a trash receptacle will not be removed unless placed within the receptacle itself or affixed with a label marked “please throw” or “trash”. All waste from such trash receptacles should be removed from the area and placed at in one of the collection dumpsters outside the terminal. The exterior of waste receptacles should damp-wiped with the ACP as needed. 2. All plastic liners that are torn or obviously soiled should be removed from trash receptacles and replaced with new plastic liners. The liners should be folded back over the rim of the receptacle and made secure. D. CLEAN ENTRANCE MATS 1. Interior entrance mats should be vacuumed daily. If the mat or surrounding area is wet, it may be necessary to use a wet/dry vacuum. The mat should be periodically removed at least weekly and the area underneath should be mopped and allowed to completely dry before replacing the mat. 2. Clean exterior mats by sweeping, vacuuming, "bumping", or hosing. Exterior mats should be replaced when they become worn, or are no longer capable of trapping dirt and moisture. In the main terminal where the “slotted” matting or other devices are installed in a pan, the matting shall be removed and the pan cleaned at least once per month. E. DUST BUILDING AND FURNITURE SURFACES 1. Use a micro fiber cloth, lambs-wool dusting tool, tank vacuum with dusting attachments, or combination of these dusting tools to remove all dust, lint, litter, dry soil, etc. from the horizontal surfaces of desks, chairs, file cabinets, and other types of furniture and equipment and from horizontal ledges, window sills, blinds, hand rails, etc., below 8’0” from the top of the floor surface. Items on desktops are not to be disturbed. After regular dusting, all such surfaces should have a uniform appearance, be free of any streaks, smudges, dust, lint, or litter. Dusting should be accomplished by removal of soil from the area and not by rearranging it from one surface to another. Desktops, counter tops, file cabinets and the like must be completely cleared before dusting. 2. In stairwells, the tops and sides of any exposed, wall mounted lighting fixtures shall be dusted weekly, as well as the tops of suspended light fixtures in other areas of the buildings, up to a height of eight (8) feet. F. REARRANGE FURNITURE AS REQUIRED 1. Chairs or other furniture moved by the custodial worker during the performance of the work should be returned to their appropriate location. Furniture must be Attachment number 1Page 23 of 33 Page 24 of 33 Contract for Custodial Services placed in specified location and missing items be reported. Seating in the Gate area shall be damp-wiped once per week. G. SPOT CLEAN FURNITURE, FIXTURES, WALLS, PARTITIONS, DOORS, ETC. 1. Use a clean micro fiber cloth and spray bottle of ACP (what is this) to remove fingerprints, smudges, marks, streaks, etc. from washable surfaces of walls, partitions, doors, desks (must be completely cleared), furniture, fixtures, appliances, rest rooms and drinking fountains. After spot cleaning, there should be no streaks, spots, or other evidence of removable soil. This includes both sides of glass in exterior doors and vestibules and in offices. H. DUST MOP/SWEEP 1. All visible litter such as paper, rubber bands, paper clips, chewing gum, etc. should be picked up or swept and placed in a waste collection container. 2. Prior to sweeping the floor surface, use a mop and solution of ACP to remove spills and obvious soil from the floor. Use a putty knife to remove gum, tar, and other sticky substances. On terrazzo or other smooth finished floor surfaces, use the largest micro fiber dust mop that is practical to remove accumulated soil and litter. On concrete exterior areas use a push broom. The entire area to be swept should be cleaned thoroughly to remove dust, dry soil, and other litter. Chairs and trash receptacles should be tilted or moved where necessary to sweep underneath. After the floor has been swept, the floor surface, including corners and abutments should be free of streaks, litter, and spots caused by spills or tracking. Soil can be removed from the dust mop by vacuuming, or carefully brushing into a trash bag or container. I. SPOT MOP 1. A wet mop, mop bucket and wringer, and an ACP solution should be used to remove all obvious soil and non-permanent stains from the entire area. The ACP solution should be changed periodically and remain clear. Trash receptacles, chairs, etc. should be moved when necessary to spot mop underneath. After being spot mopped, the floor should have a uniform appearance with no streaks, swirl marks, detergent residue, or any evidence of soil. There should be no splash marks or mop streaks on furniture, walls, baseboards, etc. or mop strands remaining in the area. J. DAMP MOP 1. Boarding ramps in the Gate area should be damp-mopped daily. Prior to being damp mopped, the floor surface should be swept or dust mopped. A wet mop, mop bucket and wringer, and an ACP solution should be used to remove soil and non-permanent stains from the entire area. The ACP solution should be changed periodically and remain clear. All accessible areas should be damp mopped. Chairs, trash receptacles, etc. should be moved when necessary to mop underneath. After being damp mopped, the floor should have a uniform appearance with no streaks, swirl marks, detergent residue, or any evidence of soil. There should be no splash marks or mop streaks on furniture, walls, baseboards, etc. or mop strands remaining in the area. K. WET MOP FLOORS Attachment number 1Page 24 of 33 Page 25 of 33 Contract for Custodial Services 1. Prior to being wet cleaned, the entire floor surface should be swept or dust mopped. A wet mop, dual compartment mop bucket, and wringer, scrub brush, floor squeegee and ACP should be used to remove all soil and non-permanent stains from the entire floor, baseboards, etc. The ACP solution should be applied to the entire floor area and allowed to remain for three to five minutes. Then the entire floor area should be scrubbed with the scrub brush if the floor is heavily soiled. In areas with floor drains, the floor should then be squeegeed dry and rinsed with clear water. In areas without a floor drain, the solution should be picked up with a wet mop and mop bucket and wringer or a wet pick-up vacuum if available and then rinsed twice with clean water. The mop should always be placed in the rinse water compartment of the mop bucket before being placed in the ACP side of the bucket. All accessible areas should be wet cleaned. Chairs, trash receptacles, etc. should be moved when necessary to mop underneath. After being wet cleaned, the floor should have a uniform appearance with no streaks, swirl marks, detergent residue, or any evidence of soil. There should be no splash marks or mop streaks on furniture, walls, baseboards, etc. or mop strands remaining in the area. L. VACUUM TRAFFIC PATTERNS 1. Use an upright carpet vacuum or Power-vac with carpet tool to remove obvious soil and litter from the carpet in the traffic areas and where surface soil is apparent. Pick up and dispose of larger pieces of litter and debris. M. VACUUM COMPLETE 1. Use an upright carpet vacuum to collect surface soil and embedded grit from all areas accessible to the carpet vacuum. The vacuum should be adjusted to correspond with the pile height of the carpet. Chairs and trash receptacles should be tilted or moved where necessary to vacuum underneath. Additionally, as necessary, to prevent any visible accumulation of soil or litter in carpeted areas inaccessible to the upright carpet vacuum, a crevice tool and brush attachment should be used. After the carpeted floor has been completely vacuumed, it should be free of all visible litter, soil, and embedded grit. N. SPOT CLEAN CARPETS 1. Use an ACP (carpet stain remover) solution, a clean micro fiber cloth, and a nylon brush to remove obvious spots and stains from carpets. Spot cleaning should be attempted only after the carpet has been completely vacuumed. Spray a small amount of the solution directly onto the spot to be removed. Using the nylon brush, start at the outer edges of the spot and brush toward the center. Remove the residue with the clean micro fiber cloth. If the spot is not completely removed, repeat the procedure. If the spot remains after the second attempt, report the problem to the Supervisor. O. RESTORE FINISH (SPRAY-BUFF FLOORS COATED WITH SYNTHETIC FLOOR FINISH) 1. Prior to being spray-buffed, the floor surface should be dust mopped and damp mopped to remove any dry or wet soil. A single-disc floor machine, buffing pad, and a spray bottle with spray-buffing solution should be used to restore a uniform gloss and protective finish to terrazzo floors which are finished with a synthetic floor finish. The spray-buff solution should be prepared by mixing a solution of equal parts of water and floor finish. The areas accessible to the floor machine should be spray buffed. Chairs, trash receptacles, etc. should be tilted and Attachment number 1Page 25 of 33 Page 26 of 33 Contract for Custodial Services moved where necessary to spray-buff underneath. The floor should be dust mopped after spray buffing. After spray buffing the entire floor should have a uniform, glossy appearance, free of scuff- marks, heel marks, and other stains, and should have a uniform coating of floor finish. All spray-buff solution should be removed from baseboards, furniture, and waste receptacles. Entrance vestibules should be spray-buffed daily. P. RESTORE FINISH (BURNISH FLOORS COATED WITH SYNTHETIC FLOOR FINISH) 1. In wide open, non-obstructed, and clear areas use the “burnishing” technique to restore the floor finish. This technique relies on the high level of heat generated by a pad driven by an ultra high-speed floor machine to polish and restore the surface of the finish. Generally, if the coat of floor finish is in good condition no spray buff or burnishing material is required to polish the floor and restore the surface of the finish. The burnishing technique requires an ultra high-speed floor machine (1000 to 2500 RPM). The burnishing effect of the high-speed machines is all that is needed to restore the luster and shine to the surface. If the floor begins to show some signs of deterioration a solution of ½ water and ½ floor finish can be damp-mopped onto the clean floor. Once this solution has dried the floor can be burnished using the ultra high-speed floor machine equipped with a burnishing pad. Q. CLEAN AND DISINFECT DRINKING FOUNTAINS 1. Use a spray bottle of cleaner/disinfectant, micro fiber cloth, and a small percolator brush or bottle brush to remove all obvious soil, streaks, smudges, etc. from the drinking fountains and cabinets. Next clean all the porcelain and polished metal surfaces including the orifices and drain. Damp wipe the sides of the fountain and clean any exposed piping, as well as ventilation louvers. Report any leaks or malfunctions to the supervisor. After cleaning, the entire drinking fountain should be free of streaks, stains, spots, smudges, scale, and other removable soil. R. CLEAN INTERIOR GLASS 1. Use a spray bottle of ACP glass cleaning solution and a clean dry micro fiber cloth to completely clean both sides of interior glass in doors, windows, partitions, workstations, displays, trophy cases, mirrors, and other areas, up to 8’0” high. Remove any papers, notices, and the like taped or otherwise attached to the glass surfaces. Use a scraper or safety razor blade to remove these items. Spray a small area (usually about 3’x4’) with the glass cleaner, and remove the cleaner and soil with a circular motion of the clean cloth Use a brush, squeegee and bucket of glass cleaning solution to clean large expanses or areas of glass. After cleaning the glass shall present a clean, uniform appearance and be free of any streaks, smudges, stain, or soil. S. RESTROOMS 1. Refer to the frequency matrix for the frequencies for completing the restroom cleaning tasks. Many of the restroom tasks are the same as for general cleaning and are not duplicated here in this section. 2. Place a “Closed for Cleaning” sign in front of the restroom entrance. Sweep or dust mop the floor and pick up and dispose of all litter. Empty the waste Attachment number 1Page 26 of 33 Page 27 of 33 Contract for Custodial Services containers and damp wipe them as needed. Replace any soiled or torn liners. Refill the soap and paper towel dispensers and replace toilet tissue as needed. Hand soap dispensers and adjacent surfaces should be damp-wiped to remove spillage. T. CLEAN AND DISINFECT SINKS, COMMODES AND URINALS 1. Apply window cleaner to the mirrors and clean the mirrors with a paper towel, being sure to remove any streaks or marks. Using the pump-up sprayer, apply the ACP solution to the basins and counter tops and to the tiled wall area beside the basins. Clean the tops, sides, insides, hardware, piping underneath and counter tops between the basins with a micro fiber cloth. Dry the surfaces with a dry cloth or paper towel to prevent spotting. 2. Use the pump-up sprayer to apply the ACP solution to all the urinals and to the tiled wall area between and below the urinals and clean with a micro fiber cloth. This cloth should be of a particular color that will be used only on commodes and urinals. Clean the insides of the urinals with a bowl mop, making sure to remove any scale and buildup. Use the bowl mop to clean the underside of the flushing rim. Wipe metal surfaces dry with a clean cloth to prevent spotting. Clean under the urinal if wall hung. 3. Use the pump-up sprayer to apply the ACP solution to the insides and outsides of the commodes and to the wall areas beside them. Spray the top of the seat first, then lift the seat and spray the remainder of the fixture. Clean the seat, outside of the fixture, and wall beside the fixture with the same color cloth used to clean the outsides of the urinals. Clean the inside of the fixture with a bowl mop, making sure to remove any scale and buildup. Use the bowl mop to clean under the flushing rim. Wipe dry the top of the seat and the metal surfaces with a cloth to prevent spotting. 4. In smaller rest rooms, particularly in the Administration, TSA and Marshal’s areas the use of a pump-up sprayer may not be practical. In these areas, use an aerosol or spray bottle to apply the cleaner/disinfectant. 5. Spray a liberal amount of ACP solution onto the tiled floor surfaces. Mop the floor, removing all soil and stains. Use a scrub brush for heavy or greasy soil. Squeegee the mopping solution into the floor drain, or finish the mopping with a well-wrung mop and mop bucket filled with ACP solution. Vacuum the carpeted entranceway. ARTICLE XLII QUALITY STANDARDS The standards shown below will, if enforced day-to-day, result in the ARA being maintained at a very high level of cleaning. The key to success is the timely completion of the prescribed cleaning tasks on a regular basis. A. CARPETS 1. Cleaning: Carpets will be thoroughly clean and free from dust, dirt, embedded grit, stains, and debris. Nap will be laid in one direction. Visible spots or stains shall be Attachment number 1Page 27 of 33 Page 28 of 33 Contract for Custodial Services removed. Worn or un-cleanable carpet tile should be replaced with new carpet tile. Contractor to notify Administrator of need to replace any carpet tiles. B. NON-CARPETED FLOORS 1. Preparation for wet cleaning a. The entire floor surface shall be dust mopped. Cleaning solutions, where used, have been mixed thoroughly and in the proportions specified in approval products test without undue spillage of either solution or rinse water. The concourse areas (terrazzo) will be power scrubbed with the auto-scrubber. b. Proper precautions will be taken to advise terminal occupants of wet and/or slippery floor conditions, and erect suitable safety warning signs. c. Care will be taken to prevent damage to furnishings, etc. The space to be wet-cleaned will be properly prepared by sweeping or vacuuming the floor area as necessary or otherwise clearing it of visible debris. 2. Floor Mopping: a. The mopping work will be performed in such a manner as to properly clean the floor surface, care having been taken to see that the correct type and mixture of cleaning solution, if required, has been used. b. All mopped areas will be clean and free from dirt, streaks, detergent residue, mop marks and strands, etc., properly rinsed, if required, and dry mopped to present an overall appearance of cleanliness. c. Wall, baseboards, furniture and other surfaces will be free of watermarks, scars, or marks from the cleaning equipment striking the surfaces and splashing from the cleaning solution and rinse water. d. Care will be taken throughout the mopping operation to prevent the liquids and equipment from coming into contact with electric outlets located in the floor areas or baseboards. 3. Preparation of Floor Area for Burnishing a. Prepare the surface by dust mopping the entire area and removing any wet spills or heavily soiled areas with a damp mop. Dried residue (gum, etc.) should be removed with a putty knife and/or gum remover. When finished, walls, baseboards, furniture bases and other surfaces will be free of watermarks, marks from the cleaning equipment or cleaning solutions. 4. Burnishing a. Use the burnishing machine to burnish the entire floor (use a burnishing pad), overlapping each pass by at least 6”. When the burnishing has been completed, the floor surface shall have a uniform high gloss with no scratch marks, swirl marks or blemishes of any kind. The burnishing solution can be applied by using the auto scrubber. Burnishing solution will be applied thinly, uniformly and evenly in such a manner as to avoid skipping of areas. Walls, baseboards, furniture and other surfaces will be free of solution residue and marks from the equipment. C. PUBLIC AREAS Attachment number 1Page 28 of 33 Page 29 of 33 Contract for Custodial Services 1. Sweeping, Dusting and Pickup: a. Public areas will be clean and free of dirt streaks, litter and spots caused by spilling or tracking. No dirt or debris will be in corners, under furniture, behind doors, or where dirt or debris has been picked up in cleaning operations. Chewing gum and other foreign materials will be removed from the area. All horizontal surfaces or surfaces that will hold dust will be free of observable dust. b. All surfaces shall have a uniform appearance, free of streaks, smudges, dust, lint or litter. c. There will be no spots on interior glass up to a height of 8’0” from floor level. Doorknobs, panic bars, kick plates, railings, floors, and other surfaces shall be cleaned and polished to the luster of new product. d. Drinking fountains, including all sides, will be free of all debris and spots. The wall surfaces around the drinking fountains will be free of water spots and streaks. Drinking fountains will be sanitized to reduce the possibility of germ contamination. D. ALL TERMINAL AREAS 1. All wastepaper baskets will be empty and in place, clean and ready for use with new liners. There will not be any foreign substances left in corners, under furniture or behind doors. Carpets will be clean. Composition floors will be clean, and have a uniform shiny gloss appearance. Furniture and equipment moved during cleaning will be returned to its original location. There will be no trash or litter under tables, or chairs. 2. All surfaces shall have a uniform appearance, free of streaks smudges, dust and litter. Corners and crevices will be free from any dust. There will smudges or finger marks on walls or interior glass. Window sills, door ledges, door frames, door louvers, elevator doors, window frames, wainscoting, baseboards, columns and partitions will clean and free of smudges or marks. 3. Mirrors, entrance doors and all interior glass will be clean and free of dirt, dust, streaks, and spots. Exterior windows will be washed on both sides as scheduled. E. RESTROOMS 1. After cleaning, restrooms will have no objectionable odor, all surfaces (except wallpaper) will be wiped clean with no marks; commodes, urinals, sinks and counter-tops will be dry, clean, and polished. Mirrors will be clean and streak- free. Floors will be clean, dry, and free from streaks, stains or whirl marks. Grout and baseboards will be clean and free of stains. All towel and hand soap dispensers will be filled. Waste baskets will be empty and will have clean liners. ARTICLE XLIII ENTIRE AGREEMENT This Contract, together with all of the Contract Documents, shall constitute the entire agreement between the parties and any prior understanding or representation of any kind preceding the date of this Contract shall not be binding upon either party except to the extent incorporated in this Contract. Attachment number 1Page 29 of 33 Page 30 of 33 Contract for Custodial Services ARTICLE XLIV GOVERNING LAW This Contract will be construed under Georgia law, including the Georgia Uniform Commercial Code; all remedies available under that code are applicable to this Contract. Contractor and City fix jurisdiction and venue for any action brought with respect to this Contract in Augusta-Richmond County, Georgia. ARTICLE XLV LEGAL CONSTRUCTION If any provision contained in this Contract is held to be invalid, illegal or unenforceable, that invalidity, illegality or unenforceability will not effect any other provision of this Contract and this Contract will be construed as if the invalid, illegal or unenforceable provision had never been contained in this Contract. ARTICLE XLVI PRIOR CONTRACTS SUPERSEDED This Contract and the Contract Documents constitute the sole and only agreement between CONTRACTOR and CITY with respect to the subject matter of this Contract and supersede any prior understandings or written or oral contracts between CITY respecting the subject matter of this Contract. ARTICLE XLVII COUNTERPARTS This Contract may be executed concurrently in one or more counterparts, each of which will be deemed to be an original, but all of which will together constitute one Contract. ARTICLE XLVIII FURTHER ACTS CITY and CONTRACTOR each agrees to perform any additional acts and execute and deliver any additional documents as may reasonably be necessary in order to carry out the provisions and effectuate the intent of this Contract. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed by their appropriate officials, as of the date first written above. SIGNATURES TO FOLLOW BALANCE OF PAGE LEFT BLANK INTENTIONALLY Attachment number 1Page 30 of 33 Page 31 of 33 Contract for Custodial Services AUGUSTA-RICHMOND COUNTY, GEORGIA _______________________________________ By: Mayor Deke Copenhaver ATTEST:_______________________________ Lena Bonner, Clerk AUGUSTA AVIATION COMMISSION ______________________________________ By: Karlton Howard Title: Chairman ABM Southern Management _______________________________________ By: As its: __________________________________ (SEAL) Attachment number 1Page 31 of 33 Page 32 of 33 Contract for Custodial Services Attachment A PRICING Attachment number 1Page 32 of 33 Page 33 of 33 Contract for Custodial Services Attachment B BID SUBMITTAL FORMS Attachment number 1Page 33 of 33 Invitation To Bid Sealed bids will be received at this office until 11:00 a.m. Friday, August 20, 2010 for furnishing: Bid Item #10-148 Automated Firing Range System for Sheriff’s Office Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 Bid documents may be obtained at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing to the office of the Procurement Department by fax at 706-821-2811 or by mail. No bid will be accepted by fax, all must be received by mail or hand delivered. All questions are to be submitted in writing by Tuesday, August 10, 2010 by 5:00 p.m. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the Procurement Department with your bonafide bid package. No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark BID number on the outside of the envelope. Bidders are cautioned that sequestration of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Augusta-Richmond County, Georgia does not operate a DBE, MBE or WBE Program but rather pursuant to its code of ordinances, this local government operates instead a Local Small Business Opportunity Program. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle July 15, 22, 29, August 5, 2010 Metro Courier July 21, 2010 cc: Tameka Allen Interim Deputy Administrator Ronnie Strength Sheriff’s Office Mary Ann Gibbs Sheriff’s Office Robert Partain Sheriff’s Office Attachment number 2Page 1 of 1 Ve n d o r s : JA N I - K I N G O F AU G U S T A 36 6 5 W H E E L E R RO A D , S U I T E 1 A AU G U S T A , G A 30 9 0 9 D & A B U I L D I N G SE R V I C E S 32 1 G E O R G I A A V E LO N G W O O D , F L 32 7 5 0 AM E R I C A N FA C I L I T Y S E R V I C E S 13 2 5 U N I O N H I L L IN D U S T I A L C T Al p h a r e t t a , G A 3 0 0 0 4 AC S E N T I A L , I N C . P. O . B O X 3 1 2 2 4 5 AT L A N T A , G A 30 3 3 1 JA N - P R O C L E A N I N G SE R V I C E S 42 9 0 - C B E L A I R FR O N T A G E R D . AU G U S T A , G A 3 0 9 0 9 AB M J A N I T O R I A L 11 2 0 S H O P R O A D CO L U M B I A , S C 29 2 0 1 At t a c h m e n t B Ye s Y e s Y e s Y e s Y e s Y e s Bi d d e r ' s Fo r m / A c k n o w l e d g Ye s Y e s Y e s Y e s Y e s Y e s Ad d e n d u m 1 Ye s Y e s Y e s Y e s Y e s Y e s 7. 0 M - F W o r k Ho u r s / W e e k $2 , 2 9 0 . 8 0 $ 1 , 9 8 6 . 0 0 $ 1 , 5 1 2 . 0 0 $ 6 , 6 8 1 . 6 0 $ 1 , 9 2 0 . 0 0 $ 1 , 4 5 4 . 4 1 8. 0 S - S W o r k Ho u r s / W e e k $4 5 4 . 4 0 $ 5 2 9 . 6 0 $ 4 0 3 . 2 0 $ 5 8 5 . 6 0 $ 5 7 6 . 0 0 $ 4 1 5 . 5 3 7C + 8 C W e e k l y Ro u t i n e C o s t $2 , 7 4 5 . 2 0 $ 2 , 5 1 5 . 6 0 $ 1 , 9 1 5 . 2 0 $ 7 , 2 6 7 . 0 7 $ 2 , 4 9 6 . 0 0 $ 1 , 8 0 3 . 7 8 Lo a d e d M - F Ho u r l y R a t e $1 9 . 0 9 $ 1 6 . 5 5 $ 2 1 . 9 1 $ 5 7 . 1 8 $ 1 6 . 0 0 $ 1 1 . 8 2 Lo a d e d W e e k e n d Ho u r l y R a t e $1 4 . 2 0 $ 1 6 . 5 5 $ 1 1 . 6 7 $ 1 9 . 8 0 $ 1 8 . 0 0 $ 1 1 . 6 0 Bi d I t e m # 1 0 - 1 3 8 Co n t r a c t C u s t o d i a l S e r v i c e s Fo r t h e C i t y o f A u g u s t a - A u g u s t a R e g i o n a l A i r p o r t Bi d O p e n i n g D a t e : F r i d a y , J u n e 1 8 , 2 0 1 0 a t 1 1 : 0 0 a . m . Pa g e 1 o f 2 Attachment number 3Page 1 of 2 Ve n d o r s : DY N A M I C CL E A N E R S 82 1 1 2 T H S T R E E T AU G U S T A , G A 3 0 9 0 1 A & A V E T E R A N S 12 5 1 G O R D O N P A R K AU G U S T A , G A 3 0 9 0 1 EA S T E R S E A L S P. O . B O X 2 4 4 1 AU G U S T A , G A 3 0 9 0 3 TA Y L O R M A D E WO R L D W I D E 36 0 2 S T E R L I N G RI D G E D R AU G U S T A , G A 3 0 9 0 9 EX E C U T I V E JA N I T O R I A L SE R V I C E S P O B O X 2 0 4 9 2 2 MA R T I N E Z , G A 3 0 9 1 7 FR I E N D S IN C O P E R A T E D P. O . B O X 1 9 7 2 HE P H Z I B A H , G A 30 8 1 5 At t a c h m e n t B Bi d d e r ' s Fo r m / A c k n o w l e d g Ad d e n d u m 1 7. 0 M - F W o r k Ho u r s / W e e k No B i d Re s p o n s e No B i d Re s p o n s e No B i d Re s p o n s e 8. 0 S - S W o r k Ho u r s / W e e k No B i d Re s p o n s e No B i d Re s p o n s e No B i d Re s p o n s e 7C + 8 C W e e k l y Ro u t i n e C o s t No B i d Re s p o n s e No B i d Re s p o n s e No B i d Re s p o n s e Lo a d e d M - F Ho u r l y R a t e No B i d Re s p o n s e No B i d Re s p o n s e No B i d Re s p o n s e Lo a d e d W e e k e n d Ho u r l y R a t e No B i d Re s p o n s e No B i d Re s p o n s e No B i d Re s p o n s e Bi d I t e m # 1 0 - 1 3 8 Co n t r a c t C u s t o d i a l S e r v i c e s Fo r t h e C i t y o f A u g u s t a - A u g u s t a R e g i o n a l A i r p o r t Bi d O p e n i n g D a t e : F r i d a y , J u n e 1 8 , 2 0 1 0 a t 1 1 : 0 0 a . m No n - Co m p l a i n t Fa i l e d t o pr o v i d e re q u i r e d E - Ve r i f y Id e n t i f i c a t i o n Nu m b e r No n - C o m p l i a n t Fa i l e d t o re t u r n t h e en t i r e s e c t i o n of A t t a c h m e n t B No n - C o m p l i a n t Fa i l e d t o r e t u r n th e e n t i r e se c t i o n o f At t a c h m e n t B an d Ac k n o w l e d g e Ad d e n d u m 1 Pa g e 2 o f 2 Attachment number 3Page 2 of 2 Attachment number 4Page 1 of 1 Attachment number 5Page 1 of 6 Attachment number 5Page 2 of 6 Attachment number 5Page 3 of 6 Attachment number 5Page 4 of 6 Attachment number 5Page 5 of 6 Attachment number 5Page 6 of 6 Commission Meeting Agenda 10/5/2010 5:00 PM Brownfield Community-Wide Assessment Grant for Hazardous Substances and Petroleum Consent, Clean Up Grant and the Targeted Brownfield Assessment Program Department:Housing & Community Development Caption:Motion to approve the filing of three (3) environmentally related grants/services: Brownfield Community-Wide Assessment Grant for Hazardous Substances and Petroleum, EPA Clean Up Grant and the Targeted Brownfield Assessment Program through the Environmental Protection Agency. (Approved by Administrative Services Committee September 27, 2010) Background:A Brownfield is defined as: real property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous substance, pollutant, or contaminant. · The Brownfield Community-Wide Assessment Grant for Hazardous Substances and Petroleum ($400,000) will allow Housing and Community Development Department (HCDD) to inventory, characterize, assess, and conduct planning and community involvement related to Brownfield. The funds will be used to address sites contaminated by petroleum and hazardous substances, pollutants, or contaminants including hazardous substances co- mingled with petroleum. · The EPA Cleanup Grant ($200,000) will provide funding to carry out cleanup activities at Brownfield sites. These activities would require a Phase I and Phase II Environmental Assessment. · The Targeted Brownfield Assessment (TBA) program ($200,000) is not a grant program, but a service provided through an EPA contract in which EPA directs a contractor to conduct environmental assessment activities to address the requestor’s needs if there is a concern in a Brownfield site. This program will cover the cost of the Phase I and Phase II Environmental Assessment for sites that potentially require clean up. The project period for each grant is three years. Analysis:These grants will be used to address sites contaminated by petroleum and hazardous substances, pollutants, or contaminants (including hazardous substances co-mingled with petroleum). One public meeting will be held to provide citizens an opportunity to participate in the development of the application prior to submission of the Brownfield Community-Wide Assessment Grant for Hazardous Substances and Petroleum. Financial Impact:There will be no financial impact to the municipality. The Community Wide Assessment Grant for Petroleum and Hazardous Substances will be in the amount of $400,000. Alternatives:none Cover Memo Recommendation:Approve the submission of the Brownfield Community Wide Assessment Grant for Petroleum and Hazardous Substances in the amount of $400,000 and approve the future submission of the EPA Clean Up Grant and the Targeted Brownfield Assessment Program applications in the amount of $200,000.00. Funds are Available in the Following Accounts: The EPA Clean Up Grant and Targeted Brownfield Assessment Program applications will be submitted at a later date. REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Commission Meeting Agenda 10/5/2010 5:00 PM Department of the Navy Department: Caption:Motion to approve the renewal of the lease agreement between Augusta, Ga. and the Department of the Navy (Naval and Marine Corps Reserve Center) for a term July 1, 2010 to June 30, 2011. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Commission Meeting Agenda 10/5/2010 5:00 PM Ordinance Relating to Parking Violations and Enforcement Department:Clerk of Commission Caption:Motion to approve an Ordinance to amend the Augusta, Georgia Code Article Twelve, Sections 3-5-92 through 3-5-95.1 relating to parking violations and enforcement; to add new Sections 3-5-95.2 through 3-5- 95.24; to allow the Downtown Development Authority to enforce parking violations and use collected funds for revitalization in Downtown Augusta; to repeal all Ordinances and parts of Ordinances in conflict herewith; to provide an effective date and for other purposes. (Approved by Administrative Services Committee September 13 & 27, 2010) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 23 Attachment number 1Page 2 of 23 Attachment number 1Page 3 of 23 Attachment number 1Page 4 of 23 Attachment number 1Page 5 of 23 Attachment number 1Page 6 of 23 Attachment number 1Page 7 of 23 Attachment number 1Page 8 of 23 Attachment number 1Page 9 of 23 Attachment number 1Page 10 of 23 Attachment number 1Page 11 of 23 Attachment number 1Page 12 of 23 Attachment number 1Page 13 of 23 Attachment number 1Page 14 of 23 Attachment number 1Page 15 of 23 Attachment number 1Page 16 of 23 Attachment number 1Page 17 of 23 Attachment number 1Page 18 of 23 Attachment number 1Page 19 of 23 Attachment number 1Page 20 of 23 Attachment number 1Page 21 of 23 Attachment number 1Page 22 of 23 Attachment number 1Page 23 of 23 Commission Meeting Agenda 10/5/2010 5:00 PM Implementation of NetMotion Virtual Private Network (VPN) software Department:Information Technology Caption:Motion to approve the purchase of NetMotion Software for mobile connectivity. (Approved by Public Safety Committee September 27, 2010) Background:Information Technology is requesting approval to purchase NetMotion Virtual Private Network (VPN) software to enhance the ability of Augusta’s Public Safety Offices by providing a reliable connection to our current New World server. With our current move to 4G broadband in all of our Public Safety vehicles, this software will provide a stable and reliable connection for the Sheriff’s Office and the Fire Department to our current CAD system, at a much faster rate. This software is designed to maintain a stable connection so our Public Safety Offices will be able to receive their dispatch calls with no delay’s, allowing better response time to public safety calls. NetMotion is designed to work with our current mobile devices in the field. By purchasing this software we will also be able to increase our transmitting speed of data to all of our vehicles in the field. This software, once implemented, will improve our overall response to the citizens of Augusta - Richmond County by allowing us to respond to calls in a quicker and more efficient manner. Analysis:Information Technology conducted an evaluation of three different VPN software providers. NetMotion was selected as the most reliable and stable platform of the three vendors. NetMotion Wireless has proven expertise in wireless mobile computing, with more than 1,600 organizational customers representing over 450,000 device licenses accessed by mobile workers. Major customers include Atlanta Gas & Light, Con Edison, Cox Communications, Continental Airlines, Florida Highway Patrol, LAPD, the Mayo Clinic, St. Jude Medical Center and Columbia County Sheriff’s Office. Financial Impact:Funding, in the amount of $90,000, is available in Information Technology’s SPLOST accounts for Wireless Projects (GL# 325-12-2110/JL#209-92- 5003). Alternatives:Remain on current network and not upgrade. Recommendation:Approve the agenda item. Funds are Available in the Following (GL# 325-12-2110/JL#209-92-5003). Cover Memo Accounts: REVIEWED AND APPROVED BY: Procurement. Information Technology. Finance. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 DELL INC P. O. BOX 534118 ATLANTA, GA 30353 SOFTWARE HOUSE INC. 33 KNIGHTSBRIDGE ROAD PISCATTAWAY, NJ 08854-3925 CDWG 230 N. MILWAUKEE AVE. VERNON HILLS, IL 60061 Tameka Allen Information Technology Steve Smead Information Technology Bid Item 10-179 mailed 8/26/2010 Bid Item 10-179 Professional Services – NetMotions Information Technology Bid Due: Fri. 9/10/2010 @ 11:00 a.m. Attachment number 2Page 1 of 1 Invitation to Bid Professional Services Sealed bids for Professional Services will be received at this office until Friday, September 10, 2010 @ 11:00 a.m. for furnishing: Bid Item #10-179 NetMotion Software for Information Technology Department BID’s will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams Procurement Department 530 Greene Street - Room 605 Augusta, Georgia 30901 706-821-2422 BID documents may be obtained at the office of Augusta, GA Procurement Department, 530 Greene Street – Room 605, Augusta, GA 30901. Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing to the office of the Procurement Department by Fax at 706-821-2811 or by mail no later than Monday, August 30, 2010 by 5:00 p.m. No bid will be accepted by fax, all must be received by mail or hand delivered. The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid preference on an eligible local project, the certification statement as a local bidder and all supporting documents must be submitted to the Procurement Department with your bonafide bid package. No BID may be withdrawn for a period of 90 days after time has been called on the date of opening. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. Please mark BID number on the outside of the envelope. Bidders are cautioned that sequestration of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Disadvantage Business Enterprise (DBE) Augusta-Richmond County, Georgia does not operate a DBE, MBE or WBE Program for Augusta funded projects, as a Federal Court has entered an Order enjoining the Race-Based portion of Augusta’s DBE Program. Instead Augusta operates a Local Small Business Opportunity Program. However, for various projects utilizing the expenditure of State or Federal funds, Augusta enforces DBE requirements and/or DBE goals set by the Federal and/or State Agencies in accordance with State and Federal laws. GERI A. SAMS, Procurement Director cc: Tameka Allen Interim Deputy Administrator Steve Smead Information Technology Attachment number 3Page 1 of 1 Attachment number 4Page 1 of 1 Commission Meeting Agenda 10/5/2010 5:00 PM New World Systems Field Reporting for Sheriff's Office Department:Information Technology Caption:Motion to approve Contract with New World Systems, Inc. for the New World Field Reporting Software Product. (Approved by Public Safety Committee September 27, 2010) Background:Augusta currently uses New World software to manage 911 Computer Aided Dispatch as well as Richmond County Sheriff's Office (RCSO) processes including records management, case management, and corrections management. Field Reporting is a tool that will enable deputies to submit incident & accident reports from their patrol cars instead of using paper processes. Additionally, the Field Reporting program enables deputies in the field to have access to more advanced technology tools used for searching and retrieving data from the New World database, which they do not currently have. Analysis:Sheriff's Deputies currently file reports using traditional paper-based methods. Paperwork is generated in the field, and is usually either hand- written or typed on a Mobile Data Terminal (MDT). Paperwork related to incidents is then forwarded through the chain of command, and finally entered into the Records Management System (RMS) by the RCSO Records Division. The Field Reporting product will eliminate redundant typing and scanning of information by managing reports electronically. Financial Impact:This project will be funded by grant funds acquired by the Richmond County Sheriff's Office. Alternatives:N/A Recommendation:Approve Contract with New World Systems, Inc. for the New World Field Reporting Software Product Funds are Available in the Following Accounts: 2010: 111032630 $152,000 available 2011: 111032634 $133,000 available Other funds will be allocated in 2011 by grant and budget amendment REVIEWED AND APPROVED BY: Procurement. Cover Memo Information Technology. Finance. Law. Administrator. Clerk of Commission Cover Memo &RUSRUDWH:HVW%LJ%HDYHU5RDG‡6XLWH‡7UR\‡0LFKLJDQ-‡-269-‡ZZZQHZZRUOGV\VWHPVFRP September 7, 2010 ADDITIONAL SOFTWARE LICENSE AGREEMENT Mr. Mike Blanchard Augusta / Richmond County 530 Greene St. Augusta, GA 30911 Dear Mr. Blanchard: New World Systems is pleased to license you additional software per your request. The attached forms (Exhibits AA, A and B) are to be reviewed and approved by you and/or your authorized representative. They describe the additional software and services you have requested along with the related fees. Other than for the purposes of internal review, we ask that you treat our fees as confidential information. This is due to the competitive nature of our business. The General Terms and Conditions from our original License Agreement with Richmond County, GA are incorporated and will apply. We thank you for your continued business with New World Systems. We look forward to working on this project with you. ACKNOWLEDGED AND AGREED TO BY: NEW WORLD SYSTEMS£ CORPORATION (New World) AUGUSTA/RICHMOND COUNTY, GEORGIA (Customer) By: _______________________________ Larry D. Leinweber, President By: _______________________________________ Authorized Signature Title By: _______________________________________ Authorized Signature Title Date: ______________________________ Date: _____________________________________ Each individual signing above represents that (s)he has the requisite authority to execute this Agreement on behalf of the organization for which (s)he represents and that all the necessary formalities have been met. 7KH³(IIHFWLYH'DWH´RIWKLV$JUHHPHQWLVWKHODWWHURIWKHWZRGDWHVLQWKHDERYHVLJQDWure block. PRICING ASSUMES CONTRACT EXECUTION BY SEPTEMBER 30, 2010. Attachment number 1Page 1 of 7 CONFIDENTIAL 1A CNT 090710 Mobile FR Page 2 of 7 Augusta/Richmond County, GA EXHIBIT AA TOTAL COST SUMMARY AND PAYMENT SCHEDULE I. Total Cost Summary: Licensed Standard Software and Implementation Services DESCRIPTION OF COST COST A. LICENSED STANDARD SOFTWARE as further detailed in Exhibit A $380,000 1. Licensed Standard Software $677,720 2. Less Customer Loyalty Software Discount (297,720) B. IMPLEMENTATION AND THIRD PARTY PRODUCTS AND SERVICES 75,000 1. PROJECT MANAGEMENT as further described in Exhibit B 2. IMPLEMENTATION AND TRAINING SERVICES as further described in Exhibit B ONE TIME PROJECT COST: $455,000 C. TRAVEL EXPENSES (Estimate) ± billed as incurred $15,000 D. STANDARD SOFTWARE MAINTENANCE SERVICES $108,435/annually PRICING ASSUMES CONTRACT EXECUTION BY SEPTEMBER 30, 2010. Attachment number 1Page 2 of 7 CONFIDENTIAL 1A CNT 090710 Mobile FR Page 3 of 7 Augusta/Richmond County, GA Exhibit AA / COST SUMMARY AND PAYMENT SCHEDULE II. Payments for Licensed Standard Software and Implementation Services DESCRIPTION OF PAYMENT PAYMENT A. LICENSED STANDARD SOFTWARE as further detailed in Exhibit A $380,000 1. Amount invoiced upon Effective Date (25%) $95,000 2. Amount invoiced upon Installation of Licensed Standard 95,000 Software (25%) 3. Amount invoiced upon Functional Operation of Application 95,000 Software on 30 Mobile Units (25%) 4. Amount invoiced 90 days after Functional Operation of 95,000 Application Software on 30 Mobile Units (25%) B. IMPLEMENTATION AND THIRD PARTY PRODUCTS AND SERVICES 75,000 1. Amount invoiced upon the Effective Date $16,875 2. Amount invoiced 90 days after the Effective Date 16,875 3. Amount invoiced 180 days after the Effective Date 16,875 4. Amount invoiced 270 days after the Effective Date 16,875 5. Amount invoiced 365 days after the Effective Date 7,500 ONE TIME PAYMENTS: $455,000 C. TRAVEL EXPENSES (Estimate) $15,000* (These expenses are billed as incurred) 1. 10 trips are anticipated. 2. Travel Time for the estimated 10 trips is not included in this estimate and will be billed as incurred. 3. Travel Expenses shall not exceed $15,000 without &XVWRPHU¶V prior written consent. *Estimate D. STANDARD SOFTWARE MAINTENANCE SERVICES $108,435 Standard Software Maintenance Agreement (SSMA) fees will increase for the above software change and will commence on May 1, 2012; year one cost to be prorated to run concurrently with &XVWRPHU¶Vexisting SSMA. Subsequent year SSMA fees for the above software will be consistent with the SSMA agreement currently in effect. ALL PAYMENTS ARE DUE WITHIN THIRTY (30) DAYS FROM RECEIPT OF INVOICE. Attachment number 1Page 3 of 7 CONFIDENTIAL 1A CNT 090710 Mobile FR Page 4 of 7 Augusta/Richmond County, GA EXHIBIT A LICENSED STANDARD SOFTWARE AND FEES 1. License Fee for Licensed Standard Software And Documentation Selected By Customer: Application Package Cost MOBILE SOFTWARE MOBILE SOFTWARE ON THE RS/6000 1 1. Additional Aegis Software for RS/6000 Message Switch - Mobile Upload Software (1-500 users) 2 70,000 MOBILE MANAGEMENT SERVER 2. Aegis Mobile Management Server Software (1-500 units) - Base CAD/NCIC/Messaging No Charge - Field Reporting 25,000 - Field Reporting Data Merge 6,000 CLIENT SOFTWARE 3. Aegis® Law Enforcement Mobile Unit Software (308 Units) Mobile Messaging State Photo Download $200 ea. 53,400 4. Aegis® Law Enforcement Mobile Unit Software Field-Based Reporting LE Field Reporting (Federal Standards) (308 Units) $1,000 ea. 267,000 The following 4 New World Reports are included: - Incident (1 form) - Case (1 form) - Arrest (1 form) - Supplement (1 form) LE Field Reporting Compliance (308 Units) $200 ea. 53,400 LE Accident Field Reporting 3 (225 Units) $1,000 ea. 267,000 The following New World Report is included: - Accident (1 form) LE Accident Field Reporting Compliance (225 Units) $300 ea. 80,100 Field Investigation Field Reporting (2 Forms) (83 Units) $300 ea. 80,100 Mobile Upload of Field Reports (308 Units) $600 ea. 160,200 NEW WORLD STANDARD SOFTWARE LICENSE FEE $677,720 LESS CUSTOMER LOYALTY SOFTWARE DISCOUNT (297,720) TOTAL SOFTWARE LICENSE FEE 4,5 $380,000 Attachment number 1Page 4 of 7 CONFIDENTIAL 1A CNT 090710 Mobile FR Page 5 of 7 Augusta/Richmond County, GA Exhibit A / LICENSED STANDARD SOFTWARE AND FEES ENDNOTES 1 Currently supporting Motorola, Data Radio (DMP & IP), CDPD, EDACS, GPRS, 802.11 and Electrocom Mobile Communication solutions only. 2 The Mobile Upload software provides for the automated upload of New World's Law Enforcement Field Reporting data over Customer's mobile data network. Customer is responsible for obtaining from their mobile vendor, the written definition and documentation of the optimal (mobile message) record size to upload laptop data over the mobile network to be used. This definition must be received within thirty (30) days of this Agreement being executed. 3 LE Accident Field Reporting requires Scene PD. Scene PD will provide an upgrade path from Customer's currently licensed Easy Street Software. 4 Prices assume that all software proposed is licensed. 5 If taxes or fees are imposed, they are the responsibility of the purchaser and will be remitted to New World upon being invoiced. Attachment number 1Page 5 of 7 CONFIDENTIAL 1A CNT 090710 Mobile FR Page 6 of 7 Augusta/Richmond County, GA EXHIBIT B PROJECT MANAGEMENT, IMPLEMENTATION AND TRAINING SUPPORT SERVICES 1. Project Management Services New World shall act as Project Manager to assist &XVWRPHU¶V management in implementing the Exhibit A software. This responsibility will include documenting, coordinating and managing the overall Implementation Plan with &XVWRPHU¶V management and the Customer Liaison. Project Management Services include: a) a summary level Implementation Plan; b) a detail level Implementation Plan; c) revised Implementation Plans (if required); d) monthly project status reports; and e) project status meetings x a project review (kickoff) meeting at &XVWRPHU¶V location x progress status meeting(s) will occur during implementation via telephone conference or at &XVWRPHU¶V location; and x a project close-out meeting at &XVWRPHU¶V location to conclude the project. f) New World consultation with other vendors or third parties. g) a Pre-Trip Report will be provided to Customer for review two weeks in advance of trip The implementation services fees described in Exhibit AA include Project Management fees for a period up to 12 months after the Effective Date. 2. Implementation and Training Support Hours Recommended It is recommended that appropriate support hours are allocated for all Licensed Standard Software listed in Exhibit A to insure successful implementation of and training on each application package. Based on the Licensed Standard Software listed on Exhibit A, up to 300 hours of New World implementation and training support services have been allocated for this project. Excess hours requested shall be billed at the Hourly Rate. Avoiding or minimizing custom or modified features will aid in keeping the support costs to the amount allocated. Customer agrees to reimburse New World for support trips canceled by Customer less than ten (10) days before the scheduled start date to cover 1HZ:RUOG¶V out-of-pocket costs and lost revenues. The recommended implementation and training support services include: a) implementation of each package of Licensed Standard Software; b) Customer training and/or assistance in testing for each package of Licensed Standard Software; and c) tailoring of Licensed Standard Software by New World technical staff and/or consultation with New World technical staff. The project management, implementation and training support services provided by New World may be performed at &XVWRPHU¶V premises and/or at New World national headquarters in Troy, Michigan (e.g., portions of project management are performed in Troy). Attachment number 1Page 6 of 7 CONFIDENTIAL 1A CNT 090710 Mobile FR Page 7 of 7 Augusta/Richmond County, GA Exhibit B / PROJECT MANAGEMENT, IMPLEMENTATION AND TRAINING SUPPORT SERVICES 3. Additional Services Available Other New World services may be required or requested for the following: a) additional software training; b) tailoring of Licensed Standard Software by New World technical staff and/or consultation with New World technical staff; c) New World consultation with other vendors or third parties; d) modifying the Licensed Standard Software; e) designing and programming Licensed Custom Software; and f) maintaining modified Licensed Standard Software and/or custom software. Customer may request these additional services in writing using 1HZ :RUOG¶V Request For Service (RFS) procedure (or other appropriate procedures mutually agreed upon by Customer and New World and will be provided at the Hourly Rate). Attachment number 1Page 7 of 7 Attachment number 2Page 1 of 1 Attachment number 3Page 1 of 2 Attachment number 3Page 2 of 2 Commission Meeting Agenda 10/5/2010 5:00 PM Purchase of Services Grant #JB-08ST-0002 for Juvenile Offenders Department:Clerk of Commission Caption:Motion to approve Purchase of Services Grant #JB-08ST-0002 for Juvenile Offenders. (Approved by Public Safety Committee September 27, 2010) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 9 Attachment number 1Page 2 of 9 Attachment number 1Page 3 of 9 Attachment number 1Page 4 of 9 Attachment number 1Page 5 of 9 Attachment number 1Page 6 of 9 Attachment number 1Page 7 of 9 Attachment number 1Page 8 of 9 Attachment number 1Page 9 of 9 Commission Meeting Agenda 10/5/2010 5:00 PM 2010 Airport Sweeper Department:Finance Department, Fleet Management Division Caption:Approve request from the Augusta Regional Airport at Bush Field to purchase one (1) runway sweeper. Background:The Augusta Regional Airport requests the purchase of one truck mounted runway sweeper to upgrade their current equipment. The airport currently uses an older broom type sweeper which is no longer effective or efficient with the amount of current aircraft traffic entering and exiting the airport on a daily basis. The new truck mounted vacuum type sweeper is much more efficient in time consumption and the cleaning of the runways. Analysis:Fleet Management would like to utilize the Federal General Services Administration bid program to purchase the unit. The GSA low bid for this unit was awarded to Maryland Industrial Trucks (bid award number GS- 30F-1012H as indicated by the attachment paperwork. Financial Impact:The unit will be purchased for $203,848 using the GMA lease program, with an annual premium of $40,769.60 each year for 5years. Alternatives:1. Approve the aware to Maryland Industrical Trucks, Inc. 2. Do not approve the request. Recommendation:Approve request to purchase the runway sweeper from Maryland Industrial Trucks, Inc. for $203,848.00 through the GMA lease program. Funds are Available in the Following Accounts: 631-00-0000/1119114 (GMA Lease Pool) REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 11 Attachment number 1Page 2 of 11 Attachment number 1Page 3 of 11 Attachment number 1Page 4 of 11 Attachment number 1Page 5 of 11 Attachment number 1Page 6 of 11 Attachment number 1Page 7 of 11 Attachment number 1Page 8 of 11 Attachment number 1Page 9 of 11 Attachment number 1Page 10 of 11 Attachment number 1Page 11 of 11 Commission Meeting Agenda 10/5/2010 5:00 PM Carol Nimmons Department:Clerk of Commission Caption:Consider a request from Ms. Carol Nimmons regarding a reduction in the amount of her property taxes for this year. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Attachment number 2Page 1 of 6 Attachment number 2Page 2 of 6 Attachment number 2Page 3 of 6 Attachment number 2Page 4 of 6 Attachment number 2Page 5 of 6 Attachment number 2Page 6 of 6 Commission Meeting Agenda 10/5/2010 5:00 PM Hotel/Motel Tax and car rental fees Department: Caption:Motion to approve an ordinance for reallocation of Hotel/Motel tax and car rental fees. (Requested by Commisioner Don Grantham) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Commission Meeting Agenda 10/5/2010 5:00 PM Ordinance Relating to Parking Violations and Enforcement Department:Clerk of Commission Caption:Motion to approve an Ordinance to amend the Augusta, Georgia Code Article Twelve, Sections 3-5-92 through 3-5-95.1 relating to parking violations and enforcement; to add new Sections 3-5-95.2 through 3-5- 95.24; to allow the Downtown Development Authority to enforce parking violations and use collected funds for revitalization in Augusta; to repeal all Ordinances and parts of Ordinances in conflict herewith; to provide an effective date and for other purposes. (Approved by Administrative Services Committee September 13, 2010) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Attachment number 1Page 1 of 23 Attachment number 1Page 2 of 23 Attachment number 1Page 3 of 23 Attachment number 1Page 4 of 23 Attachment number 1Page 5 of 23 Attachment number 1Page 6 of 23 Attachment number 1Page 7 of 23 Attachment number 1Page 8 of 23 Attachment number 1Page 9 of 23 Attachment number 1Page 10 of 23 Attachment number 1Page 11 of 23 Attachment number 1Page 12 of 23 Attachment number 1Page 13 of 23 Attachment number 1Page 14 of 23 Attachment number 1Page 15 of 23 Attachment number 1Page 16 of 23 Attachment number 1Page 17 of 23 Attachment number 1Page 18 of 23 Attachment number 1Page 19 of 23 Attachment number 1Page 20 of 23 Attachment number 1Page 21 of 23 Attachment number 1Page 22 of 23 Attachment number 1Page 23 of 23 Commission Meeting Agenda 10/5/2010 5:00 PM Engineering/Street Lighting Department:Engineering/Traffic Caption:Motion to approve a resolution creating street lighting districts. (Approved by Engineering Services Committee September 27, 2010) Background:The Engineering Department has been petitioned by the citizens requesting street lighting in their neighborhood pursuant to a 1971 Commission Resolution authorizing the creating of Street Lighting Districts. The petitioners agree to pay for all costs associated with the installation, ongoing maintenance and energy. Analysis:Currently, street lighting is non-existing in these areas. Street lighting has been an effective measure to increase pedestrian and vehicular safety, assist in crime prevention, and to promote businesses and community pride. Financial Impact:Street Lighting Districts are funded by a self supporting fund. Street Lighting charges vary based on the type lighting requested or required, billable front footage, and light wattage and spacing. Costs for the subject districts follow: Lighting District No. 75D Berckmans Hills $.45/ft Alternatives:Approve Street Lighting District No. 75D Recommendation:Approve Street Lighting District No. 75D Funds are Available in the Following Accounts: 2760416105233111 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Engineering Department Traffic Engineering Section 507 Telfair Street Augusta, Georgia 30901 Georgia, Richmond County: A petition has been filed with the Board of Commissioners of Richmond County, Georgia for the installation and maintenance of street lights in Street Light District No. 75D Berckman Hills. Street Lighting District No. 75D consists of a part of Ashland Drive and Boy Scout Road. Reference: Richmond County GA Tax Map 18-3; parcels 67-73. Tax Map 18-4; parcels 1,2,15,26.01,27. Tax Map 25-2 parcels 1-9, 15-18, 22. Same to be installed and the annual service charge to be assessed against the abutting property. Said petition has been set for hearing before the Board of Commissioners at ___________________o'clock ______________________in room 806 Municipal Building, 530 Greene Street, Augusta, Georgia. All persons whose interest are affected by the proposed installation of street lights are hereby notified to appear in person or by attorney at said time and place and present such objection or evidence herein as their interest require. This _______day of ________________, 20______. ____________________Chairman AUGUSTA-RICHMOND COUNTY COMMISSION-COUNCIL RICHMOND COUNTY, GEORGIA Attachment number 1Page 1 of 5 SREET LIGHTING RESOLUTION A resolution providing for the installation of street lights and the assessment of the annual cost of maintaining and operating said street lights against abutting property. WHEREAS a resolution was adopted by the Board of Commissioners of Richmond County, Georgia, on the 19th day of October, l971, authorizing creation of certain street light districts in Richmond County pursuant to Constitutional Amendment (GA. Laws 1970, Vol. l, page 1097); and affected by the hereinafter described improvements have petitioned the Board of Commissioners of Richmond County, Georgia, for the installation of street lights. NOW, THEREFORE, BE IT RESOLVED, by the Commission-Council of Richmond County, Georgia, as the governing body of said County, that there be and there is hereby created and established within the are area of Richmond County, Street Light District No. 75D, for the purpose of building, erecting, establishing, maintaining and operating street lights and lamps for the illumination of the public streets, roads, sidewalks and ways therein, as more Particularly shown and delineated on map entitled "Street Light District No. 75D, which map is attached hereto and made a part of this resolution by reference; and BE IT FURTHER RESOLVED that the boundaries of said district as enumerated on said map be and the same are hereby established as shown and delineated on said map as full and complete as if the full legal description of the courses, distances and boundaries of said district are fully set forth herein. Attachment number 1Page 2 of 5 BE IT FURTHER RESOLVED that the annual cost and charges for the maintenance and operation of said street lights shall be at a rate of $.45 per front foot per year and shall be a lien upon the abutting property annually and continuing each year until all annual charges have been paid. IT IS ORDERED that a copy of this resolution, together with a copy of said map be transmitted to the Tax Commissioner of Richmond County, for the collection of any and all taxes and/or service charges which may be imposed against any businesses, residents and property served by said facilities. Adopted by the Board of Commissioners of Richmond County, Georgia, this ___________day of ______________, 20_____. ____________________________ Mayor, Commission-Council Richmond County, Georgia Attest: ______________________ Clerk Attachment number 1Page 3 of 5 AJENDA ITEM _________ EDITION _____________ Date: September 16, 2010 To: Hon. Deke Copenhaver, Mayor Members of Commission Chairman, Engineering Services Committee Through: Abie L. Ladson, P E Director, Engineering Dept. Through: Fred Russell, Administrator From: Steven J. Cassell, PE, PTOE, Assist. Director²Traffic Engineering Subject: Petitioned Street Lighting Districts File Reference: 09-005E (A) CAPTION: Recommend approval of resolution creating street lighting districts. BACKGROUND: The Engineering Department has been petitioned by the citizens requesting street lighting in their neighborhood pursuant to a 1971 Commission Resolution authorizing the creating of Street Lighting Districts. The petitioners agree to pay for all costs associated with the installation, ongoing maintenance and energy. ANALYSIS: Currently, street lighting is non-existing in these areas. Street lighting has been an effective measure to increase pedestrian and vehicular safety, assist in crime prevention, and to promote businesses and community pride. FINANCIAL IMPACT: Street Lighting Districts are funded by a self supporting fund. Street Lighting charges vary based on the type lighting requested or required, billable front footage, and light wattage and spacing. Costs for the subject districts follow: Lighting District No. 75D Berckmans Hills Attachment number 1Page 4 of 5 AGENDA ITEM _______ EDITION _______ September 16, 2010 Page 2 REQUESTED AGENDA DATE: Committee Meeting: Commission Meeting: DEPARTMENT FUNDS ARE AVAILABLE IN THE DIRECTOR ACCOUNTS: 2760416105233111/Legal Advertising ADMINISTRATOR: FINANCE: SJC/ALL/PJ Cc: Charles Gifford Agenda File Traffic Engineering File Attachment number 1Page 5 of 5 Commission Meeting Agenda 10/5/2010 5:00 PM Indemnity/Hold Harmless and Mowing and Maintenance Agreement for Doug Barnard Parkway Department:Planning Commission Caption:Motion to approve Indemnity/Hold Harmless Agreement and Mowing and Maintenance Agreement for Doug Barnard Parkway. (Approved by Engineering Services Committee September 27, 2010) Background:On October 20, 2009 the Commission approved the filing of an Application for a Gateway Grant from GDOT for roadside enhancement and beautification on Doug Barnard Parkway in the vicinity of the Augusta Regional Airport and the Wastewater Treatment Plant. The grant was subsequently approved for $50,000 and work on the project is about to begin. An indemnity statement for placing and irrigation on the right-of-way and a maintenance agreement are requirements in order to obtain the encroachment permit. Time is of the essence because planting has to occur between October 15 and 29 if we are to qualify for an additional grant for 2010 funds. Analysis:The application was made with the understanding that we would indemnify the GDOT regarding the irrigation and take over maintenance. Maintenance will be done by the Treatment Plant contractor. Financial Impact:There will be a cost involved that would be incurred by the Utilities Department. Alternatives:Approve or relinquish the grant Recommendation:Approve Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Commission Meeting Agenda 10/5/2010 5:00 PM Local Administered Project (Lap) Certification Agreement Department:Abie L. Ladson, PE, CPESC, Director of Engineering Caption:Motion to approve Local Administered Project (Lap) Certification Agreement between Augusta-Richmond County and Georgia Department of Transportation (GDOT) as requested by AED. (Approved by Engineering Services Committee September 27, 2010) Background:According to Federal Highway Administration (FHWA), Locally Administered Projects (LAP) by cities and counties in 45 States across the nation are estimated to involve $6-$8 billion in Federal-aid contracts. Nearly 25% of the national Federal-Aid program is now administered by local public agencies and in Georgia’s Statewide Transportation Improvement Program 20.86% is currently shown as locally administered projects. The purpose of the agreement is to authorize qualified Local Public Agencies (LPA) to manage certain core activities for Federal-aid funded projects under federal and state guidelines. GDOT stewardship includes the responsibility to assure local projects meet or exceed all applicable Federal and State laws, standards and requirements. Analysis:AED is qualified and experienced to manage federal and state projects and is currently managing the following FHWA/GDOT projects: 1. Alexander Drive 2. St. Sebastian Way/Greene St./15th Street 3. Windsor Spring Rd., Section IV 4. Windsor Spring Rd., Section V 5. Wrightsboro Rd. Improvements Financial Impact:No financial impact. Alternatives:1) Approve Local Administered Project (Lap) Certification Agreement between Augusta-Richmond County and Georgia Department of Transportation (GDOT) as requested by AED. 2) Do not approve project. Recommendation:APPROVE ALTERNATIVE ONE Funds are Available in the Following Accounts: NO FUNDING REQUIRED. REVIEWED AND APPROVED BY:Cover Memo Finance. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 3 Attachment number 1Page 2 of 3 Attachment number 1Page 3 of 3 Commission Meeting Agenda 10/5/2010 5:00 PM Property Condemnation - Right of Way, Keisha Martin, property owner, Belair Hills Subdivision Improvement Project Tax Map 51, Parcel 52; 3968 Scott Street Augusta ARC Project No 323-04-201823332 Department:Law Department Caption:Motion to authorize condemnation to acquire title of property for right of way for the Belair Hills Subdivision Project, (Parcel 134-0-004-00-0) 3968 Scott Street. (Approved by Engineering Services Committee September 27, 2010) Background:Despite repeated efforts, the City has been unable to reach an agreement with the property owner and therefore seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn subject property. The required property consists of 42,120 square feet of right of way. The appraised value is $30,000.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNT: GL 324- 04-1110-54.11120 JL 2038243335-54.11120 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Commission Meeting Agenda 10/5/2010 5:00 PM Street Lighting 9/2010 Department:Engineering/Traffic Caption:Motion to approve installation of streetlights along Walton Way between 8th Street and 10th Street. Installation will be performed by Georgia Power as requested by Traffic Engineering .(Approved by Engineering Services Committee September 27, 2010) Background:This project will upgrade the street lights along the frontage of the City’s new Judicial Center as well as close an existing gap in the city’s streetlighting along Walton Way that currently exists between 8th Street and 9th Street. Analysis:Upgrade will improve pedestrian and roadway lighting along Walton Way. Financial Impact:Based on the proposal provided by Georgia Power, the cost of installation is $64,500. Alternatives:1) Approve the proposed supplement. 2) Do not approve. Recommendation:Approve option 1. Funds are Available in the Following Accounts: 276-041610-5414410 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo Attachment number 1Page 1 of 1 Commission Meeting Agenda 10/5/2010 5:00 PM Wrightsboro Road Widening Department:Engineering Caption:Motion to approve Capital Project Budget number 324-041110-201824333 and Supplemental Agreement Number One to Cranston Engineering Group, PC, in the amount of $25,345.00 to provide detailed modeling analysis for the Wrightsboro Road Widening, Phase I project. Funding is available in the project engineering account for the Engineering Department. (Approved by Engineering Services Committee September 27, 2010) Background:Phase I of the Wrightsboro Road Widening Project was part of SPLOST Phase IV and called for traffic operational improvements along Wrightsboro Road between Augusta West Parkway and Marks Church Road. The area covered by this project is adjacent to Augusta Mall, and I-520 and is essential to the regional mobility of this area. Therefore, as concepts have been developed, an important tool for evaluating the effects of specific improvements is through simulation modeling. The additional modeling for this project will include the existing, build year and design year scenarios and used to analyze proposed intersection and interchange modifications in the area. Analysis:The additional modeling for the interchange corridor will provide integral analysis and evaluation as well as serving as a visual aid during public hearings on the project. Financial Impact:Funds are available in the project engineering 324-041110-5212115- 201824333 upon Commission’s approval. Alternatives:1)Approve Capital Project Budget number 324-041110-201824333 and Supplemental Agreement Number One to Cranston Engineering Group, PC, in the amount of $25,345.00 to provide detailed modeling analysis for the Wrightsboro Road Widening, Phase I project. Funding is available in the project engineering account for the Engineering Department. 2) Do not approve and cancel project. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 324-041110-5212115/201824333-5212115 Cover Memo REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Cover Memo CPB# 324-041110-201824333 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby authorized: Section 1: The project is authorized for CPB# 324-041110-201824333. This project is for Wrightsboro Road Widening, Phase I design cost associated with traffic operational improvements along Wrightsboro Road between Augusta West Parkway and Marks Church Road. This authorization is for Engineering associated with the said project, in the total amount of $25,345.00 to be funded by the Special 1 % Sales Tax, Phase IV to provide detailed modeling analysis on the project for Supplemental Agreement Number One. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. Special 1% Sales Tax, Phase IV 2,782,000$ Section 3: The following amounts are appropriated for the project: By Basin By District CAPITAL PROJECT BUDGET WRIGHTSBORO ROAD WIDENING, PHASE I (Augusta West Parkway to Marks Church Road) Please do not process this document. Once approved by the Commission, the original will be sent to Clerk of Commission for execution. For information reference this request contact Shelette @ ext 5070. By Basin By District Raes Creek $2,782,000 7th $2,782,000 Section 4: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department Honorable Deke Copenhaver, Mayor Please do not process this document. Once approved by the Commission, the original will be sent to Clerk of Commission for execution. For information reference this request contact Shelette @ ext 5070. 1 of 2 9.16.2010 Attachment number 1Page 1 of 2 CPB# 324-041110-201824333 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET WRIGHTSBORO ROAD WIDENING, PHASE I (Augusta West Parkway to Marks Church Road) Please do not process this document. Once approved by the Commission, the original will be sent to Clerk of Commission for execution. For information reference this request contact Shelette @ ext 5070. CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB CHANGE CPB SPECIAL 1% SALES TAX, PHASE IV 324-04-1110-201824333 $2,782,000 $0 $2,782,000 TOTAL SOURCES: $2,782,000 $0 $2,782,000 USE OF FUNDS ENGINEERING 324-04-1110-5212115-201824333 $398,000 $0 $398,000 SA #1: Cranston Eng/PB Americas, Inc. $25,345 ADVERTISING 324-04-1110-5233119-201824333 $2,000 $0 $2,000 CONTINGENCYCONTINGENCY 324-04-1110-6011110-201824333 $2,382,000 $0 $2,382,000 TOTAL USES: $2,782,000 $0 $2,782,000 2 of 2 9.16.2010 Attachment number 1Page 2 of 2 (SA01 – For changes more than $20,000) September 2010 AUGUSTA, GEORGIA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT Please do not process this document. Once approved by the Commission, the original will be sent to Clerk of Commission for execution. For information reference this request contact Shelette @ ext 5070. Project No. 324-041110-201824333 Supplemental Agreement No.1 PO: 179102 WHEREAS, We, “Cranston Engineering Group” Consultant, entered into a contract with Augusta-Richmond County on “April 1, 2010”, for engineering design services associated with the “Wrightsboro Rd. Widening Phase I ”, Project No. 324-041110-201824333, File Reference No. 10-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Engineering Services to provide detailed modeling analysis For the Wrightsboro Road Widening, Phase I It is agreed that as a result of the above described modification the contract amount is increased by $25,345.00 from $196,430.00 to a new total of $221,775.00 Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, “Cranston Engineering Group”, Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This day of , 2010. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHMOND COUNTY AUGUSTA, GEORGIA Fred Russell, Administrator Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: Title: Attachment number 2Page 1 of 1 Attachment number 3Page 1 of 2 Attachment number 3Page 2 of 2 Commission Meeting Agenda 10/5/2010 5:00 PM Minutes Department:Clerk of Commission Caption:Motion to approve the minutes of the regular meeting of the Commission held September 21st, and legal meeting held September 27, 2010. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo Commission Meeting Agenda 10/5/2010 5:00 PM Affidavit Department:Clerk of Commission Caption:Motion to authorize execution by the Mayor of the affidavit of compliance with Georgia's Open Meeting Act. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Clerk of Commission Cover Memo